STATE OF NEW YORK
________________________________________________________________________
S. 7504--D A. 9504--D
SENATE - ASSEMBLY
January 16, 2018
___________
IN SENATE -- A BUDGET BILL, submitted by the Governor pursuant to arti-
cle seven of the Constitution -- read twice and ordered printed, and
when printed to be committed to the Committee on Finance -- committee
discharged, bill amended, ordered reprinted as amended and recommitted
to said committee -- committee discharged, bill amended, ordered
reprinted as amended and recommitted to said committee -- committee
discharged, bill amended, ordered reprinted as amended and recommitted
to said committee -- committee discharged, bill amended, ordered
reprinted as amended and recommitted to said committee
IN ASSEMBLY -- A BUDGET BILL, submitted by the Governor pursuant to
article seven of the Constitution -- read once and referred to the
Committee on Ways and Means -- committee discharged, bill amended,
ordered reprinted as amended and recommitted to said committee --
again reported from said committee with amendments, ordered reprinted
as amended and recommitted to said committee -- again reported from
said committee with amendments, ordered reprinted as amended and
recommitted to said committee -- again reported from said committee
with amendments, ordered reprinted as amended and recommitted to said
committee
AN ACT making appropriations for the support of government; and to amend
a chapter of the laws of 2018 enacting the aid to localities budget,
in relation to the support of government
CAPITAL PROJECTS BUDGET
The People of the State of New York, represented in Senate and Assem-bly, do enact as follows:
1 Section 1. a) The several amounts specified in this chapter for capi-
2 tal projects, or so much thereof as shall be necessary to accomplish the
3 purpose of the appropriations, are appropriated by comprehensive
4 construction programs (hereinafter referred to by the abbreviation CCP),
5 purposes, and projects designated by the appropriations, and authorized
6 to be made available as hereinafter provided to the respective public
7 officers; such appropriations shall be deemed to provide all costs
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[] is old law to be omitted.
LBD12654-10-8
2 12654-10-8
1 necessary and pertinent to accomplish the intent of the appropriations
2 and are appropriated in accordance with the provisions of section 93 of
3 the state finance law.
4 b) Any amounts specified in this chapter for advances for capital
5 projects, or so much thereof as shall be necessary to accomplish the
6 purpose of the appropriations, are appropriated by comprehensive
7 construction programs (hereinafter referred to by the abbreviation CCP),
8 purposes and projects designated by the appropriations as advances from
9 the capital projects fund in accordance with the provisions of sections
10 40-a and 93 of the state finance law, and are authorized to be paid as
11 hereinafter provided as an advance for a share, part or whole of the
12 cost for such programs, purposes and projects hereinafter specified.
13 c) The several amounts specified in this chapter as capital projects -
14 reappropriations, or so much thereof as shall be sufficient to accom-
15 plish the purpose of the appropriations, as appropriated by comprehen-
16 sive construction programs (hereinafter referred to by the abbreviation
17 CCP), purposes, and projects, being the undisbursed and/or unexpended
18 balances of the prior year's appropriations, are reappropriated and
19 unless otherwise amended or repealed in part or total in this chapter
20 shall continue to be available for the same purposes as the prior appro-
21 priations or as otherwise amended for the fiscal year beginning April 1,
22 2018.
23 The capital projects reappropriations contained in this chapter may be
24 amended by repealing the items set forth in brackets and by adding ther-
25 eto the underscored material. Certain reappropriations in this chapter
26 are shown using abbreviated text, with three leader dots (an ellipsis)
27 followed by three spaces (... ) used to indicate where existing law
28 that is being continued is not shown. However, unless a change is clear-
29 ly indicated by the use of brackets [] for deletions and underscores
30 for additions, the purpose, amounts, funding source and all other
31 aspects pertinent to each item of appropriation shall be as last appro-
32 priated.
33 For the purpose of complying with section 25 of the state finance law,
34 the year, chapter and section of the last act reappropriating a former
35 original appropriation or any part thereof is, unless otherwise indi-
36 cated, chapter 54, section 1, of the laws of 2017.
37 d) No moneys appropriated by this chapter shall be available for
38 payment until a certificate of approval has been issued by the director
39 of the budget, who shall file such certificate with the department of
40 audit and control, the chairperson of the senate finance committee and
41 the chairperson of the assembly ways and means committee.
42 e) The appropriations contained in this chapter shall be available for
43 the fiscal year beginning on April 1, 2018 except as otherwise noted.
3 12654-10-8
ADIRONDACK PARK AGENCY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Special Revenue Funds - Other ...... 0 1,500,000
3 ---------------- ----------------
4 All Funds ........................ 0 1,500,000
5 ================ ================
6 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
7 Special Revenue Funds - Other
8 Combined Expendable Trust Fund
9 Miscellaneous Gifts Account
10 Preservation of Facilities Purpose
11 By chapter 54, section 1, of the laws of 2012:
12 For alterations, rehabilitations and improvements of various facili-
13 ties, including personal service and payment of liabilities incurred
14 prior to April 1, 2012 (13GI1203) ... 500,000 ....... (re. $500,000)
15 By chapter 54, section 1, of the laws of 2011:
16 For alterations, rehabilitations and improvements of various facili-
17 ties, including personal service and payment of liabilities incurred
18 prior to April 1, 2011 (13GI1103) ... 500,000 ....... (re. $500,000)
19 By chapter 55, section 1, of the laws of 2010:
20 For alterations, rehabilitations and improvements of various facili-
21 ties, including personal service and payment of liabilities incurred
22 prior to April 1, 2010 (13GI1003) ... 500,000 ....... (re. $500,000)
4 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 16,915,000 68,458,000
6 ---------------- ----------------
7 All Funds ........................ 16,915,000 68,458,000
8 ================ ================
9 NEW YORK WORKS (CCP) ......................................... 3,215,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Administrative Services Purpose
14 For the purchase and replacement of vehicles
15 and equipment (60VS18AS) ....................... 600,000
16 For services and expenses related to the
17 purchase or replacement of laboratory
18 equipment (60ES18AS) ........................... 115,000
19 Capital Projects Funds - Other
20 Capital Projects Fund
21 Preservation of Facilities Purpose
22 For services and expenses related to New
23 York Works Infrastructure projects for
24 alterations, rehabilitation and improve-
25 ments at the state fair, including
26 personal service and the payment of
27 liabilities incurred prior to April 1,
28 2018. All or a portion of the funds appro-
29 priated hereby may be suballocated or
30 transferred to any department, agency or
31 public authority (60NY1803) .................. 2,500,000
32 STATE FAIR (CCP) ............................................. 3,700,000
33 --------------
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Preservation of Facilities Purpose
37 For payment of the costs including personal
38 services, nonpersonal services, fringe
39 benefits and indirect costs, of alter-
40 ations, rehabilitation and improvements
41 including preventive maintenance, replace-
5 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2018-19
1 ment, refurbishment and energy conserva-
2 tion of various facilities, including the
3 payment of liabilities incurred prior to
4 April 1, 2018 (60MN1803) ..................... 1,700,000
5 Capital Projects Funds - Other
6 Miscellaneous Capital Projects Fund
7 State Fair Capital Improvement Account
8 Preservation of Facilities Purpose
9 For payment of the costs including personal
10 services, nonpersonal services, fringe
11 benefits and indirect costs, of alter-
12 ations, rehabilitation and improvements
13 including preventive maintenance, replace-
14 ment, refurbishment and energy conserva-
15 tion of various facilities, including the
16 payment of liabilities incurred prior to
17 April 1, 2018 (60RI1803) ..................... 2,000,000
18 NEW FACILITIES PURPOSE (CCP) .................. 10,000,000
19 --------------
20 Capital Projects Funds - Other
21 Capital Projects Fund
22 New Facilities Purpose
23 For payment to agricultural or horticultural
24 corporations and county extension service
25 associations that are eligible to receive
26 premium reimbursement pursuant to section
27 286 of the agriculture and markets law
28 for: the costs of construction, reno-
29 vation, alteration, rehabilitation,
30 improvements, installation, acquisition,
31 repair or replacement of fairground build-
32 ings, equipment or permanent or temporary
33 facilities used to house or promote agri-
34 culture, excluding parking facilities and
35 signage; or for the costs of construction,
36 renovation, alteration, rehabilitation,
37 improvements, installation, acquisition,
38 repair or replacement of water systems,
39 restrooms, septic systems, and/or storm
40 water management systems on fairgrounds or
41 in fairground buildings to be allocated by
42 the commissioner in amounts not to exceed
43 $200,000 to such eligible agricultural and
44 horticultural corporations or county
45 extension services on a non-competitive
46 basis until such funds are exhausted
47 (60LF1803) ................................... 5,000,000
6 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2018-19
1 For grants to municipal and incorporated
2 not-for-profit pounds, shelters and humane
3 societies. Use of the grant funds is
4 restricted to the costs of capital
5 projects including, but not limited to,
6 construction, renovation, rehabilitation,
7 installation, acquisition, or expansion of
8 buildings, equipment, or facilities neces-
9 sary for the secure containment, health,
10 and adequate care of sheltered dogs and
11 cats. These grants shall be allocated by
12 the commissioner on a competitive basis
13 until such funds are extinguished as
14 follows: (a) In municipalities with a
15 population of less than two million, for
16 such pounds, shelters or humane societies
17 that are operated by or under contract for
18 the provision of pound or shelter services
19 with one or more municipalities: projects
20 serving an individual municipality, grants
21 in amounts not less than $50,000 and not
22 more than $200,000, not to exceed fifty
23 percent of the total project cost; and for
24 projects serving two or more munici-
25 palities, grants in amounts not less than
26 $100,000 and not more than $500,000, not
27 to exceed seventy-five percent of the
28 total project cost; (b) In municipalities
29 with a population of more than two
30 million, for such pounds, shelters or
31 humane societies that are operated by or
32 under contract for the provision of pound
33 or shelter services with one or more muni-
34 cipalities, grants in amounts not less
35 than $100,000 and not more than $500,000,
36 not to exceed seventy-five percent of the
37 total project cost; and (c) to the extent
38 such funds have not been extinguished, for
39 projects in underserved municipalities or
40 regions, for such pounds, shelters or
41 humane societies that are not operated by
42 or under contract with one or more munici-
43 palities for the provision of pound or
44 shelter services, grants in amounts not
45 more than $50,000, not to exceed fifty
46 percent of the total project cost. Up to
47 five percent of the total appropriation
48 amount may be made available for the
49 services and expenses of the department in
50 relation to these grants, including
51 personal service, non-personal service,
7 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2018-19
1 fringe benefits, and indirect costs
2 (60AS1803) ................................... 5,000,000
8 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NEW FACILITIES PURPOSE (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 New Facilities Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For payment to agricultural or horticultural corporations and county
7 extension service associations that are eligible to receive premium
8 reimbursement pursuant to section 286 of the agriculture and markets
9 law for the costs of construction, renovation, alteration, rehabili-
10 tation, improvements, installation, acquisition, repair or replace-
11 ment of fairground buildings, equipment or permanent or temporary
12 facilities used to house or promote agriculture, excluding parking
13 facilities and signage, to be allocated by the commissioner in
14 amounts not to exceed $200,000 to such eligible agricultural and
15 horticultural corporations or county extension services on a non-
16 competitive basis until such funds are exhausted [(60LF1703)]
17 (60LF1707) ... 5,000,000 .......................... (re. $5,000,000)
18 For grants to municipal and incorporated not-for-profit pounds, shel-
19 ters and humane societies. Use of the grant funds is restricted to
20 the costs of capital projects including, but not limited to,
21 construction, renovation, rehabilitation, installation, acquisition,
22 or expansion of buildings, equipment, or facilities necessary for
23 the secure containment, health, and adequate care of sheltered dogs
24 and cats. These grants shall be allocated by the commissioner on a
25 competitive basis until such funds are extinguished as follows: (a)
26 In municipalities with a population of less than two million, for
27 such pounds, shelters or humane societies that are operated by or
28 under contract for the provision of pound or shelter services with
29 one or more municipalities: projects serving an individual munici-
30 pality, grants in amounts not less than $50,000 and not more than
31 $200,000, not to exceed fifty percent of the total project cost; and
32 for projects serving two or more municipalities, grants in amounts
33 not less than $100,000 and not more than $500,000, not to exceed
34 seventy-five percent of the total project cost; (b) In munici-
35 palities with a population of more than two million, for such
36 pounds, shelters or humane societies that are operated by or under
37 contract for the provision of pound or shelter services with one or
38 more municipalities, grants in amounts not less than $100,000 and
39 not more than $500,000, not to exceed seventy-five percent of the
40 total project cost; and (c) to the extent such funds have not been
41 extinguished, for projects in underserved municipalities or regions,
42 for such pounds, shelters or humane societies that are not operated
43 by or under contract with one or more municipalities for the
44 provision of pound or shelter services, grants in amounts not more
45 than $50,000, not to exceed fifty percent of the total project cost.
46 Up to five percent of the total appropriation amount may be made
47 available for the services and expenses of the Department in
48 relation to these grants, including personal service, non-personal
49 service, fringe benefits, and indirect costs [(60AS1703)] (60AS1707)
50 ... 5,000,000 ..................................... (re. $5,000,000)
9 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2016:
2 For payment to agricultural or horticultural corporations and county
3 extension service associations that are eligible to receive premium
4 reimbursement pursuant to section 286 of the agriculture and markets
5 law for the costs of construction, renovation, alteration, rehabili-
6 tation, improvements, installation, acquisition, repair or replace-
7 ment of fairground buildings, equipment or permanent or temporary
8 facilities used to house or promote agriculture, excluding parking
9 facilities and signage, to be allocated by the commissioner in
10 amounts not to exceed $200,000 to such eligible agricultural and
11 horticultural corporations or county extension services on a non-
12 competitive basis until such funds are exhausted [(60LF1603)]
13 (60LF1607) ... 5,000,000 .......................... (re. $4,411,000)
14 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
15 section 1, of the laws of 2012:
16 For building and equipping the Finger Lakes Community College viticul-
17 ture center in Geneva, and building renovations and equipment in
18 support of food processing and viticulture educational technologies
19 at the New York State Agricultural Experiment Station in Geneva
20 (60010809) ... 8,000,000 ............................. (re. $43,000)
21 By chapter 55, section 1, of the laws of 2006, as amended by chapter 53,
22 section 3, of the laws of 2006:
23 For services and expenses related to the Fredonia Vineyard Laboratory
24 (60030607) ... 2,000,000 ............................. (re. $28,000)
25 By chapter 55, section 1, of the laws of 2006, as amended by chapter
26 108, section 5, of the laws of 2006:
27 For services and expenses related to the construction of the New York
28 State department of agriculture and markets food laboratory, includ-
29 ing but not limited to the cost of property acquisition, studies,
30 appraisals, surveys, testing, environmental impact statements and
31 for design and construction management services (60010607) .........
32 40,000,000 ........................................... (re. $78,000)
33 NEW YORK WORKS (CCP)
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Administrative Services Purpose
37 By chapter 54, section 1, of the laws of 2017:
38 For the purchase and replacement of vehicles and equipment (60VS17AS)
39 ... 600,000 ......................................... (re. $267,000)
40 For services and expenses related to the purchase or replacement of
41 laboratory equipment (60ES17AS) 115,000 .............. (re. $34,000)
42 Capital Projects Funds - Other
43 Capital Projects Fund
44 Preservation of Facilities Purpose
10 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For services and expenses related to New York Works Infrastructure
3 projects for alterations, rehabilitation and improvements at the
4 state fair, including personal service and the payment of liabil-
5 ities incurred prior to April 1, 2017. All or a portion of the funds
6 appropriated hereby may be suballocated or transferred to any
7 department, agency or public authority (60NY1703) ..................
8 2,500,000 ......................................... (re. $1,214,000)
9 For services and expenses related to New York Works Infrastructure
10 projects for alterations, rehabilitation and improvements to modern-
11 ize the state fair, including personal service and the payment of
12 liabilities incurred prior to April 1, 2017. All or a portion of the
13 funds appropriated hereby may be suballocated or transferred to any
14 department, agency or public authority (60SF1703) ..................
15 50,000,000 ....................................... (re. $50,000,000)
16 By chapter 55, section 1, of the laws of 2016:
17 For services and expenses related to New York Works Infrastructure
18 projects for alterations, rehabilitation and improvements at the
19 state fair, including personal service and the payment of liabil-
20 ities incurred prior to April 1, 2016. All or a portion of the funds
21 appropriated hereby may be suballocated or transferred to any
22 department, agency or public authority (60NY1603) ..................
23 2,500,000 ........................................... (re. $168,000)
24 By chapter 54, section 1, of the laws of 2015:
25 For services and expenses related to New York Works Infrastructure
26 projects for alterations, rehabilitation and improvements at the
27 state fair, including personal service and the payment of liabil-
28 ities incurred prior to April 1, 2015. All or a portion of the funds
29 appropriated hereby may be suballocated or transferred to any
30 department, agency or public authority (60NY1503) ..................
31 2,500,000 ............................................ (re. $58,000)
32 STATE FAIR (CCP)
33 Capital Projects Funds - Other
34 Capital Projects Fund
35 Preservation of Facilities Purpose
36 By chapter 54, section 1, of the laws of 2017:
37 For payment of the costs including personal services, nonpersonal
38 services, fringe benefits and indirect costs, of alterations, reha-
39 bilitation and improvements including preventive maintenance,
40 replacement, refurbishment and energy conservation of various facil-
41 ities, including the payment of liabilities incurred prior to April
42 1, 2017 (60MN1703) ... 1,000,000 .................... (re. $185,000)
43 Capital Projects Funds - Other
44 Miscellaneous Capital Projects Fund
45 Preservation of Facilities Purpose
11 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For payment of the costs including personal services, nonpersonal
3 services, fringe benefits and indirect costs, of alterations, reha-
4 bilitation and improvements including preventive maintenance,
5 replacement, refurbishment and energy conservation of various facil-
6 ities, including the payment of liabilities incurred prior to April
7 1, 2017 (60RI1703) ... 2,000,000 .................. (re. $2,000,000)
8 By chapter 55, section 1, of the laws of 2016:
9 For payment of the costs including personal services, nonpersonal
10 services, fringe benefits and indirect costs, of alterations, reha-
11 bilitation and improvements including preventive maintenance,
12 replacement, refurbishment and energy conservation of various facil-
13 ities, including the payment of liabilities incurred prior to April
14 1, 2016 (60RI1603) ... 2,000,000 .................. (re. $2,000,000)
15 By chapter 54, section 1, of the laws of 2015:
16 For payment of the costs including personal services, nonpersonal
17 services, fringe benefits and indirect costs, of alterations, reha-
18 bilitation and improvements including preventive maintenance,
19 replacement, refurbishment and energy conservation of various facil-
20 ities, including the payment of liabilities incurred prior to April
21 1, 2015 (60RI1503) ... 2,000,000 .................. (re. $2,000,000)
22 By chapter 54, section 1, of the laws of 2014:
23 For payment of the costs including personal services, nonpersonal
24 services, fringe benefits and indirect costs, of alterations, reha-
25 bilitation and improvements including preventive maintenance,
26 replacement, refurbishment and energy conservation of various facil-
27 ities, including the payment of liabilities incurred prior to April
28 1, 2014 (60RI1403) ... 2,000,000 .................. (re. $2,000,000)
29 By chapter 54, section 1, of the laws of 2013:
30 For payment of the costs including personal services, nonpersonal
31 services, fringe benefits and indirect costs, of alterations, reha-
32 bilitation and improvements including preventive maintenance,
33 replacement, refurbishment and energy conservation of various facil-
34 ities, including the payment of liabilities incurred prior to April
35 1, 2013 (60RI1303) ... 2,000,000 .................. (re. $2,000,000)
36 By chapter 54, section 1, of the laws of 2012:
37 For payment of the costs including personal services, nonpersonal
38 services, fringe benefits and indirect costs, of alterations, reha-
39 bilitation and improvements including preventive maintenance,
40 replacement, refurbishment and energy conservation of various facil-
41 ities, including the payment of liabilities incurred prior to April
42 1, 2012 (60RI1203) ... 2,000,000 .................. (re. $2,000,000)
43 By chapter 54, section 1, of the laws of 2011:
44 For payment of the costs including personal services, nonpersonal
45 services, fringe benefits and indirect costs, of alterations, reha-
46 bilitation and improvements including preventive maintenance,
12 12654-10-8
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 replacement, refurbishment and energy conservation of various facil-
2 ities, including the payment of liabilities incurred prior to April
3 1, 2011 (60RI1103) ... 2,000,000 .................. (re. $2,000,000)
13 12654-10-8
DEPARTMENT OF AUDIT AND CONTROL
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 4,724,000 3,581,000
6 ---------------- ----------------
7 All Funds ........................ 4,724,000 3,581,000
8 ================ ================
9 IT INITIATIVE PROGRAM (CCP) .................................. 4,724,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Program Improvement/Change Purpose
14 For services and expenses related to the
15 acquisition and development of technology,
16 including but not limited to equipment,
17 software and services (OS011808) ............. 4,724,000
14 12654-10-8
DEPARTMENT OF AUDIT AND CONTROL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 IT INITIATIVE PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Program Improvement/Change Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For services and expenses related to the acquisition and development
7 of technology, including but not limited to equipment, software and
8 services (OS011608) ... 6,000,000 ................. (re. $3,581,000)
15 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 369,688,000 2,411,509,000
6 ---------------- ----------------
7 All Funds ........................ 369,688,000 2,411,509,000
8 ================ ================
9 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ................. 284,222,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 For services and expenses related to alter-
15 ations and improvements to existing facil-
16 ities for capital maintenance, including
17 but not limited to capital design,
18 construction, reconstruction, rehabili-
19 tation, and equipment; for health and
20 safety, preservation of facilities,
21 program improvement or program change,
22 environmental protection, energy conserva-
23 tion, accreditation, facilities for the
24 physically disabled, preventative mainte-
25 nance and related projects, including
26 costs incurred prior to April 1, 2018 and
27 subject to a plan developed and submitted
28 annually by the city university of New
29 York and approved by the director of the
30 budget, and which may include, but not be
31 limited to, projects in the following
32 schedule. Notwithstanding any other law to
33 the contrary, all or a portion of the
34 amounts hereby appropriated may be subal-
35 located or transferred to the dormitory
36 authority of the state of New York for
37 such purpose (30031803) .................... 284,222,000
38 Project Schedule
39 PROJECT AMOUNT
40 ----------------------------------------------------------
41 (thousands of dollars)
16 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2018-19
1 Baruch College
2 Campus-wide maintenance to
3 various facilities ............................. 2,511
4 Brooklyn College
5 Campus-wide maintenance to
6 various facilities ............................. 5,433
7 City College
8 Campus-wide maintenance to
9 various facilities ............................. 8,136
10 Graduate School and University Center
11 Campus-wide maintenance to
12 various facilities ................................ 25
13 Honors college
14 Campus-wide maintenance to
15 various facilities ................................ 25
16 Hunter College
17 Campus-wide maintenance to
18 various facilities ............................. 5,799
19 John Jay College of Criminal Justice
20 Campus-wide maintenance to
21 various facilities ............................. 3,193
22 Lehman College
23 Campus-wide maintenance to
24 various facilities ............................. 2,438
25 Medgar Evers College
26 Campus-wide maintenance to
27 various facilities ............................. 3,096
28 New York City College of Technology
29 Campus-wide maintenance to
30 various facilities ............................. 3,485
31 Queens College
32 Campus-wide maintenance to
33 various facilities ............................. 5,433
34 College of Staten Island
35 Campus-wide maintenance to
36 various facilities ............................. 2,877
37 York College
38 Campus-wide maintenance to
39 various facilities ............................. 3,899
40 For university-wide maintenance or
41 capital improvement costs at senior
42 colleges attributable to the findings of
43 condition surveys for health and safety
44 needs ............................................ 9,270
45 For university-wide maintenance or
46 capital improvement costs at senior
47 colleges attributable to the findings of
48 condition surveys for preservation of
49 facilities needs ................................ 12,463
17 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2018-19
1 For university-wide maintenance or
2 capital improvement costs at senior
3 colleges attributable to mechanical and
4 infrastructure needs ............................. 7,210
5 For university-wide maintenance or
6 capital improvement costs at senior
7 colleges attributable to ADA needs ............... 6,180
8 For university-wide maintenance or
9 capital improvement costs at senior
10 colleges attributable to certificate of
11 occupancy/public assembly needs .................. 2,060
12 For university-wide maintenance or
13 capital improvement costs at senior
14 colleges attributable to energy
15 conservation needs ............................... 4,120
16 For university-wide maintenance or
17 capital improvement costs at senior
18 colleges attributable to science lab
19 upgrade needs .................................... 2,060
20 For university-wide maintenance or
21 capital improvement costs at senior
22 colleges attributable to bathroom
23 facilities upgrade needs ......................... 1,030
24 For university-wide maintenance or
25 capital improvement costs at senior
26 colleges attributable to educational
27 technology initiative needs ...................... 6,695
28 For university-wide maintenance or
29 capital improvement costs at senior
30 colleges attributable to science and
31 technology equipment needs ....................... 5,047
32 For university-wide maintenance or
33 capital improvement costs at senior
34 colleges attributable to CUNY TV
35 renovation needs ................................... 515
36 For university-wide priority capital
37 maintenance or capital improvement
38 projects to support the preservation
39 of facilities .................................. 181,222
40 --------------
41 Total ........................................ 284,222
42 ==============
43 PROJECT ADMINISTRATION (CCP)................................. 36,983,000
44 --------------
45 Capital Projects Funds - Other
46 Capital Projects Fund
47 Administration Purpose
18 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2018-19
1 For payment to the dormitory authority of
2 the state of New York, for services and
3 expenses of the authority related to
4 construction activities administered by
5 the authority for the state share of capi-
6 tal projects of the city university of New
7 York which are appropriated by the state
8 and otherwise authorized by law (30DA1850) .. 21,000,000
9 For payment to the city university
10 construction fund, for services and
11 expenses of the city university
12 construction fund related to construction
13 activities administered by the city
14 university construction fund for the state
15 share of capital projects of the city
16 university of New York which are appropri-
17 ated by the state and otherwise authorized
18 by law (30CF1850) ........................... 15,983,000
19 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) .................. 48,483,000
5 --------------
6 Capital Projects Funds - Other
7 Capital Projects Fund
8 Preservation of Facilities Purpose
9 For services and expenses for state finan-
10 cial assistance to community colleges for
11 alterations and improvements to various
12 facilities including services and
13 expenses, capital design, construction,
14 reconstruction, rehabilitation and equip-
15 ment; for health and safety, preservation
16 of facilities, new facilities program
17 improvement or program change, environ-
18 mental protection, energy conservation,
19 accreditation, facilities for the phys-
20 ically disabled, and related projects,
21 including costs incurred prior to April 1,
22 2018 subject to an annual plan developed
23 by the city university and approved by the
24 state director of the budget, and which
25 may include, but not be limited to,
26 projects in the following schedule.
27 Notwithstanding any other law to the
28 contrary, all or a portion of the amounts
29 hereby appropriated may be suballocated or
30 transferred to the dormitory authority of
31 the state of New York for such purpose
32 (30CC1803) .................................. 48,483,000
33 Project Schedule
34 ESTIMATED ESTIMATED
35 TOTAL STATE 50 PERCENT
36 & LOCAL SHARE STATE SHARE
37 ----------------------------------------------------------
38 (thousands of dollars)
39 Borough Manhattan Community College
40 Lighting Upgrades ................ 2,650 1,325
41 Pedestrian Walkway Upgrades ...... 1,800 900
42 Bronx Community College
43 Student Center Exterior Renovation 1,000 500
44 Goud Memorial Library Restoration. 4,000 2,000
45 Community Hall Renovation ........ 1,000 500
20 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS 2018-19
1 Student Center ADA Upgrades ...... 800 400
2 Hostos Community College
3 Lighting Upgrade ................. 750 375
4 Electrical System Upgrades ....... 500 250
5 Kingsborough Community College
6 Marina Upgrades .................. 3,000 1,500
7 Roadway Upgrades.................. 1,500 750
8 LaGuardia Community College
9 Science Lab Renovations .......... 10,200 5,100
10 Queensborough Community College
11 Theater Upgrades ................. 2,200 1,100
12 Kitchen and Cafeteria Renovation.. 6,400 3,200
13 For university-wide community college
14 critical maintenance or capital
15 improvement costs attributable to
16 preservation of facilities ....... 58,166 29,083
17 For university-wide community college
18 critical maintenance or capital
19 improvement costs attributable to
20 facilities which support ASAP
21 programs ......................... 3,000 1,500
22 ------- ------
23 Total .......................... 96,966 48,483
24 ======= ======
21 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 The appropriation made by chapter 54, section 1, of the laws of 2017, is
6 hereby amended and reappropriated to read:
7 For services and expenses related to alterations and improvements to
8 existing facilities for capital maintenance, including but not
9 limited to capital design, construction, reconstruction, rehabili-
10 tation, and equipment; for health and safety, preservation of facil-
11 ities, program improvement or program change, environmental
12 protection, energy conservation, accreditation, facilities for the
13 physically disabled, preventative maintenance and related projects,
14 including costs incurred prior to April 1, 2017 and subject to a
15 plan developed and submitted annually by the city university of New
16 York and approved by the director of the budget, and which may
17 include, but not be limited to, projects in the following schedule.
18 Notwithstanding any other law to the contrary, all or a portion of
19 the amounts hereby appropriated may be suballocated or transferred
20 to the dormitory authority of the state of New York for such purpose
21 (30031750) ... 224,222,000 ...................... (re. $224,222,000)
22 Project Schedule
23 PROJECT AMOUNT
24 ----------------------------------------------------------
25 (thousands of dollars)
26 Baruch College
27 Campus-wide maintenance to
28 various facilities ............................ 2,511
29 Brooklyn College
30 Campus-wide maintenance to
31 various facilities ............................ 5,433
32 City College
33 Campus-wide maintenance to
34 various facilities ............................ 8,136
35 Graduate School and University Center
36 Campus-wide maintenance to
37 various facilities ................................ 25
38 Honors college
39 Campus-wide maintenance to
40 various facilities............................... 25
41 Hunter College
42 Campus-wide maintenance to
43 various facilities ............................ 5,799
44 John Jay College of Criminal Justice
45 Campus-wide maintenance to
22 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 various facilities ............................. 3,193
2 Lehman College
3 Campus-wide maintenance to
4 various facilities ............................ 2,438
5 Medgar Evers College
6 Campus-wide maintenance to
7 various facilities ............................. 3,096
8 New York City College of Technology
9 Campus-wide maintenance to
10 various facilities ............................ 3,485
11 Queens College
12 Campus-wide maintenance to
13 various facilities ............................ 5,433
14 College of Staten Island
15 Campus-wide maintenance to
16 various facilities ............................. 2,877
17 York College
18 Campus-wide maintenance to
19 various facilities ............................ 3,899
20 For university-wide maintenance or
21 capital improvement costs at senior
22 colleges attributable to the findings of
23 condition surveys for health and safety
24 needs ........................................... 9,270
25 For university-wide maintenance or
26 capital improvement costs at senior
27 colleges attributable to the findings of
28 condition surveys for preservation of
29 facilities needs ................................ 12,463
30 For university-wide maintenance or
31 capital improvement costs at senior
32 colleges attributable to mechanical and
33 infrastructure needs ............................ 7,210
34 For university-wide maintenance or
35 capital improvement costs at senior
36 colleges attributable to ADA needs ............... 6,180
37 For university-wide maintenance or
38 capital improvement costs at senior
39 colleges attributable to certificate of
40 occupancy/public assembly needs ................. 2,060
41 For university-wide maintenance or
42 capital improvement costs at senior
43 colleges attributable to energy
44 conservation needs .............................. 4,120
45 For university-wide maintenance or
46 capital improvement costs at senior
47 colleges attributable to science lab
48 upgrade needs .................................... 2,060
49 For university-wide maintenance or
50 capital improvement costs at senior
23 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 colleges attributable to bathroom
2 facilities upgrade needs ......................... 1,030
3 For university-wide maintenance or
4 capital improvement costs at senior
5 colleges attributable to educational
6 technology initiative needs ..................... 6,695
7 For university-wide maintenance or
8 capital improvement costs at senior
9 colleges attributable to science and
10 technology equipment needs ...................... 5,047
11 For university-wide maintenance or
12 capital improvement costs at senior
13 colleges attributable to CUNY TV
14 renovation needs ................................... 515
15 For university-wide priority capital
16 maintenance or capital improvement
17 projects to support the preservation
18 of facilities .................................. 121,222
19 --------------
20 Total ........................................ 224,222
21 ==============
22 For services and expenses related to alterations and improvements to
23 various facilities including but not limited to capital design,
24 construction, reconstruction, rehabilitation, and equipment; for
25 health and safety, preservation of facilities, program improvement
26 or program change, environmental protection, energy conservation,
27 accreditation, facilities for the physically disabled, preventative
28 maintenance and related projects, including costs incurred prior to
29 April 1, 2017 and subject to a plan developed and submitted annually
30 by the city university of New York and approved by the director of
31 the budget, and which may include, but not be limited to, projects
32 in the following schedule. Notwithstanding any other law to the
33 contrary, all or a portion of the amounts hereby appropriated may be
34 suballocated or transferred to the dormitory authority of the state
35 of New York for such purpose (30051750) ............................
36 60,000,000 ....................................... (re. $60,000,000)
37 Project Schedule
38 PROJECT AMOUNT
39 ----------------------------------------------------------
40 (thousands of dollars)
41 Baruch College
42 Campus-wide projects ............................. 1,260
43 Brooklyn College
44 Campus-wide projects ............................. 8,460
45 City College
46 Campus-wide projects ............................ 15,120
47 Graduate School and University Center
24 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide projects ................................ 60
2 Honors college
3 Campus-wide projects ................................ 60
4 Hunter College
5 Campus-wide projects ............................. 9,360
6 John Jay College of Criminal Justice
7 Campus-wide projects ............................. 2,940
8 Lehman College
9 Campus-wide projects ............................. 1,080
10 Medgar Evers College
11 Campus-wide projects ............................. 2,700
12 New York City College of Technology
13 Campus-wide projects ............................ 3,660
14 Queens College
15 Campus-wide projects ............................ 8,460
16 College of Staten Island
17 Campus-wide projects ............................. 2,160
18 York College
19 Campus-wide projects ............................ 4,680
20 --------------
21 Total ......................................... 60,000
22 ==============
23 The appropriation made by chapter 55, section 1, of the laws of 2016, as
24 amended by chapter 53, section 3, of the laws of 2016, is hereby
25 amended and reappropriated to read:
26 For services and expenses related to alterations and improvements to
27 existing facilities for capital maintenance, including but not
28 limited to capital design, construction, reconstruction, rehabili-
29 tation, and equipment; for health and safety, preservation of facil-
30 ities, program improvement or program change, environmental
31 protection, energy conservation, accreditation, facilities for the
32 physically disabled, preventative maintenance and related projects,
33 including costs incurred prior to April 1, 2016 and subject to a
34 plan developed and submitted annually by the city university of New
35 York and approved by the director of the budget, and which may
36 include, but not be limited to, projects in the following schedule.
37 Notwithstanding any other law to the contrary, all or a portion of
38 the amounts hereby appropriated may be suballocated or transferred
39 to the dormitory authority of the state of New York for such purpose
40 (30031650) ... 103,000,000 ...................... (re. $103,000,000)
41 Project Schedule
42 PROJECT AMOUNT
43 ----------------------------------------------------------
44 (thousands of dollars)
45 Baruch College
46 Campus-wide maintenance to
25 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 various facilities ............................ 2,511
2 Brooklyn College
3 Campus-wide maintenance to
4 various facilities ............................ 5,433
5 City College
6 Campus-wide maintenance to
7 various facilities ............................ 8,136
8 Graduate School and University Center
9 Campus-wide maintenance to
10 various facilities ................................ 25
11 Honors college
12 Campus-wide maintenance to
13 various facilities............................... 25
14 Hunter College
15 Campus-wide maintenance to
16 various facilities ............................ 5,799
17 John Jay College of Criminal Justice
18 Campus-wide maintenance to
19 various facilities ............................. 3,193
20 Lehman College
21 Campus-wide maintenance to
22 various facilities ............................ 2,438
23 Medgar Evers College
24 Campus-wide maintenance to
25 various facilities ............................. 3,096
26 New York City College of Technology
27 Campus-wide maintenance to
28 various facilities ............................ 3,485
29 Queens College
30 Campus-wide maintenance to
31 various facilities ............................ 5,433
32 College of Staten Island
33 Campus-wide maintenance to
34 various facilities ............................. 2,877
35 York College
36 Campus-wide maintenance to
37 various facilities ............................ 3,899
38 For university-wide maintenance or
39 capital improvement costs at senior
40 colleges attributable to the findings of
41 condition surveys for health and safety
42 needs ........................................... 9,270
43 For university-wide maintenance or
44 capital improvement costs at senior
45 colleges attributable to the findings of
46 condition surveys for preservation of
47 facilities needs ................................ 12,463
48 For university-wide maintenance or
49 capital improvement costs at senior
50 colleges attributable to mechanical and
26 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 infrastructure needs ............................ 7,210
2 For university-wide maintenance or
3 capital improvement costs at senior
4 colleges attributable to ADA needs ............... 6,180
5 For university-wide maintenance or
6 capital improvement costs at senior
7 colleges attributable to certificate of
8 occupancy/public assembly needs ................. 2,060
9 For university-wide maintenance or
10 capital improvement costs at senior
11 colleges attributable to energy
12 conservation needs .............................. 4,120
13 For university-wide maintenance or
14 capital improvement costs at senior
15 colleges attributable to science lab
16 upgrade needs .................................... 2,060
17 For university-wide maintenance or
18 capital improvement costs at senior
19 colleges attributable to bathroom
20 facilities upgrade needs ......................... 1,030
21 For university-wide maintenance or
22 capital improvement costs at senior
23 colleges attributable to educational
24 technology initiative needs ..................... 6,695
25 For university-wide maintenance or
26 capital improvement costs at senior
27 colleges attributable to science and
28 technology equipment needs ...................... 5,047
29 For university-wide maintenance or
30 capital improvement costs at senior
31 colleges attributable to CUNY TV
32 renovation needs ................................... 515
33 --------------
34 Total ........................................ 103,000
35 ==============
36 For additional services and expenses related to alterations and
37 improvements to existing facilities for capital maintenance, includ-
38 ing but not limited to capital design, construction, reconstruction,
39 rehabilitation, and equipment; for health and safety, preservation
40 of facilities, program improvement or program change, environmental
41 protection, energy conservation, accreditation, facilities for the
42 physically disabled, preventative maintenance and related projects,
43 including costs incurred prior to April 1, 2016 and subject to a
44 plan developed and submitted annually by the city university of New
45 York and approved by the director of the budget, and which may
46 include, but not be limited to, projects in the following schedule.
47 Notwithstanding any other law to the contrary, all or a portion of
48 the amounts hereby appropriated may be suballocated or transferred
27 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to the dormitory authority of the state of New York for such purpose
2 (30041650) ... 40,000,000 ........................ (re. $40,000,000)
3 Project Schedule
4 PROJECT AMOUNT
5 ----------------------------------------------------------
6 (thousands of dollars)
7 Baruch College
8 Campus-wide maintenance to
9 various facilities ............................... 378
10 Brooklyn College
11 Campus-wide maintenance to
12 various facilities ............................. 2,538
13 City College
14 Campus-wide maintenance to
15 various facilities ............................. 4,536
16 Graduate School and University Center
17 Campus-wide maintenance to
18 various facilities ................................ 18
19 Honors college
20 Campus-wide maintenance to
21 various facilities................................. 18
22 Hunter College
23 Campus-wide maintenance to
24 various facilities ............................. 2,808
25 John Jay College of Criminal Justice
26 Campus-wide maintenance to
27 various facilities ............................... 882
28 Lehman College
29 Campus-wide maintenance to
30 various facilities ............................... 324
31 Medgar Evers College
32 Campus-wide maintenance to
33 various facilities ............................... 810
34 New York City College of Technology
35 Campus-wide maintenance to
36 various facilities ............................. 1,098
37 Queens College
38 Campus-wide maintenance to
39 various facilities ............................. 2,538
40 College of Staten Island
41 Campus-wide maintenance to
42 various facilities ............................... 648
43 York College
44 Campus-wide maintenance to
45 various facilities ............................. 1,404
46 For university-wide maintenance or
47 capital improvement costs at senior
48 colleges attributable to the findings of
28 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 condition surveys for health and safety
2 needs ............................................ 3,600
3 For university-wide maintenance or
4 capital improvement costs at senior
5 colleges attributable to the findings of
6 condition surveys for preservation of
7 facilities needs ................................. 4,840
8 For university-wide maintenance or
9 capital improvement costs at senior
10 colleges attributable to mechanical and
11 infrastructure needs ............................ 2,800
12 For university-wide maintenance or
13 capital improvement costs at senior
14 colleges attributable to ADA needs ............... 2,400
15 For university-wide maintenance or
16 capital improvement costs at senior
17 colleges attributable to certificate of
18 occupancy/public assembly needs .................... 800
19 For university-wide maintenance or
20 capital improvement costs at senior
21 colleges attributable to energy
22 conservation needs ............................... 1,600
23 For university-wide maintenance or
24 capital improvement costs at senior
25 colleges attributable to science lab
26 upgrade needs ...................................... 800
27 For university-wide maintenance or
28 capital improvement costs at senior
29 colleges attributable to bathroom
30 facilities upgrade needs ........................... 400
31 For university-wide maintenance or
32 capital improvement costs at senior
33 colleges attributable to educational
34 technology initiative needs ...................... 2,600
35 For university-wide maintenance or
36 capital improvement costs at senior
37 colleges attributable to science and
38 technology equipment needs ....................... 1,960
39 For university-wide maintenance or
40 capital improvement costs at senior
41 colleges attributable to CUNY TV
42 renovation needs ................................... 200
43 --------------
44 Total ......................................... 40,000
45 ==============
46 The appropriation made by chapter 55, section 1, of the laws of 2016, as
47 amended by chapter 73, section 1 of part M, of the laws of 2016, is
48 hereby amended and reappropriated to read:
29 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For additional services and expenses related to alterations and
2 improvements to various facilities for capital projects, including
3 but not limited to capital design, construction, acquisition, recon-
4 struction, rehabilitation, and equipment; for health and safety,
5 preservation of facilities, program improvement or program change,
6 environmental protection, energy conservation, accreditation, facil-
7 ities for the physically disabled, preventative maintenance and
8 related projects, including costs incurred prior to April 1, 2016
9 and subject to a plan developed and submitted by the city university
10 of New York board of trustees and approved by the director of the
11 budget. Notwithstanding any other law to the contrary, all or a
12 portion of the amounts hereby appropriated may be suballocated or
13 transferred to the dormitory authority of the state of New York for
14 such purpose (30051650) ... 20,000,000 ........... (re. $20,000,000)
15 The appropriation made by chapter 54, section 1, of the laws of 2015, is
16 hereby amended and reappropriated to read:
17 For services and expenses related to alterations and improvements to
18 existing facilities for capital maintenance, including but not
19 limited to capital design, construction, reconstruction, rehabili-
20 tation, and equipment; for health and safety, preservation of facil-
21 ities, program improvement or program change, environmental
22 protection, energy conservation, accreditation, facilities for the
23 physically disabled, preventative maintenance and related projects,
24 including costs incurred prior to April 1, 2015 and subject to a
25 plan developed and submitted annually by the city university of New
26 York and approved by the director of the budget, and which may
27 include, but not be limited to, projects in the following schedule.
28 Notwithstanding any other law to the contrary, all or a portion of
29 the amounts hereby appropriated may be suballocated or transferred
30 to the dormitory authority of the state of New York for such purpose
31 (30031550) ... 103,000,000 ....................... (re. $97,284,000)
32 Project Schedule
33 PROJECT AMOUNT
34 ----------------------------------------------------------
35 (thousands of dollars)
36 Baruch College
37 Campus-wide maintenance to
38 various facilities ............................ 4,635
39 Brooklyn College
40 Campus-wide maintenance to
41 various facilities ............................ 3,811
42 City College
43 Campus-wide maintenance to
44 various facilities ............................ 5,665
45 Graduate School and University Center
46 Campus-wide maintenance to
30 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 various facilities ............................. 1,030
2 Honors college
3 Campus-wide maintenance to
4 various facilities.............................. 412
5 Hunter College
6 Campus-wide maintenance to
7 various facilities ............................ 3,914
8 John Jay College of Criminal Justice
9 Campus-wide maintenance to
10 various facilities ............................. 2,163
11 Lehman College
12 Campus-wide maintenance to
13 various facilities ............................ 3,811
14 Medgar Evers College
15 Campus-wide maintenance to
16 various facilities ............................. 3,811
17 New York City College of Technology
18 Campus-wide maintenance to
19 various facilities ............................ 3,811
20 Queens College
21 Campus-wide maintenance to
22 various facilities ............................ 5,665
23 College of Staten Island
24 Campus-wide maintenance to
25 various facilities ............................. 3,811
26 York College
27 Campus-wide maintenance to
28 various facilities ............................ 3,811
29 For university-wide maintenance or
30 capital improvement costs at senior
31 colleges attributable to the findings of
32 condition surveys for health and safety
33 needs ........................................... 8,755
34 For university-wide maintenance or
35 capital improvement costs at senior
36 colleges attributable to the findings of
37 condition surveys for preservation of
38 facilities needs ................................ 10,815
39 For university-wide maintenance or
40 capital improvement costs at senior
41 colleges attributable to mechanical and
42 infrastructure needs ............................ 6,695
43 For university-wide maintenance or
44 capital improvement costs at senior
45 colleges attributable to ADA needs ............... 5,150
46 For university-wide maintenance or
47 capital improvement costs at senior
48 colleges attributable to certificate of
49 occupancy/public assembly needs ................. 2,060
50 For university-wide maintenance or
31 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 capital improvement costs at senior
2 colleges attributable to energy
3 conservation needs .............................. 4,120
4 For university-wide maintenance or
5 capital improvement costs at senior
6 colleges attributable to science lab
7 upgrade needs .................................... 2,060
8 For university-wide maintenance or
9 capital improvement costs at senior
10 colleges attributable to bathroom
11 facilities upgrade needs ......................... 1,030
12 For university-wide maintenance or
13 capital improvement costs at senior
14 colleges attributable to asbestos
15 abatement needs .................................. 1,030
16 For university-wide maintenance or
17 capital improvement costs at senior
18 colleges attributable to educational
19 technology initiative needs ..................... 6,695
20 For university-wide maintenance or
21 capital improvement costs at senior
22 colleges attributable to science and
23 technology equipment needs....................... 7,210
24 For university-wide maintenance or
25 capital improvement costs at senior
26 colleges attributable CUNY TV
27 renovation needs ................................. 1,030
28 --------------
29 Total ........................................ 103,000
30 ==============
31 The appropriation made by chapter 54, section 1, of the laws of 2014, is
32 hereby amended and reappropriated to read:
33 Advances for alterations and improvements to existing facilities for
34 capital critical maintenance, including but not limited to capital
35 design, construction, reconstruction, rehabilitation, and equipment;
36 for health and safety, preservation of facilities, program improve-
37 ment or program change, environmental protection, energy conserva-
38 tion, accreditation, facilities for the physically disabled, preven-
39 tative maintenance and related projects, including costs incurred
40 prior to April 1, 2014, and subject to a plan developed and submit-
41 ted annually by the city university of New York and approved by the
42 director of the budget, and which may include, but not be limited
43 to, projects in the following schedule. Notwithstanding any other
44 law to the contrary, all or a portion of the amounts hereby appro-
45 priated may be suballocated or transferred to the dormitory authori-
46 ty of the state of New York for such purpose (30031450) ............
47 206,000,000 ..................................... (re. $157,795,000)
48 Project Schedule
32 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 PROJECT AMOUNT
2 ----------------------------------------------------------
3 (thousands of dollars)
4 Baruch College
5 Campus-wide critical maintenance to
6 various facilities .............................. 14,000
7 Brooklyn College
8 Campus-wide critical maintenance to
9 various facilities .............................. 12,500
10 City College
11 Campus-wide critical maintenance to
12 various facilities .............................. 17,000
13 Graduate School and University Center
14 Campus-wide critical maintenance to
15 various facilities ............................... 2,000
16 Honors college
17 Campus-wide critical maintenance to
18 various facilities................................ 1,000
19 Hunter College
20 Campus-wide critical maintenance to
21 various facilities .............................. 1,000
22 John Jay College of Criminal Justice
23 Campus-wide critical maintenance to
24 various facilities ............................... 5,000
25 Lehman College
26 Campus-wide critical maintenance to
27 various facilities .............................. 10,000
28 Medgar Evers College
29 Campus-wide critical maintenance to
30 various facilities ...............................10,000
31 New York City College of Technology
32 Campus-wide critical maintenance to
33 various facilities .............................. 8,000
34 Queens College
35 Campus-wide critical maintenance to
36 various facilities .............................. 17,000
37 College of Staten Island
38 Campus-wide critical maintenance to
39 various facilities ...............................10,000
40 York College
41 Campus-wide critical maintenance to
42 various facilities .............................. 12,000
43 For university-wide critical maintenance or
44 capital improvement costs at senior
45 colleges attributable to the findings of
46 condition surveys for health and safety
47 needs ........................................... 27,000
48 For university-wide critical maintenance or
49 capital improvement costs at senior
50 colleges attributable to the findings of
33 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 condition surveys for preservation of
2 facilities needs ................................ 30,000
3 For university-wide critical maintenance or
4 capital improvement costs at senior
5 colleges attributable to mechanical and
6 infrastructure needs ............................ 20,500
7 For university-wide critical maintenance or
8 capital improvement costs at senior
9 colleges attributable to ADA needs ...............10,000
10 For university-wide critical maintenance or
11 capital improvement costs at senior
12 colleges attributable to certificate of
13 occupancy/public assembly needs ................. 5,000
14 For university-wide critical maintenance or
15 capital improvement costs at senior
16 colleges attributable to energy
17 conservation needs .............................. 12,000
18 For university-wide critical maintenance or
19 capital improvement costs at senior
20 colleges attributable to science lab
21 upgrade needs .................................... 8,000
22 For university-wide critical maintenance or
23 capital improvement costs at senior
24 colleges attributable to bathroom
25 facilities upgrade needs ......................... 3,000
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges attributable to asbestos
29 abatement needs .................................. 1,500
30 For university-wide critical maintenance or
31 capital improvement costs at senior
32 colleges attributable to educational
33 technology initiative needs ..................... 15,000
34 For university-wide critical maintenance or
35 capital improvement costs at senior
36 colleges attributable to science and
37 technology equipment needs........................ 5,000
38 For university-wide critical maintenance or
39 capital improvement costs at senior
40 colleges attributable CUNY TV
41 renovation needs ................................. 1,500
42 Less an amount to be allocated by the board
43 of trustees .................................... (52,000)
44 --------------
45 Total ........................................ 206,000
46 ==============
47 Advances for alterations and improvements to various facilities for
48 capital strategic initiatives, including but not limited to capital
49 design, construction, acquisition, reconstruction, rehabilitation, and
34 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 equipment; for health and safety, preservation of facilities, new
2 facilities, program improvement or program change, environmental
3 protection, energy conservation, accreditation, facilities for the
4 physically disabled, preventative maintenance and related projects,
5 including costs incurred prior to April 1, 2014, and subject to a plan
6 developed and submitted annually by the city university of New York
7 and approved by the director of the budget, and which may include, but
8 not be limited to, projects in the following schedule. Notwithstand-
9 ing any other law to the contrary, all or a portion of the amounts
10 hereby appropriated may be suballocated or transferred to the dormito-
11 ry authority of the state of New York for such purpose (30041450) ...
12 127,000,000 ....................................... (re. $127,000,000)
13 Project Schedule
14 PROJECT AMOUNT
15 ----------------------------------------------------------
16 (thousands of dollars)
17 Baruch College
18 17 Lex. Ave Building ............................ 30,000
19 Brooklyn College
20 Roosevelt Hall .................................. 35,000
21 College of Staten Island
22 Interdisciplinary High Performance
23 Computational Center ............................ 10,000
24 Lehman College
25 Nursing Education ............................... 22,000
26 York College
27 Academic Village/Conference Center .............. 30,000
28 --------------
29 Total ........................................ 127,000
30 ==============
31 Notwithstanding any provision of law this appropriation shall be allo-
32 cated only pursuant to a plan setting forth an itemized list of
33 projects with the amount to be received by each, or the methodology
34 for allocating such appropriation. Such plan shall be subject to the
35 approval of the temporary president of the senate and the director
36 of the budget and thereafter shall be included in a resolution call-
37 ing for the expenditure of such monies, which resolution must be
38 approved by a majority vote of all members elected to the senate
39 upon a roll call vote.
40 Notwithstanding any other law to the contrary, all or a portion of the
41 amounts hereby appropriated may be suballocated or transferred to
42 the dormitory authority of the state of New York for such purpose
43 (30051450) ... 67,000,000 ........................ (re. $67,000,000)
44 The appropriation made by chapter 54, section 1, of the laws of 2012, is
45 hereby amended and reappropriated to read:
35 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Advances for alterations and improvements to various facilities for
2 capital critical maintenance, including but not limited to capital
3 design, construction, acquisition, reconstruction, rehabilitation,
4 and equipment; for health and safety, preservation of facilities,
5 program improvement or program change, environmental protection,
6 energy conservation, accreditation, facilities for the physically
7 disabled, preventative maintenance and related projects, including
8 costs incurred prior to April 1, 2012, and subject to a plan devel-
9 oped and submitted annually by the city university of New York and
10 approved by the director of the budget, and which may include, but
11 not be limited to, projects in the following schedule. Notwith-
12 standing any other law to the contrary, all or a portion of the
13 amounts hereby appropriated may be suballocated or transferred to
14 the dormitory authority of the state of New York for such purpose
15 (30031250) ... 284,222,000 ...................... (re. $249,907,000)
16 Project Schedule
17 PROJECT AMOUNT
18 ----------------------------------------------------------
19 (thousands of dollars)
20 Baruch College
21 Campus-wide critical maintenance to
22 various facilities .............................. 12,000
23 Brooklyn College
24 Campus-wide critical maintenance to
25 various facilities .............................. 15,000
26 City College
27 Campus-wide critical maintenance to
28 various facilities .............................. 12,000
29 Graduate School and University Center
30 Campus-wide critical maintenance to
31 various facilities ............................... 3,000
32 Hunter College
33 Campus-wide critical maintenance to
34 various facilities .............................. 10,000
35 John Jay College of Criminal Justice
36 Campus-wide critical maintenance to
37 various facilities ............................... 9,922
38 Lehman College
39 Campus-wide critical maintenance to
40 various facilities .............................. 10,000
41 Medgar Evers College
42 Campus-wide critical maintenance to
43 various facilities ............................... 6,000
44 New York City College of Technology
45 Campus-wide critical maintenance to
46 various facilities .............................. 15,000
47 Queens College
48 Campus-wide critical maintenance to
36 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 various facilities .............................. 17,000
2 College of Staten Island
3 Campus-wide critical maintenance to
4 various facilities ............................... 9,000
5 York College
6 Campus-wide critical maintenance to
7 various facilities .............................. 10,000
8 For university-wide critical maintenance or
9 capital improvement costs at senior
10 colleges attributable to the findings of
11 condition surveys for health and safety
12 needs ........................................... 36,000
13 For university-wide critical maintenance or
14 capital improvement costs at senior
15 colleges attributable to the findings of
16 condition surveys for preservation of
17 facilities needs ................................ 36,000
18 For university-wide critical maintenance or
19 capital improvement costs at senior
20 colleges attributable to ADA needs ............... 3,000
21 For university-wide critical maintenance or
22 capital improvement costs at senior
23 colleges attributable to certificate of
24 occupancy/public assembly needs ................. 10,000
25 For university-wide critical maintenance or
26 capital improvement costs at senior
27 colleges attributable to energy
28 conservation needs .............................. 10,000
29 For university-wide critical maintenance or
30 capital improvement costs at senior
31 colleges attributable to science and
32 technology equipment needs ....................... 5,000
33 For university-wide critical maintenance or
34 capital improvement costs at senior
35 colleges attributable to educational
36 technology initiative needs ..................... 15,000
37 For university-wide critical maintenance or
38 capital improvement costs at senior
39 colleges attributable to science lab
40 upgrade needs ................................... 10,000
41 For university-wide critical maintenance or
42 capital improvement costs at senior
43 colleges attributable to bathroom
44 facilities upgrade needs ......................... 3,300
45 For university-wide critical maintenance or
46 capital improvement costs at senior
47 colleges attributable to asbestos
48 abatement needs .................................. 1,500
49 For university-wide critical maintenance or
50 capital improvement costs at senior
37 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 colleges attributable to athletic
2 facilities upgrade needs ......................... 1,000
3 For university-wide critical maintenance or
4 capital improvement costs at senior
5 colleges attributable CUNY TV
6 renovation needs ................................. 1,500
7 For university-wide critical maintenance or
8 capital improvement costs at senior
9 colleges attributable to mechanical and
10 infrastructure needs ............................ 23,000
11 --------------
12 Total ........................................ 284,222
13 ==============
14 The appropriation made by chapter 54, section 1, of the laws of 2011, is
15 hereby amended and reappropriated to read:
16 Advances for alterations and improvements to various facilities for
17 capital critical maintenance, including but not limited to capital
18 design, construction, acquisition, reconstruction, rehabilitation,
19 and equipment; for health and safety, preservation of facilities,
20 program improvement or program change, environmental protection,
21 energy conservation, accreditation, facilities for the physically
22 disabled, preventative maintenance and related projects, including
23 costs incurred prior to April 1, 2011, and subject to a plan devel-
24 oped and submitted annually by the city university of New York and
25 approved by the director of the budget, and which may include, but
26 not be limited to, projects in the following schedule. Notwith-
27 standing any other law to the contrary, all or a portion of the
28 amounts hereby appropriated may be suballocated or transferred to
29 the dormitory authority of the state of New York for such purpose
30 (30031150) ... 284,222,000 ...................... (re. $124,232,000)
31 Project Schedule
32 PROJECT AMOUNT
33 ----------------------------------------------------------
34 (thousands of dollars)
35 Baruch College
36 Campus-wide critical maintenance to
37 various facilities ............................... 5,000
38 Brooklyn College
39 Campus-wide critical maintenance to
40 various facilities ............................... 7,500
41 City College
42 Campus-wide critical maintenance to
43 various facilities ............................... 6,000
44 Hunter College
45 Campus-wide critical maintenance to
46 various facilities ............................... 7,000
47 John Jay College of Criminal Justice
38 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide critical maintenance to
2 various facilities ............................... 3,500
3 Lehman College
4 Campus-wide critical maintenance to
5 various facilities ............................... 3,500
6 Medgar Evers College
7 Campus-wide critical maintenance to
8 various facilities ............................... 8,000
9 New York City College of Technology
10 Campus-wide critical maintenance to
11 various facilities .............................. 10,000
12 Queens College
13 Campus-wide critical maintenance to
14 various facilities .............................. 12,500
15 College of Staten Island
16 Campus-wide critical maintenance to
17 various facilities ............................... 5,000
18 York College
19 Campus-wide critical maintenance to
20 various facilities ............................... 5,000
21 For university-wide critical maintenance or
22 capital improvement costs at senior
23 colleges attributable to the findings of
24 condition surveys for health and safety
25 needs ........................................... 56,000
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges attributable to the findings of
29 condition surveys for preservation of
30 facilities needs ................................ 60,000
31 For university-wide critical maintenance or
32 capital improvement costs at senior
33 colleges attributable to ADA needs ............... 1,800
34 For university-wide critical maintenance or
35 capital improvement costs at senior
36 colleges attributable to certificate of
37 occupancy/public assembly needs ................. 10,000
38 For university-wide critical maintenance or
39 capital improvement costs at senior
40 colleges attributable to energy
41 conservation needs .............................. 10,000
42 For university-wide critical maintenance or
43 capital improvement costs at senior
44 colleges attributable to science and
45 technology equipment needs ....................... 5,000
46 For university-wide critical maintenance or
47 capital improvement costs at senior
48 colleges attributable to educational
49 technology initiative needs ..................... 12,000
50 For university-wide critical maintenance or
39 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 capital improvement costs at senior
2 colleges attributable to science lab
3 upgrade needs .................................... 8,600
4 For university-wide critical maintenance or
5 capital improvement costs at senior
6 colleges attributable to bathroom
7 facilities upgrade needs ......................... 1,700
8 For university-wide critical maintenance or
9 capital improvement costs at senior
10 colleges attributable to asbestos
11 abatement needs .................................. 1,700
12 For university-wide critical maintenance or
13 capital improvement costs at senior
14 colleges attributable to athletic
15 facilities upgrade needs ......................... 2,000
16 For university-wide critical maintenance or
17 capital improvement costs at senior
18 colleges attributable CUNY TV
19 renovation needs ................................. 2,422
20 For university-wide critical maintenance or
21 capital improvement costs at senior
22 colleges attributable to mechanical and
23 infrastructure needs ............................ 40,000
24 --------------
25 Total ........................................ 284,222
26 ==============
27 The appropriation made by chapter 53, section 1, of the laws of 2010, is
28 hereby amended and reappropriated to read:
29 Advances for alterations and improvements to various facilities for
30 capital critical maintenance, including but not limited to capital
31 design, construction, acquisition, reconstruction, rehabilitation,
32 and equipment; for health and safety, preservation of facilities,
33 program improvement or program change, environmental protection,
34 energy conservation, accreditation, facilities for the physically
35 disabled, preventative maintenance and related projects, including
36 costs incurred prior to April 1, 2010, and subject to a plan devel-
37 oped and submitted annually by the city university of New York and
38 approved by the director of the budget, and which may include, but
39 not be limited to, projects in the following schedule. Notwith-
40 standing any other law to the contrary, all or a portion of the
41 amounts hereby appropriated may be suballocated or transferred to
42 the dormitory authority of the state of New York for such purpose
43 (30031050) ... 284,222,000 ...................... (re. $100,574,000)
44 Project Schedule
45 PROJECT AMOUNT
46 ----------------------------------------------------------
40 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (thousands of dollars)
2 Baruch College
3 Campus-wide critical maintenance to
4 various facilities ............................... 9,400
5 Brooklyn College
6 Campus-wide critical maintenance to
7 various facilities .............................. 14,542
8 City College
9 Campus-wide critical maintenance to
10 various facilities .............................. 22,900
11 Graduate School and University Center
12 Campus-wide critical maintenance to
13 various facilities ............................... 1,500
14 Hunter College
15 Campus-wide critical maintenance to
16 various facilities .............................. 18,000
17 John Jay College of Criminal Justice
18 Campus-wide critical maintenance to
19 various facilities .............................. 11,000
20 Lehman College
21 Campus-wide critical maintenance to
22 various facilities ............................... 7,000
23 Medgar Evers College
24 Campus-wide critical maintenance to
25 various facilities .............................. 14,630
26 New York City College of Technology
27 Campus-wide critical maintenance to
28 various facilities .............................. 19,800
29 Queens College
30 Campus-wide critical maintenance to
31 various facilities .............................. 11,550
32 College of Staten Island
33 Campus-wide critical maintenance to
34 various facilities ............................... 8,100
35 York College
36 Campus-wide critical maintenance to
37 various facilities ............................... 6,500
38 For university-wide critical maintenance or
39 capital improvement costs at senior
40 colleges attributable to the findings of
41 condition surveys for health and safety
42 needs ........................................... 35,000
43 For university-wide critical maintenance or
44 capital improvement costs at senior
45 colleges attributable to the findings of
46 condition surveys for preservation of
47 facilities needs ................................ 30,000
48 For university-wide critical maintenance or
49 capital improvement costs at senior
41 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 colleges attributable to ADA needs ............... 1,800
2 For university-wide critical maintenance or
3 capital improvement costs at senior
4 colleges attributable to certificate of
5 occupancy/public assembly needs ................. 10,000
6 For university-wide critical maintenance or
7 capital improvement costs at senior
8 colleges attributable to energy
9 conservation needs .............................. 17,000
10 For university-wide critical maintenance or
11 capital improvement costs at senior
12 colleges attributable to science and
13 technology equipment needs ....................... 5,000
14 For university-wide critical maintenance or
15 capital improvement costs at senior
16 colleges attributable to educational
17 technology initiative needs ...................... 5,000
18 For university-wide critical maintenance or
19 capital improvement costs at senior
20 colleges attributable to science lab
21 upgrade needs .................................... 8,600
22 For university-wide critical maintenance or
23 capital improvement costs at senior
24 colleges attributable to bathroom
25 facilities upgrade needs ......................... 1,700
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges attributable to asbestos
29 abatement needs .................................. 1,700
30 For university-wide critical maintenance or
31 capital improvement costs at senior
32 colleges attributable to athletic
33 facilities upgrade needs ......................... 2,000
34 For university-wide critical maintenance or
35 capital improvement costs at senior
36 colleges attributable CUNY TV
37 renovation needs ................................. 1,500
38 For university-wide critical maintenance or
39 capital improvement costs at senior
40 colleges attributable to mechanical and
41 infrastructure needs ............................ 20,000
42 --------------
43 Total ........................................ 284,222
44 ==============
45 The appropriation made by chapter 53, section 1, of the laws of 2009, is
46 hereby amended and reappropriated to read:
47 Advances for alterations and improvements to various facilities for
48 capital critical maintenance, including but not limited to capital
49 design, construction, acquisition, reconstruction, rehabilitation,
42 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and equipment; for health and safety, preservation of facilities,
2 program improvement or program change, environmental protection,
3 energy conservation, accreditation, facilities for the physically
4 disabled, preventative maintenance and related projects, including
5 costs incurred prior to April 1, 2009, and subject to a plan devel-
6 oped and submitted annually by the city university of New York and
7 approved by the director of the budget, and which may include, but
8 not be limited to, projects in the following schedule. Notwith-
9 standing any other law to the contrary, all or a portion of the
10 amounts hereby appropriated may be suballocated or transferred to
11 the dormitory authority of the state of New York for such purpose
12 (30020950) ... 284,222,000 ....................... (re. $56,574,000)
13 Project Schedule
14 PROJECT AMOUNT
15 ----------------------------------------------------------
16 (thousands of dollars)
17 Baruch College
18 Campus-wide critical maintenance to
19 various facilities ............................. 2,705
20 Brooklyn College
21 Campus-wide critical maintenance to
22 various facilities ............................. 3,661
23 City College
24 Campus-wide critical maintenance to
25 various facilities ............................ 27,407
26 Hunter College
27 Campus-wide critical maintenance to
28 various facilities ............................ 14,482
29 John Jay College of Criminal Justice
30 Campus-wide critical maintenance to
31 various facilities ............................. 5,681
32 Lehman College
33 Campus-wide critical maintenance to
34 various facilities ............................ 30,000
35 New York City College of Technology
36 Campus-wide critical maintenance to
37 various facilities ............................. 9,400
38 Queens College
39 Campus-wide critical maintenance to
40 various facilities ............................ 35,567
41 College of Staten Island
42 Campus-wide critical maintenance to
43 various facilities ............................. 9,565
44 York College
45 Campus-wide critical maintenance to
46 various facilities ............................. 7,954
47 For university-wide critical maintenance or
48 capital improvement costs at senior
43 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 colleges attributable to the findings of
2 condition surveys for health and safety
3 needs ........................................... 35,000
4 For university-wide critical maintenance or
5 capital improvement costs at senior
6 colleges attributable to the findings of
7 condition surveys for preservation of
8 facilities needs ................................ 30,000
9 For university-wide critical maintenance or
10 capital improvement costs at senior
11 colleges attributable to ADA needs ............... 1,800
12 For university-wide critical maintenance or
13 capital improvement costs at senior
14 colleges attributable to certificate of
15 occupancy/public assembly needs ................. 10,000
16 For university-wide critical maintenance or
17 capital improvement costs at senior
18 colleges attributable to energy
19 conservation needs .............................. 17,000
20 For university-wide critical maintenance or
21 capital improvement costs at senior
22 colleges attributable to science and
23 technology equipment needs ....................... 5,000
24 For university-wide critical maintenance or
25 capital improvement costs at senior
26 colleges attributable to educational
27 technology initiative needs ...................... 5,000
28 For university-wide critical maintenance or
29 capital improvement costs at senior
30 colleges attributable to science lab
31 upgrade needs .................................... 8,600
32 For university-wide critical maintenance or
33 capital improvement costs at senior
34 colleges attributable to bathroom
35 facilities upgrade needs ......................... 1,700
36 For university-wide critical maintenance or
37 capital improvement costs at senior
38 colleges attributable to asbestos
39 abatement needs .................................. 1,700
40 For university-wide critical maintenance or
41 capital improvement costs at senior
42 colleges attributable to athletic
43 facilities upgrade needs ......................... 2,000
44 For university-wide critical maintenance or
45 capital improvement costs at senior
46 colleges attributable to mechanical and
47 infrastructure needs ............................ 20,000
48 --------------
49 Total ........................................ 284,222
50 ==============
44 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 53, section 1, of the laws of 2008:
2 Alterations and improvements to various facilities for minor rehabili-
3 tation, including but not limited to capital design, construction,
4 acquisition, reconstruction, rehabilitation, and equipment; for
5 health and safety, preservation of facilities, program improvement
6 or program change, environmental protection, energy conservation,
7 accreditation, facilities for the physically disabled, preventative
8 maintenance and related projects, including costs incurred prior to
9 April 1, 2008, and subject to a plan submitted annually by the city
10 university of New York and approved by the director of the budget
11 (30080850) ... 23,232,000 ......................... (re. $2,898,000)
12 The appropriation made by chapter 53, section 1, of the laws of 2008, is
13 hereby amended and reappropriated to read:
14 Advances for alterations and improvements to various facilities for
15 capital critical maintenance, including but not limited to capital
16 design, construction, acquisition, reconstruction, rehabilitation,
17 and equipment; for health and safety, preservation of facilities,
18 program improvement or program change, environmental protection,
19 energy conservation, accreditation, facilities for the physically
20 disabled, preventative maintenance and related projects, including
21 costs incurred prior to April 1, 2008, and subject to a plan devel-
22 oped and submitted annually by the city university of New York and
23 approved by the director of the budget, and which may include, but
24 not be limited to, projects in the following schedule. Notwith-
25 standing any other law to the contrary, all or a portion of the
26 amounts hereby appropriated may be suballocated or transferred to
27 the dormitory authority of the state of New York for such purpose
28 (30010850) ... 284,222,000 ....................... (re. $59,112,000)
29 Project Schedule
30 PROJECT AMOUNT
31 ----------------------------------------------
32 (thousands of dollars)
33 Baruch College
34 Campus-wide critical maintenance
35 to various facilities ................ 6,746
36 Brooklyn College
37 Campus-wide critical maintenance
38 to various facilities ............... 10,811
39 City College
40 Campus-wide critical maintenance
41 to various facilities ............... 23,466
42 Graduate School and University Center
43 Campus-wide critical maintenance
44 to various facilities .................. 300
45 Hunter College
46 Campus-wide critical maintenance
45 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to various facilities ................ 3,176
2 John Jay College of Criminal Justice
3 Campus-wide critical maintenance
4 to various facilities ................ 6,873
5 Lehman College
6 Campus-wide critical maintenance
7 to various facilities ............... 15,941
8 New York City College of Technology
9 Campus-wide critical maintenance
10 to various facilities ............... 10,800
11 Queens College
12 Campus-wide critical maintenance
13 to various facilities ............... 21,117
14 College of Staten Island
15 Campus-wide critical maintenance
16 to various facilities ............... 18,125
17 York College
18 Campus-wide critical maintenance
19 to various facilities ............... 15,223
20 For university-wide critical
21 maintenance or capital
22 improvement costs at senior
23 colleges attributable to the
24 findings of condition surveys
25 for health and safety needs ......... 33,154
26 For university-wide critical
27 maintenance or capital
28 improvement costs at senior
29 colleges attributable to the
30 findings of condition surveys
31 for preservation of facilities
32 needs ............................... 40,001
33 For university-wide critical
34 maintenance or capital
35 improvement costs at senior
36 colleges attributable to ADA
37 needs ................................ 1,989
38 For university-wide critical
39 maintenance or capital
40 improvement costs at senior
41 colleges attributable to science
42 and technology equipment needs ....... 5,000
43 For university-wide critical
44 maintenance or capital
45 improvement costs at senior
46 colleges attributable to
47 certificate of occupancy/public
48 assembly needs ....................... 8,000
49 For university-wide critical
50 maintenance or capital
46 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 improvement costs at senior
2 colleges attributable to energy
3 conservation needs .................. 18,787
4 For university-wide critical
5 maintenance or capital
6 improvement costs at senior
7 colleges attributable to science
8 lab upgrade needs .................... 9,504
9 For university-wide critical
10 maintenance or capital
11 improvement costs at senior
12 colleges attributable to
13 educational technology initiative
14 needs ............................... 10,000
15 For university-wide critical
16 maintenance or capital
17 improvement costs at senior
18 colleges attributable to bathroom
19 facilities upgrade needs ............. 1,879
20 For university-wide critical
21 maintenance or capital improvement
22 costs at senior colleges
23 attributable to asbestos
24 abatement needs ...................... 1,879
25 For university-wide critical
26 maintenance or capital improvement
27 costs at senior colleges
28 attributable to CUNY TV
29 renovations needs .................... 1,450
30 For university-wide critical
31 maintenance or capital improvement
32 costs at senior colleges
33 attributable to mechanical and
34 infrastructure needs ............... 20,000
35 --------------
36 Total .............................. 284,222
37 ==============
38 The appropriation made by chapter 53, section 1, of the laws of 2008, as
39 amended by chapter 53, section 1, of the laws of 2009, is hereby
40 amended and reappropriated to read:
41 Advances for alterations and improvements to various facilities for
42 capital strategic initiatives, including but not limited to capital
43 design, construction, acquisition, reconstruction, rehabilitation,
44 and equipment; for health and safety, preservation of facilities,
45 new facilities, program improvement or program change, environmental
46 protection, energy conservation, accreditation, facilities for the
47 physically disabled, preventative maintenance and related projects,
48 including costs incurred prior to April 1, 2008, and subject to a
49 plan developed and submitted annually by the city university of New
47 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 York and approved by the director of the budget, and which may
2 include, but not be limited to, projects in the following schedule.
3 Notwithstanding any other law to the contrary, all or a portion of
4 the amounts hereby appropriated may be suballocated or transferred
5 to the dormitory authority of the state of New York for such purpose
6 (30060850) ... 1,311,732,000 .................... (re. $271,434,000)
7 Project Schedule
8 PROJECT AMOUNT
9 --------------------------------------------
10 (thousands of dollars)
11 Baruch College
12 17 Lexington Ave. Building
13 Renovation/Field Building
14 Renovation ........................ 40,000
15 Brooklyn College
16 West Quad Building ................ 22,782
17 Roosevelt Hall Science
18 Facility .......................... 52,000
19 Performing Arts Center ............ 29,000
20 Fire Alarm and Security
21 Project ............................ 9,834
22 City College
23 New Science Facility .............. 70,334
24 Marshak Building Interior ......... 10,000
25 School of Architecture
26 Renovation ........................ 10,000
27 Central Plant Expansion and
28 Distribution ...................... 37,727
29 Hunter College
30 School of Social Work ............ 84,318
31 New Science Lab Building,
32 Phase I .......................... 74,682
33 John Jay College of Criminal Justice
34 John Jay College Building
35 Expansion ....................... 125,000
36 CUNY School of Law
37 New Facility ..................... 50,000
38 Lehman College
39 New Science Facility,
40 Phase II ......................... 20,000
41 Swing Space for New Science
42 Facility ......................... 20,000
43 Media Production Center & Virtual
44 Small Business Assistance Center .. 2,217
45 New York City College of Technology
46 Academic Building I ............. 100,000
47 Educational Technology Initiative ... 250
48 Queens College
48 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Louis Armstrong Center ............. 5,000
2 Tennis Courts ...................... 1,500
3 College of Staten Island
4 Center for Computational
5 Science ............................ 6,500
6 Sports and Recreation Center
7 Upgrades ........................... 1,000
8 Campus-wide Site Security & Lighting,
9 Phase II .......................... 12,988
10 York College
11 Student Services Center/Classroom
12 Building ........................... 5,000
13 University-wide
14 CUNY ERP (CUNY FIRST) ............ 142,000
15 Advanced Science Research Center,
16 Phase I, and CCNY New Science
17 Facility ......................... 207,878
18 Project Administration ............ 61,722
19 Operational Changes .............. 110,000
20 --------------
21 Total ........................ 1,311,732
22 ==============
23 The appropriation made by chapter 53, section 1, of the laws of 2007, is
24 hereby amended and reappropriated to read:
25 An advance for alterations and improvements to various facilities
26 including services and expenses, capital design, construction,
27 acquisition, reconstruction, rehabilitation and equipment; including
28 but not limited to health and safety, preservation of facilities,
29 new facilities, program improvement or program change, environmental
30 protection, energy conservation, accreditation, facilities for the
31 physically disabled, preventive maintenance and related projects,
32 including costs incurred prior to April 1, 2007, and subject to a
33 plan to be developed and submitted annually by the city university
34 of New York and approved by the state director of the budget, and
35 which may include, but not be limited to, projects in the following
36 schedule. Notwithstanding any other law to the contrary, all or a
37 portion of the amounts hereby appropriated may be suballocated or
38 transferred to the dormitory authority of the state of New York for
39 such purpose (30670750) ... 225,000,000 .......... (re. $25,545,000)
40 Project Schedule
41 AMOUNT
42 ----------------------------------------------------------
43 (thousands of dollars)
44 For the City College Marshak Building,
45 provided however that subdivision (b) of
46 section 6281 of the education law, as
47 amended by chapter 1081 of the laws of
49 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 1969, shall apply to the dormitory author-
2 ity and/or the city university
3 construction fund, as the letting agency,
4 unless, in its discretion, it determines
5 to utilize a project labor agreement for
6 all work performed in the renovation of
7 the Marshak science building, the city
8 college science facility and the new
9 science research center at city college,
10 which means a prehire collective bargain-
11 ing agreement between the agency and a
12 labor organization establishing the labor
13 organization as the collective bargaining
14 representative for all persons who will
15 perform work pursuant to all contracts for
16 the construction, reconstruction, rehabil-
17 itation or improvement of facilities, and
18 which provides that only contractors and
19 subcontractors who sign a prenegotiated
20 agreement with the labor organization can
21 perform project work, when the record
22 supporting the decision to enter into such
23 an agreement establishes that it is justi-
24 fied by the interests underlying the
25 competitive bidding laws ....................... 30,000
26 For the City College Science Facility,
27 provided however that subdivision (b) of
28 section 6281 of the education law, as
29 amended by chapter 1081 of the laws of
30 1969, shall apply to the dormitory author-
31 ity and/or the city university
32 construction fund, as the letting agency,
33 unless, in its discretion, it determines
34 to utilize a project labor agreement for
35 all work performed in the renovation of
36 the Marshak science building, the city
37 college science facility and the new
38 science research center at city college,
39 which means a prehire collective bargain-
40 ing agreement between the agency and a
41 labor organization establishing the labor
42 organization as the collective bargaining
43 representative for all persons who will
44 perform work pursuant to all contracts for
45 the construction, reconstruction, rehabil-
46 itation or improvement of facilities, and
47 which provides that only contractors and
48 subcontractors who sign a prenegotiated
49 agreement with the labor organization can
50 perform project work, when the record
50 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 supporting the decision to enter into such
2 an agreement establishes that it is justi-
3 fied by the interests underlying the
4 competitive bidding laws ....................... 55,300
5 For the Advanced Science Research Center at
6 City College ................................... 14,500
7 For Central Utilities Plan Expansion at
8 Lehman College ................................. 11,100
9 For the Voorhees Building facade at New York
10 City College of Technology ..................... 14,100
11 For structural repairs at the Pearl Street
12 Building at New York City College of Tech-
13 nology ......................................... 5,000
14 For expansion of the Central Plant at City
15 College ........................................ 30,000
16 For university-wide critical maintenance or
17 capital improvement costs at senior
18 colleges attributable to the findings of
19 condition surveys for health and safety
20 needs .......................................... 20,000
21 For university-wide critical maintenance or
22 capital improvement costs at senior
23 colleges attributable to the findings of
24 condition surveys for preservation of
25 facilities needs ............................... 30,000
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges to correct deficiencies in the
29 mechanical, electrical and plumbing
30 infrastructure ................................. 15,000
31 --------------
32 Total .......................................... 225,000
33 ==============
34 The appropriation made by chapter 53, section 1, of the laws of 2006, as
35 amended by chapter 53, section 1, of the laws of 2007, is hereby
36 amended and reappropriated to read:
37 An additional advance for alterations and improvements to various
38 facilities including services and expenses, service contracts, memo-
39 randum of understanding, capital design, construction, acquisition,
40 reconstruction, rehabilitation and equipment; for health and safety,
41 preservation of facilities, new facilities, program improvement or
42 program change, technology, environmental protection, energy conser-
43 vation, accreditation, facilities for the physically disabled and
44 related projects including costs incurred prior to April 1, 2006
45 subject to an annual plan developed by the city university of New
46 York which shall include projects in the following schedule.
47 Notwithstanding any other law to the contrary, all or a portion of
48 the amounts hereby appropriated may be suballocated or transferred
51 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to the dormitory authority of the state of New York for such purpose
2 (30670650) ... 235,500,000 ....................... (re. $35,246,000)
3 Project Schedule
4 PROJECT AMOUNT
5 ---------------------------------------------------------
6 (thousands of dollars)
7 Brooklyn College
8 The West Quad Project .......................... 12,000
9 Roosevelt Hall ................................. 11,000
10 The Performing Arts Center ..................... 15,000
11 City College
12 School of Architecture (SAUDLA) ................ 8,000
13 Marshak Building ............................... 13,800
14 Science Facility ............................... 57,700
15 College of Staten Island
16 2M Building .................................... 5,000
17 Upgrades, Renovations, Equipment -
18 Various ........................................ 4,000
19 CUNY Law
20 Law Building Renovation, Phase I ............... 500
21 Hunter College
22 Roosevelt House Renovation ..................... 1,000
23 New Science Lab Building ....................... 10,000
24 John Jay
25 Building Expansion ............................. 15,000
26 Lehman College
27 Consolidated Computer Center Phase II .......... 1,000
28 New Science Facility Phase II .................. 10,000
29 Queens College
30 Science Upgrades Phase II ...................... 6,000
31 Louis Armstrong Center ......................... 5,000
32 School of Journalism
33 School of Journalism ........................... 10,000
34 York College
35 Student Services Center ........................ 6,000
36 Campus-wide Site Improvements .................... 7,000
37 An advance for alterations and improvements
38 to various facilities including services
39 and expenses, service contracts, memoran-
40 dum of understanding, capital design,
41 construction, acquisition, reconstruction,
42 rehabilitation and equipment; for health
43 and safety, preservation of facilities,
44 new facilities, program improvement or
45 program change, technology, environmental
46 protection, energy conservation, accredi-
47 tation, facilities for the physically
48 disabled and related projects, to be
52 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 developed by the city university of New
2 York in consultation with the senate
3 majority leader and approved by the direc-
4 tor of budget ............................... 28,500
5 University-wide
6 For health and safety projects ................ 9,000
7 --------------
8 Total ....................................... 235,500
9 ==============
10 The appropriation made by chapter 53, section 1, of the laws of 2005, as
11 amended by chapter 162, section 2, of the laws of 2005, is hereby
12 amended and reappropriated to read:
13 An advance for alterations and improvements to various facilities
14 including services and expenses, capital design, construction,
15 acquisition, reconstruction, rehabilitation and equipment; including
16 but not limited to health and safety, preservation of facilities,
17 new facilities, program improvement or program change, environmental
18 protection, energy conservation, accreditation, facilities for the
19 physically disabled, preventive maintenance and related projects,
20 including costs incurred prior to April 1, 2005, and subject to a
21 plan to be developed and submitted annually by the city university
22 of New York and approved by the state director of the budget, and
23 which may include, but not be limited to, projects in the following
24 schedule. Notwithstanding any other law to the contrary, all or a
25 portion of the amounts hereby appropriated may be suballocated or
26 transferred to the dormitory authority of the state of New York for
27 such purpose (30560550) ... 69,000,000 ............ (re. $9,225,000)
28 Project Schedule
29 AMOUNT
30 --------------------------------------------
31 (thousands of dollars)
32 For preliminary planning for
33 the renovation of Brooklyn
34 College's Roosevelt Hall ........... 2,500
35 For the City College Marshak
36 Building, provided however
37 that subdivision (b) of
38 section 6281 of the education
39 law, as amended by chapter
40 1081 of the laws of 1969,
41 shall apply to the dormitory
42 authority and/or the city
43 university construction fund,
44 as the letting agency, unless,
45 in its discretion, it deter-
46 mines to utilize a project
47 labor agreement for all work
53 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 performed in the renovation of
2 the Marshak science building,
3 the city college science
4 facility and the new science
5 research center at City
6 College, which means a prehire
7 collective bargaining agree-
8 ment between the agency and a
9 labor organization establish-
10 ing the labor organization as
11 the collective bargaining
12 representative for all persons
13 who will perform work pursuant
14 to all contracts for the
15 construction, reconstruction,
16 rehabilitation or improvement
17 of facilities, and which
18 provides that only contractors
19 and subcontractors who sign a
20 prenegotiated agreement with
21 the labor organization can
22 perform project work, when the
23 record supporting the decision
24 to enter into such an agree-
25 ment establishes that it is
26 justified by the interests
27 underlying the competitive
28 bidding laws ...................... 10,000
29 For matching grants for
30 Governors Island .................. 15,000
31 For university-wide critical
32 maintenance or capital
33 improvement costs at senior
34 and community colleges includ-
35 ing but not limited to: costs
36 attributable to the findings
37 of condition surveys for
38 health and safety; preserva-
39 tion of facilities and access
40 for the physically disabled;
41 code compliance; emergencies;
42 asbestos removal; energy
43 conservation; fire alarms,
44 sprinklers, electrical
45 distribution and heating and
46 cooling system requirements;
47 and other similar campus-wide
48 and systemwide needs, provided
49 however that subdivision (b)
50 of section 6281 of the educa-
54 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion law, as amended by chap-
2 ter 1081 of the laws of 1969,
3 shall apply to the dormitory
4 authority and/or the city
5 university construction fund,
6 as the letting agency, unless,
7 in its discretion, it deter-
8 mines to utilize a project
9 labor agreement for all work
10 performed in the renovation of
11 the Marshak science building,
12 the city college science
13 facility and the new science
14 research center at City
15 College, which means a prehire
16 collective bargaining agree-
17 ment between the agency and a
18 labor organization establish-
19 ing the labor organization as
20 the collective bargaining
21 representative for all persons
22 who will perform work pursuant
23 to all contracts for the
24 construction, reconstruction,
25 rehabilitation or improvement
26 of facilities, and which
27 provides that only contractors
28 and subcontractors who sign a
29 prenegotiated agreement with
30 the labor organization can
31 perform project work, when the
32 record supporting the decision
33 to enter into such an agree-
34 ment establishes that it is
35 justified by the interests
36 underlying the competitive
37 bidding laws ...................... 41,500
38 --------------
39 Total ............................. 69,000
40 ==============
41 By chapter 53, section 1, of the laws of 2004, as added by chapter 55,
42 section 4, of the laws of 2004:
43 Alterations and improvements to various facilities including services
44 and expenses, capital design, construction, acquisition, recon-
45 struction, rehabilitation and equipment; for health and safety,
46 preservation of facilities, new facilities, program improvement or
47 program change, environmental protection, energy conservation,
48 accreditation, facilities for the physically disabled, preventive
49 maintenance and related projects, including costs incurred prior to
55 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 April 1, 2004, and subject to a plan submitted annually by the city
2 university of New York and approved by the director of the budget
3 (30060450) ... 20,000,000 ......................... (re. $3,489,000)
4 The appropriation made by chapter 53, section 1, of the laws of 2004, as
5 amended by chapter 162, section 2, of the laws of 2005, is hereby
6 amended and reappropriated to read:
7 An advance for alterations and improvements to various facilities
8 including services and expenses, capital design, construction,
9 acquisition, reconstruction, rehabilitation and equipment; for
10 health and safety, preservation of facilities, new facilities,
11 program improvement or program change, environmental protection,
12 energy conservation, accreditation, facilities for the physically
13 disabled, and related projects, including costs incurred prior to
14 April 1, 2004, and which may include, but not be limited to,
15 projects in the following schedule. Notwithstanding any other law to
16 the contrary, all or a portion of the amounts hereby appropriated
17 may be suballocated or transferred to the dormitory authority of the
18 state of New York for such purpose (30030450) ......................
19 1,095,000,000 ................................... (re. $141,381,000)
20 Project Schedule
21 AMOUNT
22 --------------------------------------------
23 (thousands of dollars)
24 Brooklyn College ................... 23,600
25 -West Quad Building
26 City College ....................... 108,000
27 -Science Facility, provided
28 however that subdivision
29 (b) of section 6281 of the
30 education law, as amended
31 by chapter 1081 of the
32 laws of 1969, shall apply
33 to the dormitory authority
34 and/or the city university
35 construction fund, as the
36 letting agency, unless, in
37 its discretion, it deter-
38 mines to utilize a project
39 labor agreement for all
40 work performed in the
41 renovation of the Marshak
42 science building, the city
43 college science facility
44 and the new science
45 research center at City
46 College, which means a
47 prehire collective
56 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 bargaining agreement
2 between the agency and a
3 labor organization estab-
4 lishing the labor organ-
5 ization as the collective
6 bargaining representative
7 for all persons who will
8 perform work pursuant to
9 all contracts for the
10 construction, recon-
11 struction, rehabilitation
12 or improvement of facili-
13 ties, and which provides
14 that only contractors and
15 subcontractors who sign a
16 prenegotiated agreement
17 with the labor organiza-
18 tion can perform project
19 work, when the record
20 supporting the decision to
21 enter into such an agree-
22 ment establishes that it
23 is justified by the inter-
24 ests underlying the
25 competitive bidding laws
26 -School of Architecture (Phase I)
27 Hunter College ..................... 95,000
28 -Science Lab Building (Phase I)
29 -Roosevelt House Rehabilitation
30 -Visual and Performing Arts Complex
31 John Jay College ................... 130,000
32 -Academic Facility (Phase II)
33 Lehman College ..................... 60,000
34 -Science Facility
35 New York City College
36 of Technology ................. 86,000
37 -Academic Complex I
38 Queens College ..................... 30,000
39 -Science Upgrades (Phase I),
40 including $15 million in
41 bond proceeds issued
42 pursuant to a capital
43 appropriation for Queens
44 College in chapter 53 of
45 the laws of 1998
46 Universitywide
47 -For a science research
48 center, excluding furni-
49 ture and equipment which
50 shall be secured from
57 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 private or other non-
2 state sources, provided
3 however that subdivision
4 (b) of section 6281 of the
5 education law, as amended
6 by chapter 1081 of the
7 laws of 1969, shall apply
8 to the dormitory authority
9 and/or the city university
10 construction fund, as the
11 letting agency, unless, in
12 its discretion, it deter-
13 mines to utilize a project
14 labor agreement for all
15 work performed in the
16 renovation of the Marshak
17 science building, the city
18 college science facility
19 and the new science
20 research center at City
21 College, which means a
22 prehire collective
23 bargaining agreement
24 between the agency and a
25 labor organization estab-
26 lishing the labor organ-
27 ization as the collective
28 bargaining representative
29 for all persons who will
30 perform work pursuant to
31 all contracts for the
32 construction, recon-
33 struction, rehabilitation
34 or improvement of facili-
35 ties, and which provides
36 that only contractors and
37 subcontractors who sign a
38 prenegotiated agreement
39 with the labor organiza-
40 tion can perform project
41 work, when the record
42 supporting the decision to
43 enter into such an agree-
44 ment establishes that it
45 is justified by the inter-
46 ests underlying the
47 competitive bidding laws............ 176,000
48 -For science laboratory
49 upgrades............................ 7,000
50 -For condition survey-
58 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 related health and safety
2 projects ........................... 75,000
3 -For condition survey-
4 related preservation of
5 facilities projects................. 60,000
6 -For condition survey-
7 related projects related
8 to the americans with dis-
9 abilities act....................... 13,000
10 -For asbestos abatement .............. 7,000
11 -For capital staff ................... 41,400
12 -For network infrastructure
13 and telecommunications ............. 40,000
14 -For universitywide critical
15 maintenance or capital im-
16 provement costs for code
17 compliance; emergencies;
18 energy conservation; fire
19 alarms, sprinklers, elec-
20 trical distribution and
21 heating and cooling system
22 requirements; and other
23 similar campuswide and
24 systemwide needs, includ-
25 ing Governors Island................ 143,000
26 ------------
27 Total .............................. 1,095,000
28 ============
29 By chapter 53, section 1, of the laws of 1998, as amended by chapter 53,
30 section 1, of the laws of 1999, for:
31 Alterations and improvements to various facilities including capital
32 design, construction, acquisition, reconstruction, rehabilitation
33 and equipment; for health and safety, preservation of facilities,
34 new facilities, program improvements or program change, environ-
35 mental protection, energy conservation, accreditation, facilities
36 for the physically disabled, preventive maintenance and related
37 projects (302198C1) ... 8,200,000 ................... (re. $993,000)
38 Alterations and improvements to provide a parent resource/day care
39 facility in the 17 Lexington Avenue Building at Baruch College
40 (302198C1) ... 1,000,000 ............................ (re. $993,000)
41 Alterations and improvements to CUNY Libraries (302198C1) ............
42 10,800,000 ........................................ (re. $3,000,000)
43 Capital Projects Funds - Other
44 Capital Projects Fund
45 Energy Conservation Purpose
46 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
47 section 3, of the laws of 1992, for:
59 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements for energy conservation (30A58805)
2 ... ... 2,065,000 ................................. (re. $851,000)
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Facilities for the Physically Disabled Purpose
6 By chapter 54, section 1, of the laws of 1995, for:
7 Alterations and improvements to make facilities accessible to the
8 physically disabled (30149504) ... ...............................
9 1,257,000 ........................................... (re. $577,000)
10 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
11 section 3, of the laws of 1992, for:
12 Alterations and improvements to make facilities accessible to the
13 physically disabled (30048704) ... ...............................
14 1,206,000 ........................................... (re. $321,000)
15 Capital Projects Funds - Other
16 Capital Projects Fund
17 Health and Safety Purpose
18 By chapter 54, section 1, of the laws of 1993, for:
19 Alterations and improvements for health and safety pursuant to a plan,
20 based on the results of building condition surveys, to be submitted
21 for approval to the director of the budget on or before July 1,
22 1993. No funds shall be made available until such plan is approved
23 by the director of the budget (30029301) ...........................
24 2,750,000 ........................................... (re. $853,000)
25 By chapter 54, section 1, of the laws of 1992, for:
26 Alterations and improvements for facilities for the physically disa-
27 bled (30A29201) ... ... 1,128,000 .................. (re. $44,000)
28 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
29 section 3, of the laws of 1995, for:
30 Alterations and improvements for health and safety (30A18901)
31 ... ... 2,780,000 .................................. (re. $55,000)
32 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
33 section 3, of the laws of 1995, for:
34 Alterations and improvements for health and safety (30018701)
35 ... ... 8,507,000 .................................. (re. $58,000)
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Preservation of Facilities Purpose
39 By chapter 53, section 1, of the laws of 1997:
60 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements for preservation of facilities (30039703)
2 ... ... 3,300,000 ............................... (re. $2,241,000)
3 By chapter 53, section 1, of the laws of 1996, for:
4 Alterations and improvements to roofs on various buildings at Brooklyn
5 College (30299603) ... 300,000 ...................... (re. $300,000)
6 By chapter 54, section 1, of the laws of 1995, for:
7 Alterations and improvements to roofs on various buildings (30239503)
8 ... ... 5,933,000 ............................... (re. $2,728,000)
9 By chapter 54, section 1, of the laws of 1994, for:
10 Alterations and improvements to roofs (30039403) .....................
11 5,579,000 ........................................... (re. $275,000)
12 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
13 section 3, of the laws of 1992, for:
14 Alterations and improvements for preservation of facilities (30A39003)
15 ... ... 9,947,000 ................................. (re. $349,000)
16 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
17 section 3, of the laws of 1994, for:
18 Alterations and improvements for preservation of facilities (30A38803)
19 ... ... 6,363,000 ................................. (re. $495,000)
20 Capital Projects Funds - Other
21 Capital Projects Fund
22 Program Improvement or Program Change Purpose
23 By chapter 54, section 1, of the laws of 1995, for:
24 Alterations and improvements to child care facilities (30289508)
25 ... ... 1,306,000 ................................. (re. $975,000)
26 By chapter 54, section 1, of the laws of 1994, for:
27 Planning for master plans, including telecommunications and pre-design
28 project estimates (30389408) ... ... 1,000,000 .... (re. $398,000)
29 PROGRAM CHANGES, EXPANSION AND IMPROVEMENTS (CCP)
30 Capital Projects [Fund] Funds - Other
31 Capital Projects Fund
32 Program Improvement or Program Change Purpose
33 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
34 section 3, of the laws of 1992, for:
35 Alterations and improvements for program improvements (30A89008)
36 ... ... 3,331,000 .................................. (re. $77,000)
37 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
38 section 3, of the laws of 1995, for:
61 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements for program improvements (30A98808)
2 ... ..... 6,602,000 ............................... (re. $100,000)
62 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 The appropriation made by chapter 54, section 1, of the laws of 2017, is
6 hereby amended and reappropriated to read:
7 For services and expenses for state financial assistance to community
8 colleges for alterations and improvements to various facilities
9 including services and expenses, capital design, construction,
10 reconstruction, rehabilitation and equipment; for health and safety,
11 preservation of facilities, new facilities program improvement or
12 program change, environmental protection, energy conservation,
13 accreditation, facilities for the physically disabled, and related
14 projects, including costs incurred prior to April 1, 2017 subject to
15 an annual plan developed by the city university and approved by the
16 state director of the budget, and which may include, but not be
17 limited to, projects in the following schedule. Notwithstanding any
18 other law to the contrary, all or a portion of the amounts hereby
19 appropriated may be suballocated or transferred to the dormitory
20 authority of the state of New York for such purpose (30CC1750) .....
21 80,353,000 ....................................... (re. $80,353,000)
22 Project Schedule
23 ESTIMATED ESTIMATED
24 TOTAL STATE 50 PERCENT
25 & LOCAL SHARE STATE SHARE
26 ----------------------------------------------------------
27 (thousands of dollars)
28 Bronx Community College
29 Critical Maintenance ............. 42,000 21,000
30 Student Success Center............ 14,000 7,000
31 STEM Resource Center ............. 300 150
32 Borough Manhattan Community College
33 Cooling Tower Rehab .............. 3,600 1,800
34 Gymnasium Light Replacement ...... 700 350
35 Hostos Community College
36 One Stop Student Services Center . 7,700 3,850
37 Kingsborough Community College
38 Roof Replacements ................ 2,000 1,000
39 Marina Upgrades .................. 500 250
40 Science Equipment................. 454 227
41 LaGuardia Community College
42 Center for Career and Employment
43 Training ......................... 6,774 3,387
44 Queensborough Community College
45 Roof Repairs ..................... 2,400 1,200
63 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Kitchen and Cafeteria Renovation.. 5,600 2,800
2 For university-wide community college
3 critical maintenance or capital
4 improvement costs attributable to
5 preservation of facilities ...... 60,678 30,339
6 For university-wide community college
7 critical maintenance or capital
8 improvement costs attributable to
9 facilities which support ASAP
10 programs ........................ 14,000 7,000
11 ------- ------
12 Total .......................... 160,706 80,353
13 ======= ======
14 The appropriation made by chapter 55, section 1, of the laws of 2016, as
15 amended by chapter 53, section 3, of the laws of 2016, is hereby
16 amended and reappropriated to read:
17 For services and expenses for state financial assistance to community
18 colleges for alterations and improvements to various facilities
19 including services and expenses, capital design, construction,
20 reconstruction, rehabilitation and equipment; for health and safety,
21 preservation of facilities, new facilities program improvement or
22 program change, environmental protection, energy conservation,
23 accreditation, facilities for the physically disabled, and related
24 projects, including costs incurred prior to April 1, 2016 subject to
25 an annual plan developed by the city university and approved by the
26 state director of the budget, and which may include, but not be
27 limited to, projects in the following schedule. Notwithstanding any
28 other law to the contrary, all or a portion of the amounts hereby
29 appropriated may be suballocated or transferred to the dormitory
30 authority of the state of New York for such purpose (30CC1650) .....
31 61,640,000 ....................................... (re. $61,478,000)
32 Project Schedule
33 ESTIMATED ESTIMATED
34 TOTAL STATE 50 PERCENT
35 & LOCAL SHARE STATE SHARE
36 ----------------------------------------------------------
37 (thousands of dollars)
38 Bronx Community College
39 Alumni Locker Room Accessibility . 500 250
40 EOC Headquarter Renovation........ 1,000 500
41 Campus Utility Upgrade ........... 8,000 4,000
42 Gould Library Rotunda Staircase .. 1,330 665
43 Fire Alarm Upgrades .............. 2,908 1,454
44 Lowe Hall ADA Improvements ....... 500 250
45 Borough Manhattan Community College
46 Lighting Controls and Sensors .... 1,552 776
47 Variable Frequency Drives ........ 1,934 967
64 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Community Room HVAC .............. 2,700 1,350
2 Perimeter Security Lighting ...... 600 300
3 199 Chambers Upgrade ............. 4,596 2,298
4 Hostos Community College
5 Summer Boiler .................... 206 103
6 Technology Upgrades .............. 430 215
7 Kingsborough Community College
8 Pool Renovations ................. 2,000 1,000
9 Marina Reconstruction ............ 1,500 750
10 LaGuardia Community College
11 Staircase Lighting................ 160 80
12 Center 3 Infrastructure Upgrades . 20,000 10,000
13 Business and Entrepreneurial
14 Training Center ................ 6,800 3,400
15 M Building Boiler Replacement .... 546 273
16 E and C Building Cooling Towers .. 688 344
17 Chiller Plant .................... 17,964 8,982
18 Queensborough Community College
19 Upgrade Research Labs ............ 3,200 1,600
20 Central Chiller Plant ............ 2,000 1,000
21 Electrical System Upgrade ........ 7,980 3,990
22 Kitchen and Cafeteria Renovation.. 2,000 1,000
23 For university-wide community college
24 critical maintenance or capital
25 improvement costs attributable to
26 health and safety ................ 14,524 7,262
27 For university-wide community college
28 critical maintenance or capital
29 improvement costs attributable to
30 preservation of facilities ....... 17,462 8,731
31 For university-wide community college
32 critical maintenance or capital
33 improvement costs attributable to
34 assistive technology ............. 200 100
35 ------- ------
36 Total .......................... 123,280 61,640
37 ======= ======
38 The appropriation made by chapter 54, section 1, of the laws of 2015, is
39 hereby amended and reappropriated to read:
40 For services and expenses for state financial assistance to community
41 colleges for alterations and improvements to various facilities
42 including services and expenses, capital design, construction,
43 reconstruction, rehabilitation and equipment; for health and safety,
44 preservation of facilities, new facilities program improvement or
45 program change, environmental protection, energy conservation,
46 accreditation, facilities for the physically disabled, and related
47 projects, including costs incurred prior to April 1, 2015 subject to
48 an annual plan developed by the city university and approved by the
49 state director of the budget, and which may include, but not be
65 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 limited to, projects in the following schedule. Notwithstanding any
2 other law to the contrary, all or a portion of the amounts hereby
3 appropriated may be suballocated or transferred to the dormitory
4 authority of the state of New York for such purpose (30C11550) .....
5 4,503,000 ......................................... (re. $4,503,000)
6 Project Schedule
7 ESTIMATED ESTIMATED
8 TOTAL STATE 50 PERCENT
9 & LOCAL SHARE STATE SHARE
10 ----------------------------------------------------------
11 (thousands of dollars)
12 Hostos Community College
13 Allied Health and Sciences
14 Building Complex ................. 9,006 4,503
15 ------- ------
16 Total ............................ 9,006 4,503
17 ======= ======
18 For services and expenses for state financial assistance to community
19 colleges for alterations and improvements to various facilities
20 including services and expenses, capital design, construction,
21 acquisition, reconstruction, rehabilitation and equipment; for
22 health and safety, preservation of facilities, new facilities,
23 program improvement or program change, environmental protection,
24 energy conservation, accreditation, facilities for the physically
25 disabled, and related projects, including costs incurred prior to
26 April 1, 2015 subject to an annual plan developed by the city
27 university and approved by the state director of the budget, and
28 which may include, but not be limited to, projects in the following
29 schedule. Notwithstanding any other law to the contrary, all or a
30 portion of the amounts hereby appropriated may be suballocated or
31 transferred to the dormitory authority of the state of New York for
32 such purpose (30CC1550) ... 16,422,000 ........... (re. $16,422,000)
33 Project Schedule
34 ESTIMATED ESTIMATED
35 TOTAL STATE 50 PERCENT
36 & LOCAL SHARE STATE SHARE
37 ----------------------------------------------------------
38 (thousands of dollars)
39 Bronx Community College
40 Ohio Track and Field Restoration ..... 750 375
41 Monument Hill Restoration ............ 400 200
42 Gould Memorial Library Windows ....... 900 450
43 Bliss Hall ADA Improvements .......... 600 300
44 Computer and Lab Upgrades ............. 70 35
45 Hostos Community College
66 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 475 Grand Concourse HVAC Upgrades .. 3,000 1,500
2 Kingsborough Community College
3 Pool Upgrades ...................... 2,000 1,000
4 Science and Resiliency Institute .. 10,000 5,000
5 LaGuardia Community College
6 Faculty Offices and Training Center 1,500 750
7 Tech Center .......................... 200 100
8 Queensborough Community College
9 Roof Repairs ....................... 1,700 850
10 Central Kitchen and
11 Cafeteria Renovation ............... 1,100 550
12 For university-wide community college
13 critical maintenance or capital
14 improvement costs attributable to
15 the preservation of facilities ..... 4,064 2,032
16 For university-wide community college
17 critical maintenance or capital
18 improvement costs attributable to
19 accelerated conservation and
20 efficiency projects ................ 6,560 3,280
21 ------- ------
22 Total .......................... 32,844 16,422
23 ======= ======
24 The appropriation made by chapter 54, section 1, of the laws of 2014, is
25 hereby amended and reappropriated to read:
26 An advance for state financial assistance to community colleges for
27 alterations and improvements to existing facilities including
28 services and expenses, capital design, construction, reconstruction,
29 rehabilitation and equipment; for health and safety, preservation of
30 facilities, program improvement or program change, environmental
31 protection, energy conservation, accreditation, facilities for the
32 physically disabled, and related projects, including costs incurred
33 prior to April 1, 2014 subject to an annual plan developed by the
34 city university and approved by the state director of the budget,
35 and which may include, but not be limited to, projects in the
36 following schedule. Notwithstanding any other law to the contrary,
37 all or a portion of the amounts hereby appropriated may be suballo-
38 cated or transferred to the dormitory authority of the state of New
39 York for such purpose (30CC1450) ...................................
40 15,628,000 ....................................... (re. $14,565,000)
41 Project Schedule
42 ESTIMATED ESTIMATED
43 TOTAL STATE 50 PERCENT
44 & LOCAL SHARE STATE SHARE
45 ----------------------------------------------------------
46 (thousands of dollars)
47 Borough of Manhattan Community
67 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 College
2 Campus-wide critical maintenance
3 to various facilities .............. 3,500 1,750
4 Bronx Community College
5 Campus-wide critical maintenance
6 to various facilities .............. 2,200 1,100
7 Kingsborough Community College
8 Campus-wide critical maintenance
9 to various facilities .............. 3,000 1,500
10 LaGuardia Community College
11 Campus-wide critical maintenance
12 to various facilities .............. 6,000 3,000
13 Queensborough Community College
14 Campus-wide critical maintenance
15 to various facilities .............. 5,500 2,750
16 For university-wide community college
17 critical maintenance or capital
18 improvement costs attributable to
19 the preservation of facilities...... 5,456 2,728
20 For university-wide community college
21 critical maintenance or capital
22 improvement costs attributable to
23 accelerated conservation and
24 efficiency projects................. 5,600 2,800
25 ------- ------
26 Total .......................... 31,256 15,628
27 ======= ======
28 The appropriation made by chapter 54, section 1, of the laws of 2013, is
29 hereby amended and reappropriated to read:
30 An advance for state financial assistance to community colleges for
31 alterations and improvements to various facilities including
32 services and expenses, capital design, construction, acquisition,
33 reconstruction, rehabilitation and equipment; for health and safety,
34 preservation of facilities, new facilities, program improvement or
35 program change, environmental protection, energy conservation,
36 accreditation, facilities for the physically disabled, and related
37 projects, including costs incurred prior to April 1, 2013 subject to
38 an annual plan developed by the city university and approved by the
39 state director of the budget, and which may include, but not be
40 limited to, projects in the following schedule. Notwithstanding any
41 other law to the contrary, all or a portion of the amounts hereby
42 appropriated may be suballocated or transferred to the dormitory
43 authority of the state of New York for such purpose (30CC1350) .....
44 8,100,000 ......................................... (re. $3,916,000)
45 Project Schedule
46 ESTIMATED ESTIMATED
47 TOTAL STATE 50 PERCENT
68 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 & LOCAL SHARE STATE SHARE
2 ----------------------------------------------------------
3 (thousands of dollars)
4 Borough of Manhattan Community
5 College
6 Campus-wide critical maintenance
7 to various facilities .............. 2,000 1,000
8 Bronx Community College
9 Campus-wide critical maintenance
10 to various facilities .............. 2,850 1,425
11 Hostos Community College
12 Campus-wide critical maintenance
13 to various facilities .............. 3,500 1,750
14 Kingsborough Community College
15 Campus-wide critical maintenance
16 to various facilities .............. 1,650 825
17 LaGuardia Community College
18 Campus-wide critical maintenance
19 to various facilities .............. 2,000 1,000
20 Queensborough Community College
21 Campus-wide critical maintenance
22 to various facilities .............. 4,200 2,100
23 ------- ------
24 Total .......................... 16,200 8,100
25 ======= ======
26 The appropriation made by chapter 54, section 1, of the laws of 2012, is
27 hereby amended and reappropriated to read:
28 An advance for state financial assistance to community colleges for
29 alterations and improvements to various facilities including
30 services and expenses, capital design, construction, acquisition,
31 reconstruction, rehabilitation and equipment; for health and safety,
32 preservation of facilities, new facilities, program improvement or
33 program change, environmental protection, energy conservation,
34 accreditation, facilities for the physically disabled, and related
35 projects, including costs incurred prior to April 1, 2012 subject to
36 an annual plan developed by the city university and approved by the
37 state director of the budget, and which may include, but not be
38 limited to, projects in the following schedule. Notwithstanding any
39 other law to the contrary, all or a portion of the amounts hereby
40 appropriated may be suballocated or transferred to the dormitory
41 authority of the state of New York for such purpose (30CC1250) .....
42 26,704,000 ........................................ (re. $9,078,000)
43 Project Schedule
44 ESTIMATED ESTIMATED
45 TOTAL STATE 50 PERCENT
46 & LOCAL SHARE STATE SHARE
47 ----------------------------------------------------------
69 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (thousands of dollars)
2 Borough of Manhattan Community
3 College
4 Campus-wide critical maintenance
5 to various facilities ............. 14,400 7,200
6 Bronx Community College
7 Campus-wide critical maintenance
8 to various facilities .............. 6,000 3,000
9 Kingsborough Community College
10 Campus-wide critical maintenance
11 to various facilities .............. 7,500 3,750
12 Health Technologies Education
13 Center ............................. 4,908 2,454
14 LaGuardia Community College
15 Center 3 Facade Replacement ........ 3,800 1,900
16 Campus-wide critical maintenance
17 to various facilities .............. 6,800 3,400
18 Queensborough Community College
19 Central Kitchen/Cafeteria .......... 2,400 1,200
20 Campus-wide critical maintenance
21 to various facilities .............. 7,600 3,800
22 ------- ------
23 Total .......................... 55,408 26,704
24 ======= ======
25 The appropriation made by chapter 54, section 1, of the laws of 2011, is
26 hereby amended and reappropriated to read:
27 An advance for state financial assistance to community colleges for
28 alterations and improvements to various facilities including
29 services and expenses, capital design, construction, acquisition,
30 reconstruction, rehabilitation and equipment; for health and safety,
31 preservation of facilities, new facilities, program improvement or
32 program change, environmental protection, energy conservation,
33 accreditation, facilities for the physically disabled, and related
34 projects, including costs incurred prior to April 1, 2011 subject to
35 an annual plan developed by the city university and approved by the
36 state director of the budget which shall include projects in the
37 following schedule. Notwithstanding any other law to the contrary,
38 all or a portion of the amounts hereby appropriated may be suballo-
39 cated or transferred to the dormitory authority of the state of New
40 York for such purpose (30CC1150) ...................................
41 31,239,000 ....................................... (re. $14,291,000)
42 Project Schedule
43 ESTIMATED ESTIMATED
44 TOTAL STATE 50 PERCENT
45 & LOCAL SHARE STATE SHARE
46 ----------------------------------------------------------
70 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (thousands of dollars)
2 Borough of Manhattan Community
3 College
4 Theater Upgrades and
5 Equipment .......................... 3,400 1,700
6 Bronx Community College
7 Campus-wide Roofing,
8 Ph. I .............................. 4,068 2,034
9 Kingsborough Community College
10 Theater Upgrades and Sciences Bldg-
11 Infrastructure...................... 5,150 2,575
12 T2 Building Upgrades................ 7,200 3,600
13 LaGuardia Community College
14 Center 3 Facade, Ph. I ............. 5,000 2,500
15 Center 3 Upgrades .................. 1,000 500
16 Campus Improvements ............... 10,000 5,000
17 Queensborough Community College
18 Central Kitchen/Dining Hall
19 Renovation ......................... 8,660 4,330
20 Upgrade Campus-wide Electrical
21 System, Ph. II .................... 18,000 9,000
22 ------- ------
23 Total ........................... 62,478 31,239
24 ======= ======
25 The appropriation made by chapter 53, section 1, of the laws of 2010, is
26 hereby amended and reappropriated to read:
27 An advance for state financial assistance to community colleges for
28 alterations and improvements to various facilities including
29 services and expenses, capital design, construction, acquisition,
30 reconstruction, rehabilitation and equipment; for health and safety,
31 preservation of facilities, new facilities, program improvement or
32 program change, environmental protection, energy conservation,
33 accreditation, facilities for the physically disabled, and related
34 projects, including costs incurred prior to April 1, 2010 subject to
35 an annual plan developed by the city university and approved by the
36 state director of the budget which shall include projects in the
37 following schedule. Notwithstanding any other law to the contrary,
38 all or a portion of the amounts hereby appropriated may be suballo-
39 cated or transferred to the dormitory authority of the state of New
40 York for such purpose (30CC1050) ...................................
41 34,563,000 ........................................ (re. $5,435,000)
42 Project Schedule
43 ESTIMATED ESTIMATED
44 TOTAL STATE 50 PERCENT
45 & LOCAL SHARE STATE SHARE
46 ----------------------------------------------------------
71 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (thousands of dollars)
2 Borough of Manhattan Community
3 College
4 Central Plant Upgrades,
5 199 Chambers Street ............. 14,000 7,000
6 Bronx Community College
7 Campus-wide Utility Upgrades,
8 Ph. I ........................... 18,626 9,313
9 Kingsborough Community College
10 Mechanical and Infrastructure
11 Improvements ....................... 4,000 2,000
12 LaGuardia Community College
13 Conference Facility Space .......... 2,000 1,000
14 Center 3 Office Space and
15 Elevators ........................ 2,500 1,250
16 Facility Upgrades ................. 10,000 5,000
17 Queensborough Community College
18 Upgrade Campus-wide Electrical
19 System, Ph. I ................... 18,000 9,000
20 ------- ------
21 Total .......................... 69,126 34,563
22 ======= ======
23 By chapter 53, section 1, of the laws of 2008:
24 State financial assistance to community colleges for alterations and
25 improvements to various facilities for minor rehabilitation, includ-
26 ing but not limited to capital design, construction, acquisition,
27 reconstruction, rehabilitation, and equipment; for health and safe-
28 ty, preservation of facilities, program improvement or program
29 change, environmental protection, energy conservation, accredi-
30 tation, facilities for the physically disabled, preventative mainte-
31 nance and related projects, including costs incurred prior to April
32 1, 2008, and subject to a plan submitted annually by the city
33 university of New York and approved by the director of the budget
34 (30110850) ... 2,750,000 .......................... (re. $2,750,000)
35 The appropriation made by chapter 53, section 1, of the laws of 2008, as
36 amended by chapter 496, section 1, of the laws of 2008, is hereby
37 amended and reappropriated to read:
38 Advances for alterations and improvements to various facilities for
39 capital critical maintenance and strategic initiatives, including
40 but not limited to capital design, construction, acquisition, recon-
41 struction, rehabilitation, and equipment; for health and safety,
42 preservation of facilities, new facilities, program improvement or
43 program change, environmental protection, energy conservation,
44 accreditation, facilities for the physically disabled, preventative
45 maintenance and related projects, including costs incurred prior to
46 April 1, 2008, and subject to a plan developed and submitted annual-
47 ly by the city university of New York and approved by the director
48 of the budget, and which may include, but not be limited to,
72 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects in the following schedule. Notwithstanding any other law to
2 the contrary, all or a portion of the amounts hereby appropriated
3 may be suballocated or transferred to the dormitory authority of the
4 state of New York for such purpose (30090850) ......................
5 206,908,000 ...................................... (re. $81,585,000)
6 Project Schedule
7 ESTIMATED ESTIMATED
8 TOTAL STATE 50 PERCENT
9 & LOCAL SHARE STATE SHARE
10 ----------------------------------------------------------
11 (thousands of dollars)
12 Borough of Manhattan Community
13 College
14 Fiterman Hall ................... 102,200 51,100
15 Bronx Community College
16 North Instructional Building ..... 24,762 12,381
17 Backflow Prevention Devices ....... 3,400 1,700
18 Campus-wide Roof Replacement ...... 1,932 966
19 Hostos Community College
20 500 Grand Concourse .............. 18,446 9,223
21 Kingsborough Community College
22 Laboratories and Mechanical
23 Infrastructure Upgrade Phase I .... 5,000 2,500
24 Medgar Evers College
25 Academic Building I .............. 68,346 34,173
26 Carroll Street Building .......... 12,000 6,000
27 University-wide
28 CUNY ERP (CUNY FIRST) ............ 27,600 13,800
29 Project Administration ........... 15,430 7,715
30 For university-wide critical main-
31 tenance or capital improvement
32 costs at community colleges
33 attributable to the findings
34 of condition surveys for health
35 and safety needs ................. 35,000 17,500
36 For university-wide critical main-
37 tenance or capital improvement
38 costs at community colleges
39 attributable to the findings
40 of condition surveys for
41 preservation of facilities needs . 35,000 17,500
42 For university-wide critical main-
43 tenance or capital improvement
44 costs at community colleges
45 attributable to ADA needs ........ 15,000 7,500
46 For university-wide critical main-
47 tenance or capital improvement
48 costs at community colleges
73 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 attributable to certificate of
2 occupancy/public assembly needs .. 18,000 9,000
3 For university-wide critical main-
4 tenance or capital improvement
5 costs at community colleges
6 attributable to energy
7 conservation needs ............... 18,000 9,000
8 For university-wide critical main-
9 tenance or capital improvement
10 costs at community colleges
11 attributable to science lab
12 upgrade needs ..................... 7,200 3,600
13 For university-wide critical main-
14 tenance or capital improvement
15 costs at community colleges
16 attributable to educational
17 technology initiative needs ....... 4,000 2,000
18 For university-wide critical main-
19 tenance or capital improvement
20 costs at community colleges
21 attributable to athletic
22 facilities upgrade needs .......... 2,500 1,250
23 ------------ ------------
24 Total ........................... 413,816 206,908
25 ============ ============
26 The appropriation made by chapter 53, section 1, of the laws of 2007, is
27 hereby amended and reappropriated to read:
28 An advance for state financial assistance to community colleges for
29 alterations and improvements to various facilities including
30 services and expenses, capital design, construction, acquisition,
31 reconstruction, rehabilitation and equipment; for health and safety,
32 preservation of facilities, new facilities, program improvement or
33 program change, environmental protection, energy conservation,
34 accreditation, facilities for the physically disabled, and related
35 projects, including costs incurred prior to April 1, 2007 subject to
36 an annual plan developed by the city university and approved by the
37 state director of the budget which shall include projects in the
38 following schedule. Notwithstanding any other law to the contrary,
39 all or a portion of the amounts hereby appropriated may be suballo-
40 cated or transferred to the dormitory authority of the state of New
41 York for such purpose (30660750) ...................................
42 40,800,000 .......................................... (re. $685,000)
43 Project Schedule
44 ESTIMATED ESTIMATED
45 TOTAL STATE 50 PERCENT
46 & LOCAL SHARE STATE SHARE
47 ----------------------------------------------------------
74 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (thousands of dollars)
2 Borough of Manhattan Community College
3 Fiterman Hall Replacement ......... 40,000 20,000
4 Bronx Community College
5 Mechanical Systems Upgrades ........ 1,800 900
6 Medgar Evers
7 Academic Building I ............... 22,000 11,000
8 For University-wide critical
9 maintenance or capital im-
10 provement costs at community
11 colleges attributable to the
12 findings of condition sur-
13 veys for health and safety
14 needs .............................. 4,800 2,400
15 For university-wide critical
16 maintenance or capital im-
17 provement costs at community
18 colleges attributable to the
19 findings of condition sur-
20 veys for preservation of
21 facilities needs ................... 3,000 1,500
22 For university-wide critical
23 maintenance or capital im-
24 provement costs at community
25 colleges to correct defic-
26 iencies in the mechanical,
27 electrical and plumbing
28 infrastructure .................... 10,000 5,000
29 ------- -------
30 Total ............................. 81,600 40,800
31 ======= =======
32 The appropriation made by chapter 53, section 1, of the laws of 2006, is
33 hereby amended and reappropriated to read:
34 An advance for state financial assistance to community colleges for
35 alterations and improvements to various facilities including
36 services and expenses, capital design, construction, acquisition,
37 reconstruction, rehabilitation and equipment; for health and safety,
38 preservation of facilities, new facilities, program improvement or
39 program change, environmental protection, energy conservation,
40 accreditation, facilities for the physically disabled, and related
41 projects, including costs incurred prior to April 1, 2006 subject to
42 an annual plan developed by the city university which shall include
43 projects in the following schedule. Notwithstanding any other law to
44 the contrary, all or a portion of the amounts hereby appropriated
45 may be suballocated or transferred to the dormitory authority of the
46 state of New York for such purpose (30660650) ......................
47 8,769,000 ......................................... (re. $1,748,000)
48 Project Schedule
75 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ESTIMATED ESTIMATED
2 TOTAL STATE 50 PERCENT
3 & LOCAL SHARE STATE SHARE
4 ----------------------------------------------------------
5 (thousands of dollars)
6 Medgar Evers College
7 Theater ........................... 3,450 1,725
8 Auditorium ....................... 14,088 7,044
9 ------- ------
10 Total ............................ 17,538 8,769
11 ======= ======
12 The appropriation made by chapter 53, section 1, of the laws of 2006, as
13 amended by chapter 108, section 2, of the laws of 2006, is hereby
14 amended and reappropriated to read:
15 Additional advance for state financial assistance to community
16 colleges for alterations and improvements to various facilities
17 including capital design, construction, acquisition, reconstruction,
18 rehabilitation, equipment and personal service costs; for health and
19 safety, preservation of facilities, new facilities, program improve-
20 ment or program change, environmental protection, energy conserva-
21 tion, accreditation, facilities for the physically disabled and
22 related projects including costs incurred prior to April 1, 2006.
23 Notwithstanding any other law to the contrary, all or a portion of
24 the amounts hereby appropriated may be suballocated or transferred
25 to the dormitory authority of the state of New York for such purpose
26 (30660650) ... 66,580,000 ........................ (re. $28,947,000)
27 Project Schedule
28 ESTIMATED ESTIMATED
29 TOTAL STATE 50 PERCENT
30 & LOCAL SHARE STATE SHARE
31 ----------------------------------------------------------
32 (thousands of dollars)
33 Borough of Manhattan Community
34 College
35 [Fitterman] Fiterman Hall
36 Replacement ...................... 15,000 7,500
37 Chambers Street Renovations
38 Phase II ......................... 14,000 7,000
39 Bronx Community College
40 Mechanical System Upgrades ........ 6,000 3,000
41 Hostos Community College
42 Renovations in 475 Grand Concourse 6,000 3,000
43 Kings Borough Community College
44 Air conditioning T5 ................. 218 109
45 Renovation of former auditorium T2
46 building as learning resource
47 center ............................ 2,000 1,000
76 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Air conditioning T4 ................. 942 471
2 Mechanical System Upgrades ........ 6,000 3,000
3 Laguardia Community College
4 Renovations of Center 3 .......... 14,000 7,000
5 Acquisition and Renovation
6 of an Additional Educational
7 Building ......................... 55,000 27,500
8 Medgar Evers
9 Academic I ........................ 8,000 4,000
10 Queensborough Community College
11 Renovation of Science Building .... 6,000 3,000
12 -------- --------
13 Total ......................... 133,160 66,580
14 ======== ========
15 The appropriation made by chapter 53, section 1, of the laws of 2005, as
16 amended by chapter 62, section 3, of the laws of 2005, is hereby
17 amended and reappropriated to read:
18 An advance for state financial assistance to community colleges for
19 alterations and improvements to various facilities including
20 services and expenses, capital design, construction, acquisition,
21 reconstruction, rehabilitation and equipment; for health and safety,
22 preservation of facilities, new facilities, program improvement or
23 program change, environmental protection, energy conservation,
24 accreditation, facilities for the physically disabled, and related
25 projects, including costs incurred prior to April 1, 2005 subject to
26 an annual plan developed by the city university which shall include
27 projects in the following schedule. Notwithstanding any other law to
28 the contrary, all or a portion of the amounts hereby appropriated
29 may be suballocated or transferred to the dormitory authority of the
30 state of New York for such purpose (30590550) ......................
31 105,849,000 ...................................... (re. $31,237,000)
32 Project Schedule
33 ESTIMATED ESTIMATED
34 TOTAL STATE 50 PERCENT
35 & LOCAL SHARE STATE SHARE
36 ----------------------------------------------------------
37 (thousands of dollars)
38 Queensborough Community College
39 Holocaust Resource Center ......... 3,000 1,500
40 Instruction Building Planning
41 and Design Costs .................. 4,948 2,474
42 Upgrade Campus Wide Electric
43 System ............................ 1,000 500
44 Upgrade Campus Wide Drainage
45 System ............................ 1,000 500
46 Kingsborough Community College
47 Roof Replacement .................. 3,000 1,500
77 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Additional Roof Replacement ....... 3,000 1,500
2 Fire Alarm Rehab .................. 6,256 3,128
3 Gymnasium ......................... 6,060 3,030
4 Marine/Academic Center ............ 5,050 2,525
5 Primary Arts Center ................. 850 425
6 Hostos Community College
7 475 Grand Concourse Renovation .... 4,948 2,474
8 Site Acquisition .................... 750 375
9 LaGuardia Community College
10 Center 3 Renovations, Phase II .... 5,346 2,673
11 Department of Humanities
12 Renovation ....................... 17,012 8,506
13 Department of Computer Information
14 Systems .......................... 21,000 10,500
15 Medgar Evers College
16 Athletic Fields ................... 1,960 980
17 Bronx Community College
18 North Instructional Building ..... 60,962 30,481
19 Mechanical Systems &
20 Infrastructure Upgrade Phase 1 .... 4,074 2,037
21 Borough Manhattan Community College
22 Training Program for Emergency
23 First Response ................... 21,400 10,700
24 North campus building ............. 2,000 1,000
25 Chambers Street Renovation Phase
26 II ................................ 5,506 2,753
27 Universitywide
28 For condition assessment: Health
29 and Safety ........................ 9,762 4,881
30 For condition assessment:
31 Facilities Preservation ........... 3,994 1,997
32 For condition assessment: ADA ..... 3,820 1,910
33 For construction, acquisition,
34 renovation or rehabilitation of
35 facilities including equipment and
36 other necessary incidental costs
37 related to the CUNY Incubator
38 Network .......................... 15,000 7,500
39 ------- -------
40 Total ......................... 211,698 105,849
41 ======= =======
42 By chapter 53, section 1, of the laws of 2003:
43 State financial assistance to community colleges for alterations and
44 improvements to various facilities including services and expenses,
45 capital design, construction, acquisition, reconstruction, rehabili-
46 tation and equipment; for health and safety, preservation of facili-
47 ties, new facilities, program improvement or program change, envi-
48 ronmental protection, energy conservation, accreditation, facilities
49 for the physically disabled, preventive maintenance and related
78 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects, including costs incurred prior to April 1, 2003, and
2 subject to a plan submitted annually by the city university of New
3 York and approved by the state director of the budget (30020350) ...
4 5,000,000 ......................................... (re. $3,711,000)
5 The appropriation made by chapter 53, section 1, of the laws of 2003, is
6 hereby amended and reappropriated to read:
7 An advance for state financial assistance to community colleges for
8 alterations and improvements to various facilities including
9 services and expenses, capital design, construction, acquisition,
10 reconstruction, rehabilitation and equipment; for health and safety,
11 preservation of facilities, new facilities, program improvement or
12 program change, environmental protection, energy conservation,
13 accreditation, facilities for the physically disabled, and related
14 projects, including costs incurred prior to April 1, 2003, subject
15 to an annual plan developed by the city university and approved by
16 the state director of the budget, and which may include, but not be
17 limited to, projects in the following schedule. Notwithstanding any
18 other law to the contrary, all or a portion of the amounts hereby
19 appropriated may be suballocated or transferred to the dormitory
20 authority of the state of New York for such purpose (30050350) .....
21 50,000,000 ........................................ (re. $9,234,000)
22 Project Schedule
23 AMOUNT
24 --------------------------------------------
25 (thousands of dollars)
26 Medgar Evers College ................ 19,400
27 -Academic Building I
28 University-wide ..................... 30,600
29 -For university-wide critical
30 maintenance or capital im-
31 provement costs attributable
32 to the findings of condition
33 surveys for health and safety,
34 preservation of facilities and
35 access for the physically dis-
36 abled; code compliance; asbes-
37 tos removal; emergencies; en-
38 ergy conservation needs; fire
39 alarms, sprinklers, electrical
40 distribution and heating and
41 cooling system requirements;
42 and other similar campus-wide
43 and system-wide needs
44 ------------
45 Total ........................... 50,000
46 ============
79 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 53, section 1, of the laws of 1998, as
2 amended by chapter 53, section 1, of the laws of 2008, is hereby
3 amended and reappropriated to read:
4 An advance for state financial assistance to community colleges for
5 alterations and improvements to various facilities including capital
6 design, construction, acquisition, reconstruction, rehabilitation
7 and equipment; for health and safety, preservation of facilities,
8 new facilities, program improvement or program change, environmental
9 protection, energy conservation, accreditation, facilities for the
10 physically disabled, and related projects according to the following
11 project schedule. Notwithstanding any other law to the contrary, all
12 or a portion of the amounts hereby appropriated may be suballocated
13 or transferred to the dormitory authority of the state of New York
14 for such purpose (303198C1) ... 109,700,000 ...... (re. $50,391,000)
15 Project Schedule
16 AMOUNT
17 --------------------------------------------
18 (thousands of dollars)
19 For payment of up to one-
20 half of the total capital
21 costs for community
22 colleges for health and
23 safety projects based on
24 the results of building
25 condition surveys ............... 1,500
26 For payment of up to one-
27 half of the total capital
28 costs for community
29 colleges for asbestos
30 removal and abatement ........... 1,000
31 For payment of up to one-
32 half of the total capital
33 costs for community
34 colleges for preservation
35 of facilities projects
36 based on the results of
37 building condition surveys ...... 2,000
38 For payment of up to one-
39 half of the total capital
40 costs for community
41 colleges for making
42 facilities accessible to the
43 physically disabled based
44 on the results of building
45 condition surveys ............... 1,000
46 For payment of up to one-
47 half of the total capital
48 costs for community
80 12654-10-8
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 colleges for the
2 telecommunications initiative ... 2,000
3 For payment of up to one-
4 half of the total capital
5 costs for community
6 colleges for energy
7 conservation .................... 1,000
8 For payment of up to one-
9 half of the total capital
10 costs for community
11 colleges for the
12 educational technology
13 equipment initiative ............ 1,500
14 An additional advance for
15 state financial assistance
16 to community colleges for
17 alterations and
18 improvements to various
19 facilities including capital
20 design, construction,
21 acquisition, reconstruction,
22 rehabilitation and
23 equipment; for health and
24 safety, preservation of
25 facilities, new facilities,
26 program improvement or
27 program change, environ-
28 mental protection, energy
29 conservation, accredita-
30 tion, facilities for the
31 physically disabled, and
32 related projects according
33 to the following project
34 schedule (303198C1) ............ 99,700
35 --------------
36 Total ......................... 109,700
37 ==============
81 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 427,000,000 701,514,000
6 ---------------- ----------------
7 All Funds ........................ 427,000,000 701,514,000
8 ================ ================
9 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 92,000,000
10 --------------
11 Capital Projects Funds - Other
12 Correctional Facilities Capital Improvement Fund
13 Maintenance and Operations Purpose
14 For the maintenance and operation of various
15 facilities and systems including personal
16 services, fringe benefits and indirect
17 costs. Notwithstanding any other law to
18 the contrary, all or a portion of the
19 funds appropriated herein may be suballo-
20 cated or transferred to any department,
21 agency, or public authority (10FM18MO) ...... 92,000,000
22 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) ... 335,000,000
23 --------------
24 Capital Projects Funds - Other
25 Correctional Facilities Capital Improvement Fund
26 Administration Purpose
27 For the preparation and review of plans,
28 specifications, estimates, studies, plant
29 evaluations, inspections, appraisals and
30 surveys, and legal claims relating to
31 existing or proposed facilities of the
32 department of corrections and community
33 supervision, and payment of personal
34 service and nonpersonal service, including
35 fringe benefits, related to the adminis-
36 tration and security of capital projects
37 provided by the department of corrections
38 and community supervision for new and
39 reappropriated projects (10501850) .......... 17,000,000
40 Capital Projects Funds - Other
41 Correctional Facilities Capital Improvement Fund
42 Environmental Protection or Improvements Purpose
82 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2018-19
1 Alterations and improvements, including
2 related departmental administrative costs,
3 for environmental protection or improve-
4 ments including liabilities incurred prior
5 to April 1, 2018 (10061806) ................. 24,000,000
6 Capital Projects Funds - Other
7 Correctional Facilities Capital Improvement Fund
8 Health and Safety Purpose
9 Alterations and improvements, including
10 related departmental administrative costs,
11 for health and safety including liabil-
12 ities incurred prior to April 1, 2018
13 (10011801) .................................. 15,000,000
14 Capital Projects Funds - Other
15 Correctional Facilities Capital Improvement Fund
16 Preservation of Facilities Purpose
17 Alterations and improvements, including
18 related departmental administrative costs,
19 for the preservation of facilities includ-
20 ing liabilities incurred prior to April 1,
21 2018 (10031803) ............................ 166,000,000
22 Alterations and improvements, including
23 related departmental administrative costs,
24 for preventative maintenance that will
25 prolong the useful life of assets includ-
26 ing liabilities incurred prior to April 1,
27 2018 (10M31803) ............................. 15,000,000
28 Capital Projects Funds - Other
29 Correctional Facilities Capital Improvement Fund
30 Program Improvement or Program Change Purpose
31 Alterations and improvements, including
32 related departmental administrative costs,
33 for program improvement or program change
34 including liabilities incurred prior to
35 April 1, 2018 (10081808) .................... 95,000,000
36 Alterations and improvements within the
37 correctional industries program, including
38 related departmental administrative costs,
39 for program improvement or program change
40 including liabilities incurred prior to
41 April 1, 2018 (10IN1808) ..................... 3,000,000
83 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
2 Capital Projects Funds - Other
3 Correctional Facilities Capital Improvement Fund
4 Maintenance and Operations Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For the maintenance and operation of various facilities and systems
7 including personal services, fringe benefits and indirect costs.
8 Notwithstanding any other law to the contrary, all or a portion of
9 the funds appropriated herein may be suballocated or transferred to
10 any department, agency, or public authority [(10FM1703)] (10FM17MO)
11 ... 91,000,000 ................................... (re. $79,017,000)
12 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
13 Capital Projects Funds - Other
14 Correctional Facilities Capital Improvement Fund
15 Administration Purpose
16 By chapter 54, section 1, of the laws of 2017:
17 For the preparation and review of plans, specifications, estimates,
18 studies, plant evaluations, inspections, appraisals and surveys, and
19 legal claims relating to existing or proposed facilities of the
20 department of corrections and community supervision, and payment of
21 personal service and nonpersonal service, including fringe benefits,
22 related to the administration and security of capital projects
23 provided by the department of corrections and community supervision
24 for new and reappropriated projects (10501750) .....................
25 17,000,000 ....................................... (re. $10,990,000)
26 By chapter 55, section 1, of the laws of 2016:
27 For the preparation and review of plans, specifications, estimates,
28 studies, plant evaluations, inspections, appraisals and surveys, and
29 legal claims relating to existing or proposed facilities of the
30 department of corrections and community supervision, and payment of
31 personal service and nonpersonal service, including fringe benefits,
32 related to the administration and security of capital projects
33 provided by the department of corrections and community supervision
34 for new and reappropriated projects (10501650) .....................
35 17,000,000 ........................................ (re. $3,121,000)
36 By chapter 54, section 1, of the laws of 2015:
37 For the preparation and review of plans, specifications, estimates,
38 studies, plant evaluations, inspections, appraisals and surveys, and
39 legal claims relating to existing or proposed facilities of the
40 department of corrections and community supervision, and payment of
41 personal service and nonpersonal service, including fringe benefits,
42 related to the administration and security of capital projects
43 provided by the department of corrections and community supervision
44 for new and reappropriated projects (10501550) .....................
45 15,000,000 ........................................ (re. $1,236,000)
84 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2014:
2 For the preparation and review of plans, specifications, estimates,
3 studies, plant evaluations, inspections, appraisals and surveys, and
4 legal claims relating to existing or proposed facilities of the
5 department of corrections and community supervision, and payment of
6 personal service and nonpersonal service, including fringe benefits,
7 related to the administration and security of capital projects
8 provided by the department of corrections and community supervision
9 for new and reappropriated projects (10501450) .....................
10 15,000,000 ........................................ (re. $1,815,000)
11 By chapter 50, section 1, of the laws of 2009:
12 For the preparation and review of plans, specifications, estimates,
13 studies, plant evaluations, inspections, appraisals and surveys, and
14 legal claims relating to existing or proposed facilities of the
15 department of correctional services, and payment of personal service
16 and nonpersonal service, including fringe benefits, related to the
17 administration and security of capital projects provided by the
18 department of correctional services for new and reappropriated
19 projects (10500950) ... 15,000,000 .................. (re. $250,000)
20 Capital Projects Funds - Other
21 Correctional Facilities Capital Improvement Fund
22 Environmental Protection or Improvements Purpose
23 By chapter 54, section 1, of the laws of 2017:
24 Alterations and improvements, including related departmental adminis-
25 trative costs, for environmental protection or improvements includ-
26 ing liabilities incurred prior to April 1, 2017 (10061706) ...
27 24,000,000 ....................................... (re. $24,000,000)
28 By chapter 55, section 1, of the laws of 2016:
29 Alterations and improvements, including related departmental adminis-
30 trative costs, for environmental protection or improvements includ-
31 ing liabilities incurred prior to April 1, 2016 (10061606) .........
32 62,000,000 ....................................... (re. $39,453,000)
33 By chapter 54, section 1, of the laws of 2013:
34 Alterations and improvements, including related departmental adminis-
35 trative costs, for environmental protection or improvements includ-
36 ing liabilities incurred prior to April 1, 2013 (10061306) .........
37 28,000,000 ........................................ (re. $8,411,000)
38 By chapter 54, section 1, of the laws of 2012:
39 Alterations and improvements, including related departmental adminis-
40 trative costs, for environmental protection or improvements includ-
41 ing liabilities incurred prior to April 1, 2012 (10061206) .........
42 24,000,000 ........................................ (re. $2,664,000)
43 By chapter 54, section 1, of the laws of 2011:
44 Alterations and improvements, including related departmental adminis-
45 trative costs, for environmental protection or improvements includ-
85 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ing liabilities incurred prior to April 1, 2011 (10061106) .........
2 24,000,000 .......................................... (re. $400,000)
3 By chapter 50, section 1, of the laws of 2010:
4 Alterations and improvements, including related departmental adminis-
5 trative costs, for environmental protection or improvements includ-
6 ing liabilities incurred prior to April 1, 2010 (10061006) .........
7 24,000,000 ............................................ (re. $4,000)
8 Capital Projects Funds - Other
9 Correctional Facilities Capital Improvement Fund
10 Facilities for the Physically Disabled Purpose
11 By chapter 54, section 1, of the laws of 2000:
12 Alterations and improvements, including related departmental adminis-
13 trative costs, of facilities for the physically disabled including
14 liabilities incurred prior to April 1, 2000 (10A40004) .............
15 2,000,000 ............................................ (re. $74,000)
16 Capital Projects Funds - Other
17 Correctional Facilities Capital Improvement Fund
18 Health and Safety Purpose
19 By chapter 54, section 1, of the laws of 2017:
20 Alterations and improvements, including related departmental adminis-
21 trative costs, for health and safety including liabilities incurred
22 prior to April 1, 2017 (10011701) ..................................
23 15,000,000 ....................................... (re. $15,000,000)
24 By chapter 55, section 1, of the laws of 2016:
25 Alterations and improvements, including related departmental adminis-
26 trative costs, for health and safety including liabilities incurred
27 prior to April 1, 2016 (10011601) ..................................
28 23,000,000 ....................................... (re. $19,996,000)
29 By chapter 54, section 1, of the laws of 2013:
30 Alterations and improvements, including related departmental adminis-
31 trative costs, for health and safety including liabilities incurred
32 prior to April 1, 2013 (10011301) ..................................
33 22,000,000 ....................................... (re. $10,437,000)
34 By chapter 54, section 1, of the laws of 2012:
35 Alterations and improvements, including related departmental adminis-
36 trative costs, for health and safety including liabilities incurred
37 prior to April 1, 2012 (10011201) ..................................
38 36,000,000 ........................................ (re. $4,521,000)
39 By chapter 54, section 1, of the laws of 2011:
40 Alterations and improvements, including related departmental adminis-
41 trative costs, for health and safety including liabilities incurred
42 prior to April 1, 2011 (10011101) ..................................
43 16,000,000 ........................................ (re. $1,048,000)
86 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 50, section 1, of the laws of 2010:
2 Alterations and improvements, including related departmental adminis-
3 trative costs, for health and safety including liabilities incurred
4 prior to April 1, 2010 (10011001) ... 16,000,000 ...... (re. $3,000)
5 By chapter 50, section 1, of the laws of 2009:
6 Alterations and improvements, including related departmental adminis-
7 trative costs, for health and safety including liabilities incurred
8 prior to April 1, 2009 (10010901) ... 16,000,000 .... (re. $208,000)
9 By chapter 50, section 1, of the laws of 2008:
10 Alterations and improvements, including related departmental adminis-
11 trative costs, for health and safety including liabilities incurred
12 prior to April 1, 2008 (10010801) ... 10,000,000 ...... (re. $5,000)
13 By chapter 50, section 1, of the laws of 2007:
14 Alterations and improvements, including related departmental adminis-
15 trative costs, for health and safety including liabilities incurred
16 prior to April 1, 2007 (10010701) ... 20,000,000 ..... (re. $19,000)
17 By chapter 50, section 1, of the laws of 2006:
18 Alterations and improvements, including related departmental adminis-
19 trative costs, for health and safety including liabilities incurred
20 prior to April 1, 2006 (10010601) ... 20,000,000 .... (re. $193,000)
21 By chapter 50, section 1, of the laws of 2005:
22 Alterations and improvements, including related departmental adminis-
23 trative costs, for health and safety including liabilities incurred
24 prior to April 1, 2005 (10010501) ... 30,000,000 ...... (re. $8,000)
25 By chapter 50, section 1, of the laws of 2004:
26 Alterations and improvements, including related departmental adminis-
27 trative costs, for health and safety including liabilities incurred
28 prior to April 1, 2004 (10010401) ... 30,000,000 ..... (re. $47,000)
29 By chapter 50, section 1, of the laws of 2003:
30 Alterations and improvements, including related departmental adminis-
31 trative costs, for health and safety including liabilities incurred
32 prior to April 1, 2003 (10010301) ... 30,000,000 ...... (re. $4,000)
33 Capital Projects Funds - Other
34 Correctional Facilities Capital Improvement Fund
35 Medical Facilities Purpose
36 By chapter 54, section 1, of the laws of 2000:
37 For the cost of studies, site acquisitions, planning, design,
38 construction, reconstruction, renovation, and equipment related to
39 the development of medical facilities, departmental administrative
40 costs including liabilities incurred prior to April 1, 2000
41 (10M200MC) ... 15,000,000 ......................... (re. $1,248,000)
42 Capital Projects Funds - Other
87 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Correctional Facilities Capital Improvement Fund
2 Preservation of Facilities Purpose
3 By chapter 54, section 1, of the laws of 2017:
4 Alterations and improvements, including related departmental adminis-
5 trative costs, for the preservation of facilities including liabil-
6 ities incurred prior to April 1, 2017 (10031703) ...................
7 141,000,000 ..................................... (re. $139,539,000)
8 Alterations and improvements, including related departmental adminis-
9 trative costs, for preventative maintenance that will prolong the
10 useful life of assets including liabilities incurred prior to April
11 1, 2017 (10M31703) ... 15,000,000 ................ (re. $14,900,000)
12 By chapter 55, section 1, of the laws of 2016:
13 Alterations and improvements, including related departmental adminis-
14 trative costs, for the preservation of facilities including liabil-
15 ities incurred prior to April 1, 2016 (10031603) ...................
16 92,000,000 ....................................... (re. $61,833,000)
17 Alterations and improvements, including related departmental adminis-
18 trative costs, for preventative maintenance that will prolong the
19 useful life of assets including liabilities incurred prior to April
20 1, 2016 (10M31603) ... 15,000,000 ................. (re. $8,485,000)
21 By chapter 54, section 1, of the laws of 2013:
22 Alterations and improvements, including related departmental adminis-
23 trative costs, for the preservation of facilities including liabil-
24 ities incurred prior to April 1, 2013 (10031303) ...................
25 186,000,000 ...................................... (re. $47,774,000)
26 Alterations and improvements, including related departmental adminis-
27 trative costs, for preventative maintenance that will prolong the
28 useful life of assets including liabilities incurred prior to April
29 1, 2013 (10M31303) ... 13,000,000 ................. (re. $4,425,000)
30 By chapter 54, section 1, of the laws of 2012:
31 Alterations and improvements, including related departmental adminis-
32 trative costs, for the preservation of facilities including liabil-
33 ities incurred prior to April 1, 2012 (10031203) ...................
34 174,000,000 ...................................... (re. $18,989,000)
35 Alterations and improvements, including related departmental adminis-
36 trative costs, for preventative maintenance that will prolong the
37 useful life of assets including liabilities incurred prior to April
38 1, 2012 (10M31203) ... 15,000,000 ................. (re. $2,519,000)
39 By chapter 54, section 1, of the laws of 2011:
40 Alterations and improvements, including related departmental adminis-
41 trative costs, for the preservation of facilities including liabil-
42 ities incurred prior to April 1, 2011 (10031103) ...................
43 174,000,000 ...................................... (re. $10,773,000)
44 Alterations and improvements, including related departmental adminis-
45 trative costs, for preventative maintenance that will prolong the
46 useful life of assets including liabilities incurred prior to April
47 1, 2011 (10M31103) ... 15,000,000 ................... (re. $765,000)
88 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 50, section 1, of the laws of 2010:
2 Alterations and improvements, including related departmental adminis-
3 trative costs, for the preservation of facilities including liabil-
4 ities incurred prior to April 1, 2010 (10031003) ...................
5 174,000,000 ....................................... (re. $5,350,000)
6 Alterations and improvements, including related departmental adminis-
7 trative costs, for preventative maintenance that will prolong the
8 useful life of assets including liabilities incurred prior to April
9 1, 2010 (10M31003) ... 15,000,000 .................... (re. $24,000)
10 By chapter 50, section 1, of the laws of 2009:
11 Alterations and improvements, including related departmental adminis-
12 trative costs, for the preservation of facilities including liabil-
13 ities incurred prior to April 1, 2009 (10030903) ...................
14 165,000,000 ......................................... (re. $864,000)
15 Alterations and improvements, including related departmental adminis-
16 trative costs, for preventative maintenance that will prolong the
17 useful life of assets including liabilities incurred prior to April
18 1, 2009 (10M30903) ... 15,000,000 ..................... (re. $5,000)
19 By chapter 50, section 1, of the laws of 2008:
20 Alterations and improvements, including related departmental adminis-
21 trative costs, for the preservation of facilities including liabil-
22 ities incurred prior to April 1, 2008 (10030803) ...................
23 170,000,000 ......................................... (re. $472,000)
24 Alterations and improvements, including related departmental adminis-
25 trative costs, for preventative maintenance that will prolong the
26 useful life of assets including liabilities incurred prior to April
27 1, 2008 (10M30803) ... 15,000,000 ................... (re. $108,000)
28 By chapter 50, section 1, of the laws of 2007:
29 Alterations and improvements, including related departmental adminis-
30 trative costs, for the preservation of facilities including liabil-
31 ities incurred prior to April 1, 2007 (10030703) ...................
32 147,000,000 ......................................... (re. $724,000)
33 By chapter 50, section 1, of the laws of 2006:
34 Alterations and improvements, including related departmental adminis-
35 trative costs, for the preservation of facilities including liabil-
36 ities incurred prior to April 1, 2006 (10030603) ...................
37 137,000,000 ......................................... (re. $298,000)
38 Alterations and improvements, including related departmental adminis-
39 trative costs, for preventative maintenance that will prolong the
40 useful life of assets including liabilities incurred prior to April
41 1, 2006 (10M30603) ... 15,000,000 .................... (re. $31,000)
42 For services and expenses associated with improvements and rehabili-
43 tation of the department of correctional services employee housing
44 units at locations including but not limited to Great Meadow in
45 Washington County, and the Willard Drug Treatment Campus in Seneca
46 County, pursuant to a plan developed by the commissioner of the
47 department of correctional services and submitted to the chair of
89 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the senate finance committee and the chair of the assembly ways and
2 means committee (10EH0603) ... 1,300,000 ............ (re. $349,000)
3 By chapter 50, section 1, of the laws of 2005:
4 Alterations and improvements, including related departmental adminis-
5 trative costs, for the preservation of facilities including liabil-
6 ities incurred prior to April 1, 2005 (10030503) ...................
7 95,000,000 ........................................... (re. $23,000)
8 Alterations and improvements, including related departmental adminis-
9 trative costs, for preventative maintenance that will prolong the
10 useful life of assets including liabilities incurred prior to April
11 1, 2005 (10M30503) ... 15,000,000 ..................... (re. $2,000)
12 By chapter 50, section 1, of the laws of 2003:
13 Alterations and improvements, including related departmental adminis-
14 trative costs, for the preservation of facilities including liabil-
15 ities incurred prior to April 1, 2003 (10030303) ...................
16 95,000,000 ........................................... (re. $11,000)
17 Capital Projects Funds - Other
18 Correctional Facilities Capital Improvement Fund
19 Program Improvement or Program Change Purpose
20 By chapter 54, section 1, of the laws of 2017:
21 Alterations and improvements, including related departmental adminis-
22 trative costs, for program improvement or program change including
23 liabilities incurred prior to April 1, 2017 (10081708) .............
24 95,000,000 ....................................... (re. $94,319,000)
25 Alterations and improvements within the correctional industries
26 program, including related departmental administrative costs, for
27 program improvement or program change including liabilities incurred
28 prior to April 1, 2017 (10IN1708) ... 3,000,000 ... (re. $3,000,000)
29 By chapter 55, section 1, of the laws of 2016:
30 Alterations and improvements, including related departmental adminis-
31 trative costs, for program improvement or program change including
32 liabilities incurred prior to April 1, 2016 (10081608) .............
33 69,000,000 ....................................... (re. $38,068,000)
34 By chapter 54, section 1, of the laws of 2013:
35 Alterations and improvements, including related departmental adminis-
36 trative costs, for program improvement or program change including
37 liabilities incurred prior to April 1, 2013 (10081308) .............
38 46,000,000 ....................................... (re. $19,190,000)
39 By chapter 54, section 1, of the laws of 2012:
40 Alterations and improvements, including related departmental adminis-
41 trative costs, for program improvement or program change including
42 liabilities incurred prior to April 1, 2012 (10081208) .............
43 56,000,000 .......................................... (re. $909,000)
44 By chapter 54, section 1, of the laws of 2011:
90 12654-10-8
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements, including related departmental adminis-
2 trative costs, for program improvement or program change including
3 liabilities incurred prior to April 1, 2011 (10081108) .............
4 76,000,000 ........................................ (re. $1,367,000)
5 By chapter 50, section 1, of the laws of 2010:
6 Alterations and improvements, including related departmental adminis-
7 trative costs, for program improvement or program change including
8 liabilities incurred prior to April 1, 2010 (10081008) .............
9 76,000,000 .......................................... (re. $537,000)
10 By chapter 50, section 1, of the laws of 2009:
11 Alterations and improvements, including related departmental adminis-
12 trative costs, for program improvement or program change including
13 liabilities incurred prior to April 1, 2009 (10080908) .............
14 90,000,000 ........................................ (re. $2,648,000)
15 By chapter 50, section 1, of the laws of 2008:
16 Alterations and improvements, including related departmental adminis-
17 trative costs, for program improvement or program change including
18 liabilities incurred prior to April 1, 2008 (10080808) .............
19 85,000,000 .......................................... (re. $668,000)
20 By chapter 50, section 1, of the laws of 2007:
21 Alterations and improvements, including related departmental adminis-
22 trative costs, for program improvement or program change including
23 liabilities incurred prior to April 1, 2007 (10080708) .............
24 87,000,000 ........................................... (re. $86,000)
25 By chapter 50, section 1, of the laws of 2006:
26 Alterations and improvements, including related departmental adminis-
27 trative costs, for program improvement or program change including
28 liabilities incurred prior to April 1, 2006 (10080608) .............
29 44,000,000 .......................................... (re. $129,000)
30 By chapter 50, section 1, of the laws of 2005:
31 Alterations and improvements, including related departmental adminis-
32 trative costs, for program improvement or program change including
33 liabilities incurred prior to April 1, 2005 (10080508) .............
34 40,000,000 ............................................ (re. $5,000)
91 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 63,700,000 4,153,308,000
6 ---------------- ----------------
7 All Funds ........................ 63,700,000 4,153,308,000
8 ================ ================
9 ADMINISTRATION (CCP) ......................................... 3,400,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 For various minor rehabilitation projects to
15 keep facilities in a safe operating condi-
16 tion subject to a plan developed by the
17 education department and approved by the
18 director of the budget (11021803) ............ 3,400,000
19 BREAKFAST AFTER THE BELL EQUIPMENT GRANTS (CCP) .............. 7,000,000
20 --------------
21 Capital Projects Funds - Other
22 Capital Projects Fund
23 Program Improvement/Change Purpose
24 For grants to public elementary or secondary
25 schools required to implement the break-
26 fast after the bell school breakfast
27 program beginning in the 2018-19 school
28 year pursuant to a chapter of the laws of
29 2018 for equipment purchases, provided,
30 however, that such grants shall be limited
31 to no more than $5,000 per school, and
32 shall be awarded based on an application
33 developed by the state education depart-
34 ment. Eligible equipment purchases shall
35 include, but not be limited to, equipment
36 used for the storage, preservation, or
37 distribution of food (11BB1808) .............. 7,000,000
38 LIBRARY CONSTRUCTION (CCP) .................................. 34,000,000
39 --------------
40 Capital Projects Funds - Other
41 Capital Projects Fund
42 Program Improvement/Change Purpose
92 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2018-19
1 For total approved project costs pursuant to
2 section 273-a of the education law, for
3 approved projects, excluding feasibility
4 studies, plans or similar activities, for
5 the acquisition of vacant land and the
6 acquisition, construction, renovation or
7 rehabilitation, including leasehold
8 improvements, of buildings of public
9 libraries and library systems chartered by
10 the regents of the state of New York or
11 established by an act of the legislature,
12 subject to distribution provisions in
13 subdivision 5 of section 273-a of the
14 education law on and upon approval by the
15 commissioner (11001808) ..................... 14,000,000
16 For additional total approved project costs
17 pursuant to section 273-a of the education
18 law, for approved projects, excluding
19 feasibility studies, plans or similar
20 activities, for the acquisition of vacant
21 land and the acquisition, construction,
22 renovation or rehabilitation, including
23 projects related to health and safety and
24 the Americans with Disabilities Act of
25 1990 and leasehold improvements, of build-
26 ings of public libraries and library
27 systems chartered by the regents of the
28 state of New York or established by an act
29 of the legislature, subject to distrib-
30 ution provisions in subdivision 5 of
31 section 273-a of the education law on and
32 upon approval by the commissioner
33 (11001808) .................................. 20,000,000
34 NON-PUBLIC SCHOOL HEALTH AND SAFETY EQUIPMENT PROJECTS
35 (CCP) ..................................................... 15,000,000
36 --------------
37 Capital Projects Funds - Other
38 Capital Projects Fund
39 Health and Safety Purpose
40 For services and expenses of health and
41 safety equipment, security personnel and
42 related assessments and training needs for
43 Nonpublic Schools, provided, however, that
44 no more than $4,500,000 of the funds
45 appropriated herein shall be made avail-
46 able prior to April 1, 2019 (11SE1801) ...... 15,000,000
47 OFFICE OF THE PROFESSIONS ELECTRONIC LICENSING SYSTEM
48 (CCP) ...................................................... 4,300,000
93 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2018-19
1 --------------
2 Capital Projects Fund - Other
3 Miscellaneous Capital Projects Fund
4 Office of the Professions Electronic Licensing Account
5 Program Improvement/Change Purpose
6 For services and expenses related to the
7 development of an electronic licensing
8 system for the office of the professions,
9 including but not limited to equipment,
10 software, hardware and services, subject
11 to a plan developed by the education
12 department in conjunction with the office
13 of information technology services and
14 approved by the director of the budget.
15 Funds appropriated herein may be suballo-
16 cated to any other state department, agen-
17 cy, or public benefit corporation, to
18 achieve the purpose of this appropriation
19 (11EL1808) ................................... 4,300,000
94 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ADMINISTRATION (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Preservation of Facilities Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For various minor rehabilitation projects to keep facilities in a safe
7 operating condition subject to a plan developed by the education
8 department and approved by the director of the budget (11021703) ...
9 3,400,000 ......................................... (re. $3,400,000)
10 By chapter 55, section 1, of the laws of 2016:
11 For various minor rehabilitation projects to keep facilities in a safe
12 operating condition subject to a plan developed by the education
13 department and approved by the director of the budget (11021603) ...
14 3,400,000 ......................................... (re. $2,854,000)
15 By chapter 54, section 1, of the laws of 2015:
16 For various minor rehabilitation projects to keep facilities in a safe
17 operating condition subject to a plan developed by the education
18 department and approved by the director of the budget (11021503) ...
19 3,400,000 ......................................... (re. $1,709,000)
20 By chapter 54, section 1, of the laws of 2014:
21 For various minor rehabilitation projects to keep facilities in a safe
22 operating condition subject to a plan developed by the education
23 department and approved by the director of the budget (11021403) ...
24 3,400,000 ......................................... (re. $1,343,000)
25 By chapter 54, section 1, of the laws of 2013:
26 For various minor rehabilitation projects to keep facilities in a safe
27 operating condition, including but not limited to fire alarm system
28 and security system upgrades at the School for the Blind at Batavia,
29 subject to a plan developed by the education department and approved
30 by the director of the budget (11021303) ...........................
31 3,400,000 ......................................... (re. $2,069,000)
32 By chapter 54, section 1, of the laws of 2012:
33 For various minor rehabilitation projects to keep facilities in a safe
34 operating condition subject to a plan developed by the education
35 department and approved by the director of the budget (11021203) ...
36 3,400,000 ........................................... (re. $219,000)
37 By chapter 54, section 1, of the laws of 2011:
38 For various minor rehabilitation projects to keep facilities in a safe
39 operating condition subject to a plan developed by the education
40 department and approved by the director of the budget (11021103) ...
41 3,400,000 ........................................... (re. $444,000)
42 By chapter 53, section 1, of the laws of 2010:
95 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For various minor rehabilitation projects to keep facilities in a safe
2 operating condition subject to a plan developed by the education
3 department and approved by the director of the budget (11021003) ...
4 6,800,000 ........................................... (re. $329,000)
5 By chapter 53, section 1, of the laws of 2009:
6 For various minor rehabilitation projects to keep facilities in a safe
7 operating condition subject to a plan developed by the education
8 department and approved by the director of the budget (11020903) ...
9 2,000,000 ........................................... (re. $410,000)
10 By chapter 53, section 1, of the laws of 2008:
11 For various minor rehabilitation projects to keep facilities in a safe
12 operating condition subject to a plan developed by the education
13 department and approved by the director of the budget (11090803) ...
14 1,000,000 ........................................... (re. $124,000)
15 By chapter 53, section 1, of the laws of 2006:
16 For various minor rehabilitation projects to keep facilities in a safe
17 operating condition subject to a plan developed by the education
18 department and approved by the director of the budget (11020603) ...
19 2,400,000 ............................................. (re. $6,000)
20 Capital Projects Funds - Other
21 Capital Projects Fund
22 Program Improvement/Change Purpose
23 By chapter 54, section 1, of the laws of 2017:
24 For services and expenses related to the development and implementa-
25 tion of data systems for the education department, including but not
26 limited to facilities management, state aid, and special education
27 providers. Provided however that the use of funds appropriated here-
28 in shall be subject to a plan developed by the education department
29 in consultation with the office of information technology services
30 and approved by the director of the budget (11031708) ..............
31 2,000,000 ......................................... (re. $2,000,000)
32 By chapter 100, section 2, of the laws of 2010, as amended by chapter
33 54, section 1, of the laws of 2011:
34 For services and expenses related to implementing a state longitudinal
35 data system including but not limited to the development and
36 purchase of computer hardware, software, and related equipment, such
37 amount shall include expenses to be made by the State University of
38 New York and the City University of New York provided that the
39 amount appropriated herein shall be subject to a plan developed by
40 the education department and approved by the director of the budget.
41 Notwithstanding any other provision of law to the contrary and subject
42 to the approval of the director of the budget, a portion of the
43 funds appropriated herein may be transferred to the State University
44 of New York and City University of New York to carry out the
45 purposes of this appropriation (11031008) ..........................
46 20,400,000 ....................................... (re. $10,220,000)
96 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 CULTURAL EDUCATION CENTER (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Health and Safety Purpose
5 By chapter 53, section 1, of the laws of 2008:
6 For the construction of an alternate emergency exit in the cultural
7 education center (11010801) ... 2,250,000 ............ (re. $65,000)
8 For fire safety system upgrades, environmental controls, and the reno-
9 vation of restrooms in the cultural education center (11030801) ....
10 2,500,000 ........................................... (re. $647,000)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 By chapter 53, section 1, of the laws of 2004, as amended by chapter 62,
15 section 3, of the laws of 2005:
16 For minor rehabilitation projects to keep facilities in a safe operat-
17 ing condition subject to a plan developed by the education depart-
18 ment and approved by the director of the budget (11020403) .........
19 1,000,000 ............................................ (re. $45,000)
20 By chapter 53, section 1, of the laws of 2002, as amended by chapter 55,
21 section 1, of the laws of 2016:
22 For renovation projects to preserve and revamp the collections and
23 exhibits of the state museum, library and archives subject to a plan
24 approved by the director of the budget (11030203) ..................
25 5,000,000 ......................................... (re. $4,490,000)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Program Improvement/Change Purpose
29 By chapter 53, section 1, of the laws of 2008:
30 An advance for projects to enhance the public display of the
31 collections and exhibits of the state museum, library and archives,
32 subject to a plan jointly submitted by the board of the cultural
33 education trust and the state education department and approved by
34 the director of the budget (11020808) ..............................
35 15,000,000 ....................................... (re. $13,501,000)
36 For preservation and stewardship of collections in the cultural educa-
37 tion center, including environmental controls, the preservation of
38 records, and the purchase and installment of map and microform cabi-
39 nets, compact shelving, and museum cabinetry (11060808) ............
40 4,325,000 ......................................... (re. $1,361,000)
41 CULTURAL EDUCATION STORAGE FACILITY (CCP)
42 Capital Projects Funds - Other
43 Capital Projects Fund
97 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 New Facilities Purpose
2 By chapter 53, section 1, of the laws of 2007, as amended by chapter 55,
3 section 1, of the laws of 2016:
4 Cultural education storage facility. For costs of a new storage facil-
5 ity for the collections of the state museum, library and archives,
6 subject to a plan jointly submitted by the board of the cultural
7 education trust and the cultural education department and approved
8 by the division of the budget provided, however, that a portion of
9 the funds appropriated herein may be used to conduct a feasibility
10 study and a land review prior to the submission of such plan
11 (11010707) ... 60,000,000 ........................ (re. $60,000,000)
12 EDUCATION BUILDING (CCP)
13 Capital Projects Funds - Other
14 Capital Projects Fund
15 Preservation of Facilities Purpose
16 By chapter 53, section 1, of the laws of 2006:
17 For partial roof replacement of the education building and education
18 building addition to keep facilities in a safe operating condition
19 subject to a plan developed by the education department and approved
20 by the director of the budget (11030603) ...........................
21 1,700,000 ........................................... (re. $178,000)
22 LIBRARY CONSTRUCTION (CCP)
23 Capital Projects Funds - Other
24 Capital Projects Fund
25 Program Improvement/Change Purpose
26 The appropriation made by chapter 54, section 1, of the laws of 2017, as
27 supplemented by a transfer in accordance with state finance law, is
28 hereby amended and reappropriated to read:
29 For total approved project costs pursuant to section 273-a of the
30 education law, for approved projects, excluding feasibility studies,
31 plans or similar activities, for the acquisition of vacant land and
32 the acquisition, construction, renovation or rehabilitation, includ-
33 ing leasehold improvements, of buildings of public libraries and
34 library systems chartered by the regents of the state of New York or
35 established by an act of the legislature, subject to distribution
36 provisions in subdivision 5 of section 273-a of the education law on
37 and upon approval by the commissioner (11011708) ...................
38 [14,000,000] 24,000,000 .......................... (re. $24,000,000)
39 The appropriation made by chapter 55, section 1, of the laws of 2016, as
40 supplemented by a transfer in accordance with state finance law, is
41 hereby amended and reappropriated to read:
42 For total approved project costs pursuant to section 273-a of the
43 education law, for approved projects, excluding feasibility studies,
44 plans or similar activities, for the acquisition of vacant land and
98 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the acquisition, construction, renovation or rehabilitation, includ-
2 ing leasehold improvements, of buildings of public libraries and
3 library systems chartered by the regents of the state of New York or
4 established by an act of the legislature, subject to distribution
5 provisions in subdivision 5 of section 273-a of the education law on
6 and upon approval by the commissioner (11011608) ...................
7 [14,000,000] 19,000,000 ........................... (re. $2,035,000)
8 By chapter 54, section 1, of the laws of 2015:
9 For total approved project costs pursuant to section 273-a of the
10 education law, for approved projects, excluding feasibility studies,
11 plans or similar activities, for the acquisition of vacant land and
12 the acquisition, construction, renovation or rehabilitation, includ-
13 ing leasehold improvements, of buildings of public libraries and
14 library systems chartered by the regents of the state of New York or
15 established by an act of the legislature, subject to distribution
16 provisions in subdivision 5 of section 273-a of the education law on
17 and upon approval by the commissioner (11011508) ...................
18 14,000,000 .......................................... (re. $796,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For total approved project costs pursuant to section 273-a of the
21 education law, for approved projects, excluding feasibility studies,
22 plans or similar activities, for the acquisition of vacant land and
23 the acquisition, construction, renovation or rehabilitation, includ-
24 ing leasehold improvements, of buildings of public libraries and
25 library systems chartered by the regents of the state of New York or
26 established by an act of the legislature, subject to distribution
27 provisions in subdivision 5 of section 273-a of the education law on
28 and upon approval by the commissioner (11011408) ...................
29 14,000,000 .......................................... (re. $207,000)
30 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
31 section 1, of the laws of 2014:
32 For total approved project costs pursuant to section 273-a of the
33 education law, for approved projects, excluding feasibility studies,
34 plans or similar activities, for the acquisition of vacant land and
35 the acquisition, construction, renovation or rehabilitation, includ-
36 ing leasehold improvements, of buildings of public libraries and
37 library systems chartered by the regents of the state of New York or
38 established by an act of the legislature, subject to distribution
39 provisions in subdivision 5 of section 273-a of the education law on
40 and upon approval by the commissioner (11011308) ...................
41 14,000,000 ........................................... (re. $42,000)
42 NON-PUBLIC SCHOOL HEALTH AND SAFETY EQUIPMENT PROJECTS (CCP)
43 Capital Projects Funds - Other
44 Capital Projects Fund
45 Health and Safety Purpose
99 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 53, section 1, of the laws of 2017, as
2 added by chapter 50, section 2, of the laws of 2017, to the office
3 of prekindergarten through grade twelve education program, general
4 fund, local assistance account - 10000, is hereby transferred and
5 reappropriated to the non-public school health and safety equipment
6 projects (CCP), capital projects funds - other, capital project
7 fund, health and safety purpose:
8 For services and expenses of health and safety equipment, security
9 personnel and related assessments and training needs for Nonpublic
10 Schools, provided, however, that no more than $4,500,000 of the
11 funds appropriated herein shall be made available prior to April 1,
12 2018 [(21715)] (11SE1701) ... 15,000,000 ......... (re. $15,000,000)
13 The appropriation made by chapter 53, section 1, of the laws of 2016, as
14 amended by chapter 50, section 2, of the laws of 2017, to the office
15 of prekindergarten through grade twelve education program, general
16 fund, local assistance account - 10000, is hereby transferred and
17 reappropriated to the non-public school health and safety equipment
18 projects (CCP), capital projects funds - other, capital project
19 fund, health and safety purpose:
20 For services and expenses of health and safety equipment, security
21 personnel and related assessments and training needs for Nonpublic
22 Schools, provided, however, that no more than $4,500,000 of the
23 funds appropriated herein shall be made available prior to April 1,
24 2017 [(21715)] (11SE1601) ... 15,000,000 ......... (re. $12,900,000)
25 The appropriation made by chapter 53, section 1, of the laws of 2015, as
26 added by chapter 61, section 1, of the laws of 2015, to the office
27 of prekindergarten through grade twelve education program, general
28 fund, local assistance account - 10000, is hereby transferred and
29 reappropriated to the non-public school health and safety equipment
30 projects (CCP), capital projects funds - other, capital project
31 fund, health and safety purpose:
32 For services and expenses of Safety Equipment for Nonpublic Schools
33 [(21715)] (11SE1501) ... 4,500,000 ................ (re. $1,600,000)
34 The appropriation made by chapter 53, section 1, of the laws of 2014, as
35 added by chapter 73, section 1 of part D, of the laws of 2016, to
36 the office of prekindergarten through grade twelve education
37 program, general fund, local assistance account - 10000, is hereby
38 transferred and reappropriated to the non-public school health and
39 safety equipment projects (CCP), capital projects funds - other,
40 capital project fund, health and safety purpose:
41 For services and expenses of Safety Equipment for Nonpublic Schools
42 (11SE1401) ... 4,500,000 .......................... (re. $1,500,000)
43 The appropriation made by chapter 53, section 1, of the laws of 2013, to
44 the office of prekindergarten through grade twelve education
45 program, general fund, local assistance account - 10000, is hereby
46 transferred and reappropriated to the non-public school health and
47 safety equipment projects (CCP), capital projects funds - other,
48 capital project fund, health and safety purpose:
100 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses of Safety Equipment for Nonpublic Schools
2 (11SE1301) ... 4,500,000 ............................ (re. $885,000)
3 NON-PUBLIC SCHOOL TECHNOLOGY PROJECTS (CCP)
4 Capital Projects Funds - Other
5 Capital Projects Fund
6 Program Improvement/Change Purpose
7 By chapter 54, section 1, of the laws of 2017:
8 For payment of the costs of capital projects undertaken by or on
9 behalf of school districts for the acquisition of smart schools
10 classroom technology to be loaned to children attending a nonpublic
11 school located in the school district, except a nonpublic school to
12 which tuition is paid under articles 85 or 89 of the education law,
13 in accordance with the requirements of section 755 of the education
14 law and guidelines developed by the commissioner of education, in
15 connection with the smart schools investment plans first submitted
16 to the education department prior to April 15, 2017 and approved by
17 the smart schools review board pursuant to subdivision 16 of section
18 3641 of the education law.
19 Each school district shall be eligible to receive an allocation from
20 the funds appropriated herein equal to the product of the enrollment
21 of all such nonpublic schools in the 2014-15 school year multiplied
22 by the per pupil amount, provided that the liability of the state
23 and the amount to be distributed or otherwise expended by the state
24 to provide such loans shall be limited to the amount appropriated
25 herein. The per pupil amount shall equal the quotient of (i) the
26 amount budgeted by such school district in its approved smart
27 schools investment plan for servers, wireless access points and
28 other portable connectivity devices to be acquired as part of a
29 school connectivity project, divided by (ii) the total public and
30 nonpublic school enrollment in such school district in the 2014-15
31 school year.
32 Provided further that no school district shall be eligible to receive
33 an allocation to support the loan of smart schools classroom tech-
34 nology in an aggregate amount greater than $250 multiplied by the
35 nonpublic school enrollment in the 2014-15 school year.
36 Notwithstanding paragraph b of subdivision 16 of section 3641 of the
37 education law, the commissioner of education shall distribute funds
38 appropriated pursuant to this paragraph upon approval of an applica-
39 tion made by the school district. Requests to the school district
40 for loan of smart schools classroom technology to be acquired with
41 the funds appropriated herein shall be made in accordance with the
42 requirements of subdivision 3 of section 755 of the education law
43 (11NP1708) ... 25,000,000 ........................ (re. $25,000,000)
44 SAFETY AND SECURITY PROJECTS FOR AT RISK FACILITIES (CCP)
45 Capital Projects Funds - Other
46 Capital Project Fund
47 Program Improvement/Change Purpose
101 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For competitive grants to provide safety and security projects at
3 nonpublic schools, community centers and day care facilities at risk
4 of hate crimes or attacks because of their ideology, beliefs or
5 mission. Provided that an assessment of facilities at risk may
6 include, but not be limited to, considerations of the vulnerabili-
7 ties of the organization based on its location and membership, and
8 the potential consequences of a hate crime or attack at the facili-
9 ty. The amount appropriated herein may be transferred or suballo-
10 cated to the division of homeland security and emergency services to
11 accomplish the intent of this appropriation (11HS1708) .............
12 25,000,000 ....................................... (re. $25,000,000)
13 SCHOOL FOR THE BLIND - BATAVIA (CCP)
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Health and Safety Purpose
17 By chapter 53, section 1, of the laws of 2009:
18 For various rehabilitation and renovation projects to keep facilities
19 at the School for the Blind in a safe operating condition subject to
20 a plan developed by the education department and approved by the
21 director of the budget (11030901) ... 800,000 ........ (re. $14,000)
22 By chapter 53, section 1, of the laws of 2008:
23 For security and fire alarm system upgrades, physical plant improve-
24 ments to infrastructure around Severne Hall, backflow prevention
25 devices, and roof replacement on Knight Hall and Hamilton Hall
26 (11050801) ... 2,330,000 ............................ (re. $678,000)
27 SCHOOL FOR THE DEAF - ROME (CCP)
28 Capital Projects Funds - Other
29 Capital Projects Fund
30 Health and Safety Purpose
31 By chapter 53, section 1, of the laws of 2008:
32 For dormitory environmental controls and the replacement of paver
33 stones, manhole covers and catch basins (11040801) .................
34 650,000 ............................................. (re. $138,000)
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Preservation of Facilities Purpose
38 By chapter 53, section 1, of the laws of 2004:
39 For minor rehabilitation projects to keep facilities in a safe operat-
40 ing condition subject to a plan developed by the education depart-
41 ment and approved by the director of the budget (11050403) .........
42 2,500,000 ............................................. (re. $1,000)
102 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 SCHOOLS FOR NATIVE AMERICAN RESERVATIONS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Health and Safety Purpose
5 By chapter 53, section 1, of the laws of 2009:
6 For various rehabilitation and renovation projects to keep facilities
7 at the St. Regis Mohawk Elementary School in a safe operating condi-
8 tion subject to a plan developed by the education department and
9 approved by the director of the budget (11020901) ..................
10 4,000,000 ............................................ (re. $88,000)
11 By chapter 53, section 1, of the laws of 2003:
12 For various rehabilitation and renovation projects to keep facilities
13 at the Tuscarora Elementary School in a safe operating condition
14 subject to a plan developed by the education department and approved
15 by the director of the budget (11020301) ... 500,000 . (re. $12,000)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Preservation of Facilities Purpose
19 By chapter 53, section 1, of the laws of 2004:
20 For various rehabilitation and renovation projects to keep facilities
21 at the St. Regis Mohawk Elementary School in a safe operating condi-
22 tion subject to a plan developed by the education department and
23 approved by the director of the budget (11040403) ..................
24 4,500,000 ............................................. (re. $2,000)
25 For various rehabilitation and renovation projects to keep facilities
26 at the Tuscarora Elementary School in a safe operating condition
27 subject to a plan developed by the education department and approved
28 by the director of the budget (11030403) ...........................
29 1,300,000 ............................................. (re. $1,000)
30 SMART SCHOOLS BOND ACT (CCP)
31 Capital Projects Funds - Other
32 Smart Schools Bond Fund
33 Bond Proceeds Purpose
34 By chapter 54, section 1, of the laws of 2014:
35 The sum of $2,000,000,000, or so much thereof as may be necessary and
36 available, is hereby appropriated from the smart schools bond fund
37 as established by section 97-oooo of the state finance law in
38 accordance with the provisions of such section, for payment to the
39 capital projects fund in order to reimburse such fund for disburse-
40 ments certified by the state comptroller as bondable under the
41 provisions of the smart schools bond act of 2014.
42 The director of the budget is hereby authorized to designate to the
43 state comptroller specific appropriations made from the capital
44 projects fund for purposes for which smart schools bond fund expend-
103 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 itures are authorized. The state comptroller shall at the commence-
2 ment of each month certify to the director of the budget, the chair-
3 man of the senate finance committee, and the chairman of the
4 assembly ways and means committee, the amounts disbursed from the
5 appropriations so designated by the director of the budget from the
6 capital projects fund for such purposes for the month preceding such
7 certification and such certifications shall not exceed in the aggre-
8 gate the moneys hereby appropriated. A copy of each such certificate
9 shall also be delivered to departments, agencies and public authori-
10 ties to which such capital projects fund appropriations are made
11 available.
12 Notwithstanding the provisions of any general or special law, no
13 moneys shall be available from the smart schools bond fund until a
14 certificate of approval of availability shall have been issued by
15 the director of the budget, and a copy of such certificate of
16 approval filed with the state comptroller, the chairman of the
17 senate finance committee and the chairman of the assembly ways and
18 means committee. Such certificate may be amended from time to time
19 by the director of the budget, and a copy of each such amendment
20 shall be filed with the state comptroller, the chairman of the
21 senate finance committee and the chairman of the assembly ways and
22 means committee (11SS1410) ... 2,000,000,000 .. (re. $2,000,000,000)
23 SMART SCHOOLS IMPLEMENTATION (CCP)
24 Capital Projects Funds - Other
25 Capital Projects Fund - Smart Schools (Bondable)
26 Educational Purpose
27 By chapter 54, section 1, of the laws of 2014:
28 For payment of the costs of capital projects undertaken by or on
29 behalf of school districts as part of such school districts' smart
30 schools investment plans as approved by the smart schools review
31 board, pursuant to the smart schools bond act of 2014 and subdivi-
32 sion 16 of section 3641 of the education law, both enacted as legis-
33 lation submitted by the governor pursuant to article VII of the New
34 York constitution, to be reimbursed from bond fund proceeds for
35 acquisition or installation of educational technology equipment or
36 for design, planning, site acquisition, construction, reconstruction
37 or rehabilitation of pre-kindergarten classroom space; instructional
38 space to replace transportable classroom units, or for high-tech
39 school safety and security projects.
40 Costs of such smart schools projects may include but not be limited to
41 interactive whiteboards; computer servers; desktop, laptop and
42 tablet computers; grants for high-speed broadband and wireless
43 internet connectivity for schools and communities within the school
44 district for enhanced educational opportunity; classroom space to
45 accommodate pre-kindergarten programs; instructional space to
46 replace transportable classroom units; and high-tech school safety
47 and security projects. Pursuant to school districts' approved smart
48 schools investment plans, all or a portion of the funds appropriated
104 12654-10-8
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 hereby may be suballocated or transferred to any department, agency,
2 or public authority.
3 No part of this appropriation shall be made available prior to
4 approval of the smart schools bond act of 2014 by the voters at the
5 general election to be held in November of 2014 (11SR14ED) .........
6 2,000,000,000 ................................. (re. $1,933,070,000)
7 SMART SCHOOLS SPECIAL EDUCATION PROJECTS (CCP)
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 Educational Purpose
11 By chapter 54, section 1, of the laws of 2014:
12 For payment of the costs of capital projects undertaken by or on
13 behalf of special act school districts, state-supported schools for
14 the blind and deaf and approved private special education schools,
15 pursuant to investment plans approved by the smart schools review
16 board established by subdivision 16 of section 3641 of the education
17 law, for acquisition or installation of educational technology
18 equipment. Costs of such projects may include but not be limited to
19 interactive whiteboards; computer servers; desktop, laptop and
20 tablet computers; and high-speed broadband and wireless Internet
21 connectivity; design, planning, site acquisition, construction,
22 reconstruction or rehabilitation of instructional space to replace
23 transportable classroom units; and high-tech school safety and secu-
24 rity projects. This appropriation shall be made available to the
25 same extent as funds are authorized and made available pursuant to
26 the smart schools bond act of 2014 (110014ED) ......................
27 5,000,000 ......................................... (re. $4,968,000)
105 12654-10-8
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 17,000,000 36,081,000
6 ---------------- ----------------
7 All Funds ........................ 17,000,000 36,081,000
8 ================ ================
9 WESTERN NEW YORK NUCLEAR SERVICE CENTER PROGRAM (CCP) ....... 17,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Western New York Nuclear Service Center Program Purpose
14 For services and expenses required to meet
15 the New York state energy research and
16 development authority obligations for the
17 western New York nuclear service center,
18 including obligations pursuant to the West
19 Valley demonstration project act (Pub. L.
20 96-368) (03WV1806) .......................... 17,000,000
106 12654-10-8
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 CLEANER, GREENER COMMUNITIES PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Environmental Protection Purpose
5 By chapter 54, section 1, of the laws of 2013:
6 For capital grants for the cleaner, greener communities program
7 (03CG1306) ... 25,000,000 ........................ (re. $20,506,000)
8 WESTERN NEW YORK NUCLEAR SERVICE CENTER PROGRAM (CCP)
9 Capital Projects Funds - Other
10 Capital Projects Fund
11 Western New York Nuclear Service Center Program Purpose
12 By chapter 54, section 1, of the laws of 2017:
13 For services and expenses required to meet the New York state energy
14 research and development authority obligations for the western New
15 York nuclear service center, including obligations pursuant to the
16 West Valley demonstration project act (Pub. L. 96-368) (03WV1706)
17 ... 15,575,000 ................................... (re. $15,575,000)
107 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 581,400,000 5,380,093,000
6 Capital Projects Funds - Federal ... 215,000,000 654,037,000
7 ---------------- ----------------
8 All Funds ........................ 796,400,000 6,034,130,000
9 ================ ================
10 ADMINISTRATION (CCP) ........................................ 17,000,000
11 --------------
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Administration Purposes
15 For employee fringe benefits and indirect
16 costs related to employees paid from
17 department capital projects funds and
18 capital accounts (09FG1850) ................. 17,000,000
19 ENVIRONMENT AND RECREATION (CCP) ........................... 300,000,000
20 --------------
21 Capital Projects Funds - Other
22 Environmental Protection Fund
23 Environment and Recreation Purpose
24 For services and expenses of projects and
25 purposes authorized by section 92-s of the
26 state finance law to receive funding from
27 the solid waste account in accordance with
28 a programmatic and financial plan to be
29 approved by the director of the budget,
30 including suballocation to other state
31 departments and agencies, according to the
32 following:
33 Non-hazardous landfill closure projects,
34 including $300,000 for Essex county under
35 an agreement with the department of envi-
36 ronmental conservation and $150,000 for
37 Hamilton county under an agreement with
38 the department of environmental conserva-
39 tion (09LC18ER) ................................ 700,000
40 Municipal waste reduction or recycling
41 projects, and $2,000,000 of such amount
42 shall be made available for municipalities
43 and not-for-profit food banks for projects
108 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 for food donation and the recycling of
2 food scraps (09MR18ER) ...................... 14,000,000
3 Secondary materials regional marketing
4 assistance (09SM18ER) .......................... 149,000
5 Pesticide program, not less than $200,000 of
6 which shall be for activities related to
7 Long Island pesticide pollution prevention
8 (09PD18ER) ................................... 1,800,000
9 Notwithstanding any law to the contrary, for
10 the payment of the costs associated with
11 environmental justice projects and
12 programs, including but not limited to:
13 monitoring of air quality; education and
14 outreach; not more than $1,000,000 for the
15 connect kids program facilitating access
16 by title 1 schools to outdoor recreational
17 activities, public lands and parks;
18 improvements to environmental quality; or
19 environmental job training, in environ-
20 mental justice, inner city and underserved
21 communities, and which are undertaken by
22 the state, or on behalf of the state by
23 municipalities or not-for-profit corpo-
24 rations; and $3,000,000 of such amount
25 shall be made available for community
26 impact and job training grants; including
27 $500,000 of such amount shall be made
28 available to a not-for-profit organization
29 for the purpose of awarding grants on a
30 competitive basis to community groups to
31 build the capacity of such groups,
32 provided that up to ten percent may be
33 made available for administrative costs
34 and/or technical assistance. Community
35 impact and job training grants shall be in
36 or affecting to environmental justice
37 communities in an amount of up to $100,000
38 for community groups for projects that
39 address an environmental justice communi-
40 ty's exposure to multiple environmental
41 harms and risks, including lead exposure
42 and shall include implementation, studies,
43 including air monitoring, to investigate
44 the environment, or related public health
45 issues of the community, research that
46 will be used to expand the knowledge or
47 understanding of the affected community
48 and ways to improve the resiliency of the
49 affected community. The results of the
50 investigation shall be disseminated to
51 members of the affected community. Commu-
52 nity groups eligible for funding shall be
109 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 located within the same community as the
2 environmental and/or related public health
3 issues to be addressed by the project.
4 Such groups shall be primarily focused on
5 addressing the environmental and/or
6 related public health issues of the resi-
7 dents of the affected community and shall
8 be comprised primarily of members of the
9 affected community (09EJ18ER) ................ 7,000,000
10 Notwithstanding any law to the contrary, for
11 assessment and recovery of any natural
12 resource damages (09RD18ER) .................. 2,025,000
13 Notwithstanding any law to the contrary, for
14 the pollution prevention institute, and
15 including $100,000 for the department to
16 contract with the Northeast waste manage-
17 ment officials' association for the Inter-
18 state Chemicals Clearing house (09PP18ER) .... 4,000,000
19 Environmental health for assessments, test-
20 ing and actions including but not limited
21 to abatement to address suspected human
22 exposure to chemical, physical and micro-
23 biological agents, including contaminants
24 in drinking water, including projects to
25 combat harmful algal blooms; including up
26 to $500,000 for the CleanSweepNY program;
27 and $1,000,000 to the State University of
28 New York at Stony Brook, directly or
29 through its research foundation, to
30 support research development and any asso-
31 ciated testing or pilot projects towards
32 the treatment of water to remove
33 1,4-dioxane; and $2,000,000 for children's
34 environmental health centers, including
35 school and community childhood lead expo-
36 sure assessment conducted by such centers
37 and not more than $625,000 for programs to
38 expand and improve access to local, fresh,
39 nutritional food to nutritionally under-
40 served neighborhoods in New York State
41 through the Fresh Connect Program; includ-
42 ing up to $500,000 to the State University
43 of New York at Stony Brook to provide for
44 a new laboratory testing facility for PFOA
45 and other chemicals (09EH18ER) ............... 6,500,000
46 Brownfield opportunity area grants as
47 authorized pursuant to section 970-r of
48 the general municipal law (09BO18ER) ......... 2,000,000
49 For services and expenses of projects and
50 purposes authorized by section 92-s of the
51 state finance law to receive funding from
52 the parks, recreation and historic preser-
110 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 vation account in accordance with a
2 programmatic and financial plan to be
3 approved by the director of the budget,
4 including suballocation to other state
5 departments and agencies, according to the
6 following:
7 Local waterfront revitalization programs,
8 notwithstanding any law to the contrary,
9 not less than, $9,000,000 for waterfront
10 revitalization projects which are in or
11 primarily serve areas where demographic
12 and other relevant data for such areas
13 demonstrate that the areas are densely
14 populated and have sustained physical
15 deterioration, decay, neglect, or disin-
16 vestment, or where a substantial propor-
17 tion of the residential population is of
18 low income or is otherwise disadvantaged
19 and is underserved with respect to the
20 existing recreational opportunities in the
21 area including up to $2,000,000 for
22 updates to existing local waterfront revi-
23 talization program plans to mitigate
24 future physical climate risks; and
25 $200,000 for the Niagara River greenway
26 commission (09WR18ER) ....................... 14,000,000
27 Parks, recreation and historic preservation
28 projects, notwithstanding any law to the
29 contrary, not less than, $10,000,000 for
30 municipal parks projects which are in or
31 primarily serve areas where demographic
32 and other relevant data for such areas
33 demonstrate that the areas are densely
34 populated and have sustained physical
35 deterioration, decay, neglect or disin-
36 vestment or where a substantial proportion
37 of the residential population is of low
38 income or is otherwise disadvantaged and
39 is underserved with respect to the exist-
40 ing recreational opportunities in the
41 area; and including $250,000 for Tivoli
42 Park; $500,000 for the Hudson River Valley
43 Trail Grants; $120,000 to the State
44 University of New York college of environ-
45 mental science and forestry and $180,000
46 to Paul Smith's College for the support of
47 the Adirondack Park interpretive centers,
48 $500,000 to the city of New York for the
49 East River Esplanade 107th Street Pier,
50 and $1,000,000 to the Wildlife Conserva-
51 tion Society for the Bronx Zoo (09MP18ER) ... 19,500,000
111 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 Notwithstanding any law to the contrary, for
2 state parks and land and easement infras-
3 tructure, access and stewardship projects
4 which shall include capital projects: (i)
5 on state parks and state lands pursuant to
6 sections 54-0303 and 56-0307 of the envi-
7 ronmental conservation law; (ii) on state
8 parks or state owned lands and easements
9 under the jurisdiction of the department
10 of environmental conservation or the
11 office of parks, recreation and historic
12 preservation for access opportunities for
13 people with disabilities; access to the
14 State Forest Preserve, State reforesta-
15 tion, Wildlife Management areas and
16 conservation easement lands; recreational
17 trail construction and maintenance; Cats-
18 kill and Adirondack camp ground improve-
19 ments to public access and sanitation
20 facilities; environmental education;
21 facility improvements; archeological,
22 historic, cultural and natural resource
23 surveys, forest health surveys, interpre-
24 tation, and inventories, and response to
25 forest pests including southern pine
26 beetle; Forest Preserve and state forest
27 unit management planning; invasive species
28 management; conservation easement public
29 recreation planning; habitat restoration
30 and enhancement; state fish hatchery
31 improvements; state tree nursery improve-
32 ments; safety equipment; water access
33 facilities and safety improvements; public
34 beach facility development and improve-
35 ment; public access improvements at day
36 use areas; state historic site exterior
37 restoration; and cabin area and camping
38 facility development, restoration and
39 reconstruction; (iii) $1,000,000 for
40 Belleayre Mountain ski center projects;
41 (iv) $500,000 from the public access and
42 stewardship allocation to Parks & Trails
43 New York for the purpose of awarding
44 grants on a competitive basis to local
45 parks and department of environmental
46 conservation friends groups, provided that
47 up to ten percent of such amount may be
48 made available for administrative costs
49 and/or technical assistance; (v) public
50 protection and emergency preparedness
51 purposes; and (vi) up to $50,000 for Earl
112 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 W. Brydges Artpark State Park improve-
2 ments; and (vii) up to $150,000 for Old
3 Fort Niagara State Park Improvements
4 (09ST18ER) .................................. 32,638,000
5 Notwithstanding subdivision 7 of section
6 92-s of the state finance law or any other
7 law to the contrary, for services and
8 expenses of the Hudson River Park Trust
9 for projects related to the development of
10 the Hudson River Park consistent with
11 provisions of chapter 592 of the laws of
12 1998, including but not limited to utility
13 infrastructure improvements; provided,
14 however, such funds shall not be available
15 for suballocation to any public benefit
16 corporation or public authority with the
17 exception of the Hudson River Park Trust
18 and shall be available solely for the
19 liabilities incurred by the Hudson River
20 Park Trust or by other state departments
21 or agencies on behalf of the Hudson River
22 Park Trust on or after April 1, 1999.
23 Provided further that, the comptroller is
24 hereby authorized and directed to release
25 monies to the Hudson River Park Trust in
26 amounts set forth in a schedule approved
27 by the director of the budget (09HR18ER) ..... 3,200,000
28 Notwithstanding any law to the contrary, for
29 zoos, botanical gardens and aquaria
30 program (09ZB18ER) .......................... 15,000,000
31 Notwithstanding any other provisions of law,
32 for the administration of the programs of
33 section 79-b of the navigation law
34 (09NV18ER) ................................... 2,000,000
35 For services and expenses of projects and
36 purposes authorized by section 92-s of the
37 state finance law to receive funding from
38 the open space account in accordance with
39 a programmatic and financial plan to be
40 approved by the director of the budget,
41 including suballocation to other state
42 departments and agencies, according to the
43 following:
44 Costs related to the acquisition of the
45 following properties: Atlantic Coast, Long
46 Island Sound, Long Island South Shore
47 Estuary Reserve, Peconic Pinelands Mari-
48 time Reserve Projects, Central Pine
49 Barrens, Western Suffolk/Nassau Special
50 Groundwater Protection Areas, Mott Haven-
51 Port Morris Waterfront, Bronx River Green-
52 way, Inner City/Underserved Community
113 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 Parks, Long Pond, Staten Island Greenbelt,
2 Staten Island Bluebelt, Staten Island Wet
3 Woods, Great Swamp, Plutarch/Black Creek
4 Wetlands Complex, New York Highlands,
5 Shawangunk Mountains Region, Delaware
6 River Highlands, Hudson River
7 Corridor/Hudson River Estuary and Greenway
8 Trail/ Hudson River School Art Trail,
9 Hudson Valley/New York City Foodshed,
10 Catskill Unfragmented Forest, Catskill
11 River and Road Corridors, New York City
12 Watershed Lands, Taconic Ridge/Harlem
13 Valley, Albany Pine Bush, Five Rivers
14 Environmental Education Center, Lake
15 George watershed, Lake Champlain
16 watershed, Boeselager forestry, Rensselaer
17 Plateau, Oomsdale Farm and Surrounding
18 Landscape, Turtle Conservation Sites,
19 Region 4 Rail Trail Projects, Susquehanna
20 River Valley Corridor, Saratoga County,
21 Hudson River Projects, Follensby Park,
22 Washington County, Rome Sand Plains, Black
23 Creek Watershed, Tug Hill Core Forests and
24 Headwater Streams, Nelson Swamp, State
25 Park Battlefields, Genny Green Trail/Link
26 Trail, Onondaga Escarpment, State Parks
27 Greenbelt/Tompkins County, Cattaraugus
28 Creek and tributaries, Northern Montezuma
29 Wetlands, Genesee River Corridor, Seneca
30 Army Depot Conservation Area, Lake Erie
31 Tributary Gorges, Buffalo River Watershed,
32 Catharine Valley Complex, High-Tor/Bristol
33 Hills/Bare Hill State Unique Area, Lake
34 Ontario and Lake Erie Shorelines, Islands
35 and Niagara River, Long Island Trails and
36 Greenways, Bronx Harlem Greenway, Harbor
37 Herons Wildlife Complex, Schunnemunk
38 Mountain/Moodna Creek/Woodcock
39 Mountain/Hudson Highlands Connectivity
40 Project, Helderbergs, and Finger Lakes
41 Shorelines and Riparian Zones, Hand Hollow
42 Conservation Area, Northern Flow River
43 Corridors, Black River Valley Corridor,
44 Fort Drum Army Compatible Use Buffer
45 Project, Herkimer Home Viewshed, Inman
46 Gulf, Massawepie Mire, Moose River Corri-
47 dor, St. Lawrence River Islands, Shoreline
48 and Wetlands, Southern Skaneateles Lake
49 Forest and Shoreline, Salmon River Corri-
50 dor, Emerald Necklace, Riparian Buffers,
51 Coastline and Wetland Protection Projects
52 Aimed at Reducing the Impacts of Storms,
114 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 Storm Surges and Flooding on Human and
2 Natural Communities, Long Distance Trail
3 Corridors, Statewide Small Projects, State
4 Forest, Unique Area Wildlife Management
5 Area Protection, Working Forest Lands,
6 State Park and State Historic Site
7 Protection, (a) notwithstanding any law to
8 the contrary, $1,000,000 from the land
9 acquisition allocation for urban forestry
10 projects provided that no less than
11 $500,000 shall be made available for such
12 programs in cities and towns with popu-
13 lations of 65,000 or more; (b) notwith-
14 standing any law to the contrary,
15 $2,500,000 from the land acquisition allo-
16 cation to the land trust alliance for the
17 purpose of awarding grants on a compet-
18 itive basis to local land trusts, provided
19 that up to ten percent of such amount may
20 be made available for administrative costs
21 and/or technical assistance; (c) notwith-
22 standing any law to the contrary, not less
23 than $3,000,000 for land acquisition in
24 department of environmental conservation
25 regions 1, 2 and 3; (d) including
26 $1,000,000 for Adirondack infrastructure
27 and environmental improvements for the
28 towns of Long Lake, North Hudson, Minerva,
29 Indian Lake, and Newcomb; and (e) $700,000
30 for the Lake George Park Commission for
31 facilities construction (09LA18ER) .......... 35,000,000
32 Albany Pine Bush Preserve Commission
33 (09AP18ER) ................................... 2,675,000
34 Long Island Central Pine Barrens Planning
35 (09LP18ER) ................................... 2,000,000
36 Notwithstanding any law to the contrary, for
37 service and expenses of the following
38 commissions: $259,000 for Susquehanna
39 river basin commission; $359,500 for the
40 Delaware river basin commission; $14,100
41 for the Ohio river basin commission;
42 $41,600 for the Interstate environmental
43 commission; and $38,000 for the New
44 England Interstate commission; and
45 $350,000 for the college of environmental
46 science and forestry center for native
47 peoples and the environment (09EC18ER) ....... 1,063,000
48 Long Island South Shore Estuary Reserve
49 (09SE18ER) ..................................... 900,000
50 Agricultural non-point source abatement and
51 control projects, notwithstanding any law
52 to the contrary, including projects to
115 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 combat harmful algal blooms; (a)
2 $1,000,000 shall be made available for
3 services and expenses of the Cornell
4 University Integrated Pest Management
5 program; (b) $500,000 shall be made avail-
6 able to the Cornell Cooperative Extension
7 of Suffolk County for nutrient management
8 planning and implementation activities;
9 and (c) $250,000 shall be made available
10 to Cornell for the pesticide management
11 education program to support training and
12 certification (09AN18ER) .................... 17,000,000
13 Non-agricultural non-point source abatement
14 and control projects notwithstanding any
15 law to the contrary, $550,000 of such
16 amount shall be made available for Cornell
17 community integrated pest management
18 (09NP18ER) ................................... 7,000,000
19 Agriculture and farmland protection activ-
20 ities, notwithstanding any law to the
21 contrary, up to $1,000,000 shall be made
22 available to the tug hill tomorrow land
23 trust for army compatible use buffer
24 program projects around Fort Drum, and up
25 to $90,000 shall be made available to
26 Cornell University for services and
27 expenses of land classification, agricul-
28 ture district mapping and master list of
29 soils (09FP18ER) ............................ 18,000,000
30 Biodiversity stewardship and research;
31 including funding for public New York
32 universities to conduct field studies and
33 research on biodiversity issues and up to
34 $500,000 of this amount to support polli-
35 nator diversity, up to $300,000 of which
36 may be allocated to Cornell University,
37 including research related to the poten-
38 tial adverse impacts of pesticides such as
39 neonicitinoids, pursuant to a contract
40 with the department of agriculture and
41 markets, including the development of bee
42 husbandry best management practices such
43 as pest and pathogen controls; creating
44 diversity of pollinator habitats; research
45 to understand, prevent and recover from
46 pollinator losses; and outreach and educa-
47 tion; and including $100,000 for the Cary
48 Institute of Ecosystem Studies to support
49 the Catskill environmental research and
50 monitoring program (09BD18ER) ................ 1,350,000
51 Notwithstanding any law to the contrary, for
52 the Hudson River Estuary Management Plan
116 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 prepared pursuant to section 11-0306 of
2 the environmental conservation law,
3 including projects to combat harmful algal
4 blooms some or all of which may be allo-
5 cated to the New England Interstate Water
6 Pollution Control Commission or Cornell
7 water resources institute or department of
8 natural resources for the purposes of
9 implementing the Hudson River Estuary
10 Action agenda, $1,000,000 of which shall
11 be for the Mohawk river action plan
12 (09HE18ER) ................................... 6,500,000
13 Notwithstanding any law to the contrary, for
14 the Finger Lakes-Lake Ontario Watershed
15 Protection Alliance (09FL18ER) ............... 2,300,000
16 Notwithstanding any law to the contrary, to
17 the Erie County Soil and Water Conserva-
18 tion District for the Lake Erie Watershed
19 Protection Alliance (09LE18ER) ................. 250,000
20 Notwithstanding any law to the contrary, for
21 the state share of costs of wastewater
22 treatment improvement projects undertaken
23 by municipalities to upgrade municipal
24 systems to meet stormwater, combined sewer
25 overflow, sanitary sewer overflow and
26 wastewater treatment discharge require-
27 ments with priority given to systems that
28 are in violation of title 8 of article 17
29 of the environmental conservation law and
30 aquatic habitat restoration projects
31 undertaken by municipalities and not-for-
32 profit corporations for aquatic habitat
33 restoration projects as defined in subdi-
34 vision 1 of section 56-0101 of the envi-
35 ronmental conservation law and including
36 projects to combat harmful algal blooms;
37 including up to $3,000,000 to Suffolk
38 county to provide a 50 percent match for a
39 program developed in consultation with the
40 department for research, development and
41 pilot projects to develop cost effective
42 methods to address nitrogen and pathogen
43 loading from septic system or cesspool
44 effluent or other sources or to support
45 such efforts without a match at the state
46 university of Stony Brook directly or
47 through its research foundation and
48 $1,500,000 for Suffolk county for sewer
49 improvement projects; and including
50 $5,000,000 for Nassau county for the Bay
51 park wastewater treatment plant outfall
52 pipe, associated conveyance systems,
117 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 nitrogen abatement treatment works, ocean
2 outfall and/or connections, including up
3 to $400,000 from such amount for testing
4 of monitoring wells in Nassau County and
5 including $250,000 from such amount to the
6 Long Island regional planning council for
7 services and expenses related to the Long
8 Island Nitrogen Action Plan; and including
9 $1,000,000 to maximize the availability of
10 drug collection programs for communities
11 throughout the state, including for the
12 purchase and distribution of tamper proof
13 drug collection boxes, and other federally
14 approved drug collection programs provided
15 that participating in the department of
16 environmental conservation's self-audit
17 program shall not be required; and includ-
18 ing $5,000,000 to update source water
19 assessment plans and develop associated
20 water protection programs some or all of
21 which may be allocated to the United
22 States Geological Survey or the New
23 England Interstate Water Pollution Control
24 Commission; and including up to $100,000
25 for the removal and appropriate disposal
26 of firefighting foam containing regulated
27 perfluoronated compounds from municipal
28 fire and emergency response departments
29 (09WQ18ER) .................................. 20,250,000
30 Notwithstanding any law to the contrary for
31 New York ocean and Great Lakes ecosystem
32 conservation projects, consistent with the
33 policy articulated in article 14 of the
34 environmental conservation law including
35 projects to combat harmful algal blooms;
36 including $200,000 to Suffolk county for
37 the Peconic Bay Estuary Program, including
38 $60,000 for the Great Lakes commission,
39 and including $50,000 for the State
40 University of New York at Brockport for
41 resiliency monitoring, and including
42 $250,000 for the State University of New
43 York Stony Brook for a study of the feasi-
44 bility, costs, location, and impacts of a
45 seagate to act as a storm surge barrier
46 for the south shore of Long Island
47 (09GL18ER) .................................. 17,250,000
48 Notwithstanding any law to the contrary, for
49 the implementation of the recommendations
50 of the invasive species task force
51 prepared pursuant to chapter 324 of the
52 laws of 2003 and for the purposes set
118 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 forth in chapter 674 of the laws of 2007
2 including not less than $450,000 for Lake
3 George, including not less than $120,000
4 for Cornell University for the plant
5 certification program, provided that not
6 less than $6,050,000 be made available for
7 invasive species eradication, including
8 but not limited to southern pine beetle,
9 including up to $500,000 to Cornell
10 University for the control of hemlock
11 wooly adelgid, and including grants
12 related to the control and management of
13 invasive species, and $500,000 to address
14 the southern pine beetle including up to
15 $250,000 to the Central Pine Barrens Joint
16 Planning and Policy Commission for the
17 implementation and administration of a
18 prescribed fire program. Such funding for
19 grants shall be provided on a competitive
20 basis in consultation with the New York
21 Invasive Species Council (09IS18ER) ......... 13,300,000
22 Notwithstanding any law to the contrary, for
23 Soil and Water Conservation District
24 activities as authorized for reimbursement
25 and funding in section 11-a of the soil
26 and water conservation districts law
27 including projects to combat harmful algal
28 blooms; including up to $270,000 for the
29 Schuyler and Chemung County SWCD Shared
30 Services Infrastructure; and up to $85,000
31 for the Steuben County SWCD Public Educa-
32 tion Outreach and Policy (09SW18ER) ......... 10,000,000
33 Notwithstanding any law to the contrary, for
34 Agricultural Waste Management projects,
35 including up to $700,000 to Cornell
36 University, in consultation with the
37 department, to continue implementing the
38 dairy acceleration program (09AW18ER) ........ 1,500,000
39 For services and expenses of projects and
40 purposes authorized by section 92-s of the
41 state finance law to receive funding from
42 the climate change mitigation and adapta-
43 tion account in accordance with a program-
44 matic and financial plan to be approved by
45 the director of the budget, including
46 suballocation to other state departments
47 and agencies, according to the following:
48 Notwithstanding any law to the contrary, to
49 address greenhouse gas emissions outside
50 of the power sector including but not
51 limited to the development of statewide
52 greenhouse gas inventories, demonstration
119 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 projects, community engagement and applied
2 research related to the transportation
3 sector or methane and other short-lived
4 climate pollutant sources (09GG18ER) ......... 1,000,000
5 Notwithstanding any law to the contrary, for
6 the department of environmental conserva-
7 tion to enter into a contract or contracts
8 for the development of local climate resi-
9 liency plans and adaptation projects
10 (09SV18ER) ................................... 3,000,000
11 Notwithstanding any law to the contrary,
12 smart growth program state assistance
13 payments, provided on a competitive basis,
14 to counties, cities, towns, or villages to
15 establish, update or implement comprehen-
16 sive plans in a manner consistent with
17 smart growth; provided, however, that up
18 to 25 percent of such payments may be
19 awarded to not-for-profit organizations
20 for such purposes (09SG18ER) ................. 2,000,000
21 Notwithstanding any law to the contrary for
22 the New York state soil and water conser-
23 vation committee in conjunction with the
24 department of agriculture and markets to
25 develop a pilot climate resilient farms
26 program consistent with agriculture and
27 markets law article 11-a, agricultural
28 environmental management program including
29 up to $200,000 for the Cornell Soil Health
30 Program for research and education to
31 improve soil resiliency to climate vari-
32 ations and mitigate greenhouse gas emis-
33 sions by carbon sequestration (09CR18ER) ..... 2,500,000
34 Climate smart communities projects pursuant
35 to title 15 of article 54 of the environ-
36 mental conservation law including clean
37 vehicle projects; notwithstanding any law
38 to the contrary, including $500,000 for a
39 resiliency planting program (09CS18ER) ...... 10,650,000
40 FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 6,000,000
41 --------------
42 Capital Projects Funds - Other
43 Capital Projects Fund
44 Maintenance and Operations Purpose
45 For the maintenance and operation of various
46 facilities and systems including personal
47 services, fringe benefits and indirect
48 costs (09FM18MO) ............................. 6,000,000
120 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 FISH AND WILDLIFE (CCP) ...................................... 1,500,000
2 --------------
3 Capital Projects Funds - Other
4 Miscellaneous Capital Projects Fund
5 Habitat Conservation and Access Account
6 Fish and Wildlife Purpose
7 For services and expenses, including
8 personal service, non-personal service,
9 fringe benefits and indirect costs related
10 to management, protection and restoration
11 fish and wildlife habitat, and improvement
12 and development of public access for fish
13 and wildlife related recreation (09HC1854) ... 1,500,000
14 LANDS AND FORESTS (CCP) ..................................... 15,000,000
15 --------------
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Lands and Forests Purpose
19 For services and expenses, including
20 personal service, non-personal service,
21 indirect costs and fringe benefits related
22 to the stewardship of newly acquired and
23 existing state lands, for the implementa-
24 tion of Unit Management Plans, costs
25 related to invasive species management
26 activities and for the development and
27 implementation of Green Certification for
28 state forests, including suballocation to
29 other state departments and agencies
30 (09LF1853) ................................... 5,000,000
31 Capital Projects Funds - Federal
32 Federal Capital Projects Fund
33 Lands and Forests Purpose
34 For the federal share of capital projects
35 pursuant to lands and forests resources
36 purposes including the costs associated
37 with the acquisition of lands under the
38 forest legacy program, including suballo-
39 cation to other state departments and
40 agencies (09FL1853) ......................... 10,000,000
41 NEW YORK WORKS (CCP) ........................................ 40,000,000
42 --------------
43 Capital Projects Funds - Other
121 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 Capital Projects Fund
2 Operational Services Purpose
3 For services, expenses, and indirect costs
4 related to New York Works projects includ-
5 ing but not limited to air monitoring
6 infrastructure investments; remediation of
7 legacy environmental contamination;
8 investments in information technology; dam
9 safety projects and the demolition of
10 unsafe structures on state-owned land;
11 state-owned flood protection projects;
12 shore protection projects; state land
13 stewardship, public access and environ-
14 mental and recreation infrastructure
15 projects including, notwithstanding any
16 law to the contrary, projects on lands
17 being sought pursuant to state land acqui-
18 sition policy under article 49 of the
19 environmental conservation law, for which
20 the state provided a letter of intent to
21 the town of North Hudson and Essex county
22 to acquire a conservation easement or
23 other interest and for which the fee owner
24 of any such property authorizes such
25 project; vehicles and equipment; water
26 quality improvement projects, fish hatch-
27 eries; rehabilitation and improvements of
28 various department facilities and systems;
29 and well plugging; including personal
30 service, non-personal service and fringe
31 benefits, including suballocation to other
32 state departments and agencies (09NY1851) ... 40,000,000
33 OPERATIONS (CCP) ............................................ 18,000,000
34 --------------
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Operational Services Purpose
38 For rehabilitation and improvements of vari-
39 ous department facilities and systems
40 including personal service and fringe
41 benefits and indirect costs in accordance
42 with a programmatic and financial plan to
43 be approved by the director of the budget
44 including suballocation to other state
45 departments and agencies (09RI1851) ......... 18,000,000
46 SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP) ................. 122,000,000
47 --------------
122 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Hazardous Waste Purpose
4 For payment by the state, as reimbursement
5 or as an advance from responsible parties
6 or volunteers for remedial and monitoring
7 work at sites contaminated with hazardous
8 waste. No portion of this appropriation
9 shall be available for expenditure until a
10 party or parties either responsible for a
11 site or volunteering to cleanup a site
12 have entered into an agreement with the
13 commissioner of the department of environ-
14 mental conservation or the commissioner's
15 designee, and which agreement is approved
16 by the director of the budget, providing
17 for repayment to the state of an amount
18 equal to the amount disbursed from this
19 appropriation. A copy of such agreement
20 shall be filed with the state comptroller,
21 the chairman of the senate finance commit-
22 tee and chairman of the assembly ways and
23 means committee.
24 Notwithstanding any other provision of law
25 to the contrary, the comptroller is
26 authorized to repay settlements or
27 advances for specified remedial and moni-
28 toring projects from this fund with monies
29 of the hazardous waste remedial fund
30 received for such projects pursuant to
31 consent orders and agreements to address
32 sites contaminated with hazardous waste.
33 The director of the budget shall certify to
34 the comptroller the specific portions of
35 this appropriation for which monies have
36 been received pursuant to such consent
37 orders and agreements (09AD18F7) ............ 16,000,000
38 Capital Projects Funds - Other
39 Hazardous Waste Remedial Fund
40 Hazardous Waste Cleanup Account
41 Hazardous Waste Purpose
42 For payment of the state share of the costs
43 of hazardous waste site remediation
44 projects, in accordance with title 13 of
45 article 27 of the environmental conserva-
46 tion law and section 97-b of the state
47 finance law, for projects, and for payment
48 of state costs associated with the remedi-
49 ation of offsite contamination at signif-
123 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 icant threat sites as provided for in
2 section 27-1411 of the environmental
3 conservation law, including personal
4 service and fringe benefits of the depart-
5 ments of environmental conservation,
6 health and law and including suballo-
7 cations to the departments of health and
8 law and including costs incidental and
9 appurtenant thereto, provided that a
10 portion of such amount may be available
11 for environmental restoration projects in
12 accordance with title 5 of article 56 of
13 the environmental conservation law. None
14 of this appropriation may be expended for
15 any purposes authorized in title 12 of
16 article 27 of the environmental conserva-
17 tion law (09HB18F7) ........................ 100,000,000
18 Capital Projects Funds - Other
19 Hazardous Waste Remedial Fund
20 Hazardous Waste Remediation Oversight and Assistance
21 Account
22 Hazardous Waste Purpose
23 For the personal services and fringe bene-
24 fits of the department of environmental
25 conservation including suballocation to
26 the department of health related to the
27 brownfield cleanup program pursuant to
28 title 14 of article 27 of the environ-
29 mental conservation law and the voluntary
30 cleanup program including costs incurred
31 prior to April 1, 2018 (09BC18F7) ............ 6,000,000
32 SOLID WASTE MANAGEMENT (CCP) ................................ 55,700,000
33 --------------
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Solid Waste Purpose
37 For pre-closure and post-closure costs asso-
38 ciated with Adirondack landfills pursuant
39 to agreements with Essex county (09EX1856) ..... 500,000
40 For services and capital expenses related to
41 the waste management and cleanup program
42 as put forth in article 27-1915 of envi-
43 ronmental conservation law, including
44 suballocation to other state departments
45 and agencies (09WT1856) ...................... 4,000,000
46 Capital Projects Funds - Other
124 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 Miscellaneous Capital Projects Fund
2 New York Environmental Protection and Spill Remediation
3 Account
4 Solid Waste Management Purposes
5 For services and capital expenses associated
6 with costs incurred under Article 12 of
7 the Navigation Law, and for cleanup,
8 investigation, and removal of petroleum
9 spills, including prior year liabilities
10 (09OS1856) .................................. 21,200,000
11 Capital Projects Funds - Federal
12 Federal Capital Projects Fund
13 Hazardous Waste Purpose
14 For the federal share of the cleanup of
15 hazardous waste sites pursuant to the
16 provision of the federal comprehensive
17 environmental response, compensation and
18 liability act of 1980 reauthorization or
19 amendments thereto including suballocation
20 to other state departments and agencies
21 (09FS18F7) .................................. 30,000,000
22 WATER RESOURCES (CCP) ...................................... 221,200,000
23 --------------
24 Capital Projects Funds - Other
25 Capital Projects Fund
26 Flood Control Purpose
27 For various new and existing flood
28 protection projects including the state
29 share of federal sponsored flood control
30 projects, and the maintenance of existing
31 flood control projects; for coastal
32 erosion hazard area mapping of the state's
33 Atlantic Ocean and Great Lakes coastlines
34 and the state share of costs associated
35 with matching federal funds for a state-
36 wide flood plain map modernization
37 program; for the state share of costs
38 associated with the installation and/or
39 reinstallation, upgrade, monitoring and
40 maintenance of a statewide network of
41 stream flow gauges, including personal
42 service, non-personal service, fringe
43 benefits and indirect costs, including
44 suballocation to other state departments
45 and agencies (09FL1863) ...................... 2,000,000
125 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2018-19
1 For an advance payment by the state for the
2 local costs of various shore protection
3 projects. No portion of this appropriation
4 shall be available until the respective
5 municipality has entered into an agreement
6 with the commissioner of the department of
7 environmental conservation, and such
8 agreement is approved by the director of
9 the budget (09AD1863) ........................ 3,000,000
10 Capital Projects Funds - Other
11 Capital Projects Fund
12 Water Resources Purpose
13 An advance for costs incurred relating to
14 work required for the safety of dams and
15 other structures impounding water, to be
16 reimbursed in accordance with section
17 15-0507 of the environmental conservation
18 law (09DA1857) ................................. 500,000
19 For payment of a portion of the state's
20 match for federal capitalization grants
21 for the water pollution control revolving
22 fund (09RF1857) ............................. 35,000,000
23 For services and expenses including personal
24 service, fringe benefits, and nonpersonal
25 service for the water pollution control
26 revolving fund and related water quality
27 activities including suballocation to
28 other state departments and agencies
29 (09SR1857) ................................... 5,500,000
30 For services and expenses including personal
31 service, fringe benefits, and nonpersonal
32 service for the Excelsior Conservation
33 Corps program including suballocation to
34 other state departments and agencies
35 (09CC1857) ..................................... 200,000
36 Capital Projects Funds - Federal
37 Federal Capital Projects Fund
38 Water Resources Purpose
39 For federal capitalization grants for the
40 water pollution control revolving fund
41 (09SF1857) ................................. 175,000,000
126 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ADMINISTRATION (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For alterations, rehabilitation and improvements at education camps
7 and centers including personal service, fringe benefits and indirect
8 costs (09ED1750) ... 500,000 ........................ (re. $500,000)
9 By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
10 section 1, of the laws of 2015:
11 For services and expenses including personal service, fringe benefits
12 and indirect costs relating to the maintenance and upgrade of the
13 department's information technology infrastructure, including but
14 not limited to the improved resiliency of the existing computer
15 systems environment, business continuance, equipment and infrastruc-
16 ture related to the DEC automated licensing system (DECALS) and
17 improvements necessary for compliance with statewide cyber security
18 requirements including suballocation to other state departments and
19 agencies (09CS1450) ... 2,000,000 ................. (re. $2,000,000)
20 By chapter 54, section 1, of the laws of 2013:
21 For alterations, rehabilitation and improvements at education camps
22 and centers including personal service, fringe benefits and indirect
23 costs (09ED1350) ... 1,000,000 ...................... (re. $649,000)
24 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
25 section 1, of the laws of 2015:
26 For services and expenses including personal service, fringe benefits
27 and indirect costs relating to the maintenance and upgrade of the
28 department's information technology infrastructure, including but
29 not limited to the improved resiliency of the existing computer
30 systems environment, business continuance, equipment and infrastruc-
31 ture related to the DEC automated licensing system (DECALS) and
32 improvements necessary for compliance with statewide cyber security
33 requirements including suballocation to other state departments and
34 agencies (09CS1350) ... 4,000,000 ................. (re. $4,000,000)
35 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
36 section 1, of the laws of 2015:
37 For services and expenses including personal service, fringe benefits
38 and indirect costs relating to the maintenance and upgrade of the
39 department's information technology infrastructure, including but
40 not limited to the improved resiliency of the existing computer
41 systems environment, business continuance, equipment and infrastruc-
42 ture related to the DEC automated licensing system (DECALS) and
43 improvements necessary for compliance with statewide cyber security
44 requirements including suballocation to other state departments and
45 agencies (09CS1250) ... 1,000,000 ................. (re. $1,000,000)
127 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2010:
2 For alterations, rehabilitation and improvements at education camps
3 and centers including personal services and fringe benefits and
4 indirect costs (09ED1050) ... 600,000 ............... (re. $318,000)
5 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
6 section 1, of the laws of 2015:
7 For services and expenses including personal services and fringe bene-
8 fits and indirect costs relating to the maintenance and upgrade of
9 the department's information technology infrastructure, including
10 but not limited to the improved resiliency of the existing computer
11 systems environment, business continuance, equipment and infrastruc-
12 ture related to the DEC automated licensing system (DECALS) and
13 improvements necessary for compliance with statewide cyber security
14 requirements including suballocation to other state departments and
15 agencies (09CS0950) ... 3,500,000 ................. (re. $1,735,000)
16 AIR RESOURCES (CCP)
17 Special Revenue Funds - Other
18 Clean Air Fund
19 Mobile Source Account
20 Air Resources Purpose
21 By chapter 55, section 1, of the laws of 1999:
22 For services and expenses relating to the implementation and adminis-
23 tration of the clean air mobile source program (09MO9955) ..........
24 3,000,000 ............................................ (re. $97,000)
25 AIR RESOURCES - CLEAN WATER/CLEAN AIR (CCP)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Air Resources Purpose
29 Air Quality Improvement Projects
30 By chapter 54, section 1, of the laws of 2002:
31 For state assistance payments for the state share of the costs of air
32 quality/green growth projects in accordance with the provisions of
33 title 6 of article 56 of the environmental conservation law for
34 project costs, including costs incidental and appurtenant thereto
35 and for payment of reimbursements to the clean water/clean air
36 implementation fund for services and expenses of state departments
37 and agencies, including fringe benefits, hereinafter referred to as
38 "Air Quality Project Disbursements". The moneys appropriated herein
39 may be suballocated to any state department or agency. Further,
40 moneys herein appropriated may be suballocated only to public
41 authorities and public benefit corporations specifically authorized
42 by title 6 of article 56 of the environmental conservation law to
43 enter into contracts for state assistance payments for the state
44 share of costs for air quality projects, provided however, that
128 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 moneys herein appropriated pursuant to subdivision 1 of section
2 56-0603 of the environmental conservation law for state clean-fueled
3 vehicles projects may be suballocated to any public authority or
4 public benefit corporation and moneys herein appropriated pursuant
5 to section 56-0607 of the environmental conservation law for other
6 air quality projects may be suballocated to the environmental facil-
7 ities corporation. Notwithstanding any other provision of law to the
8 contrary, the moneys hereby appropriated shall be available for
9 state air quality improvement projects in accordance with title 6 of
10 article 56 of the environmental conservation law upon the issuance
11 of a certificate of approval of availability by the director of the
12 division of the budget. The state comptroller shall at the commence-
13 ment of each month certify to the director of the division of the
14 budget, the commissioner of environmental conservation, the chairman
15 of the senate finance committee, and the chairman of the assembly
16 ways and means committee, the amounts disbursed from this appropri-
17 ation for "Air Quality Improvement Disbursements" for the month
18 preceding such certification (09BA0255) ............................
19 6,000,000 ......................................... (re. $1,588,000)
20 Project Schedule
21 PROJECT AMOUNT
22 --------------------------------------------
23 (thousands of dollars)
24 Clean-fueled buses projects .......... 4,000
25 State clean-fueled vehicles
26 projects ........................... 2,000
27 --------------
28 Total ............................ 6,000
29 ==============
30 By chapter 55, section 1, of the laws of 2000:
31 For state assistance payments for the state share of the costs of air
32 quality/green growth projects in accordance with the provisions of
33 title 6 of article 56 of the environmental conservation law for
34 project costs, including costs incidental and appurtenant thereto
35 and for payment of reimbursements to the clean water/clean air
36 implementation fund for services and expenses of state departments
37 and agencies, including fringe benefits, hereinafter referred to as
38 "Air Quality Project Disbursements". The moneys appropriated herein
39 may be suballocated to any state department or agency. Further,
40 moneys herein appropriated may be suballocated only to public
41 authorities and public benefit corporations specifically authorized
42 by title 6 of article 56 of the environmental conservation law to
43 enter into contracts for state assistance payments for the state
44 share of costs for air quality projects, provided however, that
45 moneys herein appropriated pursuant to subdivision 1 of section
46 56-0603 of the environmental conservation law for state clean-fueled
47 vehicles projects may be suballocated to any public authority or
48 public benefit corporation and moneys herein appropriated pursuant
49 to section 56-0607 of the environmental conservation law for other
50 air quality projects may be suballocated to the environmental facil-
129 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ities corporation. Notwithstanding any other provision of law to the
2 contrary, the moneys hereby appropriated shall be available for
3 state air quality improvement projects in accordance with title 6 of
4 article 56 of the environmental conservation law upon the issuance
5 of a certificate of approval of availability by the director of the
6 division of the budget. The state comptroller shall at the commence-
7 ment of each month certify to the director of the division of the
8 budget, the commissioner of environmental conservation, the chairman
9 of the senate finance committee, and the chairman of the assembly
10 ways and means committee, the amounts disbursed from this appropri-
11 ation for "Air Quality Improvement Disbursements" for the month
12 preceding such certification (09BA0055) ............................
13 26,000,000 .......................................... (re. $102,000)
14 Project Schedule
15 PROJECT AMOUNT
16 --------------------------------------------
17 (thousands of dollars)
18 State clean-fueled vehicles
19 projects ........................... 2,000
20 Clean-fueled buses projects .......... 4,000
21 Clean air for schools projects ...... 20,000
22 --------------
23 Total ............................. 26,000
24 ==============
25 By chapter 55, section 1, of the laws of 1999:
26 For state assistance payments for the state share of the costs of air
27 quality/green growth projects in accordance with the provisions of
28 title 6 of article 56 of the environmental conservation law for
29 project costs, including costs incidental and appurtenant thereto
30 and for payment of reimbursements to the clean water/clean air
31 implementation fund for services and expenses of state departments
32 and agencies, including fringe benefits, hereinafter referred to as
33 "Air Quality Project Disbursements". The moneys appropriated herein
34 may be suballocated to any state department or agency. Further,
35 moneys herein appropriated may be suballocated only to public
36 authorities and public benefit corporations specifically authorized
37 by title 6 of article 56 of the environmental conservation law to
38 enter into contracts for state assistance payments for the state
39 share of costs for air quality projects, provided however, that
40 moneys herein appropriated pursuant to subdivision 1 of section
41 56-0603 of the environmental conservation law for state clean-fueled
42 vehicles projects may be suballocated to any public authority or
43 public benefit corporation and moneys herein appropriated pursuant
44 to section 56-0607 of the environmental conservation law for other
45 air quality projects may be suballocated to the environmental facil-
46 ities corporation. Notwithstanding any other provision of law to the
47 contrary, the moneys hereby appropriated shall be available for
48 state air quality improvement projects in accordance with title 6 of
49 article 56 of the environmental conservation law upon the issuance
50 of a certificate of approval of availability by the director of the
130 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 division of the budget. The state comptroller shall at the commence-
2 ment of each month certify to the director of the division of the
3 budget, the commissioner of environmental conservation, the chairman
4 of the senate finance committee, and the chairman of the assembly
5 ways and means committee, the amounts disbursed from this appropri-
6 ation for "Air Quality Improvement Disbursements" for the month
7 preceding such certification (09BA9955) ............................
8 37,000,000 ........................................... (re. $38,000)
9 Project Schedule
10 PROJECT AMOUNT
11 -------------------------------------------
12 (thousands of dollars)
13 State clean-fueled vehicles
14 projects ........................... 4,000
15 Clean-fueled buses projects .......... 8,000
16 Clean air for schools projects ...... 25,000
17 --------------
18 Total ............................. 37,000
19 ==============
20 By chapter 55, section 1, of the laws of 1998:
21 For state assistance payments for the state share of the costs of air
22 quality/green growth projects in accordance with the provisions of
23 title 6 of article 56 of the environmental conservation law for
24 project costs, including costs incidental and appurtenant thereto
25 and for payment of reimbursements to the clean water/clean air
26 implementation fund for services and expenses of state departments
27 and agencies, including fringe benefits, hereinafter referred to as
28 "Air Quality Project Disbursements". The moneys appropriated herein
29 may be suballocated to any state department or agency. Further,
30 moneys herein appropriated may be suballocated only to public
31 authorities and public benefit corporations specifically authorized
32 by title 6 of article 56 of the environmental conservation law to
33 enter into contracts for state assistance payments for the state
34 share of costs for air quality projects, provided however, that
35 moneys herein appropriated pursuant to paragraph one of section
36 56-0603 of the environmental conservation law for state clean-fueled
37 vehicles projects may be suballocated to any public authority or
38 public benefit corporation and moneys herein appropriated pursuant
39 to section 56-0607 of the environmental conservation law for other
40 air quality projects may be suballocated to the environmental facil-
41 ities corporation. Notwithstanding the provisions of any general or
42 special law, the moneys hereby appropriated shall be available for
43 state air quality improvement projects in accordance with title 6 of
44 article 56 of the environmental conservation law upon the issuance
45 of a certificate of approval of availability by the director of the
46 division of the budget. The state comptroller shall at the commence-
47 ment of each month certify to the director of the division of the
48 budget, the commissioner of environmental conservation, the chairman
49 of the senate finance committee, and the chairman of the assembly
50 ways and means committee the amounts disbursed from this appropri-
131 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ation for "Air Quality Improvement Disbursements" for the month
2 preceding such certification (09BA9855) ............................
3 44,000,000 ........................................ (re. $3,121,000)
4 project schedule
5 PROJECT AMOUNT
6 --------------------------------------------
7 (thousands of dollars)
8 State clean-fueled vehicles
9 projects ........................... 6,000
10 Clean-fueled buses projects ......... 10,000
11 Other air quality projects ........... 3,000
12 Clean air for schools projects ...... 10,000
13 Clean air for schools projects ...... 15,000
14 --------------
15 Total ............................. 44,000
16 ==============
17 By chapter 55, section 1, of the laws of 1997:
18 For state assistance payments for the state share of the costs of air
19 quality/green growth projects in accordance with the provisions of
20 title 6 of article 56 of the environmental conservation law for
21 project costs, including costs incidental and appurtenant thereto
22 and for payment of reimbursements to the clean water/clean air
23 implementation fund for services and expenses of state departments
24 and agencies, including fringe benefits, hereinafter referred to as
25 "Air Quality Project Disbursements". The moneys appropriated herein
26 may be suballocated to any state department or agency. Further,
27 moneys herein appropriated may be suballocated only to public
28 authorities and public benefit corporations specifically authorized
29 by title 6 of article 56 of the environmental conservation law to
30 enter into contracts for state assistance payments for the state
31 share of costs for air quality projects, provided however, that
32 moneys herein appropriated pursuant to paragraph one of section
33 56-0603 of the environmental conservation law for state clean-fueled
34 vehicles projects may be suballocated to any public authority or
35 public benefit corporation and moneys herein appropriated pursuant
36 to section 56-0607 of the environmental conservation law for other
37 air quality projects may be suballocated to the environmental facil-
38 ities corporation. Notwithstanding the provisions of any general or
39 special law, the moneys hereby appropriated shall be available for
40 state air quality improvement projects in accordance with title 6 of
41 article 56 of the environmental conservation law upon the issuance
42 of a certificate of approval of availability by the director of the
43 division of the budget. The state comptroller shall at the commence-
44 ment of each month certify to the director of the division of the
45 budget, the commissioner of environmental conservation, the chairman
46 of the senate finance committee, and the chairman of the assembly
47 ways and means committee the amounts disbursed from this appropri-
48 ation for "Air Quality Improvement Disbursements" for the month
49 preceding such certification (09BA9755) ............................
50 80,000,000 ....................................... (re. $22,568,000)
132 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 project schedule
2 PROJECT AMOUNT
3 --------------------------------------------
4 (thousands of dollars)
5 State clean-fueled vehicles
6 projects ........................... 4,000
7 Clean-fueled buses projects .......... 4,000
8 Other air quality projects .......... 17,000
9 Clean air for schools projects ...... 25,000
10 Environmental compliance
11 assistance projects - air
12 quality ........................... 30,000
13 --------------
14 Total ............................. 80,000
15 ==============
16 AIR RESOURCES - EQBA (CCP)
17 Capital Projects Funds - Other
18 Capital Projects Fund - EQBA (Bondable)
19 Air Resources Purpose
20 Municipal Air Quality Improvement Projects
21 By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
22 section 1, of the laws of 2003:
23 For payment of the costs of state air quality improvement projects
24 including suballocation to other state departments and agencies
25 (09720255) ... 5,810,000 .......................... (re. $5,782,000)
26 By chapter 54, section 1, of the laws of 1983, as amended by chapter 55,
27 section 1, of the laws of 1996:
28 For the state share of the cost of municipal air quality improvement
29 projects, including the payment of liabilities incurred prior to
30 April one, nineteen hundred eighty-three (02878655) ... ..........
31 15,689,000 ............................................ (re. $8,000)
32 By chapter 54, section 3, of the laws of 1981, as amended by chapter 54,
33 section 3, of the laws of 1993:
34 For the state share of the cost of municipal air quality improvement
35 projects, including the payment of liabilities incurred prior to
36 April 1, 1981 (00333755) ... ... 20,222,000 ......... (re. $2,000)
37 By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
38 section 3, of the laws of 1982, for:
39 The state share of the cost of municipal air quality improvement
40 projects, including the payment of liabilities incurred prior to
41 April 1, 1975 (00320655) ... ........................ (re. $2,000)
42 By chapter 54, section 1, of the laws of 1974, as amended by chapter 54,
43 section 3, of the laws of 1988, for:
133 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The state share of the cost of municipal air quality improvement
2 projects including the payment of liabilities incurred prior to
3 April 1, 1974 (00319455) ... ... 15,483,930 ......... (re. $1,000)
4 By chapter 673, section 4, of the laws of 1973, as amended by chapter
5 54, section 3, of the laws of 1989, for:
6 The state share of the cost of municipal air quality improvement
7 projects (00319055) ... ... 15,230,931 ............ (re. $342,000)
8 State Air Quality Improvement Projects
9 By chapter 54, section 1, of the laws of 1987:
10 For payment of the cost of State air quality improvement projects,
11 including the payment of liabilities incurred prior to April 1, 1987
12 (09A18755) ... ..... 2,588,000 .................... (re. $528,000)
13 CLEAN WATER/CLEAN AIR BOND FUND (CCP)
14 Capital Projects Funds - Other
15 Clean Water/Clean Air Bond Fund
16 Bond Proceeds Purpose
17 By chapter 55, section 1, of the laws of 1997:
18 The sum of $1,475,000,000 or so much thereof as may be necessary is
19 hereby appropriated from the clean water/clean air bond fund as
20 established by section 97-aaa of the state finance law for payment
21 to the capital projects fund for disbursements from such fund as
22 certified by the state comptroller as: "Safe Drinking Water Project
23 Disbursements", "Clean Water Project Disbursements", "Solid Waste
24 Project Disbursements", "Environmental Restoration Project Disburse-
25 ments", and "Air Quality Project Disbursements".
26 The director of the budget shall designate to the state comptroller
27 appropriations made from the capital projects fund which are eligi-
28 ble for reimbursement from the clean air/clean water bond fund. The
29 state comptroller shall at the commencement of each month certify to
30 the director of the budget, the chairman of the senate finance
31 committee, and the chairman of the assembly ways and means commit-
32 tee, the amounts disbursed from such appropriations.
33 No moneys shall be available from the clean water/clean air bond fund
34 until a certificate of approval of availability shall have been
35 issued by the director of the budget, and a copy of such certificate
36 of approval filed with the chairman of the senate finance committee
37 and the chairman of the assembly ways and means committee (09019710)
38 1,475,000,000 ................................... (re. $118,940,000)
39 CLEAN WATER/CLEAN AIR IMPLEMENTATION (CCP)
40 Capital Projects Funds - Other
41 Clean Water/Clean Air Implementation Fund
42 Clean Water/Clean Air Implementation Purpose
43 By chapter 55, section 1, of the laws of 2009:
134 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses including personal services and fringe bene-
2 fits necessary to implement the clean water/clean air bond act
3 (09BA09WI) ... 1,050,000 .......................... (re. $1,050,000)
4 By chapter 55, section 1, of the laws of 2008:
5 For services and expenses including personal services and fringe bene-
6 fits necessary to implement the clean water/clean air bond act
7 (09BA08WI) ... 1,050,000 .......................... (re. $1,050,000)
8 By chapter 55, section 1, of the laws of 2007:
9 For services and expenses including personal services and fringe bene-
10 fits necessary to implement the clean water/clean air bond act
11 (09BA07WI) ... 1,050,000 .......................... (re. $1,050,000)
12 By chapter 55, section 1, of the laws of 2006:
13 For services and expenses including personal services and fringe bene-
14 fits necessary to implement the clean water/clean air bond act
15 (09BA06WI) ... 1,050,000 ............................ (re. $348,000)
16 By chapter 55, section 1, of the laws of 2005:
17 For services and expenses including personal services and fringe bene-
18 fits necessary to implement the clean water/clean air bond act
19 (09BA05WI) ... 1,050,000 .......................... (re. $1,050,000)
20 By chapter 55, section 1, of the laws of 2004:
21 For services and expenses including personal services and fringe bene-
22 fits necessary to implement the clean water/clean air bond act in
23 accordance with the purpose included in the following project sched-
24 ule (09BA04WI) ... 2,527,000 ...................... (re. $1,857,000)
25 Project Schedule
26 PROJECT AMOUNT
27 --------------------------------------------
28 (thousands of dollars)
29 Clean Water .......................... 1,071
30 Environmental Restoration ............ 1,138
31 Solid Waste ............................ 318
32 --------------
33 Total ............................ 2,527
34 ==============
35 ENVIRONMENT AND RECREATION (CCP)
36 Capital Projects Funds - Other
37 Environmental Protection Fund
38 Environment and Recreation Purpose
39 By chapter 54, section 1, of the laws of 2017:
40 For services and expenses of projects and purposes authorized by
41 section 92-s of the state finance law to receive funding from the
42 solid waste account in accordance with a programmatic and financial
43 plan to be approved by the director of the budget, including subal-
135 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 location to other state departments and agencies, according to the
2 following:
3 Non-hazardous landfill closure projects, including $300,000 for Essex
4 county under an agreement with the department of environmental
5 conservation and $150,000 for Hamilton county under an agreement
6 with the department of environmental conservation (09LC17ER) .......
7 700,000 ............................................. (re. $700,000)
8 Municipal waste reduction or recycling projects, and $2,000,000 of
9 such amount shall be made available for municipalities and not-for-
10 profit food banks for projects for food donation and the recycling
11 of food scraps (09MR17ER) ... 14,000,000 ......... (re. $13,658,000)
12 Secondary materials regional marketing assistance (09SM17ER) .........
13 500,000 ............................................. (re. $500,000)
14 Pesticide program, not less than $200,000 of which shall be for activ-
15 ities related to Long Island pesticide pollution prevention
16 (09PD17ER) ... 1,500,000 .......................... (re. $1,500,000)
17 Notwithstanding any law to the contrary, for the payment of the costs
18 associated with environmental justice projects and programs, includ-
19 ing but not limited to: monitoring of air quality; education and
20 outreach; no more than $500,000 for the community garden grant
21 program; not more than $1,000,000 for the connect kids program
22 facilitating access by title 1 schools to outdoor recreational
23 activities, public lands and parks; improvements to environmental
24 quality; or environmental job training, in environmental justice,
25 inner city and underserved communities, and which are undertaken by
26 the state, or on behalf of the state by municipalities or not-for-
27 profit corporations; and $3,000,000 of such amount shall be made
28 available for community impact and job training grants; including
29 $500,000 of such amount shall be made available to a not-for-profit
30 organization for the purpose of awarding grants on a competitive
31 basis to community groups to build the capacity of such groups,
32 provided that up to ten percent may be made available for adminis-
33 trative costs and/or technical assistance. Community impact and job
34 training grants shall be in or affecting environmental justice
35 communities in an amount of up to $100,000 for community groups for
36 projects that address an environmental justice community's exposure
37 to multiple environmental harms and risks, including lead exposure
38 and shall include implementation, studies, including air monitoring,
39 to investigate the environment, or related public health issues of
40 the community, research that will be used to expand the knowledge or
41 understanding of the affected community and ways to improve the
42 resiliency of the affected community. The results of the investi-
43 gation shall be disseminated to members of the affected community.
44 Community groups eligible for funding shall be located in the same
45 area as the environmental and/or related public health issues to be
46 addressed by the project. Such groups shall be primarily focused on
47 addressing the environmental and/or related public health issues of
48 the residents of the affected community and shall be comprised
49 primarily of members of the affected community (09EJ17ER) ..........
50 8,000,000 ......................................... (re. $8,000,000)
136 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any law to the contrary, for assessment and recovery
2 of any natural resource damages (09RD17ER) .........................
3 3,235,000 ......................................... (re. $3,235,000)
4 Notwithstanding any law to the contrary, for the pollution prevention
5 institute, and including $100,000 for the department to contract
6 with the Northeast waste management officials' association for the
7 Interstate Chemicals Clearing house (09PP17ER) .....................
8 4,000,000 ......................................... (re. $4,000,000)
9 Environmental health for assessments, testing and actions including
10 but not limited to abatement to address suspected human exposure to
11 chemical, physical and microbiological agents, including contam-
12 inants in drinking water; including up to $500,000 for the Clean-
13 SweepNY program; and $1,000,000 to the State University of New York
14 at Stony Brook, directly or through its research foundation, to
15 support research development and any associated testing or pilot
16 projects towards the treatment of water to remove 1,4-dioxane; and
17 $500,000 to land banks to assist with lead abatement; and $2,000,000
18 for children's environmental health centers, including school and
19 community childhood lead exposure assessment conducted by such
20 centers and not more than $625,000 for programs to expand and
21 improve access to local, fresh, nutritional food to nutritionally
22 underserved neighborhoods in New York State through the Fresh
23 Connect Program (09EH17ER) ... 6,500,000 .......... (re. $6,500,000)
24 Brownfield opportunity area grants as authorized pursuant to section
25 970-r of the general municipal law (09BO17ER) ......................
26 2,000,000 ......................................... (re. $2,000,000)
27 For services and expenses of projects and purposes authorized by
28 section 92-s of the state finance law to receive funding from the
29 parks, recreation and historic preservation account in accordance
30 with a programmatic and financial plan to be approved by the direc-
31 tor of the budget, including suballocation to other state depart-
32 ments and agencies, according to the following:
33 Local waterfront revitalization programs, notwithstanding any law to
34 the contrary, not less than, $10,000,000 for waterfront revitaliza-
35 tion projects which are in or primarily serve areas where demograph-
36 ic and other relevant data for such areas demonstrate that the areas
37 are densely populated and have sustained physical deterioration,
38 decay, neglect, or disinvestment, or where a substantial proportion
39 of the residential population is of low income or is otherwise
40 disadvantaged and is underserved with respect to the existing recre-
41 ational opportunities in the area including up to $2,000,000 for
42 updates to existing local waterfront revitalization program plans to
43 mitigate future physical climate risks; and including $660,000 for
44 Adirondack infrastructure and environmental improvements for the
45 towns of Minerva, Indian Lake and Newcomb and $200,000 for the
46 Niagara River greenway commission (09WR17ER) .......................
47 16,000,000 ....................................... (re. $16,000,000)
48 Parks, recreation and historic preservation projects, notwithstanding
49 any law to the contrary, not less than, $10,000,000 for municipal
50 parks projects which are in or primarily serve areas where demo-
51 graphic and other relevant data for such areas demonstrate that the
52 areas are densely populated and have sustained physical deteri-
137 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 oration, decay, neglect or disinvestment or where a substantial
2 proportion of the residential population is of low income or is
3 otherwise disadvantaged and is underserved with respect to the
4 existing recreational opportunities in the area; and including
5 $250,000 for Tivoli Park, $1,000,000 for the Ulster County rail
6 trail pursuant to initiation of a public planning process; and
7 $1,000,000 to the city of New York for the East River Esplanade
8 107th Street Pier (09MP17ER) ... 20,000,000 ...... (re. $20,000,000)
9 Notwithstanding any law to the contrary, for state parks and land and
10 easement infrastructure, access and stewardship projects which shall
11 include capital projects: (i) on state parks and state lands pursu-
12 ant to sections 54-0303 and 56-0307 of the environmental conserva-
13 tion law; (ii) on state parks or state owned lands and easements
14 under the jurisdiction of the department of environmental conserva-
15 tion or the office of parks, recreation and historic preservation
16 for access opportunities for people with disabilities; access to the
17 State Forest Preserve, State reforestation, Wildlife Management
18 areas and conservation easement lands; recreational trail
19 construction and maintenance; Catskill and Adirondack camp ground
20 improvements to public access and sanitation facilities; environ-
21 mental education; facility improvements; archeological, historic,
22 cultural and natural resource surveys, forest health surveys, inter-
23 pretation, and inventories, and response to forest pests including
24 southern pine beetle; Forest Preserve and state forest unit manage-
25 ment planning; invasive species management; conservation easement
26 public recreation planning; habitat restoration and enhancement;
27 state fish hatchery improvements; state tree nursery improvements;
28 water access facilities and safety improvements; public beach facil-
29 ity development and improvement; public access improvements at day
30 use areas; state historic site exterior restoration; and cabin area
31 and camping facility development, restoration and reconstruction;
32 (iii) $1,000,000 for Belleayre Mountain ski center projects; (iv)
33 $500,000 from the public access and stewardship allocation to Parks
34 & Trails New York for the purpose of awarding grants on a compet-
35 itive basis to local parks and department of environmental conserva-
36 tion friends groups, provided that up to ten percent of such amount
37 may be made available for administrative costs and/or technical
38 assistance; and $250,000 for the Hudson River Valley Trail Grants
39 (09ST17ER) ... 30,000,000 ........................ (re. $29,139,000)
40 Notwithstanding subdivision 7 of section 92-s of the state finance law
41 or any other law to the contrary, for services and expenses of the
42 Hudson River Park Trust for projects related to the development of
43 the Hudson River Park consistent with provisions of chapter 592 of
44 the laws of 1998, including but not limited to utility infrastruc-
45 ture improvements; provided, however, such funds shall not be avail-
46 able for suballocation to any public benefit corporation or public
47 authority with the exception of the Hudson River Park Trust and
48 shall be available solely for the liabilities incurred by the Hudson
49 River Park Trust or by other state departments or agencies on behalf
50 of the Hudson River Park Trust on or after April 1, 1999. Provided
51 further that, the comptroller is hereby authorized and directed to
52 release monies to the Hudson River Park Trust in amounts set forth
138 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 in a schedule approved by the director of the budget (09HR17ER) ...
2 3,200,000 ......................................... (re. $3,200,000)
3 Notwithstanding any law to the contrary, for zoos, botanical gardens
4 and aquaria program (09ZB17ER) ... 15,000,000 .... (re. $15,000,000)
5 Notwithstanding any other provisions of law, for the administration of
6 the programs of section 79-b of the navigation law (09NV17ER) ......
7 2,000,000 ............................................. (re. $6,000)
8 For services and expenses of projects and purposes authorized by
9 section 92-s of the state finance law to receive funding from the
10 open space account in accordance with a programmatic and financial
11 plan to be approved by the director of the budget, including subal-
12 location to other state departments and agencies, according to the
13 following:
14 Costs related to the acquisition of the following properties: Atlantic
15 Coast, Long Island Sound, Long Island South Shore Estuary Reserve,
16 Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
17 Western Suffolk/Nassau Special Groundwater Protection Areas, Mott
18 Haven-Port Morris Waterfront, Bronx River Greenway, Inner
19 City/Underserved Community Parks, Long Pond, Staten Island Green-
20 belt, Staten Island Bluebelt, Staten Island Wet Woods, Great Swamp,
21 Plutarch/Black Creek Wetlands Complex, New York Highlands, Shawan-
22 gunk Mountains Region, Delaware River Highlands, Hudson River
23 Corridor/Hudson River Estuary and Greenway Trail/ Hudson River
24 School Art Trail, Hudson Valley/New York City Foodshed, Catskill
25 Unfragmented Forest, Catskill River and Road Corridors, New York
26 City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
27 Five Rivers Environmental Education Center, Lake George watershed,
28 Lake Champlain watershed, Boeselager forestry, Rensselaer Plateau,
29 Oomsdale Farm and Surrounding Landscape, Turtle Conservation Sites,
30 Region 4 Rail Trail Projects, Susquehanna River Valley Corridor,
31 Saratoga County, Hudson River Projects, Follensby Park, Washington
32 County, Rome Sand Plains, Black Creek Watershed, Tug Hill Core
33 Forests and Headwater Streams, Nelson Swamp, State Park Battle-
34 fields, Genny Green Trail/Link Trail, Onondaga Escarpment, State
35 Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
36 Northern Montezuma Wetlands, Genesee River Corridor, Seneca Army
37 Depot Conservation Area, Lake Erie Tributary Gorges, Buffalo River
38 Watershed, Catharine Valley Complex, High-Tor/Bristol Hills/Bare
39 Hill State Unique Area, Lake Ontario and Lake Erie Shorelines,
40 Islands and Niagara River, Long Island Trails and Greenways, Bronx
41 Harlem Greenway, Harbor Herons Wildlife Complex, Schunnemunk
42 Mountain/Moodna Creek/Woodcock Mountain/Hudson Highlands Connectivi-
43 ty Project, Helderbergs, and Finger Lakes Shorelines and Riparian
44 Zones, Hand Hollow Conservation Area, Northern Flow River Corridors,
45 Black River Valley Corridor, Fort Drum Army Compatible Use Buffer
46 Project, Herkimer Home Viewshed, Inman Gulf, Massawepie Mire, Moose
47 River Corridor, St. Lawrence River Islands, Shoreline and Wetlands,
48 Southern Skaneateles Lake Forest and Shoreline, Salmon River Corri-
49 dor, Emerald Necklace, Riparian Buffers, Coastline and Wetland
50 Protection Projects Aimed at Reducing the Impacts of Storms, Storm
51 Surges and Flooding on Human and Natural Communities, Long Distance
52 Trail Corridors, Statewide Small Projects, State Forest, Unique Area
139 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Wildlife Management Area Protection, Working Forest Lands, State
2 Park and State Historic Site Protection, (a) notwithstanding any law
3 to the contrary, $1,000,000 from the land acquisition allocation for
4 urban forestry projects provided that no less than $500,000 shall be
5 made available for such programs in cities and towns with popu-
6 lations of 65,000 or more; (b) notwithstanding any law to the
7 contrary, $2,500,000 from the land acquisition allocation to the
8 land trust alliance for the purpose of awarding grants on a compet-
9 itive basis to local land trusts, provided that up to ten percent of
10 such amount may be made available for administrative costs and/or
11 technical assistance; (c) notwithstanding any law to the contrary,
12 not less than $3,000,000 for land acquisition in department of envi-
13 ronmental conservation regions 1, 2 and 3 (09LA17ER) ...............
14 36,349,000 ....................................... (re. $36,349,000)
15 Albany Pine Bush Preserve Commission, with $50,000 to the city of
16 Schenectady for the Woodlawn Preserve (09AP17ER) ...................
17 2,675,000 ......................................... (re. $2,675,000)
18 Long Island Central Pine Barrens Planning (09LP17ER) .................
19 2,000,000 ......................................... (re. $2,000,000)
20 Long Island South Shore Estuary Reserve (09SE17ER) ...................
21 900,000 ............................................. (re. $900,000)
22 Agricultural non-point source abatement and control projects, notwith-
23 standing any law to the contrary, (a) $1,000,000 shall be made
24 available for services and expenses of the Cornell University Inte-
25 grated Pest Management program; and (b) $500,000 shall be made
26 available to the Cornell Cooperative Extension of Suffolk County for
27 nutrient management planning and implementation activities
28 (09AN17ER) ... 17,000,000 ........................ (re. $17,000,000)
29 Non-agricultural non-point source abatement and control projects
30 notwithstanding any law to the contrary, $550,000 of such amount
31 shall be made available for Cornell community integrated pest
32 management (09NP17ER) ... 7,000,000 ............... (re. $7,000,000)
33 Agriculture and farmland protection activities, notwithstanding any
34 law to the contrary, up to $1,000,000 shall be made available to the
35 tug hill tomorrow land trust for army compatible use buffer program
36 projects around Fort Drum, and up to $87,000 shall be made available
37 to Cornell University for services and expenses of land classifica-
38 tion, agriculture district mapping and master list of soils
39 (09FP17ER) ... 20,000,000 ........................ (re. $20,000,000)
40 Biodiversity stewardship and research; including funding for public
41 New York universities to conduct field studies and research on bidi-
42 versity issues and up to $500,000 of this amount to support pollina-
43 tor diversity, up to $300,000 of which may be allocated to Cornell
44 University, including research related to the potential adverse
45 impacts of pesticides such as neonicitinoids, pursuant to a contract
46 with the department of agriculture and markets, including the devel-
47 opment of bee husbandry best management practices such as pest and
48 pathogen controls; creating diversity of pollinator habitats;
49 research to understand, prevent and recover from pollinator losses;
50 and outreach and education (09BD17ER) ..............................
51 1,000,000 ......................................... (re. $1,000,000)
140 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any law to the contrary, for the Hudson River Estuary
2 Management Plan prepared pursuant to section 11-0306 of the environ-
3 mental conservation law, $1,000,000 of which shall be for the Mohawk
4 river action plan (09HE17ER) .......................................
5 5,500,000 ......................................... (re. $5,500,000)
6 Notwithstanding any law to the contrary, for the Finger Lakes-Lake
7 Ontario Watershed Protection Alliance (09FL17ER) ...................
8 2,279,000 ......................................... (re. $2,279,000)
9 Notwithstanding any law to the contrary, to the Erie County Soil and
10 Water Conservation District for the Lake Erie Watershed Protection
11 Alliance (09LE17ER) ... 250,000 ..................... (re. $250,000)
12 Notwithstanding any law to the contrary, for the state share of costs
13 of wastewater treatment improvement projects undertaken by munici-
14 palities to upgrade municipal systems to meet stormwater, combined
15 sewer overflow, sanitary sewer overflow and wastewater treatment
16 discharge requirements with priority given to systems that are in
17 violation of title 8 of article 17 of the environmental conservation
18 law and aquatic habitat restoration projects undertaken by munici-
19 palities and not-for-profit corporations for aquatic habitat resto-
20 ration projects as defined in subdivision 1 of section 56-0101 of
21 the environmental conservation law; including up to $3,000,000 to
22 Suffolk county to provide a 50 percent match for a program developed
23 in consultation with the department for research, development and
24 pilot projects to develop cost effective methods to address nitrogen
25 and pathogen loading from septic system or cesspool effluent or
26 other sources or to support such efforts without a match at the
27 state university of Stony Brook directly or through its research
28 foundation and $1,500,000 for Suffolk county for sewer improvement
29 projects; and including $5,000,000 for Nassau county for the Bay
30 park wastewater treatment plant outfall pipe, associated conveyance
31 systems, nitrogen abatement treatment works, ocean outfall and/or
32 connections, including up to $400,000 from such amount for testing
33 of monitoring wells in Nassau County and including $250,000 from
34 such amount to the Long Island regional planning council for
35 services and expenses related to the Long Island Nitrogen Action
36 Plan; and including $1,000,000 to maximize the availability of drug
37 collection programs for communities throughout the state, including
38 for the purchase and distribution of tamper proof drug collection
39 boxes, and other federally approved drug collection programs
40 provided that participating in the department of environmental
41 conservation's self-audit program shall not be required; and includ-
42 ing $5,000,000 to update source water assessment plans and develop
43 associated water protection programs some or all of which may be
44 allocated to the United States Geological Survey or the New England
45 Interstate Water Pollution Control Commission; and including up to
46 $500,000 for the removal and appropriate disposal of firefighting
47 foam containing regulated perfluoronated compounds from municipal
48 fire and emergency response departments; and $1,000,000 for activ-
49 ities related to the cleanup of Scajaquada Creek (09WQ17ER) ........
50 20,250,000 ....................................... (re. $20,250,000)
51 Notwithstanding any law to the contrary for New York ocean and Great
52 Lakes ecosystem conservation projects, consistent with the policy
141 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 articulated in article 14 of the environmental conservation law;
2 including $200,000 to Suffolk county for the Peconic Bay Estuary
3 Program and including $60,000 for the Great Lakes commission; and
4 including $250,000 for the Long Island Commission for aquifer
5 protection (09GL17ER) ... 15,000,000 ............. (re. $14,940,000)
6 Notwithstanding any law to the contrary, for the implementation of the
7 recommendations of the invasive species task force prepared pursuant
8 to chapter 324 of the laws of 2003 and for the purposes set forth in
9 chapter 674 of the laws of 2007 including not less than $450,000 for
10 Lake George, provided that not less than $6,050,000 be made avail-
11 able for invasive species eradication, including but not limited to
12 southern pine beetle, including up to $500,000 to Cornell University
13 for the control of hemlock wooly adelgid and including grants
14 related to the control and management of invasive species. Such
15 funding for grants shall be provided on a competitive basis in
16 consultation with the New York Invasive Species Council (09IS17ER)
17 ... 13,000,000 ................................... (re. $12,953,000)
18 Notwithstanding any law to the contrary, for Soil and Water Conserva-
19 tion District activities as authorized for reimbursement and funding
20 in section 11-a of the soil and water conservation districts law
21 (09SW17ER) ... 9,000,000 .......................... (re. $9,000,000)
22 Notwithstanding any law to the contrary, for Agricultural Waste
23 Management projects, including up to $700,000 to Cornell University,
24 in consultation with the department, to continue implementing the
25 dairy acceleration program (09AW17ER) ..............................
26 1,500,000 ......................................... (re. $1,500,000)
27 For services and expenses of projects and purposes authorized by
28 section 92-s of the state finance law to receive funding from the
29 climate change mitigation and adaptation account in accordance with
30 a programmatic and financial plan to be approved by the director of
31 the budget, including suballocation to other state departments and
32 agencies, according to the following:
33 Notwithstanding any law to the contrary, to address greenhouse gas
34 emissions outside of the power sector including but not limited to
35 the development of statewide greenhouse gas inventories, demon-
36 stration projects, community engagement and applied research related
37 to the transportation sector or methane and other short-lived
38 climate pollutant sources (09GG17ER) ...............................
39 1,700,000 ......................................... (re. $1,700,000)
40 Notwithstanding any law to the contrary, for the department of envi-
41 ronmental conservation to fund climate adaptation projects and to
42 provide up to $750,000 to support municipalities incorporation of
43 guidance developed under the community risk and resiliency act into
44 their local planning and ordinances (09SV17ER) .....................
45 750,000 ............................................. (re. $750,000)
46 Notwithstanding any law to the contrary, smart growth program state
47 assistance payments, provided on a competitive basis, to counties,
48 cities, towns, or villages to establish, update or implement compre-
49 hensive plans in a manner consistent with smart growth; provided,
50 however, that up to 25 percent of such payments may be awarded to
51 not-for-profit organizations for such purposes (09SG17ER) ..........
52 2,000,000 ......................................... (re. $2,000,000)
142 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any law to the contrary for the New York state soil
2 and water conservation committee in conjunction with the department
3 of agriculture and markets to develop a pilot climate resilient
4 farms program consistent with agriculture and markets law article
5 11-a, agricultural environmental management program including up to
6 $400,000 for the Cornell Soil Health Program for research and educa-
7 tion to improve soil resiliency to climate variations and mitigate
8 greenhouse gas emissions by carbon sequestration; and up to $50,000
9 in consultation with the department of taxation and finance, the
10 department of agriculture and markets and the empire state develop-
11 ment corporation, for the study of incentives for carbon sequester-
12 ing farming practices which may include tax credits and grants and
13 systems or methods of quantifying carbon sequestration for such
14 incentives (09CR17ER) ... 2,500,000 ............... (re. $2,500,000)
15 Climate smart communities projects pursuant to title 15 of article 54
16 of the environmental conservation law including clean vehicle
17 projects; notwithstanding any law to the contrary, including
18 $500,000 for a resiliency planting program; and including $500,000
19 to implement easily replicated renewable energy projects, including
20 solar arrays, heat pumps, and wind turbines across the state in
21 public low income housing in suburban, urban, and rural areas with
22 the goal of advancing employment opportunities for individuals
23 living in environmental justice communities and individuals who have
24 been discharged from state correctional facilities or local jails
25 (09CS17ER) ... 12,000,000 ........................ (re. $12,000,000)
26 By chapter 55, section 1, of the laws of 2016:
27 For services and expenses of projects and purposes authorized by
28 section 92-s of the state finance law to receive funding from the
29 solid waste account in accordance with a programmatic and financial
30 plan to be approved by the director of the budget, including subal-
31 location to other state departments and agencies, according to the
32 following:
33 Non-hazardous landfill closure projects, including $300,000 for Essex
34 county under an agreement with the department of environmental
35 conservation and $150,000 for Hamilton county under an agreement
36 with the department of environmental conservation (09LC16ER) .......
37 700,000 ............................................. (re. $250,000)
38 Municipal waste reduction or recycling projects, and $3,000,000 of
39 such amount shall be made available through the household hazardous
40 waste state assistance program including, but not limited to, those
41 items defined in subdivision 5 of section 27-2601 of the environ-
42 mental conservation law (09MR16ER) .................................
43 14,000,000 ........................................ (re. $4,552,000)
44 Secondary materials regional marketing assistance including productive
45 reuse of cathode ray tubes and energy conservation services projects
46 (09SM16ER) ... 1,000,000 .......................... (re. $1,000,000)
47 Pesticide program, not less than $200,000 of which shall be for activ-
48 ities related to Long Island pesticide pollution prevention
49 (09PD16ER) ... 1,200,000 ............................ (re. $200,000)
50 Notwithstanding any law to the contrary, for the payment of the costs
51 associated with environmental justice projects and programs, includ-
143 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ing but not limited to: monitoring of air quality; education and
2 outreach; not more than $500,000 for the connect kids program facil-
3 itating access by title 1 schools to outdoor recreational activ-
4 ities, public lands and parks; improvements to environmental quali-
5 ty; or environmental job training, in environmental justice, inner
6 city and underserved communities, and which are undertaken by the
7 state, or on behalf of the state by municipalities or not-for-profit
8 corporations; and $2,000,000 of such amount shall be made available
9 for community impact and job training grants. Community impact and
10 job training grants shall be in or affecting environmental justice
11 communities in an amount of up to $50,000 for community groups for
12 projects that address an environmental justice community's exposure
13 to multiple environmental harms and risks, including lead exposure
14 and shall include implementation, studies, including air monitoring,
15 to investigate the environment, or related public health issues of
16 the community, research that will be used to expand the knowledge or
17 understanding of the affected community and ways to improve the
18 resiliency of the affected community. The results of the investi-
19 gation shall be disseminated to members of the affected community.
20 Community groups eligible for funding shall be located in the same
21 area as the environmental and/or related public health issues to be
22 addressed by the project. Such groups shall be primarily focused on
23 addressing the environmental and/or related public health issues of
24 the residents of the affected community and shall be comprised
25 primarily of members of the affected community (09EJ16ER) ..........
26 7,000,000 ......................................... (re. $6,372,000)
27 Notwithstanding any law to the contrary, for assessment and recovery
28 of any natural resource damages (09RD16ER) .........................
29 1,950,000 ......................................... (re. $1,950,000)
30 Notwithstanding any law to the contrary, for the pollution prevention
31 institute (09PP16ER) ... 4,000,000 ................ (re. $1,013,000)
32 Environmental health for assessments, testing and actions including
33 but not limited to abatement to address suspected human exposure to
34 chemical, physical and microbiological agents, including contam-
35 inants in drinking water; and $2,000,000 for children's environ-
36 mental health centers, including school and community childhood lead
37 exposure assessment conducted by such centers (09EH16ER) ...........
38 3,000,000 ......................................... (re. $3,000,000)
39 Brownfield opportunity area grants as authorized pursuant to section
40 970-r of the general municipal law (09BO16ER) ......................
41 2,000,000 ......................................... (re. $2,000,000)
42 For services and expenses of projects and purposes authorized by
43 section 92-s of the state finance law to receive funding from the
44 parks, recreation and historic preservation account in accordance
45 with a programmatic and financial plan to be approved by the direc-
46 tor of the budget, including suballocation to other state depart-
47 ments and agencies, according to the following:
48 Local waterfront revitalization programs, notwithstanding any law to
49 the contrary, not less than, $10,000,000 for waterfront revitaliza-
50 tion projects which are in or primarily serve areas where demograph-
51 ic and other relevant data for such areas demonstrate that the areas
52 are densely populated and have sustained physical deterioration,
144 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 decay, neglect, or disinvestment, or where a substantial proportion
2 of the residential population is of low income or is otherwise
3 disadvantaged and is underserved with respect to the existing recre-
4 ational opportunities in the area including up to $2,000,000 for
5 updates to existing local waterfront revitalization program plans to
6 mitigate future physical climate risks; and including $660,000 for
7 Adirondack infrastructure and environmental improvements for the
8 towns of Minerva, Indian Lake and Newcomb and $200,000 for the
9 Niagara River greenway commission and including $150,000 for
10 Hammonds Cove dredging projects; and $1,000,000 to the city of New
11 York for the East River Esplanade 107th Street pier (09WR16ER) .....
12 16,000,000 ....................................... (re. $15,580,000)
13 Parks, recreation and historic preservation projects, notwithstanding
14 any law to the contrary, not less than, $10,000,000 for municipal
15 parks projects which are in or primarily serve areas where demo-
16 graphic and other relevant data for such areas demonstrate that the
17 areas are densely populated and have sustained physical deteri-
18 oration, decay, neglect or disinvestment or where a substantial
19 proportion of the residential population is of low income or is
20 otherwise disadvantaged and is underserved with respect to the
21 existing recreational opportunities in the area; and including
22 $250,000 for Tivoli Park, $300,000 for the Ulster County rail trail,
23 pursuant to initiation of a public planning process, and including
24 $100,000 for Old Westbury Gardens to rehabilitate property barns,
25 and including $150,000 for Udall's Cove land acquisition, and
26 including $100,000 to the Town of Middlesex Vine Valley Public Park
27 (09MP16ER) ... 20,000,000 ........................ (re. $20,000,000)
28 Notwithstanding any law to the contrary, for state parks and land and
29 easement infrastructure, access and stewardship projects which shall
30 include capital projects: (i) on state parks and state lands pursu-
31 ant to sections 54-0303 and 56-0307 of the environmental conserva-
32 tion law; (ii) on state parks or state owned lands and easements
33 under the jurisdiction of the department of environmental conserva-
34 tion or the office of parks, recreation and historic preservation
35 for access opportunities for people with disabilities; access to the
36 State Forest Preserve, State reforestation, Wildlife Management
37 areas and conservation easement lands; recreational trail
38 construction and maintenance; Catskill and Adirondack camp ground
39 improvements to public access and sanitation facilities; environ-
40 mental education; facility improvements; archeological, historic,
41 cultural and natural resource surveys, forest health surveys, inter-
42 pretation, and inventories, and response to forest pests; Forest
43 Preserve and state forest unit management planning; invasive species
44 management; conservation easement public recreation planning; habi-
45 tat restoration and enhancement; state fish hatchery improvements;
46 state tree nursery improvements; water access facilities and safety
47 improvements; public beach facility development and improvement;
48 public access improvements at day use areas; state historic site
49 exterior restoration; and cabin area and camping facility develop-
50 ment, restoration and reconstruction; (iii) $500,000 for Belleayre
51 Mountain ski center projects; (iv) $500,000 from the public access
52 and stewardship allocation to Parks & Trails New York for the
145 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 purpose of awarding grants on a competitive basis to local parks'
2 friends groups, provided that up to ten percent of such amount may
3 be made available for administrative costs and/or technical assist-
4 ance; and $250,000 for the Hudson River Valley Trail Grants Program
5 and including $200,000 to SUNY ESF for an updated assessment of the
6 state's deer population (09ST16ER) .................................
7 28,000,000 ....................................... (re. $18,530,000)
8 Notwithstanding subdivision 7 of section 92-s of the state finance law
9 or any other law to the contrary, for services and expenses of the
10 Hudson River Park Trust for projects related to the development of
11 the Hudson River Park consistent with provisions of chapter 592 of
12 the laws of 1998; provided, however, such funds shall not be avail-
13 able for suballocation to any public benefit corporation or public
14 authority with the exception of the Hudson River Park Trust and
15 shall be available solely for the liabilities incurred by the Hudson
16 River Park Trust or by other state departments or agencies on behalf
17 of the Hudson River Park Trust on or after April 1, 1999. Provided
18 further that, the comptroller is hereby authorized and directed to
19 release monies to the Hudson River Park Trust in amounts set forth
20 in a schedule approved by the director of the budget (09HR16ER) ....
21 2,500,000 ......................................... (re. $2,500,000)
22 Notwithstanding any law to the contrary, for zoos, botanical gardens
23 and aquaria program (09ZB16ER) ... 15,000,000 ..... (re. $1,342,000)
24 For services and expenses of projects and purposes authorized by
25 section 92-s of the state finance law to receive funding from the
26 open space account in accordance with a programmatic and financial
27 plan to be approved by the director of the budget, including subal-
28 location to other state departments and agencies, according to the
29 following:
30 Costs related to the acquisition of the following properties: Atlan-
31 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
32 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
33 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
34 Special Groundwater Protection Areas, Mott Haven-Port Morris Water-
35 front, Bronx River Greenway, Inner City/Underserved Community Parks,
36 Long Pond/Butler Woods, Staten Island Greenbelt, Staten Island Blue-
37 belt, Staten Island Wet Woods, Great Swamp, Neversink Highlands,
38 Plutarch/Black Creek Wetlands Complex, New York Highlands, Northern
39 Putnam Greenway, Shawangunk Mountains, Catskill Mountain/ Delaware
40 River Region, Beaverkill/ Willowemoc, Hudson River Estuary/Greenway
41 Trail/Quadricentennial Legacy Trail Corridor, Catskill Unfragmented
42 Forest, Catskill River and Road Corridors, Long Path, New York City
43 Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
44 Rivers Environmental Education Center, Batten Kill Watershed-Sarato-
45 ga National Historic Park View shed, Washington County Agricultural
46 Lands-Saratoga National Historic Park View shed, Lake George
47 watershed, Lake Champlain watershed, Boeselager forestry, Rensselaer
48 plateau, Oomsdale Farm and Surrounding Landscape, Hudson River
49 Gorge, Susquehanna River Valley Corridor, Lake Champlain Shoreline
50 and Wetlands, Saratoga County, State Forest and Wildlife Management
51 Area Protection, Follensby Park, Undeveloped Lake George Shore,
52 Whitney Park, Finch Woodlands, Washington County, Washington County
146 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Grasslands, Recreational Trail Linkages and Networks, Rome Sand
2 Plains, Black Creek Watershed, Portaferry Lake, Tug Hill Core
3 Forests and Headwater Streams, Tioga County Park Opportunities,
4 Nelson Swamp, Clark Reservation State Park, State Parks
5 Greenbelt/Tompkins County, Cattaraugus Creek and tributaries, North-
6 ern Montezuma Wetlands, Seneca Army Depot Conservation Area, Lake
7 Erie Tributary Gorges, Two Rivers State Park, Buffalo River
8 Watershed, Braddock Bay, Catharine Valley Complex, Genesee
9 Greenway/Recreationway, Hi Tor/Bristol Hills, Allegany State Park,
10 Great Lakes Shorelines and Niagara River, Long Island Trail and
11 Greenway System, Bronx Harlem Greenway, Harbor Herons Wildlife
12 Complex, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Held-
13 erberg Escarpment, and Western Finger Lakes: Conesus, Hemlock,
14 Canadice & Honeoye, Hand Hollow Conservation Area, Northern Flow
15 River Corridors, Black River Valley Corridor, Fort Drum Conservation
16 Partnership Project, Herkimer Home Viewshed, Inman Gulf, Massawepie
17 Mire, Moose River Corridor, St. Lawrence River Islands, Shoreline
18 and Wetlands, Carpenter Falls/Bear Swamp Creek Corridor, Salmon
19 River Corridor, Emerald Necklace, Finger Lakes Shorelines, Long
20 Distance Trail Corridors, Statewide Small Projects, Working Forest
21 Lands, State Park and State Historic Site Protection, (a) notwith-
22 standing any law to the contrary, $1,000,000 from the land acquisi-
23 tion allocation for urban forestry projects provided that no less
24 than $500,000 shall be made available for such programs in cities
25 and towns with populations of 65,000 or more; (b) notwithstanding
26 any law to the contrary, $2,000,000 from the land acquisition allo-
27 cation to the land trust alliance for the purpose of awarding grants
28 on a competitive basis to local land trusts, provided that up to ten
29 percent of such amount may be made available for administrative
30 costs and/or technical assistance; (c) notwithstanding any law to
31 the contrary, not less than $3,000,000 for land acquisition in
32 department of environmental conservation regions 1, 2 and 3;
33 $500,000 for a resiliency planting program (09LA16ER) ..............
34 40,000,000 ....................................... (re. $28,986,000)
35 Albany Pine Bush Preserve Commission, with $50,000 to the city of
36 Schenectady for the Woodlawn Preserve (09AP16ER) ...................
37 2,675,000 ........................................... (re. $554,000)
38 Long Island Central Pine Barrens Planning (09LP16ER) .................
39 1,800,000 ........................................... (re. $916,000)
40 Long Island South Shore Estuary Reserve (09SE16ER) ...................
41 900,000 ............................................. (re. $350,000)
42 Agricultural non-point source abatement and control projects, notwith-
43 standing any law to the contrary, (a) $1,000,000 shall be made
44 available for services and expenses of the Cornell University Inte-
45 grated Pest Management program; and (b) $500,000 shall be made
46 available to the Cornell Cooperative Extension of Suffolk County for
47 nutrient management planning and implementation activities
48 (09AN16ER) ... 19,000,000 ........................ (re. $17,947,000)
49 Non-agricultural non-point source abatement and control projects
50 notwithstanding any law to the contrary, $550,000 of such amount
51 shall be made available for Cornell community integrated pest
52 management and including $250,000 to the county of Rockland for the
147 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 development of a long-term water conservation strategy (09NP16ER)
2 ... 8,000,000 ..................................... (re. $7,150,000)
3 Agriculture and farmland protection activities, notwithstanding any
4 law to the contrary, $1,000,000 shall be made available to the tug
5 hill tomorrow land trust for army compatible use buffer program
6 projects around Fort Drum, and $70,000 shall be made available to
7 Cornell University for services and expenses of land classification
8 and master list of soils (09FP16ER) ................................
9 20,000,000 ....................................... (re. $19,938,000)
10 Biodiversity stewardship and research; notwithstanding any law to the
11 contrary, any or all of this amount shall be used for the New York
12 state landowner incentive program to offer grants awarded on a
13 competitive basis to landowners for the implementation of habitat
14 conservation plans and up to $500,000 of this amount to support
15 pollinator diversity, including the development of bee husbandry
16 best management practices such as pest and pathogen controls; creat-
17 ing diversity of pollinator habitats; research to understand,
18 prevent and recover from pollinator losses; and outreach and educa-
19 tion (09BD16ER) ... 1,000,000 ....................... (re. $929,000)
20 Notwithstanding any law to the contrary, for the Hudson River Estuary
21 Management Plan prepared pursuant to section 11-0306 of the environ-
22 mental conservation law, $800,000 of which shall be for the Mohawk
23 river action plan (09HE16ER) ... 5,000,000 ........ (re. $3,085,000)
24 Notwithstanding any law to the contrary, for the Finger Lakes-Lake
25 Ontario Watershed Protection Alliance (09FL16ER) ...................
26 2,279,000 ......................................... (re. $1,494,000)
27 Notwithstanding any law to the contrary, to the Erie County Soil and
28 Water Conservation District for the Lake Erie Watershed Protection
29 Alliance (09LE16ER) ... 250,000 ..................... (re. $250,000)
30 Notwithstanding any law to the contrary, for the state share of costs
31 of wastewater treatment improvement projects undertaken by munici-
32 palities to upgrade municipal systems to meet stormwater, combined
33 sewer overflow, sanitary sewer overflow and wastewater treatment
34 discharge requirements with priority given to systems that are in
35 violation of title 8 of article 17 of the environmental conservation
36 law and aquatic habitat restoration projects undertaken by munici-
37 palities and not-for-profit corporations for aquatic habitat resto-
38 ration projects as defined in subdivision 1 of section 56-0101 of
39 the environmental conservation law; including up to $3,000,000 to
40 Suffolk county to provide a 50 percent match for a program developed
41 in consultation with the department for research, development and
42 pilot projects to develop cost effective methods to address nitrogen
43 and pathogen loading from septic system or cesspool effluent or
44 other sources or to support such efforts without a match at the
45 state university of Stony Brook directly or through its research
46 foundation and $1,500,000 for Suffolk county for sewer improvement
47 projects; and including $5,000,000 for Nassau county for the Bay
48 park wastewater treatment plant outfall pipe, associated conveyance
49 systems, nitrogen abatement treatment works, ocean outfall and/or
50 connections; including $1,000,000 to maximize the availability of
51 drug collection programs for communities throughout the state,
52 including to local law enforcement agencies for the purchase and
148 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 distribution of tamper proof drug collection boxes, and other feder-
2 ally approved drug collection programs, and including $750,000 for
3 the city of Corning Denison Park stormwater outfall pipe (09WQ16ER)
4 ... 20,000,000 ................................... (re. $19,441,000)
5 Notwithstanding any law to the contrary for New York ocean and Great
6 Lakes ecosystem conservation projects, consistent with the policy
7 articulated in article 14 of the environmental conservation law;
8 including $200,000 to Suffolk county for the Peconic Bay Estuary
9 Program (09GL16ER) ... 15,000,000 ................ (re. $11,801,000)
10 Notwithstanding any law to the contrary, for the implementation of the
11 recommendations of the invasive species task force prepared pursuant
12 to chapter 324 of the laws of 2003 and for the purposes set forth in
13 chapter 674 of the laws of 2007 including not less than $450,000 for
14 Lake George, provided that not less than $5,550,000 be made avail-
15 able for invasive species eradication, including but not limited to
16 southern pine beetle, emerald ash borer, and hydrilla and including
17 grants related to the control and management of invasive species.
18 Such funding for grants shall be provided on a competitive basis in
19 consultation with the New York Invasive Species Council (09IS16ER)
20 ... 12,000,000 ................................... (re. $11,550,000)
21 Notwithstanding any law to the contrary, for Agricultural Waste
22 Management projects (09AW16ER) ... 1,500,000 ...... (re. $1,353,000)
23 Notwithstanding any law to the contrary, for a public waterway recon-
24 struction program to be established and administered by the depart-
25 ment of state, at the request of any county, city, town, village or
26 other governmental entity, for projects to dredge, clear, and repair
27 public waterways, according to best practices, that allow for proac-
28 tively managing public waterways. Funds appropriated herein shall
29 provide fifty percent reimbursement to such localities for author-
30 ized expenditures (09DR16ER) ... 1,000,000 ........ (re. $1,000,000)
31 Notwithstanding any law to the contrary, and within amounts appropri-
32 ated, for a free water testing pilot program to be established and
33 administered by the department of health, or pursuant to contracts
34 with laboratories, within one hundred and twenty days whereby, at
35 the request of any individual, public water system, or school
36 district, the department shall cause to be provided to such individ-
37 ual, public water system, or school district a container or contain-
38 ers for the collection of a sample of drinking water and the means
39 to forward such sample to a laboratory to be tested for contam-
40 inants. The results of such test shall be forwarded to the individ-
41 ual, public water system, or school district by the laboratory as
42 soon as practicable (09WT16ER) .....................................
43 1,500,000 ......................................... (re. $1,335,000)
44 For services and expenses of projects and purposes authorized by
45 section 92-s of the state finance law to receive funding from the
46 climate change mitigation and adaptation account in accordance with
47 a programmatic and financial plan to be approved by the director of
48 the budget, including suballocation to other state departments and
49 agencies, according to the following:
50 Notwithstanding any law to the contrary, to address greenhouse gas
51 emissions outside of the power sector including but not limited to
52 the development of inventories, demonstration projects and applied
149 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 research related to the transportation sector or methane sources
2 (09GG16ER) ... 1,000,000 .......................... (re. $1,000,000)
3 Notwithstanding any law to the contrary, smart growth program state
4 assistance payments, provided on a competitive basis, to counties,
5 cities, towns, or villages to establish, update or implement compre-
6 hensive plans in a manner consistent with smart growth; provided,
7 however, that up to 25 percent of such payments may be awarded to
8 not-for-profit organizations for such purposes (09SG16ER) ..........
9 2,000,000 ......................................... (re. $1,950,000)
10 Notwithstanding any law to the contrary for the New York state soil
11 and water conservation committee in conjunction with the department
12 of agriculture and markets to develop a pilot climate resilient
13 farms program consistent with agriculture and markets law article
14 11-a, agricultural environmental management program (09CR16ER) .....
15 2,500,000 ......................................... (re. $2,500,000)
16 Climate smart communities projects pursuant to title 15 of article 54
17 of the environmental conservation law (09CS16ER) ...................
18 14,000,000 ....................................... (re. $13,895,000)
19 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
20 section 1, of the laws of 2017:
21 Notwithstanding any law to the contrary, to conduct state vulnerabili-
22 ty assessments (09SV16ER) ... 2,500,000 ........... (re. $2,468,000)
23 By chapter 54, section 1, of the laws of 2015:
24 For services and expenses of projects and purposes authorized by
25 section 92-s of the state finance law to receive funding from the
26 parks, recreation and historic preservation account in accordance
27 with a programmatic and financial plan to be approved by the direc-
28 tor of the budget, including suballocation to other state depart-
29 ments and agencies, according to the following:
30 Local waterfront revitalization programs, notwithstanding any law to
31 the contrary, not less than, $6,250,000 for waterfront revitaliza-
32 tion projects which are in or primarily serve areas where demograph-
33 ic and other relevant data for such areas demonstrate that the areas
34 are densely populated and have sustained physical deterioration,
35 decay, neglect, or disinvestment, or where a substantial proportion
36 of the residential population is of low income or is otherwise
37 disadvantaged and is underserved with respect to the existing recre-
38 ational opportunities in the area; and provided further this appro-
39 priation shall not be construed to restrict the use of any addi-
40 tional monies for such projects including $250,000 for Flood Smart
41 communities, and $250,000 for Schuyler County Soil and Water Conser-
42 vation District (09WR15ER) ... 12,500,000 ........ (re. $12,211,000)
43 Parks, recreation and historic preservation projects, notwithstanding
44 any law to the contrary, not less than, $7,875,000 for municipal
45 parks projects which are in or primarily serve areas where demo-
46 graphic and other relevant data for such areas demonstrate that the
47 areas are densely populated and have sustained physical deteri-
48 oration, decay, neglect or disinvestment or where a substantial
49 proportion of the residential population is of low income or is
50 otherwise disadvantaged and is underserved with respect to the
150 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 existing recreational opportunities in the area; including $250,000
2 for Tivoli Park; $500,000 for Clute Park; and $150,000 for Yates
3 County SWCD Keuka Outlet Trail (09MP15ER) ..........................
4 15,750,000 ....................................... (re. $14,976,000)
5 Notwithstanding any law to the contrary, for state parks and land and
6 easement infrastructure, access and stewardship projects which shall
7 include capital projects: (i) on state parks and state owned lands
8 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
9 mental conservation law; (ii) on state parks or state owned lands
10 and easements under the jurisdiction of the department of environ-
11 mental conservation or the office of parks, recreation and historic
12 preservation for access opportunities for people with disabilities;
13 access to the State Forest Preserve, State reforestation, Wildlife
14 Management areas and conservation easement lands; recreational trail
15 construction and maintenance; Catskill and Adirondack campground
16 improvements to public access and sanitation facilities; environ-
17 mental education; conservation education facility improvements;
18 archeological, historic, cultural and natural resource surveys,
19 forest health surveys, interpretation, and inventories, and response
20 to forest pests; Forest Preserve and state forest unit management
21 planning; conservation easement public recreation planning; habitat
22 restoration and enhancement; state fish hatchery improvements; state
23 tree nursery improvements; water access facilities and safety
24 improvements; public beach facility development and improvement;
25 public access improvements at day use areas; state historic site
26 exterior restoration; and cabin area and camping facility develop-
27 ment, restoration and reconstruction; (iii) $500,000 for Belleayre
28 Mountain ski center projects; (iv) $500,000 from the public access
29 and stewardship allocation to Parks & Trails New York for the
30 purpose of awarding grants on a competitive basis to local parks'
31 friends groups, provided that up to ten percent of such amount may
32 be made available for administrative costs and/or technical assist-
33 ance; and $100,000 for the Hudson River Valley Trail Grants Program
34 (09ST15ER) ... 18,500,000 ......................... (re. $4,973,000)
35 Notwithstanding subdivision 7 of section 92-s of the state finance law
36 or any other law to the contrary, for services and expenses of the
37 Hudson River Park Trust for projects related to the development of
38 the Hudson River Park consistent with provisions of chapter 592 of
39 the laws of 1998; provided, however, such funds shall not be avail-
40 able for suballocation to any public benefit corporation or public
41 authority with the exception of the Hudson River Park Trust and
42 shall be available solely for the liabilities incurred by the Hudson
43 River Park Trust or by other state departments or agencies on behalf
44 of the Hudson River Park Trust on or after April 1, 1999. Provided
45 further that, the comptroller is hereby authorized and directed to
46 release monies to the Hudson River Park Trust in amounts set forth
47 in a schedule approved by the director of the budget (09HR15ER) ....
48 2,500,000 ......................................... (re. $2,500,000)
49 Notwithstanding any law to the contrary, for zoos, botanical gardens
50 and aquaria program (09ZB15ER) ... 12,450,000 ....... (re. $297,000)
51 For services and expenses of projects and purposes authorized by
52 section 92-s of the state finance law to receive funding from the
151 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 open space account in accordance with a programmatic and financial
2 plan to be approved by the director of the budget, including subal-
3 location to other state departments and agencies, according to the
4 following:
5 Costs related to the acquisition of the following properties: Atlan-
6 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
7 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
8 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
9 Special Groundwater Protection Areas, Mott Haven-Port Morris Water-
10 front, Bronx River Greenway, Inner City/Underserved Community Parks,
11 Long Pond/Butler Woods, Staten Island Greenbelt, Staten Island Blue-
12 belt, Staten Island Wet Woods, Great Swamp, Neversink Highlands,
13 Plutarch/Black Creek Wetlands Complex, New York Highlands, Northern
14 Putnam Greenway, Shawangunk Mountains, Catskill Mountain/ Delaware
15 River Region, Beaverkill/ Willowemoc, Hudson River Estuary/Greenway
16 Trail/Quadricentennial Legacy Trail Corridor, Catskill Unfragmented
17 Forest, Catskill River and Road Corridors, Long Path, New York City
18 Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
19 Rivers Environmental Education Center, Batten Kill Watershed-Sarato-
20 ga National Historic Park View shed, Washington County Agricultural
21 Lands-Saratoga National Historic Park View shed, Lake George
22 watershed, Lake Champlain watershed, Boeselager forestry, Rensselaer
23 plateau, Oomsdale Farm and Surrounding Landscape, Hudson River
24 Gorge, Susquehanna River Valley Corridor, Lake Champlain Shoreline
25 and Wetlands, Saratoga County, State Forest and Wildlife Management
26 Area Protection, Follensby Park, Undeveloped Lake George Shore,
27 Whitney Park, Finch Woodlands, Washington County, Washington County
28 Grasslands, Recreational Trail Linkages and Networks, Rome Sand
29 Plains, Black Creek Watershed, Portaferry Lake, Tug Hill Core
30 Forests and Headwater Streams, Tioga County Park Opportunities,
31 Nelson Swamp, Clark Reservation State Park, State Parks
32 Greenbelt/Tompkins County, Cattaraugus Creek and tributaries, North-
33 ern Montezuma Wetlands, Seneca Army Depot Conservation Area, Lake
34 Erie Tributary Gorges, Two Rivers State Park, Buffalo River
35 Watershed, Braddock Bay, Catharine Valley Complex, Genesee
36 Greenway/Recreationway, Hi Tor/Bristol Hills, Allegany State Park,
37 Great Lakes Shorelines and Niagara River, Long Island Trail and
38 Greenway System, Bronx Harlem Greenway, Harbor Herons Wildlife
39 Complex, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Held-
40 erberg Escarpment, and Western Finger Lakes: Conesus, Hemlock,
41 Canadice & Honeoye, Long Distance Trail Corridors, Statewide Small
42 Projects, Working Forest Lands, State Park and State Historic Site
43 Protection, (a) notwithstanding any law to the contrary, $1,000,000
44 from the land acquisition allocation for urban forestry projects
45 provided that no less than $500,000 shall be made available for such
46 programs in cities and towns with populations of 65,000 or more; (b)
47 notwithstanding any law to the contrary, $2,000,000 from the land
48 acquisition allocation to the land trust alliance for the purpose of
49 awarding grants on a competitive basis to local land trusts,
50 provided that up to ten percent of such amount may be made available
51 for administrative costs and/or technical assistance; (c) $250,000
52 for a resiliency planting program; and, notwithstanding any law to
152 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the contrary, not less than $1,000,000 for land acquisition in
2 department of environmental conservation regions 1, 2 and 3
3 (09LA15ER) ... 26,550,000 ......................... (re. $7,647,000)
4 Long Island South Shore Estuary Reserve (09SE15ER) ...................
5 900,000 ............................................. (re. $750,000)
6 Agricultural non-point source abatement and control projects
7 (09AN15ER) ... 14,200,000 ........................ (re. $14,200,000)
8 Non-agricultural non-point source abatement and control projects
9 (09NP15ER) ... 4,800,000 .......................... (re. $4,339,000)
10 Agriculture and farmland protection activities, notwithstanding any
11 law to the contrary, $1,000,000 shall be made available to the tug
12 hill tomorrow land trust for army compatible use buffer program
13 projects around Fort Drum (09FP15ER) ...............................
14 15,000,000 ....................................... (re. $14,304,000)
15 Biodiversity stewardship and research; notwithstanding any law to the
16 contrary, any or all of this amount shall be used for the New York
17 State Landowner Incentive Program to offer grants awarded on a
18 competitive basis to landowners for the implementation of habitat
19 conservation plans (09BD15ER) ... 500,000 ........... (re. $368,000)
20 Notwithstanding any law to the contrary, for the Hudson River Estuary
21 Management Plan prepared pursuant to section 11-0306 of the environ-
22 mental conservation law, $800,000 of which shall be for the Mohawk
23 river action plan and $200,000 of which shall be for the Peconic Bay
24 Estuary Program (09HE15ER) ... 4,700,000 .......... (re. $3,195,000)
25 Notwithstanding any law to the contrary, for state assistance
26 payments, pursuant to a smart growth program, provided on a compet-
27 itive basis, to counties, cities, towns, or villages to establish,
28 update or implement comprehensive plans in a manner consistent with
29 smart growth; provided, however, that up to 25 percent of such
30 payments may be awarded to not-for-profit organizations for such
31 purposes (09SG15ER) ... 600,000 ..................... (re. $446,000)
32 Notwithstanding any law to the contrary, for the Lake Erie Watershed
33 Protection Alliance (09LE15ER) ... 250,000 ........... (re. $25,000)
34 Notwithstanding any law to the contrary, for the state share of costs
35 of wastewater treatment improvement projects undertaken by munici-
36 palities to upgrade municipal systems to meet stormwater, combined
37 sewer overflow, sanitary sewer overflow and wastewater treatment
38 discharge requirements with priority given to systems that are in
39 violation of title 8 of article 17 of the environmental conservation
40 law and aquatic habitat restoration projects undertaken by munici-
41 palities and not-for-profit corporations for aquatic habitat resto-
42 ration projects as defined in subdivision 1 of section 56-0101 of
43 the environmental conservation law; including up to $3,000,000 to
44 Suffolk county to provide a 50 percent match for a program developed
45 in consultation with the department for research, development and
46 pilot projects to develop cost effective methods to address nitrogen
47 and pathogen loading from septic system or cesspool effluent or
48 other sources or to support such efforts without a match at the
49 state university of Stony Brook directly or through its research
50 foundation (09WQ15ER) ... 8,000,000 ............... (re. $6,482,000)
51 Notwithstanding any law to the contrary for New York ocean and Great
52 Lakes ecosystem conservation projects, consistent with the policy
153 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 articulated in article 14 of the environmental conservation law
2 (09GL15ER) ... 6,050,000 .......................... (re. $4,568,000)
3 Notwithstanding any law to the contrary, for the implementation of the
4 recommendations of the invasive species task force prepared pursuant
5 to chapter 324 of the laws of 2003 and for the purposes set forth in
6 chapter 674 of the laws of 2007 including not less than $450,000 for
7 Lake George, provided that not less than $1,000,000 be made avail-
8 able for invasive species eradication, and including grants related
9 to the control and management of invasive species. Such funding for
10 grants shall be provided on a competitive basis in consultation with
11 the New York Invasive Species Council (09IS15ER) ...................
12 5,850,000 ......................................... (re. $3,615,000)
13 Notwithstanding any law to the contrary, for Soil and Water Conserva-
14 tion District activities as authorized for reimbursement and funding
15 in section 11-a of the soil and water conservation districts law;
16 including $500,000 for the New York State Soil and Water Conserva-
17 tion Committee in conjunction with the Department of Agriculture and
18 Markets to develop a pilot climate resilient farms program consist-
19 ent with agriculture and markets law article 11-a, agricultural
20 environmental management program (09SW15ER) ........................
21 5,275,000 ............................................ (re. $55,000)
22 Notwithstanding any law to the contrary, for Agricultural Waste
23 Management projects (09AW15ER) ... 1,500,000 ...... (re. $1,217,000)
24 By chapter 54, section 1, of the laws of 2015, as amended by chapter 54,
25 section 1, of the laws of 2017:
26 For services and expenses of projects and purposes authorized by
27 section 92-s of the state finance law to receive funding from the
28 solid waste account in accordance with a programmatic and financial
29 plan to be approved by the director of the budget, including subal-
30 location to other state departments and agencies, according to the
31 following:
32 Non-hazardous landfill closure projects (09LC15ER) ...................
33 250,000 ............................................. (re. $250,000)
34 Municipal waste reduction or recycling projects (09MR15ER) ...........
35 7,500,000 ........................................... (re. $164,000)
36 Secondary materials regional marketing assistance and energy conserva-
37 tion services projects (09SM15ER) ... 1,000,000 ... (re. $1,000,000)
38 Pesticide program, not less than $200,000 of which shall be for activ-
39 ities related to Long Island pesticide pollution prevention
40 (09PD15ER) ... 1,200,000 ............................ (re. $127,000)
41 Notwithstanding any law to the contrary, for community impact research
42 grants. Such grants shall be in or affecting environmental justice
43 communities in an amount of up to $50,000 for community groups for
44 projects that address an environmental justice community's exposure
45 to multiple environmental harms and risks. Such projects shall
46 include studies, including air monitoring, to investigate the envi-
47 ronment, or related public health issues of the community, research
48 that will be used to expand the knowledge or understanding of the
49 affected community and ways to improve the resiliency of the
50 affected community. The results of the investigation shall be
51 disseminated to members of the affected community. Community groups
154 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 eligible for funding shall be located in the same area as the envi-
2 ronmental and/or related public health issues to be addressed by the
3 project. Such groups shall be primarily focused on addressing the
4 environmental and/or related public health issues of the residents
5 of the affected community and shall be comprised primarily of
6 members of the affected community, $100,000 of which shall be made
7 available to the city of Buffalo for lead inspection kits in zip
8 codes of northeast Buffalo previously designated by the Erie County
9 department of health as "communities of concern" where children are
10 at exceptionally high risk for lead poisoning (09EJ15ER) ...........
11 1,100,000 ......................................... (re. $1,100,000)
12 Notwithstanding any law to the contrary, for assessment and recovery
13 of any natural resource damages (09RD15ER) .........................
14 1,000,000 ........................................... (re. $654,000)
15 Notwithstanding any law to the contrary, for the pollution prevention
16 institute (09PP15ER) ... 3,250,000 ................ (re. $2,844,000)
17 By chapter 54, section 1, of the laws of 2014:
18 For services and expenses of projects and purposes authorized by
19 section 92-s of the state finance law to receive funding from the
20 solid waste account in accordance with a programmatic and financial
21 plan to be approved by the director of the budget, including subal-
22 location to other state departments and agencies, according to the
23 following:
24 Non-hazardous landfill closure projects (09LC14ER) ...................
25 250,000 ............................................. (re. $250,000)
26 Municipal waste reduction or recycling projects (09MR14ER) ...........
27 7,000,000 ........................................... (re. $168,000)
28 Secondary materials regional marketing assistance and energy conserva-
29 tion services projects (09SM14ER) ... 1,000,000 ... (re. $1,000,000)
30 Pesticide program, not less than $200,000 of which shall be for activ-
31 ities related to Long Island pesticide pollution prevention
32 (09PD14ER) ... 1,200,000 ............................. (re. $19,000)
33 Notwithstanding any law to the contrary, for assessment and recovery
34 of any natural resource damages (09RD14ER) .........................
35 1,000,000 ........................................... (re. $393,000)
36 Notwithstanding any law to the contrary, for the pollution prevention
37 institute (09PP14ER) ... 3,250,000 .................. (re. $912,000)
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 parks, recreation and historic preservation account in accordance
41 with a programmatic and financial plan to be approved by the direc-
42 tor of the budget, including suballocation to other state depart-
43 ments and agencies, according to the following:
44 Local waterfront revitalization programs, notwithstanding any law to
45 the contrary, not less than, $6,250,000 for waterfront revitaliza-
46 tion projects which are in or primarily serve areas where demograph-
47 ic and other relevant data for such areas demonstrate that the areas
48 are densely populated and have sustained physical deterioration,
49 decay, neglect, or disinvestment, or where a substantial proportion
50 of the residential population is of low income or is otherwise
51 disadvantaged and is underserved with respect to the existing recre-
155 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ational opportunities in the area; and provided further this appro-
2 priation shall not be construed to restrict the use of any addi-
3 tional monies for such projects; including $200,000 for the Town of
4 Tonawanda; $75,000 for the Town of Evans; $125,000 for Hamburg Water
5 Rescue Unit; $50,000 for the village of Orchard Park; and $300,000
6 for the Beacon Institute (09WR14ER) ................................
7 12,500,000 ....................................... (re. $12,043,000)
8 Parks, recreation and historic preservation projects, notwithstanding
9 any law to the contrary, not less than, $7,750,000 for municipal
10 parks projects which are in or primarily serve areas where demo-
11 graphic and other relevant data for such areas demonstrate that the
12 areas are densely populated and have sustained physical deteri-
13 oration, decay, neglect or disinvestment or where a substantial
14 proportion of the residential population is of low income or is
15 otherwise disadvantaged and is underserved with respect to the
16 existing recreational opportunities in the area; including $50,000
17 for Yaddo Artists' Community; including $50,000 for Green Lake Dam;
18 including $150,000 for Greek Lakes Center; including $180,000 for
19 Joseph Rodman Drake Park; including $20,000 for Udall's Cove; and
20 including $200,000 for Chestnut Ridge Conservancy (09MP14ER) .......
21 15,500,000 ....................................... (re. $11,298,000)
22 Notwithstanding any law to the contrary, for state parks and land and
23 easement infrastructure, access and stewardship projects which shall
24 include capital projects: (i) on state parks and state owned lands
25 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
26 mental conservation law; (ii) on state parks or state owned lands
27 and easements under the jurisdiction of the department of environ-
28 mental conservation or the office of parks, recreation and historic
29 preservation for access opportunities for people with disabilities;
30 access to the State Forest Preserve; State reforestation, Wildlife
31 Management areas and conservation easement lands; recreational trail
32 construction and maintenance; Catskill and Adirondack campground
33 improvements to public access and sanitation facilities; environ-
34 mental education; conservation education facility improvements;
35 archeological, historic, cultural and natural resource surveys,
36 forest health surveys, interpretation, and inventories; Forest
37 Preserve and state forest unit management planning; conservation
38 easement public recreation planning; habitat restoration and
39 enhancement; state fish hatchery improvements; water access facili-
40 ties and safety improvements; public beach facility development and
41 improvement; public access improvements at day use areas; state
42 historic site exterior restoration; and cabin area and camping
43 facility development, restoration and reconstruction; and (iii)
44 $500,000 for Belleayre Mountain ski center projects (09ST14ER) .....
45 17,350,000 ........................................ (re. $1,603,000)
46 Notwithstanding subdivision 7 of section 92-s of the state finance law
47 or any other law to the contrary, for services and expenses of the
48 Hudson River Park Trust for projects related to the development of
49 the Hudson River Park consistent with provisions of chapter 592 of
50 the laws of 1998; provided, however, such funds shall not be avail-
51 able for suballocation to any public benefit corporation or public
52 authority with the exception of the Hudson River Park Trust and
156 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 shall be available solely for the liabilities incurred by the Hudson
2 River Park Trust or by other state departments or agencies on behalf
3 of the Hudson River Park Trust and shall be available solely for the
4 liabilities incurred by the Hudson River Park Trust or by other
5 state departments or agencies on behalf of the Hudson River Park
6 Trust on or after April 1, 1999. Provided further that, the comp-
7 troller is hereby authorized and directed to release monies to the
8 Hudson River Park Trust in amounts set forth in a schedule approved
9 by the director of the budget (09HR14ER) ...........................
10 3,000,000 ......................................... (re. $3,000,000)
11 Notwithstanding any law to the contrary, for zoos, botanical gardens
12 and aquaria program (09ZB14ER) ... 11,350,000 ......... (re. $1,000)
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 open space account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies, according to the
18 following:
19 Costs related to the acquisition of the following properties: Atlan-
20 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
21 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
22 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
23 Special Groundwater Protection Areas, Inner City/Underserved Commu-
24 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
25 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
26 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
27 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
28 Mountain/ Delaware River Region, Beaverkill/ Willowemoc, Hudson
29 River Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor,
30 Catskill Unfragmented Forest, Catskill River and Road Corridors,
31 Long Path, New York City Watershed Lands, Taconic Ridge/Harlem
32 Valley, Albany Pine Bush, Five Rivers Environmental Education
33 Center, Batten Kill Watershed-Saratoga National Historic Park View
34 shed, Washington County Agricultural Lands-Saratoga National Histor-
35 ic Park View shed, Lake George watershed, Lake Champlain watershed,
36 Boeselager forestry, Rensselaer plateau, Oomsdale Farm and Surround-
37 ing Landscape, Hudson River Gorge, Susquehanna River Valley Corri-
38 dor, Lake Champlain Shoreline and Wetlands, Saratoga County, State
39 Forest and Wildlife Management Area Protection, Follensby Park,
40 Undeveloped Lake George Shore, Whitney Park, Finch Woodlands, Wash-
41 ington County, Washington County Grasslands, Recreational Trail
42 Linkages and Networks, Rome Sand Plains, Black Creek Watershed,
43 Portaferry Lake, Tug Hill Core Forests and Headwater Streams, Tioga
44 County Park Opportunities, Nelson Swamp, Clark Reservation State
45 Park, State Parks Greenbelt/Tompkins County, Cattaraugus Creek and
46 tributaries, Northern Montezuma Wetlands, Lake Erie Tributary Gorg-
47 es, Two Rivers State Park, Buffalo River Watershed, Braddock Bay,
48 Catharine Valley Complex, Genesee Greenway/Recreationway, Hi
49 Tor/Bristol Hills, Allegany State Park, Great Lakes Shorelines and
50 Niagara River, Long Island Trail and Greenway System, Bronx Harlem
51 Greenway, Harbor Herons Wildlife Complex, Schunnemunk
52 Mountain/Moodna Creek/Woodcock Mountain, Helderberg Escarpment, and
157 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Western Finger Lakes: Conesus, Hemlock, Canadice & Honeoye, Long
2 Distance Trail Corridors, Statewide Small Projects, Working Forest
3 Lands, State Park and State Historic Site Protection, (a) notwith-
4 standing any law to the contrary, $1,000,000 from the land acquisi-
5 tion allocation for urban forestry projects provided that no less
6 than $250,000 shall be made available for such programs in cities
7 and towns with populations of 65,000 or more; (b) notwithstanding
8 any law to the contrary, $2,000,000 from the land acquisition allo-
9 cation to the land trust alliance for the purpose of awarding grants
10 on a competitive basis to local land trusts, provided that up to ten
11 percent of such amount may be made available for administrative
12 costs and/or technical assistance; (c) $250,000 for a resiliency
13 planting program; (d) notwithstanding any law to the contrary,
14 $1,500,000 for land acquisition in Department of Environmental
15 Conservation Regions 1, 2 and 3 (09LA14ER) .........................
16 21,650,000 ....................................... (re. $11,337,000)
17 Long Island South Shore Estuary Reserve (09SE14ER) ...................
18 900,000 ............................................. (re. $900,000)
19 Agricultural non-point source abatement and control projects
20 (09AN14ER) ... 14,200,000 ......................... (re. $5,431,000)
21 Non-agricultural non-point source abatement and control projects
22 (09NP14ER) ... 4,500,000 .......................... (re. $3,051,000)
23 Agriculture and farmland protection activities, notwithstanding any
24 law to the contrary, not less than $1,000,000 shall be made avail-
25 able to the tug hill tomorrow land trust for army compatible use
26 buffer program projects around Fort Drum (09FP14ER) ................
27 14,000,000 ....................................... (re. $13,000,000)
28 Biodiversity stewardship and research; notwithstanding any law to the
29 contrary, any or all of this amount shall be used for the New York
30 State Landowner Incentive Program to offer grants awarded on a
31 competitive basis to landowners for the implementation of habitat
32 conservation plans (09BD14ER) ... 500,000 ........... (re. $500,000)
33 Notwithstanding any law to the contrary, for the Hudson River Estuary
34 Management Plan prepared pursuant to section 11-0306 of the environ-
35 mental conservation law, $800,000 of which shall be for the Mohawk
36 river action plan (09HE14ER) ... 3,800,000 ........ (re. $1,317,000)
37 Notwithstanding any law to the contrary, for state assistance
38 payments, pursuant to a smart growth program, provided on a compet-
39 itive basis, to counties, cities, towns, or villages to establish,
40 update or implement comprehensive plans in a manner consistent with
41 smart growth; provided, however, that up to 25 percent of such
42 payments may be awarded to not-for-profit organizations for such
43 purposes (09SG14ER) ... 400,000 ..................... (re. $307,000)
44 Notwithstanding any law to the contrary, for the state share of costs
45 of wastewater treatment improvement projects undertaken by munici-
46 palities to upgrade municipal systems to meet stormwater, combined
47 sewer overflow, sanitary sewer overflow and wastewater treatment
48 discharge requirements with priority given to systems that are in
49 violation of title 8 of article 17 of the environmental conservation
50 law and aquatic habitat restoration projects undertaken by munici-
51 palities and not-for-profit corporations for aquatic habitat resto-
52 ration projects as defined in subdivision 1 of section 56-0101 of
158 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the environmental conservation law; including up to $3,000,000 to be
2 allocated to Suffolk county to provide a 50 percent match for a
3 program developed in consultation with the department for research,
4 development and pilot projects to develop cost effective methods to
5 address nitrogen and pathogen loading from septic system or cesspool
6 effluent or other sources and the county may transfer a portion of
7 such funds to the town of Southampton or the state university of
8 Stonybrook (09WQ14ER) ... 7,800,000 ............... (re. $6,090,000)
9 Notwithstanding any law to the contrary for New York ocean and Great
10 Lakes ecosystem conservation projects, consistent with the policy
11 articulated in article 14 of the environmental conservation law
12 (09GL14ER) ... 5,050,000 .......................... (re. $2,580,000)
13 Notwithstanding any law to the contrary, for the implementation of the
14 recommendations of the invasive species task force prepared pursuant
15 to chapter 324 of the laws of 2003 and for the purposes set forth in
16 chapter 674 of the laws of 2007 including not less than $550,000 for
17 Lake George, provided that not less than $1,000,000 be made avail-
18 able for invasive species eradication, and including grants related
19 to the control and management of invasive species. Such funding for
20 grants shall be provided on a competitive basis in consultation with
21 the New York Invasive Species Council (09IS14ER) ...................
22 4,700,000 ......................................... (re. $3,200,000)
23 Notwithstanding any law to the contrary, for Agricultural Waste
24 Management projects (09AW14ER) ... 1,500,000 ........ (re. $994,000)
25 By chapter 54, section 1, of the laws of 2013:
26 For services and expenses of projects and purposes authorized by
27 section 92-s of the state finance law to receive funding from the
28 solid waste account in accordance with a programmatic and financial
29 plan to be approved by the director of the budget, including subal-
30 location to other state departments and agencies, according to the
31 following:
32 Non-hazardous landfill closure projects (09LC13ER) ...................
33 250,000 .............................................. (re. $49,000)
34 Secondary materials regional marketing assistance and energy conserva-
35 tion services projects (09SM13ER) ... 1,000,000 ... (re. $1,000,000)
36 Notwithstanding any law to the contrary, for assessment and recovery
37 of any natural resource damages (09RD13ER) .........................
38 155,000 .............................................. (re. $15,000)
39 Notwithstanding any law to the contrary, for the pollution prevention
40 institute (09PP13ER) ... 3,250,000 ................... (re. $48,000)
41 For services and expenses of projects and purposes authorized by
42 section 92-s of the state finance law to receive funding from the
43 parks, recreation and historic preservation account in accordance
44 with a programmatic and financial plan to be approved by the direc-
45 tor of the budget, including suballocation to other state depart-
46 ments and agencies, according to the following:
47 Local waterfront revitalization programs, notwithstanding any law to
48 the contrary, not less than, $6,250,000 for waterfront revitaliza-
49 tion projects which are in or primarily serve areas where demograph-
50 ic and other relevant data for such areas demonstrate that the areas
51 are densely populated and have sustained physical deterioration,
159 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 decay, neglect, or disinvestment, or where a substantial proportion
2 of the residential population is of low income or is otherwise
3 disadvantaged and is underserved with respect to the existing recre-
4 ational opportunities in the area; and provided further this appro-
5 priation shall not be construed to restrict the use of any addi-
6 tional monies for such projects; including $300,000 for the town of
7 Tonawanda; and $75,000 for the city of Tonawanda (09WR13ER) ........
8 12,500,000 ....................................... (re. $12,500,000)
9 Parks, recreation and historic preservation projects, notwithstanding
10 any law to the contrary, not less than, $7,750,000 for municipal
11 parks projects which are in or primarily serve areas where demo-
12 graphic and other relevant data for such areas demonstrate that the
13 areas are densely populated and have sustained physical deteri-
14 oration, decay, neglect or disinvestment or where a substantial
15 proportion of the residential population is of low income or is
16 otherwise disadvantaged and is underserved with respect to the
17 existing recreational opportunities in the area; including
18 $2,000,000 for the Ulster County Rail Trail, pursuant to the initi-
19 ation of a public planning process; $200,000 for the town of Orchard
20 Park; $150,000 for the Cazenovia community resource center; $100,000
21 for the town of Evans; and $275,000 for the Buffalo military and
22 naval park (09MP13ER) ... 15,500,000 .............. (re. $7,909,000)
23 Notwithstanding any law to the contrary, for state parks and land and
24 easement infrastructure, access and stewardship projects which shall
25 include capital projects: (i) on state parks and state owned lands
26 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
27 mental conservation law; (ii) on state parks or state owned lands
28 and easements under the jurisdiction of the department of environ-
29 mental conservation or the office of parks, recreation and historic
30 preservation for access opportunities for people with disabilities;
31 access to the State Forest Preserve; State reforestation, Wildlife
32 Management areas and conservation easement lands; recreational trail
33 construction and maintenance; Catskill and Adirondack campground
34 improvements to public access and sanitation facilities; environ-
35 mental education; conservation education facility improvements;
36 archeological, historic, cultural and natural resource surveys,
37 forest health surveys, interpretation, and inventories; Forest
38 Preserve and state forest unit management planning; conservation
39 easement public recreation planning; habitat restoration and
40 enhancement; state fish hatchery improvements; water access facili-
41 ties and safety improvements; public beach facility development and
42 improvement; public access improvements at day use areas; state
43 historic site exterior restoration; and cabin area and camping
44 facility development, restoration and reconstruction; and (iii)
45 $500,000 for Belleayre Mountain ski center projects (09ST13ER) .....
46 16,600,000 ........................................ (re. $2,996,000)
47 Notwithstanding subdivision 7 of section 92-s of the state finance law
48 or any other law to the contrary, for services and expenses of the
49 Hudson River Park Trust for projects related to the development of
50 the Hudson River Park consistent with provisions of chapter 592 of
51 the laws of 1998; provided, however, such funds shall not be avail-
52 able for suballocation to any public benefit corporation or public
160 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority with the exception of the Hudson River Park Trust and
2 shall be available solely for the liabilities incurred by the Hudson
3 River Park Trust or by other state departments or agencies on behalf
4 of the Hudson River Park Trust and shall be available solely for the
5 liabilities incurred by the Hudson River Park Trust or by other
6 state departments or agencies on behalf of the Hudson River Park
7 Trust on or after April 1, 1999. Provided further that, the comp-
8 troller is hereby authorized and directed to release monies to the
9 Hudson River Park Trust in amounts set forth in a schedule approved
10 by the director of the budget (09HR13ER) ...........................
11 3,000,000 ......................................... (re. $3,000,000)
12 Notwithstanding any law to the contrary, for zoos, botanical gardens
13 and aquaria program (09ZB13ER) ... 10,250,000 ........ (re. $44,000)
14 For services and expenses of projects and purposes authorized by
15 section 92-s of the state finance law to receive funding from the
16 open space account in accordance with a programmatic and financial
17 plan to be approved by the director of the budget, including subal-
18 location to other state departments and agencies, according to the
19 following:
20 Costs related to the acquisition of the following properties: Atlan-
21 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
22 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
23 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
24 Special Groundwater Protection Areas, Inner City/Underserved Commu-
25 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
26 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
27 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
28 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
29 Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
30 Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
31 kill Unfragmented Forest, Catskill River and Road Corridors, Long
32 Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
33 Albany Pine Bush, Five Rivers Environmental Education Center, Batten
34 Kill Watershed-Saratoga National Historic Park View shed, Washington
35 County Agricultural Lands-Saratoga National Historic Park View shed,
36 Lake George watershed, Lake Champlain watershed, Boeselager fores-
37 try, Rensselaer plateau, Oomsdale Farm and Surrounding Landscape,
38 Hudson River Gorge, Susquehanna River Valley Corridor, Lake Cham-
39 plain Shoreline and Wetlands, Saratoga County, State Forest and
40 Wildlife Management Area Protection, Follensby Park, Undeveloped
41 Lake George Shore, Whitney Park, Finch Woodlands, Washington County,
42 Washington County Grasslands, Recreational Trail Linkages and
43 Networks, Rome Sand Plains, Black Creek Watershed, Portaferry Lake,
44 Tug Hill Core Forests and Headwater Streams, Tioga County Park
45 Opportunities, Nelson Swamp, Clark Reservation State Park, State
46 Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
47 Northern Montezuma Wetlands, Lake Erie Tributary Gorges, Two Rivers
48 State Park, Buffalo River Watershed, Braddock Bay, Catharine Valley
49 Complex, Genesee Greenway/Recreationway, Hi Tor/Bristol Hills, Alle-
50 gany State Park, Great Lakes Shorelines and Niagara River, Long
51 Island Trail and Greenway System, Bronx Harlem Greenway, Harbor
52 Herons Wildlife Complex, Schunnemunk Mountain/Moodna Creek/Woodcock
161 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Mountain, Helderberg Escarpment, and Western Finger Lakes: Conesus,
2 Hemlock, Canadice & Honeoye, Long Distance Trail Corridors, State-
3 wide Small Projects, Working Forest Lands, State Park and State
4 Historic Site Protection, (a) notwithstanding any law to the contra-
5 ry, $500,000 from the land acquisition allocation for urban forestry
6 projects provided that no less than $250,000 shall be made available
7 for such programs in cities and towns with populations of 65,000 or
8 more; (b) notwithstanding any law to the contrary, $1,575,000 from
9 the land acquisition allocation to the land trust alliance for the
10 purpose of awarding grants on a competitive basis to local land
11 trusts, provided that up to ten percent of such amount may be made
12 available for administrative costs and/or technical assistance; (c)
13 notwithstanding any law to the contrary, $1,000,000 for land acqui-
14 sition in department of environmental conservation regions 1, 2 and
15 3 (09LA13ER) ... 20,000,000 ....................... (re. $2,401,000)
16 Long Island South Shore Estuary Reserve (09SE13ER) ...................
17 900,000 ............................................. (re. $900,000)
18 Agricultural non-point source abatement and control projects
19 (09AN13ER) ... 14,200,000 ......................... (re. $7,300,000)
20 Non-agricultural non-point source abatement and control projects
21 (09NP13ER) ... 4,500,000 .......................... (re. $3,096,000)
22 Agriculture and farmland protection activities (09FP13ER) ............
23 13,000,000 ....................................... (re. $13,000,000)
24 Biodiversity stewardship and research (09BD13ER) .....................
25 500,000 ............................................. (re. $500,000)
26 Notwithstanding any law to the contrary, for the Hudson River Estuary
27 Management Plan prepared pursuant to section 11-0306 of the environ-
28 mental conservation law, $800,000 of which shall be for the Mohawk
29 river action plan (09HE13ER) ... 3,800,000 .......... (re. $140,000)
30 Notwithstanding any law to the contrary, for state assistance
31 payments, pursuant to a smart growth program, provided on a compet-
32 itive basis, to counties, cities, towns, or villages to establish,
33 update or implement comprehensive plans in a manner consistent with
34 smart growth; provided, however, that up to 25 percent of such
35 payments may be awarded to not-for-profit organizations for such
36 purposes (09SG13ER) ... 400,000 ..................... (re. $219,000)
37 Notwithstanding any law to the contrary, for the state share of costs
38 of wastewater treatment improvement projects undertaken by munici-
39 palities to upgrade municipal systems to meet stormwater, combined
40 sewer overflow, sanitary sewer overflow and wastewater treatment
41 discharge requirements with priority given to systems that are in
42 violation of title 8 of article 17 of the environmental conservation
43 law and aquatic habitat restoration projects undertaken by munici-
44 palities and not-for-profit corporations for aquatic habitat resto-
45 ration projects as defined in subdivision 1 of section 56-0101 of
46 the environmental conservation law; including $4,000,000 to be
47 distributed to municipalities pursuant to a competitive grants proc-
48 ess for natural infrastructure projects designed to mitigate the
49 impacts of floods, storm surge, and other effects of climate change
50 (09WQ13ER) ... 6,945,000 .......................... (re. $6,185,000)
51 Notwithstanding any law to the contrary for New York ocean and Great
52 Lakes ecosystem conservation projects, consistent with the policy
162 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 articulated in article 14 of the environmental conservation law
2 (09GL13ER) ... 4,750,000 .......................... (re. $3,278,000)
3 Notwithstanding any law to the contrary, for the implementation of the
4 recommendations of the invasive species task force prepared pursuant
5 to chapter 324 of the laws of 2003 and for the purposes set forth in
6 chapter 674 of the laws of 2007 including not less than $100,000 for
7 Lake George, provided that not less than $1,000,000 be made avail-
8 able for invasive species eradication, and including grants related
9 to the control and management of invasive species. Such funding for
10 grants shall be provided on a competitive basis in consultation with
11 the New York Invasive Species Council (09IS13ER) ...................
12 4,600,000 ......................................... (re. $2,730,000)
13 Notwithstanding any law to the contrary, for Agricultural Waste
14 Management projects (09AW13ER) ... 1,000,000 ........ (re. $122,000)
15 By chapter 54, section 1, of the laws of 2012:
16 For services and expenses of projects and purposes authorized by
17 section 92-s of the state finance law to receive funding from the
18 solid waste account in accordance with a programmatic and financial
19 plan to be approved by the director of the budget, including subal-
20 location to other state departments and agencies, according to the
21 following:
22 Secondary materials regional marketing assistance and energy conserva-
23 tion services projects (09SM12ER) ... 1,000,000 ... (re. $1,000,000)
24 Notwithstanding any law to the contrary, for assessment and recovery
25 of any natural resource damages (09RD12ER) .........................
26 175,000 ............................................. (re. $175,000)
27 For services and expenses of projects and purposes authorized by
28 section 92-s of the state finance law to receive funding from the
29 parks, recreation and historic preservation account in accordance
30 with a programmatic and financial plan to be approved by the direc-
31 tor of the budget, including suballocation to other state depart-
32 ments and agencies, according to the following:
33 Local waterfront revitalization programs, notwithstanding any law to
34 the contrary, not less than, $5,750,000 for waterfront revitaliza-
35 tion projects which are in or primarily serve areas where demograph-
36 ic and other relevant data for such areas demonstrate that the areas
37 are densely populated and have sustained physical deterioration,
38 decay, neglect, or disinvestment, or where a substantial proportion
39 of the residential population is of low income or is otherwise
40 disadvantaged and is underserved with respect to the existing recre-
41 ational opportunities in the area; and provided further this appro-
42 priation shall not be construed to restrict the use of any addi-
43 tional monies for such projects; including $60,000 for Jefferson and
44 St. Lawrence; and $400,000 for Niagara and Erie Waterfront Revitali-
45 zation (09WR12ER) ... 11,500,000 ................. (re. $10,212,000)
46 Parks, recreation and historic preservation projects, notwithstanding
47 any law to the contrary, not less than, $6,500,000 for municipal
48 parks projects which are in or primarily serve areas where demo-
49 graphic and other relevant data for such areas demonstrate that the
50 areas are densely populated and have sustained physical deteri-
51 oration, decay, neglect or disinvestment or where a substantial
163 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 proportion of the residential population is of low income or is
2 otherwise disadvantaged and is underserved with respect to the
3 existing recreational opportunities in the area; including $425,000
4 for Buffalo - area parks; and $300,000 for Niagara and Erie Historic
5 Preservation (09MP12ER) ... 13,000,000 ............ (re. $4,899,000)
6 Notwithstanding any law to the contrary, for state parks and land and
7 easement infrastructure, access and stewardship projects which shall
8 include capital projects: (i) on state parks and state owned lands
9 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
10 mental conservation law; (ii) on state parks or state owned lands
11 and easements under the jurisdiction of the department of environ-
12 mental conservation or the office of parks, recreation and historic
13 preservation for access opportunities for people with disabilities;
14 access to the State Forest Preserve; State reforestation, Wildlife
15 Management areas and conservation easement lands; recreational trail
16 construction and maintenance; Catskill and Adirondack campground
17 improvements to public access and sanitation facilities; environ-
18 mental education; conservation education facility improvements;
19 archeological, historic, cultural and natural resource surveys,
20 forest health surveys, interpretation, and inventories; Forest
21 Preserve and state forest unit management planning; conservation
22 easement public recreation planning; habitat restoration and
23 enhancement; state fish hatchery improvements; water access facili-
24 ties and safety improvements; public beach facility development and
25 improvement; public access improvements at day use areas; state
26 historic site exterior restoration; and cabin area and camping
27 facility development, restoration and reconstruction; and (iii)
28 $500,000 for Belleayre Mountain ski center projects (09ST12ER) .....
29 16,000,000 ........................................ (re. $1,793,000)
30 Notwithstanding subdivision 7 of section 92-s of the state finance law
31 or any other law to the contrary, for services and expenses of the
32 Hudson River Park Trust for projects related to the development of
33 the Hudson River Park consistent with provisions of chapter 592 of
34 the laws of 1998; provided, however, such funds shall not be avail-
35 able for suballocation to any public benefit corporation or public
36 authority with the exception of the Hudson River Park Trust and
37 shall be available solely for the liabilities incurred by the Hudson
38 River Park Trust or by other state departments or agencies on behalf
39 of the Hudson River Park Trust and shall be available solely for the
40 liabilities incurred by the Hudson River Park Trust or by other
41 state departments or agencies on behalf of the Hudson River Park
42 Trust on or after April 1, 1999. Provided further that, the comp-
43 troller is hereby authorized and directed to release monies to the
44 Hudson River Park Trust in amounts set forth in a schedule approved
45 by the director of the budget (09HR12ER) ...........................
46 3,000,000 ......................................... (re. $3,000,000)
47 For services and expenses of projects and purposes authorized by
48 section 92-s of the state finance law to receive funding from the
49 open space account in accordance with a programmatic and financial
50 plan to be approved by the director of the budget, including subal-
51 location to other state departments and agencies, according to the
52 following:
164 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Costs related to the acquisition of the following properties: Atlan-
2 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
3 Estuary Reserve, Peconic Pine lands Maritime Reserve Projects,
4 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
5 Special Groundwater Protection Areas, Inner City/Underserved Commu-
6 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
7 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
8 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
9 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
10 Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
11 Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
12 kill Unfragmented Forest, Catskill River and Road Corridors, Long
13 Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
14 Albany Pine Bush, Five Rivers Environmental Education Center, Batten
15 Kill Watershed-Saratoga National Historic Park View shed, Washington
16 County Agricultural Lands-Saratoga National Historic Park View shed,
17 Lake George watershed, Lake Champlain watershed, Boeselager fores-
18 try, Catskill River and Road corridor, Rensselaer plateau, Oomsdale
19 Farm and Surrounding Landscape, Hudson River Gorge, Susquehanna
20 River Valley Corridor, Lake Champlain Shoreline and Wetlands, Sara-
21 toga County, State Forest and Wildlife Management Area Protection,
22 Follensby Park, Undeveloped Lake George Shore, Whitney Park, Finch
23 Woodlands, Washington County, Washington County Grasslands, Recre-
24 ational Trail Linkages and Networks, Rome Sand Plains, Black Creek
25 Watershed, Portaferry Lake, Tug Hill Core Forests and Headwater
26 Streams, Tioga County Park Opportunities, Nelson Swamp, Clark Reser-
27 vation State Park, State Parks Greenbelt/Tompkins County, Cattarau-
28 gus Creek and tributaries, Northern Montezuma Wetlands, Lake Erie
29 Tributary Gorges, Two Rivers State Park, Buffalo River Watershed,
30 Braddock Bay, Catharine Valley Complex, Genesee Greenway/ Recrea-
31 tionway, Hi Tor/Bristol Hills, Allegany State Park, Great Lakes
32 Shorelines and Niagara River, Long Distance Trail Corridors, State-
33 wide Small Projects, Working Forest Lands, State Park and State
34 Historic Site Protection, (a) notwithstanding any law to the contra-
35 ry, $500,000 from the land acquisition allocation for urban forestry
36 projects provided that no less than $250,000 shall be made available
37 for such programs in cities and towns with populations of 65,000 or
38 more; (b) notwithstanding any law to the contrary, $1,575,000 from
39 the land acquisition allocation to the land trust alliance for the
40 purpose of awarding grants on a competitive basis to local land
41 trusts, provided that up to ten percent of such amount may be made
42 available for administrative costs and/or technical assistance
43 (09LA12ER) ... 17,500,000 ......................... (re. $1,190,000)
44 Long Island Central Pine Barrens Planning (09LP12ER) .................
45 1,100,000 ............................................. (re. $9,000)
46 Long Island South Shore Estuary Reserve (09SE12ER) ...................
47 900,000 ............................................. (re. $900,000)
48 Agricultural non-point source abatement and control projects
49 (09AN12ER) ... 13,000,000 ......................... (re. $2,828,000)
50 Non-agricultural non-point source abatement and control projects
51 (09NP12ER) ... 4,000,000 .......................... (re. $2,849,000)
165 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Agriculture and farmland protection activities (09FP12ER) ............
2 12,000,000 ....................................... (re. $12,000,000)
3 Biodiversity stewardship and research (09BD12ER) .....................
4 500,000 ............................................. (re. $324,000)
5 Notwithstanding any law to the contrary, for state assistance
6 payments, pursuant to a smart growth program, provided on a compet-
7 itive basis, to counties, cities, towns, or villages to establish,
8 update or implement comprehensive plans in a manner consistent with
9 smart growth; provided, however, that up to 25 percent of such
10 payments may be awarded to not-for-profit organizations for such
11 purposes (09SG12ER) ... 300,000 ..................... (re. $185,000)
12 Notwithstanding any law to the contrary, for the state share of costs
13 of wastewater treatment improvement projects undertaken by munici-
14 palities to upgrade municipal systems to meet stormwater, combined
15 sewer overflow, sanitary sewer overflow and wastewater treatment
16 discharge requirements with priority given to systems that are in
17 violation of title 8 of article 17 of the environmental conservation
18 law and aquatic habitat restoration projects undertaken by munici-
19 palities and not-for-profit corporations for aquatic habitat resto-
20 ration projects as defined in subdivision 1 of section 56-0101 of
21 the environmental conservation law and not less than $300,000 for a
22 total maximum daily load study for the Western Bays in the South
23 Shore Estuary Reserve (09WQ12ER) ... 2,932,000 .... (re. $2,583,000)
24 Notwithstanding any law to the contrary for New York ocean and Great
25 Lakes ecosystem conservation projects, consistent with the policy
26 articulated in article 14 of the environmental conservation law
27 (09GL12ER) ... 4,728,000 .......................... (re. $2,491,000)
28 Notwithstanding any law to the contrary, for the implementation of the
29 recommendations of the invasive species task force prepared pursuant
30 to chapter 324 of the laws of 2003 and for the purposes set forth in
31 chapter 674 of the laws of 2007 including not less than $100,000 for
32 Lake George, provided that not less than $1,000,000 be made avail-
33 able for invasive species eradication, and including grants related
34 to the control and management of invasive species. Such funding for
35 grants shall be provided on a competitive basis in consultation with
36 the New York Invasive Species Council (09IS12ER) ...................
37 3,400,000 ......................................... (re. $2,605,000)
38 By chapter 54, section 1, of the laws of 2011:
39 For services and expenses of projects and purposes authorized by
40 section 92-s of the state finance law to receive funding from the
41 solid waste account in accordance with a programmatic and financial
42 plan to be approved by the director of the budget, including subal-
43 location to other state departments and agencies, according to the
44 following:
45 Non-hazardous landfill closure projects (09LC11ER) ...................
46 600,000 .............................................. (re. $15,000)
47 Secondary materials regional marketing assistance and energy conserva-
48 tion services projects (09SM11ER) ... 1,000,000 ... (re. $1,000,000)
49 Notwithstanding any law to the contrary, for assessment and recovery
50 of any natural resource damages (09RD11ER) .........................
51 200,000 .............................................. (re. $20,000)
166 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses of projects and purposes authorized by
2 section 92-s of the state finance law to receive funding from the
3 parks, recreation and historic preservation account in accordance
4 with a programmatic and financial plan to be approved by the direc-
5 tor of the budget, including suballocation to other state depart-
6 ments and agencies, according to the following:
7 Local waterfront revitalization programs, notwithstanding any law to
8 the contrary, not less than, $5,750,000 for waterfront revitaliza-
9 tion projects which are in or primarily serve areas where demograph-
10 ic and other relevant data for such areas demonstrate that the areas
11 are densely populated and have sustained physical deterioration,
12 decay, neglect, or disinvestment, or where a substantial proportion
13 of the residential population is of low income or is otherwise
14 disadvantaged and is underserved with respect to the existing recre-
15 ational opportunities in the area; and provided further this appro-
16 priation shall not be construed to restrict the use of any addi-
17 tional monies for such projects, $100,000 for Hoyt Lake; $300,000
18 for Buffalo Waterfront; and $225,000 for Niagara River Greenway
19 (09WR11ER) ... 11,500,000 ......................... (re. $9,476,000)
20 Parks, recreation and historic preservation projects, notwithstanding
21 any law to the contrary, not less than, $6,500,000 for municipal
22 parks projects which are in or primarily serve areas where demo-
23 graphic and other relevant data for such areas demonstrate that the
24 areas are densely populated and have sustained physical deteri-
25 oration, decay, neglect or disinvestment or where a substantial
26 proportion of the residential population is of low income or is
27 otherwise disadvantaged and is underserved with respect to the
28 existing recreational opportunities in the area; $250,000 for Olmst-
29 ed Park; $125,000 for Hyde Park; $250,000 for Darwin Martin House;
30 and $50,000 for Graycliff Manor (09MP11ER) .........................
31 13,000,000 ........................................ (re. $3,526,000)
32 Notwithstanding any law to the contrary, for state parks and land and
33 easement infrastructure, access and stewardship projects which shall
34 include capital projects: (i) on state parks and state owned lands
35 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
36 mental conservation law; (ii) on state parks or state owned lands
37 and easements under the jurisdiction of the department of environ-
38 mental conservation or the office of parks, recreation and historic
39 preservation for access opportunities for people with disabilities;
40 access to the State Forest Preserve; State reforestation, Wildlife
41 Management areas and conservation easement lands; recreational trail
42 construction and maintenance; Catskill and Adirondack campground
43 improvements to public access and sanitation facilities; environ-
44 mental education; conservation education facility improvements;
45 archeological, historic, cultural and natural resource surveys,
46 forest health surveys, interpretation, and inventories; Forest
47 Preserve and state forest unit management planning; conservation
48 easement public recreation planning; habitat restoration and
49 enhancement; state fish hatchery improvements; water access facili-
50 ties and safety improvements; public beach facility development and
51 improvement; public access improvements at day use areas; state
52 historic site exterior restoration; and cabin area and camping
167 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 facility development, restoration and reconstruction; and (iii)
2 $500,000 for Belleayre Mountain ski center projects (09ST11ER) .....
3 16,228,000 .......................................... (re. $868,000)
4 Notwithstanding subdivision 7 of section 92-s of the state finance law
5 or any other law to the contrary, for services and expenses of the
6 Hudson River Park Trust for projects related to the development of
7 the Hudson River Park consistent with provisions of chapter 592 of
8 the laws of 1998; provided, however, such funds shall not be avail-
9 able for suballocation to any public benefit corporation or public
10 authority with the exception of the Hudson River Park Trust and
11 shall be available solely for the liabilities incurred by the Hudson
12 River Park Trust or by other state departments or agencies on behalf
13 of the Hudson River Park Trust and shall be available solely for the
14 liabilities incurred by the Hudson River Park Trust or by other
15 state departments or agencies on behalf of the Hudson River Park
16 Trust on or after April 1, 1999. Provided further that, the comp-
17 troller is hereby authorized and directed to release monies to the
18 Hudson River Park Trust in amounts set forth in a schedule approved
19 by the director of the budget (09HR11ER) ...........................
20 3,000,000 ......................................... (re. $3,000,000)
21 Notwithstanding any law to the contrary, for zoos, botanical gardens
22 and aquaria program (09ZB11ER) ... 9,000,000 .......... (re. $7,000)
23 For services and expenses of projects and purposes authorized by
24 section 92-s of the state finance law to receive funding from the
25 open space account in accordance with a programmatic and financial
26 plan to be approved by the director of the budget, including subal-
27 location to other state departments and agencies, according to the
28 following:
29 Costs related to the acquisition of the following properties: Atlan-
30 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
31 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
32 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
33 Special Groundwater Protection Areas, Inner City/Underserved Commu-
34 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
35 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
36 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
37 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
38 Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
39 Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
40 kill Unfragmented Forest, Catskill River and Road Corridors, Long
41 Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
42 Albany Pine Bush, Five Rivers Environmental Education Center, Batten
43 Kill Watershed-Saratoga National Historic Park View shed, Washington
44 County Agricultural Lands-Saratoga National Historic Park View shed,
45 Lake George watershed, Lake Champlain watershed, Boeselager fores-
46 try, Catskill River and Road corridor, Rensselaer plateau, Hudson
47 River Gorge, Susquehanna River Valley Corridor, Lake Champlain
48 Shoreline and Wetlands, Saratoga County, State Forest and Wildlife
49 Management Area Protection, Follensby Park, Undeveloped Lake George
50 Shore, Whitney Park, Finch Woodlands, Washington County, Washington
51 County Grasslands, Recreational Trail Linkages and Networks, Rome
52 Sand Plains, Portaferry Lake, Tug Hill Core Forests and Headwater
168 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Streams, Tioga County Park Opportunities, Nelson Swamp, Clark Reser-
2 vation State Park, State Parks Greenbelt/Tompkins County, Cattarau-
3 gus Creek and tributaries, Lake Erie Tributary Gorges, Two Rivers
4 State Park, Buffalo River Watershed, Braddock Bay, Catharine Valley
5 Complex, Genesee Greenway/Recreationway, Allegany State Park, Great
6 Lakes Shorelines and Niagara River, Long Distance Trail Corridors,
7 Statewide Small Projects, Working Forest Lands, State Park and State
8 Historic Site Protection, (a) notwithstanding any law to the contra-
9 ry, $500,000 from the land acquisition allocation for urban forestry
10 projects provided that no less than $250,000 shall be made available
11 for such programs in cities with populations of 65,000 or more; (b)
12 notwithstanding any law to the contrary, $1,575,000 from the land
13 acquisition allocation to the land trust alliance for the purpose of
14 awarding grants on a competitive basis to local land trusts,
15 provided that up to ten percent of such amount may be made available
16 for administrative costs and/or technical assistance (09LA11ER) ....
17 17,500,000 ........................................ (re. $1,268,000)
18 Long Island South Shore Estuary Reserve (09SE11ER) ...................
19 900,000 ............................................. (re. $637,000)
20 Agricultural non-point source abatement and control projects
21 (09AN11ER) ... 13,000,000 ......................... (re. $3,200,000)
22 Non-agricultural non-point source abatement and control projects
23 (09NP11ER) ... 4,000,000 .......................... (re. $2,954,000)
24 Agriculture and farmland protection activities (09FP11ER) ............
25 12,000,000 ....................................... (re. $12,000,000)
26 Biodiversity stewardship and research (09BD11ER) .....................
27 500,000 ............................................. (re. $282,000)
28 Notwithstanding any law to the contrary, for state assistance
29 payments, pursuant to a smart growth program, provided on a compet-
30 itive basis, to counties, cities, towns, or villages to establish,
31 update or implement comprehensive plans in a manner consistent with
32 smart growth; provided, however, that up to 25 percent of such
33 payments may be awarded to not-for-profit organizations for such
34 purposes (09SG11ER) ... 300,000 ..................... (re. $300,000)
35 Notwithstanding any law to the contrary, for the state share of costs
36 of wastewater treatment improvement projects undertaken by munici-
37 palities to upgrade municipal systems to meet stormwater, combined
38 sewer overflow, sanitary sewer overflow and wastewater treatment
39 discharge requirements with priority given to systems that are in
40 violation of title 8 of article 17 of the environmental conservation
41 law and aquatic habitat restoration projects undertaken by munici-
42 palities and not-for-profit corporations for aquatic habitat resto-
43 ration projects as defined in subdivision 1 of section 56-0101 of
44 the environmental conservation law (09WQ11ER) ......................
45 2,932,000 ......................................... (re. $2,076,000)
46 Notwithstanding any law to the contrary for New York ocean and Great
47 Lakes ecosystem conservation projects, consistent with the policy
48 articulated in article 14 of the environmental conservation law
49 (09GL11ER) ... 5,000,000 .......................... (re. $3,304,000)
50 Notwithstanding any law to the contrary, for the implementation of the
51 recommendations of the invasive species task force prepared pursuant
52 to chapter 324 of the laws of 2003 and for the purposes set forth in
169 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 chapter 674 of the laws of 2007 including not less than $95,000 for
2 Lake George, provided that not less than $1,000,000 be made avail-
3 able for invasive species eradication, and including grants related
4 to the control and management of invasive species. Such funding for
5 grants shall be provided on a competitive basis in consultation with
6 the New York Invasive Species Council (09IS11ER) ...................
7 3,800,000 ......................................... (re. $1,395,000)
8 Notwithstanding any law to the contrary, for Soil and Water Conserva-
9 tion District activities as authorized for reimbursement in section
10 11-a of the soil and water conservation districts law (09SW11ER) ...
11 3,000,000 ............................................. (re. $4,000)
12 By chapter 99, section 1, of the laws of 2010:
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 solid waste account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies, according to the
18 following:
19 Secondary materials regional marketing assistance and energy conserva-
20 tion services projects (09SM10ER) ... 1,000,000 ... (re. $1,000,000)
21 For services and expenses of projects and purposes authorized by
22 section 92-s of the state finance law to receive funding from the
23 parks, recreation and historic preservation account in accordance
24 with a programmatic and financial plan to be approved by the direc-
25 tor of the budget, including suballocation to other state depart-
26 ments and agencies, according to the following:
27 Parks, recreation and historic preservation projects, notwithstanding
28 any law to the contrary, not less than, $6,716,000 for municipal
29 parks projects which are in or primarily serve areas where demo-
30 graphic and other relevant data for such areas demonstrate that the
31 areas are densely populated and have sustained physical deteri-
32 oration, decay, neglect or disinvestment or where a substantial
33 proportion of the residential population is of low income or is
34 otherwise disadvantaged and is underserved with respect to the
35 existing recreational opportunities in the area, and notwithstanding
36 any law to the contrary, $225,000 for Olmstead Park, $125,000 for
37 Hyde Park, $225,000 for Darwin Martin House and $125,000 for Gray-
38 cliff Manor (09MP10ER) ... 13,432,000 ............. (re. $4,480,000)
39 Notwithstanding any law to the contrary, for state parks and land and
40 easement infrastructure, access and stewardship projects which shall
41 include capital projects: (i) on state parks and state owned lands
42 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
43 mental conservation law and (ii) on state parks or state owned lands
44 and easements under the jurisdiction of the department of environ-
45 mental conservation or the office of parks, recreation and historic
46 preservation for access opportunities for people with disabilities;
47 access to the State Forest Preserve; State reforestation, Wildlife
48 Management areas and conservation easement lands; recreational trail
49 construction and maintenance; Catskill and Adirondack campground
50 improvements to public access and sanitation facilities; environ-
51 mental education; conservation education facility improvements;
170 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 archeological, historic, cultural and natural resource surveys,
2 forest health surveys, interpretation, and inventories; Forest
3 Preserve and state forest unit management planning; conservation
4 easement public recreation planning; habitat restoration and
5 enhancement; state fish hatchery improvements; water access facili-
6 ties and safety improvements; public beach facility development and
7 improvement; public access improvements at day use areas; state
8 historic site exterior restoration; and cabin area and camping
9 facility development, restoration and reconstruction (09ST10ER) ....
10 16,228,000 .......................................... (re. $620,000)
11 Notwithstanding subdivision 7 of section 92-s of the state finance law
12 or any other law to the contrary, for services and expenses of the
13 Hudson River Park Trust for projects related to the development of
14 the Hudson River Park consistent with provisions of chapter 592 of
15 the laws of 1998; provided, however, such funds shall not be avail-
16 able for suballocation to any public benefit corporation or public
17 authority with the exception of the Hudson River Park Trust and
18 shall be available solely for the liabilities incurred by the Hudson
19 River Park Trust or by other state departments or agencies on behalf
20 of the Hudson River Park Trust and shall be available solely for the
21 liabilities incurred by the Hudson River Park Trust or by other
22 state departments or agencies on behalf of the Hudson River Park
23 Trust on or after April 1, 1999. Provided further that, the comp-
24 troller is hereby authorized and directed to release monies to the
25 Hudson River Park Trust in amounts set forth in a schedule approved
26 by the director of the budget (09HR10ER) ...........................
27 3,000,000 ......................................... (re. $2,025,000)
28 Notwithstanding any law to the contrary, for zoos, botanical gardens
29 and aquaria program (09ZB10ER) ... 9,000,000 .......... (re. $1,000)
30 For services and expenses of projects and purposes authorized by
31 section 92-s of the state finance law to receive funding from the
32 open space account in accordance with a programmatic and financial
33 plan to be approved by the director of the budget, including subal-
34 location to other state departments and agencies, according to the
35 following:
36 Costs related to the acquisition of the following properties: Atlan-
37 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
38 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
39 Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
40 projects, Western Suffolk/Nassau Special Groundwater Protection
41 Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
42 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
43 Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
44 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
45 lands, Mongaup Valley Wildlife Management Area, Northern Putnam
46 Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
47 Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
48 Northeastern Westchester Watershed and Biodiversity Lands, Rockland
49 Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
50 River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
51 Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
52 City Watershed Lands, Taconic Ridge/ Harlem Valley, Albany Pine
171 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Bush, Five Rivers Environmental Education Center, Helderberg Escarp-
2 ment, Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill
3 Watershed-Saratoga National Historic Park View shed, Washington
4 County Agricultural Lands-Saratoga National Historic Park View shed,
5 Westmere Woods, Lake George watershed, Lake Champlain watershed,
6 Boeselager forestry, Domtar/Lyme Fee Lands, Catskill River and Road
7 corridor, Rensselaer plateau, Hudson River Gorge, Franklinton Vlaie
8 Wildlife Management area, Black Creek Marsh/Vly Swamp, Mohawk River
9 Valley Corridor/Barge Canal, Oomsdale farm and surrounding land-
10 scape, Susquehanna River Valley Corridor, Pilot Knob, Floodwood
11 Camp, Lake Champlain Shoreline and Wetlands, Saratoga County, Mays
12 Pond Tract, State Forest and Wildlife Management Area Protection,
13 Follensby Park, Undeveloped Lake George Shore, Whitney Park, Finch
14 Woodlands, Washington County Grasslands, Northern Flow River Corri-
15 dors, Recreational Trail Linkages and Networks, Bog River/Beaver
16 River Headwater Complex, Maumee Swamp, Moose River Corridor, Rome
17 Sand Plains, Saint Lawrence River Islands, Shorelines and Wetlands,
18 Eastern Lake Ontario Shoreline and Islands, Tug Hill Core Forests
19 and Headwater Streams, Tioga County Park Opportunities, Nelson
20 Swamp, Genny-Green Trail/Link Trail, Clark Reservation State Park,
21 Salmon River Corridor, State Parks Greenbelt/Tompkins County, Catta-
22 raugus Creek and tributaries, Carpenter Falls/Bear Swamp Creek
23 Corridor, Tonawanda Creek Watershed, Two Rivers State Park, Finger
24 Lakes Shoreline, Buffalo/Niagara River Corridors, Northern Montezuma
25 Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine Valley
26 Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus, Hemlock,
27 Canadice and Honeoye, Genesee Greenway/Recreationway, Allegany State
28 Park, Alder Bottom Pond/French Creek, Great Lakes Shorelines and
29 Niagara River, Chautauqua Lake Access, Shore Lands and Vistas,
30 Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
31 Small Projects, Working Forest Lands, State Park and State Historic
32 Site Protection, (a) notwithstanding any law to the contrary,
33 $500,000 from the land acquisition allocation for urban forestry
34 projects provided that no less than $250,000 shall be made available
35 for such programs in cities with populations of 65,000 or more; (b)
36 notwithstanding any law to the contrary, $1,575,000 from the land
37 acquisition allocation to the land trust alliance for the purpose of
38 awarding grants on a competitive basis to local land trusts,
39 provided that up to ten percent of such amount may be made available
40 for administrative costs and/or technical assistance (09LA10ER) ....
41 17,614,000 .......................................... (re. $685,000)
42 Long Island South Shore Estuary Reserve (09SE10ER) ...................
43 900,000 .............................................. (re. $37,000)
44 Agricultural non-point source abatement and control projects
45 (09AN10ER) ... 13,297,000 ............................ (re. $76,000)
46 Non-agricultural non-point source abatement and control projects
47 (09NP10ER) ... 3,703,000 .......................... (re. $3,596,000)
48 Agriculture and farmland protection activities (09FP10ER) ............
49 10,750,000 ....................................... (re. $10,750,000)
50 Biodiversity stewardship and research, and notwithstanding any law to
51 the contrary, $75,000 for Cayuga Island (09BD10ER) .................
52 500,000 ............................................. (re. $335,000)
172 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any law to the contrary, for the Hudson River Estuary
2 Management Plan prepared pursuant to section 11-0306 of the environ-
3 mental conservation law (09HE10ER) ... 3,000,000 .... (re. $123,000)
4 Notwithstanding any law to the contrary, for state assistance
5 payments, pursuant to a smart growth program, provided on a compet-
6 itive basis, to counties, cities, towns, or villages to establish,
7 update or implement comprehensive plans in a manner consistent with
8 smart growth; provided, however, that up to 25 percent of such
9 payments may be awarded to not-for-profit organizations for such
10 purposes (09SG10ER) ... 300,000 ..................... (re. $300,000)
11 Notwithstanding any law to the contrary, for the state share of costs
12 of wastewater treatment improvement projects undertaken by munici-
13 palities to upgrade municipal systems to meet stormwater, combined
14 sewer overflow, sanitary sewer overflow and wastewater treatment
15 discharge requirements with priority given to systems that are in
16 violation of title 8 of article 17 of the environmental conservation
17 law and aquatic habitat restoration projects undertaken by munici-
18 palities and not-for-profit corporations for aquatic habitat resto-
19 ration projects as defined in subdivision 1 of section 56-0101 of
20 the environmental conservation law (09WQ10ER) ......................
21 2,932,000 ......................................... (re. $1,873,000)
22 Notwithstanding any law to the contrary for New York ocean and Great
23 Lakes ecosystem conservation projects, consistent with the policy
24 articulated in article 14 of the environmental conservation law
25 (09GL10ER) ... 5,000,000 .......................... (re. $2,972,000)
26 Notwithstanding any law to the contrary, for the implementation of the
27 recommendations of the invasive species task force prepared pursuant
28 to chapter 324 of the laws of 2003 and for the purposes set forth in
29 chapter 674 of the laws of 2007 including not less than $95,000 for
30 Lake George, provided that not less than $1,000,000 be made avail-
31 able for invasive species eradication, and including grants related
32 to the control and management of invasive species. Such funding for
33 grants shall be provided on a competitive basis in consultation with
34 the New York Invasive Species Council (09IS10ER) ...................
35 3,800,000 ........................................... (re. $620,000)
36 Notwithstanding any law to the contrary, for Soil and Water Conserva-
37 tion District activities as authorized for reimbursement in section
38 11-a of the soil and water conservation districts law (09SW10ER) ...
39 3,000,000 ............................................. (re. $1,000)
40 By chapter 99, section 1, of the laws of 2010, as amended by chapter 54,
41 section 1, of the laws of 2011:
42 Local waterfront revitalization programs, notwithstanding any law to
43 the contrary, not less than, $6,000,000 for waterfront revitaliza-
44 tion projects which are in or primarily serve areas where demograph-
45 ic and other relevant data for such areas demonstrate that the areas
46 are densely populated and have sustained physical deterioration,
47 decay, neglect, or disinvestment, or where a substantial proportion
48 of the residential population is of low income or is otherwise
49 disadvantaged and is underserved with respect to the existing recre-
50 ational opportunities in the area; and provided further this appro-
51 priation shall not be construed to restrict the use of any addi-
173 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tional monies for such projects; $550,000 for Buffalo Waterfront;
2 $300,000 for Niagara River Greenway; $250,000 for Hudson and Cham-
3 plain Docks; and $400,000 for the Beacon Institute including costs
4 incurred prior to April 1, 2011 (09WR10ER) .........................
5 12,000,000 ....................................... (re. $10,219,000)
6 By chapter 55, section 1, of the laws of 2009:
7 For services and expenses of projects and purposes authorized by
8 section 92-s of the state finance law to receive funding from the
9 solid waste account in accordance with a programmatic and financial
10 plan to be approved by the director of the budget, including subal-
11 location to other state departments and agencies, according to the
12 following:
13 Notwithstanding any law to the contrary, for the breast cancer and
14 environmental risk factors program at Cornell University (09BC09ER)
15 ... 450,000 ......................................... (re. $450,000)
16 For services and expenses of projects and purposes authorized by
17 section 92-s of the state finance law to receive funding from the
18 parks, recreation and historic preservation account in accordance
19 with a programmatic and financial plan to be approved by the direc-
20 tor of the budget, including suballocation to other state depart-
21 ments and agencies, according to the following:
22 Notwithstanding subdivision 7 of section 92-s of the state finance law
23 or any other law to the contrary, for services and expenses of the
24 Hudson River Park Trust for projects related to the development of
25 the Hudson River Park consistent with provisions of chapter 592 of
26 the laws of 1998; provided, however, such funds shall not be avail-
27 able for suballocation to any public benefit corporation or public
28 authority with the exception of the Hudson River Park Trust and
29 shall be available solely for the liabilities incurred by the Hudson
30 River Park Trust or by other state departments or agencies on behalf
31 of the Hudson River Park Trust and shall be available solely for the
32 liabilities incurred by the Hudson River Park Trust or by other
33 state departments or agencies on behalf of the Hudson River Park
34 Trust on or after April 1, 1999. Provided further that, the comp-
35 troller is hereby authorized and directed to release monies to the
36 Hudson River Park Trust in amounts set forth in a schedule approved
37 by the director of the budget (09HR09ER) ...........................
38 6,000,000 ........................................... (re. $486,000)
39 Notwithstanding any law to the contrary, for zoos, botanical gardens
40 and aquaria program (09ZB09ER) ... 9,000,000 .......... (re. $1,000)
41 For services and expenses of projects and purposes authorized by
42 section 92-s of the state finance law to receive funding from the
43 open space account in accordance with a programmatic and financial
44 plan to be approved by the director of the budget, including subal-
45 location to other state departments and agencies, according to the
46 following:
47 Long Island South Shore Estuary Reserve (09SE09ER) ...................
48 900,000 ............................................. (re. $244,000)
49 Non-agricultural non-point source abatement and control projects
50 (09NP09ER) ... 5,600,000 .......................... (re. $1,747,000)
174 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Biodiversity stewardship and research, and notwithstanding any law to
2 the contrary, $100,000 for Cayuga Island (09BD09ER) ................
3 500,000 ............................................. (re. $149,000)
4 By chapter 55, section 1, of the laws of 2009, as amended by chapter
5 502, section 5, of the laws of 2009:
6 Secondary materials regional marketing assistance and energy conserva-
7 tion services projects (09SM09ER) ... 1,381,000 ... (re. $1,381,000)
8 Notwithstanding any law to the contrary, for assessment and recovery
9 of any natural resource damages (09RD09ER) .........................
10 431,000 .............................................. (re. $39,000)
11 Local waterfront revitalization programs, notwithstanding any law to
12 the contrary, not less than, $9,750,000 for waterfront revitaliza-
13 tion projects which are in or primarily serve areas where demograph-
14 ic and other relevant data for such areas demonstrate that the areas
15 are densely populated and have sustained physical deterioration,
16 decay, neglect, or disinvestment, or where a substantial proportion
17 of the residential population is of low income or is otherwise
18 disadvantaged and is underserved with respect to the existing recre-
19 ational opportunities in the area; and provided further this appro-
20 priation shall not be construed to restrict the use of any addi-
21 tional monies for such projects; $1,000,000 for Buffalo Waterfront;
22 $300,000 for Niagara River Greenway; and $700,000 for Hudson and
23 Champlain Docks (09WR09ER) ... 24,021,000 ........ (re. $16,112,000)
24 Parks, recreation and historic preservation projects, notwithstanding
25 any law to the contrary, not less than, $8,490,000 for municipal
26 parks projects which are in or primarily serve areas where demo-
27 graphic and other relevant data for such areas demonstrate that the
28 areas are densely populated and have sustained physical deteri-
29 oration, decay, neglect or disinvestment or where a substantial
30 proportion of the residential population is of low income or is
31 otherwise disadvantaged and is underserved with respect to the
32 existing recreational opportunities in the area, and notwithstanding
33 any law to the contrary, $500,000 for Olmstead Park (09MP09ER) .....
34 20,813,000 ........................................ (re. $7,399,000)
35 Notwithstanding any law to the contrary, for state parks and land and
36 easement infrastructure, access and stewardship projects which shall
37 include capital projects: (i) on state parks and state owned lands
38 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
39 mental conservation law and (ii) on state parks or state owned lands
40 and easements under the jurisdiction of the department of environ-
41 mental conservation or the office of parks, recreation and historic
42 preservation for access opportunities for people with disabilities;
43 access to the State Forest Preserve; State reforestation, Wildlife
44 Management areas and conservation easement lands; recreational trail
45 construction and maintenance; Catskill and Adirondack campground
46 improvements to public access and sanitation facilities; environ-
47 mental education; conservation education facility improvements;
48 archeological, historic, cultural and natural resource surveys,
49 forest health surveys, interpretation, and inventories; Forest
50 Preserve and state forest unit management planning; conservation
51 easement public recreation planning; habitat restoration and
175 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 enhancement; state fish hatchery improvements; water access facili-
2 ties and safety improvements; public beach facility development and
3 improvement; public access improvements at day use areas; state
4 historic site exterior restoration; and cabin area and camping
5 facility development, restoration and reconstruction (09ST09ER) ....
6 5,000,000 ............................................ (re. $11,000)
7 Notwithstanding any law to the contrary, for the purposes of
8 Hudson-FultonChamplain Quadricentennial celebrations, projects and
9 programs (09QC09ER) ... 450,000 ..................... (re. $125,000)
10 Costs related to the acquisition of the following properties: Atlan-
11 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
12 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
13 Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
14 projects, Western Suffolk/Nassau Special Groundwater Protection
15 Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
16 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
17 Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
18 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
19 lands, Mongaup Valley Wildlife Management Area, Northern Putnam
20 Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
21 Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
22 Northeastern Westchester Watershed and Biodiversity Lands, Rockland
23 Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
24 River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
25 Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
26 City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
27 Five Rivers Environmental Education Center, Helderberg Escarpment,
28 Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill Watershed-
29 Saratoga National Historic Park View shed, Washington County Agri-
30 cultural Lands-Saratoga National Historic Park View shed, Westmere
31 Woods, International Paper Fee Lands, Lake George watershed, Lake
32 Champlain watershed, Boeselager forestry, Domtar/Lyme Fee Lands,
33 Catskill River and Road corridor, Rensselaer plateau, Hudson River
34 Gorge, Franklinton Vlaie Wildlife Management area, Black Creek
35 Marsh/Vly Swamp, Mohawk River Valley Corridor/Barge Canal, Oomsdale
36 farm and surrounding landscape, Susquehanna River Valley Corridor,
37 Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and Wetlands,
38 Saratoga County, Mays Pond Tract, State Forest and Wildlife Manage-
39 ment Area Protection, Follensby Park, National Lead/Tahawus, Unde-
40 veloped Lake George Shore, Whitney Park, Finch Woodlands, Washington
41 County Grasslands, Northern Flow River Corridors, Recreational Trail
42 Linkages and Networks, Bog River/Beaver River Headwater Complex,
43 Maumee Swamp, Moose River Corridor, Rome Sand Plains, Saint Lawrence
44 River Islands, Shorelines and Wetlands, Eastern Lake Ontario Shore-
45 line and Islands, Tug Hill Core Forests and Headwater Streams, Tioga
46 County Park Opportunities, Nelson Swamp, Genny-Green Trail/Link
47 Trail, Clark Reservation State Park, Salmon River Corridor, State
48 Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
49 Carpenter Falls/Bear Swamp Creek Corridor, Junius Ponds State Forest
50 and Wildlife Management Area Protection, Tonawanda Creek Watershed,
51 Two Rivers State Park, Finger Lakes Shoreline, Buffalo/Niagara River
52 Corridors, Northern Montezuma Wetlands, HiTor/Bristol Hills, Brad-
176 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 dock Bay, Catharine Valley Complex, Sonnenberg Gardens, Western
2 Finger Lakes: Conesus, Hemlock, Canadice and Honeoye, Genesee
3 Greenway/Recreationway, Allegany State Park, Alder Bottom
4 Pond/French Creek, Great Lakes Shorelines and Niagara River, Chau-
5 tauqua Lake Access, Shore Lands and Vistas, Randolph Swamp, Eighteen
6 Mile Creek/Hampton Brook Woods, Statewide Small Projects, Working
7 Forest Lands, State Park and State Historic Site Protection, (a)
8 notwithstanding any law to the contrary, $500,000 from the land
9 acquisition allocation for urban forestry projects provided that no
10 less than $250,000 shall be made available for such programs in
11 cities with populations of 65,000 or more; (b) notwithstanding any
12 law to the contrary, $1,575,000 from the land acquisition allocation
13 to the land trust alliance for the purpose of awarding grants on a
14 competitive basis to local land trusts, provided that up to ten
15 percent of such amount may be made available for administrative
16 costs and/or technical assistance (09LA09ER) .......................
17 58,900,000 ........................................... (re. $38,000)
18 Agricultural non-point source abatement and control projects
19 (09AN09ER) ... 11,468,000 ............................ (re. $82,000)
20 Notwithstanding any law to the contrary, for the Hudson River Estuary
21 Management Plan prepared pursuant to section 11-0306 of the environ-
22 mental conservation law (09HE09ER) ... 3,706,000 ..... (re. $10,000)
23 Notwithstanding any law to the contrary, for state assistance
24 payments, pursuant to a smart growth program, provided on a compet-
25 itive basis, to counties, cities, towns, or villages to establish,
26 update or implement comprehensive plans in a manner consistent with
27 smart growth; provided, however, that up to 25 percent of such
28 payments may be awarded to not-for-profit organizations for such
29 purposes (09SG09ER) ... 400,000 ..................... (re. $119,000)
30 Agriculture and farmland protection activities (09FP09ER) ............
31 22,054,000 ....................................... (re. $19,738,000)
32 Notwithstanding any law to the contrary, for the state share of costs
33 of wastewater treatment improvement projects undertaken by munici-
34 palities to upgrade municipal systems to meet stormwater, combined
35 sewer overflow, sanitary sewer overflow and wastewater treatment
36 discharge requirements with priority given to systems that are in
37 violation of title 8 of article 17 of the environmental conservation
38 law and aquatic habitat restoration projects undertaken by munici-
39 palities and not-for-profit corporations for aquatic habitat resto-
40 ration projects as defined in subdivision 1 of section 56-0101 of
41 the environmental conservation law (09WQ09ER) ......................
42 8,900,000 ........................................... (re. $764,000)
43 Notwithstanding any law to the contrary for New York ocean and Great
44 Lakes ecosystem conservation projects, consistent with the policy
45 articulated in article 14 of the environmental conservation law
46 (09GL09ER) ... 5,953,000 .......................... (re. $2,250,000)
47 Notwithstanding any law to the contrary, for the implementation of the
48 recommendations of the invasive species task force prepared pursuant
49 to chapter 324 of the laws of 2003 and for the purposes set forth in
50 chapter 674 of the laws of 2007 including not less than $96,000 for
51 Lake George, provided that not less than $1,000,000 be made avail-
52 able for invasive species eradication, and including grants related
177 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to the control and management of invasive species. Such funding for
2 grants shall be provided on a competitive basis in consultation with
3 the New York Invasive Species Council (09IS09ER) ...................
4 4,794,000 ........................................... (re. $863,000)
5 By chapter 55, section 1, of the laws of 2008:
6 For services and expenses of projects and purposes authorized by
7 section 92-s of the state finance law to receive funding from the
8 open space account in accordance with a programmatic and financial
9 plan to be approved by the director of the budget, including subal-
10 location to other state departments and agencies, according to the
11 following:
12 Long Island South Shore Estuary Reserve (09SE08ER) ...................
13 900,000 .............................................. (re. $45,000)
14 The appropriation made by chapter 55, section 1, of the laws of 2008, is
15 hereby amended and reappropriated to read:
16 For services and expenses of projects and purposes authorized by
17 section 92-s of the state finance law to receive funding from the
18 parks, recreation and historic preservation account in accordance
19 with a programmatic and financial plan to be approved by the direc-
20 tor of the budget, including suballocation to other state depart-
21 ments and agencies, according to the following:
22 Notwithstanding any law to the contrary, for zoos, botanical gardens
23 and aquaria program (09ZB08ER) ... 9,000,000 ......... (re. $74,000)
24 Notwithstanding any law to the contrary, for the Catskill Interpretive
25 Center, some or all of which may be allocated to the Catskill Center
26 for Conservation and Development (09CC08ER) ........................
27 1,000,000 ........................................... (re. $994,000)
28 Notwithstanding any law to the contrary, for the purposes of
29 Hudson-FultonChamplain Quadricentennial celebrations, projects and
30 programs (09QC08ER) ... 3,000,000 ................... (re. $137,000)
31 Notwithstanding any law to the contrary, for solar energy initiatives
32 (09SO08ER) ... 2,000,000 ............................. (re. $82,000)
33 By chapter 55, section 1, of the laws of 2008, as amended by chapter 1,
34 section 4, of the laws of 2009:
35 Secondary materials regional marketing assistance and energy conserva-
36 tion services projects (09SM08ER) ... 2,500,000 ... (re. $2,500,000)
37 Parks, recreation and historic preservation projects, notwithstanding
38 any law to the contrary, not less than, $6,400,000 for municipal
39 parks projects which are in or primarily serve areas where demo-
40 graphic and other relevant data for such areas demonstrate that the
41 areas are densely populated and have sustained physical deteri-
42 oration, decay, neglect or disinvestment or where a substantial
43 proportion of the residential population is of low income or is
44 otherwise disadvantaged and is underserved with respect to the
45 existing recreational opportunities in the area, and notwithstanding
46 any law to the contrary, $50,000 from the heritage areas allocation
47 for the purpose of awarding grants on a competitive basis to herit-
48 age area organizations designated in statute (09MP08ER) ............
49 19,225,000 ........................................ (re. $6,195,000)
178 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any law to the contrary, for state parks and land and
2 easement infrastructure, access and stewardship projects which shall
3 include capital projects: (i) on state parks and state owned lands
4 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
5 mental conservation law; (ii) on state parks or state owned lands
6 and easements under the jurisdiction of the department of environ-
7 mental conservation or the office of parks, recreation and historic
8 preservation for access opportunities for people with disabilities;
9 access to the State Forest Preserve; State reforestation, Wildlife
10 Management areas and conservation easement lands; recreational trail
11 construction and maintenance; Catskill and Adirondack campground
12 improvements to public access and sanitation facilities; environ-
13 mental education; conservation education facility improvements;
14 archeological, historic, cultural and natural resource surveys,
15 forest health surveys, interpretation, and inventories; Forest
16 Preserve and state forest unit management planning; conservation
17 easement public recreation planning; habitat restoration and
18 enhancement; state fish hatchery improvements; water access facili-
19 ties and safety improvements; public beach facility development and
20 improvement; public access improvements at day use areas; state
21 historic site exterior restoration; and cabin area and camping
22 facility development, restoration and reconstruction; (iii) $750,000
23 from such amount for Belleayre Mountain ski center projects
24 (09ST08ER) ... 4,000,000 ............................ (re. $312,000)
25 Costs related to the acquisition of the following properties: Atlan-
26 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
27 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
28 Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
29 projects, Western Suffolk/Nassau Special Groundwater Protection
30 Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
31 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
32 Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
33 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
34 lands, Mongaup Valley Wildlife Management Area, Northern Putnam
35 Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
36 Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
37 Northeastern Westchester Watershed and Biodiversity Lands, Rockland
38 Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
39 River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
40 Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
41 City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
42 Five Rivers Environmental Education Center, Helderberg Escarpment,
43 Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill Watershed-
44 Saratoga National Historic Park View shed, Washington County Agri-
45 cultural Lands-Saratoga National Historic Park View shed, Westmere
46 Woods, International Paper Fee Lands, Lake George watershed, Lake
47 Champlain watershed, Boeselager forestry, Domtar/Lyme Fee Lands,
48 working forests lands, Catskill River and Road corridor, Rensselaer
49 plateau, Hudson River Gorge, Franklinton Vlaie Wildlife Management
50 area, Black Creek Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie
51 Canal, Oomsdale farm and surrounding landscape, Susquehanna River
52 Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain Shore-
179 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 line and Wetlands, Saratoga County, Mays Pond Tract, State Forest
2 and Wildlife Management Area Protection, Follensby Park, National
3 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
4 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
5 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
6 Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
7 and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
8 Core Forests and Headwater Streams, Tioga County Park Opportunities,
9 Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
10 Park, Salmon River Corridor, State Parks Greenbelt/Tompkins County,
11 Cattaraugus Creek and tributaries, Carpenter Falls/Bear Swamp Creek
12 Corridor, Junius Ponds State Forest and Wildlife Management Area
13 Protection, Tonawanda Creek Watershed, Two Rivers State Park, Finger
14 Lakes Shoreline, Buffalo/Niagara River Corridors, Northern Montezuma
15 Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine Valley
16 Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus, Hemlock,
17 Canadice and Honeoye, Genesee Greenway/Recreationway, Allegany State
18 Park, Alder Bottom Pond/French Creek, Great Lakes Shorelines and
19 Niagara River, Chautauqua Lake Access, Shore Lands and Vistas,
20 Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
21 Small Projects, Working Forest Lands, and State Park and State
22 Historic Site Protection, (a) notwithstanding any law to the contra-
23 ry, $500,000 from the land acquisition allocation for urban forestry
24 projects provided that no less than $250,000 shall be made available
25 for such programs in cities with populations of 65,000 or more; (b)
26 notwithstanding any law to the contrary, $1,575,000 from the land
27 acquisition allocation to the land trust alliance for the purpose of
28 awarding grants on a competitive basis to local land trusts,
29 provided that up to ten percent of such amount may be made available
30 for administrative costs and/or technical assistance (09LA08ER) ....
31 58,725,000 ........................................ (re. $1,988,000)
32 Agricultural non-point source abatement and control projects
33 (09AN08ER) ... 9,500,000 .......................... (re. $1,156,000)
34 Non-agricultural non-point source abatement and control projects
35 (09NP08ER) ... 4,750,000 .......................... (re. $1,469,000)
36 Agriculture and farmland protection activities (09FP08ER) ............
37 23,000,000 ........................................ (re. $3,767,000)
38 Notwithstanding any law to the contrary, for the Hudson River Estuary
39 Management Plan prepared pursuant to section 11-0306 of the environ-
40 mental conservation law provided however that no more than
41 $1,000,000 shall be used for Hudson-Fulton Champlain Quadricentenni-
42 al celebrations, projects and programs (09HE08ER) ..................
43 5,000,000 ............................................ (re. $25,000)
44 Notwithstanding any law to the contrary, for state assistance
45 payments, pursuant to a smart growth program, provided on a compet-
46 itive basis, to counties, cities, towns, or villages to establish,
47 update or implement comprehensive plans in a manner consistent with
48 smart growth; provided, however, that up to 25 percent of such
49 payments may be awarded to not-for-profit organizations for such
50 purposes (09SG08ER) ... 1,000,000 ................... (re. $277,000)
51 Notwithstanding any law to the contrary, for the state share of costs
52 of wastewater treatment improvement projects undertaken by munici-
180 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 palities to upgrade municipal systems to meet stormwater, combined
2 sewer overflow, sanitary sewer overflow and wastewater treatment
3 discharge requirements with priority given to systems that are in
4 violation of title 8 of article 17 of the environmental conservation
5 law and aquatic habitat restoration projects undertaken by munici-
6 palities and not-for-profit corporations for aquatic habitat resto-
7 ration projects as defined in subdivision 1 of section 56-0101 of
8 the environmental conservation law (09WQ08ER) ......................
9 9,000,000 ........................................... (re. $370,000)
10 Notwithstanding any law to the contrary for New York ocean and Great
11 Lakes ecosystem conservation projects, consistent with the policy
12 articulated in article 14 of the environmental conservation law
13 (09GL08ER) ... 4,500,000 ............................ (re. $455,000)
14 Notwithstanding any law to the contrary, for the implementation of the
15 recommendations of the invasive species task force prepared pursuant
16 to chapter 324 of the laws of 2003 and for the purposes set forth in
17 chapter 674 of the laws of 2007 provided that not less than
18 $1,000,000 be made available for invasive species eradication, and
19 including grants related to the control and management of invasive
20 species. Such funding for grants shall be provided on a competitive
21 basis in consultation with the New York Invasive Species Council
22 (09IS08ER) ... 4,000,000 ............................ (re. $668,000)
23 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
24 section 1, of the laws of 2009:
25 Local waterfront revitalization programs, notwithstanding any law to
26 the contrary, not less than, $7,100,000 for waterfront revitaliza-
27 tion projects which are in or primarily serve areas where demograph-
28 ic and other relevant data for such areas demonstrate that the areas
29 are densely populated and have sustained physical deterioration,
30 decay, neglect, or disinvestment, or where a substantial proportion
31 of the residential population is of low income or is otherwise
32 disadvantaged and is underserved with respect to the existing recre-
33 ational opportunities in the area; and provided further this appro-
34 priation shall not be construed to restrict the use of any addi-
35 tional monies for such projects; $250,000 for services and expenses
36 of the Upper Susquehanna Coalition (09WR08ER) ......................
37 22,375,000 ........................................ (re. $4,548,000)
38 By chapter 55, section 1, of the laws of 2007:
39 For services and expenses of projects and purposes authorized by
40 section 92-s of the state finance law to receive funding from the
41 solid waste account in accordance with a programmatic and financial
42 plan to be approved by the director of the budget, including subal-
43 location to other state departments and agencies, according to the
44 following:
45 Secondary materials regional marketing assistance and energy conserva-
46 tion services projects (09SM07ER) ... 8,750,000 ... (re. $8,750,000)
47 Notwithstanding any law to the contrary, for assessment and recovery
48 of any natural resource damages to the Hudson River (09RD07ER) .....
49 1,300,000 ............................................ (re. $19,000)
181 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses of projects and purposes authorized by
2 section 92-s of the state finance law to receive funding from the
3 parks, recreation and historic preservation account in accordance
4 with a programmatic and financial plan to be approved by the direc-
5 tor of the budget, including suballocation to other state depart-
6 ments and agencies, according to the following:
7 Local waterfront revitalization programs, notwithstanding any law to
8 the contrary, not less than, $6,656,000 for waterfront revitaliza-
9 tion projects which are in or primarily serve areas where demograph-
10 ic and other relevant data for such areas demonstrate that the areas
11 are densely populated and have sustained physical deterioration,
12 decay, neglect, or disinvestment, or where a substantial proportion
13 of the residential population is of low income or is otherwise
14 disadvantaged and is underserved with respect to the existing recre-
15 ational opportunities in the area; and provided further this section
16 shall not be construed to restrict the use of any additional monies
17 for such projects; $1,625,000 for services and expenses of the
18 Beacon Institute; $1,000,000 for services and expenses of riverfront
19 development properties in Rensselaer county; and $1,000,000 for
20 services and expenses for Long Island water projects (09WR07ER) ....
21 26,625,000 .......................................... (re. $402,000)
22 Parks, recreation and historic preservation projects, notwithstanding
23 any law to the contrary, not less than, $5,306,000 for municipal
24 parks projects which are in or primarily serve areas where demo-
25 graphic and other relevant data for such areas demonstrate that the
26 areas are densely populated and have sustained physical deteri-
27 oration, decay, neglect or disinvestment or where a substantial
28 proportion of the residential population is of low income or is
29 otherwise disadvantaged and is underserved with respect to the
30 existing recreational opportunities in the area (09MP07ER) .........
31 21,225,000 ........................................ (re. $4,225,000)
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 open space account in accordance with a programmatic and financial
35 plan to be approved by the director of the budget, including subal-
36 location to other state departments and agencies, according to the
37 following:
38 Costs related to the acquisition of the following properties: Long
39 Island Sound Coastal Area, Long Island South Shore Estuary Reserve,
40 Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
41 Adirondack Mountain Club Lands, Hudson River projects, Western
42 Suffolk/Nassau Special Groundwater Protection Area, Inner
43 City/Underserved Community Parks, Long Pond/Butler Wood, Staten
44 Island Greenbelt, Staten Island Wet Woods, Fahnestock State Park,
45 Great Swamp, Neversink Highlands, Plutarch/Black Creek Wetlands
46 Complex, Highlands Greenway Corridor, Mongaup Valley Wildlife
47 Management Area, Northern Putnam Greenway, Schunnemunk
48 Mountain/Moodna Creek/Woodcock Mountain, Sterling Forest, Shawangunk
49 Mountains, Westchester Marine Corridor, Rockland County Highlands,
50 Catskill Mountain/Delaware River Region, Beaverkill/Willowemoc,
51 Hudson River Corridor Estuary/Greenway Trail, Catskill Unfragmented
52 Forest, Long Path, New York City Watershed Lands-Croton, Taconic
182 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Ridge/Harlem Valley, Albany Pine Bush, Five Rivers Environmental
2 Education Center, Helderberg Escarpment, Pine Bush-Hudson River
3 Link/Tivoli Preserve, Batten Kill Watershed-Saratoga National
4 Historic Park Viewshed, Washington County Agricultural LandsSaratoga
5 National Historic Park Viewshed, Westmere Woods, International Paper
6 Fee Lands, Lake George watershed, Lake Champlain watershed, Boese-
7 lager forestry, Domtar/Lyme Fee Lands, Catskill River and Road
8 corridor, Rensselaer plateau, Franklinton Vlaie Wildlife Management
9 area, Black Creek Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie
10 Canal, Oomsdale farm and surrounding landscape, Susquehanna River
11 Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain Shore-
12 line and Wetlands, Saratoga County, Mays Pond Tract, State Forest
13 and Wildlife Management Area Protection, Follensby Park, National
14 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
15 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
16 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
17 Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
18 and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
19 Core Forests and Headwater Streams, Tioga County Park Opportunities,
20 Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
21 Park, Salmon River Corridor, Cattaraugus Creek and tributaries,
22 Carpenter Falls/Bear Swamp Creek Corridor, Junius Ponds State Forest
23 and Wildlife Management Area Protection, Tonawanda Creek Watershed,
24 Two Rivers State Park, Finger Lakes Shoreline, Buffalo/Niagara River
25 Corridors, Northern Montezuma Wetlands, HiTor/Bristol Hills, Brad-
26 dock Bay, Catharine Valley Complex, Sonnenberg Gardens, Western
27 Finger Lakes: Conesus, Hemlock, Canadice and Honeoye, Genesee
28 Greenway/Recreationway, Allegany State Park, Alder Bottom
29 Pond/French Creek, Great Lakes and Niagara River Access Shore Lands
30 and Vistas, Chautauqua Lake Access, Shore Lands and Vistas, Randolph
31 Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide Small
32 Projects, Working Forest Lands, and State Park and State Historic
33 Site Protection, (a) notwithstanding any law to the contrary,
34 $500,000 from the land acquisition allocation for urban forestry
35 projects provided that no less than $250,000 shall be made available
36 for such programs in cities with populations of 65,000 or more and
37 (b) notwithstanding any law to the contrary, $1,000,000 from the
38 land acquisition allocation to the land trust alliance for the
39 purpose of awarding grants on a competitive basis to local land
40 trusts, provided that up to ten percent of such amount shall be made
41 available for administrative costs (09LA07ER) ......................
42 55,000,000 .......................................... (re. $572,000)
43 Agriculture and farmland protection activities (09FP07ER) ............
44 28,000,000 ........................................ (re. $5,893,000)
45 Long Island South Shore Estuary Reserve (09SE07ER) ...................
46 900,000 ............................................... (re. $6,000)
47 Agricultural non-point source abatement and control projects
48 (09AN07ER) ... 12,833,000 ............................ (re. $25,000)
49 Non-agricultural non-point source abatement and control projects
50 (09NP07ER) ... 6,417,000 ............................ (re. $458,000)
51 Notwithstanding any law to the contrary, for state assistance
52 payments, pursuant to a smart growth program, provided on a compet-
183 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 itive basis, to counties, cities, towns or villages to establilsh or
2 update comprehensive plans in a manner consistent with smart growth
3 (09SG07ER) ... 2,000,000 ............................. (re. $81,000)
4 Notwithstanding any law to the contrary for New York ocean and Great
5 Lakes ecosystem conservation projects, consistent with the policy
6 articulated in article 14 of the environmental conservation law
7 (09GL07ER) ... 4,000,000 ............................ (re. $857,000)
8 Notwithstanding any law to the contrary, for the implementation of the
9 recommendations of the invasive species task force prepared pursuant
10 to chapter 324 of the laws of 2003 including not less than $250,000
11 for Lake George, provided that not less than $1,000,000 be made
12 available for invasive species eradication. Funding shall be limited
13 to the preparation of a comprehensive invasive species management
14 plan, and grants for projects related to the control and management
15 of invasive species, education and outreach efforts, and for
16 projects aimed at the early detection and prevention of invasive
17 species. Such funding for grants shall be provided on a competitive
18 basis in consultation with the New York State Invasive Species Task
19 Force (09IS07ER) ... 5,000,000 ....................... (re. $84,000)
20 By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
21 section 1, of the laws of 2008:
22 Notwithstanding any law to the contrary, for state parks and land
23 infrastructure, access and stewardship projects which shall include
24 capital projects: (i) on state parks and state owned lands acquired
25 pursuant to sections 54-0303 and 56-0307 of the environmental
26 conservation law; (ii) on state parks or state owned lands under the
27 jurisdiction of the department of environmental conservation or the
28 office of parks, recreation and historic preservation for access
29 opportunities for people with disabilities; access to the State
30 Forest Preserve; recreational trail construction and maintenance;
31 Catskill and Adirondack campground improvements to public access and
32 sanitation facilities; conservation education facility improvements;
33 archeological, historic, cultural and natural resource surveys,
34 interpretation, and inventories; Forest Preserve and state forest
35 unit management planning; habitat restoration and enhancement; state
36 fish hatchery improvements; water access facilities and safety
37 improvements; public beach facility development and improvement;
38 public access improvements at day use areas; state historic site
39 exterior restoration; and cabin area and camping facility develop-
40 ment, restoration and reconstruction and (iii) $750,000 from such
41 amount for Belleayre Mountain ski center projects (09ST07ER) .......
42 22,250,000 .......................................... (re. $267,000)
43 Notwithstanding any law to the contrary, for the state share of costs
44 of wastewater treatment improvement projects undertaken by munici-
45 palities to upgrade municipal systems to meet stormwater, combined
46 sewer overflow, sanitary sewer overflow and wastewater treatment
47 discharge requirements with priority given to systems that are in
48 violation of title 8 of article 17 of the environmental conservation
49 law and aquatic habitat restoration projects undertaken by munici-
50 palities and not-for-profit corporations for aquatic habitat resto-
51 ration projects as defined in subdivision 1 of section 56-0101 of
184 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the environmental conservation law (09WQ07ER) ......................
2 10,000,000 .......................................... (re. $140,000)
3 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
4 section 1, of the laws of 2007:
5 For services and expenses of projects and purposes authorized by
6 section 92-s of the state finance law to receive funding from the
7 solid waste account in accordance with a programmatic and financial
8 plan to be approved by the director of the budget, including subal-
9 location to other state departments and agencies, including: (a)
10 notwithstanding any law to the contrary, $1,300,000 for the assess-
11 ment and recovery of any natural resource damages to the Hudson
12 River; and (b) notwithstanding any law to the contrary, $450,000 for
13 a Cornell University program to assess breast cancer and environ-
14 mental risk factors in New York State (09E206ER) ...................
15 23,770,500 ........................................ (re. $8,767,000)
16 PROJECT SCHEDULE
17 PROJECT AMOUNT
18 --------------------------------------------
19 (thousands of dollars)
20 Non-hazardous landfill closure
21 projects ........................... 3,000
22 Municipal waste reduction or
23 recycling projects ................. 8,750
24 Secondary materials regional
25 marketing assistance and
26 energy conservation services
27 projects ........................... 8,750
28 Services and expenses of the
29 assessment and recovery of
30 any natural resource damages
31 to the Hudson River ................ 1,300
32 Pesticides program ................... 2,475
33 --------------
34 Total ............................. 24,275
35 ==============
36 By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
37 section 5, of the laws of 2006:
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 parks, recreation and historic preservation account in accordance
41 with a programmatic and financial plan to be approved by the direc-
42 tor of the budget, including suballocation to other state depart-
43 ments and agencies, including: (a) notwithstanding subdivision 7 of
44 section 92-s of the state finance law or any other law to the
45 contrary, $5,000,000 for services and expenses of the Hudson River
46 Park Trust for projects related to the development of the Hudson
47 River Park consistent with provisions of chapter 592 of the laws of
48 1998; provided, however, such funds shall not be available for
49 suballocation to any public benefit corporation or public authority
185 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 with the exception of the Hudson River Park Trust and shall be
2 available solely for the liabilities incurred by the Hudson River
3 Park Trust or by other state departments or agencies on behalf of
4 the Hudson River Park Trust and shall be available solely for the
5 liabilities incurred by the Hudson River Park Trust or by other
6 state departments or agencies on behalf of the Hudson River Park
7 Trust on or after April 1, 1999. Provided further that, the comp-
8 troller is hereby authorized and directed to release monies to the
9 Hudson River Park Trust in amounts set forth in a schedule approved
10 by the director of the budget; (b) notwithstanding any law to the
11 contrary, $15,000,000 for state parks and land infrastructure,
12 access and stewardship projects which shall include capital
13 projects: (i) on state parks and state owned lands acquired pursuant
14 to sections 54-0303 and 56-0307 of the environmental conservation
15 law or (ii) on state parks or state owned lands under the jurisdic-
16 tion of the department of environmental conservation or the office
17 of parks, recreation and historic preservation for access opportu-
18 nities for people with disabilities; access to the State Forest
19 Preserve; recreational trail construction and maintenance; Catskill
20 and Adirondack campground improvements to public access and sanita-
21 tion facilities; conservation education facility improvements;
22 archeological, historic, cultural and natural resource surveys,
23 interpretation, and inventories; Forest Preserve and state forest
24 unit management planning; habitat restoration and enhancement; state
25 fish hatchery improvements; water access facilities and safety
26 improvements; public beach facility development and improvement;
27 public access improvements at day use areas; state historic site
28 exterior restoration; and cabin area and camping facility develop-
29 ment, restoration and reconstruction; and (iii) $750,000 from such
30 amount for Belleayre Mountain ski center projects; (c) notwithstand-
31 ing any law to the contrary, $5,000,000 for historic barns program;
32 (d) notwithstanding any law to the contrary, $7,500,000 for zoos,
33 botanical gardens and aquaria program; (e) notwithstanding any law
34 to the contrary, not less than, $6,750,000 for waterfront revitali-
35 zation projects which are in or primarily serve areas where demo-
36 graphic and other relevant data for such areas demonstrate that the
37 areas are densely populated and have sustained physical deteri-
38 oration, decay, neglect, or disinvestment, or where a substantial
39 proportion of the residential population is of low income or is
40 otherwise disadvantaged and is underserved with respect to the
41 existing recreational opportunities in the area; and provided
42 further this section shall not be construed to restrict the use of
43 any additional monies for such projects; (f) notwithstanding any law
44 to the contrary, not less than, $5,118,000 for municipal parks
45 projects which are in or primarily serve areas where demographic and
46 other relevant data for such areas demonstrate that the areas are
47 densely populated and have sustained physical deterioration, decay,
48 neglect or disinvestment or where a substantial proportion of the
49 residential population is of low income or is otherwise disadvan-
50 taged and is underserved with respect to the existing recreational
51 opportunities in the area; and provided further this section shall
52 not be construed to restrict the use of any additional monies for
186 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 such projects and not less than $1,500,000 for the Albany Pine Bush
2 Preserve Discovery Center; (g) notwithstanding any law to the
3 contrary, $7,250,000 from the waterfront revitalization allocation
4 for the Beacon Institute including $5,000,000 for the development of
5 the upper satellite center associated with the Beacon Institute
6 located on the Troy waterfront; and (h) notwithstanding any law to
7 the contrary, $1,000,000 for waterfront revitalization and river-
8 front development projects in the county of Rensselaer and $300,000
9 for Sea Cliff, $300,000 for the town of Huntington, $100,000 for
10 Laurel Hollow, $100,000 for Asharoken, $100,000 for Lloyd Harbor and
11 $100,000 for Bayville; provided that such state assistance payment
12 shall not be construed to restrict the use of any additional monies
13 for such project or be considered a state assistance payment or
14 other assistance for the purposes of title 11 of article 54 of the
15 environmental conservation law and title 3 of article 56 of the
16 environmental conservation law; and provided further, however that
17 such state assistance payment shall reduce the total cost of such
18 project for purposes of calculating eligibility for further state
19 assistance payments (09E306ER) ... 79,970,000 ..... (re. $4,377,000)
20 PROJECT SCHEDULE
21 PROJECT AMOUNT
22 --------------------------------------------
23 (thousands of dollars)
24 Local waterfront revitaliza-
25 tion programs ..................... 27,000
26 Parks, recreation and historic
27 preservation projects ............. 20,470
28 Stewardship projects ................ 15,000
29 Historic barn preservation ........... 5,000
30 Zoos, botanical gardens and
31 aquaria projects ................... 7,500
32 Hudson River Park .................... 5,000
33 --------------
34 Total ............................. 79,970
35 ==============
36 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
37 section 1, of the laws of 2007:
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 open space account in accordance with a programmatic and financial
41 plan to be approved by the director of the budget, including subal-
42 location to other state departments and agencies, including costs
43 related to the acquisition of the following properties: Long Island
44 Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
45 Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
46 Growth Area and Critical Resource Area, Western Suffolk/Nassau
47 Special Groundwater Protection Area, Inner City/Underserved Communi-
48 ty Parks, Long Pond/Butler Wood, Staten Island Greenbelt, Staten
49 Island Wet Woods, Fahnestock State Park, Great Swamp, Neversink
50 Highlands, Plutarch/Black Creek Wetlands Complex, Highlands Greenway
187 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Corridor, Mongaup Valley Wildlife Management Area, Northern Putnam
2 Greenway, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Ster-
3 ling Forest, Shawangunk Mountains, Westchester Marine Corridor,
4 Rockland County Highlands, Catskill Mountain/Delaware River Region,
5 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
6 Catskill Unfragmented Forest, Long Path, New York City Watershed
7 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
8 Rivers Environmental Education Center, Helderberg Escarpment, Pine
9 Bush-Hudson River Link/Tivoli Preserve, Westmere Woods, Interna-
10 tional Paper Fee Lands, Lake George watershed, Lake Champlain
11 watershed, Boeselager forestry, Domtar/Lyme Fee Lands, Catskill
12 River and Road corridor, Rensselaer plateau, Franklinton Vlaie Wild-
13 life Management area, Black Creek Marsh/Vly Swamp, Mohawk River
14 Valley Corridor/Erie Canal, Oomsdale farm and surrounding landscape,
15 Susquehanna River Valley Corridor, Pilot Knob, Floodwood Camp, Lake
16 Champlain Shoreline and Wetlands, Wilton Wildlife Preserve and Park,
17 Follensby Park, National Lead/Tahawus, Undeveloped Lake George
18 Shore, Whitney Park, Northern Flow River Corridors, Recreational
19 Trail Linkages and Networks, Bog River/Beaver River Headwater
20 Complex, Maumee Swamp, Moose River Corridor, Rome Sand Plains, Saint
21 Lawrence River Islands, Shorelines and Wetlands, Eastern Lake Ontar-
22 io Shoreline and Islands, Tug Hill Core Forests and Headwater
23 Streams, Tioga County Park Opportunities, Nelson Swamp, Genny-Green
24 Trail/Link Trail, Clark Reservation State Park, Salmon River Corri-
25 dor, Cattaraugus Creek and tributaries, Carpenter Falls/Bear Swamp
26 Creek Corridor, Junius Ponds State Forest and Wildlife Management
27 Area Protection, Tonawanda Creek Watershed, Two Rivers State Park,
28 Finger Lakes Shoreline, Buffalo/Niagara River Corridors, Northern
29 Montezuma Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine
30 Valley Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus,
31 Hemlock, Canadice and Honeoye, Genesee Greenway/Recreationway, Alle-
32 gany State Park, Alder Bottom Pond/French Creek, Great Lakes and
33 Niagara River Access Shore Lands and Vistas, Chautauqua Lake Access,
34 Shore Lands and Vistas, Randolph Swamp, Eighteen Mile Creek/Hampton
35 Brook Woods, Statewide Small Projects, Working Forest Lands, and
36 State Park and State Historic Site Protection, including: (a)
37 notwithstanding any law to the contrary, $5,000,000 for the Hudson
38 River Estuary Management Plan prepared pursuant to section 11-0306
39 of the environmental conservation law; (b) notwithstanding any law
40 to the contrary, $2,000,000 for the Finger Lakes-Lake Ontario
41 Watershed Protection Alliance; (c) notwithstanding any law to the
42 contrary, $3,000,000 for Soil and Water Conservation District activ-
43 ities as authorized for reimbursement in section 11-a of the soil
44 and water conservation districts law; (d) notwithstanding any law to
45 the contrary, $500,000 from the land acquisition allocation for
46 urban forestry projects provided that no less than $250,000 shall be
47 made available for such programs in cities with populations of
48 65,000 or more; (e) notwithstanding any law to the contrary,
49 $500,000 from the land acquisition allocation to the land trust
50 alliance for the purpose of awarding grants on a competitive basis
51 to local land trusts, provided that up to ten percent of such amount
52 shall be made available for administrative costs; (f) notwithstand-
188 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ing any law to the contrary, $3,000,000 for reimbursement of eligi-
2 ble costs related to the New York state quality communities program;
3 (g) notwithstanding any law to the contrary, $7,000,000 for the
4 state share costs of wastewater treatment improvement projects
5 undertaken by municipalities to upgrade municipal systems to meet
6 stormwater discharge requirements with priority given to systems
7 that are in violation of title 8 of article 17 of the environmental
8 conservation law and aquatic habitat restoration projects undertaken
9 by municipalities and not-for-profit corporations for aquatic habi-
10 tat restoration projects as defined in subdivision 1 of section
11 56-0101 of the environmental conservation law; (h) notwithstanding
12 any law to the contrary $3,000,000 for New York ocean and Great
13 Lakes ecosystem conservation projects, consistent with the policy
14 articulated in article 14 of the environmental conservation law; (i)
15 notwithstanding any law to the contrary, $3,250,000 for the imple-
16 mentation of the recommendations of the invasive species task force
17 prepared pursuant to chapter 324 of the laws of 2003 including not
18 less than $250,000 for Lake George, provided that not less than
19 $1,000,000 be made available for invasive species eradication.
20 Funding shall be limited to the preparation of a comprehensive inva-
21 sive species management plan, and grants for projects related to the
22 control and management of invasive species, education and outreach
23 efforts, and for projects aimed at the early detection and
24 prevention of invasive species. Such funding for grants shall be
25 provided on a competitive basis in consultation with the New York
26 State Invasive Species Task Force; and (j) notwithstanding any law
27 to the contrary, $16,505,000 for non-point source abatement and
28 control projects provided that no less than $11,003,000 shall be
29 made available for agricultural nonpoint source abatement and
30 control projects and no less than $5,502,000 shall be made available
31 for non-agricultural non-point source abatement and control projects
32 (09E606ER) ... 121,259,500 ........................ (re. $2,520,000)
33 PROJECT SCHEDULE
34 PROJECT AMOUNT
35 --------------------------------------------
36 (thousands of dollars)
37 Land acquisition .................... 50,000
38 Hudson River Estuary Manage-
39 ment Plan .......................... 5,000
40 Biodiversity stewardship and
41 research ........................... 1,500
42 County agriculture and farm-
43 land protection activities ........ 23,000
44 Agricultural non-point source
45 abatement and control
46 projects .......................... 11,003
47 Non-agricultural non-point
48 source abatement and control
49 projects ........................... 5,502
50 Soil and water conservation
51 districts .......................... 3,000
189 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Finger Lakes-Lake Ontario
2 Watershed Protection Alli-
3 ance ............................... 2,000
4 Albany Pine Bush Preserve
5 Commission ......................... 1,500
6 Long Island Central Pine
7 Barrens Planning ................... 1,100
8 Long Island South Shore Estu-
9 ary Reserve .......................... 900
10 Quality Communities Projects ......... 3,000
11 Invasive Species Projects ............ 3,250
12 Water Quality Improvement
13 Projects ........................... 7,000
14 New York ocean and Great Lakes
15 Ecosystem conservation ............. 3,000
16 --------------
17 Total ............................ 120,755
18 ==============
19 By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
20 section 1, of the laws of 2011:
21 For services and expenses of projects and purposes authorized by
22 section 92-s of the state finance law to receive funding from the
23 solid waste account in accordance with a programmatic and financial
24 plan to be approved by the director of the budget, including subal-
25 location to other state departments and agencies, including: (a)
26 notwithstanding any law to the contrary, $1,300,000 for the assess-
27 ment and recovery of any natural resource damages to the Hudson
28 River; and (b) notwithstanding any law to the contrary, $450,000 for
29 a Cornell University program to assess breast cancer and environ-
30 mental risk factors in New York State (09E205ER) ...................
31 18,750,000 .......................................... (re. $909,000)
32 PROJECT SCHEDULE
33 PROJECT AMOUNT
34 --------------------------------------------
35 (thousands of dollars)
36 Non-hazardous landfill closure
37 projects ........................... 3,000
38 Municipal waste reduction or
39 recycling projects ................. 7,000
40 Secondary materials regional
41 marketing assistance and
42 energy conservation services
43 projects ........................... 7,000
44 Services and expenses of the
45 assessment and recovery of
46 any natural resource damages
47 to the Hudson River ................ 1,300
48 Pesticides program ................... 2,475
49 --------------
190 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Total ............................. 20,775
2 ==============
3 By chapter 55, section 1, of the laws of 2005, as added by chapter 62,
4 section 4, of the laws of 2005:
5 For services and expenses of projects and purposes authorized by
6 section 92-s of the state finance law to receive funding from the
7 parks, recreation and historic preservation account in accordance
8 with a programmatic and financial plan to be approved by the direc-
9 tor of the budget, including suballocation to other state depart-
10 ments and agencies, including: (a) notwithstanding subdivision 7 of
11 section 92-s of the state finance law or any other law to the
12 contrary, $5,000,000 for services and expenses of the Hudson River
13 Park Trust for projects related to the development of the Hudson
14 River Park consistent with provisions of chapter 592 of the laws of
15 1998; provided, however, such funds shall not be available for
16 suballocation to any public benefit corporation or public authority
17 with the exception of the Hudson River Park Trust and shall be
18 available solely for the liabilities incurred by the Hudson River
19 Park Trust or by other state departments or agencies on behalf of
20 the Hudson River Park Trust and shall be available solely for the
21 liabilities incurred by the Hudson River Park Trust or by other
22 state departments or agencies on behalf of the Hudson River Park
23 Trust on or after April 1, 1999. Provided further that, the comp-
24 troller is hereby authorized and directed to release monies to the
25 Hudson River Park Trust in amounts set forth in a schedule approved
26 by the director of the budget; (b) notwithstanding any law to the
27 contrary, $6,500,000 for state parks and land infrastructure and
28 stewardship projects which shall include capital projects: (i) on
29 state parks and state owned lands acquired pursuant to sections
30 54-0303 and 56-0307 of the environmental conservation law or (ii) on
31 state parks or state owned lands under the jurisdiction of the
32 department of environmental conservation or the office of parks,
33 recreation and historic preservation for access opportunities for
34 people with disabilities; access to the State Forest Preserve;
35 recreational trail construction and maintenance; Catskill and
36 Adirondack campground improvements to public access and sanitation
37 facilities; conservation education facility improvements; archeolog-
38 ical, historic, cultural and natural resource surveys, interpreta-
39 tion, and inventories; Forest Preserve unit management planning;
40 habitat restoration and enhancement; water access facilities; public
41 beach facility development and improvement; public access improve-
42 ments at day use areas; state historic site exterior restoration;
43 and cabin area and camping facility development, restoration and
44 reconstruction; and include seven hundred fifty thousand dollars
45 from such amount for Belleayre Mountain ski center projects; (c)
46 notwithstanding any law to the contrary, $750,000 for historic barns
47 program; (d) notwithstanding any law to the contrary, $6,000,000 for
48 zoos, botanical gardens and aquaria program; (e) notwithstanding any
49 law to the contrary not less than, $3,563,000 for waterfront revi-
50 talization projects which are in or primarily serve areas where
51 demographic and other relevant data for such areas demonstrate that
191 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the areas are densely populated and have sustained physical deteri-
2 oration, decay, neglect, or disinvestment, or where a substantial
3 proportion of the residential population is of low income or is
4 otherwise disadvantaged and is underserved with respect to the
5 existing recreational opportunities in the area; and provided
6 further this section shall not be construed to restrict the use of
7 any additional monies for such projects; (f) notwithstanding any law
8 to the contrary, not less than, $3,579,000 for municipal parks
9 projects which are in or primarily serve areas where demographic and
10 other relevant data for such areas demonstrate that the areas are
11 densely populated and have sustained physical deterioration, decay,
12 neglect or disinvestment or where a substantial proportion of the
13 residential population is of low income or is otherwise disadvan-
14 taged and is underserved with respect to the existing recreational
15 opportunities in the area; and provided further this section shall
16 not be construed to restrict the use of any additional monies for
17 such projects; (g) notwithstanding any law to the contrary,
18 $1,000,000 from the waterfront revitalization allocation for the
19 rivers and estuaries center on the Hudson; and (h) notwithstanding
20 any law to the contrary, $1,000,000 for waterfront revitalization
21 and riverfront development projects in the county of Rensselaer and
22 $500,000 for Oyster Bay and $500,000 for the town of Huntington;
23 provided that such state assistance payment shall not be construed
24 to restrict the use of any additional monies for such project or be
25 considered a state assistance payment or other assistance for the
26 purposes of title 11 of article 54 of the environmental conservation
27 law and title 3 of article 56 of the environmental conservation law;
28 and provided further, however that such state assistance payment
29 shall reduce the total cost of such project for purposes of calcu-
30 lating eligibility for further state assistance payments (09E305ER)
31 ... 46,815,000 .................................... (re. $2,320,000)
32 PROJECT SCHEDULE
33 PROJECT AMOUNT
34 --------------------------------------------
35 (thousands of dollars)
36 Local waterfront revitaliza-
37 tion programs ..................... 14,250
38 Parks, recreation and historic
39 preservation projects ............. 14,315
40 Stewardship projects ................. 6,500
41 Historic barn preservation ............. 750
42 Zoos, botanical gardens and
43 aquaria projects ................... 6,000
44 Hudson River Park .................... 5,000
45 --------------
46 Total ............................. 46,815
47 ==============
48 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
49 section 1, of the laws of 2007:
192 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses of projects and purposes authorized by
2 section 92-s of the state finance law to receive funding from the
3 open space account in accordance with a programmatic and financial
4 plan to be approved by the director of the budget, including subal-
5 location to other state departments and agencies, including costs
6 related to the acquisition of the following properties: Long Island
7 Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
8 Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
9 Growth Area and Critical Resource Area, Western Suffolk/Nassau
10 Special Groundwater Protection Area, Inner City/Underserved Communi-
11 ty Parks, Long Pond/Butler Wood, Staten Island Greenbelt, Staten
12 Island Wet Woods, Fahnestock State Park, Great Swamp, Neversink
13 Highlands, Plutarch/Black Creek Wetlands Complex, Highlands Greenway
14 Corridor, Mongaup Valley Wildlife Management Area, Northern Putnam
15 Greenway, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Ster-
16 ling Forest, Shawangunk Mountains, Westchester Marine Corridor,
17 Rockland County Highlands, Catskill Mountain/Delaware River Region,
18 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Train,
19 Catskill Unfragmented Forest, Long Path, New York City Watershed
20 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
21 Rivers Environmental Education Center, Helderberg Escarpment, Pine
22 Bush-Hudson River Link/Tivoli Preserve, Westmere Woods, Black Creek
23 Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie Canal, Susquehan-
24 na River Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain
25 Shoreline and Wetlands, Wilton Wildlife Preserve and Park, National
26 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
27 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
28 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
29 Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
30 and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
31 Core Forests and Headwater Streams, Tioga County Park Opportunities,
32 Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
33 Park, Salmon River Corridor, Northern Montezuma Wetlands,
34 HiTor/Bristol Hills, Braddock Bay, Catharine Valley Complex, Sonnen-
35 berg Gardens, Western Finger Lakes: Conesus, Hemlock, Canadice and
36 Honeoye, Genesee Greenway/Recreationway, Allegany State Park, Alder
37 Bottom Pond/French Creek, Great Lakes and Niagara River Access Shore
38 Lands and Vistas, Chautauqua Lake Access, Shore Lands and Vistas,
39 Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
40 Small Projects, Working Forest Lands, and State Park and State
41 Historic Site Protection, including: (a) notwithstanding any law to
42 the contrary, $5,000,000 for the Hudson River Estuary Management
43 Plan prepared pursuant to section 11-0306 of the environmental
44 conservation law; (b) notwithstanding any law to the contrary,
45 $1,500,000 for the Finger Lakes-Lake Ontario Watershed Protection
46 Alliance; (c) notwithstanding any law to the contrary, $1,860,000
47 for Soil and Water Conservation District activities as authorized
48 for reimbursement in section 11-a of the soil and water conservation
49 districts law; (d) notwithstanding any law to the contrary, $500,000
50 from the land acquisition allocation for urban forestry projects
51 provided that no less than $250,000 shall be made available for such
52 programs in cities with populations of 65,000 or more; (e) notwith-
193 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 standing any law to the contrary, $500,000 from the land acquisition
2 allocation to the land trust alliance for the purpose of awarding
3 grants on a competitive basis to local land trusts, provided that up
4 to ten percent of such amount shall be made available for adminis-
5 trative costs; and (f) notwithstanding any law to the contrary,
6 $3,000,000 for reimbursement of eligible costs related to the New
7 York state quality communities program pursuant to chapter 62 of the
8 laws of 2005 (09E605ER) ... 84,435,000 .............. (re. $817,000)
9 PROJECT SCHEDULE
10 PROJECT AMOUNT
11 --------------------------------------------
12 (thousands of dollars)
13 Land acquisition .................... 40,000
14 Hudson River Estuary Manage-
15 ment Plan .......................... 5,000
16 Biodiversity stewardship and
17 research ........................... 1,000
18 County agriculture and farm-
19 land protection activities ........ 16,000
20 Non-point source abatement and
21 control projects .................. 11,700
22 Soil and water conservation
23 districts .......................... 1,860
24 Finger Lakes-Lake Ontario
25 Watershed Protection Alli-
26 ance ............................... 1,500
27 Albany Pine Bush Preserve
28 Commission ........................... 800
29 Long Island Central Pine
30 Barrens Planning ..................... 950
31 Long Island South Shore Estu-
32 ary Reserve .......................... 600
33 Quality Communities Projects ......... 3,000
34 --------------
35 Total ............................. 82,410
36 ==============
37 By chapter 55, section 1, of the laws of 2004:
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 solid waste account in accordance with a programmatic and financial
41 plan to be approved by the director of the budget, including subal-
42 location to other state departments and agencies (09E204ER) ........
43 16,775,000 ............................................ (re. $8,000)
44 PROJECT SCHEDULE
45 PROJECT AMOUNT
46 --------------------------------------------
47 (thousands of dollars)
48 Municipal waste reduction or
49 recycling projects ................. 6,500
194 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Secondary materials regional
2 marketing assistance and
3 energy conservation services
4 projects ........................... 6,500
5 Services and expenses of the
6 assessment and recovery of
7 any natural resource damages
8 to the Hudson River ................ 1,300
9 Pesticides program ................... 2,475
10 --------------
11 Total ............................. 16,775
12 ==============
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 open space account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies including costs
18 related to the acquisition of the following properties: Long Island
19 Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
20 Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
21 Growth Area and Critical Resource Area, Western Suffolk/Nassau
22 Special Groundwater Protection Area, Inner City/Underserved Communi-
23 ty Parks, Staten Island Green-Belt, Staten Island Wet Woods, Fahnes-
24 tock State Park, Great Swamp, Neversink Highlands, Plutarch/Black
25 Creek Wetland Complex, Highlands Greenway Corridor, Mongaup Valley
26 Wildlife Management Area, Northern Putnam Greenway, Schunnemunk
27 Mountain/Moodna Creek/Woodcock Mountain, Sterling Forest, Shawangunk
28 Mountains, Westchester Marine Corridor, Rockland County Highlands,
29 Catskill Mountain/Delaware River Region, Beaverkill/Willowemoc,
30 Hudson River Corridor Estuary/Greenway Trail, Catskill Unfragmented
31 Forest, Long Path, New York City Watershed Lands-Croton, Taconic
32 Ridge/Harlem Valley, Albany Pine Bush, Five Rivers Environmental
33 Education Center, Pine Bush-Hudson River/Tivoli Preserve, Westmere
34 Woods, Black Creek Marsh/Vly Swamp, Susquehanna River Valley Corri-
35 dor, Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and
36 Wetlands, Wilton Wildlife Preserve and Park, National Lead/Tahawus,
37 Undeveloped Lake George Shore, Whitney Park, Northern River Flow
38 Corridors, Recreational Trail Linkages and Networks, Bog
39 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
40 Corridor, Rome Sand Plains, Eastern Lake Ontario Shoreline and
41 Islands, Tug Hill Core Forests and Headwater Streams, Nelson Swamp,
42 Genny-Green Trail/Link Trail, Clark Reservation State Park, Salmon
43 River Corridor, Northern Montezuma Wetlands, HiTor/Bristol Hills,
44 Braddock Bay, Catharine Valley Complex, Western Finger Lakes: Cone-
45 sus, Hemlock, Canadice and Honeoye, Genesee Greenway/Recreation way,
46 Allegany State Park, Alder Bottom Pond/French Creek, Great Lakes and
47 Niagara River Access Shore Lands and Vistas, Chautauqua Lake Access
48 Shore Lands and Vistas, Randolph Swamp, Eighteen Mile Creek/Hampton
49 Brook Woods, Statewide Small Projects, Working Forest Lands, State
50 Park and State Historic Site Protection, Helderberg Escarpment, Long
195 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Pond/Bulter Wood, Saint Lawrence River Island, and Sonnenberg
2 Gardens (09E604ER) ... 66,660,000 .................... (re. $70,000)
3 PROJECT SCHEDULE
4 PROJECT AMOUNT
5 --------------------------------------------
6 (thousands of dollars)
7 Land acquisition .................... 32,000
8 Hudson River Estuary Manage-
9 ment Plan .......................... 5,000
10 Biodiversity stewardship and
11 research ............................. 700
12 County agriculture and farm-
13 land protection activities ........ 12,600
14 Non-point source abatement and
15 control projects .................. 10,850
16 Soil and water conservation
17 districts .......................... 1,860
18 Finger Lakes-Lake Ontario
19 Watershed Protection Alli-
20 ance ............................... 1,500
21 Albany Pine Bush Preserve
22 Commission ........................... 600
23 Long Island Central Pine
24 Barrens Planning ..................... 950
25 Long Island South Shore Estu-
26 ary Reserve .......................... 600
27 --------------
28 Total ............................. 66,660
29 ==============
30 By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
31 section 1, of the laws of 2011:
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 parks, recreation and historic preservation account in accordance
35 with a programmatic and financial plan to be approved by the direc-
36 tor of the budget, including suballocation to other state depart-
37 ments and agencies (09E304ER) ... 41,565,000 ...... (re. $1,412,000)
38 PROJECT SCHEDULE
39 PROJECT AMOUNT
40 --------------------------------------------
41 (thousands of dollars)
42 Local waterfront revitaliza-
43 tion programs ..................... 12,500
44 Parks, recreation and historic
45 preservation projects ............. 12,565
46 Hudson River Park ................... 10,000
47 Stewardship projects ................. 5,750
48 Historic barns projects ................ 750
49 --------------
196 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Total ............................. 41,565
2 ==============
3 By chapter 55, section 1, of the laws of 2003, as added by chapter 684,
4 section 2, of the laws of 2003:
5 For services and expenses of projects and purposes authorized by
6 section 92-s of the state finance law to receive funding from the
7 solid waste account in accordance with a programmatic and financial
8 plan to be approved by the director of the budget, including subal-
9 location to other state departments and agencies (09E203ER) ........
10 16,925,000 .......................................... (re. $637,000)
11 Project Schedule
12 PROJECT AMOUNT
13 --------------------------------------------
14 (thousands of dollars)
15 Municipal waste reduction or
16 recycling projects ................. 6,500
17 Secondary materials regional
18 marketing assistance and
19 energy conservation services
20 projects ........................... 6,500
21 Services and expenses of the
22 assessment and recovery of
23 any natural resource damages
24 to the Hudson River ................ 1,300
25 Pesticides program ................... 2,625
26 --------------
27 Total ............................. 16,925
28 ==============
29 For services and expenses of projects and purposes authorized by
30 section 92-s of the state finance law to receive funding from the
31 parks, recreation and historic preservation account in accordance
32 with a programmatic and financial plan to be approved by the direc-
33 tor of the budget, including suballocation to other state depart-
34 ments and agencies (09E303ER) ... 45,665,000 ........ (re. $774,000)
35 Project Schedule
36 PROJECT AMOUNT
37 --------------------------------------------
38 (thousands of dollars)
39 Local waterfront revitaliza-
40 tion projects ..................... 12,000
41 Parks, recreation and historic
42 preservation projects ............. 12,165
43 Hudson River Park ................... 15,000
44 Stewardship projects ................. 5,750
45 Historic barns projects ................ 750
46 --------------
47 Total ............................. 45,665
48 ==============
197 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses of projects and purposes authorized by
2 section 92-s of the state finance law to receive funding from the
3 open space account in accordance with a programmatic and financial
4 plan to be approved by the director of the budget, including subal-
5 location to other state departments and agencies including costs
6 related to the acquisition of the following properties: Long Island
7 Sound Coastal Area; Long Island South Shore Estuary Reserve; Peconic
8 Pinelands Maritime Reserve Projects; Pine Barrens Core, Compatible
9 Growth Area and Critical Resource Area; Western Suffolk/Nassau
10 Special Groundwater Protection Area; Inner City/Underserved Communi-
11 ty Parks; Staten Island Greenbelt; Staten Island Wet Woods; Fahnes-
12 tock State Park; Great Swamp; Neversink Highlands; Plutarch/Black
13 Creek Wetland Complex; Highlands Greenway Corridor; Mongaup Valley
14 Wildlife Management Area; Catskill Mountain/Delaware River Region;
15 Schunnemunk Mountain/Moodna Creek/Woodcock Mountain; Sterling
16 Forest; Sawangunk Mountains; Westchester Marine Corridor;
17 Beaverkill/Willowemoc; Hudson River Corridor Estuary/Greenway Trail;
18 Catskill Unfragmented Forest; Long Path; New York City Watershed
19 Lands-Croton; Taconic Ridge/Harlem Valley; Albany Pine Bush; Five
20 Rivers Environmental Education Center; Pine Bush-Hudson River/Tivoli
21 Preserve; Westmere Woods; Pilot Knob; Floodwood Camp; McLenitahn
22 Property; Lake Champlain Shoreline and Wetlands; Wilton Wildlife
23 Preserve and Park; National Lead/Hahawus; Undeveloped Lake George
24 Shore; Whitney Park; Roden Property; Northern Flow River Corridors;
25 Recreational Trail Linkages and Networks; Bog River/Beaver River
26 Headwater Complex; Eastern Lake Ontario Shoreline and Islands;
27 Maumee Swamp; Moose River Corridor; Tug Hill Core Forests and Head-
28 water Streams; Rome Sand Plains; Nelson Swamp; Genesee
29 Greenway/Recreationway; Genny-Green Trail/Link Trail; Northern
30 Montezuma Wetlands; HiTor/Bristol Hills; Western Finger Lakes:
31 Conesus, Hemlock, Canadice, and Honeoye; Allegany State Park; Alder
32 Bottom Pond/French Creek; Great Lakes and Niagara River Access,
33 Shore Lands and Vistas; Salmon River Corridor; Braddock Bay; Catha-
34 rine Valley Complex; Clark Reservation State Park; Chautauqua Lake
35 Access, Shore Lands and Vistas; Randolph Swamp; Eighteen Mile
36 Creek/Hampton Brook Woods; Statewide Small Projects; Working Forest
37 Lands; State Park and State Historic Site Protection; and Northern
38 Putnam Greenway (09E603ER) ... 62,410,000 ............ (re. $66,000)
39 Project Schedule
40 PROJECT AMOUNT
41 --------------------------------------------
42 (thousands of dollars)
43 Land acquisition .................... 30,000
44 Hudson River Estuary Manage-
45 ment Plan .......................... 5,000
46 Biodiversity stewardship and
47 research ............................. 700
48 County agriculture and farm-
49 land protection activities ........ 12,000
50 Non-point source abatement and
198 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 control projects .................. 10,100
2 Soil and water conservation
3 districts .......................... 1,860
4 Finger Lakes-Lake Ontario
5 Watershed Protection Alli-
6 ance ............................... 1,300
7 Albany Pine Bush Preserve
8 Commission ........................... 400
9 Long Island Central Pine
10 Barrens Planning ..................... 700
11 Long Island South Shore Estu-
12 ary Reserve .......................... 350
13 --------------
14 Total ............................. 62,410
15 ==============
16 By chapter 54, section 1, of the laws of 2002:
17 For services and expenses of projects and purposes authorized by
18 section 92-s of the state finance law to receive funding from the
19 solid waste account in accordance with a programmatic and financial
20 plan to be approved by the director of the budget, including subal-
21 location to other state departments and agencies (09E202ER) ........
22 14,435,000 .......................................... (re. $134,000)
23 Project Schedule
24 PROJECT AMOUNT
25 --------------------------------------------
26 (thousands of dollars)
27 Municipal waste reduction or
28 recycling projects ................. 5,255
29 Secondary materials regional
30 marketing assistance and
31 energy conservation services
32 projects ........................... 5,255
33 Services and expenses of the
34 assessment and recovery of
35 any natural resource damages
36 to the Hudson River ................ 1,300
37 Pesticides program ................... 2,625
38 --------------
39 Total ............................. 14,435
40 ==============
41 For services and expenses of projects and purposes authorized by
42 section 92-s of the state finance law to receive funding from the
43 parks, recreation and historic preservation account in accordance
44 with a programmatic and financial plan to be approved by the direc-
45 tor of the budget, including suballocation to other state depart-
46 ments and agencies. Notwithstanding any other law to the contrary,
47 $11 million of this appropriation shall support capital projects,
48 excluding personal service costs, eligible and authorized for fund-
49 ing from any office of parks, recreation and historic preservation
199 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 state park infrastructure fund - 076 appropriation or reappropri-
2 ation, subject to the approval of the director of the budget.
3 Notwithstanding any other law to the contrary, such expenses shall be
4 paid in the first instance from the state park infrastructure fund -
5 076, then reimbursed from this appropriation, including the transfer
6 of expenses and the payment of liabilities incurred prior to April
7 1, 2002, up to the limit of $11 million (09E302ER) .................
8 47,935,000 .......................................... (re. $757,000)
9 Project Schedule
10 PROJECT AMOUNT
11 --------------------------------------------
12 (thousands of dollars)
13 Local waterfront revitaliza-
14 tion programs ...................... 6,685
15 Parks, recreation and historic
16 preservation projects .............. 7,250
17 Hudson River Park ................... 15,000
18 Stewardship projects ................. 7,000
19 State parks projects ................ 11,000
20 Historic barns projects .............. 1,000
21 --------------
22 Total ............................. 47,935
23 ==============
24 For services and expenses of projects and purposes authorized by
25 section 92-s of the state finance law to receive funding from the
26 open space account in accordance with a programmatic and financial
27 plan to be approved by the director of the budget, including subal-
28 location to other state departments and agencies including costs
29 related to the acquisition of the following properties: Long Island
30 Sound Coastal Area including Held Property, Long Island South Shore
31 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects, Pine
32 Barrens Core Compatible Growth Area and Critical Resource Area,
33 Western Suffolk/Nassau Special Groundwater Protection Area Undhill,
34 Inner City/Underserved Community Parks - including Bushwick Inlet,
35 Mount Loretto, Staten Island Greenbelt, Staten Island Wet Woods,
36 Fahnestock State Park, Great Swamp, Lundy Estate, Neversink High-
37 lands, Highlands Greenway Corridor, Mongaup Valley Wildlife Manage-
38 ment Area, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain,
39 Sterling Forest, Shawangunk Mountains, Westchester Marine Corridor,
40 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
41 Catskill Unfragmented Forest, Long Path, New York City Watershed
42 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Olana
43 Viewshed, Five Rivers Environmental Education Center, Tivoli
44 Preserve, Cedarlands, Pilot Knob, Floodwood Camp, Lake Champlain
45 Shoreline and Wetlands, Wilton Wildlife Preserve and Park, National
46 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
47 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
48 River/Beaver River Headwater Complex, Eastern Lake Ontario Shoreline
49 and Islands, Minnehaha Tract, Maumee Swamp, Moose River Corridor,
50 Tug Hill Core Forests and Headwater Streams, Rome Sand Plains,
200 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Nelson Swamp, Genesee Greenway/Recreationway, Genny-Green Trail/Link
2 Trail, Northern Montezuma Wetlands, Hemlock/Canadice/Honeoye Lakes,
3 Allegany State Park, Alder Bottom/French Creek, Great Lakes &
4 Niagara River Access, Shore Lands & Vistas, Salmon River Corridor,
5 Braddock Bay, Clark Reservation State park, Chautauqua Lake Access,
6 Shore Lands and Vistas, Randolf Swamp, Eighteen Mile Creek/Hampton
7 Brook Woods, Delaware River Tailwaters, Statewide Small Projects,
8 Working Forest Lands/Conservation Easements, Working Forest
9 Lands/Conservation Easements, Working Forest Lands/Conservation
10 Easements-Domtar Inc., Working Forest Lands/Conservation Easements-
11 Boeselager Forestry, and Working Forest Lands/Conservation Ease-
12 ments-Clerical Medical Forestry (09E402ER) .........................
13 62,630,000 .......................................... (re. $368,000)
14 Project Schedule
15 PROJECT AMOUNT
16 --------------------------------------------
17 (thousands of dollars)
18 Land acquisition .................... 38,000
19 Hudson River Estuary Manage-
20 ment Plan .......................... 5,800
21 Biodiversity stewardship and
22 research ............................. 750
23 County agriculture and farm-
24 land protection activities ......... 8,000
25 Non-point source abatement and
26 control projects ................... 5,500
27 Soil and water conservation
28 districts .......................... 1,860
29 Finger Lakes-Lake Ontario
30 Watershed Protection Alli-
31 ance ............................... 1,300
32 Albany Pine Bush Preserve
33 Commission ........................... 370
34 Long Island Central Pine
35 Barrens Planning ..................... 700
36 Long Island South Shore Estu-
37 ary Reserve .......................... 350
38 --------------
39 Total ............................. 62,630
40 ==============
41 By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
42 section 1, of the laws of 2007:
43 For services and expenses of projects and purposes authorized by
44 section 92-s of the state finance law to receive funding from the
45 solid waste account in accordance with a programmatic and financial
46 plan to be approved by the director of the budget, including subal-
47 location to other state departments and agencies (09E200ER) ........
48 22,025,000 .......................................... (re. $160,000)
201 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Project Schedule
2 PROJECT AMOUNT
3 --------------------------------------------
4 (thousands of dollars)
5 Non-hazardous landfill closure
6 projects ........................... 7,000
7 Municipal waste reduction or
8 recycling projects ................. 6,225
9 Secondary materials regional
10 marketing assistance and
11 energy conservation services
12 projects ........................... 5,000
13 Services and expenses of the
14 assessment and recovery of
15 any natural resource damages
16 to the Hudson River ................ 1,300
17 Pesticides program ................... 2,650
18 --------------
19 Total ............................. 22,175
20 ==============
21 For services and expenses of projects and purposes authorized by
22 section 92-s of the state finance law to receive funding from the
23 parks, recreation and historic preservation account in accordance
24 with a programmatic and financial plan to be approved by the direc-
25 tor of the budget, including suballocation to other state depart-
26 ments and agencies (09E300ER) ... 46,550,000 ........ (re. $736,000)
27 Project Schedule
28 PROJECT AMOUNT
29 --------------------------------------------
30 (thousands of dollars)
31 Local waterfront revitaliza-
32 tion programs ...................... 7,068
33 Park, recreation and historic
34 preservation projects .............. 7,482
35 Hudson River Park ................... 20,000
36 Stewardship projects ................ 12,000
37 --------------
38 Total ............................. 46,550
39 ==============
40 By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
41 section 1, of the laws of 2007:
42 For services and expenses of projects and purposes authorized by
43 section 92-s of the state finance law to receive funding from the
44 open space account in accordance with a programmatic and financial
45 plan to be approved by the director of the budget, including subal-
46 location to other state departments and agencies including costs
47 related to the acquisition of the following properties: Long Island
48 South Shore Estuary Reserve; Peconic Pinelands Maritime Reserve
49 Projects; Pine Barrens Core and Critical Resource Areas; Mt. Loret-
202 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to; Inner City/Underserved Community Park-Eastern District Terminal;
2 Fahnestock State Park; Lundy Estate; Mongaup Valley Wildlife Manage-
3 ment Area Additions; Neversink Gorge; Schunemunk Mountain/Moodna
4 Creek; Shawangunk Ridge/Minnewaska State Park Preserve; New York
5 City Reservoirs-Croton; Sterling Forest; Hudson River
6 Estuary/Greenway Trail; Albany Pine Bush; Taconic Ridge/Harlem
7 Valley; Beaverkill/Willowemoc; Five Rivers Education Center; Long
8 Path; Bartlett Carry; Delaware River Tailwaters; Bear
9 Pen/Vly/Roundtop Mountains; Floodwood (Boy Scout Camp); Lake Cham-
10 plain Shoreline and Wetlands; National Lead/Tahawus; Underdeveloped
11 Lake George Shore; Wilton Wildlife Preserve and Park; Pilot Knob;
12 Northern Flow River Corridors; Minnehaha Tract; Rome Sand Plains;
13 Eastern Ontario Shoreline; Northern Montezuma Wetlands; Statewide
14 Small Projects; Hemlock/Canadice/Honeoye Lakes; Whitney Park;
15 Genny-Green Trail/Link Trail; Allegany State Park; Braddock Bay;
16 Chautauqua Lake Access; Nelson Swamp; Randolph Swamp; Alder Bottom
17 Pond/French Creek; Long Island Sound Coastal Area; Genesee
18 Greenway/Recreationway; Deveaux Woods; Watkins Glen State Park;
19 Taughannock Falls State Park; Onlana Viewshed; East Branch Fish
20 Creek; Staten Island Greenbelt - Decker Farm; Staten Island Green-
21 belt - Reeds Basket Willow Swamp/Chapin Avenue Woods; Westchester
22 Marine Corridor - Titus Mill Pond; Working Forest Lands/Conservation
23 Easements - Cedarlands; Working Forest Lands/Conservation Easements
24 - Champion International Inc and Working Forest Lands/Conservation
25 Easements - Domtar Inc; Lake Erie Niagara River Access/Spicer Creek;
26 Long Island Sound Coastal Access/Mt. Sinai Harbor - Chandler Estate;
27 Long Island Sound Coastal Area/Central Bays Complex - Conscience Bay
28 Watershed/Laurel Hill Cemetary; Innercity/Underserved Community Park
29 - Graniteville Quarry; Working Forest Lands/Conservation Easments
30 Boeselager Forestry; and Working Forest Lands/Conservation Easements
31 - Clerical Medical Forestry (09E400ER) .............................
32 56,425,000 ........................................... (re. $25,000)
33 Project Schedule
34 PROJECT AMOUNT
35 --------------------------------------------
36 (thousands of dollars)
37 Land acquisition .................... 33,500
38 Hudson River Estuary Manage-
39 ment Plan .......................... 6,000
40 Biodiversity stewardship and
41 research ............................. 750
42 County agriculture and farm-
43 land protection activities ......... 5,500
44 Non-point source abatement and
45 control projects ................... 6,500
46 Soil and water conservation
47 districts .......................... 1,350
48 Finger Lakes-Lake Ontario
49 Watershed Protection Alli-
50 ance ............................... 1,300
51 Albany Pine Bush Preserve
203 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Commission ........................... 325
2 Long Island Central Pine
3 Barrens Planning ..................... 700
4 Long Island South Shore Estu-
5 ary Reserve .......................... 350
6 --------------
7 Total ............................. 56,275
8 ==============
9 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
10 section 1, of the laws of 2007:
11 For services and expenses of projects and purposes authorized by
12 section 92-s of the state finance law to receive funding from the
13 solid waste account in accordance with a programmatic and financial
14 plan to be approved by the director of the budget, including subal-
15 location to other state departments and agencies (09E299ER) ........
16 22,083,319 .......................................... (re. $161,000)
17 Project Schedule
18 PROJECT AMOUNT
19 --------------------------------------------
20 (thousands of dollars)
21 Non-hazardous landfill closure
22 projects ........................... 9,000
23 Municipal waste reduction or
24 recycling projects ................. 4,500
25 Secondary materials regional
26 marketing assistance and
27 energy conservation services
28 projects ........................... 4,500
29 Services and expenses of the
30 assessment and recovery of
31 any natural resource damages
32 to the Hudson River ................ 1,300
33 Pesticides program ................... 3,600
34 --------------
35 Total ............................. 22,900
36 ==============
37 By chapter 55, section 1, of the laws of 1999:
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 parks, recreation and historic preservation account in accordance
41 with a programmatic and financial plan to be approved by the direc-
42 tor of the budget, including suballocation to other state depart-
43 ments and agencies (09E399ER) ... 44,850,000 ........ (re. $696,000)
44 Project Schedule
45 PROJECT AMOUNT
46 --------------------------------------------
47 (thousands of dollars)
48 Local waterfront revitaliza-
204 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion programs ...................... 4,975
2 Park, recreation and historic
3 preservation projects .............. 6,875
4 Hudson River Park ................... 21,000
5 Stewardship projects ................ 12,000
6 --------------
7 Total ............................. 44,850
8 ==============
9 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
10 section 1, of the laws of 2007:
11 For services and expenses of projects and purposes authorized by
12 section 92-s of the state finance law to receive funding from the
13 open space account in accordance with a programmatic and financial
14 plan to be approved by the director of the budget, including subal-
15 location to other state departments and agencies including costs
16 related to the acquisition of the following properties: Peconic
17 Pinelands Maritime Reserve Projects; Pine Barrens Core and Critical
18 Resource Areas; Fahnestock State Park; Hudson River Estuary/Greenway
19 Trail; Sterling Forest; New York City Reservoirs-Croton; Albany Pine
20 Bush; Genny-Green Trail; Blue Mountain Lake; Taconic Ridge/Harlem
21 Valley; Inner City/Underserved Community Park-Graniteville Quarry;
22 Innercity/Underserved Community Park-Eastern District Terminal;
23 Shawangunk Ridge/Minnewaska State Park Preserve; Mount Loretto;
24 Floodwood (Boy Scout Camp); National Lead/Tahawus; Eastern Ontario
25 Shoreline; Wilton Wildlife Preserve and Park; Ess Kay Farm; Five
26 Rivers Education Center; statewide small projects; Barlett Carry;
27 Benton/Ludlow Creek; Gaisman; Long Path; Braddock Bay; Fair Haven
28 Beach State Park; Northern Montezuma Wetlands; Undeveloped Lake
29 George Shore; Hemlock/Canadice/Honeoye Lakes; Beaverkill/Willowemoc;
30 Deveaux Woods; Rockland County Highlands; Allegany State Park;
31 Neversink Gorge; Delaware River Tailwaters; Relay Forest; Minnehaha;
32 Whitney Park; Northern Flow River Corridor; Chautauqua Lake Access;
33 Bear Pen/Vly/Round Top Mountains; Nelson Swamp; Irondequoit Bay;
34 Rome Sand Plains; Olana Viewshed; Randolph Swamp; Pilot Knob;
35 Taughanock Falls State Park; Alder Bottom Pond French Creek; Watkins
36 Glen State Park; Mongaup Valley Wildlife Management Area; Long
37 Island Sound Coastal Area-Grandifolia Sand Hills; Working Forest
38 Lands/Conservation Easements - Champion International Inc.; Working
39 Forest Lands/Conservation Easements - Domtar Inc.; Great Swamp and
40 Millerton Meadows (09E499ER) ... 58,066,681 .......... (re. $20,000)
41 Project Schedule
42 PROJECT AMOUNT
43 --------------------------------------------
44 (thousands of dollars)
45 Land acquisition .................... 34,250
46 Hudson River Estuary Manage-
47 ment Plan .......................... 8,325
48 Biodiversity stewardship and
49 research ............................. 300
50 County agriculture and farm-
205 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 land protection activities ......... 4,500
2 Non-point source abatement and
3 control projects ................... 6,500
4 Soil and water conservation
5 districts ............................ 900
6 Finger Lakes-Lake Ontario
7 Watershed Protection Alli-
8 ance ............................... 1,300
9 Albany Pine Bush Preserve
10 Commission ........................... 240
11 Long Island Central Pine
12 Barrens Planning ..................... 650
13 Long Island South Shore Estu-
14 ary Reserve .......................... 285
15 --------------
16 Total ............................. 57,250
17 ==============
18 By chapter 55, section 1, of the laws of 1998:
19 For services and expenses of projects and purposes authorized by
20 section 92-s of the state finance law to receive funding from the
21 solid waste account in accordance with a programmatic and financial
22 plan to be approved by the director of the budget, including subal-
23 location to other state departments and agencies (09E298ER) ........
24 26,100,000 ........................................... (re. $22,000)
25 project schedule
26 PROJECT AMOUNT
27 --------------------------------------------
28 (thousands of dollars)
29 Non-hazardous landfill closure
30 projects .......................... 13,000
31 Municipal waste reduction or
32 recycling projects ................. 6,000
33 Secondary materials regional
34 marketing assistance and
35 energy conservation services
36 projects ........................... 6,000
37 Pesticides program ................... 1,100
38 --------------
39 Total ............................. 26,100
40 ==============
41 For services and expenses of projects and purposes authorized by
42 section 92-s of the state finance law to receive funding from the
43 parks, recreation and historic preservation account in accordance
44 with a programmatic and financial plan to be approved by the direc-
45 tor of the budget, including suballocation to other state depart-
46 ments, agencies and public authorities (09E398ER) ..................
47 19,700,000 .......................................... (re. $622,000)
206 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 project schedule
2 PROJECT AMOUNT
3 --------------------------------------------
4 (thousands of dollars)
5 Local waterfront revitaliza-
6 tion programs ...................... 5,600
7 Park, recreation and historic
8 preservation projects,
9 including $4,000,000 which
10 shall be made available for
11 services and expenses
12 related to development of
13 the Hudson River Park ............. 13,100
14 Coastal rehabilitation
15 projects ........................... 1,000
16 --------------
17 Total ............................. 19,700
18 ==============
19 For services and expenses of projects and purposes authorized by
20 section 92-s of the state finance law to receive funding from the
21 open space account in accordance with a programmatic and financial
22 plan to be approved by the director of the budget, including subal-
23 location to other state departments and agencies including costs
24 related to the acquisition of the following properties: Peconic
25 Pinelands Maritime Reserve Projects; Pine Barrens Core and Critical
26 Resource Areas; Fahnestock State Park; Hudson River Estuary/Greenway
27 Trail; Sterling Forest; New York City Reservoirs-Croton; Albany Pine
28 Bush; Genny-Green Trail; Whitney Park; Northern Flow River Corri-
29 dors; Minnehaha Tract; Blue Mountain Lake; Taconic Ridge/Harlem
30 Valley; Inner City/Underserved Community Park-Graniteville Quarry;
31 Chautauqua Lake Access; Working Forest Lands; Bear Pen/Vly/Roundtop
32 Mountains; Shawangunk Ridge/Minnewaska State Park Preserve; Mount
33 Loretto; Floodwood (Boy Scout Camp); National Lead/Tahawus; Rome
34 Sand Plains; Eastern Ontario Shoreline; Nelson Swamp; Irondequoit
35 Bay; Alder Bottom Pond/French Creek; Wilton Wildlife Preserve and
36 Park; Taughannock Falls State Park; Ess Kay Farm; Watkins Glen State
37 Park; Mongaup Valley Wildlife Management Area; Five Rivers Education
38 Center; Pilot Knob; Randolph Swamp; Olana Viewshed and statewide
39 small projects (09E498ER) ... 44,725,000 ............. (re. $50,000)
40 project schedule
41 PROJECT AMOUNT
42 --------------------------------------------
43 (thousands of dollars)
44 Land acquisition .................... 32,000
45 Biodiversity stewardship and
46 research ............................. 300
47 County agriculture and farm-
48 land protection activities ......... 5,000
49 Non-point source abatement and
50 control projects, including
207 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 $1,300,000 which shall be
2 made available to the Finger
3 Lakes-Lake Ontario Watershed
4 Protection Alliance ................ 6,300
5 Albany Pine Bush Preserve
6 Commission ........................... 220
7 Long Island Central Pine
8 Barrens Planning ..................... 630
9 Long Island South Shore Estu-
10 ary Reserve .......................... 275
11 --------------
12 Total ............................. 44,725
13 ==============
14 The appropriation made by chapter 55, section 1, of the laws of 1997, as
15 supplemented by a transfer in accordance with state finance law, is
16 hereby amended and reappropriated to read:
17 For services and expenses of projects and purposes authorized by
18 section 92-s of the state finance law to receive funding from the
19 solid waste account in accordance with a programmatic and financial
20 plan to be approved by the director of the budget, including subal-
21 location to other state departments and agencies (09E297ER) ........
22 [29,110,000] 31,110,000 ............................. (re. $641,000)
23 project schedule
24 PROJECT AMOUNT
25 --------------------------------------------
26 (thousands of dollars)
27 Non-hazardous landfill closure
28 projects .......................... 17,000
29 Municipal waste reduction or
30 recycling projects ................. 5,505
31 Secondary materials regional
32 marketing assistance and
33 energy conservation services
34 projects ........................... 5,505
35 Pesticides program ................... 1,100
36 --------------
37 Total ............................. 29,110
38 ==============
39 The appropriation made by chapter 55, section 1, of the laws of 1997, as
40 amended by chapter 55, section 1, of the laws of 2007, is hereby
41 amended and reappropriated to read:
42 For services and expenses of projects and purposes authorized by
43 section 92-s of the state finance law to receive funding from the
44 parks, recreation and historic preservation account in accordance
45 with a programmatic and financial plan to be approved by the direc-
46 tor of the budget, including suballocation to other state depart-
47 ments and agencies (09E397ER) ......................................
48 [33,800,000] 31,800,000 ........................... (re. $8,645,000)
208 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 project schedule
2 PROJECT AMOUNT
3 --------------------------------------------
4 (thousands of dollars)
5 Local waterfront revitaliza-
6 tion programs ...................... 8,975
7 Park, recreation and historic
8 preservation projects ............. 14,525
9 Coastal rehabilitation
10 projects .......................... 10,675
11 --------------
12 Total ............................. 34,175
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 open space account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies including costs
18 related to the acquisition of the following properties: Albany Pine
19 Bush, Northern Flow River Corridors, Alder Bottom Pond/French Creek,
20 Rome Sand Plains, Hudson River Greenway/Trail, Fahnestock State
21 Park-Hubbard Perkins Conservation Area, Taconic Ridge/Harlem Valley,
22 Eastern Ontario Shoreline, Sterling Forest, Staten Island Greenbelt
23 - St. Francis Seminary, Peconic Pinelands Maritime Reserve Projects,
24 Massawepie Mire, Plateau Mountain, Chautauqua Lake Access, New York
25 City reservoirs-Croton, Ganondagan Historic Site, Moreau Lake state
26 park, Olana Viewshed, Hudson Valley Winery, Staten Island Wet
27 Woods/Paw-Paw Hybrid Oak Woods, Nelson Swamp, Rockland County High-
28 lands, Whitney Park, Mt. Loretto, Green Lakes, Inner
29 City/Underserved Community Park-Graniteville Quarry, Irondequoit Bay
30 and Statewide small projects (09E497ER) ............................
31 47,090,000 ........................................... (re. $13,000)
32 project schedule
33 PROJECT AMOUNT
34 --------------------------------------------
35 (thousands of dollars)
36 Land acquisition .................... 36,000
37 Biodiversity stewardship and
38 research ............................. 275
39 County agriculture and farm-
40 land protection activities ......... 4,000
41 Non-point source abatement and
42 control projects including
43 $653,000 which shall be made
44 available to county soil and
45 water conservation districts
46 and $1,300,000 which shall
47 be made available to the
48 Finger Lakes-Lake Ontario
49 Watershed Protection Alli-
209 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ance ............................... 5,400
2 Albany Pine Bush Preserve
3 Commission ........................... 200
4 Long Island Central Pine
5 Barrens Planning ..................... 615
6 Long Island South Shore Estu-
7 ary Reserve .......................... 225
8 --------------
9 Total ............................. 46,715
10 ==============
11 By chapter 55, section 1, of the laws of 1996, as amended by chapter 55,
12 section 1, of the laws of 2007:
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 parks, recreation and historic preservation account in accordance
16 with a programmatic and financial plan to be approved by the direc-
17 tor of the budget, including suballocation to other state depart-
18 ments and agencies (09E396ER) ... 21,624,000 ........ (re. $945,000)
19 project schedule
20 PROJECT AMOUNT
21 --------------------------------------------
22 (thousands of dollars)
23 Local waterfront revitaliza-
24 tion programs ...................... 3,000
25 Local waterfront revitaliza-
26 tion projects ...................... 1,500
27 Parks, recreation and historic
28 preservation projects .............. 8,000
29 Parks, recreation and historic
30 preservation projects .............. 8,500
31 Coastal rehabilitation
32 projects ........................... 1,500
33 --------------
34 Total ............................. 22,500
35 ==============
36 By chapter 54, section 1, of the laws of 1995, as amended by chapter 55,
37 section 1, of the laws of 2007:
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 parks, recreation and historic preservation account (71E395ER) .....
41 6,340,000 ........................................... (re. $216,000)
42 project schedule
43 PROJECT AMOUNT
44 --------------------------------------------
45 (thousands of dollars)
46 Local waterfront revitaliza-
47 tion plans ......................... 1,300
48 Parks, recreation and historic
210 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 preservation projects .............. 4,000
2 Coastal rehabilitation
3 projects ........................... 1,200
4 --------------
5 Total .............................. 6,500
6 ==============
7 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
8 section 1, of the laws of 2007:
9 For services and expenses of projects authorized by the environmental
10 protection act of 1993 to receive funding from the solid and hazard-
11 ous materials account (71E294ER) ... 12,400,000 ....... (re. $4,000)
12 project schedule
13 PROJECT AMOUNT
14 --------------------------------------------
15 (thousands of dollars)
16 Non-hazardous landfill closure
17 projects ........................... 9,000
18 Municipal waste reduction or
19 recycling projects ................. 2,000
20 Secondary materials regional
21 marketing assistance
22 projects ........................... 2,000
23 --------------
24 Total ............................. 13,000
25 ==============
26 ENVIRONMENTAL PROTECTION AND ENHANCEMENTS (CCP)
27 Capital Projects Funds - Other
28 Environmental Protection Fund
29 Environmental Protection and Enhancements Purpose
30 By chapter 54, section 1, of the laws of 2002:
31 For supplemental services and expenses of projects and purposes,
32 including the payment of liabilities incurred during state fiscal
33 year 2001-02 for natural resource damages and pesticides program,
34 authorized by section 92-s of the state finance law to receive fund-
35 ing from the solid waste account in accordance with a programmatic
36 and financial plan to be approved by the director of the budget,
37 including suballocation to other state departments and agencies
38 (09E502EA) ... 13,920,000 ........................... (re. $114,000)
39 Project Schedule
40 PROJECT AMOUNT
41 --------------------------------------------
42 (thousands of dollars)
43 Municipal waste reduction or
44 recycling projects ................. 5,000
45 Secondary materials regional
46 marketing assistance and
211 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 energy conservation services
2 projects ........................... 4,995
3 Services and expenses of the
4 assessment and recovery of
5 any natural resource damages
6 to the Hudson River ................ 1,300
7 Pesticides program ................... 2,625
8 --------------
9 Total ............................. 13,920
10 ==============
11 For supplemental services and expenses of projects and purposes
12 authorized by section 92-s of the state finance law to receive fund-
13 ing from the parks, recreation and historic preservation account in
14 accordance with a programmatic and financial plan to be approved by
15 the director of the budget, including suballocation to other state
16 departments and agencies. Notwithstanding any other law to the
17 contrary, $10 million of this appropriation shall support capital
18 projects, excluding personal service costs, eligible and authorized
19 for funding from any office of parks, recreation and historic pres-
20 ervation state parks infrastructure fund-076 appropriation or reap-
21 propriation, subject to the approval of the director of the budget.
22 Notwithstanding any other law to the contrary, such expenses shall be
23 paid in the first instance from the state parks infrastructure fund
24 - 076, then reimbursed from this appropriation, including the trans-
25 fer of expenses and the payment of liabilities incurred prior to
26 April 1, 2002, up to the limit of $10 million (09E602EA) ...........
27 47,750,000 ........................................ (re. $1,627,000)
28 Project Schedule
29 PROJECT AMOUNT
30 --------------------------------------------
31 (thousands of dollars)
32 Local waterfront revitaliza-
33 tion programs ...................... 6,750
34 Parks, recreation and historic
35 preservation projects .............. 8,500
36 Hudson River Park ................... 15,000
37 Stewardship projects ................. 6,500
38 State parks projects ................ 10,000
39 Historic barns projects .............. 1,000
40 --------------
41 Total ............................. 47,750
42 ==============
43 By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
44 section 1, of the laws of 2003:
45 For supplemental services and expenses of projects and purposes,
46 including the payment of liabilities incurred during state fiscal
47 year 2001-02 for biodiversity stewardship and research, soil and
48 water conservation districts. Finger Lakes-Lake Ontario Watershed
49 Protection Alliance, Albany Pinebush Preserve Commission, Long
50 Island South Shore Estuary Reserve and Peconic Bay; authorized by
212 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 section 92-s of the state finance law to receive funding from the
2 open space account in accordance with a programmatic and financial
3 plan to be approved by the director of the budget, including subalo-
4 cation to other state departments and agencies including costs
5 related to the acquisition of the following properties: Long Island
6 Sound Coastal Area including Held Property, Long Island South Shore
7 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects, Pine
8 Barrens Core Compatible Growth Area and Critical Resource Area,
9 Western Suffolk/Nassau Special Groundwater Protection Area Under-
10 hill, Inner City/Underserved Community Parks - including Bushwick
11 Inlet, Mount Loretto, Staten Island Greenbelt, Staten Island Wet
12 Woods, Fahnestock State Park, Great Swamp, Lundy Estate, Neversink
13 Highlands, Highlands Greenway Corridor, Mongaup Valley Wildlife
14 Management Area, Shunnemunk Mountain/Moodna Creek/Woodcock Mountain,
15 Sterling Forest, Shawangunk Mountains, Westchester Marine Corridor,
16 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
17 Catskill Unfragmented Forest, Long Path, New York City Watershed
18 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Olana
19 Viewshed, Five Rivers Environmental Education Center, Tivoli
20 Preserve, Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and
21 Wetlands, Wilton Wildlife Preserve and Park, National Lead/Tahawus,
22 Undeveloped Lake George Shore, Whitney Park, Recreational Trail
23 Linkages and Networks, Bog River/Beaver River Headwater Complex,
24 Eastern Lake Ontario Shoreline and Islands, Minnehaha Tract, Maumee
25 Swamp, Moose River Corridor, Tug Hill Core Forests and Headwater
26 Streams, Rome Sand Plains, Nelson Swamp, Genesee
27 Greenway/Recreationway, Genny-Green Trail/Link Trail, Northern
28 Montezuma Wetlands, Hemlock/Canadice/Honeoye Lakes, Allegany State
29 Park, Alder Bottom/French Creek, Great Lakes & Niagara River Access,
30 Shore Lands & Vistas, Salmon River Corridor, Braddock Bay, Clark
31 Reservation State Park, Chautauqua Lake Access, Shore Lands and
32 Vistas, Randolf Swamp, Eighteen Mile Creek/Hampton Brook Woods,
33 Delaware River Tailwaters, Statewide Small Projects, Working Forest
34 Lands/Conservation Easements - Cedarlands, Working Forest
35 Lands/Conservation Easements - Champion International Inc., Working
36 Forest Lands/Conservation Easements-Domtar Inc., Working Forest
37 Lands/Conservation Easements-Boeselager Forestry, and Working Forest
38 Lands/Conservation Easements-Clerical Medical Forestry (09E702EA)
39 ... 63,330,000 ...................................... (re. $119,000)
40 Project Schedule
41 PROJECT AMOUNT
42 --------------------------------------------
43 (thousands of dollars)
44 Land acquisition .................... 38,000
45 Hudson River Estuary Manage-
46 ment Plan .......................... 5,800
47 Biodiversity stewardship and
48 research ............................. 750
49 County agriculture and farm-
50 land protection activities ......... 8,000
51 Non-point source abatement and
213 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 control projects ................... 6,000
2 Soil and water conservation
3 districts .......................... 1,860
4 Finger Lakes-Lake Ontario
5 Watershed Protection Alli-
6 ance ............................... 1,300
7 Albany Pine Bush Preserve
8 Commission ........................... 370
9 Long Island Central Pine
10 Barrens Planning ..................... 700
11 Long Island South Shore Estu-
12 ary Reserve .......................... 350
13 Peconic Bay ............................ 200
14 --------------
15 Total ............................. 63,330
16 ==============
17 By chapter 55, section 1, of the laws of 2000:
18 For services and expenses of projects to receive funding from the
19 parks, recreation, and historic preservation account, in accordance
20 with a programmatic and financial plan to be approved by the direc-
21 tor of the budget, including suballocation to other state depart-
22 ments, agencies, public benefit corporations and public authorities
23 (09E500EA) ... 10,000,000 ......................... (re. $1,467,000)
24 By chapter 55, section 1, of the laws of 1999:
25 For services and expenses of projects to receive funding from the
26 solid waste account, in accordance with a programmatic and financial
27 plan to be approved by the director of the budget, including subal-
28 location to other state departments, agencies, public benefit corpo-
29 rations and public authorities (09E599EA) ..........................
30 3,250,000 ............................................ (re. $46,000)
31 For services and expenses of projects to receive funding from the
32 parks, recreation and historic preservation account, in accordance
33 with a programmatic and financial plan to be approved by the direc-
34 tor of the budget, including suballocation to other state depart-
35 ments, agencies, public benefit corporations and public authorities
36 (09E699EA) ... 26,650,000 ........................... (re. $858,000)
37 ENVIRONMENTAL QUALITY BOND ACT FUND (CCP)
38 Capital Projects Funds - Other
39 Environmental Quality Bond Act Fund
40 Bond Proceeds Purpose
41 By chapter 54, section 1, of the laws of 1992, as amended by chapter 55,
42 section 1, of the laws of 1996:
43 The sum of $209,000,000 or so much thereof as may be necessary is
44 hereby appropriated from the "environmental quality bond act fund"
45 as established by section 97-d of the state finance law for payment
46 to the capital projects fund for disbursements from such fund as
47 certified by the state comptroller as: "Hazardous Waste Site Remedi-
214 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ation Disbursements," "Municipal Landfill Closure Disbursements,"
2 "Land Acquisition, Preservation and Improvement Disbursements," and
3 "Historic Preservation, Municipal Park and Urban Cultural Parks
4 Disbursements." The director of the budget is hereby authorized to
5 designate to the state comptroller appropriations made from the
6 capital projects fund in accordance with the provisions of article
7 52 of the environmental conservation law for the purposes heretofore
8 specified. The state comptroller shall at the commencement of each
9 month certify to the director of the budget, the chairman of the
10 senate finance committee, and the chairman of the assembly ways and
11 means committee, the amounts disbursed from the appropriations
12 designated by the director of the budget for each of the purposes
13 herein enumerated for the month preceding such certification and
14 such certifications shall not exceed in the aggregate the moneys
15 appropriated therefor from the capital projects fund. A copy of each
16 such certification shall also be delivered to the public officers of
17 the respective state department or agency to which such capital
18 projects fund appropriations are made available (71109210) .........
19 209,000,000 ...................................... (re. $55,577,000)
20 ENVIRONMENTAL QUALITY PROTECTION FUND (CCP)
21 Capital Projects Funds - Other
22 Environmental Quality Protection Fund
23 Bond Proceeds Purpose
24 By chapter 54, section 1, of the laws of 1992, as amended by chapter 55,
25 section 1, of the laws of 1996:
26 The sum of $84,369,000, or so much thereof as may be necessary is
27 hereby appropriated from the "environmental quality protection fund"
28 as established by section 97-a of the state finance law for payment
29 to the capital projects fund for disbursements from such fund as
30 certified by the state comptroller as: "Water Quality Improvement
31 Disbursements," "State Air Quality Improvement Disbursements,"
32 "Municipal Air Quality Improvement Disbursements," "Land Preserva-
33 tion and Improvement Disbursements," "Municipal Solid Waste Manage-
34 ment Disbursements," and "Park Lands Disbursements."
35 The director of the budget is hereby authorized to designate to the
36 state comptroller appropriations made from the capital projects fund
37 in accordance with the provisions of article 51 of the environmental
38 conservation law for the purposes heretofore specified.
39 The state comptroller shall at the commencement of each month certify
40 to the director of the budget, the chairman of the senate finance
41 committee, and the chairman of the assembly ways and means commit-
42 tee, the amounts disbursed from the appropriations designated by the
43 director of the budget for each of the purposes herein enumerated
44 for the month preceding such certification and such certifications
45 shall not exceed in the aggregate the moneys appropriated therefor
46 from the capital projects fund. A copy of each such certification
47 shall also be delivered to the public officers of the respective
48 state department or agency to which such capital projects fund
215 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 appropriations are made available (71059210) .......................
2 84,369,000 ....................................... (re. $22,231,000)
3 By chapter 54, section 9, of the laws of 1981, as amended by chapter 55,
4 section 1, of the laws of 1996:
5 The sum of seven hundred fifty-nine million nine hundred eighty-one
6 thousand two hundred eighty dollars ($759,981,280), or so much ther-
7 eof as may be necessary is hereby appropriated from the "environ-
8 mental quality protection fund" as established by section 97-a of
9 the state finance law for payment to the capital projects fund for
10 disbursements from such fund as certified by the state comptroller
11 as: "Water Quality Improvement Disbursements," "State Air Quality
12 Improvement Disbursements," "Municipal Air Quality Improvement
13 Disbursements," "Land Preservation and Improvement Disbursements,"
14 "Municipal Solid Waste Management Disbursements," and "Park Lands
15 Disbursements."
16 The director of the budget is hereby authorized to designate to the
17 state comptroller appropriations made from the capital projects fund
18 in accordance with the provisions of article fifty-one of the envi-
19 ronmental conservation law for the purposes heretofore specified.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the budget, the chairman of the senate finance
22 committee, and the chairman of the assembly ways and means commit-
23 tee, the amounts disbursed from the appropriations designated by the
24 director of the budget for each of the purposes herein enumerated
25 for the month preceding such certification and such certifications
26 shall not exceed in the aggregate the moneys appropriated therefor
27 from the capital projects fund. A copy of each such certification
28 shall also be delivered to the public officers of the respective
29 state department or agency to which such capital projects fund
30 appropriations are made available (01371610) ...... (re. $1,269,000)
31 ENVIRONMENTAL RESTORATION - CLEAN WATER/CLEAN AIR (CCP)
32 Capital Projects Funds - Other
33 Capital Projects Fund
34 Environmental Restoration Purpose
35 By chapter 54, section 1, of the laws of 2002:
36 For state assistance payments for the state share of the costs of
37 environmental restoration projects in accordance with the provisions
38 of title 5 of article 56 of the environmental conservation law for
39 project costs, including costs incidental and appurtenant thereto
40 and for payment of reimbursements to the clean water/clean air
41 implementation fund for services and expenses of state departments
42 and agencies, including fringe benefits, hereinafter referred to as
43 "Environmental Restoration Project Disbursements". The moneys appro-
44 priated herein may be suballocated to other state departments and
45 agencies.
46 Notwithstanding the provisions of any general or special law, the
47 moneys hereby appropriated shall be available for environmental
48 restoration projects in accordance with title 5 of article 56 of the
216 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 environmental conservation law upon the issuance of a certificate of
2 approval of availability by the director of the division of the
3 budget.
4 The state comptroller shall at the commencement of each month certify
5 to the director of the division of the budget, the commissioner of
6 environmental conservation, the chairman of the senate finance
7 committee, and the chairman of the assembly ways and means committee
8 the amounts disbursed from this appropriation for "Environmental
9 Restoration Project Disbursements" for the month preceding such
10 certification (09BA02W5) ... 75,000,000 ............. (re. $523,000)
11 By chapter 54, section 1, of the laws of 2001:
12 For state assistance payments for the state share of the costs of
13 environmental restoration projects in accordance with the provisions
14 of title 5 of article 56 of the environmental conservation law for
15 project costs, including costs incidental and appurtenant thereto
16 and for payment of reimbursements to the clean water/clean air
17 implementation fund for services and expenses of state departments
18 and agencies, including fringe benefits, hereinafter referred to as
19 "Environmental Restoration Project Disbursements". The moneys appro-
20 priated herein may be suballocated to other state departments and
21 agencies.
22 Notwithstanding the provisions of any general or special law, the
23 moneys hereby appropriated shall be available for environmental
24 restoration projects in accordance with title 5 of article 56 of the
25 environmental conservation law upon the issuance of a certificate of
26 approval of availability by the director of the division of the
27 budget.
28 The state comptroller shall at the commencement of each month certify
29 to the director of the division of the budget, the commissioner of
30 environmental conservation, the chairman of the senate finance
31 committee, and the chairman of the assembly ways and means committee
32 the amounts disbursed from this appropriation for "Environmental
33 Restoration Project Disbursements" for the month preceding such
34 certification (09BA01W5) ... 25,000,000 ............. (re. $289,000)
35 By chapter 55, section 1, of the laws of 2000:
36 For state assistance payments for the state share of the costs of
37 environmental restoration projects in accordance with the provisions
38 of title 5 of article 56 of the environmental conservation law for
39 project costs, including costs incidental and appurtenant thereto
40 and for payment of reimbursements to the clean water/clean air
41 implementation fund for services and expenses of state departments
42 and agencies, including fringe benefits, hereinafter referred to as
43 "Environmental Restoration Project Disbursements". The moneys appro-
44 priated herein may be suballocated to other state departments and
45 agencies.
46 Notwithstanding the provisions of any general or special law, the
47 moneys hereby appropriated shall be available for environmental
48 restoration projects in accordance with title 5 of article 56 of the
49 environmental conservation law upon the issuance of a certificate of
217 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 approval of availability by the director of the division of the
2 budget.
3 The state comptroller shall at the commencement of each month certify
4 to the director of the division of the budget, the commissioner of
5 environmental conservation, the chairman of the senate finance
6 committee, and the chairman of the assembly ways and means committee
7 the amounts disbursed from this appropriation for "Environmental
8 Restoration Project Disbursements" for the month preceding such
9 certification (09BA00W5) ... 10,000,000 ............. (re. $496,000)
10 By chapter 55, section 1, of the laws of 1999:
11 For state assistance payments for the state share of the costs of
12 environmental restoration projects in accordance with the provisions
13 of title 5 of article 56 of the environmental conservation law for
14 project costs, including costs incidental and appurtenant thereto
15 and for payment of reimbursements to the clean water/clean air
16 implementation fund for services and expenses of state departments
17 and agencies, including fringe benefits, hereinafter referred to as
18 "Environmental Restoration Project Disbursements". The moneys appro-
19 priated herein may be suballocated to other state departments and
20 agencies.
21 Notwithstanding the provisions of any general or special law, the
22 moneys hereby appropriated shall be available for environmental
23 restoration projects in accordance with title 5 of article 56 of the
24 environmental conservation law upon the issuance of a certificate of
25 approval of availability by the director of the division of the
26 budget.
27 The state comptroller shall at the commencement of each month certify
28 to the director of the division of the budget, the commissioner of
29 environmental conservation, the chairman of the senate finance
30 committee, and the chairman of the assembly ways and means committee
31 the amounts disbursed from this appropriation for "Environmental
32 Restoration Project Disbursements" for the month preceding such
33 certification (09BA99W5) ... 10,000,000 ............. (re. $138,000)
34 By chapter 55, section 1, of the laws of 1998:
35 For state assistance payments for the state share of the costs of
36 environmental restoration projects in accordance with the provisions
37 of title 5 of article 56 of the environmental conservation law for
38 project costs, including costs incidental and appurtenant thereto
39 and for payment of reimbursements to the clean water/clean air
40 implementation fund for services and expenses of state departments
41 and agencies, including fringe benefits, hereinafter referred to as
42 "Environmental Restoration Project Disbursements". The moneys appro-
43 priated herein may be suballocated to other state departments and
44 agencies.
45 Notwithstanding the provisions of any general or special law, the
46 moneys hereby appropriated shall be available for environmental
47 restoration projects in accordance with title 5 of article 56 of the
48 environmental conservation law upon the issuance of a certificate of
49 approval of availability by the director of the division of the
50 budget.
218 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The state comptroller shall at the commencement of each month certify
2 to the director of the division of the budget, the commissioner of
3 environmental conservation, the chairman of the senate finance
4 committee, and the chairman of the assembly ways and means committee
5 the amounts disbursed from this appropriation for "Environmental
6 Restoration Project Disbursements" for the month preceding such
7 certification (09BA98W5) ... 10,000,000 ............. (re. $477,000)
8 By chapter 55, section 1, of the laws of 1997:
9 For state assistance payments for the state share of the costs of
10 environmental restoration projects in accordance with the provisions
11 of title 5 of article 56 of the environmental conservation law for
12 project costs, including costs incidental and appurtenant thereto
13 and for payment of reimbursements to the clean water/clean air
14 implementation fund for services and expenses of state departments
15 and agencies, including fringe benefits, hereinafter referred to as
16 "Environmental Restoration Project Disbursements". The moneys appro-
17 priated herein may be suballocated to other state departments and
18 agencies.
19 Notwithstanding the provisions of any general or special law, the
20 moneys hereby appropriated shall be available for environmental
21 restoration projects in accordance with title 5 of article 56 of the
22 environmental conservation law upon the issuance of a certificate of
23 approval of availability by the director of the division of the
24 budget.
25 The state comptroller shall at the commencement of each month certify
26 to the director of the division of the budget, the commissioner of
27 environmental conservation, the chairman of the senate finance
28 committee, and the chairman of the assembly ways and means committee
29 the amounts disbursed from this appropriation for "Environmental
30 Restoration Project Disbursements" for the month preceding such
31 certification (09BA97W5) ... 20,000,000 .......... (re. $20,000,000)
32 By chapter 413, section 29, of the laws of 1996, as amended by chapter
33 55, section 1, of the laws of 1997:
34 For state assistance payments for the state share of the costs of
35 environmental restoration projects in accordance with the provisions
36 of title 5 of article 56 of the environmental conservation law for
37 project costs, including costs incidental and appurtenant thereto
38 and for payment of reimbursements to the clean water/clean air
39 implementation fund for services and expenses of state departments
40 and agencies, including fringe benefits, hereinafter referred to as
41 "Environmental Restoration Project Disbursements". The moneys appro-
42 priated herein may be suballocated to other state departments and
43 agencies.
44 Notwithstanding the provisions of any general or special law, moneys
45 hereby appropriated shall be available for environmental restoration
46 projects in accordance with title 5 of article 56 of the environ-
47 mental conservation law upon the issuance of a certificate of
48 approval of availability by the director of the division of the
49 budget.
219 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The state comptroller at the commencement of each month shall certify
2 to the director of the division of the budget, the commissioner of
3 environmental conservation, the chairman of the senate finance
4 committee, and the chairman of the assembly ways and means committee
5 the amounts disbursed from this appropriation for "Environmental
6 Restoration Project Disbursements" for the month preceding such
7 certification (09BA96W5) ... 50,000,000 ........... (re. $1,025,000)
8 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
9 Capital Projects Funds - Other
10 Capital Projects Fund
11 Maintenance and Operations Purpose
12 By chapter 54, section 1, of the laws of 2017:
13 For the maintenance and operation of various facilities and systems
14 including personal services, fringe benefits and indirect costs
15 (09FM17MO) ... 6,000,000 .......................... (re. $4,545,000)
16 FISH AND WILDLIFE (CCP)
17 Capital Projects Funds - Other
18 Capital Projects Fund
19 Fish and Wildlife Purpose
20 By chapter 54, section 1, of the laws of 2013:
21 For the purchase of capital equipment and for the renovation, rehabil-
22 itation and reconstruction of the department of environmental
23 conservation's fish hatcheries including personal service, fringe
24 benefits and indirect costs (09HE1354) ... 500,000 .. (re. $500,000)
25 By chapter 54, section 1, of the laws of 2012:
26 For the purchase of capital equipment and for the renovation, rehabil-
27 itation and reconstruction of the department of environmental
28 conservation's fish hatcheries including personal service, fringe
29 benefits and indirect costs (09HE1254) ... 500,000 .. (re. $500,000)
30 By chapter 54, section 1, of the laws of 2011:
31 For the purchase of capital equipment and for the renovation, rehabil-
32 itation and reconstruction of the department of environmental
33 conservation's fish hatcheries including personal services and
34 fringe benefits and indirect costs (09HE1154) ......................
35 1,000,000 ......................................... (re. $1,000,000)
36 By chapter 55, section 1, of the laws of 2010:
37 For the purchase of capital equipment and for the renovation, rehabil-
38 itation and reconstruction of the department of environmental
39 conservation's fish hatcheries including personal services and
40 fringe benefits and indirect costs (09HE1054) ......................
41 1,000,000 ......................................... (re. $1,000,000)
42 By chapter 55, section 1, of the laws of 2009:
220 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the purchase of capital equipment and for the renovation, rehabil-
2 itation and reconstruction of the department of environmental
3 conservation's fish hatcheries including personal services and
4 fringe benefits and indirect costs (09HE0954) ......................
5 1,000,000 ......................................... (re. $1,000,000)
6 By chapter 55, section 1, of the laws of 2008:
7 For the purchase of capital equipment and for the renovation, rehabil-
8 itation and reconstruction of the department of environmental
9 conservation's fish hatcheries including personal services and
10 fringe benefits and indirect costs (09HE0854) ......................
11 1,000,000 ......................................... (re. $1,000,000)
12 By chapter 55, section 1, of the laws of 2007:
13 For the purchase of capital equipment and for the renovation, rehabil-
14 itation and reconstruction of the department of environmental
15 conservation's fish hatcheries including personal services and
16 fringe benefits and indirect costs (09HE0754) ......................
17 1,000,000 ........................................... (re. $259,000)
18 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
19 section 1, of the laws of 2004:
20 For rehabilitation and improvements of fishing access sites including
21 personal services, fringe benefits and indirect costs (09FA0354) ...
22 500,000 ............................................. (re. $409,000)
23 Capital Projects Fund - Other
24 Miscellaneous Capital Projects Fund
25 Habitat Conservation and Access Account
26 Fish and Wildlife Purpose
27 By chapter 54, section 1, of the laws of 2017:
28 For services and expenses, including personal service, nonpersonal
29 service, fringe benefits and indirect costs related to management,
30 protection and restoration fish and wildlife habitat, and improve-
31 ment and development of public access for fish and wildlife related
32 recreation (09HC1754) ... 1,500,000 ............... (re. $1,420,000)
33 By chapter 55, section 1, of the laws of 2016:
34 For services and expenses, including personal service, non-personal
35 service, fringe benefits and indirect costs related to management,
36 protection and restoration fish and wildlife habitat, and improve-
37 ment and development of public access for fish and wildlife related
38 recreation (09HC1654) ... 1,500,000 ................. (re. $775,000)
39 By chapter 54, section 1, of the laws of 2015:
40 For services and expenses, including personal service, nonpersonal
41 service, fringe benefits and indirect costs related to management,
42 protection and restoration fish and wildlife habitat, and improve-
43 ment and development of public access for fish and wildlife related
44 recreation (09HC1554) ... 1,500,000 ................. (re. $997,000)
221 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Miscellaneous Capital Projects Fund
3 Hudson River Habitat Restoration Fund
4 Fish and Wildlife Purpose
5 By chapter 712, section 3, of the laws of 1994:
6 For payment of the state match portion of any and all costs and
7 expenditures incurred for the purpose of Hudson River habitat resto-
8 ration capital projects (09HR9454) ... 600,000 ...... (re. $351,000)
9 LANDS AND FORESTS (CCP)
10 Capital Projects Funds - Other
11 Capital Projects Fund
12 Lands and Forests Purpose
13 By chapter 54, section 1, of the laws of 2017:
14 For services and expenses, including personal service, non-personal
15 service, indirect costs and fringe benefits related to the steward-
16 ship of newly acquired and existing state lands, for the implementa-
17 tion of Unit Management Plans, costs related to invasive species
18 management activities and for the development and implementation of
19 Green Certification for state forests, including suballocation to
20 other state departments and agencies (09LF1753) ....................
21 4,000,000 ......................................... (re. $4,000,000)
22 For the purchase and replacement of equipment and facility improve-
23 ments, including air monitoring, maintenance of facilities and emer-
24 gency response in support of public safety, including personal
25 services, fringe benefits and indirect costs (09PS1753) ............
26 1,000,000 ......................................... (re. $1,000,000)
27 By chapter 55, section 1, of the laws of 2016:
28 For services and expenses, including personal service, non-personal
29 service, indirect costs and fringe benefits related to the steward-
30 ship of newly acquired and existing state lands, for the implementa-
31 tion of Unit Management Plans, costs related to invasive species
32 management activities and for the development and implementation of
33 Green Certification for state forests, including suballocation to
34 other state departments and agencies (09LF1653) ....................
35 4,000,000 ......................................... (re. $3,503,000)
36 For the purchase and replacement of equipment and facility improve-
37 ments, including air monitoring, maintenance of facilities and emer-
38 gency response in support of public safety, including personal
39 services, fringe benefits and indirect costs (09PS1653) ............
40 500,000 ............................................. (re. $500,000)
41 By chapter 54, section 1, of the laws of 2015:
42 For the purchase and replacement of equipment and facility improve-
43 ments, including air monitoring, maintenance of facilities and emer-
44 gency response in support of public safety, including personal
45 services, fringe benefits and indirect costs (09PS1553) ............
46 2,500,000 ......................................... (re. $2,500,000)
222 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2014:
2 For the purchase and replacement of equipment and facility improve-
3 ments, including air monitoring, maintenance of facilities and emer-
4 gency response in support of public safety, including personal
5 services, fringe benefits and indirect costs (09PS1453) ............
6 2,300,000 ............................................. (re. $1,000)
7 By chapter 54, section 1, of the laws of 2013:
8 For the purchase and replacement of equipment and facility improve-
9 ments, including air monitoring, maintenance of facilities and emer-
10 gency response in support of public safety, including personal
11 services, fringe benefits and indirect costs (09PS1353) ............
12 1,000,000 ............................................ (re. $82,000)
13 By chapter 54, section 1, of the laws of 2012:
14 For services and expenses, including personal service and fringe bene-
15 fits, necessary for development and implementation of Green Certif-
16 ication for state forests (09GC1253) ... 100,000 ..... (re. $54,000)
17 By chapter 54, section 1, of the laws of 2011:
18 For services and expenses, including personal services and fringe
19 benefits, necessary for implementation of Unit Management Plans,
20 including suballocation to other state departments and agencies
21 (09MP1153) ... 600,000 .............................. (re. $527,000)
22 By chapter 55, section 1, of the laws of 2010:
23 For the stewardship of newly acquired and existing state lands includ-
24 ing personal services, fringe benefits and indirect costs, including
25 suballocation to other state departments and agencies (09SW1053) ...
26 500,000 ............................................. (re. $500,000)
27 By chapter 55, section 1, of the laws of 2009:
28 For the stewardship of newly acquired and existing state lands includ-
29 ing personal services, fringe benefits and indirect costs, including
30 suballocation to other state departments and agencies (09SW0953) ...
31 900,000 ............................................. (re. $810,000)
32 For services and expenses, including necessary consultant costs, for
33 judgement or settlement payments related to land acquisition claims
34 or cases, pursuant to section 503 of the eminent domain procedure
35 law or article 78 of the civil practice law and rules (09AA0953) ...
36 15,000,000 ....................................... (re. $15,000,000)
37 By chapter 55, section 1, of the laws of 2008:
38 For the purchase and replacement of equipment and facility improve-
39 ments, including air monitoring, maintenance of facilities and emer-
40 gency response in support of public safety, including personal
41 services, fringe benefits and indirect costs (09PS0853) ............
42 400,000 ............................................... (re. $2,000)
43 By chapter 55, section 1, of the laws of 2007:
44 For services and expenses, including necessary consultant costs, for
45 judgement or settlement payments related to land acquisition claims
223 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 or cases, pursuant to section 503 of the eminent domain procedure
2 law or article 78 of the civil practice law and rules (09AA0753) ...
3 4,300,000 ......................................... (re. $4,300,000)
4 By chapter 54, section 1, of the laws of 2001, as amended by chapter 55,
5 section 1, of the laws of 2003:
6 For the state's share of Federal Transportation Efficiency Act of the
7 21st Century program grants including personal services and fringe
8 benefits (09IT0153) ... 2,532,000 ................. (re. $2,325,000)
9 By chapter 55, section 1, of the laws of 2000:
10 For services and expenses, including necessary consultant costs, for
11 judgement or settlement payments related to land acquisition claims
12 or cases brought before the court of claims or the supreme court,
13 pursuant to section 503 of the eminent domain procedure law or arti-
14 cle 78 of the civil practice law and rules (09AA0053) ..............
15 1,000,000 ......................................... (re. $1,000,000)
16 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
17 section 1, of the laws of 2004:
18 For the state's share of Federal Intermodal Surface Transportation
19 Efficiency Act enhancement program grants including personal
20 services, fringe benefits and indirect costs. No portion of this
21 appropriation shall be allocated until the commissioner of the
22 department of environmental conservation and the director of the
23 budget have determined that no other sources of funding, including
24 but not limited to natural resource damage claim settlements and
25 environmental protection fund appropriations, are available for this
26 purpose (09IT9453) ... 500,000 ...................... (re. $297,000)
27 By chapter 54, section 1, of the laws of 1993:
28 For services and expenses including necessary consultant costs, for
29 judgment or settlement payments related to land acquisition claims
30 or cases brought before the court of claims or the supreme court,
31 pursuant to section 503 of the eminent domain procedure law or arti-
32 cle 78 of the civil practice law and rules (09AA9353) ..............
33 18,800,000 .......................................... (re. $596,000)
34 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
35 section 3, of the laws of 1990:
36 For demolition of buildings at the former Edgewood Hospital site on
37 Long Island (09168953) ... 3,450,000 ................ (re. $891,000)
38 By chapter 54, section 1, of the laws of 1987, for: Demolition of build-
39 ings at the former Edgewood Hospital site on Long Island (09668753)
40 ... 6,000,000 ..................................... (re. $2,246,000)
41 Capital Projects Funds - Other
42 Forest Preserve Expansion Fund
43 Lands and Forests Purpose
44 By chapter 55, section 1, of the laws of 1996:
224 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the acquisition of additional lands for the forest preserve within
2 either the Adirondack or Catskill parks, in accordance with the
3 provisions of section 97-e of the state finance law (09999653) .....
4 20,000 ............................................... (re. $20,000)
5 By chapter 54, section 1, of the laws of 1993:
6 For the acquisition of additional lands for the forest preserve within
7 either the Adirondack or Catskill parks, in accordance with the
8 provisions of section 97-e of the state finance law (09999353) .....
9 175,000 .............................................. (re. $90,000)
10 Capital Projects Funds - Federal
11 Federal Capital Projects Fund
12 Lands and Forests Purpose
13 By chapter 54, section 1, of the laws of 2017:
14 For the federal share of capital projects pursuant to lands and
15 forests resources purposes including the costs associated with the
16 acquisition of lands under the forest legacy program, including
17 suballocation to other state departments and agencies (09FL1753) ...
18 10,000,000 ....................................... (re. $10,000,000)
19 By chapter 55, section 1, of the laws of 2016:
20 For the federal share of costs associated with the acquisition of
21 lands under the forest legacy program, including suballocation to
22 other state departments and agencies (09FL1653) ....................
23 2,000,000 ......................................... (re. $2,000,000)
24 By chapter 54, section 1, of the laws of 2013:
25 For the federal share of costs associated with the acquisition of
26 lands under the forest legacy program, including suballocation to
27 other state departments and agencies (09FL1353) ....................
28 1,900,000 ......................................... (re. $1,900,000)
29 By chapter 54, section 1, of the laws of 2011:
30 For the federal share of costs associated with the acquisition of
31 lands under the forest legacy program, including suballocation to
32 other state departments and agencies (09FL1153) ....................
33 4,000,000 ......................................... (re. $3,200,000)
34 By chapter 55, section 1, of the laws of 2008:
35 For the federal share of costs associated with the acquisition of
36 lands under the forest legacy program, including suballocation to
37 other state departments and agencies (09FL0853) ....................
38 2,000,000 ......................................... (re. $1,016,000)
39 By chapter 55, section 1, of the laws of 2007:
40 For the federal share of costs associated with the acquisition of
41 lands under the forest legacy program, including suballocation to
42 other state departments and agencies (09FL0753) ....................
43 2,000,000 ........................................... (re. $505,000)
225 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 MARINE RESOURCES (CCP)
2 Capital Projects Funds - Federal
3 Federal Capital Projects Fund
4 Marine Projects Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For the federal share of capital projects undertaken pursuant to fish
7 and wildlife and marine resources purposes including the acquisition
8 of property including suballocation to other state departments and
9 agencies (09MR17A1) ... 5,000,000 ................. (re. $5,000,000)
10 By chapter 54, section 1, of the laws of 2015:
11 For the federal share of capital projects undertaken pursuant to fish
12 and wildlife and marine resources purposes including the acquisition
13 of property including suballocation to other state departments and
14 agencies (09MR15A1) ... 5,000,000 ................. (re. $4,993,000)
15 By chapter 54, section 1, of the laws of 2011:
16 For the federal share of capital projects undertaken pursuant to fish
17 and wildlife and marine resources purposes including the acquisition
18 of property including suballocation to other state departments and
19 agencies (09MR11A1) ... 5,000,000 ................. (re. $5,000,000)
20 By chapter 55, section 1, of the laws of 2010:
21 For the federal share of capital projects undertaken pursuant to fish
22 and wildlife and marine resources purposes including the acquisition
23 of property including suballocation to other state departments and
24 agencies (09MR10A1) ... 5,700,000 ................. (re. $2,167,000)
25 By chapter 55, section 1, of the laws of 2008:
26 For the federal share of capital projects undertaken pursuant to fish
27 and wildlife and marine resources purposes including the acquisition
28 of property including suballocation to other state departments and
29 agencies (09MR08A1) ... 4,000,000 ................. (re. $1,497,000)
30 NEW YORK WORKS (CCP)
31 Capital Projects Funds - Other
32 Capital Projects Fund
33 Flood Control Purpose
34 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
35 section 1, of the laws of 2015:
36 For New York Works Infrastructure projects to improve and enhance
37 water management infrastructure and public safety with respect to
38 flood management, including but not limited to various dam safety
39 projects and the demolition of unsafe structures on state-owned
40 land; various flood protection projects including the state share of
41 federal sponsored flood control projects, and the maintenance of
42 flood control projects, including Western NY, Ithaca and Syracuse
43 Channel; the state share of various shore protection projects,
226 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 including Long Island Coastal Erosion projects and Coney Island/Sea
2 Gate Beach, including an advance payment by the state for the local
3 costs of various shore protection projects, including personal
4 service, non-personal service, fringe benefits and indirect costs
5 and the payment of liabilities incurred prior to April 1, 2012,
6 including suballocation to other state departments and agencies
7 (09NY1263) ... 101,743,000 ....................... (re. $25,311,000)
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 Operational Services Purpose
11 By chapter 54, section 1, of the laws of 2017:
12 For services, expenses, and indirect costs related to New York Works
13 projects including but not limited to air monitoring infrastructure
14 investments; remediation of legacy environmental contamination;
15 investments in information technology; dam safety projects and the
16 demolition of unsafe structures on state-owned land; state-owned
17 flood protection projects; shore protection projects; state land
18 stewardship, public access and environmental and recreation infras-
19 tructure projects including, notwithstanding any law to the contra-
20 ry, projects on lands being sought pursuant to state land acquisi-
21 tion policy under article 49 of the environmental conservation law,
22 for which the state provided a letter of intent to the town of North
23 Hudson and Essex county to acquire a conservation easement or other
24 interest and for which the fee owner of any such property authorizes
25 such project; vehicles and equipment; water quality improvement
26 projects, fish hatcheries; rehabilitation and improvements of vari-
27 ous department facilities and systems; and well plugging; including
28 personal service, non-personal service and fringe benefits, includ-
29 ing suballocation to other state departments and agencies (09NY1751)
30 ... 70,000,000 ................................... (re. $68,961,000)
31 By chapter 55, section 1, of the laws of 2016:
32 For services, expenses, and indirect costs related to New York Works
33 projects including but not limited to air monitoring infrastructure
34 investments; remediation of legacy environmental contamination;
35 investments in information technology; dam safety projects and the
36 demolition of unsafe structures on state-owned land; state-owned
37 flood protection projects; shore protection projects; state land
38 stewardship, public access and environmental and recreation infras-
39 tructure projects; vehicles and equipment; water quality improvement
40 projects, fish hatcheries; and well plugging; including personal
41 service, non-personal service and fringe benefits, including subal-
42 location to other state departments and agencies (09NY1651) ........
43 40,000,000 ....................................... (re. $31,329,000)
44 By chapter 54, section 1, of the laws of 2015:
45 For services, expenses, and indirect costs related to New York Works
46 projects, including but not limited to air monitoring infrastructure
47 investments; remediation of legacy environmental contamination;
48 investments in information technology; dam safety projects and the
227 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 demolition of unsafe structures on state-owned land; state-owned
2 flood protection projects; state land stewardship, public access and
3 environmental and recreation infrastructure projects; vehicles and
4 equipment related to stewardship and emergency preparedness; water
5 quality improvement projects; and fish hatcheries; including
6 personal service, nonpersonal service and fringe benefits, including
7 suballocation to other state departments and agencies (09NY1551) ...
8 40,000,000 ....................................... (re. $24,555,000)
9 By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
10 section 1, of the laws of 2015:
11 For services, expenses, and indirect costs related to New York Works
12 projects, including but not limited to air monitoring infrastructure
13 investments; remediation of legacy environmental contamination;
14 investments in information technology; dam safety projects and the
15 demolition of unsafe structures on state-owned land; state-owned
16 flood protection projects; state land stewardship, public access and
17 environmental and recreation infrastructure projects; vehicles and
18 equipment related to stewardship and emergency preparedness; fish
19 hatcheries; and marine program infrastructure; including personal
20 service, nonpersonal service and fringe benefits, including suballo-
21 cation to other state departments and agencies (09NY1451) ..........
22 40,000,000 ....................................... (re. $20,229,000)
23 By chapter 54, section 1, of the laws of 2013, as amended by chapter 55,
24 section 1, of the laws of 2016:
25 For services, expenses, and indirect costs related to New York Works
26 projects, including but not limited to environmental restoration
27 projects; remediation of legacy environmental contamination; invest-
28 ments in information technology; State land stewardship and environ-
29 mental and recreation infrastructure projects; and water quality
30 improvement projects, including suballocation to other state depart-
31 ments and agencies.
32 Notwithstanding any law to the contrary, the Department may enter into
33 agreements with municipalities to undertake environmental restora-
34 tion projects on behalf of a municipality upon request, provided
35 that the municipality shall provide ten percent of the total project
36 costs. Any and all moneys recovered or reimbursed through agreements
37 shall be deposited with the comptroller and credited to the account
38 of the fund from which the expenditures were made (09NY1351) .......
39 40,000,000 ....................................... (re. $19,344,000)
40 OPERATIONS (CCP)
41 Capital Projects Funds - Other
42 Capital Projects Fund
43 Operational Services Purpose
44 By chapter 54, section 1, of the laws of 2017:
45 For rehabilitation and improvements of various department facilities
46 and systems including personal service and fringe benefits and indi-
47 rect costs in accordance with a programmatic and financial plan to
228 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 be approved by the director of the budget including suballocation to
2 other state departments and agencies (09RI1751) ....................
3 15,000,000 ....................................... (re. $15,000,000)
4 For replacement of vehicles and heavy duty construction equipment
5 (09EQ1751) ... 1,000,000 .......................... (re. $1,000,000)
6 For services and expenses, including personal service and fringe bene-
7 fits, necessary for projects and purposes required by Executive
8 Order 88, including design, construction, operation and maintenance
9 of all new buildings, and the development and purchase of energy
10 efficient equipment; for remedial activities at state-owned facili-
11 ties, including the compliance with state and federal laws and regu-
12 lations (09SF1751) ... 1,000,000 .................. (re. $1,000,000)
13 By chapter 55, section 1, of the laws of 2016:
14 For rehabilitation and improvements of various department facilities
15 and systems including personal service and fringe benefits and indi-
16 rect costs in accordance with a programmatic and financial plan to
17 be approved by the director of the budget including suballocation to
18 other state departments and agencies (09RI1651) ....................
19 11,750,000 ....................................... (re. $10,291,000)
20 For replacement of vehicles and heavy duty construction equipment
21 (09EQ1651) ... 1,000,000 .......................... (re. $1,000,000)
22 For services and expenses, including personal service and fringe bene-
23 fits, necessary for projects and purposes required by Executive
24 Order 88, including design, construction, operation and maintenance
25 of all new buildings, and the development and purchase of energy
26 efficient equipment; for remedial activities at state-owned facili-
27 ties, including the compliance with state and federal laws and regu-
28 lations (09SF1651) ... 900,000 ...................... (re. $900,000)
29 By chapter 54, section 1, of the laws of 2015:
30 For rehabilitation and improvements of various department facilities
31 and systems including personal service and fringe benefits and indi-
32 rect costs in accordance with a programmatic and financial plan to
33 be approved by the director of the budget including suballocation to
34 other state departments and agencies (09RI1551) ....................
35 9,650,000 ......................................... (re. $4,260,000)
36 For replacement of vehicles and heavy duty construction equipment
37 (09EQ1551) ... 2,750,000 .......................... (re. $2,750,000)
38 For services and expenses, including personal services and fringe
39 benefits, for design and construction of department facilities
40 (09DF1551) ... 750,000 .............................. (re. $750,000)
41 For services and expenses, including personal service, fringe bene-
42 fits, and non-personal services necessary for remedial activities to
43 plug or replug abandoned oil and gas wells including the surface
44 restoration of the affected land pursuant to article 23 of the envi-
45 ronmental conservation law (09OG1551) ... 500,000 ... (re. $500,000)
46 For services and expenses, including personal service and fringe bene-
47 fits, necessary for projects and purposes required by Executive
48 Order 88, including design, construction, operation and maintenance
49 of all new buildings, and the development and purchase of energy
50 efficient equipment; for remedial activities at state-owned facili-
229 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ties, including the compliance with state and federal laws and regu-
2 lations (09SF1551) ... 2,000,000 .................. (re. $2,000,000)
3 By chapter 54, section 1, of the laws of 2014:
4 For replacement of vehicles and heavy duty construction equipment
5 (09EQ1451) ... 2,000,000 ............................ (re. $603,000)
6 For services and expenses, including personal services and fringe
7 benefits, for design and construction of department facilities
8 (09DF1451) ... 750,000 .............................. (re. $750,000)
9 For services and expenses, including personal service, fringe bene-
10 fits, and non-personal services necessary for remedial activities to
11 plug or replug abandoned oil and gas wells including the surface
12 restoration of the affected land pursuant to article 23 of the envi-
13 ronmental conservation law (09OG1451) ... 500,000 ... (re. $500,000)
14 For services and expenses, including personal service and fringe bene-
15 fits, necessary for projects and purposes required by Executive
16 Order 111, including design, construction, operation and maintenance
17 of all new buildings, and the development and purchase of energy
18 efficient equipment; for remedial activities at state-owned facili-
19 ties, including the compliance with state and federal laws and regu-
20 lations (09SF1451) ... 1,200,000 .................... (re. $395,000)
21 By chapter 54, section 1, of the laws of 2013:
22 For services and expenses relating to the operational services of the
23 department of environmental conservation (09HD1351) ................
24 12,000,000 ....................................... (re. $12,000,000)
25 For rehabilitation and improvements of various department facilities
26 and systems including personal service and fringe benefits and indi-
27 rect costs in accordance with a programmatic and financial plan to
28 be approved by the director of the budget including suballocation to
29 other state departments and agencies (09RI1351) ....................
30 9,150,000 ........................................... (re. $661,000)
31 For services and expenses, including personal services and fringe
32 benefits, for design and construction of department facilities
33 (09DF1351) ... 750,000 .............................. (re. $467,000)
34 For services and expenses, including personal service, fringe bene-
35 fits, and non-personal services necessary for remedial activities to
36 plug or replug abandoned oil and gas wells including the surface
37 restoration of the affected land pursuant to article 23 of the envi-
38 ronmental conservation law (09OG1351) ... 500,000 ... (re. $500,000)
39 For services and expenses, including personal service and fringe bene-
40 fits, necessary for projects and purposes required by Executive
41 Order 111, including design, construction, operation and maintenance
42 of all new buildings, and the development and purchase of energy
43 efficient equipment; for remedial activities at state-owned facili-
44 ties, including the compliance with state and federal laws and regu-
45 lations (09SF1351) ... 1,000,000 .................... (re. $577,000)
46 By chapter 54, section 1, of the laws of 2012:
47 For services and expenses relating to the operational services of the
48 department of environmental conservation (09HD1251) ................
49 12,000,000 ....................................... (re. $12,000,000)
230 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For rehabilitation and improvements of various department facilities
2 and systems including personal service and fringe benefits and indi-
3 rect costs in accordance with a programmatic and financial plan to
4 be approved by the director of the budget including suballocation to
5 other state departments and agencies (09RI1251) ....................
6 10,000,000 ........................................... (re. $71,000)
7 For replacement of vehicles and heavy duty construction equipment
8 (09EQ1251) ... 500,000 ................................ (re. $4,000)
9 For dam safety and the demolition of unsafe structures on state-owned
10 land, and for various dam safety projects including personal service
11 and fringe benefits (09DS1251) ... 1,500,000 ...... (re. $1,500,000)
12 For services and expenses, including personal service and fringe bene-
13 fits, necessary for projects and purposes required by Executive
14 Order 111, including design, construction, operation and maintenance
15 of all new buildings, and the development and purchase of energy
16 efficient equipment; for remedial activities at state-owned facili-
17 ties, including the compliance with state and federal laws and regu-
18 lations (09SF1251) ... 1,000,000 .................... (re. $100,000)
19 By chapter 54, section 1, of the laws of 2011:
20 For services and expenses relating to the operational services of the
21 department of environmental conservation (09HD1151) ................
22 12,000,000 ....................................... (re. $12,000,000)
23 For rehabilitation and improvements of various department facilities
24 and systems including personal services and fringe benefits and
25 indirect costs in accordance with a programmatic and financial plan
26 to be approved by the director of the budget including suballocation
27 to other state departments and agencies (09RI1151) .................
28 10,250,000 .......................................... (re. $250,000)
29 By chapter 55, section 1, of the laws of 2010:
30 For services and expenses, including personal services and fringe
31 benefits, necessary for projects and purposes required by Executive
32 Order 111, including design, construction, operation and maintenance
33 of all new buildings, and the development and purchase of energy
34 efficient equipment; for remedial activities at state-owned facili-
35 ties, including the compliance with state and federal laws and regu-
36 lations (09SF1051) ... 2,000,000 ..................... (re. $56,000)
37 By chapter 55, section 1, of the laws of 2009:
38 For replacement of vehicles and heavy duty construction equipment
39 (09EQ0951) ... 4,200,000 .............................. (re. $5,000)
40 For dam safety and the demolition of unsafe structures on state-owned
41 land, and for various dam safety projects including personal
42 services and fringe benefits (09DS0951) ............................
43 2,000,000 ......................................... (re. $1,753,000)
44 For services and expenses, including personal services and fringe
45 benefits, for design and construction of department facilities
46 (09DF0951) ... 450,000 ............................... (re. $34,000)
47 For services and expenses, including personal services and fringe
48 benefits, necessary for projects and purposes required by Executive
49 Order 111, including design, construction, operation and maintenance
231 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of all new buildings, and the development and purchase of energy
2 efficient equipment; for remedial activities at state-owned facili-
3 ties, including the compliance with state and federal laws and regu-
4 lations (09SF0951) ... 3,000,000 ..................... (re. $25,000)
5 By chapter 55, section 1, of the laws of 2008:
6 For dam safety and the demolition of unsafe structures on state-owned
7 land, and for various dam safety projects including personal
8 services and fringe benefits (09DS0851) ............................
9 2,000,000 ......................................... (re. $1,910,000)
10 For services and expenses, including personal services and fringe
11 benefits, for design and construction of department facilities
12 (09DF0851) ... 450,000 .............................. (re. $277,000)
13 For services and expenses, including personal services and fringe
14 benefits, necessary for projects and purposes required by Executive
15 Order 111, including design, construction, operation and maintenance
16 of all new buildings, and the development and purchase of energy
17 efficient equipment; for remedial activities at state-owned facili-
18 ties, including the compliance with state and federal laws and regu-
19 lations (09SF0851) ... 3,000,000 ..................... (re. $46,000)
20 By chapter 55, section 1, of the laws of 2007:
21 For dam safety and the demolition of unsafe structures on state-owned
22 land including personal services and fringe benefits (09DS0751) ....
23 2,000,000 ........................................... (re. $690,000)
24 For services and expenses, including personal services and fringe
25 benefits, for design and construction of department facilities
26 (09DF0751) ... 250,000 ................................ (re. $6,000)
27 For services and expenses, including personal services and fringe
28 benefits, necessary for projects and purposes required by Executive
29 Order 111, including design, construction, operation and maintenance
30 of all new buildings, and the development and purchase of energy
31 efficient equipment; for remedial activities at state-owned facili-
32 ties, including the compliance with state and federal laws and regu-
33 lations (09SF0751) ... 3,000,000 ..................... (re. $64,000)
34 By chapter 55, section 1, of the laws of 2006:
35 For services and expenses, including personal services and fringe
36 benefits, for design and construction of department facilities
37 (09DF0651) ... 750,000 ............................... (re. $58,000)
38 For services and expenses, including personal services and fringe
39 benefits, necessary for projects and purposes required by Executive
40 Order 111, including design, construction, operation and maintenance
41 of all new buildings, and the development and purchase of energy
42 efficient equipment; for remedial activities at state-owned facili-
43 ties, including the compliance with state and federal laws and regu-
44 lations (09SF0651) ... 2,090,000 ..................... (re. $11,000)
45 By chapter 55, section 1, of the laws of 2005:
46 For services and expenses of remedial activities performed at state-
47 owned sites and including compliance with state and federal laws and
48 regulations (09SF0551) ... 8,000,000 ................ (re. $140,000)
232 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Miscellaneous Capital Projects Fund
3 Operational Services Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 For services and expenses of the department to complete or remediate a
6 department-regulated project using the proceeds specified in the
7 project's required financial security arrangement when the terms of
8 that arrangement must be implemented.
9 Notwithstanding any other provision of law or terms of any financial
10 security instrument, any residuals may be available for department
11 capital projects (09431751) ... 5,000,000 ......... (re. $5,000,000)
12 By chapter 55, section 1, of the laws of 2016:
13 For services and expenses of the department to complete or remediate a
14 department-regulated project using the proceeds specified in the
15 project's required financial security arrangement when the terms of
16 that arrangement must be implemented. No portion of this appropri-
17 ation shall be available for projects for which financial security
18 proceeds have not been received (09431651) .........................
19 5,000,000 ......................................... (re. $5,000,000)
20 By chapter 54, section 1, of the laws of 1994:
21 For services and expenses of the department to complete or remediate a
22 department-regulated project using the proceeds specified in the
23 project's required financial security arrangement when the terms of
24 that arrangement must be implemented. No portion of this appropri-
25 ation shall be available for projects for which financial security
26 proceeds have not been received (09439451) .........................
27 2,000,000 ........................................... (re. $767,000)
28 Capital Projects Funds - Other
29 Natural Resource Damages Fund
30 Operational Services Purpose
31 By chapter 55, section 1, of the laws of 2016:
32 For services and expenses related to restoration projects, replacement
33 acquisition projects or combinations thereof resulting from success-
34 ful natural resource damages claims including suballocation to other
35 state departments and agencies (09441651) ..........................
36 26,000,000 ....................................... (re. $26,000,000)
37 By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
38 section 1, of the laws of 2013:
39 For services and expenses related to restoration projects, replacement
40 acquisition projects or combinations thereof resulting from success-
41 ful natural resource damages claims, and suballocation to other
42 state departments and agencies (09440751) ..........................
43 26,000,000 ....................................... (re. $10,178,000)
44 By chapter 54, section 1, of the laws of 1994, as amended by chapter 54,
45 section 1, of the laws of 2005:
233 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses related to restoration projects, replacement
2 acquisition projects or combinations thereof resulting from success-
3 ful natural resource damages claims. No portion of this appropri-
4 ation shall be available for projects for which recovered funds have
5 not been received including suballocation to the department of
6 health and the office of parks, recreation and historic preservation
7 (09449451) ... 23,503,000 ........................... (re. $504,000)
8 PURE WATERS BOND FUND (CCP)
9 Capital Projects Funds - Other
10 Pure Waters Bond Fund
11 Bond Proceeds Purpose
12 By chapter 54, section 8, of the laws of 1978, as amended by chapter 55,
13 section 1, of the laws of 1996:
14 The sum of two hundred sixty-three million thirty-five thousand nine
15 hundred sixty-one dollars ($263,035,961) or so much thereof as may
16 be necessary, is hereby appropriated from the proceeds of the sale
17 of bonds authorized pursuant to the provisions of chapter one
18 hundred and seventy-six of the laws of nineteen hundred sixty-five
19 known as the "Pure Waters Bond Act" for payment to the capital
20 projects fund as created by section ninety-three of the state
21 finance law for disbursements from such fund pursuant to appropri-
22 ations for the payment of the non-municipal share of the cost of
23 construction of sewage treatment works in the manner and to the
24 extent specified in section 17-1903 of the environmental conserva-
25 tion law. Such disbursements are hereinafter referred to as "Pure
26 Waters disbursements."
27 The director of the budget is hereby authorized to designate to the
28 state comptroller appropriations made from the capital projects fund
29 for purposes for which pure waters expenditures are authorized. The
30 state comptroller shall at the commencement of each month certify to
31 the director of the budget, the chairman of the senate finance
32 committee, and the chairman of the assembly ways and means commit-
33 tee, the amounts disbursed from the appropriations designated by the
34 director of the budget from the capital construction fund for pure
35 waters disbursements for the month preceding such certification.
36 Such certifications shall not exceed in aggregate the moneys appro-
37 priated thereof from the capital projects fund. A copy of each such
38 certification shall also be delivered to the public officer of the
39 respective state department to which such capital projects fund
40 appropriations are made available (01354910) ..... (re. $20,568,000)
41 RECREATION (CCP)
42 Capital Projects Funds - Other
43 Capital Projects Fund
44 Recreation Purpose
45 By chapter 54, section 1, of the laws of 2017:
234 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For campground modernization and reconstruction including personal
2 services, fringe benefits and indirect costs (09CM1752) ............
3 500,000 ............................................. (re. $500,000)
4 By chapter 54, section 1, of the laws of 2013:
5 For campground modernization and reconstruction including personal
6 services, fringe benefits and indirect costs (09CM1352) ............
7 1,000,000 ......................................... (re. $1,000,000)
8 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
9 section 1, of the laws of 2012:
10 For alterations and improvements to Belleayre Mountain Ski Center
11 lifts and trails to comply with safety regulations including
12 personal services, fringe benefits and indirect costs, including
13 suballocation to other state departments and agencies (09LS1052) ...
14 500,000 ............................................. (re. $117,000)
15 By chapter 55, section 1, of the laws of 2009:
16 For campground modernization and reconstruction including personal
17 services, fringe benefits and indirect costs (09CM0952) ............
18 500,000 ............................................. (re. $500,000)
19 By chapter 55, section 1, of the laws of 2008:
20 For campground modernization and reconstruction including personal
21 services, fringe benefits and indirect costs (09CM0852) ............
22 1,000,000 ........................................... (re. $151,000)
23 By chapter 55, section 1, of the laws of 2006:
24 For campground modernization and reconstruction including personal
25 services, fringe benefits and indirect costs (09CM0652) ............
26 1,000,000 ............................................ (re. $17,000)
27 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
28 section 1, of the laws of 2012:
29 For services and expenses for the construction of a new ski lodge at
30 Belleayre Mountain Ski Center, including suballocation to other
31 state departments and agencies (09BL0652) ..........................
32 5,500,000 ......................................... (re. $3,168,000)
33 SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP)
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Hazardous Waste Purpose
37 By chapter 54, section 1, of the laws of 2017:
38 For payment by the state, as reimbursement or as an advance from
39 responsible parties or volunteers for remedial and monitoring work
40 at sites contaminated with hazardous waste. No portion of this
41 appropriation shall be available for expenditure until a party or
42 parties either responsible for a site or volunteering to cleanup a
43 site have entered into an agreement with the commissioner of the
235 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 department of environmental conservation or the commissioner's
2 designee, and which agreement is approved by the director of the
3 budget, providing for repayment to the state of an amount equal to
4 the amount disbursed from this appropriation. A copy of such agree-
5 ment shall be filed with the state comptroller, the chairman of the
6 senate finance committee and chairman of the assembly ways and means
7 committee.
8 Notwithstanding any other provision of law to the contrary, the comp-
9 troller is authorized to repay settlements or advances for specified
10 remedial and monitoring projects from this fund with monies of the
11 hazardous waste remedial fund received for such projects pursuant to
12 consent orders and agreements to address sites contaminated with
13 hazardous waste.
14 The director of the budget shall certify to the comptroller the
15 specific portions of this appropriation for which monies have been
16 received pursuant to such consent orders and agreements (09AD17F7)
17 ... 16,000,000 ................................... (re. $16,000,000)
18 By chapter 55, section 1, of the laws of 2016:
19 For payment by the state, as reimbursement or as an advance from
20 responsible parties or volunteers for remedial and monitoring work
21 at sites contaminated with hazardous waste. No portion of this
22 appropriation shall be available for expenditure until a party or
23 parties either responsible for a site or volunteering to cleanup a
24 site have entered into an agreement with the commissioner of the
25 department of environmental conservation or the commissioner's
26 designee, and which agreement is approved by the director of the
27 budget, providing for repayment to the state of an amount equal to
28 the amount disbursed from this appropriation. A copy of such agree-
29 ment shall be filed with the state comptroller, the chairman of the
30 senate finance committee and chairman of the assembly ways and means
31 committee.
32 Notwithstanding any other provision of law to the contrary, the comp-
33 troller is authorized to repay settlements or advances for specified
34 remedial and monitoring projects from this fund with monies of the
35 hazardous waste remedial fund received for such projects pursuant to
36 consent orders and agreements to address sites contaminated with
37 hazardous waste.
38 The director of the budget shall certify to the comptroller the
39 specific portions of this appropriation for which monies have been
40 received pursuant to such consent orders and agreements (09AD16F7)
41 ... 8,000,000 ..................................... (re. $8,000,000)
42 By chapter 54, section 1, of the laws of 2015:
43 For payment by the state, as reimbursement or as an advance from
44 responsible parties or volunteers for remedial and monitoring work
45 at sites contaminated with hazardous waste. No portion of this
46 appropriation shall be available for expenditure until a party or
47 parties either responsible for a site or volunteering to cleanup a
48 site have entered into an agreement with the commissioner of the
49 department of environmental conservation or the commissioner's
50 designee, and which agreement is approved by the director of the
236 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 budget, providing for repayment to the state of an amount equal to
2 the amount disbursed from this appropriation. A copy of such agree-
3 ment shall be filed with the state comptroller, the chairman of the
4 senate finance committee and chairman of the assembly ways and means
5 committee.
6 Notwithstanding any other provision of law to the contrary, the comp-
7 troller is authorized to repay settlements or advances for specified
8 remedial and monitoring projects from this fund with monies of the
9 hazardous waste remedial fund received for such projects pursuant to
10 consent orders and agreements to address sites contaminated with
11 hazardous waste.
12 The director of the budget shall certify to the comptroller the
13 specific portions of this appropriation for which monies have been
14 received pursuant to such consent orders and agreements (09AD15F7)
15 ... 8,000,000 ..................................... (re. $5,093,000)
16 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
17 section 1, of the laws of 2010:
18 For payment by the state, as reimbursement or as an advance from
19 responsible parties for remedial and monitoring work at inactive
20 hazardous waste disposal sites or from volunteers for the voluntary
21 cleanup of contaminated brownfield sites. No portion of this appro-
22 priation shall be available for expenditure until a party or parties
23 either responsible for a site or volunteering to cleanup a site have
24 entered into an agreement with the commissioner of the department of
25 environmental conservation or the commissioner's designee, and which
26 agreement is approved by the director of the budget, providing for
27 repayment to the state of an amount equal to the amount disbursed
28 from this appropriation. A copy of such agreement shall be filed
29 with the state comptroller, the chairman of the senate finance
30 committee and chairman of the assembly ways and means committee.
31 Nothwithstanding any other provision of law to the contrary, the comp-
32 troller is authorized to repay settlements or advances for specified
33 inactive hazardous waste remedial projects and voluntary cleanup
34 projects from this fund with monies of the hazardous waste remedial
35 fund received for such projects pursuant to inactive hazardous waste
36 site remediation consent orders and voluntary cleanup agreements.
37 The director of the budget shall certify to the comptroller the
38 specific portions of this appropriation for which monies have been
39 received pursuant to such consent orders and voluntary cleanup
40 agreements (09AD08F7) ... 10,000,000 .............. (re. $3,581,000)
41 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
42 section 1, of the laws of 2007:
43 For services and expenses for the Town of Smithtown/Kings Park Psychi-
44 atric Center Rehabilitation including suballocation to other state
45 departments and agencies (09KP06F7) ................................
46 25,000,000 ........................................ (re. $6,440,000)
47 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
48 section 1, of the laws of 2006:
237 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment by the state, as reimbursement or as an advance from
2 responsible parties for remedial and monitoring work at inactive
3 hazardous waste disposal sites or from volunteers for the voluntary
4 cleanup of contaminated brownfield sites. No portion of this appro-
5 priation shall be available for expenditure until a party or parties
6 either responsible for a site or volunteering to cleanup a site have
7 entered into an agreement with the commissioner of the department of
8 environmental conservation or the commission's designee, and which
9 agreement is approved by the director of the budget, providing for
10 repayment to the state of an amount equal to the amount disbursed
11 from this appropriation. A copy of such agreement shall be filed
12 with the state comptroller, the chairman of the senate finance
13 committee and chairman of the assembly ways and means committee.
14 Notwithstanding any other provision of law to the contrary, the comp-
15 troller is authorized to repay settlements or advances for specified
16 inactive hazardous waste remedial projects and voluntary cleanup
17 projects from this fund with monies of the hazardous waste remedial
18 fund received for such projects pursuant to inactive hazardous waste
19 site remediation consent orders and voluntary cleanup agreements.
20 The director of the budget shall certify to the comptroller the
21 specific portions of this appropriation for which monies have been
22 received pursuant to such consent orders and voluntary cleanup
23 agreements (09AD04F7) ... 30,000,000 .............. (re. $1,469,000)
24 By chapter 55, section 1, of the laws of 1999:
25 For payment by the state, as an advance for remedial and monitoring
26 work at inactive hazardous waste disposal sites. No portion of this
27 appropriation shall be available for expenditure until a party or
28 parties responsible for a site have entered into an agreement with
29 the commissioner of the department of environmental conservation,
30 and which agreement is approved by the director of the budget,
31 providing for repayment to the state of an amount equal to the
32 amount disbursed from this appropriation. A copy of such agreement
33 shall be filed with the state comptroller, the chairman of the
34 senate finance committee and chairman of the assembly ways and means
35 committee.
36 Notwithstanding any other provision of law to the contrary, the comp-
37 troller is authorized to repay advances for specified inactive
38 hazardous waste remedial projects from this fund with moneys of the
39 hazardous waste remedial fund received for such projects pursuant to
40 inactive hazardous waste site remediation consent orders. The direc-
41 tor of the budget shall certify to the comptroller the specific
42 portions of this appropriation for which moneys have been received
43 pursuant to such consent orders (09AD99F7) .........................
44 60,000,000 ........................................ (re. $2,163,000)
45 By chapter 55, section 1, of the laws of 1998:
46 For payment by the state, as an advance for remedial and monitoring
47 work at inactive hazardous waste disposal sites (09AD98F7) .........
48 30,000,000 .......................................... (re. $501,000)
49 Capital Projects Funds - Other
238 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Hazardous Waste Remedial Fund
2 Hazardous Waste Cleanup Account
3 Hazardous Waste Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 For payment of the state share of the costs of hazardous waste site
6 remediation projects, in accordance with title 13 of article 27 of
7 the environmental conservation law and section 97-b of the state
8 finance law, for projects, and for payment of state costs associated
9 with the remediation of offsite contamination at significant threat
10 sites as provided for in section 27-1411 of the environmental
11 conservation law, including personal service and fringe benefits of
12 the departments of environmental conservation, health and law and
13 including suballocations to the departments of health and law and
14 including costs incidental and appurtenant thereto, provided that a
15 portion of such amount may be available for environmental restora-
16 tion projects in accordance with title 5 of article 56 of the envi-
17 ronmental conservation law. None of this appropriation may be
18 expended for any purposes authorized in title 12 of article 27 of
19 the environmental conservation law (09HB17F7) ......................
20 100,000,000 ...................................... (re. $88,399,000)
21 By chapter 55, section 1, of the laws of 2016:
22 For payment of the state share of the costs of hazardous waste site
23 remediation projects, in accordance with title 13 of article 27 of
24 the environmental conservation law and section 97-b of the state
25 finance law, for projects, and for payment of state costs associated
26 with the remediation of offsite contamination at significant threat
27 sites as provided for in section 27-1411 of the environmental
28 conservation law, including personal service and fringe benefits of
29 the departments of environmental conservation, health and law and
30 including suballocations to the departments of health and law and
31 including costs incidental and appurtenant thereto, provided that a
32 portion of such amount may be available for environmental restora-
33 tion projects in accordance with title 5 of article 56 of the envi-
34 ronmental conservation law (09HB16F7) ..............................
35 100,000,000 ...................................... (re. $50,970,000)
36 By chapter 54, section 1, of the laws of 2015:
37 For payment of the state share of the costs of hazardous waste site
38 remediation projects, in accordance with title 13 of article 27 of
39 the environmental conservation law and section 97-b of the state
40 finance law, for projects, and for payment of state costs associated
41 with the remediation of offsite contamination at significant threat
42 sites as provided for in section 27-1411 of the environmental
43 conservation law, including personal service and fringe benefits of
44 the departments of environmental conservation, health and law and
45 including suballocations to the departments of health and law and
46 including costs incidental and appurtenant thereto, provided that a
47 portion of such amount may be available for environmental restora-
48 tion projects in accordance with title 5 of article 56 of the envi-
239 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ronmental conservation law (09HB15F7) ..............................
2 100,000,000 ...................................... (re. $37,304,000)
3 By chapter 54, section 1, of the laws of 2012:
4 For payment of the state share of the costs of hazardous waste site
5 remediation projects, in accordance with title 13 of article 27 of
6 the environmental conservation law and section 97-b of the state
7 finance law, for projects, and for payment of state costs associated
8 with the remediation of offsite contamination at significant threat
9 sites as provided for in section 27-1411 of the environmental
10 conservation law, including personal service and fringe benefits of
11 the departments of environmental conservation, health and law and
12 including suballocations to the departments of health and law and
13 including costs incidental and appurtenant thereto (09HB12F7) ......
14 120,000,000 ...................................... (re. $11,588,000)
15 By chapter 54, section 1, of the laws of 2011:
16 For payment of the state share of the costs of hazardous waste site
17 remediation projects, in accordance with title 13 of article 27 of
18 the environmental conservation law and section 97-b of the state
19 finance law, for projects, and for payment of state costs associated
20 with the remediation of offsite contamination at significant threat
21 sites as provided for in section 27-1411 of the environmental
22 conservation law, including personal services and fringe benefits of
23 the departments of environmental conservation, health and law and
24 including suballocations to the departments of health and law and
25 including costs incidental and appurtenant thereto (09HB11F7) ......
26 120,000,000 ...................................... (re. $31,958,000)
27 By chapter 55, section 1, of the laws of 2010:
28 For payment of the state share of the costs of hazardous waste site
29 remediation projects, in accordance with title 13 of article 27 of
30 the environmental conservation law and section 97-b of the state
31 finance law, for projects, and for payment of state costs associated
32 with the remediation of offsite contamination at significant threat
33 sites as provided for in section 27-1411 of the environmental
34 conservation law, including personal services and fringe benefits of
35 the departments of environmental conservation, health and law and
36 including suballocations to the departments of health and law and
37 including costs incidental and appurtenant thereto (09HB10F7) ......
38 120,000,000 ...................................... (re. $16,418,000)
39 By chapter 55, section 1, of the laws of 2009:
40 For payment of the state share of the costs of hazardous waste site
41 remediation projects, in accordance with title 13 of article 27 of
42 the environmental conservation law and section 97-b of the state
43 finance law, for projects, and for payment of state costs associated
44 with the remediation of offsite contamination at significant threat
45 sites as provided for in section 27-1411 of the environmental
46 conservation law, including personal services and fringe benefits of
47 the departments of environmental conservation, health and law and
48 including suballocations to the departments of health and law and
240 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 including costs incidental and appurtenant thereto (09HB09F7) ......
2 120,000,000 ....................................... (re. $4,121,000)
3 By chapter 55, section 1, of the laws of 2008:
4 For payment of the state share of the costs of hazardous waste site
5 remediation projects, in accordance with title 13 of article 27 of
6 the environmental conservation law and section 97-b of the state
7 finance law, for projects, and for payment of state costs associated
8 with the remediation of offsite contamination at significant threat
9 sites as provided for in section 27-1411 of the environmental
10 conservation law, including personal services and fringe benefits of
11 the departments of environmental conservation, health and law and
12 including suballocations to the departments of health and law and
13 including costs incidental and appurtenant thereto (09HB08F7) ......
14 120,000,000 ...................................... (re. $14,747,000)
15 By chapter 55, section 1, of the laws of 2007:
16 For payment of the state share of the costs of hazardous waste site
17 remediation projects, in accordance with title 13 of article 27 of
18 the environmental conservation law and section 97-b of the state
19 finance law, for projects, and for payment of state costs associated
20 with the remediation of offsite contamination at significant threat
21 sites as provided for in section 27-1411 of the environmental
22 conservation law, including personal services and fringe benefits of
23 the departments of environmental conservation, health and law and
24 including suballocations to the departments of health and law and
25 including costs incidental and appurtenant thereto (09HB07F7) ......
26 120,000,000 ....................................... (re. $2,643,000)
27 By chapter 55, section 1, of the laws of 2006:
28 For payment of the state share of the costs of hazardous waste site
29 remediation projects, in accordance with title 13 of article 27 of
30 the environmental conservation law and section 97-b of the state
31 finance law, for projects, and for payment of state costs associated
32 with the remediation of offsite contamination at significant threat
33 sites as provided for in section 27-1411 of the environmental
34 conservation law, including personal services and fringe benefits of
35 the departments of environmental conservation, health and law and
36 including suballocations to the departments of health and law and
37 including costs incidental and appurtenant thereto (09HB06F7) ......
38 120,000,000 ....................................... (re. $3,465,000)
39 By chapter 55, section 1, of the laws of 2005:
40 For payment of the state share of the costs of hazardous waste site
41 remediation projects, in accordance with title 13 of article 27 of
42 the environmental conservation law and section 97-b of the state
43 finance law, for projects, and for payment of state costs associated
44 with the remediation of offsite contamination at significant threat
45 sites as provided for in section 27-1411 of the environmental
46 conservation law, including personal services and related fringe
47 benefits of the departments of environmental conservation, health
48 and law and including suballocations to the departments of health
241 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and law and including costs incidental and appurtenant thereto
2 (09HB05F7) ... 120,000,000 ........................ (re. $2,582,000)
3 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
4 section 1, of the laws of 2005:
5 For payment of the state share of the costs of hazardous waste site
6 remediation projects, in accordance with title 13 of article 27 of
7 the environmental conservation law and section 97-b of the state
8 finance law, for projects, and for payment of state costs associated
9 with the remediation of offsite contamination at significant threat
10 sites as provided for in section 27-1411 of the environmental
11 conservation law, including personal services and related fringe
12 benefits of the departments of environmental conservation, health
13 and law and including suballocations to the departments of health
14 and law and including costs incidental and appurtenant thereto
15 (09HB04F7) ... 120,222,000 ........................ (re. $5,884,000)
16 SCHEDULE
17 Personal service .............................. 15,855,844
18 Nonpersonal service .............................. 975,871
19 Fringe benefits ................................ 5,746,290
20 Maintenance undistributed
21 For services and expenses related to the
22 hazardous waste remedial program at the
23 department of health and for suballocation
24 to the department of health .................. 5,880,163
25 For services and expenses related to the
26 hazardous waste remedial program at the
27 department of law and for suballocation to
28 the department of law .......................... 763,832
29 For payment of the state share of the costs
30 of hazardous waste site remediation
31 projects in accordance with title 13 of
32 article 27 of the environmental conserva-
33 tion law and section 97-b of the state
34 finance law and for payment of state costs
35 associated with the remediation of offsite
36 contamination at significant threat sites
37 as provided for in section 27-1411 of the
38 environmental conservation law, including
39 costs incidental and appurtenant thereto .... 91,000,000
40 --------------
41 Available for maintenance undistributed ..... 97,643,995
42 --------------
43 Total of schedule ........................ 120,222,000
44 ==============
45 By chapter 55, section 1, of the laws of 2003, as amended by chapter 1,
46 part I, section 5, of the laws of 2003:
242 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the state share of costs of hazardous waste site reme-
2 diation projects, in accordance with title 13 of article 27 of the
3 environmental conservation law and section 97-b of the state finance
4 law, for projects, and for payment of state costs associated with
5 the remediation of offsite contamination at significant threat sites
6 as provided for in section 27-1411 of the environmental conservation
7 law, including personal services and related fringe benefits of the
8 departments of environmental conservation, health and law and
9 including costs incidental and appurtenant thereto (09HB03F7) ......
10 120,000,000 ....................................... (re. $6,427,000)
11 SCHEDULE
12 Personal service .............................. 15,700,000
13 Nonpersonal service .............................. 966,325
14 Fringe benefits ................................ 5,689,680
15 Maintenance undistributed
16 For services and expenses related to the
17 hazardous waste remedial program at the
18 department of health and for suballocation
19 to the department of health .................. 5,880,163
20 For services and expenses related to the
21 hazardous waste remedial program at the
22 department of law and for suballocation to
23 the department of law .......................... 763,832
24 For payment of the state share of the costs
25 of hazardous waste site remediation
26 projects in accordance with title 13 of
27 article 27 of the environmental conserva-
28 tion law and section 97-b of the state
29 finance law and for payment of state costs
30 associated with the remediation of offsite
31 contamination at significant threat sites
32 as provided for in section 27-1411 of the
33 environmental conservation law, including
34 costs incidental and appurtenant thereto .... 91,000,000
35 --------------
36 Available for maintenance undistributed ..... 97,643,995
37 --------------
38 Total of schedule ........................ 120,000,000
39 ==============
40 Capital Projects Funds - Other
41 Hazardous Waste Remedial Fund
42 Hazardous Waste Remediation Oversight and Assistance Account
43 Hazardous Waste Purpose
44 The appropriation made by chapter 54, section 1, of the laws of 2017, is
45 hereby amended and reappropriated to read:
46 For the personal services and fringe benefits of the department of
47 environmental conservation including suballocation to the department
243 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of health related to the brownfield cleanup program pursuant to
2 title 14 of article 27 of the environmental conservation law and the
3 voluntary cleanup program including costs incurred prior to April 1,
4 [2016] 2017 (09BC17F7) ... 6,000,000 .............. (re. $5,063,000)
5 By chapter 55, section 1, of the laws of 2016:
6 For the personal services and fringe benefits of the department of
7 environmental conservation including suballocation to the department
8 of health related to the brownfield cleanup program pursuant to
9 title 14 of article 27 of the environmental conservation law and the
10 voluntary cleanup program including costs incurred prior to April 1,
11 2016 (09BC16F7) ... 6,000,000 ....................... (re. $664,000)
12 By chapter 54, section 1, of the laws of 2015:
13 For the personal services and fringe benefits of the department of
14 environmental conservation including suballocation to the department
15 of health related to the brownfield cleanup program pursuant to
16 title 14 of article 27 of the environmental conservation law and the
17 voluntary cleanup program including costs incurred prior to April 1,
18 2015 (09BC15F7) ... 6,000,000 ....................... (re. $630,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For the personal services and fringe benefits of the department of
21 environmental conservation including suballocation to the department
22 of health related to the brownfield cleanup program pursuant to
23 title 14 of article 27 of the environmental conservation law and the
24 voluntary cleanup program including costs incurred prior to April 1,
25 2014 (09BC14F7) ... 6,000,000 ....................... (re. $439,000)
26 By chapter 54, section 1, of the laws of 2013:
27 For the personal services and fringe benefits of the department of
28 environmental conservation including suballocation to the department
29 of health related to the brownfield cleanup program pursuant to
30 title 14 of article 27 of the environmental conservation law and the
31 voluntary cleanup program including costs incurred prior to April 1,
32 2013 (09BC13F7) ... 6,000,000 ....................... (re. $629,000)
33 By chapter 54, section 1, of the laws of 2012:
34 For the personal services and fringe benefits of the department of
35 environmental conservation including suballocation to the department
36 of health related to the brownfield cleanup program pursuant to
37 title 14 of article 27 of the environmental conservation law and the
38 voluntary cleanup program including costs incurred prior to April 1,
39 2012 (09BC12F7) ... 10,000,000 .................... (re. $4,405,000)
40 By chapter 54, section 1, of the laws of 2011:
41 For the personal services and fringe benefits of the department of
42 environmental conservation including suballocation to the department
43 of health related to the brownfield cleanup program pursuant to
44 title 14 of article 27 of the environmental conservation law and the
45 voluntary cleanup program including costs incurred prior to April 1,
46 2011 (09BC11F7) ... 10,000,000 .................... (re. $5,564,000)
244 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2010:
2 For the following purposes: non-bondable services and expenses associ-
3 ated with the brownfield cleanup and hazardous waste remediation
4 projects; and, suballocation to other state departments and agen-
5 cies; and for other brownfield site cleanup hazardous waste purposes
6 (09TG10F7) ... 2,250,000 .......................... (re. $2,250,000)
7 For the personal services and fringe benefits of the department of
8 environmental conservation including suballocation to the department
9 of health related to the brownfield cleanup program pursuant to
10 title 14 of article 27 of the environmental conservation law and the
11 voluntary cleanup program including costs incurred prior to April 1,
12 2010 (09BC10F7) ... 10,000,000 .................... (re. $5,414,000)
13 By chapter 55, section 1, of the laws of 2009:
14 For the following purposes: non-bondable services and expenses associ-
15 ated with the brownfield cleanup and hazardous waste remediation
16 projects; and, suballocation to other state departments and agen-
17 cies; and for other brownfield site cleanup hazardous waste purposes
18 (09TG09F7) ... 2,250,000 .......................... (re. $2,250,000)
19 For the personal services and fringe benefits of the department of
20 environmental conservation including suballocation to the department
21 of health related to the brownfield cleanup program pursuant to
22 title 14 of article 27 of the environmental conservation law and the
23 voluntary cleanup program including costs incurred prior to April 1,
24 2009 (09BC09F7) ... 10,000,000 .................... (re. $3,462,000)
25 By chapter 55, section 1, of the laws of 2008:
26 For the following purposes: non-bondable services and expenses associ-
27 ated with the brownfield cleanup and hazardous waste remediation
28 projects; and, suballocation to other state departments and agen-
29 cies; and for other brownfield site cleanup hazardous waste purposes
30 (09TG08F7) ... 2,250,000 .......................... (re. $2,250,000)
31 For the following purposes: non-bondable services and expenses associ-
32 ated with the brownfield cleanup and hazardous waste remediation
33 projects; grants authorized pursuant to section 970-r of the general
34 municipal law; and, suballocation to other state departments and
35 agencies; and for other brownfield site cleanup hazardous waste
36 purposes (09BA08F7) ... 2,750,000 ................. (re. $1,862,000)
37 For the personal services and fringe benefits of the department of
38 environmental conservation including suballocation to the department
39 of health related to the brownfield cleanup program pursuant to
40 title 14 of article 27 of the environmental conservation law and the
41 voluntary cleanup program including costs incurred prior to April 1,
42 2008 (09BC08F7) ... 10,275,000 .................... (re. $2,022,000)
43 By chapter 55, section 1, of the laws of 2007:
44 For the following purposes: non-bondable services and expenses associ-
45 ated with the brownfield cleanup and hazardous waste remediation
46 projects; and, suballocation to other state departments and agen-
47 cies; and for other brownfield site cleanup hazardous waste purposes
48 (09TG07F7) ... 2,250,000 ............................ (re. $711,000)
245 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the following purposes: non-bondable services and expenses associ-
2 ated with the brownfield cleanup and hazardous waste remediation
3 projects; grants authorized pursuant to section 970-r of the general
4 municipal law; and, suballocation to other state departments and
5 agencies; and for other brownfield site cleanup hazardous waste
6 purposes (09BA07F7) ... 12,750,000 .................. (re. $938,000)
7 For the personal services and fringe benefits of the department of
8 environmental conservation including suballocation to the department
9 of health related to the brownfield cleanup program pursuant to
10 title 14 of article 27 of the environmental conservation law and the
11 voluntary cleanup program including costs incurred prior to April 1,
12 2007 (09BC07F7) ... 9,375,000 ..................... (re. $3,417,000)
13 By chapter 55, section 1, of the laws of 2006:
14 For the following purposes pursuant to a memorandum of understanding
15 to be executed by the governor, the temporary president of the
16 senate and the speaker of the assembly: non-bondable services and
17 expenses associated with the brownfield cleanup and hazardous waste
18 remediation projects; grants authorized pursuant to section 970-r of
19 the general municipal law; technical assistance grants pursuant to
20 titles 13 and 14 of article 27 of the environmental conservation
21 law; services and expenses associated with negotiating and oversee-
22 ing implementation of brownfield site cleanup agreements in accord-
23 ance with title 14 of article 27 of the environmental conservation
24 law; including personal services and fringe benefits of the depart-
25 ment of environmental conservation including costs incidental and
26 appurtenant thereto including suballocation to other state depart-
27 ments and agencies; and for other brownfield site cleanup hazardous
28 waste purposes (09HT06F7) ... 15,000,000 ......... (re. $15,000,000)
29 For the personal services and fringe benefits of the department of
30 environmental conservation including suballocation to the department
31 of health related to the brownfield cleanup program pursuant to
32 title 14 of article 27 of the environmental conservation law and the
33 voluntary cleanup program including costs incurred prior to April 1,
34 2006 (09BC06F7) ... 7,375,000 ....................... (re. $702,000)
35 By chapter 55, section 1, of the laws of 2005:
36 For the following purposes pursuant to a memorandum of understanding
37 to be executed by the governor, the temporary president of the
38 senate and the speaker of the assembly: non-bondable services and
39 expenses associated with the brownfield cleanup and hazardous waste
40 remediation projects; grants authorized pursuant to section 970-r of
41 the general municipal law; technical assistance grants pursuant to
42 titles 13 and 14 of article 27 of the environmental conservation
43 law; services and expenses associated with negotiating and oversee-
44 ing implementation of brownfield site cleanup agreements in accord-
45 ance with title 14 of article 27 of the environmental conservation
46 law; including personal services and related fringe benefits of the
47 department of environmental conservation including costs incidental
48 and appurtenant thereto including suballocation to other state
49 departments and agencies; and for other brownfield site cleanup
246 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 hazardous waste purposes (09HT05F7) ................................
2 15,000,000 ....................................... (re. $15,000,000)
3 For the personal services and related fringe benefits of the depart-
4 ment of environmental conservation including suballocation to the
5 department of health related to the brownfield cleanup program
6 pursuant to title 14 of article 27 of the environmental conservation
7 law and the voluntary cleanup program including costs incurred prior
8 to April 1, 2005 (09BC05F7) ... 14,217,000 ........ (re. $1,762,000)
9 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
10 section 1, of the laws of 2009:
11 For the following purposes pursuant to a memorandum of understanding
12 to be executed by the governor, the temporary president of the
13 senate and the speaker of the assembly: non-bondable services and
14 expenses associated with the brownfield cleanup and hazardous waste
15 remediation projects; grants authorized pursuant to section 970-r of
16 the general municipal law; technical assistance grants pursuant to
17 titles 13 and 14 of article 27 of the environmental conservation
18 law; services and expenses associated with negotiating and oversee-
19 ing implementation of brownfield site cleanup agreements in accord-
20 ance with title 14 of article 27 of the environmental conservation
21 law; including personal services and related fringe benefits of the
22 department of environmental conservation including costs incidental
23 and appurtenant thereto including suballocation to other state
24 departments and agencies; and for other brownfield site cleanup
25 hazardous waste purposes (09HT04F7) ................................
26 15,000,000 ........................................ (re. $6,340,000)
27 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
28 section 1, of the laws of 2009:
29 For the following purposes pursuant to a Memorandum of Understanding
30 to be executed by the Governor, the temporary president of the
31 Senate and the speaker of the Assembly: non-bondable services and
32 expenses associated with brownfield clean up and hazardous waste
33 remediation projects; grants authorized pursuant to section 970-r of
34 the general municipal law; technical assistance grants pursuant to
35 titles 13 and 14 of article 27 of the environmental conservation
36 law; services and expenses associated with negotiating and oversee-
37 ing implementation of brownfield site cleanup agreements in accord-
38 ance with title 14 of article 27 of the environmental conservation
39 law; including personal services and related fringe benefits of the
40 department of environmental conservation including costs incidental
41 and appurtenant thereto including suballocation to other state
42 departments and agencies; and for other brownfield site cleanup
43 hazardous waste purposes (09HT03F7) ................................
44 15,000,000 ........................................ (re. $8,371,000)
45 Capital Projects Funds - Other
46 Hazardous Waste Remedial Fund
47 Hazardous Waste Remediation Site Investigation and Construction
48 Account
49 Hazardous Waste Purpose
247 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2016:
2 For services and expenses related to Hazardous Waste Program, includ-
3 ing personal service, fringe benefits and non-bondable services and
4 expenses related to hazardous waste remediation projects (09IN16F7)
5 ... 2,000,000 ..................................... (re. $2,000,000)
6 SOLID AND HAZARDOUS WASTE MANAGEMENT - EQBA 86 (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Hazardous Waste Purpose
10 By chapter 55, section 1, of the laws of 1999:
11 For payment of the state's share of the costs of hazardous waste site
12 remediation projects, in accordance with the provisions of title 3
13 of article 52 of the environmental conservation law, for projects,
14 including costs incidental and appurtenant thereto, and for payment
15 of reimbursements to the hazardous waste remedial fund for services
16 and expenses of the departments of environmental conservation, law
17 and health, including fringe benefits (09HW99F7) ...................
18 37,625,000 .......................................... (re. $579,000)
19 By chapter 55, section 1, of the laws of 1997:
20 For payment of the state's share of the costs of hazardous waste site
21 remediation projects, in accordance with the provisions of title 3
22 of article 52 of the environmental conservation law, for projects,
23 including costs incidental and appurtenant thereto (09HW97F7)
24 ... ..... 30,000,000 .............................. (re. $501,000)
25 By chapter 55, section 1, of the laws of 1996:
26 For payment of the state's share of the costs of hazardous waste site
27 remediation projects, in accordance with the provisions of title 3
28 of article 52 of the environmental conservation law, for projects,
29 including costs incidental and appurtenant thereto (09HW96F7)
30 ... ..... 32,800,000 .............................. (re. $228,000)
31 By chapter 54, section 1, of the laws of 1995:
32 For payment of the state's share of the costs of hazardous waste site
33 remediation projects, in accordance with the provisions of title 3
34 of article 52 of the environmental conservation law, for projects,
35 including costs incidental and appurtenant thereto (09HW95F7)
36 ... ..... 66,000,000 ............................ (re. $1,642,000)
37 By chapter 54, section 1, of the laws of 1994:
38 For payment of the state's share of the costs of hazardous waste site
39 remediation projects, in accordance with the provisions of title 3
40 of article 52 of the environmental conservation law, for projects,
41 including costs incidental and appurtenant thereto (09HW94F7)
42 ... ..... 150,000,000 .......................... (re. $11,785,000)
43 By chapter 54, section 1, of the laws of 1993:
248 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the state's share of the costs of hazardous waste site
2 remediation projects, in accordance with the provisions of title 3
3 of article 52 of the environmental conservation law, for projects,
4 including costs incidental and appurtenant thereto (09HW93F7)
5 ... ..... 140,000,000 ........................... (re. $9,501,000)
6 By chapter 54, section 1, of the laws of 1992:
7 For payment of the state's share of the costs of hazardous waste site
8 remediation projects, in accordance with the provisions of title 3
9 of article 52 of the environmental conservation law, for projects,
10 including costs incidental and appurtenant thereto (09HW92F7)
11 ... ..... 204,000,000 ........................... (re. $4,298,000)
12 By chapter 54, section 1, of the laws of 1991, as amended by chapter 54,
13 section 3, of the laws of 1992:
14 For payment of the state's share of the costs of hazardous waste site
15 remediation projects, in accordance with the provisions of title 3
16 of article 52 of the environmental conservation law, for projects,
17 including costs incidental and appurtenant thereto (091691F7)
18 ... ..... 110,000,000 ........................... (re. $5,050,000)
19 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
20 section 3, of the laws of 1991:
21 For payment of the state share of the costs of hazardous waste site
22 remediation projects, in accordance with the provisions of title 3
23 of article 52 of the environmental conservation law, for projects,
24 including costs incidental and appurtenant thereto (095390F7)
25 ... ..... 173,575,000 .......................... (re. $10,170,000)
26 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
27 section 3, of the laws of 1990:
28 For payment of the state share of the costs of hazardous waste site
29 remediation projects, in accordance with the provisions of title 3
30 of article 52 of the environmental conservation law, for projects,
31 including costs incidental and appurtenant thereto (095489F7)
32 ... ..... 26,000,000 ............................ (re. $1,960,000)
33 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
34 section 3, of the laws of 1990:
35 For payment of the state share of the costs of hazardous waste site
36 remediation projects, in accordance with the provisions of title
37 three of article fifty-two of the environmental conservation law,
38 for projects, including the transfer of obligations from capital
39 projects appropriations funded from the hazardous waste remedial
40 fund - 312 and including costs incidental and appurtenant thereto,
41 (095887F7) ... ..... 100,000,000 ................ (re. $1,499,000)
42 Capital Projects Funds - Other
43 Capital Projects Fund
44 Solid Waste Management Purpose
45 By chapter 55, section 1, of the laws of 2010:
249 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the state share of the costs of municipal landfill
2 closure projects, in accordance with the provisions of article 52
3 and title 5 of article 54 of the environmental conservation law, for
4 projects, including costs incidental and appurtenant thereto and the
5 payment of liabilities incurred prior to April 1, 2010 (09571056)
6 ... 342,000 ......................................... (re. $342,000)
7 By chapter 54, section 1, of the laws of 1991:
8 For payment of the state's share of the costs of municipal landfill
9 closure projects, in accordance with the provisions of article 52
10 and title 5 of article 54 of the environmental conservation law, for
11 projects, including costs incidental and appurtenant thereto
12 (09279156) ... ..... 50,000,000 ................... (re. $188,000)
13 SOLID WASTE - CLEAN WATER/CLEAN AIR (CCP)
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Solid Waste Management Purpose
17 By chapter 54, section 1, of the laws of 2001:
18 For state assistance payments for the state share of the costs of
19 solid waste projects in accordance with the provisions of title 4 of
20 article 56 of the environmental conservation law for project costs,
21 including costs incidental and appurtenant thereto and for payment
22 of reimbursements to the clean water/clean air implementation fund
23 for services and expenses of state departments and agencies, includ-
24 ing fringe benefits, hereinafter referred to as "Solid Waste Project
25 Disbursements". The moneys appropriated herein may be suballocated
26 to other state departments and agencies.
27 Notwithstanding the provisions of any general or special law, the
28 moneys hereby appropriated shall be available for solid waste
29 projects in accordance with title 4 of article 56 of the environ-
30 mental conservation law upon the issuance of a certificate of
31 approval of availability by the director of the division of the
32 budget.
33 The state comptroller shall at the commencement of each month certify
34 to the director of the division of the budget, the commissioner of
35 environmental conservation, the chairman of the senate finance
36 committee, and the chairman of the assembly ways and means committee
37 the amounts disbursed from this appropriation for "Solid Waste
38 Project Disbursements" for the month preceding such certification
39 (09BA0156) ... 45,000,000 ........................... (re. $200,000)
40 Project Schedule
41 PROJECT AMOUNT
42 --------------------------------------------
43 (thousands of dollars)
44 Fresh Kills landfill closure
45 project ........................... 30,000
46 Municipal landfill projects .......... 2,000
47 Municipal recycling projects ........ 13,000
250 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 --------------
2 Total ............................. 45,000
3 ==============
4 By chapter 55, section 1, of the laws of 2000:
5 For state assistance payments for the state share of the costs of
6 solid waste projects in accordance with the provisions of title 4 of
7 article 56 of the environmental conservation law for project costs,
8 including costs incidental and appurtenant thereto and for payment
9 of reimbursements to the clean water/clean air implementation fund
10 for services and expenses of state departments and agencies, includ-
11 ing fringe benefits, hereinafter referred to as "Solid Waste Project
12 Disbursements". The moneys appropriated herein may be suballocated
13 to other state departments and agencies.
14 Notwithstanding the provisions of any general or special law, the
15 moneys hereby appropriated shall be available for solid waste
16 projects in accordance with title 4 of article 56 of the environ-
17 mental conservation law upon the issuance of a certificate of
18 approval of availability by the director of the division of the
19 budget.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the division of the budget, the commissioner of
22 environmental conservation, the chairman of the senate finance
23 committee, and the chairman of the assembly ways and means committee
24 the amounts disbursed from this appropriation for "Solid Waste
25 Project Disbursements" for the month preceding such certification
26 (09BA0056) ... 16,500,000 ........................... (re. $130,000)
27 Project Schedule
28 PROJECT AMOUNT
29 --------------------------------------------
30 (thousands of dollars)
31 Fresh Kills landfill closure
32 project ........................... 10,000
33 Municipal landfill projects .......... 1,500
34 Municipal recycling projects ......... 5,000
35 --------------
36 Total ............................. 16,500
37 ==============
38 By chapter 55, section 1, of the laws of 1998:
39 For state assistance payments for the state share of the costs of
40 solid waste projects in accordance with the provisions of title 4 of
41 article 56 of the environmental conservation law for project costs,
42 including costs incidental and appurtenant thereto and for payment
43 of reimbursements to the clean water/clean air implementation fund
44 for services and expenses of state departments and agencies, includ-
45 ing fringe benefits, hereinafter referred to as "Solid Waste Project
46 Disbursements". The moneys appropriated herein may be suballocated
47 to other state departments and agencies.
48 Notwithstanding the provisions of any general or special law, the
49 moneys hereby appropriated shall be available for solid waste
251 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects in accordance with title 4 of article 56 of the environ-
2 mental conservation law upon the issuance of a certificate of
3 approval of availability by the director of the division of the
4 budget.
5 The state comptroller shall at the commencement of each month certify
6 to the director of the division of the budget, the commissioner of
7 environmental conservation, the chairman of the senate finance
8 committee, and the chairman of the assembly ways and means committee
9 the amounts disbursed from this appropriation for "Solid Waste
10 Project Disbursements" for the month preceding such certification
11 (09BA9856) ... 25,000,000 ............................ (re. $35,000)
12 project schedule
13 PROJECT AMOUNT
14 --------------------------------------------
15 (thousands of dollars)
16 Fresh Kills landfill closure
17 project ........................... 15,000
18 Municipal landfill projects .......... 5,000
19 Municipal recycling projects ......... 5,000
20 --------------
21 Total ............................. 25,000
22 ==============
23 By chapter 413, section 28, of the laws of 1996, as amended by chapter
24 55, section 1, of the laws of 1997:
25 For state assistance payments for the state share of the costs of
26 solid waste projects in accordance with the provisions of title 4 of
27 article 56 of the environmental conservation law for project costs,
28 including costs incidental and appurtenant thereto and for payment
29 of reimbursements to the clean water/clean air implementation fund
30 for services and expenses of state departments and agencies, includ-
31 ing fringe benefits, hereinafter referred to as "Solid Waste Project
32 Disbursements". The moneys appropriated herein may be suballocated
33 to other state departments and agencies.
34 Notwithstanding the provisions of any general or special law, moneys
35 hereby appropriated shall be available for solid waste projects in
36 accordance with title 4 of article 56 of the environmental conserva-
37 tion law upon the issuance of a certificate of approval of avail-
38 ability by the director of the division of the budget.
39 The state comptroller at the commencement of each month shall certify
40 to the director of the division of the budget, the commissioner of
41 environmental conservation, the chairman of the senate finance
42 committee, and the chairman of the assembly ways and means committee
43 the amounts disbursed from this appropriation for "Solid Waste
44 Project Disbursements" for the month preceding such certification
45 (09BA9656) ... 35,000,000 ........................... (re. $446,000)
46 SOLID WASTE MANAGEMENT (CCP)
47 Capital Projects Funds - Other
48 Capital Projects Fund
252 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Solid Waste Purpose
2 By chapter 54, section 1, of the laws of 2017:
3 For pre-closure and post-closure costs associated with Adirondack
4 landfills pursuant to agreements with Essex county (09EX1756) ......
5 500,000 ............................................. (re. $500,000)
6 By chapter 55, section 1, of the laws of 2016:
7 For pre-closure and post-closure costs associated with Adirondack
8 landfills pursuant to agreements with Essex county (09EX1656) ......
9 500,000 ............................................. (re. $500,000)
10 By chapter 55, section 1, of the laws of 2010:
11 For post-closure costs associated with the state-owned Rush Landfill
12 including suballocation to other state departments and agencies
13 (09RL1056) ... 50,000 ................................ (re. $50,000)
14 By chapter 55, section 1, of the laws of 2009:
15 For post-closure costs associated with the state-owned Rush Landfill
16 including suballocation to other state departments and agencies
17 (09RL0956) ... 50,000 ................................ (re. $50,000)
18 By chapter 55, section 1, of the laws of 2008:
19 For post-closure costs associated with the state-owned Rush Landfill
20 including suballocation to other state departments and agencies
21 (09RL0856) ... 50,000 ................................. (re. $4,000)
22 By chapter 55, section 1, of the laws of 2007:
23 For pre-closure and post-closure costs associated with Adirondack
24 landfills pursuant to agreements with Essex county (09EX0756) ......
25 400,000 ............................................. (re. $235,000)
26 For post-closure costs associated with the state-owned Rush Landfill
27 including suballocation to other state departments and agencies
28 (09RL0756) ... 350,000 .............................. (re. $350,000)
29 By chapter 55, section 1, of the laws of 2006:
30 For pre-closure and post-closure costs associated with Adirondack
31 landfills pursuant to agreements with Essex county (09EX0656) ......
32 495,000 .............................................. (re. $63,000)
33 For post-closure costs associated with the state-owned Rush Landfill
34 including suballocation to other state departments and agencies
35 (09RL0656) ... 450,000 ............................... (re. $68,000)
36 Capital Projects Funds - Other
37 Miscellaneous Capital Projects Fund
38 New York Environmental Protection and Spill Remediation Account
39 Solid Waste Management Purposes
40 By chapter 54, section 1, of the laws of 2017:
41 For services and capital expenses associated with costs incurred under
42 Article 12 of the Navigation Law, and for cleanup, investigation,
253 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and removal of petroleum spills, including prior year liabilities
2 (09OS1756) ... 21,200,000 ........................ (re. $18,763,000)
3 Capital Projects Funds - Federal
4 Federal Capital Projects Fund
5 Hazardous Waste Purpose
6 By chapter 55, section 1, of the laws of 2016:
7 For the federal share of the cleanup of hazardous waste sites pursuant
8 to the provision of the federal comprehensive environmental
9 response, compensation and liability act of 1980 reauthorization or
10 amendments thereto including suballocation to other state depart-
11 ments and agencies (09FS16F7) ... 30,000,000 ..... (re. $30,000,000)
12 By chapter 55, section 1, of the laws of 2004:
13 For the federal share of the cleanup of hazardous waste sites pursuant
14 to the provision of the federal comprehensive environmental
15 response, compensation and liability act of 1980 reauthorization or
16 amendments thereto including suballocation to other state depart-
17 ments and agencies (09FS04F7) ... 10,000,000 ...... (re. $8,239,000)
18 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
19 section 1, of the laws of 2005:
20 For the federal share of the cleanup of hazardous waste sites pursuant
21 to the provisions of the federal comprehensive environmental
22 response, compensation and liability act of 1980 reauthorization or
23 amendments thereto including suballocation to other state depart-
24 ments and agencies (09FS99F7) ... 30,082,000 ...... (re. $2,903,000)
25 By chapter 54, section 1, of the laws of 1986, as amended by chapter 55,
26 section 1, of the laws of 1997:
27 For the federal share of the cleanup of hazardous waste sites pursuant
28 to the provisions of the federal comprehensive environmental
29 response, compensation and liability act of 1980 reauthorization or
30 amendments thereto including suballocation to the department of
31 health (090486F7) ... 55,000,000 .................. (re. $3,609,000)
32 By chapter 54, section 1, of the laws of 1983, as amended by chapter 55,
33 section 1, of the laws of 1997:
34 For the federal share of the clean up of hazardous waste sites pursu-
35 ant to the provisions of the federal comprehensive environmental
36 response, compensation and liability act of 1980 reauthorization or
37 amendments thereto including suballocation to the department of
38 health (028789F7) ................................. (re. $2,128,000)
39 SOLID WASTE MANAGEMENT - EQBA (CCP)
40 Capital Projects Funds - Other
41 Capital Projects Fund
42 Solid Waste Management Purpose
254 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Municipal Solid Waste Management Projects
2 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
3 section 1, of the laws of 2002:
4 For the state share of the costs of municipal solid waste management
5 projects, including the payment of liabilities incurred prior to
6 April 1, 1989, in accordance with the following schedule and with
7 the provisions of title 9 of article 51 of the environmental conser-
8 vation law, including costs incidental and appurtenant thereto,
9 hereinafter referred to as "Municipal Solid Waste Management
10 Disbursements."
11 Notwithstanding the provisions of any general or special law, the
12 moneys hereby appropriated shall be available for municipal solid
13 waste management expenditures approved for municipal solid waste
14 management projects in accordance with section 51-0905 of the envi-
15 ronmental conservation law upon the issuance of a certificate of
16 approval of availability by the director of the division of the
17 budget. The state comptroller shall at the commencement of each
18 month certify to the director of the division of the budget, the
19 commissioner of environmental conservation, the chairman of the
20 senate finance committee and the chairman of the assembly ways and
21 means committee the amounts expended from this appropriation for
22 "Municipal Solid Waste Management Disbursements" for each approved
23 project for the month preceding such certification (09A58956) ......
24 6,250,000 ........................................... (re. $113,000)
25 project schedule
26 ESTIMATED
27 STATE
28 PROJECT SHARE
29 --------------------------------------------
30 (thousands of dollars)
31 Brookhaven. Notwithstanding
32 the provisions of any gener-
33 al or special law, the
34 amounts hereby appropriated,
35 in whole or in part, for
36 municipal solid waste
37 management projects may be
38 used by the Town of Brookha-
39 ven, for the purpose of
40 providing recycling, materi-
41 als recovery, and solid
42 waste management services
43 within Suffolk and Nassau
44 counties. In addition to
45 other purposes allowed by
46 law, such funds may be used
47 for the purpose of acquiring
48 land and making improvements
49 thereon; for the purpose of
50 constructing new structures
255 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 or purchasing existing
2 structures and making
3 improvements thereon; and
4 for the purchase of resource
5 recovery equipment and
6 source separation equipment
7 as such terms are defined in
8 section 51-0903 of the envi-
9 ronmental conservation
10 law. Notwithstanding the
11 provisions of subdivision 1
12 of section 51-0905 of the
13 environmental conservation
14 law, this project for the
15 Town of Brookhaven is hereby
16 deemed to be eligible for a
17 payment of the funds herein
18 appropriated for eligible
19 project costs ...................... 6,250
20 --------------
21 Total ............................ 6,250
22 ==============
23 The appropriation made by chapter 54, section 1, of the laws of 1985, as
24 amended by chapter 54, section 1, of the laws of 2002, is hereby
25 amended and reappropriated to read:
26 For the state share of the cost of municipal solid waste management
27 projects, including the payment of liabilities incurred prior to
28 April one, nineteen hundred eighty-five, in accordance with the
29 following schedule and with the provisions of title nine of article
30 fifty-one of the environmental conservation law, including costs
31 incidental and appurtenant thereto, hereinafter referred to as
32 "Municipal Solid Waste Management Disbursements."
33 Notwithstanding the provisions of any general or special law, the
34 moneys hereby appropriated shall be available for municipal solid
35 waste management expenditures approved for municipal solid waste
36 management projects in accordance with section 51-0905 of the envi-
37 ronmental conservation law upon the issuance of a certificate of
38 approval of availability by the director of the division of the
39 budget.
40 The state comptroller shall at the commencement of each month certify
41 to the director of the division of the budget, the commissioner of
42 environmental conservation, the chairman of the senate finance
43 committee and the chairman of the assembly ways and means committee
44 the amounts expended from this appropriation for "Municipal Solid
45 Waste Management Disbursements" for each approved project for the
46 month preceding such certification (09108556) ......................
47 [7,812,000] 7,687,000 ................................ (re. $32,000)
48 project schedule
49 ESTIMATED
256 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 STATE
2 PROJECT SHARE
3 --------------------------------------------
4 (thousands)
5 St. Lawrence .......................... $750
6 Broome ............................... 5,562
7 Oneida ............................... 1,000
8 Source separation and recycl-
9 ing projects, Nassau and
10 Suffolk counties ..................... 500
11 --------------
12 Total ............................. $7,812
13 ==============
14 By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
15 section 3, of the laws of 1990, and as adjusted by certificate of
16 transfer issued pursuant to the provisions of section 93 of the
17 state finance law as amended, for:
18 The state share of the cost of municipal solid waste management
19 projects, including the payment of liabilities incurred prior to
20 April 1, 1975 (00320856) ... ... 40,285,000 ..... (re. $3,361,000)
21 By chapter 673, section 6, of the laws of 1973, as amended by chapter
22 54, section 1, of the laws of 2002:
23 The state share of the cost of municipal solid waste management
24 projects in accordance with the following schedule and the
25 provisions of title nine of article fifty-one of the environmental
26 conservation law, including costs incidental and appurtenant there-
27 to, hereinafter referred to as "Municipal Solid Waste Management
28 Disbursements."
29 Notwithstanding the provisions of any general or special law, the
30 moneys hereby appropriated shall be available for municipal solid
31 waste management disbursements approved for municipal solid waste
32 management projects in accordance with the following schedule as
33 provided by section 51-0905 of the environmental conservation law
34 upon the issuance of a certificate of approval of availability by
35 the director of the division of the budget. A copy of such certif-
36 icate shall be filed with the state comptroller, the chairman of the
37 senate finance committee and the chairman of the assembly ways and
38 means committee. Such certificate may be amended from time to time
39 subject to the approval of the director of the division of the budg-
40 et and a copy of each such amendment shall be filed with the state
41 comptroller, the chairman of the senate finance committee, and the
42 chairman of the assembly ways and means committee.
43 The state comptroller shall at the commencement of each month certify
44 to the director of the division of the budget, the commissioner of
45 environmental conservation, the chairman of the senate finance
46 committee, and the chairman of the assembly ways and means committee
47 the amounts disbursed from this appropriation for Municipal Solid
48 Waste Management Disbursements for the month preceding such certif-
49 ication. The moneys hereby appropriated, when made available pursu-
50 ant to a certificate of approval of availability issued by the
257 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 director of the division of the budget, shall be paid from the capi-
2 tal construction fund on the audit and warrant of the state comp-
3 troller on vouchers approved by the commissioner of environmental
4 conservation (00319256) ... 38,339,000 .............. (re. $725,000)
5 project schedule
6 ESTIMATED
7 ELIGIBLE ESTIMATED
8 PROJECT STATE
9 PROJECT COST SHARE
10 -----------------------------------------------------------------------
11 Resource Recovery Projects (thousands)
12 New York City ................................... $38,000 $14,000
13 (Notwithstanding the provisions of any
14 general or special law, the amounts
15 hereby appropriated for resource recov-
16 ery projects within the city of New
17 York, shall be used by such city for the
18 purpose of implementing a local law or
19 ordinance governing the source sepa-
20 ration and segregation of recyclable or
21 reusable materials, pursuant to section
22 120-aa of the general municipal law. In
23 addition to other purposes allowed by
24 law, such funds may be used for the
25 purpose of acquiring land and making
26 improvements thereon; for the purpose of
27 constructing new structures or purchas-
28 ing existing structures and making
29 improvements thereon; and, for the
30 purchase of resource recovery equipment,
31 and source separation equipment, as such
32 terms are defined in section 51-0903 of
33 the environmental conservation law,
34 provided that such purposes are neces-
35 sary to the implementation of the local
36 law or ordinance required pursuant to
37 section 120-aa of the general municipal
38 law.)
39 Town of Smithtown ............................... 2,600 1,300
40 (Notwithstanding the provisions of article
41 fifty-one of the environmental conserva-
42 tion law, any rules and regulations and
43 any general or special law, this project
44 for the Town of Smithtown is hereby
45 deemed to be eligible for a State grant
46 of fifty percent of the eligible project
47 cost)
48 Chemung County .................................. 1,008 556
49 Monroe County ................................... 18,000 9,000
50 Onondaga County ................................. 1,000 295
258 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Westchester County .............................. 12,000 6,000
2 Various Solid Waste Disposal Projects statewide . 14,000 3,500
3 Solid Waste Management Projects
4 Town of North Hempstead ......................... 8,000 3,688
5 -------
6 (Notwithstanding any other section of law,
7 rule, or regulation, any reimbursement
8 for project costs pursuant to this reap-
9 propriation shall be eligible for up to
10 fifty percent of the total cost of the
11 project)
12 Total ....................................... $38,339
13 ========
14 WATER RESOURCES (CCP)
15 Capital Projects Funds - Other
16 Capital Projects Fund
17 Flood Control Purpose
18 By chapter 54, section 1, of the laws of 2017:
19 For various new and existing flood protection projects including the
20 state share of federal sponsored flood control projects, and the
21 maintenance of existing flood control projects; for coastal erosion
22 hazard area mapping of the state's Atlantic Ocean and Great Lakes
23 coastlines and the state share of costs associated with matching
24 federal funds for a state- wide flood plain map modernization
25 program; for the state share of costs associated with the installa-
26 tion and/or reinstallation, upgrade, monitoring and maintenance of a
27 statewide network of stream flow gauges, including personal service,
28 non-personal service, fringe benefits and indirect costs, including
29 suballocation to other state departments and agencies (09FL1763) ...
30 2,000,000 ......................................... (re. $2,000,000)
31 For an advance payment by the state for the local costs of various
32 shore protection projects. No portion of this appropriation shall be
33 available until the respective municipality has entered into an
34 agreement with the commissioner of the department of environmental
35 conservation, and such agreement is approved by the director of the
36 budget (09AD1763) ... 3,000,000 ................... (re. $3,000,000)
37 By chapter 55, section 1, of the laws of 2016:
38 For various new and existing flood protection projects including the
39 state share of federal sponsored flood control projects, and the
40 maintenance of existing flood control projects; for coastal erosion
41 hazard area mapping of the state's Atlantic Ocean and Great Lakes
42 coastlines and the state share of costs associated with matching
43 federal funds for a statewide flood plain map modernization program;
44 for the state share of costs associated with the installation and/or
45 reinstallation, upgrade, monitoring and maintenance of a statewide
46 network of stream flow gauges, including personal service, non-per-
47 sonal service, fringe benefits and indirect costs, including subal-
259 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 location to other state departments and agencies (09FL1663) ........
2 2,250,000 ......................................... (re. $2,250,000)
3 For an advance payment by the state for the local costs of various
4 shore protection projects. No portion of this appropriation shall be
5 available until the respective municipality has entered into an
6 agreement with the commissioner of the department of environmental
7 conservation, and such agreement is approved by the director of the
8 budget (09AD1663) ... 3,000,000 ................... (re. $3,000,000)
9 By chapter 54, section 1, of the laws of 2015:
10 For an advance payment by the state for the local costs of various
11 shore protection projects. No portion of this appropriation shall be
12 available until the respective municipality has entered into an
13 agreement with the commissioner of the department of environmental
14 conservation, and such agreement is approved by the director of the
15 budget (09AD1563) ... 3,000,000 ................... (re. $3,000,000)
16 By chapter 54, section 1, of the laws of 2014:
17 For various new and existing flood protection projects including the
18 state share of federal sponsored flood control projects, and the
19 maintenance of existing flood control projects; for coastal erosion
20 hazard area mapping of the state's Atlantic Ocean and Great Lakes
21 coastlines and the state share of costs associated with matching
22 federal funds for a statewide flood plain map modernization program;
23 for the state share of costs associated with the installation and/or
24 reinstallation, upgrade, monitoring and maintenance of a statewide
25 network of stream flow gauges, including personal service, nonper-
26 sonal service, fringe benefits and indirect costs, including subal-
27 location to other state departments and agencies (09FL1463) ........
28 1,000,000 ........................................... (re. $675,000)
29 By chapter 54, section 1, of the laws of 2013:
30 For various new and existing flood protection projects including the
31 state share of federal sponsored flood control projects, and the
32 maintenance of existing flood control projects; for coastal erosion
33 hazard area mapping of the state's Atlantic Ocean and Great Lakes
34 coastlines and the state share of costs associated with matching
35 federal funds for a statewide flood plain map modernization program;
36 for the state share of costs associated with the installation and/or
37 reinstallation, upgrade, monitoring and maintenance of a statewide
38 network of stream flow gauges, including personal service, nonper-
39 sonal service, fringe benefits and indirect costs, including subal-
40 location to other state departments and agencies (09FL1363) ........
41 500,000 ............................................. (re. $500,000)
42 By chapter 54, section 1, of the laws of 2012:
43 For the state's share including personal service, nonpersonal service,
44 fringe benefits and indirect costs of various shore protection
45 projects including suballocation to other state departments and
46 agencies (09W11263) ... 1,000,000 ................. (re. $1,000,000)
47 For various new and existing flood protection projects including the
48 state share of federal sponsored flood control projects, and the
260 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 maintenance of existing flood control projects; for coastal erosion
2 hazard area mapping of the state's Atlantic Ocean and Great Lakes
3 coastlines and the state share of costs associated with matching
4 federal funds for a statewide flood plain map modernization program;
5 for the state share of costs associated with the installation and/or
6 reinstallation, upgrade, monitoring and maintenance of a statewide
7 network of stream flow gauges, including personal service, nonper-
8 sonal service, fringe benefits and indirect costs, including subal-
9 location to other state departments and agencies (09FL1263) ........
10 5,000,000 ........................................... (re. $991,000)
11 By chapter 54, section 1, of the laws of 2011:
12 For the state's share including personal services, fringe benefits and
13 indirect costs of various shore protection projects including subal-
14 location to other state departments and agencies (09W11163) ........
15 1,000,000 ......................................... (re. $1,000,000)
16 For various new and existing flood protection projects including the
17 state share of federal sponsored flood control projects, and the
18 maintenance of existing flood control projects including personal
19 services and fringe benefits, including suballocation to other state
20 departments and agencies (09FL1163) ................................
21 1,000,000 ......................................... (re. $1,000,000)
22 For services and expenses for the state share of costs associated with
23 matching federal funds for a statewide flood plain map modernization
24 program, including suballocation to other state departments and
25 agencies (09FP1163) ... 834,000 ..................... (re. $834,000)
26 By chapter 55, section 1, of the laws of 2010:
27 For various new and existing flood protection projects including the
28 state share of federal sponsored flood control projects, and the
29 maintenance of existing flood control projects including personal
30 services and fringe benefits, including suballocation to other state
31 departments and agencies (09FL1063) ................................
32 1,000,000 ......................................... (re. $1,000,000)
33 For services and expenses for the state share of costs associated with
34 matching federal funds for a statewide flood plain map modernization
35 program, including suballocation to other state departments and
36 agencies (09FP1063) ... 834,000 ..................... (re. $834,000)
37 By chapter 55, section 1, of the laws of 2009:
38 For the state's share including personal services, fringe benefits and
39 indirect costs of various shore protection projects including subal-
40 location to other state departments and agencies (09W10963) ........
41 1,000,000 ......................................... (re. $1,000,000)
42 For various new and existing flood protection projects including the
43 state share of federal sponsored flood control projects, and the
44 maintenance of existing flood control projects including personal
45 services and fringe benefits, including suballocation to other state
46 departments and agencies (09FL0963) ... 1,000,000 ... (re. $331,000)
47 For services and expenses for the state share of costs associated with
48 matching federal funds for a statewide flood plain map modernization
261 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 program, including suballocation to other state departments and
2 agencies (09FP0963) ... 834,000 ..................... (re. $834,000)
3 By chapter 55, section 1, of the laws of 2008:
4 For the state's share including personal services, fringe benefits and
5 indirect costs of various shore protection projects including subal-
6 location to other state departments and agencies (09W10863) ........
7 50,000 ............................................... (re. $22,000)
8 For services and expenses for the state share of costs associated with
9 matching federal funds for a statewide flood plain map modernization
10 program, including suballocation to other state departments and
11 agencies (09FP0863) ... 834,000 ...................... (re. $95,000)
12 By chapter 55, section 1, of the laws of 2007:
13 For various dam safety projects (09FD0763) ...........................
14 300,000 ............................................. (re. $261,000)
15 By chapter 55, section 1, of the laws of 2006:
16 For the state's share including personal services, fringe benefits and
17 indirect costs of various shore protection projects including subal-
18 location to other state departments and agencies (09W10663) ........
19 797,000 ............................................. (re. $537,000)
20 For services and expenses for the state share of costs associated with
21 matching federal funds for a statewide flood plain map modernization
22 program, including suballocation to other state departments and
23 agencies (09FP0663) ... 834,000 ..................... (re. $145,000)
24 By chapter 55, section 1, of the laws of 2005:
25 For the state's share including personal services, fringe benefits and
26 indirect costs of various shore protection projects including subal-
27 location to other state departments and agencies (09W10563) ........
28 800,000 ............................................. (re. $800,000)
29 By chapter 55, section 1, of the laws of 2004:
30 For the state's share including personal services, fringe benefits and
31 indirect costs of various shore protection projects including subal-
32 location to other state departments and agencies (09W10463) ........
33 1,000,000 ......................................... (re. $1,000,000)
34 By chapter 55, section 1, of the laws of 2003:
35 For the state's share including personal services, fringe benefits and
36 indirect costs of various shore protection projects including subal-
37 location to other state departments and agencies (09W10363) ........
38 2,210,000 ........................................... (re. $337,000)
39 For the state's share of federally funded flood control projects
40 including personal services, fringe benefits and indirect costs. No
41 portion of this appropriation shall be available until the federal
42 share of such projects is appropriated (09FC0363) ..................
43 2,359,000 ......................................... (re. $2,088,000)
44 For an advance payment by the state for the local costs of various
45 shore protection projects. No portion of this appropriation shall be
46 available until the respective county has entered into an agreement
262 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 with the commissioner of the department of environmental conserva-
2 tion, and such agreement is approved by the director of the budget
3 (09AD0363) ... 895,000 .............................. (re. $150,000)
4 By chapter 54, section 1, of the laws of 2002:
5 For the state's share of various shore protection projects including
6 suballocation to other state departments and agencies (09W10263) ...
7 3,500,000 ............................................ (re. $15,000)
8 For an advance payment by the state for the local costs of various
9 shore protection projects. No portion of this appropriation shall be
10 available until the respective county has entered into an agreement
11 with the commissioner of the department of environmental conserva-
12 tion, and such agreement is approved by the director of the budget
13 (09AD0263) ... 1,955,000 ............................ (re. $102,000)
14 By chapter 54, section 1, of the laws of 2001:
15 For the state's share of various shore protection projects including
16 suballocation to other state departments and agencies (09W10163) ...
17 4,020,000 ........................................... (re. $725,000)
18 For an advance payment by the state for the local costs of various
19 shore protection projects. No portion of this appropriation shall be
20 available until the respective county has entered into an agreement
21 with the commissioner of the department of environmental conserva-
22 tion, and such agreement is approved by the director of the budget
23 (09070163) ... 1,275,000 .............................. (re. $3,000)
24 By chapter 55, section 1, of the laws of 2000:
25 For the state's share of various shore protection projects including
26 suballocation to other state departments and agencies (09W10063) ...
27 6,300,000 ........................................... (re. $143,000)
28 For an advance payment by the state for the local costs of various
29 shore protection projects. No portion of this appropriation shall be
30 available until the respective county has entered into an agreement
31 with the commissioner of the department of environmental conserva-
32 tion, and such agreement is approved by the director of the budget
33 (09A10063) ... 1,275,000 ............................. (re. $55,000)
34 By chapter 55, section 1, of the laws of 1999:
35 For an advance payment by the state for the local costs of various
36 shore protection projects. No portion of this appropriation shall be
37 available until the respective county has entered into an agreement
38 with the commissioner of the department of environmental conserva-
39 tion, and such agreement is approved by the director of the budget
40 (09A29963) ... 880,000 .............................. (re. $525,000)
41 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
42 section 1, of the laws of 2009:
43 For the state's share of shore protection projects including Shinne-
44 cock Inlet, coastal erosion of Coney Island, coastal erosion of
45 Westhampton, West of Shinnecock, Orchard Beach and the Rockaway
46 Beach Nourishment Project (09W29963) ... 3,750,000 .. (re. $147,000)
263 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For an advance by the state for shore protection projects including
2 Shinnecock Inlet, coastal erosion of Coney Island, coastal erosion
3 of Westhampton, West of Shinnecock, Orchard Beach and the local
4 costs of the Rockaway Beach nourishment Shore protection Project.
5 No portion of this appropriation shall be available until the
6 respective county has entered into an agreement with the commission-
7 er of the department of environmental conservation, and such agree-
8 ment is approved by the director of the budget (09A39963) ..........
9 1,600,000 ............................................ (re. $63,000)
10 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
11 section 1, of the laws of 2009:
12 For the state's share of shore protection projects including Shinne-
13 cock Inlet, coastal erosion of Coney Island, coastal erosion of
14 Westhampton, West of Shinnecock, Orchard Beach and the Jones Inlet
15 Beach Nourishment Project (09W39863) ... 490,000 .... (re. $490,000)
16 For an advance payment by the state for shore protection projects
17 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
18 erosion of Westhampton, West of Shinnecock, Orchard Beach and Nassau
19 county's share of the costs of a beach nourishment project at Jones
20 Beach Inlet. No portion of this appropriation shall be available
21 until the county has entered into an agreement with the commissioner
22 of the department of environmental conservation, and such agreement
23 is approved by the director of the budget (09A29863) ...............
24 210,000 ............................................. (re. $210,000)
25 For an advance payment by the state of shore protection projects
26 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
27 erosion of Westhampton, West of Shinnecock, Orchard Beach and the
28 local costs of the Shinnecock Inlet Shore Protection project includ-
29 ing suballocation to the department of state. No portion of this
30 appropriation shall be available until the county has entered into
31 an agreement with the commissioner of the department of environ-
32 mental conservation, and such agreement is approved by the director
33 of the budget (09A49863) ... 2,013,000 ............ (re. $1,225,000)
34 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
35 section 1, of the laws of 2010:
36 For the state's share of shore protection projects including Shinne-
37 cock Inlet, coastal erosion of Coney Island, coastal erosion of
38 Westhampton, West of Shinnecock, Orchard Beach and the Shinnecock
39 Inlet project including suballocation to the department of state
40 (09W49863) ... 2,183,000 ............................ (re. $130,000)
41 By chapter 55, section 1, of the laws of 1997, as amended by chapter
42 108, section 5, of the laws of 2006:
43 For various dam safety projects (09009763) ...........................
44 500,000 .............................................. (re. $72,000)
45 For costs associated with storm damage reduction and beach nourishment
46 projects on Long Beach Barrier Island in the communities of Point
47 Lookout and Lido Beach (09099763) ... 7,600,000 ... (re. $7,600,000)
264 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
2 section 1, of the laws of 2004:
3 For various state and municipal flood projects including personal
4 services, fringe benefits and indirect costs; and rehabilitation of
5 flood damage incurred subsequent to January 1, 1996, for flood
6 control projects for which federal funding is available and for
7 projects which are eligible for funds pursuant to section 299-x of
8 the county law (09799763) ... 2,633,000 ............. (re. $727,000)
9 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
10 section 1, of the laws of 2009:
11 For the state's share of shore protection projects including Shinne-
12 cock Inlet, coastal erosion of Coney Island, coastal erosion of
13 Westhampton, West of Shinnecock, Orchard Beach and the Jones Inlet
14 Beach nourishment project (09539463) ... 840,000 .... (re. $611,000)
15 For the state's share of shore protection projects including Shinne-
16 cock Inlet, coastal erosion of Coney Island, coastal erosion of
17 Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
18 shore monitoring systems (09A69463) ... 1,400,000 ... (re. $900,000)
19 For the state's share of shore protection projects including Shinne-
20 cock Inlet, coastal erosion of Coney Island, coastal erosion of
21 Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
22 sand bypassing projects at Asharoken Beach and the LILCO Jetties
23 (09A79463) ... 1,000,000 ............................. (re. $65,000)
24 For the state's share of shore protection projects including Shinne-
25 cock Inlet, coastal erosion of Coney Island, coastal erosion of
26 Westhampton, West of Shinnecock, Orchard Beach and sand bypassing
27 projects at the Long Island South Shore Inlets (09A19463) ..........
28 1,450,000 ............................................ (re. $55,000)
29 For the state's share of shore protection projects including Shinne-
30 cock Inlet, coastal erosion of Coney Island, coastal erosion of
31 Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
32 evacuation route projects at Bayville, Rockaway and Long Beach
33 (09A49463) ... 2,000,000 .......................... (re. $1,072,000)
34 By chapter 54, section 2, of the laws of 1994, as amended by chapter 55,
35 section 1, of the laws of 2009:
36 An advance for the payment by the state of shore protection projects
37 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
38 erosion of Westhampton, West of Shinnecock, Orchard Beach and Nassau
39 County's share of the costs of a coastal erosion project at Jones
40 Inlet.
41 No portion of this appropriation shall be available until the county
42 has entered into an agreement with the commissioner of the depart-
43 ment of environmental conservation, and such agreement is approved
44 by the director of the budget (09019463) ...........................
45 360,000 ............................................. (re. $333,000)
46 By chapter 54, section 2, of the laws of 1993, as amended by chapter 55,
47 section 1, of the laws of 2009:
48 For payment by the state, as an advance, of shore protection projects
49 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
265 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 erosion of Westhampton, West of Shinnecock, Orchard Beach and New
2 York City's share of the costs of a coastal erosion project at Coney
3 Island.
4 No portion of this appropriation shall be available for the city's
5 share of project costs until the city has entered into an agreement
6 with the commissioner of the department of environmental conserva-
7 tion, and which agreement is approved by the director of the budget,
8 providing for repayment to the state of an amount equal to the
9 amount disbursed from this appropriation. A copy of such agreement
10 shall be filed with the state comptroller, the chairman of the
11 senate finance committee and the chairman of the assembly ways and
12 means committee (09099363) ... 2,800,000 ............. (re. $55,000)
13 By chapter 54, section 2, of the laws of 1990, as amended by chapter 55,
14 section 1, of the laws of 2009:
15 For payment by the state, as an advance, of shore protection projects
16 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
17 erosion of Westhampton, West of Shinnecock, Orchard Beach and
18 Suffolk county's share of the costs of a coastal erosion project at
19 Westhampton Beach.
20 No portion of this appropriation shall be available for the county's
21 share of project costs until the county has entered into an agree-
22 ment with the commissioner of the department of environmental
23 conservation, and which agreement is approved by the director of the
24 division of the budget, providing for repayment to the state of an
25 amount equal to the amount disbursed from this appropriation. A copy
26 of such agreement shall be filed with the state comptroller, the
27 chairman of the senate finance committee and the chairman of the
28 assembly ways and means committee (091A9063) .......................
29 4,050,000 ........................................... (re. $318,000)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Water Resources Purpose
33 By chapter 54, section 1, of the laws of 2017:
34 An advance for costs incurred relating to work required for the safety
35 of dams and other structures impounding water, to be reimbursed in
36 accordance with section 15-0507 of the environmental conservation
37 law (09DA1757) ... 500,000 .......................... (re. $500,000)
38 For payment of a portion of the state's match for federal capitaliza-
39 tion grants for the water pollution control revolving fund
40 (09RF1757) ... 35,000,000 ........................ (re. $35,000,000)
41 For services and expenses including personal service, fringe benefits,
42 and nonpersonal service for the water pollution control revolving
43 fund and related water quality activities including suballocation to
44 other state departments and agencies (09SR1757) ....................
45 3,500,000 ......................................... (re. $3,500,000)
46 For services and expenses including personal service, fringe benefits,
47 and nonpersonal service for the Excelsior Conservation Corps program
48 including suballocation to other state departments and agencies
49 (09CC1757) ... 200,000 .............................. (re. $200,000)
266 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2017, is
2 hereby amended and reappropriated to read:
3 For the state's share of shore protection or [costal] coastal erosion
4 projects, including the Army Corp of Engineers South Shore of Staten
5 Island Project (09SI1757) ... 151,000,000 ....... (re. $151,000,000)
6 The sum of $2,500,000,000 is hereby appropriated for the capital costs
7 of clean water infrastructure projects, including services,
8 expenses, and indirect costs, as follows: not less than
9 $1,000,000,000 to the environmental facilities corporation for
10 projects authorized by the New York state water infrastructure
11 improvement act of 2017; not less than $150,000,000 to the environ-
12 mental facilities corporation for New York state intermunicipal
13 water infrastructure projects pursuant to section 1285-s of the
14 public authorities law; not less than $245,000,000 for water quality
15 improvement projects, including nonagricultural nonpoint source
16 abatement and control projects, municipal wastewater treatment
17 projects, and municipal separate storm sewer system projects, and
18 including up to $25,000,000 of such amount for projects for the
19 proper management of road salt; up to $50,000,000 for green infras-
20 tructure projects; $110,000,000 for land acquisition projects for
21 source water protection pursuant to title 33 of article 15 of the
22 environmental conservation law, including suballocation to the
23 department of agriculture and markets; up to $50,000,000 for subal-
24 location to the department of agriculture and markets for state
25 assistance payments, services, and expenses to soil and water
26 conservation districts for the cost of water quality protection
27 projects awarded on a competitive basis prioritizing financial need
28 and hardship, intended to assist concentrated animal feeding oper-
29 ations; up to $130,000,000 for [transfer to the hazardous waste
30 remedial fund for] the remediation of sites pursuant to titles 12
31 and 13 of article 27 of the environmental conservation law and
32 consistent with the provisions of section 97-b of the state finance
33 law, provided however that no more than $25,000,000 of such appro-
34 priation may be expended for investigation, mitigation and remedi-
35 ation of solid waste sites; not less than $20,000,000 for suballo-
36 cation to the department of health for replacement of lead drinking
37 water service lines pursuant to section 1114 of the public health
38 law; $200,000,000 for New York City for water quality projects
39 located within the New York City watershed; not less than
40 $75,000,000 to the environmental facilities corporation for a
41 program to upgrade or replace septic systems and cesspools pursuant
42 to section 1285-u of the public authorities law; up to $10,000,000
43 to the environmental facilities corporation for water infrastructure
44 emergency assistance pursuant to section 1285-t of the public
45 authorities law; $100,000,000 to the environmental facilities corpo-
46 ration to support municipal water quality infrastructure programs
47 which may otherwise not qualify for state support, or may require
48 additional state support; and up to $10,000,000 for the development
49 of information technology systems related to water quality pursuant
50 to section 3-0315 of the environmental conservation law including
51 suballocation to the department of health (09CW1757) ...............
52 2,500,000,000 ................................. (re. $2,497,000,000)
267 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2016:
2 An advance for costs incurred relating to work required for the safety
3 of dams and other structures impounding water, to be reimbursed in
4 accordance with section 15-0507 of the environmental conservation
5 law (09DA1657) ... 500,000 .......................... (re. $500,000)
6 For payment of a portion of the state's match for federal capitaliza-
7 tion grants for the water pollution control revolving fund
8 (09RF1657) ... 35,000,000 ........................ (re. $35,000,000)
9 For services and expenses including personal service, fringe benefits,
10 and nonpersonal service for the water pollution control revolving
11 fund and related water quality activities including suballocation to
12 other state departments and agencies (09SR1657) ....................
13 3,500,000 ........................................... (re. $561,000)
14 For services and expenses including personal service, fringe benefits,
15 and nonpersonal service for the Excelsior Conservation Corps program
16 including suballocation to other state departments and agencies
17 (09CC1657) ... 200,000 .............................. (re. $200,000)
18 The sum of $200,000,000 is hereby appropriated over a multi-year peri-
19 od for the capital costs of water quality infrastructure projects as
20 authorized by the New York state water infrastructure improvement
21 act of 2015. Up to $100,000,000 shall be available from this appro-
22 priation in state fiscal year 2016-17, with no less than $10,000,000
23 available for water quality infrastructure projects for compliance
24 with environmental and public health laws and regulations related to
25 water quality; and up to an additional $100,000,000 shall be avail-
26 able in state fiscal year 2017-18, with no less than $10,000,000
27 available for water quality infrastructure projects for compliance
28 with environmental and public health laws and regulations related to
29 water quality. All or a portion of the funds may be suballocated or
30 transferred to any department, agency, or public authority
31 (09WW1657) ... 200,000,000 ...................... (re. $200,000,000)
32 By chapter 54, section 1, of the laws of 2015:
33 An advance for costs incurred relating to work required for the safety
34 of dams and other structures impounding water, to be reimbursed in
35 accordance with section 15-0507 of the environmental conservation
36 law (09DA1557) ... 500,000 .......................... (re. $500,000)
37 The sum of $200,000,000 is hereby appropriated over a multi-year peri-
38 od for the capital costs of water quality infrastructure projects as
39 authorized by the New York state water infrastructure improvement
40 act of 2015. Up to $50 million shall be available from this appro-
41 priation in state fiscal year 2015-16, up to an additional $75
42 million shall be available in state fiscal year 2016-17, and up to
43 an additional $75 million shall be available in state fiscal year
44 2017-18. All or a portion of the funds may be suballocated or trans-
45 ferred to any department, agency, or public authority (09WW1557) ...
46 200,000,000 ..................................... (re. $140,000,000)
47 For payment of a portion of the state's match for federal capitaliza-
48 tion grants for the water pollution control revolving fund
49 (09RF1557) ... 35,000,000 ........................ (re. $35,000,000)
50 By chapter 54, section 1, of the laws of 2014:
268 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 An advance for costs incurred relating to work required for the safety
2 of dams and other structures impounding water, to be reimbursed in
3 accordance with section 15-0507 of the environmental conservation
4 law (09DA1457) ... 500,000 .......................... (re. $500,000)
5 For payment of a portion of the state's match for federal capitaliza-
6 tion grants for the water pollution control revolving fund
7 (09RF1457) ... 35,000,000 ......................... (re. $8,489,000)
8 By chapter 54, section 1, of the laws of 2013:
9 An advance for costs incurred relating to work required for the safety
10 of dams and other structures impounding water, to be reimbursed in
11 accordance with section 15-0507 of the environmental conservation
12 law (09DA1357) ... 500,000 .......................... (re. $500,000)
13 By chapter 54, section 1, of the laws of 2012:
14 An advance for costs incurred relating to work required for the safety
15 of dams and other structures impounding water, to be reimbursed in
16 accordance with section 15-0507 of the environmental conservation
17 law (09DA1257) ... 500,000 .......................... (re. $500,000)
18 By chapter 55, section 1, of the laws of 2007:
19 An advance for costs incurred relating to work required for the safety
20 of dams and other structures impounding water, to be reimbursed in
21 accordance with section 15-0507 of the environmental conservation
22 law (09DA0757) ... 350,000 .......................... (re. $349,000)
23 By chapter 55, section 1, of the laws of 2006:
24 An advance for costs incurred relating to work required for the safety
25 of dams and other structures impounding water, to be reimbursed in
26 accordance with section 15-0507 of the environmental conservation
27 law (09DA0657) ... 300,000 .......................... (re. $300,000)
28 By chapter 54, section 1, of the laws of 1985, as amended by chapter 55,
29 section 1, of the laws of 2009:
30 For the state share of shore protection projects including Shinnecock
31 Inlet, coastal erosion of Coney Island, coastal erosion of Westhamp-
32 ton, West of Shinnecock, Orchard Beach and for removal of derelict
33 structures and other hazards along the New York harbor shoreline
34 under provisions of PL930251 water resources development act of 1974
35 ... (09168557) ...................................... (re. $180,000)
36 Capital Projects Funds - Federal
37 Federal Capital Projects Fund
38 Water Resources Purpose
39 By chapter 54, section 1, of the laws of 2017:
40 For federal capitalization grants for the water pollution control
41 revolving fund (09SF1757) ... 175,000,000 ....... (re. $175,000,000)
42 By chapter 55, section 1, of the laws of 2016:
43 For federal capitalization grants for the water pollution control
44 revolving fund (09SF1657) ... 175,000,000 ....... (re. $175,000,000)
269 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2015:
2 For federal capitalization grants for the water pollution control
3 revolving fund (09SF1557) ... 175,000,000 ....... (re. $175,000,000)
4 By chapter 54, section 1, of the laws of 2014:
5 For federal capitalization grants for the water pollution control
6 revolving fund (09SF1457) ... 175,000,000 ........ (re. $42,444,000)
7 By chapter 55, section 1, of the laws of 2009:
8 For federal capitalization grants for the water pollution control
9 revolving fund, as funded by the American recovery and reinvestment
10 act of 2009. Funds appropriated herein shall be subject to all
11 applicable reporting and accountability requirements contained in
12 such act (09FS0957) ... 435,000,000 ............... (re. $2,436,000)
13 WATER RESOURCES - CLEAN WATER/CLEAN AIR (CCP)
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Water Resources Purpose
17 Water Quality Improvement Projects
18 By chapter 54, section 1, of the laws of 2002:
19 For state assistance payments for the state share of the costs of
20 clean water projects in accordance with the provisions of title 3 of
21 article 56 of the environmental conservation law for project cost,
22 including costs incidental and appurtenant thereto and for payment
23 of reimbursements to the clean water/clean air implementation fund
24 for services and expenses of state departments and agencies, includ-
25 ing fringe benefits, hereinafter referred to as "Clean Water Project
26 Disbursements".
27 The moneys appropriated herein may be suballocated to all state
28 departments and agencies. Further, moneys herein appropriated may be
29 suballocated only to public authorities and public benefit corpo-
30 rations specifically authorized by paragraph (1) of subdivision 1 of
31 section 56-0303 of the environmental conservation law to enter into
32 contracts for state assistance payments for the state share of costs
33 for clean water projects, provided however, that moneys herein
34 appropriated pursuant to paragraph (i) of subdivision 1 of section
35 56-0303 of the environmental conservation law for state facility
36 projects may be suballocated to any public authority or public bene-
37 fit corporation.
38 Notwithstanding the provisions of any general or special law, the
39 moneys hereby appropriated shall be available for clean water quali-
40 ty projects in accordance with title 3 of article 56 of the environ-
41 mental conservation law upon the issuance of a certificate of
42 approval of availability by the director of the division of the
43 budget.
44 The state comptroller shall at the commencement of each month certify
45 to the director of the division of the budget, the commissioner of
46 environmental conservation, the chairman of the senate finance
270 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 committee, and the chairman of the assembly ways and means committee
2 the amounts disbursed from this appropriation for "Clean Water
3 Project Disbursements" for the month preceding such certification
4 (09BA0257) ... 46,918,000 ......................... (re. $7,571,000)
5 Project Schedule
6 PROJECT AMOUNT
7 --------------------------------------------
8 (thousands of dollars)
9 Hudson River water quality
10 improvement projects ............... 1,334
11 Long Island Sound water quali-
12 ty improvement projects ........... 21,000
13 New York Harbor water quality
14 improvement projects ............... 1,142
15 Finger Lakes water quality
16 improvement projects ............... 3,372
17 Peconic and South Shore Estu-
18 ary water quality improve-
19 ment projects ...................... 7,500
20 State facility projects .............. 1,881
21 Municipal wastewater treatment
22 improvement projects and
23 municipal flood control
24 projects ........................... 2,575
25 Dam safety projects .................. 4,000
26 State parks projects ................. 1,814
27 Municipal parks projects and
28 historic preservation and
29 heritage area projects ............. 2,300
30 --------------
31 Total ............................. 46,918
32 ==============
33 By chapter 54, section 1, of the laws of 2001:
34 For state assistance payments for the state share of the costs of
35 clean water projects in accordance with the provisions of title 3 of
36 article 56 of the environmental conservation law for project cost,
37 including costs incidental and appurtenant thereto and for payment
38 of reimbursements to the clean water/clean air implementation fund
39 for services and expenses of state departments and agencies, includ-
40 ing fringe benefits, hereinafter referred to as "Clean Water Project
41 Disbursements".
42 The moneys appropriated herein may be suballocated to all state
43 departments and agencies. Further, moneys herein appropriated may be
44 suballocated only to public authorities and public benefit corpo-
45 rations specifically authorized by paragraph (1) of subdivision 1 of
46 section 56-0303 of the environmental conservation law to enter into
47 contracts for state assistance payments for the state share of costs
48 for clean water projects, provided however, that moneys herein
49 appropriated pursuant to paragraph (i) of subdivision 1 of section
50 56-0303 of the environmental conservation law for state facility
271 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects may be suballocated to any public authority or public bene-
2 fit corporation.
3 Notwithstanding the provisions of any general or special law, the
4 moneys hereby appropriated shall be available for clean water quali-
5 ty projects in accordance with title 3 of article 56 of the environ-
6 mental conservation law upon the issuance of a certificate of
7 approval of availability by the director of the division of the
8 budget.
9 The state comptroller shall at the commencement of each month certify
10 to the director of the division of the budget, the commissioner of
11 environmental conservation, the chairman of the senate finance
12 committee, and the chairman of the assembly ways and means committee
13 the amounts disbursed from this appropriation for "Clean Water
14 Project Disbursements" for the month preceding such certification
15 (09BA0157) ... 87,582,000 ......................... (re. $9,021,000)
16 Project Schedule
17 PROJECT AMOUNT
18 --------------------------------------------
19 (thousands of dollars)
20 Hudson River water quality
21 improvement projects ............... 2,800
22 Long Island Sound water quali-
23 ty improvement projects ........... 50,000
24 Lake Champlain water quality
25 improvement projects ............... 1,000
26 Onondaga Lake water quality
27 improvement projects ............... 9,912
28 New York Harbor water quality
29 improvement projects ............... 1,500
30 Finger Lakes water quality
31 improvement projects ............... 3,500
32 Peconic and South Shore Estu-
33 ary water quality improve-
34 ment projects ...................... 2,000
35 State facility projects .............. 1,400
36 Open space land conservation
37 projects ........................... 3,470
38 State parks projects ................. 4,000
39 Municipal parks projects and
40 historic preservation and
41 heritage area projects ............. 8,000
42 --------------
43 Total ............................. 87,582
44 ==============
45 By chapter 55, section 1, of the laws of 2000:
46 For state assistance payments for the state share of the costs of
47 clean water projects in accordance with the provisions of title 3 of
48 article 56 of the environmental conservation law for project cost,
49 including costs incidental and appurtenant thereto and for payment
50 of reimbursements to the clean water/clean air implementation fund
272 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 for services and expenses of state departments and agencies, includ-
2 ing fringe benefits, hereinafter referred to as "Clean Water Project
3 Disbursements".
4 The moneys appropriated herein may be suballocated to all state
5 departments and agencies. Further, moneys herein appropriated may be
6 suballocated only to public authorities and public benefit corpo-
7 rations specifically authorized by paragraph (1) of subdivision 1 of
8 section 56-0303 of the environmental conservation law to enter into
9 contracts for state assistance payments for the state share of costs
10 for clean water projects, provided however, that moneys herein
11 appropriated pursuant to paragraph (i) of subdivision 1 of section
12 56-0303 of the environmental conservation law for state facility
13 projects may be suballocated to any public authority or public bene-
14 fit corporation.
15 Notwithstanding the provisions of any general or special law, the
16 moneys hereby appropriated shall be available for clean water quali-
17 ty projects in accordance with title 3 of article 56 of the environ-
18 mental conservation law upon the issuance of a certificate of
19 approval of availability by the director of the division of the
20 budget.
21 The state comptroller shall at the commencement of each month certify
22 to the director of the division of the budget, the commissioner of
23 environmental conservation, the chairman of the senate finance
24 committee, and the chairman of the assembly ways and means committee
25 the amounts disbursed from this appropriation for "Clean Water
26 Project Disbursements" for the month preceding such certification
27 (09BA0057) ... 104,500,000 ........................ (re. $9,316,000)
28 Project Schedule
29 PROJECT AMOUNT
30 --------------------------------------------
31 (thousands of dollars)
32 Hudson River water quality
33 improvement projects ............... 2,000
34 Long Island Sound water quali-
35 ty improvement projects ........... 30,000
36 Lake Champlain water quality
37 improvement projects ............... 1,000
38 Onondaga Lake water quality
39 improvement projects .............. 15,000
40 New York Harbor water quality
41 improvement projects ............... 2,000
42 Finger Lakes water quality
43 improvement projects ............... 3,500
44 Peconic and South Shore Estu-
45 ary water quality improve-
46 ment projects ...................... 2,000
47 State facility projects .............. 2,500
48 Municipal wastewater treatment
49 improvement projects and
50 municipal flood control
273 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects ........................... 2,000
2 Dam safety projects .................. 2,000
3 Open space land conservation
4 projects .......................... 30,000
5 State parks projects ................. 4,500
6 Municipal parks projects and
7 historic preservation and
8 heritage area projects ............. 8,000
9 --------------
10 Total ............................ 104,500
11 ==============
12 For state assistance payments for the state share of the costs of
13 clean water projects in accordance with the provisions of title 3 of
14 article 56 of the environmental conservation law for project costs,
15 including costs incidental and appurtenant thereto and for payment
16 of reimbursements to the clean water/clean air implementation fund
17 for services and expenses of state departments and agencies, includ-
18 ing fringe benefits, hereinafter referred to as "Clean Water Project
19 Disbursements".
20 The moneys appropriated herein may be suballocated to all state
21 departments and agencies. Further, moneys herein appropriated may be
22 suballocated only to public authorities and public benefit corpo-
23 rations specifically authorized by paragraph (1) of subdivision 1 of
24 section 56-0303 of the environmental conservation law to enter into
25 contracts for state assistance payments for the state share of costs
26 for clean water projects, provided however, that moneys herein
27 appropriated pursuant to paragraph (i) of subdivision 1 of section
28 56-0303 of the environmental conservation law for state facility
29 projects may be suballocated to any public authority or public bene-
30 fit corporation.
31 Notwithstanding the provisions of any general or special law, the
32 moneys hereby appropriated shall be available for clean water quali-
33 ty projects in accordance with title 3 of article 56 of the environ-
34 mental conservation law upon the issuance of a certificate of
35 approval of availability by the director of the division of the
36 budget.
37 The state comptroller shall at the commencement of each month certify
38 to the director of the division of the budget, the commissioner of
39 environmental conservation, the chairman of the senate finance
40 committee, and the chairman of the assembly ways and means committee
41 the amounts disbursed from this appropriation for "Clean Water
42 Project Disbursements" for the month preceding such certification
43 (09B20057) ... 5,000,000 ............................ (re. $176,000)
44 By chapter 55, section 1, of the laws of 1999:
45 For state assistance payments for the state share of the costs of
46 clean water projects in accordance with the provisions of title 3 of
47 article 56 of the environmental conservation law for project cost,
48 including costs incidental and appurtenant thereto and for payment
49 of reimbursements to the clean water/clean air implementation fund
50 for services and expenses of state departments and agencies, includ-
274 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ing fringe benefits, hereinafter referred to as "Clean Water Project
2 Disbursements".
3 The moneys appropriated herein may be suballocated to all state
4 departments and agencies. Further, moneys herein appropriated may be
5 suballocated only to public authorities and public benefit corpo-
6 rations specifically authorized by paragraph (1) of subdivision one
7 of section 56-0303 of the environmental conservation law to enter
8 into contracts for state assistance payments for the state share of
9 costs for clean water projects, provided however, that moneys herein
10 appropriated pursuant to paragraph (i) of subdivision 1 of section
11 56-0303 of the environmental conservation law for state facility
12 projects may be suballocated to any public authority or public bene-
13 fit corporation.
14 Notwithstanding the provisions of any general or special law, the
15 moneys hereby appropriated shall be available for clean water quali-
16 ty projects in accordance with title 3 of article 56 of the environ-
17 mental conservation law upon the issuance of a certificate of
18 approval of availability by the director of the division of the
19 budget.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the division of the budget, the commissioner of
22 environmental conservation, the chairman of the senate finance
23 committee, and the chairman of the assembly ways and means committee
24 the amounts disbursed from this appropriation for "Clean Water
25 Project Disbursements" for the month preceding such certification
26 (09BA9957) ... 188,000,000 ........................ (re. $8,402,000)
27 Project Schedule
28 PROJECT AMOUNT
29 --------------------------------------------
30 (thousands of dollars)
31 Hudson River water quality
32 improvement projects ............... 4,000
33 Long Island Sound water quali-
34 ty improvement projects ........... 50,000
35 Lake Champlain water quality
36 improvement projects ............... 2,000
37 Onondaga Lake water quality
38 improvement projects .............. 20,000
39 New York Harbor water quality
40 improvement projects ............... 2,000
41 Great Lakes water quality
42 improvement projects ............... 1,000
43 Finger Lakes water quality
44 improvement projects ............... 7,000
45 Peconic and South Shore Estu-
46 ary water quality improve-
47 ment projects ...................... 7,000
48 State facility projects .............. 5,000
49 Municipal wastewater treatment
50 improvement projects and
51 municipal flood control
275 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects ........................... 2,000
2 Environmental compliance
3 assistance projects-water
4 quality ........................... 26,000
5 Dam safety projects .................. 2,000
6 Open space land conservation
7 projects .......................... 40,000
8 State parks projects ................ 10,000
9 Municipal parks projects and
10 historic preservation and
11 heritage area projects ............ 10,000
12 --------------
13 Total ............................ 188,000
14 ==============
15 For state assistance payments for the state share of the costs of
16 clean water projects in accordance with the provisions of title 3 of
17 article 56 of the environmental conservation law for project costs,
18 including costs incidental and appurtenant thereto and for payment
19 of reimbursements to the clean water/clean air implementation fund
20 for services and expenses of state departments and agencies, includ-
21 ing fringe benefits, hereinafter referred to as "Clean Water Project
22 Disbursements". The moneys appropriated herein may be suballocated
23 to all state departments and agencies. Further, moneys herein appro-
24 priated may be suballocated only to public authorities and public
25 benefit corporations specifically authorized by paragraph (1) of
26 subdivision 1 of section 56-0303 of the environmental conservation
27 law to enter into contracts for state assistance payments for the
28 state share of costs for clean water projects, provided however,
29 that moneys herein appropriated pursuant to paragraph (i) of subdi-
30 vision 1 of section 56-0303 of the environmental conservation law
31 for state facility projects may be suballocated to any public
32 authority or public benefit corporation.
33 Notwithstanding the provisions of any general or special law, the
34 moneys hereby appropriated shall be available for clean water quali-
35 ty projects in accordance with title 3 of article 56 of the environ-
36 mental conservation law upon the issuance of a certificate of
37 approval of availability of the director of the division of the
38 budget.
39 The state comptroller shall at the commencement of each month certify
40 to the director of the division of the budget, the commissioner of
41 environmental conservation, the chairman of the senate finance
42 committee, and the chairman of the assembly ways and means committee
43 the amounts disbursed from this appropriation for "Clean Water
44 Project Disbursements" for the month preceding such certification
45 (09B29957) ... 8,000,000 .......................... (re. $2,254,000)
46 By chapter 55, section 1, of the laws of 1998:
47 For state assistance payments for the state share of the costs of
48 clean water projects in accordance with the provisions of title 3 of
49 article 56 of the environmental conservation law for project costs,
50 including costs incidental and appurtenant thereto and for payment
276 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of reimbursements to the clean water/clean air implementation fund
2 for services and expenses of state departments and agencies, includ-
3 ing fringe benefits, hereinafter referred to as "Clean Water Project
4 Disbursements".
5 The moneys appropriated herein may be suballocated to all state
6 departments and agencies. Further, moneys herein appropriated may be
7 suballocated only to public authorities and public benefit corpo-
8 rations specifically authorized by paragraph (1) of subdivision one
9 of section 56-0303 of the environmental conservation law to enter
10 into contracts for state assistance payments for the state share of
11 costs for clean water projects, provided however, that moneys herein
12 appropriated pursuant to paragraph (i) of subdivision one of section
13 56-0303 of the environmental conservation law for state facility
14 projects may be suballocated to any public authority or public bene-
15 fit corporation.
16 Notwithstanding the provisions of any general or special law, the
17 moneys hereby appropriated shall be available for clean water quali-
18 ty projects in accordance with title 3 of article 56 of the environ-
19 mental conservation law upon the issuance of a certificate of
20 approval of availability by the director of the division of the
21 budget.
22 The state comptroller shall at the commencement of each month certify
23 to the director of the division of the budget, the commissioner of
24 environmental conservation, the chairman of the senate finance
25 committee, and the chairman of the assembly ways and means committee
26 the amounts disbursed from this appropriation for "Clean Water
27 Project Disbursements" for the month preceding such certification
28 (09BA9857) ... 149,000,000 ........................ (re. $4,516,000)
29 project schedule
30 PROJECT AMOUNT
31 --------------------------------------------
32 (thousands of dollars)
33 Hudson River water quality
34 improvement projects ............... 5,000
35 Long Island Sound water quali-
36 ty improvement projects ........... 15,000
37 Lake Champlain water quality
38 improvement projects ............... 5,000
39 Onondaga Lake water quality
40 improvement projects .............. 20,000
41 New York Harbor water quality
42 improvement projects ............... 2,000
43 Great Lakes water quality
44 improvement projects ............... 2,000
45 Finger Lakes water quality
46 improvement projects ............... 5,000
47 Peconic and South Shore Estu-
48 ary water quality improve-
49 ment projects ...................... 5,000
50 State facility projects .............. 5,000
51 Municipal wastewater treatment
277 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 improvement projects and
2 municipal flood control
3 projects ........................... 6,000
4 Municipal wastewater treatment
5 improvement projects and
6 municipal flood control
7 projects .......................... 15,000
8 Environmental compliance
9 assistance projects-water
10 quality ............................ 2,000
11 Dam safety projects .................. 2,000
12 Open space land conservation
13 projects .......................... 40,000
14 State parks projects ................ 10,000
15 Municipal parks projects and
16 historic preservation and
17 heritage area projects ............ 10,000
18 --------------
19 Total ............................ 149,000
20 ==============
21 For state assistance payments for the state share of the costs of
22 clean water projects in accordance with the provisions of title 3 of
23 article 56 of the environmental conservation law for project costs,
24 including costs incidental and appurtenant thereto and for payment
25 of reimbursements to the clean water/clean air implementation fund
26 for services and expenses of state departments and agencies, includ-
27 ing fringe benefits, hereinafter referred to as "Clean Water Project
28 Disbursements". The moneys appropriated herein may be suballocated
29 to all state departments and agencies. Further, moneys herein appro-
30 priated may be suballocated only to public authorities and public
31 benefit corporations specifically authorized by paragraph (1) of
32 subdivision one of section 56-0303 of the environmental conservation
33 law to enter into contracts for state assistance payments for the
34 state share of costs for clean water projects, provided however,
35 that moneys herein appropriated pursuant to paragraph (i) of subdi-
36 vision one of section 56-0303 of the environmental conservation law
37 for state facility projects may be suballocated to any public
38 authority or public benefit corporation.
39 Notwithstanding the provisions of any general or special law, the
40 moneys hereby appropriated shall be available for clean water quali-
41 ty projects in accordance with title 3 of article 56 of the environ-
42 mental conservation law upon the issuance of a certificate of
43 approval of availability of the director of the division of budget.
44 The state comptroller shall at the commencement of each month certify
45 to the director of the division of the budget, the commissioner of
46 environmental conservation, the chairman of the senate finance
47 committee, and the chairman of the assembly ways and means committee
48 the amounts disbursed from this appropriation for "Clean Water
49 Project Disbursements" for the month preceding such certification
50 (09B29857) ... 15,000,000 ........................... (re. $185,000)
278 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 1997:
2 For state assistance payments for the state share of the costs of
3 clean water projects in accordance with the provisions of title 3 of
4 article 56 of the environmental conservation law for project costs,
5 including costs incidental and appurtenant thereto and for payment
6 of reimbursements to the clean water/clean air implementation fund
7 for services and expenses of state departments and agencies, includ-
8 ing fringe benefits, hereinafter referred to as "Clean Water Project
9 Disbursements".
10 The moneys appropriated herein may be suballocated to all state
11 departments and agencies. Further, moneys herein appropriated may be
12 suballocated only to public authorities and public benefit corpo-
13 rations specifically authorized by paragraph (1) of subdivision one
14 of section 56-0303 of the environmental conservation law to enter
15 into contracts for state assistance payments for the state share of
16 costs for clean water projects, provided however, that moneys herein
17 appropriated pursuant to paragraph (i) of subdivision one of section
18 56-0303 of the environmental conservation law for state facility
19 projects may be suballocated to any public authority or public bene-
20 fit corporation.
21 Notwithstanding the provisions of any general or special law, the
22 moneys hereby appropriated shall be available for clean water quali-
23 ty projects in accordance with title 3 of article 56 of the environ-
24 mental conservation law upon the issuance of a certificate of
25 approval of availability by the director of the division of the
26 budget.
27 The state comptroller shall at the commencement of each month certify
28 to the director of the division of the budget, the commissioner of
29 environmental conservation, the chairman of the senate finance
30 committee, and the chairman of the assembly ways and means committee
31 the amounts disbursed from this appropriation for "Clean Water
32 Project Disbursements" for the month preceding such certification
33 (09BA9757) ... 101,000,000 ........................ (re. $4,000,000)
34 project schedule
35 PROJECT AMOUNT
36 --------------------------------------------
37 (thousands of dollars)
38 Hudson River water quality
39 improvement projects ............... 2,000
40 Long Island Sound water quali-
41 ty improvement projects ........... 14,000
42 Lake Champlain water quality
43 improvement projects ............... 2,000
44 Onondaga Lake water quality
45 improvement projects .............. 10,000
46 New York Harbor water quality
47 improvement projects ............... 3,000
48 Great Lakes water quality
49 improvement projects ............... 2,000
50 Finger Lakes water quality
279 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 improvement projects ............... 2,000
2 Peconic and South Shore Estu-
3 ary water quality improve-
4 ment projects ...................... 2,000
5 Other water bodies water qual-
6 ity improvement projects ........... 2,000
7 State facility projects .............. 5,000
8 Municipal wastewater treatment
9 improvement projects and
10 municipal flood control
11 projects .......................... 15,000
12 Environmental compliance
13 assistance projects-water
14 quality ............................ 2,000
15 Dam safety projects .................. 5,000
16 Open space land conservation
17 projects .......................... 20,000
18 State parks projects ................ 10,000
19 Municipal parks projects and
20 historic preservation and
21 heritage area projects ............. 5,000
22 --------------
23 Total ............................ 101,000
24 ==============
25 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
26 section 1, of the laws of 1998:
27 For state assistance payments for the state share of the costs of
28 clean water projects in accordance with the provisions of title 3 of
29 article 56 of the environmental conservation law for project costs,
30 including costs incidental and appurtenant thereto and for payment
31 of reimbursements to the clean water/clean air implementation fund
32 for services and expenses of state departments and agencies, includ-
33 ing fringe benefits, hereinafter referred to as "Clean Water Project
34 Disbursements". The moneys appropriated herein may be suballocated
35 to all state departments and agencies. Further, moneys herein appro-
36 priated may be suballocated only to public authorities and public
37 benefit corporations specifically authorized by paragraph (1) of
38 subdivision one of section 56-0303 of the environmental conservation
39 law to enter into contracts for state assistance payments for the
40 state share of costs for clean water projects, provided however,
41 that moneys herein appropriated pursuant to paragraph (i) of subdi-
42 vision one of section 56-0303 of the environmental conservation law
43 for state facility projects may be suballocated to any public
44 authority or public benefit corporation.
45 Notwithstanding the provisions of any general or special law, the
46 moneys hereby appropriated shall be available for clean water quali-
47 ty projects in accordance with title 3 of article 56 of the environ-
48 mental conservation law upon the issuance of a certificate of
49 approval of availability of the director of the division of budget.
50 The state comptroller shall at the commencement of each month certify
51 to the director of the division of the budget, the commissioner of
280 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 environmental conservation, the chairman of the senate finance
2 committee, and the chairman of the assembly ways and means committee
3 the amounts disbursed from this appropriation for "Clean Water
4 Project Disbursements" for the month preceding such certification
5 (09B29757) ... 10,000,000 ........................... (re. $504,000)
6 By chapter 413, section 27, of the laws of 1996, as amended by chapter
7 55, section 1, of the laws of 1997:
8 For state assistance payments for the state share of the costs of
9 clean water projects in accordance with the provisions of title 3 of
10 article 56 of the environmental conservation law for project costs,
11 including costs incidental and appurtenant thereto and for payment
12 of reimbursements to the clean water/clean air implementation fund
13 for services and expenses of state departments and agencies, includ-
14 ing fringe benefits, hereinafter referred to as "Clean Water Project
15 Disbursements". The moneys appropriated herein may be suballocated
16 to the environmental facilities corporation, other state depart-
17 ments, agencies, and public authorities.
18 Notwithstanding the provisions of any general or special law, moneys
19 hereby appropriated shall be available for clean water quality
20 projects in accordance with title 3 of article 56 of the environ-
21 mental conservation law upon the issuance of a certificate of
22 approval of availability by the director of the division of the
23 budget. The state comptroller at the commencement of each month
24 shall certify to the director of the division of the budget, the
25 commissioner of environmental conservation, the chairman of the
26 senate finance committee, and the chairman of the assembly ways and
27 means committee the amounts disbursed from this appropriation for
28 "Clean Water Project Disbursements" for the month preceding such
29 certification (09BA9657) ... 75,000,000 ........... (re. $2,681,000)
30 WATER RESOURCES - EQBA (CCP)
31 Capital Projects Funds - Other
32 Capital Projects Fund
33 Water Resources Purpose
34 By chapter 54, section 1, of the laws of 1981, as amended by chapter 54,
35 section 1, of the laws of 2002:
36 For the state share of the costs of construction of water quality
37 improvement projects, including the payment of liabilities incurred
38 prior to April 1, 1981, in accordance with the provisions of title
39 three of article fifty-one of the environmental conservation law as
40 amended for projects included in the following schedule, including
41 costs incidental and appurtenant thereto, hereinafter referred to as
42 "Water Quality Improvement Disbursements."
43 Notwithstanding the provisions of any general or special law, the
44 moneys hereby appropriated shall be available for water quality
45 improvement expenditures for eligible water quality improvement
46 projects as defined by section 51-0303 of the environmental conser-
47 vation law upon the issuance of a certificate of approval of avail-
48 ability by the director of the division of the budget. The state
281 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 comptroller shall at the commencement of each month certify to the
2 director of the division of the budget, the commissioner of environ-
3 mental conservation, the chairman of the senate finance committee,
4 and the chairman of the assembly ways and means committee the
5 amounts disbursed from this appropriation for Water Quality Improve-
6 ment Disbursements for the month preceding such certification
7 (01387057) ... 27,190,300 ........................... (re. $604,000)
8 project schedule
9 ESTIMATED ESTIMATED
10 ELIGIBLE STATE
11 COUNTY PROJECT PROJECT COST SHARE
12 -----------------------------------------------------------------------
13 (thousands)
14 Supplements to previous appro-
15 priations:
16 Allegany County
17 Village of Cuba ............................... $6,200 $775
18 Broome County
19 Village of Endicott ........................... 608 76
20 Town of Sanford ............................... 952 119
21 Chautauqua County
22 Village of Brocton ............................ 1,272 159
23 Ripley Sewer District ......................... 2,384 298
24 Chautauqua County ............................. 560 70
25 Columbia County
26 Village of Chatham ............................ 880 110
27 Erie County
28 Southtown's Sewage Treatment
29 Agency ...................................... 440 55
30 Village of Alden .............................. 1,808 195
31 City of Lackawanna ............................ 984 123
32 Village of Blasdell ........................... 4,600 548
33 Genesee
34 Village of Attica ............................. 3,480 435
35 Monroe County
36 Rochester Pure Waters District ................ 47,736 5,967
37 Nassau County
38 Nassau County Sewer District 3 ................ 11,920 1,490
39 New York City
40 City of New York: Newtown
41 Creek Plant Upgrading ....................... 2,040 255
42 Niagara County
43 Village of Middleport ......................... 96 12
44 Oneida County
45 City of Sherrill .............................. 1,384 173
46 Onondaga County
47 Baldwinsville-Seneca Knolls
48 Sewer District .............................. 2,224 278
49 Nine Mile Creek ............................... 2,936 367
50 Orange County
282 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Town of New Windsor ........................... 1,336 167
2 St. Lawrence County
3 City of Ogdensburg ............................ 696 87
4 Saratoga County
5 Village of South Glens Falls .................. 1,200 150
6 Seneca County
7 Seneca County Sewer District 1 ............... 4,200 525
8 Sullivan County
9 Town of Rockland .............................. 296 37
10 Town of Delaware .............................. 412 89
11 Tioga County
12 Village of Waverly ............................ 1,104 138
13 Village of Owego .............................. 1,408 176
14 Tompkins County
15 City of Ithaca ................................ 440 55
16 Yates County
17 Village of Penn Yan ........................... 1,720 215
18 --------- --------
19 Subtotal-Supplements .......................... $13,144
20 New Projects (In Planning and
21 Construction):
22 Albany County
23 City of Albany ................................ $360 $45
24 Cattaraugus County
25 Town of Olean ................................. 8 1
26 Clinton County
27 Clinton County Sludge Study ................... 1,040 130
28 Town of Black Brook ........................... 1,384 173
29 Cortland County
30 Village of McGraw ............................. 912 114
31 Delaware County
32 Village of Hancock ............................ 968 121
33 Village of Hobart ............................. 72 9
34 Fulton County
35 City of Gloversville .......................... 2,192 274
36 Genesee County
37 Batavia Sewer District 2 ...................... 72 9
38 Greene County
39 Town and Village of Catskill .................. 96 12
40 Town of Catskill .............................. 192 24
41 Herkimer County
42 Village of Herkimer ........................... 304 38
43 Livingston County
44 Village of Avon ............................... 160 20
45 Madison County
46 Village of Hamilton ........................... 504 63
47 Monroe County
48 Town of Perinton .............................. 88 11
49 Rochester Pure Waters District ................ 1,528 191
50 Village of Spencerport ........................ 1,400 175
51 Town of Henrietta ............................. 56 7
52 Ontario County
283 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 City of Geneva ................................ 1,720 215
2 Onondaga County
3 Onondaga County/Syracuse
4 Metro ....................................... 10,776 1,347
5 Onondaga County (Ley Creek) ................... 56 7
6 Orange County
7 Town of Montgomery ............................ 728 91
8 Village of Montgomery ......................... 1,632 204
9 Orleans County
10 Town of Shelby ................................ 8 1
11 Town of Ridgeway .............................. 264 33
12 Putnam County
13 Putnam County ................................. 152 19
14 Rockland County
15 Village of Suffern ............................ 4,160 520
16 Seneca County
17 Village of Lodi ............................... 360 45
18 Town of Waterloo .............................. 144 18
19 St. Lawrence County
20 Town of Lawrence .............................. 200 25
21 Steuben County
22 Village of South Corning ...................... 808 101
23 Sullivan County
24 Town of Tusten ................................ 816 102
25 Town of Fallsburg ............................. 504 63
26 Tompkins County
27 Town of Newfield .............................. 384 48
28 Village of Dryden ............................. 1,000 125
29 Ulster County
30 Village of Ellenville ......................... 448 56
31 Town of Wawarsing ............................. 1,224 153
32 Town of Crawford .............................. 1,240 155
33 Town of Saugerties ............................ 5,912 702
34 Westchester County
35 Town of North Castle .......................... 1,408 176
36 Wyoming County
37 Village of Castile ............................ 40 5
38 --------
39 Subtotal-New Projects ......................... $5,628
40 Statewide
41 Supplement to various previously
42 scheduled projects .......................... $62,152 $7,684
43 Engineering studies, reports
44 and designs, various projects ............... 6,088 736
45 --------
46 Supplements ................................... $8,420
47 Grand Total Appropriation ................... $27,190
48 =========
49 By chapter 54, section 3, of the laws of 1978, as amended by chapter 55,
50 section 1, of the laws of 2003, for:
284 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The state share of the cost of construction of water quality improve
2 ment projects, including the payment of liabilities incurred prior
3 to April 1, 1978, in accordance with the provisions of title three
4 of article fifty-one of the environmental conservation law as
5 amended for projects included in the following schedule, including
6 costs incidental and appurtenant thereto, hereinafter referred to as
7 "Water Quality Improvement Disbursements."
8 Notwithstanding the provisions of any general or special law, the
9 moneys hereby appropriated shall be available for water quality
10 improvement expenditures for eligible water quality improvement
11 projects as defined by section 51-0303 of the environmental conser-
12 vation law upon the issuance of a certificate of approval of avail-
13 ability by the director of the division of the budget.
14 The state comptroller shall at the commencement of each month certify
15 to the director of the division of the budget, the commissioner of
16 environmental conservation, the chairman of the senate finance
17 committee, and the chairman of the assembly ways and means committee
18 the amounts disbursed from this appropriation for Water Quality
19 Improvement Disbursements for the month preceding such certification
20 (01385957) ... 21,229,100 ........................... (re. $525,000)
21 project schedule
22 ESTIMATED
23 ELIGIBLE ESTIMATED
24 PROJECT STATE
25 COUNTY OR CITY PROJECT COST SHARE
26 -----------------------------------------------------------------------
27 (thousands)
28 Supplements to previous appropriations:
29 Albany
30 Town of Guilderland .............................. $2,088 $261
31 Chautauqua
32 City of Jamestown ................................. 3,720 465
33 Chautauqua Lake Sewer District .................... 4,864 164
34 Delaware
35 Village of Hancock ................................ 4,984 623
36 Erie
37 Buffalo Sewer Authority ........................... 33,104 4,001
38 Towns of Aurora and Holland; Village of East
39 Aurora .......................................... 3,448 431
40 Southtown's Sewage Treatment Agency ............... 22,944 2,757
41 Niagara
42 Village of Wilson ................................. 2,600 311
43 Ontario
44 Honeoye Lake Sewer District ....................... 1,664 208
45 Orange
46 Towns of Blooming Grove, Cornwall and New Wind-
47 sor ............................................. 1,104 138
48 Oswego
49 City of Fulton .................................... 4,680 585
50 Rensselaer
285 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Town of Sand Lake ................................. 2,208 97
2 Rockland
3 Rockland County Sewer District No. 1 .............. 8,136 1,017
4 Suffolk
5 Suffolk County Sewer District No. 3 ............... 1,296 162
6 Sullivan
7 Town of Bethel .................................... 7,208 901
8 Westchester
9 Mamaroneck Sewer District ......................... 5,128 641
10 --------
11 Subtotal-Supplements .............................. $12,761
12 New Construction Projects:
13 Albany
14 Town of Coeymans .................................. $440 $55
15 Chautauqua
16 Village of Falconer ............................... 424 53
17 Clinton
18 Town of Peru ...................................... 1,072 134
19 Columbia
20 Town of Stockport ................................. 544 68
21 Erie
22 Buffalo Sewer Authority (Project C-36-915) ........ 768 96
23 City of Lackawanna ................................ 7,080 885
24 Genesee
25 Village of Elba ................................... 256 32
26 Greene
27 Town of Hunter and Village of Tannersville ........ 120 15
28 Jefferson
29 Village of Brownville ............................. 104 13
30 Town of Watertown ................................. 176 22
31 Madison
32 Town of Sullivan .................................. 72 9
33 Oneida
34 Town of Marcy ..................................... 144 18
35 Onondaga
36 Meadowbrook-Limestone Sewage Treatment Plant Ex-
37 pansion ......................................... 1,352 169
38 Morgan Road Sewer Agency .......................... 3,056 382
39 Ontario
40 Town of Farmington ................................ 408 51
41 Village of Holcomb ................................ 392 49
42 Orange
43 Village of Montgomery ............................. 1,576 197
44 Town of Warwick and Village of Greenwood Lake ..... 48 6
45 Town of Woodbury .................................. 12,472 1,559
46 Otsego
47 City and Town of Oneonta .......................... 320 40
48 Village of Richfield Springs ...................... 15 2
49 Rensselaer
50 Town of Brunswick ................................. 128 16
51 Town of North Greenbush ........................... 152 19
52 Schoharie
286 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Village of Richmondville .......................... 16 2
2 Schuyler
3 Town of Reading ................................... 384 48
4 Seneca
5 Towns of Romulus and Varick ....................... 304 38
6 Seneca County Sewer District No. 1 ................ 2,352 294
7 Village of Waterloo ............................... 1,368 171
8 Ulster
9 City of Kingston .................................. 2,744 343
10 New York City
11 City of New York: Area Sludge Study (C-36-1082) ... 9,608 1,118
12 --------
13 Subtotal-New Projects ............................. $5,904
14 New Projects (In Planning):
15 Albany
16 City of Cohoes .................................... $72 $9
17 Broome
18 Village of Endicott ............................... 144 18
19 Town of Sanford ................................... 16 2
20 Cattaraugus
21 City of Olean ..................................... 144 18
22 Village of Portville .............................. 64 8
23 Chautauqua
24 Town of Ellicott .................................. 32 4
25 Ripley Sewer District ............................. 152 19
26 Village of Sinclairville .......................... 16 2
27 Clinton
28 Town of Champlain ................................. 104 13
29 Town of Plattsburgh ............................... 788 99
30 Dutchess
31 Village of Pawling ................................ 192 24
32 Erie
33 Village of Akron .................................. 80 10
34 Town of Brant ..................................... 110 14
35 Buffalo Sewer Authority (Project C-36-1044) ....... 3,416 427
36 Buffalo Sewer Authority (Project C-36-1070) ....... 112 14
37 Buffalo Sewer Authority (Project C-36-1130) ....... 800 100
38 Village of Springville ............................ 104 13
39 Essex
40 Town of Port Henry ................................ 40 5
41 Town of Willsboro ................................. 80 10
42 Franklin
43 Village of Tupper Lake ............................ 104 13
44 Fulton
45 City of Gloversville and Village of Johnstown ..... 360 45
46 Genesee
47 City of Batavia ................................... 560 70
48 Greene
49 Village of Coxsackie .............................. 160 20
50 Jefferson
51 Village of Deferiet ............................... 32 4
52 Lewis
287 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Village of Castorland ............................. 8 1
2 Madison
3 Village of Chittenango ............................ 88 11
4 Monroe
5 Town of Brighton .................................. 32 4
6 Towns of Hamlin and Kendall ....................... 48 6
7 Montgomery
8 City of Amsterdam and Town of Amsterdam ........... 336 42
9 Nassau
10 Nassau County Sewer District No. 3 ................ 1,021 128
11 Oyster Bay Sewer District ......................... 256 32
12 West Long Beach Sewer District (Project C-36-
13 1043) ........................................... 1,984 248
14 Niagara
15 Town of Lewiston .................................. 88 11
16 Village of Middleport ............................. 136 17
17 Oneida
18 Town of Marcy ..................................... 552 69
19 County of Oneida, Pump Station, Sequoit Creek ..... 520 65
20 Onondaga
21 Village of Marcellus .............................. 224 28
22 Orange
23 Town of Warwick ................................... 264 33
24 Orleans
25 Village of Medina ................................. 376 47
26 Rensselaer
27 Village of Hoosick Falls .......................... 56 7
28 City of Rensselaer ................................ 56 7
29 Rockland
30 Village of Suffern ................................ 200 25
31 St. Lawrence
32 Village of Heuvelton .............................. 56 7
33 Village of Norwood ................................ 64 8
34 Saratoga
35 Village of South Glens Falls ...................... 104 13
36 Seneca
37 Town of Seneca Falls .............................. 528 66
38 Steuben
39 City of Corning ................................... 200 22
40 Suffolk
41 Village of Greenport and Town of Southold ......... 1,064 133
42 Town of Huntington ................................ 312 39
43 Town of Southold .................................. 24 3
44 Sullivan
45 Towns of Callicoon and Delaware, and Village of
46 Jeffersonville (C-D-J) Joint Sewer Board ........ 40 5
47 Town of Delaware .................................. 72 9
48 Tompkins
49 Village of Lansing ................................ 104 13
50 Ulster
51 Town of Wawarsing ................................. 16 2
288 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Town of Woodstock ................................. 120 15
2 Washington
3 Village of Fort Ann ............................... 32 4
4 Wayne
5 Village of Clyde .................................. 64 8
6 Village of Newark ................................. 128 16
7 Village of Lyons .................................. 40 5
8 Westchester
9 Town of Mount Pleasant ............................ 128 16
10 Yonkers Sewer District ............................ 728 91
11 Town of Yorktown .................................. 168 21
12 Wyoming
13 Village of Attica ................................. 280 35
14 Town of Bennington and Hamlet of Cowlesville ...... 24 3
15 Towns of Castile and Perry ........................ 288 36
16 New York City
17 City of New York: Newtown Creek Plant Upgrading
18 (C-36-713) ...................................... 2,008 251
19 --------
20 Subtotal-Projects In Planning ..................... $2,563
21 Grand Total of Appropriations ................. $21,229
22 ========
23 By chapter 54, section 3, of the laws of 1977, as amended by chapter 54,
24 section 1, of the laws of 2002:
25 The state share of the cost of construction of water quality improve-
26 ment projects, including the payment of liabilities incurred prior
27 to April 1, 1977, in accordance with the provisions of title three
28 of article fifty-one of the environmental conservation law as
29 amended for projects included in the following schedule, including
30 costs incidental and appurtenant thereto, hereinafter referred to as
31 "Water Quality Improvement Disbursements."
32 Notwithstanding the provisions of any general or special law, the
33 moneys hereby appropriated shall be available for water quality
34 improvement expenditures for eligible water quality improvement
35 projects as defined by section 51-0303 of the environmental conser-
36 vation law upon the issuance of a certificate of approval of avail-
37 ability by the director of the division of the budget.
38 The state comptroller shall at the commencement of each month certify
39 to the director of the division of the budget, the commissioner of
40 environmental conservation, the chairman of the senate finance
41 committee, and the chairman of the assembly ways and means committee
42 the amounts expended from this appropriation for Water Quality
43 Improvement Disbursements for the month preceding such certification
44 (01385757) ... 20,829,700 ........................... (re. $415,000)
45 project schedule
46 ADDITIONAL
47 ESTIMATED ADDITIONAL
48 ELIGIBLE ESTIMATED
289 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 PROJECT STATE
2 COUNTY OR CITY PROJECT COST SHARE
3 -----------------------------------------------------------------------
4 (thousands)
5 Supplements to previous appropriations:
6 Chautauqua
7 City of Jamestown .............................. $3,824 $478
8 Erie
9 Southtown's sewage treatment agency ............ 8,128 880
10 Monroe
11 Town of Webster ................................ 5,560 695
12 Rochester pure waters district (project C-36-
13 745) ......................................... 80,736 10,092
14 Irondequoit Bay pure waters district ........... 352 44
15 South Central pure waters district ............. 1,112 139
16 Ontario
17 City of Canandaigua ............................ 4,640 580
18 Rockland
19 Rockland County sewer district No. 1 ........... 4,304 538
20 Saratoga
21 Saratoga County sewer district No. 1 ........... 1,864 ...
22 Sullivan
23 Town of Thompson, Village of Monticello ........ 4,344 543
24 Wayne
25 Town of Ontario ................................ 8 1
26 New York City
27 Oakwood Beach .................................. 23,424 2,928
28 ---------
29 Subtotal-Supplements ........................... $16,909
30 ---------
31 New Projects
32 Chautauqua
33 North Chautauqua Lake sewer district
34 (project C-36-913) ........................... $2,701 $338
35 Chenango
36 Village of Greene .............................. 43 6
37 Madison
38 Town of Lenox .................................. 1,700 213
39 Town of Sullivan, East Sullivan ................ 400 50
40 Oneida
41 Town of Verona, East Oneida Lake ............... 2,500 313
42 Otsego
43 Town of Oneonta ................................ 302 38
44 Suffolk
45 Suffolk County sewer district (project C-36-
46 1036) ........................................ 20,064 2,508
47 ---------
48 Subtotal-New Projects .......................... $3,466
49 Step I Planning
50 Albany
51 Town of Bethlehem (C-36-1096) .................. $6
52 Chautauqua
290 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Portland, Pomfret, Dunkirk Sewer District
2 (C-36-1097) .................................. 4
3 Chenango
4 Village of Sherburne (C-36-1051) ............... 8
5 Columbia
6 Village of Chatham (C-36-1101) ................. 4
7 Town of Kinderhook (C-36-1118) ................. 5
8 Cortland
9 Cortland County SA (C-36-1001) ................. 5
10 Delaware
11 Village of Hancock (C-36-874) .................. 5
12 Village of Stamford (C-36-1114) ................ 1
13 Erie
14 Town of Aurora (C-36-836) ...................... 26
15 Village of Blasdell (C-36-1012) ................ 25
16 Buffalo Sewer Authority (C-36-830) ............. 32
17 Essex
18 Village of Elizabethtown (C-36-1105) ........... 3
19 Franklin
20 St. Regis Mohawk Indian Reservation
21 (C-36-1111) .................................. 10
22 Genesee
23 Town of Pavilion (C-36-1078) ................... 2
24 Greene
25 Town of Catskill (C-36-1024) ................... 1
26 Herkimer
27 Town of West Winfield (C-36-1084) .............. 1
28 Jefferson
29 Village of Dexter (C-36-1005) .................. 1
30 LaFargeville, Town of Orleans (C-36-1119) ...... 4
31 Livingston
32 Village of Caledonia (C-36-1010) ............... 5
33 Town of Livonia (C-36-1088) .................... 3
34 Town of York (C-36-1011) ....................... 5
35 Madison
36 Town of Cazenovia (C-36-1092) .................. 3
37 Onondaga
38 Village of Skaneateles (C-36-1000) ............. 13
39 Ontario
40 Village of Rushville (C-36-1094) ............... 9
41 Oswego
42 City of Fulton (C-36-1009) ..................... 24
43 Rensselaer
44 Town of Schodack (C-36-1117) ................... 10
45 Rockland
46 Town of Stony Point (C-36-993) ................. 10
47 St. Lawrence
48 Village of Waddington (C-36-1076) .............. 4
49 Saratoga
50 Town of Stillwater (C-36-1113) ................. 5
51 Schoharie
52 Village of Middleburgh (C-36-929) .............. 3
291 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Village of Sharon Springs (C-36-1098) .......... 1
2 Seneca
3 Village of Seneca Falls (C-36-1102) ............ 7
4 Sullivan
5 Town of Bethel (C-36-1115) ..................... 10
6 Tioga
7 Town of Owego (C-36-1004) ...................... 3
8 Tompkins
9 City of Ithaca (C-36-1095) ..................... 42
10 Ulster
11 Town of Gardiner (C-36-1086) ................... 6
12 Town of Marlborough (C-36-1098) ................ 101
13 Town & Village of New Paltz (C-36-1087) ........ 12
14 Washington
15 Washington County SA (C-36-1021) ............... 28
16 Wayne
17 Village of Sodus (C-36-1091) ................... 3
18 Yates
19 Village of Penn Yan (C-36-1022) ................ 5
20 ---------
21 Subtotal-Step I Planning ....................... $455
22 ---------
23 Grand Total Appropriation .................... $20,830
24 =========
25 By chapter 54, section 5, of the laws of 1976, as amended by chapter 55,
26 section 1, of the laws of 2003, for:
27 The state share of the cost of construction of water quality improve
28 ment projects, including the payment of liabilities incurred prior
29 to April 1, 1976, in accordance with the provisions of title three
30 of article fifty-one of the environmental conservation law as
31 amended for projects included in the following schedule, including
32 costs incidental and appurtenant thereto, hereinafter referred to as
33 "Water Quality Improvement Disbursements."
34 Notwithstanding the provisions of any general or special law, the
35 moneys hereby appropriated shall be available for water quality
36 improvement expenditures for eligible water quality improvement
37 projects as defined by section 51-0303 of the environmental conser-
38 vation law upon the issuance of a certificate of approval of avail-
39 ability by the director of the division of the budget.
40 The state comptroller shall at the commencement of each month certify
41 to the director of the division of the budget, the commissioner of
42 environmental conservation, the chairman of the senate finance
43 committee, and the chairman of the assembly ways and means committee
44 the amounts disbursed from this appropriation for Water Quality
45 Improvement Disbursements for the month preceding such certification
46 (01385557) ... 45,543,700 ........................... (re. $346,000)
47 project schedule
48 ADDITIONAL
49 ESTIMATED ADDITIONAL
50 ELIGIBLE ESTIMATED
292 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 PROJECT STATE
2 COUNTY OR CITY PROJECT COST SHARE
3 -----------------------------------------------------------------------
4 (thousands)
5 Supplements to previous appropriations:
6 Albany
7 Village of Green Island ....................... $424 $53
8 Chautauqua
9 So. Central Chautauqua Lake sewer district .... 3,592 449
10 Erie
11 Town of Grand Island .......................... 3,824 478
12 Southtown's Sewage Treatment Agency ........... 13,664 1,708
13 Herkimer
14 Herkimer County sewer district ................ 2,136 267
15 Madison
16 City of Oneida ................................ 2,208 276
17 Monroe
18 Rochester pure waters district (project C-36-
19 745) ........................................ 16,560 1,935
20 Town of Webster ............................... 288 36
21 Nassau
22 Recharge facility, Nassau Co. sewer district
23 No. 3 ....................................... 6,224 778
24 Niagara
25 Town of Niagara ............................... 2,432 304
26 Oneida
27 Village of Sylvan Beach ....................... 1,416 177
28 City of Utica ................................. 496 62
29 Onondaga
30 Baldwinsville--
31 Seneca Knolls sewer district .................. 4,032 504
32 Oak Orchard service area ...................... 3,744 468
33 Ontario
34 City of Canandaigua ........................... 904 113
35 Putnam
36 Town of Carmel, Lake Secor sewer district
37 No. 4 ....................................... 704 88
38 Rockland
39 Rockland County sewer district No. 1 .......... 9,600 1,200
40 Sullivan
41 Town of Thompson, Village of Monticello ....... 1,208 151
42 Wayne
43 Town of Williamson ............................ 2,424 303
44 Westchester
45 Blind Brook sewer district .................... 1,368 171
46 Port Chester sewer district ................... 1,488 186
47 New York City
48 Coney Island .................................. 53,776 6,722
49 Oakwood Beach ................................. 20,864 2,608
50 Red Hook ...................................... 19,608 2,451
51 Statewide
52 Supplements to various previously scheduled
293 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 projects ................................... 157,864 19,171
2 ---------
3 Subtotal--Supplements ........................... $40,659
4 ---------
5 New Projects
6 Genesee
7 Town of Batavia, Sewer district No. 1 ......... $51 $7
8 Onondaga
9 Meadowbrook Trunk sewer ....................... 1,000 125
10 Statewide Engineering studies, reports and
11 designs, various projects ................... 38,584 4,764
12 ---------
13 Subtotal--New Projects ........................ $4,896
14 ---------
15 Grand Total Appropriation ................... $45,544
16 =========
17 By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
18 section 1, of the laws of 2002, for:
19 The state share of the cost of construction of water quality improve-
20 ment projects, including the payment of liabilities incurred prior
21 to April 1, 1975, in accordance with the provisions of title three
22 of article fifty-one of the environmental conservation law as
23 amended for projects included in the following schedule, including
24 costs incidental and appurtenant thereto, hereinafter referred to as
25 "Water Quality Improvement Disbursements."
26 Notwithstanding the provisions of any general or special law, the
27 moneys hereby appropriated shall be available for water quality
28 improvement expenditures for eligible water quality improvement
29 projects as defined by section 51-0303 of the environmental conser-
30 vation law upon the issuance of a certificate of approval of avail-
31 ability by the director of the division of the budget.
32 The state comptroller shall at the commencement of each month certify
33 to the director of the division of the budget, the commissioner of
34 environmental conservation, the chairman of the senate finance
35 committee, and the chairman of the assembly ways and means committee
36 the amounts disbursed from this appropriation for Water Quality
37 Improvement Disbursements for the month preceding such certification
38 (00320557) ... 92,201,700 ........................... (re. $460,000)
39 project schedule
40 ESTIMATED
41 ELIGIBLE ESTIMATED
42 PROJECT STATE
43 COUNTY PROJECT COST SHARE
44 -----------------------------------------------------------------------
45 (thousands)
46 Supplements to previous appropriations
47 Albany
48 Village of Altamont ............................ $315 $39
49 Town of Guilderland ............................ 1,182 148
294 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Village of Green Island ........................ 130 16
2 Cattaraugus
3 Village of Franklinville ....................... 205 26
4 Village of Limestone ........................... 50 7
5 Village of Little Valley ....................... 1,594 200
6 Chautauqua
7 So. Chautauqua Lake Sewer District ............. 422 53
8 Chautauqua Utility District .................... 2,080 260
9 Village of Fredonia ............................ 2,400 300
10 Town of Hanover ................................ 770 96
11 Village of Sherman ............................. 211 26
12 Chemung
13 Chemung County ................................. 27,770 3,471
14 Columbia
15 Town of Greenport .............................. 420 52
16 City of Hudson ................................. 24 3
17 Village of Philmont ............................ 449 57
18 Village of Valatie ............................. 161 20
19 Cortland
20 City of Cortland ............................... 64 8
21 Erie
22 Erie County Sewer District No. 4 ............... 6,352 794
23 Town of Amherst ................................ 65,184 8,148
24 Essex
25 Village of Ticonderoga ......................... 512 64
26 Franklin
27 Village of Chateaugay .......................... 28 4
28 Herkimer
29 Herkimer County Sewer District ................. 1,304 163
30 Jefferson
31 Village of Adams ............................... 490 62
32 City of Watertown .............................. 904 113
33 Lewis
34 Village of Croghan ............................. 26 3
35 Livingston
36 Village of Dansville ........................... 80 10
37 Madison
38 Cazenovia ...................................... 112 14
39 Monroe
40 City of Rochester .............................. 44,850 5,607
41 Montgomery
42 Montgomery County Sewer District No. 1 ......... 1,400 175
43 Niagara
44 Town of Newfane ................................ 670 84
45 Niagara County Sewer District No. 1 ............ 1,880 235
46 City of North Tonawanda ........................ 126 16
47 Village of Youngstown, Town of Porter .......... 376 47
48 Town of Somerset, Village of Barker ............ 184 23
49 Oneida
50 Village of Clinton, Town of Kirkland ........... 1,497 187
51 City of Sherrill ............................... 450 57
295 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Village of Sylvan Beach ........................ 4,877 610
2 Onondaga
3 Clay Sewer District ............................ 3,537 442
4 Village of Jordan .............................. 94 12
5 Limestone Sewer District ....................... 10 2
6 Baldwinsville Seneca Knolls Sewer District ..... 1,992 249
7 Ontario
8 City of Canandaigua ............................ 845 106
9 Orange
10 Town of Goshen ................................. 48 6
11 Orleans
12 Village of Albion .............................. 2,428 304
13 Oswego
14 Village of Mexico .............................. 56 7
15 Town of Minetto ................................ 98 12
16 City of Oswego ................................. 1,656 207
17 Village of Phoenix ............................. 416 52
18 Otsego
19 Village of Milford ............................. 128 16
20 Putnam
21 Town of Carmel, Lake Secor Sewer District No.
22 4 ............................................ 625 79
23 Rensselaer
24 Village of Castleton-on-Hudson ................. 177 23
25 Town of East Greenbush ......................... 390 48
26 Town of North Greenbush ........................ 240 30
27 Rockland
28 Rockland County Sewer District No. 1 ........... 6,273 784
29 St. Lawrence
30 Village of Massena ............................. 455 57
31 City of Ogdensburg ............................. 144 18
32 Saratoga
33 Saratoga County Sewer District No. 1 ........... 1,820 184
34 Village of Schuylerville ....................... 447 55
35 Town and Village of Waterford .................. 1,722 216
36 Schuyler
37 Village of Watkins Glen ........................ 520 65
38 Steuben
39 Village of Wayland ............................. 217 28
40 Suffolk
41 Village of Ocean Beach ......................... 210 26
42 Sullivan
43 Village of Monticello, Town of Thompson ........ 1,471 184
44 Town of Fallsburg .............................. 15,336 1,917
45 Village of Woodbridge .......................... 1,944 243
46 Tioga
47 Village of Owego ............................... 97 12
48 Village of Waverly ............................. 74 10
49 Tompkins
50 Village of Groton .............................. 39 5
51 Ulster
296 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Town of Shawangunk ............................. 2,135 267
2 Wayne
3 Town of Marion ................................. 165 21
4 Town of Williamson ............................. 4,960 620
5 Westchester
6 Blind Brook Sewer District ..................... 7,215 902
7 Ossining Sewer District ........................ 10,221 1,278
8 Port Chester Sewer District .................... 1,800 225
9 Wyoming
10 Village of Warsaw .............................. 110 14
11 New York City
12 Coney Island ................................... 1,584 198
13 Oakwood Beach .................................. 7,229 904
14 --------
15 Subtotal Supplements ........................... $31,026
16 New Projects
17 Albany
18 City of Albany ................................. $280 $35
19 Allegany
20 Village of Bolivar ............................. 904 113
21 Broome
22 City of Binghamton ............................. 10,952 1,330
23 Cattaraugus
24 Village of Allegany ............................ 1,560 191
25 Cayuga
26 City of Auburn ................................. 70 9
27 Village and Town of Union Springs .............. 2,118 265
28 Chautauqua
29 City of Jamestown .............................. 6,136 665
30 City of Jamestown .............................. 4,000 500
31 Village of Brocton ............................. 1,200 150
32 Chenango
33 City of Norwich ................................ 3,000 375
34 Dutchess
35 Tri-Municipal Sewer District ................... 16,840 2,105
36 Erie
37 Village of Alden ............................... 1,870 234
38 Village of Gowanda ............................. 3,017 377
39 City of Lackawanna ............................. 4,000 500
40 Southtowns ..................................... 40,335 5,042
41 Greene
42 Town of New Baltimore .......................... 830 104
43 Herkimer
44 Town of Webb ................................... 400 50
45 Livingston
46 Village of Geneseo ............................. 900 113
47 Madison
48 Village of Canastota ........................... 2,577 322
49 Monroe
50 City of Rochester, West Side ................... 152,560 19,070
51 Village of Honeoye Falls ....................... 296 37
297 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Town of Victor, Town of Mendon ................. 1,240 155
2 Nassau
3 Sewer District No. 2, Bay Park ................. 150,000 18,750
4 Wantaugh Recharge Sewer District No. 3 ......... 14,803 1,850
5 Niagara
6 City of Lockport ............................... 600 75
7 Village of Wilson .............................. 1,360 170
8 Oneida
9 Starch Factory Creek ........................... 2,356 295
10 Town of Kirkland ............................... 40 5
11 Onondaga
12 Nine Mile Creek ................................ 6,700 837
13 Ontario
14 Canandaigua Lake Sewer District ................ 2,695 337
15 Otsego
16 Village of Cooperstown ......................... 24 3
17 Oswego
18 Village of Parish .............................. 470 59
19 Orange
20 Sewer District No. 2 ........................... 800 100
21 Town of Newburgh ............................... 784 98
22 Putnam
23 Town of Putnam Valley .......................... 112 14
24 Rensselaer
25 Town of Sand Lake .............................. 2,823 353
26 Schenectady
27 Town of Niskayuna .............................. 480 60
28 Town of Rotterdam .............................. 3,968 496
29 Seneca
30 Village of Interlaken .......................... 88 11
31 Suffolk
32 Port Jefferson Sewer District .................. 9,184 1,148
33 Town of Riverhead .............................. 3,664 458
34 Sullivan
35 Village of Liberty ............................. 4,700 547
36 Town of Liberty ................................ 1,528 191
37 Ulster
38 Town of Esopus ................................. 3,000 375
39 Village of Rosendale ........................... 778 97
40 Warren
41 Village of Lake George ......................... 955 119
42 Warren County Sewer District ................... 1,760 182
43 Washington
44 Village of Cambridge ........................... 48 6
45 Westchester
46 Irvington Extension ............................ 1,552 194
47 Mamaroneck Sewer District ...................... 20,000 2,500
48 Town of North Castle, Armonk Sewer District .... 1,500 188
49 Town of Greenburgh ............................. 208 26
50 --------
51 Subtotal New Projects ............................ $61,176
52 --------
298 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Grand Total Appropriations ..................... $92,202
2 ========
3 WATER RESOURCES - PWBA (CCP)
4 Capital Projects Funds - Other
5 Capital Projects Fund
6 Water Resources Purpose
7 Water Quality Improvements
8 By chapter 55, section 1, of the laws of 2003:
9 For water resources purposes, shall be available for the state share
10 of the costs of water quality improvement projects, as defined in
11 section 56-0101 of the environmental conservation law, to implement
12 the Long Island Sound Comprehensive Conservation Management Plan
13 consistent with paragraph (b) of subdivision 1 of section 56-0303 of
14 the environmental conservation law, and to implement wastewater
15 treatment improvement projects in small upstate communities
16 (09650357) ... 8,168,000 ............................ (re. $543,000)
17 By chapter 54, section 1, of the laws of 2002:
18 For water resources purposes, shall be available for the state share
19 of the costs of water quality improvement projects, as defined in
20 section 56-0101 of the environmental conservation law, to implement
21 the Long Island Sound Comprehensive Conservation Management Plan
22 consistent with paragraph (b) of subdivision 1 of section 56-0303 of
23 the environmental conservation law, and to implement wastewater
24 treatment improvement projects in small upstate communities
25 (09650257) ... 4,900,000 ............................ (re. $668,000)
26 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
27 section 1, of the laws of 2002:
28 For the state share of the costs of construction of water quality
29 improvement projects, including the payment of liabilities incurred
30 prior to April 1, 1990, in accordance with the provisions of title 3
31 of article 51 of the environmental conservation law as amended, to
32 provide state matching funds for projects scheduled to receive
33 construction grants from federal fiscal years 1989 and 1990 funds,
34 including costs incidental and appurtenant thereto, hereinafter
35 referred to as "Water Quality Improvement Disbursements."
36 Notwithstanding the provisions of any general or special law, the
37 moneys hereby appropriated shall be available for water quality
38 improvement expenditures for eligible water quality improvement
39 projects as defined by section 51-0303 of the environmental conser-
40 vation law upon the issuance of a certificate of approval of avail-
41 ability by the director of the division of the budget. No such
42 certificates of approval of availability shall be issued for or
43 include funds for projects which have not received a federal grant
44 for the construction of sewage treatment related facilities.
45 Notwithstanding the provisions of any general or special law, the
46 amounts hereby appropriated shall have all disbursements reimbursed
299 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 from the Pure Waters Bond Act proceeds authorizations and are
2 contingent upon the partial repeal of existing capital projects fund
3 authorizations elsewhere in this chapter. The state comptroller
4 shall at the commencement of each month certify to the director of
5 the division of the budget, the commissioner of environmental
6 conservation, the chairman of the senate finance committee, and the
7 chairman of the assembly ways and means committee the amounts
8 disbursed from this appropriation for Water Quality Improvement
9 Disbursements for the month preceding such certification (09019057)
10 ... 4,609,600 ..................................... (re. $1,466,000)
11 By chapter 54, section 1, of the laws of 1988, as amended by chapter 55,
12 section 1, of the laws of 2003:
13 For the state share of the costs of construction of water quality
14 improvement projects, including the payment of liabilities incurred
15 prior to April 1, 1988, in accordance with the provisions of title 3
16 of article 51 of the environmental conservation law as amended, to
17 provide a reserve to supplement or fund additional phases of
18 projects previously appropriated and scheduled on or after May 12,
19 1965.
20 Notwithstanding the provisions of any general or special law, the
21 moneys hereby appropriated shall be available for water quality
22 improvement expenditures for any project scheduled in appropriation
23 bills on or after May 12, 1965.
24 Notwithstanding the provisions of any general or special law, the
25 amounts hereby appropriated shall be made available from the Pure
26 Waters Bond Act authorizations and are contingent upon the repeal of
27 existing authorizations elsewhere in this chapter.
28 Notwithstanding the provisions of any general or special law, the
29 moneys hereby appropriated shall not be made available until the
30 director of the division of the budget issues a certificate of
31 approval of availability with a schedule of approved and previously
32 authorized projects for which such funds shall be used. No such
33 certificates of approval of availability shall be issued for or
34 include funds for projects which have not received a federal grant
35 for the construction of sewage treatment related facilities. The
36 state comptroller shall at the commencement of each month certify to
37 the director of the division of the budget, the commissioner of
38 environmental conservation, the chairman of the senate finance
39 committee, and the chairman of the assembly ways and means committee
40 the amounts disbursed from this appropriation for Water Quality
41 Improvement Disbursements for the month preceding such certification
42 (09P28857) ... 11,690,000 ........................... (re. $718,000)
43 By chapter 54, section 1, of the laws of 1984, as amended by chapter 55,
44 section 1, of the laws of 2006:
45 For the state share of the costs of construction of water quality
46 improvement projects, including the payment of liabilities incurred
47 prior to April one, nineteen hundred eighty-four, in accordance with
48 the provisions of title three of article fifty-one of the environ-
49 mental conservation law as amended, for projects previously appro-
300 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 priated and scheduled on or after April one, nineteen hundred seven-
2 ty-two.
3 Notwithstanding the provisions of any general or special law, the
4 moneys hereby appropriated shall be available for water quality
5 improvement expenditures for any project scheduled in appropriation
6 bills on or after April one, nineteen hundred seventy-two.
7 Notwithstanding the provisions of any general or special law, the
8 amounts hereby appropriated shall be made available from the Pure
9 Water Bond Act authorizations and are contingent upon the repeal of
10 existing authorizations elsewhere in this chapter.
11 Notwithstanding the provisions of any general or special law, the
12 moneys hereby appropriated shall not be made available until the
13 director of the division of the budget issues a certificate of
14 approval of availability with a schedule of approved and previously
15 authorized projects for which such funds shall be used. No such
16 certificates of approval of availability shall be issued for or
17 include funds for projects which have not received a federal grant
18 for the construction of sewage treatment related facilities
19 (09178457) ... 56,869,200 ........................... (re. $913,000)
20 By chapter 79, section 14, of the laws of 1970, as amended by chapter
21 55, section 1, of the laws of 2006:
22 Notwithstanding the provisions of chapter 657 of the laws of 1982 to
23 the contrary, the sum of two hundred eighty million nine hundred
24 thirty-four thousand dollars ($280,934,000), or so much thereof as
25 may be necessary, is hereby appropriated from the Capital Projects
26 Fund to the department of environmental conservation for the payment
27 of the nonmunicipal share of the cost of construction of sewage
28 treatment works in the manner and to the extent specified in section
29 17-1903 of the Environmental Conservation Law.
30 Notwithstanding the provisions of any general or special law, no part
31 of this appropriation made hereby shall be available until a certif-
32 icate of approval of availability shall have been issued by the
33 director of the budget and a copy of such certificate filed with the
34 state comptroller, the chairman of the senate finance committee and
35 the chairman of the assembly ways and means committee.
36 Such certificate may be amended from time to time by the director of
37 the budget and a copy of each such amendment shall be filed with the
38 state comptroller, the chairman of the senate finance committee and
39 the chairman of the assembly ways and means committee (01385357) ...
40 272,873,100 ....................................... (re. $1,101,000)
41 By chapter 177, section 5, of the laws of 1965, as amended by chapter
42 55, section 1, of the laws of 2003:
43 The sum of two hundred eighty-six million three hundred thirty-four
44 thousand dollars ($286,334,000), or so much thereof as may be neces-
45 sary, is hereby appropriated from the Capital Projects Fund to the
46 department of environmental conservation for the payment of the
47 nonmunicipal share of the cost of construction of sewage treatment
48 works in the manner and to the extent specified in section 17-1903
49 of the Environmental Conservation Law.
301 12654-10-8
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding the provisions of any general or special law, no part
2 of the appropriation made hereby shall be available until a certif-
3 icate of approval of availability shall have been issued by the
4 director of the budget and a copy of such certificate filed with the
5 state comptroller, the chairman of the senate finance committee and
6 the chairman of the assembly ways and means committee. Such certif-
7 icate may be amended from time to time by the director of the budget
8 and a copy of each such amendment shall be filed with the state
9 comptroller, the chairman of the senate finance committee and the
10 chairman of the assembly ways and means committee (01385057) .......
11 278,484,000 ......................................... (re. $630,000)
302 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Fund - Other ...... 92,699,000 386,880,000
6 ---------------- ----------------
7 All Funds ........................ 92,699,000 386,880,000
8 ================ ================
9 DESIGN AND CONSTRUCTION SUPERVISION (CCP) .................... 7,000,000
10 --------------
11 Capital Projects Funds - Other
12 Youth Facilities Improvement Fund
13 Preparation of Plans Purpose
14 For payment of design and construction
15 management account of the centralized
16 services fund of the New York state office
17 of general services for the purpose of
18 preparation and review of plans, specifi-
19 cations, estimates, services, construction
20 management and supervision, inspection
21 studies, appraisals, surveys, testing and
22 environmental impact statements and for
23 the cost of consultant design service
24 (25GS1830) ................................... 7,000,000
25 FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 5,000,000
26 --------------
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Maintenance and Operations Purpose
30 For the maintenance and operation of various
31 facilities and systems including personal
32 services, fringe benefits and indirect
33 costs. Notwithstanding any other law to
34 the contrary, all or a portion of the
35 funds appropriated herein may be suballo-
36 cated or transferred to any department,
37 agency, or public authority (25FM18M0) ....... 5,000,000
38 MAINTENANCE AND IMPROVEMENT OF YOUTH FACILITIES (CCP) ....... 70,699,000
39 --------------
40 Capital Projects Funds - Other
41 Capital Projects Fund
303 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2018-19
1 Administration Purpose
2 For the preparation and review of plans,
3 specifications, estimates, studies,
4 inspections, appraisals and surveys, and
5 payment of personal service and nonper-
6 sonal service, including fringe benefits
7 and indirect costs related to the adminis-
8 tration and security of capital projects
9 provided by the office of children and
10 family services for new and reappropriated
11 projects (25AD1850) ............................ 874,000
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Preservation of Facilities Purpose
15 For alterations and improvements to youth
16 facilities, including the preparation of
17 designs, plans, specifications, and esti-
18 mates for the preservation of existing
19 facilities and programs, including liabil-
20 ities incurred prior to April 1, 2018
21 (25GM1803) ................................... 1,725,000
22 For the cost of maintaining the Tonawanda
23 Indian Community House pursuant to chapter
24 549 of the laws of 1936 (25T31803) ............. 100,000
25 Capital Projects Funds - Other
26 Youth Facilities Improvement Fund
27 Environmental Protection or Improvements Purpose
28 For payment of the cost of construction,
29 reconstruction and improvements, including
30 the preparation of designs, plans, spec-
31 ifications and estimates for environmental
32 protection or improvements at various
33 youth facilities, including liabilities
34 incurred prior to April 1, 2018 (25EN1806)
35 .............................................. 5,000,000
36 Capital Projects Funds - Other
37 Youth Facilities Improvement Fund
38 Health and Safety Purpose
39 For payment of the cost of construction,
40 reconstruction and improvements, including
41 the preparation of designs, plans, spec-
42 ifications and estimates, for health and
43 safety improvements to existing youth
44 facilities and programs, including liabil-
304 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2018-19
1 ities incurred prior to April 1, 2018
2 (25011801) ................................... 6,000,000
3 Capital Projects Funds - Other
4 Youth Facilities Improvement Fund
5 Preservation of Facilities Purpose
6 For payment of the cost of construction,
7 reconstruction and improvements, including
8 the preparation of designs, plans, spec-
9 ifications, and estimates for the preser-
10 vation of existing facilities and
11 programs, including liabilities incurred
12 prior to April 1, 2018 (25031803) ............ 7,000,000
13 Capital Projects Funds - Other
14 Youth Facilities Improvement Fund
15 Program Improvement or Program Change Purpose
16 For payment of the cost of land acquisition,
17 construction, reconstruction, rehabili-
18 tation and improvements, including the
19 preparation of designs, plans, specifica-
20 tions and estimates, for new and existing
21 capital projects and programs including,
22 but not limited to, preparation of plans,
23 administration, maintenance and improve-
24 ment of existing facilities of any state
25 agency, new facilities, energy conserva-
26 tion, environmental protection or improve-
27 ment, health and safety, preservation of
28 facilities, accreditation and program
29 improvement or program changes associated
30 with the raising the age of juvenile
31 jurisdiction, including to the extent
32 feasible, the reuse of a facility of any
33 state agency or a new facility, provided,
34 however, that expenditures from this
35 appropriation are pursuant to part WWW of
36 chapter 59 of the laws of 2017 and no
37 expenditures may be made from this appro-
38 priation until a plan of projects has been
39 approved by the director of the budget.
40 Notwithstanding any other provision of law
41 to the contrary, money hereby appropriated
42 may be suballocated or transferred to the
43 department of corrections and community
44 supervision or any other agency for
45 expenses related to this program
46 (25RA1808) .................................. 50,000,000
305 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2018-19
1 PROGRAM IMPROVEMENT OR PROGRAM CHANGE (CCP) ................. 10,000,000
2 --------------
3 Capital Projects Funds - Other
4 Youth Facilities Improvement Fund
5 Program Improvement or Program Change Purpose
6 For payment of the cost of construction,
7 reconstruction, security and other
8 improvements, including the preparation of
9 designs, plans, specifications and esti-
10 mates related to improvements or changes
11 to existing facilities or programs,
12 including liabilities incurred prior to
13 April 1, 2018 (25081808) .................... 10,000,000
306 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
2 Capital Projects Funds - Other
3 Youth Facilities Improvement Fund
4 Preparation of Plans Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For payment of design and construction management account of the
7 centralized services fund of the New York state office of general
8 services for the purpose of preparation and review of plans, spec-
9 ifications, estimates, services, construction management and super-
10 vision, inspection studies, appraisals, surveys, testing and envi-
11 ronmental impact statements and for the cost of consultant design
12 service (25GS1730) ... 7,000,000 .................. (re. $7,000,000)
13 By chapter 55, section 1, of the laws of 2016:
14 For payment of design and construction management account of the
15 centralized services fund of the New York state office of general
16 services for the purpose of preparation and review of plans, spec-
17 ifications, estimates, services, construction management and super-
18 vision, inspection studies, appraisals, surveys, testing and envi-
19 ronmental impact statements and for the cost of consultant design
20 service (25GS1630) ... 7,000,000 .................. (re. $6,878,000)
21 By chapter 54, section 1, of the laws of 2015:
22 For payment of design and construction management account of the
23 centralized services fund of the New York state office of general
24 services for the purpose of preparation and review of plans, spec-
25 ifications, estimates, services, construction management and super-
26 vision, inspection studies, appraisals, surveys, testing and envi-
27 ronmental impact statements and for the cost of consultant design
28 service (25GS1530) ... 7,000,000 .................. (re. $1,600,000)
29 By chapter 54, section 1, of the laws of 2014:
30 For payment of design and construction management account of the
31 centralized services fund of the New York state office of general
32 services for the purpose of preparation and review of plans, spec-
33 ifications, estimates, services, construction management and super-
34 vision, inspection studies, appraisals, surveys, testing and envi-
35 ronmental impact statements and for the cost of consultant design
36 service (25GS1430) ... 7,000,000 .................. (re. $4,056,000)
37 By chapter 54, section 1, of the laws of 2013:
38 For payment of design and construction management account of the
39 centralized services fund of the New York state office of general
40 services for the purpose of preparation and review of plans, spec-
41 ifications, estimates, services, construction management and super-
42 vision, inspection studies, appraisals, surveys, testing and envi-
43 ronmental impact statements and for the cost of consultant design
44 service (25GS1330) ... 7,000,000 .................. (re. $1,057,000)
307 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2012:
2 For payment of design and construction management account of the
3 centralized services fund of the New York state office of general
4 services for the purpose of preparation and review of plans, spec-
5 ifications, estimates, services, construction management and super-
6 vision, inspection studies, appraisals, surveys, testing and envi-
7 ronmental impact statements and for the cost of consultant design
8 service (25GS1230) ... 7,000,000 .................. (re. $3,573,000)
9 By chapter 54, section 1, of the laws of 2011:
10 For payment of design and construction management account of the
11 centralized services fund of the New York state office of general
12 services for the purpose of preparation and review of plans, spec-
13 ifications, estimates, services, construction management and super-
14 vision, inspection studies, appraisals, surveys, testing and envi-
15 ronmental impact statements and for the cost of consultant design
16 service (25GS1130) ... 7,000,000 .................. (re. $3,559,000)
17 By chapter 53, section 1, of the laws of 2009:
18 For payment of design and construction management account of the
19 centralized services fund of the New York state office of general
20 services for the purpose of preparation and review of plans, spec-
21 ifications, estimates, services, construction management and super-
22 vision, inspection studies, appraisals, surveys, testing and envi-
23 ronmental impact statements and for the cost of consultant design
24 service (25GS0930) ... 7,000,000 .................. (re. $2,134,000)
25 By chapter 53, section 1, of the laws of 2008:
26 For payment of design and construction management account of the
27 centralized services fund of the New York state office of general
28 services for the purpose of preparation and review of plans, spec-
29 ifications, estimates, services, construction management and super-
30 vision, inspection studies, appraisals, surveys, testing and envi-
31 ronmental impact statements and for the cost of consultant design
32 service (25GS0830) ... 7,000,000 ..................... (re. $34,000)
33 By chapter 53, section 1, of the laws of 2007:
34 For payment of design and construction management account of the
35 centralized services fund of the New York state office of general
36 services for the purpose of preparation and review of plans, spec-
37 ifications, estimates, services, construction management and super-
38 vision, inspection studies, appraisals, surveys, testing and envi-
39 ronmental impact statements and for the cost of consultant design
40 service (25GS0730) ... 7,000,000 ..................... (re. $28,000)
41 By chapter 53, section 1, of the laws of 2006:
42 For payment of design and construction management account of the
43 centralized services fund of the New York state office of general
44 services for the purpose of preparation and review of plan, specifi-
45 cations, estimates, services, construction management and super-
46 vision, inspection studies, appraisals, surveys, testing and envi-
308 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ronmental impact statements and for the cost of consultant design
2 service (25GS0630) ... 7,000,000 ..................... (re. $62,000)
3 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
4 Capital Projects Funds - Other
5 Capital Projects Fund
6 Maintenance and Operations Purpose
7 By chapter 54, section 1, of the laws of 2017:
8 For the maintenance and operation of various facilities and systems
9 including personal services, fringe benefits and indirect costs.
10 Notwithstanding any other law to the contrary, all or a portion of
11 the funds appropriated herein may be suballocated or transferred to
12 any department, agency, or public authority (25FM17M0) .............
13 5,000,000 ......................................... (re. $3,721,000)
14 MAINTENANCE AND IMPROVEMENT OF YOUTH FACILITIES (CCP)
15 Capital Projects Funds - Other
16 Capital Projects Fund
17 Preservation of Facilities Purpose
18 By chapter 54, section 1, of the laws of 2017:
19 For alterations and improvements to youth facilities, including the
20 preparation of designs, plans, specifications, and estimates for the
21 preservation of existing facilities and programs, including liabil-
22 ities incurred prior to April 1, 2017 (25GM1703) ...................
23 1,725,000 ......................................... (re. $1,602,000)
24 For the cost of maintaining the Tonawanda Indian Community House
25 pursuant to chapter 549 of the laws of 1936 (25T31703) .............
26 100,000 .............................................. (re. $97,000)
27 By chapter 55, section 1, of the laws of 2016:
28 For alterations and improvements to youth facilities, including the
29 preparation of designs, plans, specifications, and estimates for the
30 preservation of existing facilities and programs, including liabil-
31 ities incurred prior to April 1, 2016 (25GM1603) ...................
32 1,725,000 ........................................... (re. $589,000)
33 For the cost of maintaining the Tonawanda Indian Community House
34 pursuant to chapter 549 of the laws of 1936 (25T31603) .............
35 100,000 .............................................. (re. $70,000)
36 By chapter 54, section 1, of the laws of 2015:
37 For alterations and improvements to youth facilities, including the
38 preparation of designs, plans, specifications, and estimates for the
39 preservation of existing facilities and programs, including liabil-
40 ities incurred prior to April 1, 2015 (25GM1503) ...................
41 1,725,000 ........................................... (re. $515,000)
309 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the cost of maintaining the Tonawanda Indian Community House
2 pursuant to chapter 549 of the laws of 1936 (25T31503) .............
3 100,000 ............................................... (re. $6,000)
4 By chapter 54, section 1, of the laws of 2014:
5 For alterations and improvements to youth facilities, including the
6 preparation of designs, plans, specifications, and estimates for the
7 preservation of existing facilities and programs, including liabil-
8 ities incurred prior to April 1, 2014 (25GM1403) ...................
9 1,725,000 ......................................... (re. $1,238,000)
10 By chapter 54, section 1, of the laws of 2013:
11 For alterations and improvements to youth facilities, including the
12 preparation of designs, plans, specifications, and estimates for the
13 preservation of existing facilities and programs, including liabil-
14 ities incurred prior to April 1, 2013 (25GM1303) ...................
15 1,725,000 ........................................... (re. $901,000)
16 For the cost of maintaining the Tonawanda Indian Community House
17 pursuant to chapter 549 of the laws of 1936 (25T31303) .............
18 100,000 ............................................... (re. $3,000)
19 By chapter 54, section 1, of the laws of 2012:
20 For the cost of maintaining the Tonawanda Indian Community House
21 pursuant to chapter 549 of the laws of 1936 (25T31203) .............
22 100,000 ............................................. (re. $100,000)
23 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
24 section 1, of the laws of 2013:
25 For alterations and improvements to youth facilities, including the
26 preparation of designs, plans, specifications, and estimates for the
27 preservation of existing facilities and programs, including liabil-
28 ities incurred prior to April 1, 2012 (25GM1203) ...................
29 1,725,000 ........................................... (re. $423,000)
30 By chapter 54, section 1, of the laws of 2011:
31 For alterations and improvements to youth facilities, including the
32 preparation of designs, plans, specifications, and estimates for the
33 preservation of existing facilities and programs, including liabil-
34 ities incurred prior to April 1, 2011 (25GM1103) ...................
35 1,725,000 ........................................... (re. $419,000)
36 For the cost of maintaining the Tonawanda Indian Community House
37 pursuant to chapter 549 of the laws of 1936 (25T31103) .............
38 100,000 .............................................. (re. $59,000)
39 By chapter 53, section 1, of the laws of 2010:
40 For alterations and improvements to youth facilities, including the
41 preparation of designs, plans, specifications, and estimates for the
42 preservation of existing facilities and programs, including liabil-
43 ities incurred prior to April 1, 2010 (25GM1003) ...................
44 1,725,000 ......................................... (re. $1,725,000)
310 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 53, section 1, of the laws of 2009:
2 For alterations and improvements to youth facilities, including the
3 preparation of designs, plans, specifications, and estimates for the
4 preservation of existing facilities and programs, including liabil-
5 ities incurred prior to April 1, 2009 (25GM0903) ...................
6 1,500,000 ......................................... (re. $1,500,000)
7 For the cost of maintaining the Tonawanda Indian Community House
8 pursuant to chapter 549 of the laws of 1936 (25T30903) .............
9 325,000 ............................................. (re. $325,000)
10 By chapter 53, section 1, of the laws of 2008:
11 For alterations and improvements to youth facilities, including the
12 preparation of designs, plans, specifications, and estimates for the
13 preservation of existing facilities and programs, including liabil-
14 ities incurred prior to April 1, 2008 (25GM0803) ...................
15 1,500,000 ......................................... (re. $1,500,000)
16 For the cost of maintaining the Tonawanda Indian Community House
17 pursuant to chapter 549 of the laws of 1936 (25T30803) .............
18 325,000 ............................................. (re. $325,000)
19 By chapter 53, section 1, of the laws of 2007:
20 For alterations and improvements to youth facilities, including the
21 preparation of designs, plans, specifications, and estimates for the
22 preservation of existing facilities and programs, including liabil-
23 ities incurred prior to April 1, 2007 (25GM0703) ...................
24 1,500,000 ......................................... (re. $1,500,000)
25 For the cost of maintaining the Tonawanda Indian Community House
26 pursuant to chapter 549 of the laws of 1936 (25T30703) .............
27 325,000 ............................................. (re. $325,000)
28 By chapter 53, section 1, of the laws of 2006:
29 For alterations and improvements to youth facilities, including the
30 preparation of designs, plans, specifications, and estimates for the
31 preservation of existing facilities and programs, including liabil-
32 ities incurred prior to April 1, 2006 (25GM0603) ...................
33 1,500,000 ............................................ (re. $18,000)
34 For the cost of maintaining the Tonawanda Indian Community House
35 pursuant to chapter 549 of the laws of 1936 (25T30603) .............
36 325,000 ............................................. (re. $200,000)
37 By chapter 53, section 1, of the laws of 2005:
38 For alterations and improvements to youth facilities, including the
39 preparation of designs, plans, specifications, and estimates for the
40 preservation of existing facilities and programs, including liabil-
41 ities incurred prior to April 1, 2005 (25GM0503) ...................
42 1,000,000 ............................................. (re. $2,000)
43 By chapter 53, section 1, of the laws of 2004:
44 For the cost of maintaining the Tonawanda Indian Community House
45 pursuant to chapter 549 of the laws of 1936 (25T30403) .............
46 325,000 .............................................. (re. $60,000)
311 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 53, section 1, of the laws of 2003:
2 For the cost of maintaining the Tonawanda Indian Community House
3 pursuant to chapter 549 of the laws of 1936 (25T30303) .............
4 1,930,000 ........................................... (re. $304,000)
5 By chapter 53, section 1, of the laws of 2002:
6 For the cost of maintaining the Tonawanda Indian Community House
7 pursuant to chapter 549 of the laws of 1936 (25T30203) .............
8 935,000 .............................................. (re. $80,000)
9 Capital Projects Funds - Other
10 Youth Facilities Improvement Fund
11 Administration Purpose
12 By chapter 54, section 1, of the laws of 2017:
13 For the preparation and review of plans, specifications, estimates,
14 studies, inspections, appraisals and surveys, and payment of
15 personal service and nonpersonal service, including fringe benefits
16 and indirect costs related to the administration and security of
17 capital projects provided by the office of children and family
18 services for new and reappropriated projects (25ST1750) ............
19 874,000 ............................................. (re. $725,000)
20 By chapter 55, section 1, of the laws of 2016:
21 For the preparation and review of plans, specifications, estimates,
22 studies, inspections, appraisals and surveys, and payment of
23 personal service and nonpersonal service, including fringe benefits
24 and indirect costs related to the administration and security of
25 capital projects provided by the office of children and family
26 services for new and reappropriated projects (25ST1650) ............
27 850,000 ............................................. (re. $453,000)
28 By chapter 54, section 1, of the laws of 2015:
29 For the preparation and review of plans, specifications, estimates,
30 studies, inspections, appraisals and surveys, and payment of
31 personal service and nonpersonal service, including fringe benefits
32 and indirect costs related to the administration and security of
33 capital projects provided by the office of children and family
34 services for new and reappropriated projects (25ST1550) ............
35 850,000 ............................................. (re. $374,000)
36 By chapter 54, section 1, of the laws of 2014:
37 For the preparation and review of plans, specifications, estimates,
38 studies, inspections, appraisals and surveys, and payment of
39 personal service and nonpersonal service, including fringe benefits
40 and indirect costs related to the administration and security of
41 capital projects provided by the office of children and family
42 services for new and reappropriated projects (25ST1450) ............
43 850,000 .............................................. (re. $91,000)
44 Capital Projects Funds - Other
312 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Youth Facilities Improvement Fund
2 Environmental Protection or Improvements Purpose
3 By chapter 54, section 1, of the laws of 2017:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates for environmental protection or improvements at vari-
7 ous youth facilities, including liabilities incurred prior to April
8 1, 2017 (25EN1706) ... 5,000,000 .................. (re. $5,000,000)
9 By chapter 55, section 1, of the laws of 2016:
10 For payment of the cost of construction, reconstruction and improve-
11 ments, including the preparation of designs, plans, specifications
12 and estimates for environmental protection or improvements at vari-
13 ous youth facilities, including liabilities incurred prior to April
14 1, 2016 (25EN1606) ... 5,000,000 .................. (re. $5,000,000)
15 By chapter 54, section 1, of the laws of 2015:
16 For payment of the cost of construction, reconstruction and improve-
17 ments, including the preparation of designs, plans, specifications
18 and estimates for environmental protection or improvements at vari-
19 ous youth facilities, including liabilities incurred prior to April
20 1, 2015 (25EN1506) ... 5,000,000 .................. (re. $4,930,000)
21 By chapter 54, section 1, of the laws of 2014:
22 For payment of the cost of construction, reconstruction and improve-
23 ments, including the preparation of designs, plans, specifications
24 and estimates for environmental protection or improvements at vari-
25 ous youth facilities, including liabilities incurred prior to April
26 1, 2014 (25EN1406) ... 5,000,000 .................. (re. $4,477,000)
27 By chapter 54, section 1, of the laws of 2013:
28 For payment of the cost of construction, reconstruction and improve-
29 ments, including the preparation of designs, plans, specifications
30 and estimates for environmental protection or improvements at vari-
31 ous youth facilities, including liabilities incurred prior to April
32 1, 2013 (25EN1306) ... 5,000,000 .................. (re. $2,864,000)
33 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
34 section 1, of the laws of 2013:
35 For payment of the cost of construction, reconstruction and improve-
36 ments, including the preparation of designs, plans, specifications
37 and estimates for environmental protection or improvements at vari-
38 ous youth facilities, including liabilities incurred prior to April
39 1, 2012 (25EN1206) ... 5,000,000 .................. (re. $2,874,000)
40 By chapter 54, section 1, of the laws of 2011:
41 For payment of the cost of construction, reconstruction and improve-
42 ments, including the preparation of designs, plans, specifications
43 and estimates for environmental protection or improvements at vari-
313 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ous youth facilities, including liabilities incurred prior to April
2 1, 2011 (25EN1106) ... 5,000,000 .................. (re. $5,000,000)
3 By chapter 53, section 1, of the laws of 2010:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates for environmental protection or improvements at vari-
7 ous youth facilities, including liabilities incurred prior to April
8 1, 2010 (25EN1006) ... 5,000,000 .................. (re. $5,000,000)
9 By chapter 53, section 1, of the laws of 2009:
10 For payment of the cost of construction, reconstruction and improve-
11 ments, including the preparation of designs, plans, specifications
12 and estimates for environmental protection or improvements at vari-
13 ous youth facilities, including liabilities incurred prior to April
14 1, 2009 (25EN0906) ... 4,000,000 .................. (re. $4,000,000)
15 By chapter 53, section 1, of the laws of 2008:
16 For payment of the cost of construction, reconstruction and improve-
17 ments, including the preparation of designs, plans, specifications
18 and estimates for environmental protection or improvements at vari-
19 ous youth facilities, including liabilities incurred prior to April
20 1, 2008 (25EN0806) ... 4,000,000 .................. (re. $4,000,000)
21 By chapter 53, section 1, of the laws of 2007:
22 For payment of the cost of construction, reconstruction and improve-
23 ments, including the preparation of designs, plans, specifications
24 and estimates for environmental protection or improvements at vari-
25 ous youth facilities, including liabilities incurred prior to April
26 1, 2007 (25EN0706) ... 4,000,000 .................. (re. $4,000,000)
27 By chapter 53, section 1, of the laws of 2006:
28 For payment of the cost of construction, reconstruction and improve-
29 ments, including the preparation of designs, plans, specifications
30 and estimates for environmental protection or improvements at vari-
31 ous youth facilities, including liabilities incurred prior to April
32 1, 2006 (25EN0606) ... 4,000,000 .................... (re. $680,000)
33 By chapter 53, section 1, of the laws of 2005:
34 For payment of the cost of construction, reconstruction and improve-
35 ments, including the preparation of designs, plans, specifications
36 and estimates for environmental protection or improvements at vari-
37 ous youth facilities, including liabilities incurred prior to April
38 1, 2005 (25EN0506) ... 4,000,000 .................. (re. $2,147,000)
39 By chapter 53, section 1, of the laws of 2004:
40 For payment of the cost of construction, reconstruction and improve-
41 ments, including the preparation of designs, plans, specifications
42 and estimates for environmental protection or improvements at vari-
43 ous youth facilities, including liabilities incurred prior to April
44 1, 2004 (25EN0406) ... 4,100,000 .................. (re. $2,032,000)
314 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 53, section 1, of the laws of 2003:
2 For payment of the cost of construction, reconstruction and improve-
3 ments, including the preparation of designs, plans, specifications
4 and estimates for environmental protection or improvements at vari-
5 ous youth facilities, including liabilities incurred prior to April
6 1, 2003 (25EN0306) ... 4,000,000 .................. (re. $1,546,000)
7 By chapter 53, section 1, of the laws of 2001:
8 For payment of the cost of construction, reconstruction and improve-
9 ments, including the preparation of designs, plans, specifications
10 and estimates for environmental protection or improvements at vari-
11 ous youth facilities, including liabilities incurred prior to April
12 1, 2001 (25EN0106) ... 2,650,000 .................... (re. $203,000)
13 Capital Projects Funds - Other
14 Youth Facilities Improvement Fund
15 Health and Safety Purpose
16 By chapter 54, section 1, of the laws of 2017:
17 For payment of the cost of construction, reconstruction and improve-
18 ments, including the preparation of designs, plans, specifications
19 and estimates, for health and safety improvements to existing youth
20 facilities and programs, including liabilities incurred prior to
21 April 1, 2017 (25011701) ... 6,000,000 ............ (re. $6,000,000)
22 By chapter 55, section 1, of the laws of 2016:
23 For payment of the cost of construction, reconstruction and improve-
24 ments, including the preparation of designs, plans, specifications
25 and estimates, for health and safety improvements to existing youth
26 facilities and programs, including liabilities incurred prior to
27 April 1, 2016 (25011601) ... 6,000,000 ............ (re. $6,000,000)
28 By chapter 54, section 1, of the laws of 2015:
29 For payment of the cost of construction, reconstruction and improve-
30 ments, including the preparation of designs, plans, specifications
31 and estimates, for health and safety improvements to existing youth
32 facilities and programs, including liabilities incurred prior to
33 April 1, 2015 (25011501) ... 6,000,000 ............ (re. $2,146,000)
34 By chapter 54, section 1, of the laws of 2014:
35 For payment of the cost of construction, reconstruction and improve-
36 ments, including the preparation of designs, plans, specifications
37 and estimates, for health and safety improvements to existing youth
38 facilities and programs, including liabilities incurred prior to
39 April 1, 2014 (25011401) ... 6,000,000 ............ (re. $4,859,000)
40 By chapter 54, section 1, of the laws of 2013:
41 For payment of the cost of construction, reconstruction and improve-
42 ments, including the preparation of designs, plans, specifications
43 and estimates, for health and safety improvements to existing youth
315 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 facilities and programs, including liabilities incurred prior to
2 April 1, 2013 (25011301) ... 6,000,000 ............ (re. $3,158,000)
3 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
4 section 1, of the laws of 2013:
5 For payment of the cost of construction, reconstruction and improve-
6 ments, including the preparation of designs, plans, specifications
7 and estimates, for health and safety improvements to existing youth
8 facilities and programs, including liabilities incurred prior to
9 April 1, 2012 (25011201) ... 6,000,000 .............. (re. $383,000)
10 By chapter 54, section 1, of the laws of 2011:
11 For payment of the cost of construction, reconstruction and improve-
12 ments, including the preparation of designs, plans, specifications
13 and estimates, for health and safety improvements to existing youth
14 facilities and programs, including liabilities incurred prior to
15 April 1, 2011 (25011101) ... 6,000,000 ............ (re. $3,341,000)
16 By chapter 53, section 1, of the laws of 2010:
17 For payment of the cost of construction, reconstruction and improve-
18 ments, including the preparation of designs, plans, specifications
19 and estimates, for health and safety improvements to existing youth
20 facilities and programs, including liabilities incurred prior to
21 April 1, 2010 (25011001) ... 6,000,000 ............ (re. $6,000,000)
22 By chapter 53, section 1, of the laws of 2009:
23 For payment of the cost of construction, reconstruction and improve-
24 ments, including the preparation of designs, plans, specifications
25 and estimates, for health and safety improvements to existing youth
26 facilities and programs, including liabilities incurred prior to
27 April 1, 2009 (25010901) ... 5,000,000 ............ (re. $5,000,000)
28 By chapter 53, section 1, of the laws of 2008:
29 For payment of the cost of construction, reconstruction and improve-
30 ments, including the preparation of designs, plans, specifications
31 and estimates, for health and safety improvements to existing youth
32 facilities and programs, including liabilities incurred prior to
33 April 1, 2008 (25010801) ... 5,000,000 ............ (re. $5,000,000)
34 By chapter 53, section 1, of the laws of 2007:
35 For payment of the cost of construction, reconstruction and improve-
36 ments, including the preparation of designs, plans, specifications
37 and estimates, for health and safety improvements to existing youth
38 facilities and programs, including liabilities incurred prior to
39 April 1, 2007 (25010701) ... 5,000,000 ............ (re. $3,653,000)
40 By chapter 53, section 1, of the laws of 2006:
41 For payment of the cost of construction, reconstruction and improve-
42 ments, including the preparation of designs, plans, specifications
43 and estimates, for health and safety improvements to existing youth
316 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 facilities and programs, including liabilities incurred prior to
2 April 1, 2006 (25010601) ... 5,000,000 .............. (re. $965,000)
3 By chapter 53, section 1, of the laws of 2005:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates, for health and safety improvements to existing youth
7 facilities and programs, including liabilities incurred prior to
8 April 1, 2005 (25010501) ... 6,000,000 ............ (re. $1,361,000)
9 By chapter 53, section 1, of the laws of 2004:
10 For payment of the cost of construction, reconstruction and improve-
11 ments, including the preparation of designs, plans, specifications
12 and estimates, for health and safety improvements to existing youth
13 facilities and programs, including liabilities incurred prior to
14 April 1, 2004 (25010401) ... 4,600,000 .............. (re. $828,000)
15 By chapter 53, section 1, of the laws of 2003:
16 For payment of the cost of construction, reconstruction and improve-
17 ments, including the preparation of designs, plans, specifications
18 and estimates, for health and safety improvements to existing youth
19 facilities and programs, including liabilities incurred prior to
20 April 1, 2003 (25010301) ... 3,000,000 .............. (re. $595,000)
21 By chapter 53, section 1, of the laws of 2002:
22 For payment of the cost of construction, reconstruction and improve-
23 ments, including the preparation of designs, plans, specifications
24 and estimates, for health and safety improvements to existing youth
25 facilities and programs, including liabilities incurred prior to
26 April 1, 2002 (25A10201) ... 2,200,000 ............... (re. $48,000)
27 Capital Projects Funds - Other
28 Youth Facilities Improvement Fund
29 Preservation of Facilities Purpose
30 By chapter 54, section 1, of the laws of 2017:
31 For payment of the cost of construction, reconstruction and improve-
32 ments, including the preparation of designs, plans, specifications,
33 and estimates for the preservation of existing facilities and
34 programs, including liabilities incurred prior to April 1, 2017
35 (25031703) ... 7,000,000 .......................... (re. $7,000,000)
36 By chapter 55, section 1, of the laws of 2016:
37 For payment of the cost of construction, reconstruction and improve-
38 ments, including the preparation of designs, plans, specifications,
39 and estimates for the preservation of existing facilities and
40 programs, including liabilities incurred prior to April 1, 2016
41 (25031603) ... 7,000,000 .......................... (re. $6,993,000)
42 By chapter 54, section 1, of the laws of 2015:
317 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications,
3 and estimates for the preservation of existing facilities and
4 programs, including liabilities incurred prior to April 1, 2015
5 (25031503) ... 7,000,000 .......................... (re. $2,116,000)
6 By chapter 54, section 1, of the laws of 2014:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications,
9 and estimates for the preservation of existing facilities and
10 programs, including liabilities incurred prior to April 1, 2014
11 (25031403) ... 7,000,000 .......................... (re. $5,043,000)
12 By chapter 54, section 1, of the laws of 2013:
13 For payment of the cost of construction, reconstruction and improve-
14 ments, including the preparation of designs, plans, specifications,
15 and estimates for the preservation of existing facilities and
16 programs, including liabilities incurred prior to April 1, 2013
17 (25031303) ... 7,000,000 .......................... (re. $3,620,000)
18 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
19 section 1, of the laws of 2013:
20 For payment of the cost of construction, reconstruction and improve-
21 ments, including the preparation of designs, plans, specifications,
22 and estimates for the preservation of existing facilities and
23 programs, including liabilities incurred prior to April 1, 2012
24 (25031203) ... 7,000,000 ............................ (re. $797,000)
25 By chapter 54, section 1, of the laws of 2011:
26 For payment of the cost of construction, reconstruction and improve-
27 ments, including the preparation of designs, plans, specifications,
28 and estimates for the preservation of existing facilities and
29 programs, including liabilities incurred prior to April 1, 2011
30 (25031103) ... 7,000,000 .......................... (re. $5,597,000)
31 By chapter 53, section 1, of the laws of 2010:
32 For payment of the cost of construction, reconstruction and improve-
33 ments, including the preparation of designs, plans, specifications,
34 and estimates for the preservation of existing facilities and
35 programs, including liabilities incurred prior to April 1, 2010
36 (25031003) ... 7,000,000 .......................... (re. $7,000,000)
37 By chapter 53, section 1, of the laws of 2009:
38 For payment of the cost of construction, reconstruction and improve-
39 ments, including the preparation of designs, plans, specifications,
40 and estimates for the preservation of existing facilities and
41 programs, including liabilities incurred prior to April 1, 2009
42 (25030903) ... 6,000,000 .......................... (re. $5,035,000)
43 By chapter 53, section 1, of the laws of 2008:
318 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications,
3 and estimates for the preservation of existing facilities and
4 programs, including liabilities incurred prior to April 1, 2008
5 (25030803) ... 6,000,000 .......................... (re. $1,238,000)
6 By chapter 53, section 1, of the laws of 2007:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications,
9 and estimates for the preservation of existing facilities and
10 programs, including liabilities incurred prior to April 1, 2007
11 (25030703) ... 6,000,000 .......................... (re. $1,667,000)
12 By chapter 53, section 1, of the laws of 2006:
13 For payment of the cost of construction, reconstruction and improve-
14 ments, including the preparation of designs, plans, specifications,
15 and estimates for the preservation of existing facilities and
16 programs, including liabilities incurred prior to April 1, 2006
17 (25030603) ... 6,000,000 ............................. (re. $70,000)
18 By chapter 53, section 1, of the laws of 2004:
19 For payment of the cost of construction, reconstruction and improve-
20 ments, including the preparation of designs, plans, specifications,
21 and estimates for the preservation of existing facilities and
22 programs, including liabilities incurred prior to April 1, 2004
23 (25030403) ... 5,000,000 ............................. (re. $11,000)
24 By chapter 53, section 1, of the laws of 2003:
25 For payment of the cost of construction, reconstruction and improve-
26 ments, including the preparation of designs, plans, specifications,
27 and estimates for the preservation of existing facilities and
28 programs, including liabilities incurred prior to April 1, 2003
29 (25030303) ... 4,000,000 ............................ (re. $645,000)
30 By chapter 53, section 1, of the laws of 2002:
31 For payment of the cost of construction, reconstruction and improve-
32 ments, including the preparation of designs, plans, specifications,
33 and estimates for the preservation of existing facilities and
34 programs, including liabilities incurred prior to April 1, 2002
35 (25030203) ... 2,000,000 ............................ (re. $279,000)
36 Capital Projects Funds - Other
37 Youth Facilities Improvement Fund
38 Program Improvement or Program Change Purpose
39 The appropriation made by chapter 54, section 1, of the laws of 2017, is
40 hereby amended and reappropriated to read:
41 For payment of the cost of land acquisition, construction, recon-
42 struction, rehabilitation and improvements, including the prepara-
43 tion of designs, plans, specifications and estimates, for new and
44 existing capital projects and programs including, but not limited
319 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to, preparation of plans, administration, maintenance and improve-
2 ment of existing facilities of any state agency, new facilities,
3 energy conservation, environmental protection or improvement, health
4 and safety, preservation of facilities, accreditation and program
5 improvement or program changes associated with the raising the age
6 of juvenile jurisdiction, including to the extent feasible, the
7 reuse of a facility of any state agency or a new facility, provided,
8 however, that expenditures from this appropriation are pursuant to
9 [a] part WWW of chapter 59 of the laws of 2017 and no expenditures
10 may be made from this appropriation until a plan of projects has
11 been approved by the director of the budget. Notwithstanding any
12 other provision of law to the contrary, money hereby appropriated
13 may be suballocated or transferred to the department of corrections
14 and community supervision or any other agency for expenses related
15 to this program (25RA1708) ... 110,000,000 ...... (re. $110,000,000)
16 PROGRAM IMPROVEMENT OR PROGRAM CHANGE (CCP)
17 Capital Projects Funds - Other
18 Youth Facilities Improvement Fund
19 Program Improvement or Program Change Purpose
20 By chapter 54, section 1, of the laws of 2017:
21 For payment of the cost of construction, reconstruction, security and
22 other improvements, including the preparation of designs, plans,
23 specifications and estimates related to improvements or changes to
24 existing facilities or programs, including liabilities incurred
25 prior to April 1, 2017 (25081708) ..................................
26 10,000,000 ....................................... (re. $10,000,000)
27 By chapter 55, section 1, of the laws of 2016:
28 For payment of the cost of construction, reconstruction, security and
29 other improvements, including the preparation of designs, plans,
30 specifications and estimates related to improvements or changes to
31 existing facilities or programs, including liabilities incurred
32 prior to April 1, 2016 (25081608) ..................................
33 10,000,000 ........................................ (re. $9,908,000)
34 By chapter 54, section 1, of the laws of 2015:
35 For payment of the cost of construction, reconstruction, security and
36 other improvements, including the preparation of designs, plans,
37 specifications and estimates related to improvements or changes to
38 existing facilities or programs, including liabilities incurred
39 prior to April 1, 2015 (25081508) ... 10,000,000 .. (re. $2,122,000)
40 By chapter 54, section 1, of the laws of 2014:
41 For payment of the cost of construction, reconstruction, security and
42 other improvements, including the preparation of designs, plans,
43 specifications and estimates related to improvements or changes to
44 existing facilities or programs, including liabilities incurred
45 prior to April 1, 2014 (25081408) ... 10,000,000 .. (re. $9,347,000)
320 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 For payment of the cost of construction, reconstruction, security and
3 other improvements, including the preparation of designs, plans,
4 specifications and estimates related to improvements or changes to
5 existing facilities or programs, including liabilities incurred
6 prior to April 1, 2013 (25081308) ... 10,000,000 .. (re. $5,455,000)
7 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
8 section 1, of the laws of 2013:
9 For payment of the cost of construction, reconstruction, security and
10 other improvements, including the preparation of designs, plans,
11 specifications and estimates related to improvements or changes to
12 existing facilities or programs, including liabilities incurred
13 prior to April 1, 2012 (25081208) ... 10,000,000 .... (re. $144,000)
14 By chapter 54, section 1, of the laws of 2011:
15 For payment of the cost of construction, reconstruction, security and
16 other improvements, including the preparation of designs, plans,
17 specifications and estimates related to improvements or changes to
18 existing facilities or programs, including liabilities incurred
19 prior to April 1, 2011 (25081108) ... 10,000,000 .. (re. $9,482,000)
20 By chapter 53, section 1, of the laws of 2010:
21 For payment of the cost of construction, reconstruction, security and
22 other improvements, including the preparation of designs, plans,
23 specifications and estimates related to improvements or changes to
24 existing facilities or programs, including liabilities incurred
25 prior to April 1, 2010 (25081008) ..................................
26 10,000,000 ....................................... (re. $10,000,000)
27 By chapter 53, section 1, of the laws of 2009:
28 For payment of the cost of construction, reconstruction, security and
29 other improvements, including the preparation of designs, plans,
30 specifications and estimates related to improvements or changes to
31 existing facilities or programs, including liabilities incurred
32 prior to April 1, 2009 (25080908) ..................................
33 13,000,000 ....................................... (re. $13,000,000)
34 By chapter 53, section 1, of the laws of 2008:
35 For payment of the cost of construction, reconstruction, security and
36 other improvements, including the preparation of designs, plans,
37 specifications and estimates related to improvements or changes to
38 existing facilities or programs, including liabilities incurred
39 prior to April 1, 2008 (25A80808) ... 13,840,000 .. (re. $7,984,000)
40 By chapter 53, section 1, of the laws of 2006:
41 For payment of the cost of construction, reconstruction, security and
42 other improvements, including the preparation of designs, plans,
43 specifications and estimates related to improvements or changes to
44 existing facilities or programs, including liabilities incurred
45 prior to April 1, 2006 (25A80608) ... 8,000,000 ....... (re. $6,000)
321 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 64,000,000 168,539,000
6 ---------------- ----------------
7 All Funds ........................ 64,000,000 168,539,000
8 ================ ================
9 SUPPORTED HOUSING PROGRAM (CCP) ............................. 64,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Homeless Housing Grants Purpose
14 Notwithstanding any inconsistent provision
15 of law, funds appropriated herein shall be
16 used for the preparation and review of
17 proposals, specifications, estimates,
18 studies, inspections, appraisals and
19 surveys, and payment of personal service
20 and nonpersonal service, including fringe
21 benefits and indirect costs related to
22 implementing the provisions of the home-
23 less housing and assistance program in
24 accordance with title 1 of article 2-A of
25 the social services law provided by the
26 office of temporary and disability assis-
27 tance for new and reappropriated projects
28 (27OP18G5) ................................... 1,000,000
29 Capital Projects Funds - Other
30 Housing Program Fund
31 Homeless Housing Grants Purpose
32 For services and expenses, including the
33 payments on contracts executed prior to
34 April 1, 2018, related to implementing the
35 provisions of the homeless housing and
36 assistance program in accordance with
37 title 1 of article 2-A of the social
38 services law, including costs incurred
39 through individual or joint contracts with
40 any entity where such contract will result
41 in expedited homeless project development,
42 and including, without deposit to the
43 homeless housing and assistance account,
322 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2018-19
1 payments to any entity for technical
2 assistance required to approve contracts.
3 Up to $1,000,000 of the amount appropriated
4 herein may be used for purposes of neces-
5 sary health and safety improvements to
6 existing emergency shelters located in
7 local social services districts with a
8 population of less than five million.
9 Notwithstanding any inconsistent
10 provisions of law, such funds shall be
11 disbursed pursuant to contracts made in
12 accordance with the terms and conditions
13 established by the homeless housing and
14 assistance corporation.
15 Notwithstanding any inconsistent provision
16 of law, up to two percent of the appropri-
17 ation for any fiscal year may be used to
18 pay for technical assistance in support of
19 project development and operation, support
20 services development, architecture and
21 engineering, legal services and financial
22 services and may be provided by individ-
23 uals and not-for-profit or business corpo-
24 rations. No funds shall be expended from
25 this appropriation until the director of
26 the budget has approved a financial plan
27 submitted by the office of temporary and
28 disability assistance on behalf of the
29 homeless housing and assistance program in
30 such detail as required by the budget
31 director (270318G5) ......................... 58,000,000
32 For the development of permanent, emergency
33 and transitional housing for persons with
34 AIDS in accordance with article 2-A of the
35 social services law including the payment
36 of liabilities prior to April 1, 2018;
37 provided, however, that if an insufficient
38 number of viable proposals for persons
39 with AIDS are received, the balance of
40 funding can be used for the development of
41 permanent, emergency and transitional
42 housing for other priority need popu-
43 lations as determined by the commissioner
44 of the office of temporary and disability
45 assistance and approved by the director of
46 the budget. Notwithstanding any inconsist-
47 ent provision of law, up to two percent of
48 the appropriation for any fiscal year may
49 be used to pay for technical assistance in
50 support of project development and opera-
51 tion, support services development, archi-
323 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2018-19
1 tecture and engineering, legal services
2 and financial services and may be provided
3 by individuals and not-for-profit or busi-
4 ness corporations (270818G5) ................. 5,000,000
324 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 SUPPORTED HOUSING PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Homeless Housing Grants Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 Notwithstanding any inconsistent provision of law, funds appropriated
7 herein shall be used for the preparation and review of proposals,
8 specifications, estimates, studies, inspections, appraisals and
9 surveys, and payment of personal service and nonpersonal service,
10 including fringe benefits and indirect costs related to implementing
11 the provisions of the homeless housing and assistance program in
12 accordance with title 1 of article 2-A of the social services law
13 provided by the office of temporary and disability assistance for
14 new and reappropriated projects (27OP17G5) .........................
15 1,000,000 ........................................... (re. $938,000)
16 Capital Projects Funds - Other
17 Housing Program Fund
18 Homeless Housing Grants Purpose
19 By chapter 54, section 1, of the laws of 2017:
20 For services and expenses, including the payments on contracts
21 executed prior to April 1, 2017, related to implementing the
22 provisions of the homeless housing and assistance program in accor-
23 dance with title 1 of article 2-A of the social services law,
24 including costs incurred through individual or joint contracts with
25 any entity where such contract will result in expedited homeless
26 project development, and including, without deposit to the homeless
27 housing and assistance account, payments to any entity for technical
28 assistance required to approve contracts.
29 Notwithstanding any inconsistent provision of law, up to $1,000,000 of
30 the amount appropriated herein may be used for emergency shelter
31 repairs in local social services districts with a population of less
32 than five million.
33 Notwithstanding any inconsistent provision of law, up to two percent
34 of the appropriation for any fiscal year may be used to pay for
35 technical assistance in support of project development and opera-
36 tion, support services development, architecture and engineering,
37 legal services and financial services and may be provided by indi-
38 viduals and not-for-profit or business corporations. No funds shall
39 be expended from this appropriation until the director of the budget
40 has approved a financial plan submitted by the office of temporary
41 and disability assistance on behalf of the homeless housing and
42 assistance program in such detail as required by the budget director
43 (270317G5) ... 58,000,000 ........................ (re. $58,000,000)
44 For the development of permanent, emergency and transitional housing
45 for persons with AIDS in accordance with article 2-A of the social
46 services law including the payment of liabilities prior to April 1,
47 2017; provided, however, that if an insufficient number of viable
325 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 proposals for persons with AIDS are received, the balance of funding
2 can be used for the development of permanent, emergency and transi-
3 tional housing for other priority need populations as determined by
4 the commissioner of the office of temporary and disability assis-
5 tance and approved by the director of the budget. Notwithstanding
6 any inconsistent provision of law, up to two percent of the appro-
7 priation for any fiscal year may be used to pay for technical
8 assistance in support of project development and operation, support
9 services development, architecture and engineering, legal services
10 and financial services and may be provided by individuals and not-
11 for-profit or business corporations (270817G5) .....................
12 5,000,000 ......................................... (re. $5,000,000)
13 By chapter 55, section 1, of the laws of 2016:
14 For services and expenses, including the payments on contracts
15 executed prior to April 1, 2016, related to implementing the
16 provisions of the homeless housing and assistance program in accor-
17 dance with title 1 of article 2-A of the social services law,
18 including costs incurred through individual or joint contracts with
19 any entity where such contract will result in expedited homeless
20 project development, and including, without deposit to the homeless
21 housing and assistance account, payments to any entity for technical
22 assistance required to approve contracts. Notwithstanding any incon-
23 sistent provision of law, up to two percent of the appropriation for
24 any fiscal year may be used to pay for technical assistance in
25 support of project development and operation, support services
26 development, architecture and engineering, legal services and finan-
27 cial services and may be provided by individuals and not-for-profit
28 or business corporations. No funds shall be expended from this
29 appropriation until the director of the budget has approved a finan-
30 cial plan submitted by the office of temporary and disability
31 assistance on behalf of the homeless housing assistance program in
32 such detail as required by the budget director (270316G5) ..........
33 58,000,000 ....................................... (re. $58,000,000)
34 For the development of permanent, emergency and transitional housing
35 for persons with AIDS in accordance with article 2-A of the social
36 services law; provided, however, that if an insufficient number of
37 viable proposals for persons with AIDS are received, the balance of
38 funding can be used for the development of permanent, emergency and
39 transitional housing for other priority need populations as deter-
40 mined by the commissioner of the office of temporary and disability
41 assistance and approved by the director of the budget.
42 Notwithstanding any inconsistent provision of law, up to two percent
43 of the appropriation for any fiscal year may be used to pay for
44 technical assistance in support of project development and opera-
45 tion, support services development, architecture and engineering,
46 legal services and financial services and may be provided by indi-
47 viduals and not-for-profit or business corporations (270816G5) .....
48 5,000,000 ......................................... (re. $5,000,000)
49 By chapter 54, section 1, of the laws of 2015:
326 12654-10-8
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For services and expenses, including the payments on contracts
2 executed prior to April 1, 2015, related to implementing the
3 provisions of the homeless housing and assistance program in accor-
4 dance with title 1 of article 2-A of the social services law,
5 including costs incurred through individual or joint contracts with
6 any entity where such contract will result in expedited homeless
7 project development, and including, without deposit to the homeless
8 housing and assistance account, payments to any entity for technical
9 assistance required to approve contracts. Notwithstanding any incon-
10 sistent provision of law, up to two percent of the appropriation for
11 any fiscal year may be used to pay for technical assistance in
12 support of project development and operation, support services
13 development, architecture and engineering, legal services and finan-
14 cial services and may be provided by individuals and not-for-profit
15 or business corporations. No funds shall be expended from this
16 appropriation until the director of the budget has approved a finan-
17 cial plan submitted by the office of temporary and disability
18 assistance on behalf of the homeless housing assistance program in
19 such detail as required by the budget director (270315G5) ..........
20 58,000,000 ....................................... (re. $41,601,000)
327 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 179,000,000 672,171,000
6 ---------------- ----------------
7 All Funds ........................ 179,000,000 672,171,000
8 ================ ================
9 DESIGN AND CONSTRUCTION SUPERVISION (CCP) ................... 11,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preparation of Plans Purpose
14 For payment to the design and construction
15 management account of the centralized
16 services fund of the New York state office
17 of general services for the purpose of
18 preparation and review of plans, specifi-
19 cations, estimates, services, construction
20 management and supervision, inspection,
21 studies, appraisals, surveys, testing and
22 environmental impact statements, value
23 engineering, life cycle costing, or, for
24 the costs of consultant services to
25 perform said purposes to be used for the
26 rehabilitation, erection, construction,
27 reconstruction, alteration, or improvement
28 of new or existing facilities or programs,
29 including the payment of liabilities
30 incurred prior to April 1, 2018, providing
31 that moneys hereby appropriated shall be
32 available to the office net of disallow-
33 ances, refunds, rebates, reimbursements
34 and credits (05061830) ...................... 11,000,000
35 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 46,000,000
36 --------------
37 Capital Projects Funds - Other
38 Capital Projects Fund
39 Maintenance and Operations Purpose
40 For the maintenance and operation of various
41 facilities and systems including personal
42 services, fringe benefits and indirect
43 costs. Notwithstanding any other law to
328 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2018-19
1 the contrary, all or a portion of the
2 funds appropriated herein may be suballo-
3 cated or transferred to any department,
4 agency, or public authority (05FM18MO) ...... 46,000,000
5 FLOOD RECOVERY (CCP) ........................................ 15,000,000
6 --------------
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Flood Recovery Purpose
10 For services and expenses associated with
11 repairing, restoring, or replacing state-
12 owned structures and their contents in
13 accordance with section 203-A of the exec-
14 utive law. Notwithstanding any other
15 provision of the law to the contrary, the
16 office of general services in consultation
17 with the division of homeland security and
18 emergency services shall, upon approval of
19 the budget director, suballocate or trans-
20 fer the funding appropriated herein to any
21 other state department or agency maintain-
22 ing or in control of such state-owned
23 structures and their contents in an amount
24 not less than the limits of coverage that
25 would be applicable if such state-owned
26 structures and their contents had been
27 covered by standard flood insurance poli-
28 cies, as defined in 44 CFR 59.1 (05FR18FR) .. 15,000,000
29 MAINTENANCE AND IMPROVEMENT OF REAL PROPERTY FACILITIES
30 (CCP) .................................................... 107,000,000
31 --------------
32 Capital Projects Funds - Other
33 Capital Projects Fund
34 Energy Conservation Purpose
35 For the payment of the costs of energy
36 conservation projects for existing facili-
37 ties including the payment of liabilities
38 incurred prior to April 1, 2018 (05131805) ... 2,000,000
39 Capital Projects Funds - Other
40 Capital Projects Fund
41 Health and Safety Purpose
42 For payment of the cost of demolition,
43 alterations and improvements for health
44 and safety to existing facilities, includ-
329 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2018-19
1 ing the payment of liabilities incurred
2 prior to April 1, 2018 (05071801) ........... 12,400,000
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Preservation of Facilities Purpose
6 For payment of the cost of alterations and
7 improvements and minor rehabilitation and
8 improvements for the preservation of
9 existing facilities, including the payment
10 of liabilities incurred prior to April 1,
11 2018 (05011803) ............................. 25,500,000
12 For payment of the cost of alterations and
13 improvements and maintenance rehabili-
14 tation for the state capitol and the
15 legislative office building .................. 2,000,000
16 For payment of the cost of alterations and
17 improvements and maintenance rehabili-
18 tation for the state capitol and the
19 legislative office building .................. 2,000,000
20 For payment of the costs of alterations,
21 improvements and rehabilitation for the
22 preservation of various facilities
23 throughout the state, including the
24 payment of liabilities incurred prior to
25 April 1, 2018 (05NR1803) .................... 26,100,000
26 For payment of the cost of alterations,
27 improvements and rehabilitation, including
28 design, consultants, furniture, moving,
29 and technology, for the preservation of
30 various facilities throughout the state,
31 including the payment of liabilities
32 incurred prior to April 1, 2018, that will
33 result in the reduction of vacant and
34 underutilized space within buildings owned
35 and leased by the office of general
36 services. The office of general services
37 shall submit a utilization plan to the
38 division of the budget and no expenditures
39 may be made from this appropriation until
40 the plan has been approved by the division
41 of the budget (05OS1803) .................... 25,000,000
42 Capital Projects Funds - Other
43 Capital Projects Fund
44 Preventive Maintenance Purpose
45 For preventive maintenance on state facili-
46 ties including personal services, non-per-
47 sonal services, fringe benefits and the
330 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS 2018-19
1 contractual services provided by private
2 firms, including the payment of liabil-
3 ities incurred prior to April 1, 2018
4 (050918PM) .................................. 16,000,000
331 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Preparation of Plans Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For payment to the design and construction management account of the
7 centralized services fund of the New York state office of general
8 services for the purpose of preparation and review of plans, spec-
9 ifications, estimates, services, construction management and super-
10 vision, inspection, studies, appraisals, surveys, testing and envi-
11 ronmental impact statements, value engineering, life cycle costing,
12 or, for the costs of consultant services to perform said purposes to
13 be used for the rehabilitation, erection, construction, recon-
14 struction, alteration, or improvement of new or existing facilities
15 or programs, including the payment of liabilities incurred prior to
16 April 1, 2017 (05061730) ... 10,000,000 .......... (re. $10,000,000)
17 By chapter 55, section 1, of the laws of 2016:
18 For payment to the design and construction management account of the
19 centralized services fund of the New York state office of general
20 services for the purpose of preparation and review of plans, spec-
21 ifications, estimates, services, construction management and super-
22 vision, inspection, studies, appraisals, surveys, testing and envi-
23 ronmental impact statements, value engineering, life cycle costing,
24 or, for the costs of consultant services to perform said purposes to
25 be used for the rehabilitation, erection, construction, recon-
26 struction, alteration, or improvement of new or existing facilities
27 or programs, including the payment of liabilities incurred prior to
28 April 1, 2016 (05061630) ... 9,000,000 ............ (re. $8,926,000)
29 For payment of a marketing and redevelopment study concerning the most
30 appropriate uses of the J N Adam developmental center (the center),
31 located in the town of Perrysburg, county of Cattaraugus, and an
32 analysis of the historic significance of the buildings comprising
33 the center, in consultation with the commissioner of the office for
34 people with developmental disabilities, the empire state development
35 corporation, the office of parks, recreation and historic preserva-
36 tion, and the department of environmental conservation. Copies of
37 such study and analysis shall be provided to the governor, temporary
38 president of the senate, the speaker of the assembly, and state and
39 local officials representing the county of Cattaraugus, town of
40 Perrysburg, and city of Buffalo (05JN1630) .........................
41 235,000 ............................................. (re. $224,000)
42 By chapter 54, section 1, of the laws of 2015:
43 For payment to the design and construction management account of the
44 centralized services fund of the New York state office of general-
45 services for the purpose of preparation and review of plans, spec-
46 ifications, estimates, services, construction management and super-
47 vision, inspection, studies, appraisals, surveys, testing and
48 environmental impact statements, value engineering, life cycle cost-
332 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ing, or, for the costs of consultant services to perform said
2 purposes to be used for the rehabilitation, erection, construction,
3 reconstruction, alteration, or improvement of new or existing facil-
4 ities or programs, including the payment of liabilities incurred
5 prior to April 1, 2015 (05021530) ... 9,000,000 ... (re. $7,474,000)
6 By chapter 54, section 1, of the laws of 2014:
7 For payment to the design and construction management account of the
8 centralized services fund of the New York state office of general
9 services for the purpose of preparation and review of plans, spec-
10 ifications, estimates, services, construction management and super-
11 vision, inspection, studies, appraisals, surveys, testing and envi-
12 ronmental impact statements, value engineering, life cycle costing,
13 or, for the costs of consultant services to perform said purposes to
14 be used for the rehabilitation, erection, construction, recon-
15 struction, alteration, or improvement of new or existing facilities
16 or programs, including the payment of liabilities incurred prior to
17 April 1, 2014 (05011430) ... 9,000,000 ............ (re. $2,716,000)
18 By chapter 54, section 1, of the laws of 2013:
19 For payment to the design and construction management account of the
20 centralized services fund of the New York state office of general
21 services for the purpose of preparation and review of plans, spec-
22 ifications, estimates, services, construction management and super-
23 vision, inspection, studies, appraisals, surveys, testing and envi-
24 ronmental impact statements, value engineering, life cycle costing,
25 or, for the costs of consultant services to perform said purposes to
26 be used for the rehabilitation, erection, construction, recon-
27 struction, alteration, or improvement of new or existing facilities
28 or programs, including the payment of liabilities incurred prior to
29 April 1, 2013 (05011330) ... 9,000,000 .............. (re. $754,000)
30 By chapter 50, section 1, of the laws of 2010:
31 For payment to the design and construction management account of the
32 centralized services fund of the New York state office of general
33 services for the purpose of preparation and review of plans, spec-
34 ifications, estimates, services, construction management and super-
35 vision, inspection, studies, appraisals, surveys, testing and envi-
36 ronmental impact statements, value engineering, life cycle costing,
37 or, for the costs of consultant services to perform said purposes to
38 be used for the rehabilitation, erection, construction, recon-
39 struction, alteration, or improvement of new or existing facilities
40 or programs, including the payment of liabilities incurred prior to
41 April 1, 2010 (05061030) ... 12,766,000 ........... (re. $1,641,000)
42 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
43 Capital Projects Funds - Other
44 Capital Projects Fund
45 Maintenance and Operations Purpose
46 By chapter 54, section 1, of the laws of 2017:
333 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the maintenance and operation of various facilities and systems
2 including personal services, fringe benefits and indirect costs.
3 Notwithstanding any other law to the contrary, all or a portion of
4 the funds appropriated herein may be suballocated or transferred to
5 any department, agency, or public authority (05FM17MO) .............
6 32,000,000 ....................................... (re. $26,277,000)
7 FLOOD RECOVERY (CCP)
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 Flood Recovery Purpose
11 By chapter 54, section 1, of the laws of 2017:
12 For services and expenses associated with repairing, restoring, or
13 replacing state-owned structures and their contents in accordance
14 with section 203-A of the executive law. Notwithstanding any other
15 provision of the law to the contrary, the office of general services
16 in consultation with the division of homeland security and emergency
17 services shall, upon approval of the budget director, suballocate or
18 transfer the funding appropriated herein to any other state depart-
19 ment or agency maintaining or in control of such stateowned struc-
20 tures and their contents in an amount not less than the limits of
21 coverage that would be applicable if such state-owned structures and
22 their contents had been covered by standard flood insurance poli-
23 cies, as defined in 44 CFR 59.1 (05FR17FR) .........................
24 15,000,000 ....................................... (re. $15,000,000)
25 MAINTENANCE AND IMPROVEMENT OF REAL PROPERTY FACILITIES (CCP)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Economic Development Purpose
29 By chapter 50, section 1, of the laws of 2006:
30 For services and expenses related to the redevelopment of the Governor
31 Averell Harriman State Office Building Campus, including the costs
32 of demolition and site preparation, and for services provided by the
33 design and construction account of the centralized services fund of
34 the New York state office of general services (05060609) ...........
35 10,000,000 ........................................ (re. $2,575,000)
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Energy Conservation Purpose
39 By chapter 54, section 1, of the laws of 2017:
40 For the payment of the costs of energy conservation projects for
41 existing facilities including the payment of liabilities incurred
42 prior to April 1, 2017 (05131705) ... 2,000,000 ... (re. $2,000,000)
43 For services and expenses related to the design and construction on
44 Sheridan Avenue in Albany of a cogeneration plant and microgrid, to
334 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 operate on renewable energy, natural gas and/or fuel oil number two,
2 including payment of liabilities incurred prior to April 1, 2017
3 (05CG1705) ... 87,600,000 ........................ (re. $87,600,000)
4 By chapter 55, section 1, of the laws of 2016:
5 For the payment of the costs of energy conservation projects for
6 existing facilities including the payment of liabilities incurred
7 prior to April 1, 2016 (05131605) ... 2,000,000 ... (re. $2,000,000)
8 By chapter 54, section 1, of the laws of 2015:
9 For the payment of the costs of energy conservation projects for
10 existing facilities including the payment of liabilities incurred
11 prior to April 1, 2015 (05041505) ... 4,000,000 ... (re. $4,000,000)
12 By chapter 54, section 1, of the laws of 2014:
13 For the payment of the costs of energy conservation projects for
14 existing facilities including the payment of liabilities incurred
15 prior to April 1, 2014 (05131405) ... 9,080,000 ... (re. $8,875,000)
16 By chapter 54, section 1, of the laws of 2013:
17 For the payment of the costs of energy conservation projects for
18 existing facilities including the payment of liabilities incurred
19 prior to April 1, 2013 (05131305) ... 9,080,000 ... (re. $1,385,000)
20 Capital Projects Funds - Other
21 Capital Projects Fund
22 Health and Safety Purpose
23 By chapter 54, section 1, of the laws of 2017:
24 For payment of the cost of demolition, alterations and improvements
25 for health and safety to existing facilities, including the payment
26 of liabilities incurred prior to April 1, 2017 (05071701) ..........
27 3,000,000 ......................................... (re. $2,990,000)
28 By chapter 55, section 1, of the laws of 2016:
29 For payment of the cost of demolition, alterations and improvements
30 for health and safety to existing facilities, including the payment
31 of liabilities incurred prior to April 1, 2016 (05071601) ..........
32 16,000,000 ....................................... (re. $15,922,000)
33 By chapter 54, section 1, of the laws of 2015:
34 For payment of the cost of demolition, alterations and improvements
35 for health and safety to existing facilities, including the payment
36 of liabilities incurred prior to April 1, 2015 (05011501) ..........
37 9,080,000 ......................................... (re. $8,735,000)
38 By chapter 54, section 1, of the laws of 2014:
39 For payment of the cost of demolition, alterations and improvements
40 for health and safety to existing facilities, including the payment
41 of liabilities incurred prior to April 1, 2014 (05071401) ..........
42 4,000,000 ......................................... (re. $1,800,000)
335 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 For payment of the cost of demolition, alterations and improvements
3 for health and safety to existing facilities, including the payment
4 of liabilities incurred prior to April 1, 2013 (05071301) ..........
5 6,320,000 ......................................... (re. $5,814,000)
6 By chapter 54, section 1, of the laws of 2012:
7 For payment of the cost of demolition, alterations and improvements
8 for health and safety to existing facilities, including the payment
9 of liabilities incurred prior to April 1, 2012 (05061201) ..........
10 17,279,000 ....................................... (re. $10,779,000)
11 For additional funds for the construction of a security portal on the
12 State Street entrance of the third floor of the Legislative Office
13 Building (05071201) ... 65,000 ....................... (re. $65,000)
14 By chapter 50, section 1, of the laws of 2010:
15 For payment of the cost of alterations and improvements for health and
16 safety to existing facilities, including the payment of liabilities
17 incurred prior to April 1, 2010 (05061001) .........................
18 22,000,000 ........................................ (re. $6,722,000)
19 By chapter 50, section 1, of the laws of 2008:
20 For payment of the cost of alterations and improvements for health and
21 safety to existing facilities, including the payment of liabilities
22 incurred prior to April 1, 2008 (05060801) .........................
23 10,700,000 ........................................ (re. $2,052,000)
24 By chapter 50, section 1, of the laws of 2007:
25 For payment of the cost of alterations and improvements for health and
26 safety to existing facilities, including the payment of liabilities
27 incurred prior to April 1, 2007 (05060701) .........................
28 10,700,000 ........................................ (re. $2,272,000)
29 Capital Projects Funds - Other
30 Capital Projects Fund
31 New Facilities Purpose
32 By chapter 50, section 1, of the laws of 2009:
33 For services and expenses related to the design and construction of
34 state facilities, including payment of liabilities incurred prior to
35 April 1, 2009. Amounts appropriated herein may be transferred from
36 this appropriation to any other capital projects appropriation made
37 to any other state department or agency, for the purpose of
38 constructing a facility that will benefit multiple state agencies
39 (05AA0907) ... 10,000,000 ........................ (re. $10,000,000)
40 By chapter 50, section 1, of the laws of 2008:
41 For services and expenses related to the design and construction of
42 state facilities, including payment of liabilities incurred prior to
43 April 1, 2008. Amounts appropriated herein may be transferred from
44 this appropriation to any other capital projects appropriation made
45 to any other state department or agency, for the purpose of
336 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 constructing a facility that will benefit multiple state agencies
2 (05AA0807) ... 10,000,000 ........................ (re. $10,000,000)
3 By chapter 50, section 1, of the laws of 2007:
4 For services and expenses related to the design and construction of
5 state facilities, including payment of liabilities incurred prior to
6 April 1, 2007. Notwithstanding section 51 of the state finance law,
7 funds may be transferred from this appropriation to any other capi-
8 tal projects appropriation made to a state department or agency, for
9 the purpose of constructing a facility that will benefit multiple
10 state agencies (05AA0707) ... 10,000,000 .......... (re. $9,000,000)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 By chapter 54, section 1, of the laws of 2017:
15 For payment of the cost of alterations and improvements and minor
16 rehabilitation and improvements for the preservation of existing
17 facilities, including the payment of liabilities incurred prior to
18 April 1, 2017 (05011703) ... 22,400,000 .......... (re. $21,916,000)
19 For payment of the costs of alterations, improvements and rehabili-
20 tation for the preservation of various facilities throughout the
21 state, including the payment of liabilities incurred prior to April
22 1, 2017 (05NR1703) ... 32,600,000 ................ (re. $32,600,000)
23 For payment of the cost of alterations, improvements and rehabili-
24 tation, including design, consultants, furniture, moving, and tech-
25 nology, for the preservation of various facilities throughout the
26 state, including the payment of liabilities incurred prior to April
27 1, 2017, that will result in the reduction of vacant and underuti-
28 lized space within buildings owned and leased by the office of
29 general services. The office of general services shall submit a
30 utilization plan to the division of the budget and no expenditures
31 may be made from this appropriation until the plan has been approved
32 by the division of the budget (05OS1703) ...........................
33 25,000,000 ....................................... (re. $24,999,000)
34 By chapter 55, section 1, of the laws of 2016:
35 For payment of the cost of alterations and improvements and minor
36 rehabilitation and improvements for the preservation of existing
37 facilities, including the payment of liabilities incurred prior to
38 April 1, 2016 (05011603) ... 25,800,000 .......... (re. $18,794,000)
39 For payment of the costs of alterations, improvements and rehabili-
40 tation for the preservation of the state capitol building, including
41 the payment of liabilities incurred prior to April 1, 2016
42 (05CR1603) ... 200,000 .............................. (re. $200,000)
43 For payment of the costs of alterations, improvements and rehabili-
44 tation for the preservation of various facilities throughout the
45 state, including the payment of liabilities incurred prior to April
46 1, 2016 (05NR1603) ... 14,000,000 ................ (re. $13,993,000)
47 By chapter 54, section 1, of the laws of 2015:
337 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the cost of alterations and improvements and minor
2 rehabilitation and improvements for the preservation of existing
3 facilities, including the payment of liabilities incurred prior to
4 April 1, 2015 (05031503) ... 42,720,000 .......... (re. $34,610,000)
5 For payment of the costs of alterations, improvements and rehabili-
6 tation for the preservation of the state capitol building, including
7 the payment of liabilities incurred prior to April 1, 2015
8 (05CR1503) ... 200,000 .............................. (re. $200,000)
9 For payment of the cost of design and related services, demolition,
10 alterations, improvements, and rehabilitation at the Harriman state
11 office campus, including the payment of liabilities incurred prior
12 to April 1,2015 (05HC1503) ... 152,000,000 ...... (re. $121,291,000)
13 For payment of the costs of alterations, improvements and rehabili-
14 tation for the preservation of various facilities throughout the
15 state, including the payment of liabilities incurred prior to April
16 1, 2015 (05NR1503) ... 10,000,000 ................. (re. $8,479,000)
17 By chapter 54, section 1, of the laws of 2014:
18 For payment of the cost of alterations and improvements and minor
19 rehabilitation and improvements for the preservation of existing
20 facilities, including the payment of liabilities incurred prior to
21 April 1, 2014 (05131403) ... 32,720,000 ........... (re. $8,813,000)
22 For payment of the costs of alterations, improvements and rehabili-
23 tation for the preservation of the state capitol building, including
24 the payment of liabilities incurred prior to April 1, 2014
25 (05CR1403) ... 200,000 .............................. (re. $200,000)
26 For payment of the costs of alterations, improvements and rehabili-
27 tation for the preservation of various facilities throughout the
28 state, including the payment of liabilities incurred prior to April
29 1, 2014 (05NR1403) ... 20,000,000 ................. (re. $9,688,000)
30 By chapter 53, section 1, of the laws of 2014, as amended by chapter 55,
31 section 1, of the laws of 2016:
32 For services and expenses of the correctional officers' memorial fund
33 established pursuant to chapter 55 of the laws of 2014. Funds herein
34 shall be for the construction of such correctional officers' memori-
35 al on the New York state empire state plaza (05CM1403) .............
36 300,000 .............................................. (re. $30,000)
37 By chapter 54, section 1, of the laws of 2013:
38 For payment of the costs of alterations, improvements and rehabili-
39 tation for the preservation of the state capitol building, including
40 the payment of liabilities incurred prior to April 1, 2013
41 (05CR1303) ... 10,000,000 ........................ (re. $10,000,000)
42 For payment of the costs of alterations, improvements and rehabili-
43 tation for the preservation of various facilities throughout the
44 state, including the payment of liabilities incurred prior to April
45 1, 2013 (05NR1303) ... 20,000,000 ................. (re. $4,402,000)
46 For payment of the costs of alterations, improvements and rehabili-
47 tation for the preservation of the governor Nelson A. Rockefeller
48 empire state plaza, including the payment of liabilities incurred
49 prior to April 1, 2013 (05CC1303) ... 5,000,000 ... (re. $4,118,000)
338 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2012:
2 For payment of the costs of alterations, improvements and rehabili-
3 tation for the preservation of the state Capitol Building (05CR1203)
4 ... 250,000 ......................................... (re. $250,000)
5 For payment of the costs of alterations, improvements and rehabili-
6 tation for the preservation of various facilities throughout the
7 State, including the payment of liabilities incurred prior to April
8 1, 2012 (05NR1203) ... 26,000,000 ................. (re. $3,571,000)
9 By chapter 54, section 1, of the laws of 2011:
10 For payment of the costs of alterations, improvements and rehabili-
11 tation for the preservation of the state Capitol Building (05CR1103)
12 ... 650,000 ......................................... (re. $650,000)
13 By chapter 50, section 1, of the laws of 2010:
14 For payment of the cost of alterations and improvements and minor
15 rehabilitation and improvements for the preservation of existing
16 facilities, including the payment of liabilities incurred prior to
17 April 1, 2010 (05061003) ... 12,634,000 ........... (re. $3,218,000)
18 For payment of the costs of alterations, improvements and rehabili-
19 tation for the preservation of the state Capitol Building (05CR1003)
20 ... 3,650,000 ..................................... (re. $3,650,000)
21 By chapter 50, section 1, of the laws of 2009:
22 For payment of the cost of alterations and improvements and minor
23 rehabilitation and improvements for the preservation of existing
24 facilities, including the payment of liabilities incurred prior to
25 April 1, 2009 (05060903) ... 7,000,000 ............ (re. $2,590,000)
26 For payment of the costs of alterations, improvements and rehabili-
27 tation for the preservation of the state Capitol Building (05CR0903)
28 ... 15,000,000 ................................... (re. $15,000,000)
29 For payment of the costs of alterations, improvements and rehabili-
30 tation for the preservation of the Governor Nelson A. Rockefeller
31 Empire State Plaza (05NR0903) ... 10,000,000 ...... (re. $1,435,000)
32 By chapter 50, section 1, of the laws of 2008:
33 For payment of the cost of alterations and improvements and minor
34 rehabilitation and improvements for the preservation of existing
35 facilities, including the payment of liabilities incurred prior to
36 April 1, 2008 (05060803) ... 20,000,000 ........... (re. $2,865,000)
37 For payment of the costs of alterations, improvements and rehabili-
38 tation for the preservation of the state Capitol Building (05CR0803)
39 ... 5,000,000 ..................................... (re. $5,000,000)
40 For the payment of the costs of alterations, improvement and rehabili-
41 tation for the preservation of Hearing Room C located in the Legis-
42 lative Office Building (05LC0803) ... 1,075,000 ..... (re. $137,000)
43 By chapter 50, section 1, of the laws of 2007:
44 For payment of the costs of alterations, improvements and rehabili-
45 tation for the preservation of the state Capitol Building (05CR0703)
46 ... 5,000,000 ..................................... (re. $1,216,000)
339 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 50, section 1, of the laws of 2006:
2 For payment of the costs of alterations, improvements and rehabili-
3 tation for the preservation of the state Capitol Building (05030603)
4 ... 26,000,000 .................................... (re. $4,312,000)
5 For payment of the costs of alterations, improvements and rehabili-
6 tation for the preservation of Hearing Rooms B and C located in the
7 Legislative Office Building (05LL0603) .............................
8 1,645,000 ........................................... (re. $103,000)
9 For payment of the state's share of costs of alterations and improve-
10 ments for preservation of facilities at the Binghamton Governmental
11 Complex, including but not limited to repair and rehabilitation of
12 parking garage facilities. The state's share of such costs shall be
13 determined pursuant to a written tripartite agreement between the
14 state of New York, Broome County, and the city of Binghamton. All or
15 part of this amount may be used for payment to the design and
16 construction management account of the centralized services fund of
17 the New York state office of general services for services rendered
18 (05BP0603) ... 6,200,000 .......................... (re. $1,160,000)
19 Advance for costs of alterations and improvements for preservation of
20 facilities at the Binghamton Governmental Complex, including but not
21 limited to repair and rehabilitation of parking garage facilities.
22 All or part of this amount may be used for payment to the design and
23 construction management account of the centralized services fund of
24 the New York state office of general services for services rendered.
25 No portion of this appropriation shall be available until the divi-
26 sion of the budget has reviewed and approved a repayment agreement
27 with the city of Binghamton and Broome county. Such agreement, at
28 the minimum, shall provide for reimbursement to the state by the
29 city of Binghamton and Broome county for their respective shares of
30 all design and construction disbursements (05BL0603) ...............
31 5,800,000 ........................................... (re. $230,000)
32 Capital Projects Funds - Other
33 Capital Projects Fund
34 Preventive Maintenance Purpose
35 By chapter 54, section 1, of the laws of 2017:
36 For preventive maintenance on state facilities including personal
37 services, non-personal services, fringe benefits and the contractual
38 services provided by private firms, including the payment of liabil-
39 ities incurred prior to April 1, 2017 (050917PM) ...................
40 20,000,000 ....................................... (re. $15,691,000)
41 By chapter 55, section 1, of the laws of 2016:
42 For preventive maintenance on state facilities including personal
43 services, non-personal services, fringe benefits and the contractual
44 services provided by private firms, including the payment of liabil-
45 ities incurred prior to April 1, 2016 (050916PM) ...................
46 23,000,000 ........................................ (re. $9,488,000)
47 By chapter 54, section 1, of the laws of 2015:
340 12654-10-8
OFFICE OF GENERAL SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For preventive maintenance on state facilities including personal
2 services, non-personal services, fringe benefits and the contractual
3 services provided by private firms, including the payment of liabil-
4 ities incurred prior to April 1, 2015 (050515PM) ...................
5 15,000,000 ........................................ (re. $5,440,000)
6 By chapter 54, section 1, of the laws of 2014:
7 For preventive maintenance on state facilities including personal
8 services, non-personal services, fringe benefits and the contractual
9 services provided by private firms, including the payment of liabil-
10 ities incurred prior to April 1, 2014 (050614PM) ...................
11 15,000,000 ........................................ (re. $6,278,000)
12 By chapter 54, section 1, of the laws of 2013:
13 For preventive maintenance on state facilities including personal
14 services, non-personal services, fringe benefits and the contractual
15 services provided by private firms, including the payment of liabil-
16 ities incurred prior to April 1, 2013 (050613PM) ...................
17 15,000,000 ........................................ (re. $7,020,000)
18 By chapter 54, section 1, of the laws of 2012:
19 For preventive maintenance on state facilities including personal
20 services, non-personal services, fringe benefits and the contractual
21 services provided by private firms, including the payment of liabil-
22 ities incurred prior to April 1, 2012 (050912PM) ...................
23 16,000,000 ........................................ (re. $3,219,000)
24 SUSTAINABILITY (CCP)
25 Capital Projects Funds - Other
26 Capital Projects Fund
27 Sustainability Purpose
28 By chapter 50, section 1, of the laws of 2009:
29 For payments on sustainability projects at various facilities through-
30 out the State, including the payment of liabilities incurred prior
31 to April 1, 2009 (050109SU) ... 13,300,000 ....... (re. $10,343,000)
341 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 650,904,000 2,977,146,000
6 Capital Projects Funds - Federal ... 77,000,000 249,049,000
7 ---------------- ----------------
8 All Funds ........................ 727,904,000 3,226,195,000
9 ================ ================
10 ALL PAYERS CLAIMS DATABASE (CCP) ............................ 10,000,000
11 --------------
12 Capital Project Funds - Other
13 Capital Projects Fund
14 Program Improvement/Change Purpose
15 For grants, services and expenses related to
16 the establishment of an all payers claim
17 database, including but not limited to
18 technology, equipment, software, personal
19 service, fringe benefits, and indirect
20 costs. For purposes of the program, all
21 such activities are deemed to constitute a
22 capital expenditure. No expenditures
23 related to this appropriation shall be
24 made without a plan, prepared by the
25 commissioner of health and approved by the
26 director of the budget, detailing suffi-
27 cient resources are available to support
28 such expenditures (12AP1808) ................ 10,000,000
29 HEALTH CARE FACILITY TRANSFORMATION PROGRAM (CCP) .......... 525,000,000
30 --------------
31 Capital Project Funds - Other
32 Capital Projects Fund
33 Health Care System Improvement Purpose
34 For payments and grants to support health
35 care facility transformation statewide.
36 Notwithstanding section 163 of the state
37 finance law or any other provision of law
38 to the contrary, this appropriation may be
39 used to fund payments and or grants made
40 by the commissioner of health in his or
41 her sole discretion, without a competitive
42 bid or request for proposal process, to
43 eligible applicants as determined by the
44 commissioner of health for the purposes
342 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2018-19
1 that strengthen and protect continued
2 access to health care services in communi-
3 ties including but not limited to chil-
4 dren's residential treatment facilities.
5 Such purposes may include debt retirement
6 and capital projects or non-capital
7 projects that facilitate health care
8 transformation activities including, merg-
9 er, consolidation, acquisition or other
10 activities intended to: create financially
11 sustainable systems of care; preserve or
12 expand essential health care services;
13 modernize obsolete facility physical
14 plants and infrastructure; foster partic-
15 ipation in alternative payment arrange-
16 ments, including but not limited to
17 contracts with managed care plans and
18 accountable care organizations; increase
19 the quality of resident care or experience
20 in residential health care facilities; or
21 improve health information technology
22 infrastructure, including telehealth, to
23 strengthen the acute, post-acute care,
24 primary care, and longterm care continuum.
25 Grants shall not be available to support
26 general operating expenses.
27 The commissioner and the president of the
28 dormitory authority of the state of New
29 York shall enter into an agreement,
30 subject to the approval of the director of
31 the budget, and subject to section 1680-r
32 of the public authorities law, for the
33 purposes of awarding, distributing, and
34 administering the funds made available
35 pursuant to this appropriation.
36 In determining awards for eligible appli-
37 cants under this appropriation, the
38 commissioner of health shall consider
39 criteria including, but not limited to:
40 (a) The extent to which the proposed project
41 will contribute to the integration of
42 health care services or the long term
43 sustainability of the applicant or preser-
44 vation of essential health services in the
45 community or communities served by the
46 applicant;
47 (b) The extent to which the proposed project
48 or purpose is aligned with delivery system
49 reform incentive payment ("DSRIP") program
50 goals and objectives;
51 (c) The geographic distribution of funds;
343 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2018-19
1 (d) The relationship between the proposed
2 project and identified community need;
3 (e) The extent to which the applicant has
4 access to alternative financing;
5 (f) The extent to which the proposed project
6 furthers the development of primary care
7 and other outpatient services;
8 (g) The extent to which the proposed project
9 benefits medicaid enrollees and uninsured
10 individuals;
11 (h) The extent to which the applicant has
12 engaged the community affected by the
13 proposed project and the manner in which
14 community engagement has shaped such
15 project; and
16 (i) The extent to which the proposed project
17 addresses potential risk to patient safety
18 and welfare.
19 The department shall provide a report on a
20 quarterly basis to the chairs of the
21 senate finance, assembly ways and means,
22 and senate health and assembly health
23 committees, until such time as the depart-
24 ment determines that the projects that
25 receive funding pursuant to this appropri-
26 ation are substantially complete. Such
27 reports shall be submitted no later than
28 sixty days after the close of the quarter,
29 and shall include, for each award, the
30 name of the applicant, a description of
31 the project or purpose, the amount of the
32 award, disbursement date, and status of
33 achievement of process and performance
34 metrics and milestones pursuant to subdi-
35 vision 6 of section 2825-f of the public
36 health law.
37 Within amounts appropriated herein, a mini-
38 mum of $45,000,000 shall be made available
39 for grant awards to residential health
40 care facilities, up to $20,000,000 may be
41 made available for grant awards made
42 pursuant to paragraphs (l) and (m) of
43 subdivision 3 of section 461-l of the
44 social services law, pursuant to criteria
45 to be determined by the commissioner and a
46 minimum of $60,000,000 shall be made
47 available for grant awards to community-
48 based health care providers which shall be
49 defined as a diagnostic and treatment
50 center licensed or granted an operating
51 certificate under article 28 of the public
52 health law, a mental health clinic
344 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2018-19
1 licensed or granted an operating certif-
2 icate under article 31 of the mental
3 hygiene law, a substance use disorder
4 treatment clinic licensed or granted an
5 operating certificate under article 32 of
6 the mental hygiene law, a primary care
7 provider, a home care provider certified
8 or licensed pursuant to article 36 of the
9 public health law, a facility granted an
10 operating certificate under article 16 of
11 the mental hygiene law or hospices
12 licensed or granted an operating certif-
13 icate pursuant to article 40 of the public
14 health law.
15 The dormitory authority may issue bonds for
16 such purposes up to the amount appropri-
17 ated herein. No expenditures may be made
18 from this appropriation to a facility
19 until a facility specific plan has been
20 submitted to the department of health and
21 has been approved by the director of the
22 budget (12SW18HE) .......................... 525,000,000
23 IT INITIATIVES PROGRAM (CCP) ................................ 10,000,000
24 --------------
25 Capital Projects Fund - Other
26 Miscellaneous Capital Projects Fund
27 Health Care IT Capital Account
28 Program Improvement/Change Purpose
29 For services and expenses related to infor-
30 mation technology projects undertaken by
31 the department of health, including the
32 payment of liabilities incurred prior to
33 April 1, 2018. Upon the request of the
34 commissioner of the department of health
35 and approval of the director of the divi-
36 sion of the budget, all or a portion of
37 the funds appropriated hereby may be
38 suballocated or transferred to the office
39 of information technology services
40 (12IT1808) .................................. 10,000,000
41 LABORATORIES AND RESEARCH (CCP) .............................. 8,000,000
42 --------------
43 Capital Projects Funds - Other
44 Capital Projects Fund
45 Preservation of Facilities Purpose
46 To maintain and improve existing facilities
47 including preparation of plans and for
345 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2018-19
1 payment to the design and construction
2 management account of the centralized
3 services fund of the New York state office
4 of general services. Upon the request of
5 the commissioner of the department of
6 health and approval of the director of the
7 division of the budget, funds of this
8 appropriation may be transferred to the
9 dormitory authority of the state of New
10 York for capital projects (12591803) ......... 8,000,000
11 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP) ... 67,904,000
12 --------------
13 Capital Projects Funds - Other
14 Capital Projects Fund
15 Preservation of Facilities Purpose
16 For minor alterations, improvements and
17 preventive maintenance of St. Albans Nurs-
18 ing Home, Helen Hayes Hospital, Oxford
19 Nursing Home, Batavia Nursing Home, and
20 Montrose Nursing Home including prepara-
21 tion of plans and for payment to the
22 design and construction management account
23 of the centralized services fund of the
24 New York state office of general services.
25 Upon the request of the commissioner of
26 the department of health and approval of
27 the director of the division of the budg-
28 et, funds of this appropriation may be
29 transferred to the dormitory authority of
30 the state of New York for capital projects
31 (12601803) ................................... 7,600,000
32 The sum of $51,304,000 is hereby appropri-
33 ated to support capital expenses of the
34 Roswell Park cancer institute corporation.
35 Notwithstanding any law to the contrary,
36 all or a portion of funds appropriated
37 herein may be transferred to the Roswell
38 Park cancer institute corporation, subject
39 to a plan developed by Roswell Park cancer
40 institute corporation, submitted to the
41 department of health, and approved by the
42 director of the budget (12RP1803) ........... 51,304,000
43 For the maintenance and operation of various
44 facilities and systems including personal
45 services, fringe benefits, and indirect
46 costs. Notwithstanding any other law to
47 the contrary, all or a portion of the
48 funds appropriated herein may be suballo-
346 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS 2018-19
1 cated or transferred to any department,
2 agency, or public authority (12FM1803) ....... 9,000,000
3 STATEWIDE HEALTH INFORMATION NETWORK FOR NEW YORK (CCP) ..... 30,000,000
4 --------------
5 Capital Project Funds - Other
6 Capital Projects Fund
7 Program Improvement/Change Purpose
8 For grants, services and expenses including
9 contracts for the New York eHealth Colla-
10 borative for the purpose of supporting and
11 administering the statewide health infor-
12 mation network for New York, including but
13 not limited to qualified entities certi-
14 fied by the department, technology, equip-
15 ment, software, personal service, fringe
16 benefits, and indirect costs. For purposes
17 of the program, all such activities are
18 deemed to constitute a capital expendi-
19 ture. No expenditures related to this
20 appropriation shall be made without a
21 plan, prepared by the commissioner of
22 health and approved by the director of the
23 budget, detailing sufficient resources are
24 available to support such expenditures
25 (12SH1808) .................................. 30,000,000
26 WATER RESOURCES (CCP) ....................................... 77,000,000
27 --------------
28 Capital Projects Funds - Federal
29 Federal Capital Projects Fund
30 Water Resources Purpose
31 For federal grants for the safe drinking
32 water revolving fund (12021857) ............. 70,000,000
33 For services and expenses of the state
34 revolving funds program (12DW1857) ........... 7,000,000
347 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 All or a portion of the disbursements made pursuant to the reappropri-
2 ations made hereinafter from the capital projects fund may be eligi-
3 ble for reimbursement from proceeds of bonds issued by the dormitory
4 authority. The dormitory authority and the department of health
5 shall report quarterly to the director of the budget the amounts
6 expended from appropriations which are eligible for reimbursement
7 from the proceeds of the bonds. The director of the budget shall
8 review these reports and then certify to the comptroller amounts
9 expended from these appropriations which are reimbursable from bond
10 proceeds. Until such time as the dormitory authority determines that
11 amounts expended from these appropriations are not reimbursable from
12 bond proceeds, all such expenditures shall be considered to be reim-
13 bursable from bond proceeds.
14 ALL PAYERS CLAIMS DATABASE (CCP)
15 Capital Project Funds - Other
16 Capital Projects Fund
17 Program Improvement/Change Purpose
18 By chapter 54, section 1, of the laws of 2017:
19 For grants, services and expenses related to the establishment of an
20 all payers claim database, including but not limited to technology,
21 equipment, software, personal service, fringe benefits, and indirect
22 costs. For purposes of the program, all such activities are deemed
23 to constitute a capital expenditure. No expenditures related to this
24 appropriation shall be made without a plan, prepared by the commis-
25 sioner of health and approved by the director of the budget, detail-
26 ing sufficient resources are available to support such expenditures
27 (12AP1708) ... 10,000,000 ......................... (re. $4,600,000)
28 CAPITAL RESTRUCTURING FINANCING PROGRAM FOR HEALTH CARE AND RELATED
29 FACILITIES (CCP)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Health Care System Improvement Purpose
33 The appropriation made by chapter 54, section 1, of the laws of 2014, is
34 hereby amended and reappropriated to read:
35 An advance for payments and grants establishing the capital restruc-
36 turing financing program for health care and related facilities
37 licensed pursuant to public health law or mental hygiene law,
38 including general hospitals, nursing homes, clinics, residential
39 health care facilities, diagnostic and treatment centers, and clin-
40 ics licensed pursuant to the public health law or the mental hygiene
41 law, assisted living programs, primary care providers, and home care
42 providers certified or licensed pursuant to article thirty-six of
43 this chapter and other primary care providers, to support capital
44 projects that will improve the quality, financial viability, and
45 efficiency of the health care delivery system in New York state,
46 including necessary support to facilitate restructuring, closures,
348 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 conversions and consolidations within the health care delivery
2 system including funding intended to maintain facility viability,
3 provided, however, that no expenditures may be made from this appro-
4 priation to a facility until a facility specific plan has been
5 submitted to the department of health and has been approved by the
6 director of the budget. Up to $75,000,000 of this appropriation may
7 be suballocated to the state university of New York, provided howev-
8 er that these funds shall be used for eligible project costs of the
9 ambulatory care integration project awarded to upstate university
10 hospital pursuant to request for applications number 1504100252 and
11 in accordance with an agreement between the department of health and
12 the state university construction fund and approved by the director
13 of the budget (12CR14HE) ...........................................
14 1,200,000,000 ................................. (re. $1,189,313,000)
15 HEALTH CARE FACILITY TRANSFORMATION PROGRAM (CCP)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Health Care System Improvement Purpose
19 The appropriation made by chapter 54, section 1, of the laws of 2017, to
20 the program improvement/change purpose, is hereby transferred and
21 reappropriated to the health care system improvement purpose:
22 For payments and grants to support health care facility transformation
23 statewide for capital, non-operational works. Notwithstanding
24 section 163 of the state finance law or any other provision of law
25 to the contrary, this appropriation may be used to fund payments and
26 or grants made by the commissioner of health in his or her sole
27 discretion, without a competitive bid or request for proposal proc-
28 ess, to eligible applicants as determined by the commissioner of
29 health for purposes in support of essential health care services.
30 Such purposes may include debt retirement and capital projects or
31 non-capital projects that facilitate health care transformation,
32 including mergers, consolidation, acquisition or other corporate
33 restructuring activities intended to create a financially sustaina-
34 ble system of care that promotes a patient-centered model of health
35 care delivery or preserves or expands essential health care
36 services. Grants shall not be available to support general operating
37 expenses.
38 The commissioner and the president of the dormitory authority of the
39 state of New York shall enter into an agreement, subject to the
40 approval of the director of the budget, and subject to section
41 1680-r of the public authorities law, for the purposes of awarding,
42 distributing, and administering the funds made available pursuant to
43 this appropriation.
44 In determining awards for eligible applicants under this appropri-
45 ation, the commissioner of health shall consider stakeholder, commu-
46 nity, and legislative input pursuant to subdivision 4-a of section
47 2825-e of the public health law criteria including, but not limited
48 to:
349 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (a) the extent to which the proposed project will contribute to the
2 integration of health care services or the long term sustainability
3 of the applicant or preservation of essential health services in the
4 community or communities served by the applicant;
5 (b) The extent to which the proposed project or purpose is aligned
6 with delivery system reform incentive payment ("DSRIP") program
7 goals and objectives;
8 (c) Consideration of geographic distribution of funds;
9 (d) The relationship between the proposed project and identified
10 community need;
11 (e) The extent to which the applicant has access to alternative
12 financing;
13 (f) The extent that the proposed project furthers the development of
14 primary care and other outpatient services;
15 (g) The extent to which the proposed project benefits medicaid enrol-
16 lees and uninsured individuals;
17 (h) The extent to which the applicant has engaged the community
18 affected by the proposed capital project and the manner in which
19 community engagement has shaped such capital project; and
20 (i) The extent to which the proposed project addresses potential risk
21 to patient safety and welfare.
22 Notwithstanding any inconsistent provision of law to the contrary, and
23 upon approval of the director of the budget, the commissioner of
24 health may award up to $300,000,000 of the funds made available
25 pursuant to this appropriation for unfunded project applications
26 submitted in response to the request for applications number
27 1607010255 issued by the department on July 20, 2016 pursuant to
28 section 2825-d of the public health law.
29 The department shall provide a report on a quarterly basis to the
30 chairs of the senate finance, assembly ways and means, and senate
31 health and assembly health committees. Such reports shall be submit-
32 ted no later than 60 days after the close of the quarter, and shall
33 include, for each award, the name of the applicant, a description of
34 the project or purpose, the amount of the award, disbursement date,
35 and status of achievement of process and performance metrics and
36 milestones pursuant to subdivision 5 of section 2825-e of the public
37 health law.
38 Within amounts appropriated herein, the director of the budget is
39 authorized to make a determination to fund up to $200,000,000 for
40 grant awards which are not eligible to be funded with the proceeds
41 of bonds issued pursuant to section 1680-r of the public authorities
42 law.
43 Within amounts appropriated herein, $50,000,000 shall be made avail-
44 able for grant awards to Montefiore medical center, and a minimum of
45 $75,000,000 shall be made available for grant awards to community-
46 based health care providers which shall be defined as a diagnostic
47 and treatment center licensed or granted an operating certificate
48 under article 28 of the public health law, a mental health clinic
49 licensed or granted an operating certificate under article 31 of the
50 mental hygiene law, an alcohol and substance abuse treatment clinic
51 licensed or granted an operating certificate under article 32 of the
350 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 mental hygiene law, a primary care provider, or a home care provider
2 certified or licensed pursuant to article 36 of public health law.
3 The dormitory authority may issue bonds for such purposes up to the
4 amount appropriated herein. No expenditures may be made from this
5 appropriation to a facility until a facility specific plan has been
6 submitted to the department of health and has been approved by the
7 director of the budget (12SW17HE) ..................................
8 500,000,000 ..................................... (re. $500,000,000)
9 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
10 section 1, of the laws of 2017:
11 For payments and grants to support health care facility transformation
12 statewide for capital, non-operational works. Notwithstanding
13 section 163 of the state finance law or any other provision of law
14 to the contrary, this appropriation may be used to fund payments and
15 or grants made by the commissioner of health in his or her sole
16 discretion, without a competitive bid or request for proposal proc-
17 ess, to eligible applicants as determined by the commissioner of
18 health for purposes in support of essential health care services.
19 Such purposes may include renovating or replacing inefficient or
20 outdated facilities as part of a merger, consolidation, acquisition
21 or other significant corporate restructuring activity that is part
22 of an overall transformation plan intended to create a financially
23 sustainable system of care that promotes a patient-centered model of
24 health care delivery aimed at improving the overall health and well-
25 being of a community. Eligible applicants shall be those deemed by
26 the commissioner to be a provider that fulfills or will fulfill a
27 health care need for acute inpatient, outpatient, primary, home care
28 or residential health care services in a community. The commissioner
29 and the president of the dormitory authority of the state of New
30 York shall enter into an agreement, subject to the approval of the
31 director of the budget, and subject to section 1680-r of the public
32 authorities law, for the purposes of awarding, distributing, and
33 administering the funds made available pursuant to this appropri-
34 ation. In determining awards for eligible applicants under this
35 appropriation, the commissioner of health and the president of the
36 authority shall consider criteria including, but not limited to:
37 (a) the extent to which the proposed capital project will contribute
38 to the integration of health care services and long term sustaina-
39 bility of the applicant or preservation of essential health services
40 in the community or communities served by the applicant;
41 (b) the extent to which the proposed project or purpose is aligned
42 with delivery system reform incentive payment ("DSRIP") program
43 goals and objectives;
44 (c) consideration of geographic distribution of funds;
45 (d) the relationship between the proposed capital project and identi-
46 fied community need;
47 (e) the extent to which the applicant has access to alternative
48 financing;
49 (f) the extent that the proposed capital project furthers the develop-
50 ment of primary care and other outpatient services;
351 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (g) the extent to which the proposed capital project benefits medicaid
2 enrollees and uninsured individuals;
3 (h) the extent to which the applicant has engaged the community
4 affected by the proposed capital project and the manner in which
5 community engagement has shaped such capital project; and
6 (i) the extent to which the proposed capital project addresses poten-
7 tial risk to patient safety and welfare.
8 Disbursement of awards made pursuant to this appropriation shall be
9 conditioned on the awardee achieving certain process and performance
10 metrics and milestones as determined in the sole discretion of the
11 commissioner. Such metrics and milestones shall be structured to
12 ensure that the health care transformation and provider sustainabil-
13 ity goals of the project are achieved, and such metrics and mile-
14 stones shall be included in grant disbursement agreements or other
15 contractual documents as required by the commissioner.
16 The department shall provide a report on a quarterly basis to the
17 chairs of the senate finance, assembly ways and means, senate health
18 and assembly health committees. Such reports shall be submitted no
19 later than sixty days after the close of the quarter, and shall
20 include, for each award, the name of the applicant, a description of
21 the project or purpose, the amount of the award, disbursement date,
22 and status of achievement of process and performance metrics and
23 milestones pursuant to subdivision 5 of section 2825-b of the public
24 health law. Within amounts appropriated herein, up to $5,000,000 may
25 be made available for the purchase of mammography equipped vehicles,
26 and a minimum of $30,000,000 shall be made available for community-
27 based health care providers which shall be defined as a diagnostic
28 and treatment center licensed or granted an operating certificate
29 under article twenty-eight of the public health law, a mental health
30 clinic licensed or granted an operating certificate under article
31 thirty-one of the mental hygiene law, an alcohol and substance
32 abuse treatment clinic licensed or granted an operating certificate
33 under article thirty-two of the mental hygiene law, primary care
34 providers, or a home care provider certified or licensed pursuant to
35 article 36 of the Public Health Law.
36 The dormitory authority may issue bonds for such purposes in an amount
37 appropriated herein. No expenditures may be made from this appropri-
38 ation to a facility until a facility specific plan has been submit-
39 ted to the department of health and has been approved by the direc-
40 tor of the budget (12SW16HE) ... 200,000,000 ... (re. $200,000,000)
41 By chapter 54, section 1, of the laws of 2015:
42 For payments and grants to support health care facility transformation
43 within the county of Kings, for capital, non-operational works serv-
44 ing communities whose residents are experiencing significant levels
45 of health care disparities, health care needs and other risk
46 factors. Funding will be awarded in the discretion of the commis-
47 sioner of health, without a competitive bid or request for proposal
48 process, for purposes in support of essential health care services.
49 Such purposes may include renovating or replacing inefficient or
50 outdated facilities as part of a merger, consolidation, acquisition
51 or other significant corporate restructuring activity intended to
352 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 create a financially sustainable system of care that promotes a
2 patient-centered model of health care delivery aimed at improving
3 the overall health and well-being of a community. The dormitory
4 authority may issue bonds for such purposes in an amount appropri-
5 ated herein. No expenditures may be made from this appropriation to
6 a facility until a facility specific plan has been submitted to the
7 department of health and has been approved by the director of the
8 budget (12BK15HE) ... 700,000,000 ............... (re. $700,000,000)
9 For payments and grants to support health care facility transformation
10 within the county of Oneida, for capital, non-operational works.
11 Funding will be awarded in the discretion of the commissioner of
12 health in support of projects located in the largest population
13 center in Oneida County, without a competitive bid or request for
14 proposal process, for the purpose of consolidating multiple licensed
15 health care facilities into an integrated system of acute inpatient,
16 outpatient primary and other health care services. The dormitory
17 authority may issue bonds for such purposes in an amount appropri-
18 ated herein. No expenditures may be made from this appropriation to
19 a facility until a facility specific plan has been submitted to the
20 department of health and has been approved by the director of the
21 budget (12UT15HE) ... 300,000,000 ............... (re. $300,000,000)
22 IT INITIATIVES PROGRAM (CCP)
23 Capital Projects Fund - Other
24 Miscellaneous Capital Projects Fund
25 Health Care IT Capital Account
26 Program Improvement/Change Purpose
27 By chapter 54, section 1, of the laws of 2017:
28 For services and expenses related to information technology projects
29 undertaken by the department of health, including the payment of
30 liabilities incurred prior to April 1, 2017. Upon the request of the
31 commissioner of the department of health and approval of the direc-
32 tor of the division of the budget, all or a portion of the funds
33 appropriated hereby may be suballocated or transferred to the office
34 of information technology services (12IT1708) ......................
35 10,000,000 ........................................ (re. $4,500,000)
36 LABORATORIES AND RESEARCH (CCP)
37 Capital Projects Funds - Other
38 Capital Projects Fund
39 Preservation of Facilities Purpose
40 By chapter 54, section 1, of the laws of 2017:
41 To maintain and improve existing facilities including preparation of
42 plans and for payment to the design and construction management
43 account of the centralized services fund of the New York state
44 office of general services. Upon the request of the commissioner of
45 the department of health and approval of the director of the divi-
46 sion of the budget, funds of this appropriation may be transferred
353 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to the dormitory authority of the state of New York for capital
2 projects (12591703) ... 8,000,000 ................. (re. $7,648,000)
3 By chapter 55, section 1, of the laws of 2016:
4 To maintain and improve existing facilities including preparation of
5 plans and for payment to the design and construction management
6 account of the centralized services fund of the New York state
7 office of general services. Upon the request of the commissioner of
8 the department of health and approval of the director of the divi-
9 sion of the budget, funds of this appropriation may be transferred
10 to the dormitory authority of the state of New York for capital
11 projects (12591603) ... 8,000,000 ................. (re. $4,757,000)
12 By chapter 54, section 1, of the laws of 2015:
13 To maintain and improve existing facilities including preparation of
14 plans and for payment to the design and construction management
15 account of the centralized services fund of the New York state
16 office of general services. Upon the request of the commissioner of
17 the department of health and approval of the director of the divi-
18 sion of the budget, funds of this appropriation may be transferred
19 to the dormitory authority of the state of New York for capital
20 projects (12591503) ... 8,000,000 ................. (re. $6,104,000)
21 By chapter 54, section 1, of the laws of 2014:
22 To maintain and improve existing facilities including preparation of
23 plans and for payment to the design and construction management
24 account of the centralized services fund of the New York state
25 office of general services. Upon the request of the commissioner of
26 the department of health and approval of the director of the divi-
27 sion of the budget, funds of this appropriation may be transferred
28 to the dormitory authority of the state of New York for capital
29 projects (12591403) ... 8,000,000 ................. (re. $4,291,000)
30 By chapter 54, section 1, of the laws of 2013:
31 To maintain and improve existing facilities including preparation of
32 plans and for payment to the design and construction management
33 account of the centralized services fund of the New York state
34 office of general services. Upon the request of the commissioner of
35 the department of health and approval of the director of the divi-
36 sion of the budget, funds of this appropriation may be transferred
37 to the dormitory authority of the state of New York for capital
38 projects (12591303) ... 8,000,000 ................. (re. $5,786,000)
39 By chapter 54, section 1, of the laws of 2012:
40 To maintain and improve existing facilities including preparation of
41 plans and for payment to the design and construction management
42 account of the centralized services fund of the New York state
43 office of general services. Upon the request of the commissioner of
44 the department of health and approval of the director of the divi-
45 sion of the budget, funds of this appropriation may be transferred
46 to the dormitory authority of the state of New York for capital
47 projects (12591203) ... 8,000,000 ................. (re. $4,884,000)
354 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2011:
2 To maintain and improve existing facilities including preparation of
3 plans and for payment to the design and construction management
4 account of the centralized services fund of the New York state
5 office of general services. Upon the request of the commissioner of
6 the department of health and approval of the director of the divi-
7 sion of the budget, funds of this appropriation may be transferred
8 to the dormitory authority of the state of New York for capital
9 projects (12591103) ... 8,000,000 ................. (re. $1,846,000)
10 By chapter 54, section 1, of the laws of 2010:
11 To maintain and improve existing facilities including preparation of
12 plans and for payment to the design and construction management
13 account of the centralized services fund of the New York state
14 office of general services. Upon the request of the commissioner of
15 the department of health and approval of the director of the divi-
16 sion of the budget, funds of this appropriation may be transferred
17 to the dormitory authority of the state of New York for capital
18 projects (12591003) ... 8,000,000 ................... (re. $892,000)
19 By chapter 54, section 1, of the laws of 2009:
20 To maintain and improve existing facilities including preparation of
21 plans and for payment to the design and construction management
22 account of the centralized services fund of the New York state
23 office of general services. Upon the request of the commissioner of
24 the department of health and approval of the director of the divi-
25 sion of the budget, funds of this appropriation may be transferred
26 to the dormitory authority of the state of New York for capital
27 projects (12590903) ... 8,000,000 ................. (re. $3,145,000)
28 By chapter 54, section 1, of the laws of 2008:
29 To maintain and improve existing facilities including preparation of
30 plans and for payment to the design and construction management
31 account of the centralized services fund of the New York state
32 office of general services. Upon the request of the commissioner of
33 the department of health and approval of the director of the divi-
34 sion of the budget, funds of this appropriation may be transferred
35 to the dormitory authority of the state of New York for capital
36 projects (12590803) ... 10,000,000 .................. (re. $477,000)
37 By chapter 54, section 1, of the laws of 2007:
38 To maintain and improve existing facilities including preparation of
39 plans and for payment to the design and construction management
40 account of the centralized services fund of the New York state
41 office of general services. Upon the request of the commissioner of
42 the department of health and approval of the director of the divi-
43 sion of the budget, funds of this appropriation may be transferred
44 to the dormitory authority of the state of New York for capital
45 projects (12590703) ... 10,000,000 ................ (re. $1,163,000)
46 By chapter 54, section 1, of the laws of 2006:
355 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 To maintain and improve existing facilities including preparation of
2 plans and for payment to the design and construction management
3 account of the centralized services fund of the New York state
4 office of general services. Upon the request of the commissioner of
5 the department of health and approval of the director of the divi-
6 sion of the budget, funds of this appropriation may be transferred
7 to the dormitory authority of the state of New York for capital
8 projects (12590603) ... 10,000,000 ................ (re. $3,637,000)
9 By chapter 54, section 1, of the laws of 2005:
10 To maintain and improve existing facilities including preparation of
11 plans and for payment to the design and construction management
12 account of the centralized services fund of the New York state
13 office of general services (12590503) ... 4,000,000 . (re. $778,000)
14 By chapter 54, section 1, of the laws of 2004:
15 To maintain and improve existing facilities including preparation of
16 plans and for payment to the design and construction management
17 account of the centralized services fund of the New York state
18 office of general services (12590403) ... 4,000,000 . (re. $217,000)
19 By chapter 54, section 1, of the laws of 2003:
20 To maintain and improve existing facilities including preparation of
21 plans and for payment to the design and construction management
22 account of the centralized services fund of the New York state
23 office of general services (12590303) ... 4,000,000 . (re. $436,000)
24 Capital Projects Funds - Other
25 Capital Projects Fund
26 Umbilical Cord Blood Bank Purpose
27 By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
28 section 1, of the laws of 2007:
29 For payments and grants for the design and construction of an umbili-
30 cal cord blood bank facility in Syracuse, New York. Upon the request
31 of the Commissioner of the department of health and approval of the
32 Director of the division of the budget, these funds may be available
33 and are authorized for transfer to the state university of New York
34 construction fund (125906BB) ... 5,000,000 .......... (re. $802,000)
35 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Preservation of Facilities Purpose
39 By chapter 54, section 1, of the laws of 2017:
40 For minor alterations, improvements and preventive maintenance of St.
41 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
42 Batavia Nursing Home, and Montrose Nursing Home including prepara-
43 tion of plans and for payment to the design and construction manage-
44 ment account of the centralized services fund of the New York state
356 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 office of general services. Upon the request of the commissioner of
2 the department of health and approval of the director of the divi-
3 sion of the budget, funds of this appropriation may be transferred
4 to the dormitory authority of the state of New York for capital
5 projects (12601703) ... 7,600,000 ................ (re. $7,479,000)
6 For the maintenance and operation of various facilities and systems
7 including personal services, fringe benefits, and indirect costs.
8 Notwithstanding any other law to the contrary, all or a portion of
9 the funds appropriated herein may be suballocated or transferred to
10 any department, agency, or public authority (12FM17MO) .............
11 9,000,000 ......................................... (re. $3,200,000)
12 By chapter 55, section 1, of the laws of 2016:
13 For minor alterations, improvements and preventive maintenance of St.
14 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
15 Batavia Nursing Home, and Montrose Nursing Home including prepara-
16 tion of plans and for payment to the design and construction manage-
17 ment account of the centralized services fund of the New York state
18 office of general services. Upon the request of the commissioner of
19 the department of health and approval of the director of the divi-
20 sion of the budget, funds of this appropriation may be transferred
21 to the dormitory authority of the state of New York for capital
22 projects (12601603) ... 7,600,000 ................. (re. $6,362,000)
23 By chapter 54, section 1, of the laws of 2015:
24 For minor alterations, improvements and preventive maintenance of St.
25 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
26 Batavia Nursing Home, and Montrose Nursing Home including prepara-
27 tion of plans and for payment to the design and construction manage-
28 ment account of the centralized services fund of the New York state
29 office of general services. Upon the request of the commissioner of
30 the department of health and approval of the director of the divi-
31 sion of the budget, funds of this appropriation may be transferred
32 to the dormitory authority of the state of New York for capital
33 projects (12601503) ... 7,600,000 ................. (re. $6,409,000)
34 By chapter 54, section 1, of the laws of 2014:
35 For minor alterations, improvements and preventive maintenance of St.
36 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
37 Batavia Nursing Home, and Montrose Nursing Home including prepara-
38 tion of plans and for payment to the design and construction manage-
39 ment account of the centralized services fund of the New York state
40 office of general services. Upon the request of the commissioner of
41 the department of health and approval of the director of the divi-
42 sion of the budget, funds of this appropriation may be transferred
43 to the dormitory authority of the state of New York for capital
44 projects (12601403) ... 7,600,000 ................. (re. $7,600,000)
45 By chapter 54, section 1, of the laws of 2013:
46 For minor alterations, improvements and preventive maintenance of St.
47 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
48 Batavia Nursing Home, and Montrose Nursing Home including prepara-
357 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion of plans and for payment to the design and construction manage-
2 ment account of the centralized services fund of the New York state
3 office of general services. Upon the request of the commissioner of
4 the department of health and approval of the director of the divi-
5 sion of the budget, funds of this appropriation may be transferred
6 to the dormitory authority of the state of New York for capital
7 projects (12601303) ... 7,600,000 ................. (re. $5,117,000)
8 By chapter 54, section 1, of the laws of 2012:
9 For minor alterations, improvements and preventive maintenance of St.
10 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
11 Batavia Nursing Home, and Montrose Nursing Home including prepara-
12 tion of plans and for payment to the design and construction manage-
13 ment account of the centralized services fund of the New York state
14 office of general services. Upon the request of the commissioner of
15 the department of health and approval of the director of the divi-
16 sion of the budget, funds of this appropriation may be transferred
17 to the dormitory authority of the state of New York for capital
18 projects (12601203) ... 7,600,000 ................. (re. $1,058,000)
19 By chapter 54, section 1, of the laws of 2011:
20 For minor alterations, improvements and preventive maintenance of St.
21 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
22 Batavia Nursing Home, and Montrose Nursing Home including prepara-
23 tion of plans and for payment to the design and construction manage-
24 ment account of the centralized services fund of the New York state
25 office of general services. Upon the request of the commissioner of
26 the department of health and approval of the director of the divi-
27 sion of the budget, funds of this appropriation may be transferred
28 to the dormitory authority of the state of New York for capital
29 projects (12601103) ... 7,600,000 ................. (re. $1,884,000)
30 By chapter 54, section 1, of the laws of 2010:
31 For minor alterations, improvements and preventive maintenance of St.
32 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
33 Batavia Nursing Home, and Montrose Nursing Home including prepara-
34 tion of plans and for payment to the design and construction manage-
35 ment account of the centralized services fund of the New York state
36 office of general services. Upon the request of the commissioner of
37 the department of health and approval of the director of the divi-
38 sion of the budget, funds of this appropriation may be transferred
39 to the dormitory authority of the state of New York for capital
40 projects (12601003) ... 7,600,000 ................. (re. $2,931,000)
41 By chapter 54, section 1, of the laws of 2009:
42 For minor alterations, improvements and preventive maintenance of St.
43 Albans Nursing Home, Helen Hayes Hospital, Oxford Nursing Home,
44 Batavia Nursing Home, and Montrose Nursing Home including prepara-
45 tion of plans and for payment to the design and construction manage-
46 ment account of the centralized services fund of the New York state
47 office of general services. Upon the request of the commissioner of
48 the department of health and approval of the director of the divi-
358 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sion of the budget, funds of this appropriation may be transferred
2 to the dormitory authority of the state of New York for capital
3 projects (12600903) ... 7,600,000 ................. (re. $2,130,000)
4 STATEWIDE HEALTH INFORMATION NETWORK FOR NEW YORK (CCP)
5 Capital Project Funds - Other
6 Capital Projects Fund
7 Program Improvement/Change Purpose
8 By chapter 54, section 1, of the laws of 2017:
9 For grants, services and expenses including contracts for the state
10 designated entity and the qualified entities certified by the
11 department for the purpose of supporting and administering the
12 statewide health information network for New York, including but not
13 limited to technology, equipment, software, personal service, fringe
14 benefits, and indirect costs. For purposes of the program, all such
15 activities are deemed to constitute a capital expenditure. No
16 expenditures related to this appropriation shall be made without a
17 plan, prepared by the commissioner of health and approved by the
18 director of the budget, detailing sufficient resources are available
19 to support such expenditures (12SH1708) ............................
20 30,000,000 ....................................... (re. $21,600,000)
21 WATER RESOURCES (CCP)
22 Capital Projects Funds - Federal
23 Federal Capital Projects Fund
24 Water Resources Purpose
25 By chapter 54, section 1, of the laws of 2017:
26 For federal grants for the safe drinking water revolving fund
27 (12021757) ... 70,000,000 ........................ (re. $70,000,000)
28 For services and expenses of the state revolving funds program
29 (12DW1757) ... 7,000,000 .......................... (re. $7,000,000)
30 By chapter 55, section 1, of the laws of 2016:
31 For federal grants for the safe drinking water revolving fund
32 (12021657) ... 70,000,000 ........................ (re. $36,484,000)
33 For services and expenses of the state revolving funds program
34 (12DW1657) ... 7,000,000 .......................... (re. $1,918,000)
35 By chapter 54, section 1, of the laws of 2015:
36 For federal grants for the safe drinking water revolving fund
37 (12021557) ... 70,000,000 ........................ (re. $26,188,000)
38 By chapter 54, section 1, of the laws of 2014:
39 For federal grants for the safe drinking water revolving fund
40 (12021457) ... 70,000,000 ........................ (re. $30,974,000)
41 By chapter 54, section 1, of the laws of 2013:
359 12654-10-8
DEPARTMENT OF HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For federal grants for the safe drinking water revolving fund
2 (12021357) ... 70,000,000 ........................ (re. $14,641,000)
3 By chapter 54, section 1, of the laws of 2010:
4 For federal grants for the safe drinking water revolving fund
5 (12021057) ... 157,183,000 ....................... (re. $61,844,000)
360 12654-10-8
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 3,000,000 553,042,000
6 ---------------- ----------------
7 All Funds ........................ 3,000,000 553,042,000
8 ================ ================
9 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) ..... 3,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 Alterations and improvements for the preser-
15 vation of facilities including liabilities
16 incurred prior to April 1, 2018 (ERPF1803) ... 3,000,000
361 12654-10-8
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 COLLEGE OF EMERGENCY PREPAREDNESS, HOMELAND SECURITY AND CYBERSECURITY
2 (CCP)
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 New Facilities Purpose
6 The appropriation made by chapter 54, section 1, of the laws of 2014, is
7 hereby amended and reappropriated to read:
8 For the cost of studies, site acquisitions, planning, design,
9 construction, reconstruction, renovation, and equipment necessary to
10 establish a college of emergency preparedness, homeland security and
11 cybersecurity under a plan developed in consultation with the [divi1
12 sion] division of homeland security and emergency services. All or a
13 portion of the funds appropriated herein may be suballocated or
14 transferred to any department, agency, or public authority
15 (ERCG1407) ... 15,000,000 ........................ (re. $15,000,000)
16 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
17 Capital Projects Funds - Other
18 Capital Projects Fund
19 New Facilities Purpose
20 By chapter 50, section 1, of the laws of 2010:
21 For the cost of studies, site acquisitions, planning, design,
22 construction, reconstruction, renovation, and equipment related to
23 the development of centralized state public safety training facili-
24 ties including related departmental administrative costs incurred
25 prior to April 1, 2010 (ERNF1007) ... 42,000,000 . (re. $8,309,000)
26 DISASTER ASSISTANCE (CCP)
27 Capital Projects Funds - Other
28 New York Storm Recovery Capital Fund
29 Storm Recovery Account
30 Disaster Assistance Purpose
31 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
32 section 1, of the laws of 2014:
33 For the cost of repair, rehabilitation, or replacement of capital
34 works or purposes damaged by hurricane Sandy which are expected to
35 be eligible for reimbursement by the federal emergency management
36 agency (FEMA), the federal transit administration (FTA), the federal
37 highway administration (FHWA) and/or any other federal reimbursement
38 source, including liabilities incurred prior to April 1, 2013. This
39 appropriation may be available to provide advances in anticipation
40 of reimbursement for the repair, rehabilitation, or replacement of
41 capital works or purposes damaged by hurricane Sandy which are
42 expected to be eligible for reimbursement by FEMA, FTA, FHWA and/or
43 any other federal reimbursement source. No such advances for a
44 project shall be made unless the division of budget has first deter-
362 12654-10-8
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 mined that there is a substantial likelihood that the project is
2 eligible for reimbursement by FEMA, FTA, FHWA and/or any other
3 federal reimbursement source. Notwithstanding any provision of law
4 to the contrary, the state comptroller shall credit these appropri-
5 ations with federal grants received pursuant to the federal communi-
6 ty development block grant program or any other federal program
7 providing disaster aid, in recognition that the state was required
8 to make payments for eligible projects in advance of the availabili-
9 ty of federal reimbursement. Funds appropriated herein may be subal-
10 located or transferred to any other state department, agency, or
11 public benefit corporation, to achieve this purpose. Five business
12 days after the close of each month, the division of the budget shall
13 report to the chair of the senate finance committee and the chair of
14 the assembly ways and means committee total disbursements from this
15 appropriation (73FA13DA) ... 450,000,000 ........ (re. $450,000,000)
16 INTEROPERABLE COMMUNICATIONS (CCP)
17 Capital Projects Funds - Other
18 Capital Projects Fund
19 Program Improvement Purpose
20 By chapter 54, section 1, of the laws of 2017:
21 For the provision of grants or reimbursement to counties for the
22 development, consolidation or operation of public safety communi-
23 cations systems or networks designed to support statewide interoper-
24 able communications for first responders. Expenditures from this
25 appropriation shall reduce appropriations for grants from the state-
26 wide public safety communications account for the same purpose by an
27 equivalent amount, and such appropriation authority in such account
28 shall then be deemed to have lapsed to the extent of such reduction
29 (ERIC1708) ... 50,000,000 ........................ (re. $50,000,000)
30 By chapter 54, section 1, of the laws of 2015:
31 For projects designed to advance completion of a fully interoperable
32 statewide public safety communications network. Expenditures from
33 this appropriation shall reduce appropriations for grants from the
34 statewide public safety communications account for the same purpose
35 by an equivalent amount, and such appropriation authority in such
36 account shall then be deemed to have lapsed to the extent of such
37 reduction (ERCN1508) ... 15,000,000 .............. (re. $15,000,000)
38 By chapter 54, section 1, of the laws of 2014:
39 For projects designed to advance completion of a fully interoperable
40 statewide public safety communications network. Expenditures from
41 this appropriation shall reduce appropriations for grants from the
42 statewide public safety communications account for the same purpose
43 by an equivalent amount, and such appropriation authority in such
44 account shall then be deemed to have lapsed to the extent of such
45 reduction (ERCN1408) ... 15,000,000 .............. (re. $11,733,000)
46 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
363 12654-10-8
DIVISION OF HOMELAND SECURITY AND EMERGENCY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Health and Safety Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 Alterations and improvements for health and safety including liabil-
6 ities incurred prior to April 1, 2017 (ERHS1701) ...................
7 2,000,000 ......................................... (re. $2,000,000)
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 Preservation of Facilities Purpose
11 By chapter 54, section 1, of the laws of 2017:
12 Alterations and improvements for the preservation of facilities
13 including liabilities incurred prior to April 1, 2017 (ERPF1703) ...
14 1,000,000 ......................................... (re. $1,000,000)
364 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 479,200,000 2,818,715,000
6 Capital Projects Funds - Federal ... 0 10,027,000
7 ---------------- ----------------
8 All Funds ........................ 479,200,000 2,828,742,000
9 ================ ================
10 ACCESS TO HOME PROGRAM (CCP) ................................. 1,000,000
11 --------------
12 Capital Projects Funds - Other
13 Housing Program Fund
14 New Facilities Purpose
15 For allocation as follows: For contract with
16 eligible applicants to provide financial
17 assistance for the actual costs of an
18 access to home program pursuant to article
19 XXV of the private housing finance law
20 (08051807) ................................... 1,000,000
21 AFFORDABLE HOUSING CORPORATION (CCP) ........................ 26,000,000
22 --------------
23 Capital Projects Funds - Other
24 Housing Program Fund
25 New Facilities Purpose
26 For allocation as follows: For deposit in
27 the affordable housing development account
28 created pursuant to section 59-b of the
29 private housing finance law for the
30 purposes of carrying out the provisions of
31 article XIX of the private housing finance
32 law. No funds shall be expended from this
33 appropriation until the director of the
34 budget has approved a financial plan
35 submitted by the affordable housing corpo-
36 ration in such detail as required by the
37 director of the budget.
38 Up to 5 percent of the funds appropriated
39 herein may be used for administrative
40 purposes (08011807) ......................... 26,000,000
41 HOMES FOR WORKING FAMILIES PROGRAM (CCP) .................... 14,000,000
42 --------------
365 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2018-19
1 Capital Projects Funds - Other
2 Housing Program Fund
3 New Facilities Purpose
4 For allocation as follows: For deposit in
5 the housing trust fund account created
6 pursuant to section 59-a of the private
7 housing finance law and subject to the
8 provisions of article XVIII of the private
9 housing finance law for the purpose of
10 maximizing the state's utilization of
11 federal low income housing tax credits in
12 conjunction with the issuance of tax
13 exempt bonds used to finance affordable
14 housing construction. Up to 5 percent of
15 the funds appropriated herein may be used
16 for administrative purposes (08031807) ...... 14,000,000
17 HOUSING OPPORTUNITIES PROGRAM FOR THE ELDERLY (CCP) .......... 1,400,000
18 --------------
19 Capital Projects Funds - Other
20 Housing Program Fund
21 Preservation of Facilities Purpose
22 For allocation as follows: For contracts
23 with not-for-profit corporations or muni-
24 cipalities to provide state financial
25 assistance to administer emergency home
26 repairs programs which provide grants and
27 loans in an amount not to exceed $10,000
28 per unit for the cost of correcting any
29 condition which poses a threat to the
30 life, health or safety of a low income
31 elderly homeowner pursuant to article 29
32 of the private housing finance law. No
33 funds shall be expended from this appro-
34 priation until the director of the budget
35 has approved a financial plan submitted by
36 the housing trust fund corporation on
37 behalf of the housing opportunities for
38 the elderly program in such detail as
39 required by the director of the budget.
40 Up to 5 percent of the funds appropriated
41 herein may be used for administrative
42 purposes (08081803) .......................... 1,400,000
43 HOUSING PROGRAM (CCP) ...................................... 132,000,000
44 --------------
45 Capital Projects Funds - Other
46 Housing Program Fund
366 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2018-19
1 New Facilities Purpose
2 In support of a comprehensive, statewide
3 multi-year housing program. Spending
4 authorized by this appropriation shall be
5 subject to the same reporting requirements
6 as the 2016-17 and 2017-18 state fiscal
7 year housing program (CCP).
8 Notwithstanding any other law to the contra-
9 ry, the amounts appropriated herein may be
10 suballocated or transferred to any state
11 department, agency, or public authority
12 for the purposes stated herein.
13 When combined with other funds made avail-
14 able in the 2016-17 and 2017-18 state
15 fiscal year housing program (CCP), funds
16 appropriated herein shall be made avail-
17 able for the purpose of providing capital
18 subsidies for the development of 6,000 or
19 more supportive housing units throughout
20 the state over the next five years, as
21 determined by a competitive selection
22 process (08111807) ......................... 132,000,000
23 LOW INCOME HOUSING TRUST FUND (CCP) ......................... 44,200,000
24 --------------
25 Capital Projects Funds - Other
26 Housing Program Fund
27 New Facilities Purpose
28 For allocation as follows: For deposit in
29 the housing trust fund account created
30 pursuant to section 59-a of the private
31 housing finance law for the purposes of
32 carrying out the provisions of article
33 XVIII of the private housing finance law
34 including up to $300,000 to offset housing
35 trust fund corporation costs of adminis-
36 tering the low income housing trust fund
37 program established by such article. No
38 funds shall be expended from this appro-
39 priation until the director of the budget
40 has approved a financial plan submitted by
41 the housing trust fund corporation on
42 behalf of the housing trust fund program
43 in such detail as required by the director
44 of the budget.
45 Up to 5 percent of the funds appropriated
46 herein may be used for administrative
47 purposes (08141807) ......................... 44,200,000
367 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2018-19
1 MAIN STREET PROGRAM (CCP) .................................... 4,200,000
2 --------------
3 Capital Projects Funds - Other
4 Housing Program Fund
5 New Facilities Purpose
6 For allocation as follows: For contract with
7 not-for-profit corporations and munici-
8 palities to provide state fiscal assist-
9 ance to administer main street or downtown
10 revitalization projects for communities
11 pursuant to article XXVI of the private
12 housing finance law (08061807) ............... 4,200,000
13 NEW YORK CITY HOUSING AUTHORITY PROGRAM (CCP) .............. 250,000,000
14 --------------
15 Capital Projects Funds - Other
16 Housing Program Fund
17 New Facilities Purpose
18 For the purpose of capital projects and
19 other improvements to address issues
20 relating to conditions of governance and
21 habitability, including but not limited
22 to, heating, mold, or lead, and other such
23 conditions affecting the health and safety
24 of tenants at housing developments owned
25 or operated by the New York city housing
26 authority. Notwithstanding any other law
27 to the contrary, funds appropriated herein
28 shall be made available pursuant to a plan
29 established under section 402-d of the
30 public housing law. All work conducted
31 utilizing the funds appropriated herein
32 must be conducted exclusively in accord-
33 ance with the terms and conditions of the
34 plan described therein. Notwithstanding
35 any law to the contrary, no funds made
36 available pursuant to chapter 54 of the
37 laws of 2017 for capital projects and
38 other improvements related to housing
39 developments owned or operated by the New
40 York city housing authority shall be allo-
41 cated until the establishment of a plan
42 pursuant to section 402-d of the public
43 housing law. The amounts appropriated
44 herein may be suballocated or transferred
45 to any state department, agency, or public
46 authority for the purposes stated herein ... 250,000,000
368 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS 2018-19
1 PUBLIC HOUSING MODERNIZATION PROGRAM (CCP) ................... 6,400,000
2 --------------
3 Capital Projects Funds - Other
4 Housing Program Fund
5 Preservation of Facilities Purpose
6 For allocation as follows: For services and
7 expenses of a public housing modernization
8 program. Of the amount appropriated here-
9 in, the sum of $400,000 shall be allocated
10 for capital project activities associated
11 with article XII of the public housing
12 law. No funds shall be expended from this
13 appropriation until the director of the
14 budget has approved a financial plan
15 submitted by the housing trust fund corpo-
16 ration on behalf of the public housing
17 modernization program in such detail as
18 required by the director of the budget.
19 Up to 5 percent of the funds appropriated
20 herein may be used for administrative
21 purposes (08051803) .......................... 6,400,000
369 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ACCESS TO HOME PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Housing Program Fund
4 New Facilities Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For allocation as follows: For contract with eligible applicants to
7 provide financial assistance for the actual costs of an access to
8 home program pursuant to article XXV of the private housing finance
9 law (08051707) ... 1,000,000 ...................... (re. $1,000,000)
10 By chapter 55, section 1, of the laws of 2016:
11 For allocation as follows: For contract with eligible applicants to
12 provide financial assistance for the actual costs of an access to
13 home program pursuant to article XXV of the private housing finance
14 law (08051607) ... 1,000,000 ........................ (re. $247,000)
15 AFFORDABLE HOUSING CORPORATION (CCP)
16 Capital Projects Funds - Other
17 Housing Program Fund
18 New Facilities Purpose
19 By chapter 54, section 1, of the laws of 2017:
20 For allocation as follows: For deposit in the affordable housing
21 development account created pursuant to section 59-b of the private
22 housing finance law for the purposes of carrying out the provisions
23 of article XIX of the private housing finance law. No funds shall be
24 expended from this appropriation until the director of the budget
25 has approved a financial plan submitted by the affordable housing
26 corporation in such detail as required by the director of the budg-
27 et.
28 Up to 5 percent of the funds appropriated herein may be used for
29 administrative purposes (08011707) .................................
30 26,000,000 ....................................... (re. $26,000,000)
31 By chapter 55, section 1, of the laws of 2016:
32 For allocation as follows: For deposit in the affordable housing
33 development account created pursuant to section 59-b of the private
34 housing finance law for the purposes of carrying out the provisions
35 of article XIX of the private housing finance law. No funds shall be
36 expended from this appropriation until the director of the budget
37 has approved a financial plan submitted by the affordable housing
38 corporation in such detail as required by the director of the budg-
39 et.
40 Up to 5 percent of the funds appropriated herein may be used for
41 administrative purposes (08011607) .................................
42 26,000,000 ....................................... (re. $25,725,000)
43 By chapter 54, section 1, of the laws of 2015:
370 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For allocation as follows: For deposit in the affordable housing
2 development account created pursuant to section 59-b of the private
3 housing finance law for the purposes of carrying out the provisions
4 of article XIX of the private housing finance law. No funds shall be
5 expended from this appropriation until the director of the budget
6 has approved a financial plan submitted by the affordable housing
7 corporation in such detail as required by the director of the budg-
8 et.
9 Up to 5 percent of the funds appropriated herein may be used for
10 administrative purposes (08011507) .................................
11 29,000,000 ....................................... (re. $28,250,000)
12 By chapter 54, section 1, of the laws of 2014:
13 For allocation as follows: For deposit in the affordable housing
14 development account created pursuant to section 59-b of the private
15 housing finance law for the purposes of carrying out the provisions
16 of article XIX of the private housing finance law. No funds shall be
17 expended from this appropriation until the director of the budget
18 has approved a financial plan submitted by the affordable housing
19 corporation in such detail as required by the director of the budg-
20 et.
21 Up to 5 percent of the funds appropriated herein may be used for
22 administrative purposes (08011407) .................................
23 25,000,000 ....................................... (re. $24,725,000)
24 By chapter 54, section 1, of the laws of 2013:
25 For allocation as follows: For deposit in the affordable housing
26 development account created pursuant to section 59-b of the private
27 housing finance law for the purposes of carrying out the provisions
28 of article XIX of the private housing finance law. No funds shall be
29 expended from this appropriation until the director of the budget
30 has approved a financial plan submitted by the affordable housing
31 corporation in such detail as required by the director of the budg-
32 et.
33 Up to 5 percent of the funds appropriated herein may be used for
34 administrative purposes (08011307) .................................
35 25,000,000 ....................................... (re. $18,934,000)
36 By chapter 54, section 1, of the laws of 2012:
37 For allocation as follows: For deposit in the affordable housing
38 development account created pursuant to section 59-b of the private
39 housing finance law for the purposes of carrying out the provisions
40 of article XIX of the private housing finance law. No funds shall be
41 expended from this appropriation until the director of the budget
42 has approved a financial plan submitted by the affordable housing
43 corporation in such detail as required by the director of the budg-
44 et.
45 Up to 5 percent of the funds appropriated herein may be used for
46 administrative purposes (08021207) .................................
47 25,000,000 .......................................... (re. $975,000)
48 HOMES FOR WORKING FAMILIES PROGRAM (CCP)
371 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Housing Program Fund
3 New Facilities Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 For allocation as follows: For deposit in the housing trust fund
6 account created pursuant to section 59-a of the private housing
7 finance law and subject to the provisions of article XVIII of the
8 private housing finance law for the purpose of maximizing the
9 state's utilization of federal low income housing tax credits in
10 conjunction with the issuance of tax exempt bonds used to finance
11 affordable housing construction.
12 Up to 5 percent of the funds appropriated herein may be used for
13 administrative purposes (08031707) .................................
14 14,000,000 ....................................... (re. $14,000,000)
15 By chapter 55, section 1, of the laws of 2016:
16 For allocation as follows: For deposit in the housing trust fund
17 account created pursuant to section 59-a of the private housing
18 finance law and subject to the provisions of article XVIII of the
19 private housing finance law for the purpose of maximizing the
20 state's utilization of federal low income housing tax credits in
21 conjunction with the issuance of tax exempt bonds used to finance
22 affordable housing construction.
23 Up to 5 percent of the funds appropriated herein may be used for
24 administrative purposes (08031607) .................................
25 14,000,000 ....................................... (re. $14,000,000)
26 By chapter 54, section 1, of the laws of 2015:
27 For allocation as follows: For deposit in the housing trust fund
28 account created pursuant to section 59-a of the private housing
29 finance law and subject to the provisions of article XVIII of the
30 private housing finance law for the purpose of maximizing the
31 state's utilization of federal low income housing tax credits in
32 conjunction with the issuance of tax exempt bonds used to finance
33 affordable housing construction.
34 Up to 5 percent of the funds appropriated herein may be used for
35 administrative purposes (08021507) .................................
36 9,000,000 ......................................... (re. $6,235,000)
37 HOUSING OPPORTUNITIES PROGRAM FOR THE ELDERLY (CCP)
38 Capital Projects Funds - Other
39 Housing Program Fund
40 Preservation of Facilities Purpose
41 By chapter 54, section 1, of the laws of 2017:
42 For allocation as follows: For contracts with not-for-profit corpo-
43 rations or municipalities to provide state financial assistance to
44 administer emergency home repairs programs which provide grants and
45 loans in an amount not to exceed $10,000 per unit for the cost of
46 correcting any condition which poses a threat to the life, health or
372 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 safety of a low income elderly homeowner. No funds shall be expended
2 from this appropriation until the director of the budget has
3 approved a financial plan submitted by the housing trust fund corpo-
4 ration on behalf of the housing opportunities for the elderly
5 program in such detail as required by the director of the budget.
6 Up to 5 percent of the funds appropriated herein may be used for
7 administrative purposes (08081703) .................................
8 1,400,000 ......................................... (re. $1,400,000)
9 By chapter 55, section 1, of the laws of 2016:
10 For allocation as follows: For contracts with not-for-profit corpo-
11 rations or municipalities to provide state financial assistance to
12 administer emergency home repairs programs which provide grants and
13 loans in an amount not to exceed $10,000 per unit for the cost of
14 correcting any condition which poses a threat to the life, health or
15 safety of a low income elderly homeowner. No funds shall be expended
16 from this appropriation until the director of the budget has
17 approved a financial plan submitted by the housing trust fund corpo-
18 ration on behalf of the housing opportunities for the elderly
19 program in such detail as required by the director of the budget.
20 Up to 5 percent of the funds appropriated herein may be used for
21 administrative purposes (08031603) ... 1,400,000 .... (re. $694,000)
22 HOUSING PROGRAM (CCP)
23 Capital Projects Funds - Other
24 Dedicated Infrastructure Investment Fund
25 Infrastructure Investment Account
26 New Facilities Purpose
27 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
28 section 1, of the laws of 2017:
29 In support of a comprehensive, statewide multi-year housing program.
30 The commissioner shall provide, in electronic excel format or as
31 requested by the Legislature, an annual report to the director of
32 the budget, the speaker of the Assembly, and the temporary president
33 of the Senate, on or before July 1 of each year, that summarizes the
34 activities undertaken pursuant to the funding made available in the
35 2016-17 and 2017-18 state fiscal year housing program (ccp). Such
36 annual report shall be cumulative and shall include an itemized list
37 of each project utilizing funds appropriated by the 2016-17 and
38 2017-18 state fiscal year housing program (ccp), including a brief
39 description of the project, street address, county, awardee, total
40 budget, amount of capital subsidy appropriated by the housing
41 program (ccp), relevant section of the housing program (ccp), bonded
42 or cash, amount of each additional public funding source, funding
43 program, number of units, area median income requirements if appli-
44 cable, month and year construction will commence, projected date of
45 occupancy, and project phase (in development, engineering,
46 construction, complete, defunded). Such annual report shall continue
47 to be provided until such time as the final disbursement of funds
373 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 appropriated in the 2016-17 and 2017-18 state fiscal year housing
2 program (ccp) has occurred.
3 Notwithstanding any other law to the contrary, the amounts appropri-
4 ated herein may be suballocated to any state department, agency, or
5 public authority for the purposes stated herein. Notwithstanding
6 section 40 of the state finance law or any other law to the contra-
7 ry, all assistance appropriations made from this account shall
8 remain in full force and effect in accordance, in the aggregate,
9 with the following schedule: not more than $344,000,000 for the
10 period April 1, 2016, through and past March 31, 2017, and not more
11 than an additional $246,000,000 for the period April 1, 2017 through
12 and past March 31, 2018 as indicated below:
13 1. When combined with other funds made available in the 2016-17 and
14 2017-18 state fiscal year housing program (ccp), up to a total of
15 $950,000,000 shall be made available for the purpose of providing
16 capital and operating subsidies for the development of 6,000 or more
17 supportive housing units throughout the state over the next five
18 years, as determined by a competitive selection process.
19 2. When combined with other funds made available in the 2016-17 and
20 2017-18 state fiscal year housing program (ccp), up to a total of
21 $472,025,000 shall be made available for the purpose of providing
22 capital subsidies for the new construction or adaptive reuse of
23 rental housing affordable to households that earn up to 60 percent
24 of area median income (AMI) and that advance one or more of the
25 specific housing priorities of the state. Up to 5 percent of the
26 funds allocated herein may be used for administrative purposes.
27 3. When combined with other funds made available in the 2016-17 and
28 2017-18 state fiscal year housing program (ccp), up to a total of
29 $125,000,000 shall be made available for the purpose of developing
30 or rehabilitating one hundred percent senior rental affordable hous-
31 ing targeted to low-income seniors, aged 60 and above.
32 4. When combined with other funds made available in the 2016-17 and
33 2017-18 state fiscal year housing program (ccp), up to a total of
34 $45,000,000 for purposes of the rural and urban community investment
35 fund program created pursuant to article XXVII of the private hous-
36 ing finance law.
37 5. When combined with other funds made available in the 2016-17 and
38 2017-18 state fiscal year housing program (ccp), up to a total of
39 $150,000,000 shall be made available for the purpose of providing
40 capital subsidies for the new construction, adaptive reuse, or
41 reconstruction of rental housing affordable to households that earn
42 between 60 percent and 130 percent of AMI and that advance one or
43 more of the specific housing priorities of the state.
44 6. When combined with other funds made available in the 2016-17 and
45 2017-18 state fiscal year housing program (ccp), up to a total of
46 $146,000,000 shall be made available for the purpose of substantial
47 or moderate rehabilitation of site-specific multi-family rental
48 housing currently under a regulatory agreement or extended use
49 agreement with the division of housing and community renewal or
50 another state, federal or local housing agency.
51 7. When combined with other funds made available in the 2016-17 and
52 2017-18 state fiscal year housing program (ccp), up to a total of
374 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 $75,000,000 shall be made available for the purpose of providing
2 capital subsidies to preserve and improve Mitchell-Lama properties
3 in the state.
4 8. When combined with other funds made available in the 2016-17 and
5 2017-18 state fiscal year housing program (ccp), up to a total of
6 $125,000,000 shall be made available for the purpose of substantial
7 or moderate rehabilitation and/or the demolition and replacement
8 through new construction of site-specific multi-family rental hous-
9 ing currently owned by public housing authorities outside of New
10 York city. The distribution of any funds which the division of hous-
11 ing and community renewal or other appropriate state agencies or
12 authorities authorizes to be used as part of a federal housing
13 program, shall require the division of housing and community renewal
14 to monitor and ensure that any affected public housing tenants are
15 properly informed regarding participation in the federal housing
16 program and that appropriate documents related to participation in
17 such federal housing program are made publicly available and are
18 posted on each applicable housing authority's website in a timely
19 manner to properly inform such public housing authority tenants.
20 The residents of public housing that receives and uses such funds to
21 participate in such federal program shall be provided a uniform
22 lease agreement that provides, at a minimum, terms and conditions
23 consistent with those found in the public housing lease they had
24 prior to the public housing having received any such funds. Public
25 housing authorities that receive and use such funds shall be
26 required to: provide resident education, which shall include compre-
27 hensive information about any anticipated changes to the public
28 housing; provide language assistance to residents with limited
29 English proficiency; recognize the right of residents to form a
30 resident organization; require resident participation funding
31 commensurate to the funding that was being allocated to residents
32 already; develop a set of procedures for resident grievances and
33 lease termination proceedings that apply to residents following the
34 use of such funds, which shall be consistent with any existing
35 procedures, can provide stronger resident protections, and conform
36 with any other applicable federal rules and/or regulations. In cases
37 when there is a property manager other than the public housing
38 authority that receives these funds, then such property manager
39 shall be required to take actions including, but not limited to,
40 providing clear and accessible information to residents before,
41 during, and after becoming the property manager; provide language
42 assistance to residents with limited English proficiency; and recog-
43 nize a legitimate resident organization as the residents' represen-
44 tative, invite such resident organization to all resident engage-
45 ments, and meet regularly with the resident organization to discuss
46 emerging property-wide issues.
47 9. When combined with other funds made available in the 2016-17 and
48 2017-18 state fiscal year housing program (ccp), up to a total of
49 $62,500,000 shall be made available for the purpose of substantial
50 or moderate rehabilitation and/or the demolition and replacement
51 through new construction of buildings of 5 to 40 units.
375 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 10. When combined with other funds made available in the 2016-17 and
2 2017-18 state fiscal year housing program (ccp), up to a total of
3 $41,475,000 shall be made available for the purpose of promoting
4 home ownership among families of low and moderate income for whom
5 there are few affordable home ownership alternatives in the private
6 market, and to stimulate the development, stabilization, and preser-
7 vation of New York communities.
8 11. When combined with other funds made available in the 2016-17 and
9 2017-18 state fiscal year housing program (ccp), up to a total of
10 $13,000,000 shall be made available for the purposes of mobile and
11 manufactured home replacement program pursuant to chapter 54 of the
12 laws of 2016.
13 12. When combined with other funds made available in the 2016-17 and
14 2017-18 state fiscal year housing program (ccp), up to a total of
15 $10,000,000 shall be made available for the purpose of stimulating
16 reinvestment in properties located within mixed-used commercial
17 districts located in urban, small town, and rural areas of the state
18 pursuant to article XXVI of the private housing finance law.
19 13. When combined with other funds made available in the 2016-17 and
20 2017-18 state fiscal year housing program (ccp), up to a total of
21 $200,000,000 shall be made available, pursuant to a plan approved by
22 the director of the budget, in consultation with the New York city
23 housing authority chair and the dormitory authority of the state of
24 New York, for the purpose of capital projects and other improvements
25 related to housing developments owned or operated by the New York
26 city housing authority.
27 14. When combined with other funds made available in the 2016-17 and
28 2017-18 state fiscal year housing program (ccp), up to a total of
29 $100,000,000 shall be made available for the preservation, restora-
30 tion or creation of affordable housing units in a city having a
31 population of one million or more, one hundred percent of which
32 shall be affordable to households that earn up to sixty percent of
33 the area median income adjusted for family size. Priority shall be
34 given to applicants incorporated pursuant to the not-for-profit
35 corporation law, with prior experience in community development
36 projects with at least a fifty-one percent controlling interest in
37 such project. Not-for-profits shall strive to develop projects
38 utilizing state or city-owned land and such utilization shall be
39 prioritized in the agency review of such project (08101607) ........
40 590,000,000 ..................................... (re. $497,820,000)
41 Capital Projects Funds - Other
42 Housing Program Fund
43 New Facilities Purpose
44 By chapter 54, section 1, of the laws of 2017:
45 In support of a comprehensive, statewide multi-year housing program.
46 The commissioner shall provide, in electronic excel format or as
47 requested by the Legislature, an annual report to the director of
48 the budget, the speaker of the Assembly, and the temporary president
49 of the Senate, on or before July 1 of each year, that summarizes the
50 activities undertaken pursuant to the funding made available in the
376 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 2016-17 and 2017-18 state fiscal year housing program (ccp). Such
2 annual report shall be cumulative and shall include an itemized list
3 of each project utilizing funds appropriated by the 2016-17 and
4 2017-18 state fiscal year housing program (ccp), including a brief
5 description of the project, street address, county, awardee, total
6 budget, amount of capital subsidy appropriated by the housing
7 program (ccp), relevant section of the housing program (ccp), bonded
8 or cash, amount of each additional public funding source, funding
9 program, number of units, area median income requirements if appli-
10 cable, month and year construction will commence, projected date of
11 occupancy, and project phase (in development, engineering,
12 construction, complete, defunded). Such annual report shall continue
13 to be provided until such time as the final disbursement of funds
14 appropriated in the 2016-17 and 2017-18 state fiscal year housing
15 program (ccp) has occurred.
16 Notwithstanding any other law to the contrary, the amounts appropri-
17 ated herein may be suballocated to any state department, agency, or
18 public authority for the purposes stated herein. Notwithstanding
19 section 40 of the state finance law or any other law to the contra-
20 ry, all assistance appropriations made from this account shall
21 remain in full force and effect in accordance, in the aggregate,
22 with the following schedule: not more than an additional
23 $500,000,000 for the period April 1, 2019 through and past March 31,
24 2020, and not more than an additional $41,525,000 for the period
25 April 1, 2020 through and past March 31, 2021 as indicated below:
26 1. When combined with other funds made available in the 2016-17 and
27 2017-18 state fiscal year housing program (ccp), up to a total of
28 $950,000,000 shall be made available for the purpose of providing
29 capital and operating subsidies for the development of 6,000 or more
30 supportive housing units throughout the state over the next five
31 years, as determined by a competitive selection process.
32 2. When combined with other funds made available in the 2016-17 and
33 2017-18 state fiscal year housing program (ccp), up to a total of
34 $472,025,000 shall be made available for the purpose of providing
35 capital subsidies for the new construction or adaptive reuse of
36 rental housing affordable to households that earn up to 60 percent
37 of area median income (AMI) and that advance one or more of the
38 specific housing priorities of the state. Up to 5 percent of the
39 funds allocated herein may be used for administrative purposes.
40 3. When combined with other funds made available in the 2016-17 and
41 2017-18 state fiscal year housing program (ccp), up to a total of
42 $125,000,000 shall be made available for the purpose of developing
43 or rehabilitating one hundred percent senior rental affordable hous-
44 ing targeted to low-income seniors, aged 60 and above.
45 4. When combined with other funds made available in the 2016-17 and
46 2017-18 state fiscal year housing program (ccp), up to a total of
47 $45,000,000 for purposes of the rural and urban community investment
48 fund program created pursuant to article XXVII of the private hous-
49 ing finance law.
50 5. When combined with other funds made available in the 2016-17 and
51 2017-18 state fiscal year housing program (ccp), up to a total of
52 $150,000,000 shall be made available for the purpose of providing
377 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 capital subsidies for the new construction, adaptive reuse, or
2 reconstruction of rental housing affordable to households that earn
3 between 60 percent and 130 percent of AMI and that advance one or
4 more of the specific housing priorities of the state.
5 6. When combined with other funds made available in the 2016-17 and
6 2017-18 state fiscal year housing program (ccp), up to a total of
7 $146,000,000 shall be made available for the purpose of substantial
8 or moderate rehabilitation of site-specific multi-family rental
9 housing currently under a regulatory agreement or extended use
10 agreement with the division of housing and community renewal or
11 another state, federal or local housing agency.
12 7. When combined with other funds made available in the 2016-17 and
13 2017-18 state fiscal year housing program (ccp), up to a total of
14 $75,000,000 shall be made available for the purpose of providing
15 capital subsidies to preserve and improve Mitchell-Lama properties
16 in the state.
17 8. When combined with other funds made available in the 2016-17 and
18 2017-18 state fiscal year housing program (ccp), up to a total of
19 $125,000,000 shall be made available for the purpose of substantial
20 or moderate rehabilitation and/or the demolition and replacement
21 through new construction of site-specific multi-family rental hous-
22 ing currently owned by public housing authorities outside of New
23 York city. The distribution of any funds which the division of hous-
24 ing and community renewal or other appropriate state agencies or
25 authorities authorizes to be used as part of a federal housing
26 program, shall require the division of housing and community renewal
27 to monitor and ensure that any affected public housing tenants are
28 properly informed regarding participation in the federal housing
29 program and that appropriate documents related to participation in
30 such federal housing program are made publicly available and are
31 posted on each applicable housing authority's website in a timely
32 manner to properly inform such public housing authority tenants. The
33 residents of public housing that receives and uses such funds to
34 participate in such federal program shall be provided a uniform
35 lease agreement that provides, at a minimum, terms and conditions
36 consistent with those found in the public housing lease they had
37 prior to the public housing having received any such funds. Public
38 housing authorities that receive and use such funds shall be
39 required to: provide resident education, which shall include compre-
40 hensive information about any anticipated changes to the public
41 housing; provide language assistance to residents with limited
42 English proficiency; recognize the right of residents to form a
43 resident organization; require resident participation funding
44 commensurate to the funding that was being allocated to residents
45 already; develop a set of procedures for resident grievances and
46 lease termination proceedings that apply to residents following the
47 use of such funds, which shall be consistent with any existing
48 procedures, can provide stronger resident protections, and conform
49 with any other applicable federal rules and/or regulations. In cases
50 when there is a property manager other than the public housing
51 authority that receives these funds, then such property manager
52 shall be required to take actions including, but not limited to,
378 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 providing clear and accessible information to residents before,
2 during, and after becoming the property manager; provide language
3 assistance to residents with limited English proficiency; and recog-
4 nize a legitimate resident organization as the residents' represen-
5 tative, invite such resident organization to all resident engage-
6 ments, and meet regularly with the resident organization to discuss
7 emerging property-wide issues.
8 9. When combined with other funds made available in the 2016-17 and
9 2017-18 state fiscal year housing program (ccp), up to a total of
10 $62,500,000 shall be made available for the purpose of substantial
11 or moderate rehabilitation and/or the demolition and replacement
12 through new construction of buildings of 5 to 40 units.
13 10. When combined with other funds made available in the 2016-17 amd
14 2017-18 state fiscal year housing program (ccp), up to a total of
15 $41,475,000 shall be made available for the purpose of promoting
16 home ownership among families of low and moderate income for whom
17 there are few affordable home ownership alternatives in the private
18 market, and to stimulate the development, stabilization, and preser-
19 vation of New York communities.
20 11. When combined with other funds made available in the 2016-17 and
21 2017-18 state fiscal year housing program (ccp), up to a total of
22 $13,000,000 shall be made available for the purposes of mobile and
23 manufactured home replacement program pursuant to chapter 54 of the
24 laws of 2016.
25 12. When combined with other funds made available in the 2016-17 and
26 2017-18 state fiscal year housing program (ccp), up to a total of
27 $10,000,000 shall be made available for the purpose of stimulating
28 reinvestment in properties located within mixed-used commercial
29 districts located in urban, small town, and rural areas of the state
30 pursuant to article XXVI of the private housing finance law.
31 13. When combined with other funds made available in the 2016-17 and
32 2017-18 state fiscal year housing program (ccp), up to a total of
33 $200,000,000 shall be made available, pursuant to a plan approved by
34 the director of the budget, in consultation with the New York city
35 housing authority chair and the dormitory authority of the state of
36 New York, for the purpose of capital projects and other improvements
37 related to housing developments owned or operated by the New York
38 city housing authority.
39 14. When combined with other funds made available in the 2016-17 and
40 2017-18 state fiscal year housing program (ccp), up to a total of
41 $100,000,000 shall be made available for the preservation, restora-
42 tion or creation of affordable housing units in a city having a
43 population of one million or more, one hundred percent of which
44 shall be affordable to households that earn up to sixty percent of
45 the area median income adjusted for family size. Priority shall be
46 given to applicants incorporated pursuant to the not-for-profit
47 corporation law, with prior experience in community development
48 projects with at least a fifty-one percent controlling interest in
49 such project. Not-for-profits shall strive to develop projects
50 utilizing state or city-owned land and such utilization shall be
51 prioritized in the agency review of such project (08111707) ........
52 541,525,000 ..................................... (re. $541,525,000)
379 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
2 section 1, of the laws of 2017:
3 In support of a comprehensive, statewide multi-year housing program.
4 The commissioner shall provide, in electronic excel format or as
5 requested by the Legislature, an annual report to the director of
6 the budget, the speaker of the Assembly, and the temporary president
7 of the Senate, on or before July 1 of each year, that summarizes the
8 activities undertaken pursuant to the funding made available in the
9 2016-17 and 2017-18 state fiscal year housing program (ccp). Such
10 annual report shall be cumulative and shall include an itemized list
11 of each project utilizing funds appropriated by the 2016-17 and
12 2017-18 state fiscal year housing program (ccp), including a brief
13 description of the project, street address, county, awardee, total
14 budget, amount of capital subsidy appropriated by the housing
15 program (ccp), relevant section of the housing program (ccp), bonded
16 or cash, amount of each additional public funding source, funding
17 program, number of units, area median income requirements if appli-
18 cable, month and year construction will commence, projected date of
19 occupancy, and project phase (in development, engineering,
20 construction, complete, defunded). Such annual report shall continue
21 to be provided until such time as the final disbursement of funds
22 appropriated in the 2016-17 and 2017-18 state fiscal year housing
23 program (ccp) has occurred.
24 Notwithstanding any other law to the contrary, the amounts appropri-
25 ated herein may be suballocated to any state department, agency, or
26 public authority for the purposes stated herein. Notwithstanding
27 section 40 of the state finance law or any other law to the contra-
28 ry, all assistance appropriations made from this account shall
29 remain in full force and effect in accordance, in the aggregate,
30 with the following schedule: not more than $303,384,000 for the
31 period April 1, 2017 through and past March 31, 2018, not more than
32 an additional $354,715,000 for the period April 1, 2018 through and
33 past March 31, 2019, not more than an additional $359,565,000 for
34 the period April 1, 2019 through and past March 31, 2020, and not
35 more than an additional $365,811,000 for the period April 1, 2020
36 through and past March 31, 2021 as indicated below:
37 1. When combined with other funds made available in the 2016-17 and
38 2017-18 state fiscal year housing program (ccp), up to a total of
39 $950,000,000 shall be made available for the purpose of providing
40 capital and operating subsidies for the development of 6,000 or more
41 supportive housing units throughout the state over the next five
42 years, as determined by a competitive selection process.
43 2. When combined with other funds made available in the 2016-17 and
44 2017-18 state fiscal year housing program (ccp), up to a total of
45 $472,025,000 shall be made available for the purpose of providing
46 capital subsidies for the new construction or adaptive reuse of
47 rental housing affordable to households that earn up to 60 percent
48 of area median income (AMI) and that advance one or more of the
49 specific housing priorities of the state. Up to 5 percent of the
50 funds allocated herein may be used for administrative purposes.
51 3. When combined with other funds made available in the 2016-17 and
52 2017-18 state fiscal year housing program (ccp), up to a total of
380 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 $125,000,000 shall be made available for the purpose of developing
2 or rehabilitating one hundred percent senior rental affordable hous-
3 ing targeted to low-income seniors, aged 60 and above.
4 4. When combined with other funds made available in the 2016-17 and
5 2017-18 state fiscal year housing program (ccp), up to a total of
6 $45,000,000 for purposes of the rural and urban community investment
7 fund program created pursuant to article XXVII of the private hous-
8 ing finance law.
9 5. When combined with other funds made available in the 2016-17 and
10 2017-18 state fiscal year housing program (ccp), up to a total of
11 $150,000,000 shall be made available for the purpose of providing
12 capital subsidies for the new construction, adaptive reuse, or
13 reconstruction of rental housing affordable to households that earn
14 between 60 percent and 130 percent of AMI and that advance one or
15 more of the specific housing priorities of the state.
16 6. When combined with other funds made available in the 2016-17 and
17 2017-18 state fiscal year housing program (ccp), up to a total of
18 $146,000,000 shall be made available for the purpose of substantial
19 or moderate rehabilitation of site-specific multi-family rental
20 housing currently under a regulatory agreement or extended use
21 agreement with the division of housing and community renewal or
22 another state, federal or local housing agency.
23 7. When combined with other funds made available in the 2016-17 and
24 2017-18 state fiscal year housing program (ccp), up to a total of
25 $75,000,000 shall be made available for the purpose of providing
26 capital subsidies to preserve and improve Mitchell-Lama properties
27 in the state.
28 8. When combined with other funds made available in the 2016-17 and
29 2017-18 state fiscal year housing program (ccp), up to a total of
30 $125,000,000 shall be made available for the purpose of substantial
31 or moderate rehabilitation and/or the demolition and replacement
32 through new construction of site-specific multi-family rental hous-
33 ing currently owned by public housing authorities outside of New
34 York city. The distribution of any funds which the division of hous-
35 ing and community renewal or other appropriate state agencies or
36 authorities authorizes to be used as part of a federal housing
37 program, shall require the division of housing and community renewal
38 to monitor and ensure that any affected public housing tenants are
39 properly informed regarding participation in the federal housing
40 program and that appropriate documents related to participation in
41 such federal housing program are made publicly available and are
42 posted on each applicable housing authority's website in a timely
43 manner to properly inform such public housing authority tenants.
44 The residents of public housing that receives and uses such funds to
45 participate in such federal program shall be provided a uniform
46 lease agreement that provides, at a minimum, terms and conditions
47 consistent with those found in the public housing lease they had
48 prior to the public housing having received any such funds. Public
49 housing authorities that receive and use such funds shall be
50 required to: provide resident education, which shall include compre-
51 hensive information about any anticipated changes to the public
52 housing; provide language assistance to residents with limited
381 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 English proficiency; recognize the right of residents to form a
2 resident organization; require resident participation funding
3 commensurate to the funding that was being allocated to residents
4 already; develop a set of procedures for resident grievances and
5 lease termination proceedings that apply to residents following the
6 use of such funds, which shall be consistent with any existing
7 procedures, can provide stronger resident protections, and conform
8 with any other applicable federal rules and/or regulations. In cases
9 when there is a property manager other than the public housing
10 authority that receives these funds, then such property manager
11 shall be required to take actions including, but not limited to,
12 providing clear and accessible information to residents before,
13 during, and after becoming the property manager; provide language
14 assistance to residents with limited English proficiency; and recog-
15 nize a legitimate resident organization as the residents' represen-
16 tative, invite such resident organization to all resident engage-
17 ments, and meet regularly with the resident organization to discuss
18 emerging property-wide issues.
19 9. When combined with other funds made available in the 2016-17 and
20 2017-18 state fiscal year housing program (ccp), up to a total of
21 $62,500,000 shall be made available for the purpose of substantial
22 or moderate rehabilitation and/or the demolition and replacement
23 through new construction of buildings of 5 to 40 units.
24 10. When combined with other funds made available in the 2016-17 and
25 2017-18 state fiscal year housing program (ccp), up to a total of
26 $41,475,000 shall be made available for the purpose of promoting
27 home ownership among families of low and moderate income for whom
28 there are few affordable home ownership alternatives in the private
29 market, and to stimulate the development, stabilization, and preser-
30 vation of New York communities.
31 11. When combined with other funds made available in the 2016-17 and
32 2017-18 state fiscal year housing program (ccp), up to a total of
33 $13,000,000 shall be made available for the purposes of mobile and
34 manufactured home replacement program pursuant to chapter 54 of the
35 laws of 2016.
36 12. When combined with other funds made available in the 2016-17 and
37 2017-18 state fiscal year housing program (ccp), up to a total of
38 $10,000,000 shall be made available for the purpose of stimulating
39 reinvestment in properties located within mixed-used commercial
40 districts located in urban, small town, and rural areas of the state
41 pursuant to article XXVI of the private housing finance law.
42 13. When combined with other funds made available in the 2016-17 and
43 2017-18 state fiscal year housing program (ccp), up to a total of
44 $200,000,000 shall be made available, pursuant to a plan approved by
45 the director of the budget, in consultation with the New York city
46 housing authority chair and the dormitory authority of the state of
47 New York, for the purpose of capital projects and other improvements
48 related to housing developments owned or operated by the New York
49 city housing authority.
50 14. When combined with other funds made available in the 2016-17 and
51 2017-18 state fiscal year housing program (ccp), up to a total of
52 $100,000,000 shall be made available for the preservation, restora-
382 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion or creation of affordable housing units in a city having a
2 population of one million or more, one hundred percent of which
3 shall be affordable to households that earn up to sixty percent of
4 the area median income adjusted for family size. Priority shall be
5 given to applicants incorporated pursuant to the not-for-profit
6 corporation law, with prior experience in community development
7 projects with at least a fifty-one percent controlling interest in
8 such project. Not-for-profits shall strive to develop projects
9 utilizing state or city-owned land and such utilization shall be
10 prioritized in the agency review of such project (08111607) ........
11 1,383,475,000 ................................. (re. $1,383,475,000)
12 HOUSING PROGRAM CAPITAL IMPROVEMENT (CCP)
13 Capital Projects Funds - Other
14 Capital Projects Fund
15 Administration Purpose
16 By chapter 54, section 1, of the laws of 1990, as added by chapter 215,
17 section 10, of the laws of 1990, and as amended by chapter 55,
18 section 1, of the laws of 1996:
19 For transfer to the Housing Program Fund for the non-bondable costs of
20 projects authorized by appropriations in the Housing Program Fund.
21 Upon certification of such non-bondable costs by the director of the
22 budget, the comptroller is hereby authorized and directed to trans-
23 fer moneys to the Housing Program Fund to repay such costs
24 (71259050) ... 120,000,000 ....................... (re. $19,720,000)
25 LOW INCOME HOUSING TRUST FUND (CCP)
26 Capital Projects Funds - Other
27 Housing Program Fund
28 New Facilities Purpose
29 By chapter 54, section 1, of the laws of 2017:
30 For allocation as follows: For deposit in the housing trust fund
31 account created pursuant to section 59-a of the private housing
32 finance law for the purposes of carrying out the provisions of arti-
33 cle XVIII of the private housing finance law including up to
34 $300,000 to offset housing trust fund corporation costs of adminis-
35 tering the low income housing trust fund program established by such
36 article. No funds shall be expended from this appropriation until
37 the director of the budget has approved a financial plan submitted
38 by the housing trust fund corporation on behalf of the housing trust
39 fund program in such detail as required by the director of the budg-
40 et.
41 Up to 5 percent of the funds appropriated herein may be used for
42 administrative purposes (08041707) .................................
43 44,200,000 ....................................... (re. $44,200,000)
44 By chapter 55, section 1, of the laws of 2016:
383 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For allocation as follows: For deposit in the housing trust fund
2 account created pursuant to section 59-a of the private housing
3 finance law for the purposes of carrying out the provisions of arti-
4 cle XVIII of the private housing finance law including up to
5 $300,000 to offset housing trust fund corporation costs of adminis-
6 tering the low income housing trust fund program established by such
7 article. No funds shall be expended from this appropriation until
8 the director of the budget has approved a financial plan submitted
9 by the housing trust fund corporation on behalf of the housing trust
10 fund program in such detail as required by the director of the budg-
11 et.
12 Up to 5 percent of the funds appropriated herein may be used for
13 administrative purposes (08041607) .................................
14 44,200,000 ....................................... (re. $44,200,000)
15 By chapter 54, section 1, of the laws of 2015:
16 For allocation as follows: For deposit in the housing trust fund
17 account created pursuant to section 59-a of the private housing
18 finance law for the purposes of carrying out the provisions of arti-
19 cle XVIII of the private housing finance law including up to
20 $300,000 to offset housing trust fund corporation costs of adminis-
21 tering the low income housing trust fund program established by such
22 article. No funds shall be expended from this appropriation until
23 the director of the budget has approved a financial plan submitted
24 by the housing trust fund corporation on behalf of the housing trust
25 fund program in such detail as required by the director of the budg-
26 et.
27 Up to 5 percent of the funds appropriated herein may be used for
28 administrative purposes (08041507) .................................
29 40,200,000 ....................................... (re. $40,200,000)
30 By chapter 54, section 1, of the laws of 2014:
31 For allocation as follows: For deposit in the housing trust fund
32 account created pursuant to section 59-a of the private housing
33 finance law for the purposes of carrying out the provisions of arti-
34 cle XVIII of the private housing finance law including up to
35 $300,000 to offset housing trust fund corporation costs of adminis-
36 tering the low income housing trust fund program established by such
37 article. No funds shall be expended from this appropriation until
38 the director of the budget has approved a financial plan submitted
39 by the housing trust fund corporation on behalf of the housing trust
40 fund program in such detail as required by the director of the budg-
41 et.
42 Up to 5 percent of the funds appropriated herein may be used for
43 administrative purposes (08041407) .................................
44 44,200,000 ....................................... (re. $32,452,000)
45 MAIN STREET PROGRAM (CCP)
46 Capital Projects Funds - Other
47 Housing Program Fund
48 New Facilities Purpose
384 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For allocation as follows: For contract with not-for-profit corpo-
3 rations and municipalities to provide state fiscal assistance to
4 administer main street or downtown revitalization projects for
5 communities pursuant to article XXVI of the private housing finance
6 law (08061707) ... 4,200,000 ...................... (re. $4,200,000)
7 By chapter 55, section 1, of the laws of 2016:
8 For allocation as follows: For contract with not-for-profit corpo-
9 rations and municipalities to provide state fiscal assistance to
10 administer main street or downtown revitalization projects for
11 communities pursuant to article XXVI of the private housing finance
12 law (08061607) ... 4,200,000 ........................ (re. $266,000)
13 MITCHELL LAMA REHABILITATION AND PRESERVATION PROGRAM AND ALL AFFORDABLE
14 PROGRAM (CCP)
15 Capital Projects Funds - Other
16 Housing Assistance Fund
17 Preservation of Facilities Purpose
18 By chapter 55, section 1, of the laws of 2008, as added by chapter 1,
19 section 4, of the laws of 2009:
20 For allocation as follows: For services and expenses related to the
21 New York state housing finance agency's Mitchell Lama Rehabilitation
22 and Preservation Program and the All Affordable Program (08ML0803)
23 ... 10,000,000 .................................... (re. $4,000,000)
24 NEW FACILITIES (CCP)
25 Capital Projects Funds - Federal
26 Federal Capital Projects Fund
27 New Facilities Purpose
28 The appropriation made by chapter 54, section 1, of the laws of 1991, as
29 amended by chapter 54, section 1, of the laws of 2017, is hereby
30 amended and reappropriated to read:
31 For expenditure of funds made available pursuant to the CranstonGon-
32 zales National Affordable Housing Act (, being P.L. 101-625) for
33 activities authorized pursuant to article 24 of the Private Housing
34 Finance Law. Notwithstanding any other provision of law,
35 [$64,800,000] $67,800,000 of the amount appropriated herein shall be
36 used for payment of administrative costs incurred in the implementa-
37 tion of article XXIV of the private housing finance law for Federal
38 aid made available under the HOME Investment Partnership Program to
39 pay State personal service and fringe benefit costs related to
40 administration of the HOME program. Such funds allocated for admin-
41 istration shall be set aside prior to the distribution of funds to
42 projects as required by article XXIV of the private housing finance
43 law (08019107) ... 125,132,000 ................... (re. $10,027,000)
44 PUBLIC HOUSING MODERNIZATION PROGRAM (CCP)
385 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Housing Program Fund
3 Preservation of Facilities Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 For allocation as follows: For services and expenses of a public hous-
6 ing modernization program. Of the amount appropriated herein, the
7 sum of $400,000 shall be allocated for capital project activities
8 associated with article XII of the public housing law. No funds
9 shall be expended from this appropriation until the director of the
10 budget has approved a financial plan submitted by the housing trust
11 fund corporation on behalf of the public housing modernization
12 program in such detail as required by the director of the budget.
13 Up to 5 percent of the funds appropriated herein may be used for
14 administrative purposes (08051703) ... 6,400,000 .. (re. $6,400,000)
15 By chapter 55, section 1, of the laws of 2016:
16 For allocation as follows: For services and expenses of a public hous-
17 ing modernization program. Of the amount appropriated herein, the
18 sum of $400,000 shall be allocated for capital project activities
19 associated with article XII of the public housing law. No funds
20 shall be expended from this appropriation until the director of the
21 budget has approved a financial plan submitted by the housing trust
22 fund corporation on behalf of the public housing modernization
23 program in such detail as required by the director of the budget.
24 Up to 5 percent of the funds appropriated herein may be used for
25 administrative purposes (08061603) ... 6,400,000 .. (re. $6,400,000)
26 By chapter 54, section 1, of the laws of 2015:
27 For allocation as follows: For services and expenses of a public hous-
28 ing modernization program. Of the amount appropriated herein, the
29 sum of $400,000 shall be allocated for capital project activities
30 associated with article XII of the public housing law. No funds
31 shall be expended from this appropriation until the director of the
32 budget has approved a financial plan submitted by the housing trust
33 fund corporation on behalf of the public housing modernization
34 program in such detail as required by the director of the budget.
35 Up to 5 percent of the funds appropriated herein may be used for
36 administrative purposes (08051503) ... 6,400,000 .. (re. $6,400,000)
37 By chapter 54, section 1, of the laws of 2014:
38 For allocation as follows: For services and expenses of a public hous-
39 ing modernization program. Of the amount appropriated herein, the
40 sum of $400,000 shall be allocated for capital project activities
41 associated with article XII of the public housing law. No funds
42 shall be expended from this appropriation until the director of the
43 budget has approved a financial plan submitted by the housing trust
44 fund corporation on behalf of the public housing modernization
45 program in such detail as required by the director of the budget.
46 Up to 5 percent of the funds appropriated herein may be used for
47 administrative purposes (08051403) ... 6,400,000 .. (re. $6,400,000)
386 12654-10-8
DIVISION OF HOUSING AND COMMUNITY RENEWAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 For allocation as follows: For services and expenses of a public hous-
3 ing modernization program. Of the amount appropriated herein, the
4 sum of $400,000 shall be allocated for capital project activities
5 associated with article XII of the public housing law. No funds
6 shall be expended from this appropriation until the director of the
7 budget has approved a financial plan submitted by the housing trust
8 fund corporation on behalf of the public housing modernization
9 program in such detail as required by the director of the budget.
10 Up to 5 percent of the funds appropriated herein may be used for
11 administrative purposes (08051303) ... 6,400,000 .. (re. $6,000,000)
12 By chapter 54, section 1, of the laws of 2012:
13 For allocation as follows: For services and expenses of a public hous-
14 ing modernization program. Of the amount appropriated herein, the
15 sum of $400,000 shall be allocated for capital project activities
16 associated with article XII of the public housing law. No funds
17 shall be expended from this appropriation until the director of the
18 budget has approved a financial plan submitted by the housing trust
19 fund corporation on behalf of the public housing modernization
20 program in such detail as required by the director of the budget.
21 Up to 5 percent of the funds appropriated herein may be used for
22 administrative purposes (08041203) ... 6,400,000 .. (re. $5,528,000)
23 STATE HOUSING BOND FUND (CCP)
24 Capital Projects Funds - Other
25 State Housing Fund
26 New Facilities Purpose
27 By chapter 955, section 4, of the laws of 1958, as amended by chapter
28 55, section 1, of the laws of 1996, for:
29 Loan contracts for low rent public housing. No funds shall be made
30 available until a plan which includes a draft request for proposals
31 has been submitted to the chairs of the senate and assembly housing
32 committees and approved by the director of the budget. In any event,
33 no expenditure shall be made pursuant to this appropriation prior to
34 October 1, 1994 (01347607) ........................ (re. $7,294,000)
35 By chapter 27, section 4, of the laws of 1949, as amended by chapter 55,
36 section 1, of the laws of 1996, for:
37 Loan contracts for public housing (01347407) ........... (re. $50,000)
387 12654-10-8
HUDSON RIVER PARK TRUST
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 50,000,000 86,000
6 ---------------- ----------------
7 All Funds ........................ 50,000,000 86,000
8 ================ ================
9 IMPROVEMENT AND REHABILITATION OF HUDSON RIVER PARK (CCP) ... 50,000,000
10 --------------
11 Capital Projects Fund - Other
12 Capital Projects Fund
13 Environmental Protection or Improvements Purpose
14 For services and expenses of the Hudson
15 River park trust for projects related to
16 the development of the Hudson River park
17 in coordination with a matching payment by
18 New York city in the amount of $50,000,000
19 (29HR1806) .................................. 50,000,000
388 12654-10-8
HUDSON RIVER PARK TRUST
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 REGIONAL DEVELOPMENT (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Regional Development Purpose
5 By chapter 55, section 1, of the laws of 2009:
6 For an advance by the state for the New York city costs of the Hudson
7 River Park project, and provided that the comptroller is authorized
8 and directed to release moneys to the Hudson River Park Trust in
9 amounts set forth in a schedule approved by the director of the
10 budget, and provided further that no portion of this appropriation
11 shall be available until New York city has entered into an agreement
12 with the chairman of the Hudson River Park Trust, and such agreement
13 is approved by the director of the budget. Such agreement shall
14 require New York city to repay to the state an amount equal to the
15 amount disbursed from this appropriation within 90 days after being
16 notified by the state of the disbursement of the appropriation by
17 the Hudson River Park Trust to its vendors. Such agreement shall
18 further provide that in the event amounts disbursed from this appro-
19 priation are not repaid within such period, the director of the
20 budget shall certify the amount not repaid to the comptroller, and
21 the comptroller shall, to the extent not otherwise prohibited by law
22 or state covenant, withhold such amount from the next succeeding
23 payment of per capita assistance to be apportioned to New York city
24 subject to the following limitations: prior to withholding amounts
25 due the state from the city, the comptroller shall pay in full any
26 amount due the state of New York municipal bond bank agency, on
27 account of the city's obligation to such agency; the city university
28 construction fund pursuant to the provisions of the city university
29 construction fund act; the New York city housing development corpo-
30 ration, pursuant to the provisions of the New York city housing
31 development corporation act (article XII of the private housing
32 finance law); the transit construction fund, pursuant to the
33 provisions of title 9-a of article 5 of the public authorities law;
34 pursuant to section 92-e of the state finance law, any amounts
35 necessary for payments to holders of bonds or notes as certified by
36 the municipal assistance corporation for the city of New York
37 created under article 10 of the public authorities law; and the
38 dormitory authority of the state of New York, pursuant to section
39 1680-B of the public authorities law (29NY09A3) ....................
40 7,000,000 ............................................ (re. $82,000)
41 By chapter 55, section 1, of the laws of 2008:
42 For an advance by the state for the New York city costs of the Hudson
43 River Park project, and provided that the comptroller is authorized
44 and directed to release moneys to the Hudson River Park Trust in
45 amounts set forth in a schedule approved by the director of the
46 budget, and provided further that no portion of this appropriation
47 shall be available until New York city has entered into an agreement
48 with the chairman of the Hudson River Park Trust, and such agreement
49 is approved by the director of the budget. Such agreement shall
389 12654-10-8
HUDSON RIVER PARK TRUST
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 require New York city to repay to the state an amount equal to the
2 amount disbursed from this appropriation within 90 days after being
3 notified by the state of the disbursement of the appropriation by
4 the Hudson River Park Trust to its vendors. Such agreement shall
5 further provide that in the event amounts disbursed from this appro-
6 priation are not repaid within such period, the director of the
7 budget shall certify the amount not repaid to the comptroller, and
8 the comptroller shall, to the extent not otherwise prohibited by law
9 or state covenant, withhold such amount from the next succeeding
10 payment of per capita assistance to be apportioned to New York city
11 subject to the following limitations: prior to withholding amounts
12 due the state from the city, the comptroller shall pay in full any
13 amount due the state of New York municipal bond bank agency, on
14 account of the city's obligation to such agency; the city university
15 construction fund pursuant to the provisions of the city university
16 construction fund act; the New York city housing development corpo-
17 ration, pursuant to the provisions of the New York city housing
18 development corporation act (article XII of the private housing
19 finance law); the transit construction fund, pursuant to the
20 provisions of title 9-a of article 5 of the public authorities law;
21 pursuant to section 92-e of the state finance law, any amounts
22 necessary for payments to holders of bonds or notes as certified by
23 the municipal assistance corporation for the city of New York
24 created under article 10 of the public authorities law; and the
25 dormitory authority of the state of New York, pursuant to section
26 1680-B of the public authorities law (29NY08A3) ....................
27 25,000,000 ............................................ (re. $4,000)
390 12654-10-8
OFFICE OF INFORMATION TECHNOLOGY SERVICES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Fund - Other ...... 85,700,000 157,357,000
6 ---------------- ----------------
7 All Funds ........................ 85,700,000 157,357,000
8 ================ ================
9 IT INITIATIVE PROGRAM (CCP) ................................. 85,700,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Program Improvement/Change Purpose
14 For services and expenses related to tech-
15 nology equipment, software and services
16 with a demonstrated return on investment
17 or service improvement, as well as the
18 exploration and study of lower-cost alter-
19 natives. Funds appropriated herein may be
20 suballocated to any other state depart-
21 ment, agency, or public benefit corpo-
22 ration, to achieve this purpose (00IT1808) .. 85,700,000
391 12654-10-8
OFFICE OF INFORMATION TECHNOLOGY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 IT INITIATIVE PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Program Improvement/Change Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For services and expenses related to technology equipment, software
7 and services with a demonstrated return on investment or service
8 improvement, as well as the exploration and study of lower-cost
9 alternatives. Funds appropriated herein may be suballocated to any
10 other state department, agency, or public benefit corporation, to
11 achieve this purpose (00IT1708) ... 85,700,000 ... (re. $85,700,000)
12 By chapter 55, section 1, of the laws of 2016:
13 For services and expenses related to technology equipment, software
14 and services with a demonstrated return on investment or service
15 improvement, as well as the exploration and study of lowercost
16 alternatives. Funds appropriated herein may be suballocated to any
17 other state department, agency, or public benefit corporation, to
18 achieve this purpose (00IT1608) ... 85,700,000 ... (re. $45,276,000)
19 Capital Projects Funds - Other
20 Miscellaneous Capital Projects Fund
21 Information Technology Capital Financing Account
22 Program Improvement/Change Purpose
23 By chapter 54, section 1, of the laws of 2014:
24 Amounts appropriated herein may be made available, subject to the
25 identification and transferability of appropriate revenue, for the
26 expenses of information technology projects and services (00BS1408)
27 ... 30,000,000 ................................... (re. $26,381,000)
392 12654-10-8
DEPARTMENT OF LAW
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 1,000,000 13,181,000
6 ---------------- ----------------
7 All Funds ........................ 1,000,000 13,181,000
8 ================ ================
9 IT INITIATIVE PROGRAM (CCP) .................................. 1,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Program Improvement/Change Purpose
14 For services and expenses related to the
15 acquisition and development of technology,
16 including but not limited to equipment,
17 software and services (36011808) ............. 1,000,000
393 12654-10-8
DEPARTMENT OF LAW
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 IT INITIATIVE PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Program Improvement/Change Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For services and expenses related to the acquisition and development
7 of technology, including but not limited to equipment, software and
8 services (36011708) ... 5,000,000 ................. (re. $4,937,000)
9 By chapter 55, section 1, of the laws of 2016:
10 For services and expenses related to the acquisition and development
11 of technology, including but not limited to equipment, software and
12 services (36011608) ... 10,000,000 ................ (re. $7,366,000)
13 By chapter 54, section 1, of the laws of 2015:
14 For services and expenses related to the acquisition and development
15 of technology, including but not limited to equipment, software and
16 services (36011508) ... 1,000,000 ................... (re. $749,000)
17 By chapter 54, section 1, of the laws of 2014:
18 For services and expenses related to the acquisition and development
19 of technology, including but not limited to equipment, software and
20 services (36011408) ... 9,000,000 ................... (re. $129,000)
394 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Fund - Other ...... 100,000,000 501,522,000
6 ---------------- ----------------
7 All Funds ........................ 100,000,000 501,522,000
8 ================ ================
9 COMMUNITY ALCOHOLISM AND SUBSTANCE ABUSE FACILITIES (CCP) ... 79,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Minor Rehabilitation Purpose
14 For minor alterations and improvements to
15 various facilities, including the payment
16 of liabilities incurred prior to April 1,
17 2018, provided, however, that no expendi-
18 tures may be made from this appropriation
19 until a comprehensive plan of projects has
20 been approved by the director of the budg-
21 et (53031889) ................................ 4,000,000
22 Capital Projects Funds - Other
23 Mental Hygiene Facilities Capital Improvement Fund
24 New Facilities Purpose
25 For the acquisition of property, design,
26 construction and extensive rehabilitation
27 of facilities for the purpose of deliver-
28 ing chemical dependence services, pursuant
29 to the mental hygiene law. No expenditure
30 shall be made from this appropriation
31 until a spending plan for proposed
32 projects has been submitted by the commis-
33 sioner of the office of alcoholism and
34 substance abuse services and approved by
35 the director of the budget (53AA1807) ....... 40,000,000
36 Capital Projects Funds - Other
37 Mental Hygiene Facilities Capital Improvement Fund
38 Preservation of Facilities Purpose
39 For alterations and improvements for preser-
40 vation of various facilities including
41 rehabilitation projects and the acquisi-
395 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS 2018-19
1 tion of property, provided, however, that
2 no expenditures may be made from this
3 appropriation until a comprehensive plan
4 of projects has been approved by the
5 director of the budget (53031803) ........... 25,000,000
6 Capital Projects Funds - Other
7 Mental Hygiene Facilities Capital Improvement Fund
8 Program Improvement/Change Purpose
9 For the acquisition of property, design,
10 construction and/or rehabilitation of
11 facilities to expand substance abuse
12 supports and services, including treat-
13 ment, recovery and prevention services to
14 support efforts to develop, expand and/or
15 operate substance abuse supports and
16 services for treatment, recovery, and
17 prevention of heroin and opiate use and
18 addiction disorders including but not
19 limited to the provision of housing
20 services for affected populations.
21 Notwithstanding sections 112 and 163 of the
22 state finance law and section 142 of the
23 economic development law, or any other
24 inconsistent provision of law, funds
25 available for expenditure pursuant to this
26 appropriation for the development, expan-
27 sion, and/or operation of treatment,
28 recovery, prevention and/or housing
29 services for persons with heroin and
30 opiate use and addiction disorders, may be
31 allocated and distributed by the commis-
32 sioner of the office of alcoholism and
33 substance abuse services, subject to
34 approval of the director of the budget,
35 without a competitive bid or request for
36 proposal process. Prior to an award being
37 granted to an applicant pursuant to this
38 process, the commissioner shall formally
39 notify in writing the chair of the senate
40 finance committee and the chair of the
41 assembly ways and means committee of the
42 intent to grant such an award. Such notice
43 shall include information regarding how
44 the prospective recipient meets objective
45 criteria established by the commissioner
46 (53MH1808) .................................. 10,000,000
396 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS 2018-19
1 DESIGN AND CONSTRUCTION SUPERVISION (CCP) .................... 6,000,000
2 --------------
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Preparation of Plans Purpose
6 For payment to the design and construction
7 management account of the centralized
8 services fund of the New York state office
9 of general services or to the dormitory
10 authority of the state of New York for the
11 purpose of preparation and review of
12 plans, specifications, estimates,
13 services, construction management and
14 supervision, inspection, studies,
15 appraisals, surveys, testing and environ-
16 mental impact statements for new projects
17 (53PP1830) ................................... 5,000,000
18 Capital Projects Funds - Other
19 Mental Hygiene Facilities Capital Improvement Fund
20 Preparation of Plans Purpose
21 For payment to the design and construction
22 management account of the centralized
23 services fund of the New York state office
24 of general services or to the dormitory
25 authority of the state of New York for the
26 purpose of preparation and review of
27 plans, specifications, estimates,
28 services, construction management and
29 supervision, inspection, studies,
30 appraisals, surveys, testing and environ-
31 mental impact statements for new projects
32 (53DC1830) ................................... 1,000,000
33 FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 3,000,000
34 --------------
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Maintenance and Operations Purpose
38 For the maintenance and operation of various
39 facilities and systems including personal
40 services, fringe benefits and indirect
41 costs (53FM18MO) ............................. 3,000,000
397 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS 2018-19
1 INSTITUTIONAL SERVICES PROGRAM (CCP) ........................ 11,000,000
2 --------------
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Minor Rehabilitation Purpose
6 For minor alterations and improvements to
7 various facilities, including the payment
8 of liabilities incurred prior to April 1,
9 2018, provided, however, that no expendi-
10 tures may be made from this appropriation
11 until a comprehensive plan of projects has
12 been approved by the director of the budg-
13 et (53HD1889) ................................ 1,000,000
14 Capital Projects Funds - Other
15 Mental Hygiene Facilities Capital Improvement Fund
16 Preservation of Facilities Purpose
17 For alterations and improvements for preser-
18 vation of various facilities including
19 rehabilitation projects, provided, howev-
20 er, that no expenditures may be made from
21 this appropriation until a comprehensive
22 plan of projects has been approved by the
23 director of the budget. This appropriation
24 may be used for the cost of potential
25 claims against contracts awarded by the
26 dormitory authority of the state of New
27 York. Upon request of the commissioner of
28 the office of alcoholism and substance
29 abuse services and approval by the direc-
30 tor of the budget, this appropriation may
31 be transferred or suballocated to the
32 dormitory authority of the state of New
33 York (53A21803) ............................. 10,000,000
34 NON-BONDABLE PROJECTS (CCP) .................................. 1,000,000
35 --------------
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Non-Bondable Purpose
39 For transfer to the Mental Hygiene Capital
40 Improvement Fund for reimbursement of the
41 non-bondable cost of community facilities
42 authorized by appropriations or reappro-
43 priations funded from the Mental Hygiene
398 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS 2018-19
1 Capital Improvement Fund including liabil-
2 ities incurred prior to April 1, 2018 or
3 for payment to the dormitory authority of
4 the state of New York for defeasance of
5 bonds. Upon request of the commissioner of
6 the office of alcoholism and substance
7 abuse services and approval by the direc-
8 tor of the budget, this appropriation may
9 be transferred to the dormitory authority
10 of the state of New York (53NB18NB) .......... 1,000,000
399 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 COMMUNITY ALCOHOLISM AND SUBSTANCE ABUSE FACILITIES (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Minor Rehabilitation Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For minor alterations and improvements to various facilities, includ-
7 ing the payment of liabilities incurred prior to April 1, 2017,
8 provided, however, that no expenditures may be made from this appro-
9 priation until a comprehensive plan of projects has been approved by
10 the director of the budget (53031789) ..............................
11 10,000,000 ....................................... (re. $10,000,000)
12 By chapter 55, section 1, of the laws of 2016, as transferred by chapter
13 54, section 1, of the laws of 2017:
14 For services and expenses approved by the office of alcoholism and
15 substance abuse services related to chemical dependency detection,
16 prevention, treatment and recovery, including, but not limited to,
17 purchase of equipment. Notwithstanding any other provision of law,
18 the money hereby appropriated may be transferred to any other state
19 agency, with the approval of the director of the budget (53CD1689)
20 ... 5,000,000 ..................................... (re. $2,667,000)
21 By chapter 54, section 1, of the laws of 2013:
22 For minor alterations and improvements to various facilities, includ-
23 ing the payment of liabilities incurred prior to April 1, 2013,
24 provided, however, that no expenditures may be made from this appro-
25 priation until a comprehensive plan of projects has been approved by
26 the director of the budget (53031389) ..............................
27 3,810,000 ......................................... (re. $3,810,000)
28 By chapter 54, section 1, of the laws of 2012:
29 For minor alterations and improvements to various facilities, includ-
30 ing the payment of liabilities incurred prior to April 1, 2012,
31 provided, however, that no expenditures may be made from this appro-
32 priation until a comprehensive plan of projects has been approved by
33 the director of the budget (53031289) ..............................
34 4,810,000 ......................................... (re. $4,220,000)
35 By chapter 54, section 1, of the laws of 2011:
36 For minor alterations and improvements to various facilities, includ-
37 ing the payment of liabilities incurred prior to April 1, 2011,
38 provided, however, that no expenditures may be made from this appro-
39 priation until a comprehensive plan of projects has been approved by
40 the director of the budget (53031189) ... 4,810,000 . (re. $822,000)
41 By chapter 54, section 1, of the laws of 2009:
42 For minor alterations and improvements to various facilities, includ-
43 ing the payment of liabilities incurred prior to April 1, 2009,
400 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 provided, however, that no expenditures may be made from this appro-
2 priation until a comprehensive plan of projects has been approved by
3 the director of the budget (53030989) ... 4,810,000 . (re. $181,000)
4 By chapter 54, section 1, of the laws of 2008:
5 For minor alterations and improvements to various facilities, includ-
6 ing the payment of liabilities incurred prior to April 1, 2008,
7 provided, however, that no expenditures may be made from this appro-
8 priation until a comprehensive plan of projects has been approved by
9 the director of the budget (53030889) ... 4,810,000 . (re. $168,000)
10 By chapter 54, section 1, of the laws of 2007:
11 For minor alterations and improvements to various facilities, includ-
12 ing the payment of liabilities incurred prior to April 1, 2007,
13 provided, however, that no expenditures may be made from this appro-
14 priation until a comprehensive plan of projects has been approved by
15 the director of the budget (53030789) ... 4,810,000 . (re. $260,000)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Program Improvement/Change Purpose
19 By chapter 55, section 1, of the laws of 2016:
20 For the acquisition of property, design, construction and/or rehabili-
21 tation of facilities to expand substance abuse supports and
22 services, including treatment, recovery and prevention services to
23 support efforts to develop, expand, and/or operate substance abuse
24 supports and services for treatment, recovery, and prevention of
25 heroin and opiate use and addiction disorders including but not
26 limited to the provision of housing services for affected popu-
27 lations. No expenditure shall be made from this appropriation until
28 a spending plan for the proposed projects has been submitted by the
29 commissioner of the office of alcoholism and substance abuse
30 services and approved by the director of the budget. Notwithstand-
31 ing sections 112 and 163 of the state finance law and section 142 of
32 the economic development law, or any other inconsistent provision of
33 law, funds available for expenditure pursuant to this appropriation
34 for the development, expansion, and/or operation of treatment,
35 recovery, prevention and/or housing services for persons with heroin
36 and opiate use and addiction disorders, may be allocated and
37 distributed by the commissioner of the office of alcoholism and
38 substance abuse services, subject to approval of the director of the
39 budget, without a competitive bid or request for proposal process.
40 Prior to an award being granted to an applicant pursuant to this
41 process, the commissioner shall formally notify in writing the chair
42 of the senate finance committee and the chair of the assembly ways
43 and means committee of the intent to grant such an award. Such
44 notice shall include information regarding how the prospective
45 recipient meets objective criteria established by the commissioner.
46 Expenditures made from this appropriation shall reduce appropri-
401 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ations for grants from the OASAS general fund local assistance
2 account for the same purpose by an equivalent amount, and such
3 appropriation authority in such account shall then be deemed to have
4 lapsed to the extent of such reduction (53CD1608) ..................
5 10,000,000 ........................................ (re. $9,900,000)
6 Capital Projects Funds - Other
7 Mental Hygiene Facilities Capital Improvement Fund
8 New Facilities Purpose
9 By chapter 54, section 1, of the laws of 2013:
10 For the acquisition of property, design, construction and extensive
11 rehabilitation of facilities for the purpose of delivering chemical
12 dependence services, pursuant to the mental hygiene law. No expendi-
13 ture shall be made from this appropriation until a spending plan for
14 proposed projects has been submitted by the commissioner of the
15 office of alcoholism and substance abuse services and approved by
16 the director of the budget (53AA1307) ..............................
17 34,773,000 ....................................... (re. $34,773,000)
18 By chapter 54, section 1, of the laws of 2012:
19 For the acquisition of property, design, construction and extensive
20 rehabilitation of facilities for the purpose of delivering chemical
21 dependence services, pursuant to the mental hygiene law. No expendi-
22 ture shall be made from this appropriation until a spending plan for
23 proposed projects has been submitted by the commissioner of the
24 office of alcoholism and substance abuse services and approved by
25 the director of the budget (53AA1207) ..............................
26 42,273,000 ....................................... (re. $40,079,000)
27 By chapter 54, section 1, of the laws of 2011:
28 For the acquisition of property, design, construction and extensive
29 rehabilitation of facilities for the purpose of delivering chemical
30 dependence services, pursuant to the mental hygiene law. No expendi-
31 ture shall be made from this appropriation until a spending plan for
32 proposed projects has been submitted by the commissioner of the
33 office of alcoholism and substance abuse services and approved by
34 the director of the budget (53AA1107) ..............................
35 40,273,000 ....................................... (re. $28,483,000)
36 By chapter 54, section 1, of the laws of 2010:
37 For the acquisition of property, design, construction and extensive
38 rehabilitation of facilities for the purpose of delivering chemical
39 dependence services, pursuant to the mental hygiene law. No expendi-
40 ture shall be made from this appropriation until a spending plan for
41 proposed projects has been submitted by the commissioner of the
42 office of alcoholism and substance abuse services and approved by
43 the director of the budget (53AA1007) ..............................
44 42,273,000 ....................................... (re. $28,397,000)
402 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2009:
2 For the acquisition of property, design, construction and extensive
3 rehabilitation of facilities for the purpose of delivering chemical
4 dependence services, pursuant to the mental hygiene law. No expendi-
5 ture shall be made from this appropriation until a spending plan for
6 proposed projects has been submitted by the commissioner of the
7 office of alcoholism and substance abuse services and approved by
8 the director of the budget (53AA0907) ..............................
9 42,273,000 ....................................... (re. $20,403,000)
10 By chapter 54, section 1, of the laws of 2008:
11 For the acquisition of property, design, construction and extensive
12 rehabilitation of facilities for the purpose of delivering chemical
13 dependence services, pursuant to the mental hygiene law. No expendi-
14 ture shall be made from this appropriation until a spending plan for
15 proposed projects has been submitted by the commissioner of the
16 office of alcoholism and substance abuse services and approved by
17 the director of the budget (53AA0807) ..............................
18 66,273,000 ....................................... (re. $17,626,000)
19 By chapter 54, section 1, of the laws of 2007:
20 For the acquisition of property, design, construction and extensive
21 rehabilitation of facilities for the purpose of delivering chemical
22 dependence services, pursuant to the mental hygiene law. No expendi-
23 ture shall be made from this appropriation until a spending plan for
24 proposed projects has been submitted by the commissioner of the
25 office of alcoholism and substance abuse services and approved by
26 the director of the budget (53AA0707) ... 27,423,000 .. (re. $5,000)
27 By chapter 54, section 1, of the laws of 2007, as amended by chapter 54,
28 section 1, of the laws of 2017:
29 For the acquisition of property, design, construction and rehabili-
30 tation of facilities for the purpose of delivering chemical depend-
31 ence services, which may include 100 community residential treatment
32 beds in Suffolk and Nassau counties, to be developed for operation
33 by voluntary-operated or local government operated chemical depend-
34 ency treatment providers. Notwithstanding any other inconsistent
35 provision of law, the moneys hereby appropriated may support up to
36 100 percent of approved capital costs of such chemical dependency
37 facilities. Notwithstanding any other inconsistent provision of law,
38 and subject to approval of the director of the budget, funds from
39 this appropriation may be paid to the dormitory authority of the
40 state of New York or the office of general services to the design
41 and construction management account pursuant to one or more certif-
42 icates approved by the director of the budget for purposes of carry-
43 ing out the projects provided for herein. No expenditure shall be
44 made from this appropriation until a spending plan for the proposed
45 projects has been submitted by the commissioner of the office of
46 alcoholism and substance abuse services and approved by the director
47 of the budget (53010707) ... 26,600,000 .......... (re. $23,846,000)
403 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the acquisition of property, design, construction and rehabili-
2 tation of facilities for the purpose of delivering chemical depend-
3 ence services, which may include 100 intensive residential and/or
4 community residential beds for veterans, to be developed for opera-
5 tion by voluntary-operated or local government operated chemical
6 dependency treatment providers. Notwithstanding any other inconsist-
7 ent provision of law, the moneys hereby appropriated may support up
8 to 100 percent of approved capital costs of such chemical dependency
9 facilities.
10 Notwithstanding any other inconsistent provision of law, and subject
11 to approval of the director of the budget, funds from this appropri-
12 ation may be paid to the dormitory authority of the state of New
13 York or the office of general services to the design and
14 construction management account pursuant to one or more certificates
15 approved by the director of the budget for purposes of carrying out
16 the projects provided for herein. No expenditure shall be made from
17 this appropriation until a spending plan for the proposed projects
18 has been submitted by the commissioner of the office of alcoholism
19 and substance abuse services and approved by the director of the
20 budget (53020707) ... 25,400,000 ................. (re. $13,644,000)
21 By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
22 section 1, of the laws of 2017:
23 For the acquisition of property design, construction and rehabili-
24 tation of facilities for the purpose of delivering chemical depend-
25 ence services, which may include 108 beds for adolescents and/or
26 women and their children, to be developed for operation by voluntar-
27 y-operated or local government operated chemical dependency treat-
28 ment providers. Notwithstanding any other inconsistent provision of
29 the law, the moneys hereby appropriated may support up to 100
30 percent of approved capital costs of such chemical dependency facil-
31 ities. Notwithstanding any other inconsistent provision of the law,
32 and subject to approval of the director of the budget, funds from
33 this appropriation may be paid to the dormitory authority of the
34 state of New York or the office of general services to the design
35 and construction management account pursuant to one or more certif-
36 icates approved by the director of the budget for purposes of carry-
37 ing out the projects provided for herein. No expenditure shall be
38 made from this appropriation until a spending plan for the proposed
39 projects has been submitted by the commissioner of the office of
40 alcoholism and substance abuse services and approved by the director
41 of the budget (53010607) ... 24,900,000 .......... (re. $16,187,000)
42 Capital Projects Funds - Other
43 Mental Hygiene Facilities Capital Improvement Fund
44 Preservation of Facilities Purpose
45 By chapter 54, section 1, of the laws of 2017:
46 For alterations and improvements for preservation of various facili-
47 ties including rehabilitation projects and the acquisition of prop-
404 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 erty, provided, however, that no expenditures may be made from this
2 appropriation until a comprehensive plan of projects has been
3 approved by the director of the budget (53031703) ..................
4 32,000,000 ....................................... (re. $32,000,000)
5 By chapter 54, section 1, of the laws of 2013:
6 For alterations and improvements for preservation of various facili-
7 ties including rehabilitation projects and the acquisition of prop-
8 erty, provided, however, that no expenditures may be made from this
9 appropriation until a comprehensive plan of projects has been
10 approved by the director of the budget (53031303) ..................
11 34,773,000 ....................................... (re. $34,773,000)
12 By chapter 54, section 1, of the laws of 2012:
13 For alterations and improvements for preservation of various facili-
14 ties including rehabilitation projects and the acquisition of prop-
15 erty, provided, however, that no expenditures may be made from this
16 appropriation until a comprehensive plan of projects has been
17 approved by the director of the budget (53031203) ..................
18 42,273,000 ....................................... (re. $42,273,000)
19 By chapter 54, section 1, of the laws of 2011:
20 For alterations and improvements for preservation of various facili-
21 ties including rehabilitation projects and the acquisition of prop-
22 erty, provided, however, that no expenditures may be made from this
23 appropriation until a comprehensive plan of projects has been
24 approved by the director of the budget (53031103) ..................
25 40,273,000 ....................................... (re. $34,936,000)
26 By chapter 54, section 1, of the laws of 2009:
27 For alterations and improvements for preservation of various facili-
28 ties including rehabilitation projects and the acquisition of prop-
29 erty, provided, however, that no expenditures may be made from this
30 appropriation until a comprehensive plan of projects has been
31 approved by the director of the budget (53030903) ..................
32 42,273,000 .......................................... (re. $592,000)
33 By chapter 54, section 1, of the laws of 2008:
34 For alterations and improvements for preservation of various facili-
35 ties including rehabilitation projects and the acquisition of prop-
36 erty, provided, however, that no expenditures may be made from this
37 appropriation until a comprehensive plan of projects has been
38 approved by the director of the budget (53030803) ..................
39 42,273,000 ........................................ (re. $8,335,000)
40 By chapter 54, section 1, of the laws of 2007:
41 For alterations and improvements for preservation of various facili-
42 ties including rehabilitation projects and the acquisition of prop-
43 erty, provided, however, that no expenditures may be made from this
44 appropriation until a comprehensive plan of projects has been
405 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 approved by the director of the budget (53030703) ..................
2 27,423,000 ........................................ (re. $2,036,000)
3 By chapter 54, section 1, of the laws of 2006:
4 For alterations and improvements for preservation of various facili-
5 ties including rehabilitation projects and the acquisition of prop-
6 erty, provided, however, that no expenditures may be made from this
7 appropriation until a comprehensive plan of projects has been
8 approved by the director of the budget (53030603) ..................
9 17,243,000 ....................................... (re. $11,236,000)
10 By chapter 54, section 1, of the laws of 2005:
11 For alterations and improvements for preservation of various facili-
12 ties including rehabilitation projects and the acquisition of prop-
13 erty, provided, however, that no expenditures may be made from this
14 appropriation until a comprehensive plan of projects has been
15 approved by the director of the budget (53030503) ..................
16 13,125,000 .......................................... (re. $601,000)
17 Capital Projects Funds - Other
18 Mental Hygiene Facilities Capital Improvement Fund
19 Program Improvement/Change Purpose
20 By chapter 54, section 1, of the laws of 2017:
21 For the acquisition of property, design, construction and/or rehabili-
22 tation of facilities to expand substance abuse supports and
23 services, including treatment, recovery and prevention services to
24 support efforts to develop, expand and/or operate substance abuse
25 supports and services for treatment, recovery, and prevention of
26 heroin and opiate use and addiction disorders including but not
27 limited to the provision of housing services for affected popu-
28 lations. Notwithstanding sections 112 and 163 of the state finance
29 law and section 142 of the economic development law, or any other
30 inconsistent provision of law, funds available for expenditure
31 pursuant to this appropriation for the development, expansion,
32 and/or operation of treatment, recovery, prevention and/or housing
33 services for persons with heroin and opiate use and addiction disor-
34 ders, may be allocated and distributed by the commissioner of the
35 office of alcoholism and substance abuse services, subject to
36 approval of the director of the budget, without a competitive bid or
37 request for proposal process. Prior to an award being granted to an
38 applicant pursuant to this process, the commissioner shall formally
39 notify in writing the chair of the senate finance committee and the
40 chair of the assembly ways and means committee of the intent to
41 grant such an award. Such notice shall include information regarding
42 how the prospective recipient meets objective criteria established
43 by the commissioner (53MH1708) ... 10,000,000 .... (re. $10,000,000)
44 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
406 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Preparation of Plans Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 For payment to the design and construction management account of the
6 centralized services fund of the New York state office of general
7 services or to the dormitory authority of the state of New York for
8 the purpose of preparation and review of plans, specifications,
9 estimates, services, construction management and supervision,
10 inspection, studies, appraisals, surveys, testing and environmental
11 impact statements for new projects (53PP1730) ......................
12 5,000,000 ......................................... (re. $5,000,000)
13 By chapter 55, section 1, of the laws of 2016:
14 For payment to the design and construction management account of the
15 centralized services fund of the New York state office of general
16 services or to the dormitory authority of the state of New York for
17 the purpose of preparation and review of plans, specifications,
18 estimates, services, construction management and supervision,
19 inspection, studies, appraisals, surveys, testing and environmental
20 impact statements for new projects (53PP1630) ......................
21 5,000,000 ......................................... (re. $3,681,000)
22 Capital Projects Funds - Other
23 Mental Hygiene Facilities Capital Improvement Fund
24 Preparation of Plans Purpose
25 By chapter 54, section 1, of the laws of 2017:
26 For payment to the design and construction management account of the
27 centralized services fund of the New York state office of general
28 services or to the dormitory authority of the state of New York for
29 the purpose of preparation and review of plans, specifications,
30 estimates, services, construction management and supervision,
31 inspection, studies, appraisals, surveys, testing and environmental
32 impact statements for new projects (53DC1730) ......................
33 1,000,000 ......................................... (re. $1,000,000)
34 By chapter 55, section 1, of the laws of 2016:
35 For payment to the design and construction management account of the
36 centralized services fund of the New York state office of general
37 services or to the dormitory authority of the state of New York for
38 the purpose of preparation and review of plans, specifications,
39 estimates, services, construction management and supervision,
40 inspection, studies, appraisals, surveys, testing and environmental
41 impact statements for new projects (53A61630) ......................
42 1,000,000 ............................................ (re. $52,000)
43 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
407 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Maintenance and Operations Purpose
4 By chapter 54, section 1, of the laws of 2017:
5 For the maintenance and operation of various facilities and systems
6 including personal services, fringe benefits and indirect costs
7 (53FM17MO) ... 3,000,000 .......................... (re. $2,514,000)
8 INSTITUTIONAL SERVICES PROGRAM (CCP)
9 Capital Projects Funds - Other
10 Capital Projects Fund
11 Minor Rehabilitation Purpose
12 By chapter 54, section 1, of the laws of 2017:
13 For minor alterations and improvements to various facilities, includ-
14 ing the payment of liabilities incurred prior to April 1, 2017,
15 provided, however, that no expenditures may be made from this appro-
16 priation until a comprehensive plan of projects has been approved by
17 the director of the budget (53HD1789) ..............................
18 1,000,000 ......................................... (re. $1,000,000)
19 By chapter 55, section 1, of the laws of 2016:
20 For minor alterations and improvements to various facilities, includ-
21 ing the payment of liabilities incurred prior to April 1, 2016,
22 provided, however, that no expenditures may be made from this appro-
23 priation until a comprehensive plan of projects has been approved by
24 the director of the budget (53HD1689) ..............................
25 1,000,000 ......................................... (re. $1,000,000)
26 By chapter 54, section 1, of the laws of 2015:
27 For minor alterations and improvements to various facilities, includ-
28 ing the payment of liabilities incurred prior to April 1, 2015,
29 provided, however, that no expenditures may be made from this appro-
30 priation until a comprehensive plan of projects has been approved by
31 the director of the budget (53HD1589) ..............................
32 1,000,000 ......................................... (re. $1,000,000)
33 By chapter 54, section 1, of the laws of 2014:
34 For minor alterations and improvements to various facilities, includ-
35 ing the payment of liabilities incurred prior to April 1, 2014,
36 provided, however, that no expenditures may be made from this appro-
37 priation until a comprehensive plan of projects has been approved by
38 the director of the budget (53HD1489) ..............................
39 1,000,000 ......................................... (re. $1,000,000)
40 By chapter 54, section 1, of the laws of 2013:
41 For minor alterations and improvements to various facilities, includ-
42 ing the payment of liabilities incurred prior to April 1, 2013,
408 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 provided, however, that no expenditures may be made from this appro-
2 priation until a comprehensive plan of projects has been approved by
3 the director of the budget (53HD1389) ... 1,000,000 . (re. $692,000)
4 By chapter 54, section 1, of the laws of 2012:
5 For minor alterations and improvements to various facilities, includ-
6 ing the payment of liabilities incurred prior to April 1, 2012,
7 provided, however, that no expenditures may be made from this appro-
8 priation until a comprehensive plan of projects has been approved by
9 the director of the budget (53HD1289) ... 1,000,000 . (re. $396,000)
10 By chapter 54, section 1, of the laws of 2011:
11 For minor alterations and improvements to various facilities, includ-
12 ing the payment of liabilities incurred prior to April 1, 2011,
13 provided, however, that no expenditures may be made from this appro-
14 priation until a comprehensive plan of projects has been approved by
15 the director of the budget (53HD1189) ... 1,000,000 . (re. $771,000)
16 By chapter 54, section 1, of the laws of 2010:
17 For minor alterations and improvements to various facilities, includ-
18 ing the payment of liabilities incurred prior to April 1, 2010,
19 provided, however, that no expenditures may be made from this appro-
20 priation until a comprehensive plan of projects has been approved by
21 the director of the budget (53HD1089) ... 1,000,000 . (re. $406,000)
22 By chapter 54, section 1, of the laws of 2009:
23 For minor alterations and improvements to various facilities, includ-
24 ing the payment of liabilities incurred prior to April 1, 2009,
25 provided, however, that no expenditures may be made from this appro-
26 priation until a comprehensive plan of projects has been approved by
27 the director of the budget (53HD0989) ... 1,000,000 . (re. $298,000)
28 By chapter 54, section 1, of the laws of 2008:
29 For minor alterations and improvements to various facilities, includ-
30 ing the payment of liabilities incurred prior to April 1, 2008,
31 provided, however, that no expenditures may be made from this appro-
32 priation until a comprehensive plan of projects has been approved by
33 the director of the budget (53HD0889) ... 500,000 ... (re. $117,000)
34 By chapter 54, section 1, of the laws of 2007:
35 For minor alterations and improvements to various facilities, includ-
36 ing the payment of liabilities incurred prior to April 1, 2007,
37 provided, however, that no expenditures may be made from this appro-
38 priation until a comprehensive plan of projects has been approved by
39 the director of the budget (53HD0789) ... 500,000 ... (re. $128,000)
40 By chapter 54, section 1, of the laws of 2006:
41 For minor alterations and improvements to various facilities, includ-
42 ing the payment of liabilities incurred prior to April 1, 2006,
43 provided, however, that no expenditures may be made from this appro-
409 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 priation until a comprehensive plan of projects has been approved by
2 the director of the budget (53HD0689) ... 500,000 ..... (re. $1,000)
3 By chapter 54, section 1, of the laws of 2004:
4 For minor alterations and improvements to various facilities, includ-
5 ing the payment of liabilities incurred prior to April 1, 2004,
6 provided, however, that no expenditures may be made from this appro-
7 priation until a comprehensive plan of projects has been approved by
8 the director of the budget (53HD0489) ... 500,000 ... (re. $119,000)
9 Capital Projects Funds - Other
10 Mental Hygiene Facilities Capital Improvement Fund
11 Preservation of Facilities Purpose
12 The appropriation made by chapter 54, section 1, of the laws of 2017, is
13 hereby amended and reappropriated to read:
14 For alterations and improvements for preservation of various facili-
15 ties including rehabilitation projects, provided, however, that no
16 expenditures may be made from this appropriation until a comprehen-
17 sive plan of projects has been approved by the director of the budg-
18 et. This appropriation may be used for the cost of potential claims
19 against contracts awarded by the dormitory authority of the state of
20 New York. Upon request of the commissioner of the office of alcohol-
21 ism and substance abuse services and approval by the director of the
22 budget, this appropriation may be transferred or suballocated to the
23 dormitory authority of the state of New York (53A21703) ............
24 15,000,000 ....................................... (re. $15,000,000)
25 The appropriation made by chapter 55, section 1, of the laws of 2016, is
26 hereby amended and reappropriated to read:
27 For alterations and improvements for preservation of various facili-
28 ties including rehabilitation projects, provided, however, that no
29 expenditures may be made from this appropriation until a comprehen-
30 sive plan of projects has been approved by the director of the budg-
31 et. This appropriation may be used for the cost of potential claims
32 against contracts awarded by the dormitory authority of the state of
33 New York. Upon request of the commissioner of the office of alcohol-
34 ism and substance abuse services and approval by the director of the
35 budget, this appropriation may be transferred or suballocated to the
36 dormitory authority of the state of New York (53A21603) ............
37 10,000,000 ....................................... (re. $10,000,000)
38 The appropriation made by chapter 54, section 1, of the laws of 2015, is
39 hereby amended and reappropriated to read:
40 For alterations and improvements for preservation of various facili-
41 ties including rehabilitation projects, provided, however, that no
42 expenditures may be made from this appropriation until a comprehen-
43 sive plan of projects has been approved by the director of the budg-
44 et. This appropriation may be used for the cost of potential claims
45 against contracts awarded by the dormitory authority of the state of
410 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 New York. Upon request of the commissioner of the office of alcohol-
2 ism and substance abuse services and approval by the director of the
3 budget, this appropriation may be transferred or suballocated to the
4 dormitory authority of the state of New York (53A21503) ............
5 3,000,000 ......................................... (re. $3,000,000)
6 The appropriation made by chapter 54, section 1, of the laws of 2013, is
7 hereby amended and reappropriated to read:
8 For alterations and improvements for preservation of various facili-
9 ties including rehabilitation projects, provided, however, that no
10 expenditures may be made from this appropriation until a comprehen-
11 sive plan of projects has been approved by the director of the budg-
12 et. This appropriation may be used for the cost of potential claims
13 against contracts awarded by the dormitory authority of the state of
14 New York. Upon request of the commissioner of the office of alcohol-
15 ism and substance abuse services and approval by the director of the
16 budget, this appropriation may be transferred or suballocated to the
17 dormitory authority of the state of New York (53A21303) ............
18 18,000,000 ....................................... (re. $14,754,000)
19 The appropriation made by chapter 54, section 1, of the laws of 2012, is
20 hereby amended and reappropriated to read:
21 For alterations and improvements for preservation of various facili-
22 ties including rehabilitation projects, provided, however, that no
23 expenditures may be made from this appropriation until a comprehen-
24 sive plan of projects has been approved by the director of the budg-
25 et. This appropriation may be used for the cost of potential claims
26 against contracts awarded by the dormitory authority of the state of
27 New York. Upon request of the commissioner of the office of alcohol-
28 ism and substance abuse services and approval by the director of the
29 budget, this appropriation may be transferred or suballocated to the
30 dormitory authority of the state of New York (53A21203) ............
31 3,000,000 ........................................... (re. $804,000)
32 The appropriation made by chapter 54, section 1, of the laws of 2011, is
33 hereby amended and reappropriated to read:
34 For alterations and improvements for preservation of various facili-
35 ties including rehabilitation projects, provided, however, that no
36 expenditures may be made from this appropriation until a comprehen-
37 sive plan of projects has been approved by the director of the budg-
38 et. This appropriation may be used for the cost of potential claims
39 against contracts awarded by the dormitory authority of the state of
40 New York. Upon request of the commissioner of the office of alcohol-
41 ism and substance abuse services and approval by the director of the
42 budget, this appropriation may be transferred or suballocated to the
43 dormitory authority of the state of New York (53A21103) ............
44 7,000,000 ......................................... (re. $3,403,000)
45 The appropriation made by chapter 54, section 1, of the laws of 2010, is
46 hereby amended and reappropriated to read:
411 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For alterations and improvements for preservation of various facili-
2 ties including rehabilitation projects, provided, however, that no
3 expenditures may be made from this appropriation until a comprehen-
4 sive plan of projects has been approved by the director of the budg-
5 et. This appropriation may be used for the cost of potential claims
6 against contracts awarded by the dormitory authority of the state of
7 New York. Upon request of the commissioner of the office of alcohol-
8 ism and substance abuse services and approval by the director of the
9 budget, this appropriation may be transferred or suballocated to the
10 dormitory authority of the state of New York (53A21003) ............
11 3,000,000 ........................................... (re. $410,000)
12 The appropriation made by chapter 54, section 1, of the laws of 2009, is
13 hereby amended and reappropriated to read:
14 For alterations and improvements for preservation of various facili-
15 ties including rehabilitation projects, provided, however, that no
16 expenditures may be made from this appropriation until a comprehen-
17 sive plan of projects has been approved by the director of the budg-
18 et. This appropriation may be used for the cost of potential claims
19 against contracts awarded by the dormitory authority of the state of
20 New York. Upon request of the commissioner of the office of alcohol-
21 ism and substance abuse services and approval by the director of the
22 budget, this appropriation may be transferred or suballocated to the
23 dormitory authority of the state of New York (53A20903) ............
24 3,000,000 ........................................... (re. $662,000)
25 The appropriation made by chapter 54, section 1, of the laws of 2008, is
26 hereby amended and reappropriated to read:
27 For alterations and improvements for preservation of various facili-
28 ties including rehabilitation projects, provided, however, that no
29 expenditures may be made from this appropriation until a comprehen-
30 sive plan of projects has been approved by the director of the budg-
31 et. This appropriation may be used for the cost of potential claims
32 against contracts awarded by the dormitory authority of the state of
33 New York. Upon request of the commissioner of the office of alcohol-
34 ism and substance abuse services and approval by the director of the
35 budget, this appropriation may be transferred or suballocated to the
36 dormitory authority of the state of New York (53A20803) ............
37 3,000,000 ........................................... (re. $434,000)
38 The appropriation made by chapter 54, section 1, of the laws of 2007, is
39 hereby amended and reappropriated to read:
40 For alterations and improvements for preservation of various facili-
41 ties including rehabilitation projects, provided, however, that no
42 expenditures may be made from this appropriation until a comprehen-
43 sive plan of projects has been approved by the director of the budg-
44 et. This appropriation may be used for the cost of potential claims
45 against contracts awarded by the dormitory authority of the state of
46 New York. Upon request of the commissioner of the office of alcohol-
47 ism and substance abuse services and approval by the director of the
412 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 budget, this appropriation may be transferred or suballocated to the
2 dormitory authority of the state of New York (53A20703) ............
3 1,000,000 ............................................ (re. $62,000)
4 The appropriation made by chapter 54, section 1, of the laws of 2006, is
5 hereby amended and reappropriated to read:
6 For alterations and improvements for preservation of various facili-
7 ties including rehabilitation projects, provided, however, that no
8 expenditures may be made from this appropriation until a comprehen-
9 sive plan of projects has been approved by the director of the budg-
10 et. This appropriation may be used for the cost of potential claims
11 against contracts awarded by the dormitory authority of the state of
12 New York. Upon request of the commissioner of the office of alcohol-
13 ism and substance abuse services and approval by the director of the
14 budget, this appropriation may be transferred or suballocated to the
15 dormitory authority of the state of New York (53A20603) ............
16 7,800,000 ........................................... (re. $437,000)
17 The appropriation made by chapter 54, section 1, of the laws of 2003, is
18 hereby amended and reappropriated to read:
19 For alterations and improvements for preservation of various facili-
20 ties including rehabilitation projects, provided, however, that no
21 expenditures may be made from this appropriation until a comprehen-
22 sive plan of projects has been approved by the director of the budg-
23 et. This appropriation may be used for the cost of potential claims
24 against contracts awarded by the dormitory authority of the state of
25 New York or the facilities development corporation. Upon request of
26 the commissioner of the office of alcoholism and substance abuse
27 services and approval by the director of the budget, this appropri-
28 ation may be transferred or suballocated to the dormitory authority
29 of the state of New York (53PR0303) ... 1,000,000 ... (re. $259,000)
30 The appropriation made by chapter 54, section 1, of the laws of 2001, is
31 hereby amended and reappropriated to read:
32 For alterations and improvements for preservation of various facili-
33 ties including rehabilitation projects, provided, however, that no
34 expenditures may be made from this appropriation until a comprehen-
35 sive plan of projects has been approved by the director of the budg-
36 et. This appropriation may be used for the cost of potential claims
37 against contracts awarded by the dormitory authority of the state of
38 New York or the facilities development corporation. Upon request of
39 the commissioner of the office of alcoholism and substance abuse
40 services and approval by the director of the budget, this appropri-
41 ation may be transferred or suballocated to the dormitory authority
42 of the state of New York (53PR0103) ... 2,000,000 ... (re. $869,000)
413 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 434,472,000 2,089,377,000
6 ---------------- ----------------
7 All Funds ........................ 434,472,000 2,089,377,000
8 ================ ================
9 COMMUNITY MENTAL HEALTH FACILITIES (CCP) .................... 71,722,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Infrastructure Purpose
14 State aid to municipalities and other public
15 and not-for-profit agencies for acquisi-
16 tion, rehabilitation, and/or improvements
17 to existing community mental health facil-
18 ities as required to address code
19 violations, health and safety issues,
20 and/or structural/mechanical deficiencies.
21 Notwithstanding any inconsistent provision
22 of law, within the amounts hereby appro-
23 priated, the commissioner of the office of
24 mental health may provide state aid grants
25 of up to 100 per centum of reasonable
26 capital costs associated with the acquisi-
27 tion, rehabilitation, and/or improvements
28 (501118A4) ................................... 6,000,000
29 Capital Projects Funds - Other
30 Mental Health Facilities Capital Improvement Fund
31 Infrastructure Purpose
32 For the acquisition of property,
33 construction and rehabilitation of new
34 facilities and/or relocation of existing
35 community mental health facilities under
36 the auspice of municipalities and other
37 public and not-for-profit agencies,
38 approved by the commissioner of the office
39 of mental health, pursuant to article 41
40 of the mental hygiene law. Additionally,
41 this appropriation may be used for payment
42 of personal service and nonpersonal
43 service, including fringe benefits related
414 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2018-19
1 to the administration of the community
2 capital program provided by the office of
3 mental health for new and reappropriated
4 community capital projects. Upon request
5 of the commissioner of mental health and
6 approval by the director of the budget,
7 this appropriation may be transferred to
8 the dormitory authority of the state of
9 New York (500118A4) .......................... 5,722,000
10 For the acquisition of property,
11 construction, and rehabilitation of new
12 facilities, for purposes of developing
13 residential crisis programs, which may
14 include the renovation of existing commu-
15 nity mental health facilities for such
16 purposes, under the auspice of munici-
17 palities and other public and not-for-pro-
18 fit agencies, approved by the commissioner
19 of the office of mental health, pursuant
20 to article 41 of the mental hygiene law
21 (50CR18A4) .................................. 50,000,000
22 For services and expenses of not-for-profit
23 agencies licensed, certified or approved
24 by the office of mental health, to support
25 the preservation, restructuring, or expan-
26 sion of children's behavioral health
27 services .................................... 10,000,000
28 NON-BONDABLE PROJECTS (CCP) .................................. 1,000,000
29 --------------
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Non-Bondable Purpose
33 For transfer to the Mental Hygiene Capital
34 Improvement Fund for reimbursement of the
35 non-bondable cost of projects for communi-
36 ty facilities authorized by appropriations
37 or reappropriations funded from the Mental
38 Hygiene Capital Improvement Fund including
39 liabilities incurred prior to April 1,
40 2018 or for payment to the dormitory
41 authority of the state of New York for
42 defeasance of bonds. Upon request of the
43 commissioner of mental health and approval
44 by the director of the budget, this appro-
45 priation may be transferred to the dormi-
46 tory authority of the state of New York
47 (500418NB) ................................... 1,000,000
415 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2018-19
1 STATE MENTAL HEALTH FACILITIES (CCP) ....................... 361,750,000
2 --------------
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Infrastructure Purpose
6 For payment of the cost of land acquisition,
7 construction, reconstruction, rehabili-
8 tation and improvements, including the
9 preparation of designs, plans, specifica-
10 tions and estimates, for new, existing,
11 and reappropriated capital projects and
12 programs, including, but not limited to,
13 preparation of plans, administration,
14 maintenance and improvement of existing
15 facilities, new facilities, energy conser-
16 vation, environmental protection or
17 improvement, health and safety, preserva-
18 tion of facilities, accreditation and
19 program improvement or program changes,
20 maintenance and operation of various
21 facilities and systems including personal
22 services, fringe benefits, and indirect
23 costs; provided, however, that no expendi-
24 tures may be made from this appropriation
25 until a comprehensive plan of projects has
26 been approved by the director of the budg-
27 et. Additionally, this appropriation may
28 be used for payment to the design and
29 construction management account of the
30 centralized services fund of the New York
31 state office of general services or to the
32 dormitory authority of the state of New
33 York for the purpose of preparation and
34 review of plans, specifications, esti-
35 mates, services, construction management
36 and supervision, inspection, studies,
37 appraisals, surveys, testing and environ-
38 mental impact statements for new, existing
39 and reappropriated capital projects and
40 programs. Upon request of the commissioner
41 of mental health and approval by the
42 director of the budget, this appropriation
43 may be transferred to the dormitory
44 authority of the state of New York.
45 Furthermore, upon approval of the director
46 of the budget, funds from this appropri-
47 ation may be suballocated or transferred
416 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS 2018-19
1 to any department, agency, or public
2 authority (50IS18A4) ........................ 86,750,000
3 Capital Projects Funds - Other
4 Mental Hygiene Facilities Capital Improvement Fund
5 Infrastructure Purpose
6 For payment of the cost of land acquisition,
7 construction, reconstruction, rehabili-
8 tation and improvements, including the
9 preparation of designs, plans, specifica-
10 tions and estimates, for new, existing and
11 reappropriated capital projects and
12 programs including, but not limited to,
13 preparation of plans, administration,
14 maintenance and improvement of existing
15 facilities, new facilities, energy conser-
16 vation, environmental protection or
17 improvement, health and safety, preserva-
18 tion of facilities, accreditation and
19 program improvement or program changes;
20 provided, however, that no expenditures
21 may be made from this appropriation until
22 a comprehensive plan of projects has been
23 approved by the director of the budget.
24 This appropriation may be used for payment
25 of personal service and nonpersonal
26 service, including fringe benefits, and
27 indirect cost recovery, related to the
28 administration of the capital projects and
29 programs provided by the office of mental
30 health. Additionally, this appropriation
31 may be used for payment to the design and
32 construction management account of the
33 centralized services fund of the New York
34 state office of general services or to the
35 dormitory authority of the state of New
36 York for the purpose of preparation and
37 review of plans, specifications, esti-
38 mates, services, construction management
39 and supervision, inspection, studies,
40 appraisals, surveys, testing and environ-
41 mental impact statements for new and
42 existing projects. Upon request of the
43 commissioner of mental health and approval
44 by the director of the budget, this appro-
45 priation may be suballocated or trans-
46 ferred to any department, agency, or
47 public authority (50A418A4) ................ 275,000,000
417 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 COMMUNITY MENTAL HEALTH FACILITIES (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Infrastructure Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 State aid to municipalities and other public and not-for-profit agen-
7 cies for acquisition, rehabilitation, and/or improvements to exist-
8 ing community mental health facilities as required to address code
9 violations, health and safety issues, and/or structural/mechanical
10 deficiencies. Notwithstanding any inconsistent provision of law,
11 within the amounts hereby appropriated, the commissioner of the
12 office of mental health may provide state aid grants of up to 100
13 per centum of reasonable capital costs associated with the acquisi-
14 tion, rehabilitation, and/or improvements (501117A4) ...............
15 6,000,000 ......................................... (re. $6,000,000)
16 By chapter 55, section 1, of the laws of 2016:
17 State aid to municipalities and other public and not-for-profit agen-
18 cies for acquisition, rehabilitation, and/or improvements to exist-
19 ing community mental health facilities as required to address code
20 violations, health and safety issues, and/or structural/mechanical
21 deficiencies. Notwithstanding any inconsistent provision of law,
22 within the amounts hereby appropriated, the commissioner of the
23 office of mental health may provide state aid grants of up to 100
24 per centum of reasonable capital costs associated with the acquisi-
25 tion, rehabilitation, and/or improvements (501116A4) ...............
26 6,000,000 ......................................... (re. $6,000,000)
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Minor Rehabilitation Purpose
30 By chapter 54, section 1, of the laws of 2013:
31 State aid to municipalities and other public and not-for-profit agen-
32 cies for acquisition, rehabilitation, and/or improvements to exist-
33 ing community mental health facilities as required to address code
34 violations, health and safety issues, and/or structural/mechanical
35 deficiencies. Notwithstanding any inconsistent provision of law,
36 within the amounts hereby appropriated, the commissioner of the
37 office of mental health may provide state aid grants of up to 100
38 per centum of reasonable capital costs associated with the acquisi-
39 tion, rehabilitation, and/or improvements (50101389) ...............
40 6,000,000 ......................................... (re. $6,000,000)
41 By chapter 54, section 1, of the laws of 2012:
42 State aid to municipalities and other public and not-for-profit agen-
43 cies for acquisition, rehabilitation, and/or improvements to exist-
44 ing community mental health facilities as required to address code
418 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 violations, health and safety issues, and/or structural/mechanical
2 deficiencies. Notwithstanding any inconsistent provision of law,
3 within the amounts hereby appropriated, the commissioner of the
4 office of mental health may provide state aid grants of up to 100
5 per centum of reasonable capital costs associated with the acquisi-
6 tion, rehabilitation, and/or improvements (50101289) ...............
7 6,000,000 ......................................... (re. $6,000,000)
8 By chapter 54, section 1, of the laws of 2011:
9 State aid to municipalities and other public and not-for-profit agen-
10 cies for acquisition, rehabilitation, and/or improvements to exist-
11 ing community mental health facilities as required to address code
12 violations, health and safety issues, and/or structural/mechanical
13 deficiencies. Notwithstanding any inconsistent provision of law,
14 within the amounts hereby appropriated, the commissioner of the
15 office of mental health may provide state aid grants of up to 100
16 per centum of reasonable capital costs associated with the acquisi-
17 tion, rehabilitation, and/or improvements (50101189) ...............
18 6,000,000 ......................................... (re. $6,000,000)
19 By chapter 54, section 1, of the laws of 2010:
20 State aid to municipalities and other public and not-for-profit agen-
21 cies for acquisition, rehabilitation, and/or improvements to exist-
22 ing community mental health facilities as required to address code
23 violations, health and safety issues, and/or structural/mechanical
24 deficiencies. Notwithstanding any inconsistent provision of law,
25 within the amounts hereby appropriated, the commissioner of the
26 office of mental health may provide state aid grants of up to 100
27 per centum of reasonable capital costs associated with the acquisi-
28 tion, rehabilitation, and/or improvements (50101089) ...............
29 6,000,000 ......................................... (re. $2,308,000)
30 By chapter 54, section 1, of the laws of 2009:
31 State aid to municipalities and other public and not-for-profit agen-
32 cies for acquisition, rehabilitation, and/or improvements to exist-
33 ing community mental health facilities as required to address code
34 violations, health and safety issues, and/or structural/mechanical
35 deficiencies. Notwithstanding any inconsistent provision of law,
36 within the amounts hereby appropriated, the commissioner of the
37 office of mental health may provide state aid grants of up to 100
38 per centum of reasonable capital costs associated with the acquisi-
39 tion, rehabilitation, and/or improvements (50100989) ...............
40 6,000,000 ......................................... (re. $5,255,000)
41 By chapter 54, section 1, of the laws of 2008:
42 State aid to municipalities and other public and not-for-profit agen-
43 cies for acquisition, rehabilitation, and/or improvements to exist-
44 ing community mental health facilities as required to address code
45 violations, health and safety issues, and/or structural/mechanical
46 deficiencies. Notwithstanding any inconsistent provision of law,
419 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 within the amounts hereby appropriated, the commissioner of the
2 office of mental health may provide state aid grants of up to 100
3 per centum of reasonable capital costs associated with the acquisi-
4 tion, rehabilitation, and/or improvements (50100889) ...............
5 6,000,000 ........................................... (re. $485,000)
6 By chapter 54, section 1, of the laws of 2007:
7 State aid to municipalities and other public and not-for-profit agen-
8 cies for acquisition, rehabilitation, and/or improvements to exist-
9 ing community mental health facilities as required to address code
10 violations, health and safety issues, and/or structural/mechanical
11 deficiencies. Notwithstanding any inconsistent provision of law,
12 within the amounts hereby appropriated, the commissioner of the
13 office of mental health may provide state aid grants of up to 100
14 per centum of reasonable capital costs associated with the acquisi-
15 tion, rehabilitation, and/or improvements (50100789) ...............
16 6,000,000 ......................................... (re. $1,401,000)
17 By chapter 54, section 1, of the laws of 2006:
18 State aid to municipalities and other public and not-for-profit agen-
19 cies for acquisition, rehabilitation, and/or improvements to exist-
20 ing community mental health facilities as required to address code
21 violations, health and safety issues, and/or structural/mechanical
22 deficiencies. Notwithstanding any inconsistent provision of law,
23 within the amounts hereby appropriated, the commissioner of the
24 office of mental health may provide state aid grants of up to 100
25 per centum of reasonable capital costs associated with the acquisi-
26 tion, rehabilitation, and/or improvements (50100689) ...............
27 6,000,000 ........................................... (re. $658,000)
28 Capital Projects Funds - Other
29 Capital Projects Fund
30 New Facilities Purpose
31 By chapter 54, section 1, of the laws of 1994, for:
32 State aid to municipalities and other public and not-for-profit
33 private agencies for acquisition of property, design, construction
34 and rehabilitation of community mental health facilities and associ-
35 ated programs including, but not limited to, article 28 or article
36 31 community mental health facilities or supported housing beds, and
37 for state aid grants for facilities intended to serve mentally ill
38 persons (50239407) ... 16,070,000 ................... (re. $309,000)
39 Capital Projects Funds - Other
40 Mental Health Facilities Capital Improvement Fund
41 Infrastructure Purpose
42 The appropriation made by chapter 54, section 1, of the laws of 2017, is
43 hereby amended and reappropriated to read:
420 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the acquisition of property, construction and rehabilitation of
2 new facilities and/or relocation of existing community mental health
3 facilities under the auspice of municipalities and other public and
4 not-for-profit agencies, approved by the commissioner of the office
5 of mental health, pursuant to article 41 of the mental hygiene law.
6 Additionally, this appropriation may be used for payment of personal
7 service and nonpersonal service, including fringe benefits related
8 to the administration of the community capital program provided by
9 the office of mental health for new and reappropriated community
10 capital projects. Upon request of the commissioner of mental health
11 and approval by the director of the budget, this appropriation may
12 be transferred or suballocated to the dormitory authority of the
13 state of New York (500117A4) ... 5,722,000 ........ (re. $5,721,000)
14 The appropriation made by chapter 54, section 1, of the laws of 2017, to
15 the capital projects fund, is hereby transferred and reappropriated
16 to the mental health facilities capital improvement fund:
17 For services and expenses of not-for-profit agencies licensed, certi-
18 fied or approved by the office of mental health, to support the
19 preservation, restructuring, or expansion of children's behavioral
20 health services (501217A4) ... 10,000,000 ........ (re. $10,000,000)
21 The appropriation made by chapter 55, section 1, of the laws of 2016, is
22 hereby amended and reappropriated to read:
23 For the acquisition of property, construction and rehabilitation of
24 new facilities and/or relocation of existing community mental health
25 facilities under the auspice of municipalities and other public and
26 not-for-profit agencies, approved by the commissioner of the office
27 of mental health, pursuant to article 41 of the mental hygiene law.
28 Additionally, this appropriation may be used for payment of personal
29 service and nonpersonal service, including fringe benefits related
30 to the administration of the community capital program provided by
31 the office of mental health for new and reappropriated community
32 capital projects. Upon request of the commissioner of mental health
33 and approval by the director of the budget, this appropriation may
34 be transferred or suballocated to the dormitory authority of the
35 state of New York (500116A4) ... 5,722,000 ........ (re. $5,524,000)
36 Capital Projects Funds - Other
37 Mental Hygiene Facilities Capital Improvement Fund
38 New Facilities Purpose
39 By chapter 54, section 1, of the laws of 2008:
40 For payment to municipalities and not-for-profit community providers
41 for the acquisition of property, design, construction and rehabili-
42 tation of housing for mentally ill persons. To the extent that any
43 portion of such appropriation is utilized to develop housing in any
44 city having a population of one million or more, that portion of the
45 appropriation shall be matched on a 50/50 basis. Notwithstanding any
46 other provision of law to the contrary, any of the amounts appropri-
421 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ated herein may be increased or decreased by interchange or transfer
2 without limit with any appropriation of the office of mental health
3 capital projects budget, upon the request of the commissioner of
4 mental health and with the approval of the director of the budget,
5 who shall file such approval with the department of audit and
6 control and copies thereof with the chairman of the senate finance
7 committee and the chairman of the assembly ways and means committee
8 (50VY0807) ... 145,000,000 ....................... (re. $91,506,000)
9 By chapter 54, section 1, of the laws of 2007:
10 For payment to municipalities and not-for-profit community providers
11 for the acquisition of property, design, construction and rehabili-
12 tation of housing for mentally ill persons. To the extent that any
13 portion of such appropriation is utilized to develop housing in any
14 city having a population of one million or more, that portion of the
15 appropriation shall be matched on a 50/50 basis. Notwithstanding any
16 other provision of law to the contrary, any of the amounts appropri-
17 ated herein may be increased or decreased by interchange or transfer
18 without limit with any appropriation of the office of mental health
19 capital projects budget, upon the request of the commissioner of
20 mental health and with the approval of the director of the budget,
21 who shall file such approval with the department of audit and
22 control and copies thereof with the chairman of the senate finance
23 committee and the chairman of the assembly ways and means committee
24 (50VY0707) ... 200,000,000 ...................... (re. $134,795,000)
25 By chapter 54, section 1, of the laws of 2006:
26 For payment to municipalities and other public and not-for-profit
27 community providers approved by the commissioner of the office of
28 mental health, pursuant to mental hygiene law, for the acquisition
29 of property, construction and rehabilitation of supportive housing
30 for mentally ill homeless persons. Notwithstanding any other
31 provision of law to the contrary, any of the amounts appropriated
32 herein may be increased or decreased by interchange or transfer
33 without limit with any appropriation of the office of mental health
34 capital projects budget, upon the request of the commissioner of
35 mental health and with the approval of the director of the budget,
36 who shall file such approval with the department of audit and
37 control and copies thereof with the chairman of the senate finance
38 committee and the chairman of the assembly ways and means committee
39 (50VY0607) ... 211,000,000 ...................... (re. $106,010,000)
40 By chapter 54, section 1, of the laws of 2005, as amended by chapter 54,
41 section 1, of the laws of 2014:
42 For payment to municipalities and not-for-profit community providers
43 for the acquisition of property, design, construction and rehabili-
44 tation of housing for mentally ill persons. Of such appropriation up
45 to eighty percent shall be matched on a 50/50 basis. Notwithstand-
46 ing any other provision of law to the contrary, any of the amounts
47 appropriated herein may be increased or decreased by interchange or
422 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 transfer without limit with any appropriation of the office of
2 mental health capital projects budget, upon the request of the
3 commissioner of mental health and with the approval of the director
4 of the budget, who shall file such approval with the department of
5 audit and control and copies thereof with the chairman of the senate
6 finance committee and the chairman of the assembly ways and means
7 committee (50VY0507) ... 75,000,000 .............. (re. $23,944,000)
8 By chapter 54, section 1, of the laws of 2003, as amended by chapter 54,
9 section 1, of the laws of 2014:
10 For payment to municipalities and not-for-profit community providers
11 for the acquisition of property, design, construction and rehabili-
12 tation of housing for mentally ill persons. Of such appropriation up
13 to eighty percent shall be matched on a 50/50 basis. Notwithstand-
14 ing any other provision of law to the contrary, any of the amounts
15 appropriated herein may be increased or decreased by interchange or
16 transfer without limit with any appropriation of the office of
17 mental health capital projects budget, upon the request of the
18 commissioner of mental health and with the approval of the director
19 of the budget, who shall file such approval with the department of
20 audit and control and copies thereof with the chairman of the senate
21 finance committee and the chairman of the assembly ways and means
22 committee (50VY0307) ... 65,000,000 .............. (re. $23,365,000)
23 By chapter 54, section 1, of the laws of 1999, as amended by chapter 54,
24 section 1, of the laws of 2014:
25 For payment to municipalities and not-for-profit community providers
26 for the acquisition of property, design, construction and rehabili-
27 tation of housing for mentally ill persons. Of such appropriation
28 eighty percent shall be matched on a 50/50 basis and twenty percent
29 shall not require a match. Notwithstanding any other provision of
30 law to the contrary, any of the amounts appropriated herein may be
31 increased or decreased by interchange or transfer without limit with
32 any appropriation of the office of mental health capital projects
33 budget, upon the request of the commissioner of mental health and
34 with the approval of the director of the budget, who shall file such
35 approval with the department of audit and control and copies thereof
36 with the chairman of the senate finance committee and the chairman
37 of the assembly ways and means committee (50VY9907) ................
38 50,000,000 ....................................... (re. $15,102,000)
39 Capital Projects Funds - Other
40 Mental Hygiene Facilities Capital Improvement Fund
41 Preservation of Facilities Purpose
42 By chapter 54, section 1, of the laws of 2013:
43 For the acquisition of property, construction and rehabilitation of
44 new facilities and/or relocation of existing community mental health
45 facilities under the auspice of municipalities and other public and
46 not-for-profit agencies, approved by the commissioner of the office
423 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of mental health, pursuant to article 41 of the mental hygiene law
2 (50231303) ... 5,000,000 .......................... (re. $5,000,000)
3 By chapter 54, section 1, of the laws of 2012:
4 For the acquisition of property, construction and rehabilitation of
5 new facilities and/or relocation of existing community mental health
6 facilities under the auspice of municipalities and other public and
7 not-for-profit agencies, approved by the commissioner of the office
8 of mental health, pursuant to article 41 of the mental hygiene law
9 (50231203) ... 5,000,000 .......................... (re. $1,173,000)
10 By chapter 54, section 1, of the laws of 2011:
11 For the acquisition of property, construction and rehabilitation of
12 new facilities and/or relocation of existing community mental health
13 facilities under the auspice of municipalities and other public and
14 not-for-profit agencies, approved by the commissioner of the office
15 of mental health, pursuant to article 41 of the mental hygiene law
16 (50231103) ... 5,000,000 .......................... (re. $2,868,000)
17 By chapter 54, section 1, of the laws of 2010:
18 For the acquisition of property, construction and rehabilitation of
19 new facilities and/or relocation of existing community mental health
20 facilities under the auspice of municipalities and other public and
21 not-for-profit agencies, approved by the commissioner of the office
22 of mental health, pursuant to article 41 of the mental hygiene law
23 (50231003) ... 5,000,000 .......................... (re. $2,565,000)
24 By chapter 54, section 1, of the laws of 2009:
25 For the acquisition of property, construction and rehabilitation of
26 new facilities and/or relocation of existing community mental health
27 facilities under the auspice of municipalities and other public and
28 not-for-profit agencies, approved by the commissioner of the office
29 of mental health, pursuant to article 41 of the mental hygiene law
30 (50230903) ... 5,000,000 .......................... (re. $1,016,000)
31 By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
32 section 1, of the laws of 2014:
33 For the acquisition of property, construction and rehabilitation of
34 new facilities and/or relocation of existing community mental health
35 facilities under the auspice of municipalities and other public and
36 not-for-profit agencies, approved by the commissioner of the office
37 of mental health, pursuant to article 41 of the mental hygiene law.
38 Notwithstanding any other provision of law to the contrary, any of
39 the amounts appropriated herein may be increased or decreased by
40 interchange or transfer without limit with any appropriation of the
41 office of mental health capital projects budget, upon the request of
42 the commissioner of mental health and with the approval of the
43 director of the budget, who shall file such approval with the
44 department of audit and control and copies thereof with the chairman
45 of the senate finance committee and the chairman of the assembly
424 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ways and means committee (50230803) ................................
2 28,000,000 ....................................... (re. $15,271,000)
3 By chapter 54, section 1, of the laws of 2007, as amended by chapter 54,
4 section 1, of the laws of 2014:
5 For the acquisition of property, construction and rehabilitation of
6 new facilities and/or relocation of existing community mental health
7 facilities under the auspice of municipalities and other public and
8 not-for-profit agencies, approved by the commissioner of the office
9 of mental health, pursuant to article 41 of the mental hygiene law.
10 Notwithstanding any other provision of law to the contrary, any of
11 the amounts appropriated herein may be increased or decreased by
12 interchange or transfer without limit with any appropriation of the
13 office of mental health capital projects budget, upon the request of
14 the commissioner of mental health and with the approval of the
15 director of the budget, who shall file such approval with the
16 department of audit and control and copies thereof with the chairman
17 of the senate finance committee and the chairman of the assembly
18 ways and means committee (50230703) ................................
19 112,000,000 ...................................... (re. $45,848,000)
20 By chapter 54, section 1, of the laws of 2006, as amended by chapter 54,
21 section 1, of the laws of 2014:
22 For the acquisition of property, construction and rehabilitation of
23 new facilities and/or relocation of existing community mental health
24 facilities under the auspice of municipalities and other public and
25 not-for-profit agencies, approved by the commissioner of the office
26 of mental health, pursuant to article 41 of the mental hygiene law.
27 Notwithstanding any other provision of law to the contrary, any of
28 the amounts appropriated herein may be increased or decreased by
29 interchange or transfer without limit with any appropriation of the
30 office of mental health capital projects budget, upon the request of
31 the commissioner of mental health and with the approval of the
32 director of the budget, who shall file such approval with the
33 department of audit and control and copies thereof with the chairman
34 of the senate finance committee and the chairman of the assembly
35 ways and means committee (50230603) ................................
36 15,000,000 ........................................ (re. $5,128,000)
37 By chapter 54, section 1, of the laws of 2001:
38 For the acquisition of property, construction, rehabilitation and/or
39 relocation of existing community mental health facilities under the
40 auspice of municipalities and other public and not-for-profit agen-
41 cies, approved by the commissioner of the office of mental health,
42 pursuant to article 41 of the mental hygiene law (50230103) ........
43 5,000,000 ........................................... (re. $225,000)
44 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
45 Capital Projects Funds - Other
425 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Fund
2 Environmental Protection or Improvements Purpose
3 By chapter 54, section 1, of the laws of 2013:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates for environmental protection (50EP1306) ..............
7 5,911,000 ......................................... (re. $1,718,000)
8 By chapter 54, section 1, of the laws of 2012:
9 For payment of the cost of construction, reconstruction and improve-
10 ments, including the preparation of designs, plans, specifications
11 and estimates for environmental protection (50EP1206) ..............
12 4,950,000 ........................................... (re. $928,000)
13 By chapter 54, section 1, of the laws of 2011:
14 For payment of the cost of construction, reconstruction and improve-
15 ments, including the preparation of designs, plans, specifications
16 and estimates for environmental protection (50EP1106) ..............
17 4,100,000 ........................................... (re. $210,000)
18 Capital Projects Funds - Other
19 Capital Projects Fund
20 Health and Safety Purpose
21 By chapter 54, section 1, of the laws of 2013:
22 For payment of the cost of construction, reconstruction and improve-
23 ments, including the preparation of designs, plans, specifications
24 and estimates, for health and safety improvements to existing facil-
25 ities and programs, provided, however, that no expenditures may be
26 made from this appropriation until a comprehensive plan of projects
27 has been approved by the director of the budget. Upon request of the
28 commissioner of mental health and approval by the director of the
29 budget, this appropriation may be transferred to the dormitory
30 authority of the state of New York (50HS1301) ......................
31 6,274,000 ......................................... (re. $1,925,000)
32 By chapter 54, section 1, of the laws of 2012:
33 For payment of the cost of construction, reconstruction and improve-
34 ments, including the preparation of designs, plans, specifications
35 and estimates, for health and safety improvements to existing facil-
36 ities and programs, provided, however, that no expenditures may be
37 made from this appropriation until a comprehensive plan of projects
38 has been approved by the director of the budget. Upon request of the
39 commissioner of mental health and approval by the director of the
40 budget, this appropriation may be transferred to the dormitory
41 authority of the state of New York (50HS1201) ......................
42 4,000,000 ........................................... (re. $462,000)
43 By chapter 54, section 1, of the laws of 2011:
426 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications
3 and estimates, for health and safety improvements to existing facil-
4 ities and programs, provided, however, that no expenditures may be
5 made from this appropriation until a comprehensive plan of projects
6 has been approved by the director of the budget. Upon request of the
7 commissioner of mental health and approval by the director of the
8 budget, this appropriation may be transferred to the dormitory
9 authority of the state of New York (50HS1101) ......................
10 5,000,000 ........................................... (re. $328,000)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
15 section 1, of the laws of 2014:
16 For payment of the cost of construction, reconstruction and improve-
17 ments, including the preparation of designs, plans, specifications
18 and estimates to existing facilities and programs, provided, howev-
19 er, that no expenditures may be made from this appropriation until a
20 comprehensive plan of projects has been approved by the director of
21 the budget. Notwithstanding any other provision of law to the
22 contrary, any of the amounts appropriated herein may be increased or
23 decreased by interchange or transfer without limit with any appro-
24 priation of the office of mental health capital projects budget,
25 upon the request of the commissioner of mental health and with the
26 approval of the director of the budget, who shall file such approval
27 with the department of audit and control and copies thereof with the
28 chairman of the senate finance committee and the chairman of the
29 assembly ways and means committee (50PF1303) .......................
30 16,965,000 ........................................ (re. $4,063,000)
31 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
32 section 1, of the laws of 2014:
33 For payment of the cost of construction, reconstruction and improve-
34 ments, including the preparation of designs, plans, specifications
35 and estimates to existing facilities and programs, provided, howev-
36 er, that no expenditures may be made from this appropriation until a
37 comprehensive plan of projects has been approved by the director of
38 the budget. Notwithstanding any other provision of law to the
39 contrary, any of the amounts appropriated herein may be increased or
40 decreased by interchange or transfer without limit with any appro-
41 priation of the office of mental health capital projects budget,
42 upon the request of the commissioner of mental health and with the
43 approval of the director of the budget, who shall file such approval
44 with the department of audit and control and copies thereof with the
45 chairman of the senate finance committee and the chairman of the
46 assembly ways and means committee (50PF1203) .......................
47 19,700,000 ........................................ (re. $1,254,000)
427 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2011:
2 For payment of the cost of construction, reconstruction and improve-
3 ments, including the preparation of designs, plans, specifications
4 and estimates to existing facilities and programs, provided, howev-
5 er, that no expenditures may be made from this appropriation until a
6 comprehensive plan of projects has been approved by the director of
7 the budget (50PF1103) ... 15,000,000 ................ (re. $405,000)
8 Capital Projects Funds - Other
9 Mental Hygiene Facilities Capital Improvement Fund
10 Accreditation Purpose
11 The appropriation made by chapter 54, section 1, of the laws of 2013, as
12 amended by chapter 54, section 1, of the laws of 2014, is hereby
13 amended and reappropriated to read:
14 For payment of the cost of land acquisition, construction, recon-
15 struction and improvements, including the preparation of designs,
16 plans, specifications and estimates related to accreditation
17 improvements to existing facilities and programs. This appropriation
18 may be used for payment of personal service, indirect cost recovery,
19 and fringe benefit costs associated with New York State employees
20 assigned to such capital projects. Upon request of the commissioner
21 of mental health and approval by the director of the budget, this
22 appropriation may be transferred or suballocated to the dormitory
23 authority of the state of New York. Notwithstanding any other
24 provision of law to the contrary, any of the amounts appropriated
25 herein may be increased or decreased by interchange or transfer
26 without limit with any appropriation of the office of mental health
27 capital projects budget, upon the request of the commissioner of
28 mental health and with the approval of the director of the budget,
29 who shall file such approval with the department of audit and
30 control and copies thereof with the chairman of the senate finance
31 committee and the chairman of the assembly ways and means committee
32 (50061302) ... 28,188,000 ........................ (re. $27,287,000)
33 The appropriation made by chapter 54, section 1, of the laws of 2012, as
34 amended by chapter 54, section 1, of the laws of 2014, is hereby
35 amended and reappropriated to read:
36 For payment of the cost of land acquisition, construction, recon-
37 struction and improvements, including the preparation of designs,
38 plans, specifications and estimates related to accreditation
39 improvements to existing facilities and programs. This appropriation
40 may be used for payment of personal service, indirect cost recovery,
41 and fringe benefit costs associated with New York State employees
42 assigned to such capital projects. Upon request of the commissioner
43 of mental health and approval by the director of the budget, this
44 appropriation may be transferred or suballocated to the dormitory
45 authority of the state of New York. Notwithstanding any other
46 provision of law to the contrary, any of the amounts appropriated
47 herein may be increased or decreased by interchange or transfer
428 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 without limit with any appropriation of the office of mental health
2 capital projects budget, upon the request of the commissioner of
3 mental health and with the approval of the director of the budget,
4 who shall file such approval with the department of audit and
5 control and copies thereof with the chairman of the senate finance
6 committee and the chairman of the assembly ways and means committee
7 (50061202) ... 14,441,000 ......................... (re. $8,801,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2011, as
9 amended by chapter 54, section 1, of the laws of 2014, is hereby
10 amended and reappropriated to read:
11 For payment of the cost of land acquisition, construction, recon-
12 struction and improvements, including the preparation of designs,
13 plans, specifications and estimates related to accreditation
14 improvements to existing facilities and programs. This appropriation
15 may be used for payment of personal service, indirect cost recovery,
16 and fringe benefit costs associated with New York State employees
17 assigned to such capital projects. Upon request of the commissioner
18 of mental health and approval by the director of the budget, this
19 appropriation may be transferred or suballocated to the dormitory
20 authority of the state of New York. Notwithstanding any other
21 provision of law to the contrary, any of the amounts appropriated
22 herein may be increased or decreased by interchange or transfer
23 without limit with any appropriation of the office of mental health
24 capital projects budget, upon the request of the commissioner of
25 mental health and with the approval of the director of the budget,
26 who shall file such approval with the department of audit and
27 control and copies thereof with the chairman of the senate finance
28 committee and the chairman of the assembly ways and means committee
29 (50061102) ... 36,477,000 ........................ (re. $18,120,000)
30 The appropriation made by chapter 54, section 1, of the laws of 2010, is
31 hereby amended and reappropriated to read:
32 For payment of the cost of land acquisition, construction, recon-
33 struction and improvements, including the preparation of designs,
34 plans, specifications and estimates related to accreditation
35 improvements to existing facilities and programs. This appropriation
36 may be used for payment of personal service, indirect cost recovery,
37 and fringe benefit costs associated with New York State employees
38 assigned to such capital projects. Upon request of the commissioner
39 of mental health and approval by the director of the budget, this
40 appropriation may be transferred or suballocated to the dormitory
41 authority of the state of New York (50061002) ......................
42 9,565,000 ......................................... (re. $2,434,000)
43 The appropriation made by chapter 54, section 1, of the laws of 2009, as
44 amended by chapter 54, section 1, of the laws of 2014, is hereby
45 amended and reappropriated to read:
46 For payment of the cost of land acquisition, construction, recon-
47 struction and improvements, including the preparation of designs,
429 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 plans, specifications and estimates related to accreditation
2 improvements to existing facilities and programs. This appropriation
3 may be used for payment of personal service, indirect cost recovery,
4 and fringe benefit costs associated with New York State employees
5 assigned to such capital projects. Upon request of the commissioner
6 of mental health and approval by the director of the budget, this
7 appropriation may be transferred or suballocated to the dormitory
8 authority of the state of New York. Notwithstanding any other
9 provision of law to the contrary, any of the amounts appropriated
10 herein may be increased or decreased by interchange or transfer
11 without limit with any appropriation of the office of mental health
12 capital projects budget, upon the request of the commissioner of
13 mental health and with the approval of the director of the budget,
14 who shall file such approval with the department of audit and
15 control and copies thereof with the chairman of the senate finance
16 committee and the chairman of the assembly ways and means committee
17 (50060902) ... 347,480,000 ...................... (re. $123,731,000)
18 The appropriation made by chapter 54, section 1, of the laws of 2008, as
19 amended by chapter 54, section 1, of the laws of 2014, is hereby
20 amended and reappropriated to read:
21 For payment of the cost of land acquisition, construction, recon-
22 struction and improvements, including the preparation of designs,
23 plans, specifications and estimates related to accreditation
24 improvements to existing facilities and programs. This appropriation
25 may be used for payment of personal service, indirect cost recovery,
26 and fringe benefit costs associated with New York State employees
27 assigned to such capital projects. Upon request of the commissioner
28 of mental health and approval by the director of the budget, this
29 appropriation may be transferred or suballocated to the dormitory
30 authority of the state of New York. Notwithstanding any other
31 provision of law to the contrary, any of the amounts appropriated
32 herein may be increased or decreased by interchange or transfer
33 without limit with any appropriation of the office of mental health
34 capital projects budget, upon the request of the commissioner of
35 mental health and with the approval of the director of the budget,
36 who shall file such approval with the department of audit and
37 control and copies thereof with the chairman of the senate finance
38 committee and the chairman of the assembly ways and means committee
39 (50060802) ... 95,624,000 ........................ (re. $10,895,000)
40 The appropriation made by chapter 54, section 1, of the laws of 2007, as
41 amended by chapter 54, section 1, of the laws of 2014, is hereby
42 amended and reappropriated to read:
43 For payment of the cost of land acquisition, construction, recon-
44 struction and improvements, including the preparation of designs,
45 plans, specifications and estimates related to accreditation
46 improvements to existing facilities and programs. Upon request of
47 the commissioner of mental health and approval by the director of
48 the budget, this appropriation may be transferred or suballocated to
430 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the dormitory authority of the state of New York. Notwithstanding
2 any other provision of law to the contrary, any of the amounts
3 appropriated herein may be increased or decreased by interchange or
4 transfer without limit with any appropriation of the office of
5 mental health capital projects budget, upon the request of the
6 commissioner of mental health and with the approval of the director
7 of the budget, who shall file such approval with the department of
8 audit and control and copies thereof with the chairman of the senate
9 finance committee and the chairman of the assembly ways and means
10 committee (50060702) ... 164,153,000 ................ (re. $457,000)
11 Capital Projects Funds - Other
12 Mental Hygiene Facilities Capital Improvement Fund
13 Environmental Protection or Improvements Purpose
14 The appropriation made by chapter 54, section 1, of the laws of 2013, is
15 hereby amended and reappropriated to read:
16 For payment of the cost of construction, reconstruction and improve-
17 ments, including the preparations of designs, plans, specifications
18 and estimates for environmental protection. Upon request of the
19 commissioner of mental health and approval by the director of the
20 budget, this appropriation may be transferred or suballocated to the
21 dormitory authority of the state of New York (50061306) ............
22 1,500,000 ......................................... (re. $1,500,000)
23 The appropriation made by chapter 54, section 1, of the laws of 2012, is
24 hereby amended and reappropriated to read:
25 For payment of the cost of construction, reconstruction and improve-
26 ments, including the preparations of designs, plans, specifications
27 and estimates for environmental protection. Upon request of the
28 commissioner of mental health and approval by the director of the
29 budget, this appropriation may be transferred or suballocated to the
30 dormitory authority of the state of New York (50061206) ............
31 1,000,000 ........................................... (re. $508,000)
32 The appropriation made by chapter 54, section 1, of the laws of 2011, is
33 hereby amended and reappropriated to read:
34 For payment of the cost of construction, reconstruction and improve-
35 ments, including the preparations of designs, plans, specifications
36 and estimates for environmental protection. Upon request of the
37 commissioner of mental health and approval by the director of the
38 budget, this appropriation may be transferred or suballocated to the
39 dormitory authority of the state of New York (50061106) ............
40 1,000,000 ........................................... (re. $508,000)
41 By chapter 54, section 1, of the laws of 2009:
42 For payment of the cost of construction, reconstruction and improve-
43 ments, including the preparations of designs, plans, specifications
44 and estimates for environmental protection. Upon request of the
45 commissioner of mental health and approval by the director of the
431 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 budget, this appropriation may be transferred to the dormitory
2 authority of the state of New York (50060906) ......................
3 1,000,000 ........................................... (re. $253,000)
4 Capital Projects Funds - Other
5 Mental Hygiene Facilities Capital Improvement Fund
6 Health and Safety Purpose
7 The appropriation made by chapter 54, section 1, of the laws of 2013, as
8 amended by chapter 54, section 1, of the laws of 2014, is hereby
9 amended and reappropriated to read:
10 For payment of the cost of construction, reconstruction and improve-
11 ments, including the preparation of designs, plans, specifications
12 and estimates, for health and safety improvements to existing facil-
13 ities and programs, provided, however, that no expenditures may be
14 made from this appropriation until a comprehensive plan of projects
15 has been approved by the director of the budget. This appropriation
16 may be used for payment of personal service, indirect cost recovery,
17 and fringe benefit costs associated with New York State employees
18 assigned to such capital projects. Upon request of the commissioner
19 of mental health and approval by the director of the budget, this
20 appropriation may be transferred or suballocated to the dormitory
21 authority of the state of New York. Notwithstanding any other
22 provision of law to the contrary, any of the amounts appropriated
23 herein may be increased or decreased by interchange or transfer
24 without limit with any appropriation of the office of mental health
25 capital projects budget, upon the request of the commissioner of
26 mental health and with the approval of the director of the budget,
27 who shall file such approval with the department of audit and
28 control and copies thereof with the chairman of the senate finance
29 committee and the chairman of the assembly ways and means committee
30 (50011301) ... 28,737,000 ........................ (re. $28,720,000)
31 The appropriation made by chapter 54, section 1, of the laws of 2012, as
32 amended by chapter 54, section 1, of the laws of 2014, is hereby
33 amended and reappropriated to read:
34 For payment of the cost of construction, reconstruction and improve-
35 ments, including the preparation of designs, plans, specifications
36 and estimates, for health and safety improvements to existing facil-
37 ities and programs, provided, however, that no expenditures may be
38 made from this appropriation until a comprehensive plan of projects
39 has been approved by the director of the budget. This appropriation
40 may be used for payment of personal service, indirect cost recovery,
41 and fringe benefit costs associated with New York State employees
42 assigned to such capital projects. Upon request of the commissioner
43 of mental health and approval by the director of the budget, this
44 appropriation may be transferred or suballocated to the dormitory
45 authority of the state of New York. Notwithstanding any other
46 provision of law to the contrary, any of the amounts appropriated
47 herein may be increased or decreased by interchange or transfer
432 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 without limit with any appropriation of the office of mental health
2 capital projects budget, upon the request of the commissioner of
3 mental health and with the approval of the director of the budget,
4 who shall file such approval with the department of audit and
5 control and copies thereof with the chairman of the senate finance
6 committee and the chairman of the assembly ways and means committee
7 (50011201) ... 24,920,000 ........................ (re. $20,637,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2011, as
9 amended by chapter 54, section 1, of the laws of 2014, is hereby
10 amended and reappropriated to read:
11 For payment of the cost of construction, reconstruction and improve-
12 ments, including the preparation of designs, plans, specifications
13 and estimates, for health and safety improvements to existing facil-
14 ities and programs, provided, however, that no expenditures may be
15 made from this appropriation until a comprehensive plan of projects
16 has been approved by the director of the budget. This appropriation
17 may be used for payment of personal service, indirect cost recovery,
18 and fringe benefit costs associated with New York State employees
19 assigned to such capital projects. Upon request of the commissioner
20 of mental health and approval by the director of the budget, this
21 appropriation may be transferred or suballocated to the dormitory
22 authority of the state of New York. Notwithstanding any other
23 provision of law to the contrary, any of the amounts appropriated
24 herein may be increased or decreased by interchange or transfer
25 without limit with any appropriation of the office of mental health
26 capital projects budget, upon the request of the commissioner of
27 mental health and with the approval of the director of the budget,
28 who shall file such approval with the department of audit and
29 control and copies thereof with the chairman of the senate finance
30 committee and the chairman of the assembly ways and means committee
31 (50011101) ... 33,114,000 ........................ (re. $14,304,000)
32 The appropriation made by chapter 54, section 1, of the laws of 2010, as
33 amended by chapter 54, section 1, of the laws of 2014, is hereby
34 amended and reappropriated to read:
35 For payment of the cost of construction, reconstruction and improve-
36 ments, including the preparation of designs, plans, specifications
37 and estimates, for health and safety improvements to existing facil-
38 ities and programs, provided, however, that no expenditures may be
39 made from this appropriation until a comprehensive plan of projects
40 has been approved by the director of the budget. This appropriation
41 may be used for payment of personal service, indirect cost recovery,
42 and fringe benefit costs associated with New York State employees
43 assigned to such capital projects. Upon request of the commissioner
44 of mental health and approval by the director of the budget, this
45 appropriation may be transferred or suballocated to the dormitory
46 authority of the state of New York. Notwithstanding any other
47 provision of law to the contrary, any of the amounts appropriated
48 herein may be increased or decreased by interchange or transfer
433 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 without limit with any appropriation of the office of mental health
2 capital projects budget, upon the request of the commissioner of
3 mental health and with the approval of the director of the budget,
4 who shall file such approval with the department of audit and
5 control and copies thereof with the chairman of the senate finance
6 committee and the chairman of the assembly ways and means committee
7 (50011001) ... 37,066,000 ........................ (re. $11,986,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2009, as
9 amended by chapter 54, section 1, of the laws of 2014, is hereby
10 amended and reappropriated to read:
11 For payment of the cost of construction, reconstruction and improve-
12 ments, including the preparation of designs, plans, specifications
13 and estimates, for health and safety improvements to existing facil-
14 ities and programs, provided, however, that no expenditures may be
15 made from this appropriation until a comprehensive plan of projects
16 has been approved by the director of the budget. This appropriation
17 may be used for payment of personal service, indirect cost recovery,
18 and fringe benefit costs associated with New York State employees
19 assigned to such capital projects. Upon request of the commissioner
20 of mental health and approval by the director of the budget, this
21 appropriation may be transferred or suballocated to the dormitory
22 authority of the state of New York. Notwithstanding any other
23 provision of law to the contrary, any of the amounts appropriated
24 herein may be increased or decreased by interchange or transfer
25 without limit with any appropriation of the office of mental health
26 capital projects budget, upon the request of the commissioner of
27 mental health and with the approval of the director of the budget,
28 who shall file such approval with the department of audit and
29 control and copies thereof with the chairman of the senate finance
30 committee and the chairman of the assembly ways and means committee
31 (50010901) ... 38,125,000 ......................... (re. $8,398,000)
32 The appropriation made by chapter 54, section 1, of the laws of 2008, as
33 amended by chapter 54, section 1, of the laws of 2014, is hereby
34 amended and reappropriated to read:
35 For payment of the cost of construction, reconstruction and improve-
36 ments, including the preparation of designs, plans, specifications
37 and estimates, for health and safety improvements to existing facil-
38 ities and programs, provided, however, that no expenditures may be
39 made from this appropriation until a comprehensive plan of projects
40 has been approved by the director of the budget. This appropriation
41 may be used for payment of personal service, indirect cost recovery,
42 and fringe benefit costs associated with New York State employees
43 assigned to such capital projects. Upon request of the commissioner
44 of mental health and approval by the director of the budget, this
45 appropriation may be transferred or suballocated to the dormitory
46 authority of the state of New York. Notwithstanding any other
47 provision of law to the contrary, any of the amounts appropriated
48 herein may be increased or decreased by interchange or transfer
434 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 without limit with any appropriation of the office of mental health
2 capital projects budget, upon the request of the commissioner of
3 mental health and with the approval of the director of the budget,
4 who shall file such approval with the department of audit and
5 control and copies thereof with the chairman of the senate finance
6 committee and the chairman of the assembly ways and means committee
7 (50010801) ... 60,276,000 ......................... (re. $6,300,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2007, is
9 hereby amended and reappropriated to read:
10 For payment of the cost of construction, reconstruction and improve-
11 ments, including the preparation of designs, plans, specifications
12 and estimates, for health and safety improvements to existing facil-
13 ities and programs, provided, however, that no expenditures may be
14 made from this appropriation until a comprehensive plan of projects
15 has been approved by the director of the budget. Upon request of the
16 commissioner of mental health and approval by the director of the
17 budget, this appropriation may be transferred or suballocated to the
18 dormitory authority of the state of New York (50010701) ............
19 28,963,000 .......................................... (re. $552,000)
20 Capital Projects Funds - Other
21 Mental Hygiene Facilities Capital Improvement Fund
22 Preservation of Facilities Purpose
23 The appropriation made by chapter 54, section 1, of the laws of 2013, as
24 amended by chapter 54, section 1, of the laws of 2014, is hereby
25 amended and reappropriated to read:
26 For payment of the cost of construction, reconstruction and improve-
27 ments, including the preparation of designs, plans, specifications
28 and estimates, and minor rehabilitation and improvements for the
29 preservation of existing facilities and programs, provided, however,
30 that no expenditures may be made from this appropriation until a
31 comprehensive plan of projects has been approved by the director of
32 the budget. This appropriation may be used for payment of personal
33 service, indirect cost recovery, and fringe benefit costs associated
34 with New York State employees assigned to such capital projects.
35 Upon request of the commissioner of mental health and approval by
36 the director of the budget, this appropriation may be transferred or
37 suballocated to the dormitory authority of the state of New York.
38 Notwithstanding any other provision of law to the contrary, any of
39 the amounts appropriated herein may be increased or decreased by
40 interchange or transfer without limit with any appropriation of the
41 office of mental health capital projects budget, upon the request of
42 the commissioner of mental health and with the approval of the
43 director of the budget, who shall file such approval with the
44 department of audit and control and copies thereof with the chairman
45 of the senate finance committee and the chairman of the assembly
46 ways and means committee (50031303) ................................
47 51,546,000 ....................................... (re. $40,366,000)
435 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2012, as
2 amended by chapter 54, section 1, of the laws of 2014, is hereby
3 amended and reappropriated to read:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates, and minor rehabilitation and improvements for the
7 preservation of existing facilities and programs, provided, however,
8 that no expenditures may be made from this appropriation until a
9 comprehensive plan of projects has been approved by the director of
10 the budget. This appropriation may be used for payment of personal
11 service, indirect cost recovery, and fringe benefit costs associated
12 with New York State employees assigned to such capital projects.
13 Upon request of the commissioner of mental health and approval by
14 the director of the budget, this appropriation may be transferred or
15 suballocated to the dormitory authority of the state of New York.
16 Notwithstanding any other provision of law to the contrary, any of
17 the amounts appropriated herein may be increased or decreased by
18 interchange or transfer without limit with any appropriation of the
19 office of mental health capital projects budget, upon the request of
20 the commissioner of mental health and with the approval of the
21 director of the budget, who shall file such approval with the
22 department of audit and control and copies thereof with the chairman
23 of the senate finance committee and the chairman of the assembly
24 ways and means committee (50031203) ................................
25 48,743,000 ....................................... (re. $30,498,000)
26 The appropriation made by chapter 54, section 1, of the laws of 2011, as
27 amended by chapter 54, section 1, of the laws of 2014, is hereby
28 amended and reappropriated to read:
29 For payment of the cost of construction, reconstruction and improve-
30 ments, including the preparation of designs, plans, specifications
31 and estimates, and minor rehabilitation and improvements for the
32 preservation of existing facilities and programs, provided, however,
33 that no expenditures may be made from this appropriation until a
34 comprehensive plan of projects has been approved by the director of
35 the budget. This appropriation may be used for payment of personal
36 service, indirect cost recovery, and fringe benefit costs associated
37 with New York State employees assigned to such capital projects.
38 Upon request of the commissioner of mental health and approval by
39 the director of the budget, this appropriation may be transferred or
40 suballocated to the dormitory authority of the state of New York.
41 Notwithstanding any other provision of law to the contrary, any of
42 the amounts appropriated herein may be increased or decreased by
43 interchange or transfer without limit with any appropriation of the
44 office of mental health capital projects budget, upon the request of
45 the commissioner of mental health and with the approval of the
46 director of the budget, who shall file such approval with the
47 department of audit and control and copies thereof with the chairman
48 of the senate finance committee and the chairman of the assembly
436 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ways and means committee (50031103) ................................
2 59,543,000 ....................................... (re. $32,346,000)
3 The appropriation made by chapter 54, section 1, of the laws of 2010, as
4 amended by chapter 54, section 1, of the laws of 2014, is hereby
5 amended and reappropriated to read:
6 For payment of the cost of construction, reconstruction and improve-
7 ments, including the preparation of designs, plans, specifications
8 and estimates, and minor rehabilitation and improvements for the
9 preservation of existing facilities and programs, provided, however,
10 that no expenditures may be made from this appropriation until a
11 comprehensive plan of projects has been approved by the director of
12 the budget. This appropriation may be used for payment of personal
13 service, indirect cost recovery, and fringe benefit costs associated
14 with New York State employees assigned to such capital projects.
15 Upon request of the commissioner of mental health and approval by
16 the director of the budget, this appropriation may be transferred or
17 suballocated to the dormitory authority of the state of New York.
18 Notwithstanding any other provision of law to the contrary, any of
19 the amounts appropriated herein may be increased or decreased by
20 interchange or transfer without limit with any appropriation of the
21 office of mental health capital projects budget, upon the request of
22 the commissioner of mental health and with the approval of the
23 director of the budget, who shall file such approval with the
24 department of audit and control and copies thereof with the chairman
25 of the senate finance committee and the chairman of the assembly
26 ways and means committee (50031003) ................................
27 110,767,000 ...................................... (re. $82,348,000)
28 The appropriation made by chapter 54, section 1, of the laws of 2009, as
29 amended by chapter 54, section 1, of the laws of 2014, is hereby
30 amended and reappropriated to read:
31 For payment of the cost of construction, reconstruction and improve-
32 ments, including the preparation of designs, plans, specifications
33 and estimates, and minor rehabilitation and improvements for the
34 preservation of existing facilities and programs, provided, however,
35 that no expenditures may be made from this appropriation until a
36 comprehensive plan of projects has been approved by the director of
37 the budget. This appropriation may be used for payment of personal
38 service, indirect cost recovery, and fringe benefit costs associated
39 with New York State employees assigned to such capital projects.
40 Upon request of the commissioner of mental health and approval by
41 the director of the budget, this appropriation may be transferred or
42 suballocated to the dormitory authority of the state of New York.
43 Notwithstanding any other provision of law to the contrary, any of
44 the amounts appropriated herein may be increased or decreased by
45 interchange or transfer without limit with any appropriation of the
46 office of mental health capital projects budget, upon the request of
47 the commissioner of mental health and with the approval of the
48 director of the budget, who shall file such approval with the
437 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 department of audit and control and copies thereof with the chairman
2 of the senate finance committee and the chairman of the assembly
3 ways and means committee (50030903) ................................
4 45,396,000 ....................................... (re. $13,618,000)
5 The appropriation made by chapter 54, section 1, of the laws of 2008, is
6 hereby amended and reappropriated to read:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications
9 and estimates, and minor rehabilitation and improvements for the
10 preservation of existing facilities and programs, provided, however,
11 that no expenditures may be made from this appropriation until a
12 comprehensive plan of projects has been approved by the director of
13 the budget. This appropriation may be used for payment of personal
14 service, indirect cost recovery, and fringe benefit costs associated
15 with New York State employees assigned to such capital projects.
16 Upon request of the commissioner of mental health and approval by
17 the director of the budget, this appropriation may be transferred or
18 suballocated to the dormitory authority of the state of New York
19 (50030803) ... 24,688,000 ........................... (re. $987,000)
20 The appropriation made by chapter 54, section 1, of the laws of 2007, is
21 hereby amended and reappropriated to read:
22 For payment of the cost of construction, reconstruction and improve-
23 ments, including the preparation of designs, plans, specifications
24 and estimates, and minor rehabilitation and improvements for the
25 preservation of existing facilities and programs, provided, however,
26 that no expenditures may be made from this appropriation until a
27 comprehensive plan of projects has been approved by the director of
28 the budget. Upon request of the commissioner of mental health and
29 approval by the director of the budget, this appropriation may be
30 transferred or suballocated to the dormitory authority of the state
31 of New York (50030703) ... 34,946,000 ............. (re. $1,388,000)
32 Capital Projects Funds - Other
33 Mental Hygiene Facilities Capital Improvement Fund
34 Program Improvement or Program Change Purpose
35 The appropriation made by chapter 54, section 1, of the laws of 2013, as
36 amended by chapter 54, section 1, of the laws of 2014, is hereby
37 amended and reappropriated to read:
38 For payment of the cost of construction, reconstruction and improve-
39 ments, including the preparation of designs, plans, specifications
40 and estimates related to improvements or changes to existing facili-
41 ties and programs. Upon request of the commissioner of mental health
42 and approval by the director of the budget, this appropriation may
43 be transferred or suballocated to the dormitory authority of the
44 state of New York. Notwithstanding any other provision of law to the
45 contrary, any of the amounts appropriated herein may be increased or
46 decreased by interchange or transfer without limit with any appro-
438 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 priation of the office of mental health capital projects budget,
2 upon the request of the commissioner of mental health and with the
3 approval of the director of the budget, who shall file such approval
4 with the department of audit and control and copies thereof with the
5 chairman of the senate finance committee and the chairman of the
6 assembly ways and means committee (50081308) .......................
7 22,878,000 ....................................... (re. $21,903,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2012, as
9 amended by chapter 54, section 1, of the laws of 2014, is hereby
10 amended and reappropriated to read:
11 For payment of the cost of construction, reconstruction and improve-
12 ments, including the preparation of designs, plans, specifications
13 and estimates related to improvements or changes to existing facili-
14 ties and programs. Upon request of the commissioner of mental health
15 and approval by the director of the budget, this appropriation may
16 be transferred or suballocated to the dormitory authority of the
17 state of New York. Notwithstanding any other provision of law to the
18 contrary, any of the amounts appropriated herein may be increased or
19 decreased by interchange or transfer without limit with any appro-
20 priation of the office of mental health capital projects budget,
21 upon the request of the commissioner of mental health and with the
22 approval of the director of the budget, who shall file such approval
23 with the department of audit and control and copies thereof with the
24 chairman of the senate finance committee and the chairman of the
25 assembly ways and means committee (50081208) .......................
26 36,455,000 ....................................... (re. $22,459,000)
27 The appropriation made by chapter 54, section 1, of the laws of 2011, as
28 amended by chapter 54, section 1, of the laws of 2014, is hereby
29 amended and reappropriated to read:
30 For payment of the cost of construction, reconstruction and improve-
31 ments, including the preparation of designs, plans, specifications
32 and estimates related to improvements or changes to existing facili-
33 ties and programs. Upon request of the commissioner of mental health
34 and approval by the director of the budget, this appropriation may
35 be transferred or suballocated to the dormitory authority of the
36 state of New York. Notwithstanding any other provision of law to the
37 contrary, any of the amounts appropriated herein may be increased or
38 decreased by interchange or transfer without limit with any appro-
39 priation of the office of mental health capital projects budget,
40 upon the request of the commissioner of mental health and with the
41 approval of the director of the budget, who shall file such approval
42 with the department of audit and control and copies thereof with the
43 chairman of the senate finance committee and the chairman of the
44 assembly ways and means committee (50081108) .......................
45 31,784,000 ........................................ (re. $5,266,000)
46 The appropriation made by chapter 54, section 1, of the laws of 2010, is
47 hereby amended and reappropriated to read:
439 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications
3 and estimates related to improvements or changes to existing facili-
4 ties and programs. Upon request of the commissioner of mental health
5 and approval by the director of the budget, this appropriation may
6 be transferred or suballocated to the dormitory authority of the
7 state of New York (50081008) ... 16,937,000 ....... (re. $7,188,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2009, as
9 amended by chapter 54, section 1, of the laws of 2014, is hereby
10 amended and reappropriated to read:
11 For payment of the cost of construction, reconstruction and improve-
12 ments, including the preparation of designs, plans, specifications
13 and estimates related to improvements or changes to existing facili-
14 ties and programs. Upon request of the commissioner of mental health
15 and approval by the director of the budget, this appropriation may
16 be transferred or suballocated to the dormitory authority of the
17 state of New York. Notwithstanding any other provision of law to the
18 contrary, any of the amounts appropriated herein may be increased or
19 decreased by interchange or transfer without limit with any appro-
20 priation of the office of mental health capital projects budget,
21 upon the request of the commissioner of mental health and with the
22 approval of the director of the budget, who shall file such approval
23 with the department of audit and control and copies thereof with the
24 chairman of the senate finance committee and the chairman of the
25 assembly ways and means committee (50080908) .......................
26 85,185,000 ....................................... (re. $20,246,000)
27 The appropriation made by chapter 54, section 1, of the laws of 2008, as
28 amended by chapter 54, section 1, of the laws of 2014, is hereby
29 amended and reappropriated to read:
30 For payment of the cost of construction, reconstruction and improve-
31 ments, including the preparation of designs, plans, specifications
32 and estimates related to improvements or changes to existing facili-
33 ties and programs. Upon request of the commissioner of mental health
34 and approval by the director of the budget, this appropriation may
35 be transferred or suballocated to the dormitory authority of the
36 state of New York. Notwithstanding any other provision of law to the
37 contrary, any of the amounts appropriated herein may be increased or
38 decreased by interchange or transfer without limit with any appro-
39 priation of the office of mental health capital projects budget,
40 upon the request of the commissioner of mental health and with the
41 approval of the director of the budget, who shall file such approval
42 with the department of audit and control and copies thereof with the
43 chairman of the senate finance committee and the chairman of the
44 assembly ways and means committee (50080808) .......................
45 32,952,000 ........................................ (re. $2,755,000)
440 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2007, as
2 amended by chapter 54, section 1, of the laws of 2014, is hereby
3 amended and reappropriated to read:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates related to improvements or changes to existing facili-
7 ties and programs. Upon request of the commissioner of mental health
8 and approval by the director of the budget, this appropriation may
9 be transferred or suballocated to the dormitory authority of the
10 state of New York. Notwithstanding any other provision of law to the
11 contrary, any of the amounts appropriated herein may be increased or
12 decreased by interchange or transfer without limit with any appro-
13 priation of the office of mental health capital projects budget,
14 upon the request of the commissioner of mental health and with the
15 approval of the director of the budget, who shall file such approval
16 with the department of audit and control and copies thereof with the
17 chairman of the senate finance committee and the chairman of the
18 assembly ways and means committee (50080708) .......................
19 46,208,000 .......................................... (re. $347,000)
20 NON-BONDABLE PROJECTS (CCP)
21 Capital Projects Funds - Other
22 Capital Projects Fund
23 Non-Bondable Purpose
24 By chapter 54, section 1, of the laws of 2000:
25 For transfer to the Mental Hygiene Capital Improvement Fund for
26 reimbursement of the non-bondable cost of institutional projects
27 authorized by appropriations or reappropriations funded from the
28 Mental Hygiene Capital Improvement Fund including liabilities
29 incurred prior to April 1, 2000 or for payment to the dormitory
30 authority of the state of New York for defeasance of bonds. Upon
31 request of the commissioner of mental health and approval by the
32 director of the budget, this appropriation may be transferred to the
33 dormitory authority of the state of New York (50FO00NB) ............
34 8,000,000 ......................................... (re. $5,044,000)
35 STATE MENTAL HEALTH FACILITIES (CCP)
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Infrastructure Purpose
39 By chapter 54, section 1, of the laws of 2017:
40 For payment of the cost of land acquisition, construction, recon-
41 struction, rehabilitation and improvements, including the prepara-
42 tion of designs, plans, specifications and estimates, for new,
43 existing, and reappropriated capital projects and programs, includ-
44 ing, but not limited to, preparation of plans, administration, main-
441 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tenance and improvement of existing facilities, new facilities,
2 energy conservation, environmental protection or improvement, health
3 and safety, preservation of facilities, accreditation and program
4 improvement or program changes, maintenance and operation of various
5 facilities and systems including personal services, fringe benefits,
6 and indirect costs; provided, however, that no expenditures may be
7 made from this appropriation until a comprehensive plan of projects
8 has been approved by the director of the budget. Additionally, this
9 appropriation may be used for payment to the design and construction
10 management account of the centralized services fund of the New York
11 state office of general services or to the dormitory authority of
12 the state of New York for the purpose of preparation and review of
13 plans, specifications, estimates, services, construction management
14 and supervision, inspection, studies, appraisals, surveys, testing
15 and environmental impact statements for new, existing and reappro-
16 priated capital projects and programs. Upon request of the commis-
17 sioner of mental health and approval by the director of the budget,
18 this appropriation may be transferred to the dormitory authority of
19 the state of New York. Furthermore, upon approval of the director of
20 the budget, funds from this appropriation may be suballocated or
21 transferred to any department, agency, or public authority
22 (50IS17A4) ... 86,750,000 ........................ (re. $68,019,000)
23 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
24 section 1, of the laws of 2017:
25 For payment of the cost of land acquisition, construction, recon-
26 struction, rehabilitation and improvements, including the prepara-
27 tion of designs, plans, specifications and estimates, for new,
28 existing, and reappropriated capital projects and programs, includ-
29 ing, but not limited to, preparation of plans, administration, main-
30 tenance and improvement of existing facilities, new facilities,
31 energy conservation, environmental protection or improvement, health
32 and safety, preservation of facilities, accreditation and program
33 improvement or program changes; provided, however, that no expendi-
34 tures may be made from this appropriation until a comprehensive plan
35 of projects has been approved by the director of the budget. Addi-
36 tionally, this appropriation may be used for payment to the design
37 and construction management account of the centralized services fund
38 of the New York state office of general services or to the dormitory
39 authority of the state of New York for the purpose of preparation
40 and review of plans, specifications, estimates, services,
41 construction management and supervision, inspection, studies,
42 appraisals, surveys, testing and environmental impact statements for
43 new, existing and reappropriated capital projects and programs.
44 Upon request of the commissioner of mental health and approval by
45 the director of the budget, this appropriation may be transferred to
46 the dormitory authority of the state of New York. Furthermore, upon
47 approval of the director of the budget, funds from this appropri-
48 ation may be transferred to the office for people with developmental
49 disabilities and the office of alcoholism and substance abuse
442 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 services for payment to the dormitory authority of the state of New
2 York in relation to the preparation of plans (50IS16A4) ............
3 84,450,000 ....................................... (re. $34,999,000)
4 By chapter 54, section 1, of the laws of 2015:
5 For payment of the cost of land acquisition, construction, recon-
6 struction, rehabilitation and improvements, including the prepara-
7 tion of designs, plans, specifications and estimates, for new,
8 existing, and reappropriated capital projects and programs, includ-
9 ing, but not limited to, preparation of plans, administration, main-
10 tenance and improvement of existing facilities, new facilities,
11 energy conservation, environmental protection or improvement, health
12 and safety, preservation of facilities, accreditation and program
13 improvement or program changes; provided, however, that no expendi-
14 tures may be made from this appropriation until a comprehensive plan
15 of projects has been approved by the director of the budget. Addi-
16 tionally, this appropriation may be used for payment to the design
17 and construction management account of the centralized services fund
18 of the New York state office of general services or to the dormitory
19 authority of the state of New York for the purpose of preparation
20 and review of plans, specifications, estimates, services,
21 construction management and supervision, inspection, studies,
22 appraisals, surveys, testing and environmental impact statements for
23 new, existing and reappropriated capital projects and programs.
24 Upon request of the commissioner of mental health and approval by
25 the director of the budget, this appropriation may be transferred to
26 the dormitory authority of the state of New York. Furthermore, upon
27 approval of the director of the budget, funds from this appropri-
28 ation may be transferred to the office for people with developmental
29 disabilities and the office of alcoholism and substance abuse
30 services for payment to the dormitory authority of the state of New
31 York in relation to the preparation of plans (50IS15A4) ............
32 35,750,000 ....................................... (re. $23,170,000)
33 By chapter 54, section 1, of the laws of 2014:
34 For payment of the cost of land acquisition, construction, recon-
35 struction, rehabilitation and improvements, including the prepara-
36 tion of designs, plans, specifications and estimates, for new,
37 existing, and reappropriated capital projects and programs, includ-
38 ing, but not limited to, preparation of plans, administration, main-
39 tenance and improvement of existing facilities, new facilities,
40 energy conservation, environmental protection or improvement, health
41 and safety, preservation of facilities, accreditation and program
42 improvement or program changes; provided, however, that no expendi-
43 tures may be made from this appropriation until a comprehensive plan
44 of projects has been approved by the director of the budget. Addi-
45 tionally, this appropriation may be used for payment to the design
46 and construction management account of the centralized services fund
47 of the New York state office of general services or to the dormitory
48 authority of the state of New York for the purpose of preparation
443 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and review of plans, specifications, estimates, services,
2 construction management and supervision, inspection, studies,
3 appraisals, surveys, testing and environmental impact statements for
4 new, existing and reappropriated capital projects and programs.
5 Upon request of the commissioner of mental health and approval by
6 the director of the budget, this appropriation may be transferred to
7 the dormitory authority of the state of New York. Furthermore, upon
8 approval of the director of the budget, funds from this appropri-
9 ation may be transferred to the office for people with developmental
10 disabilities and the office of alcoholism and substance abuse
11 services for payment to the dormitory authority of the state of New
12 York in relation to the preparation of plans (50IS14A4) ............
13 36,950,000 ........................................ (re. $9,306,000)
14 Capital Projects Funds - Other
15 Mental Hygiene Facilities Capital Improvement Fund
16 Infrastructure Purpose
17 By chapter 54, section 1, of the laws of 2017:
18 For payment of the cost of land acquisition, construction, recon-
19 struction, rehabilitation and improvements, including the prepara-
20 tion of designs, plans, specifications and estimates, for new,
21 existing and reappropriated capital projects and programs including,
22 but not limited to, preparation of plans, administration, mainte-
23 nance and improvement of existing facilities, new facilities, energy
24 conservation, environmental protection or improvement, health and
25 safety, preservation of facilities, accreditation and program
26 improvement or program changes; provided, however, that no expendi-
27 tures may be made from this appropriation until a comprehensive plan
28 of projects has been approved by the director of the budget. This
29 appropriation may be used for payment of personal service and
30 nonpersonal service, including fringe benefits, and indirect cost
31 recovery, related to the administration of the capital projects and
32 programs provided by the office of mental health. Additionally,
33 this appropriation may be used for payment to the design and
34 construction management account of the centralized services fund of
35 the New York state office of general services or to the dormitory
36 authority of the state of New York for the purpose of preparation
37 and review of plans, specifications, estimates, services,
38 construction management and supervision, inspection, studies,
39 appraisals, surveys, testing and environmental impact statements for
40 new and existing projects. Upon request of the commissioner of
41 mental health and approval by the director of the budget, this
42 appropriation may be suballocated or transferred to any department,
43 agency, or public authority (50A417A4) .............................
44 275,000,000 ..................................... (re. $275,000,000)
45 The appropriation made by chapter 55, section 1, of the laws of 2016, is
46 hereby amended and reappropriated to read:
444 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the cost of land acquisition, construction, recon-
2 struction, rehabilitation and improvements, including the prepara-
3 tion of designs, plans, specifications and estimates, for new,
4 existing and reappropriated capital projects and programs including,
5 but not limited to, preparation of plans, administration, mainte-
6 nance and improvement of existing facilities, new facilities, energy
7 conservation, environmental protection or improvement, health and
8 safety, preservation of facilities, accreditation and program
9 improvement or program changes; provided, however, that no expendi-
10 tures may be made from this appropriation until a comprehensive plan
11 of projects has been approved by the director of the budget. This
12 appropriation may be used for payment of personal service and
13 nonpersonal service, including fringe benefits, and indirect cost
14 recovery, related to the administration of the capital projects and
15 programs provided by the office of mental health. Additionally,
16 this appropriation may be used for payment to the design and
17 construction management account of the centralized services fund of
18 the New York state office of general services or to the dormitory
19 authority of the state of New York for the purpose of preparation
20 and review of plans, specifications, estimates, services,
21 construction management and supervision, inspection, studies,
22 appraisals, surveys, testing and environmental impact statements for
23 new and existing projects. Upon request of the commissioner of
24 mental health and approval by the director of the budget, this
25 appropriation may be transferred or suballocated to the dormitory
26 authority of the state of New York. Furthermore, upon approval of
27 the director of the budget, funds from this appropriation may be
28 transferred to the office for people with developmental disabilities
29 and the office of alcoholism and substance abuse services for
30 payment to the dormitory authority of the state of New York in
31 relation to the preparation of plans (50A416A4) ....................
32 275,000,000 ..................................... (re. $275,000,000)
33 The appropriation made by chapter 54, section 1, of the laws of 2015, is
34 hereby amended and reappropriated to read:
35 For payment of the cost of land acquisition, construction, recon-
36 struction, rehabilitation and improvements, including the prepara-
37 tion of designs, plans, specifications and estimates, for new,
38 existing and reappropriated capital projects and programs including,
39 but not limited to, preparation of plans, administration, mainte-
40 nance and improvement of existing facilities, new facilities, energy
41 conservation, environmental protection or improvement, health and
42 safety, preservation of facilities, accreditation and program
43 improvement or program changes; provided, however, that no expendi-
44 tures may be made from this appropriation until a comprehensive plan
45 of projects has been approved by the director of the budget. This
46 appropriation may be used for payment of personal service and
47 nonpersonal service, including fringe benefits, and indirect cost
48 recovery, related to the administration of the capital projects and
49 programs provided by the office of mental health. Additionally, this
445 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 appropriation may be used for payment to the design and construction
2 management account of the centralized services fund of the New York
3 state office of general services or to the dormitory authority of
4 the state of New York for the purpose of preparation and review of
5 plans, specifications, estimates, services, construction management
6 and supervision, inspection, studies, appraisals, surveys, testing
7 and environmental impact statements for new and existing projects.
8 Upon request of the commissioner of mental health and approval by
9 the director of the budget, this appropriation may be transferred or
10 suballocated to the dormitory authority of the state of New York.
11 Furthermore, upon approval of the director of the budget, funds from
12 this appropriation may be transferred to the office for people with
13 developmental disabilities and the office of alcoholism and
14 substance abuse services for payment to the dormitory authority of
15 the state of New York in relation to the preparation of plans
16 (50A415A4) ... 275,000,000 ...................... (re. $261,049,000)
17 The appropriation made by chapter 54, section 1, of the laws of 2014, is
18 hereby amended and reappropriated to read:
19 For payment of the cost of land acquisition, construction, recon-
20 struction, rehabilitation and improvements, including the prepara-
21 tion of designs, plans, specifications and estimates, for new,
22 existing and reappropriated capital projects and programs including,
23 but not limited to, preparation of plans, administration, mainte-
24 nance and improvement of existing facilities, new facilities, energy
25 conservation, environmental protection or improvement, health and
26 safety, preservation of facilities, accreditation and program
27 improvement or program changes; provided, however, that no expendi-
28 tures may be made from this appropriation until a comprehensive plan
29 of projects has been approved by the director of the budget. This
30 appropriation may be used for payment of personal service and
31 nonpersonal service, including fringe benefits, and indirect cost
32 recovery, related to the administration of the capital projects and
33 programs provided by the office of mental health. Additionally, this
34 appropriation may be used for payment to the design and construction
35 management account of the centralized services fund of the New York
36 state office of general services or to the dormitory authority of
37 the state of New York for the purpose of preparation and review of
38 plans, specifications, estimates, services, construction management
39 and supervision, inspection, studies, appraisals, surveys, testing
40 and environmental impact statements for new and existing projects.
41 Upon request of the commissioner of mental health and approval by
42 the director of the budget, this appropriation may be transferred or
43 suballocated to the dormitory authority of the state of New York.
44 Furthermore, upon approval of the director of the budget, funds from
45 this appropriation may be transferred to the office for people with
46 developmental disabilities and the office of alcoholism and
47 substance abuse services for payment to the dormitory authority of
48 the state of New York in relation to the preparation of plans
49 (50A414A4) ... 51,493,000 ........................ (re. $21,742,000)
446 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE OF MENTAL HEALTH
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 (APPROPRIATED TO THE FACILITIES DEVELOPMENT CORPORATION)
2 EXECUTIVE DIRECTION (CCP)
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Preservation of Facilities Purpose
6 By chapter 1, section 8, of the laws of 1965, as amended by chapter 54,
7 section 1, of the laws of 2011:
8 (1) The payment of all claims for personal injury, death or property
9 damage for which the New York State Medical Care Facilities Finance
10 Agency or the facilities development corporation or the dormitory
11 authority might be liable occurring upon, in or about any projects
12 covered by the Agreement of Lease entered into by the facilities
13 development corporation, the department of mental hygiene and the
14 New York State Medical Care Facilities Finance Agency under date of
15 October 1, 1987 as from time to time amended and supplemented and
16 any and all penalties, costs, including attorneys' fees, claims,
17 demands and causes of action due directly or indirectly to the use,
18 disuse, misuse or interest in such projects; (2) in the case of
19 damage, loss or destruction of any such project, or any part of any
20 such project, the payment of the costs of repairing, restoring,
21 rebuilding or replacing the same in accordance with the obligations
22 of the facilities development corporation so to do from the proceeds
23 of insurance under the provisions of paragraph (b) of section 3.04
24 of the Agreement of Lease; and (3) payments to the New York State
25 Medical Care Facilities Finance Agency of moneys at the times and in
26 the amounts that annual rentals would be due with respect to each
27 project during such time or times as each such project may be
28 damaged or destroyed and not available for use by the department of
29 mental hygiene in accordance with the terms of the Agreement of
30 Lease.
31 Notwithstanding the provisions of any general or special law, the
32 facilities development corporation may assign to the New York State
33 Medical Care Facilities Finance Agency all or any portion of the
34 moneys hereby appropriated for the purposes hereinabove set forth.
35 Notwithstanding the foregoing, in the event the appropriation is
36 insufficient to cover the losses, upon notification from the Facili-
37 ties Development Corporation, the director of the division of the
38 budget shall submit a request for additional appropriations to cover
39 the additional losses. Upon approval by the director of the budget,
40 funds from this appropriation may be transferred to the office for
41 people with developmental disabilities and the office of alcoholism
42 and substance abuse services for payment to the dormitory authority
43 of the state of New York (00638103) ... 4,000,000 . (re. $2,425,000)
447 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 96,400,000 546,836,000
6 ---------------- ----------------
7 All Funds ........................ 96,400,000 546,836,000
8 ================ ================
9 COMMUNITY AND INSTITUTIONAL SERVICES PROGRAM (CCP) .......... 46,400,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Infrastructure Purpose
14 For acquisition, alterations, improvements,
15 and preservation of various community
16 program and institutional program facili-
17 ties, including, but not limited to, reha-
18 bilitation projects, health and safety
19 projects, fire safety projects and other
20 capital and administrative costs related
21 to this purpose. For state aid, to munici-
22 palities and other public and not-for-pro-
23 fit agencies, including the payment of
24 liabilities incurred prior to April 1,
25 2018 for up to 100 per centum of the net
26 cost of feasibility studies, property
27 options, capital renovations, acquisition
28 of property, construction, rehabilitation
29 and capital costs incidental and appurten-
30 ant to facilities required to be licensed
31 pursuant to article 16, as defined in the
32 mental hygiene law, and for services and
33 expenses related to the maintenance and
34 improvement inclusive of fire safety and
35 life safety upgrades of voluntary not-for-
36 profit provider operated community resi-
37 dential and day service programs and envi-
38 ronmental modifications and adaptive
39 technology services at voluntary not-for-
40 profit provider operated community resi-
41 dential facilities, certified family care
42 homes and private residences, as a loan
43 and/or grant to family care providers, for
44 payment to other public housing agencies,
45 including municipal, county, state and
448 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2018-19
1 federal housing agencies, public benefit
2 corporations or authorities, or private
3 corporations and for capital development,
4 improvements and alterations of residen-
5 tial housing or day program alternatives
6 not currently defined in the mental
7 hygiene law. Notwithstanding section 163
8 of the state finance law, section 142 of
9 the economic development law, and article
10 41 of the mental hygiene law, the commis-
11 sioner of the office for people with
12 developmental disabilities may make the
13 funds appropriated herein available as
14 state aid, a loan or a grant, pursuant to
15 terms and conditions established by the
16 commissioner of the office for people with
17 developmental disabilities, to cover a
18 portion of the development costs of
19 private, public and/or non-profit organ-
20 izations, including corporations and part-
21 nerships established pursuant to the
22 private housing finance law and/or any
23 other statutory provisions. Further, the
24 office for people with developmental disa-
25 bilities shall have a lien on the real
26 property developed with such state aid,
27 loans or grants, which shall be in the
28 amount of the loan or grant, for a maximum
29 term of 30 years, or other longer term
30 consistent with the requirements of anoth-
31 er regulatory agency. Upon request of the
32 commissioner of the office for people with
33 developmental disabilities and approval by
34 the director of the budget, the funds
35 appropriated herein may be suballocated or
36 transferred to any other public housing
37 agencies, including municipal, county,
38 state and federal housing agencies, public
39 benefit corporations or authorities, or
40 private corporations, provided, however,
41 that no expenditures may be made from this
42 appropriation until a comprehensive plan
43 of projects has been approved by the
44 director of the budget (510118A4) ........... 31,400,000
45 Capital Projects Funds - Other
46 Mental Hygiene Facilities Capital Improvement Fund
47 Infrastructure Purpose
449 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2018-19
1 For acquisition, alterations, improvements,
2 and preservation of various community
3 program and institutional program facili-
4 ties, including, but not limited to, reha-
5 bilitation projects, health and safety
6 projects, fire safety projects and other
7 capital and administrative costs related
8 to this purpose. For state aid, to munici-
9 palities and other public and not-for-pro-
10 fit agencies, including the payment of
11 liabilities incurred prior to April 1,
12 2018 for up to 100 per centum of the net
13 cost of feasibility studies, property
14 options, capital renovations, acquisition
15 of property, construction, rehabilitation
16 and capital costs incidental and appurten-
17 ant to facilities required to be licensed
18 pursuant to article 16, as defined in the
19 mental hygiene law, and for services and
20 expenses related to the maintenance and
21 improvement inclusive of fire safety and
22 life safety upgrades of voluntary not-for-
23 profit provider operated community resi-
24 dential and day service programs and envi-
25 ronmental modifications and adaptive
26 technology services at voluntary not-for-
27 profit provider operated community resi-
28 dential facilities, certified family care
29 homes and private residences, as a loan
30 and/or grant to family care providers, for
31 payment to other public housing agencies,
32 including municipal, county, state and
33 federal housing agencies, public benefit
34 corporations or authorities, or private
35 corporations and for capital development,
36 improvements and alterations of residen-
37 tial housing or day program alternatives
38 not currently defined in the mental
39 hygiene law. Notwithstanding section 163
40 of the state finance law, section 142 of
41 the economic development law, and article
42 41 of the mental hygiene law, the commis-
43 sioner of the office for people with
44 developmental disabilities may make the
45 funds appropriated herein available pursu-
46 ant to terms and conditions established by
47 the commissioner of the office for people
48 with developmental disabilities, to cover
49 a portion of the development costs of
50 private, public and/or non-profit organ-
450 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2018-19
1 izations, including corporations and part-
2 nerships established pursuant to the
3 private housing finance law and/or any
4 other statutory provisions, for supportive
5 housing units that have been set aside for
6 individuals with intellectual and develop-
7 mental disabilities. The funds appropri-
8 ated herein may also be made available for
9 the payment to municipalities and other
10 public and not-for-profit community
11 providers approved by the commissioner of
12 the office for people with developmental
13 disabilities, for the acquisition of prop-
14 erty, construction and rehabilitation of
15 supportive housing units for individuals
16 with intellectual and developmental disa-
17 bilities. Further, the office for people
18 with developmental disabilities shall have
19 a lien on the real property developed with
20 such state aid, loans or grants, which
21 shall be in the amount of the loan or
22 grant, for a maximum term of 30 years, or
23 other longer term consistent with the
24 requirements of another regulatory agency.
25 Upon request of the commissioner of the
26 office for people with developmental disa-
27 bilities and approval by the director of
28 the budget, the funds appropriated herein
29 may be suballocated or transferred to any
30 public housing agencies, including munici-
31 pal, county, state or federal agencies,
32 public benefit corporations or authori-
33 ties, or private corporations for the
34 purposes stated above, provided, however,
35 that no expenditures may be made from this
36 appropriation until a comprehensive plan
37 of projects has been approved by the
38 director of the budget (510218A4) ........... 15,000,000
39 DESIGN AND CONSTRUCTION SUPERVISION (CCP) ................... 13,000,000
40 --------------
41 Capital Projects Funds - Other
42 Capital Projects Fund
43 Preparation of Plans Purpose
44 For payment to the design and construction
45 management account of the centralized
46 services fund of the New York state office
47 of general services or to the dormitory
48 authority for the purpose of preparation
451 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2018-19
1 and review of plans, specifications, esti-
2 mates, services, construction management
3 and supervision, inspection, studies,
4 appraisals, surveys, testing and environ-
5 mental impact statements for new and
6 existing projects associated with the
7 community services and institutional
8 services programs. Upon the request of the
9 commissioner of the office for people with
10 developmental disabilities and the
11 approval of the director of the budget,
12 this appropriation may be transferred or
13 suballocated to the dormitory authority of
14 the state of New York. Upon approval by
15 the director of the budget, funds from
16 this appropriation may be transferred to
17 the office of mental health and the office
18 of alcoholism and substance abuse services
19 for payment to the dormitory authority of
20 the state of New York for the preparation
21 of plans purpose (51F21830) .................. 6,000,000
22 Capital Projects Funds - Other
23 Mental Hygiene Facilities Capital Improvement Fund
24 Preparation of Plans Purpose
25 For payment to the design and construction
26 management account of the centralized
27 services fund of the New York state office
28 of general services or to the dormitory
29 authority for the purpose of preparation
30 and review of plans, specifications, esti-
31 mates, services, construction management
32 and supervision, inspection, studies,
33 appraisals, surveys, testing and environ-
34 mental impact statements for new and
35 existing projects associated with the
36 institutional services program and the
37 community services program. Upon the
38 request of the commissioner of the office
39 for people with developmental disabilities
40 and the approval of the director of the
41 budget, this appropriation may be trans-
42 ferred or suballocated to the dormitory
43 authority of the state of New York. Upon
44 approval by the director of the budget,
45 funds from this appropriation may be
46 transferred to the office of mental health
47 and the office of alcoholism and substance
452 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS 2018-19
1 abuse services for payment to the dormito-
2 ry authority of the state of New York for
3 the preparation of plans purpose
4 (51F11830) ................................... 7,000,000
5 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 37,000,000
6 --------------
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Maintenance and Operations Purpose
10 For the maintenance and operation of various
11 facilities and systems including personal
12 services, fringe benefits and indirect
13 costs (51FM18MO) ............................ 37,000,000
453 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 COMMUNITY AND INSTITUTIONAL SERVICES PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Infrastructure Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For acquisition, alterations, improvements, and preservation of vari-
7 ous community program and institutional program facilities, includ-
8 ing, but not limited to, rehabilitation projects, health and safety
9 projects, fire safety projects and other capital and administrative
10 costs related to this purpose. For state aid, to municipalities and
11 other public and not-for-profit agencies, including the payment of
12 liabilities incurred prior to April 1, 2017 for up to 100 per centum
13 of the net cost of feasibility studies, property options, capital
14 renovations, acquisition of property, construction, rehabilitation
15 and capital costs incidental and appurtenant to facilities required
16 to be licensed pursuant to article 16, as defined in the mental
17 hygiene law, and for services and expenses related to the mainte-
18 nance and improvement inclusive of fire safety and life safety
19 upgrades of voluntary not-for-profit provider operated community
20 residential and day service programs and environmental modifications
21 and adaptive technology services at voluntary not-for-profit provid-
22 er operated community residential facilities, certified family care
23 homes and private residences, as a loan and/or grant to family care
24 providers, for payment to other public housing agencies, including
25 municipal, county, state and federal housing agencies, public bene-
26 fit corporations or authorities, or private corporations and for
27 capital development, improvements and alterations of residential
28 housing or day program alternatives not currently defined in the
29 mental hygiene law. Notwithstanding section 163 of the state
30 finance law, section 142 of the economic development law, and arti-
31 cle 41 of the mental hygiene law, the commissioner of the office for
32 people with developmental disabilities may make the funds appropri-
33 ated herein available as state aid, a loan or a grant, pursuant to
34 terms and conditions established by the commissioner of the office
35 for people with developmental disabilities, to cover a portion of
36 the development costs of private, public and/or non-profit organiza-
37 tions, including corporations and partnerships established pursuant
38 to the private housing finance law and/or any other statutory
39 provisions. Further, the office for people with developmental disa-
40 bilities shall have a lien on the real property developed with such
41 state aid, loans or grants, which shall be in the amount of the loan
42 or grant, for a maximum term of 30 years, or other longer term
43 consistent with the requirements of another regulatory agency. Upon
44 request of the commissioner of the office for people with develop-
45 mental disabilities and approval by the director of the budget, the
46 funds appropriated herein may be suballocated or transferred to any
47 other public housing agencies, including municipal, county, state
48 and federal housing agencies, public benefit corporations or author-
454 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ities, or private corporations, provided, however, that no expendi-
2 tures may be made from this appropriation until a comprehensive plan
3 of projects has been approved by the director of the budget
4 (510117A4) ... 21,000,000 ........................ (re. $18,791,000)
5 By chapter 55, section 1, of the laws of 2016:
6 For acquisition, alterations, improvements, and preservation of vari-
7 ous community program and institutional program facilities, includ-
8 ing, but not limited to, rehabilitation projects, health and safety
9 projects, fire safety projects and other capital and administrative
10 costs related to this purpose. For state aid, to municipalities and
11 other public and not-for-profit agencies, including the payment of
12 liabilities incurred prior to April 1, 2016 for up to 100 per centum
13 of the net cost of feasibility studies, property options, capital
14 renovations, acquisition of property, construction, rehabilitation
15 and capital costs incidental and appurtenant to facilities required
16 to be licensed pursuant to article 16, as defined in the mental
17 hygiene law, and for services and expenses related to the mainte-
18 nance and improvement inclusive of fire safety and life safety
19 upgrades of voluntary not-for-profit provider operated community
20 residential and day service programs and environmental modifications
21 and adaptive technology services at voluntary not-for-profit provid-
22 er operated community residential facilities, certified family care
23 homes and private residences, as a loan and/or grant to family care
24 providers, for payment to other state and federal housing agencies,
25 private corporations and for capital development, improvements and
26 alterations of residential housing or day program alternatives not
27 currently defined in the mental hygiene law. Notwithstanding section
28 163 of the state finance law, section 142 of the economic develop-
29 ment law, and article 41 of the mental hygiene law, the commissioner
30 of the office for people with developmental disabilities may make
31 the funds appropriated herein available as state aid, a loan or a
32 grant, pursuant to terms and conditions established by the commis-
33 sioner of the office for people with developmental disabilities, to
34 cover a portion of the development costs of private, public and/or
35 non-profit organizations, including corporations and partnerships
36 established pursuant to the private housing finance law and/or any
37 other statutory provisions, for supportive housing units that have
38 been set aside for individuals with intellectual and developmental
39 disabilities. Further, the office for people with developmental
40 disabilities shall have a lien on the real property developed with
41 such state aid, loans or grants, which shall be in the amount of the
42 loan or grant, for a maximum term of 30 years, or other longer term
43 consistent with the requirements of another regulatory agency. Upon
44 request of the commissioner of the office for people with develop-
45 mental disabilities and approval by the director of the budget, this
46 appropriation may be transferred to the dormitory authority of the
47 state of New York, provided, however, that no expenditures may be
48 made from this appropriation until a comprehensive plan of projects
455 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 has been approved by the director of the budget (510116A4) ...
2 5,000,000 ......................................... (re. $2,048,000)
3 By chapter 54, section 1, of the laws of 2014:
4 For acquisition, alterations, improvements, and preservation of vari-
5 ous community program and institutional program facilities, includ-
6 ing, but not limited to, rehabilitation projects, health and safety
7 projects, fire safety projects and other capital and administrative
8 costs related to this purpose. For state aid, to municipalities and
9 other public and not-for-profit agencies, including the payment of
10 liabilities incurred prior to April 1, 2014 for up to 100 per centum
11 of the net cost of feasibility studies, property options, capital
12 renovations, acquisition of property, construction, rehabilitation
13 and capital costs incidental and appurtenant to facilities required
14 to be licensed pursuant to article 16, as defined in the mental
15 hygiene law, and for services and expenses related to the mainte-
16 nance and improvement inclusive of fire safety and life safety
17 upgrades of voluntary not-for-profit provider operated community
18 residential and day service programs and environmental modifications
19 and adaptive technology services at voluntary not-for-profit provid-
20 er operated community residential facilities, certified family care
21 homes and private residences, as a loan and/or grant to family care
22 providers, for payment to other state and federal housing agencies,
23 private corporations and for capital development, improvements and
24 alterations of residential housing or day program alternatives not
25 currently defined in the mental hygiene law. Upon request of the
26 commissioner of the office for people with developmental disabili-
27 ties and approval by the director of the budget, this appropriation
28 may be transferred to the dormitory authority of the state of New
29 York, provided, however, that no expenditures may be made from this
30 appropriation until a comprehensive plan of projects has been
31 approved by the director of the budget (510114A4) ..................
32 22,910,000 .......................................... (re. $506,000)
33 Capital Projects Funds - Other
34 Mental Hygiene Facilities Capital Improvement Fund
35 Infrastructure Purpose
36 By chapter 54, section 1, of the laws of 2017:
37 For acquisition, alterations, improvements, and preservation of vari-
38 ous community program and institutional program facilities, includ-
39 ing, but not limited to, rehabilitation projects, health and safety
40 projects, fire safety projects and other capital and administrative
41 costs related to this purpose. For state aid, to municipalities and
42 other public and not-for-profit agencies, including the payment of
43 liabilities incurred prior to April 1, 2017 for up to 100 per centum
44 of the net cost of feasibility studies, property options, capital
45 renovations, acquisition of property, construction, rehabilitation
46 and capital costs incidental and appurtenant to facilities required
47 to be licensed pursuant to article 16, as defined in the mental
456 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 hygiene law, and for services and expenses related to the mainte-
2 nance and improvement inclusive of fire safety and life safety
3 upgrades of voluntary not-for-profit provider operated community
4 residential and day service programs and environmental modifications
5 and adaptive technology services at voluntary not-for-profit provid-
6 er operated community residential facilities, certified family care
7 homes and private residences, as a loan and/or grant to family care
8 providers, for payment to other public housing agencies, including
9 municipal, county, state and federal housing agencies, public bene-
10 fit corporations or authorities, or private corporations and for
11 capital development, improvements and alterations of residential
12 housing or day program alternatives not currently defined in the
13 mental hygiene law. Notwithstanding section 163 of the state finance
14 law, section 142 of the economic development law, and article 41 of
15 the mental hygiene law, the commissioner of the office for people
16 with developmental disabilities may make the funds appropriated
17 herein available pursuant to terms and conditions established by the
18 commissioner of the office for people with developmental disabili-
19 ties, to cover a portion of the development costs of private, public
20 and/or nonprofit organizations, including corporations and partner-
21 ships established pursuant to the private housing finance law and/or
22 any other statutory provisions, for supportive housing units that
23 have been set aside for individuals with intellectual and develop-
24 mental disabilities. The funds appropriated herein may also be made
25 available for the payment to municipalities and other public and
26 not-for-profit community providers approved by the commissioner of
27 the office for people with developmental disabilities, for the
28 acquisition of property, construction and rehabilitation of support-
29 ive housing units for individuals with intellectual and develop-
30 mental disabilities. Further, the office for people with develop-
31 mental disabilities shall have a lien on the real property developed
32 with such state aid, loans or grants, which shall be in the amount
33 of the loan or grant, for a maximum term of 30 years, or other long-
34 er term consistent with the requirements of another regulatory agen-
35 cy. Upon request of the commissioner of the office for people with
36 developmental disabilities and approval by the director of the budg-
37 et, the funds appropriated herein may be suballocated or transferred
38 to any public housing agencies, including municipal, county, state
39 or federal agencies, public benefit corporations or authorities, or
40 private corporations for the purposes stated above, provided, howev-
41 er, that no expenditures may be made from this appropriation until a
42 comprehensive plan of projects has been approved by the director of
43 the budget (510217A4) ... 15,000,000 ............. (re. $15,000,000)
44 The appropriation made by chapter 55, section 1, of the laws of 2016, is
45 hereby amended and reappropriated to read:
46 For acquisition, alterations, improvements, and preservation of vari-
47 ous community program and institutional program facilities, includ-
48 ing, but not limited to, rehabilitation projects, health and safety
49 projects, fire safety projects and other capital and administrative
457 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 costs related to this purpose. For state aid, to municipalities and
2 other public and not-for-profit agencies, including the payment of
3 liabilities incurred prior to April 1, 2016 for up to 100 per centum
4 of the net cost of feasibility studies, property options, capital
5 renovations, acquisition of property, construction, rehabilitation
6 and capital costs incidental and appurtenant to facilities required
7 to be licensed pursuant to article 16, as defined in the mental
8 hygiene law, and for services and expenses related to the mainte-
9 nance and improvement inclusive of fire safety and life safety
10 upgrades of voluntary not-for-profit provider operated community
11 residential and day service programs and environmental modifications
12 and adaptive technology services at voluntary not-for-profit provid-
13 er operated community residential facilities, certified family care
14 homes and private residences, as a loan and/or grant to family care
15 providers, for payment to other state and federal housing agencies,
16 private corporations and for capital development, improvements and
17 alterations of residential housing or day program alternatives not
18 currently defined in the mental hygiene law. Notwithstanding section
19 163 of the state finance law, section 142 of the economic develop-
20 ment law, and article 41 of the mental hygiene law, the commissioner
21 of the office for people with developmental disabilities may make
22 the funds appropriated herein available pursuant to terms and condi-
23 tions established by the commissioner of the office for people with
24 developmental disabilities, to cover a portion of the development
25 costs of private, public and/or non-profit organizations, including
26 corporations and partnerships established pursuant to the private
27 housing finance law and/or any other statutory provisions, for
28 supportive housing units that have been set aside for individuals
29 with intellectual and developmental disabilities. The funds appro-
30 priated herein may also be made available for the payment to munici-
31 palities and other public and not-for-profit community providers
32 approved by the commissioner of the office for people with develop-
33 mental disabilities, for the acquisition of property, construction
34 and rehabilitation of supportive housing units for individuals with
35 intellectual and developmental disabilities. Further, the office for
36 people with developmental disabilities shall have a lien on the real
37 property developed with such state aid, loans or grants, which shall
38 be in the amount of the loan or grant, for a maximum term of 30
39 years, or other longer term consistent with the requirements of
40 another regulatory agency. Upon request of the commissioner of the
41 office for people with developmental disabilities and approval by
42 the director of the budget, this appropriation may be suballocated
43 or transferred to the dormitory authority of the state of New York,
44 or the New York state housing finance agency, provided, however,
45 that no expenditures may be made from this appropriation until a
46 comprehensive plan of projects has been approved by the director of
47 the budget (510216A4) ... 10,000,000 .............. (re. $7,865,000)
48 The appropriation made by chapter 54, section 1, of the laws of 2014, is
49 hereby amended and reappropriated to read:
458 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For acquisition, alterations, improvements, and preservation of vari-
2 ous community program and institutional program facilities, includ-
3 ing, but not limited to, rehabilitation projects, health and safety
4 projects, fire safety projects and other capital and administrative
5 costs related to this purpose. For state aid, to municipalities and
6 other public and not-for-profit agencies, including the payment of
7 liabilities incurred prior to April 1, 2014 for up to 100 per centum
8 of the net cost of feasibility studies, property options, capital
9 renovations, acquisition of property, construction, rehabilitation
10 and capital costs incidental and appurtenant to facilities required
11 to be licensed pursuant to article 16, as defined in the mental
12 hygiene law, and for services and expenses related to the mainte-
13 nance and improvement inclusive of fire safety and life safety
14 upgrades of voluntary not-for-profit provider operated community
15 residential and day service programs and environmental modifications
16 and adaptive technology services at voluntary not-for-profit provid-
17 er operated community residential facilities, certified family care
18 homes and private residences, as a loan and/or grant to family care
19 providers, for payment to other state and federal housing agencies,
20 private corporations and for capital development, improvements and
21 alterations of residential housing or day program alternatives not
22 currently defined in the mental hygiene law. Upon request of the
23 commissioner of the office for people with developmental disabili-
24 ties and approval by the director of the budget, this appropriation
25 may be suballocated or transferred to the dormitory authority of the
26 state of New York, provided, however, that no expenditures may be
27 made from this appropriation until a comprehensive plan of projects
28 has been approved by the director of the budget (510214A4) .........
29 10,000,000 ....................................... (re. $10,000,000)
30 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
31 Capital Projects Funds - Other
32 Capital Projects Fund
33 Preparation of Plans Purpose
34 By chapter 54, section 1, of the laws of 2017:
35 For payment to the design and construction management account of the
36 centralized services fund of the New York state office of general
37 services or to the dormitory authority for the purpose of prepara-
38 tion and review of plans, specifications, estimates, services,
39 construction management and supervision, inspection, studies,
40 appraisals, surveys, testing and environmental impact statements for
41 new and existing projects associated with the community services and
42 institutional services programs. Upon the request of the commission-
43 er of the office for people with developmental disabilities and the
44 approval of the director of the budget, this appropriation may be
45 transferred to the dormitory authority of the state of New York.
46 Upon approval by the director of the budget, funds from this appro-
47 priation may be transferred to the office of mental health and the
459 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 office of alcoholism and substance abuse services for payment to the
2 dormitory authority of the state of New York for the preparation of
3 plans purpose (51F21730) ... 6,000,000 ............ (re. $4,712,000)
4 By chapter 54, section 1, of the laws of 2014:
5 For: (1) the payment of all claims for personal injury, death or prop-
6 erty damage for which the New York State Medical Care Facilities
7 Finance Agency, the facilities development corporation, or the
8 dormitory authority of the state of New York might be liable occur-
9 ring upon, in or about any projects covered by the Agreement of
10 Lease entered into by the facilities development corporation, the
11 department of mental hygiene and the New York State Medical Care
12 Facilities Finance Agency under date of October 1, 1987 as from time
13 to time amended and supplemented and any and all penalties, costs,
14 including attorneys' fees, claims, demands and causes of action due
15 directly or indirectly to the use, disuse, misuse or interest in
16 such projects; (2) in the case of damage, loss or destruction of any
17 such project, or any part of any such project, the payment of the
18 costs of repairing, restoring, rebuilding or replacing the same in
19 accordance with the obligations of the facilities development corpo-
20 ration so to do from the proceeds of insurance under the provisions
21 of paragraph (b) of section 3.04 of the Agreement of Lease; and (3)
22 payments to the New York State Medical Care Facilities Finance Agen-
23 cy of moneys at the times and in the amounts that annual rentals
24 would be due with respect to each project during such time or times
25 as each such project may be damaged or destroyed and not available
26 for use by the department of mental hygiene in accordance with the
27 terms of the Agreement of Lease.
28 Notwithstanding the provisions of any general or special law, the
29 facilities development corporation may assign to the New York State
30 Medical Care Facilities Finance Agency all or any portion of the
31 moneys hereby appropriated for the purposes hereinabove set forth.
32 Notwithstanding the foregoing, in the event the appropriation is
33 insufficient to cover the losses, upon notification from the facili-
34 ties development corporation, the director of the budget shall
35 submit a request for additional appropriations to cover the addi-
36 tional losses. Upon approval by the director of the budget, funds
37 from this appropriation may be transferred to the office of mental
38 health and the office of alcoholism and substance abuse services for
39 payment to the dormitory authority of the state of New York for the
40 preparation of plans purpose (51WC1430) ............................
41 2,000,000 ......................................... (re. $2,000,000)
42 By chapter 54, section 1, of the laws of 2013:
43 For: (1) the payment of all claims for personal injury, death or prop-
44 erty damage for which the New York State Medical Care Facilities
45 Finance Agency, the facilities development corporation, or the
46 dormitory authority of the state of New York might be liable occur-
47 ring upon, in or about any projects covered by the Agreement of
48 Lease entered into by the facilities development corporation, the
460 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 department of mental hygiene and the New York State Medical Care
2 Facilities Finance Agency under date of October 1, 1987 as from time
3 to time amended and supplemented and any and all penalties, costs,
4 including attorneys' fees, claims, demands and causes of action due
5 directly or indirectly to the use, disuse, misuse or interest in
6 such projects; (2) in the case of damage, loss or destruction of any
7 such project, or any part of any such project, the payment of the
8 costs of repairing, restoring, rebuilding or replacing the same in
9 accordance with the obligations of the facilities development corpo-
10 ration so to do from the proceeds of insurance under the provisions
11 of paragraph (b) of section 3.04 of the Agreement of Lease; and (3)
12 payments to the New York State Medical Care Facilities Finance Agen-
13 cy of moneys at the times and in the amounts that annual rentals
14 would be due with respect to each project during such time or times
15 as each such project may be damaged or destroyed and not available
16 for use by the department of mental hygiene in accordance with the
17 terms of the Agreement of Lease.
18 Notwithstanding the provisions of any general or special law, the
19 facilities development corporation may assign to the New York State
20 Medical Care Facilities Finance Agency all or any portion of the
21 moneys hereby appropriated for the purposes hereinabove set forth.
22 Notwithstanding the foregoing, in the event the appropriation is
23 insufficient to cover the losses, upon notification from the facili-
24 ties development corporation, the director of the budget shall
25 submit a request for additional appropriations to cover the addi-
26 tional losses. Upon approval by the director of the budget, funds
27 from this appropriation may be transferred to the office of mental
28 health and the office of alcoholism and substance abuse services for
29 payment to the dormitory authority of the state of New York for the
30 preparation of plans purpose (51WC1330) ............................
31 2,000,000 ......................................... (re. $2,000,000)
32 By chapter 54, section 1, of the laws of 2012:
33 For: (1) the payment of all claims for personal injury, death or prop-
34 erty damage for which the New York State Medical Care Facilities
35 Finance Agency, the facilities development corporation, or the
36 dormitory authority of the state of New York might be liable occur-
37 ring upon, in or about any projects covered by the Agreement of
38 Lease entered into by the facilities development corporation, the
39 department of mental hygiene and the New York State Medical Care
40 Facilities Finance Agency under date of October 1, 1987 as from time
41 to time amended and supplemented and any and all penalties, costs,
42 including attorneys' fees, claims, demands and causes of action due
43 directly or indirectly to the use, disuse, misuse or interest in
44 such projects; (2) in the case of damage, loss or destruction of any
45 such project, or any part of any such project, the payment of the
46 costs of repairing, restoring, rebuilding or replacing the same in
47 accordance with the obligations of the facilities development corpo-
48 ration so to do from the proceeds of insurance under the provisions
49 of paragraph (b) of section 3.04 of the Agreement of Lease; and (3)
461 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 payments to the New York State Medical Care Facilities Finance Agen-
2 cy of moneys at the times and in the amounts that annual rentals
3 would be due with respect to each project during such time or times
4 as each such project may be damaged or destroyed and not available
5 for use by the department of mental hygiene in accordance with the
6 terms of the Agreement of Lease.
7 Notwithstanding the provisions of any general or special law, the
8 facilities development corporation may assign to the New York State
9 Medical Care Facilities Finance Agency all or any portion of the
10 moneys hereby appropriated for the purposes hereinabove set forth.
11 Notwithstanding the foregoing, in the event the appropriation is
12 insufficient to cover the losses, upon notification from the facili-
13 ties development corporation, the director of the budget shall
14 submit a request for additional appropriations to cover the addi-
15 tional losses. Upon approval by the director of the budget, funds
16 from this appropriation may be transferred to the office of mental
17 health and the office of alcoholism and substance abuse services for
18 payment to the dormitory authority of the state of New York for the
19 preparation of plans purpose (51WC1230) ............................
20 2,000,000 ......................................... (re. $2,000,000)
21 Capital Projects Funds - Other
22 Mental Hygiene Facilities Capital Improvement Fund
23 Preparation of Plans Purpose
24 The appropriation made by chapter 54, section 1, of the laws of 2017, is
25 hereby amended and reappropriated to read:
26 For payment to the design and construction management account of the
27 centralized services fund of the New York state office of general
28 services or to the dormitory authority for the purpose of prepara-
29 tion and review of plans, specifications, estimates, services,
30 construction management and supervision, inspection, studies,
31 appraisals, surveys, testing and environmental impact statements for
32 new and existing projects associated with the institutional services
33 program and the community services program. Upon the request of the
34 commissioner of the office for people with developmental disabili-
35 ties and the approval of the director of the budget, this appropri-
36 ation may be suballocated or transferred to the dormitory authority
37 of the state of New York. Upon approval by the director of the budg-
38 et, funds from this appropriation may be transferred to the office
39 of mental health and the office of alcoholism and substance abuse
40 services for payment to the dormitory authority of the state of New
41 York for the preparation of plans purpose (51F11730) ...............
42 7,000,000 ......................................... (re. $7,000,000)
43 The appropriation made by chapter 55, section 1, of the laws of 2016, is
44 hereby amended and reappropriated to read:
45 For payment to the design and construction management account of the
46 centralized services fund of the New York state office of general
47 services or to the dormitory authority for the purpose of prepara-
462 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion and review of plans, specifications, estimates, services,
2 construction management and supervision, inspection, studies,
3 appraisals, surveys, testing and environmental impact statements for
4 new and existing projects associated with the institutional services
5 program and the community services program. Upon the request of the
6 commissioner of the office for people with developmental disabili-
7 ties and the approval of the director of the budget, this appropri-
8 ation may be suballocated or transferred to the dormitory authority
9 of the state of New York. Upon approval by the director of the budg-
10 et, funds from this appropriation may be transferred to the office
11 of mental health and the office of alcoholism and substance abuse
12 services for payment to the dormitory authority of the state of New
13 York for the preparation of plans purpose (51F11630) ...............
14 7,000,000 ......................................... (re. $7,000,000)
15 The appropriation made by chapter 54, section 1, of the laws of 2015, is
16 hereby amended and reappropriated to read:
17 For payment to the design and construction management account of the
18 centralized services fund of the New York state office of general
19 services or to the dormitory authority for the purpose of prepara-
20 tion and review of plans, specifications, estimates, services,
21 construction management and supervision, inspection, studies,
22 appraisals, surveys, testing and environmental impact statements for
23 new and existing projects associated with the institutional services
24 program and the community services program. Upon the request of the
25 commissioner of the office for people with developmental disabili-
26 ties and the approval of the director of the budget, this appropri-
27 ation may be suballocated or transferred to the dormitory author ity
28 of the state of New York. Upon approval by the director of the budg-
29 et, funds from this appropriation may be transferred to the office
30 of mental health and the office of alcoholism and substance abuse
31 services for payment to the dormitory authority of the state of New
32 York for the preparation of plans purpose (51F11530) ...............
33 7,000,000 ......................................... (re. $1,134,000)
34 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Maintenance and Operations Purpose
38 By chapter 54, section 1, of the laws of 2017:
39 For the maintenance and operation of various facilities and systems
40 including personal services, fringe benefits and indirect costs
41 (51FM17MO) ... 37,000,000 ........................ (re. $25,015,000)
42 INSTITUTIONAL SERVICES PROGRAM (CCP)
43 Capital Projects Funds - Other
44 Capital Projects Fund
463 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Health and Safety Purpose
2 By chapter 54, section 1, of the laws of 2013:
3 For alterations and improvements for health and safety projects at
4 various facilities. Upon request of the commissioner of the office
5 for people with developmental disabilities and approval by the
6 director of the budget, this appropriation may be transferred to the
7 dormitory authority of the state of New York, provided, however,
8 that no expenditures may be made from this appropriation until a
9 comprehensive plan of projects has been approved by the director of
10 the budget (51H11301) ... 5,000,000 ............... (re. $5,000,000)
11 By chapter 54, section 1, of the laws of 2012:
12 For alterations and improvements for health and safety projects at
13 various facilities. Upon request of the commissioner of the office
14 for people with developmental disabilities and approval by the
15 director of the budget, this appropriation may be transferred to the
16 dormitory authority of the state of New York, provided, however,
17 that no expenditures may be made from this appropriation until a
18 comprehensive plan of projects has been approved by the director of
19 the budget (51H11201) ... 3,447,000 ............... (re. $1,463,000)
20 By chapter 54, section 1, of the laws of 2011:
21 For alterations and improvements for health and safety projects at
22 various facilities. Upon request of the commissioner of the office
23 for people with developmental disabilities and approval by the
24 director of the budget, this appropriation may be transferred to the
25 dormitory authority of the state of New York (51H11101) ............
26 7,700,000 ......................................... (re. $3,172,000)
27 By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
28 section 1, of the laws of 2011:
29 For alterations and improvements for health and safety projects at
30 various facilities. Upon request of the commissioner of the office
31 for people with developmental disabilities and approval by the
32 director of the budget, this appropriation may be transferred to the
33 dormitory authority of the state of New York (51H11001) ............
34 7,600,000 ........................................... (re. $677,000)
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Preservation of Facilities Purpose
38 By chapter 54, section 1, of the laws of 2013:
39 For alterations and improvements for preservation of various facili-
40 ties including rehabilitation projects. This appropriation may be
41 used for the cost of potential claims against contracts awarded by
42 the dormitory authority of the state of New York. Upon request of
43 the commissioner of the office for people with developmental disa-
44 bilities and approval by the director of the budget, this appropri-
464 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ation may be transferred to the dormitory authority of the state of
2 New York, provided, however, that no expenditures may be made from
3 this appropriation until a comprehensive plan of projects has been
4 approved by the director of the budget (51P11303) ..................
5 5,100,000 ......................................... (re. $5,100,000)
6 For minor maintenance, preservation and alterations of facilities on
7 the grounds of former developmental centers. Upon request of the
8 commissioner of the office for people with developmental disabili-
9 ties and approval by the director of the budget, this appropriation
10 may be transferred to the dormitory authority of the state of New
11 York, provided, however, that no expenditures may be made from this
12 appropriation until a comprehensive plan of projects has been
13 approved by the director of the budget (51M21303) ..................
14 5,600,000 ......................................... (re. $4,441,000)
15 By chapter 54, section 1, of the laws of 2012:
16 For alterations and improvements for preservation of various facili-
17 ties including rehabilitation projects. This appropriation may be
18 used for the cost of potential claims against contracts awarded by
19 the dormitory authority of the state of New York. Upon request of
20 the commissioner of the office for people with developmental disa-
21 bilities and approval by the director of the budget, this appropri-
22 ation may be transferred to the dormitory authority of the state of
23 New York, provided, however, that no expenditures may be made from
24 this appropriation until a comprehensive plan of projects has been
25 approved by the director of the budget (51P11203) ..................
26 5,035,000 ......................................... (re. $4,929,000)
27 For minor maintenance, preservation and alterations of facilities on
28 the grounds of former developmental centers. Upon request of the
29 commissioner of the office for people with developmental disabili-
30 ties and approval by the director of the budget, this appropriation
31 may be transferred to the dormitory authority of the state of New
32 York, provided, however, that no expenditures may be made from this
33 appropriation until a comprehensive plan of projects has been
34 approved by the director of the budget (51M21203) ..................
35 5,400,000 ......................................... (re. $3,270,000)
36 By chapter 54, section 1, of the laws of 2011:
37 For alterations and improvements for preservation of various facili-
38 ties including rehabilitation projects. This appropriation may be
39 used for the cost of potential claims against contracts awarded by
40 the dormitory authority of the state of New York. Upon request of
41 the commissioner of the office for people with developmental disa-
42 bilities and approval by the director of the budget, this appropri-
43 ation may be transferred to the dormitory authority of the state of
44 New York (51P11103) ... 4,835,000 ................... (re. $471,000)
45 For minor maintenance, preservation and alterations of facilities on
46 the grounds of former developmental centers. Upon request of the
47 commissioner of the office for people with developmental disabili-
48 ties and approval by the director of the budget, this appropriation
465 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 may be transferred to the dormitory authority of the state of New
2 York (51M21103) ... 5,000,000 ..................... (re. $4,941,000)
3 By chapter 54, section 1, of the laws of 2010, as amended by chapter 54,
4 section 1, of the laws of 2011:
5 For minor maintenance, preservation and alterations of facilities on
6 the grounds of former developmental centers. Upon request of the
7 commissioner of the office for people with developmental disabili-
8 ties and approval by the director of the budget, this appropriation
9 may be transferred to the dormitory authority of the state of New
10 York (51M21003) ... 4,500,000 ....................... (re. $806,000)
11 By chapter 54, section 1, of the laws of 2009, as amended by chapter 54,
12 section 1, of the laws of 2011:
13 For alterations and improvements for preservation of various facili-
14 ties including rehabilitation projects. This appropriation may be
15 used for the cost of potential claims against contracts awarded by
16 the dormitory authority of the state of New York. Upon request of
17 the commissioner of the office for people with developmental disa-
18 bilities and approval by the director of the budget, this appropri-
19 ation may be transferred to the dormitory authority of the state of
20 New York (51P10903) ... 4,420,000 ................... (re. $449,000)
21 By chapter 54, section 1, of the laws of 2008, as amended by chapter 54,
22 section 1, of the laws of 2011:
23 For alterations and improvements for preservation of various facili-
24 ties including rehabilitation projects. This appropriation may be
25 used for the cost of potential claims against contracts awarded by
26 the dormitory authority of the state of New York. Upon request of
27 the commissioner of the office for people with developmental disa-
28 bilities and approval by the director of the budget, this appropri-
29 ation may be transferred to the dormitory authority of the state of
30 New York (51P10803) ... 7,600,000 ................... (re. $569,000)
31 Capital Projects Funds - Other
32 Mental Hygiene Facilities Capital Improvement Fund
33 Health and Safety Purpose
34 The appropriation made by chapter 54, section 1, of the laws of 2013, is
35 hereby amended and reappropriated to read:
36 For alterations and improvements for health and safety projects at
37 various facilities. This appropriation may be used for the cost of
38 potential claims against contracts awarded by the dormitory authori-
39 ty of the state of New York. Upon request of the commissioner of the
40 office for people with developmental disabilities and approval by
41 the director of the budget, this appropriation may be suballocated
42 or transferred to the dormitory authority of the state of New York,
43 provided, however, that no expenditures may be made from this appro-
44 priation until a comprehensive plan of projects has been approved by
466 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the director of the budget (51H31301) ..............................
2 42,000,000 ....................................... (re. $42,000,000)
3 The appropriation made by chapter 54, section 1, of the laws of 2012, is
4 hereby amended and reappropriated to read:
5 For alterations and improvements for health and safety projects at
6 various facilities. This appropriation may be used for the cost of
7 potential claims against contracts awarded by the dormitory authori-
8 ty of the state of New York. Upon request of the commissioner of the
9 office for people with developmental disabilities and approval by
10 the director of the budget, this appropriation may be suballocated
11 or transferred to the dormitory authority of the state of New York,
12 provided, however, that no expenditures may be made from this appro-
13 priation until a comprehensive plan of projects has been approved by
14 the director of the budget (51H31201) ..............................
15 28,830,000 ....................................... (re. $28,830,000)
16 The appropriation made by chapter 54, section 1, of the laws of 2011, is
17 hereby amended and reappropriated to read:
18 For alterations and improvements for health and safety projects at
19 various facilities. This appropriation may be used for the cost of
20 potential claims against contracts awarded by the dormitory authori-
21 ty of the state of New York. Upon request of the commissioner of the
22 office for people with developmental disabilities and approval by
23 the director of the budget, this appropriation may be suballocated
24 or transferred to the dormitory authority of the state of New York
25 (51H31101) ... 44,855,000 ........................ (re. $44,855,000)
26 The appropriation made by chapter 54, section 1, of the laws of 2010, as
27 amended by chapter 54, section 1, of the laws of 2011, is hereby
28 amended and reappropriated to read:
29 For alterations and improvements for health and safety projects at
30 various facilities. This appropriation may be used for the cost of
31 potential claims against contracts awarded by the dormitory authori-
32 ty of the state of New York. Upon request of the commissioner of the
33 office for people with developmental disabilities and approval by
34 the director of the budget, this appropriation may be suballocated
35 or transferred to the dormitory authority of the state of New York
36 (51H31001) ... 40,500,000 ........................ (re. $32,882,000)
37 The appropriation made by chapter 54, section 1, of the laws of 2008, as
38 amended by chapter 54, section 1, of the laws of 2011, is hereby
39 amended and reappropriated to read:
40 For alterations and improvements for health and safety projects at
41 various facilities. This appropriation may be used for the cost of
42 potential claims against contracts awarded by the dormitory authori-
43 ty of the state of New York. Upon request of the commissioner of the
44 office for people with developmental disabilities and approval by
45 the director of the budget, this appropriation may be suballocated
467 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 or transferred to the dormitory authority of the state of New York
2 (51H30801) ... 33,200,000 ........................ (re. $10,200,000)
3 The appropriation made by chapter 54, section 1, of the laws of 2007, as
4 amended by chapter 54, section 1, of the laws of 2011, is hereby
5 amended and reappropriated to read:
6 For alterations and improvements for health and safety projects at
7 various facilities. This appropriation may be used for the cost of
8 potential claims against contracts awarded by the dormitory authori-
9 ty of the state of New York. Upon request of the commissioner of the
10 office for people with developmental disabilities and approval by
11 the director of the budget, this appropriation may be suballocated
12 or transferred to the dormitory authority of the state of New York
13 (51H30701) ... 32,290,000 ......................... (re. $6,579,000)
14 The appropriation made by chapter 54, section 1, of the laws of 2006, as
15 amended by chapter 54, section 1, of the laws of 2011, is hereby
16 amended and reappropriated to read:
17 For alterations and improvements for health and safety projects at
18 various facilities. This appropriation may be used for the cost of
19 potential claims against contracts awarded by the dormitory authori-
20 ty of the state of New York. Upon request of the commissioner of the
21 office for people with developmental disabilities and approval by
22 the director of the budget, this appropriation may be suballocated
23 or transferred to the dormitory authority of the state of New York
24 (51H30601) ... 32,143,000 ......................... (re. $4,746,000)
25 NON-BONDABLE PROJECTS (CCP)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Non-Bondable Purpose
29 By chapter 54, section 1, of the laws of 2014:
30 For transfer to the mental hygiene capital improvement fund for
31 reimbursement of non-bondable costs of projects authorized by appro-
32 priations or reappropriations funded from the mental hygiene capital
33 improvement fund including liabilities incurred prior to April 1,
34 2014 or for payment to the dormitory authority of the state of New
35 York for defeasance of bonds. Upon request of the commissioner of
36 the office for people with developmental disabilities and approval
37 by the director of the budget, this appropriation may be transferred
38 to the dormitory authority of the state of New York (51FL14NB) .....
39 1,000,000 ........................................... (re. $954,000)
40 STATE-OPERATED COMMUNITY SERVICES PROGRAM (CCP)
41 Capital Projects Funds - Other
42 Capital Projects Fund
43 Administration Purpose
468 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 For payment of personal service and non-personal service costs related
3 to the administration of capital projects for new and reappropriated
4 appropriations. Upon request of the commissioner of the office for
5 people with developmental disabilities and approval by the director
6 of the budget, this appropriation may be transferred to the dormito-
7 ry authority of the state of New York, provided, however, that no
8 expenditures may be made from this appropriation until a comprehen-
9 sive plan of projects has been approved by the director of the budg-
10 et (51A113C1) ... 3,250,000 ......................... (re. $244,000)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 New Facilities Purpose
14 By chapter 54, section 1, of the laws of 2013:
15 For alterations and improvements of sites leased for state-operated
16 programs, and for the purchase of furniture and equipment for state-
17 operated programs. Upon request of the commissioner of the office
18 for people with developmental disabilities and approval by the
19 director of the budget, this appropriation may be transferred to the
20 dormitory authority of the state of New York, provided, however,
21 that no expenditures may be made from this appropriation until a
22 comprehensive plan of projects has been approved by the director of
23 the budget (51L11307) ... 4,700,000 ............... (re. $4,696,000)
24 By chapter 54, section 1, of the laws of 2012:
25 For alterations and improvements of sites leased for state-operated
26 programs, and for the purchase of furniture and equipment for state-
27 operated programs. Upon request of the commissioner of the office
28 for people with developmental disabilities and approval by the
29 director of the budget, this appropriation may be transferred to the
30 dormitory authority of the state of New York, provided, however,
31 that no expenditures may be made from this appropriation until a
32 comprehensive plan of projects has been approved by the director of
33 the budget (51L11207) ... 4,600,000 ............... (re. $4,176,000)
34 By chapter 54, section 1, of the laws of 2011:
35 For alterations and improvements of sites leased for state-operated
36 programs, and for the purchase of furniture and equipment for state-
37 operated programs. Upon request of the commissioner of the office
38 for people with developmental disabilities and approval by the
39 director of the budget, this appropriation may be transferred to the
40 dormitory authority of the state of New York (51L11107) ............
41 4,700,000 ............................................ (re. $14,000)
42 Capital Projects Funds - Other
43 Mental Hygiene Facilities Capital Improvement Fund
44 Fire Safety Purpose
469 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2013, is
2 hereby amended and reappropriated to read:
3 For alterations and improvements for fire safety and life safety
4 upgrades of state-owned community residential and day program facil-
5 ities for persons with developmental disabilities. Upon request of
6 the commissioner of the office for people with developmental disa-
7 bilities and approval by the director of the budget, this appropri-
8 ation may be suballocated or transferred to the dormitory authority
9 of the state of New York, provided, however, that no expenditures
10 may be made from this appropriation until a comprehensive plan of
11 projects has been approved by the director of the budget (51FS13F3)
12 ... 16,000,000 ................................... (re. $16,000,000)
13 The appropriation made by chapter 54, section 1, of the laws of 2012, is
14 hereby amended and reappropriated to read:
15 For alterations and improvements for fire safety and life safety
16 upgrades of state-owned community residential and day program facil-
17 ities for persons with developmental disabilities. Upon request of
18 the commissioner of the office for people with developmental disa-
19 bilities and approval by the director of the budget, this appropri-
20 ation may be suballocated or transferred to the dormitory authority
21 of the state of New York, provided, however, that no expenditures
22 may be made from this appropriation until a comprehensive plan of
23 projects has been approved by the director of the budget (51FS12F3)
24 .. 24,500,000 .................................... (re. $22,839,000)
25 Capital Projects Funds - Other
26 Mental Hygiene Facilities Capital Improvement Fund
27 New Facilities Purpose
28 The appropriation made by chapter 54, section 1, of the laws of 2011, is
29 hereby amended and reappropriated to read:
30 For the acquisition and alterations and improvements of property to be
31 used as state-operated community residential facilities. Upon
32 request of the commissioner of the office for people with develop-
33 mental disabilities and approval by the director of the budget, this
34 appropriation may be suballocated or transferred to the dormitory
35 authority of the state of New York. Upon request of the commissioner
36 of the office for people with developmental disabilities, and
37 approval by the director of the budget, this appropriation may be
38 used for the acquisition and alterations and improvements of proper-
39 ty to be used as not-for-profit facilities licensed pursuant to
40 articles 16 and 41 of the mental hygiene law (51R11107) ............
41 31,000,000 ....................................... (re. $31,000,000)
42 The appropriation made by chapter 54, section 1, of the laws of 2010, as
43 amended by chapter 54, section 1, of the laws of 2011, is hereby
44 amended and reappropriated to read:
45 For the acquisition and alterations and improvements of property to be
46 used as state-operated community residential facilities. Upon
470 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 request of the commissioner of the office for people with develop-
2 mental disabilities and approval by the director of the budget, this
3 appropriation may be suballocated or transferred to the dormitory
4 authority of the state of New York. Upon request of the commissioner
5 of the office for people with developmental disabilities, and
6 approval by the director of the budget, this appropriation may be
7 used for the acquisition and alterations and improvements of proper-
8 ty to be used as not-for-profit facilities licensed pursuant to
9 articles 16 and 41 of the mental hygiene law (51R11007) ............
10 28,325,000 ....................................... (re. $28,325,000)
11 The appropriation made by chapter 54, section 1, of the laws of 2009, as
12 amended by chapter 54, section 1, of the laws of 2011, is hereby
13 amended and reappropriated to read:
14 For the acquisition and alterations and improvements of property to be
15 used as state-operated community residential facilities. Upon
16 request of the commissioner of the office for people with develop-
17 mental disabilities and approval by the director of the budget, this
18 appropriation may be suballocated or transferred to the dormitory
19 authority of the state of New York. Upon request of the commissioner
20 of the office for people with developmental disabilities, and
21 approval by the director of the budget, this appropriation may be
22 used for the acquisition and alterations and improvements of proper-
23 ty to be used as not-for-profit facilities licensed pursuant to
24 articles 16 and 41 of the mental hygiene law (51R10907) ............
25 14,675,000 ........................................ (re. $6,977,000)
26 The appropriation made by chapter 54, section 1, of the laws of 2008, as
27 amended by chapter 54, section 1, of the laws of 2011, is hereby
28 amended and reappropriated to read:
29 For the acquisition and alterations and improvements of property to be
30 used as state-operated community residential facilities. Upon
31 request of the commissioner of the office for people with develop-
32 mental disabilities and approval by the director of the budget, this
33 appropriation may be suballocated or transferred to the dormitory
34 authority of the state of New York. Upon request of the commissioner
35 of the office for people with developmental disabilities, and
36 approval by the director of the budget, this appropriation may be
37 used for the acquisition and alterations and improvements of proper-
38 ty to be used as not-for-profit facilities licensed pursuant to
39 articles 16 and 41 of the mental hygiene law (51R10807) ............
40 24,575,000 ........................................ (re. $4,961,000)
41 Capital Projects Funds - Other
42 Mental Hygiene Facilities Capital Improvement Fund
43 Preservation of Facilities Purpose
44 The appropriation made by chapter 54, section 1, of the laws of 2013, is
45 hereby amended and reappropriated to read:
471 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For renovation and minor rehabilitation and improvements of state-
2 owned community residential and day program facilities for persons
3 with developmental disabilities. Upon request of the commissioner of
4 the office for people with developmental disabilities and approval
5 by the director of the budget, this appropriation may be suballo-
6 cated or transferred to the dormitory authority of the state of New
7 York, provided, however, that no expenditures may be made from this
8 appropriation until a comprehensive plan of projects has been
9 approved by the director of the budget (51PR1303) ..................
10 1,000,000 ......................................... (re. $1,000,000)
11 The appropriation made by chapter 54, section 1, of the laws of 2012, is
12 hereby amended and reappropriated to read:
13 For renovation and minor rehabilitation and improvements of state-
14 owned community residential and day program facilities for persons
15 with developmental disabilities. Upon request of the commissioner of
16 the office for people with developmental disabilities and approval
17 by the director of the budget, this appropriation may be suballo-
18 cated or transferred to the dormitory authority of the state of New
19 York, provided, however, that no expenditures may be made from this
20 appropriation until a comprehensive plan of projects has been
21 approved by the director of the budget (51PR1203) ..................
22 1,000,000 ......................................... (re. $1,000,000)
23 The appropriation made by chapter 54, section 1, of the laws of 2011, is
24 hereby amended and reappropriated to read:
25 For renovation and minor rehabilitation and improvements of state-
26 owned community residential and day program facilities for persons
27 with developmental disabilities. Upon request of the commissioner of
28 the office for people with developmental disabilities and approval
29 by the director of the budget, this appropriation may be suballo-
30 cated or transferred to the dormitory authority of the state of New
31 York (51PR1103) ... 1,000,000 ....................... (re. $357,000)
32 The appropriation made by chapter 54, section 1, of the laws of 2010, as
33 amended by chapter 54, section 1, of the laws of 2011, is hereby
34 amended and reappropriated to read:
35 For renovation and minor rehabilitation and improvements of state-
36 owned community residential and day program facilities for persons
37 with developmental disabilities. Upon request of the commissioner of
38 the office for people with developmental disabilities and approval
39 by the director of the budget, this appropriation may be suballo-
40 cated or transferred to the dormitory authority of the state of New
41 York (51PR1003) ... 1,000,000 ....................... (re. $235,000)
42 The appropriation made by chapter 54, section 1, of the laws of 2009, as
43 amended by chapter 54, section 1, of the laws of 2011, is hereby
44 amended and reappropriated to read:
45 For renovation and minor rehabilitation and improvements of state-
46 owned community residential and day program facilities for persons
472 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 with developmental disabilities. Upon request of the commissioner of
2 the office for people with developmental disabilities and approval
3 by the director of the budget, this appropriation may be suballo-
4 cated or transferred to the dormitory authority of the state of New
5 York (51PR0903) ... 1,000,000 ........................ (re. $64,000)
6 The appropriation made by chapter 54, section 1, of the laws of 2008, as
7 amended by chapter 54, section 1, of the laws of 2011, is hereby
8 amended and reappropriated to read:
9 For renovation and minor rehabilitation and improvements of state-
10 owned community residential and day program facilities for persons
11 with developmental disabilities. Upon request of the commissioner of
12 the office for people with developmental disabilities and approval
13 by the director of the budget, this appropriation may be suballo-
14 cated or transferred to the dormitory authority of the state of New
15 York (51PR0803) ... 1,000,000 ....................... (re. $342,000)
16 VOLUNTARY-OPERATED COMMUNITY FACILITIES (CCP)
17 Capital Projects Funds - Other
18 Capital Projects Fund
19 New Facilities Purpose
20 By chapter 54, section 1, of the laws of 2013:
21 For state aid, to municipalities and other public and not-forprofit
22 agencies, including the payment of liabilities incurred prior to
23 April 1, 2013 for up to 100 per centum of the net cost of feasibil-
24 ity studies, property options, capital renovations, acquisition of
25 property, construction, rehabilitation and capital costs incidental
26 and appurtenant to facilities required to be licensed pursuant to
27 article 16, as defined in the mental hygiene law, and for services
28 and expenses related to environmental modifications and adaptive
29 technology services at voluntary not-for-profit provider operated
30 community residential facilities, certified family care homes and
31 private residences, as a loan and/or grant to family care providers,
32 for payment to other state and federal housing agencies, private
33 corporations and for capital development of residential housing or
34 day program alternatives not currently defined in the mental hygiene
35 law, provided, however, that no expenditures may be made from this
36 appropriation until a comprehensive plan of projects has been
37 approved by the director of the budget (51B11307) ..................
38 5,900,000 ......................................... (re. $5,900,000)
39 By chapter 54, section 1, of the laws of 2012:
40 For state aid, to municipalities and other public and not-forprofit
41 agencies, including the payment of liabilities incurred prior to
42 April 1, 2012 for up to 100 per centum of the net cost of feasibil-
43 ity studies, property options, capital renovations, acquisition of
44 property, construction, rehabilitation and capital costs incidental
45 and appurtenant to facilities required to be licensed pursuant to
473 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 article 16, as defined in the mental hygiene law, and for services
2 and expenses related to environmental modifications and adaptive
3 technology services at voluntary not-for-profit provider operated
4 community residential facilities, certified family care homes and
5 private residences, as a loan and/or grant to family care providers,
6 for payment to other state and federal housing agencies, private
7 corporations and for capital development of residential housing or
8 day program alternatives not currently defined in the mental hygiene
9 law, provided, however, that no expenditures may be made from this
10 appropriation until a comprehensive plan of projects has been
11 approved by the director of the budget (51B11207) ..................
12 5,740,000 ......................................... (re. $5,740,000)
13 By chapter 54, section 1, of the laws of 2011:
14 For state aid, to municipalities and other public and not-for-profit
15 agencies, including the payment of liabilities incurred prior to
16 April 1, 2011 for up to 100 per centum of the net cost of feasibil-
17 ity studies, property options, capital renovations, acquisition of
18 property, construction, rehabilitation and capital costs incidental
19 and appurtenant to facilities required to be licensed pursuant to
20 article 16, as defined in the mental hygiene law, and for services
21 and expenses related to environmental modifications and adaptive
22 technology services at voluntary not-for-profit provider operated
23 community residential facilities, certified family care homes and
24 private residences, as a loan and/or grant to family care providers,
25 for payment to other state and federal housing agencies, private
26 corporations and for capital development of residential housing or
27 day program alternatives not currently defined in the mental hygiene
28 law (51B11107) ... 5,370,000 ...................... (re. $5,370,000)
29 Capital Projects Funds - Other
30 Capital Projects Fund
31 Preservation of Facilities Purpose
32 By chapter 54, section 1, of the laws of 2013:
33 For state aid, to municipalities and other public and not-forprofit
34 agencies, including the payment of liabilities incurred prior to
35 April 1, 2013, for up to 100 per centum of the net cost of services
36 and expenses related to the maintenance and improvement inclusive of
37 fire safety and life safety upgrades of voluntary not-for-profit
38 provider operated community residential and day service programs,
39 provided, however, that no expenditures may be made from this appro-
40 priation until a comprehensive plan of projects has been approved by
41 the director of the budget (51201303) ..............................
42 5,000,000 ......................................... (re. $5,000,000)
43 By chapter 54, section 1, of the laws of 2012:
44 For state aid, to municipalities and other public and not-for-profit
45 agencies, including the payment of liabilities incurred prior to
46 April 1, 2012, for up to 100 per centum of the net cost of services
474 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and expenses related to the maintenance and improvement inclusive of
2 fire safety and life safety upgrades of voluntary not-for-profit
3 provider operated community residential and day service programs,
4 provided, however, that no expenditures may be made from this appro-
5 priation until a comprehensive plan of projects has been approved by
6 the director of the budget (51201203) ..............................
7 5,000,000 ......................................... (re. $1,801,000)
8 Capital Projects Funds - Other
9 Mental Hygiene Facilities Capital Improvement Fund
10 Community Facilities Purpose
11 The appropriation made by chapter 54, section 1, of the laws of 2013, is
12 hereby amended and reappropriated to read:
13 For the comprehensive construction programs, purposes and projects as
14 herein specified, and for departmental administrative costs related
15 thereto, consistent with section 41.34 of the mental hygiene law,
16 and for the acquisition of property, construction and rehabiliation,
17 including the payment of preoperational costs incurred prior to
18 occupancy, of article 16 community mental retardation facilities and
19 associated programs and facilities and under the auspice of munici-
20 palities and other public and not-for-profit private agencies
21 approved by the commissioner of the office for people with develop-
22 mental disabilities, pursuant to article 41 of the mental hygiene
23 law and for management fees associated with voluntary not-for-profit
24 operated projects to be financed through dormitory authority of the
25 state of New York bonds, provided, however, that no expenditures may
26 be made from this appropriation until a comprehensive plan of
27 projects has been approved by the director of the budget. Upon
28 request of the commissioner of the office for people with develop-
29 mental disabilities and approval by the director of the budget, this
30 appropriation may be suballocated or transferred to the dormitory
31 authority of the state of New York (513213H2) ......................
32 7,400,000 ......................................... (re. $7,400,000)
33 The appropriation made by chapter 54, section 1, of the laws of 2012, is
34 hereby amended and reappropriated to read:
35 For the comprehensive construction programs, purposes and projects as
36 herein specified, and for departmental administrative costs related
37 thereto, consistent with section 41.34 of the mental hygiene law,
38 and for the acquisition of property, construction and rehabili-
39 tation, including the payment of preoperational costs incurred prior
40 to occupancy, of article 16 community mental retardation facilities
41 and associated programs and facilities and under the auspice of
42 municipalities and other public and not-for-profit private agencies
43 approved by the commissioner of the office for people with develop-
44 mental disabilities, pursuant to article 41 of the mental hygiene
45 law and for management fees associated with voluntary not-for-profit
46 operated projects to be financed through dormitory authority of
47 thestate of New York bonds, provided, however, that no expenditures
475 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 may be made from this appropriation until a comprehensive plan of
2 projects has been approved by the director of the budget. Upon
3 request of the commissioner of the office for people with develop-
4 mental disabilities and approval by the director of the budget, this
5 appropriation may be suballocated or transferred to the dormitory
6 authority of the state of New York (513212H2) ......................
7 7,280,000 ......................................... (re. $7,280,000)
8 The appropriation made by chapter 54, section 1, of the laws of 2011, is
9 hereby amended and reappropriated to read:
10 For the comprehensive construction programs, purposes and projects as
11 herein specified, and for departmental administrative costs related
12 thereto, consistent with section 41.34 of the mental hygiene law,
13 and for the acquisition of property, construction and rehabili-
14 tation, including the payment of preoperational costs incurred prior
15 to occupancy, of article 16 community mental retardation facilities
16 and associated programs and facilities and under the auspice of
17 municipalities and other public and not-for-profit private agencies
18 approved by the commissioner of the office for people with develop-
19 mental disabilities, pursuant to article 41 of the mental hygiene
20 law and for management fees associated with voluntary not-for-profit
21 operated projects to be financed through dormitory authority of the
22 state of New York bonds. Upon request of the commissioner of the
23 office for people with developmental disabilities and approval by
24 the director of the budget, this appropriation may be suballocated
25 or transferred to the dormitory authority of the state of New York
26 (513211H2) ... 7,000,000 .......................... (re. $7,000,000)
27 The appropriation made by chapter 54, section 1, of the laws of 2010, as
28 amended by chapter 54, section 1, of the laws of 2011, is hereby
29 amended and reappropriated to read:
30 For the comprehensive construction programs, purposes and projects as
31 herein specified, and for departmental administrative costs related
32 thereto, consistent with section 41.34 of the mental hygiene law,and
33 for the acquisition of property, construction and rehabilitation,
34 including the payment of preoperational costs incurred prior to
35 occupancy, of article 16 community mental retardation facilities and
36 associated programs and facilities and under the auspice of munici-
37 palities and other public and not-for-profit private agencies
38 approved by the commissioner of the office for people with develop-
39 mental disabilities, pursuant to article 41 of the mental hygiene
40 law and for management fees associated with voluntary not-for-profit
41 operated projects to be financed through dormitory authority of the
42 state of New York bonds. Upon request of the commissioner of the
43 office for people with developmental disabilities and approval by
44 the director of the budget, this appropriation may be suballocated
45 or transferred to the dormitory authority of the state of New York
46 (513210H2) ... 6,710,000 .......................... (re. $6,710,000)
47 Capital Projects Funds - Other
476 12654-10-8
DEPARTMENT OF MENTAL HYGIENE
OFFICE FOR PEOPLE WITH DEVELOPMENTAL DISABILITIES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Mental Hygiene Facilities Capital Improvement Fund
2 Fire Safety Purpose
3 The appropriation made by chapter 54, section 1, of the laws of 2013, is
4 hereby amended and reappropriated to read:
5 For the comprehensive construction programs, purposes and projects as
6 herein specified, and for departmental administrative costs related
7 thereto, consistent with section 41.34 of the mental hygiene law,
8 and for alterations and improvements for fire safety and life safety
9 upgrades of article 16 community mental retardation facilities and
10 associated programs and facilities and under the auspice of munici-
11 palities and other public and not-for-profit private agencies
12 approved by the commissioner of the office for people with develop-
13 mental disabilities, pursuant to article 41 of the mental hygiene
14 law and for management fees associated with voluntary not-for-profit
15 operated projects to be financed through dormitory authority of the
16 state of New York bonds, provided, however, that no expenditures may
17 be made from this appropriation until a comprehensive plan of
18 projects has been approved by the director of the budget. Upon
19 request of the commissioner of the office for people with develop-
20 mental disabilities and approval by the director of the budget, this
21 appropriation may be suballocated or transferred to the dormitory
22 authority of the state of New York (51FV13F3) ......................
23 30,000,000 ....................................... (re. $30,000,000)
24 The appropriation made by chapter 54, section 1, of the laws of 2012, is
25 hereby amended and reappropriated to read:
26 For the comprehensive construction programs, purposes and projects as
27 herein specified, and for departmental administrative costs related
28 thereto, consistent with section 41.34 of the mental hygiene law,
29 and for alterations and improvements for fire safety and life safety
30 upgrades of article 16 community mental retardation facilities and
31 associated programs and facilities and under the auspice of munici-
32 palities and other public and not-for-profit private agencies
33 approved by the commissioner of the office for people with develop-
34 mental disabilities, pursuant to article 41 of the mental hygiene
35 law and for management fees associated with voluntary not-for-profit
36 operated projects to be financed through dormitory authority of the
37 state of New York bonds, provided, however, that no expenditures may
38 be made from this appropriation until a comprehensive plan of
39 projects has been approved by the director of the budget. Upon
40 request of the commissioner of the office for people with develop-
41 mental disabilities and approval by the director of the budget, this
42 appropriation may be suballocated or transferred to the dormitory
43 authority of the state of New York (51FV12F3) ......................
44 31,000,000 ....................................... (re. $31,000,000)
477 12654-10-8
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 1,641,200,000 5,943,456,000
6 ---------------- ----------------
7 All Funds ........................ 1,641,200,000 5,943,456,000
8 ================ ================
9 METROPOLITAN TRANSPORTATION AUTHORITY (CCP) .............. 1,641,200,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Mass Transit Purpose
14 For the costs of the metropolitan transpor-
15 tation authority's 2015-2019 capital
16 program, pursuant to chapter 54 of the
17 laws of 2016 regarding the commitment of
18 the state of New York to fund, over a
19 multi-year period, $7,336,000,000 of capi-
20 tal costs related to such program. Funds
21 appropriated herein shall be made avail-
22 able in the event that the state elects to
23 meet its commitment through direct
24 payments (26JW18MT) ...................... 1,467,200,000
25 For the costs of capital projects for the
26 planning and design, acquisition,
27 construction, reconstruction, replacement,
28 improvement, reconditioning, rehabili-
29 tation and preservation, including the
30 acquisition of real property and interests
31 therein required or expected to be
32 required in connection therewith, of urban
33 mass transit systems, facilities and
34 equipment, including acquisition, which
35 are in the subway action plan approved by
36 the metropolitan transportation authority
37 board (26AC18MT) ........................... 174,000,000
478 12654-10-8
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 METROPOLITAN TRANSPORTATION AUTHORITY (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Mass Transit Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For the costs of the metropolitan transportation authority's 2015-2019
7 capital program, pursuant to chapter 54 of the laws of 2016 regard-
8 ing the commitment of the state of New York to fund, over a multi-
9 year period, $7,336,000,000 of capital costs related to such
10 program. Funds appropriated herein shall be made available in the
11 event that the state elects to meet its commitment through direct
12 payments (26JW17MT) ... 1,467,200,000 ......... (re. $1,467,200,000)
13 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
14 section 1, of the laws of 2017:
15 For the costs of the metropolitan transportation authority's 2015-
16 2019 capital program, pursuant to chapter 54 of the laws of 2016
17 regarding the commitment of the state of New York to fund, over a
18 multi-year period, $7,336,000,000 of capital costs related to such
19 program. Funds appropriated herein shall be made available in the
20 event that the state elects to meet its commitment through direct
21 payments (26JW16MT) ... 2,934,400,000 ......... (re. $2,934,400,000)
22 By chapter 54, section 1, of the laws of 2015:
23 For the costs of capital projects for the planning and design, acqui-
24 sition, construction, reconstruction, replacement, improvement,
25 reconditioning, rehabilitation and preservation, including the
26 acquisition of real property and interests therein required or
27 expected to be required in connection therewith, of urban and
28 commuter passenger, freight rail, omnibus, mass transit and rapid
29 transit systems, facilities and equipment, including acquisition,
30 which are capital elements set forth in the 2015-2019 capital
31 program plans approved by the metropolitan transportation authority
32 capital program review board (260215MT) ............................
33 750,000,000 ..................................... (re. $750,000,000)
34 By chapter 54, section 1, of the laws of 2012:
35 For the costs of capital projects for the planning and design, acqui-
36 sition, construction, reconstruction, replacement, improvement,
37 reconditioning, rehabilitation and preservation, including the
38 acquisition of real property and interests therein required or
39 expected to be required in connection therewith, of urban and
40 commuter passenger, freight rail, omnibus, mass transit and rapid
41 transit systems, facilities and equipment, including acquisition,
42 which are capital elements set forth in the 2010-2014 capital
43 program plans approved by the metropolitan transportation authority
44 capital program review board (260112MT) ............................
45 770,000,000 ..................................... (re. $370,000,000)
46 Capital Projects Funds - Other
479 12654-10-8
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Fund
2 Mass Transportation and Rail Freight Purpose
3 TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY
4 The appropriation made by chapter 314, section 30, of the laws of 1981,
5 as amended by chapter 54, section 1, of the laws of 2017, is hereby
6 amended and reappropriated to read:
7 Advance for: The sum of thirty-six million dollars ($36,000,000), or
8 so much thereof as may be necessary, is hereby appropriated as an
9 advance from the capital projects fund to the Triborough bridge and
10 tunnel authority for replacements of the authority's insurance
11 reserve and operating contingency reserve for the period beginning
12 April 1, [2017] 2018 and ending March 31, [2018] 2019. The advance
13 appropriation shall be made available and paid only if the Tribor-
14 ough bridge and tunnel authority's insurance reserve and operating
15 contingency reserve is needed for the purposes for which the
16 reserves were created.
17 Notwithstanding the provisions of any general or special law, no part
18 of any such appropriation shall be available for the purposes desig-
19 nated until a certificate of approval of availability shall have
20 been issued by the director of the budget, and a copy of such
21 certificate filed with the state comptroller, the chairman of the
22 senate finance committee and the chairman of the assembly ways and
23 means committee. Such certificate may be amended from time to time
24 subject to the approval of the director of the budget, and a copy of
25 each such amendment shall be filed with the state comptroller, the
26 chairman of the senate finance committee and the chairman of the
27 assembly ways and means committee (03310912) ..... (re. $36,000,000)
28 URBAN AND COMMUTER MASS TRANSPORTATION BONDABLE (CCP)
29 Capital Projects Funds - Other
30 Capital Projects Fund - Rebuild and Renew New York (Bondable)
31 Mass Transit Purpose
32 By chapter 55, section 1, of the laws of 2009:
33 For the costs, pursuant to the provisions of the rebuild and renew New
34 York transportation bond act of 2005 and section 1270-f of the
35 public authorities law, of capital projects to be reimbursed from
36 bond fund proceeds for the planning and design, acquisition,
37 construction, reconstruction, replacement, improvement, recondition-
38 ing, rehabilitation and preservation, including the acquisition of
39 real property and interests therein required or expected to be
40 required in connection therewith, of urban and commuter passenger,
41 freight rail, omnibus, mass transit and rapid transit systems,
42 facilities and equipment, including acquisition, which are capital
43 elements set forth in the 2005-2009 capital program plans approved
44 by the metropolitan transportation authority capital program review
45 board (26BA09MT) ... 82,000,000 .................. (re. $82,000,000)
46 By chapter 55, section 1, of the laws of 2008:
480 12654-10-8
METROPOLITAN TRANSPORTATION AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the costs, pursuant to the provisions of the rebuild and renew New
2 York transportation bond act of 2005 and section 1270-f of the
3 public authorities law, of capital projects to be reimbursed from
4 bond fund proceeds for the planning and design, acquisition,
5 construction, reconstruction, replacement, improvement, recondition-
6 ing, rehabilitation and preservation, including the acquisition of
7 real property and interests therein required or expected to be
8 required in connection therewith, of urban and commuter passenger,
9 freight rail, omnibus, mass transit and rapid transit systems,
10 facilities and equipment, including acquisition, which are capital
11 elements set forth in the 2005-2009 capital program plans approved
12 by the metropolitan transportation authority capital program review
13 board (26BA08MT) ... 487,000,000 ................ (re. $303,400,000)
14 By chapter 55, section 1, of the laws of 2007:
15 For the costs, pursuant to the provisions of the rebuild and renew New
16 York transportation bond act of 2005 and section 1270-f of the
17 public authorities law, of capital projects to be reimbursed from
18 bond fund proceeds for the planning and design, acquisition,
19 construction, reconstruction, replacement, improvement, recondition-
20 ing, rehabilitation and preservation, including the acquisition of
21 real property and interests therein required or expected to be
22 required in connection therewith, of urban and commuter passenger,
23 freight rail, omnibus, mass transit and rapid transit systems,
24 facilities and equipment, including acquisition, which are capital
25 elements set forth in the 2005-2009 capital program plans approved
26 by the metropolitan transportation authority capital program review
27 board (26BA07MT) ... 352,000,000 .................... (re. $456,000)
481 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes, and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 37,200,000 55,883,000
6 Capital Projects Funds - Federal ... 33,000,000 166,454,000
7 ---------------- ----------------
8 All Funds ........................ 70,200,000 222,337,000
9 ================ ================
10 DESIGN AND CONSTRUCTION SUPERVISION (CCP) ................... 21,200,000
11 --------------
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Preservation of Facilities Purpose
15 Alterations and improvements for the preser-
16 vation of facilities including liabilities
17 incurred prior to April 1, 2018 (07SP1803) .. 13,200,000
18 Capital Projects Funds - Federal
19 Federal Capital Projects Fund
20 New Facilities Purpose
21 For the cost of studies, site acquisitions,
22 planning, design, construction, recon-
23 struction, renovation, and equipment
24 related to the development of federal
25 military and state organized militia
26 facilities including related departmental
27 administrative costs incurred prior to
28 April 1, 2018 (07NF1807) ..................... 8,000,000
29 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 11,000,000
30 --------------
31 Capital Projects Funds - Other
32 Capital Projects Fund
33 Maintenance and Operations Purpose
34 For the maintenance and operation of various
35 facilities and systems including personal
36 services, fringe benefits and indirect
37 costs. Notwithstanding any other law to
38 the contrary, all or a portion of the
39 funds appropriated herein may be suballo-
40 cated or transferred to any department,
41 agency, or public authority (07FM18MO) ....... 4,000,000
482 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS 2018-19
1 Capital Projects Funds - Federal
2 Federal Capital Projects Fund
3 Maintenance and Operations Purpose
4 For the maintenance and operation of various
5 facilities and systems including personal
6 services, fringe benefits and indirect
7 costs. Notwithstanding any other law to
8 the contrary, all or a portion of the
9 funds appropriated herein may be suballo-
10 cated or transferred to any department,
11 agency, or public authority (07MF18MO) ....... 7,000,000
12 MAINTENANCE AND IMPROVEMENTS (CCP) .......................... 38,000,000
13 --------------
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Preservation of Facilities Purpose
17 Alterations and improvements for the preser-
18 vation of facilities including liabilities
19 incurred prior to April 1, 2018 (07MB1803) .. 20,000,000
20 Capital Projects Funds - Federal
21 Federal Capital Projects Fund
22 Preservation of Facilities Purpose
23 Alterations and improvements for the preser-
24 vation of facilities including liabilities
25 incurred prior to April 1, 2018 (07FO1803) .. 18,000,000
483 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 New Facilities Purpose
5 By chapter 54, section 1, of the laws of 2015:
6 For the cost of studies, site acquisitions, planning, design,
7 construction, reconstruction, renovation, and equipment related to
8 the development of federal military and state organized militia
9 facilities including related departmental administrative costs
10 incurred prior to April 1, 2015 (07SN1507) .........................
11 1,000,000 ........................................... (re. $994,000)
12 By chapter 54, section 1, of the laws of 2014:
13 For the cost of studies, site acquisitions, planning, design,
14 construction, reconstruction, renovation, and equipment related to
15 the development of federal military and state organized militia
16 facilities including related departmental administrative costs
17 incurred prior to April 1, 2014 (07SN1407) .........................
18 2,000,000 ......................................... (re. $2,000,000)
19 By chapter 54, section 1, of the laws of 2013:
20 For the cost of studies, site acquisitions, planning, design,
21 construction, reconstruction, renovation, and equipment related to
22 the development of federal military and state organized militia
23 facilities including related departmental administrative costs
24 incurred prior to April 1, 2013 (07SN1307) .........................
25 2,200,000 ......................................... (re. $1,666,000)
26 By chapter 54, section 1, of the laws of 2012:
27 For the cost of studies, site acquisitions, planning, design,
28 construction, reconstruction, renovation, and equipment related to
29 the development of federal military and state organized militia
30 facilities including related departmental administrative costs
31 incurred prior to April 1, 2012 (07SN1207) .........................
32 3,200,000 ........................................... (re. $944,000)
33 By chapter 54, section 1, of the laws of 2011:
34 For the cost of studies, site acquisitions, planning, design,
35 construction, reconstruction, renovation, and equipment related to
36 the development of federal military and state organized militia
37 facilities including related departmental administrative costs
38 incurred prior to April 1, 2011 (07SN1107) .........................
39 3,200,000 ........................................... (re. $149,000)
40 By chapter 50, section 1, of the laws of 2010:
41 For the cost of studies, site acquisitions, planning, design,
42 construction, reconstruction, renovation, and equipment related to
43 the development of federal military and state organized militia
44 facilities including related departmental administrative costs
484 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 incurred prior to April 1, 2010 (07SN1007) .........................
2 2,100,000 ............................................. (re. $6,000)
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Preservation of Facilities Purpose
6 By chapter 54, section 1, of the laws of 2017:
7 Alterations and improvements for the preservation of facilities
8 including liabilities incurred prior to April 1, 2017 (07OB1703) ...
9 3,000,000 ......................................... (re. $2,869,000)
10 By chapter 55, section 1, of the laws of 2016:
11 Alterations and improvements for the preservation of facilities
12 including liabilities incurred prior to April 1, 2016 (07SP1603) ...
13 6,000,000 ......................................... (re. $3,724,000)
14 By chapter 54, section 1, of the laws of 2015:
15 Alterations and improvements for the preservation of facilities
16 including liabilities incurred prior to April 1, 2015 (07SP1503) ...
17 2,000,000 ........................................... (re. $327,000)
18 By chapter 54, section 1, of the laws of 2014:
19 Alterations and improvements for the preservation of facilities
20 including liabilities incurred prior to April 1, 2014 (07SP1403) ...
21 5,000,000 ............................................ (re. $30,000)
22 By chapter 54, section 1, of the laws of 2013:
23 Alterations and improvements for the preservation of facilities
24 including liabilities incurred prior to April 1, 2013 (07SP1303) ...
25 3,000,000 ........................................... (re. $281,000)
26 Capital Projects Funds - Federal
27 Federal Capital Projects Fund
28 New Facilities Purpose
29 By chapter 54, section 1, of the laws of 2017:
30 For the cost of studies, site acquisitions, planning, design,
31 construction, reconstruction, renovation, and equipment related to
32 the development of federal military and state organized militia
33 facilities including related departmental administrative costs
34 incurred prior to April 1, 2017 (07NF1707) .........................
35 8,000,000 ......................................... (re. $8,000,000)
36 By chapter 55, section 1, of the laws of 2016:
37 For the cost of studies, site acquisitions, planning, design,
38 construction, reconstruction, renovation, and equipment related to
39 the development of federal military and state organized militia
40 facilities including related departmental administrative costs
41 incurred prior to April 1, 2016 (07NF1607) .........................
42 1,000,000 ......................................... (re. $1,000,000)
485 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2015:
2 For the cost of studies, site acquisitions, planning, design,
3 construction, reconstruction, renovation, and equipment related to
4 the development of federal military and state organized militia
5 facilities including related departmental administrative costs
6 incurred prior to April 1, 2015 (07NF1507) .........................
7 2,000,000 ......................................... (re. $2,000,000)
8 By chapter 54, section 1, of the laws of 2014:
9 For the cost of studies, site acquisitions, planning, design,
10 construction, reconstruction, renovation, and equipment related to
11 the development of federal military and state organized militia
12 facilities including related departmental administrative costs
13 incurred prior to April 1, 2014 (07NF1407) .........................
14 4,600,000 ......................................... (re. $4,600,000)
15 By chapter 54, section 1, of the laws of 2013:
16 For the cost of studies, site acquisitions, planning, design,
17 construction, reconstruction, renovation, and equipment related to
18 the development of federal military and state organized militia
19 facilities including related departmental administrative costs
20 incurred prior to April 1, 2013 (07FN1307) .........................
21 7,600,000 ......................................... (re. $7,600,000)
22 By chapter 54, section 1, of the laws of 2012:
23 For the cost of studies, site acquisitions, planning, design,
24 construction, reconstruction, renovation, and equipment related to
25 the development of federal military and state organized militia
26 facilities including related departmental administrative costs
27 incurred prior to April 1, 2012 (07FN1207) .........................
28 6,600,000 ......................................... (re. $6,600,000)
29 By chapter 54, section 1, of the laws of 2011:
30 For the cost of studies, site acquisitions, planning, design,
31 construction, reconstruction, renovation, and equipment related to
32 the development of federal military and state organized militia
33 facilities including related departmental administrative costs
34 incurred prior to April 1, 2011 (07FN1107) .........................
35 6,600,000 ......................................... (re. $5,123,000)
36 By chapter 50, section 1, of the laws of 2010:
37 For the cost of studies, site acquisitions, planning, design,
38 construction, reconstruction, renovation, and equipment related to
39 the development of federal military and state organized militia
40 facilities including related departmental administrative costs
41 incurred prior to April 1, 2010 (07NF1007) .........................
42 2,000,000 ........................................... (re. $213,000)
43 By chapter 50, section 1, of the laws of 2008:
44 For the cost of studies, site acquisitions, planning, design,
45 construction, reconstruction, renovation, and equipment related to
46 the development of federal military and state organized militia
486 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 facilities including related departmental administrative costs
2 incurred prior to April 1, 2008 (07FN0807) .........................
3 1,100,000 ........................................... (re. $203,000)
4 By chapter 50, section 1, of the laws of 2007:
5 For the cost of studies, site acquisitions, planning, design,
6 construction, reconstruction, renovation, and equipment related to
7 the development of federal military and state organized militia
8 facilities including related departmental administrative costs
9 incurred prior to April 1, 2007 (07M40707) .........................
10 5,000,000 ......................................... (re. $1,960,000)
11 By chapter 50, section 1, of the laws of 2005:
12 For the cost of studies, site acquisitions, planning, design,
13 construction, reconstruction, renovation, and equipment related to
14 the development of federal military and state organized militia
15 facilities including related departmental administrative costs
16 incurred prior to April 1, 2005 (07M10507) .........................
17 10,000,000 .......................................... (re. $197,000)
18 Capital Projects Funds - Federal
19 Federal Capital Projects Fund
20 Preservation of Facilities Purpose
21 By chapter 55, section 1, of the laws of 2016:
22 Alterations and improvements for the preservation of facilities
23 including liabilities incurred prior to April 1, 2016 (07FP1603) ...
24 3,000,000 ......................................... (re. $3,000,000)
25 By chapter 54, section 1, of the laws of 2015:
26 Alterations and improvements for the preservation of facilities
27 including liabilities incurred prior to April 1, 2015 (07FP1503) ...
28 3,000,000 ......................................... (re. $3,000,000)
29 By chapter 54, section 1, of the laws of 2014:
30 Alterations and improvements for the preservation of facilities
31 including liabilities incurred prior to April 1, 2014 (07FP1403) ...
32 5,000,000 ......................................... (re. $5,000,000)
33 By chapter 54, section 1, of the laws of 2013:
34 Alterations and improvements for the preservation of facilities
35 including liabilities incurred prior to April 1, 2013 (07FP1303) ...
36 3,000,000 ......................................... (re. $2,943,000)
37 By chapter 54, section 1, of the laws of 2012:
38 Alterations and improvements for the preservation of facilities
39 including liabilities incurred prior to April 1, 2012 (07FP1203) ...
40 3,000,000 ......................................... (re. $2,841,000)
41 By chapter 54, section 1, of the laws of 2011:
487 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements for the preservation of facilities
2 including liabilities incurred prior to April 1, 2011 (07FP1103) ...
3 3,000,000 ......................................... (re. $2,450,000)
4 By chapter 50, section 1, of the laws of 2010:
5 Alterations and improvements for the preservation of facilities
6 including liabilities incurred prior to April 1, 2010 (07FP1003) ...
7 3,000,000 ........................................... (re. $451,000)
8 By chapter 50, section 1, of the laws of 2009:
9 Alterations and improvements for the preservation of facilities
10 including liabilities incurred prior to April 1, 2009 (07FP0903) ...
11 3,000,000 ........................................... (re. $714,000)
12 By chapter 50, section 1, of the laws of 2008:
13 Alterations and improvements for the preservation of facilities
14 including liabilities incurred prior to April 1, 2008 (07FP0803) ...
15 2,500,000 ......................................... (re. $1,026,000)
16 By chapter 50, section 1, of the laws of 2007:
17 Alterations and improvements for the preservation of facilities
18 including liabilities incurred prior to April 1, 2007 (07F20703) ...
19 2,500,000 ........................................... (re. $306,000)
20 MAINTENANCE AND IMPROVEMENT (CCP)
21 Capital Projects Funds - Other
22 Capital Projects Fund
23 New Facilities Purpose
24 By chapter 54, section 1, of the laws of 2015:
25 For the cost of studies, site acquisitions, planning, design,
26 construction, reconstruction, renovation, and equipment related to
27 the development of federal military and state organized militia
28 facilities including related departmental administrative costs
29 incurred prior to April 1, 2015 (07SF1507) .........................
30 7,000,000 ......................................... (re. $7,000,000)
31 By chapter 54, section 1, of the laws of 2013:
32 For the cost of studies, site acquisitions, planning, design,
33 construction, reconstruction, renovation, and equipment related to
34 the development of federal military and state organized militia
35 facilities including related departmental administrative costs
36 incurred prior to April 1, 2013 (07SF1307) .........................
37 1,000,000 ........................................... (re. $642,000)
38 By chapter 54, section 1, of the laws of 2012:
39 For the cost of studies, site acquisitions, planning, design,
40 construction, reconstruction, renovation, and equipment related to
41 the development of federal military and state organized militia
42 facilities including related departmental administrative costs
488 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 incurred prior to April 1, 2012 (07SF1207) .........................
2 11,000,000 ........................................ (re. $5,235,000)
3 By chapter 50, section 1, of the laws of 2009:
4 For the cost of studies, site acquisitions, planning, design,
5 construction, reconstruction, renovation, and equipment related to
6 the development of federal military and state organized militia
7 facilities including related departmental administrative costs
8 incurred prior to April 1, 2009 (07SF0907) .........................
9 1,000,000 ........................................... (re. $607,000)
10 By chapter 50, section 1, of the laws of 2006:
11 For the cost of studies, site acquisitions, planning, design,
12 construction, reconstruction, renovation, and equipment related to
13 the development of federal military and state organized militia
14 facilities including related departmental administrative costs
15 incurred prior to April 1, 2006 (07M20607) .........................
16 3,500,000 ........................................... (re. $301,000)
17 Capital Projects Funds - Other
18 Capital Projects Fund
19 Preservation of Facilities Purpose
20 By chapter 54, section 1, of the laws of 2017:
21 Alterations and improvements for the preservation of facilities
22 including liabilities incurred prior to April 1, 2017 (07MB1703) ...
23 17,000,000 ....................................... (re. $15,635,000)
24 By chapter 55, section 1, of the laws of 2016:
25 Alterations and improvements for the preservation of facilities
26 including liabilities incurred prior to April 1, 2016 (07SO1603) ...
27 7,200,000 ......................................... (re. $6,349,000)
28 For preventive maintenance on state facilities including personal
29 services, non-personal services, fringe benefits and the contractual
30 services provided by private firms, including the payment of liabil-
31 ities incurred prior to April 1, 2016 (07SM1603) ...................
32 3,000,000 ........................................... (re. $845,000)
33 By chapter 54, section 1, of the laws of 2015:
34 Alterations and improvements for the preservation of facilities
35 including liabilities incurred prior to April 1, 2015 (07SO1503) ...
36 3,200,000 ........................................... (re. $817,000)
37 By chapter 54, section 1, of the laws of 2014:
38 Alterations and improvements for the preservation of facilities
39 including liabilities incurred prior to April 1, 2014 (07SO1403) ...
40 6,200,000 ......................................... (re. $3,347,000)
41 By chapter 54, section 1, of the laws of 2013:
42 Alterations and improvements for the preservation of facilities
43 including liabilities incurred prior to April 1, 2013 (07SO1303) ...
44 7,000,000 ......................................... (re. $1,491,000)
489 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2012:
2 Alterations and improvements for the preservation of facilities
3 including liabilities incurred prior to April 1, 2012 (07SO1203) ...
4 7,000,000 ........................................... (re. $909,000)
5 By chapter 54, section 1, of the laws of 2011:
6 Alterations and improvements for the preservation of facilities
7 including liabilities incurred prior to April 1, 2011 (07SO1103) ...
8 7,000,000 ........................................... (re. $522,000)
9 By chapter 50, section 1, of the laws of 2010:
10 Alterations and improvements for the preservation of facilities
11 including liabilities incurred prior to April 1, 2010 (07SO1003) ...
12 7,000,000 ............................................ (re. $38,000)
13 Capital Projects Funds - Federal
14 Federal Capital Projects Fund
15 New Facilities Purpose
16 By chapter 55, section 1, of the laws of 2016:
17 For the cost of studies, site acquisitions, planning, design,
18 construction, reconstruction, renovation, and equipment related to
19 the development of federal military and state organized militia
20 facilities including related departmental administrative costs
21 incurred prior to April 1, 2016 (07FF1607) .........................
22 10,000,000 ....................................... (re. $10,000,000)
23 By chapter 54, section 1, of the laws of 2015:
24 For the cost of studies, site acquisitions, planning, design,
25 construction, reconstruction, renovation, and equipment related to
26 the development of federal military and state organized militia
27 facilities including related departmental administrative costs
28 incurred prior to April 1, 2015 (07FF1507) .........................
29 14,000,000 ....................................... (re. $14,000,000)
30 By chapter 54, section 1, of the laws of 2014:
31 For the cost of studies, site acquisitions, planning, design,
32 construction, reconstruction, renovation, and equipment related to
33 the development of federal military and state organized militia
34 facilities including related departmental administrative costs
35 incurred prior to April 1, 2014 (07FF1407) .........................
36 3,800,000 ......................................... (re. $3,800,000)
37 By chapter 54, section 1, of the laws of 2013:
38 For the cost of studies, site acquisitions, planning, design,
39 construction, reconstruction, renovation, and equipment related to
40 the development of federal military and state organized militia
41 facilities including related departmental administrative costs
42 incurred prior to April 1, 2013 (07FF1307) .........................
43 2,800,000 ......................................... (re. $1,717,000)
44 By chapter 54, section 1, of the laws of 2012:
490 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the cost of studies, site acquisitions, planning, design,
2 construction, reconstruction, renovation, and equipment related to
3 the development of federal military and state organized militia
4 facilities including related departmental administrative costs
5 incurred prior to April 1, 2012 (07F11207) .........................
6 56,000,000 ....................................... (re. $12,796,000)
7 By chapter 54, section 1, of the laws of 2011:
8 For the cost of studies, site acquisitions, planning, design,
9 construction, reconstruction, renovation, and equipment related to
10 the development of federal military and state organized militia
11 facilities including related departmental administrative costs
12 incurred prior to April 1, 2011 (07F11107) .........................
13 2,800,000 ........................................... (re. $119,000)
14 By chapter 50, section 1, of the laws of 2008:
15 For the cost of studies, site acquisitions, planning, design,
16 construction, reconstruction, renovation, and equipment related to
17 the development of federal military and state organized militia
18 facilities including related departmental administrative costs
19 incurred prior to April 1, 2008 (07FF0807) .........................
20 2,000,000 ........................................... (re. $796,000)
21 Capital Projects Funds - Federal
22 Federal Capital Projects Fund
23 Preservation of Facilities Purpose
24 By chapter 54, section 1, of the laws of 2017:
25 Alterations and improvements for the preservation of facilities
26 including liabilities incurred prior to April 1, 2017 (07FO1703) ...
27 18,000,000 ....................................... (re. $18,000,000)
28 By chapter 55, section 1, of the laws of 2016:
29 Alterations and improvements for the preservation of facilities
30 including liabilities incurred prior to April 1, 2016 (07FO1603) ...
31 12,000,000 ....................................... (re. $12,000,000)
32 For preventive maintenance on state facilities including personal
33 services, non-personal services, fringe benefits and the contractual
34 services provided by private firms, including the payment of liabil-
35 ities incurred prior to April 1, 2016 (07FM1603) ...................
36 5,000,000 ......................................... (re. $3,154,000)
37 By chapter 54, section 1, of the laws of 2015:
38 Alterations and improvements for the preservation of facilities
39 including liabilities incurred prior to April 1, 2015 (07FO1503) ...
40 7,000,000 ......................................... (re. $7,000,000)
41 By chapter 54, section 1, of the laws of 2014:
42 Alterations and improvements for the preservation of facilities
43 including liabilities incurred prior to April 1, 2014 (07FO1403) ...
44 12,600,000 ....................................... (re. $12,600,000)
491 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 Alterations and improvements for the preservation of facilities
3 including liabilities incurred prior to April 1, 2013 (07FO1303) ...
4 12,600,000 ........................................ (re. $9,501,000)
5 By chapter 54, section 1, of the laws of 2012:
6 Alterations and improvements for the preservation of facilities
7 including liabilities incurred prior to April 1, 2012 (07FO1203) ...
8 12,600,000 ........................................ (re. $4,324,000)
9 By chapter 54, section 1, of the laws of 2011:
10 Alterations and improvements for the preservation of facilities
11 including liabilities incurred prior to April 1, 2011 (07FO1103) ...
12 12,600,000 .......................................... (re. $745,000)
13 By chapter 50, section 1, of the laws of 2010:
14 Alterations and improvements for the preservation of facilities
15 including liabilities incurred prior to April 1, 2010 (07FO1003) ...
16 12,600,000 ........................................ (re. $1,232,000)
17 By chapter 50, section 1, of the laws of 2009:
18 Alterations and improvements for the preservation of facilities
19 including liabilities incurred prior to April 1, 2009 (07FO0903) ...
20 14,600,000 ........................................... (re. $41,000)
21 By chapter 50, section 1, of the laws of 2008:
22 Alterations and improvements for the preservation of facilities
23 including liabilities incurred prior to April 1, 2008 (07FO0803) ...
24 12,000,000 ........................................... (re. $91,000)
25 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Maintenance and Operations Purpose
29 By chapter 54, section 1, of the laws of 2017:
30 For the maintenance and operation of various facilities and systems
31 including personal services, fringe benefits and indirect costs.
32 Notwithstanding any other law to the contrary, all or a portion of
33 the funds appropriated herein may be suballocated or transferred to
34 any department, agency, or public authority (07FM17MO) .............
35 4,000,000 ......................................... (re. $4,000,000)
36 Capital Projects Funds - Federal
37 Federal Capital Projects Fund
38 Maintenance and Operations Purpose
39 By chapter 54, section 1, of the laws of 2017:
40 For the maintenance and operation of various facilities and systems
41 including personal services, fringe benefits and indirect costs.
42 Notwithstanding any other law to the contrary, all or a portion of
492 12654-10-8
DIVISION OF MILITARY AND NAVAL AFFAIRS
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the funds appropriated herein may be suballocated or transferred to
2 any department, agency, or public authority (07MF17MO) .............
3 7,000,000 ......................................... (re. $7,000,000)
493 12654-10-8
DEPARTMENT OF MOTOR VEHICLES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 234,414,000 2,500,000
6 ---------------- ----------------
7 All Funds ........................ 234,414,000 2,500,000
8 ================ ================
9 TRANSPORTATION SUPPORT (CCP) ............................... 234,414,000
10 --------------
11 Capital Projects Funds - Other
12 Dedicated Highway and Bridge Trust Fund
13 Transportation Support Purpose
14 For services and expenses of the department
15 of motor vehicles.
16 The items shown in the schedule below shall
17 be for projects with a common purpose and
18 may be interchanged without limitation
19 subject to the approval of the director of
20 the budget.
21 Notwithstanding any other provision of law
22 to the contrary, the OGS Interchange and
23 Transfer Authority and the IT Interchange
24 and Transfer Authority as defined in the
25 2018-19 state fiscal year state operations
26 appropriation for the budget division
27 program of the division of the budget, are
28 deemed fully incorporated herein and a
29 part of this appropriation as if fully
30 stated.
31 Personal service (231118TS) .................. 100,737,000
32 Nonpersonal service (231218TS) ................ 64,864,000
33 Fringe benefits (231318TS) .................... 65,648,000
34 Indirect costs (231418TS) ...................... 3,165,000
494 12654-10-8
DEPARTMENT OF MOTOR VEHICLES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 TRANSPORTATION SUPPORT (CCP)
2 Capital Projects Funds - Other
3 Dedicated Highway and Bridge Trust Fund
4 Transportation Support Purpose
5 By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
6 section 1, of the laws of 2012:
7 For services and expenses of the department of motor vehicles
8 (230103TS).
9 Maintenance undistributed
10 For services and expenses related to the establishment, operation and
11 maintenance of stationary offices in any city within the county of
12 Monroe with a population of two hundred thousand or more and in any
13 hamlet within the town of Brookhaven within the county of Suffolk
14 with a population of not less than seven thousand nor more than ten
15 thousand ... 2,500,000 ............................ (re. $2,500,000)
495 12654-10-8
OLYMPIC REGIONAL DEVELOPMENT AUTHORITY
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 60,000,000 23,086,000
6 ---------------- ----------------
7 All Funds ........................ 60,000,000 23,086,000
8 ================ ================
9 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP).... 60,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 The sum of $10,000,000 is hereby appropri-
15 ated for services and expenses related to
16 maintenance of olympic and ski facilities,
17 including but not limited to energy effi-
18 ciency projects, lift maintenance, build-
19 ing maintenance and other infrastructure
20 and preventive maintenance projects,
21 including personal service and the payment
22 of liabilities incurred prior to April 1,
23 2018 (20021803) ............................. 10,000,000
24 The sum of $50,000,000 is hereby appropri-
25 ated for services and expenses related to
26 the upgrade, renovation, and modernization
27 of olympic, ski, and other facilities
28 owned and operated by the olympic regional
29 development authority, including personal
30 service and the payment of liabilities
31 incurred prior to April 1, 2018. The
32 availability of funds from this appropri-
33 ation shall be subject to the approval of
34 a strategic long-term modernization
35 investment plan by the director of the
36 division of the budget (20011803) ........... 50,000,000
496 12654-10-8
OLYMPIC REGIONAL DEVELOPMENT AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Preservation of Facilities Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 The sum of $10,000,000 is hereby appropriated for services and
7 expenses related to maintenance of olympic and ski facilities,
8 including but not limited to energy efficiency projects, lift main-
9 tenance, building maintenance and other infrastructure and preven-
10 tive maintenance projects, including personal service and the
11 payment of liabilities incurred prior to April 1, 2017 (20011703)
12 ... 10,000,000 ................................... (re. $4,586,000)
13 The sum of $28,000,000 is hereby appropriated for services and
14 expenses related to upgrades to ski facilities, in an amount up to
15 $20,000,000 for projects located at Whiteface mountain, Gore moun-
16 tain, and Mount Van Hoevenberg ski resorts, and in an amount up to
17 $8,000,000 for projects located at Belleayre mountain ski resort
18 (20021703) ... 28,000,000 ........................ (re. $18,500,000)
497 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other...... 180,700,000 417,460,000
6 Capital Projects Funds - Federal.... 20,000,000 17,253,000
7 ---------------- ----------------
8 All Funds ........................ 200,700,000 434,713,000
9 ================ ================
10 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 21,000,000
11 --------------
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Maintenance and Operations Purpose
15 For the maintenance and operation of various
16 facilities and systems including personal
17 services, fringe benefits and indirect
18 costs (49FM18MO) ............................ 21,000,000
19 FEDERAL CAPITAL PROJECTS FUND (CCP) ......................... 20,000,000
20 --------------
21 Capital Projects Funds - Federal
22 Federal Capital Projects Fund
23 Preservation of Facilities Purpose
24 For the federal government's share of the
25 cost to prepare and review plans, specifi-
26 cations and estimates, for the acquisition
27 of property and for the construction,
28 expansion and rehabilitation of state
29 facilities for recreation. Portions of
30 this appropriation may be suballocated to
31 other state agencies for such eligible
32 projects subject to the approval of the
33 director of the budget (49FE1803) ........... 20,000,000
34 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP) ... 67,200,000
35 --------------
36 Capital Projects Funds - Other
37 Miscellaneous Capital Projects Fund
38 Capital Miscellaneous Gifts Account
39 Preservation of Facilities Purpose
40 For alterations, rehabilitation and improve-
41 ments of various park facilities and
498 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2018-19
1 historic sites, including personal service
2 and the payment of liabilities incurred
3 prior to April 1, 2018, including suballo-
4 cation to other state departments and
5 agencies (49GI1803) ......................... 24,300,000
6 Capital Projects Funds - Other
7 Miscellaneous Capital Projects Fund
8 I Love NY Water Account
9 Preservation of Facilities Purpose
10 For services and expenses related to boating
11 access and maintenance in accordance with
12 a plan to be approved by the director of
13 the budget (49LV1803) ........................ 2,000,000
14 Capital Projects Funds - Other
15 Miscellaneous Capital Projects Fund
16 Minekill State Park Account
17 Preservation of Facilities Purpose
18 For rehabilitation and improvements at Mine-
19 kill State Park, including the payment of
20 liabilities incurred prior to April 1,
21 2018 (49PA1803) ................................ 500,000
22 Capital Projects Funds - Other
23 Miscellaneous Capital Projects Fund
24 Parks Capital Investment Account
25 Preservation of Facilities Purpose
26 For rehabilitation, replacement and refur-
27 bishment of facilities at various parks
28 and historic sites, including the payment
29 of liabilities incurred prior to April 1,
30 2018 (49RR1803) ................................ 500,000
31 Capital Projects Funds - Other
32 Miscellaneous Capital Projects Fund
33 Resource Account
34 Preservation of Facilities Purpose
35 For rehabilitation and improvements at vari-
36 ous parks and historic sites, including
37 the payment of liabilities incurred prior
38 to April 1, 2018, including suballocation
39 to other state departments and agencies
40 (49NR1803) ................................... 1,500,000
41 Capital Projects Funds - Other
42 State Park Infrastructure Fund
43 Energy Conservation Purpose
499 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2018-19
1 For energy conservation purposes at various
2 parks and historic sites, including
3 personal service and the payment of
4 liabilities incurred prior to April 1,
5 2018 (49EC1805) ................................ 700,000
6 Capital Projects Funds - Other
7 State Park Infrastructure Fund
8 Engineering Services Purpose
9 For state park engineering services and
10 expenses, including the preparation of
11 plans and designs; specifications and
12 estimates; construction management and
13 supervision; surveys and testing; environ-
14 mental impact and historic project assess-
15 ment; and related services for state parks
16 infrastructure fund projects including the
17 payment of contractual services, travel
18 expenses and supplies and fringe benefits
19 charges (490618ES) ........................... 3,800,000
20 Capital Projects Funds - Other
21 State Park Infrastructure Fund
22 Facilities for the Physically Disabled Purpose
23 To improve accessibility of facilities for
24 the disabled at various parks and historic
25 sites, including personal service and the
26 payment of liabilities incurred prior to
27 April 1, 2018 (49041804) ....................... 700,000
28 Capital Projects Funds - Other
29 State Park Infrastructure Fund
30 Health and Safety Purpose
31 For health and safety projects at various
32 parks and historic sites, including
33 personal service and the payment of
34 liabilities incurred prior to April 1,
35 2018, including suballocation to other
36 state departments and agencies (49011801) .... 4,700,000
37 Capital Projects Funds - Other
38 State Park Infrastructure Fund
39 Preservation of Facilities Purpose
40 For alterations, rehabilitation and improve-
41 ments of various park facilities and
42 historic sites including personal service
43 and the payment of liabilities incurred
44 prior to April 1, 2018, including suballo-
500 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS 2018-19
1 cation to other state departments and
2 agencies (49031803) ......................... 24,500,000
3 Capital Projects Funds - Other
4 State Park Infrastructure Fund
5 Preventive Maintenance Purpose
6 For preventive maintenance at various parks
7 and historic sites, including personal
8 services and fringe benefits (49ZZ18PM) ...... 4,000,000
9 NEW YORK WORKS (CCP) ........................................ 92,500,000
10 --------------
11 Capital Projects Funds - Other
12 State Park Infrastructure Fund
13 Preservation of Facilities Purpose
14 For services and expenses related to New
15 York Works Infrastructure projects at
16 state parks and historic sites, provided
17 that not less than $2.5 million is
18 provided to the olympic regional develop-
19 ment authority, including $500,000 for
20 Belleayre Mountain Ski Center, including
21 but not limited to lift maintenance,
22 building maintenance and other infrastruc-
23 ture and preventive maintenance projects,
24 including personal service and the payment
25 of liabilities incurred prior to April 1,
26 2018. All or a portion of the funds appro-
27 priated hereby may be suballocated or
28 transferred to any department, agency or
29 public authority (49NY1803) ................. 92,500,000
501 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Maintenance and Operations Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For the maintenance and operation of various facilities and systems
7 including personal services, fringe benefits and indirect costs
8 (49FM17MO) ... 21,000,000 ........................ (re. $11,000,000)
9 FEDERAL CAPITAL PROJECTS FUND (CCP)
10 Capital Projects Funds - Federal
11 Federal Capital Projects Fund
12 Preservation of Facilities Purpose
13 By chapter 54, section 1, of the laws of 2017:
14 For the federal government's share of the cost to prepare and review
15 plans, specifications and estimates, for the acquisition of property
16 and for the construction, expansion and rehabilitation of state
17 facilities for recreation. Portions of this appropriation may be
18 suballocated to other state agencies for such eligible projects
19 subject to the approval of the director of the budget (49FE1703) ...
20 4,000,000 ......................................... (re. $3,200,000)
21 By chapter 55, section 1, of the laws of 2016:
22 For the federal government's share of the cost to prepare and review
23 plans, specifications and estimates, for the acquisition of property
24 and for the construction, expansion and rehabilitation of state
25 facilities for recreation. Portions of this appropriation may be
26 suballocated to other state agencies for such eligible projects
27 subject to the approval of the director of the budget (49FE1603) ...
28 4,000,000 ......................................... (re. $4,000,000)
29 By chapter 54, section 1, of the laws of 2015:
30 For the federal government's share of the cost to prepare and review
31 plans, specifications and estimates, for the acquisition of property
32 and for the construction, expansion and rehabilitation of state
33 facilities for recreation. Portions of this appropriation may be
34 suballocated to other state agencies for such eligible projects
35 subject to the approval of the director of the budget (49FE1503) ...
36 4,000,000 ......................................... (re. $1,998,000)
37 By chapter 54, section 1, of the laws of 2014:
38 For the federal government's share of the cost to prepare and review
39 plans, specifications and estimates, for the acquisition of property
40 and for the construction, expansion and rehabilitation of state
41 facilities for recreation. Portions of this appropriation may be
42 suballocated to other state agencies for such eligible projects
43 subject to the approval of the director of the budget (49FE1403)....
44 4,000,000 ........................................... (re. $284,000)
502 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 For the federal government's share of the cost to prepare and review
3 plans, specifications and estimates, for the acquisition of property
4 and for the construction, expansion and rehabilitation of state
5 facilities for recreation. Portions of this appropriation may be
6 suballocated to other state agencies for such eligible projects
7 subject to the approval of the director of the budget (49FE1303) ...
8 4,000,000 ......................................... (re. $2,656,000)
9 By chapter 54, section 1, of the laws of 2012:
10 For the federal government's share of the cost to prepare and review
11 plans, specifications and estimates, for the acquisition of property
12 and for the construction, expansion and rehabilitation of state
13 facilities for recreation. Portions of this appropriation may be
14 suballocated to other state agencies for such eligible projects
15 subject to the approval of the director of the budget (49FE1203) ...
16 4,000,000 ......................................... (re. $1,414,000)
17 By chapter 54, section 1, of the laws of 2011:
18 For the federal government's share of the cost to prepare and review
19 plans, specifications and estimates, for the acquisition of property
20 and for the construction, expansion and rehabilitation of state
21 facilities for recreation. Portions of this appropriation may be
22 suballocated to other state agencies for such eligible projects
23 subject to the approval of the director of the budget (49FE1103) ...
24 4,000,000 ........................................... (re. $819,000)
25 By chapter 55, section 1, of the laws of 2009:
26 For the federal government's share of the cost to prepare and review
27 plans, specifications and estimates, for the acquisition of property
28 and for the construction, expansion and rehabilitation of state
29 facilities for recreation. Portions of this appropriation may be
30 suballocated to other state agencies for such eligible projects
31 subject to the approval of the director of the budget (49FE0903) ...
32 4,000,000 ........................................... (re. $282,000)
33 By chapter 55, section 1, of the laws of 2007:
34 For the federal government's share of the cost to prepare and review
35 plans, specifications and estimates, for the acquisition of property
36 and for the construction, expansion and rehabilitation of state
37 facilities for recreation. Portions of this appropriation may be
38 suballocated to other state agencies for such eligible projects
39 subject to the approval of the director of the budget (49FE0703) ...
40 4,000,000 ......................................... (re. $2,600,000)
41 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
42 Capital Projects Funds - Other
43 Miscellaneous Capital Projects Fund
44 Capital Miscellaneous Gifts Account
45 Preservation of Facilities Purpose
503 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For alterations, rehabilitation and improvements of various park
3 facilities and historic sites, including personal service and the
4 payment of liabilities incurred prior to April 1, 2017, including
5 suballocation to other state departments and agencies (49GI1703) ...
6 24,300,000 ....................................... (re. $24,300,000)
7 By chapter 55, section 1, of the laws of 2016:
8 For alterations, rehabilitation and improvements of various park
9 facilities and historic sites, including personal service and the
10 payment of liabilities incurred prior to April 1, 2016, including
11 suballocation to other state departments and agencies (49GI1603) ...
12 25,000,000 ....................................... (re. $24,591,000)
13 By chapter 54, section 1, of the laws of 2015:
14 For alterations, rehabilitation and improvements of various park
15 facilities and historic sites, including personal service and the
16 payment of liabilities incurred prior to April 1, 2015, including
17 suballocation to other state departments and agencies (49GI1503) ...
18 25,000,000 ....................................... (re. $23,508,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For alterations, rehabilitation and improvements of various park
21 facilities and historic sites, including personal service and the
22 payment of liabilities incurred prior to April 1, 2014, including
23 suballocation to other state departments and agencies (49GI1403) ...
24 25,000,000 ....................................... (re. $16,000,000)
25 By chapter 54, section 1, of the laws of 2013:
26 For alterations, rehabilitation and improvements of various park
27 facilities and historic sites, including personal service and the
28 payment of liabilities incurred prior to April 1, 2013, including
29 suballocation to other state departments and agencies (49GI1303) ...
30 25,000,000 ........................................ (re. $9,828,000)
31 By chapter 54, section 1, of the laws of 2012:
32 For alterations, rehabilitation and improvements of various park
33 facilities and historic sites, including personal service and the
34 payment of liabilities incurred prior to April 1, 2012, including
35 suballocation to other state departments and agencies (49GI1203) ...
36 25,000,000 ........................................ (re. $3,420,000)
37 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
38 section 1, of the laws of 2012:
39 For alterations, rehabilitation and improvements of various park
40 facilities and historic sites, including personal service and the
41 payment of liabilities incurred prior to April 1, 2011, including
42 suballocation to other state departments and agencies (49GI1103) ...
43 10,000,000 ........................................ (re. $5,297,000)
44 Capital Projects Funds - Other
45 Miscellaneous Capital Projects Fund
504 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 I Love NY Water Account
2 Preservation of Facilities Purpose
3 By chapter 54, section 1, of the laws of 2017:
4 For services and expenses related to boating access and maintenance in
5 accordance with a plan to be approved by the director of the budget
6 (49LV1703) ... 2,000,000 .......................... (re. $2,000,000)
7 By chapter 55, section 1, of the laws of 2016:
8 For services and expenses related to boating access and maintenance in
9 accordance with a plan to be approved by the director of the budget
10 (49LV1603) ... 1,300,000 .......................... (re. $1,300,000)
11 By chapter 54, section 1, of the laws of 2015:
12 For services and expenses related to boating access and maintenance in
13 accordance with a plan to be approved by the director of the budget
14 (49LV1503) ... 1,300,000 .......................... (re. $1,300,000)
15 By chapter 54, section 1, of the laws of 2014:
16 For services and expenses related to boating access and maintenance in
17 accordance with a plan to be approved by the director of the budget
18 (49LV1403) ... 1,300,000 .......................... (re. $1,300,000)
19 By chapter 54, section 1, of the laws of 2013:
20 For services and expenses related to boating access and maintenance in
21 accordance with a plan to be approved by the director of the budget
22 (49LV1303) ... 1,300,000 .......................... (re. $1,300,000)
23 By chapter 54, section 1, of the laws of 2012:
24 For services and expenses related to boating access and maintenance in
25 accordance with a plan to be approved by the director of the budget
26 (49LV1203) ... 1,300,000 ............................ (re. $653,000)
27 By chapter 54, section 1, of the laws of 2011:
28 For services and expenses related to boating access and maintenance in
29 accordance with a plan to be approved by the director of the budget
30 (49LV1103) ... 1,300,000 ............................ (re. $317,000)
31 By chapter 55, section 1, of the laws of 2010:
32 For services and expenses related to boating access and maintenance in
33 accordance with a plan to be approved by the director of the budget
34 (49LV1003) ... 1,300,000 ............................ (re. $234,000)
35 By chapter 55, section 1, of the laws of 2009:
36 For services and expenses related to boating access and maintenance in
37 accordance with a plan to be approved by the director of the budget
38 (49LV0903) ... 1,300,000 ............................. (re. $19,000)
39 Capital Projects Funds - Other
40 Miscellaneous Capital Projects Fund
41 Minekill State Park Account
42 Preservation of Facilities Purpose
505 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For rehabilitation and improvements at Minekill State Park, including
3 the payment of liabilities incurred prior to April 1, 2017
4 (49PA1703) ... 500,000 .............................. (re. $500,000)
5 By chapter 55, section 1, of the laws of 2016:
6 For rehabilitation and improvements at Minekill State Park, including
7 the payment of liabilities incurred prior to April 1, 2016
8 (49PA1603) ... 500,000 .............................. (re. $500,000)
9 By chapter 54, section 1, of the laws of 2015:
10 For rehabilitation and improvements at Minekill State Park, including
11 the payment of liabilities incurred prior to April 1, 2015
12 (49PA1503) ... 500,000 .............................. (re. $470,000)
13 By chapter 54, section 1, of the laws of 2014:
14 For rehabilitation and improvements at Minekill State Park, including
15 the payment of liabilities incurred prior to April 1, 2014
16 (49PA1403) ... 500,000 .............................. (re. $500,000)
17 By chapter 54, section 1, of the laws of 2013:
18 For rehabilitation and improvements at Minekill State Park, including
19 the payment of liabilities incurred prior to April 1, 2013
20 (49PA1303) ... 500,000 .............................. (re. $500,000)
21 By chapter 54, section 1, of the laws of 2012:
22 For rehabilitation and improvements at Minekill State Park, including
23 the payment of liabilities incurred prior to April 1, 2012
24 (49PA1203) ... 500,000 .............................. (re. $500,000)
25 By chapter 54, section 1, of the laws of 2011:
26 For rehabilitation and improvements at Minekill State Park, including
27 the payment of liabilities incurred prior to April 1, 2011
28 (49PA1103) ... 500,000 .............................. (re. $500,000)
29 By chapter 55, section 1, of the laws of 2010:
30 For rehabilitation and improvements at Minekill State Park, including
31 the payment of liabilities incurred prior to April 1, 2010
32 (49PA1003) ... 500,000 .............................. (re. $500,000)
33 By chapter 55, section 1, of the laws of 2009:
34 For rehabilitation and improvements at Minekill State Park, including
35 the payment of liabilities incurred prior to April 1, 2009
36 (49PA0903) ... 500,000 .............................. (re. $167,000)
37 Capital Projects Funds - Other
38 Miscellaneous Capital Projects Fund
39 Parks Capital Investment Account
40 Preservation of Facilities Purpose
41 By chapter 54, section 1, of the laws of 2017:
506 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For rehabilitation, replacement and refurbishment of facilities at
2 various parks and historic sites, including the payment of liabil-
3 ities incurred prior to April 1, 2017 (49RR1703) ...................
4 500,000 ............................................. (re. $500,000)
5 By chapter 55, section 1, of the laws of 2016:
6 For rehabilitation, replacement and refurbishment of facilities at
7 various parks and historic sites, including the payment of liabil-
8 ities incurred prior to April 1, 2016 (49RR1603) ...................
9 500,000 ............................................. (re. $500,000)
10 By chapter 54, section 1, of the laws of 2015:
11 For rehabilitation, replacement and refurbishment of facilities at
12 various parks and historic sites, including the payment of liabil-
13 ities incurred prior to April 1, 2015 (49RR1503) ...................
14 500,000 ............................................. (re. $500,000)
15 By chapter 54, section 1, of the laws of 2014:
16 For rehabilitation, replacement and refurbishment of facilities at
17 various parks and historic sites, including the payment of liabil-
18 ities incurred prior to April 1, 2014 (49RR1403) ...................
19 500,000 ............................................. (re. $500,000)
20 By chapter 54, section 1, of the laws of 2013:
21 For rehabilitation, replacement and refurbishment of facilities at
22 various parks and historic sites, including the payment of liabil-
23 ities incurred prior to April 1, 2013 (49RR1303) ...................
24 500,000 ............................................. (re. $500,000)
25 By chapter 54, section 1, of the laws of 2012:
26 For rehabilitation, replacement and refurbishment of facilities at
27 various parks and historic sites, including the payment of liabil-
28 ities incurred prior to April 1, 2012 (49RR1203) ...................
29 500,000 ............................................. (re. $500,000)
30 By chapter 54, section 1, of the laws of 2011:
31 For rehabilitation, replacement and refurbishment of facilities at
32 various parks and historic sites, including the payment of liabil-
33 ities incurred prior to April 1, 2011 (49RR1103) ...................
34 500,000 ............................................. (re. $500,000)
35 By chapter 55, section 1, of the laws of 2010:
36 For rehabilitation, replacement and refurbishment of facilities at
37 various parks and historic sites, including the payment of liabil-
38 ities incurred prior to April 1, 2010 (49RR1003) ...................
39 500,000 ............................................. (re. $500,000)
40 By chapter 55, section 1, of the laws of 2009:
41 For rehabilitation, replacement and refurbishment of facilities at
42 various parks and historic sites, including the payment of liabil-
43 ities incurred prior to April 1, 2009 (49RR0903) ...................
44 500,000 ............................................. (re. $390,000)
507 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2008:
2 For rehabilitation, replacement and refurbishment of facilities at
3 various parks and historic sites, including the payment of liabil-
4 ities incurred prior to April 1, 2008 (49RR0803) ...................
5 500,000 ............................................. (re. $255,000)
6 By chapter 55, section 1, of the laws of 2007:
7 For rehabilitation, replacement and refurbishment of facilities at
8 various parks and historic sites, including the payment of liabil-
9 ities incurred prior to April 1, 2007 (49RR0703) ...................
10 500,000 .............................................. (re. $70,000)
11 By chapter 55, section 1, of the laws of 2006:
12 For rehabilitation, replacement and refurbishment of facilities at
13 various parks and historic sites, including the payment of liabil-
14 ities incurred prior to April 1, 2006 (49RR0603) ...................
15 500,000 .............................................. (re. $10,000)
16 By chapter 55, section 1, of the laws of 2005:
17 For rehabilitation, replacement and refurbishment of facilities at
18 various parks and historic sites, including the payment of liabil-
19 ities incurred prior to April 1, 2005 (49RR0503) ...................
20 750,000 ............................................. (re. $235,000)
21 By chapter 55, section 1, of the laws of 2003:
22 For rehabilitation, replacement and refurbishment of facilities at
23 various parks and historic sites, including the payment of liabil-
24 ities incurred prior to April 1, 2003 (49RR0303) ...................
25 500,000 .............................................. (re. $26,000)
26 Capital Projects Funds - Other
27 Miscellaneous Capital Projects Fund
28 Resource Account
29 Preservation of Facilities Purpose
30 By chapter 54, section 1, of the laws of 2017:
31 For rehabilitation and improvements at various parks and historic
32 sites, including the payment of liabilities incurred prior to April
33 1, 2017, including suballocation to other state departments and
34 agencies (49NR1703) ... 1,500,000 ........................ 1,500,000
35 By chapter 55, section 1, of the laws of 2016:
36 For rehabilitation and improvements at various parks and historic
37 sites, including the payment of liabilities incurred prior to April
38 1, 2016, including suballocation to other state departments and
39 agencies (49NR1603) ... 1,500,000 ................. (re. $1,500,000)
40 By chapter 54, section 1, of the laws of 2015:
41 For rehabilitation and improvements at various parks and historic
42 sites, including the payment of liabilities incurred prior to April
43 1, 2015, including suballocation to other state departments and
44 agencies (49NR1503) ... 1,500,000 ................. (re. $1,495,000)
508 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2014:
2 For rehabilitation and improvements at various parks and historic
3 sites, including the payment of liabilities incurred prior to April
4 1, 2014, including suballocation to other state departments and
5 agencies (49NR1403) ... 1,500,000 ................. (re. $1,000,000)
6 By chapter 54, section 1, of the laws of 2013:
7 For rehabilitation and improvements at various parks and historic
8 sites, including the payment of liabilities incurred prior to April
9 1, 2013, including suballocation to other state departments and
10 agencies (49NR1303) ... 1,500,000 ................. (re. $1,000,000)
11 By chapter 54, section 1, of the laws of 2012:
12 For rehabilitation and improvements at various parks and historic
13 sites, including the payment of liabilities incurred prior to April
14 1, 2012 (49NR1203) ... 1,500,000 .................... (re. $551,000)
15 By chapter 54, section 1, of the laws of 2011:
16 For rehabilitation and improvements at various parks and historic
17 sites, including the payment of liabilities incurred prior to April
18 1, 2011 (49NR1103) ... 1,500,000 .................... (re. $170,000)
19 By chapter 55, section 1, of the laws of 2010:
20 For rehabilitation and improvements at various parks and historic
21 sites, including the payment of liabilities incurred prior to April
22 1, 2010 (49NR1003) ... 1,500,000 .................... (re. $317,000)
23 By chapter 55, section 1, of the laws of 2009:
24 For rehabilitation and improvements at various parks and historic
25 sites, including the payment of liabilities incurred prior to April
26 1, 2009 (49NR0903) ... 1,500,000 .................... (re. $512,000)
27 By chapter 55, section 1, of the laws of 2008:
28 For rehabilitation and improvements at various parks and historic
29 sites, including the payment of liabilities incurred prior to April
30 1, 2008 (49NR0803) ... 1,500,000 ..................... (re. $78,000)
31 State Park Infrastructure Fund
32 In accordance with Section 97-mm of the state finance law, all funds
33 received and designated by the commissioner of parks, recreation and
34 historic preservation to the credit of SPIF, shall be directed to
35 state park infrastructure projects including engineering services
36 costs.
37 A portion of the amounts included within these appropriations, subject
38 to the approval of the director of the budget, may be made available
39 to the New York State Office of General Services for payment to the
40 design and construction management account of the centralized
41 services fund of the New York State Office of General Services, to
42 accomplish the purpose of these appropriations. All or a portion of
43 the disbursements made pursuant to the following appropriations may
509 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 be repaid from proceeds of bonds issued by the environmental facili-
2 ties corporation in state fiscal year 1992-1993.
3 Capital Projects Funds - Other
4 State Park Infrastructure Fund
5 Energy Conservation Purpose
6 By chapter 54, section 1, of the laws of 2017:
7 For energy conservation purposes at various parks and historic sites,
8 including personal service and the payment of liabilities incurred
9 prior to April 1, 2017 (49EC1705) ... 700,000 ....... (re. $695,000)
10 By chapter 55, section 1, of the laws of 2016:
11 For energy conservation purposes at various parks and historic sites,
12 including personal service and the payment of liabilities incurred
13 prior to April 1, 2016 (49EC1605) ... 700,000 ....... (re. $502,000)
14 By chapter 54, section 1, of the laws of 2015:
15 For energy conservation purposes at various parks and historic sites,
16 including personal service and the payment of liabilities incurred
17 prior to April 1, 2015 (49EC1505) ... 700,000 ....... (re. $667,000)
18 By chapter 54, section 1, of the laws of 2014:
19 For energy conservation purposes at various parks and historic sites,
20 including personal service and the payment of liabilities incurred
21 prior to April 1, 2014 (49EC1405) ... 700,000 ....... (re. $361,000)
22 By chapter 54, section 1, of the laws of 2013:
23 For energy conservation purposes at various parks and historic sites,
24 including personal service and the payment of liabilities incurred
25 prior to April 1, 2013 (49EC1305) ... 700,000 ....... (re. $527,000)
26 By chapter 54, section 1, of the laws of 2012:
27 For energy conservation purposes at various parks and historic sites,
28 including personal service and the payment of liabilities incurred
29 prior to April 1, 2012 (49EC1205) ... 700,000 ....... (re. $357,000)
30 By chapter 54, section 1, of the laws of 2011:
31 For energy conservation purposes at various parks and historic sites,
32 including personal service and the payment of liabilities incurred
33 prior to April 1, 2011 (49EC1105) ... 751,000 ....... (re. $259,000)
34 By chapter 55, section 1, of the laws of 2010:
35 For energy conservation purposes at various parks and historic sites,
36 including personal service and the payment of liabilities incurred
37 prior to April 1, 2010 (49EC1005) ... 751,000 ....... (re. $600,000)
38 By chapter 55, section 1, of the laws of 2009:
39 For energy conservation purposes at various parks and historic sites,
40 including personal service and the payment of liabilities incurred
41 prior to April 1, 2009 (49EC0905) ... 751,000 ....... (re. $432,000)
510 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2008:
2 For energy conservation purposes at various parks and historic sites,
3 including personal service and the payment of liabilities incurred
4 prior to April 1, 2008 (49EC0805) ... 751,000 ....... (re. $115,000)
5 By chapter 55, section 1, of the laws of 2007:
6 For energy conservation purposes at various parks and historic sites,
7 including personal service and the payment of liabilities incurred
8 prior to April 1, 2007 (49EC0705) ... 420,000 ......... (re. $8,000)
9 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
10 section 1, of the laws of 2007:
11 For energy conservation purposes at various parks and historic sites,
12 including personal service and the payment of liabilities incurred
13 prior to April 1, 2006 (49EC0605) ... 485,000 ....... (re. $175,000)
14 Capital Projects Funds - Other
15 State Park Infrastructure Fund
16 Engineering Services Purpose
17 By chapter 54, section 1, of the laws of 2017:
18 For state park engineering services and expenses, including the prepa-
19 ration of plans and designs; specifications and estimates;
20 construction management and supervision; surveys and testing; envi-
21 ronmental impact and historic project assessment; and related
22 services for state parks infrastructure fund projects including the
23 payment of contractual services, travel expenses and supplies and
24 fringe benefits charges (490617ES) ... 3,800,000 .. (re. $2,361,000)
25 By chapter 55, section 1, of the laws of 2016:
26 For state park engineering services and expenses, including the prepa-
27 ration of plans and designs; specifications and estimates;
28 construction management and supervision; surveys and testing; envi-
29 ronmental impact and historic project assessment; and related
30 services for state parks infrastructure fund projects including the
31 payment of contractual services, travel expenses and supplies and
32 fringe benefits charges (490616ES) ... 3,800,000 .... (re. $881,000)
33 By chapter 54, section 1, of the laws of 2014:
34 For state park engineering services and expenses, including the prepa-
35 ration of plans and designs; specifications and estimates;
36 construction management and supervision; surveys and testing; envi-
37 ronmental impact and historic project assessment; and related
38 services for state parks infrastructure fund projects including the
39 payment of contractual services, travel expenses and supplies and
40 fringe benefits charges (490614ES) ... 3,800,000 .... (re. $762,000)
41 By chapter 54, section 1, of the laws of 2013:
42 For state park engineering services and expenses, including the prepa-
43 ration of plans and designs; specifications and estimates;
44 construction management and supervision; surveys and testing; envi-
45 ronmental impact and historic project assessment; and related
511 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 services for state parks infrastructure fund projects including the
2 payment of contractual services, travel expenses and supplies and
3 fringe benefits charges (490613ES) ... 3,800,000 .... (re. $657,000)
4 By chapter 54, section 1, of the laws of 2011:
5 For state park engineering services and expenses, including the prepa-
6 ration of plans and designs; specifications and estimates;
7 construction management and supervision; surveys and testing; envi-
8 ronmental impact and historic project assessment; and related
9 services for state parks infrastructure fund projects including the
10 payment of contractual services, travel expenses and supplies and
11 fringe benefits charges (490611ES) ... 3,800,000 .... (re. $500,000)
12 By chapter 55, section 1, of the laws of 2010:
13 For state park engineering services and expenses, including the prepa-
14 ration of plans and designs; specifications and estimates;
15 construction management and supervision; surveys and testing; envi-
16 ronmental impact and historic project assessment; and related
17 services for state parks infrastructure fund projects including the
18 payment of contractual services, travel expenses and supplies and
19 fringe benefits charges (490610ES) ... 3,800,000 .... (re. $365,000)
20 Capital Projects Funds - Other
21 State Park Infrastructure Fund
22 Facilities for the Physically Disabled Purpose
23 By chapter 54, section 1, of the laws of 2017:
24 To improve accessibility of facilities for the disabled at various
25 parks and historic sites, including personal service and the payment
26 of liabilities incurred prior to April 1, 2017 (49041704) ..........
27 700,000 ............................................. (re. $698,000)
28 By chapter 55, section 1, of the laws of 2016:
29 To improve accessibility of facilities for the disabled at various
30 parks and historic sites, including personal service and the payment
31 of liabilities incurred prior to April 1, 2016 (49041604) ..........
32 700,000 ............................................. (re. $586,000)
33 By chapter 54, section 1, of the laws of 2015:
34 To improve accessibility of facilities for the disabled at various
35 parks and historic sites, including personal service and the payment
36 of liabilities incurred prior to April 1, 2015 (49041504) ..........
37 700,000 ............................................. (re. $687,000)
38 By chapter 54, section 1, of the laws of 2014:
39 To improve accessibility of facilities for the disabled at various
40 parks and historic sites, including personal service and the payment
41 of liabilities incurred prior to April 1, 2014 (49041404) ..........
42 700,000 ............................................. (re. $334,000)
43 By chapter 54, section 1, of the laws of 2013:
512 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 To improve accessibility of facilities for the disabled at various
2 parks and historic sites, including personal service and the payment
3 of liabilities incurred prior to April 1, 2013 (49041304) ..........
4 700,000 ............................................. (re. $691,000)
5 By chapter 54, section 1, of the laws of 2012:
6 To improve accessibility of facilities for the disabled at various
7 parks and historic sites, including personal service and the payment
8 of liabilities incurred prior to April 1, 2012 (49041204) ..........
9 700,000 ............................................. (re. $406,000)
10 By chapter 54, section 1, of the laws of 2011:
11 To improve accessibility of facilities for the disabled at various
12 parks and historic sites, including personal service and the payment
13 of liabilities incurred prior to April 1, 2011 (49041104) ..........
14 707,000 ............................................. (re. $190,000)
15 By chapter 55, section 1, of the laws of 2010:
16 To improve accessibility of facilities for the disabled at various
17 parks and historic sites, including personal service and the payment
18 of liabilities incurred prior to April 1, 2010 (49041004) ..........
19 707,000 ............................................. (re. $616,000)
20 By chapter 55, section 1, of the laws of 2009:
21 To improve accessibility of facilities for the disabled at various
22 parks and historic sites, including personal service and the payment
23 of liabilities incurred prior to April 1, 2009 (49040904) ..........
24 707,000 ............................................. (re. $707,000)
25 By chapter 55, section 1, of the laws of 2008:
26 To improve accessibility of facilities for the disabled at various
27 parks and historic sites, including personal service and the payment
28 of liabilities incurred prior to April 1, 2008 (49040804) ..........
29 707,000 ............................................. (re. $400,000)
30 By chapter 55, section 1, of the laws of 2007:
31 To improve accessibility of facilities for the disabled at various
32 parks and historic sites, including personal service and the payment
33 of liabilities incurred prior to April 1, 2007 (49040704) ..........
34 355,000 ............................................. (re. $115,000)
35 By chapter 55, section 1, of the laws of 2006:
36 To improve accessibility of facilities for the disabled at various
37 parks and historic sites, including personal service and the payment
38 of liabilities incurred prior to April 1, 2006 (49040604) ..........
39 360,000 .............................................. (re. $61,000)
40 Capital Projects Funds - Other
41 State Park Infrastructure Fund
42 Health and Safety Purpose
43 By chapter 54, section 1, of the laws of 2017:
513 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For health and safety projects at various parks and historic sites,
2 including personal service and the payment of liabilities incurred
3 prior to April 1, 2017, including suballocation to other state
4 departments and agencies (49011701) ................................
5 4,700,000 ......................................... (re. $4,640,000)
6 By chapter 55, section 1, of the laws of 2016:
7 For health and safety projects at various parks and historic sites,
8 including personal service and the payment of liabilities incurred
9 prior to April 1, 2016, including suballocation to other state
10 departments and agencies (49011601) ................................
11 4,700,000 ......................................... (re. $3,263,000)
12 By chapter 54, section 1, of the laws of 2015:
13 For health and safety projects at various parks and historic sites,
14 including personal service and the payment of liabilities incurred
15 prior to April 1, 2015, including suballocation to other state
16 departments and agencies (49011501) ................................
17 4,700,000 ......................................... (re. $2,569,000)
18 By chapter 54, section 1, of the laws of 2014:
19 For health and safety projects at various parks and historic sites,
20 including personal service and the payment of liabilities incurred
21 prior to April 1, 2014, including suballocation to other state
22 departments and agencies (49011401) ................................
23 4,700,000 ......................................... (re. $1,303,000)
24 By chapter 54, section 1, of the laws of 2013:
25 For health and safety projects at various parks and historic sites,
26 including personal service and the payment of liabilities incurred
27 prior to April 1, 2013, including suballocation to other state
28 departments and agencies (49011301) ................................
29 4,700,000 ........................................... (re. $526,000)
30 By chapter 54, section 1, of the laws of 2012:
31 For health and safety projects at various parks and historic sites,
32 including personal service and the payment of liabilities incurred
33 prior to April 1, 2012, including suballocation to other state
34 departments and agencies (49011201) ................................
35 4,683,000 ......................................... (re. $1,447,000)
36 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
37 section 1, of the laws of 2012:
38 For health and safety projects at various parks and historic sites,
39 including personal service and the payment of liabilities incurred
40 prior to April 1, 2011, including suballocation to other state
41 departments and agencies (49011101) ................................
42 4,625,000 ......................................... (re. $1,318,000)
43 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
44 section 1, of the laws of 2011:
514 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For health and safety projects at various parks and historic sites,
2 including personal service and the payment of liabilities incurred
3 prior to April 1, 2010, including suballocation to other state
4 departments and agencies (49011001) ... 4,625,000 ... (re. $278,000)
5 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
6 section 1, of the laws of 2011:
7 For health and safety projects at various parks and historic sites,
8 including personal service and the payment of liabilities incurred
9 prior to April 1, 2008, including suballocation to other state
10 departments and agencies (49010801) ... 4,625,000 ... (re. $628,000)
11 By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
12 section 1, of the laws of 2011:
13 For health and safety projects at various parks and historic sites,
14 including personal service and the payment of liabilities incurred
15 prior to April 1, 2007, including suballocation to other state
16 departments and agencies (49010701) ... 3,713,000 ... (re. $117,000)
17 Capital Projects Funds - Other
18 State Park Infrastructure Fund
19 New Facilities Purpose
20 By chapter 55, section 1, of the laws of 2005, as added by chapter 54,
21 section 4, of the laws of 2005:
22 For services and expenses including but not limited to construction,
23 reconstruction, engineering services and rehabilitation for Tioga
24 State Park (49TS0503) ... 1,000,000 ................. (re. $881,000)
25 Capital Projects Funds - Other
26 State Park Infrastructure Fund
27 Preservation of Facilities Purpose
28 By chapter 54, section 1, of the laws of 2017:
29 For alterations, rehabilitation and improvements of various park
30 facilities and historic sites including personal service and the
31 payment of liabilities incurred prior to April 1, 2017, including
32 suballocation to other state departments and agencies (49031703) ...
33 18,500,000 ....................................... (re. $17,337,000)
34 By chapter 55, section 1, of the laws of 2016:
35 For alterations, rehabilitation and improvements of various park
36 facilities and historic sites including personal service and the
37 payment of liabilities incurred prior to April 1, 2016, including
38 suballocation to other state departments and agencies (49031603) ...
39 15,500,000 ........................................ (re. $4,310,000)
40 By chapter 54, section 1, of the laws of 2015:
41 For alterations, rehabilitation and improvements of various park
42 facilities and historic sites including personal service and the
43 payment of liabilities incurred prior to April 1, 2015, including
515 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 suballocation to other state departments and agencies (49031503) ...
2 14,500,000 ........................................ (re. $2,834,000)
3 By chapter 54, section 1, of the laws of 2014:
4 For alterations, rehabilitation and improvements of various park
5 facilities and historic sites including personal service and the
6 payment of liabilities incurred prior to April 1, 2014, including
7 suballocation to other state departments and agencies (49031403) ...
8 9,500,000 ........................................... (re. $384,000)
9 By chapter 54, section 1, of the laws of 2013:
10 For alterations, rehabilitation and improvements of various park
11 facilities and historic sites including personal service and the
12 payment of liabilities incurred prior to April 1, 2013, including
13 suballocation to other state departments and agencies (49031303) ...
14 9,500,000 ......................................... (re. $1,696,000)
15 By chapter 54, section 1, of the laws of 2012:
16 For alterations, rehabilitation and improvements of various park
17 facilities and historic sites including personal service and the
18 payment of liabilities incurred prior to April 1, 2012, including
19 suballocation to other state departments and agencies (49031203) ...
20 15,118,000 ........................................ (re. $1,472,000)
21 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
22 section 1, of the laws of 2012:
23 For alterations, rehabilitation and improvements of various park
24 facilities and historic sites including personal service and the
25 payment of liabilities incurred prior to April 1, 2011, including
26 suballocation to other state departments and agencies (49031103) ...
27 15,118,000 ........................................ (re. $2,405,000)
28 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
29 section 1, of the laws of 2011:
30 For alterations, rehabilitation and improvements of various park
31 facilities and historic sites including personal service and the
32 payment of liabilities incurred prior to April 1, 2010, including
33 suballocation to other state departments and agencies (49031003) ...
34 15,118,000 .......................................... (re. $780,000)
35 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
36 section 1, of the laws of 2011:
37 For alterations, rehabilitation and improvements of various park
38 facilities and historic sites including personal service and the
39 payment of liabilities incurred prior to April 1, 2009, including
40 suballocation to other state departments and agencies (49030903) ...
41 20,317,000 ........................................ (re. $2,560,000)
42 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
43 section 1, of the laws of 2011:
44 For alterations, rehabilitation and improvements of various park
45 facilities and historic sites including personal service and the
516 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 payment of liabilities incurred prior to April 1, 2008, including
2 suballocation to other state departments and agencies (49030803) ...
3 20,317,000 ........................................ (re. $1,500,000)
4 By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
5 section 1, of the laws of 2011:
6 For alterations, rehabilitation and improvements of various park
7 facilities and historic sites including personal service and the
8 payment of liabilities incurred prior to April 1, 2007, including
9 suballocation to other state departments and agencies (49030703) ...
10 21,912,000 .......................................... (re. $947,000)
11 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
12 section 1, of the laws of 2011:
13 For alterations, rehabilitation and improvements of various park
14 facilities and historic sites including personal service and the
15 payment of liabilities incurred prior to April 1, 2006, including
16 suballocation to other state departments and agencies (49030603) ...
17 19,160,000 ............................................ (re. $2,000)
18 Capital Projects Funds - Other
19 State Park Infrastructure Fund
20 Preventive Maintenance Purpose
21 By chapter 54, section 1, of the laws of 2017:
22 For preventive maintenance at various parks and historic sites,
23 including personal services and fringe benefits (49ZZ17PM) .........
24 4,000,000 ......................................... (re. $2,090,000)
25 By chapter 55, section 1, of the laws of 2016:
26 For preventive maintenance at various parks and historic sites,
27 including personal services and fringe benefits (49ZZ16PM) .........
28 4,000,000 ........................................... (re. $151,000)
29 By chapter 54, section 1, of the laws of 2015:
30 For preventive maintenance at various parks and historic sites,
31 including personal services and fringe benefits (49ZZ15PM) .........
32 4,000,000 ........................................... (re. $696,000)
33 By chapter 54, section 1, of the laws of 2014:
34 For preventive maintenance at various parks and historic sites,
35 including personal services and fringe benefits (49ZZ14PM) .........
36 4,000,000 ........................................... (re. $641,000)
37 By chapter 54, section 1, of the laws of 2013:
38 For preventive maintenance at various parks and historic sites,
39 including personal services and fringe benefits (49ZZ13PM) .........
40 4,000,000 ........................................... (re. $948,000)
41 By chapter 54, section 1, of the laws of 2012:
517 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For preventive maintenance at various parks and historic sites,
2 including personal services and fringe benefits (49ZZ12PM) .........
3 4,000,000 ........................................... (re. $309,000)
4 By chapter 54, section 1, of the laws of 2011:
5 For preventive maintenance at various parks and historic sites,
6 including personal services and fringe benefits (49ZZ11PM) .........
7 4,000,000 ........................................... (re. $275,000)
8 By chapter 55, section 1, of the laws of 2010:
9 For preventive maintenance at various parks and historic sites,
10 including personal services and fringe benefits (49ZZ10PM) .........
11 4,000,000 ........................................... (re. $165,000)
12 Special Revenue Funds - Other
13 Combined Expendable Trust Fund
14 Miscellaneous Gifts Account
15 Preservation of Facilities Purpose
16 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
17 section 1, of the laws of 2011:
18 For alterations, rehabilitation and improvements of various park
19 facilities and historic sites, including personal service and the
20 payment of liabilities incurred prior to April 1, 2010, including
21 suballocation to other state departments and agencies (49GI1003) ...
22 10,000,000 ........................................ (re. $2,552,000)
23 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
24 section 1, of the laws of 2011:
25 For alterations, rehabilitation and improvements of various park
26 facilities and historic sites, including personal service and the
27 payment of liabilities incurred prior to April 1, 2009, including
28 suballocation to other state departments and agencies (49GI0903) ...
29 10,000,000 .......................................... (re. $718,000)
30 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
31 section 1, of the laws of 2011:
32 For alterations, rehabilitation and improvements of various park
33 facilities and historic sites, including personal service and the
34 payment of liabilities incurred prior to April 1, 2008, including
35 suballocation to other state departments and agencies (49GI0803) ...
36 10,000,000 .......................................... (re. $225,000)
37 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
38 section 1, of the laws of 2011:
39 For alterations, rehabilitation and improvements of various park
40 facilities and historic sites, including personal service and the
41 payment of liabilities incurred prior to April 1, 2006, including
42 suballocation to other state departments and agencies (49GI0603) ...
43 10,000,000 .......................................... (re. $440,000)
518 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
2 section 1, of the laws of 2011:
3 For alterations, rehabilitation and improvements of various park
4 facilities and historic sites, including personal service and the
5 payment of liabilities incurred prior to April 1, 2005, including
6 suballocation to other state departments and agencies (49GI0503) ...
7 25,000,000 ........................................... (re. $43,000)
8 NATURAL HERITAGE TRUST (CCP)
9 Capital Projects Funds - Other
10 Capital Projects Fund
11 Program Improvement or Program Change Purpose
12 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
13 section 1, of the laws of 1996:
14 State aid for services and expenses for: Museum of Ceramic Art at
15 Alfred (20039408) ... 1,000,000 ..................... (re. $300,000)
16 NEW YORK WORKS (CCP)
17 Capital Projects Funds - Other
18 State Park Infrastructure Fund
19 Preservation of Facilities Purpose
20 By chapter 54, section 1, of the laws of 2017:
21 For services and expenses related to New York Works Infrastructure
22 projects at state parks and historic sites, provided that not less
23 than $2.5 million is provided to the olympic regional development
24 authority, including $500,000 for Belleayre Mountain Ski Center,
25 including but not limited to lift maintenance, building maintenance
26 and other infrastructure and preventive maintenance projects,
27 including personal service and the payment of liabilities incurred
28 prior to April 1, 2017. All or a portion of the funds appropriated
29 hereby may be suballocated or transferred to any department, agency
30 or public authority (49NY1703) ... 122,500,000 .. (re. $117,350,000)
31 By chapter 55, section 1, of the laws of 2016:
32 For services and expenses related to New York Works Infrastructure
33 projects at state parks and historic sites, provided that not less
34 than $2.5 million is provided to the olympic regional development
35 authority, including $500,000 for Belleayre Mountain Ski Center,
36 including but not limited to lift maintenance, building maintenance
37 and other infrastructure and preventive maintenance projects,
38 including personal service and the payment of liabilities incurred
39 prior to April 1, 2016. All or a portion of the funds appropriated
40 hereby may be suballocated or transferred to any department, agency
41 or public authority (49NY1603) ... 92,500,000 .... (re. $44,730,000)
42 By chapter 54, section 1, of the laws of 2015:
43 For services and expenses related to New York Works Infrastructure
44 projects at state parks and historic sites, provided that not less
519 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 than $2.5 million is provided to the olympic regional development
2 authority, including $500,000 for Belleayre Mountain Ski Center,
3 including but not limited to lift maintenance, building maintenance
4 and other infrastructure and preventive maintenance projects,
5 including personal service and the payment of liabilities incurred
6 prior to April 1, 2015. All or a portion of the funds appropriated
7 hereby may be suballocated or transferred to any department, agency
8 or public authority (49NY1503) ... 112,500,000 ... (re. $22,949,000)
9 By chapter 54, section 1, of the laws of 2014:
10 For services and expenses related to New York Works Infrastructure
11 projects at state parks and historic sites, provided that not less
12 than $2.5 million is provided to the olympic regional development
13 authority, including not less than $500,000 for Belleayre Mountain
14 Ski center, including but not limited to lift maintenance, building
15 maintenance and other infrastructure and preventive maintenance
16 projects, including personal service and the payment of liabilities
17 incurred prior to April 1, 2014. All or a portion of the funds
18 appropriated hereby may be suballocated or transferred to any
19 department, agency or public authority (49NY1403) ..................
20 92,500,000 ........................................ (re. $8,173,000)
21 By chapter 54, section 1, of the laws of 2013:
22 For services and expenses related to New York Works Infrastructure
23 projects at state parks and historic sites, provided that not less
24 than $2.5 million is provided to the olympic regional development
25 authority, including not less than $500,000 for Belleayre Mountain
26 ski center, including but not limited to lift maintenance, building
27 maintenance and other infrastructure and preventive maintenance
28 projects, including personal service and the payment of liabilities
29 incurred prior to April 1, 2013. All or a portion of the funds
30 appropriated hereby may be suballocated or transferred to any
31 department, agency or public authority (49NY1303) ..................
32 47,500,000 .......................................... (re. $744,000)
33 By chapter 54, section 1, of the laws of 2012:
34 For services and expenses related to New York Works Infrastructure
35 projects at state parks and historic sites, provided that not less
36 than $5 million is provided to the olympic regional development
37 authority, including not less than $1 million for Belleayre Mountain
38 ski center, including but not limited to lift maintenance, building
39 maintenance and other infrastructure and preventive maintenance
40 projects, including personal service and the payment of liabilities
41 incurred prior to April 1, 2012. All or a portion of the funds
42 appropriated hereby may be suballocated or transferred to any
43 department, agency or public authority (49NY1203) ..................
44 94,270,000 ........................................ (re. $1,566,000)
45 OUTDOOR RECREATION DEVELOPMENT FUND (CCP)
46 Capital Projects Funds - Other
47 Outdoor Recreation Development Fund
520 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Bond Proceeds Purpose
2 By chapter 558, section 19, of the laws of 1965, and chapter 558,
3 section 20, of the laws of 1965, as consolidated by chapter 54,
4 section 7, of the laws of 1976, and as amended by chapter 55,
5 section 1, of the laws of 1996, for:
6 The sale of bonds as authorized pursuant to the provisions of chapter
7 five hundred fifty-eight of the laws of nineteen hundred sixty-five
8 known as the "Outdoor Recreation Development Bond Act" for payment
9 to the capital projects fund as created by section ninety-three of
10 the state finance law for disbursements from such fund pursuant to
11 appropriations for the development and acquisition of lands for
12 outdoor recreation and for historic sites for the purposes, in the
13 manner and to the extent specified in the outdoor recreation devel-
14 opment act as enacted by chapter five hundred fifty-eight of the
15 laws of nineteen hundred sixty-five, and as such disbursements are
16 hereinafter referred to as "Outdoor Recreation Development and
17 Acquisition of Lands Disbursements" and "Outdoor Recreation Develop-
18 ment and Acquisition of Land for Historic Sites Disbursements"
19 (01377210) .......................................... (re. $230,000)
20 PARKS - EQBA 86 (CCP)
21 Capital Projects Funds - Other
22 Capital Projects Fund
23 New Facilities Purpose
24 By chapter 54, section 1, of the laws of 1989:
25 For payment of the state share of the costs of historic preservation
26 and municipal park projects in accordance with the provisions of
27 title 9 of article 52 of the environmental conservation law, for
28 projects, included in the following schedule, including costs inci-
29 dental and appurtenant thereto, hereinafter referred to as "Historic
30 Preservation and Municipal Park Disbursements."
31 The commissioner shall submit to the chairmen of the senate finance
32 committee and the assembly ways and means committee a list of
33 proposed grants and the amounts thereof not less than 14 days prior
34 to approval of such grants.
35 Notwithstanding the provisions of any general or special law, the
36 moneys hereby appropriated shall be available for historic preserva-
37 tion and municipal park expenditures for approved historic preserva-
38 tion and municipal park projects in accordance with section 52-0901
39 of the environmental conservation law upon the issuance of a certif-
40 icate of approval of availability by the director of the division of
41 the budget.
42 The state comptroller shall at the commencement of each month certify
43 to the director of the division of the budget, the commissioner of
44 the office of parks, recreation and historic preservation, the
45 chairman of the senate finance committee, and the chairman of the
46 assembly ways and means committee the amounts disbursed from this
47 appropriation for Historic Preservation and Municipal Park Disburse-
521 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ments for the month preceding such certification (49EQ8907) ........
2 30,000,000 .......................................... (re. $196,000)
3 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
4 section 3, of the laws of 1989:
5 For payment of the state share of the costs of historic preservation,
6 municipal park, and urban cultural park projects in accordance with
7 the provisions of title 9 of article 52 of the environmental conser-
8 vation law, for projects, included in the following schedule,
9 including costs incidental and appurtenant thereto, hereinafter
10 referred to as "Historic Preservation, Municipal Park and Urban
11 Cultural Park Disbursements." The commissioner shall submit to the
12 chairmen of the senate finance committee and the assembly ways and
13 means committee a list of proposed grants and the amounts thereof
14 not less than 14 days prior to approval of such grants.
15 Notwithstanding the provisions of any general or special law, the
16 moneys hereby appropriated shall be available for historic preserva-
17 tion, municipal park, and urban cultural park expenditures for
18 approved historic preservation, municipal park, and urban cultural
19 park projects in accordance with section 52-0901 of the environ-
20 mental conservation law upon the issuance of a certificate of
21 approval of availability by the director of the division of the
22 budget.
23 The state comptroller, shall at the commencement of each month certify
24 to the director of the division of the budget, the commissioner of
25 the office of parks, recreation and historic preservation, the
26 chairman of the senate finance committee, and the chairman of the
27 assembly ways and means committee the amounts disbursed from this
28 appropriation for Historic Preservation, Municipal Park and Urban
29 Cultural Park Disbursements for the month preceding such certif-
30 ication (49EQ8807) ... .... 35,000,000 ............ (re. $604,000)
31 By chapter 54, section 1, of the laws of 1987:
32 For payment of the state share of the costs of historic preservation,
33 municipal parks and urban cultural park projects in accordance with
34 the provisions of title nine of article fifty-two of the environ-
35 mental conservation law, for projects, included in the following
36 schedule, including costs incidental and appurtenant thereto, here-
37 inafter referred to as "Historic Preservation, Municipal Park and
38 Urban Cultural Parks Disbursements." The commissioner shall submit
39 to the chairmen of the senate finance committee and the assembly
40 ways and means committee a list of proposed grants and the amounts
41 thereof not less than fourteen days prior to approval of such
42 grants.
43 Notwithstanding the provisions of any general or special law, the
44 moneys hereby appropriated shall be available for historic preserva-
45 tion, municipal park and urban cultural park expenditures for
46 approved historic preservation, municipal park and urban cultural
47 park projects in accordance with section 52-0901 of the environ-
48 mental conservation law upon the issuance of a certificate of
49 approval of availability by the director of the division of the
50 budget.
522 12654-10-8
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The state comptroller, shall at the commencement of each month certify
2 to the director of the division of the budget, the commissioner of
3 environmental conservation, the chairman of the senate finance
4 committee, and the chairman of the assembly ways and means committee
5 the amounts disbursed from this appropriation for Historic Preserva-
6 tion, Municipal Park and Urban Cultural Park Disbursements for the
7 month preceding such certification (49EQ8707) ......................
8 30,000,000 ........................................ (re. $1,007,000)
9 PARKS AND RECREATION LAND ACQUISITION BOND FUND (CCP)
10 Capital Projects Funds - Other
11 Parks and Recreation Land Acquisition Bond Fund
12 New Facilities Purpose
13 By chapter 491, section 7, of the laws of 1963, and chapter 523, section
14 3, of the laws of 1960, and as amended by chapter 55, section 1, of
15 the laws of 1996, for:
16 Acquisition of lands for the purposes, in the manner and to the extent
17 specified in the park recreation land act as amended (01377107) ....
18 ..................................................... (re. $752,000)
523 12654-10-8
NEW YORK POWER AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other ..... 0 78,528,000
3 ---------------- ----------------
4 All Funds ........................ 0 78,528,000
5 ================ ================
6 CANAL DEVELOPMENT PROGRAM (CCP)
7 Capital Projects Funds - Other
8 New York State Canal System Development Fund
9 Canals and Waterways Purpose
10 By chapter 54, section 1, of the laws of 2014, as amended by chapter 55,
11 section 1, of the laws of 2016:
12 For the maintenance, construction, reconstruction, development or
13 promotion of the New York State Canal System in accordance with the
14 provisions of section 92-u of the state finance law including the
15 payment of liabilities incurred prior to April 1, 2014 (95011416) ..
16 2,000,000 ......................................... (re. $2,000,000)
17 By chapter 54, section 1, of the laws of 2013, as amended by chapter 55,
18 section 1, of the laws of 2016:
19 For the maintenance, construction, reconstruction, development or
20 promotion of the New York State Canal System in accordance with the
21 provisions of section 92-u of the state finance law including the
22 payment of liabilities incurred prior to April 1, 2013 (95011316) ..
23 2,000,000 ......................................... (re. $2,000,000)
24 By chapter 54, section 1, of the laws of 2012, as amended by chapter 55,
25 section 1, of the laws of 2016:
26 For the maintenance, construction, reconstruction, development or
27 promotion of the New York State Canal System in accordance with the
28 provisions of section 92-u of the state finance law including the
29 payment of liabilities incurred prior to April 1, 2012 (95011216) ..
30 2,000,000 ........................................... (re. $328,000)
31 EMPIRE STATE TRAIL (CCP)
32 Capital Projects Funds - Other
33 Capital Projects Fund
34 Environment and Recreation Purpose
35 By chapter 54, section 1, of the laws of 2017:
36 For the costs and expenses, including personal services, nonpersonal
37 services, fringe benefits and indirect costs of projects related to
38 improvements, alterations, rehabilitation and completion of the
39 Empire State Trail network in the hudson river valley, champlain
40 valley and along the erie canal, including the payment of liabil-
41 ities incurred prior to April 1, 2017. All or a portion of the funds
42 appropriated herein may be suballocated or transferred to any
524 12654-10-8
NEW YORK POWER AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 department, agency or public authority (95ET17ER) ..................
2 77,000,000 ....................................... (re. $74,200,000)
525 12654-10-8
DEPARTMENT OF STATE
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 100,000,000 109,674,000
6 ---------------- ----------------
7 All Funds ........................ 100,000,000 109,674,000
8 ================ ================
9 DOWNTOWN REVITALIZATION (CCP) .............................. 100,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Economic Development Purpose
14 For services and expenses, loans, grants,
15 and costs associated with program adminis-
16 tration, including the payment of liabil-
17 ities incurred prior to April 1, 2018. All
18 or a portion of the funds appropriated
19 hereby may be suballocated or transferred
20 to any department, agency, or public
21 authority, according to the following:
22 For payments related to a downtown revitali-
23 zation program designed and executed by
24 the department of state and the division
25 of housing and community renewal for
26 transformative housing, economic develop-
27 ment, transportation, and community
28 projects, including those designed to
29 increase the property tax base (19001809) .. 100,000,000
526 12654-10-8
DEPARTMENT OF STATE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 DOWNTOWN REVITALIZATION (CCP)
2 Capital Projects Funds - Other
3 Dedicated Infrastructure Investment Fund
4 Infrastructure Investment Account
5 [Special Infrastructure] Economic Development Purpose
6 The appropriation made by chapter 54, section 1, of the laws of 2017, to
7 the New York state special infrastructure account, New York state
8 special infrastructure account (CCP), special infrastructure
9 purpose, is hereby transferred and reappropriated to the department
10 of state, downtown revitalization (CCP), economic development
11 purpose, and is amended to read:
12 For services and expenses, loans, grants, and costs associated with
13 program administration, of projects and purposes authorized by
14 section 93-b of the state finance law to receive funding from the
15 dedicated infrastructure investment fund - infrastructure investment
16 account, including the payment of liabilities incurred prior to
17 April 1, 2017 [; provided however, that loans or grants under this
18 appropriation to a private corporation, association or enterprise
19 shall only be made or given by a public corporation or authority].
20 All or a portion of the funds appropriated hereby may be suballo-
21 cated or transferred to any department, agency, or public authority,
22 according to the following:
23 For payments related to a downtown revitalization program designed and
24 executed by the department of state and the division of housing and
25 community renewal for transformative housing, economic development,
26 transportation, and community projects, including those designed to
27 increase the property tax base [(93SI17SP)] (19011709) .............
28 100,000,000 ..................................... (re. $100,000,000)
29 MAINTENANCE AND REPAIR (CCP)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Preservation of Facilities Purpose
33 By chapter 54, section 1, of the laws of 2017:
34 For services and expenses, maintenance, including building repairs,
35 pursuant to an application made to the cemetery board under para-
36 graph (h) of section 1507 of the not-for-profit corporation law by
37 the towns of Ellenburg and Plattsburgh (19CR1703) ..................
38 2,000,000 ......................................... (re. $2,000,000)
39 SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP)
40 Capital Projects Funds - Other
41 Hazardous Waste Remedial Fund
42 Hazardous Waste Remediation Oversight and Assistance Account
43 Hazardous Waste Purpose
44 By chapter 54, section 1, of the laws of 2013:
527 12654-10-8
DEPARTMENT OF STATE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the following purposes: non-bondable services and expenses associ-
2 ated with the brownfield cleanup and hazardous waste remediation
3 projects; grants authorized pursuant to section 970-r of the general
4 municipal law; and, suballocation to other state departments and
5 agencies; and for other brownfield site cleanup hazardous waste
6 purposes (191313F7) ... 10,000,000 ................ (re. $6,970,000)
7 By chapter 55, section 1, of the laws of 2010:
8 For the following purposes: non-bondable services and expenses associ-
9 ated with the brownfield cleanup and hazardous waste remediation
10 projects; grants authorized pursuant to section 970-r of the general
11 municipal law; and, suballocation to other state departments and
12 agencies; and for other brownfield site cleanup hazardous waste
13 purposes (19BA10F7) ... 2,750,000 ................... (re. $560,000)
14 By chapter 55, section 1, of the laws of 2009:
15 For the following purposes: non-bondable services and expenses associ-
16 ated with the brownfield cleanup and hazardous waste remediation
17 projects; grants authorized pursuant to section 970-r of the general
18 municipal law; and, suballocation to other state departments and
19 agencies; and for other brownfield site cleanup hazardous waste
20 purposes (19BA09F7) ... 2,750,000 ................... (re. $144,000)
528 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Fund - Other....... 116,500,000 84,818,000
6 ---------------- ----------------
7 All Funds......................... 116,500,000 84,818,000
8 ================ ================
9 FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 8,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Maintenance and Operations Purpose
14 For the maintenance and operation of various
15 facilities and systems including personal
16 services, fringe benefits and indirect
17 costs. Notwithstanding any other law to
18 the contrary, all or a portion of the
19 funds appropriated herein may be suballo-
20 cated or transferred to any department,
21 agency, or public authority (06FM18MO) ....... 8,000,000
22 LAW ENFORCEMENT (CCP) ....................................... 60,000,000
23 --------------
24 Capital Projects Funds - Other
25 Miscellaneous Capital Projects Fund
26 DSP Capital Equitable Sharing Agreement - Justice
27 Account
28 Program Improvement or Program Change Purpose
29 For moneys to the division of state police
30 for the justice department federal equita-
31 ble sharing agreement to be used for law
32 enforcement purposes distributed pursuant
33 to a plan prepared by superintendent of
34 the division of state police and approved
35 by the director of the budget.
36 Notwithstanding any provision of law to the
37 contrary, upon approval of the director of
38 the budget, the funding appropriated here-
39 in may be suballocated, interchanged, or
40 transferred and may be used for the
41 payment of prior year liabilities
42 (06JU1808) .................................. 30,000,000
43 Capital Projects Funds - Other
529 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS 2018-19
1 Miscellaneous Capital Projects Fund
2 DSP Capital Equitable Sharing Agreement - Treasury
3 Account
4 Program Improvement or Program Change Purpose
5 For moneys to the division of state police
6 for the treasury department federal equi-
7 table sharing agreement to be used for law
8 enforcement purposes distributed pursuant
9 to a plan prepared by superintendent of
10 the division of state police and approved
11 by the director of the budget.
12 Notwithstanding any provision of law to the
13 contrary, upon approval of the director of
14 the budget, the funding appropriated here-
15 in may be suballocated, interchanged, or
16 transferred and may be used for the
17 payment of prior year liabilities
18 (06TR1808) .................................. 30,000,000
19 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) .... 48,500,000
20 --------------
21 Capital Projects Funds - Other
22 Capital Projects Fund
23 Health and Safety Purpose
24 Alterations and improvements for health and
25 safety including liabilities incurred
26 prior to April 1, 2018 (06HS1801) ............ 2,000,000
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Preservation of Facilities Purpose
30 Alterations and improvements for the preser-
31 vation of facilities and the replacement,
32 maintenance and repair of equipment and
33 equipment parts including liabilities
34 incurred prior to April 1, 2018 (06PF1803) .. 40,500,000
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Program Improvements Purpose
38 For services and expenses associated with
39 the design, construction and renovation of
40 evidence storage facilities at troop head-
41 quarters, including but not limited to the
42 costs of studies, appraisals, surveys,
43 preparation of plans, design,
44 construction, equipment, and renovations
530 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS 2018-19
1 including liabilities incurred prior to
2 April 1, 2018 (06EV1808) ..................... 6,000,000
531 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 FACILITIES MAINTENANCE AND OPERATIONS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Maintenance and Operations Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For the maintenance and operation of various facilities and systems
7 including personal services, fringe benefits and indirect costs.
8 Notwithstanding any other law to the contrary, all or a portion of
9 the funds appropriated herein may be suballocated or transferred to
10 any department, agency, or public authority (06FM17MO) .............
11 8,000,000 ......................................... (re. $2,780,000)
12 IT INITIATIVE PROGRAM (CCP)
13 Capital Projects Funds - Other
14 Capital Projects Fund
15 Program Improvement or Program Change Purpose
16 By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
17 section 1, of the laws of 2017:
18 For services and expenses related to the development of a records
19 management system. Funds appropriated herein may be suballocated to
20 the office of information technology services to achieve this
21 purpose. The division of criminal justice services, after consulta-
22 tion with the division of state police and the office of information
23 technology, shall submit a plan to the legislative leaders setting
24 forth the plan to develop such a records management system and
25 assessing any privacy and security implications, and no expenditures
26 may be made from this appropriation until the plan has been approved
27 by the legislative leaders (06SC1408) ..............................
28 10,000,000 ....................................... (re. $10,000,000)
29 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Health and Safety Purpose
33 By chapter 54, section 1, of the laws of 2017:
34 Alterations and improvements for health and safety including liabil-
35 ities incurred prior to April 1, 2017 (06HS1701) ...................
36 2,000,000 ......................................... (re. $2,000,000)
37 By chapter 55, section 1, of the laws of 2016:
38 Alterations and improvements for health and safety including liabil-
39 ities incurred prior to April 1, 2016 (06HS1601) ...................
40 2,000,000 ......................................... (re. $1,326,000)
41 By chapter 54, section 1, of the laws of 2015:
532 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements for health and safety including liabil-
2 ities incurred prior to April 1, 2015 (06HS1501) ...................
3 2,000,000 ......................................... (re. $1,368,000)
4 By chapter 54, section 1, of the laws of 2013:
5 Alterations and improvements for health and safety including liabil-
6 ities incurred prior to April 1, 2013 (06HS1301) ...................
7 2,000,000 ......................................... (re. $1,300,000)
8 By chapter 54, section 1, of the laws of 2011:
9 Alterations and improvements for health and safety including liabil-
10 ities incurred prior to April 1, 2011 (06HS1101) ...................
11 2,000,000 ........................................... (re. $429,000)
12 By chapter 50, section 1, of the laws of 2010:
13 Alterations and improvements for health and safety including liabil-
14 ities incurred prior to April 1, 2010 (06HS1001) ...................
15 2,000,000 ........................................... (re. $496,000)
16 By chapter 50, section 1, of the laws of 2009:
17 Alterations and improvements for health and safety including liabil-
18 ities incurred prior to April 1, 2009 (06HS0901) ...................
19 2,000,000 ............................................ (re. $29,000)
20 By chapter 50, section 1, of the laws of 2008:
21 Alterations and improvements for health and safety including liabil-
22 ities incurred prior to April 1, 2008 (06HS0801) ...................
23 2,000,000 ............................................ (re. $33,000)
24 By chapter 50, section 1, of the laws of 2007:
25 Alterations and improvements for health and safety including liabil-
26 ities incurred prior to April 1, 2007 (06HS0701) ...................
27 2,000,000 ........................................... (re. $281,000)
28 Capital Projects Funds - Other
29 Capital Projects Fund
30 Preservation of Facilities Purpose
31 By chapter 54, section 1, of the laws of 2017:
32 Alterations and improvements for the preservation of facilities and
33 the replacement, maintenance and repair of equipment and equipment
34 parts including liabilities incurred prior to April 1, 2017
35 (06PF1703) ... 35,500,000 ........................ (re. $30,468,000)
36 By chapter 55, section 1, of the laws of 2016:
37 Alterations and improvements for the preservation of facilities and
38 replacement of equipment including liabilities incurred prior to
39 April 1, 2016 (06PF1603) ... 23,500,000 ........... (re. $7,849,000)
40 By chapter 54, section 1, of the laws of 2015:
533 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Alterations and improvements for the preservation of facilities and
2 replacement of equipment including liabilities incurred prior to
3 April 1, 2015 (06PF1503) ... 23,500,000 ............. (re. $753,000)
4 By chapter 54, section 1, of the laws of 2013:
5 Alterations and improvements for the preservation of facilities and
6 equipment including liabilities incurred prior to April 1, 2013
7 (06PF1303) ... 3,500,000 ............................ (re. $352,000)
8 By chapter 54, section 1, of the laws of 2011:
9 Alterations and improvements for the preservation of facilities and
10 equipment including liabilities incurred prior to April 1, 2011
11 (06PF1103) ... 3,500,000 ............................ (re. $501,000)
12 By chapter 50, section 1, of the laws of 2010:
13 Alterations and improvements for the preservation of facilities and
14 equipment including liabilities incurred prior to April 1, 2010
15 (06PF1003) ... 3,500,000 ............................ (re. $501,000)
16 By chapter 50, section 1, of the laws of 2009:
17 Alterations and improvements for the preservation of facilities and
18 equipment including liabilities incurred prior to April 1, 2009
19 (06PF0903) ... 3,500,000 ............................ (re. $226,000)
20 By chapter 50, section 1, of the laws of 2008:
21 Alterations and improvements for the preservation of facilities and
22 equipment including liabilities incurred prior to April 1, 2008
23 (06PF0803) ... 3,500,000 ............................. (re. $70,000)
24 By chapter 50, section 1, of the laws of 2007:
25 Alterations and improvements for the preservation of facilities and
26 equipment including liabilities incurred prior to April 1, 2007
27 (06PF0703) ... 4,200,000 ............................. (re. $40,000)
28 Capital Projects Funds - Other
29 Capital Projects Fund
30 Program Improvements Purpose
31 By chapter 54, section 1, of the laws of 2017:
32 For services and expenses associated with the design, construction and
33 renovation of evidence storage facilities at troop headquarters,
34 including but not limited to the costs of studies, appraisals,
35 surveys, preparation of plans, design, construction, equipment, and
36 renovations including liabilities incurred prior to April 1, 2017
37 (06EV1708) ... 6,000,000 .......................... (re. $6,000,000)
38 By chapter 55, section 1, of the laws of 2016:
39 For services and expenses associated with the design and construction
40 of evidence storage facilities at troop headquarters, including but
41 not limited to the costs of studies, appraisals, surveys, prepara-
42 tion of plans, design, construction, equipment, and renovations
534 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 including liabilities incurred prior to April 1, 2016 (06EV1608) ...
2 6,000,000 ......................................... (re. $6,000,000)
3 By chapter 54, section 1, of the laws of 2015:
4 For services and expenses associated with the design and construction
5 of evidence storage facilities at troop headquarters, including but
6 not limited to the costs of studies, appraisals, surveys, prepara-
7 tion of plans, design, construction, equipment, and renovations
8 including liabilities incurred prior to April 1, 2015 (06EV1508) ...
9 6,000,000 ......................................... (re. $3,048,000)
10 By chapter 54, section 1, of the laws of 2014:
11 For services and expenses associated with the design and construction
12 of evidence storage facilities at troop headquarters, including but
13 not limited to the costs of studies, appraisals, surveys, prepara-
14 tion of plans, design, construction, equipment, and renovations
15 including liabilities incurred prior to April 1, 2014 (06EV1408) ...
16 6,000,000 ......................................... (re. $6,000,000)
17 By chapter 54, section 1, of the laws of 2012:
18 For services and expenses associated with the design and construction
19 of evidence storage facilities at Troop Headquarters, including but
20 not limited to the costs of studies, appraisals, surveys, prepara-
21 tion of plans, design, construction, equipment, and renovations
22 including liabilities incurred prior to April 1, 2012 (06EV1208) ...
23 6,000,000 ......................................... (re. $1,147,000)
24 By chapter 54, section 1, of the laws of 2011:
25 For services and expenses associated with the design and construction
26 of evidence storage facilities at Troop Headquarters, including but
27 not limited to the costs of studies, appraisals, surveys, prepara-
28 tion of plans, design, construction, equipment, and renovations
29 including liabilities incurred prior to April 1, 2011 (06EV1108) ...
30 6,000,000 ........................................... (re. $250,000)
31 NEW FACILITIES (CCP)
32 Capital Projects Funds - Other
33 Capital Projects Fund
34 New Facilities Purpose
35 By chapter 54, section 1, of the laws of 2013:
36 For services and expenses related to the development of a Troop L
37 facility, including but not limited to the costs of property acqui-
38 sition, studies, appraisals, surveys, preparation of plans, design,
39 construction, equipment, and environmental impact statements
40 (06NF1307) ... 7,000,000 .......................... (re. $4,571,000)
41 By chapter 50, section 1, of the laws of 2007:
42 For services and expenses related to the development of a Troop G
43 facility, including but not limited to the costs of property acqui-
44 sition, studies, appraisals, surveys, preparation of plans, design,
535 12654-10-8
DIVISION OF STATE POLICE
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 construction, equipment, and environmental impact statements
2 (06NF0707) ... 50,000,000 ......................... (re. $3,465,000)
3 By chapter 50, section 1, of the laws of 2006:
4 For services and expenses related to the development of a Troop L
5 facility, including but not limited to the costs of property acqui-
6 sition, studies, appraisals, surveys, preparation of plans, design,
7 construction, equipment, and environmental impact statements
8 (06NF0607) ... 4,000,000 .......................... (re. $1,210,000)
9 By chapter 50, section 1, of the laws of 2005:
10 For the costs of studies, site acquisitions, planning, design,
11 construction, reconstruction, equipment, renovation and development
12 of a Troop G Headquarters. A portion of the amounts included within
13 this appropriation, subject to the approval of the director of the
14 budget, shall be made available for payment to the design and
15 construction management account of the centralized services fund of
16 the New York state office of general services for the purposes of
17 this appropriation (06060507) ... 15,700,000 ........ (re. $150,000)
536 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 1,227,232,000 3,360,956,000
6 ---------------- ----------------
7 All Funds ........................ 1,227,232,000 3,360,956,000
8 ================ ================
9 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................ 162,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Maintenance and Operations Purpose
14 For the maintenance and operation of various
15 facilities and systems including personal
16 services, fringe benefits and indirect
17 costs. Notwithstanding any other law to
18 the contrary, all or a portion of the
19 funds appropriated herein may be suballo-
20 cated or transferred to any department,
21 agency, or public authority (28FM18MO) ..... 162,000,000
22 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ................. 815,864,000
23 --------------
24 Capital Projects Funds - Other
25 Capital Projects Fund
26 Preservation of Facilities Purpose
27 For services and expenses related to alter-
28 ations and improvements to existing facil-
29 ities for capital maintenance, including
30 but not limited to capital design,
31 construction, reconstruction, rehabili-
32 tation, in-kind replacement of accessory
33 and support structures as well as equip-
34 ment; for health and safety, preservation
35 of facilities, program improvement or
36 program change, environmental protection,
37 energy conservation, accreditation, facil-
38 ities for the physically disabled, preven-
39 tative maintenance and related projects,
40 including costs incurred prior to April 1,
41 2018 and subject to a plan developed and
42 submitted annually by the state university
537 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 of New York and approved by the director
2 of the budget, and which may include, but
3 not be limited to, projects in the follow-
4 ing schedule (28F11803) .................... 350,000,000
5 Project Schedule
6 PROJECT AMOUNT
7 ----------------------------------------------------------
8 (thousands of dollars)
9 Albany
10 Campus-wide maintenance projects ................. 9,685
11 Alfred Ceramics
12 Campus-wide maintenance projects ................... 857
13 Alfred State
14 Campus-wide maintenance projects ................. 2,358
15 Binghamton
16 Campus-wide maintenance projects ................ 10,762
17 Brockport
18 Campus-wide maintenance projects ................. 5,521
19 Brooklyn Health Science Center (HSC)
20 Campus-wide maintenance projects ................. 3,681
21 Buffalo College
22 Campus-wide maintenance projects ................. 6,476
23 Buffalo University
24 Campus-wide maintenance projects ................ 18,002
25 Canton
26 Campus-wide maintenance projects ................. 1,827
27 Cobleskill
28 Campus-wide maintenance projects ................. 1,927
29 Cornell
30 Campus-wide maintenance projects ................. 9,924
31 Cortland
32 Campus-wide maintenance projects ................. 4,799
33 Delhi
34 Campus-wide maintenance projects ................. 1,849
35 Empire State
36 Campus-wide maintenance projects ................... 411
37 Environmental Science and Forestry
38 Campus-wide maintenance projects ................. 2,423
39 Farmingdale
40 Campus-wide maintenance projects ................. 4,999
41 Fredonia
42 Campus-wide maintenance projects ................. 3,763
43 Geneseo
44 Campus-wide maintenance projects ................. 3,571
45 Maritime
46 Campus-wide maintenance projects ................. 1,809
47 Morrisville
48 Campus-wide maintenance projects ................. 2,316
49 New Paltz
538 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 Campus-wide maintenance projects ................. 4,898
2 Old Westbury
3 Campus-wide maintenance projects ................. 2,521
4 Oneonta
5 Campus-wide maintenance projects ................. 4,016
6 Optometry
7 Campus-wide maintenance projects ................... 901
8 Oswego
9 Campus-wide maintenance projects ................. 5,760
10 Plattsburgh
11 Campus-wide maintenance projects ................. 3,756
12 Potsdam
13 Campus-wide maintenance projects ................. 3,896
14 Purchase
15 Campus-wide maintenance projects ................. 4,183
16 State Univ Plaza
17 Campus-wide maintenance projects ................. 1,479
18 Stony Brook, incl Health Science Center
19 (HSC) and Long Island State Veterans Home:
20 Campus-wide maintenance projects ................ 21,315
21 Syracuse Health Science Center (HSC)
22 Campus-wide maintenance projects ................. 2,676
23 SUNY Polytechnic
24 Campus-wide maintenance projects ................. 1,039
25 University-wide Alterations and Improvements
26 Maintenance undistributed
27 For priority capital maintenance or capi-
28 tal improvement projects to support the
29 preservation of facilities ................... 196,600
30 --------------
31 Total .......................................... 350,000
32 ==============
33 For services and expenses related to alter-
34 ations and improvements to existing facil-
35 ities for capital maintenance, including
36 but not limited to capital design,
37 construction, reconstruction, rehabili-
38 tation, in-kind replacement of accessory
39 and support structures as well as equip-
40 ment; for health and safety, preservation
41 of facilities, program improvement or
42 program change, environmental protection,
43 energy conservation, accreditation, facil-
44 ities for the physically disabled, preven-
45 tative maintenance and related projects,
46 including costs incurred prior to April 1,
47 2018 and subject to a plan developed and
48 submitted annually by the state university
49 of New York and approved by the director
50 of the budget, and which may include, but
539 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 not be limited to, projects in the follow-
2 ing schedule (28FU1803) .................... 200,000,000
3 Project Schedule
4 PROJECT AMOUNT
5 ----------------------------------------------------------
6 (thousands of dollars)
7 Albany
8 Campus-wide maintenance projects ................ 12,627
9 Alfred Ceramics
10 Campus-wide maintenance projects ................. 1,117
11 Alfred State
12 Campus-wide maintenance projects ................. 3,074
13 Binghamton
14 Campus-wide maintenance projects ................ 14,031
15 Brockport
16 Campus-wide maintenance projects ................. 7,198
17 Brooklyn Health Science Center (HSC)
18 Campus-wide maintenance projects ................. 4,799
19 Buffalo College
20 Campus-wide maintenance projects ................. 8,441
21 Buffalo University
22 Campus-wide maintenance projects ................ 23,471
23 Canton
24 Campus-wide maintenance projects ................. 2,382
25 Cobleskill
26 Campus-wide maintenance projects ................. 2,512
27 Cornell
28 Campus-wide maintenance projects ................ 12,939
29 Cortland
30 Campus-wide maintenance projects ................. 6,257
31 Delhi
32 Campus-wide maintenance projects ................. 2,411
33 Empire State
34 Campus-wide maintenance projects ................... 536
35 Environmental Science and Forestry
36 Campus-wide maintenance projects ................. 3,159
37 Farmingdale
38 Campus-wide maintenance projects ................. 6,518
39 Fredonia
40 Campus-wide maintenance projects ................. 4,906
41 Geneseo
42 Campus-wide maintenance projects ................. 4,656
43 Maritime
44 Campus-wide maintenance projects ................. 2,359
45 Morrisville
46 Campus-wide maintenance projects ................. 3,020
47 New Paltz
48 Campus-wide maintenance projects ................. 6,386
49 Old Westbury
540 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 Campus-wide maintenance projects ................. 3,287
2 Oneonta
3 Campus-wide maintenance projects ................. 5,236
4 Optometry
5 Campus-wide maintenance projects ................. 1,175
6 Oswego
7 Campus-wide maintenance projects ................. 7,510
8 Plattsburgh
9 Campus-wide maintenance projects ................. 4,897
10 Potsdam
11 Campus-wide maintenance projects ................. 5,080
12 Purchase
13 Campus-wide maintenance projects ................. 5,454
14 State Univ Plaza
15 Campus-wide maintenance projects ................. 1,928
16 Stony Brook, incl Health Science Center
17 (HSC) and Long Island State Veterans Home:
18 Campus-wide maintenance projects ................ 27,790
19 Syracuse Health Science Center (HSC)
20 Campus-wide maintenance projects ................. 3,489
21 SUNY Polytechnic
22 Campus-wide maintenance projects ................. 1,355
23 --------------
24 Total .......................................... 200,000
25 ==============
26 For services and expenses of SUNY hospitals
27 for alterations, improvements, services
28 and expenses, and new facilities, includ-
29 ing costs incurred prior to April 1, 2018
30 subject to a plan developed by the state
31 university and approved by the director of
32 the budget (28FI1803) ...................... 100,000,000
33 Project Schedule
34 PROJECT AMOUNT
35 ----------------------------------------------------------
36 (thousands of dollars)
37 Upstate University Hospital ....................... 50,000
38 For university-wide projects
39 Stony Brook University Hospital ................... 50,000
40 For university-wide projects
41 --------------
42 Total ........................................ 100,000
43 ==============
44 For services and expenses of SUNY hospitals
45 for alterations, improvements, services
46 and expenses, and new facilities, includ-
47 ing costs incurred prior to April 1, 2018
48 subject to a plan developed by the state
541 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 university and approved by the director of
2 the budget (28FJ1803) ....................... 77,300,000
3 Project Schedule
4 PROJECT AMOUNT
5 ----------------------------------------------------------
6 (thousands of dollars)
7 Upstate University Hospital ....................... 40,800
8 For university-wide projects
9 Stony Brook University Hospital ................... 36,500
10 For university-wide projects
11 --------------
12 Total ......................................... 77,300
13 ==============
14 For services and expenses of SUNY hospitals
15 for alterations, improvements, services
16 and expenses, and new facilities, includ-
17 ing costs incurred prior to April 1, 2018
18 subject to a plan developed by the state
19 university and approved by the director of
20 the budget (28FK1803) ....................... 78,564,000
21 For services and expenses related to alter-
22 ations and improvements to facilities and
23 capital maintenance for educational oppor-
24 tunity centers (28E01803) ................... 10,000,000
25 PROJECT ADMINISTRATION (CCP) ................................ 25,098,000
26 --------------
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Administration Purpose
30 For payment to the state university
31 construction fund, for services and
32 expenses of the state university
33 construction fund including payments for
34 personal service, fringe benefits charges,
35 supplies and materials, contractual
36 services, equipment, travel expenses,
37 indirect costs and liabilities incurred
38 prior to April 1, 2018 (28SF1850) ........... 25,098,000
39 STATE UNIVERSITY CAPITAL PROJECTS FUND (CCP) ............... 100,000,000
40 --------------
41 Capital Projects Funds - Other
42 State University Capital Projects Fund
43 Preservation of Facilities Purpose
542 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS 2018-19
1 Alterations and improvements for projects
2 university-wide including, services and
3 expenses, new facilities, and projects
4 approved pursuant to the NY-SUNY 2020
5 challenge grant program, which may include
6 revenue transfers from various external
7 revenue sources and the payment of liabil-
8 ities prior to April 1, 2018 (28C11803) .... 100,000,000
9 STATE UNIVERSITY RESIDENCE HALL REHABILITATION FUND (CCP) ... 50,000,000
10 --------------
11 Capital Projects Funds - Other
12 State University Residence Hall Rehabilitation Fund
13 Preservation of Facilities Purpose
14 Alterations and improvements for residence
15 hall rehabilitation projects and for resi-
16 dence hall renovations including services
17 and expenses, to be financed by a transfer
18 from the debt service fund state universi-
19 ty dormitory income fund or other external
20 revenue sources subject to a plan devel-
21 oped by the state university and approved
22 by the director of the budget. Notwith-
23 standing any other law to the contrary,
24 all or a portion of the amounts hereby
25 appropriated may be transferred or subal-
26 located to the dormitory authority and/or
27 the state university of New York for such
28 purpose (28D31803) .......................... 50,000,000
543 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) .................. 74,270,000
5 --------------
6 Capital Projects Funds - Other
7 Capital Projects Fund
8 Program Improvement or Program Change Purpose
9 For services and expenses for the state
10 share of financial assistance to community
11 colleges for alterations and improvements
12 to various facilities including service
13 contracts, memoranda of understanding,
14 capital design, construction, acquisition,
15 reconstruction, rehabilitation, equipment
16 and personal service costs; for health and
17 safety, preservation of facilities, tech-
18 nology upgrades, new facilities, program
19 improvements or program changes, environ-
20 mental protection, energy conservation,
21 accreditation, facilities for the phys-
22 ically disabled, and related projects,
23 including costs incurred prior to April 1,
24 2018, subject to a plan submitted by the
25 state university and approved by the
26 director of the budget, and which may
27 include, but not be limited to, projects
28 in the following schedule. Notwithstanding
29 any other law to the contrary, all or a
30 portion of the amounts hereby appropriated
31 may be suballocated or transferred to the
32 state university construction fund or the
33 dormitory authority of the state of New
34 York for such purposes (28CC1808) ........... 74,270,000
35 Project Schedule
36 ESTIMATED ESTIMATED
37 TOTAL SHARE 50 PERCENT
38 & LOCAL SHARE STATE SHARE
39 ----------------------------------------------------------
40 (thousands of dollars)
41 Adirondack Community College
42 Campus wide improvements ......... 798 399
43 Furniture Fixtures and
44 Equipment Culinary Center ...... 300 150
45 Columbia-Greene Community College
46 Renovations and Improvements ..... 20,000 10,000
544 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS 2018-19
1 Classroom Upgrades ............... 300 150
2 Corning Community College
3 Critical Maintenance Items ....... 500 250
4 Dutchess County Community College
5 Facility Master Planning ......... 500 250
6 Fire Alarm Upgrade ............... 824 412
7 Erie Community College
8 Building Infrastructure
9 Improvements/Renovations ......... 1,000 500
10 College-wide Sitework ............ 800 400
11 Code Compliance Upgrades ......... 600 300
12 Roof Replacement and Water-
13 proofing ....................... 2,000 1,000
14 Mechanical, Electrical and
15 Plumbing Improvements .......... 1,000 500
16 College-wide Preservation ........ 600 300
17 Fashion Institute of Technology
18 Energy Savings and Refurbishment
19 Projects ....................... 7,372 3,686
20 Classroom Renovations ............ 300 150
21 College Bookstore Ph 1 ........... 1,328 664
22 New Academic Building ............ 40,754 20,377
23 Finger Lakes Community College
24 Parking and Utility Upgrades ..... 750 375
25 Athletic Fields Renovation ....... 5,000 2,500
26 Critical Maintenance Items ....... 1,000 500
27 Herkimer County Community College
28 Bookstore/Library Renovations .... 300 150
29 Roofs: RMCC/Tech Centers ......... 1,500 750
30 Stadium Turf Replacement ......... 700 350
31 Hudson Valley Community College
32 Center: Manufacturing Skills ..... 11,600 5,800
33 Update Mechanical Systems ...... 1,022 511
34 Jamestown Community College
35 Critical Maintenance ............. 1,000 500
36 Mohawk Valley Community College
37 Data/WiFi Infrastructure ......... 200 100
38 Athletic Field Revitalization .... 500 250
39 Science/Tech Building Expansion .. 450 225
40 ACC Basement Flooding Mitigation.. 250 125
41 Monroe Community College
42 Renovate Science Labs ............ 3,856 1,928
43 Nassau County Community College
44 Historic Theater Building Renova-
45 tion ........................... 6,000 3,000
46 Tunnel Repair .................. 4,200 2,100
47 Campus-wide Facilities Up-
48 grade ........................ 3,000 1,500
49 Culinary Food Service Renova-
50 tion ......................... 3,000 1,500
51 Road and Parking Rehabilitation. 2,350 1,175
545 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS 2018-19
1 Infrastructure and Master
2 Plan ......................... 2,252 1,126
3 Road Parking and Paving ........ 2,000 1,000
4 Concrete Repairs ............... 1,200 600
5 Renovation to Cluster C ........ 700 350
6 Building Systems Upgrades ...... 500 250
7 Various Facilities Upgrades .... 500 250
8 Elevator Restoration ........... 200 100
9 North Country Community College
10 Maintenance Upgrades ............. 310 155
11 Dining Services Upgrades ......... 200 100
12 Orange County Community College
13 Horton Hall Site Repairs ......... 350 175
14 Pumps and Motors Replacement ..... 300 150
15 Campus Wayfinding ................ 260 130
16 Instructional Equipment .......... 500 250
17 Kaplan Facade Repair ............. 60 30
18 Schenectady Community College
19 Elston Hall Exterior Renovations.. 350 175
20 Begley Learning Commons Ph 1 ..... 672 336
21 Campus Safety Office Relocation .. 142 71
22 Campus Wayfinding ................ 178 89
23 Suffolk County Community College
24 Infrastructure Improvements Ph II. 5,150 2,575
25 SUNY Sullivan
26 Facility Master Planning ......... 200 100
27 Ulster County Community College
28 Infrastructure: Public Safety Fa-
29 cility ......................... 4,552 2,276
30 Westchester Community College
31 Site Improvement/Upgrade Ph II ... 750 375
32 Technology Upgrades On-Campus
33 Cycle 2 Ph I ................... 1,236 618
34 Technology Upgrades Off-Campus
35 Cycle 2 Ph I ................... 100 50
36 Facility Master Planning ......... 224 112
37 ---------- ----------
38 Total .......................... 148,540 74,270
39 ========== ==========
546 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 By chapter 53, section 1, of the laws of 1998, as amended by chapter 53,
6 section 3, of the laws of 2016:
7 Advance for campus core component projects including services and
8 expenses for alterations and improvements to various facilities,
9 capital design including the cost of services provided by private
10 firms, including but not limited to the preparation of designs,
11 plans, specifications and estimates; underground utilities; acquisi-
12 tion of property and operation of parking facilities; construction,
13 reconstruction and rehabilitation; construction management and
14 supervision; appraisals, surveys, testing and environmental impact
15 statements; equipment costs; and the payment of liabilities incurred
16 prior to April 1, 1998 (28F898C1) ... ............................
17 947,326,000 ....................................... (re. $4,553,000)
18 Advance for campus technology/campus development component projects
19 including services and expenses for alterations and improvements to
20 various facilities, capital design including the cost of services
21 provided by private firms, including but not limited to the prepara-
22 tion of designs, plans, specifications and estimates; underground
23 utilities; acquisition of property; construction, reconstruction and
24 rehabilitation; construction management and supervision; appraisals,
25 surveys, testing and environmental impact statements; equipment
26 costs; including not more than $8,467,000 for design, construction
27 and development of a health and wellness center at Alfred Ceramics,
28 provided, however that any previous allocation from this appropri-
29 ation for the center for ceramic education at Alfred Ceramics shall
30 be deemed repealed and the payment of liabilities incurred prior to
31 April 1, 1998 (28F698C1) ... ... 187,038,000 .... (re. $2,911,000)
32 Advance for systemwide component projects including services and
33 expenses for alterations and improvements to various facilities,
34 capital design including the cost of services provided by private
35 firms, including but not limited to the preparation of designs,
36 plans, specifications and estimates; underground utilities; acquisi-
37 tion of property and operation of parking facilities; construction,
38 reconstruction and rehabilitation; construction management and
39 supervision; appraisals, surveys, testing and environmental impact
40 statements; equipment costs; and the payment of liabilities incurred
41 prior to April 1, 1998 (28F498C1) ... ............................
42 73,125,000 ........................................ (re. $1,744,000)
43 Advance for campus improvement/quality of life component projects
44 including services and expenses for alterations and improvements to
45 various facilities, capital design including the cost of services
46 provided by private firms, including but not limited to the prepara-
47 tion of designs, plans, specifications and estimates; underground
48 utilities; acquisition of property; construction, reconstruction and
49 rehabilitation; construction management and supervision; appraisals,
547 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 surveys, testing and environmental impact statements; equipment
2 costs for state university educational facility projects; and the
3 payment of liabilities incurred prior to April 1, 1998 (28F398C1)
4 ... ... 45,120,000 .............................. (re. $1,726,000)
5 Advance for the hospital facility program including services and
6 expenses for alterations and improvements to various facilities,
7 capital design including the cost of services provided by private
8 firms, including but not limited to the preparation of designs,
9 plans, specifications and estimates; underground utilities; acquisi-
10 tion of property and operation of parking facilities; construction,
11 reconstruction and rehabilitation; construction management and
12 supervision; appraisals, surveys, testing and environmental impact
13 statements; equipment costs; and the payment of liabilities incurred
14 prior to April 1, 1998 (28F198C1) ... ............................
15 75,000,000 .......................................... (re. $547,000)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Program Improvement or Program Change Purpose
19 The appropriation made by chapter 54, section 1, of the laws of 2017, to
20 the preservation of facilities purpose, is hereby transferred and
21 reappropriated to the program improvement or program change purpose:
22 For services and expenses of SUNY hospitals for alterations, improve-
23 ments, services and expenses, and new facilities, including costs
24 incurred prior to April 1, 2017 subject to a plan developed by the
25 state university and approved by the director of the budget
26 (28FI1708) ... 100,000,000 ...................... (re. $100,000,000)
27 Project Schedule
28 PROJECT AMOUNT
29 ----------------------------------------------------------
30 (thousands of dollars)
31 Upstate University Hospital ....................... 50,000
32 For university-wide projects
33 Stony Brook University Hospital ................... 50,000
34 For university-wide projects
35 --------------
36 Total ........................................ 100,000
37 ==============
38 The appropriation made by chapter 55, section 1, of the laws of 2016, as
39 amended by chapter 53, section 3, of the laws of 2016, to the pres-
40 ervation of facilities purpose, is hereby transferred and reappro-
41 priated to the program improvement or program change purpose:
42 For services and expenses of upstate university hospital capital
43 projects and facilities. Moneys from this appropriation shall be
44 made available only as matching funds up to an equal amount of funds
45 awarded to upstate university hospital through the capital restruc-
46 turing financing program pursuant to section 2825 of the public
548 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 health law, including costs incurred prior to April 1, 2016
2 (28FH1608) ... 75,000,000 ........................ (re. $75,000,000)
3 For services and expenses of SUNY hospitals for alterations, improve-
4 ments, services and expenses, and new facilities, including costs
5 incurred prior to April 1, 2016 subject to a plan developed by the
6 state university and approved by the director of the budget
7 (28FI1608) ... 100,000,000 ....................... (re. $90,803,000)
8 Project Schedule
9 PROJECT AMOUNT
10 ----------------------------------------------------------
11 (thousands of dollars)
12 Upstate University Hospital ....................... 50,000
13 For university-wide projects
14 Stony Brook University Hospital ................... 50,000
15 For university-wide projects
16 --------------
17 Total ........................................ 100,000
18 ==============
19 Capital Projects Funds - Other
20 Capital Projects Fund
21 Preservation of Facilities Purpose
22 By chapter 54, section 1, of the laws of 2017:
23 For services and expenses related to alterations and improvements to
24 existing facilities for capital maintenance, including but not
25 limited to capital design, construction, reconstruction, rehabili-
26 tation, and equipment; for health and safety, preservation of facil-
27 ities, program improvement or program change, environmental
28 protection, energy conservation, accreditation, facilities for the
29 physically disabled, preventative maintenance and related projects,
30 including costs incurred prior to April 1, 2017 and subject to a
31 plan developed and submitted annually by the state university of New
32 York and approved by the director of the budget, and which may
33 include, but not be limited to, projects in the following schedule
34 (28F11703) ... 450,000,000 ...................... (re. $446,906,000)
35 Project Schedule
36 PROJECT AMOUNT
37 ----------------------------------------------------------
38 (thousands of dollars)
39 Albany
40 Campus-wide maintenance projects ................. 9,447
41 Alfred Ceramics
42 Campus-wide maintenance projects ................... 843
43 Alfred State
44 Campus-wide maintenance projects ................. 2,283
45 Binghamton
46 Campus-wide maintenance projects ................ 10,604
47 Brockport
549 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide maintenance projects ................. 5,708
2 Brooklyn Health Science Center (HSC)
3 Campus-wide maintenance projects ................. 3,687
4 Buffalo College
5 Campus-wide maintenance projects ................. 6,594
6 Buffalo University
7 Campus-wide maintenance projects ................ 17,756
8 Canton
9 Campus-wide maintenance projects ................. 1,771
10 Cobleskill
11 Campus-wide maintenance projects ................. 1,979
12 Cornell
13 Campus-wide maintenance projects ................. 9,723
14 Cortland
15 Campus-wide maintenance projects ................. 4,691
16 Delhi
17 Campus-wide maintenance projects ................. 1,867
18 Empire State
19 Campus-wide maintenance projects ................... 405
20 Environmental Science and Forestry
21 Campus-wide maintenance projects ................. 2,452
22 Farmingdale
23 Campus-wide maintenance projects ................. 4,841
24 Fredonia
25 Campus-wide maintenance projects ................. 3,655
26 Geneseo
27 Campus-wide maintenance projects ................. 3,697
28 Maritime
29 Campus-wide maintenance projects ................. 1,813
30 Morrisville
31 Campus-wide maintenance projects ................. 2,310
32 New Paltz
33 Campus-wide maintenance projects ................. 4,664
34 Old Westbury
35 Campus-wide maintenance projects ................. 2,583
36 Oneonta
37 Campus-wide maintenance projects ................. 3,962
38 Optometry
39 Campus-wide maintenance projects ................... 895
40 Oswego
41 Campus-wide maintenance projects ................. 5,736
42 Plattsburgh
43 Campus-wide maintenance projects ................. 3,832
44 Potsdam
45 Campus-wide maintenance projects ................. 3,957
46 Purchase
47 Campus-wide maintenance projects ................. 4,289
48 State Univ Plaza
49 Campus-wide maintenance projects ................. 1,585
50 Stony Brook, incl Health Science Center
51 (HSC) and Long Island State Veterans Home:
550 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide maintenance projects ................ 21,138
2 Syracuse Health Science Center (HSC)
3 Campus-wide maintenance projects ................. 3,578
4 SUNY Polytechnic
5 Campus-wide maintenance projects ................. 1,055
6 University-wide Alterations and Improvements
7 Maintenance undistributed
8 For priority capital maintenance or capi-
9 tal improvement projects to support the
10 preservation of facilities ................... 296,600
11 --------------
12 Total .......................................... 450,000
13 ==============
14 For services and expenses related to alterations and improvements to
15 various facilities including but not limited to capital design,
16 construction, reconstruction, rehabilitation, and equipment; for
17 health and safety, preservation of facilities, program improvement
18 or program change, environmental protection, energy conservation,
19 accreditation, facilities for the physically disabled, preventative
20 maintenance and related projects, including costs incurred prior to
21 April 1, 2017 and subject to a plan developed and submitted annually
22 by the state university of New York and approved by the director of
23 the budget, and which may include, but not be limited to, projects
24 in the following schedule (28F41703) ...............................
25 100,000,000 ...................................... (re. $99,973,000)
26 Project Schedule
27 PROJECT AMOUNT
28 ----------------------------------------------------------
29 (thousands of dollars)
30 Albany
31 Campus-wide projects ............................. 6,159
32 Alfred Ceramics
33 Campus-wide projects ............................... 550
34 Alfred State
35 Campus-wide projects ............................. 1,489
36 Binghamton
37 Campus-wide projects ............................. 6,912
38 Brockport
39 Campus-wide projects ............................. 3,721
40 Brooklyn Health Science Center (HSC)
41 Campus-wide projects ............................. 2,403
42 Buffalo College
43 Campus-wide projects ............................. 4,299
44 Buffalo University
45 Campus-wide projects ............................ 11,575
46 Canton
47 Campus-wide projects ............................. 1,155
48 Cobleskill
551 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide projects ............................. 1,290
2 Cornell
3 Campus-wide projects ............................. 6,338
4 Cortland
5 Campus-wide projects ............................. 3,058
6 Delhi
7 Campus-wide projects ............................. 1,217
8 Empire State
9 Campus-wide projects ............................... 264
10 Environmental Science and Forestry
11 Campus-wide projects ............................. 1,598
12 Farmingdale
13 Campus-wide projects ............................. 3,156
14 Fredonia
15 Campus-wide projects ............................. 2,383
16 Geneseo
17 Campus-wide projects ............................. 2,410
18 Maritime
19 Campus-wide projects ............................. 1,182
20 Morrisville
21 Campus-wide projects ............................. 1,506
22 New Paltz
23 Campus-wide projects ............................. 3,041
24 Old Westbury
25 Campus-wide projects ............................. 1,684
26 Oneonta
27 Campus-wide projects ............................. 2,583
28 Optometry
29 Campus-wide projects ............................... 584
30 Oswego
31 Campus-wide projects ............................. 3,739
32 Plattsburgh
33 Campus-wide projects ............................. 2,498
34 Potsdam
35 Campus-wide projects ............................. 2,580
36 Purchase
37 Campus-wide projects ............................. 2,796
38 State Univ Plaza
39 Campus-wide projects ............................. 1,029
40 Stony Brook, incl Health Science Center
41 (HSC) and Long Island State Veterans Home:
42 Campus-wide projects ............................ 13,780
43 Syracuse Health Science Center (HSC)
44 Campus-wide projects ............................. 2,333
45 SUNY Polytechnic
46 Campus-wide projects ............................... 688
47 --------------
48 Total .......................................... 100,000
49 ==============
552 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2016, as amended by chapter 53,
2 section 3, of the laws of 2016:
3 For services and expenses related to alterations and improvements to
4 existing facilities for capital maintenance, including but not
5 limited to services and expenses, service agreements or service
6 contracts and memoranda of understanding; for capital design includ-
7 ing the cost of services provided by private firms, including prepa-
8 ration of designs, plans, specifications and estimates; facility
9 reconstruction, rehabilitation, equipment; for health and safety
10 improvements and upgrades to preserve or enhance facility function-
11 ing; for program improvements or program change; to support improve-
12 ments in technology, research, environmental protection, energy and
13 resource conservation, and accreditation; to finance costs attribut-
14 able to executive order 88, ADA and code compliance needs, claims,
15 emergencies and remediation of environmental hazards; to ensure the
16 functionality of major building systems such as fire alarms and
17 sprinklers, electrical, mechanical, plumbing, heating/cooling
18 systems and supporting infrastructure, including underground utili-
19 ties; and to provide for facilities for the disabled and related
20 projects including costs incurred prior to April 1, 2016 subject to
21 a plan developed by the state university of New York and approved by
22 the director of the budget (28F11603) ..............................
23 200,000,000 ..................................... (re. $145,422,000)
24 Project Schedule
25 PROJECT AMOUNT
26 ----------------------------------------------------------
27 (thousands of dollars)
28 Albany
29 Campus-wide maintenance projects ................. 9,500
30 Alfred Ceramics
31 Campus-wide maintenance projects ................... 800
32 Alfred State
33 Campus-wide maintenance projects ................. 2,300
34 Binghamton
35 Campus-wide maintenance projects ................ 10,600
36 Brockport
37 Campus-wide maintenance projects ................. 5,700
38 Brooklyn Health Science Center (HSC)
39 Campus-wide maintenance projects ................. 3,700
40 Buffalo College
41 Campus-wide maintenance projects ................. 6,700
42 Buffalo University
43 Campus-wide maintenance projects ................ 17,300
44 Canton
45 Campus-wide maintenance projects ................. 1,800
46 Cobleskill
47 Campus-wide maintenance projects ................. 2,100
48 Cornell
49 Campus-wide maintenance projects ................. 9,600
50 Cortland
553 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide maintenance projects ................. 4,700
2 Delhi
3 Campus-wide maintenance projects ................. 1,900
4 Empire State
5 Campus-wide maintenance projects ................... 400
6 Environmental Science and Forestry
7 Campus-wide maintenance projects ................. 2,500
8 Farmingdale
9 Campus-wide maintenance projects ................. 4,800
10 Fredonia
11 Campus-wide maintenance projects ................. 3,800
12 Geneseo
13 Campus-wide maintenance projects ................. 3,700
14 Maritime
15 Campus-wide maintenance projects ................. 1,800
16 Morrisville
17 Campus-wide maintenance projects ................. 2,200
18 New Paltz
19 Campus-wide maintenance projects ................. 4,700
20 Old Westbury
21 Campus-wide maintenance projects ................. 2,400
22 Oneonta
23 Campus-wide maintenance projects ................. 4,100
24 Optometry
25 Campus-wide maintenance projects ................... 900
26 Oswego
27 Campus-wide maintenance projects ................. 6,100
28 Plattsburgh
29 Campus-wide maintenance projects ................. 3,900
30 Potsdam
31 Campus-wide maintenance projects ................. 4,000
32 Purchase
33 Campus-wide maintenance projects ................. 4,300
34 State Univ Plaza
35 Campus-wide maintenance projects ................. 1,600
36 Stony Brook, incl Health Science Center
37 (HSC) and Long Island State Veterans Home:
38 Campus-wide maintenance projects ................ 21,000
39 Syracuse Health Science Center (HSC)
40 Campus-wide maintenance projects ................. 3,500
41 SUNY Polytechnic
42 Campus-wide maintenance projects ................. 1,000
43 University-wide Alterations and Improvements
44 Maintenance undistributed
45 For university-wide capital maintenance or
46 capital improvement costs, including
47 costs attributable to executive order
48 88; ADA and code compliance claims;
49 environmental hazards; emergencies
50 health and safety, and energy conserva-
51 tion needs, asbestos and PCB remedi-
554 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ation; fire alarms and sprinklers; elec-
2 trical, mechanical, plumbing and heating
3 and cooling system requirements and
4 other similar university-wide needs ........... 16,600
5 University-wide Alterations and Improvements
6 Maintenance undistributed
7 For priority capital maintenance or capi-
8 tal improvement projects to support the
9 preservation of facilities .................... 30,000
10 --------------
11 Total .......................................... 200,000
12 ==============
13 For additional services and expenses related to alterations and
14 improvements to existing facilities for capital maintenance, includ-
15 ing but not limited to services and expenses, service agreements or
16 service contracts and memoranda of understanding; for capital design
17 including the cost of services provided by private firms, including
18 preparation of designs, plans, specifications and estimates; facili-
19 ty reconstruction, rehabilitation, equipment; for health and safety
20 improvements and upgrades to preserve or enhance facility function-
21 ing; for program improvements or program change; to support improve-
22 ments in technology, research, environmental protection, energy and
23 resource conservation, and accreditation; to finance costs attribut-
24 able to executive order 88, ADA and code compliance needs, claims,
25 emergencies and remediation of environmental hazards; to ensure the
26 functionality of major building systems such as fire alarms and
27 sprinklers, electrical, mechanical, plumbing, heating/cooling
28 systems and supporting infrastructure, including underground utili-
29 ties; and to provide for facilities for the disabled and related
30 projects including costs incurred prior to April 1, 2016 subject to
31 a plan developed by the state university of New York and approved by
32 the director of the budget (28F21603) ..............................
33 60,000,000 ....................................... (re. $52,874,000)
34 Project Schedule
35 PROJECT AMOUNT
36 ----------------------------------------------------------
37 (thousands of dollars)
38 Albany
39 Campus-wide maintenance projects ................. 2,800
40 Alfred Ceramics
41 Campus-wide maintenance projects ................... 200
42 Alfred State
43 Campus-wide maintenance projects ................... 700
44 Binghamton
45 Campus-wide maintenance projects ................. 3,100
46 Brockport
47 Campus-wide maintenance projects ................. 1,700
48 Brooklyn Health Science Center (HSC)
555 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide maintenance projects ................. 1,100
2 Buffalo College
3 Campus-wide maintenance projects ................. 2,000
4 Buffalo University
5 Campus-wide maintenance projects ................. 5,100
6 Canton
7 Campus-wide maintenance projects ................... 500
8 Cobleskill
9 Campus-wide maintenance projects ................... 600
10 Cornell
11 Campus-wide maintenance projects ................. 2,800
12 Cortland
13 Campus-wide maintenance projects ................. 1,400
14 Delhi
15 Campus-wide maintenance projects ................... 600
16 Empire State
17 Campus-wide maintenance projects ................... 100
18 Environmental Science and Forestry
19 Campus-wide maintenance projects ................... 700
20 Farmingdale
21 Campus-wide maintenance projects ................. 1,400
22 Fredonia
23 Campus-wide maintenance projects ................. 1,100
24 Geneseo
25 Campus-wide maintenance projects ................. 1,100
26 Maritime
27 Campus-wide maintenance projects ................... 500
28 Morrisville
29 Campus-wide maintenance projects ................... 700
30 New Paltz
31 Campus-wide maintenance projects ................. 1,400
32 Old Westbury
33 Campus-wide maintenance projects ................... 700
34 Oneonta
35 Campus-wide maintenance projects ................. 1,200
36 Optometry
37 Campus-wide maintenance projects ................... 300
38 Oswego
39 Campus-wide maintenance projects ................. 1,800
40 Plattsburgh
41 Campus-wide maintenance projects ................. 1,200
42 Potsdam
43 Campus-wide maintenance projects ................. 1,200
44 Purchase
45 Campus-wide maintenance projects ................. 1,300
46 State Univ Plaza
47 Campus-wide maintenance projects ................... 500
48 Stony Brook, incl Health Science Center
49 (HSC) and Long Island State Veterans Home:
50 Campus-wide maintenance projects ................. 6,200
51 Syracuse Health Science Center (HSC)
556 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide maintenance projects ................. 1,000
2 SUNY Polytechnic
3 Campus-wide maintenance projects ................... 300
4 University-wide Alterations and Improvements
5 Maintenance undistributed
6 For university-wide capital maintenance or
7 capital improvement costs, including
8 costs attributable to executive order
9 88; ADA and code compliance claims;
10 environmental hazards; emergencies
11 health and safety, and energy conserva-
12 tion needs, asbestos and PCB remedi-
13 ation; fire alarms and sprinklers; elec-
14 trical, mechanical, plumbing and heating
15 and cooling system requirements and
16 other similar university-wide needs ............ 5,700
17 University-wide Alterations and Improvements
18 Maintenance undistributed
19 For priority capital maintenance or capi-
20 tal improvement projects to support the
21 preservation of facilities ..................... 9,000
22 --------------
23 Total ........................................... 60,000
24 ==============
25 By chapter 55, section 1, of the laws of 2016, as amended by chapter 73,
26 section 1 of part M, of the laws of 2016:
27 For additional services and expenses related to alterations and
28 improvements to various facilities for capital projects, including
29 but not limited to services and expenses, service agreements or
30 service contracts and memoranda of understanding; for capital design
31 including the cost of services provided by private firms, including
32 preparation of designs, plans, specifications and estimates; for
33 property acquisition, facility construction, reconstruction, reha-
34 bilitation, equipment; for health and safety improvements and
35 upgrades to preserve or enhance facility functioning; for program
36 improvements or program change; to support improvements in technolo-
37 gy, research, environmental protection, energy and resource conser-
38 vation, and accreditation; to finance costs attributable to execu-
39 tive order 88, ADA and code compliance needs, claims, emergencies
40 and remediation of environmental hazards; to ensure the functionali-
41 ty of major building systems such as fire alarms and sprinklers,
42 electrical, mechanical, plumbing, heating/cooling systems and
43 supporting infrastructure, including underground utilities; and to
44 provide for facilities for the disabled and related projects includ-
45 ing costs incurred prior to April 1, 2016 subject to a plan devel-
46 oped by the state university of New York and approved by the direc-
47 tor of the budget (28F31603) ... 30,000,000 ...... (re. $28,307,000)
557 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Project Schedule
2 PROJECT AMOUNT
3 ----------------------------------------------------------
4 (thousands of dollars)
5 Albany
6 Campus-wide projects ............................. 1,400
7 Alfred Ceramics
8 Campus-wide projects ............................... 100
9 Alfred State
10 Campus-wide projects ............................... 350
11 Binghamton
12 Campus-wide projects ............................. 1,550
13 Brockport
14 Campus-wide projects ............................... 850
15 Brooklyn Health Science Center (HSC)
16 Campus-wide projects ............................... 550
17 Buffalo College
18 Campus-wide projects ............................. 1,000
19 Buffalo University
20 Campus-wide projects ............................. 2,550
21 Canton
22 Campus-wide projects ............................... 250
23 Cobleskill
24 Campus-wide projects ............................... 300
25 Cornell
26 Campus-wide projects ............................. 1,400
27 Cortland
28 Campus-wide projects ............................... 700
29 Delhi
30 Campus-wide projects ............................... 300
31 Empire State
32 Campus-wide projects ................................ 50
33 Environmental Science and Forestry
34 Campus-wide projects ............................... 350
35 Farmingdale
36 Campus-wide projects ............................... 700
37 Fredonia
38 Campus-wide projects ............................... 550
39 Geneseo
40 Campus-wide projects ............................... 550
41 Maritime
42 Campus-wide projects ............................... 250
43 Morrisville
44 Campus-wide projects ............................... 350
45 New Paltz
46 Campus-wide projects ............................... 700
47 Old Westbury
48 Campus-wide projects ............................... 350
49 Oneonta
50 Campus-wide projects ............................... 600
51 Optometry
558 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide projects ............................... 150
2 Oswego
3 Campus-wide projects ............................... 900
4 Plattsburgh
5 Campus-wide projects ............................... 600
6 Potsdam
7 Campus-wide projects ............................... 600
8 Purchase
9 Campus-wide projects ............................... 650
10 State Univ Plaza
11 Campus-wide projects ............................... 250
12 Stony Brook, incl Health Science Center
13 (HSC) and Long Island State Veterans Home:
14 Campus-wide projects ............................. 3,100
15 Syracuse Health Science Center (HSC)
16 Campus-wide projects ............................... 500
17 SUNY Polytechnic
18 Campus-wide projects ............................... 150
19 University-wide Alterations and Improvements
20 Maintenance undistributed
21 For university-wide capital project costs,
22 including costs attributable to executive
23 order 88; ADA and code compliance claims;
24 environmental hazards; emergencies health
25 and safety, and energy conservation needs,
26 asbestos and PCB remediation; fire alarms
27 and sprinklers; electrical, mechanical,
28 plumbing and heating and cooling system
29 requirements and other university-wide
30 needs ............................................ 2,850
31 University-wide Alterations and Improvements
32 Maintenance undistributed
33 For priority capital projects ...................... 4,500
34 --------------
35 Total ........................................... 30,000
36 ==============
37 By chapter 54, section 1, of the laws of 2015:
38 For services and expenses related to alterations and improvements to
39 existing facilities for capital maintenance, including but not
40 limited to services and expenses, service agreements or service
41 contracts and memoranda of understanding; for capital design includ-
42 ing the cost of services provided by private firms, including prepa-
43 ration of designs, plans, specifications and estimates; facility
44 reconstruction, rehabilitation, equipment; for health and safety
45 improvements and upgrades to preserve or enhance facility function-
46 ing; for program improvements or program change; to support improve-
47 ments in technology, research, environmental protection, energy and
48 resource conservation, and accreditation; to finance costs attribut-
49 able to executive order 88, ADA and code compliance needs, claims,
50 emergencies and remediation of environmental hazards; to ensure the
559 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 functionality of major building systems such as fire alarms and
2 sprinklers, electrical, mechanical, plumbing, heating/cooling
3 systems and supporting infrastructure, including underground utili-
4 ties; and to provide for facilities for the disabled and related
5 projects including costs incurred prior to April 1, 2015 subject to
6 a plan developed by the state university of New York and approved by
7 the director of the budget (28F11503) ..............................
8 200,000,000 ..................................... (re. $108,652,000)
9 Project Schedule
10 PROJECT AMOUNT
11 ----------------------------------------------------------
12 (thousands of dollars)
13 Albany
14 Campus-wide maintenance projects ................ 10,412
15 Alfred Ceramics
16 Campus-wide maintenance projects ................... 897
17 Alfred State
18 Campus-wide maintenance projects ................. 2,411
19 Binghamton
20 Campus-wide maintenance projects ................ 11,026
21 Brockport
22 Campus-wide maintenance projects ................. 6,054
23 Brooklyn Health Science Center (HSC)
24 Campus-wide maintenance projects ................. 4,007
25 Buffalo College
26 Campus-wide maintenance projects ................. 7,305
27 Buffalo University
28 Campus-wide maintenance projects ................ 18,271
29 Canton
30 Campus-wide maintenance projects ................. 1,949
31 Cobleskill
32 Campus-wide maintenance projects ................. 2,156
33 Cornell
34 Campus-wide maintenance projects ................ 10,294
35 Cortland
36 Campus-wide maintenance projects ................. 5,182
37 Delhi
38 Campus-wide maintenance projects ................. 1,938
39 Empire State
40 Campus-wide maintenance projects ................... 396
41 Environmental Science and Forestry
42 Campus-wide maintenance projects ................. 2,694
43 Farmingdale
44 Campus-wide maintenance projects ................. 5,038
45 Fredonia
46 Campus-wide maintenance projects ................. 4,064
47 Geneseo
48 Campus-wide maintenance projects ................. 3,988
49 Maritime
560 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide maintenance projects ................. 1,916
2 Morrisville
3 Campus-wide maintenance projects ................. 2,416
4 New Paltz
5 Campus-wide maintenance projects ................. 4,924
6 Old Westbury
7 Campus-wide maintenance projects ................. 2,774
8 Oneonta
9 Campus-wide maintenance projects ................. 4,474
10 Optometry
11 Campus-wide maintenance projects ................... 974
12 Oswego
13 Campus-wide maintenance projects ................. 6,651
14 Plattsburgh
15 Campus-wide maintenance projects ................. 4,101
16 Potsdam
17 Campus-wide maintenance projects ................. 4,228
18 Purchase
19 Campus-wide maintenance projects ................. 4,367
20 State Univ Plaza
21 Campus-wide maintenance projects ................. 1,683
22 Stony Brook, incl Health Science Center (HSC)
23 Campus-wide maintenance projects ................ 22,223
24 Syracuse Health Science Center (HSC)
25 Campus-wide maintenance projects ................. 3,627
26 SUNY Polytechnic
27 Campus-wide maintenance projects ................. 1,060
28 University-wide Alterations and Improvements
29 Maintenance undistributed
30 For university-wide capital maintenance or
31 capital improvement costs, including
32 costs attributable to executive order
33 88; ADA and code compliance claims;
34 environmental hazards; emergencies
35 health and safety, and energy conserva-
36 tion needs, asbestos and PCB remedi-
37 ation; fire alarms and sprinklers; elec-
38 trical, mechanical, plumbing and heating
39 and cooling system requirements and
40 other similar university-wide needs ........... 16,500
41 University-wide Alterations and Improvements
42 Maintenance undistributed
43 For priority capital maintenance or capi-
44 tal improvement projects to support the
45 preservation of facilities .................... 20,000
46 --------------
47 Total .......................................... 200,000
48 ==============
49 For services and expenses for alterations and improvements to existing
50 facilities for capital maintenance, at Stony Brook, including the
561 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 health science center (HSC), including but not limited to service
2 agreements or service contracts and memoranda of understanding; for
3 capital design including the cost of services provided by private
4 firms, including preparation of designs, plans, specifications and
5 estimates; facility reconstruction, rehabilitation, equipment; for
6 health and safety improvements and upgrades to preserve or enhance
7 facility functioning; for program improvements or program change; to
8 support improvements in technology, research, environmental
9 protection, energy and resource conservation, and accreditation; to
10 finance costs attributable to executive order 88, ADA and code
11 compliance needs, claims, emergencies and remediation of environ-
12 mental hazards; to ensure the functionality of major building
13 systems such as fire alarms and sprinklers, electrical, mechanical,
14 plumbing, heating/cooling systems and supporting infrastructure,
15 including underground utilities; and to provide for facilities for
16 the disabled and related projects including costs incurred prior to
17 April 1, 2015 (28F21503) ... 19,000,000 ........... (re. $3,184,000)
18 By chapter 54, section 1, of the laws of 2014:
19 Advances for alterations and improvements to existing facilities for
20 capital critical maintenance, including but not limited to services
21 and expenses, service agreements or service contracts and memoranda
22 of understanding; for capital design including the cost of services
23 provided by private firms, including preparation of designs, plans,
24 specifications and estimates; facility reconstruction, rehabili-
25 tation, equipment; for health and safety improvements and upgrades
26 to preserve or enhance facility functioning; for program improve-
27 ments or program change; to support improvements in technology,
28 research, environmental protection, energy and resource conserva-
29 tion, and accreditation; to finance costs attributable to executive
30 order 88, ADA and code compliance needs, claims, emergencies and
31 remediation of environmental hazards; to ensure the functionality of
32 major building systems such as fire alarms and sprinklers, elec-
33 trical, mechanical, plumbing, heating/cooling systems and supporting
34 infrastructure, including underground utilities; and to provide for
35 facilities for the disabled and related projects including costs
36 incurred prior to April 1, 2014 subject to a plan developed by the
37 state university and approved by the director of the budget
38 (28F11403) ... 402,000,000 ...................... (re. $124,240,000)
39 Project Schedule
40 PROJECT AMOUNT
41 ----------------------------------------------------------
42 (thousands of dollars)
43 Albany
44 Campus-wide critical maintenance projects ....... 28,595
45 Alfred Ceramics
46 Campus-wide critical maintenance projects ........ 2,520
47 Alfred State
48 Campus-wide critical maintenance projects ........ 6,753
49 Binghamton
563 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide critical maintenance projects ........ 4,400
2 Stony Brook, incl Health Science Center (HSC)
3 Campus-wide critical maintenance projects ....... 64,659
4 Syracuse Health Science Center (HSC)
5 Campus-wide critical maintenance projects ........ 9,996
6 Utica-Rome
7 Campus-wide critical maintenance projects ........ 3,093
8 University-wide Alterations and Improvements
9 Maintenance undistributed
10 For university-wide capital critical main-
11 tenance or capital improvement costs,
12 including costs attributable to execu-
13 tive order 88; ADA and code compliance
14 claims; environmental hazards; emergen-
15 cies health and safety, and energy
16 conservation needs, asbestos and PCB
17 remediation; fire alarms and sprinklers;
18 electrical, mechanical, plumbing and
19 heating and cooling system requirements
20 and other similar university-wide needs ....... 16,500
21 Less an amount to be allocated by the
22 board of trustees ........................... (98,000)
23 --------------
24 Total .......................................... 402,000
25 ==============
26 Advances for alterations and improvements to various facilities
27 including services and expenses, service contracts, memoranda of
28 understanding, capital design, construction, acquisition, recon-
29 struction, rehabilitation and equipment; for health and safety,
30 preservation of facilities, new facilities, program improvement or
31 program change, technology, environment protection, energy conserva-
32 tion, accreditation, facilities for the physically disabled, and
33 related projects, including costs incurred prior to April 1, 2014,
34 subject to an annual plan developed by the state university of New
35 York and approved by the director of the budget (28F31403) .........
36 82,000,000 ....................................... (re. $72,269,000)
37 Project Schedule
38 PROJECT AMOUNT
39 ----------------------------------------------------------
40 (thousands of dollars)
41 Morrisville
42 Campus-wide Electrical Feeders and
43 Distribution ................................... 3,000
44 Oneonta
45 Campus Welcome Center ............................ 5,000
46 Milne Library Reconstruction ..................... 8,000
47 Potsdam
48 Child Care Center ................................ 6,000
49 Stony Brook, incl Health Science Center (HSC)
564 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Mezzanine ....................................... 60,000
2 --------------
3 Total ........................................... 82,000
4 ==============
5 Advances for alterations and improvements to existing facilities for
6 capital critical maintenance, including but not limited to services
7 and expenses, service agreements or service contracts and memoranda
8 of understanding; for capital design including the cost of services
9 provided by private firms, including preparation of designs, plans,
10 specifications and estimates; facility reconstruction, rehabili-
11 tation, equipment; for health and safety improvements and upgrades
12 to preserve or enhance facility functioning; for program improve-
13 ments or program change; to support improvements in technology,
14 research, environmental protection, energy and resource conserva-
15 tion, and accreditation; to finance costs attributable to executive
16 order 88, ADA and code compliance needs, claims, emergencies and
17 remediation of environmental hazards; to ensure the functionality of
18 major building systems such as fire alarms and sprinklers, elec-
19 trical, mechanical, plumbing, heating/cooling systems and supporting
20 infrastructure, including underground utilities; and to provide for
21 facilities for the disabled and related projects including costs
22 incurred prior to April 1, 2014 subject to a plan developed by the
23 state university and approved by the director of the budget
24 (28F21403) ... 19,000,000 ......................... (re. $8,841,000)
25 Project Schedule
26 PROJECT AMOUNT
27 ----------------------------------------------------------
28 (thousands of dollars)
29 Stony Brook, incl Health Science Center
30 (HSC) Campus-wide projects, including
31 facility rehabilitation and research lab
32 renovations ..................................... 19,000
33 Notwithstanding any provision of law this appropriation shall be allo-
34 cated only pursuant to a plan setting forth an itemized list of
35 projects with the amount to be received by each, or the methodology
36 for allocating such appropriation. Such plan shall be subject to the
37 approval of the temporary president of the senate and the director
38 of the budget and thereafter shall be included in a resolution call-
39 ing for the expenditure of such monies, which resolution must be
40 approved by a majority vote of all members elected to the senate
41 upon a roll call vote (28F41403) ... 49,000,000 .. (re. $28,292,000)
42 By chapter 54, section 1, of the laws of 2013:
43 Advances for alterations and improvements to facilities for capital
44 critical maintenance, including but not limited to services and
45 expenses, service agreements or service contracts and memoranda of
46 understanding; for capital design including the cost of services
47 provided by private firms, including preparation of designs, plans,
565 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 specifications and estimates; for property acquisition, and facility
2 reconstruction, rehabilitation, equipment; for health and safety
3 improvements and upgrades to preserve or enhance facility function-
4 ing; for program improvements or program change; to support improve-
5 ments in technology, research, environmental protection, energy and
6 resource conservation, and accreditation; to finance costs attribut-
7 able to executive order 111, ADA and code compliance needs, claims,
8 emergencies and remediation of environmental hazards; to ensure the
9 functionality of major building systems such as fire alarms and
10 sprinklers, electrical, mechanical, plumbing, heating/cooling
11 systems and supporting infrastructure, including underground utili-
12 ties; and to provide for facilities for the disabled and related
13 projects including costs incurred prior to April 1, 2013 subject to
14 a plan developed by the state university and approved by the direc-
15 tor of the budget (28F21303) ... 60,000,000 ....... (re. $5,172,000)
16 Project Schedule
17 PROJECT AMOUNT
18 ----------------------------------------------------------
19 (thousands of dollars)
20 Stony Brook, incl Health Science Center
21 (HSC) Campus-wide projects, including
22 improvements to the Campus Electrical
23 Distribution System ............................. 60,000
24 By chapter 54, section 1, of the laws of 2012:
25 Advances for alterations and improvements to facilities for capital
26 critical maintenance, including but not limited to services and
27 expenses, service agreements or service contracts and memoranda of
28 understanding; for capital design including the cost of services
29 provided by private firms, including preparation of designs, plans,
30 specifications and estimates; for property acquisition, and facility
31 reconstruction, rehabilitation, equipment; for health and safety
32 improvements and upgrades to preserve or enhance facility function-
33 ing; for program improvements or program change; to support improve-
34 ments in technology, research, environmental protection, energy and
35 resource conservation, and accreditation; to finance costs attribut-
36 able to executive order 111, ADA and code compliance needs, claims,
37 emergencies and remediation of environmental hazards; to ensure the
38 functionality of major building systems such as fire alarms and
39 sprinklers, electrical, mechanical, plumbing, heating/cooling
40 systems and supporting infrastructure, including underground utili-
41 ties; and to provide for facilities for the disabled and related
42 projects including costs incurred prior to April 1, 2012 subject to
43 a plan developed by the state university and approved by the direc-
44 tor of the budget. Notwithstanding any provision of law, rule or
45 regulation to the contrary, amounts designated as university-wide,
46 may be made available for projects identified and approved by the
47 governor and the chancellor of the state university of New York
48 pursuant to the NY-SUNY 2020 challenge grant program (28F11203) ....
49 550,000,000 ...................................... (re. $50,187,000)
566 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Project Schedule
2 PROJECT AMOUNT
3 ----------------------------------------------------------
4 (thousands of dollars)
5 Albany
6 Campus-wide projects, including Fire Alarm
7 Upgrades to Downtown Campus ..................... 32,477
8 Alfred Ceramics
9 Campus-wide projects, including Satellite
10 Boilers .......................................... 2,836
11 Alfred State
12 Campus-wide projects, including Rehabili-
13 tation of Campus Quad for ADA Compliance
14 and Hinkle Library ............................... 7,799
15 Binghamton
16 Campus-wide projects, including Rehabili-
17 tation of University Union North Phase II ....... 31,360
18 Brockport
19 Campus-wide projects, including Rehabili-
20 tation of Exterior Decks & Plaza ................ 19,430
21 Brooklyn Health Science Center (HSC)
22 Campus-wide projects, including New Utili-
23 ty Chases - BSB ................................. 12,699
24 Buffalo College
25 Campus-wide projects, including Renovation
26 of Underground Utilities ........................ 24,305
27 Buffalo University
28 Campus-wide projects, including ADA
29 Improvements .................................... 65,903
30 Canton
31 Campus-wide projects, including Rehabili-
32 tation of Mechanical/Electrical/Plumbing ......... 5,830
33 Cobleskill
34 Campus-wide projects, including Renovate
35 Old Gym for Business School ...................... 7,001
36 Cornell
37 Campus-wide projects, including Energy
38 Conservation-Multiple Buildings ................. 32,862
39 Cortland
40 Campus-wide projects, including Replace-
41 ment of Neubig Roof ............................. 16,417
42 Delhi
43 Campus-wide projects, including Site Util-
44 ities Study & Site Infrastructure Improve-
45 ments ............................................ 6,351
46 Empire State
47 Campus-wide projects, including Rehab of
48 Elevators in Union Facility ...................... 1,168
49 Environmental Science and Forestry
50 Campus-wide projects, including Site
567 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Improvements, Phase II ........................... 8,328
2 Farmingdale
3 Campus-wide projects, including Nold Hall
4 Generator ....................................... 15,243
5 Fredonia
6 Campus-wide projects, including Rehabili-
7 tation and Elevator Upgrades .................... 13,382
8 Geneseo
9 Campus-wide projects, including Sidewalk &
10 Drainage Improvements, Phase A .................. 13,769
11 Maritime
12 Campus-wide projects, including Replace
13 Exterior Doors in Various Buildings .............. 6,363
14 Morrisville
15 Campus-wide projects, including Renovate
16 Charlton Hall, Phase I ........................... 8,229
17 New Paltz
18 Campus-wide projects, including Upgrade
19 Electrical Distribution ......................... 16,680
20 Old Westbury
21 Campus-wide projects, including Repave
22 Access and Ring Road ............................. 9,513
23 Oneonta
24 Campus-wide projects, including Upgrade
25 tele Communication and Data Systems ............. 13,896
26 Optometry
27 Campus-wide projects, Bathroom Renovations ....... 3,103
28 Oswego
29 Campus-wide projects, including Rehabili-
30 tation of Roadways and Walkways ................. 21,032
31 Plattsburgh
32 Campus-wide projects, including Replace
33 Insulation on High Temperature Water Heat-
34 ers in Various Buildings ........................ 13,676
35 Potsdam
36 Campus-wide projects, including Masonry
37 Restoration to Various Buildings ................ 13,850
38 Purchase
39 Campus-wide projects, including Rehabili-
40 tation of Exterior of Academic Buildings ........ 18,360
41 State Univ Plaza
42 Campus-wide projects, including General
43 Infrastructure and Space Rehabilitation .......... 4,384
44 Stony Brook, incl Health Science Center (HSC)
45 Campus-wide projects, including Replace-
46 ment of Electrical Feeders ...................... 74,524
47 Syracuse Health Science Center (HSC)
48 Campus-wide projects, including Upgrade
49 Steam Plant ...................................... 9,607
50 Utica-Rome
51 Campus-wide projects, including South
568 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Plaza Rehabilitation-Campus Center ............... 3,123
2 University-wide Alterations and Improvements
3 Maintenance Undistributed
4 For university-wide capital critical main-
5 tenance or capital improvement costs,
6 including costs attributable to executive
7 order 111; ADA and code compliance claims;
8 environmental hazards; emergencies health
9 and safety, and energy conservation needs,
10 asbestos and PCB remediation; fire alarms
11 and sprinklers; electrical, mechanical,
12 plumbing and heating and cooling system
13 requirements and other similar
14 university-wide needs ........................... 16,500
15 --------------
16 Total .......................................... 550,000
17 ==============
18 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
19 section 1, of the laws of 2012:
20 Advances for alterations and improvements to facilities for capital
21 critical maintenance, including but not limited to services and
22 expenses, service agreements or service contracts and memoranda of
23 understanding; for capital design including the cost of services
24 provided by private firms, including preparation of designs, plans,
25 specifications and estimates; for property acquisition, and facility
26 reconstruction, rehabilitation, equipment; for health and safety
27 improvements and upgrades to preserve or enhance facility function-
28 ing; for program improvements or program change; to support improve-
29 ments in technology, research, environmental protection, energy and
30 resource conservation, and accreditation; to finance costs attribut-
31 able to executive order 111, ADA and code compliance needs, claims,
32 emergencies and remediation of environmental hazards; to ensure the
33 functionality of major building systems such as fire alarms and
34 sprinklers, electrical, mechanical, plumbing, heating/cooling
35 systems and supporting infrastructure, including underground utili-
36 ties; and to provide for facilities for the disabled and related
37 projects including costs incurred prior to April 1, 2011 subject to
38 a plan developed by the state university and approved by the direc-
39 tor of the budget. Notwithstanding any provision of law, rule or
40 regulation to the contrary, amounts designated as university-wide,
41 may be made available for projects identified and approved by the
42 governor and the chancellor of the state university of New York
43 pursuant to the NY-SUNY 2020 challenge grant program (28F11103) ....
44 550,000,000 ...................................... (re. $40,670,000)
45 Project Schedule
46 PROJECT AMOUNT
47 ----------------------------------------------------------
48 (thousands of dollars)
49 Albany
569 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide projects, including
2 Rehabilitation/Preservation of Podium
3 Structures ...................................... 32,830
4 Alfred Ceramics
5 Campus-wide projects, including McMahon
6 Hall-Replace Windows ............................. 2,776
7 Alfred State
8 Campus-wide projects, including Adminis-
9 tration Building ADA Improvements ................ 7,503
10 Binghamton
11 Campus-wide projects, including Exterior
12 Building Reconstruction ......................... 31,269
13 Brockport
14 Campus-wide projects, including Exterior
15 ADA Improvements ................................ 18,806
16 Brooklyn Health Science Center (HSC)
17 Campus-wide projects, including Basic
18 Science Building-Additional Vertical Util-
19 ity Chases ...................................... 12,738
20 Buffalo College
21 Campus-wide projects, including ADA
22 Improvements .................................... 24,779
23 Buffalo University
24 Campus-wide projects, including Hayes Hall
25 Renovation ...................................... 65,913
26 Canton
27 Campus-wide projects, including Reno-
28 vations to Chaney Dining Center .................. 5,612
29 Cobleskill
30 Campus-wide projects, including Renovate
31 Home Economics-Old Quad Building ................. 7,163
32 Cornell
33 Campus-wide projects, including Renovate
34 Ken Post Greenhouse Loop Steam Distrib-
35 ution ........................................... 32,058
36 Cortland
37 Campus-wide projects, including Art & Art
38 History Dept. Safety Upgrades ................... 16,418
39 Delhi
40 Campus-wide projects, including Road and
41 Sidewalk Improvements ............................ 6,269
42 Empire State
43 Campus-wide projects, including Security
44 System Upgrades .................................. 1,301
45 Environmental Science and Forestry
46 Campus-wide projects, including Illick
47 Hall Interior Rehab .............................. 8,355
48 Farmingdale
49 Campus-wide projects, including Rehab
50 Campus Walkways and Plazas ...................... 15,542
51 Fredonia
570 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide projects, including Rockefel-
2 ler Arts Center Roof and Exterior Rehab ......... 13,234
3 Geneseo
4 Campus-wide projects, including Security
5 Upgrades/Card Access Installation ............... 13,885
6 Maritime
7 Campus-wide projects, including Replace
8 Roof-Heritage Hall ............................... 6,268
9 Morrisville
10 Campus-wide projects, including Renovate
11 Bailey Hall ...................................... 8,162
12 New Paltz
13 Campus-wide projects, including Renovate
14 Elting Gymnasium ................................ 16,991
15 Old Westbury
16 Campus-wide projects, including Rehab
17 Campus Center Envelope Bldgs 51 & 56 ............. 9,147
18 Oneonta
19 Campus-wide projects, including Rehab
20 Physical Education Building ..................... 13,805
21 Optometry
22 Campus-wide projects, including Rehab
23 Office Areas ..................................... 3,108
24 Oswego
25 Campus-wide projects, including Rehab
26 Lanigan Hall Ph. II ............................. 20,826
27 Plattsburgh
28 Campus-wide projects, including Field
29 House Mechanical Rehab .......................... 13,877
30 Potsdam
31 Campus-wide projects, including Rebuild
32 Exterior Plazas ................................. 13,752
33 Purchase
34 Campus-wide projects, including Masonry
35 Repairs-Natural Science Building ................ 18,572
36 State Univ Plaza
37 Campus-wide projects, including Plaza Bldg
38 Boiler Replacement ............................... 4,595
39 Stony Brook, incl Health Science Center (HSC)
40 Campus-wide projects, including Rehab
41 Mechanical Systems-Various Bldgs ................ 74,679
42 Syracuse Health Science Center (HSC)
43 Campus-wide projects, including Abate/
44 Renovate Academic Labs-6 South Univ Hospi-
45 tal ............................................. 10,092
46 Utica-Rome
47 Campus-wide projects, including Upgrade
48 Parking/Landscape-Student Cntr/Field House ....... 3,175
49 University-wide Alterations and Improvements
50 Maintenance Undistributed
51 For university-wide capital critical main-
571 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tenance or capital improvement costs,
2 including costs attributable to executive
3 order 111; ADA and code compliance claims;
4 environmental hazards; emergencies health
5 and safety, and energy conservation needs,
6 asbestos and PCB remediation; fire alarms
7 and sprinklers; electrical, mechanical,
8 plumbing and heating and cooling system
9 requirements and other similar university-
10 wide needs ...................................... 16,500
11 --------------
12 Total .......................................... 550,000
13 ==============
14 By chapter 53, section 1, of the laws of 2010, as amended by chapter 54,
15 section 1, of the laws of 2012:
16 Advances for alterations and improvements to facilities for capital
17 critical maintenance, including but not limited to services and
18 expenses, service agreements or service contracts and memoranda of
19 understanding; for capital design including the cost of services
20 provided by private firms, including preparation of designs, plans,
21 specifications and estimates; for property acquisition, and facility
22 reconstruction, rehabilitation, equipment; for health and safety
23 improvements and upgrades to preserve or enhance facility function-
24 ing; for program improvements or program change; to support improve-
25 ments in technology, research, environmental protection, energy and
26 resource conservation, and accreditation; to finance costs attribut-
27 able to executive order 111, ADA and code compliance needs, claims,
28 emergencies and remediation of environmental hazards; to ensure the
29 functionality of major building systems such a fire alarms and
30 sprinklers, electrical, mechanical, plumbing, heating/cooling
31 systems and supporting infrastructure, including underground utili-
32 ties; and to provide for facilities for the disabled and related
33 projects including costs incurred prior to April 1, 2010 subject to
34 a plan developed by the state university and approved by the direc-
35 tor of the budget. Notwithstanding any provision of law, rule or
36 regulation to the contrary, amounts designated as university-wide,
37 may be made available for projects identified and approved by the
38 governor and the chancellor of the state university of New York
39 pursuant to the NY-SUNY 2020 challenge grant program (28F11003) ....
40 550,000,000 ...................................... (re. $31,670,000)
41 Project Schedule
42 PROJECT AMOUNT
43 ----------------------------------------------------------
44 (thousands of dollars)
45 Albany
46 Campus-wide projects, including Renovate
47 University Library ............................ 33,006
48 Alfred Ceramics
49 Campus-wide projects, including Binns
572 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Merrill Hall-Structural Upgrades ............... 2,736
2 Alfred State
3 Campus-wide projects, including Replace
4 Roof-Orvis Gym ................................. 7,293
5 Binghamton
6 Campus-wide projects, including Replace
7 Electrical Systems-Various Bldgs .............. 31,910
8 Brockport
9 Campus-wide projects, including Replace
10 Roofs-Various Bldgs, Ph I ..................... 19,150
11 Brooklyn Health Science Center (HSC)
12 Campus-wide projects, including Replace
13 Windows-Basic Sci Bldg, Ph I .................. 12,683
14 Buffalo College
15 Campus-wide projects, including Modify/
16 Replace Storm Sewer Syst Components ........... 24,433
17 Buffalo University
18 Campus-wide projects, including Site
19 Lighting Renewal, North Campus, Ph I .......... 66,230
20 Canton
21 Campus-wide projects, including Reno-
22 vations to Chaney Dining Center ................ 5,401
23 Cobleskill
24 Campus-wide projects, including Rehab
25 Locker Rooms-Bldg. 14A ......................... 7,150
26 Cornell
27 Campus-wide projects, including Martha Van
28 Rensselaer & E. Wing Renovation-Ph, IB ........ 32,212
29 Cortland
30 Campus-wide projects, including Art & Art
31 History Dept. Safety Upgrades ................. 16,476
32 Delhi
33 Campus-wide projects, including Interior
34 Upgrades-Alumni Hall ........................... 6,137
35 Empire State
36 Campus-wide projects, including Security
37 System Upgrades ................................ 1,108
38 Environmental Science and Forestry
39 Campus-wide projects, including Illick
40 Hall Interior Rehab ............................ 8,371
41 Farmingdale
42 Campus-wide projects, including Replace
43 Site Lighting-Various Locations ............... 15,278
44 Fredonia
45 Campus-wide projects, including Upgrade UG
46 Electrical Distribution, Study & Ph I ......... 13,390
47 Geneseo
48 Campus-wide projects, including Letchworth
49 Dining Hall Renovations ....................... 13,757
50 Maritime
51 Campus-wide projects, including HVAC Rehab
573 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Ph I-Marvin & Tode ............................. 6,093
2 Morrisville
3 Campus-wide projects, including Renovate
4 Bailey Hall .................................... 8,367
5 New Paltz
6 Campus-wide projects, including Site Reno-
7 vation-Ph II .................................. 16,664
8 Old Westbury
9 Campus-wide projects, including Rehab
10 Campus Center Envelope Bldgs 51 & 56 ........... 8,922
11 Oneonta
12 Campus-wide projects, including Rehab
13 Physical Science Building ..................... 13,657
14 Optometry
15 Campus-wide projects, including Replace
16 Switchgear/Upgrade Electrical Feeders .......... 3,060
17 Oswego
18 Campus-wide projects, including C-wide
19 Utilities & Infrastructure-Program Study ...... 21,181
20 Plattsburgh
21 Campus-wide projects, including Replace
22 Parking ....................................... 14,045
23 Potsdam
24 Campus-wide projects, including Rehab HVAC
25 Systems-Kellas & Timerman Halls ............... 14,080
26 Purchase
27 Campus-wide projects, including Expansion
28 of University Police Department ............... 18,483
29 State Univ Plaza
30 Campus-wide projects, including Renovate
31 Plaza Bldg-3rd Floor South ..................... 4,592
32 Stony Brook, incl Health Science Center (HSC)
33 Campus-wide projects, including Rehab
34 Mechanical Systems-Various Bldgs .............. 75,205
35 Syracuse Health Science Center (HSC)
36 Campus-wide projects, including Abate/
37 Renovate Academic Labs-6 South Univ
38 Hospital ....................................... 9,122
39 Utica-Rome
40 Campus-wide projects, including Upgrade
41 Parking/Landscape-Student Cntr/Field
42 House .......................................... 3,308
43 University-wide Alterations and Improvements
44 Maintenance Undistributed
45 For university-wide capital critical main-
46 tenance or capital improvement costs,
47 including costs attributable to executive
48 order 111; ADA and code compliance claims;
49 environmental hazards; emergencies health
50 and safety, and energy conservation needs,
51 asbestos and PCB remediation; fire alarms
574 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and sprinklers; electrical, mechanical,
2 plumbing and heating and cooling system
3 requirements and other similar university-
4 wide needs ...................................... 16,500
5 --------------
6 Total .......................................... 550,000
7 ==============
8 By chapter 53, section 1, of the laws of 2009, as amended by chapter 54,
9 section 1, of the laws of 2012:
10 Advances for alterations and improvements to facilities for capital
11 critical maintenance, including but not limited to services and
12 expenses, service agreements or service contracts and memoranda of
13 understanding; for capital design including the cost of services
14 provided by private firms, including preparation of designs, plans,
15 specifications and estimates; for property acquisition, and facility
16 reconstruction, rehabilitation, equipment; for health and safety
17 improvements and upgrades to preserve or enhance facility function-
18 ing; for program improvements or program change; to support improve-
19 ments in technology, research, environmental protection, energy and
20 resource conservation, and accreditation; to finance costs attribut-
21 able to executive order 111, ADA and code compliance needs, claims,
22 emergencies and remediation of environmental hazards; to ensure the
23 functionality of major building systems such a fire alarms and
24 sprinklers, electrical, mechanical, plumbing, heating/cooling
25 systems and supporting infrastructure, including underground utili-
26 ties; and to provide for facilities for the disabled and related
27 projects including costs incurred prior to April 1, 2009 subject to
28 a plan developed by the state university and approved by the direc-
29 tor of the budget. Notwithstanding any provision of law, rule or
30 regulation to the contrary, amounts designated as university-wide,
31 may be made available for projects identified and approved by the
32 governor and the chancellor of the state university of New York
33 pursuant to the NY-SUNY 2020 challenge grant program (28F10903) ....
34 550,000,000 ...................................... (re. $15,377,000)
35 Project Schedule
36 PROJECT AMOUNT
37 ----------------------------------------------------------
38 (thousands of dollars)
39 Albany
40 Campus-wide projects, including Renovate
41 Health Center ................................. 33,927
42 Alfred Ceramics
43 Campus-wide projects, including McMahon
44 Hall Full interior Rehab - Phase I ............. 2,845
45 Alfred State
46 Campus-wide projects, including Rehab
47 Central Dining Hall - Phase II ................. 7,343
48 Binghamton
49 Campus-wide projects, including Central
575 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus Quad Site Reconstruction ............... 32,129
2 Brockport
3 Campus-wide projects, including Infras-
4 tructure Improvements - Tuttle N, Phase
5 II ............................................ 19,429
6 Brooklyn Health Science Center (HSC)
7 Campus-wide projects, including Renovate
8 for New Labs - Basic Science Building ......... 12,884
9 Buffalo College
10 Campus-wide projects, including UG Steam
11 Distribution System Rehab Butler .............. 23,974
12 Buffalo University
13 Campus-wide projects, including IT Infras-
14 tructure Renewal .............................. 67,395
15 Canton
16 Campus-wide projects, including Campus
17 Standby Power System & Sub Stn Rehab ........... 5,174
18 Cobleskill
19 Campus-wide projects, including Roof
20 Replacement - Various Buildings ................ 6,989
21 Cornell
22 Campus-wide projects, including Warren
23 Hall Renovation ............................... 32,817
24 Cortland
25 Campus-wide projects, including Moffett
26 Renovation .................................... 16,646
27 Delhi
28 Campus-wide projects, including Renovate
29 Sanford Hall ................................... 6,150
30 Empire State
31 Campus-wide projects, including Site Rehab
32 - Parking Lot, No 1 Union Ave .................... 872
33 Environmental Science and Forestry
34 Campus-wide projects, including Illick
35 Hall Interior Rehab ............................ 8,386
36 Farmingdale
37 Campus-wide projects, including Rehab
38 Whitman Hall .................................. 15,095
39 Fredonia
40 Campus-wide projects, including William's
41 Center Interior Rehab ......................... 13,396
42 Geneseo
43 Campus-wide projects, including Bailey
44 Hall Renovation ............................... 14,191
45 Maritime
46 Campus-wide projects, including Replace
47 Roof - Reisenberg Gym .......................... 6,049
48 Morrisville
49 Campus-wide projects, including Renovate
50 Charlton Hall .................................. 8,428
51 New Paltz
576 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide projects, including Comprehen-
2 sive Renov/Demol - Wooster Science Bldg ....... 16,020
3 Old Westbury
4 Campus-wide projects, including Replace
5 Heat/Chill Plant & Distribution System ......... 9,158
6 Oneonta
7 Campus-wide projects, including Rehab
8 Physical Science Building ..................... 13,957
9 Optometry
10 Campus-wide projects, including HVAC Rehab
11 - Phase I ...................................... 3,176
12 Oswego
13 Campus-wide projects, including Piez Hall
14 Reconstruction ................................ 21,400
15 Plattsburgh
16 Campus-wide projects, including Renovate
17 Beaumont Hall - Phase I ....................... 14,233
18 Potsdam
19 Campus-wide projects, including Raymond/
20 Sisson Halls - Replace Windows ................ 13,837
21 Purchase
22 Campus-wide projects, including Rehab HVAC
23 - Visual Arts Bldg ............................ 18,143
24 State Univ Plaza
25 Campus-wide projects, including Repair
26 Facade - Historic Plaza Building ............... 4,596
27 Stony Brook, incl Health Science Center (HSC)
28 Campus-wide projects, including Interior
29 Rehab - Various Bldgs ......................... 73,847
30 Syracuse Health Science Center (HSC)
31 Campus-wide projects, including Renovate
32 Weiskotten Basement Central Core ............... 7,862
33 Utica-Rome
34 Campus-wide projects, including Site
35 Lighting Upgrades - Campuswide ................. 3,152
36 University-wide Alterations and Improvements
37 Maintenance Undistributed
38 For university-wide capital critical main-
39 tenance or capital improvement costs,
40 including costs attributable to executive
41 order 111; ADA and code compliance claims;
42 environmental hazards; emergencies health
43 and safety, and energy conservation needs,
44 asbestos and PCB remediation; fire alarms
45 and sprinklers; electrical, mechanical,
46 plumbing and heating and cooling system
47 requirements and other similar university-
48 wide needs ...................................... 16,500
49 --------------
50 Total .......................................... 550,000
51 ==============
577 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
2 section 1, of the laws of 2012:
3 Advances for alterations and improvements to facilities for capital
4 critical maintenance, including but not limited to services and
5 expenses, service agreements or service contracts and memoranda of
6 understanding; for capital design including the cost of services
7 provided by private firms, including preparation of designs, plans,
8 specifications and estimates; for property acquisition, and facility
9 reconstruction, rehabilitation, equipment; for health and safety
10 improvements and upgrades to preserve or enhance facility function-
11 ing; for program improvements or program change; to support improve-
12 ments in technology, research, environmental protection, energy and
13 resource conservation, and accreditation; to finance costs attribut-
14 able to executive order 111, ADA and code compliance needs, claims,
15 emergencies and remediation of environmental hazards; to ensure the
16 functionality of major building systems such a fire alarms and
17 sprinklers, electrical, mechanical, plumbing, heating/cooling
18 systems and supporting infrastructure, including underground utili-
19 ties; and to provide for facilities for the disabled and related
20 projects including costs incurred prior to April 1, 2008 subject to
21 a plan developed by the state university and approved by the direc-
22 tor of the budget. Notwithstanding any provision of law, rule or
23 regulation to the contrary, amounts designated as university-wide,
24 may be made available for projects identified and approved by the
25 governor and the chancellor of the state university of New York
26 pursuant to the NY-SUNY 2020 challenge grant program (28F10803) ....
27 550,000,000 ...................................... (re. $14,913,000)
28 Project Schedule
29 PROJECT AMOUNT
30 ----------------------------------------------------------
31 (thousands of dollars)
32 Albany
33 Campus-wide critical maintenance projects
34 such as Relocation of the Data Center ......... 33,755
35 Alfred Ceramics
36 Campus-wide critical maintenance projects
37 such as McMahon Hall Window Replacement ........ 2,924
38 Alfred State
39 Campus-wide critical maintenance projects
40 such as Classroom/Lab Upgrades and
41 Central Dining Hall Renovation, Phase II ....... 7,707
42 Binghamton
43 Campus-wide critical maintenance projects
44 such as Science II, IV and V Renovations ...... 32,568
45 Brockport
46 Campus-wide critical maintenance projects
47 such as Smith Hall Infrastructure/
48 Exterior Renovations .......................... 19,927
49 Brooklyn Health Science Center (HSC)
50 Campus-wide critical maintenance projects
578 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 such as Elevator Upgrades and HVAC
2 Replacement ................................... 13,087
3 Buffalo College
4 Campus-wide critical maintenance projects
5 such as Rockwell Hall Renovations ............. 24,908
6 Buffalo University
7 Campus-wide critical maintenance projects
8 such as Underground Utility Renovations
9 on both North and South campuses .............. 64,027
10 Canton
11 Campus-wide critical maintenance projects
12 such as Structural Renovations to Dana
13 Hall ........................................... 5,286
14 Cobleskill
15 Campus-wide critical maintenance projects
16 such as Dairy Complex Infrastructure
17 Improvements ................................... 7,057
18 Cornell
19 Campus-wide critical maintenance projects
20 such as Warren Hall Renovation ................ 33,624
21 Cortland
22 Campus-wide critical maintenance projects
23 such as Power Plant Upgrades and Lusk
24 Field House Renovations ....................... 16,916
25 Delhi
26 Campus-wide critical maintenance projects
27 such as Upgrades to Alumni Hall and Road
28 & Sidewalk Improvements ........................ 6,068
29 Empire State
30 Campus-wide critical maintenance projects
31 such as Security System Upgrades ................. 736
32 Environmental Science and Forestry
33 Campus-wide critical maintenance projects
34 such as Electrical Substation Replace-
35 ment and Illick Hall Exterior Reno-
36 vations ........................................ 8,515
37 Farmingdale
38 Campus-wide critical maintenance projects
39 such as Roof and Elevator Replacements ........ 15,199
40 Fredonia
41 Campus-wide critical maintenance projects
42 such as Fenton Hall Renovations and
43 Campus Code Compliance, Phase II .............. 13,857
44 Geneseo
45 Campus-wide critical maintenance projects
46 such as Security Upgrades and Newton
47 Hall Renovation, Phase II ..................... 14,607
48 Maritime
49 Campus-wide critical maintenance projects
50 such as Reisenberg Gym HVAC Upgrades and
579 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Roof Replacement ............................... 5,971
2 Morrisville
3 Campus-wide critical maintenance projects
4 such as Minor Renovation Projects .............. 8,693
5 New Paltz
6 Campus-wide critical maintenance projects
7 such as Elting Gymnasium Renovation ........... 16,456
8 Old Westbury
9 Campus-wide critical maintenance projects
10 such as Campus Center Renovations .............. 9,194
11 Oneonta
12 Campus-wide critical maintenance projects
13 such as Electrical Upgrades and Heating
14 Plant Renovation, Phase II .................... 14,285
15 Optometry
16 Campus-wide critical maintenance projects
17 such as Restroom Renovations, Phase I &
18 II ............................................. 3,248
19 Oswego
20 Campus-wide critical maintenance projects
21 such as Penfield Library Renovation and
22 Utilities & Infrastructure Program Study ...... 21,931
23 Plattsburgh
24 Campus-wide critical maintenance projects
25 such as Hudson Hall Renovation, Phase II ...... 13,824
26 Potsdam
27 Campus-wide critical maintenance projects
28 such as Stowell & Flagg Hall HVAC Reha-
29 bilitations ................................... 14,233
30 Purchase
31 Campus-wide critical maintenance projects
32 such as various HVAC Rehabilitations .......... 16,015
33 State Univ Plaza
34 Campus-wide critical maintenance projects
35 such as Plaza Building Window Replace-
36 ments .......................................... 5,141
37 Stony Brook, incl Health Science
38 Center (HSC)
39 Campus-wide critical maintenance projects
40 such as Old Chemistry Building Reno-
41 vation ........................................ 72,893
42 Syracuse Health Science Center (HSC)
43 Campus-wide critical maintenance projects
44 such as various Weiskotten Hall Reno-
45 vations ........................................ 7,839
46 Utica-Rome
47 Campus-wide critical maintenance projects
48 such as Underground Electrical Upgrades/
49 Replacements ................................... 3,009
50 University-wide Alterations and Improvements
51 For University-wide capital critical main-
580 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tenance or capital improvement costs,
2 including costs attributable to execu-
3 tive order 111; ADA compliance claims;
4 environmental hazards; emergencies for
5 health and safety, and energy conserva-
6 tion needs, asbestos and PCB remedi-
7 ation; fire alarms and sprinklers; elec-
8 trical, mechanical, plumbing and heating
9 and cooling system requirements along
10 with other similar university-wide needs ...... 16,500
11 --------------
12 Total ........................................ 550,000
13 ==============
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Program Improvement or Program Change Purpose
17 By chapter 54, section 1, of the laws of 2015:
18 For services and expenses of studies, site acquisitions, planning,
19 design, construction, reconstruction, renovation, and equipment
20 necessary to establish a school of pharmacy at the state university
21 of New York at Binghamton. Amounts appropriated herein shall be in
22 addition to $25,000,000 appropriated in the urban development corpo-
23 ration projects budget (28F21508) ... 25,000,000 . (re. $24,524,000)
24 By chapter 54, section 1, of the laws of 2014:
25 Advances for the cost of studies, site acquisitions, planning, design,
26 construction, reconstruction, renovation, and equipment necessary to
27 establish a school of pharmacy at the state university of New York
28 at Binghamton (28F11408) ... 10,000,000 ........... (re. $2,921,000)
29 By chapter 54, section 1, of the laws of 2013:
30 Advances for the design and construction of an emerging technology and
31 entrepreneurial complex, as identified and approved by the governor
32 and the chancellor of the state of New York pursuant to the NY-SUNY
33 2020 challenge grant program for the state university of New York at
34 Albany, including but not limited to services and expenses, service
35 agreements or service contracts and memoranda of understanding; for
36 capital design including the cost of services provided by private
37 firms, including preparation of designs, plans, specifications and
38 estimates; for property acquisition, and facility construction or
39 reconstruction and equipment; claims, emergencies and remediation of
40 environmental hazards (28201308) ... 88,000,000 .. (re. $88,000,000)
41 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
42 section 1, of the laws of 2013:
43 Advances for the relocation and construction of a medical school and
44 biomedical sciences facility, as identified and approved by the
45 governor and the chancellor of the state of New York pursuant to the
46 NY-SUNY 2020 challenge grant program for the state university of New
581 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 York at Buffalo, including but not limited to services and expenses,
2 service agreements or service contracts and memoranda of understand-
3 ing; for capital design including the cost of services provided by
4 private firms, including preparation of designs, plans, specifica-
5 tions and estimates; for property acquisition, and facility
6 construction or reconstruction and equipment; claims, emergencies
7 and remediation of environmental hazards. Notwithstanding any incon-
8 sistent provision of law to the contrary, the state university
9 construction fund is hereby authorized to enter into a service
10 agreement to transfer $25,000,000 of this appropriation to universi-
11 ty at Buffalo-affiliated entities for design, construction, property
12 acquisition and equipment costs related to the relocation and
13 construction of the medical school and biomedical sciences facility
14 and related facilities (28201208) ..................................
15 215,000,000 ...................................... (re. $11,047,000)
16 By chapter 53, section 1, of the laws of 2008:
17 Advances to SUNY hospitals for alterations, improvements services and
18 expenses, and new facilities, including costs incurred prior to
19 April 1, 2008 subject to a plan developed by the state university
20 and approved by the director of the budget (28FH0808) ..............
21 450,000,000 ..................................... (re. $156,337,000)
22 Project Schedule
23 PROJECT AMOUNT
24 ----------------------------------------------------------
25 (thousands of dollars)
26 Brooklyn ......................................... 150,000
27 For university-wide projects which may
28 include but are not limited to:
29 -Ambulatory Services Expansion, Phase I
30 -Ongoing Critical Maintenance Projects
31 Syracuse ......................................... 150,000
32 For university-wide projects which may
33 include but are not limited to:
34 -Heart Center Renovations
35 -Cancer Center Design and Construction
36 -UH North and West Wing Renovations
37 -Ancillary Services Facilities
38 Stony Brook ...................................... 150,000
39 For university-wide projects which may
40 include but are not limited to:
41 -Intensive Care Building Design and
42 Construction
43 -Level 8 & 9 Hospital Floor Rehabili-
44 tation
45 -Hospital Building Exterior Renovation
46 -Neorointerventional Program Facilities
47 --------------
48 Total .......................................... 450,000
49 ==============
582 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 53, section 1, of the laws of 2008, as
2 amended by chapter 54, section 1, of the laws of 2017, is hereby
3 amended and reappropriated to read:
4 Advances for alterations and improvements to various facilities
5 including services and expenses, service contracts, memoranda of
6 understanding, capital design, construction, acquisition, recon-
7 struction, rehabilitation and equipment; for health and safety,
8 preservation of facilities, new facilities, program improvement or
9 program change, technology, environment protection, energy conserva-
10 tion, accreditation, facilities for the physically disabled, and
11 related projects, including costs incurred prior to April 1, 2008,
12 subject to an annual plan developed by the state university of New
13 York and approved by the director of the budget. Of the amount
14 appropriated herein, up to $400,000 may be suballocated or trans-
15 ferred to the office of general services for capital costs related
16 to the NY Network (28F20808) ... 1,675,613,000 .. (re. $224,978,000)
17 Project Schedule
18 PROJECT AMOUNT
19 --------------------------------------------
20 (thousands of dollars)
21 Albany
22 Construct Business School ......... 54,000
23 Campus Center Expansion/
24 Improvements ...................... 30,000
25 Campus Revitalization/Site
26 Improvements, Phase II ............. 5,000
27 Alfred Ceramics
28 Infill Project-VariousBuildings .... 9,000
29 Alfred State
30 Student Union / Student Activities
31 Center ............................ 27,500
32 Dining Hall ........................ 6,000
33 Binghamton
34 Nursing Facility ................... 3,000
35 Center for Excellence Building .... 15,000
36 Nursing Facility ................... 5,000
37 Upgrade to Events Center ........... 1,000
38 Brockport
39 Construct Academic Building ....... 29,300
40 Brooklyn Health Science Center (HSC)
41 Life & Health Safety
42 Improvements ...................... 25,300
43 Construct Academic Bldg for School
44 of Public Health ................. 100,000
45 Expansion of Administration
46 Complex ........................... 17,600
47 Traditional and Alternative
48 Notwithstanding any inconsis-
49 tent provision of law to the
50 contrary, the state univer-
583 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sity construction fund is
2 authorized to enter into a
3 service agreement to transfer
4 up to $6,000,000 in state
5 university capital construction
6 funds to Bio-Bat, Inc., to be
7 administered by The Research
8 Foundation of State University
9 of New York, for the construc-
10 tion, reconstruction, rehabil-
11 itation and redevelopment of
12 energy sources development at
13 the Brooklyn Army Terminal
14 biotechnology commercial and
15 research center. Bio-Bat, Inc.,
16 or its designee is authorized
17 to construct, reconstruct,
18 rehabilitate and redevelop
19 energy sources for such facil-
20 ity using funds transferred
21 from the state university
22 construction fund to Bio-Bat,
23 Inc. ............................. 6,000
24 Buffalo College
25 Renovate/Addition Science
26 Building - Phase I ................ 45,000
27 Renovate/Addition Science
28 Building - Phase II ............... 48,262
29 Buffalo University
30 UB Gateway & Urban Technology
31 Incubator Phases I, II, III
32 Downtown. Notwithstanding
33 any inconsistent
34 provision of law to the
35 contrary, the State University
36 Construction Fund is hereby
37 authorized to enter into a
38 service agreement to transfer
39 up to $32,000,000 of this
40 appropriation in
41 State University capital
42 construction funds to the Buffalo
43 2020 Development Corporation for
44 the purpose of constructing,
45 acquiring, or creating a
46 Clinical/Translational Research
47 facility on the downtown
48 campus, an incubator facility
49 on the downtown campus, the UB
50 Gateway project, and reimbursing
51 the University at Buffalo
584 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Foundation for property
2 acquisition for the Educational
3 Opportunity Center and the UB
4 Gateway project, provided,
5 that all contracts for the
6 construction of any such
7 facilities shall require compliance
8 with the provisions of
9 section two hundred twenty of
10 the labor law and shall be subject
11 to article XV-a of the executive
12 law ............................... 32,000
13 Construct Clinical/Transitional
14 Research Facility - Ph III.
15 Notwithstanding any inconsistent
16 provision of law to the contrary,
17 the State University Construction
18 Fund is hereby authorized to enter
19 into a service agreement to transfer
20 up to $100,000,000 of this
21 appropriation to the Buffalo 2020
22 Development Corporation for the
23 purpose of constructing, acquiring,
24 or creating a Clinical/Translational
25 Research facility and an incubator
26 facility on the downtown campus,
27 provided, that all contracts for
28 the construction of any such
29 facilities shall require compliance
30 with the provisions of section two
31 hundred twenty of the labor law and
32 shall be subject to article XV-a of
33 the executive law ................ 100,000
34 UB Gateway, Phase IV.
35 Notwithstanding any law to the
36 contrary, the State University
37 Construction Fund is hereby
38 authorized to enter into a service
39 agreement to transfer up to $6,000,000
40 of this appropriation to the Buffalo
41 2020 Development Corporation for the
42 purpose of constructing or creating
43 the UB Gateway project, and
44 reimbursing the University at
45 Buffalo Foundation for property
46 acquisition for the Educational
47 Opportunity Center and the UB
48 Gateway project, provided, however
49 that to the extent any portion of
50 such appropriation is utilized for
51 construction purposes, all contracts
585 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 for the construction of such facilities
2 shall require compliance with
3 the provisions of section two
4 hundred twenty of the labor law and
5 shall be subject to article XV-a of
6 the executive law .................. 6,000
7 Canton
8 Center for Athletics/Recreational
9 Complex Phase II .................. 21,200
10 Cobleskill
11 Construct Environmental Science
12 & Technology Center ................ 3,700
13 Construct Agriculture & Technology
14 Center ............................ 38,200
15 Cornell
16 Stocking Hall Renovation and
17 Replacement ....................... 64,000
18 Construct Surge Space for Stocking
19 Hall .............................. 16,000
20 Replacement of the Dairy Barn ...... 7,000
21 Cortland
22 Construct Student Life Center ..... 51,200
23 Delhi
24 Campus Utility Master Plan ......... 1,000
25 Farnsworth Hall .................... 6,000
26 Empire State
27 Construct Regional Center-Suffolk
28 CC Amermann Campus Facility ....... 12,900
29 Environmental Science and Forestry
30 Construct Gateway Building ........ 22,000
31 [Construct Academic Building]
32 Renovation and addition for Marshall
33 Hall and Illick hall ............... 6,000
34 Adirondack Ecological Center ....... 2,500
35 Student Recreation Center at
36 Ranger School ........................ 250
37 Farmingdale
38 Construct School of Business ...... 28,900
39 New Daycare Center ................. 7,500
40 Covered Practice Field ............... 175
41 Physical Infrastructure .............. 750
42 Applied Mathematics Center ......... 1,000
43 Information Commons/Green
44 Library ............................ 1,000
45 Fredonia
46 Construct/Renovate Science
47 Technology Building ............... 38,000
48 Addition/Renovate Rockefeller
49 Arts Center ....................... 40,000
50 Geneseo
51 College Stadium Rehab &
586 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Renovation ........................ 16,300
2 Brody Hall ........................... 800
3 HVAC Improvements .................. 1,500
4 Track Improvements ................... 750
5 Maritime
6 Construct Academic Building ....... 30,000
7 Laboratory Accreditation Upgrades .. 4,500
8 Morrisville
9 Upgrade Athletic Fields ............ 5,000
10 Landscape/Campus Beautification .... 1,000
11 New Paltz
12 Library Renovation ................ 12,800
13 Construct Science Building ........ 48,026
14 Old Westbury
15 Renovation of Library/Academic
16 Space ............................. 13,000
17 Oneonta
18 Rehabilitate Fitzelle Hall ........ 36,000
19 Rehabilitate Physical Science
20 Building .......................... 30,000
21 Optometry
22 Renovate to Improve Clinical
23 Space .............................. 2,200
24 Campus Center for Student Life
25 & Learning ......................... 4,500
26 Oswego
27 General Science Lab ............... 69,500
28 Plattsburgh
29 Renovate/Expand School of
30 Business .......................... 20,400
31 Potsdam
32 Performing Arts Building .......... 55,000
33 Purchase
34 Renovate/Construct Center for
35 Integrated Technology Learning .... 20,900
36 Renovate for Theater Arts &
37 Film Programs ..................... 10,400
38 State Univ Plaza
39 Site Rehabilitation / Plaza
40 Renovation ......................... 5,000
41 Stony Brook, incl Health Science Center (HSC)
42 Construct Student Recreation
43 Center - Phase II ................. 18,000
44 Construct Computer Science
45 Building .......................... 40,800
46 To support development of academic
47 and student program space at Stony
48 Brook Southampton campus ........... 5,000
49 Renovate/modernize classroom
50 buildings, laboratories and
51 new student learning spaces
587 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 at Stony Brook Southampton ......... 7,500
2 Construct Marine Science Bldg -
3 Southampton ........................ 6,900
4 Long Island State Veteran's
5 Home ............................... 5,000
6 Computational Biomedicine Visual-
7 ization and drug development magnet
8 facility at Stony Brook University . 2,000
9 Stony Brook Long Island Children's
10 Hospital / MART Center ............. 3,000
11 Planning of Stony Brook Law
12 School ............................... 250
13 Stadium Expansion .................. 2,700
14 Stony Brook Long Island Children's
15 Hospital / MART Center ............ 45,000
16 University/Basketball Arena ....... 12,300
17 Syracuse Health Science Center (HSC)
18 Lab Addition/Surge Space -
19 Institute for Human Performance ... 72,000
20 Construct Academic Building ....... 36,000
21 Cord Blood Center Phase II ........ 10,000
22 Utica-Rome
23 Center for Advanced Technol-
24 ogy. Notwithstanding any
25 provision of law to the
26 contrary, the state
27 university construction
28 fund is hereby authorized
29 to enter into a service
30 agreement to transfer up
31 to $27,500,000 in state
32 university capital
33 construction funds to the
34 fort schuyler management
35 corporation, or other
36 appropriate corporation,
37 pursuant to appropriation
38 for the construction of a
39 center for advanced tech-
40 nology and other related
41 facilities for the state
42 university college of
43 technology at utica-rome ........ 27,500
44 Renovate for Tiered Class-
45 room. Notwithstanding any
46 provision of law to the
47 contrary, the state
48 university construction
49 fund is hereby authorized
50 to enter into a service
51 agreement to transfer up
588 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to $400,000 in state
2 university capital
3 construction funds to the
4 fort schuyler management
5 corporation, or other
6 appropriate corporation,
7 pursuant to appropriation
8 for the construction of a
9 center for advanced tech-
10 nology and other related
11 facilities for the state
12 university college of
13 technology at utica-rome ........... 400
14 Student Center - Equipment ......... 1,250
15 Field House Equipment .............. 1,750
16 Statewide
17 New York Network ................... 2,000
18 Castle Renovation - Notwith-
19 standing any provision of
20 law to the contrary, all
21 or a portion of the funds
22 appropriated hereby may be
23 suballocated or trans-
24 ferred to any department,
25 agency, or public authori-
26 ty pursuant to a plan
27 developed by the urban
28 development corporation
29 and approved by the direc-
30 tor of the division of the
31 budget to support capital
32 costs associated with the
33 implementation of the plan ...... 12,450
34 Albany Emerging Technology
35 and Entrepreneurial Complex,
36 or other project identified
37 and approved by the governor
38 and the chancellor of the
39 state university of New York,
40 pursuant to the NY-SUNY 2020
41 challenge grant program ........... 42,000
42 --------------
43 Schedule Subtotal ............ 1,675,613
44 ==============
45 The appropriation made by chapter 53, section 1, of the laws of 2007, as
46 amended by chapter 54, section 1, of the laws of 2017, is hereby
47 amended and reappropriated to read:
48 Advance for alterations and improvements to various facilities includ-
49 ing services and expenses, service contracts, memorandum of under-
50 standing, capital design, construction, acquisition, reconstruction,
589 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 rehabilitation and equipment; for health and safety, preservation of
2 facilities, new facilities, program improvement or program change,
3 technology, environmental, protection, energy conservation, accredi-
4 tation, facilities for the physically disabled and related projects
5 including costs incurred prior to April 1, 2007 subject to a plan
6 developed by the state university and approved by the director of
7 the budget. Notwithstanding any provision of law, rule or regulation
8 to the contrary, amounts designated as university-wide, may be made
9 available for projects identified and approved by the governor and
10 the chancellor of the state university of New York pursuant to the
11 NY-SUNY 2020 challenge grant program (28F10708) ....................
12 379,700,000 ...................................... (re. $49,807,000)
13 Project Schedule
14 PROJECT AMOUNT
15 ----------------------------------------------------------
16 (thousands of dollars)
17 Albany
18 Campus-wide critical maintenance projects
19 such as Classroom Renovations & Upgrades,
20 Phase I .......................................... 5,988
21 Alfred Ceramics
22 Campus-wide critical maintenance projects
23 such as Harder Hall Window Replacement ............. 515
24 Alfred State
25 Campus-wide critical maintenance projects
26 such as Administration Building Repairs .......... 1,391
27 Binghamton
28 Campus-wide critical maintenance projects
29 such as East Gym Repairs ......................... 5,766
30 Brockport
31 Special Events Recreation Center Construc-
32 tion ............................................ 24,000
33 Campus-wide critical maintenance projects
34 such as Smith Hall Renovations ................... 3,572
35 Brooklyn Health Science Center (HSC)
36 Campus-wide critical maintenance projects
37 such as Basic Science Building Heating &
38 Air Conditioning Renovations ..................... 1,968
39 Buffalo College
40 Campus-wide critical maintenance projects
41 such as Replace Underground Water-Lines .......... 4,384
42 Buffalo University
43 Campus-wide critical maintenance projects
44 such as Alumni Hall Replace Pool Condens-
45 ing Units ....................................... 11,004
46 Canton
47 Campus-wide critical maintenance projects
48 such as Payson Hall Repairs ........................ 938
49 Cobleskill
50 Warm Water Aquaculture Center Construction
590 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 & Facility Conversion ............................ 3,500
2 Campus-wide critical maintenance projects
3 such as Electric Distribution System Reno-
4 vation ........................................... 1,264
5 Cornell
6 Campus-wide critical maintenance projects
7 such as Heating & Air Conditioning
8 Upgrades & Energy Conservation ................... 6,038
9 Cortland
10 Studio West Expansion & Renovation .............. 15,000
11 Campus-wide critical maintenance projects
12 such as Campus Roads & Sidewalk Repairs,
13 Phase I .......................................... 3,043
14 Delhi
15 Farnsworth Hall .................................. 6,700
16 Campus-wide critical maintenance projects
17 such as Classroom and Laboratory Upgrades ........ 1,085
18 Empire State
19 Construct Regional Center ....................... 15,660
20 Campus-wide critical maintenance projects
21 such as Union Ave Renovations ...................... 167
22 Environmental Science and Forestry [Academic
23 & Research Surge Space Construction]
24 Renovation and addition for Marshall Hall
25 and Illick Hall ................................. 23,000
26 Campus-wide critical maintenance projects
27 such as Replace Underground Communications
28 Cabling .......................................... 1,523
29 Farmingdale
30 Student Center Renovation Phase II .............. 18,400
31 Campus-wide critical maintenance projects
32 such as Roof Replacements ........................ 2,724
33 Fredonia
34 Child Care Center Construction ................... 4,600
35 Campus-wide critical maintenance projects
36 such as Code Compliance Upgrades ................. 2,485
37 Geneseo
38 Doty Building Renovations ....................... 12,000
39 Campus-wide critical maintenance projects
40 such as Bailey Hall Renovations .................. 2,545
41 Maritime
42 Health, Safety & Facility Upgrades .............. 18,850
43 Campus-wide critical maintenance projects
44 such as Reisenberg Gym Heating & Air
45 Conditioning Repairs ............................. 1,072
46 Morrisville
47 Campus-wide critical maintenance projects
48 such as Charlton & Hamilton Halls Roof
49 Repairs .......................................... 1,497
50 New Paltz
51 Old Main Renovation ............................. 10,740
591 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Campus-wide critical maintenance projects
2 such as Roof Replacements ........................ 2,988
3 Old Westbury
4 Academic Village Construction ................... 51,275
5 Campus-wide critical maintenance projects
6 such as Heating & Air Conditioning Instal-
7 lation ........................................... 1,479
8 Oneonta
9 Campus-wide critical maintenance projects
10 such as Fire Alarm Upgrades ...................... 2,545
11 Optometry
12 Safety & Facility Upgrades, Phase I .............. 9,000
13 Campus-wide critical maintenance projects
14 such as Emergency Power Generator Instal-
15 lation ............................................. 577
16 Oswego
17 Campus-wide critical maintenance projects
18 such as Wilber Hall Renovation ................... 3,817
19 Plattsburgh
20 Combined Science Facilities Renovations &
21 Additions ....................................... 23,000
22 Campus-wide critical maintenance projects
23 such as Field House Mechanical System
24 Repairs .......................................... 2,459
25 Potsdam
26 Campus-wide critical maintenance projects
27 such as Maxcy, Stillman & Raymond Halls
28 Renovations ...................................... 2,474
29 Purchase
30 Visual Arts Facility - Heating & Air
31 Conditioning Renovations ......................... 8,500
32 Campus-wide critical maintenance projects
33 such as Heating & Air Conditioning
34 Repairs, Phase II ................................ 2,807
35 State University Plaza
36 Campus-wide critical maintenance projects
37 such as Electrical Switchgear Repairs &
38 Replacement ........................................ 917
39 Stony Brook, including Health Science Center
40 (HSC)
41 Southampton Campus Renovations .................. 20,800
42 LI Veterans Home (Matching Grant Funds) .......... 1,000
43 Campus-wide critical maintenance projects
44 such as Campus Walkway & Lighting Upgrades ...... 13,267
45 Syracuse Health Science Center (HSC)
46 Weiskotten Hall Renovations ..................... 13,675
47 Campus-wide critical maintenance projects
48 such as Restrooms Renovations for ADA
49 Compliance ....................................... 2,165
50 Utica-Rome
51 Campus-wide critical maintenance projects
592 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 such as Campus Electrical System Upgrade ........... 536
2 University-wide Alterations and Improvements
3 For university-wide critical maintenance or
4 capital improvement costs, including costs
5 attributable to executive order 111; ADA
6 and code compliance; claims; environmental
7 hazards; emergencies, health and safety,
8 and energy conservation needs; asbestos
9 and PCB remediation; fire alarms and
10 sprinklers; electrical distribution and
11 heating and cooling system requirements;
12 and other similar university-wide need ........... 5,000
13 --------------
14 Total ............................................ 379,700
15 ==============
16 By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
17 section 1, of the laws of 2014:
18 Advance for alterations and improvements to various facilities includ-
19 ing services and expenses, service contracts, memorandum of under-
20 standing, capital design, construction, acquisition, reconstruction,
21 rehabilitation and equipment; for health and safety, preservation of
22 facilities, new facilities, program improvement or program change,
23 technology, environmental, protection, energy conservation, accredi-
24 tation, facilities for the physically disabled and related projects
25 including costs incurred prior to April 1, 2006 subject to a plan
26 developed by the state university and approved by the director of
27 the budget (28F10608) ... 49,723,000 .............. (re. $4,522,000)
28 Project Schedule
29 PROJECT AMOUNT
30 ----------------------------------------------------------
31 (thousands of dollars)
32 Old Westbury
33 Academic village new construction ............... 22,300
34 Empire State
35 Center for Distance Learning construction ........ 6,000
36 Critical maintenance and high priority
37 projects
38 Universitywide .................................... 16,423
39 For services and expenses related to the
40 acquisition, renovation, reconstruction,
41 design, construction or equipping the Neil
42 D. Levin graduate institute of interna-
43 tional relations and commerce .................... 5,000
44 --------------
45 Total ........................................... 49,723
46 ==============
593 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 53, section 1, of the laws of 2006, as
2 amended by chapter 54, section 1, of the laws of 2017, is hereby
3 amended and reappropriated to read:
4 An additional advance for alterations and improvements to various
5 facilities including services and expenses, service contracts, memo-
6 randum of understanding, capital design, construction, acquisition,
7 reconstruction, rehabilitation and equipment; for health and safety,
8 preservation of facilities, new facilities, program improvement or
9 program change, technology, environmental protection, energy conser-
10 vation, accreditation, facilities for the physically disabled and
11 related projects including costs incurred prior to April 1, 2006
12 subject to an annual plan developed by the state university of New
13 York which shall include projects in the following schedule
14 (28F20608) ... 436,503,000 ....................... (re. $21,875,000)
15 Project Schedule
16 PROJECT AMOUNT
17 ----------------------------------------------------------
18 (thousands of dollars)
19 Albany
20 Campus Revitalization Project ................... 25,000
21 Alfred State College
22 Grazing/Organic Management at Centennial
23 Farm ............................................. 4,900
24 Binghamton
25 Engineering Science Research and Develop-
26 ment ............................................ 60,000
27 Brockport
28 New Student Recreation Center/Multipurpose
29 Fieldhouse ...................................... 15,000
30 Brooklyn HSC
31 Basic Science Building Renovation ............... 20,000
32 Brooklyn Army Terminal. Notwithstanding any
33 inconsistent provision of law to the
34 contrary, the state university
35 construction fund is hereby authorized to
36 enter into a service agreement to transfer
37 up to $36,000,000 in state university
38 capital construction funds to Bio-Bat,
39 Inc., to be administered by The Research
40 Foundation of State University of New
41 York, for the construction, recon-
42 struction, rehabilitation and redevelop-
43 ment of the Brooklyn Army Terminal for use
44 as a biotechnology commercial and research
45 center. Bio-Bat, Inc., or other appropri-
46 ate corporation, is authorized to
47 construct, reconstruct, rehabilitate and
48 redevelop such facility using funds trans-
49 ferred from the state university
50 construction fund to Bio-Bat, Inc.,
594 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 including costs, not to exceed $1,000,000,
2 for costs incurred before July 1, 2006 .......... 36,000
3 Buffalo State
4 Athletic Stadium ................................. 2,577
5 Buffalo University
6 School of Engineering ........................... 24,600
7 Canton
8 Convocation, Athletic & Recreation Center ....... 18,000
9 Ceramic
10 Kazuo Inamori School of Engineering .............. 5,000
11 Cobleskill
12 Old Quad/Wheeler Hall ........................... 11,300
13 Frisbee Hall Renovation .......................... 6,500
14 Cornell
15 ILR faculty Building Cost Escalation ............. 2,000
16 Agriculture Food Technology Park
17 Construction. Notwithstanding any incon-
18 sistent provision of law to the contrary,
19 the state university construction fund is
20 hereby authorized to enter into a service
21 agreement to transfer $1,000,000 in state
22 university capital construction funds to
23 the Cornell Agriculture and Food Technolo-
24 gy Park (CAFTP) for the partial costs of
25 constructing the flexible technology
26 research facility and related site
27 improvements on the parcel of land trans-
28 ferred by the state to Cornell University
29 and leased to the CAFTP for this purpose
30 pursuant to chapter 463 of the laws of
31 2001 ............................................. 1,000
32 Martha Van Rensselaer Hall Building
33 Replacement Project .............................. 5,000
34 Cortland
35 Bowers Hall/Upgrade Science/Tech ................ 20,000
36 Delhi
37 Farnsworth Hall ................................. 10,000
38 Farmingdale
39 Dental Hygiene Care Center ....................... 1,700
40 Construction of Student Center .................. 20,000
41 Forestry
42 [New Academic Building] Renovation and
43 addition for Marshall Hall and Illick
44 Hall ............................................ 15,000
45 Fredonia
46 Dunkirk Incubator ................................ 1,700
47 Morrisville
48 Dairy Facility Reconfiguration ................... 8,500
49 New Paltz
50 Old Main Building ............................... 10,000
51 Oneonta
595 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Renovation of Cooperstown Facility ............... 6,000
2 Optometry
3 Health and Safety Upgrades ....................... 4,000
4 Oswego
5 Renovations/Additions to Science Facili-
6 ties, Phase I ................................... 25,000
7 Plattsburgh
8 Electrical Projects .............................. 6,226
9 Purchase
10 Campuswide renovations including HVAC ............ 8,100
11 Purchase College Heritage Site ................... 6,000
12 Stony Brook
13 Southampton Campus - Renovations ................ 10,000
14 Stadium .......................................... 3,000
15 Gyrodene - Upgrade and renovations ............... 6,000
16 Basketball Arena ................................. 8,000
17 The Living Skin and Cellular Therapy
18 Production Facility ................................ 400
19 Utica-Rome
20 Field House ..................................... 20,000
21 University-wide
22 For services and expenses of a not-for-
23 profit corporation to be created for the
24 development of the East Campus of the
25 State university of New York at Albany for
26 use as biotechnology research and technol-
27 ogy center. Notwithstanding any provisions
28 of law to the contrary, the state univer-
29 sity construction fund is hereby author-
30 ized to enter into a service agreement to
31 transfer up to $10,000,000 in state
32 university capital construction funds to a
33 not-for-profit corporation to be created
34 for the development of biotechnology
35 research and technology center on the East
36 Campus of the State university of New York
37 at Albany ....................................... 10,000
38 --------------
39 Total .......................................... 436,503
40 ==============
41 By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
42 section 1, of the laws of 2014:
43 Advance for alterations and improvements to various facilities includ-
44 ing services and expenses, service contracts, memorandum of under-
45 standing, capital design, construction, acquisition, reconstruction,
46 rehabilitation and equipment; for health and safety, preservation of
47 facilities, new facilities, program improvement or program change,
48 technology, environmental, protection, energy conservation, accredi-
49 tation, facilities for the physically disabled and related projects
50 including costs incurred prior to April 1, 2005 subject to a plan
596 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 developed by the state university and approved by the director of
2 the budget. Notwithstanding any provision of law, rule or regulation
3 to the contrary, amounts designated as university-wide, may be made
4 available for projects identified and approved by the governor and
5 the chancellor of the state university of New York pursuant to the
6 NY-SUNY 2020 challenge grant program (28F10508) ....................
7 234,400,000 ....................................... (re. $4,706,000)
8 Project Schedule
9 PROJECT AMOUNT
10 --------------------------------------------
11 (thousands of dollars)
12 Albany
13 -CESTM power substation
14 construction. Nothwith-
15 standing any provision of
16 law to the contrary, the
17 state university
18 construction fund is here-
19 by authorized to enter
20 into a service agreement
21 to transfer up to
22 $5,000,000 in state
23 university capital
24 construction funds to the
25 Fuller road management
26 corporation, pursuant to
27 appropriation, for the
28 construction of a power
29 substation for the center
30 for environmental sciences
31 and logy management build-
32 ing and other related
33 facilities on the univer-
34 sity at Albany campus.
35 Fuller road management
36 corporation is authorized
37 to construct such facility
38 using funds transferred
39 from the state university
40 construction fund to Full-
41 er road management corpo-
42 ration, and other funds
43 available to Fuller road
44 management corporation,
45 pursuant to the terms of
46 an executed lease agree-
47 ment with the state
48 university of New York
49 trustees as authorized by
50 chapter 643 of the laws of
597 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 1997 ............................. 5,000
2 -ASML High Tech Center
3 construction. Notwith-
4 standing any provision of
5 law to the contrary, the
6 state university
7 construction fund is here-
8 by authorized to enter
9 into a service agreement
10 to transfer up to
11 $75,000,000 in state
12 university capital
13 construction funds to the
14 Fuller road management
15 corporation, or other
16 appropriate corporation,
17 pursuant to appropriation,
18 for the construction of a
19 high tech center for ASML
20 and other related facili-
21 ties on the university at
22 Albany campus. Fuller road
23 management corporation, or
24 other appropriate corpo-
25 ration, is authorized to
26 construct such facility
27 using funds transferred
28 from the state university
29 construction fund to the
30 Fuller road management
31 corporation, or other
32 appropriate corporation,
33 and other funds available
34 to Fuller road management
35 corporation, or other
36 appropriate corporation,
37 pursuant to the terms of
38 an executed lease agree-
39 ment with the state
40 university of New York
41 trustees as authorized by
42 chapter 643 of the laws of
43 1997 ............................ 75,000
44 Buffalo University
45 -Pharmacy School construction ..... 27,000
46 Cornell
47 -Martha Van Rensselaer
48 construction ..................... 9,000
49 Empire State College
50 -Construction ..................... 20,000
51 Fredonia
598 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 -Heating system replacement ....... 14,000
2 Stony Brook
3 -Long Island Veterans' Home
4 improvements ...................... 400
5 Universitywide
6 -Campuswide priority proj-
7 ects including the Monroe
8 Community College-New Down-
9 town Campus and the Orange
10 County Community College-
11 Newburgh Campus according to
12 the following schedule ............ 83,000
13 sub-schedule
14 Universitywide
15 -Campuswide projects ........... 50,000
16 -Monroe Community
17 College New Downtown
18 Campus (State Share)........... 18,000
19 -Orange County Com-
20 munity College New-
21 burgh Campus (State
22 (Share) ....................... 15,000
23 ----------
24 Total ...................... 234,400
25 ==========
26 The appropriation made by chapter 53, section 1, of the laws of 2005, as
27 amended by chapter 55, section 1, of the laws of 2016, is hereby
28 amended and reappropriated to read:
29 An additional advance for alterations and improvements to various
30 facilities including services and expenses, service contracts, memo-
31 randum of understanding, capital design, construction, acquisition,
32 reconstruction, rehabilitation and equipment; for health and safety,
33 preservation of facilities, new facilities, program improvement or
34 program change, technology, environmental protection, energy conser-
35 vation, accreditation, facilities for the physically disabled and
36 related projects including costs incurred prior to April 1, 2005
37 subject to an annual plan developed by the state university of New
38 York which shall include projects in the following schedule
39 (28F20508) ... [427,775,000] 415,775,000 ......... (re. $38,707,000)
40 Project Schedule
41 Project Amount
42 --------------------------------------------
43 (thousands of dollars)
44 Albany
45 Nanotechnology Research Facility
46 and Equipment for the Interna-
47 tional Venture for Nanotech-
48 nology (INVENT). Notwithstand-
49 ing any provision of law to
599 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the contrary, the state
2 university construction fund
3 is hereby authorized to enter
4 into a service agreement to
5 transfer up to $75,000,000 in
6 state university capital
7 construction funds to the
8 Fuller road management corpo-
9 ration, pursuant to appropri-
10 ation, for the construction of
11 a nanotechnology research
12 facility and equipment for the
13 international venture for
14 nanotechnology on the univer-
15 sity at Albany campus. Fuller
16 road management corporation is
17 authorized to construct such
18 facility using funds trans-
19 ferred from the state univer-
20 sity construction fund to
21 Fuller road management corpo-
22 ration, and other funds avail-
23 able to Fuller road management
24 corporation, pursuant to the
25 terms of an executed lease
26 agreement with the state
27 university of New York trus-
28 tees as authorized by chapter
29 643 of the laws of 1997 ....... 75,000
30 East Campus Cancer Research
31 Bldg/Equipment School of
32 Public Health Expansion.
33 Notwithstanding any inconsist-
34 ent provision of law to the
35 contrary, the state university
36 construction fund is hereby
37 authorized to enter into a
38 service agreement to transfer
39 up to $25,000,000 in state
40 university capital
41 construction funds to the
42 university of Albany founda-
43 tion or its designee for
44 construction of a cancer
45 research center at the east
46 campus and equipment and
47 infrastructure for the school
48 of public health expansion,
49 pursuant to appropriation
50 therefor ...................... 25,000
51 Life Sciences Bldg Equipment ...... 14,000
600 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 New Entry/Admissions Bldg
2 Equipment ........................ 3,500
3 New Entry/Admissions Bldg
4 Site/Plaza Improvements .......... 5,000
5 Life Sciences Bldg
6 Complete Shelled Wing ............ 2,000
7 Brubacher Hall ..................... 1,000
8 Alfred Ceramics
9 Expansion of the School of Arts
10 & Design ........................ 10,000
11 Binghamton
12 Nanotech Center .................... 6,000
13 Athletic Fields .................... 5,000
14 Downtown Campus .................... 4,000
15 Brooklyn HSC
16 Notwithstanding any inconsistent
17 provision of law to the con-
18 trary, the state university
19 construction fund is hereby
20 authorized to enter into a
21 service agreement to transfer
22 up to $3,000,000 in state
23 university capital construction
24 funds to the Research
25 Foundation of State University of
26 New York, for the construction
27 of phase III [incu bator] incu-
28 bator for SUNY Downstate's Bio-
29 technology Incubator Project ..... 3,000
30 Canton
31 Nevaldine Hall Improvements ........ 6,000
32 Cornell
33 ILR Faculty Wing Restoration ....... 3,000
34 Cortland
35 Child Care Center ................. 10,000
36 Empire State
37 Additional Construction ............ 5,000
38 Farmingdale
39 Library Renovations, Roof and
40 Renovations ...................... 1,500
41 Athletic Complex Renovation ........ 500
42 Student & Financial Information
43 Sys. Soft/Hardware ............... 1,000
44 Forestry
45 Bio Fuel Initiative .................. 500
46 Distance Learning .................. 3,150
47 Public Display ..................... 3,150
48 Fredonia
49 High Tech Incubator ................ 3,000
50 Geneseo
51 Integrated Science Building
601 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Project ......................... 14,500
2 Maritime
3 Campus-wide Projects ................. 700
4 Pier Replacement and expansion .... 10,000
5 Morrisville
6 Automotive Performance Center
7 Rehabilitation ................... 2,500
8 New Paltz
9 Student Union Building
10 Renovation and Improvements ..... 10,000
11 Oneonta
12 Fine Arts Building ................. 8,000
13 Oswego
14 Renovation of Television and
15 radio facilities ................... 875
16 Plattsburgh
17 Electrical Systems Upgrade ......... 3,000
18 Emergency Power System ............. 3,000
19 Potsdam
20 Cogeneration Facility .............. 8,000
21 Purchase
22 Central Plaza Renovations and
23 Improvements .................... 15,000
24 Stony Brook
25 Student Recreation Center ......... 19,500
26 Athletic Department .......... 1,500
27 Expansion and outdoor athletics
28 stadium ......................... 22,200
29 Stony Brook Long Island Children's
30 Hospital / MART Center ........... 5,000
31 Southampton Acquisition ........... 35,000
32 Utica-Rome
33 Auxiliary Services Building ....... 13,600
34 University at Buffalo
35 School of Engineering - Phase 1 ... 25,000
36 University-wide
37 For services and expenses
38 for the development of a
39 high-tech portal to be
40 developed pursuant to a
41 memorandum of understand-
42 ing to be executed by the
43 Commission on Independent
44 Colleges and Universities
45 (CICU) and the state
46 university of New York
47 (SUNY) ........................... 2,500
48 New York Network ................... 1,600
49 Educational Opportunity
50 Centers Construction, acqui-
51 sition, renovation or reha-
602 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 bilitation of a facility
2 including equipment and
3 other necessary and inci-
4 dental costs related to a
5 new Educational Opportunity
6 Center to be located in the
7 City of Rochester ................. 12,000
8 Construction, acquisition,
9 renovation or rehabilitation
10 of a facility including
11 equipment and other neces-
12 sary and incidental costs
13 related to a new Educational
14 Opportunity Center to be
15 located in the City of
16 Buffalo ........................... 12,000
17 -----------
18 [427,775]
19 Total ............................ 415,775
20 ===========
21 By chapter 53, section 1, of the laws of 2005, as amended by chapter 62,
22 section 3, of the laws of 2005:
23 An advance to SUNY hospitals for alterations, improvements, service
24 and expenses, and new facilities including costs incurred prior to
25 April 1, 2005 (28FH0508) ... 69,000,000 .......... (re. $19,782,000)
26 Project Schedule
27 AMOUNT
28 --------------------------------------------
29 (thousands of dollars)
30 Brooklyn
31 Emergency Department Expansion
32 including Bio-terrorism
33 Readiness construction and
34 renovation ......................... 5,000
35 Emergency system Expansion and
36 Information Technology
37 Infrastructure ..................... 3,000
38 Cardiovascular Service
39 restoration and expansion .......... 4,000
40 Intensive Care Unit Expansion ........ 2,000
41 Ambulatory Services Expansion and
42 rehabilitation ..................... 3,000
43 Parking Services Expansion and
44 Rehabilitation ..................... 2,000
45 Clinical Laboratory Relocation ....... 3,000
46 Additional Hospital-wide
47 priorities ......................... 1,000
48 Syracuse
49 Additional costs related to
603 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 medical/surgical expansion ........ 10,000
2 East Wing Ambulatory Cancer
3 Center ............................ 10,000
4 Additional Hospital-wide
5 priorities ......................... 3,000
6 Stonybrook HSC
7 Cancer Center ..................... 23,000
8 ----------
9 69,000
10 ==========
11 By chapter 53, section 1, of the laws of 2004, as amended by chapter 54,
12 section 1, of the laws of 2012:
13 Advance for alterations and improvements to various facilities includ-
14 ing services and expenses, service contracts, memorandum of under-
15 standing, capital design, construction, acquisition, reconstruction,
16 rehabilitation and equipment; for health and safety, preservation of
17 facilities, new facilities, program improvement or program change,
18 technology, environmental, protection, energy conservation, accredi-
19 tation, facilities for the physically disabled and related projects
20 including costs incurred prior to April 1, 2004 subject to a plan
21 developed by the state university and approved by the director of
22 the budget. Notwithstanding any provision of law, rule or regulation
23 to the contrary, amounts designated as university-wide, may be made
24 available for projects identified and approved by the governor and
25 the chancellor of the state university of New York pursuant to the
26 NY-SUNY 2020 challenge grant program (28F80408) ....................
27 1,612,000,000 ................................... (re. $17,261,000)
28 By chapter 53, section 1, of the laws of 2004, as amended by chapter 53,
29 section 1, of the laws of 2010:
30 Alterations and improvements for projects university-wide, including
31 services and expenses and minor rehabilitation and improvement,
32 including costs incurred prior to April 1, 2004 (28R80408) .........
33 25,002,000 .......................................... (re. $159,000)
34 By chapter 53, section 1, of the laws of 2003:
35 Advance to SUNY hospitals for alterations, improvements, services and
36 expenses, and new facilities including costs incurred prior to April
37 1, 2003 subject to a plan developed by the state university and
38 approved by the director of the budget (28FH0308) ..................
39 350,000,000 ...................................... (re. $17,289,000)
40 Schedule
41 PROJECT AMOUNT
42 ----------------------------------------------------------
43 (thousands of dollars)
44 Brooklyn .......................................... 74,700
45 For university-wide projects which may
46 include but are not limited to:
47 -Cancer Center
604 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 -Children's Center
2 -General and Ambulatory Surgery
3 -Transplant and Renal Services
4 -Geriatrics Center
5 Syracuse ......................................... 126,700
6 For university-wide projects which may
7 include but are not limited to:
8 -Medical/Surgical Expansion
9 -Cancer Center
10 -Pediatric Center
11 -Northwing Renovation
12 -Operating Room Expansion
13 Stony Brook ...................................... 123,600
14 For university-wide projects which may
15 include but are not limited to:
16 -Cardiovascular Expansion
17 -Cancer Center
18 -Neo-natal Intensive Care Unit and Obstet-
19 rics
20 -Expansion Ambulatory Surgery Expansion
21 -Medical/Surgical Expansion
22 University-wide Hospital Projects ................. 25,000
23 -Subject to a plan developed by the state
24 university and approved by the director
25 of the budget
26 --------------
27 Total .......................................... 350,000
28 ==============
29 By chapter 53, section 1, of the laws of 1998, as amended by chapter 55,
30 section 1, of the laws of 2016:
31 For additional General Maintenance and improvements (28R89808) .......
32 100,250,000 ....................................... (re. $1,481,000)
33 STATE UNIVERSITY CAPITAL PROJECTS FUND (CCP)
34 Capital Projects Funds - Other
35 State University Capital Projects Fund
36 Administration Purpose
37 By chapter 54, section 1, of the laws of 2014:
38 Alterations and improvements for projects university-wide including,
39 services and expenses, new facilities, and projects approved pursu-
40 ant to the NY-SUNY 2020 challenge grant program, which may include
41 revenue transfers from various external revenue sources and the
42 payment of liabilities prior to April 1, 2014 (28C11450) ...........
43 150,000,000 ..................................... (re. $150,000,000)
44 By chapter 54, section 1, of the laws of 2013:
45 Alterations and improvements for projects university-wide including,
46 services and expenses, new facilities, and projects approved pursu-
605 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ant to the NY-SUNY 2020 challenge grant program, which may include
2 revenue transfers from various external revenue sources and the
3 payment of liabilities prior to April 1, 2013 (28C11350) ...........
4 25,000,000 ....................................... (re. $25,000,000)
5 By chapter 54, section 1, of the laws of 2012:
6 Alterations and improvements for projects university-wide including,
7 services and expenses, new facilities, and projects approved pursu-
8 ant to the NY-SUNY 2020 challenge grant program. May include revenue
9 transfers from various external revenue sources and the payment of
10 liabilities prior to April 1, 2012 (28C11250) ......................
11 184,000,000 ...................................... (re. $73,562,000)
12 By chapter 53, section 1, of the laws of 2008:
13 Alterations and improvements for projects university-wide including
14 services and expenses and new facilities. May include revenue trans-
15 fer from various external revenue sources and the payment of liabil-
16 ities incurred prior to April 1, 2008 (28C10850) ...................
17 500,000,000 ..................................... (re. $151,067,000)
18 By chapter 53, section 1, of the laws of 2004, as added by chapter 55,
19 section 4, of the laws of 2004:
20 Alterations and improvements for projects university-wide including
21 services and expenses and new facilities. May include revenue trans-
22 fer from various external revenue sources and the payment of liabil-
23 ities incurred prior to April 1, 2004 (28080450) ...................
24 150,000,000 ...................................... (re. $26,552,000)
25 By chapter 53, section 1, of the laws of 2002:
26 Alterations and improvements for projects university-wide including
27 new facilities. May include revenue transfer from various external
28 revenue sources and the payment of liabilities incurred prior to
29 April 1, 2002 (28C10250) ... 20,000,000 .......... (re. $11,086,000)
30 STATE UNIVERSITY RESIDENCE HALL REHABILITATION FUND (CCP)
31 Capital Projects Funds - Other
32 State University Residence Hall Rehabilitation Fund
33 Preservation of Facilities Purpose
34 By chapter 55, section 1, of the laws of 2016:
35 Alterations and improvements for residence hall rehabilitation
36 projects and for residence hall renovations including services and
37 expenses, to be financed by a transfer from the debt service fund
38 state university dormitory income fund or other external revenue
39 sources subject to a plan developed by the state university and
40 approved by the director of the budget. Notwithstanding any other
41 law to the contrary, all or a portion of the amounts hereby appro-
42 priated may be transferred or suballocated to the dormitory authori-
43 ty and/or the state university of New York for such purpose
44 (28D31603) ... 50,000,000 ........................ (re. $50,000,000)
606 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2015:
2 Alterations and improvements for residence hall rehabilitation
3 projects and for residence hall renovations including services and
4 expenses, to be financed by a transfer from the debt service fund
5 state university dormitory income fund or other external revenue
6 sources subject to a plan developed by the state university and
7 approved by the director of the budget. Notwithstanding any other
8 law to the contrary, all or a portion of the amounts hereby appro-
9 priated may be transferred or suballocated to the dormitory authori-
10 ty and/or the state university of New York for such purpose
11 (28D31503) ... 50,000,000 ........................ (re. $37,517,000)
12 By chapter 54, section 1, of the laws of 2014:
13 Alterations and improvements for residence hall rehabilitation
14 projects and for residence hall renovations including services and
15 expenses, to be financed by a transfer from the debt service fund
16 state university dormitory income fund or other external revenue
17 sources subject to a plan developed by the state university and
18 approved by the director of the budget. Notwithstanding any other
19 law to the contrary, all or a portion of the amounts hereby appro-
20 priated may be transferred or suballocated to the dormitory authori-
21 ty and/or the state university of New York for such purpose
22 (28D31403) ... 50,000,000 ........................ (re. $26,301,000)
23 By chapter 54, section 1, of the laws of 2013:
24 Alterations and improvements for residence hall rehabilitation
25 projects and for residence hall renovations including services and
26 expenses, to be financed by a transfer from the debt service fund
27 state university dormitory income fund or other external revenue
28 sources subject to a plan developed by the state university and
29 approved by the director of the budget. Notwithstanding any other
30 law to the contrary, all or a portion of the amounts hereby appro-
31 priated may be transferred or suballocated to the dormitory authori-
32 ty and/or the state university of New York for such purpose
33 (28D31303) ... 50,000,000 ........................ (re. $16,135,000)
34 By chapter 54, section 1, of the laws of 2012:
35 Alterations and improvements for residence hall rehabilitation
36 projects and for residence hall renovations including services and
37 expenses, to be financed by a transfer from the debt service fund
38 state university dormitory income fund or other external revenue
39 sources subject to a plan developed by the state university and
40 approved by the director of the budget. Notwithstanding any other
41 law to the contrary, all or a portion of the amounts hereby appro-
42 priated may be transferred or suballocated to the dormitory authori-
43 ty and/or the state university of New York for such purpose
44 (28D31203) ... 45,000,000 ........................ (re. $13,686,000)
45 By chapter 54, section 1, of the laws of 2011:
46 Alterations and improvements for residence hall rehabilitation
47 projects and for residence hall renovations including services and
607 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 expenses, to be financed by a transfer from the debt service fund
2 state university dormitory income fund or other external revenue
3 sources subject to a plan developed by the state university and
4 approved by the director of the budget. Notwithstanding any other
5 law to the contrary, all or a portion of the amounts hereby appro-
6 priated may be transferred to the dormitory authority and/or the
7 state university of New York for such purpose (28D31103) ...........
8 90,000,000 ........................................ (re. $7,822,000)
9 By chapter 53, section 1, of the laws of 2008:
10 Alterations and improvements for residence hall rehabilitation
11 projects and for residence hall renovations including services and
12 expenses, to be financed by a transfer from the debt service fund
13 state university dormitory income fund - 330 or other external
14 revenue sources subject to a plan developed by the state university
15 and approved by the director of the budget. Notwithstanding any
16 other law to the contrary, all or a portion of the amounts hereby
17 appropriated may be transferred to the dormitory authority and/or
18 the State University of New York for such purposes (28D30803) ......
19 123,000,000 ....................................... (re. $2,479,000)
20 Advance for alterations, improvements and new construction for resi-
21 dence hall projects, including personal service costs, to be
22 financed by the issuance of State University Dormitory's Facility
23 Bonds or other external revenue sources subject to a plan developed
24 by the state university and approved by the director of the budget.
25 Notwithstanding any other law to the contrary, all or a portion of
26 the amounts hereby appropriated may be transferred to the dormitory
27 authority and/or the State University of New York for such purposes
28 (28DB0803) ... 450,000,000 ....................... (re. $88,055,000)
29 By chapter 53, section 1, of the laws of 2006, as amended by chapter 54,
30 section 1, of the laws of 2012:
31 Advance for alterations, improvements and new construction for resi-
32 dence hall projects, including personal service Costs to be financed
33 by the issuance of State University Dormitory's Facility Bonds or
34 other external revenue sources subject to a plan developed by the
35 state university and approved by the director of the budget.
36 Notwithstanding any other law to the contrary, all or a portion of
37 the amounts hereby appropriated may be transferred to the dormitory
38 authority and/or the State University of New York for such purposes
39 (28DC0603) ... 350,000,000 ........................ (re. $5,450,000)
40 By chapter 53, section 1, of the laws of 2003:
41 Alterations and improvements for residence hall rehabilitation
42 projects and for residence hall renovations including services and
43 expenses, to be financed by a transfer from the debt service fund
44 state university dormitory income fund - 330 or other external
45 revenue sources subject to a plan developed by the state university
46 and approved by the director of the budget.
47 Notwithstanding any other law to the contrary, all or a portion of the
48 amounts hereby appropriated may be transferred to the dormitory
608 12654-10-8
STATE UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE STATE UNIVERSITY CONSTRUCTION FUND)
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority for such purposes (28D30303) .............................
2 100,000,000 ......................................... (re. $819,000)
609 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 By chapter 53, section 1, of the laws of 1998, as amended by chapter 55,
6 section 1, of the laws of 2016:
7 For additional state financial assistance to community colleges for
8 alterations and improvements to various facilities including capital
9 design, construction, acquisition, reconstruction, rehabilitation
10 and equipment; for health and safety, preservation of facilities,
11 new facilities, program improvement or program change, environmental
12 protection, energy conservation, accreditation, facilities for the
13 physically disabled, and related projects. Notwithstanding any other
14 law to the contrary, all or a portion of the amounts hereby appro-
15 priated may be suballocated or transferred to the state university
16 construction fund for such purposes (28PR98C1) .....................
17 25,000,000 .......................................... (re. $201,000)
18 The appropriation made by chapter 53, section 1, of the laws of 1998, as
19 amended by chapter 55, section 1, of the laws of 2016, is hereby
20 amended and reappropriated to read:
21 For an additional advance for state financial assistance to community
22 colleges for alterations and improvements to various facilities
23 including capital design, construction, acquisition, reconstruction,
24 rehabilitation and equipment; for health and safety, preservation of
25 facilities, new facilities, program improvement or program change,
26 environmental protection, energy conservation, accreditation, facil-
27 ities for the physically disabled, and related projects including
28 plan preparation costs incurred prior to April 1, 1998. Notwith-
29 standing any other law to the contrary, all or a portion of the
30 amounts hereby appropriated may be suballocated or transferred to
31 the state university construction fund or the dormitory authority of
32 the state of New York for such purposes (28NF98C1) .................
33 175,000,000 ....................................... (re. $1,000,000)
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Health and Safety Purpose
37 By chapter 53, section 1, of the laws of 2008, as amended by chapter 54,
38 section 1, of the laws of 2012:
39 State financial assistance to community colleges for alterations and
40 improvements to various facilities including service contracts,
41 memorandum of understanding, capital design, construction, acquisi-
42 tion, reconstruction, rehabilitation, equipment and personal service
43 costs; for health and safety, preservation of facilities, technology
44 upgrades, new facilities, program improvements or program changes,
45 environmental protection, energy conservation, accreditation, facil-
46 ities for the physically disabled, and related projects, including
610 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 costs incurred prior to April 1, 2008, subject to a plan submitted
2 by the state university and approved by the director of the budget.
3 Notwithstanding any other law to the contrary, all or a portion of
4 the amounts hereby appropriated may be suballocated or transferred
5 to the state university construction fund for such purposes
6 (28R80801) ... 20,000,000 ........................ (re. $19,775,000)
7 Project Schedule
8 ESTIMATED ESTIMATED
9 TOTAL STATE 50 PERCENT
10 & LOCAL SHARE STATE SHARE
11 -------------------------------------------------------------
12 (thousands of dollars)
13 Statewide
14 Subject to a plan developed
15 by the state university
16 and approved by the
17 director of the budget
18 Critical Maintenance, Safety
19 and Security ...................... 40,000 20,000
20 ------- -------
21 Total ................................. 40,000 20,000
22 ======= =======
23 Capital Projects Funds - Other
24 Capital Projects Fund
25 Program Improvement or Program Change Purpose
26 The appropriation made by chapter 54, section 1, of the laws of 2017, is
27 hereby amended and reappropriated to read:
28 For services and expenses for the state share of financial assistance
29 to community colleges for alterations and improvements to various
30 facilities including service contracts, memoranda of understanding,
31 capital design, construction, acquisition, reconstruction, rehabili-
32 tation, equipment and personal service costs; for health and safety,
33 preservation of facilities, technology upgrades, new facilities,
34 program improvements or program changes, environmental protection,
35 energy conservation, accreditation, facilities for the physically
36 disabled, and related projects, including costs incurred prior to
37 April 1, 2017, subject to a plan submitted by the state university
38 and approved by the director of the budget, and which may include,
39 but not be limited to, projects in the following schedule. Notwith-
40 standing any other law to the contrary, all or a portion of the
41 amounts hereby appropriated may be suballocated or transferred to
42 the state university construction fund or the dormitory authority of
43 the state of New York for such purposes (28CC1708) .................
44 55,079,000 ....................................... (re. $54,659,000)
45 Project Schedule
46 ESTIMATED ESTIMATED
47 TOTAL SHARE 50 PERCENT
611 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 & LOCAL SHARE STATE SHARE
2 ----------------------------------------------------------
3 (thousands of dollars)
4 Adirondack Community College
5 Purchase and Improvements ............ 180 90
6 Campus wide improvements ............. 620 310
7 Energy Improvements .................. 100 50
8 Warren hall/Student Success .......... 400 200
9 Furniture Fixtures and
10 Equipment ........................ 1,300 650
11 Clinton Community College
12 Main Building Upgrades ............ 12,000 6,000
13 Columbia-Greene Community College
14 Critical Maintenance and Safety ...... 100 50
15 Transformer Upgrades ................. 150 75
16 Corning Community College
17 Health Education Center ............ 1,000 500
18 Dutchess County Community College
19 Aviation and Powerplant Program .... 8,090 4,045
20 Erie Community College
21 Building Infrastructure
22 Improvements/Renovations ........... 2,000 1,000
23 College-wide Sitework .............. 1,300 650
24 Code Compliance Upgrades ............. 750 375
25 Roof Replacement and Water-
26 proofing ......................... 2,000 1,000
27 Mechanical, Electrical and
28 Plumbing Improvements ............ 1,000 500
29 Fashion Institute of Technology
30 Energy Savings and Elevator/
31 Escalator Refurbishment ......... 10,556 5,278
32 Info Lab ............................. 300 150
33 Finger Lakes Community College
34 Maintenance Upgrades ............... 1,508 754
35 Telephone Upgrade .................... 800 400
36 Greenhouse Replacement ............... 100 50
37 Athletic Fields Renovation ........... 100 50
38 Fulton Montgomery Community College
39 Administrative and Community
40 Center ........................... 2,600 1,300
41 Bathroom and Locker Room Upgrades .. 2,200 1,100
42 Campus Upgrades ...................... 900 450
43 Herkimer County Community College
44 Energy Savings Projects ............ 1,898 949
45 Jamestown Community College
46 Maintenance Upgrades ............... 1,000 500
47 Mohawk Valley Community College
48 Technology Upgrades .................. 400 200
49 Nassau County Community College
50 Space Consolidation ................ 8,000 4,000
51 Brick Cafe Renovation .............. 6,000 3,000
612 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Building Systems Upgrade ........... 1,000 500
2 Concrete Repairs ..................... 500 250
3 Utility Repairs .................... 2,000 1,000
4 Roof Repairs ....................... 1,200 600
5 Academic Dept Renovation ........... 3,000 1,500
6 Infrastructure Upgrades ............ 1,000 500
7 Parking and Paving ................. 6,200 3,100
8 Cluster C Upgrades ................. 4,000 2,000
9 Roof and Parking Upgrades .......... 2,950 1,475
10 Health and Safety .................. 1,000 500
11 Library Renovation ................. 1,000 500
12 ADA Compliance ..................... 1,200 600
13 North Country Community College
14 Maintenance Upgrades ............... 1,550 775
15 Orange County Community College
16 Parking Improvements ................. 400 200
17 Heating Upgrades ..................... 376 188
18 Cooling Tower ........................ 252 126
19 Schenectady Community College
20 Elston Hall Facility Improvements .. 2,160 1,080
21 Master Plan ........................... 30 15
22 Suffolk County Community College
23 Roof Upgrade ......................... 408 204
24 Health and Sports Facility ......... 4,000 2,000
25 Tompkins Cortland Community College
26 Childcare Facility ................. 3,000 1,500
27 Ulster County Community College
28 Roof and Exterior Upgrades ........... 396 198
29 Other Sitework ........................ 60 30
30 Infrastructure Upgrades .............. 1,352 676
31 Westchester Community College
32 Phase 4 Roof Replacement ........... 1,886 943
33 Infrastructure Upgrades .............. 786 393
34 Technology Upgrades On-Campus
35 Phase V .......................... 1,000 500
36 Technology Upgrades Off-Campus
37 Phase V ............................ 100 50
38 ---------- ----------
39 Total .......................... 110,158 55,079
40 ========== ==========
41 The appropriation made by chapter 55, section 1, of the laws of 2016, as
42 amended by chapter 53, section 3, of the laws of 2016, is hereby
43 amended and reappropriated to read:
44 For services and expenses for the state share of financial assistance
45 to community colleges for alterations and improvements to various
46 facilities including service contracts, memoranda of understanding,
47 capital design, construction, acquisition, reconstruction, rehabili-
48 tation, equipment and personal service costs; for health and safety,
49 preservation of facilities, technology upgrades, new facilities,
50 program improvements or program changes, environmental protection,
613 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 energy conservation, accreditation, facilities for the physically
2 disabled, and related projects, including costs incurred prior to
3 April 1, 2016, subject to a plan submitted by the state university
4 and approved by the director of the budget, and which may include,
5 but not be limited to, projects in the following schedule. Notwith-
6 standing any other law to the contrary, all or a portion of the
7 amounts hereby appropriated may be suballocated or transferred to
8 the state university construction fund or the dormitory authority of
9 the state of New York for such purposes (28CC1608) .................
10 23,053,000 ....................................... (re. $22,116,000)
11 Project Schedule
12 ESTIMATED ESTIMATED
13 TOTAL SHARE 50 PERCENT
14 & LOCAL SHARE STATE SHARE
15 ----------------------------------------------------------
16 (thousands of dollars)
17 Broome County Community College
18 Disabilities Access .................. 500 250
19 HVAC and Roof Replacements ........... 540 270
20 Roads, Parking and Walkway
21 Replacement ........................ 740 370
22 Clinton Community College
23 Mechanical Equipment Replacement ..... 250 125
24 Learning Commons Renovations ....... 3,000 1,500
25 Columbia-Greene Community College
26 Emergency Repairs and Critical
27 Maintenance and Safety ............. 100 50
28 Erie Community College
29 Building Infrastructure
30 Improvements/Renovations ........... 1,200 600
31 College-wide Sitework .............. 1,000 500
32 Roof Replacement and Water-
33 proofing ......................... 2,000 1,000
34 Fashion Institute of Technology
35 Energy Savings Upgrades ........... 10,698 5,349
36 Finger Lakes Community College
37 Classroom Upgrades .................. 356 178
38 Site and Building Improvements ....... 946 473
39 Genesee County Community College
40 Dining Hall/Kitchen Expansion ........ 450 225
41 Herkimer County Community College
42 Master Planning ...................... 100 50
43 Hudson Valley Community College
44 Athletics Facility Upgrades ........ 1,000 500
45 Mohawk Valley Community College
46 Bookstore and Student Commons ........ 900 450
47 Campus Way-finding and Signage ........ 76 38
48 Learning Commons Development and
49 Related Renovation ................. 400 200
50 Monroe Community College
614 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Property Preservation Phase 2 ...... 3,604 1,802
2 Orange County Community College
3 PE Building Reconstruction ........... 120 60
4 Roof Reconstruction .................. 400 200
5 Building Demolition/Parking
6 Expansion .......................... 180 90
7 Morrison Hall: Heat Pumps
8 Replacement ........................ 300 150
9 Safety/Security: Cameras Phase II .... 300 150
10 Schenectady Community College
11 Elston Hall Facility Improvements .. 1,276 638
12 Roof Repairs Phase 3 ................. 300 150
13 Boiler Replacements .................. 120 60
14 Suffolk County Community College
15 Infrastructure Improvements ........ 5,150 2,575
16 Storm Water Initiative ............... 786 393
17 Improvements to New and Existing
18 Facilities ....................... 1,000 500
19 Ulster County Community College
20 Backup Generators .................... 994 497
21 [HAVC] HVAC Controllers .............. 300 150
22 Leach Field .......................... 208 104
23 Vanderlyn Pedestrian Bridge .......... 176 88
24 Interior Renovation and Equipment .... 150 75
25 Gym Wall Replacement ................. 114 57
26 Technology Facility Upgrades ......... 300 150
27 Water Supply Extension to Public
28 Water ............................ 3,004 1,502
29 Kelder House Renovation .............. 142 71
30 Westchester Community College
31 Site Improvements/Upgrade Phase I .. 1,626 813
32 Technology Upgrades On-Campus
33 Phase IV ......................... 1,200 600
34 Technology Upgrades Off-Campus
35 Phase IV ........................... 100 50
36 ---------- ----------
37 Total ........................... 46,106 23,053
38 ========== ==========
39 The appropriation made by chapter 54, section 1, of the laws of 2015, is
40 hereby amended and reappropriated to read:
41 For services and expenses for the state share of financial assistance
42 to community colleges for alterations and improvements to various
43 facilities including service contracts, memoranda of understanding,
44 capital design, construction, acquisition, reconstruction, rehabili-
45 tation, equipment and personal service costs; for health and safety,
46 preservation of facilities, technology upgrades, new facilities,
47 program improvements or program changes, environmental protection,
48 energy conservation, accreditation, facilities for the physically
49 disabled, and related projects, including costs incurred prior to
50 April 1, 2015, subject to a plan submitted by the state university
615 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and approved by the director of the budget, and which may include,
2 but not be limited to, projects in the following schedule. Notwith-
3 standing any other law to the contrary, all or a portion of the
4 amounts hereby appropriated may be suballocated or transferred to
5 the state university construction fund or the dormitory authority of
6 the state of New York for such purposes (28C11508) .................
7 81,176,000 ....................................... (re. $51,500,000)
8 Project Schedule
9 ESTIMATED ESTIMATED
10 TOTAL STATE 50 PERCENT
11 & LOCAL SHARE STATE SHARE
12 ----------------------------------------------------------
13 (thousands of dollars)
14 Broome County Community College
15 Carnegie Building ............... 10,000 5,000
16 Cayuga Community College
17 Karpinski Stadium ............... 6,000 3,000
18 Fashion Institute of Technology
19 Renovation: Amphitheater ........ 12,000 6,000
20 Classroom Renovation ............ 18,000 9,000
21 Genesee County Community College
22 Admissions Relocation ........... 256 128
23 Admissions Renovation ........... 896 448
24 Success Center .................. 5,188 2,594
25 Event Center .................... 13,850 6,925
26 Herkimer County Community College
27 Johnson Hall .................... 50 25
28 Jefferson Community College
29 Collaborative Learning Center ... 12,300 6,150
30 Dewey Building .................. 1,700 850
31 Monroe Community College
32 Downtown Campus ................. 13,212 6,606
33 Niagara Community College
34 New Learning Commons: Design .... 1,000 500
35 New Learning Commons: Construc-
36 tion .......................... 24,000 12,000
37 Onondaga Community College
38 West Quad Renovation:
39 Ferante/Coulter ................. 17,600 8,800
40 Orange County Community College
41 Biotech Building Renovation ..... 6,800 3,400
42 Suffolk County Community College
43 STEM Building ................... 19,500 9,750
44 ---------- ----------
45 Total ......................... 162,352 81,176
46 ========== ==========
47 For services and expenses for the state share of financial assistance
48 to community colleges for alterations and improvements to various
49 facilities including service contracts, memoranda of understanding,
616 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 capital design, construction, acquisition, reconstruction, rehabili-
2 tation, equipment and personal service costs; for health and safety,
3 preservation of facilities, technology upgrades, new facilities,
4 program improvements or program changes, environmental protection,
5 energy conservation, accreditation, facilities for the physically
6 disabled, and related projects, including costs incurred prior to
7 April 1, 2015, subject to a plan submitted by the state university
8 and approved by the director of the budget, and which may include,
9 but not be limited to, projects in the following schedule. Notwith-
10 standing any other law to the contrary, all or a portion of the
11 amounts hereby appropriated may be suballocated or transferred to
12 the state university construction fund or the dormitory authority of
13 the state of New York for such purposes (28CC1508) .................
14 62,153,000 ....................................... (re. $30,578,000)
15 Project Schedule
16 ESTIMATED ESTIMATED
17 TOTAL STATE 50 PERCENT
18 & LOCAL SHARE STATE SHARE
19 ----------------------------------------------------------
20 (thousands of dollars)
21 Adirondack County Community College
22 Critical Maintenance and Facilities
23 Improvements ................... 1,630 815
24 STEM Building Renovation ......... 21,000 10,500
25 Broome County Community College
26 Site Improvements ................ 1,200 600
27 Electrical System Upgrades ....... 350 175
28 Clinton County Community College
29 Athletic Facilities Renovation ... 300 150
30 Columbia-Green Community College
31 Emergency Repairs ................ 70 35
32 Erie County Community College
33 Roof Replacements and Waterproof-
34 ing ............................ 6,000 3,000
35 College Wide Code Compliance .... 300 150
36 Finger Lakes Community College
37 Capital Improvements ............ 2,750 1,375
38 Sanitary Improvements ........... 190 95
39 Site Improvements ............... 200 100
40 Geneva Campus ................... 1,148 574
41 Fulton Montgomery County Community
42 College
43 Site Work and Campus Safety ..... 1,000 500
44 Infrastructure Upgrades ......... 1,876 938
45 Student Union Improvements ...... 2,330 1,165
46 Hudson Valley Community College
47 Athletic Facilities Renovation .. 3,500 1,750
48 Jefferson Community College
49 Maintenance and Facility Upgrades 7,000 3,500
50 Mohawk Valley Community College
617 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Plumley Addition & Renovation ... 29,224 14,612
2 Payne Hall Restoration .......... 520 260
3 Trades Building Renovation ...... 2,950 1,475
4 Nassau Community College
5 Building Systems Renovations .... 1,500 750
6 Master Plan Construction ........ 5,338 2,669
7 Hospitality Program Renovation .. 1,500 750
8 Various Facilities Upgrades ..... 500 250
9 Concrete Repairs ................ 1,200 600
10 ADA Renovations ................. 700 350
11 Site Improvements ............... 950 475
12 Site and Road Improvements ...... 1,400 700
13 Academic Building Renovation .... 2,000 1,000
14 Critical Maintenance Projects ... 5,000 2,500
15 Niagara Community College
16 Grounds Storage and Site Modifica-
17 tion ........................... 300 150
18 Orange County Community College
19 Site Improvements ................ 220 110
20 Boiler Replacements .............. 710 355
21 Critical/Deferred Maintenance .... 200 100
22 Safety and Security Systems ...... 250 125
23 Schenectady County Community College
24 Phase 2 Roof Repairs ............. 350 175
25 Suffolk County Community College
26 Master Plan Update ............... 500 250
27 Sullivan County Community College
28 Energy Savings Improvements ...... 9,000 4,500
29 Roadway Improvements ............. 950 475
30 Ulster County Community College
31 Kingston Extension Center ........ 7,058 3,529
32 Westchester County Community College
33 On Campus Technology Upgrades .... 1,042 521
34 Off Campus Technology Upgrades ... 100 50
35 ---------- ----------
36 Total .......................... 124,306 62,153
37 ========== ==========
38 The appropriation made by chapter 54, section 1, of the laws of 2014, is
39 hereby amended and reappropriated to read:
40 An advance for the state share of financial assistance to community
41 colleges for alterations and improvements to existing facilities
42 including service contracts, memorandum of understanding, capital
43 design, construction, reconstruction, rehabilitation, equipment and
44 personal service costs; for health and safety, preservation of
45 facilities, technology upgrades, program improvements or program
46 changes, environmental protection, energy conservation, accredi-
47 tation, facilities for the physically disabled, and related
48 projects, including costs incurred prior to April 1, 2014, subject
49 to a plan submitted by the state university and approved by the
50 director of the budget, and which may include, but not be limited
618 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to, projects in the following schedule. Notwithstanding any other
2 law to the contrary, all or a portion of the amounts hereby appro-
3 priated may be suballocated or transferred to the state university
4 construction fund or the dormitory authority of the state of New
5 York for such purposes (28CC1408) ..................................
6 32,129,000 ....................................... (re. $24,537,000)
7 Project Schedule
8 ESTIMATED ESTIMATED
9 TOTAL STATE 50 PERCENT
10 & LOCAL SHARE STATE SHARE
11 ----------------------------------------------------------
12 (thousands of dollars)
13 Adirondack Community College
14 Campus Renovations ................... 710 355
15 Critical/Deferred Maintenance ........ 268 134
16 Health/Safety Projects ............... 854 427
17 Broome County Community College
18 Rehabilitate Campus Buildings ..... 19,500 9,750
19 HVAC and Roof Replacements ........... 500 250
20 Update Facilities Master Plan ........ 300 150
21 Music Practice Suite Renovation ...... 500 250
22 Clinton Community College
23 Science Building Emergency Power ..... 550 275
24 Columbia-Greene Community College
25 Update Facilities Master Plan ........ 120 60
26 Erie Community College
27 Roof Repair and Replacement ........ 1,600 800
28 Masonry Repairs ...................... 150 75
29 Infrastructure Improvements .......... 500 250
30 Fashion Institute of Technology
31 Building Fire Alarm Upgrades ....... 6,000 3,000
32 Renovation: Museum ................ 2,800 1,400
33 Classroom Renovation ................. 200 100
34 Finger Lakes Community College
35 Geneva Campus Renovation ........... 1,424 712
36 Canandaigua Campus Renovation ........ 700 350
37 Fulton-Montgomery Community College
38 Technology Upgrades .................. 800 400
39 Genesee County Community College
40 Main Building Entrance Renovation .... 135 68
41 Herkimer County Community College
42 Flood Damage Reconstruction ........... 20 10
43 Jamestown Community College
44 Food Service Renovation ............ 1,540 770
45 Mohawk Valley Community College
46 Exterior Renovations ................. 147 74
47 Community Room Renovation ............ 345 172
48 Campus Wayfinding and Signage ........ 469 235
49 Monroe Community College
50 Library Renovation ................. 1,004 502
619 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Services for Students Renovation ... 2,000 1,000
2 Science Lab Renovation ............... 864 432
3 Nassau Community College
4 Information Technology Upgrades ...... 760 380
5 Window Restoration Program ......... 2,000 1,000
6 Infrastructure Repairs ............. 2,000 1,000
7 Elevator Replacement Program ....... 2,000 1,000
8 Health and Safety Projects ......... 1,000 500
9 Security Upgrades .................. 2,200 1,100
10 North Country Community College
11 Campus Wide Capital Renovations ...... 400 200
12 Orange County Community College
13 Roof Repair and Replacement .......... 320 160
14 Road and Parking Rehabilitation ...... 500 250
15 Swimming Pool Renovations ............ 310 155
16 Update Facilities Master Plan ........ 150 75
17 Student Services Renovation .......... 268 134
18 Schenectady Community College
19 Workforce Development Renovation ..... 500 250
20 Generator and Transformer ............ 400 200
21 Suffolk County Community College
22 Kreiling Hall Renovation ........... 3,180 1,590
23 Sullivan County Community College
24 Critical Maintenance Upgrades ........ 500 250
25 Road and Parking Rehabilitation ...... 950 475
26 Site Stabilization ................. 1,000 500
27 Equipment Replacement ................ 250 125
28 Instructional Facility Renovation ... 500 250
29 Westchester Community College
30 Historic Roof Replacement .......... 1,068 534
31 ---------- ----------
32 Total ........................... 64,256 32,129
33 ========== ==========
34 The appropriation made by chapter 54, section 1, of the laws of 2013, is
35 hereby amended and reappropriated to read:
36 An advance for the state share of financial assistance to community
37 colleges for alterations and improvements to various facilities
38 including service contracts, memorandum of understanding, capital
39 design, construction, acquisition, reconstruction, rehabilitation,
40 equipment and personal service costs; for health and safety, preser-
41 vation of facilities, technology upgrades, new facilities, program
42 improvements or program changes, environmental protection, energy
43 conservation, accreditation, facilities for the physically disabled,
44 and related projects, including costs incurred prior to April 1,
45 2013, subject to a plan submitted by the state university and
46 approved by the director of the budget, and which may include, but
47 not be limited to, projects in the following schedule. Notwith-
48 standing any other law to the contrary, all or a portion of the
49 amounts hereby appropriated may be suballocated or transferred to
50 the state university construction fund or the dormitory authority of
620 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the state of New York for such purposes (28CC1308) .................
2 38,499,000 ....................................... (re. $19,658,000)
3 Project Schedule
4 ESTIMATED ESTIMATED
5 TOTAL STATE 50 PERCENT
6 & LOCAL SHARE STATE SHARE
7 ----------------------------------------------------------
8 (thousands of dollars)
9 Adirondack Community College
10 Renovations: Student Center .......... 850 425
11 Cayuga County Community College
12 Building System Upgrades ............. 786 393
13 Clinton Community College
14 Roofs ................................ 150 75
15 Fire Safety and Security Systems....... 60 30
16 Corning Community College
17 Facilities Master Plan ............... 180 90
18 Erie Community College
19 Roofs .............................. 2,000 1,000
20 Window and Door Replacement ........ 1,000 500
21 Code Compliance ...................... 400 200
22 Fashion Institute of Technology
23 Building System Upgrades ........... 3,000 1,500
24 Renovation: Museum ................ 2,000 1,000
25 Classroom Renovation ............... 1,800 900
26 Finger Lakes Community College
27 Infrastructure Project ............. 1,220 610
28 Herkimer County Community College
29 Renovation of Alumni Hall .......... 1,000 500
30 Monroe Community College
31 Property Preservation ............. 23,180 11,590
32 Site Improvements .................. 2,400 1,200
33 Renovation of Public Safety
34 Building ......................... 6,140 3,070
35 Nassau Community College
36 Energy/Sustainability Projects ....... 310 155
37 Orange County Community College
38 HVAC Rehabilitation ................. 596 298
39 Critical Maintenance and Safety
40 Projects ........................... 316 158
41 Exterior Renovations ................. 300 150
42 Rockland Community College
43 Building System Upgrades ........... 1,400 700
44 Suffolk County Community College
45 Infrastructure Improvements ....... 10,300 5,150
46 Site Improvements .................. 3,740 1,870
47 Renovation: Plant Operations ...... 3,650 1,825
48 Renovation: Warehouse ............... 680 340
49 Tompkins-Cortland Community College
621 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Master Plan Items .................. 7,050 3,525
2 Westchester Community College
3 Roofs .............................. 1,210 605
4 Technology Upgrades ................ 1,280 640
5 ---------- ----------
6 Total ........................... 76,998 38,499
7 ========== ==========
8 The appropriation made by chapter 54, section 1, of the laws of 2012, is
9 hereby amended and reappropriated to read:
10 An advance for the state share of financial assistance to community
11 colleges for alterations and improvements to various facilities
12 including service contracts, memorandum of understanding, capital
13 design, construction, acquisition, reconstruction, rehabilitation,
14 equipment and personal service costs; for health and safety, preser-
15 vation of facilities, technology upgrades, new facilities, program
16 improvements or program changes, environmental protection, energy
17 conservation, accreditation, facilities for the physically disabled,
18 and related projects, including costs incurred prior to April 1,
19 2011, subject to a plan submitted by the state university and
20 approved by the director of the budget, and which may include, but
21 not be limited to, projects in the following schedule. Notwith-
22 standing any other law to the contrary, all or a portion of the
23 amounts hereby appropriated may be suballocated or transferred to
24 the state university construction fund or the dormitory authority of
25 the state of New York for such purposes (28CC1208) .................
26 86,969,000 ....................................... (re. $48,925,000)
27 Project Schedule
28 ESTIMATED ESTIMATED
29 TOTAL STATE 50 PERCENT
30 & LOCAL SHARE STATE SHARE
31 ----------------------------------------------------------
32 (thousands of dollars)
33 Adirondack Community College
34 Capital Improvement Program
35 Projects ............................ 544 272
36 Broome Community College
37 Science Technology Building,
38 Construction ....................... 2,000 1,000
39 Cayuga County Community College
40 Fulton Campus Expansion ............ 5,200 2,600
41 Performing Arts Center ............. 2,920 1,460
42 Clinton Community College
43 Boiler System Project .............. 2,500 1,250
44 Corning Community College
45 Renovation and Revitalization:
46 A/C ............................... 12,724 6,362
47 Dutchess Community College Roof
48 Replacement .......................... 450 225
49 Erie Community College
622 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 New Academic Building: North
2 Campus ............................ 30,000 15,000
3 Masonry Project: City Campus ...... 2,000 1,000
4 Roofs: College-wide ............... 4,000 2,000
5 North Campus Cooling System ........ 2,000 1,000
6 Fire Alarm Systems: College-
7 wide ................................. 500 250
8 Infrastructure Improvements:
9 College-wide ......................... 500 250
10 Burt Flickinger Athletic Cen-
11 Ter Renovation ....................... 354 177
12 Code Compliance: College-
13 wide ................................. 200 100
14 Fashion Institute of Technology
15 Pomerantz Pavilion .................. 1,000 500
16 Fire Alarm Replacement .............. 3,000 1,500
17 Haft Auditorium: Construc-
18 tion ................................ 1,000 500
19 Finger Lakes Community College
20 Maintenance Capital Projects ........ 1,000 500
21 Viticulture Capital Project ......... 2,526 1,263
22 Fulton Montgomery Community College
23 Physical Education Building/
24 College Union Renovation ............ 2,276 1,138
25 Jamestown Community College
26 ARSC Building: Expansion/
27 Renovation .......................... 4,150 2,075
28 MTI Building: Expansion/
29 Renovation .......................... 1,884 942
30 Land Acquisition, Carnathan
31 Building Renovation ................. 1,600 800
32 CSCE Demolition ....................... 350 175
33 Mohawk Valley Community College
34 Field House/Jorgenson Center:
35 Construction .......................... 200 100
36 Monroe Community College
37 Public Safety Building/Build-
38 ing 12 .............................. 3,790 1,895
39 Window Replacement .................. 2,500 1,250
40 Parking & Loop Road Improve-
41 ments ............................... 1,200 600
42 Nassau Community College
43 Cluster C: Construction ............ 16,000 8,000
44 Space Consolidation: Con-
45 struction ........................... 8,000 4,000
46 IT Phased Infrastructure Up-
47 grades .............................. 8,000 4,000
48 Window Replacements ................. 4,000 2,000
49 Health and Safety Project ............. 500 250
50 Physical Plant Equipment and
51 Vehicles .............................. 600 300
623 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Public Safety Building .............. 1,000 500
2 ADA Upgrades: Campus-wide ............ 500 250
3 NCC Fountain House .................... 120 60
4 IT Equipment Upgrades ............... 1,000 500
5 Niagara Community College
6 Culinary Arts/Hospitality/
7 Tourism Center ..................... 3,000 1,500
8 Orange County Community College
9 Science Engineering and
10 Technology Center ................. 21,100 10,550
11 Main Power Plant Upgrade ............ 1,000 500
12 Greenhouse II: Replace Green-
13 house Building ........................ 300 150
14 Security/Safety Cameras:
15 Campus-wide ........................... 250 125
16 Schenectady County Community College
17 Roof Repair ........................... 830 415
18 Elevator Repair/Renovation ............ 362 181
19 Land Acquisition ...................... 260 130
20 Electrical Master Plan ................. 40 20
21 Flood Repair Project ................ 3,000 1,500
22 Suffolk County Community College
23 Infrastructure Improvements ........ 10,300 5,150
24 Parking Expansion: Ammerman
25 Campus ................................ 240 120
26 Westchester Community College
27 Technology Upgrades ................ 1,168 584
28 ---------- ----------
29 Total .......................... 173,938 86,969
30 ========== ==========
31 The appropriation made by chapter 54, section 1, of the laws of 2011, as
32 amended by chapter 54, section 1, of the laws of 2012, is hereby
33 amended and reappropriated to read:
34 An advance for the state share of financial assistance to community
35 colleges for alterations and improvements to various facilities
36 including service contracts, memorandum of understanding, capital
37 design, construction, acquisition, reconstruction, rehabilitation,
38 equipment and personal service costs; for health and safety, preser-
39 vation of facilities, technology upgrades, new facilities, program
40 improvements or program changes, environmental protection, energy
41 conservation, accreditation, facilities for the physically disabled,
42 and related projects, including costs incurred prior to April 1,
43 2011, subject to a plan submitted by the state university and
44 approved by the director of the budget. Notwithstanding any other
45 law to the contrary, all or a portion of the amounts hereby appro-
46 priated may be suballocated or transferred to the state university
47 construction fund or the dormitory authority of the state of New
48 York for such purposes (28CC1108) ... 31,571,000 .. (re. $9,596,000)
49 Project Schedule
624 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ESTIMATED ESTIMATED
2 TOTAL STATE 50 PERCENT
3 & LOCAL SHARE STATE SHARE
4 ----------------------------------------------------------
5 (thousands of dollars)
6 Adirondack Community College
7 Capital Improvement Program
8 2011 ............................. 1,458 729
9 Fashion Institute of Technology
10 Gladys Marcus Library
11 Collections Facility ............. 1,000 500
12 Broadcast Studio ................. 1,372 686
13 Wellness Center .................. 1,000 500
14 Finger Lakes Community College
15 Capital Improvement Program ...... 1,000 500
16 Niagara Community College
17 Hospitality & Tourism Institute
18 Project-Culinary ................. 9,650 4,825
19 Nassau County Community College
20 Rehab Plaza, Ph. II .............. 100 50
21 Renovation to Building C-Design .. 950 475
22 Renovation to Building V-Design .. 650 325
23 Renovation to Library-Design ..... 4,000 2,000
24 Elevator Renovations ............. 2,000 1,000
25 Space Consolidation Project-
26 Design ........................... 1,000 500
27 Infrastructure Assessment & MP
28 Update ........................... 500 250
29 Energy Savings Initiatives ....... 6,000 3,000
30 Repair Water Damaged Buildings ... 3,000 1,500
31 Health & Safety Improvements ..... 500 250
32 Tennis Facilities ................ 400 200
33 Orange County Community College
34 Newburgh Project ................. 10,708 5,354
35 Suffolk County Community College
36 Infrastructure Improvements ...... 10,300 5,150
37 Westchester Community College
38 Safety and Security Improve-
39 ments ............................ 1,742 871
40 Classroom Building Renovations ... 284 142
41 Gateway Building ................. 5,528 2,764
42 ---------- ----------
43 Total .......................... 63,142 31,571
44 ========== ==========
45 For additional advances for the state share of financial assistance to
46 community colleges for alterations and improvements to various
47 facilities including service contracts, memorandum of understanding,
48 capital design, construction, acquisition, reconstruction, rehabili-
49 tation, equipment and personal service costs; for health and safety,
50 preservation of facilities, technology upgrades, new facilities,
625 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 program improvements or program changes, environmental protection,
2 energy conservation, accreditation, facilities for the physically
3 disabled, and related projects, including costs incurred prior to
4 April 1, 2011, subject to a plan submitted by the state university
5 and approved by the director of the budget. Notwithstanding any
6 other law to the contrary, all or a portion of the amounts hereby
7 appropriated may be suballocated or transferred to the state univer-
8 sity construction fund for such purposes (28CL1108) ................
9 799,750 ............................................. (re. $799,750)
10 Project Schedule
11 ESTIMATED ESTIMATED
12 TOTAL STATE 50 PERCENT
13 & LOCAL SHARE STATE SHARE
14 ----------------------------------------------------------
15 Jamestown Community College
16 Renovation of Carnahan
17 Center ......................... 1,199,500 599,750
18 Acquisition of land adjacent
19 to Jamestown campus .............. 400,000 200,000
20 ---------- ----------
21 The appropriation made by chapter 53, section 1, of the laws of 2010, as
22 amended by chapter 54, section 1, of the laws of 2012, is hereby
23 amended and reappropriated to read:
24 An advance for the state share of financial assistance to community
25 colleges for alterations and improvements to various facilities
26 including service contracts, memorandum of understanding, capital
27 design, construction, acquisition, reconstruction, rehabilitation,
28 equipment and personal service costs; for health and safety, preser-
29 vation of facilities, technology upgrades, new facilities, program
30 improvements or program changes, environmental protection, energy
31 conservation, accreditation, facilities for the physically disabled,
32 and related projects, including costs incurred prior to April 1,
33 2010, subject to a plan submitted by the state university and
34 approved by the director of the budget. Notwithstanding any other
35 law to the contrary, all or a portion of the amounts hereby appro-
36 priated may be suballocated or transferred to the state university
37 construction fund or the dormitory authority of the state of New
38 York for such purposes (28CC1008) ... 22,426,000 .. (re. $7,713,000)
39 Project Schedule
40 ESTIMATED ESTIMATED
41 TOTAL STATE 50 PERCENT
42 & LOCAL SHARE STATE SHARE
43 ----------------------------------------------------------
44 (thousands of dollars)
45 Cayuga Community College
46 Purchase New Fulton Campus
47 And Expansion ................... 10,904 5,452
626 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Performing Arts Center ............ 4,800 2,400
2 Finger Lakes Community College
3 Master Plan Project, Ph I .......... 5,516 2,758
4 Wayne County Science Lab-
5 Equipment .......................... 290 145
6 Fulton-Montgomery Community College
7 Classroom Building Ph, II .......... 2,500 1,250
8 Fashion Institute of Technology
9 FIT Labs Increase .................. 4,500 2,250
10 Gladys Marcus Library Special
11 Collections ...................... 1,000 500
12 Haft Auditorium .................... 2,000 1,000
13 Orange County Community College
14 Campus Electric Power
15 Distribution ..................... 1,150 575
16 Parking Lot Paving ................... 500 250
17 Nassau County Community College
18 Banner Project/Life Sciences Build-
19 ing ................................ 1,612 806
20 Parking ............................ 4,000 2,000
21 Health and Safety
22 Infrastructure Assessment
23 and Master Plan Update ........... 570 285
24 North Country Community College
25 Capital Planning, Architec-
26 tural and Engineering Site
27 Analysis ........................... 220 110
28 Suffolk County Community College
29 Security Notification ................ 900 450
30 Infrastructure Improvements .......... 300 150
31 Westchester Community College
32 Safety and Security Improve-
33 ments ............................ 4,090 2,045
34 ---------- ----------
35 Total ........................... 44,852 22,426
36 ========== ==========
37 The appropriation made by chapter 53, section 1, of the laws of 2009, as
38 amended by chapter 54, section 1, of the laws of 2012, is hereby
39 amended and reappropriated to read:
40 An advance for the state share of financial assistance to community
41 colleges for alterations and improvements to various facilities
42 including service contracts, memorandum of understanding, capital
43 design, construction, acquisition, reconstruction, rehabilitation,
44 equipment and personal service costs; for health and safety, preser-
45 vation of facilities, technology upgrades, new facilities, program
46 improvements or program changes, environmental protection, energy
47 conservation, accreditation, facilities for the physically disabled,
48 and related projects, including costs incurred prior to April 1,
49 2009, subject to a plan submitted by the state university and
50 approved by the director of the budget. Notwithstanding any other
627 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 law to the contrary, all or a portion of the amounts hereby appro-
2 priated may be suballocated or transferred to the state university
3 construction fund or the dormitory authority of the state of New
4 York for such purposes (28CC0908) ..................................
5 45,700,000 ....................................... (re. $12,353,000)
6 Project Schedule
7 ESTIMATED ESTIMATED
8 TOTAL STATE 50 PERCENT
9 & LOCAL SHARE STATE SHARE
10 ----------------------------------------------------------
11 (thousands of dollars)
12 Adirondack Community College
13 Facilities Master Plan and
14 Facilities Capital Improvement
15 Plan .......................... 1,270 635
16 Corning Community College
17 Athletic Center - Field House 10,274 5,137
18 Commons Renovation ............ 1,013 507
19 Library Expansion and Renova-
20 tion ........................ 10,992 5,496
21 Fulton-Montgomery Community
22 College
23 Critical Maintenance Projects
24 Campuswide .................. 1,250 625
25 Fashion Institute of Technology
26 Improvement Projects Campus-
27 wide .......................... 4,338 2,169
28 Jamestown Community College
29 Critical Maintenance Projects
30 Campuswide .................. 2,000 1,000
31 ARSC Third Floor Renovations .. 2,000 1,000
32 Demolition of Dilapidated
33 Housing ..................... 500 250
34 Parking Lot Expansion
35 (Cattaraugus) ............... 1,000 500
36 Library Learning Center Impv
37 (Cattaraugus) ............... 1,000 500
38 North County Center Purchase .. 4,000 2,000
39 New Science Building .......... 12,000 6,000
40 Monroe Community College
41 Building 9 Renovations,
42 Phase II .................... 4,380 2,190
43 Property Preservation ......... 7,600 3,800
44 Nassau Community College
45 Security System Expansion ..... 700 350
46 Fire Alarm Upgrades ........... 2,000 1,000
47 Road and Parking Lot Paving ... 9,600 4,800
48 Onondaga Community College
49 Renovate the Poor Farm
628 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and Van Duyn Buildings ........ 6,200 3,100
2 Tompkins-Cortland Community
3 College
4 Upgrade/Modernization of
5 Electrical Panel ............ 1,600 800
6 Classroom Upgrade ............. 2,000 1,000
7 Westchester Community College
8 Health and Safety Improve-
9 ments, PH I ................. 2,292 1,146
10 To supplement campus-wide
11 improvements for projects
12 previously approved:
13 Campuswide site; Hartford
14 Hall; Health Sci.; Admin
15 and PE Buildings ............ 3,390 1,695
16 ---------- ----------
17 Total ....................... 91,400 45,700
18 ========== ==========
19 The appropriation made by chapter 53, section 1, of the laws of 2008, as
20 amended by chapter 54, section 1, of the laws of 2012, is hereby
21 amended and reappropriated to read:
22 An advance for the state share of financial assistance to community
23 colleges for alterations and improvements to various facilities
24 including service contracts, memorandum of understanding, capital
25 design, construction, acquisition, reconstruction, rehabilitation,
26 equipment and personal service costs; for health and safety, preser-
27 vation of facilities, technology upgrades, new facilities, program
28 improvements or program changes, environmental protection, energy
29 conservation, accreditation, facilities for the physically disabled,
30 and related projects, including costs incurred prior to April 1,
31 2008, subject to a plan submitted by the state university and
32 approved by the director of the budget. Notwithstanding any other
33 law to the contrary, all or a portion of the amounts hereby appro-
34 priated may be suballocated or transferred to the state university
35 construction fund or the dormitory authority of the state of New
36 York for such purposes (28CC0808) ..................................
37 370,153,000 ..................................... (re. $182,198,000)
38 Project Schedule
39 ESTIMATED ESTIMATED
40 TOTAL STATE 50 PERCENT
41 & LOCAL SHARE STATE SHARE
42 -------------------------------------------------------------------
43 (thousands of dollars)
44 Adirondack Community College
45 Regional Higher Education Center ............ 556 278
46 Broome Community College
47 Technology Building ...................... 10,000 5,000
48 Wales Building ............................ 3,000 1,500
49 Columbia-Greene Community College
629 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Rehabilitation and Improvement-
2 Various Projects .......................... 1,900 950
3 Corning Community College
4 Renovations & Revitalization
5 Phase 2 .................................. 13,090 6,545
6 Alterations & Additions to Goff
7 Road Facility ............................. 1,436 718
8 Dutchess Community College
9 Hudson Hall Renovation ...................... 962 481
10 Campus Infrastructure ..................... 3,586 1,793
11 Washington Hall - Retaining Wall
12 and Lab Exhaust ............................. 460 230
13 Miscellaneous Repairs ....................... 200 100
14 Browne Hall Renovations ..................... 600 300
15 Hudson Hall MEP ........................... 2,656 1,328
16 CBI Emergency Generator ..................... 508 254
17 Taconic Hall Addition and
18 Renovations ............................... 6,000 3,000
19 Falcon Hall Improvements .................... 200 100
20 Sitework Repairs and Modifications-
21 Parking Lot B ............................... 400 200
22 Drumlin and Dutchess Renovation ............. 934 467
23 Fashion Institute of Technology
24 Toy Design and Development Lab .............. 300 150
25 C2 Building ............................. 148,000 74,000
26 Finger Lakes Community College
27 Auditorium and Performing Arts
28 Facility ................................. 16,000 8,000
29 Finger Lakes Community College
30 Geneva Expansion ......................... 12,000 6,000
31 Fulton-Montgomery Community College
32 Upgrades to Waste Water Treatment
33 Plant ....................................... 422 211
34 Herkimer County Community College
35 Library Additions & Renovations .............. 50 25
36 Science Lab Updating and
37 Remodeling ................................ 2,200 1,100
38 Hudson Valley Community College
39 New Parking Structure .................... 15,600 7,800
40 Brahan Science Center and
41 Related Building Renovations ............. 54,400 27,200
42 Jamestown Community College
43 Facilities Master Plan Update ............... 140 70
44 Science Building and Facility
45 Enhancements ............................. 12,000 6,000
46 Mohawk Valley Community College
47 Campus Wide Improvements .................. 5,400 2,700
48 Field house .............................. 11,000 5,500
49 Monroe Community College
50 ATEC/DCC Building ........................ 12,900 6,450
630 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ATEC/Building 9, Phase I ................. 12,000 6,000
2 Nassau Community College
3 Window Replacement ........................ 1,200 600
4 Road and Parking Paving ................... 4,000 2,000
5 Energy Savings Initiatives ................ 6,000 3,000
6 Fire Alarms and Public Address
7 System .................................... 4,200 2,100
8 New Performing Arts Building ............. 41,600 20,800
9 Niagara County Community College
10 Construct New Culinary Arts
11 Facility ................................. 13,200 6,600
12 Onondaga Community College
13 Athletics Complex ........................ 33,000 16,500
14 Technology Improvements ................... 1,782 891
15 Upgrade Biology Laboratories .............. 2,700 1,350
16 Mawhinney Hall Renovation-
17 Phase 3 ................................... 4,118 2,059
18 Construct New Academic/Admini-
19 strative Building on East Quad ........... 18,900 9,450
20 Site Improvements ......................... 5,948 2,974
21 Relocate President's Suite ................ 1,012 506
22 Prepare Program Study of
23 Coulter Library ............................. 300 150
24 Campus-Wide Energy Projects ................. 676 338
25 Orange County Community College
26 Science, Engineering and
27 Tech Center .............................. 38,900 19,450
28 Improvements to Classroom
29 Facilities ................................ 2,000 1,000
30 Rockland Community College
31 Multi-Purpose Language Lab .................. 600 300
32 Master Plan Update .......................... 126 63
33 Academic II Building ........................ 500 250
34 Art Gallery and Art Studio/
35 Cultural Arts Center ........................ 200 100
36 Day Care Center ............................. 500 250
37 Building Energy Conservation .............. 1,000 500
38 Elevators Rehabilitation .................. 1,800 900
39 Library Roof Replacement .................. 1,100 550
40 Cultural Arts Center Roof
41 Replacement ................................. 736 368
42 Field House Resurface ....................... 400 200
43 Campus Site Improvements .................... 400 200
44 Tennis Court Resurface ....................... 76 38
45 Swimming Pool Repairs ....................... 250 125
46 Boiler Equipment Upgrade .................... 300 150
47 Cultural Arts Center HVAC
48 Upgrade ..................................... 150 75
49 Parking Lot and Road Repairs .............. 1,250 625
50 Academic I Roof Replacement ................. 500 250
51 Field House Roof Replacement .............. 1,000 500
631 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Library Improvements and
2 Renovations .............................. 10,000 5,000
3 Field House Interior and Ext-
4 erior Improvements ........................ 1,800 900
5 Installation of Emergency No-
6 tification System ........................... 400 200
7 Special Projects ............................ 300 150
8 Schenectady County Community College
9 Building Renovations ...................... 2,410 1,205
10 Athletic Fields Relocation .................. 850 425
11 Building Renovations ...................... 1,146 573
12 Infrastructure Improvements ............... 1,182 591
13 Athletic Field Access/Roadways .............. 252 126
14 HVAC Upgrades ............................. 1,574 787
15 Building Renovations ........................ 650 325
16 HVAC Upgrades ............................. 1,396 698
17 Infrastructure Improvements ............... 2,602 1,301
18 Landscaping ................................. 500 250
19 HVAC Upgrades ............................. 1,374 687
20 Infrastructure Improvements ............... 2,416 1,208
21 Building Renovations ...................... 1,382 691
22 Athletic Fields Enhancements .............. 1,846 923
23 Infrastructure Improvements ............... 1,034 517
24 Public Safety/Business Center ............ 23,800 11,900
25 Campus Connecting Walkway ................. 4,700 2,350
26 Building Renovations ...................... 4,224 2,112
27 Property Acquisition ........................ 250 125
28 Gateway Building Addition ................. 1,700 850
29 Property Acquisition ........................ 250 125
30 Property Acquisition ........................ 250 125
31 Parking Garage ........................... 22,800 11,400
32 Suffolk County Community College
33 Fire Sprinkler Infrastructure ................ 74 37
34 Reconstruction of Central Plaza ............. 750 375
35 Renovations to Sagikos Bldg ............... 6,100 3,050
36 Health and Sports Facilities-
37 Eastern Campus ........................... 17,750 8,875
38 Learning Resource Center-Grant
39 Campus ................................... 32,400 16,200
40 Air Conditioning-College-wide ............. 7,550 3,775
41 Sullivan County Community College
42 Safety Equipment Across Campus .............. 800 400
43 Upgrade Current Computer Labs ............. 1,000 500
44 Replacement of Roofs ...................... 2,250 1,125
45 Complete Mainframe Computer
46 Upgrade ................................... 2,400 1,200
47 Center for Advanced Science and
48 Technology ................................ 6,000 3,000
49 Renovations for Instructional ............... 250 125
50 Center for Advanced Science and
51 Technology/Green Building
632 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Initiative ............................... 15,000 7,500
2 Ulster County Community College
3 Update Facilities Master Plan
4 Phase 1 ..................................... 840 420
5 Improvements to Classroom
6 Facilities ................................ 2,000 1,000
7 Westchester Community College
8 Administration Building
9 Renovations ............................... 2,548 1,274
10 Air Conditioning and CFC .................... 244 122
11 Physical Education Field
12 Improvements .............................. 2,866 1,433
13 Physical Education Building
14 Renovations ............................... 4,196 2,098
15 Health Science Building
16 Renovations ............................... 2,174 1,087
17 Technology Improvements ................... 2,702 1,351
18 ------- -------
19 Total ................................. 740,306 370,153
20 ======= =======
21 The appropriation made by chapter 53, section 1, of the laws of 2006, as
22 amended by chapter 54, section 1, of the laws of 2012, to the admin-
23 istration purpose, is hereby transferred and reappropriated to the
24 program improvement or program change purpose and amended to read:
25 An advance for the state share of financial assistance to community
26 colleges for alterations and improvements to various facilities
27 including service contracts, memorandum of understanding, capital
28 design, construction, acquisition, reconstruction, rehabilitation,
29 equipment and personal service costs; for health and safety, preser-
30 vation of facilities, new facilities, program improvement or program
31 change, environmental protection, energy conservation, accredi-
32 tation, facilities for the physically disabled and relate projects
33 including costs incurred prior to April 1, 2006 subject to a plan
34 submitted by the SUNY trustees and approved by the director of the
35 budget. Notwithstanding any other law to the contrary, all or a
36 portion of the amounts hereby appropriated may be suballocated or
37 transferred to the state university construction fund or the dormi-
38 tory authority of the state of New York for such purposes
39 [(28FC0650)] (28FE0608) ... 41,700,000 .............. (re. $674,000)
40 Project Schedule
41 ESTIMATED ESTIMATED
42 TOTAL STATE 50 PERCENT
43 & LOCAL SHARE STATE SHARE
44 ------------------------------------------------------------
45 (thousands of dollars)
46 Cayuga County Community College
47 Master Plan Projects 800 400
48 Finger Lakes Community College
49 Student Services Center and
633 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Auditorium, Phase 1B
2 Renovations 12,000 6,000
3 Herkimer County Community College
4 Library Addition and Renovation
5 Phase II 6,850 3,400
6 Jamestown Community College
7 Master Plan Phases II and III 5,400 2,700
8 Jefferson Community College
9 Renovation and Revitalization Project
10 Phase II 2,400 1,200
11 Monroe Community College
12 Athletic Field House 12,000 6,000
13 Niagara County Community College
14 Bookstore Expansion Project 1,000 500
15 Orange County Community College
16 Newburgh Campus 30,000 15,000
17 Westchester Community College
18 Master Plan Projects 13,000 6,500
19 ------- -------
20 Total ............................ 83,400 41,700
21 ======= =======
22 Additional advance for state financial assistance to community
23 colleges for alterations and improvements to various facilities
24 including capital design, construction, acquisition, reconstruction,
25 rehabilitation, equipment and personal service costs; for health and
26 safety, preservation of facilities, new facilities, program improve-
27 ment or program change, environmental protection, energy conserva-
28 tion, accreditation, facilities for the physically disabled and
29 related projects including costs incurred prior to April 1, 2006.
30 Notwithstanding any other law to the contrary, all or a portion of
31 the amounts hereby appropriated may be suballocated or transferred
32 to the state university construction fund or the dormitory authority
33 of the state of New York for such purposes [(28FC0607)] (28FD0608)
34 ... 40,936,000 .................................... (re. $7,661,000)
35 Project Schedule
36 ESTIMATED ESTIMATED
37 TOTAL STATE 50 PERCENT
38 & LOCAL SHARE STATE SHARE
39 ------------------------------------------------------------
40 (thousands of dollars)
41 Adirondack Community College
42 Regional Higher Education Center .... 4,000 2,000
43 Erie Community College
44 Industrial Refrigeration Lab ........ 400 200
45 Fashion Institute of Technology
46 Bill Blass Center ................... 400 200
47 Hudson Valley Community College
48 Site Improvements and Improvements
49 for Pedestrian and Vehicular
634 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Circulation ......................... 2,000 1,000
2 Jefferson Community College
3 McVean Gymnasium/Renovation Projects . 2,926 1,463
4 Nassau County Community College
5 Performing Arts Center Design ....... 4,500 2,250
6 Plaza Reconstruction Phase 2 ........ 5,300 2,650
7 Fire Alarm Upgrade Phase 1 .......... 500 250
8 Rockland Community College
9 Children's Day Care Center .......... 800 400
10 Simulated Nursing Skills
11 Training Center ..................... 400 200
12 Suffolk County Community College
13 Culinary Equipment & Technology Expenses 300 150
14 Fire Sprinkler System ............... 546 273
15 Science and Technology Building ..... 15,000 7,500
16 Tompkins Cortland Community College
17 Master Plan Amendment Increase ...... 4,800 2,400
18 Westchester Community College
19 Additional Master Plan Projects ..... 40,000 20,000
20 ------- -------
21 Total.............................. 81,872 40,936
22 ======= =======
23 The appropriation made by chapter 53, section 1, of the laws of 2005, as
24 amended by chapter 54, section 1, of the laws of 2012, to the admin-
25 istration purpose, is hereby transferred and reappropriated to the
26 program improvement or program change purpose and amended to read:
27 An advance for state financial assistance to community colleges for
28 alterations and improvements to various facilities including capital
29 design, construction, acquisition, reconstruction, rehabilitation,
30 equipment and personal service costs; for health and safety, preser-
31 vation of facilities, new facilities, program improvement or program
32 change, environmental protection, energy conservation, accredi-
33 tation, facilities for the physically disabled and related projects
34 including costs incurred prior to April 1, 2005. Notwithstanding any
35 other law to the contrary, all or a portion of the amounts hereby
36 appropriated may be suballocated or transferred to the state univer-
37 sity construction fund or the dormitory authority of the state of
38 New York for such purposes (28FC0508) ..............................
39 53,270,000 ........................................ (re. $2,203,000)
40 Project Schedule
41 ESTIMATED ESTIMATED
42 TOTAL STATE 50 PERCENT
43 & LOCAL SHARE STATE SHARE
44 ------------------------------------------------------------
45 (thousands of dollars)
46 Tompkins Cortland Community College
47 College Athletic Complex ............ 21,200 10,600
48 Hudson Valley Community College
49 Facility Design and Planning ........ 1,000 500
635 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Master Plan ......................... 11,400 5,700
2 Finger Lakes Community College
3 Auditorium and Performing Arts
4 Program Facility .................... 2,000 1,000
5 Orange County Community College
6 Master Plan ......................... 1,618 809
7 Erie Community College
8 North Campus conversion of
9 Lab Space to Classrooms ............. 30 15
10 North Campus Industrial
11 Refrigeration Technology
12 Center .............................. 600 300
13 Corning Community College
14 Academic and Career Advancement
15 Center .............................. 1,000 500
16 Onondaga Community College
17 Academic Building - HVAC,
18 electrical, mechancial
19 systems upgrades .................... 526 263
20 Children's Learning Center .......... 2,500 1,250
21 Coulter Library - HVAC, elec-
22 trical, mechanical systems
23 upgrades ............................ 2,750 1,375
24 Coulter Library - Safety and
25 Security Enhancements ............... 1,838 919
26 Gordon Student Center ............... 2,852 1,426
27 Health and Physical Education
28 Building - Humdification sys-
29 tem and renovations ................. 1,598 799
30 J. Stanley Coyne Building -
31 HVAC, electrical, mechanical
32 systems upgrades .................... 300 150
33 Roof Replacement - Gordon
34 Student Center and Ferrante
35 Hall ................................ 946 473
36 Service and Maintenance
37 Building - HVAC, electrical,
38 mechanical systems upgrades ......... 570 285
39 Technology upgrades and
40 Expansion ........................... 1,984 992
41 Ulster Community College
42 Microbiology Lab Upgrades ........... 572 286
43 Fashion Institute of Technology
44 For the Establishment of a
45 Bill Blass Center for
46 Innovative Design ................... 400 200
47 Schenectady Community College
48 Workforce training program in
49 superconductive tech ................ 1,110 555
50 The completion of the Master Plan ... 10,000 5,000
51 Jefferson Community College
636 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Construction ........................ 2,400 1,200
2 Suffolk County Community College
3 Construction ........................ 14,276 7,138
4 Westchester Community College
5 Technology Bldg Renovation .......... 14,097 7,049
6 Classroom Building Renovation ....... 2,895 1,448
7 Academic Arts Building
8 Renovation .......................... 4,078 2,039
9 Broome Community College
10 Capital Projects ................... 2,000 1,000
11 ------- -------
12 Total ........................... 106,540 53,270
13 ======== =======
14 By chapter 53, section 1, of the laws of 2003, as amended by chapter 54,
15 section 1, of the laws of 2012:
16 State financial assistance to community colleges for alterations and
17 improvements to various facilities including services and expenses,
18 capital design, construction, acquisition, reconstruction, rehabili-
19 tation and equipment; for health and safety, preservation of facili-
20 ties, new facilities, program improvement or program change, envi-
21 ronmental protection, energy conservation, accreditation, facilities
22 for the physically disabled, and related projects including costs
23 incurred prior to April 1, 2003 subject to a plan developed by the
24 state university and approved by the director of the budget.
25 Notwithstanding any other law to the contrary, all or a portion of
26 the amounts hereby appropriated may be suballocated or transferred
27 to the state university construction fund for such purposes
28 (28RC0308) ... 25,000,000 ......................... (re. $7,003,000)
29 Project Schedule
30 ESTIMATED ESTIMATED
31 TOTAL STATE 50 PERCENT
32 & LOCAL SHARE STATE SHARE
33 ----------------------------------------------------------
34 (thousands of dollars)
35 Adirondack Community College ........... 700 350
36 Broome County College ................ 1,358 679
37 Cayuga Community College ............... 634 317
38 Clinton Community College .............. 452 226
39 Columbia-Greene Community College ...... 376 188
40 Corning Community College .............. 974 487
41 Dutchess Community College ........... 1,518 759
42 Erie Community College ............... 3,108 1,554
43 Fashion Institute of Technology ...... 2,720 1,360
44 Finger Lakes Community College ....... 1,084 542
45 Fulton-Montgomery Community College .... 516 258
46 Genesee Community College ............ 1,036 518
47 Herkimer County Community College ...... 754 377
48 Hudson Valley Community College ...... 2,472 1,236
49 Jamestown Community College ............ 880 440
637 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Jefferson Community College ............ 726 363
2 Mohawk Valley Community College ...... 1,342 671
3 Monroe Community College ............. 4,060 2,030
4 Nassau Community College ............. 5,134 2,567
5 Niagara County Community College ..... 1,292 646
6 North Country Community College ........ 286 143
7 Onondaga Community College ........... 1,932 966
8 Orange County Community College ...... 1,236 618
9 Rockland Community College ........... 1,524 762
10 Schenectady County Community College ... 790 395
11 Suffolk County Community College ..... 4,372 2,186
12 Sullivan County Community College ...... 380 190
13 Tompkins-Cortland Community College .... 806 403
14 Ulster County Community College ........ 674 337
15 Westchester Community College ........ 3,164 1,582
16 University-Wide
17 For University-wide projects
18 which may include, but are not
19 limited to funding for a comm-
20 unity college capital condition
21 assessment study ................... 3,700 1,850
22 --------
23 Total .............................. 25,000
24 ========
25 State financial assistance to community colleges for alterations and
26 improvements for technology including costs incurred prior to April
27 1, 2003 subject to a plan developed by the state university and
28 approved by the director of the budget. Notwithstanding any other
29 law to the contrary, all or a portion of the amounts hereby appro-
30 priated may be suballocated or transferred to the state university
31 construction fund for such purposes (28RT0308) .....................
32 10,000,000 .......................................... (re. $283,000)
33 The appropriation made by chapter 53, section 1, of the laws of 2003, as
34 amended by chapter 54, section 1, of the laws of 2012, is hereby
35 amended and reappropriated to read:
36 An advance for state financial assistance to community colleges for
37 alterations and improvements to various facilities including capital
38 design, construction, acquisition, reconstruction, rehabilitation,
39 equipment and personal service costs; for health and safety, preser-
40 vation of facilities, new facilities, program improvement or program
41 change, environmental protection, energy conservation, accredi-
42 tation, facilities for the physically disabled, and related projects
43 including costs incurred prior to April 1, 2003 subject to a plan
44 developed by the state university and approved by the director of
45 the budget. Notwithstanding any other law to the contrary, all or a
46 portion of the amounts hereby appropriated may be suballocated or
47 transferred to the state university construction fund or the dormi-
48 tory authority of the state of New York for such purposes (28FC0308)
49 ... 175,000,000 .................................. (re. $28,668,000)
638 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Project Schedule
2 ESTIMATED ESTIMATED
3 TOTAL STATE 50 PERCENT
4 & LOCAL SHARE STATE SHARE
5 ----------------------------------------------------------
6 (thousands of dollars)
7 Adirondack Community College ......... 5,000 2,500
8 For university-wide projects which
9 may include, but are not limited to:
10 -Humanities Building expansion
11 -Student Center and Randles Hall
12 renovation
13 -Eisenhart Hall renovation
14 Broome Community College ............. 9,600 4,800
15 For university-wide projects which
16 may include, but are not limited to:
17 -Parking lot relocation and repair
18 -Boiler replacement
19 -Student Center expansion
20 Cayuga Community College ............. 4,600 2,300
21 For university-wide projects which
22 may include, but are not limited to:
23 -Mechanical and electrical improve-
24 ments
25 -Roof repair
26 -HVAC System improvements
27 Clinton Community College ............ 3,200 1,600
28 For university-wide projects which
29 may include, but are not limited to:
30 -Campus Master Plan update
31 -Emergency Generator replacement
32 -Stucco repair
33 Columbia-Greene Community College .... 2,800 1,400
34 For university-wide projects which
35 may include, but are not limited to:
36 -Master plan update
37 -Kiln Building construction
38 -Water Tank Rehabilitation
39 Corning Community College ............ 7,000 3,500
40 For university-wide projects which
41 may include, but are not limited to:
42 -Health and Safety renovations
43 -Gymnasium renovations
44 -Learning Center roof replacement
45 Dutchess Community College .......... 10,800 5,400
46 For university-wide projects which
47 may include, but are not limited to:
48 -Property acquisition
49 -Master plan development
50 -Brown Hall renovations
51 Erie Community College .............. 21,800 10,900
639 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For university-wide projects which
2 may include, but are not limited to:
3 -Dental Hygiene Clinic renovations
4 -Masonry restoration
5 -Heating Plant renovations
6 Fashion Institute of Technology ..... 19,200 9,600
7 For university-wide projects which
8 may include, but are not limited to:
9 -Fire alarm and sprinkler upgrade
10 -Turbine retrofit
11 -Instructional space addition
12 Finger Lakes Community College ....... 7,600 3,800
13 For university-wide projects which
14 may include, but are not limited to:
15 -Auditorium & Performing Arts
16 Program Facility
17 -Student Center Facility
18 -Wellness Center Facility
19 Fulton-Montgomery Community College .. 3,800 1,900
20 For university-wide projects which
21 may include, but are not limited to:
22 -Campus Fire Alarms integration
23 -Library & Comm Arts Bldg connection
24 -Exterior Lighting and Security Cameras
25 Genesee Community College ............ 7,400 3,700
26 For university-wide projects which
27 may include, but are not limited to:
28 -Update Main Building Mechanical
29 Systems
30 -Pool Dehumidification System
31 replacement
32 -Smart Classrooms construction
33 Herkimer County Community College .... 5,400 2,700
34 For university-wide projects which
35 may include, but are not limited to:
36 -Athletic Complex Master Plan
37 -Library roof replacement
38 -Track Facility improvement
39 Hudson Valley Community College ..... 17,512 8,756
40 For university-wide projects which
41 may include, but are not limited to:
42 -Campus Center Rehab
43 -Acad/Admin Bldg construction
44 -Loop Road renovation
45 Jamestown Community College .......... 6,200 3,100
46 For university-wide projects which
47 may include, but are not limited to:
48 -Hamilton Collegiate Center
49 Improvements
50 -Central Heating Plant renovations
640 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 -Gymnasium improvements
2 Jefferson Community College .......... 5,200 2,600
3 For university-wide projects which
4 may include, but are not limited to:
5 -Dewey Library renovation
6 -McVean College Center A/C
7 -Guthrie Science/Engr Building
8 renovation
9 Mohawk Valley Community College ...... 9,600 4,800
10 For university-wide projects which
11 may include, but are not limited to:
12 -Rome Campus Master Plan update
13 -Campus-wide Road Drainage, Walk-
14 ways, and Signage improvements
15 -Athletic Facilities Master Plan
16 (Ice Arena, Field House) update
17 Monroe Community College ............ 28,388 14,194
18 For university-wide projects which
19 may include, but are not limited to:
20 -Advanced Training & Ed Center
21 construction
22 -Building 9 Renovation for
23 training and education
24 -Health and Safety renovations
25 Nassau Community College ............ 36,000 18,000
26 For university-wide projects which
27 may include, but are not limited to:
28 -Emergency Generator upgrade
29 -HVAC upgrade
30 -Library Renovation
31 Niagara County Community College ..... 9,200 4,600
32 For university-wide projects which
33 may include, but are not limited to:
34 -Cafeteria Floor replacement
35 -Campus Signage upgrade
36 -Emergency System upgrade
37 North Country Community College ...... 2,200 1,100
38 For university-wide projects which
39 may include, but are not limited to:
40 -Classroom renovations
41 -Hodson Hall roof replacement
42 -Campus Master Plan update
43 Onondaga Community College .......... 13,600 6,800
44 For university-wide projects which
45 may include, but are not limited to:
46 -Coyne Building elevator renovations
47 -Security System upgrade
48 -Signage improvements
49 Orange County Community College ...... 8,800 4,400
50 For university-wide projects which
51 may include, but are not limited to:
641 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 -Bio-Tech Facility upgrades
2 -Cooling Tower replacement
3 -Retaining wall repair
4 Rockland Community College .......... 10,800 5,400
5 For university-wide projects which
6 may include, but are not limited to:
7 -Master Plan update
8 -Student Union/Library HVAC
9 renovations
10 -Elevator upgrades
11 Schenectady County Community College . 5,600 2,800
12 For university-wide projects which
13 may include, but are not limited to:
14 -Boiler Replacement
15 -Van Curler Room renovations
16 -Property acquisition
17 Suffolk County Community College .... 30,600 15,300
18 For university-wide projects which
19 may include, but are not limited to:
20 -Health & Safety projects
21 -Roofs repairs
22 -ADA Compliance
23 Sullivan County Community College .... 2,800 1,400
24 For university-wide projects which
25 may include, but are not limited to:
26 -Paul Gerry Field House renovations
27 -Window replacement
28 -Student Union renovation
29 Tompkins-Cortland Community College .. 5,800 2,900
30 For university-wide projects which
31 may include, but are not limited to:
32 -Sports Complex construction
33 -Cyber Cafe/Student Event Area
34 construction
35 -Infrastructure repairs
36 Ulster County Community College ...... 4,800 2,400
37 For university-wide projects which
38 may include, but are not limited to:
39 -Master Plan update
40 -Gymnasium rehabilitation
41 -Parking lots, roads and side-
42 walk repairs
43 Westchester Community College ....... 22,200 11,100
44 For university-wide projects which
45 may include, but are not limited to:
46 -Academic Building renovation
47 -Instructional Building construction
48 -Student Center improvements/
49 expansion
50 Systemwide .......................... 22,500 11,250
51 For university-wide projects which
642 12654-10-8
STATE UNIVERSITY OF NEW YORK
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 may include, but are not limited to:
2 -program improvement
3 --------
4 Total ........................................ 175,000
5 ========
643 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 2,999,306,000 9,052,744,000
6 Capital Projects Funds - Federal ... 2,486,000,000 8,341,832,000
7 Special Revenue Funds - Federal .... 19,379,000 85,472,000
8 Fiduciary Funds .................... 50,000,000 506,939,000
9 ---------------- ----------------
10 All Funds ........................ 5,554,685,000 17,986,987,000
11 ================ ================
12 AIRPORT OR AVIATION STATE PROGRAM (CCP) ...................... 4,000,000
13 --------------
14 Capital Projects Funds - Other
15 Dedicated Highway and Bridge Trust Fund
16 Aviation Purpose Account
17 Aviation Purpose
18 For state aid to municipal corporations,
19 private airports as authorized by section
20 14-h of the transportation law and for
21 payment of the cost of projects at Stewart
22 and Republic Airports, for the acquisi-
23 tion, construction, reconstruction, and
24 improvement of airport or aviation capital
25 projects, including the acquisition of
26 real property and liabilities incurred
27 prior to April 1, 2018.
28 Prior to requesting approval of a certif-
29 icate of approval of availability for
30 moneys appropriated, the commissioner of
31 transportation shall certify that each
32 airport or aviation project progressed
33 under the program, other than state owned
34 airports, has received federal approval
35 and the federally authorized level of
36 financial assistance (17231814) .............. 4,000,000
37 ENGINEERING SERVICES PROGRAM (CCP) .......................... 19,379,000
38 --------------
39 Special Revenue Funds - Federal
40 Federal Miscellaneous Operating Grants Fund
41 Metropolitan Planning Organization Account
42 Preparation of Plans Purpose
43 New York Metropolitan Transportation Council
644 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 For the continuing comprehensive transporta-
2 tion planning and coordinated support
3 undertaken as part of the united work
4 programs of participating local planning
5 or municipal agreements in accordance with
6 grant agreements approved by the federal
7 transit administration or the federal
8 highway administration.
9 Personal service (17M11830) .................... 4,518,000
10 Nonpersonal service (17M41830) ................ 11,416,000
11 Fringe benefits (17M81830) ..................... 2,823,000
12 Indirect costs (17M91830) ........................ 287,000
13 Watertown Jefferson County Area Transportation Council
14 For the continuing comprehensive transporta-
15 tion planning and coordinated support
16 undertaken as part of the united work
17 programs of participating local planning
18 or municipal agreements in accordance with
19 grant agreements approved by the federal
20 transit administration or the federal
21 highway administration.
22 Personal service (17W11830) ...................... 137,000
23 Nonpersonal service (17W41830) ................... 103,000
24 Fringe benefits (17W81830) ........................ 86,000
25 Indirect costs (17W91830) .......................... 9,000
26 FEDERAL AID HIGHWAYS FEDERAL PURPOSE (CCP) ............... 2,480,000,000
27 --------------
28 Capital Projects Funds - Federal
29 Federal Capital Projects Fund
30 Federal Aid Highways Purpose
31 For the federal share, from any federal
32 agency under any federal program, of state
33 transportation projects including but not
34 limited to construction, reconstruction,
35 reconditioning and preservation, operating
36 costs as provided for in the fixing Ameri-
37 ca's surface transportation (FAST) act and
38 related prior and successive federal
39 legislation, and the payment of liabil-
40 ities incurred prior to April 1, 2018
41 (17031820) ............................... 2,010,000,000
42 For the federal share, from any federal
43 agency under any federal program, of the
44 acquisition of property for state trans-
45 portation projects including but not
46 limited to construction, reconstruction,
47 reconditioning and preservation, including
645 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 the payment of liabilities incurred prior
2 to April 1, 2018 (17RW1820) ................. 50,000,000
3 For reimbursements to the dedicated highway
4 and bridge trust fund of the department of
5 transportation, of the federal share of
6 engineering costs, including fringe bene-
7 fits, personal services, and nonpersonal
8 services, for activities including but not
9 limited to the preparation of designs,
10 plans, specifications and estimates;
11 construction management and supervision;
12 and appraisals, surveys, testing, and
13 environmental impact statements for trans-
14 portation projects, the payment of liabil-
15 ities incurred prior to April 1, 2018 and
16 other such purposes as specified in
17 section 89-b of the state finance law as
18 amended (17EG1820) ......................... 260,000,000
19 For reimbursements to the dedicated highway
20 and bridge trust fund of the department of
21 transportation, of the federal share of
22 engineering costs, including the contract
23 services provided by private firms, for
24 activities including but not limited to
25 the preparation of designs, plans, spec-
26 ifications and estimates; construction
27 management and supervision; and
28 appraisals, surveys, testing, and environ-
29 mental impact statements for transporta-
30 tion projects, the payment of liabilities
31 incurred prior to April 1, 2018 and other
32 such purposes as specified in section 89-b
33 of the state finance law as amended
34 (17EC1820) ................................. 160,000,000
35 FEDERAL AIRPORT OR AVIATION (CCP) ............................ 6,000,000
36 --------------
37 Capital Projects Funds - Federal
38 Federal Capital Projects Fund
39 Aviation Purpose
40 For payment by the state of the federal
41 share of the cost, including payment of
42 liabilities incurred prior to April 1,
43 2018, of construction, reconstruction,
44 alteration and rehabilitation of airport
45 and aviation facilities at Republic
46 airport, including the cost of acquisition
47 of real property, the acquisition of
48 equipment and other related incidental
49 expenses thereto and for the federal share
646 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 of consultant services in carrying out
2 federally approved aviation studies.
3 Within the amount appropriated herein,
4 authorization is granted to the department
5 of transportation to enter into all neces-
6 sary contracts and agreements, subject to
7 the approval of the director of the budg-
8 et, to carry out the purposes of this
9 appropriation.
10 Prior to requesting a certificate of
11 approval of availability for any of the
12 moneys authorized herein, the commissioner
13 of transportation shall certify to the
14 director of the budget that the federal
15 government has agreed to finance the
16 federal share of the project. However with
17 the approval of the director of the budg-
18 et, projects may be designed prior to
19 federal approval upon the written assur-
20 ance by the commissioner of transportation
21 that federal funds are likely to be forth-
22 coming (17521814) ............................ 6,000,000
23 MAINTENANCE FACILITIES (CCP) ................................ 32,405,000
24 --------------
25 Capital Projects Funds - Other
26 Dedicated Highway and Bridge Trust Fund
27 Highway Maintenance Facilities Purpose
28 For the preparation of designs, plans, spec-
29 ifications and estimates, for the acquisi-
30 tion, alterations, and rehabilitation of
31 existing facilities, for the acquisition
32 of land and construction of new facilities
33 for highway maintenance purposes, for the
34 contract engineering services provided by
35 private firms, including the payment of
36 liabilities incurred prior to April 1,
37 2018 (17251813) ............................. 27,405,000
38 Capital Projects Funds - Other
39 Dedicated Highway and Bridge Trust Fund
40 Preparation of Plans Purpose
41 For payment to the design and construction
42 management account of the centralized
43 services fund of the New York state office
44 of general services for the purpose of
45 preparation and review of plans, specifi-
46 cations, estimates, services, construction
47 management and supervision, inspection,
647 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 studies, appraisals, surveys, testing and
2 environmental impact statements, including
3 the payment of liabilities incurred prior
4 to April 1, 2018 (17D11830) .................. 5,000,000
5 MASS TRANSPORTATION (CCP) ................................... 38,500,000
6 --------------
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Mass Transit Purpose
10 For the costs of mass transportation capital
11 projects and facilities including replace-
12 ment of buses meeting federal standards
13 for replacement, related bus equipment and
14 the acquisition, design and construction,
15 including engineering and consulting
16 costs, of mass transit bus garages or
17 other mass transportation projects and
18 facilities approved by the commissioner of
19 transportation in a program of projects.
20 Such funding may be part of a total
21 project of which a portion is federally
22 funded. The moneys hereby appropriated are
23 to be made available for projects under-
24 taken by mass transit systems which are
25 outside of the Metropolitan Transportation
26 Commuter District (17KC18MT) ................ 20,000,000
27 Project Schedule
28 Project Amount
29 --------------------------------------------
30 To the Capital District trans-
31 portation authority for
32 capital projects in support
33 of public transportation
34 services provided directly
35 or under contract .............. 3,596,000
36 To the Central New York
37 regional transportation
38 authority for capital
39 projects in support of
40 public transportation
41 services provided directly
42 or under contract .............. 3,282,600
43 To the Rochester-Genesee
44 regional transportation
45 authority for capital
46 projects in support of
47 public transportation bus
48 services provided directly
648 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 or under contract .............. 3,985,700
2 To the Niagara Frontier trans-
3 portation authority for
4 capital projects in support
5 of public transportation
6 services provided directly
7 or under contract .............. 5,177,500
8 To all other public transpor-
9 tation systems serving
10 primarily outside the metro-
11 politan commuter transporta-
12 tion district, as defined in
13 section 1262 of the public
14 authorities law and eligible
15 to receive operating assist-
16 ance under the provisions of
17 section 18-b of the trans-
18 portation law, for capital
19 projects in support of
20 public transportation
21 services provided directly
22 or under contract in accord-
23 ance with a formula to be
24 established by the commis-
25 sioner of transportation
26 with the approval of the
27 director of the budget ......... 3,958,200
28 --------------
29 Total ....................... 20,000,000
30 ==============
31 Capital Projects Funds - Other
32 Capital Projects Fund
33 Omnibus and Transit Purpose
34 For state aid to municipal corporations for
35 the preparation of designs, plans, spec-
36 ifications and estimates, for the acquisi-
37 tion, construction, reconstruction, and
38 improvement of mass transportation capital
39 projects including the acquisition of real
40 property, for other mass transportation
41 projects including local transportation
42 planning studies. Notwithstanding any
43 inconsistent provisions of law, the state
44 share of such projects shall be 50 percent
45 of the non-federal share, but in no event
46 shall the state share exceed 10 percent of
47 project costs.
48 Notwithstanding any other provision of law,
49 the commissioner of transportation shall
50 make available directly to the City of New
649 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 York (City) an amount commensurate with
2 the state share of (i) federal funds
3 previously awarded to the City and reallo-
4 cated to the metropolitan transportation
5 authority (MTA), and (ii) the federally
6 authorized level of financial assistance
7 transferred by resolution of the metropol-
8 itan planning organization (MPO) to the
9 metropolitan transportation authority
10 (MTA) and credited to the City by the MTA
11 for capital expenses.
12 The state share of such reimbursement shall
13 be 50 percent of the non-federal share of
14 the federally authorized level of finan-
15 cial assistance transferred to the MTA,
16 but in no event shall the state share
17 exceed 10 percent of project costs. Prior
18 to requesting reimbursement for projects
19 progressed by the MTA on behalf of the
20 City, the City shall certify to the
21 commissioner of transportation that each
22 eligible project progressed under this
23 provision is federally eligible and that
24 the match amount requested does not exceed
25 the state share of the federally author-
26 ized level of financial assistance. In
27 addition, the City must provide an appli-
28 cation to the commissioner of transporta-
29 tion certifying that the work to be funded
30 under the project has been performed and
31 that the City has reimbursed the MTA for
32 100 percent of the match amount for the
33 project. Upon such application, the
34 commissioner of transportation shall
35 review and approve eligible activities for
36 reimbursement.
37 Prior to requesting approval of a certif-
38 icate of approval of availability for the
39 moneys hereby appropriated, the commis-
40 sioner of transportation shall certify
41 that each omnibus project progressed under
42 the program has received federal approval.
43 Such certificate shall report the federally
44 authorized level of financial assistance
45 (17OM1829) .................................. 18,500,000
46 MASS TRANSPORTATION AND RAIL FREIGHT (CCP) .................. 92,830,000
47 --------------
48 Capital Projects Funds - Other
49 Capital Projects Fund
50 Non-MTA Capital Purpose
650 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 For the payment of the costs of mass trans-
2 portation capital projects and facilities
3 including replacement of buses meeting
4 federal standards for replacement, related
5 bus equipment and the acquisition, design
6 and construction, including engineering
7 and consulting costs, of mass transit bus
8 garages or other mass transportation
9 projects and facilities approved by the
10 commissioner of transportation in a
11 program of projects. Such funding may be
12 part of a total project of which a portion
13 is federally funded but shall not be used
14 in substitution for the required non-fed-
15 eral matching shares of the federally-
16 funded portion of the project to which it
17 is added. The moneys hereby appropriated
18 are to be made available for projects
19 undertaken by mass transit systems other
20 than those mass transit operating agencies
21 which receive money from the metropolitan
22 transportation authority dedicated tax
23 fund (17NM1831) ............................. 18,500,000
24 For the payment of the costs of mass trans-
25 portation capital projects and facilities
26 including replacement of buses meeting
27 federal standards for replacement, related
28 bus equipment and the acquisition, design
29 and construction, including engineering
30 and consulting costs, of mass transit bus
31 garages or other mass transportation
32 projects and facilities approved by the
33 commissioner of transportation in a
34 program of projects. Such funding may be
35 part of a total project of which a portion
36 is federally funded but shall not be used
37 in substitution for the required non-fed-
38 eral matching shares of the federally-
39 funded portion of the project to which it
40 is added. The moneys hereby appropriated
41 are to be made available for projects
42 undertaken by mass transit systems other
43 than those mass transit operating agencies
44 which receive money from the metropolitan
45 transportation authority dedicated tax
46 fund (17NP1831) ............................. 20,000,000
47 Capital Projects Funds - Other
48 Dedicated Highway and Bridge Trust Fund
49 Rail Service Preservation Purpose
651 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 For the payment of the costs, including the
2 payment of liabilities incurred prior to
3 April 1, 2018, of the construction and
4 improvement of passenger rail, freight
5 rail, and, notwithstanding any inconsist-
6 ent provisions of law, for port capital
7 facilities outside the jurisdiction of the
8 port authority of New York and New Jersey,
9 including but not limited to the acquisi-
10 tion, construction, reconstruction,
11 improvement or rehabilitation of railroad
12 or port capital facilities, and any capi-
13 tal improvement used in connection here-
14 with, and for the acquisition of real
15 property or interests in real property
16 required or expected to be required there-
17 for (17161841) .............................. 10,000,000
18 Notwithstanding the provisions of section
19 89-b of the state finance law, for
20 contractual agreements entered into for
21 rail passenger service (17171841) ........... 44,330,000
22 NEW YORK STATE AGENCY FUND (CCP) ............................ 50,000,000
23 --------------
24 Fiduciary Funds
25 Miscellaneous New York State Agency Fund
26 Highway Costs Improvement Accounts
27 Non-Federal Aided Highway Purpose
28 For that portion of liabilities incurred by
29 the department of transportation on behalf
30 of entities other than state departments
31 or agencies pursuant to the highway law or
32 transportation law (17501822) ............... 50,000,000
33 NEW YORK WORKS (CCP) ....................................... 638,579,000
34 --------------
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Aviation Purpose
38 For state aid to municipal corporations and
39 private airports as authorized by section
40 14-h of the transportation law and for
41 payment of the cost of projects at Stewart
42 and Republic airports, for the acquisi-
43 tion, construction, reconstruction, and
44 improvement of airport or aviation capital
45 projects, including the acquisition of
46 real property and liabilities incurred
652 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 prior to April 1, 2018. Prior to request-
2 ing approval of a certificate of approval
3 of availability for moneys appropriated,
4 the commissioner of transportation shall
5 certify that each airport or aviation
6 project progressed under the program,
7 other than state owned airports, has
8 received federal approval and the feder-
9 ally authorized level of financial assist-
10 ance. Funds from this appropriation may
11 also be utilized for grants to municipal
12 corporations and private airports for the
13 cost of projects authorized by section
14 14-l of the transportation law, including
15 the acquisition of real property and
16 liabilities incurred prior to April 1,
17 2018 (17551814) ............................. 12,500,000
18 Capital Projects Funds - Other
19 Capital Projects Fund
20 Non-Federal Aided Highway Purpose
21 Transportation infrastructure and facilities
22 in the five-year department of transporta-
23 tion plan for 2015-16 through 2019-20, for
24 the payment of costs, including the
25 payment of liabilities incurred prior to
26 April 1, 2018, of transportation infras-
27 tructure projects, including but not
28 limited to, state and local roads and
29 bridges; airport, freight and passenger
30 rail, port and transit projects or multi-
31 modal facilities, including work appurten-
32 ant and ancillary thereto. Project costs
33 funded from this appropriation may include
34 but shall not be limited to construction,
35 reconstruction, reconditioning and preser-
36 vation, the acquisition of property, and
37 engineering services, including personal
38 services, nonpersonal services, fringe
39 benefits, the contract services provided
40 by private firms, and reimbursements to
41 the dedicated highway and bridge trust
42 fund and capital projects funds, for
43 activities including but not limited to,
44 the preparation of designs, plans, spec-
45 ifications and estimates; construction
46 management and supervision; and
47 appraisals, surveys, testing and environ-
48 mental impact statements for transporta-
49 tion infrastructure projects (17991822) .... 206,175,000
653 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 For the payment of the costs, which shall be
2 reimbursed from bond proceeds, including
3 the payment of liabilities incurred prior
4 to April 1, 2018, of state highways, park-
5 ways, bridges, the New York State Thruway,
6 Indian reservation roads, and facilities,
7 including work appurtenant and ancillary
8 thereto. Project costs funded from this
9 appropriation may include but shall not be
10 limited to construction, reconstruction,
11 reconditioning and preservation, and the
12 acquisition of property, and for engineer-
13 ing services, including personal services,
14 nonpersonal services, fringe benefits, and
15 the contract services provided by private
16 firms, and including but not limited to
17 the preparation of designs, plans, spec-
18 ifications and estimates; construction
19 management and supervision; and
20 appraisals, surveys, testing and environ-
21 mental impact statements for transporta-
22 tion projects (17JS1822) ................... 102,904,000
23 For the payment of the costs, which shall be
24 reimbursed from bond proceeds, including
25 the payment of liabilities incurred prior
26 to April 1, 2018, of state and local
27 bridges, including work appurtenant and
28 ancillary thereto. Project costs funded
29 from this appropriation may include but
30 shall not be limited to construction,
31 reconstruction, reconditioning and preser-
32 vation, and the acquisition of property,
33 and for engineering services, including
34 personal services, nonpersonal services,
35 fringe benefits, and the contract services
36 provided by private firms, and including
37 but not limited to the preparation of
38 designs, plans, specifications and esti-
39 mates; construction management and super-
40 vision; and appraisals, surveys, testing
41 and environmental impact statements for
42 transportation projects (17BR1822) ......... 150,000,000
43 Capital Projects Funds - Other
44 Capital Projects Fund
45 Non-MTA Capital Purpose
46 For the costs of mass transportation capital
47 projects and facilities including replace-
48 ment of buses meeting federal standards
49 for replacement, related bus equipment and
50 the acquisition, design and construction,
654 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 including engineering and consulting
2 costs, of mass transit bus garages or
3 other mass transportation projects and
4 facilities approved by the commissioner of
5 transportation in a program of projects.
6 Such funding may be part of a total
7 project of which a portion is federally
8 funded but shall not be used in substi-
9 tution for the required non-federal match-
10 ing shares of the federally-funded portion
11 of the project to which it is added. The
12 moneys hereby appropriated are to be made
13 available for projects undertaken by mass
14 transit systems other than those mass
15 transit operating agencies which receive
16 money from the metropolitan transportation
17 authority dedicated tax fund (17551831) ..... 27,500,000
18 Capital Projects Funds - Other
19 Capital Projects Fund
20 Rail Service Preservation Purpose
21 For the construction and improvement of rail
22 freight projects including, but not limit-
23 ed to, the acquisition, construction,
24 reconstruction, improvement or rehabili-
25 tation of any railroad capital facility
26 and any capital improvement used in
27 connection herewith, and for the acquisi-
28 tion of real property or interests in real
29 property required or expected to be
30 required therefor.
31 Of this appropriation, the amount of up to
32 $3,000,000 will be provided to the metro-
33 politan transportation authority for costs
34 associated with implementing a program to
35 upgrade diesel train engines owned by the
36 Long Island Rail Road to improve emissions
37 standards, and the amount of up to
38 $1,000,000 for other diesel train engine
39 retrofit uses (17551841) .................... 17,500,000
40 Capital Projects Funds - Other
41 Capital Projects Fund
42 Capital Assistance Purpose
43 The sum of $122,000,000 is hereby appropri-
44 ated for the New York State Capital
45 Assistance Program for Transportation,
46 Infrastructure, and Economic Development.
47 Funds appropriated herein shall be for
48 services and expenses, grants, and costs
655 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 of program administration for projects
2 related to capital investment in: trans-
3 portation; aviation; water and sewer
4 infrastructure improvements; industrial
5 and manufacturing water supply infrastruc-
6 ture renovations and improvements; and
7 other economic development purposes. Indi-
8 vidual grants issued pursuant to this
9 appropriation shall be in an amount no
10 less than $125,000. Funding under this
11 appropriation shall be pursuant to a plan
12 submitted to the director of the division
13 of the budget. Notwithstanding any
14 provision of law to the contrary, funds
15 appropriated herein may, subject to the
16 approval of the director of the budget, be
17 (i) interchanged, (ii) transferred from
18 this appropriation to any other appropri-
19 ation of any state department, agency, or
20 public benefit corporation, or (iii)
21 suballocated to any other state depart-
22 ment, agency or public benefit corpo-
23 ration, to achieve this purpose (17CA1851) . 122,000,000
24 NON-FEDERALLY AIDED HIGHWAY CAPITAL PROJECTS (CCP) ....... 1,649,820,000
25 --------------
26 Capital Projects Funds - Other
27 Dedicated Highway and Bridge Trust Fund
28 Aviation Purpose Account
29 Aviation Purpose
30 For Aviation Bureau including personal
31 services, nonpersonal services, fringe
32 benefits and the contract services
33 provided by private firms.
34 Notwithstanding any other provision of law
35 to the contrary, the OGS Interchange and
36 Transfer Authority and the IT Interchange
37 and Transfer Authority as defined in the
38 2018-19 state fiscal year state operations
39 appropriation for the budget division
40 program of the division of the budget, are
41 deemed fully incorporated herein and a
42 part of this appropriation as if fully
43 stated.
44 Personal service (17011814) ...................... 700,000
45 Nonpersonal service (17041814) .................... 17,000
46 Fringe benefits (17081814) ....................... 447,000
47 Indirect costs (17091814) ......................... 22,000
48 Capital Projects Funds - Other
656 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 Dedicated Highway and Bridge Trust Fund
2 Highway Maintenance Purpose
3 For the payment of costs, including the
4 payment of liabilities incurred prior to
5 April 1, 2018, of preventive maintenance
6 on state roads and bridges as defined in
7 paragraph (a) of subdivision 1 of section
8 10-d of the highway law, and snow and ice
9 control on state highways, including
10 personal services, nonpersonal services,
11 fringe benefits and contractual services
12 provided by private firms and munici-
13 palities, but not including the costs of
14 heavy equipment.
15 Personal service (170118HM) .................. 124,903,000
16 Nonpersonal service (170418HM) ............... 104,419,000
17 Fringe benefits (170818HM) .................... 79,801,000
18 Indirect costs (170918HM) ...................... 3,847,000
19 For the payment of the costs of heavy equip-
20 ment, including the payment of liabilities
21 incurred prior to April 1, 2018 (54275).
22 Nonpersonal service (170518HM) ................ 38,963,000
23 Capital Projects Funds - Other
24 Dedicated Highway and Bridge Trust Fund
25 Non-Federal Aided Highway Purpose
26 For the payment of the costs, including the
27 payment of liabilities incurred prior to
28 April 1, 2018, of state highways, park-
29 ways, bridges, the New York State Thruway,
30 Indian reservation roads, and facilities
31 for which the responsibility is vested
32 with the state department of transporta-
33 tion including work appurtenant and ancil-
34 lary thereto, for the state share of
35 federally authorized high speed rail
36 improvement projects, and for the cost of
37 administrative services of the department
38 of transportation and the cost of services
39 provided by private firms; including the
40 costs of preventive maintenance on state
41 roads and bridges as defined in paragraph
42 (a) of subdivision 1 of section 10-d of
43 the highway law for contractual preventive
44 maintenance services provided by private
45 firms; and including but not limited to
46 the preparation of designs, plans, spec-
47 ifications and estimates; construction
48 management and supervision, and
49 appraisals, surveys, testing and environ-
657 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 mental impact statements for transporta-
2 tion projects. Project costs funded from
3 this appropriation may include but shall
4 not be limited to construction, recon-
5 struction, reconditioning and preserva-
6 tion, and preventive maintenance. Up to
7 $5,000,000 of this appropriation may be
8 used for traffic maintenance and traffic
9 protection services provided by the divi-
10 sion of state police.
11 With the approval of the director of the
12 budget, the commissioner of transportation
13 is authorized to enter into agreements
14 with any municipality to finance local
15 bridge projects through state non-federal-
16 ly aided highway funds appropriated herein
17 when the use of federal aid funds for such
18 local bridge projects would not be cost
19 effective and the federal aid and state
20 matching funds saved as a result of the
21 use of non federal aid funds for local
22 bridge projects are made available for
23 bridge projects on the state highway
24 system. The total amount of non-federally
25 aided highway funds made available for
26 local bridge projects from this appropri-
27 ation shall not exceed $2,500,000 in state
28 fiscal year 2018-19.
29 Personal service (17011822) .................... 5,000,000
30 Nonpersonal service (17041822) ................ 20,000,000
31 Capital projects (17081822) .................. 449,150,000
32 For the payment of the costs, including the
33 payment of liabilities incurred prior to
34 April 1, 2018, of the acquisition of prop-
35 erty related to construction, recon-
36 struction, reconditioning and preserva-
37 tion, and preventive maintenance of state
38 highways, parkways, bridges, the New York
39 State Thruway, Indian reservation roads,
40 and facilities for which the responsibil-
41 ity is vested with the state department of
42 transportation (17091822) ................... 22,000,000
43 Capital Projects Funds - Other
44 Dedicated Highway and Bridge Trust Fund
45 Preparation of Plans Purpose
46 Capital Project Management and Traffic and Safety
47 For capital project management and traffic
48 and safety, including personal services,
49 nonpersonal services, fringe benefits, and
658 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 the contract services provided by private
2 firms.
3 Personal service (17P11830) ................... 44,171,000
4 Nonpersonal service (17P41830) ................... 122,000
5 Fringe benefits (17P81830) .................... 28,053,000
6 Indirect costs (17P91830) ...................... 1,754,000
7 Department Management and Administration
8 For department management and administration
9 including personal services, nonpersonal
10 services, fringe benefits and the contract
11 services provided by private firms.
12 Notwithstanding any other provision of law
13 to the contrary, the OGS Interchange and
14 Transfer Authority and the IT Interchange
15 and Transfer Authority as defined in the
16 2018-19 state fiscal year state operations
17 appropriation for the budget division
18 program of the division of the budget, are
19 deemed fully incorporated herein and a
20 part of this appropriation as if fully
21 stated.
22 Personal service (17A11830) ................... 31,604,000
23 Nonpersonal service (17A41830) ................ 33,363,000
24 Fringe benefits (17A81830) .................... 20,192,000
25 Indirect costs (17A91830) ........................ 974,000
26 Design and Construction
27 For engineering services, including personal
28 services, nonpersonal services, and fringe
29 benefits, including, but not limited to,
30 the preparation of designs, plans, spec-
31 ifications and estimates; construction
32 management and supervision; and
33 appraisals, surveys, testing, and environ-
34 mental impact statements for transporta-
35 tion projects, and for suballocation of
36 $575,000 to the office of the inspector
37 general.
38 Notwithstanding any other provision of law
39 to the contrary, the OGS Interchange and
40 Transfer Authority and the IT Interchange
41 and Transfer Authority as defined in the
42 2018-19 state fiscal year state operations
43 appropriation for the budget division
44 program of the division of the budget, are
45 deemed fully incorporated herein and a
46 part of this appropriation as if fully
47 stated.
659 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 Personal service (17E11830) .................. 257,419,000
2 Nonpersonal service (17E41830) ................ 10,741,000
3 Fringe benefits (17E81830) ................... 142,816,000
4 Indirect costs (17E91830) ...................... 8,927,000
5 For the costs of the contract services
6 provided by private firms including, but
7 not limited to, the preparation of
8 designs, plans, specifications and esti-
9 mates; construction management and super-
10 vision; and appraisals, surveys, testing,
11 and environmental impact statements for
12 transportation projects.
13 Nonpersonal service (17EP1830) ............... 199,520,000
14 Real Estate
15 For real estate services, including personal
16 services, nonpersonal services, fringe
17 benefits and the contract services
18 provided by private firms.
19 Notwithstanding any other provision of law
20 to the contrary, the OGS Interchange and
21 Transfer Authority and the IT Interchange
22 and Transfer Authority as defined in the
23 2018-19 state fiscal year state operations
24 appropriation for the budget division
25 program of the division of the budget, are
26 deemed fully incorporated herein and a
27 part of this appropriation as if fully
28 stated.
29 Personal service (17R11830) ................... 12,296,000
30 Nonpersonal service (17R41830) ................... 302,000
31 Fringe benefits (17R81830) ..................... 7,809,000
32 Indirect costs (17R91830) ........................ 488,000
33 OTHER TRANSPORTATION AID (CCP) ............................. 543,172,000
34 --------------
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Highway Aid Purpose
38 For capital grants to municipalities under
39 the municipal streets and highways program
40 for repayment of eligible costs of federal
41 aid municipal street and highway projects
42 pursuant to section 15 of chapter 329 of
43 the laws of 1991, as added by section 9 of
44 chapter 330 of the laws of 1991, as
45 amended. The department of transportation
46 shall provide such information to the
47 municipalities as may be necessary to
660 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 maintain the federal tax exempt status of
2 any bonds, notes, or other obligations
3 issued by such municipalities to provide
4 for the non-federal share of the cost of
5 projects pursuant to chapter 330 of the
6 laws of 1991 or section 80-b of the high-
7 way law (17MA1821) .......................... 39,700,000
8 For capital grants to municipalities under
9 the consolidated local street and highway
10 improvement program:
11 The sum of $379,300,000 to counties, cities,
12 towns and villages for reimbursement of
13 eligible costs of local highway and bridge
14 projects pursuant to sections 16 and 16-a
15 of chapter 329 of the laws of 1991, as
16 added by section 9 of chapter 330 of the
17 laws of 1991, as amended. For the purposes
18 of computing allocations to munici-
19 palities, the amount distributed pursuant
20 to section 16 of chapter 329 of the laws
21 of 1991 shall be deemed to be
22 $125,540,000. The amount distributed
23 pursuant to section 16-a of chapter 329 of
24 the laws of 1991 shall be deemed to be
25 $253,760,000. Notwithstanding the
26 provisions of any general or special law,
27 the amounts deemed distributed in accord-
28 ance with section 16 of chapter 329 of the
29 laws of 1991 shall be adjusted so that
30 such amounts will not be less than 86.579
31 percent of the "funding level" as defined
32 in subdivision 5 of section 10-c of the
33 highway law for each such municipality. In
34 order to achieve the objectives of section
35 16 of chapter 329 of the laws of 1991, to
36 the extent necessary, the amounts in
37 excess of 86.579 percent of the funding
38 level to be deemed distributed to each
39 municipality under this subdivision shall
40 be reduced in equal proportion.
41 The sum of $58,797,000 to municipalities for
42 reimbursement of eligible costs of local
43 highway and bridge projects pursuant to
44 sections 16 and 16-a of chapter 329 of the
45 laws of 1991, as added by section 9 of
46 chapter 330 of the laws of 1991, as
47 amended. For the purposes of computing
48 allocations to municipalities, the amount
49 distributed pursuant to section 16 of
50 chapter 329 of the laws of 1991 shall be
51 deemed to be $19,460,000. The amount
52 distributed pursuant to section 16-a of
661 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 chapter 329 of the laws of 1991 shall be
2 deemed to be $39,337,000. Notwithstanding
3 the provisions of any general or special
4 law, the amounts deemed distributed in
5 accordance with section 16 of chapter 329
6 of the laws of 1991 shall be adjusted so
7 that such amounts will not be less than
8 13.421 percent of the "funding level" as
9 defined in subdivision 5 of section 10-c
10 of the highway law for each such munici-
11 pality. In order to achieve the objectives
12 of section 16 of chapter 329 of the laws
13 of 1991, to the extent necessary, the
14 amounts in excess of 13.421 percent of the
15 funding level to be deemed distributed to
16 each municipality under this paragraph
17 shall be reduced in equal proportion. To
18 the extent that the total of remaining
19 payment allocations calculated herein
20 varies from $58,797,000, the payment
21 amounts to each locality shall be adjusted
22 by a uniform percentage so that the total
23 payments equal $58,797,000.
24 Payments shall be made on the fifteenth day
25 of June, September, December and March
26 (17CH1821) ................................. 438,097,000
27 For capital grants to municipalities for
28 extreme winter recovery:
29 The sum of $65,000,000 to municipalities for
30 reimbursement of eligible costs of local
31 highway and bridge projects pursuant to
32 section 16-a of chapter 329 of the laws of
33 1991, as added by section 9 of chapter 330
34 of the laws of 1991, as amended. For the
35 purposes of computing allocations to muni-
36 cipalities, the amount distributed pursu-
37 ant to section 16-a of chapter 329 of the
38 laws of 1991 shall be deemed to be
39 $65,000,000. To the extent that the total
40 of payment allocations calculated herein
41 varies from $65,000,000, the payment
42 amounts to each locality shall be adjusted
43 by a uniform percentage so that the total
44 payments equal $65,000,000.
45 Payments shall be made on the fifteenth day
46 of June, September, December and March
47 (17EW1821) .................................. 65,000,000
48 For municipalities eligible to receive aid
49 under section 10-c of the highway law, for
50 the reimbursement of eligible costs to
51 replace guiderail end-cap terminals
662 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS 2018-19
1 removed from the department of transporta-
2 tion's approved list during state fiscal
3 year 2017-18, provided such costs do not
4 exceed $10,000 per unit (17GR1821) ............. 375,000
663 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 All or a portion of the disbursements made pursuant to the reappropri-
2 ations made hereinafter from the dedicated highway and bridge trust
3 fund may be repaid from the proceeds of bonds and notes issued
4 pursuant to chapter 56 of the laws of 1993.
5 ACCELERATED CAPACITY AND TRANSPORTATION IMPROVEMENTS FUND (CCP)
6 Capital Projects Funds - Other
7 Accelerated Capacity and Transportation Improvements Fund
8 Bond Proceeds Purpose
9 By chapter 54, section 1, of the laws of 1989, as amended by chapter 55,
10 section 1, of the laws of 1996:
11 The sum of $2,530,000,000, or so much thereof as may be necessary and
12 available, is hereby appropriated from the accelerated capacity and
13 transportation improvements fund as established by section 77 of the
14 state finance law in accordance with the provisions of such section
15 for payment to the capital projects fund in order to reimburse such
16 fund for disbursements certified by the state comptroller as bonda-
17 ble under the provisions of section 50 of chapter 261 of the laws of
18 1988.
19 The director of the budget is hereby authorized to designate to the
20 state comptroller specific appropriations made from the capital
21 projects fund for purposes for which accelerated capacity and trans-
22 portation improvements fund expenditures are authorized. The state
23 comptroller shall at the commencement of each month certify to the
24 director of the budget, the chairman of the senate finance commit-
25 tee, and the chairman of the assembly ways and means committee, the
26 amounts disbursed from the appropriations so designated by the
27 director of the budget from the capital projects fund for such
28 purposes for the month preceding such certification and such certif-
29 ications shall not exceed in the aggregate the moneys hereby appro-
30 priated. A copy of each such certificate shall also be delivered to
31 state departments and agencies to which such capital projects fund
32 appropriations are made available.
33 Notwithstanding the provisions of any general or special law, no
34 moneys shall be available from the accelerated capacity and trans-
35 portation improvements fund until a certificate of approval of
36 availability shall have been issued by the director of the budget,
37 and a copy of such certificate of approval filed with the state
38 comptroller, the chairman of the senate finance committee and the
39 chairman of the assembly ways and means committee. Such certificate
40 may be amended from time to time by the director of the budget, and
41 a copy of each such amendment shall be filed with the state comp-
42 troller, the chairman of the senate finance committee and the chair-
43 man of the assembly ways and means committee (71258910) ............
44 2,530,000,000 .................................... (re. $23,010,000)
45 AIRPORT OR AVIATION PROGRAM (CCP)
46 Capital Projects Funds - Other
47 Capital Projects Fund
664 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Aviation Purpose
2 By chapter 54, section 1, of the laws of 1990:
3 For state aid to municipal corporations, private airports as author-
4 ized by section 14-h of the transportation law, and to the depart-
5 ment of transportation for the preparation of designs, plans, spec-
6 ifications and estimates, for the contract engineering services
7 provided by private firms, and for the acquisition, construction,
8 reconstruction, and improvement of airport or aviation capital
9 projects, including the acquisition of real property, pursuant to
10 the provisions of the rebuild New York through transportation
11 infrastructure renewal bond act of 1983, in accordance with the
12 schedule set forth below. The moneys hereby appropriated are to be
13 made available for payment of state aid to municipal corporations
14 including payment of liabilities incurred prior to April 1, 1990.
15 The items shown in the project schedule below shall be for projects
16 with a common purpose and may be interchanged without limitation
17 subject to the approval of the director of the division of the budg-
18 et.
19 Prior to requesting approval of a certificate of approval of avail-
20 ability for the moneys hereby appropriated, the commissioner of
21 transportation shall certify that each airport or aviation project
22 progressed under the program categories listed in the schedule below
23 has received federal approval. Such certification shall report the
24 amount of the federally authorized level of financial assistance
25 (17239014) ... ..... 2,800,000 ..................... (re. $10,000)
26 By chapter 54, section 1, of the laws of 1989, for:
27 For state aid to municipal corporations, private airports as author-
28 ized by section 14-h of the transportation law, and to the depart-
29 ment of transportation for the preparation of designs, plans, spec-
30 ifications and estimates, for the contract engineering services
31 provided by private firms, and for the acquisition, construction,
32 reconstruction, and improvement of airport or aviation capital
33 projects, including the acquisition of real property, pursuant to
34 the provisions of the rebuild New York through transportation
35 infrastructure renewal bond act of 1983, in accordance with the
36 schedule set forth below. The moneys hereby appropriated are to be
37 made available for payment of state aid to municipal corporations
38 including payment of liabilities incurred prior to April 1, 1989.
39 The items shown in the project schedule below shall be for projects
40 with a common purpose and may be interchanged without limitation
41 subject to the approval of the director of the division of the budg-
42 et.
43 Prior to requesting approval of a certificate of approval of avail-
44 ability for the moneys hereby appropriated, the commissioner of
45 transportation shall certify that each airport or aviation project
46 progressed under the program categories listed in the schedule below
47 has received federal approval and the amount of federally authorized
48 level of financial assistance (17238914) ... .....................
49 2,800,000 ............................................. (re. $3,000)
665 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 1988, as amended by chapter
2 262, section 1, of the laws of 1988:
3 For state aid to municipal corporations, private airports as author-
4 ized by section 14-h of the transportation law, and to the depart-
5 ment of transportation for the preparation of designs, plans, spec-
6 ifications and estimates, for the contract engineering services
7 provided by private firms, and for the acquisition, construction,
8 reconstruction, and improvement of airport or aviation capital
9 projects, including the acquisition of real property, pursuant to
10 the provisions of the rebuild New York through transportation
11 infrastructure renewal bond act of 1983, in accordance with the
12 schedule set forth below. The moneys hereby appropriated are to be
13 made available for payment of state aid to municipal corporations
14 including payment of liabilities incurred prior to April 1, 1988.
15 The items shown in the project schedule below shall be for projects
16 with a common purpose and may be interchanged without limitation
17 subject to the approval of the director of the division of the budg-
18 et.
19 Prior to requesting approval of a certificate of approval of avail-
20 ability for the moneys hereby appropriated, the commissioner of
21 transportation shall certify that each airport or aviation project
22 progressed under the program categories listed in the schedule below
23 has received federal approval and the federally authorized level of
24 financial assistance (17238814) ... ..............................
25 10,400,000 ........................................... (re. $52,000)
26 By chapter 54, section 1, of the laws of 1987:
27 For state aid to municipal corporations and to the department of
28 transportation for the preparation of designs, plans, specifications
29 and estimates, for the contract engineering services provided by
30 private firms, and for the acquisition, construction, recon-
31 struction, and improvement of airport or aviation capital projects,
32 including the acquisition of real property, pursuant to the
33 provisions of the rebuild New York through transportation infras-
34 tructure renewal bond act of 1983, in accordance with the schedule
35 set forth below. The moneys hereby appropriated are to be made
36 available for payment of state aid to municipal corporations includ-
37 ing payment of liabilities incurred prior to April 1, 1987. The
38 items shown in the project schedule below shall be for projects with
39 a common purpose and may be interchanged without limitation subject
40 to the approval of the director of the division of the budget.
41 Prior to requesting approval of a certificate of approval of avail-
42 ability for the moneys hereby appropriated, the commissioner shall
43 certify that each airport or aviation project progressed under the
44 program categories listed in the schedule below has received federal
45 approval and the federally authorized level of financial assistance
46 (17168714) ... ..... 3,900,000 .................... (re. $183,000)
47 By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
48 section 3, of the laws of 1988:
49 For state aid to municipal corporations and to the department of
50 transportation for the preparation of designs, plans, specifications
666 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and estimates, for the contract engineering services provided by
2 private firms, and for the acquisition, construction, recon-
3 struction, and improvement of airport or aviation capital projects,
4 including the acquisition of real property, pursuant to the
5 provisions of the rebuild New York through transportation infras-
6 tructure renewal bond act of 1983, in accordance with the schedule
7 set forth below. The moneys hereby appropriated are to be made
8 available for payment of state aid to municipal corporations includ-
9 ing payment of liabilities incurred prior to April one, nineteen
10 hundred eighty-six. The items shown in the project schedule below
11 shall be for projects with a common purpose and may be interchanged
12 without limitation subject to the approval of the director of the
13 division of the budget.
14 Prior to requesting approval of a certificate of approval of avail-
15 ability for the moneys hereby appropriated, the commissioner shall
16 certify that each airport or aviation project progressed under the
17 program categories listed in the schedule below has received federal
18 approval and the federally authorized level of financial assistance
19 (17238614) ... ..... 5,100,000 .................... (re. $110,000)
20 By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
21 section 3, of the laws of 1987:
22 For payment of the costs, including the payment of liabilities
23 incurred prior to April one, nineteen hundred eighty-six, for the
24 preparation of designs, plans, specifications and estimates, for the
25 construction, reconstruction, and improvement of airport or aviation
26 capital projects, including infrastructure improvements at Stewart
27 airport, for the costs of real property acquisition, contract engi-
28 neering services provided by private firms, and other expenses
29 related thereto, pursuant to the transportation capital facilities
30 development act of nineteen hundred sixty-seven, notwithstanding any
31 inconsistent provisions of law.
32 No funds shall be allocated that are directly related to a private
33 facility until the commissioner of transportation enters into a
34 written agreement, subject to the approval of the director of the
35 budget, with such private entity providing that such entity is
36 committed to locate its facilities at Stewart airport and has
37 arranged financing for the costs of construction of such facilities.
38 Funds shall not be allocated from this appropriation for infrastruc-
39 ture improvements or other development purposes not directly related
40 to a private facility until the commissioner of transportation has
41 provided the director of the budget with the following projections
42 to support any such allocation of funds: (a) effect on Stewart
43 airport net operating revenues; (b) effect on new jobs for the state
44 of New York; and (c) effect on net revenues of amortization of state
45 capital expenditures.
46 The commissioner of transportation shall secure and use any federal
47 funds which are or may become available for the purposes of this
48 appropriation. Any such funds shall be used to reduce the state's
49 share of project costs for which federal funds become available
50 (17A18614) ... 19,500,000 ........................... (re. $134,000)
667 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
2 section 3, of the laws of 1988:
3 For state aid to municipal corporations for the acquisition,
4 construction, reconstruction, and improvement of airport or aviation
5 capital projects, including the acquisition of real property, pursu-
6 ant to the transportation capital facilities development act of
7 nineteen hundred sixty-seven notwithstanding any inconsistent
8 provisions of law, in accordance with the schedule set forth below.
9 The moneys hereby appropriated are to be made available for payment
10 of state aid to municipal corporations including payment of liabil-
11 ities incurred prior to April one, nineteen hundred eighty-five, as
12 defined in the transportation capital facilities development act of
13 nineteen hundred sixty-seven. The items shown in the project sched-
14 ule below shall be for projects with a common purpose and may be
15 interchanged without limitation subject to the approval of the
16 director of the division of the budget.
17 Prior to requesting approval of a certificate of approval of avail-
18 ability for the moneys hereby appropriated, the commissioner shall
19 certify that each airport or aviation project progressed under the
20 program categories listed in the schedule below has received federal
21 approval and the federally authorized level of financial assistance
22 (17158514) ... ..... 3,700,000 .................... (re. $726,000)
23 By chapter 54, section 1, of the laws of 1984:
24 For state aid to municipal corporations for the acquisition,
25 construction, reconstruction, and improvement of airport or aviation
26 capital projects, including the acquisition of real property, pursu-
27 ant to the transportation capital facilities development act of
28 nineteen hundred sixty-seven notwithstanding any inconsistent
29 provisions of law, in accordance with the schedule set forth below.
30 The moneys hereby appropriated are to be made available for payment
31 of state aid to municipal corporations including payment of liabil-
32 ities incurred prior to April one, nineteen hundred eighty-four, as
33 defined in the transportation capital facilities development act of
34 nineteen hundred sixty-seven.
35 Prior to requesting approval of a certificate of approval of avail-
36 ability for the moneys hereby appropriated, the commissioner shall
37 certify that each airport or aviation project progressed under the
38 program categories listed in the schedule below has received federal
39 approval and the federally authorized level of financial assistance
40 (17178414) ... .................................... (re. $313,000)
41 REPUBLIC AND STEWART AIRPORTS
42 By chapter 54, section 7, of the laws of 1973, as transferred by chapter
43 370, section 3, of the laws of 1982, and as amended by chapter 54,
44 section 3, of the laws of 1986:
45 To the department of transportation, notwithstanding the provisions of
46 title one of chapter seven hundred seventeen of the laws of nineteen
47 hundred sixty-seven, as amended, or of any agreements entered into
48 pursuant to such provisions (which agreements shall no longer be
49 applicable to such projects), for one hundred percentum of the net
668 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 project cost of the acquisition, construction, reconstruction and
2 improvement, with expected federal aid as indicated, of airport or
3 aviation capital projects in accordance with the schedule set forth
4 below, including the completion of those of the said projects
5 already commenced, which amount shall be available for the payment
6 of liabilities incurred prior to April 1, 1971, provided that as to
7 any project in the foregoing schedule which has not heretofore been
8 authorized by the legislature in an appropriation act, no certif-
9 icate of approval of availability shall be issued until the commis-
10 sioner of transportation has delivered to the director of the budget
11 his certification that such project is consistent with the
12 provisions of subdivision 1 of section 15 of the transportation law.
13 The amount hereby appropriated is in addition to and supplemental to
14 the amounts heretofore expended from the capital construction fund
15 as part of the "net project cost" as set forth in the schedule
16 below:
17 AIRPORT OR AVIATION CAPITAL PROJECTS
18 project schedule
19 ADDITIONAL
20 ADDITIONAL ESTIMATED ADDITIONAL
21 COMPLETION ESTIMATED FEDERAL NET PROJECT
22 CAPITAL PROJECT DATE TOTAL COST SHARE COST
23 -----------------------------------------------------------------------
24 (thousands)
25 To supplement the project
26 appropriated by 320/23/71 as
27 supplemented by 34/8/72, for
28 the project reading:
29 "Acquire and develop Republic
30 Airport, including new
31 hangars, administration
32 building, and other capital
33 improvements;
34 acquire lands;
35 close Zahn's Airport" ..... 12/74 $4,205 ........ $4,205
36 ------- -------
37 Total ................... $4,205 $4,205
38 ======= =======
39 Notwithstanding the provisions of any general or special law, no part
40 of any such appropriation shall be available for the purposes desig-
41 nated until a certificate of approval of availability shall have
42 been issued by the director of the budget and a copy of such certif-
43 icate filed with the state comptroller, the chairman of the senate
44 finance committee and the chairman of the assembly ways and means
45 committee. Such certificate may be amended from time to time subject
46 to the approval of the director of the budget and a copy of each
47 such amendment shall be filed with the state comptroller, the chair-
48 man of the senate finance committee and the chairman of the assembly
49 ways and means committee.
669 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The moneys hereby appropriated, when made available pursuant to a
2 certificate of approval of availability, issued by the director of
3 the budget, shall be paid from the capital construction fund on the
4 audit and warrant of the state comptroller on vouchers approved by
5 the commissioner of transportation or his duly designated officer
6 (02412614) ... 4,205,000 ............................ (re. $837,000)
7 AIRPORT OR AVIATION PROGRAM--BONDABLE (CCP)
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 Aviation Purpose
11 By chapter 54, section 1, of the laws of 1991:
12 For state aid to municipal corporations, private airports as author-
13 ized by section 14-h of the transportation law and for payment of
14 the state share of federally aided projects at Stewart and Republic
15 Airports, for the acquisition, construction, reconstruction, and
16 improvement of airport or aviation capital projects, including the
17 acquisition of real property, pursuant to the transportation capital
18 facilities development act of 1967 notwithstanding any inconsistent
19 provisions of law, in accordance with the schedule set forth below.
20 The moneys hereby appropriated are to be made available for payment
21 of state aid to municipal corporations, private airports as author-
22 ized by section 14-h of the transportation law and for payment of
23 the state share of federally aided projects at Stewart and Republic
24 Airports, including payment of liabilities incurred prior to April
25 1, 1991, as defined in the transportation capital facilities devel-
26 opment act of 1967. The items shown in the project schedule below
27 shall be for projects with a common purpose and may be interchanged
28 without limitation subject to the approval of the director of the
29 division of the budget.
30 Prior to requesting approval of a certificate of approval of avail-
31 ability for the moneys hereby appropriated, the commissioner of
32 transportation shall certify that each airport or aviation project
33 progressed under the program categories listed in the schedule below
34 has received federal approval and the federally authorized level of
35 financial assistance.
36 No funds shall be allocated for projects at Stewart Airport that are
37 directly related to a private facility until the commissioner of
38 transportation enters into a written agreement, subject to the
39 approval of the director of the budget, with such private entity
40 providing that such entity is committed to locate its facilities at
41 Stewart airport and has arranged financing for the costs of
42 construction of such facilities.
43 Funds shall not be allocated for projects at Stewart airport from this
44 appropriation for infrastructure improvements or other development
45 purposes not directly related to a private facility until the
46 commissioner of transportation has provided the director of the
47 budget with the following projections to support any such allocation
48 of funds: (a) effect on Stewart airport net operating revenues; (b)
49 effect on new jobs for the state of New York; and (c) effect on net
670 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 revenues of amortization of state capital expenditures. It is
2 acknowledged that funds provided herein pursuant to the transporta-
3 tion capital facilities development act of 1967 are made available
4 by repealing a portion of an appropriation for the payment of the
5 state's share to the Niagara frontier transportation authority for
6 construction, reconstruction, and improvement of airport or aviation
7 capital projects at Buffalo international airport. It is the intent
8 of the legislature that the repeal of such funds appropriated to the
9 Niagara frontier transportation authority does not void the state's
10 commitment to provide alternative state share funding sources to the
11 authority to complete the airport or aviation capital projects at
12 Buffalo international airport as originally provided by chapter 54,
13 section 1, of the laws of 1982, as amended by chapter 54, section 3,
14 of the laws of 1988. It is further the intent of the legislature
15 that such alternative state share funding be provided to the author-
16 ity no later than March 31, 1993 (17439114) ........................
17 11,800,000 .......................................... (re. $824,000)
18 AIRPORT OR AVIATION STATE PROGRAM (CCP)
19 Capital Projects Funds - Other
20 Dedicated Highway and Bridge Trust Fund
21 Aviation Purpose Account
22 Aviation Purpose
23 By chapter 54, section 1, of the laws of 2017:
24 For state aid to municipal corporations, private airports as author-
25 ized by section 14-h of the transportation law and for payment of
26 the cost of projects at Stewart and Republic Airports, for the
27 acquisition, construction, reconstruction, and improvement of
28 airport or aviation capital projects, including the acquisition of
29 real property and liabilities incurred prior to April 1, 2017.
30 Prior to requesting approval of a certificate of approval of avail-
31 ability for moneys appropriated, the commissioner of transportation
32 shall certify that each airport or aviation project progressed under
33 the program, other than state owned airports, has received federal
34 approval and the federally authorized level of financial assistance
35 (17231714) ... 4,000,000 .......................... (re. $4,000,000)
36 By chapter 55, section 1, of the laws of 2016, as transferred by chapter
37 54, section 1, of the laws of 2017:
38 For state aid to municipal corporations, private airports as author-
39 ized by section 14-h of the transportation law and for payment of
40 the cost of projects at Stewart and Republic Airports, for the
41 acquisition, construction, reconstruction, and improvement of
42 airport or aviation capital projects, including the acquisition of
43 real property and liabilities incurred prior to April 1, 2016.
44 Prior to requesting approval of a certificate of approval of avail-
45 ability for moneys appropriated, the commissioner of transportation
46 shall certify that each airport or aviation project progressed under
47 the program, other than state owned airports, has received federal
671 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 approval and the federally authorized level of financial assistance
2 (17231614) ... 4,000,000 .......................... (re. $3,983,000)
3 By chapter 54, section 1, of the laws of 2015, as transferred by chapter
4 54, section 1, of the laws of 2017:
5 For state aid to municipal corporations, private airports as author-
6 ized by section 14-h of the transportation law and for payment of
7 the cost of projects at Stewart and Republic Airports, for the
8 acquisition, construction, reconstruction, and improvement of
9 airport or aviation capital projects, including the acquisition of
10 real property and liabilities incurred prior to April 1, 2015.
11 Prior to requesting approval of a certificate of approval of avail-
12 ability for moneys appropriated, the commissioner of transportation
13 shall certify that each airport or aviation project progressed under
14 the program, other than state owned airports, has received federal
15 approval and the federally authorized level of financial assistance
16 (17231514) ... 4,000,000 .......................... (re. $1,973,000)
17 By chapter 54, section 1, of the laws of 2014, as transferred by chapter
18 54, section 1, of the laws of 2017:
19 For state aid to municipal corporations, private airports as author-
20 ized by section 14-h of the transportation law and for payment of
21 the cost of projects at Stewart and Republic Airports, for the
22 acquisition, construction, reconstruction, and improvement of
23 airport or aviation capital projects, including the acquisition of
24 real property and liabilities incurred prior to April 1, 2014.
25 Prior to requesting approval of a certificate of approval of avail-
26 ability for moneys appropriated, the commissioner of transportation
27 shall certify that each airport or aviation project progressed under
28 the program, other than state owned airports, has received federal
29 approval and the federally authorized level of financial assistance
30 (17231414) ... 4,000,000 ............................ (re. $484,000)
31 By chapter 54, section 1, of the laws of 2013, as transferred by chapter
32 54, section 1, of the laws of 2017:
33 For state aid to municipal corporations, private airports as author-
34 ized by section 14-h of the transportation law and for payment of
35 the cost of projects at Stewart and Republic Airports, for the
36 acquisition, construction, reconstruction, and improvement of
37 airport or aviation capital projects, including the acquisition of
38 real property and liabilities incurred prior to April 1, 2013.
39 Prior to requesting approval of a certificate of approval of avail-
40 ability for moneys appropriated, the commissioner of transportation
41 shall certify that each airport or aviation project progressed under
42 the program, other than state owned airports, has received federal
43 approval and the federally authorized level of financial assistance
44 (17231314) ... 4,000,000 ............................ (re. $278,000)
45 By chapter 54, section 1, of the laws of 2012, as transferred by chapter
46 54, section 1, of the laws of 2017:
47 For state aid to municipal corporations, private airports as author-
48 ized by section 14-h of the transportation law and for payment of
672 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the cost of projects at Stewart and Republic Airports, for the
2 acquisition, construction, reconstruction, and improvement of
3 airport or aviation capital projects, including the acquisition of
4 real property and liabilities incurred prior to April 1, 2012.
5 Prior to requesting approval of a certificate of approval of avail-
6 ability for moneys appropriated, the commissioner of transportation
7 shall certify that each airport or aviation project progressed under
8 the program, other than state owned airports, has received federal
9 approval and the federally authorized level of financial assistance.
10 Funds from this appropriation may also be utilized for grants to
11 municipal corporations and private airports for the cost of projects
12 authorized by section 14-l of the transportation law, including the
13 acquisition of real property and liabilities incurred prior to April
14 1, 2012; provided, however, that funds available for this purpose
15 shall not exceed the amount by which $1,000,000 exceeds the sum of
16 the amount in such state fiscal year necessary for the state share
17 of federal projects provided pursuant to section 14-h of the trans-
18 portation law and the amount in such state fiscal year required for
19 payment of the costs of projects at Stewart and Republic Airports,
20 upon certification by the commissioner of transportation at the end
21 of the calendar year (17231214) ... 1,000,000 ....... (re. $469,000)
22 By chapter 54, section 1, of the laws of 2011, as transferred by chapter
23 54, section 1, of the laws of 2017:
24 For state aid to municipal corporations, private airports as author-
25 ized by section 14-h of the transportation law and for payment of
26 the cost of projects at Stewart and Republic Airports, for the
27 acquisition, construction, reconstruction, and improvement of
28 airport or aviation capital projects, including the acquisition of
29 real property and liabilities incurred prior to April 1, 2011.
30 Prior to requesting approval of a certificate of approval of avail-
31 ability for moneys appropriated, the commissioner of transportation
32 shall certify that each airport or aviation project progressed under
33 the program, other than state owned airports, has received federal
34 approval and the federally authorized level of financial assistance.
35 Funds from this appropriation may also be utilized for grants to
36 municipal corporations and private airports for the cost of projects
37 authorized by section 14-l of the transportation law, including the
38 acquisition of real property and liabilities incurred prior to April
39 1, 2011; provided, however, that funds available for this purpose
40 shall not exceed the amount by which $4,000,000 exceeds the sum of
41 the amount in such state fiscal year necessary for the state share
42 of federal projects provided pursuant to section 14-h of the trans-
43 portation law and the amount in such state fiscal year required for
44 payment of the costs of projects at Stewart and Republic Airports,
45 upon certification by the commissioner of transportation at the end
46 of the calendar year (17231114) ... 4,000,000 ..... (re. $4,000,000)
47 By chapter 55, section 1, of the laws of 2010, as transferred by chapter
48 54, section 1, of the laws of 2017:
49 For state aid to municipal corporations, private airports as author-
50 ized by section 14-h of the transportation law and for payment of
673 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the cost of projects at Stewart and Republic Airports, for the
2 acquisition, construction, reconstruction, and improvement of
3 airport or aviation capital projects, including the acquisition of
4 real property and liabilities incurred prior to April 1, 2010.
5 Prior to requesting approval of a certificate of approval of avail-
6 ability for moneys appropriated, the commissioner of transportation
7 shall certify that each airport or aviation project progressed under
8 the program, other than state owned airports, has received federal
9 approval and the federally authorized level of financial assistance
10 (17231014) ... 4,000,000 .......................... (re. $4,000,000)
11 By chapter 55, section 1, of the laws of 2009, as transferred by chapter
12 54, section 1, of the laws of 2017:
13 For state aid to municipal corporations, private airports as author-
14 ized by section 14-h of the transportation law and for payment of
15 the cost of projects at Stewart and Republic Airports, for the
16 acquisition, construction, reconstruction, and improvement of
17 airport or aviation capital projects, including the acquisition of
18 real property and liabilities incurred prior to April 1, 2009.
19 Prior to requesting approval of a certificate of approval of avail-
20 ability for moneys appropriated, the commissioner of transportation
21 shall certify that each airport or aviation project progressed under
22 the program, other than state owned airports, has received federal
23 approval and the federally authorized level of financial assistance.
24 Funds from this appropriation may also be utilized for grants to
25 municipal corporations and private airports for the cost of projects
26 authorized by section 14-l of the transportation law, including the
27 acquisition of real property and liabilities incurred prior to April
28 1, 2008; provided, however, that funds available for this purpose
29 shall not exceed the amount by which $4,000,000 exceeds the sum of
30 the amount in such state fiscal year necessary for the state share
31 of federal projects provided pursuant to section 14-h of the trans-
32 portation law and the amount in such state fiscal year required for
33 payment of the costs of projects at Stewart and Republic Airports,
34 upon certification by the commissioner of transportation at the end
35 of the calendar year (17230914) ... 4,000,000 ..... (re. $4,000,000)
36 By chapter 55, section 1, of the laws of 2008, as transferred by chapter
37 54, section 1, of the laws of 2017:
38 For state aid to municipal corporations, private airports as author-
39 ized by section 14-h of the transportation law and for payment of
40 the cost of projects at Stewart and Republic Airports, for the
41 acquisition, construction, reconstruction, and improvement of
42 airport or aviation capital projects, including the acquisition of
43 real property and liabilities incurred prior to April 1, 2008.
44 Prior to requesting approval of a certificate of approval of avail-
45 ability for moneys appropriated, the commissioner of transportation
46 shall certify that each airport or aviation project progressed under
47 the program, other than state owned airports, has received federal
48 approval and the federally authorized level of financial assistance.
49 Funds from this appropriation may also be utilized for grants to
50 municipal corporations and private airports for the cost of projects
674 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authorized by section 14-l of the transportation law, including the
2 acquisition of real property and liabilities incurred prior to April
3 1, 2008; provided, however, that funds available for this purpose
4 shall not exceed the amount by which $8,000,000 exceeds the sum of
5 the amount in such state fiscal year necessary for the state share
6 of federal projects provided pursuant to section 14-h of the trans-
7 portation law and the amount in such state fiscal year required for
8 payment of the costs of projects at Stewart and Republic Airports,
9 upon certification by the commissioner of transportation at the end
10 of the calendar year (17230814) ... 8,000,000 ..... (re. $8,000,000)
11 By chapter 55, section 1, of the laws of 2007, as transferred by chapter
12 54, section 1, of the laws of 2017:
13 For state aid to municipal corporations, private airports as author-
14 ized by section 14-h of the transportation law and for payment of
15 the cost of projects at Stewart and Republic Airports, for the
16 acquisition, construction, reconstruction, and improvement of
17 airport or aviation capital projects, including the acquisition of
18 real property and liabilities incurred prior to April 1, 2007.
19 Prior to requesting approval of a certificate of approval of avail-
20 ability for moneys appropriated, the commissioner of transportation
21 shall certify that each airport or aviation project progressed under
22 the program, other than state owned airports, has received federal
23 approval and the federally authorized level of financial assistance.
24 Funds from this appropriation may also be utilized for grants to
25 municipal corporations and private airports for the cost of projects
26 authorized by section 14-l of the transportation law, including the
27 acquisition of real property and liabilities incurred prior to April
28 1, 2007; provided, however, that funds available for this purpose
29 shall not exceed the amount by which $8,000,000 exceeds the sum of
30 the amount in such state fiscal year necessary for the state share
31 of federal projects provided pursuant to section 14-h of the trans-
32 portation law and the amount in such state fiscal year required for
33 payment of the costs of projects at Stewart and Republic Airports,
34 upon certification by the commissioner of transportation at the end
35 of the calendar year (17230714) ... 8,000,000 ..... (re. $2,476,000)
36 By chapter 55, section 1, of the laws of 2006, as transferred by chapter
37 54, section 1, of the laws of 2017:
38 For state aid to municipal corporations, private airports as author-
39 ized by section 14-h of the transportation law and for payment of
40 the cost of projects at Stewart and Republic Airports, for the
41 acquisition, construction, reconstruction, and improvement of
42 airport or aviation capital projects, including the acquisition of
43 real property and liabilities incurred prior to April 1, 2006.
44 Prior to requesting approval of a certificate of approval of avail-
45 ability for moneys appropriated, the commissioner of transportation
46 shall certify that each airport or aviation project progressed under
47 the program, other than state owned airports, has received federal
48 approval and the federally authorized level of financial assistance
49 (17230614) ... 8,000,000 .......................... (re. $1,593,000)
675 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2005, as transferred by chapter
2 54, section 1, of the laws of 2017:
3 For state aid to municipal corporations, private airports as author-
4 ized by section 14-h of the transportation law and for payment of
5 the cost of projects at Stewart and Republic Airports, for the
6 acquisition, construction, reconstruction, and improvement of
7 airport or aviation capital projects, including the acquisition of
8 real property and liabilities incurred prior to April 1, 2005.
9 Prior to requesting approval of a certificate of approval of avail-
10 ability for moneys appropriated, the commissioner of transportation
11 shall certify that each airport or aviation project progressed under
12 the program, other than state owned airports, has received federal
13 approval and the federally authorized level of financial assistance
14 (17230514) ... 8,000,000 .......................... (re. $1,856,000)
15 By chapter 55, section 1, of the laws of 2004, as transferred by chapter
16 54, section 1, of the laws of 2017:
17 For state aid to municipal corporations, private airports as author-
18 ized by section 14-h of the transportation law and for payment of
19 the cost of projects at Stewart and Republic Airports, for the
20 acquisition, construction, reconstruction, and improvement of
21 airport or aviation capital projects, including the acquisition of
22 real property and liabilities incurred prior to April 1, 2004.
23 Prior to requesting approval of a certificate of approval of avail-
24 ability for moneys appropriated, the commissioner of transportation
25 shall certify that each airport or aviation project progressed under
26 the program, other than state owned airports, has received federal
27 approval and the federally authorized level of financial assistance
28 (17230414) ... 8,000,000 ............................ (re. $198,000)
29 By chapter 55, section 1, of the laws of 2002, as transferred by chapter
30 54, section 1, of the laws of 2017:
31 For state aid to municipal corporations, private airports as author-
32 ized by section 14-h of the transportation law and for payment of
33 the cost of projects at Stewart and Republic Airports, for the
34 acquisition, construction, reconstruction, and improvement of
35 airport or aviation capital projects, including the acquisition of
36 real property and liabilities incurred prior to April 1, 2002.
37 Prior to requesting approval of a certificate of approval of avail-
38 ability for moneys appropriated, the commissioner of transportation
39 shall certify that each airport or aviation project progressed under
40 the program, other than state owned airports, has received federal
41 approval and the federally authorized level of financial assistance
42 (17230214) ... 8,000,000 ............................ (re. $125,000)
43 By chapter 55, section 1, of the laws of 2001, as transferred by chapter
44 54, section 1, of the laws of 2017:
45 For state aid to municipal corporations, private airports as author-
46 ized by section 14-h of the transportation law and for payment of
47 the cost of projects at Stewart and Republic Airports, for the
48 acquisition, construction, reconstruction, and improvement of
49 airport or aviation capital projects, including the acquisition of
676 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 real property and liabilities incurred prior to April 1, 2001, in
2 accordance with the following project schedule.
3 Prior to requesting approval of a certificate of approval of avail-
4 ability for moneys appropriated, the commissioner of transportation
5 shall certify that each airport or aviation project progressed under
6 the program categories listed in a project schedule other than state
7 owned airports, has received federal approval and the federally
8 authorized level of financial assistance.
9 The items shown in the project schedule below shall be for projects
10 with a common purpose and may be interchanged without limitation
11 subject to the approval of the director of the budget (17230114) ...
12 6,000,000 ............................................ (re. $50,000)
13 By chapter 55, section 1, of the laws of 2000, as transferred by chapter
14 54, section 1, of the laws of 2017:
15 For state aid to municipal corporations, private airports as author-
16 ized by section 14-h of the transportation law and for payment of
17 the cost of projects at Stewart and Republic Airports, for the
18 acquisition, construction, reconstruction, and improvement of
19 airport or aviation capital projects, including the acquisition of
20 real property and liabilities incurred prior to April 1, 2000, in
21 accordance with the following project schedule.
22 Prior to requesting approval of a certificate of approval of avail-
23 ability for moneys appropriated, the commissioner of transportation
24 shall certify that each airport or aviation project progressed under
25 the program categories listed in a project schedule other than state
26 owned airports, has received federal approval and the federally
27 authorized level of financial assistance.
28 The items shown in the project schedule below shall be for projects
29 with a common purpose and may be interchanged without limitation
30 subject to the approval of the director of the budget (17230014)
31 ... ..... 6,000,000 ............................... (re. $132,000)
32 By chapter 55, section 1, of the laws of 1999, as transferred by chapter
33 54, section 1, of the laws of 2017:
34 For state aid to municipal corporations, private airports as author-
35 ized by section 14-h of the transportation law and for payment of
36 the cost of projects at Stewart and Republic Airports, for the
37 acquisition, construction, reconstruction, and improvement of
38 airport or aviation capital projects, including the acquisition of
39 real property and liabilities incurred prior to April 1, 1999, in
40 accordance with the following project schedule.
41 Prior to requesting approval of a certificate of approval of avail-
42 ability for moneys appropriated, the commissioner of transportation
43 shall certify that each airport or aviation project progressed under
44 the program categories listed in a project schedule other than state
45 owned airports, has received federal approval and the federally
46 authorized level of financial assistance.
47 The items shown in the project schedule below shall be for projects
48 with a common purpose and may be interchanged without limitation
49 subject to the approval of the director of the budget (17239914)
50 ... ..... 4,500,000 ............................... (re. $137,000)
677 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 1998, as transferred by chapter
2 54, section 1, of the laws of 2017:
3 For state aid to municipal corporations, private airports as author-
4 ized by section 14-h of the transportation law and for payment of
5 the cost of projects at Stewart and Republic Airports, for the
6 acquisition, construction, reconstruction, and improvement of
7 airport or aviation capital projects, including the acquisition of
8 real property and liabilities incurred prior to April 1, 1998, in
9 accordance with the following project schedule.
10 Prior to requesting approval of a certificate of approval of avail-
11 ability for moneys appropriated, the commissioner of transportation
12 shall certify that each airport or aviation project progressed under
13 the program categories listed in a project schedule other than state
14 owned airports, has received federal approval and the federally
15 authorized level of financial assistance.
16 The items shown in the project schedule below shall be for projects
17 with a common purpose and may be interchanged without limitation
18 subject to the approval of the director of the budget (17239814)
19 ... ..... 4,500,000 ................................ (re. $99,000)
20 By chapter 55, section 1, of the laws of 1997, as transferred by chapter
21 54, section 1, of the laws of 2017:
22 For state aid to municipal corporations, private airports as author-
23 ized by section 14-h of the transportation law and for payment of
24 the cost of projects at Stewart and Republic Airports, for the
25 acquisition, construction, reconstruction, and improvement of
26 airport or aviation capital projects, including the acquisition of
27 real property and liabilities incurred prior to April 1, 1997, in
28 accordance with the following project schedule.
29 Prior to requesting approval of a certificate of approval of avail-
30 ability for moneys appropriated, the commissioner of transportation
31 shall certify that each airport or aviation project progressed under
32 the program categories listed in a project schedule other than state
33 owned airports, has received federal approval and the federally
34 authorized level of financial assistance.
35 The items shown in the project schedule below shall be for projects
36 with a common purpose and may be interchanged without limitation
37 subject to the approval of the director of the budget (17249714)
38 ... ..... 4,500,000 ................................ (re. $17,000)
39 By chapter 54, section 1, of the laws of 1995, as transferred by chapter
40 54, section 1, of the laws of 2017:
41 For state aid to municipal corporations, private airports as author-
42 ized by section 14-h of the transportation law and for payment of
43 the cost of projects at Stewart and Republic Airports, for the
44 acquisition, construction, reconstruction, and improvement of
45 airport or aviation capital projects, including the acquisition of
46 real property and liabilities incurred prior to April 1, 1995, in
47 accordance with the following project schedule. The items shown in
48 the project schedule below shall be for projects with a common
49 purpose and may be interchanged without limitation subject to the
678 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 approval of the director of the budget (17239514) ... .....
2 6,500,000 ............................................ (re. $73,000)
3 By chapter 54, section 1, of the laws of 1993, as transferred by chapter
4 54, section 1, of the laws of 2017:
5 For payment of the costs, including the payment of liabilities
6 incurred prior to April 1, 1993, for the preparation of designs,
7 plans, specifications, estimates and studies, for the construction,
8 reconstruction, and improvement of airport or aviation capital
9 projects, including infrastructure improvements at Stewart and
10 Republic airports, for the costs of real property acquisition,
11 contract engineering services provided by private firms, and other
12 expenses related thereto.
13 The commissioner of transportation shall secure and use any federal
14 funds which are or may become available for the purposes of this
15 appropriation. Any such funds shall be used to reduce the state's
16 share of project costs for which federal funds become available.
17 The items shown in the project schedule below shall be for projects
18 with a common purpose and may be interchanged without limitation
19 subject to the approval of the director of the division of the budg-
20 et (17229314) ... ..... 10,840,000 .............. (re. $1,370,000)
21 By chapter 54, section 1, of the laws of 1992, as transferred by chapter
22 54, section 1, of the laws of 2017:
23 For state aid to municipal corporations, private airports as author-
24 ized by section 14-h of the transportation law and for payment of
25 the cost of projects at Stewart and Republic Airports, for the
26 acquisition, construction, reconstruction, and improvement of
27 airport or aviation capital projects, including the acquisition of
28 real property and liabilities incurred prior to April 1, 1992, in
29 accordance with the schedule set forth below.
30 The items shown in the project schedule below shall be for projects
31 with a common purpose and may be interchanged without limitation
32 subject to the approval of the director of the budget.
33 Prior to requesting approval of a certificate of approval of avail-
34 ability for the moneys hereby appropriated, the commissioner of
35 transportation shall certify that each airport or aviation project
36 progressed under the program categories listed in the schedule
37 below, other than state owned airports, has received federal
38 approval and the federally authorized level of financial assistance
39 (17239214) ... ..... 12,300,000 .................... (re. $57,000)
40 Capital Projects Funds - Other
41 Miscellaneous Capital Projects Fund
42 Aviation Purpose
43 By chapter 54, section 1, of the laws of 2012:
44 For state aid to municipal corporations, private airports as author-
45 ized by section 14-h of the transportation law and for payment of
46 the cost of projects at Stewart and Republic Airports, for the
47 acquisition, construction, reconstruction, and improvement of
679 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 airport or aviation capital projects, including the acquisition of
2 real property and liabilities incurred prior to April 1, 2012.
3 Prior to requesting approval of a certificate of approval of avail-
4 ability for moneys appropriated, the commissioner of transportation
5 shall certify that each airport or aviation project progressed under
6 the program, other than state owned airports, has received federal
7 approval and the federally authorized level of financial assistance.
8 Funds from this appropriation may also be utilized for grants to
9 municipal corporations and private airports for the cost of projects
10 authorized by section 14-l of the transportation law, including the
11 acquisition of real property and liabilities incurred prior to April
12 1, 2012; provided, however, that funds available for this purpose
13 shall not exceed the amount by which $3,000,000 exceeds the sum of
14 the amount in such state fiscal year necessary for the state share
15 of federal projects provided pursuant to section 14-h of the trans-
16 portation law and the amount in such state fiscal year required for
17 payment of the costs of projects at Stewart and Republic Airports,
18 upon certification by the commissioner of transportation at the end
19 of the calendar year (17241214) ... 3,000,000 ....... (re. $163,000)
20 By chapter 55, section 1, of the laws of 2008:
21 For payment of costs related to Stewart Airport, including but not
22 limited to environmental remediation; acquisition, construction,
23 reconstruction, demolition and improvement of capital projects;
24 acquisition of real property and facilities; projects related to
25 passenger, cargo, and commercial development; acquisition of equip-
26 ment; funding of operating needs; and for liabilities incurred prior
27 to April 1, 2008 (17RA0814) ... 4,000,000 ......... (re. $4,000,000)
28 By chapter 55, section 1, of the laws of 2006:
29 For payment of costs related to municipal, private, state owned and
30 public authority airports and aviation facilities, including but not
31 limited to environmental remediation; acquisition, construction,
32 reconstruction, demolition and improvement of capital projects;
33 acquisition of real property and facilities; projects related to
34 passenger, cargo, and commercial development; acquisition of equip-
35 ment; funding of operating needs; and for liabilities incurred prior
36 to April 1, 2006.
37 The items shown in the schedule below shall be for projects with a
38 common purpose and may be interchanged without limitation subject to
39 the approval of the director of the budget (17RA0614) ... ........
40 5,300,000 ........................................... (re. $831,000)
41 By chapter 55, section 1, of the laws of 1999, as amended by chapter
42 108, section 5, of the laws of 2006:
43 For payment of costs related to Stewart International Airport includ-
44 ing, but not limited to, acquisition of real property and facili-
45 ties; construction, reconstruction, demolition and improvement of
46 capital facilities; and payment of liabilities incurred prior to
47 April 1, 1999. Notwithstanding any inconsistent provision of law, of
48 amounts appropriated herein, $1,000,000 shall be made available to
680 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 labor organizations for training programs (17RA9914) ...............
2 17,500,000 ........................................ (re. $1,097,000)
3 For payment of the costs of capital projects as set forth in a memo-
4 randum of understanding among the governor, the majority leader of
5 the senate, and the speaker of the assembly (17RD9914) .............
6 4,500,000 ......................................... (re. $1,500,000)
7 For expenses and payments incurred in implementation of the airport
8 improvement and revitalization program (17RE9914) ..................
9 2,500,000 ............................................ (re. $69,000)
10 By chapter 55, section 1, of the laws of 1999, as amended by chapter
11 295, part A, section 1, of the laws of 2001:
12 For payment of the costs of operating and capital projects including,
13 but not limited to, acquisition of real property and facilities;
14 construction, reconstruction, demolition and improvement of capital
15 facilities; and payment of liabilities incurred prior to April 1,
16 1999 (17RB9914) ... 2,500,000 ....................... (re. $757,000)
17 AMERICAN RECOVERY AND REINVESTMENT ACT (CCP)
18 Capital Projects Funds - Federal
19 Federal Capital Projects Fund
20 American Recovery and Reinvestment Act Purpose
21 By chapter 55, section 1, of the laws of 2009:
22 For Transit Capital Assistance funded by Title 12 of the American
23 Recovery and Reinvestment Act of 2009. Funds appropriated herein
24 shall be subject to all applicable reporting and accountability
25 requirements contained in such act.
26 For the payment of the costs of mass transportation capital projects
27 and facilities including replacement of buses meeting federal stand-
28 ards for replacement, related bus equipment and the acquisition,
29 design and construction, including engineering and consulting costs,
30 of mass transit bus garages or other mass transportation projects
31 and facilities, including liabilities incurred prior to April 1,
32 2009 (170509FS) ... 26,300,000 .................... (re. $3,085,000)
33 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
34 section 1, of the laws of 2013:
35 For Highway Infrastructure Investment funded by Title 12 of the Ameri-
36 can Recovery and Reinvestment Act of 2009. Funds appropriated herein
37 shall be subject to all applicable reporting and accountability
38 requirements contained in such act.
39 For the payment of eligible costs, including but not limited to
40 construction, reconstruction, replacement, improvement, recondition-
41 ing, rehabilitation, preservation, related appurtenances, equipment,
42 facilities, the acquisition of real property and interests therein,
43 the preparation of designs, plans, specifications and estimates;
44 construction management and supervision; and appraisals, surveys,
45 testing and environmental impact statements, including the payment
46 of liabilities incurred prior to April 1, 2009.
681 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of engineering services, including reimbursements to the
2 dedicated highway and bridge trust fund, including but not limited
3 to personal services, nonpersonal services and fringe benefits, for
4 activities including but not limited to the preparation of designs,
5 plans, specifications and estimates; construction management and
6 supervision; and appraisals, surveys, testing and environmental
7 impact statements, including the payment of liabilities incurred
8 prior to April 1, 2009 (170309FS) ..................................
9 950,700,000 ...................................... (re. $27,099,000)
10 For Capital Assistance for High Speed Rail Corridors and Intercity
11 Passenger Rail Service funded by Title 12 of the American Recovery
12 and Reinvestment Act of 2009. Funds appropriated herein shall be
13 subject to all applicable reporting and accountability requirements
14 contained in such act.
15 For the payment of eligible costs, including but not limited to
16 construction, reconstruction, replacement, improvement, recondition-
17 ing, rehabilitation, preservation, related appurtenances, equipment,
18 facilities, the acquisition of real property and interests therein,
19 the preparation of designs, plans, specifications and estimates;
20 construction management and supervision; and appraisals, surveys,
21 testing and environmental impact statements, including the payment
22 of liabilities incurred prior to April 1, 2009.
23 For payment of engineering services, including reimbursements to the
24 dedicated highway and bridge trust fund, including but not limited
25 to personal services, nonpersonal services and fringe benefits, for
26 activities including but not limited to the preparation of designs,
27 plans, specifications and estimates; construction management and
28 supervision; and appraisals, surveys, testing and environmental
29 impact statements, including the payment of liabilities incurred
30 prior to April 1, 2009 (170409FS) ..................................
31 600,000,000 ..................................... (re. $120,951,000)
32 AVIATION (CCP)
33 Capital Projects Funds - Other
34 Transportation Capital Facilities Bond Fund
35 Bond Proceeds Purpose
36 By chapter 54, section 9, of the laws of 1981, as amended by chapter 55,
37 section 1, of the laws of 2008:
38 The sum of $17,305,787, or so much thereof as may be necessary is
39 hereby appropriated from the transportation capital facilities bond
40 fund pursuant to the provisions of chapter seven hundred fifteen of
41 the laws of nineteen hundred sixty-seven, known as the "Transporta-
42 tion Capital Facilities Bond Act", for payment to the capital
43 projects fund for disbursements from such fund pursuant to appropri-
44 ations for the acquisition, construction, reconstruction and
45 improvement of any airport or aviation capital facility and of any
46 capital equipment used in connection therewith, by the State, any
47 county, city, town, village, special transportation district, public
48 benefit corporation or other public corporation, or two or more of
49 the foregoing acting jointly in accordance with the provisions of
682 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the transportation capital facilities development act and as herein-
2 after referred to as "airport or aviation capital project bond
3 disbursements."
4 Notwithstanding the provisions of any general or special law, no
5 moneys shall be available from the transportation capital facilities
6 bond fund until a certificate of approval of availability shall have
7 been issued by the director of the division of the budget, and a
8 copy of such certificate filed with the state comptroller, the
9 chairman of the senate finance committee and the chairman of the
10 assembly ways and means committee. Such certificate may be amended
11 from time to time by the director of the division of the budget and
12 a copy of each such amendment shall be filed with the state comp-
13 troller, the chairman of the senate finance committee and the chair-
14 man of the assembly ways and means committee.
15 The director of the division of the budget is hereby authorized to
16 designate to the state comptroller specific appropriations made from
17 the capital projects fund for purposes for which airport or aviation
18 capital project bond expenditures are authorized. The state comp-
19 troller shall, at the commencement of each month, certify to the
20 director of the division of the budget, the chairman of the senate
21 finance committee and the chairman of the assembly ways and means
22 committee, the amounts disbursed from the appropriations designated
23 by the director of the division of the budget from the capital
24 projects fund for these disbursements pursuant to appropriations
25 from such fund for such purposes for the month preceding such
26 certification and such certifications shall not exceed in the aggre-
27 gate the moneys hereby appropriated (03025510) .....................
28 17,305,787 ........................................ (re. $3,329,000)
29 CANALS AND WATERWAYS - BONDABLE (CCP)
30 Capital Projects Funds - Other
31 Capital Projects Fund - Infrastructure Renewal (Bondable)
32 Canals and Waterways Purpose
33 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
34 section 3, of the laws of 1991:
35 For the preparation of designs, plans, specifications and estimates,
36 for the contract engineering services provided by private firms, for
37 the acquisition of property, reconstruction and improvement of dams,
38 canal locks, embankments and related structures and facilities on
39 the state barge canal system, including the payment of liabilities
40 incurred prior to April 1, 1988, pursuant to the rebuild New York
41 through transportation infrastructure renewal bond act of 1983.
42 The moneys hereby appropriated, when made available pursuant to a
43 certificate of approval of availability issued by the director of
44 the budget, shall be made available in accordance with the schedule
45 shown below. The items shown in the project schedule below shall be
46 for projects with a common purpose and may be interchanged without
47 limitation subject to the approval of the director of the division
48 of the budget (17328816) ... ..... 2,823,657 ...... (re. $158,000)
683 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
2 section 3, of the laws of 1989:
3 For the preparation of designs, plans, specifications and estimates,
4 for the contract engineering services provided by private firms, for
5 the acquisition of property, reconstruction and improvement of dams,
6 canal locks, embankments and related structures and facilities on
7 the state barge canal system, including the payment of liabilities
8 incurred prior to April 1, 1987, pursuant to the rebuild New York
9 through transportation infrastructure renewal bond act of 1983.
10 The moneys hereby appropriated, when made available pursuant to a
11 certificate of approval of availability issued by the director of
12 the budget, shall be made available in accordance with the schedule
13 shown below. The items shown in the project schedule below shall be
14 for projects with a common purpose and may be interchanged without
15 limitation subject to the approval of the director of the division
16 of the budget (17208716) ... ..... 6,200,000 ...... (re. $326,000)
17 ENGINEERING SERVICES PROGRAM (CCP)
18 Capital Projects Funds - Other
19 Department of Transportation Engineering Services Fund
20 Preparation of Plans Purpose
21 By chapter 55, section 1, of the laws of 2002, as amended by chapter 55,
22 section 1, of the laws of 2004:
23 For engineering services, including personal services, nonpersonal
24 services, fringe benefits and the contract services provided by
25 private firms, including, but not limited to, the preparation of
26 designs, plans, specifications and estimates; construction manage-
27 ment and supervision; and appraisals, surveys, testing, and environ-
28 mental impact statements for transportation projects.
29 For suballocation of $170,000 to the office of inspector general for
30 services and expenses including fringe benefits (17H10230) .........
31 546,256,000 ....................................... (re. $9,630,000)
32 For capital project management and traffic and safety, including
33 personal services, nonpersonal services, fringe benefits and the
34 contract services provided by private firms (17H20230) .............
35 57,259,000 .......................................... (re. $526,000)
36 By chapter 55, section 1, of the laws of 2001, as amended by chapter 55,
37 section 1, of the laws of 2003:
38 For engineering services, including personal services, nonpersonal
39 services, fringe benefits and the contract services provided by
40 private firms, including, but not limited to, the preparation of
41 designs, plans, specifications and estimates; construction manage-
42 ment and supervision; and appraisals, surveys, testing, and environ-
43 mental impact statements for transportation projects.
44 For suballocation of $170,000 to the office of inspector general for
45 services and expenses including fringe benefits (17H10130) .........
46 566,922,000 ....................................... (re. $7,597,000)
47 For capital project management and traffic and safety, including
48 personal services, nonpersonal services, fringe benefits and the
684 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 contract services provided by private firms (17H20130) .............
2 53,384,000 .......................................... (re. $334,000)
3 By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
4 section 1, of the laws of 2002:
5 For engineering services, including personal services, nonpersonal
6 services, fringe benefits and the contract services provided by
7 private firms, including, but not limited to, the preparation of
8 designs, plans, specifications and estimates; construction manage-
9 ment and supervision; and appraisals, surveys, testing, and environ-
10 mental impact statements for transportation projects.
11 For suballocation of $170,000 to the office of inspector general for
12 services and expenses including fringe benefits (17H10030) .........
13 513,628,000 ....................................... (re. $6,039,000)
14 For capital project management and traffic and safety, including
15 personal services, nonpersonal services, fringe benefits and the
16 contract services provided by private firms (17H20030) .............
17 51,892,000 .......................................... (re. $830,000)
18 For real estate services, including personal services, nonpersonal
19 services, fringe benefits and the contract services provided by
20 private firms (17H30030) ... 16,684,000 ............. (re. $615,000)
21 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
22 section 1, of the laws of 2005:
23 For engineering services, including personal services, nonpersonal
24 services, fringe benefits and the contract services provided by
25 private firms, including, but not limited to, the preparation of
26 designs, plans, specifications and estimates; construction manage-
27 ment and supervision; and appraisals, surveys, testing, and environ-
28 mental impact statements for transportation projects.
29 For suballocation of $170,000 to the office of inspector general for
30 services and expenses including fringe benefits (17H19930) .........
31 492,101,680 ....................................... (re. $1,806,000)
32 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
33 section 1, of the laws of 2000:
34 For engineering services, including personal services, nonpersonal
35 services, fringe benefits and the contract services provided by
36 private firms (17H19830) ... .... 532,078,000 .. (re. $23,709,000)
37 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
38 section 1, of the laws of 2000:
39 For capital project management and traffic and safety, including
40 personal services, nonpersonal services, fringe benefits and the
41 contract services provided by private firms (17H29830) ... .......
42 56,876,000 .......................................... (re. $674,000)
43 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
44 section 1, of the laws of 2000:
45 For engineering services, including personal services, nonpersonal
46 services, fringe benefits and the contract services provided by
47 private firms (17H19730) ... .... 490,281,000 ... (re. $5,634,000)
685 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 1996:
2 For engineering services, including personal services, nonpersonal
3 services, fringe benefits and the contract services provided by
4 private firms.
5 The items shown in the project schedule below shall be for projects
6 with a common purpose and may be interchanged without limitation
7 subject to the approval of the director of the budget (17H19630)
8 ... ..... 471,758,000 ........................... (re. $2,833,000)
9 By chapter 54, section 1, of the laws of 1995:
10 For engineering services, including personal services, nonpersonal
11 services, fringe benefits and the contract services provided by
12 private firms (17H19530) ... 470,364,000 ......... (re. $19,724,000)
13 By chapter 54, section 1, of the laws of 1994:
14 For engineering services, including personal services, nonpersonal
15 services, fringe benefits and the contract services provided by
16 private firms (17H19430) ... .... 530,329,000 .. (re. $21,505,000)
17 By chapter 54, section 1, of the laws of 1993, as amended by chapter 54,
18 section 3, of the laws of 1995:
19 For engineering services, including personal services, nonpersonal
20 services, fringe benefits and the contract services provided by
21 private firms (17H19330) ... .... 500,923,000 ... (re. $4,586,000)
22 By chapter 54, section 1, of the laws of 1992, as amended by chapter 54,
23 section 3, of the laws of 1995:
24 For engineering services, including personal services, nonpersonal
25 services, fringe benefits and the contract services provided by
26 private firms (17H19230) ... .... 455,207,200 .. (re. $15,611,000)
27 Special Revenue Funds - Federal
28 Federal Miscellaneous Operating Grants Fund
29 Metropolitan Planning Organization Account
30 Preparation of Plans Purpose
31 New York Metropolitan Transportation Council
32 By chapter 54, section 1, of the laws of 2017:
33 For the continuing comprehensive transportation planning and coordi-
34 nated support undertaken as part of the united work programs of
35 participating local planning or municipal agreements in accordance
36 with grant agreements approved by the federal transit administration
37 or the federal highway administration.
38 Personal service (17M11730) ... 4,485,000 ........... (re. $1,843,000)
39 Nonpersonal service (17M41730) ... 11,416,000 ...... (re. $10,865,000)
40 Fringe benefits (17M81730) ... 2,690,000 ............ (re. $2,171,000)
41 Indirect costs (17M91730) ... 197,000 ................. (re. $117,000)
42 The appropriation made by chapter 55, section 1, of the laws of 2016, as
43 amended by chapter 54, section 1, of the laws of 2017, is hereby
44 amended and reappropriated to read:
686 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the continuing comprehensive transportation planning and coordi-
2 nated support undertaken as part of the united work programs of
3 participating local planning or municipal agreements in accordance
4 with grant agreements approved by the federal transit administration
5 or the federal highway administration.
6 Personal service (17M11630) ... [4,485,000] 841,179 ... (re. $744,000)
7 Nonpersonal service (17M41630) .......................................
8 [11,416,000] 9,365,163 ............................ (re. $8,663,000)
9 Fringe benefits (17M81630) ... [2,510,000] 865,985 .... (re. $865,000)
10 Indirect costs (17M91630) ... [120,000] 44,621 ......... (re. $44,000)
11 The appropriation made by chapter 54, section 1, of the laws of 2015, as
12 amended by chapter 54, section 1, of the laws of 2017, is hereby
13 amended and reappropriated to read:
14 For the continuing comprehensive transportation planning and coordi-
15 nated support undertaken as part of the united work programs of
16 participating local planning or municipal agreements in accordance
17 with grant agreements approved by the federal transit administration
18 or the federal highway administration.
19 Personal service (17M11530) ... [4,478,000] 933,623 ... (re. $933,000)
20 Nonpersonal service (17M41530) .......................................
21 [11,416,000] 8,977,108 ............................ (re. $8,954,000)
22 Fringe benefits (17M81530) ... [2,507,000] 560,252 ..... (re. $27,000)
23 Indirect costs (17M91530) ... [114,000] 25,886 .......... (re. $2,000)
24 The appropriation made by chapter 54, section 1, of the laws of 2014, as
25 amended by chapter 54, section 1, of the laws of 2017, is hereby
26 amended and reappropriated to read:
27 For the continuing comprehensive transportation planning and coordi-
28 nated support undertaken as part of the united work programs of
29 participating local planning or municipal agreements in accordance
30 with grant agreements approved by the federal transit administration
31 or the federal highway administration.
32 Personal service (17M11430) ... [4,327,000] 383,260 ... (re. $383,000)
33 Nonpersonal service (17M41430) .......................................
34 [11,416,000] 8,138,071 ............................ (re. $7,756,000)
35 Fringe benefits (17M81430) ... [2,454,000] 235,268 .... (re. $235,000)
36 Indirect costs (17M91430) ... [122,000] 12,741 ......... (re. $12,000)
37 The appropriation made by chapter 54, section 1, of the laws of 2013, as
38 amended by chapter 54, section 1, of the laws of 2017, is hereby
39 amended and reappropriated to read:
40 For the continuing comprehensive transportation planning and coordi-
41 nated support undertaken as part of the united work programs of
42 participating local planning or municipal agreements in accordance
43 with grant agreements approved by the federal transit administration
44 or the federal highway administration.
45 Personal service (17M11330) ... [4,228,000] 325,828 ... (re. $325,000)
46 Nonpersonal service (17M41330) .......................................
47 [11,453,000] 10,450,902 ........................... (re. $9,744,000)
48 Fringe benefits (17M81330) ... [2,473,000] 323,259 .... (re. $323,000)
49 Indirect costs (17M91330) ... [165,000] 44,494 ......... (re. $44,000)
687 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2012, as
2 amended by chapter 54, section 1, of the laws of 2017, is hereby
3 amended and reappropriated to read:
4 For the continuing comprehensive transportation planning and coordi-
5 nated support undertaken as part of the united work programs of
6 participating local planning or municipal agreements in accordance
7 with grant agreements approved by the federal transit administration
8 or the federal highway administration.
9 Personal service (17M11230) ... [4,188,000] 358,282 ... (re. $358,000)
10 Nonpersonal service (17M41230) .......................................
11 [11,453,000] 6,907,424 ............................ (re. $6,329,000)
12 Fringe benefits (17M81230) ... [2,101,000] 87,098 ...... (re. $87,000)
13 Indirect costs (17M91230) ... [154,000] 49,174 ......... (re. $49,000)
14 The appropriation made by chapter 54, section 1, of the laws of 2011, as
15 amended by chapter 54, section 1, of the laws of 2017, is hereby
16 amended and reappropriated to read:
17 For the continuing comprehensive transportation planning and coordi-
18 nated support undertaken as part of the united work programs of
19 participating local planning or municipal agreements in accordance
20 with grant agreements approved by the federal transit administration
21 or the federal highway administration (17NC1130) ...................
22 [18,148,000] 4,520,393 ............................ (re. $4,077,000)
23 [Personal service ............... 4,377,000
24 Nonpersonal service ............. 11,678,000
25 Fringe benefits .................. 1,894,000
26 Indirect costs ..................... 199,000
27 18,148,000
28 ==============]
29 The appropriation made by chapter 55, section 1, of the laws of 2010, as
30 amended by chapter 54, section 1, of the laws of 2017, is hereby
31 amended and reappropriated to read:
32 For the continuing comprehensive transportation planning and coordi-
33 nated support undertaken as part of the united work programs of
34 participating local planning or municipal agreements in accordance
35 with grant agreements approved by the federal transit administration
36 or the federal highway administration (17NC1030) ...................
37 [19,300,000] 6,462,022 ............................ (re. $6,430,000)
38 [Personal service ................ 5,029,000
39 Nonpersonal service ............. 11,678,000
40 Fringe benefits .................. 2,436,000
41 Indirect costs ..................... 157,000
42 19,300,000
43 ==============]
44 The appropriation made by chapter 55, section 1, of the laws of 2009, as
45 amended by chapter 54, section 1, of the laws of 2017, is hereby
46 amended and reappropriated to read:
688 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the continuing comprehensive transportation planning and coordi-
2 nated support undertaken as part of the united work programs of
3 participating local planning or municipal agreements in accordance
4 with grant agreements approved by the federal transit administration
5 or the federal highway administration (17NC0930) ...................
6 [19,597,000] 3,325,948 ............................ (re. $3,206,000)
7 [Personal service ................ 5,238,000
8 Nonpersonal service ............. 11,678,000
9 Fringe benefits .................. 2,452,000
10 Indirect costs ..................... 229,000
11 19,597,000
12 ==============]
13 The appropriation made by chapter 55, section 1, of the laws of 2008, as
14 amended by chapter 54, section 1, of the laws of 2017, is hereby
15 amended and reappropriated to read:
16 For the continuing comprehensive transportation planning and coordi-
17 nated support undertaken as part of the united work programs of
18 participating local planning or municipal agreements in accordance
19 with grant agreements approved by the federal transit administration
20 or the federal highway administration (17NC0830) ...................
21 [19,094,000] 5,471,502 ............................ (re. $5,056,000)
22 [Personal service ................ 5,623,000
23 Nonpersonal service ............. 10,846,000
24 Fringe benefits .................. 2,399,000
25 Indirect costs ..................... 226,000
26 19,094,000
27 ==============]
28 The appropriation made by chapter 55, section 1, of the laws of 2007, as
29 amended by chapter 54, section 1, of the laws of 2017, is hereby
30 amended and reappropriated to read:
31 For the continuing comprehensive transportation planning and coordi-
32 nated support undertaken as part of the united work programs of
33 participating local planning or municipal agreements in accordance
34 with grant agreements approved by the federal transit administration
35 or the federal highway administration (17NC0730) ...................
36 [15,894,000] 1,080,731 .............................. (re. $846,000)
37 [Personal service ................ 5,654,000
38 Nonpersonal service .............. 7,411,000
39 Fringe benefits .................. 2,615,000
40 Indirect costs ..................... 214,000
41 15,894,000
42 ==============]
43 The appropriation made by chapter 55, section 1, of the laws of 2006, as
44 amended by chapter 54, section 1, of the laws of 2017, is hereby
45 amended and reappropriated to read:
689 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the continuing comprehensive transportation planning and coordi-
2 nated support undertaken as part of the united work programs of
3 participating local planning or municipal agreements in accordance
4 with grant agreements approved by the federal transit administration
5 or the federal highway administration (17NC0630) ... .............
6 [15,894,000] 659,748 ................................ (re. $659,000)
7 The appropriation made by chapter 55, section 1, of the laws of 2005, as
8 amended by chapter 54, section 1, of the laws of 2017, is hereby
9 amended and reappropriated to read:
10 For the continuing comprehensive transportation planning and coordi-
11 nated support undertaken as part of the united work programs of
12 participating local planning or municipal agreements in accordance
13 with grant agreements approved by the federal transit administration
14 or the federal highway administration (17NC0530) ... .............
15 [10,202,000] 1,494,680 ............................ (re. $1,355,000)
16 The appropriation made by chapter 55, section 1, of the laws of 2004, as
17 amended by chapter 54, section 1, of the laws of 2017, is hereby
18 amended and reappropriated to read:
19 For the continuing comprehensive transportation planning and coordi-
20 nated support undertaken as part of the united work programs of
21 participating local planning or municipal agreements in accordance
22 with grant agreements approved by the federal transit administration
23 or the federal highway administration (17NC0430) ... .............
24 [10,180,000] 442,854 ................................ (re. $442,000)
25 The appropriation made by chapter 55, section 1, of the laws of 2003, as
26 amended by chapter 54, section 1, of the laws of 2017, is hereby
27 amended and reappropriated to read:
28 For the continuing comprehensive transportation planning and coordi-
29 nated support undertaken as part of the united work programs of
30 participating local planning or municipal agreements in accordance
31 with grant agreements approved by the federal transit administration
32 or the federal highway administration (17NC0330) ... .............
33 [10,312,000] 1,251,229 ............................ (re. $1,163,000)
34 Watertown Jefferson County Area Transportation Council
35 By chapter 54, section 1, of the laws of 2017:
36 For the continuing comprehensive transportation planning and coordi-
37 nated support undertaken as part of the united work programs of
38 participating local planning or municipal agreements in accordance
39 with grant agreements approved by the federal transit administration
40 or the federal highway administration.
41 Personal service (17W11730) ... 700,000 ............... (re. $700,000)
42 Nonpersonal service (17W41730) ... 590,000 ............ (re. $590,000)
43 Fringe benefits (17W81730) ... 400,000 ................ (re. $400,000)
44 Indirect costs (17W91730) ... 35,000 ................... (re. $35,000)
45 FEDERAL AID HIGHWAYS BONDABLE PURPOSE (CCP)
690 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Federal Aid Highways Purpose
4 By chapter 54, section 1, of the laws of 1988:
5 For the state share of highway projects to be reimbursed from the
6 infrastructure renewal bond fund and pursuant to the provisions of
7 that bond act (17028820) ... 56,000,000 ........... (re. $1,419,000)
8 By chapter 54, section 1, of the laws of 1987:
9 For the state share of highway projects to be reimbursed from the
10 infrastructure renewal bond fund and pursuant to the provisions of
11 that bond act (17028720) ... 66,000,000 ........... (re. $1,126,000)
12 By chapter 54, section 1, of the laws of 1986:
13 For the state share of highway projects to be reimbursed from the
14 infrastructure renewal bond fund and pursuant to the provisions of
15 that bond act (17428620) ... 66,000,000 ............. (re. $356,000)
16 By chapter 54, section 1, of the laws of 1985:
17 For the state share of highway projects to be reimbursed from the
18 infrastructure renewal bond fund and pursuant to the provisions of
19 that bond act (17028520) .......................... (re. $1,210,000)
20 By chapter 54, section 1, of the laws of 1984:
21 For the state share of highway projects to be reimbursed from the
22 infrastructure renewal bond fund and pursuant to the provisions of
23 that bond act (17028420) .......................... (re. $1,969,000)
24 FEDERAL AID HIGHWAYS FEDERAL PURPOSE (CCP)
25 Capital Projects Funds - Federal
26 Federal Capital Projects Fund
27 Federal Aid Highways Purpose
28 By chapter 54, section 1, of the laws of 2017:
29 For the federal share, from any federal agency under any federal
30 program, of state transportation projects including but not limited
31 to construction, reconstruction, reconditioning and preservation,
32 operating costs as provided for in the fixing America's surface
33 transportation (FAST) act and related prior and successive federal
34 legislation, and the payment of liabilities incurred prior to April
35 1, 2017 (17031720) ... 1,950,000,000 .......... (re. $1,897,430,000)
36 For the federal share, from any federal agency under any federal
37 program, of the acquisition of property for state transportation
38 projects including but not limited to construction, reconstruction,
39 reconditioning and preservation, including the payment of liabil-
40 ities incurred prior to April 1, 2017 (17RW1720) ...................
41 50,000,000 ....................................... (re. $49,988,000)
42 For reimbursements to the dedicated highway and bridge trust fund of
43 the department of transportation, of the federal share of engineer-
44 ing costs, including fringe benefits, personal services, and nonper-
691 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sonal services, for activities including but not limited to the
2 preparation of designs, plans, specifications and estimates;
3 construction management and supervision; and appraisals, surveys,
4 testing, and environmental impact statements for transportation
5 projects, the payment of liabilities incurred prior to April 1, 2017
6 and other such purposes as specified in section 89-b of the state
7 finance law as amended (17EG1720) ..................................
8 260,000,000 ..................................... (re. $260,000,000)
9 For reimbursements to the dedicated highway and bridge trust fund of
10 the department of transportation, of the federal share of engineer-
11 ing costs, including the contract services provided by private
12 firms, for activities including but not limited to the preparation
13 of designs, plans, specifications and estimates; construction
14 management and supervision; and appraisals, surveys, testing, and
15 environmental impact statements for transportation projects, the
16 payment of liabilities incurred prior to April 1, 2017 and other
17 such purposes as specified in section 89-b of the state finance law
18 as amended (17EC1720) ... 160,000,000 ........... (re. $160,000,000)
19 By chapter 55, section 1, of the laws of 2016:
20 For the federal share, from any federal agency under any federal
21 program, of state transportation projects including but not limited
22 to construction, reconstruction, reconditioning and preservation,
23 operating costs as provided for in the fixing America's surface
24 transportation (FAST) act and related prior and successive federal
25 legislation, and the payment of liabilities incurred prior to April
26 1, 2016 (17031620) ... 1,711,000,000 .......... (re. $1,179,210,000)
27 For the federal share, from any federal agency under any federal
28 program, of the acquisition of property for state transportation
29 projects including but not limited to construction, reconstruction,
30 reconditioning and preservation, including the payment of liabil-
31 ities incurred prior to April 1, 2016 (17RW1620) ...................
32 50,000,000 ....................................... (re. $36,562,000)
33 For reimbursements to the dedicated highway and bridge trust fund of
34 the department of transportation, of the federal share of engineer-
35 ing costs, including fringe benefits, personal services, and nonper-
36 sonal services, for activities including but not limited to the
37 preparation of designs, plans, specifications and estimates;
38 construction management and supervision; and appraisals, surveys,
39 testing, and environmental impact statements for transportation
40 projects, the payment of liabilities incurred prior to April 1, 2016
41 and other such purposes as specified in section 89-b of the state
42 finance law as amended (17EG1620) ..................................
43 250,000,000 ...................................... (re. $95,333,000)
44 For reimbursements to the dedicated highway and bridge trust fund of
45 the department of transportation, of the federal share of engineer-
46 ing costs, including the contract services provided by private
47 firms, for activities including but not limited to the preparation
48 of designs, plans, specifications and estimates; construction
49 management and supervision; and appraisals, surveys, testing, and
50 environmental impact statements for transportation projects, the
51 payment of liabilities incurred prior to April 1, 2016 and other
692 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 such purposes as specified in section 89-b of the state finance law
2 as amended (17EC1620) ... 151,000,000 ........... (re. $139,789,000)
3 By chapter 54, section 1, of the laws of 2015:
4 For the federal share, from any federal agency under any federal
5 program, of state transportation projects including but not limited
6 to construction, reconstruction, reconditioning and preservation,
7 operating costs as provided for in the moving ahead for progress in
8 the 21st century legislation and related prior and successive feder-
9 al legislation, and the payment of liabilities incurred prior to
10 April 1, 2015 (17031520) ... 1,600,000,000 ...... (re. $709,024,000)
11 For the federal share, from any federal agency under any federal
12 program, of the acquisition of property for state transportation
13 projects including but not limited to construction, reconstruction,
14 reconditioning and preservation, including the payment of liabil-
15 ities incurred prior to April 1, 2015 (17RW1520) ...................
16 50,000,000 ....................................... (re. $42,152,000)
17 For reimbursements to the dedicated highway and bridge trust fund of
18 the department of transportation, of the federal share of engineer-
19 ing costs, including fringe benefits, personal services, and nonper-
20 sonal services, for activities including but not limited to the
21 preparation of designs, plans, specifications and estimates;
22 construction management and supervision; and appraisals, surveys,
23 testing, and environmental impact statements for transportation
24 projects, the payment of liabilities incurred prior to April 1, 2015
25 and other such purposes as specified in section 89-b of the state
26 finance law as amended (17EG1520) ..................................
27 225,000,000 ...................................... (re. $38,093,000)
28 For reimbursements to the dedicated highway and bridge trust fund of
29 the department of transportation, of the federal share of engineer-
30 ing costs, including the contract services provided by private
31 firms, for activities including but not limited to the preparation
32 of designs, plans, specifications and estimates; construction
33 management and supervision; and appraisals, surveys, testing, and
34 environmental impact statements for transportation projects, the
35 payment of liabilities incurred prior to April 1, 2015 and other
36 such purposes as specified in section 89-b of the state finance law
37 as amended (17EC1520) ... 125,000,000 ............ (re. $62,574,000)
38 By chapter 54, section 1, of the laws of 2014:
39 For the federal share, from any federal agency under any federal
40 program, of state transportation projects including but not limited
41 to construction, reconstruction, reconditioning and preservation,
42 operating costs as provided for in the moving ahead for progress in
43 the 21st century legislation and related prior and successive feder-
44 al legislation, and the payment of liabilities incurred prior to
45 April 1, 2014 (17031420) ... 1,600,000,000 ...... (re. $693,367,000)
46 For the federal share, from any federal agency under any federal
47 program, of the acquisition of property for state transportation
48 projects including but not limited to construction, reconstruction,
49 reconditioning and preservation, including the payment of liabil-
693 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ities incurred prior to April 1, 2014 (17RW1420) ...................
2 50,000,000 ....................................... (re. $37,785,000)
3 For reimbursements to the dedicated highway and bridge trust fund of
4 the department of transportation, of the federal share of engineer-
5 ing costs, including fringe benefits, personal services, and nonper-
6 sonal services, for activities including but not limited to the
7 preparation of designs, plans, specifications and estimates;
8 construction management and supervision; and appraisals, surveys,
9 testing, and environmental impact statements for transportation
10 projects, the payment of liabilities incurred prior to April 1, 2014
11 and other such purposes as specified in section 89-b of the state
12 finance law as amended (17EG1420) ..................................
13 225,000,000 ...................................... (re. $46,727,000)
14 For reimbursements to the dedicated highway and bridge trust fund of
15 the department of transportation, of the federal share of engineer-
16 ing costs, including the contract services provided by private
17 firms, for activities including but not limited to the preparation
18 of designs, plans, specifications and estimates; construction
19 management and supervision; and appraisals, surveys, testing, and
20 environmental impact statements for transportation projects, the
21 payment of liabilities incurred prior to April 1, 2014 and other
22 such purposes as specified in section 89-b of the state finance law
23 as amended (17EC1420) ... 125,000,000 ............ (re. $56,101,000)
24 By chapter 54, section 1, of the laws of 2013:
25 For the federal share, from any federal agency under any federal
26 program, of state transportation projects including but not limited
27 to construction, reconstruction, reconditioning and preservation,
28 the acquisition of property, operating costs as provided for in the
29 Moving Ahead for Progress in the 21st Century legislation and
30 related prior and successive federal legislation, payment of
31 reimbursements to the dedicated highway and bridge trust fund of the
32 department of transportation, including but not limited to fringe
33 benefits, and the contract services provided by private firms;
34 personal services, nonpersonal services, for activities including
35 but not limited to the preparation of designs, plans, specifications
36 and estimates; construction management and supervision; and
37 appraisals, surveys, testing, and environmental impact statements
38 for transportation projects, the payment of liabilities incurred
39 prior to April 1, 2013 and any other such purposes as specified in
40 section 89-b of the state finance law as amended (17031320) ........
41 2,000,000,000 ................................... (re. $634,642,000)
42 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
43 section 1, of the laws of 2013:
44 For the federal share, from any federal agency under any federal
45 program, of state transportation projects including but not limited
46 to construction, reconstruction, reconditioning and preservation,
47 the acquisition of property, operating costs as provided for in the
48 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
49 Legacy for Users and any successive legislation, payment of
50 reimbursements to the dedicated highway and bridge trust fund of the
694 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 department of transportation, including but not limited to fringe
2 benefits, and the contract services provided by private firms;
3 personal services, nonpersonal services, for activities including
4 but not limited to the preparation of designs, plans, specifications
5 and estimates; construction management and supervision; and
6 appraisals, surveys, testing, and environmental impact statements
7 for transportation projects, the payment of liabilities incurred
8 prior to April 1, 2012 and any other such purposes as specified in
9 section 89-b of the state finance law as amended (17031220) ........
10 1,800,000,000 ................................... (re. $263,751,000)
11 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
12 section 1, of the laws of 2013:
13 For the federal share, from any federal agency under any federal
14 program, of state transportation projects including but not limited
15 to construction, reconstruction, reconditioning and preservation,
16 the acquisition of property, operating costs as provided for in the
17 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
18 Legacy for Users and any successive legislation, payment of
19 reimbursements to the dedicated highway and bridge trust fund of the
20 department of transportation, including but not limited to fringe
21 benefits, and the contract services provided by private firms;
22 personal services, nonpersonal services, for activities including
23 but not limited to the preparation of designs, plans, specifications
24 and estimates; construction management and supervision; and
25 appraisals, surveys, testing, and environmental impact statements
26 for transportation projects, the payment of liabilities incurred
27 prior to April 1, 2011 and any other such purposes as specified in
28 section 89-b of the state finance law as amended (17031120) ........
29 1,600,000,000 ................................... (re. $266,472,000)
30 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
31 section 1, of the laws of 2013:
32 For the federal share, from any federal agency under any federal
33 program, of state transportation projects including but not limited
34 to construction, reconstruction, reconditioning and preservation,
35 the acquisition of property, operating costs as provided for in the
36 Safe, Accountable, Flexible, Efficient Transportation Equity Act: A
37 Legacy for Users and any successive legislation, payment of
38 reimbursements to the dedicated highway and bridge trust fund of the
39 department of transportation, including but not limited to fringe
40 benefits, and the contract services provided by private firms;
41 personal services, nonpersonal services, for activities including
42 but not limited to the preparation of designs, plans, specifications
43 and estimates; construction management and supervision; and
44 appraisals, surveys, testing, and environmental impact statements
45 for transportation projects, the payment of liabilities incurred
46 prior to April 1, 2010 and any other such purposes as specified in
47 section 89-b of the state finance law as amended (17031020) ........
48 1,725,000,000 ................................... (re. $220,518,000)
695 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
2 section 1, of the laws of 2013:
3 For the federal share of state transportation projects including but
4 not limited to construction, reconstruction, reconditioning and
5 preservation, the acquisition of property, operating costs as
6 provided for in the Safe, Accountable, Flexible, Efficient Transpor-
7 tation Equity Act: A Legacy for Users and any successive legis-
8 lation, payment of reimbursements to the dedicated highway and
9 bridge trust fund of the department of transportation, including but
10 not limited to fringe benefits, and the contract services provided
11 by private firms; personal services, nonpersonal services, for
12 activities including but not limited to the preparation of designs,
13 plans, specifications and estimates; construction management and
14 supervision; and appraisals, surveys, testing, and environmental
15 impact statements for transportation projects, the payment of
16 liabilities incurred prior to April 1, 2009 and any other such
17 purposes as specified in section 89-b of the state finance law as
18 amended (17030920) ... 1,550,000,000 ............ (re. $171,362,000)
19 By chapter 55, section 1, of the laws of 2008:
20 For the federal share of state transportation maintenance projects
21 including but not limited to construction, reconstruction, recondi-
22 tioning and preservation, the acquisition of property, operating
23 costs as provided for in the Safe, Accountable, Flexible, Efficient
24 Transportation Equity Act: A Legacy for Users, and any successive
25 legislation, payment of reimbursements to the dedicated highway and
26 bridge trust fund of the department of transportation, including but
27 not limited to fringe benefits, and the contract services provided
28 by private firms; personal services, nonpersonal services, for
29 activities including but not limited to the preparation of designs,
30 plans, specifications and estimates; construction management and
31 supervision; and appraisals, surveys, testing, and environmental
32 impact statements for transportation projects, the payment of
33 liabilities incurred prior to April 1, 2008 and any other such
34 purposes as specified in section 89-b of the state finance law as
35 amended (17440820) ... 50,000,000 ................ (re. $50,000,000)
36 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
37 section 1, of the laws of 2016:
38 For the federal share of state transportation projects including but
39 not limited to construction, reconstruction, reconditioning and
40 preservation, the acquisition of property, operating costs as
41 provided for in the Safe, Accountable, Flexible, Efficient Transpor-
42 tation Equity Act: A Legacy for Users and any successive legis-
43 lation, payment of reimbursements to the dedicated highway and
44 bridge trust fund of the department of transportation, including but
45 not limited to fringe benefits, and the contract services provided
46 by private firms; personal services, nonpersonal services, for
47 activities including but not limited to the preparation of designs,
48 plans, specifications and estimates; construction management and
49 supervision; and appraisals, surveys, testing, and environmental
50 impact statements for transportation projects, the payment of
696 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 liabilities incurred prior to April 1, 2008 and any other such
2 purposes as specified in section 89-b of the state finance law as
3 amended (17030820) ... 1,915,000,000 ............ (re. $133,095,000)
4 By chapter 55, section 1, of the laws of 2007:
5 For the federal share of state transportation projects including but
6 not limited to construction, reconstruction, reconditioning and
7 preservation, the acquisition of property, operating costs as
8 provided for in the Safe, Accountable, Flexible, Efficient Transpor-
9 tation Equity Act: A Legacy for Users and any successive legis-
10 lation, payment of reimbursements to the dedicated highway and
11 bridge trust fund of the department of transportation, including but
12 not limited to fringe benefits, and the contract services provided
13 by private firms; personal services, nonpersonal services, for
14 activities including but not limited to the preparation of designs,
15 plans, specifications and estimates; construction management and
16 supervision; and appraisals, surveys, testing, and environmental
17 impact statements for transportation projects, the payment of
18 liabilities incurred prior to April 1, 2007 and any other such
19 purposes as specified in section 89-b of the state finance law as
20 amended (17030720) ... 1,977,299,000 ............ (re. $130,478,000)
21 For the federal share of state transportation maintenance projects
22 including but not limited to construction, reconstruction, recondi-
23 tioning and preservation, the acquisition of property, operating
24 costs as provided for in the Safe, Accountable, Flexible, Efficient
25 Transportation Equity Act: A Legacy for Users, and any successive
26 legislation, payment of reimbursements to the dedicated highway and
27 bridge trust fund of the department of transportation, including but
28 not limited to fringe benefits, and the contract services provided
29 by private firms; personal services, nonpersonal services, for
30 activities including but not limited to the preparation of designs,
31 plans, specifications and estimates; construction management and
32 supervision; and appraisals, surveys, testing, and environmental
33 impact statements for transportation projects, the payment of
34 liabilities incurred prior to April 1, 2007 and any other such
35 purposes as specified in section 89-b of the state finance law as
36 amended.
37 The items shown in the schedule below shall be for projects with a
38 common purpose and may be interchanged without limitation subject to
39 the approval of the director of budget (17440720) ..................
40 50,000,000 ....................................... (re. $14,754,000)
41 PERSONAL SERVICE
42 Personal service--regular ...................... 5,000,000
43 Holiday/overtime compensation .................... 500,000
44 --------------
45 Amount available for personal service ........ 5,500,000
46 --------------
697 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NONPERSONAL SERVICE
2 Supplies and materials ......................... 4,200,000
3 Travel ........................................... 300,000
4 Contractual services .......................... 11,850,000
5 Equipment ..................................... 25,386,000
6 Fringe benefits ................................ 2,534,000
7 Indirect costs ................................... 230,000
8 --------------
9 Amount available for nonpersonal service .... 44,500,000
10 --------------
11 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
12 section 1, of the laws of 2013:
13 For the federal share of state transportation projects including but
14 not limited to construction, reconstruction, reconditioning and
15 preservation, the acquisition of property, operating costs as
16 provided for in the Safe, Accountable, Flexible, Efficient Transpor-
17 tation Equity Act: A Legacy for Users and any successive legis-
18 lation, payment of reimbursements to the dedicated highway and
19 bridge trust fund of the department of transportation, including but
20 not limited to fringe benefits, and the contract services provided
21 by private firms; personal services, nonpersonal services, for
22 activities including but not limited to the preparation of designs,
23 plans, specifications and estimates; construction management and
24 supervision; and appraisals, surveys, testing, and environmental
25 impact statements for transportation projects, the payment of
26 liabilities incurred prior to April 1, 2006 and any other such
27 purposes as specified in section 89-b of the state finance law as
28 amended (17030620) ... 1,580,000,000 ............. (re. $92,749,000)
29 By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
30 section 1, of the laws of 2013:
31 For the federal share of state transportation projects including but
32 not limited to construction, reconstruction, reconditioning and
33 preservation, the acquisition of property, operating costs as
34 provided for in the Transportation Equity Act for the 21st Century
35 and any successive legislation, payment of reimbursements to the
36 dedicated highway and bridge trust fund of the department of trans-
37 portation, including but not limited to fringe benefits, and the
38 contract services provided by private firms; personal services,
39 nonpersonal services, for activities including but not limited to
40 the preparation of designs, plans, specifications and estimates;
41 construction management and supervision; and appraisals, surveys,
42 testing, and environmental impact statements for transportation
43 projects, the payment of liabilities incurred prior to April 1, 2005
44 and any other such purposes as specified in section 89-b of the
45 state finance law as amended (17030520) ............................
46 1,580,000,000 .................................... (re. $56,792,000)
47 By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
48 section 1, of the laws of 2013:
698 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the federal share of state transportation projects including but
2 not limited to construction, reconstruction, reconditioning and
3 preservation, the acquisition of property, operating costs as
4 provided for in the Transportation Equity Act for the 21st Century
5 and any successive legislation, payment of reimbursements to the
6 dedicated highway and bridge trust fund of the department of trans-
7 portation, including but not limited to fringe benefits, and the
8 contract services provided by private firms; personal services,
9 nonpersonal services, for activities including but not limited to
10 the preparation of designs, plans, specifications and estimates;
11 construction management and supervision; and appraisals, surveys,
12 testing, and environmental impact statements for transportation
13 projects, the payment of liabilities incurred prior to April 1, 2004
14 and any other such purposes as specified in section 89-b of the
15 state finance law as amended (17030420) ............................
16 1,610,000,000 .................................... (re. $62,490,000)
17 By chapter 55, section 1, of the laws of 2003, as amended by chapter 54,
18 section 1, of the laws of 2013:
19 For the federal share of state transportation projects including but
20 not limited to construction, reconstruction, reconditioning and
21 preservation, the acquisition of property, operating costs as
22 provided for in the Transportation Equity Act for the 21st Century
23 and any successive legislation, payment of reimbursements to the
24 dedicated highway and bridge trust fund of the department of trans-
25 portation, including but not limited to fringe benefits, and the
26 contract services provided by private firms; personal services,
27 nonpersonal services, for activities including but not limited to
28 the preparation of designs, plans, specifications and estimates;
29 construction management and supervision; and appraisals, surveys,
30 testing, and environmental impact statements for transportation
31 projects, the payment of liabilities incurred prior to April 1, 2003
32 and any other such purposes as specified in section 89-b of the
33 state finance law as amended (17030320) ............................
34 1,597,000,000 .................................... (re. $57,116,000)
35 By chapter 55, section 1, of the laws of 2002, as amended by chapter 54,
36 section 1, of the laws of 2013:
37 For the federal share of state transportation projects including but
38 not limited to construction, reconstruction, reconditioning and
39 preservation, the acquisition of property, operating costs as
40 provided for in the Transportation Equity Act for the 21st Century
41 and any successive legislation, payment of reimbursements to the
42 engineering services fund of the department of transportation,
43 including but not limited to fringe benefits, and the contract
44 services provided by private firms; personal services, nonpersonal
45 services, for activities including but not limited to the prepara-
46 tion of designs, plans, specifications and estimates; construction
47 management and supervision; and appraisals, surveys, testing, and
48 environmental impact statements for transportation projects, the
49 payment of liabilities incurred prior to April 1, 2002 and any other
699 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 such purposes as specified in section 89-b of the state finance law
2 as amended (17030220) ... 1,451,000,000 .......... (re. $54,767,000)
3 By chapter 55, section 1, of the laws of 2001, as amended by chapter 54,
4 section 1, of the laws of 2013:
5 For the federal share of state transportation projects including but
6 not limited to construction, reconstruction, reconditioning and
7 preservation, the acquisition of property, operating costs as
8 provided for in the Transportation Equity Act for the 21st Century
9 and any successive legislation, payment of reimbursements to the
10 engineering services fund of the department of transportation,
11 including but not limited to fringe benefits, and the contract
12 services provided by private firms; personal services, nonpersonal
13 services, for activities including but not limited to the prepara-
14 tion of designs, plans, specifications and estimates; construction
15 management and supervision; and appraisals, surveys, testing, and
16 environmental impact statements for transportation projects, the
17 payment of liabilities incurred prior to April 1, 2001 and any other
18 such purposes as specified in section 89-b of the state finance law
19 as amended (17030120) ... 1,440,500,000 .......... (re. $30,591,000)
20 By chapter 55, section 1, of the laws of 2000, as amended by chapter 54,
21 section 1, of the laws of 2013:
22 For the federal share of state transportation projects including but
23 not limited to construction, reconstruction, reconditioning and
24 preservation, the acquisition of property, operating costs as
25 provided for in the Transportation Equity Act for the 21st Century
26 and any successive legislation, payment of reimbursements to the
27 engineering services fund of the department of transportation,
28 including but not limited to fringe benefits, and the contract
29 services provided by private firms; personal services, nonpersonal
30 services, for activities including but not limited to the prepara-
31 tion of designs, plans, specifications and estimates; construction
32 management and supervision; and appraisals, surveys, testing, and
33 environmental impact statements for transportation projects, the
34 payment of liabilities incurred prior to April 1, 2000 and any other
35 such purposes as specified in section 89-b of the state finance law
36 as amended (17030020) ... 1,205,500,000 .......... (re. $26,651,000)
37 By chapter 55, section 1, of the laws of 1999, as amended by chapter 54,
38 section 1, of the laws of 2013:
39 For the federal share of state transportation projects including but
40 not limited to construction, reconstruction, reconditioning and
41 preservation, the acquisition of property, operating costs as
42 provided for in the Transportation Equity Act for the 21st Century
43 and any successive legislation, payment of reimbursements to the
44 engineering services fund of the department of transportation,
45 including but not limited to fringe benefits, and the contract
46 services provided by private firms; personal services, nonpersonal
47 services, for activities including but not limited to the prepara-
48 tion of designs, plans, specifications and estimates; construction
49 management and supervision; and appraisals, surveys, testing, and
700 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 environmental impact statements for transportation projects, the
2 payment of liabilities incurred prior to April 1, 1999 and any other
3 such purposes as specified in section 89-b of the state finance law
4 as amended (17039920) ... 1,260,000,000 .......... (re. $18,573,000)
5 By chapter 55, section 1, of the laws of 1998, as amended by chapter 54,
6 section 1, of the laws of 2013:
7 For the federal share of state transportation projects including but
8 not limited to construction, reconstruction, reconditioning and
9 preservation, the acquisition of property, operating costs as
10 provided for in the Intermodal Surface Transportation Efficiency Act
11 of 1991 and any successive legislation, payment of reimbursements to
12 the engineering services fund of the department of transportation,
13 including but not limited to fringe benefits, and the contract
14 services provided by private firms; personal services, nonpersonal
15 services, for activities including but not limited to the prepara-
16 tion of designs, plans, specifications and estimates; construction
17 management and supervision; and appraisals, surveys, testing, and
18 environmental impact statements for transportation projects, the
19 payment of liabilities incurred prior to April 1, 1998 and any other
20 such purposes as specified in section 89-b of the state finance law
21 as amended (17039820) ... 1,175,000,000 .......... (re. $25,686,000)
22 By chapter 55, section 1, of the laws of 1997, as amended by chapter 54,
23 section 1, of the laws of 2013:
24 For the federal share of state transportation projects including but
25 not limited to construction, reconstruction, reconditioning and
26 preservation, the acquisition of property, operating costs as
27 provided for in the Intermodal Surface Transportation Efficiency Act
28 of 1991 and any successive legislation, payment of reimbursements to
29 the engineering services fund of the department of transportation,
30 including but not limited to fringe benefits, and the contract
31 services provided by private firms; personal services, nonpersonal
32 services, for activities including but not limited to the prepara-
33 tion of designs, plans, specifications and estimates; construction
34 management and supervision; and appraisals, surveys, testing, and
35 environmental impact statements for transportation projects, the
36 payment of liabilities incurred prior to April 1, 1997 and any other
37 such purposes as specified in section 89-b of the state finance law
38 as amended by chapter 56 of the laws of 1993 (17039720) ............
39 1,120,000,000 .................................... (re. $31,515,000)
40 By chapter 55, section 1, of the laws of 1996, as amended by chapter 54,
41 section 1, of the laws of 2013:
42 For the federal share of state transportation projects including but
43 not limited to construction, reconstruction, reconditioning and
44 preservation, the acquisition of property, operating costs as
45 provided for in the Intermodal Surface Transportation Efficiency Act
46 of 1991, payment of reimbursements to the engineering services fund
47 of the department of transportation, including but not limited to
48 fringe benefits, and the contract services provided by private
49 firms; personal services, nonpersonal services, for activities
701 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 including but not limited to the preparation of designs, plans,
2 specifications and estimates; construction management and super-
3 vision; and appraisals, surveys, testing, and environmental impact
4 statements for transportation projects, the payment of liabilities
5 incurred prior to April 1, 1996 and any other such purposes as spec-
6 ified in section 89-b of the state finance law as amended by chapter
7 56 of the laws of 1993 (17039620) ..................................
8 1,135,000,000 .................................... (re. $35,179,000)
9 By chapter 54, section 1, of the laws of 1995, as amended by chapter 54,
10 section 1, of the laws of 2013:
11 For the federal share of state transportation projects including but
12 not limited to construction, reconstruction, reconditioning and
13 preservation, the acquisition of property, operating costs as
14 provided for in the Intermodal Surface Transportation Efficiency Act
15 of 1991, payment of reimbursements to the engineering services fund
16 of the department of transportation, including but not limited to
17 fringe benefits, and the contract services provided by private
18 firms; personal services, nonpersonal services, for activities
19 including but not limited to the preparation of designs, plans,
20 specifications and estimates; construction management and super-
21 vision; and appraisals, surveys, testing, and environmental impact
22 statements for transportation projects, the payment of liabilities
23 incurred prior to April 1, 1995 and any other such purposes as spec-
24 ified in section 89-b of the state finance law as amended by chapter
25 56 of the laws of 1993 (17039520) ..................................
26 908,000,000 ...................................... (re. $59,372,000)
27 By chapter 54, section 1, of the laws of 1994, as amended by chapter 54,
28 section 1, of the laws of 2013:
29 For the federal share of state highway projects including but not
30 limited to construction, reconstruction, reconditioning and preser-
31 vation, the acquisition of property, operating costs as provided for
32 in the Intermodal Surface Transportation Efficiency Act of 1991,
33 payment of reimbursements to the engineering services fund of the
34 department of transportation, including but not limited to fringe
35 benefits, and the contract services provided by private firms;
36 personal services, nonpersonal services, for activities including
37 but not limited to the preparation of designs, plans, specifications
38 and estimates; construction management and supervision; and
39 appraisals, surveys, testing, and environmental impact statements
40 for transportation projects, the payment of liabilities incurred
41 prior to April 1, 1994 and any other such purposes as specified in
42 section 89-b of the state finance law as amended by chapter 56 of
43 the laws of 1993 (17039420) ... ..................................
44 670,100,000 ...................................... (re. $27,267,000)
45 By chapter 54, section 1, of the laws of 1993, as amended by chapter 54,
46 section 1, of the laws of 2013:
47 For the federal share of highway projects including the state thruway
48 (17039320) ... ... 780,100,000 ................. (re. $17,604,000)
702 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 1992, as amended by chapter 54,
2 section 1, of the laws of 2013:
3 For the federal share of highway projects including the state thruway
4 (17039220) ... ... 892,100,000 ................. (re. $30,549,000)
5 By chapter 54, section 1, of the laws of 1991, as amended by chapter 54,
6 section 1, of the laws of 2013:
7 For the federal share of highway projects including the state thruway
8 (17039120) ... ... 690,000,000 ................. (re. $17,664,000)
9 FEDERAL AIRPORT OR AVIATION (CCP)
10 Capital Projects Funds - Federal
11 Federal Capital Projects Fund
12 Aviation Purpose
13 By chapter 54, section 1, of the laws of 2017:
14 For payment by the state of the federal share of the cost, including
15 payment of liabilities incurred prior to April 1, 2017, of
16 construction, reconstruction, alteration and rehabilitation of
17 airport and aviation facilities at Republic airport, including the
18 cost of acquisition of real property, the acquisition of equipment
19 and other related incidental expenses thereto and for the federal
20 share of consultant services in carrying out federally approved
21 aviation studies.
22 Within the amount appropriated herein, authorization is granted to the
23 department of transportation to enter into all necessary contracts
24 and agreements, subject to the approval of the director of the budg-
25 et, to carry out the purposes of this appropriation.
26 Prior to requesting a certificate of approval of availability for any
27 of the moneys authorized herein, the commissioner of transportation
28 shall certify to the director of the budget that the federal govern-
29 ment has agreed to finance the federal share of the project. Howev-
30 er with the approval of the director of the budget, projects may be
31 designed prior to federal approval upon the written assurance by the
32 commissioner of transportation that federal funds are likely to be
33 forthcoming (17521714) ... 6,000,000 .............. (re. $6,000,000)
34 By chapter 55, section 1, of the laws of 2016:
35 For payment by the state of the federal share of the cost, including
36 payment of liabilities incurred prior to April 1, 2016, of
37 construction, reconstruction, alteration and rehabilitation of
38 airport and aviation facilities at Republic airport, including the
39 cost of acquisition of real property, the acquisition of equipment
40 and other related incidental expenses thereto and for the federal
41 share of consultant services in carrying out federally approved
42 aviation studies.
43 Within the amount appropriated herein, authorization is granted to the
44 department of transportation to enter into all necessary contracts
45 and agreements, subject to the approval of the director of the budg-
46 et, to carry out the purposes of this appropriation.
703 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Prior to requesting a certificate of approval of availability for any
2 of the moneys authorized herein, the commissioner of transportation
3 shall certify to the director of the budget that the federal govern-
4 ment has agreed to finance the federal share of the project. Howev-
5 er with the approval of the director of the budget, projects may be
6 designed prior to federal approval upon the written assurance by the
7 commissioner of transportation that federal funds are likely to be
8 forthcoming (17521614) ... 6,000,000 .............. (re. $6,000,000)
9 By chapter 54, section 1, of the laws of 2015:
10 For payment by the state of the federal share of the cost, including
11 payment of liabilities incurred prior to April 1, 2015, of
12 construction, reconstruction, alteration and rehabilitation of
13 airport and aviation facilities at Republic airport, including the
14 cost of acquisition of real property, the acquisition of equipment
15 and other related incidental expenses thereto and for the federal
16 share of consultant services in carrying out federally approved
17 aviation studies.
18 Within the amount appropriated herein, authorization is granted to the
19 department of transportation to enter into all necessary contracts
20 and agreements, subject to the approval of the director of the budg-
21 et, to carry out the purposes of this appropriation.
22 Prior to requesting a certificate of approval of availability for any
23 of the moneys authorized herein, the commissioner of transportation
24 shall certify to the director of the budget that the federal govern-
25 ment has agreed to finance the federal share of the project. Howev-
26 er with the approval of the director of the budget, projects may be
27 designed prior to federal approval upon the written assurance by the
28 commissioner of transportation that federal funds are likely to be
29 forthcoming (17521514) ... 6,000,000 .............. (re. $6,000,000)
30 By chapter 54, section 1, of the laws of 2014:
31 For payment by the state of the federal share of the cost, including
32 payment of liabilities incurred prior to April 1, 2014, of
33 construction, reconstruction, alteration and rehabilitation of
34 airport and aviation facilities at Republic airport, including the
35 cost of acquisition of real property, the acquisition of equipment
36 and other related incidental expenses thereto and for the federal
37 share of consultant services in carrying out federally approved
38 aviation studies.
39 Within the amount appropriated herein, authorization is granted to the
40 department of transportation to enter into all necessary contracts
41 and agreements, subject to the approval of the director of the budg-
42 et, to carry out the purposes of this appropriation.
43 Prior to requesting a certificate of approval of availability for any
44 of the moneys authorized herein, the commissioner of transportation
45 shall certify to the director of the budget that the federal govern-
46 ment has agreed to finance the federal share of the project. Howev-
47 er with the approval of the director of the budget, projects may be
48 designed prior to federal approval upon the written assurance by the
49 commissioner of transportation that federal funds are likely to be
50 forthcoming (17521414) ... 6,000,000 .............. (re. $6,000,000)
704 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2013:
2 For payment by the state of the federal share of the cost, including
3 payment of liabilities incurred prior to April 1, 2013, of
4 construction, reconstruction, alteration and rehabilitation of
5 airport and aviation facilities at Republic airport, including the
6 cost of acquisition of real property, the acquisition of equipment
7 and other related incidental expenses thereto and for the federal
8 share of consultant services in carrying out federally approved
9 aviation studies.
10 Within the amount appropriated herein, authorization is granted to the
11 department of transportation to enter into all necessary contracts
12 and agreements, subject to the approval of the director of the budg-
13 et, to carry out the purposes of this appropriation.
14 Prior to requesting a certificate of approval of availability for any
15 of the moneys authorized herein, the commissioner of transportation
16 shall certify to the director of the budget that the federal govern-
17 ment has agreed to finance the federal share of the project. Howev-
18 er with the approval of the director of the budget, projects may be
19 designed prior to federal approval upon the written assurance by the
20 commissioner of transportation that federal funds are likely to be
21 forthcoming (17521314) ... 6,000,000 .............. (re. $6,000,000)
22 By chapter 54, section 1, of the laws of 2012:
23 For payment by the state of the federal share of the cost, including
24 payment of liabilities incurred prior to April 1, 2012, of
25 construction, reconstruction, alteration and rehabilitation of
26 airport and aviation facilities at Republic airport, including the
27 cost of acquisition of real property, the acquisition of equipment
28 and other related incidental expenses thereto and for the federal
29 share of consultant services in carrying out federally approved
30 aviation studies.
31 Within the amount appropriated herein, authorization is granted to the
32 department of transportation to enter into all necessary contracts
33 and agreements, subject to the approval of the director of the budg-
34 et, to carry out the purposes of this appropriation.
35 Prior to requesting a certificate of approval of availability for any
36 of the moneys authorized herein, the commissioner of transportation
37 shall certify to the director of the budget that the federal govern-
38 ment has agreed to finance the federal share of the project. Howev-
39 er with the approval of the director of the budget, projects may be
40 designed prior to federal approval upon the written assurance by the
41 commissioner of transportation that federal funds are likely to be
42 forthcoming (17521214) ... 6,000,000 .............. (re. $6,000,000)
43 By chapter 54, section 1, of the laws of 2011:
44 For payment by the state of the federal share of the cost, including
45 payment of liabilities incurred prior to April 1, 2011, of
46 construction, reconstruction, alteration and rehabilitation of
47 airport and aviation facilities at Republic airport, including the
48 cost of acquisition of real property, the acquisition of equipment
49 and other related incidental expenses thereto and for the federal
705 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 share of consultant services in carrying out federally approved
2 aviation studies.
3 Within the amount appropriated herein, authorization is granted to the
4 department of transportation to enter into all necessary contracts
5 and agreements, subject to the approval of the director of the budg-
6 et, to carry out the purposes of this appropriation.
7 Prior to requesting a certificate of approval of availability for any
8 of the moneys authorized herein, the commissioner of transportation
9 shall certify to the director of the budget that the federal govern-
10 ment has agreed to finance the federal share of the project. Howev-
11 er with the approval of the director of the budget, projects may be
12 designed prior to federal approval upon the written assurance by the
13 commissioner of transportation that federal funds are likely to be
14 forthcoming (17521114) ... 6,000,000 .............. (re. $5,487,000)
15 By chapter 55, section 1, of the laws of 2010:
16 For payment by the state of the federal share of the cost, including
17 payment of liabilities incurred prior to April 1, 2010, of
18 construction, reconstruction, alteration and rehabilitation of
19 airport and aviation facilities at Republic airport, including the
20 cost of acquisition of real property, the acquisition of equipment
21 and other related incidental expenses thereto and for the federal
22 share of consultant services in carrying out federally approved
23 aviation studies.
24 Within the amount appropriated herein, authorization is granted to the
25 department of transportation to enter into all necessary contracts
26 and agreements, subject to the approval of the director of the budg-
27 et, to carry out the purposes of this appropriation.
28 Prior to requesting a certificate of approval of availability for any
29 of the moneys authorized herein, the commissioner of transportation
30 shall certify to the director of the budget that the federal govern-
31 ment has agreed to finance the federal share of the project. Howev-
32 er with the approval of the director of the budget, projects may be
33 designed prior to federal approval upon the written assurance by the
34 commissioner of transportation that federal funds are likely to be
35 forthcoming (17521014) ... 6,000,000 .............. (re. $3,776,000)
36 By chapter 55, section 1, of the laws of 2008:
37 For payment by the state of the federal share of the cost, including
38 payment of liabilities incurred prior to April 1, 2008, of
39 construction, reconstruction, alteration and rehabilitation of
40 airport and aviation facilities at Republic airport, including the
41 cost of acquisition of real property, the acquisition of equipment
42 and other related incidental expenses thereto and for the federal
43 share of consultant services in carrying out federally approved
44 aviation studies.
45 Within the amount appropriated herein, authorization is granted to the
46 department of transportation to enter into all necessary contracts
47 and agreements, subject to the approval of the director of the budg-
48 et, to carry out the purposes of this appropriation.
49 Prior to requesting a certificate of approval of availability for any
50 of the moneys authorized herein, the commissioner of transportation
706 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 shall certify to the director of the budget that the federal govern-
2 ment has agreed to finance the federal share of the project. Howev-
3 er with the approval of the director of the budget, projects may be
4 designed prior to federal approval upon the written assurance by the
5 commissioner of transportation that federal funds are likely to be
6 forthcoming (17520814) ... 6,000,000 .............. (re. $2,484,000)
7 By chapter 55, section 1, of the laws of 2007:
8 For payment by the state of the federal share of the cost, including
9 payment of liabilities incurred prior to April 1, 2007, of
10 construction, reconstruction, alteration and rehabilitation of
11 airport and aviation facilities at Republic airport, including the
12 cost of acquisition of real property, the acquisition of equipment
13 and other related incidental expenses thereto and for the federal
14 share of consultant services in carrying out federally approved
15 aviation studies.
16 Within the amount appropriated herein, authorization is granted to the
17 department of transportation to enter into all necessary contracts
18 and agreements, subject to the approval of the director of the budg-
19 et, to carry out the purposes of this appropriation.
20 Prior to requesting a certificate of approval of availability for any
21 of the moneys authorized herein, the commissioner of transportation
22 shall certify to the director of the budget that the federal govern-
23 ment has agreed to finance the federal share of the project. Howev-
24 er with the approval of the director of the budget, projects may be
25 designed prior to federal approval upon the written assurance by the
26 commissioner of transportation that federal funds are likely to be
27 forthcoming (17520714) ... 6,000,000 .............. (re. $2,041,000)
28 By chapter 55, section 1, of the laws of 2006:
29 For payment by the state of the federal share of the cost, including
30 payment of liabilities incurred prior to April 1, 2006, of
31 construction, reconstruction, alteration and rehabilitation of
32 airport and aviation facilities at Republic airport, including the
33 cost of acquisition of real property, the acquisition of equipment
34 and other related incidental expenses thereto and for the federal
35 share of consultant services in carrying out federally approved
36 aviation studies.
37 Within the amount appropriated herein, authorization is granted to the
38 department of transportation to enter into all necessary contracts
39 and agreements, subject to the approval of the director of the budg-
40 et, to carry out the purposes of this appropriation.
41 Prior to requesting a certificate of approval of availability for any
42 of the moneys authorized herein, the commissioner of transportation
43 shall certify to the director of the budget that the federal govern-
44 ment has agreed to finance the federal share of the project. Howev-
45 er with the approval of the director of the budget, projects may be
46 designed prior to federal approval upon the written assurance by the
47 commissioner of transportation that federal funds are likely to be
48 forthcoming (17520614) ... 6,000,000 .............. (re. $1,496,000)
49 By chapter 55, section 1, of the laws of 2005:
707 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment by the state of the federal share of the cost, including
2 payment of liabilities incurred prior to April 1, 2005, of
3 construction, reconstruction, alteration and rehabilitation of
4 airport and aviation facilities at Republic airport, including the
5 cost of acquisition of real property, the acquisition of equipment
6 and other related incidental expenses thereto and for the federal
7 share of consultant services in carrying out federally approved
8 aviation studies.
9 Within the amount appropriated herein, authorization is granted to the
10 department of transportation to enter into all necessary contracts
11 and agreements, subject to the approval of the director of the budg-
12 et, to carry out the purposes of this appropriation.
13 Prior to requesting a certificate of approval of availability for any
14 of the moneys authorized herein, the commissioner of transportation
15 shall certify to the director of the budget that the federal govern-
16 ment has agreed to finance the federal share of the project. Howev-
17 er with the approval of the director of the budget, projects may be
18 designed prior to federal approval upon the written assurance by the
19 commissioner of transportation that federal funds are likely to be
20 forth coming (17520514) ... 6,000,000 ............... (re. $526,000)
21 By chapter 54, section 1, of the laws of 1991:
22 For payment by the state of the federal share of the cost, including
23 payment of liabilities incurred prior to April 1, 1991, of
24 construction, reconstruction, alteration and rehabilitation of
25 airport and aviation facilities at Stewart and Republic airports,
26 including the cost of acquisition of real property, the acquisition
27 of equipment and other related incidental expenses thereto and for
28 the federal share of consultant services in carrying out federally
29 approved aviation studies.
30 Within the amount appropriated herein, authorization is granted to the
31 department of transportation to enter into all necessary contracts
32 and agreements, subject to the approval of the director of the budg-
33 et, to carry out the purposes of this appropriation.
34 Prior to requesting a certificate of approval of availability for any
35 of the moneys authorized herein, the commissioner of transportation
36 shall certify to the director of the budget that the federal govern-
37 ment has agreed to finance the federal share of the project. Howev-
38 er with the approval of the director of the budget, projects may be
39 designed prior to federal approval upon the written assurance by the
40 commissioner of transportation that federal funds are likely to be
41 forthcoming (17529114) ... 40,000,000 ............. (re. $2,115,000)
42 HIGHWAY FACILITIES (CCP)
43 Capital Projects Funds - Other
44 Dedicated Highway and Bridge Trust Fund
45 Highway Facilities Purpose
708 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 STATE HIGHWAYS
2 By chapter 54, section 1, of the laws of 1987, as amended by chapter 55,
3 section 1, of the laws of 2000:
4 The sum of $37,310,801 is hereby appropriated for the preparation of
5 designs, plans, specifications and estimates, for the contract engi-
6 neering services provided by private firms, for the acquisition of
7 property, and the construction of highway, bridge and traffic
8 improvements related to the expansion of Fort Drum, with or without
9 Federal aid, including the payment of liabilities incurred prior to
10 April 1, 1987 (17068711) ... 36,926,559 ........... (re. $9,489,000)
11 STATE GATEWAY INFORMATION CENTERS
12 By chapter 50, section 1, of the laws of 1986, as amended by chapter 55,
13 section 1, of the laws of 2000, and as transferred from state oper-
14 ations - miscellaneous by chapter 54, section 3, of the laws of
15 1988:
16 For construction of state gateway information centers on the state's
17 major highways by the department of transportation. Such centers
18 shall be established on Interstate Route 90 in the vicinity of the
19 Massachusetts border; on Interstate Route 87 in the vicinity of
20 Chazy in the county of Clinton; on Interstate Route 81 in the vicin-
21 ity of the Canadian border; in Chautauqua county in the vicinity of
22 the Pennsylvania border; on Interstate Route 81 in the vicinity of
23 the Pennsylvania border; and on Interstate Route 87 in the vicinity
24 of State Route 17 (17B18611) ... 1,999,373 .......... (re. $656,000)
25 HIGHWAY - RAILROAD
26 GRADE CROSSING ELIMINATIONS
27 MINEOLA GRADE CROSSING
28 By chapter 998, section 3, of the laws of 1983:
29 For the payment of the State's share of the cost of construction, with
30 or without federal aid, of a grade crossing elimination project in
31 Mineola, Nassau County, including the cost of the acquisition of
32 property and other related work. No expenditures shall be made from
33 this appropriation for services and expenses other than the cost of
34 consulting services (03334811) .................... (re. $1,773,000)
35 INFRASTRUCTURE BOND ACT PROJECTS (CCP)
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Infrastructure Bond Act Purpose
39 By chapter 54, section 1, of the laws of 1988:
40 For the costs, pursuant to the provisions of the rebuild New York
41 through transportation infrastructure renewal bond act of 1983, of
42 capital projects to be reimbursed from bond fund proceeds for the
43 improvement of highways, parkways, commuter parking facilities, and
709 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 other highway facilities including bridges, other structures, and
2 appurtenances.
3 Project costs funded from this appropriation may include, but shall
4 not be limited to, preliminary planning and feasibility studies;
5 survey and design; acquisition of property, construction, recon-
6 struction, reconditioning and preservation; the supervision and
7 inspection of construction; and for the cost of engineering
8 services. No expenditures shall be made from this appropriation for
9 personal services and expenses other than consulting services.
10 The items shown in the project schedule below shall be for projects
11 with a common purpose and may be interchanged without limitation
12 subject to the approval of the director of the division of the budg-
13 et.
14 Funds from this appropriation may be made available for the payment of
15 liabilities incurred prior to April 1, 1988 (17068823) ... .......
16 22,673,000 ........................................ (re. $1,304,000)
17 For payment of the costs of acquisition of real property and for the
18 elimination of existing highway-railroad crossings at grade in
19 accordance with the provisions of article ten of the transportation
20 law or other highway/bridge projects identified in the project sche-
21 dule below, for the costs of preparation of designs, plans, specifi-
22 cations and estimates and for contract engineering services provided
23 by private firms, including the payment of liabilities incurred
24 prior to April 1, 1988, pursuant to the rebuild New York through
25 transportation infrastructure renewal bond act of 1983. The items
26 shown in the project schedule below shall be for projects with a
27 common purpose and may be interchanged without limitation subject to
28 the approval of the director of the budget (17428823) ... ........
29 7,727,000 ......................................... (re. $3,311,000)
30 By chapter 54, section 1, of the laws of 1987:
31 For the costs pursuant to the provisions of the rebuild New York
32 through transportation infrastructure renewal bond act of 1983, of
33 the cost of capital projects to be reimbursed from bond fund
34 proceeds for the improvement of highways, parkways, commuter parking
35 facilities, and other highway facilities including bridges, other
36 structures, and appurtenances.
37 Project costs funded from this appropriation may include, but shall
38 not be limited to, preliminary planning and feasibility studies;
39 survey and design; acquisition of property, construction, recon-
40 struction, reconditioning and preservation; the supervision and
41 inspection of construction; and for the cost of engineering
42 services.
43 No expenditures shall be made from this appropriation for personal
44 services and expenses other than consulting services.
45 Notwithstanding any other provision of law, the commissioner of trans-
46 portation is authorized to acquire all necessary land not on the
47 state highway system for the purpose of highway projects at the
48 request of the locality under whose jurisdiction the project is
49 constructed or reconstructed.
50 The items shown in the project schedule below shall be for projects
51 with a common purpose and may be interchanged without limitation
710 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 subject to the approval of the director of the division of the budg-
2 et.
3 Funds from this appropriation may be made available for the payment of
4 liabilities incurred prior to April 1, 1987 (17078723) ... .......
5 92,000,000 .......................................... (re. $429,000)
6 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
7 section 3, of the laws of 1988:
8 For payment of the costs of acquisition of real property and for the
9 elimination of existing highway-railroad crossings at grade in
10 accordance with the provisions of article ten of the transportation
11 law or other highway/bridge projects identified in the project sche-
12 dule below, for the costs of preparation of designs, plans, specifi-
13 cations and estimates and for contract engineering services provided
14 by private firms, including the payment of liabilities incurred
15 prior to April 1, 1987, pursuant to the rebuild New York through
16 transportation infrastructure renewal bond act of 1983. The items
17 shown in the project schedule below shall be for projects with a
18 common purpose and may be interchanged without limitation subject to
19 the approval of the director of the budget (17088723) ... ........
20 8,700,000 ......................................... (re. $1,118,000)
21 By chapter 54, section 1, of the laws of 1986, as amended by chapter 54,
22 section 3, of the laws of 1988:
23 For the costs pursuant to the provisions of the rebuild New York
24 through transportation infrastructure renewal bond act of 1983, of
25 the cost of capital projects to be reimbursed from bond fund
26 proceeds for the improvement of highways, parkways, commuter parking
27 facilities, and other highway facilities including bridges, other
28 structures, and appurtenances.
29 Project costs funded from this appropriation may include, but shall
30 not be limited to, preliminary planning and feasibility studies;
31 survey and design; acquisition of property, construction, recon-
32 struction, reconditioning and preservation; the supervision and
33 inspection of construction; and for the cost of engineering
34 services. No expenditures shall be made from this appropriation for
35 personal services and expenses other than consulting services.
36 Notwithstanding any other provision of law, the commissioner of trans-
37 portation is authorized to acquire all necessary land not on the
38 state highway system for the purpose of highway projects at the
39 request of the locality under whose jurisdiction the project is
40 constructed or reconstructed.
41 The items shown in the project schedule below shall be for projects
42 with a common purpose and may be interchanged without limitation
43 subject to the approval of the director of the division of the budg-
44 et.
45 Funds from this appropriation may be made available for the payment of
46 liabilities incurred prior to April one, nineteen hundred eightysix
47 (17068623) ... .... 76,000,000 .................... (re. $429,000)
48 By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
49 section 3, of the laws of 1988:
711 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the costs pursuant to the provisions of the rebuild New York
2 through transportation infrastructure renewal bond act of 1983, of
3 the cost of capital projects to be reimbursed from bond fund
4 proceeds for the improvement of highways, parkways, commuter parking
5 facilities, and other highway facilities including bridges, other
6 structures, and appurtenances.
7 Project costs funded from this appropriation may include, but shall
8 not be limited to, preliminary planning and feasibility studies;
9 survey and design; acquisition of property, construction, recon-
10 struction, reconditioning and preservation; the supervision and
11 inspection of construction; and for the cost of engineering
12 services. No expenditures shall be made from this appropriation for
13 personal services and expenses other than consulting services.
14 Notwithstanding any other provision of law, the commissioner of trans-
15 portation is authorized to acquire all necessary land not on the
16 state highway system for the purpose of highway projects at the
17 request of the locality under whose jurisdiction the project is
18 constructed or reconstructed.
19 The items shown in the project schedule below shall be for projects
20 with a common purpose and may be interchanged without limitation or
21 certification subject to the approval of the director of the divi-
22 sion of the budget.
23 Funds from this appropriation may be made available for the payment of
24 liabilities incurred prior to April one, nineteen hundred eightyfive
25 but not for the payment of liabilities incurred prior to November
26 eight, nineteen hundred eighty-three (17058523) ... ..............
27 ..................................................... (re. $346,000)
28 By chapter 54, section 1, of the laws of 1984, as amended by chapter 54,
29 section 3, of the laws of 1988:
30 For the costs pursuant to the provisions of the rebuild New York
31 through transportation infrastructure renewal bond act of 1983, of
32 the cost of capital projects to be reimbursed from bond fund
33 proceeds for the improvement of highways, parkways, commuter parking
34 facilities, and other highway facilities including bridges, other
35 structures, and appurtenances.
36 Project costs funded from this appropriation may include, but shall
37 not be limited to, preliminary planning and feasibility studies;
38 survey and design; acquisition of property, construction, recon-
39 struction, reconditioning and preservation; the supervision and
40 inspection of construction; and for the cost of engineering
41 services. No expenditures shall be made from this appropriation for
42 personal services and expenses other than consulting services.
43 Notwithstanding any other provision of law, the commissioner of trans-
44 portation is authorized to acquire all necessary land not on the
45 state highway system for the purpose of highway projects at the
46 request of the locality under whose jurisdiction the project is
47 constructed or reconstructed.
48 The items in the schedule below for the purpose of infrastructure
49 bonds are projects with a common purpose and as such, may be inter-
50 changed without limitation subject to the approval of the director
51 of the budget.
712 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Funds from this appropriation may be made available for the payment of
2 liabilities incurred prior to April one, nineteen hundred eighty-
3 four but not for the payment of liabilities incurred prior to Novem-
4 ber eight, nineteen hundred eighty-three (17278423) ... ..........
5 ..................................................... (re. $314,000)
6 MAINTENANCE FACILITIES (CCP)
7 Capital Projects Funds - Other
8 Dedicated Highway and Bridge Trust Fund
9 Equipment Management Facilities Purpose
10 EQUIPMENT MANAGEMENT FACILITIES
11 By chapter 55, section 1, of the laws of 2003:
12 For the purchase of transportation related equipment, including the
13 cost of all vehicles under 8,500 pounds, and including the payment
14 of liabilities incurred prior to April 1, 2003 (17260318) ..........
15 18,100,000 .......................................... (re. $342,000)
16 By chapter 55, section 1, of the laws of 2002:
17 For the purchase of transportation related equipment, including the
18 cost of all vehicles under 8,500 pounds, and including the payment
19 of liabilities incurred prior to April 1, 2002 (17260218) ..........
20 18,100,000 ........................................... (re. $28,000)
21 By chapter 55, section 1, of the laws of 1998:
22 For the preparation of designs, plans, specifications and estimates,
23 for the acquisition, alterations, and rehabilitation and improvement
24 of existing equipment management facilities, for the acquisition of
25 land and construction of new facilities for equipment management
26 purposes, and for the contract engineering services provided by
27 private firms and for the purchase of transportation related equip-
28 ment, including the payment of liabilities incurred prior to April
29 1, 1998 (17269818) ... 16,300,000 .................... (re. $47,000)
30 Capital Projects Funds - Other
31 Dedicated Highway and Bridge Trust Fund
32 Highway Maintenance Facilities Purpose
33 By chapter 54, section 1, of the laws of 2017:
34 For the preparation of designs, plans, specifications and estimates,
35 for the acquisition, alterations, and rehabilitation of existing
36 facilities, for the acquisition of land and construction of new
37 facilities for highway maintenance purposes, for the contract engi-
38 neering services provided by private firms, including the payment of
39 liabilities incurred prior to April 1, 2017 (17251713)..............
40 15,965,000 ....................................... (re. $15,965,000)
41 By chapter 55, section 1, of the laws of 2016:
42 For the preparation of designs, plans, specifications and estimates,
43 for the acquisition, alterations, and rehabilitation of existing
713 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 facilities, for the acquisition of land and construction of new
2 facilities for highway maintenance purposes, for the contract engi-
3 neering services provided by private firms, including the payment of
4 liabilities incurred prior to April 1, 2016 (17251613) .............
5 15,965,000 ....................................... (re. $15,918,000)
6 By chapter 54, section 1, of the laws of 2015:
7 For the preparation of designs, plans, specifications and estimates,
8 for the acquisition, alterations, and rehabilitation of existing
9 facilities, for the acquisition of land and construction of new
10 facilities for highway maintenance purposes, for the contract engi-
11 neering services provided by private firms, including the payment of
12 liabilities incurred prior to April 1, 2015 (17251513) .............
13 15,965,000 ........................................ (re. $9,416,000)
14 By chapter 54, section 1, of the laws of 2014:
15 For the preparation of designs, plans, specifications and estimates,
16 for the acquisition, alterations, and rehabilitation of existing
17 facilities, for the acquisition of land and construction of new
18 facilities for highway maintenance purposes, for the contract engi-
19 neering services provided by private firms, including the payment of
20 liabilities incurred prior to April 1, 2014 (17251413) .............
21 15,965,000 ........................................ (re. $1,341,000)
22 By chapter 54, section 1, of the laws of 2013:
23 For the preparation of designs, plans, specifications and estimates,
24 for the acquisition, alterations, and rehabilitation of existing
25 facilities, for the acquisition of land and construction of new
26 facilities for highway maintenance purposes, for the contract engi-
27 neering services provided by private firms, including the payment of
28 liabilities incurred prior to April 1, 2013 (17251313) .............
29 15,965,000 ........................................ (re. $1,107,000)
30 By chapter 54, section 1, of the laws of 2012:
31 For the preparation of designs, plans, specifications and estimates,
32 for the acquisition, alterations, and rehabilitation of existing
33 facilities, for the acquisition of land and construction of new
34 facilities for highway maintenance purposes, for the contract engi-
35 neering services provided by private firms, including the payment of
36 liabilities incurred prior to April 1, 2012 (17251213) .............
37 15,965,000 .......................................... (re. $293,000)
38 By chapter 54, section 1, of the laws of 2011:
39 For the preparation of designs, plans, specifications and estimates,
40 for the acquisition, alterations, and rehabilitation of existing
41 facilities, for the acquisition of land and construction of new
42 facilities for highway maintenance purposes, and for the contract
43 engineering services provided by private firms, including the
44 payment of liabilities incurred prior to April 1, 2011 (17251113)
45 ... 15,965,000 .................................... (re. $4,848,000)
46 By chapter 55, section 1, of the laws of 2010:
714 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the preparation of designs, plans, specifications and estimates,
2 for the acquisition, alterations, and rehabilitation of existing
3 facilities, for the acquisition of land and construction of new
4 facilities for highway maintenance purposes, and for the contract
5 engineering services provided by private firms, including the
6 payment of liabilities incurred prior to April 1, 2010 (17251013)
7 ... 15,965,000 .................................... (re. $8,032,000)
8 By chapter 55, section 1, of the laws of 2009:
9 For the preparation of designs, plans, specifications and estimates,
10 for the acquisition, alterations, and rehabilitation of existing
11 facilities, for the acquisition of land and construction of new
12 facilities for highway maintenance purposes, and for the contract
13 engineering services provided by private firms, including the
14 payment of liabilities incurred prior to April 1, 2009 (17250913)
15 ... 15,965,000 ................................... (re. $12,772,000)
16 By chapter 55, section 1, of the laws of 2008:
17 For the preparation of designs, plans, specifications and estimates,
18 for the acquisition, alterations, and rehabilitation of existing
19 facilities, for the acquisition of land and construction of new
20 facilities for highway maintenance purposes, and for the contract
21 engineering services provided by private firms, including the
22 payment of liabilities incurred prior to April 1, 2008 (17250813)
23 ... 15,485,000 .................................... (re. $2,492,000)
24 By chapter 55, section 1, of the laws of 2007:
25 For the preparation of designs, plans, specifications and estimates,
26 for the acquisition, alterations, and rehabilitation of existing
27 facilities, for the acquisition of land and construction of new
28 facilities for highway maintenance purposes, and for the contract
29 engineering services provided by private firms, including the
30 payment of liabilities incurred prior to April 1, 2007 (17250713)
31 ... 15,050,000 ........................................ (re. $6,000)
32 Capital Projects Funds - Other
33 Dedicated Highway and Bridge Trust Fund
34 Preparation of Plans Purpose
35 By chapter 54, section 1, of the laws of 2017:
36 For payment to the design and construction management account of the
37 centralized services fund of the New York state office of general
38 services for the purpose of preparation and review of plans, spec-
39 ifications, estimates, services, construction management and super-
40 vision, inspection, studies, appraisals, surveys, testing and envi-
41 ronmental impact statements, including the payment of liabilities
42 incurred prior to April 1, 2017 (17D11730) .........................
43 2,200,000 ......................................... (re. $1,504,000)
44 By chapter 55, section 1, of the laws of 2016:
45 For payment to the design and construction management account of the
46 centralized services fund of the New York state office of general
715 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 services for the purpose of preparation and review of plans, spec-
2 ifications, estimates, services, construction management and super-
3 vision, inspection, studies, appraisals, surveys, testing and envi-
4 ronmental impact statements, including the payment of liabilities
5 incurred prior to April 1, 2016 (17D11630) .........................
6 2,200,000 ........................................... (re. $268,000)
7 By chapter 54, section 1, of the laws of 2015:
8 For payment to the design and construction management account of the
9 centralized services fund of the New York state office of general
10 services for the purpose of preparation and review of plans, spec-
11 ifications, estimates, services, construction management and super-
12 vision, inspection, studies, appraisals, surveys, testing and envi-
13 ronmental impact statements, including the payment of liabilities
14 incurred prior to April 1, 2015 (17D11530) .........................
15 2,200,000 ............................................ (re. $79,000)
16 By chapter 54, section 1, of the laws of 2014:
17 For payment to the design and construction management account of the
18 centralized services fund of the New York state office of general
19 services for the purpose of preparation and review of plans, spec-
20 ifications, estimates, services, construction management and super-
21 vision, inspection, studies, appraisals, surveys, testing and envi-
22 ronmental impact statements, including the payment of liabilities
23 incurred prior to April 1, 2014 (17D11430) .........................
24 2,200,000 ............................................ (re. $26,000)
25 By chapter 54, section 1, of the laws of 2013:
26 For payment to the design and construction management account of the
27 centralized services fund of the New York state office of general
28 services for the purpose of preparation and review of plans, spec-
29 ifications, estimates, services, construction management and super-
30 vision, inspection, studies, appraisals, surveys, testing and envi-
31 ronmental impact statements, including the payment of liabilities
32 incurred prior to April 1, 2013 (17D11330) .........................
33 2,200,000 ............................................ (re. $13,000)
34 By chapter 54, section 1, of the laws of 2011:
35 For payment to the design and construction management account of the
36 centralized services fund of the New York state office of general
37 services for the purpose of preparation and review of plans, spec-
38 ifications, estimates, services, construction management and super-
39 vision, inspection, studies, appraisals, surveys, testing and envi-
40 ronmental impact statements, including the payment of liabilities
41 incurred prior to April 1, 2011 (17D11130) .........................
42 2,200,000 ............................................ (re. $12,000)
43 MASS TRANSPORTATION (CCP)
44 Capital Projects Funds - Other
45 Capital Projects Fund
46 Mass Transit Purpose
716 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For the costs of mass transportation capital projects and facilities
3 including replacement of buses meeting federal standards for
4 replacement, related bus equipment and the acquisition, design and
5 construction, including engineering and consulting costs, of mass
6 transit bus garages or other mass transportation projects and facil-
7 ities approved by the commissioner of transportation in a program of
8 projects. Such funding may be part of a total project of which a
9 portion is federally funded. The moneys hereby appropriated are to
10 be made available for projects undertaken by mass transit systems
11 which are outside of the Metropolitan Transportation Commuter
12 District (17KC17MT) ... 20,000,000 ............... (re. $20,000,000)
13 Project Schedule
14 Project Amount
15 --------------------------------------------
16 To the Capital District trans-
17 portation authority for
18 capital projects in support
19 of public transportation
20 services provided directly
21 or under contract .............. 3,596,000
22 To the Central New York
23 regional transportation
24 authority for capital
25 projects in support of
26 public transportation
27 services provided directly
28 or under contract .............. 3,282,600
29 To the Rochester-Genesee
30 regional transportation
31 authority for capital
32 projects in support of
33 public transportation bus
34 services provided directly
35 or under contract .............. 3,985,700
36 To the Niagara Frontier trans-
37 portation authority for
38 capital projects in support
39 of public transportation
40 services provided directly
41 or under contract .............. 5,177,500
42 To all other public transpor-
43 tation systems serving
44 primarily outside the metro-
45 politan commuter transporta-
46 tion district, as defined in
47 section 1262 of the public
48 authorities law and eligible
49 to receive operating assist-
50 ance under the provisions of
51 section 18-b of the trans-
717 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 portation law, for capital
2 projects in support of
3 public transportation
4 services provided directly
5 or under contract in accord-
6 ance with a formula to be
7 established by the commis-
8 sioner of transportation
9 with the approval of the
10 director of the budget ......... 3,958,200
11 --------------
12 Total ....................... 20,000,000
13 ==============
14 By chapter 55, section 1, of the laws of 2016:
15 For the costs of mass transportation capital projects and facilities
16 including replacement of buses meeting federal standards for
17 replacement, related bus equipment and the acquisition, design and
18 construction, including engineering and consulting costs, of mass
19 transit bus garages or other mass transportation projects and facil-
20 ities approved by the commissioner of transportation in a program of
21 projects. Such funding may be part of a total project of which a
22 portion is federally funded. The moneys hereby appropriated are to
23 be made available for projects undertaken by mass transit systems
24 which are outside of the Metropolitan Transportation Commuter
25 District (17KC16MT) ... 20,000,000 ............... (re. $20,000,000)
26 Project Schedule
27 Project Amount
28 --------------------------------------------
29 To the Capital District trans-
30 portation authority for
31 capital projects in support
32 of public transportation
33 services provided directly
34 or under contract .............. 3,596,000
35 To the Central New York
36 regional transportation
37 authority for capital
38 projects in support of
39 public transportation
40 services provided directly
41 or under contract .............. 3,282,600
42 To the Rochester-Genesee
43 regional transportation
44 authority for capital
45 projects in support of
46 public transportation bus
47 services provided directly
48 or under contract .............. 3,985,700
49 To the Niagara Frontier trans-
50 portation authority for
718 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 capital projects in support
2 of public transportation
3 services provided directly
4 or under contract .............. 5,177,500
5 To all other public transpor-
6 tation systems serving
7 primarily outside the metro-
8 politan commuter transporta-
9 tion district, as defined in
10 section 1262 of the public
11 authorities law and eligible
12 to receive operating assist-
13 ance under the provisions of
14 section 18-b of the trans-
15 portation law, for capital
16 projects in support of
17 public transportation
18 services provided directly
19 or under contract in accord-
20 ance with a formula to be
21 established by the commis-
22 sioner of transportation
23 with the approval of the
24 director of the budget ......... 3,958,200
25 --------------
26 Total ....................... 20,000,000
27 ==============
28 By chapter 54, section 1, of the laws of 2015:
29 For the costs of mass transportation capital projects and facilities
30 including replacement of buses meeting federal standards for
31 replacement, related bus equipment and the acquisition, design and
32 construction, including engineering and consulting costs, of mass
33 transit bus garages or other mass transportation projects and facil-
34 ities approved by the commissioner of transportation in a program of
35 projects. Such funding may be part of a total project of which a
36 portion is federally funded. The moneys hereby appropriated are to
37 be made available for projects undertaken by mass transit systems
38 which are outside of the Metropolitan Transportation Commuter
39 District (17KC15MT) ... 15,000,000 ................ (re. $2,814,000)
40 Project Schedule
41 Project Amount
42 --------------------------------------------
43 To the Capital District trans-
44 portation authority for
45 capital projects in support
46 of public transportation
47 services provided directly
48 or under contract .............. 2,697,022
49 To the Central New York
50 regional transportation
719 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority for capital
2 projects in support of
3 public transportation
4 services provided directly
5 or under contract .............. 2,461,947
6 To the Rochester-Genesee
7 regional transportation
8 authority for capital
9 projects in support of
10 public transportation bus
11 services provided directly
12 or under contract .............. 2,989,262
13 To the Niagara Frontier trans-
14 portation authority for
15 capital projects in support
16 of public transportation
17 services provided directly
18 or under contract .............. 3,883,115
19 To all other public transpor-
20 tation systems serving
21 primarily outside the metro-
22 politan commuter transporta-
23 tion district, as defined in
24 section 1262 of the public
25 authorities law and eligible
26 to receive operating assist-
27 ance under the provisions of
28 section 18-b of the trans-
29 portation law, for capital
30 projects in support of
31 public transportation
32 services provided directly
33 or under contract in accord-
34 ance with a formula to be
35 established by the commis-
36 sioner of transportation
37 with the approval of the
38 director of the budget ......... 2,968,654
39 --------------
40 Total ....................... 15,000,000
41 --------------
42 By chapter 54, section 1, of the laws of 2015, as amended by chapter 55,
43 section 1, of the laws of 2016:
44 Notwithstanding any inconsistent provision of law, the following
45 appropriations are for payment of capital expenses including but not
46 limited to the planning and design, acquisition, construction,
47 reconstruction, replacement, improvement, reconditioning, rehabili-
48 tation and preservation of mass transit facilities, vehicles,
49 related equipment and rolling stock with an average service life of
50 no less than 5 years. Such elements will be set forth in plans to be
720 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 approved by the director of the budget (17KW15MT) ..................
2 121,547,600 ...................................... (re. $17,091,000)
3 Project Schedule
4 Project Amount
5 --------------------------------------------
6 To the metropolitan transpor-
7 tation authority for capital
8 projects in support of
9 public transportation
10 services provided directly
11 or under contract ............ 104,127,375
12 To the county of Rockland for
13 capital projects in support
14 of public transportation
15 services provided directly
16 or under contract ................ 193,212
17 To the city of New York for
18 capital projects in support
19 of the Staten Island ferry ..... 1,884,829
20 To the county of Westchester
21 for capital projects in
22 support of public transpor-
23 tation services provided
24 directly or under contract ..... 3,163,599
25 To the county of Nassau for
26 capital projects in support
27 of public transportation
28 services provided directly
29 or under contract .............. 3,826,323
30 To the county of Suffolk for
31 capital projects in support
32 of public transportation
33 services provided directly
34 or under contract .............. 1,488,296
35 To the city of New York for
36 capital projects in support
37 of public transportation bus
38 services provided directly
39 or under contract .............. 5,036,899
40 To all other public transpor-
41 tation systems serving
42 primarily within the metro-
43 politan commuter transporta-
44 tion district, as defined in
45 section 1262 of the public
46 authorities law and eligible
47 to receive operating assist-
48 ance under the provisions of
49 section 18-b of the trans-
50 portation law, for capital
51 projects in support of
721 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 public transportation
2 services provided directly
3 or under contract in accord-
4 ance with a formula to be
5 established by the commis-
6 sioner of transportation
7 with the approval of the
8 director of the budget ......... 1,827,067
9 --------------
10 Total ........................ 121,547,600
11 --------------
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Omnibus and Transit Purpose
15 By chapter 54, section 1, of the laws of 2017:
16 For state aid to municipal corporations for the preparation of
17 designs, plans, specifications and estimates, for the acquisition,
18 construction, reconstruction, and improvement of mass transportation
19 capital projects including the acquisition of real property, for
20 other mass transportation projects including local transportation
21 planning studies. Notwithstanding any inconsistent provisions of
22 law, the state share of such projects shall be 50 percent of the
23 non-federal share, but in no event shall the state share exceed 10
24 percent of project costs.
25 Notwithstanding any other provision of law, the commissioner of trans-
26 portation shall make available directly to the City of New York
27 (City) an amount commensurate with the state share of (i) federal
28 funds previously awarded to the City and reallocated to the metro-
29 politan transportation authority (MTA), and (ii) the federally
30 authorized level of financial assistance transferred by resolution
31 of the metropolitan planning organization (MPO) to the metropolitan
32 transportation authority (MTA) and credited to the City by the MTA
33 for capital expenses.
34 The state share of such reimbursement shall be 50 percent of the non-
35 federal share of the federally authorized level of financial assist-
36 ance transferred to the MTA, but in no event shall the state share
37 exceed 10 percent of project costs. Prior to requesting reimburse-
38 ment for projects progressed by the MTA on behalf of the City, the
39 City shall certify to the commissioner of transportation that each
40 eligible project progressed under this provision is federally eligi-
41 ble and that the match amount requested does not exceed the state
42 share of the federally authorized level of financial assistance. In
43 addition, the City must provide an application to the commissioner
44 of transportation certifying that the work to be funded under the
45 project has been performed and that the City has reimbursed the MTA
46 for 100 percent of the match amount for the project. Upon such
47 application, the commissioner of transportation shall review and
48 approve eligible activities for reimbursement.
49 Prior to requesting approval of a certificate of approval of avail-
50 ability for the moneys hereby appropriated, the commissioner of
722 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 transportation shall certify that each omnibus project progressed
2 under the program has received federal approval.
3 Such certificate shall report the federally authorized level of finan-
4 cial assistance (17OM1729) ... 18,500,000 ........ (re. $18,500,000)
5 By chapter 55, section 1, of the laws of 2016:
6 For state aid to municipal corporations for the preparation of
7 designs, plans, specifications and estimates, for the acquisition,
8 construction, reconstruction, and improvement of mass transportation
9 capital projects including the acquisition of real property, for
10 other mass transportation projects including local transportation
11 planning studies. Notwithstanding any inconsistent provisions of
12 law, the state share of such projects shall be 50 percent of the
13 non-federal share, but in no event shall the state share exceed 10
14 percent of project costs.
15 Notwithstanding any other provision of law, the commissioner of trans-
16 portation shall make available directly to the City of New York
17 (City) an amount commensurate with the state share of (i) federal
18 funds previously awarded to the City and reallocated to the metro-
19 politan transportation authority (MTA), and (ii) the federally
20 authorized level of financial assistance transferred by resolution
21 of the metropolitan planning organization (MPO) to the metropolitan
22 transportation authority (MTA) and credited to the City by the MTA
23 for capital expenses.
24 The state share of such reimbursement shall be 50 percent of the
25 nonfederal share of the federally authorized level of financial
26 assistance transferred to the MTA, but in no event shall the state
27 share exceed 10 percent of project costs. Prior to requesting
28 reimbursement for projects progressed by the MTA on behalf of the
29 City, the City shall certify to the commissioner of transportation
30 that each eligible project progressed under this provision is feder-
31 ally eligible and that the match amount requested does not exceed
32 the state share of the federally authorized level of financial
33 assistance. In addition, the City must provide an application to the
34 commissioner of transportation certifying that the work to be funded
35 under the project has been performed and that the City has reim-
36 bursed the MTA for 100 percent of the match amount for the project.
37 Upon such application, the commissioner of transportation shall
38 review and approve eligible activities for reimbursement.
39 Prior to requesting approval of a certificate of approval of avail-
40 ability for the moneys hereby appropriated, the commissioner of
41 transportation shall certify that each omnibus project progressed
42 under the program has received federal approval.
43 Such certificate shall report the federally authorized level of finan-
44 cial assistance (17OM1629) ... 18,500,000 ........ (re. $18,500,000)
45 By chapter 53, section 1, of the laws of 2015, as amended by chapter 55,
46 section 1, of the laws of 2016:
47 For state aid to municipal corporations for the preparation of
48 designs, plans, specifications and estimates, for the acquisition,
49 construction, reconstruction, and improvement of mass transportation
50 capital projects including the acquisition of real property, for
723 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 other mass transportation projects including local transportation
2 planning studies. Notwithstanding any inconsistent provisions of
3 law, the state share of such projects shall be 50 percent of the
4 non-federal share, but in no event shall the state share exceed 10
5 percent of project costs.
6 Notwithstanding any other provision of law, the commissioner of trans-
7 portation shall make available directly to the City of New York
8 (City) an amount commensurate with the state share of (i) federal
9 funds previously awarded to the City and reallocated to the metro-
10 politan transportation authority (MTA), and (ii) the federally
11 authorized level of financial assistance transferred by resolution
12 of the metropolitan planning organization (MPO) to the metropolitan
13 transportation authority (MTA) and credited to the City by the MTA
14 for capital expenses.
15 The state share of such reimbursement shall be 50 percent of the
16 nonfederal share of the federally authorized level of financial
17 assistance transferred to the MTA, but in no event shall the state
18 share exceed 10 percent of project costs. Prior to requesting
19 reimbursement for projects progressed by the MTA on behalf of the
20 City, the City shall certify to the commissioner of transportation
21 that each eligible project progressed under this provision is feder-
22 ally eligible and that the match amount requested does not exceed
23 the state share of the federally authorized level of financial
24 assistance. In addition, the City must provide an application to the
25 commissioner of transportation certifying that the work to be funded
26 under the project has been performed and that the City has reim-
27 bursed the MTA for 100 percent of the match amount for the project.
28 Upon such application, the commissioner of transportation shall
29 review and approve eligible activities for reimbursement.
30 Prior to requesting approval of a certificate of approval of avail-
31 ability for the moneys hereby appropriated, the commissioner of
32 transportation shall certify that each omnibus project progressed
33 under the program has received federal approval.
34 Such certificate shall report the federally authorized level of finan-
35 cial assistance (17OM1529) ... 18,500,000 ........ (re. $18,500,000)
36 By chapter 53, section 1, of the laws of 2014, as amended by chapter 55,
37 section 1, of the laws of 2016:
38 For state aid to municipal corporations for the preparation of
39 designs, plans, specifications and estimates, for the acquisition,
40 construction, reconstruction, and improvement of mass transportation
41 capital projects including the acquisition of real property, for
42 other mass transportation projects including local transportation
43 planning studies. Notwithstanding any inconsistent provisions of
44 law, the state share of such projects shall be 50 percent of the
45 nonfederal share, but in no event shall the state share exceed 10
46 percent of project costs.
47 Notwithstanding any other provision of law, the commissioner of trans-
48 portation shall make available directly to the City of New York
49 (City) an amount commensurate with the state share of (i) federal
50 funds previously awarded to the City and reallocated to the metro-
51 politan transportation authority (MTA), and (ii) the federally
724 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authorized level of financial assistance transferred by resolution
2 of the metropolitan planning organization (MPO) to the metropolitan
3 transportation authority (MTA) and credited to the City by the MTA
4 for capital expenses.
5 The state share of such reimbursement shall be 50 percent of the
6 nonfederal share of the federally authorized level of financial
7 assistance transferred to the MTA, but in no event shall the state
8 share exceed 10 percent of project costs. Prior to requesting
9 reimbursement for projects progressed by the MTA on behalf of the
10 City, the City shall certify to the commissioner of transportation
11 that each eligible project progressed under this provision is feder-
12 ally eligible and that the match amount requested does not exceed
13 the state share of the federally authorized level of financial
14 assistance. In addition, the City must provide an application to the
15 commissioner of transportation certifying that the work to be funded
16 under the project has been performed and that the City has reim-
17 bursed the MTA for 100 percent of the match amount for the project.
18 Upon such application, the commissioner of transportation shall
19 review and approve eligible activities for reimbursement.
20 Prior to requesting approval of a certificate of approval of avail-
21 ability for the moneys hereby appropriated, the commissioner
22 oftransportation shall certify that each omnibus project progressed
23 under the program has received federal approval.
24 Such certificate shall report the federally authorized level of finan-
25 cial assistance (17OM1429) ... 18,500,000 ........ (re. $13,431,000)
26 The appropriation made by chapter 54, section 1, of the laws of 2013, as
27 amended by chapter 55, section 1, of the laws of 2016, is hereby
28 amended and reappropriated to read:
29 For state aid to municipal corporations for the preparation of
30 designs, plans, specifications and estimates, for the acquisition,
31 construction, reconstruction, and improvement of mass transportation
32 capital projects including the acquisition of real property, for
33 other mass transportation projects including local transportation
34 planning studies. Notwithstanding any inconsistent provisions of
35 law, the state share of such projects shall be 50 percent of the
36 nonfederal share, but in no event shall the state share exceed 10
37 percent of project costs.
38 Notwithstanding any other provision of law, the commissioner of trans-
39 portation shall make available directly to the City of New York
40 (City) an amount commensurate with the state share of (i) federal
41 funds previously awarded to the City and reallocated to the metro-
42 politan transportation authority (MTA), and (ii) the federally
43 authorized level of financial assistance transferred by resolution
44 of the metropolitan planning organization (MPO) to the metropolitan
45 transportation authority (MTA) and credited to the City by the MTA
46 for capital expenses.
47 The state share of such reimbursement shall be 50 percent of the
48 nonfederal share of the federally authorized level of financial
49 assistance transferred to the MTA, but in no event shall the state
50 share exceed 10 percent of project costs. Prior to requesting
51 reimbursement for projects progressed by the MTA on behalf of the
725 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 City, the City shall certify to the commissioner of transportation
2 that each eligible project progressed under this provision is feder-
3 ally eligible and that the match amount requested does not exceed
4 the state share of the federally authorized level of financial
5 assistance. In addition, the City must provide an application to the
6 commissioner of transportation certifying that the work to be funded
7 under the project has been performed and that the City has reim-
8 bursed the MTA for 100 percent of the match amount for the project.
9 Upon such application, the commissioner of transportation shall
10 review and approve eligible activities for reimbursement.
11 Prior to requesting approval of a certificate of approval of avail-
12 ability for the moneys hereby appropriated, the commissioner of
13 transportation shall certify that each omnibus project progressed
14 under the program has received federal approval.
15 Such certificate shall report the federally authorized level of finan-
16 cial assistance (17OM1329) .........................................
17 [18,500,000] 17,740,294 ........................... (re. $7,205,000)
18 The appropriation made by chapter 54, section 1, of the laws of 2012, as
19 amended by chapter 55, section 1, of the laws of 2016, is hereby
20 amended and reappropriated to read:
21 For state aid to municipal corporations for the preparation of
22 designs, plans, specifications and estimates, for the acquisition,
23 construction, reconstruction, and improvement of mass transportation
24 capital projects including the acquisition of real property, for
25 other mass transportation projects including local transportation
26 planning studies. Notwithstanding any inconsistent provisions of
27 law, the state share of such projects shall be 50 percent of the
28 nonfederal share, but in no event shall the state share exceed 10
29 percent of project costs.
30 Notwithstanding any other provision of law, the commissioner of trans-
31 portation shall make available directly to the City of New York
32 (City) an amount commensurate with the state share of (i) federal
33 funds previously awarded to the City and reallocated to the metro-
34 politan transportation authority (MTA), and (ii) the federally
35 authorized level of financial assistance transferred by resolution
36 of the metropolitan planning organization (MPO) to the metropolitan
37 transportation authority (MTA) and credited to the City by the MTA
38 for capital expenses.
39 The state share of such reimbursement shall be 50 percent of the
40 nonfederal share of the federally authorized level of financial
41 assistance transferred to the MTA, but in no event shall the state
42 share exceed 10 percent of project costs. Prior to requesting
43 reimbursement for projects progressed by the MTA on behalf of the
44 City, the City shall certify to the commissioner of transportation
45 that each eligible project progressed under this provision is feder-
46 ally eligible and that the match amount requested does not exceed
47 the state share of the federally authorized level of financial
48 assistance. In addition, the City must provide an application to the
49 commissioner of transportation certifying that the work to be funded
50 under the project has been performed and that the City has reim-
51 bursed the MTA for 100 percent of the match amount for the project.
726 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Upon such application, the commissioner of transportation shall
2 review and approve eligible activities for reimbursement.
3 Prior to requesting approval of a certificate of approval of avail-
4 ability for the moneys hereby appropriated, the commissioner of
5 transportation shall certify that each omnibus project progressed
6 under the program has received federal approval. Such certificate
7 shall report the federally authorized level of financial assistance
8 (17OM1229) ... [18,500,000] 11,709,313 ............ (re. $5,008,000)
9 The appropriation made by chapter 54, section 1, of the laws of 2011, as
10 amended by chapter 55, section 1, of the laws of 2016, is hereby
11 amended and reappropriated to read:
12 For state aid to municipal corporations for the preparation of
13 designs, plans, specifications and estimates, for the acquisition,
14 construction, reconstruction, and improvement of mass transportation
15 capital projects including the acquisition of real property, for
16 other mass transportation projects including local transportation
17 planning studies. Notwithstanding any inconsistent provisions of
18 law, the state share of such projects shall be 50 percent of the
19 nonfederal share, but in no event shall the state share exceed 10
20 percent of project costs.
21 Notwithstanding any other provision of law, the commissioner of trans-
22 portation shall make available directly to the City of New York
23 (City) an amount commensurate with the state share of (i) federal
24 funds previously awarded to the City and reallocated to the metro-
25 politan transportation authority (MTA), and (ii) the federally
26 authorized level of financial assistance transferred by resolution
27 of the metropolitan planning organization (MPO) to the metropolitan
28 transportation authority (MTA) and credited to the City by the MTA
29 for capital expenses.
30 The state share of such reimbursement shall be 50 percent of the
31 nonfederal share of the federally authorized level of financial
32 assistance transferred to the MTA, but in no event shall the state
33 share exceed 10 percent of project costs. Prior to requesting
34 reimbursement for projects progressed by the MTA on behalf of the
35 City, the City shall certify to the commissioner of transportation
36 that each eligible project progressed under this provision is feder-
37 ally eligible and that the match amount requested does not exceed
38 the state share of the federally authorized level of financial
39 assistance. In addition, the City must provide an application to
40 the commissioner of transportation certifying that the work to be
41 funded under the project has been performed and that the City has
42 reimbursed the MTA for 100 percent of the match amount for the
43 project. Upon such application, the commissioner of transportation
44 shall review and approve eligible activities for reimbursement.
45 Prior to requesting approval of a certificate of approval of avail-
46 ability for the moneys hereby appropriated, the commissioner of
47 transportation shall certify that each omnibus project progressed
48 under the program has received federal approval. Such certificate
49 shall report the federally authorized level of financial assistance
50 (17OM1129) ... [18,500,000] 4,694,992 ............. (re. $1,417,000)
727 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2010, as amended by chapter 55,
2 section 1, of the laws of 2016:
3 For state aid to municipal corporations for the preparation of
4 designs, plans, specifications and estimates, for the acquisition,
5 construction, reconstruction, and improvement of mass transportation
6 capital projects including the acquisition of real property, for
7 other mass transportation projects including local transportation
8 planning studies. Notwithstanding any inconsistent provisions of
9 law, the state share of such projects shall be 50 percent of the
10 nonfederal share, but in no event shall the state share exceed 10
11 percent of project costs.
12 Notwithstanding any other provision of law, the commissioner of trans-
13 portation shall make available directly to the City of New York
14 (City) an amount commensurate with the state share of (i) federal
15 funds previously awarded to the City and reallocated to the metro-
16 politan transportation authority (MTA), and (ii) the federally
17 authorized level of financial assistance transferred by resolution
18 of the metropolitan planning organization (MPO) to the metropolitan
19 transportation authority (MTA) and credited to the City by the MTA
20 for capital expenses.
21 The state share of such reimbursement shall be 50 percent of the
22 nonfederal share of the federally authorized level of financial
23 assistance transferred to the MTA, but in no event shall the state
24 share exceed 10 percent of project costs. Prior to requesting
25 reimbursement for projects progressed by the MTA on behalf of the
26 City, the City shall certify to the commissioner of transportation
27 that each eligible project progressed under this provision is feder-
28 ally eligible and that the match amount requested does not exceed
29 the state share of the federally authorized level of financial
30 assistance. In addition, the City must provide an application to
31 the commissioner of transportation certifying that the work to be
32 funded under the project has been performed and that the City has
33 reimbursed the MTA for 100 percent of the match amount for the
34 project. Upon such application, the commissioner of transportation
35 shall review and approve eligible activities for reimbursement.
36 Prior to requesting approval of a certificate of approval of avail-
37 ability for the moneys hereby appropriated, the commissioner of
38 transportation shall certify that each omnibus project progressed
39 under the program has received federal approval. Such certificate
40 shall report the federally authorized level of financial assistance
41 (17OM1029) ... [18,500,000] 4,394,227 ............. (re. $2,360,000)
42 The appropriation made by chapter 55, section 1, of the laws of 2009, as
43 amended by chapter 55, section 1, of the laws of 2016, is hereby
44 amended and reappropriated to read:
45 For state aid to municipal corporations for the preparation of
46 designs, plans, specifications and estimates, for the acquisition,
47 construction, reconstruction, and improvement of mass transportation
48 capital projects including the acquisition of real property, for
49 other mass transportation projects including local transportation
50 planning studies. Notwithstanding any inconsistent provisions of
51 law, the state share of such projects shall be 50 percent of the
728 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 nonfederal share, but in no event shall the state share exceed 10
2 percent of project costs.
3 Notwithstanding any other provision of law, the commissioner of trans-
4 portation shall make available directly to the City of New York
5 (City) an amount commensurate with the state share of (i) federal
6 funds previously awarded to the City and reallocated to the metro-
7 politan transportation authority (MTA), and (ii) the federally
8 authorized level of financial assistance transferred by resolution
9 of the metropolitan planning organization (MPO) to the metropolitan
10 transportation authority (MTA) and credited to the City by the MTA
11 for capital expenses.
12 The state share of such reimbursement shall be 50 percent of the
13 nonfederal share of the federally authorized level of financial
14 assistance transferred to the MTA, but in no event shall the state
15 share exceed 10 percent of project costs. Prior to requesting
16 reimbursement for projects progressed by the MTA on behalf of the
17 City, the City shall certify to the commissioner of transportation
18 that each eligible project progressed under this provision is feder-
19 ally eligible and that the match amount requested does not exceed
20 the state share of the federally authorized level of financial
21 assistance. In addition, the City must provide an application to the
22 commissioner of transportation certifying that the work to be funded
23 under the project has been performed and that the City has reim-
24 bursed the MTA for 100 percent of the match amount for the project.
25 Upon such application, the commissioner of transportation shall
26 review and approve eligible activities for reimbursement.
27 Prior to requesting approval of a certificate of approval of avail-
28 ability for the moneys hereby appropriated, the commissioner of
29 transportation shall certify that each omnibus project progressed
30 under the program has received federal approval. Such certificate
31 shall report the federally authorized level of financial assistance
32 (17OM0929) ... [21,000,000] 4,278,964 ............. (re. $2,733,000)
33 The appropriation made by chapter 55, section 1, of the laws of 2008, as
34 amended by chapter 55, section 1, of the laws of 2016, is hereby
35 amended and reappropriated to read:
36 For state aid to municipal corporations for the preparation of
37 designs, plans, specifications and estimates, for the acquisition,
38 construction, reconstruction, and improvement of mass transportation
39 capital projects including the acquisition of real property, for
40 other mass transportation projects including local transportation
41 planning studies. Notwithstanding any inconsistent provisions of
42 law, the state share of such projects shall be 50 percent of the
43 nonfederal share, but in no event shall the state share exceed 10
44 percent of project costs.
45 Notwithstanding any other provision of law, the commissioner of trans-
46 portation shall make available directly to the City of New York
47 (City) an amount commensurate with the state share of (i) federal
48 funds previously awarded to the City and reallocated to the metro-
49 politan transportation authority (MTA), and (ii) the federally
50 authorized level of financial assistance transferred by resolution
51 of the metropolitan planning organization (MPO) to the metropolitan
729 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 transportation authority (MTA) and credited to the City by the MTA
2 for capital expenses.
3 The state share of such reimbursement shall be 50 percent of the
4 nonfederal share of the federally authorized level of financial
5 assistance transferred to the MTA, but in no event shall the state
6 share exceed 10 percent of project costs. Prior to requesting
7 reimbursement for projects progressed by the MTA on behalf of the
8 City, the City shall certify to the commissioner of transportation
9 that each eligible project progressed under this provision is feder-
10 ally eligible and that the match amount requested does not exceed
11 the state share of the federally authorized level of financial
12 assistance. In addition, the City must provide an application to the
13 commissioner of transportation certifying that the work to be funded
14 under the project has been performed and that the City has reim-
15 bursed the MTA for 100 percent of the match amount for the project.
16 Upon such application, the commissioner of transportation shall
17 review and approve eligible activities for reimbursement.
18 Prior to requesting approval of a certificate of approval of avail-
19 ability for the moneys hereby appropriated, the commissioner of
20 transportation shall certify that each omnibus project progressed
21 under the program has received federal approval. Such certificate
22 shall report the federally authorized level of financial assistance
23 (17OM0829) ... [20,000,000] 3,162,902 ............. (re. $2,529,000)
24 The appropriation made by chapter 55, section 1, of the laws of 2007, as
25 amended by chapter 55, section 1, of the laws of 2016, is hereby
26 amended and reappropriated to read:
27 For state aid to municipal corporations for the preparation of
28 designs, plans, specifications and estimates, for the acquisition,
29 construction, reconstruction, and improvement of mass transportation
30 capital projects including the acquisition of real property, for
31 other mass transportation projects including local transportation
32 planning studies. Notwithstanding any inconsistent provisions of
33 law, the state share of such projects shall be 50 percent of the
34 nonfederal share, but in no event shall the state share exceed 10
35 percent of project costs.
36 Notwithstanding any other provision of law, the commissioner of trans-
37 portation shall make available directly to the City of New York
38 (City) an amount commensurate with the state share of (i) federal
39 funds previously awarded to the City and reallocated to the metro-
40 politan transportation authority (MTA), and (ii) the federally
41 authorized level of financial assistance transferred by resolution
42 of the metropolitan planning organization (MPO) to the metropolitan
43 transportation authority (MTA) and credited to the City by the MTA
44 for capital expenses.
45 The state share of such reimbursement shall be 50 percent of the
46 nonfederal share of the federally authorized level of financial
47 assistance transferred to the MTA, but in no event shall the state
48 share exceed 10 percent of project costs. Prior to requesting
49 reimbursement for projects progressed by the MTA on behalf of the
50 City, the City shall certify to the commissioner of transportation
51 that each eligible project progressed under this provision is feder-
730 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ally eligible and that the match amount requested does not exceed
2 the state share of the federally authorized level of financial
3 assistance. In addition, the City must provide an application to the
4 commissioner of transportation certifying that the work to be funded
5 under the project has been performed and that the City has reim-
6 bursed the MTA for 100 percent of the match amount for the project.
7 Upon such application, the commissioner of transportation shall
8 review and approve eligible activities for reimbursement.
9 Prior to requesting approval of a certificate of approval of avail-
10 ability for the moneys hereby appropriated, the commissioner of
11 transportation shall certify that each omnibus project progressed
12 under the program has received federal approval. Such certificate
13 shall report the federally authorized level of financial assistance
14 (17OM0729) ... [19,000,000] 3,272,225 ............. (re. $2,807,000)
15 The appropriation made by chapter 55, section 1, of the laws of 2006, as
16 amended by chapter 55, section 1, of the laws of 2016, is hereby
17 amended and reappropriated to read:
18 For state aid to municipal corporations for the preparation of
19 designs, plans, specifications and estimates, for the acquisition,
20 construction, reconstruction, and improvement of mass transportation
21 capital projects including the acquisition of real property, for
22 other mass transportation projects including local transportation
23 dlanning studies. Notwithstanding any inconsistent provisions of
24 law, the state share of such projects shall be 50 percent of the
25 nonfederal share, but in no event shall the state share exceed 10
26 percent of project costs.
27 Notwithstanding any other provision of law, the commissioner of trans-
28 portation shall make available directly to the City of New York
29 (City) an amount commensurate with the state share of (i) federal
30 funds previously awarded to the City and reallocated to the metro-
31 politan transportation authority (MTA), and (ii) the federally
32 authorized level of financial assistance transferred by resolution
33 of the metropolitan planning organization (MPO) to the metropolitan
34 transportation authority (MTA) and credited to the City by the MTA
35 for capital expenses.
36 The state share of such reimbursement shall be 50 percent of the non-
37 federal share of the federally authorized level of financial assist-
38 ance transferred to the MTA, but in no event shall the state share
39 exceed 10 percent of project costs. Prior to requesting reimburse-
40 ment for projects progressed by the MTA on behalf of the City, the
41 City shall certify to the commissioner of transportation that each
42 eligible project progressed under this provision is federally eligi-
43 ble and that the match amount requested does not exceed the state
44 share of the federally authorized level of financial assistance. In
45 addition, the City must provide an application to the commissioner
46 of transportation certifying that the work to be funded under the
47 project has been performed and that the City has reimbursed the MTA
48 for 100 percent of the match amount for the project. Upon such
49 application, the commissioner of transportation shall review and
50 approve eligible activities for reimbursement.
731 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Prior to requesting approval of a certificate of approval of avail-
2 ability for the moneys hereby appropriated, the commissioner of
3 transportation shall certify that each omnibus project progressed
4 under the program has received federal approval. Such certificate
5 shall report the federally authorized level of financial assistance
6 (17OM0629) ... [18,000,000] 1,000,246 ............... (re. $584,000)
7 The appropriation made by chapter 55, section 1, of the laws of 2005, as
8 amended by chapter 55, section 1, of the laws of 2016, is hereby
9 amended and reappropriated to read:
10 For state aid to municipal corporations for the preparation of
11 designs, plans, specifications and estimates, for the acquisition,
12 construction, reconstruction, and improvement of mass transportation
13 capital projects including the acquisition of real property, for
14 other mass transportation projects including local transportation
15 planning studies and liabilities incurred prior to April 1, 2005.
16 Notwithstanding any inconsistent provisions of law, the state share
17 of such projects shall be 50 percent of the non-federal share, but
18 in no event shall the state share exceed 10 percent of project
19 costs.
20 Notwithstanding any other provision of law, the commissioner of trans-
21 portation shall make available directly to the City of New York
22 (City) an amount commensurate with the state share of (i) federal
23 funds previously awarded to the City and reallocated to the metro-
24 politan transportation authority (MTA), and (ii) the federally
25 authorized level of financial assistance transferred by resolution
26 of the metropolitan planning organization (MPO) to the metropolitan
27 transportation authority (MTA) and credited to the City by the MTA
28 for capital expenses. The state share of such reimbursement shall be
29 50 percent of the non-federal share of the federally authorized
30 level of financial assistance transferred to the MTA, but in no
31 event shall the state share exceed 10 percent of project costs.
32 Prior to requesting reimbursement for projects progressed by the MTA
33 on behalf of the City, the City shall certify to the commissioner of
34 transportation that each eligible project progressed under this
35 provision is federally eligible and that the match amount requested
36 does not exceed the state share of the federally authorized level of
37 financial assistance. In addition, the City must provide an applica-
38 tion to the commissioner of transportation certifying that the work
39 to be funded under the project has been performed and that the City
40 has reimbursed the MTA for 100 percent of the match amount for the
41 project. Upon such application, the commissioner of transportation
42 shall review and approve eligible activities for reimbursement.
43 Prior to requesting approval of a certificate of approval of avail-
44 ability for the moneys hereby appropriated, the commissioner of
45 transportation shall certify that each omnibus project progressed
46 under the program has received federal approval. Such certificate
47 shall report the federally authorized level of financial assistance
48 (17OB0529) ... [24,000,000] 772,717 ................. (re. $759,000)
49 For state aid to municipal corporations for the preparation of
50 designs, plans, specifications and estimates, for the acquisition,
51 construction, reconstruction, and improvement of mass transportation
732 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 capital projects including the acquisition of real property, for
2 other mass transportation projects including local transportation
3 planning studies. Notwithstanding any inconsistent provisions of
4 law, the state share of such projects shall be 50 percent of the
5 nonfederal share, but in no event shall the state share exceed 10
6 percent of project costs.
7 Notwithstanding any other provision of law, the commissioner of trans-
8 portation shall make available directly to the City of New York
9 (City) an amount commensurate with the state share of (i) federal
10 funds previously awarded to the City and reallocated to the metro-
11 politan transportation authority (MTA), and (ii) the federally
12 authorized level of financial assistance transferred by resolution
13 of the metropolitan planning organization (MPO) to the metropolitan
14 transportation authority (MTA) and credited to the City by the MTA
15 for capital expenses. The state share of such reimbursement shall be
16 50 percent of the non-federal share of the federally authorized
17 level of financial assistance transferred to the MTA, but in no
18 event shall the state share exceed 10 percent of project costs.
19 Prior to requesting reimbursement for projects progressed by the MTA
20 on behalf of the City, the City shall certify to the commissioner of
21 transportation that each eligible project progressed under this
22 provision is federally eligible and that the match amount requested
23 does not exceed the state share of the federally authorized level of
24 financial assistance. In addition, the City must provide an applica-
25 tion to the commissioner of transportation certifying that the work
26 to be funded under the project has been performed and that the City
27 has reimbursed the MTA for 100 percent of the match amount for the
28 project. Upon such application, the commissioner of transportation
29 shall review and approve eligible activities for reimbursement.
30 Prior to requesting approval of a certificate of approval of avail-
31 ability for the moneys hereby appropriated, the commissioner of
32 transportation shall certify that each omnibus project progressed
33 under the program has received federal approval. Such certificate
34 shall report the federally authorized level of financial assistance
35 (17OM0529) ... [17,000,000] 406,613 ................. (re. $325,000)
36 The appropriation made by chapter 55, section 1, of the laws of 2004, as
37 amended by chapter 55, section 1, of the laws of 2016, is hereby
38 amended and reappropriated to read:
39 For state aid to municipal corporations for the preparation of
40 designs, plans, specifications and estimates, for the acquisition,
41 construction, reconstruction, and improvement of mass transportation
42 capital projects including the acquisition of real property, for
43 other mass transportation projects including local transportation
44 planning studies and liabilities incurred prior to April 1, 2004.
45 Notwithstanding any inconsistent provisions of law, the state share of
46 such projects shall be 50 percent of the non-federal share, but in
47 no event shall the state share exceed 10 percent of project costs.
48 Prior to requesting approval of a certificate of approval of avail-
49 ability for the moneys hereby appropriated, the commissioner of
50 transportation shall certify that each omnibus project progressed
51 under the program has received federal approval. Such certificate
733 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 shall report the federally authorized level of financial assistance
2 (17OM0429) ... ..... [15,815,000] 1,365,089 ....... (re. $630,000)
3 The appropriation made by chapter 55, section 1, of the laws of 2003, as
4 amended by chapter 55, section 1, of the laws of 2016, is hereby
5 amended and reappropriated to read:
6 For state aid to municipal corporations for the preparation of
7 designs, plans, specifications and estimates, for the acquisition,
8 construction, reconstruction, and improvement of mass transportation
9 capital projects including the acquisition of real property, for
10 other mass transportation projects including local transportation
11 planning studies and liabilities incurred prior to April 1, 2003
12 (17OM0329) ... ..... [15,815,000] 55,159 ........... (re. $55,000)
13 The appropriation made by chapter 55, section 1, of the laws of 2002, as
14 amended by chapter 55, section 1, of the laws of 2016, is hereby
15 amended and reappropriated to read:
16 For state aid to municipal corporations for the preparation of
17 designs, plans, specifications and estimates, for the acquisition,
18 construction, reconstruction, and improvement of mass transportation
19 capital projects including the acquisition of real property, for
20 other mass transportation projects including local transportation
21 planning studies and liabilities incurred prior to April 1, 2002
22 (17OM0229) ... ..... [15,815,000] 136,853 ......... (re. $111,000)
23 The appropriation made by chapter 55, section 1, of the laws of 2001, as
24 amended by chapter 55, section 1, of the laws of 2016, is hereby
25 amended and reappropriated to read:
26 For state aid to municipal corporations for the preparation of
27 designs, plans, specifications and estimates, for the acquisition,
28 construction, reconstruction, and improvement of mass transportation
29 capital projects including the acquisition of real property, for
30 other mass transportation projects including local transportation
31 planning studies and liabilities incurred prior to April 1, 2001
32 (17OM0129) ... ..... [15,815,000] 447,258 ......... (re. $447,000)
33 The appropriation made by chapter 55, section 1, of the laws of 2000, as
34 amended by chapter 55, section 1, of the laws of 2016, is hereby
35 amended and reappropriated to read:
36 For state aid to municipal corporations for the preparation of
37 designs, plans, specifications and estimates, for the acquisition,
38 construction, reconstruction, and improvement of mass transportation
39 capital projects including the acquisition of real property, for
40 other mass transportation projects including local transportation
41 planning studies and liabilities incurred prior to April 1, 2000
42 (17OM0029) ... ..... [15,568,000] 6,854,619 ..... (re. $6,748,000)
43 The appropriation made by chapter 55, section 1, of the laws of 1999, as
44 amended by chapter 55, section 1, of the laws of 2016, is hereby
45 amended and reappropriated to read:
46 For state aid to municipal corporations for the preparation of
47 designs, plans, specifications and estimates, for the acquisition,
734 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 construction, reconstruction, and improvement of mass transportation
2 capital projects including the acquisition of real property, for
3 other mass transportation projects including local transportation
4 planning studies and liabilities incurred prior to April 1, 1999
5 (17OM9929) ... ..... [14,628,000] 1,130,662 ..... (re. $1,130,000)
6 The appropriation made by chapter 55, section 1, of the laws of 1998, as
7 amended by chapter 55, section 1, of the laws of 2016, is hereby
8 amended and reappropriated to read:
9 For state aid to municipal corporations for the preparation of
10 designs, plans, specifications and estimates, for the acquisition,
11 construction, reconstruction, and improvement of mass transportation
12 capital projects including the acquisition of real property, for
13 other mass transportation projects including local transportation
14 planning studies and liabilities incurred prior to April 1, 1998
15 (17OM9829) ... ..... [10,489,000] 380,078 ......... (re. $380,000)
16 The appropriation made by chapter 55, section 1, of the laws of 1997, as
17 amended by chapter 55, section 1, of the laws of 2016, is hereby
18 amended and reappropriated to read:
19 For state aid to municipal corporations for the preparation of
20 designs, plans, specifications and estimates, for the acquisition,
21 construction, reconstruction, and improvement of mass transportation
22 capital projects including the acquisition of real property, for
23 other mass transportation projects including local transportation
24 planning studies and liabilities incurred prior to April 1, 1997
25 (17OM9729) ... ..... [10,489,000] 434,519 ......... (re. $434,000)
26 The appropriation made by chapter 55, section 1, of the laws of 1996, as
27 amended by chapter 55, section 1, of the laws of 2016, is hereby
28 amended and reappropriated to read:
29 For state aid to municipal corporations for the preparation of
30 designs, plans, specifications and estimates, for the acquisition,
31 construction, reconstruction, and improvement of mass transportation
32 capital projects including the acquisition of real property and
33 liabilities incurred prior to April 1, 1996 (17OM9629) ... .......
34 [12,200,000] 487,483 ................................ (re. $487,000)
35 The appropriation made by chapter 54, section 1, of the laws of 1994, as
36 amended by chapter 55, section 1, of the laws of 2016, is hereby
37 amended and reappropriated to read:
38 For state aid to municipal corporations for the preparation of
39 designs, plans, specifications and estimates, for the acquisition,
40 construction, reconstruction, and improvement of mass transportation
41 capital projects including the acquisition of real property and
42 liabilities incurred prior to April 1, 1994 (17OM9429) ... .......
43 [19,427,000] 9,075,757 ............................ (re. $8,664,000)
44 The appropriation made by chapter 54, section 1, of the laws of 1993, as
45 amended by chapter 55, section 1, of the laws of 2016, is hereby
46 amended and reappropriated to read:
735 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For state aid to municipal corporations for the preparation of
2 designs, plans, specifications and estimates, for the acquisition,
3 construction, reconstruction, and improvement of mass transportation
4 capital projects including the acquisition of real property and
5 liabilities incurred prior to April 1, 1993 (17OM9329) ... .......
6 [11,052,000] 4,181,445 ............................ (re. $3,359,000)
7 The appropriation made by chapter 54, section 1, of the laws of 1986, as
8 amended by chapter 55, section 1, of the laws of 2016, is hereby
9 amended and reappropriated to read:
10 For state aid to municipal corporations for the preparation of
11 designs, plans, specifications and estimates, for the acquisition,
12 construction, reconstruction, and improvement of mass transportation
13 capital projects notwithstanding any inconsistent provisions of law,
14 including the acquisition of real property and liabilities incurred
15 prior to April one, nineteen hundred eighty-six (17OS8629) ... ...
16 [9,700,000] 641,834 ................................. (re. $641,000)
17 MASS TRANSPORTATION AND RAIL FREIGHT (CCP)
18 Capital Projects Funds - Other
19 Capital Projects Fund
20 High Speed Rail Purpose
21 By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
22 section 5, of the laws of 2006:
23 For the construction and reconstruction of rail capital and highway
24 railroad crossings, facilities and intercity rail passenger service
25 improvements to the New York State Empire Rail Corridor between New
26 York City and Niagara Falls. A corridor program of projects shall be
27 advanced in accordance with a memorandum of understanding between
28 the commissioner and the senate task force on high speed rail
29 (17270641) ... 22,000,000 ......................... (re. $6,122,000)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Mass Transportation and Rail Freight Purpose
33 RAIL AND RAPID TRANSIT
34 By chapter 369, section 2, of the laws of 1979, as amended by chapter
35 54, section 3, of the laws of 1988, for:
36 The acquisition, construction, reconstruction, establishment, improve-
37 ment and rehabilitation of urban, commuter and intercity rail
38 passenger and rapid transit systems and rail freight capital facili-
39 ties, for the acquisition of real property and interests in real
40 roperty required or expected to be required therefor, and for any
41 capital equipment to be used in connection therewith, including all
42 costs incidental thereto in accordance with the following schedule:
43 (01395012) ... .................................... (re. $148,000)
44 The commissioner of transportation shall prepare and submit to the
45 governor as part of his annual budget request submission a report
736 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 which shall make findings and recommendations with respect to the
2 state's intercity rail passenger service and rail service energy
3 conservation programs. Such report shall include, in addition to any
4 other information the commissioner shall determine appropriate, the
5 following: (a) the impact and effectiveness of the state's programs
6 to continue and preserve rail passenger and rail freight services,
7 including federal and state operating subsidy payments actually made
8 and projected to be made during each of the two next succeeding
9 state fiscal years; and (b) the development of operating, pricing
10 and fare guidelines and standards of service and equipment and
11 facility maintenance standards that may be applied in evaluating the
12 cost and quality of service on those rail lines receiving state
13 and/or federal operating and/or capital assistance.
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Non-MTA Capital Purpose
17 By chapter 54, section 1, of the laws of 2017:
18 For the payment of the costs of mass transportation capital projects
19 and facilities including replacement of buses meeting federal stand-
20 ards for replacement, related bus equipment and the acquisition,
21 design and construction, including engineering and consulting costs,
22 of mass transit bus garages or other mass transportation projects
23 and facilities approved by the commissioner of transportation in a
24 program of projects. Such funding may be part of a total project of
25 which a portion is federally funded but shall not be used in substi-
26 tution for the required non-federal matching shares of the federal-
27 ly-funded portion of the project to which it is added. The moneys
28 hereby appropriated are to be made available for projects undertaken
29 by mass transit systems other than those mass transit operating
30 agencies which receive money from the metropolitan transportation
31 authority dedicated tax fund [(17NM1729)] (17NM1731) ...............
32 18,500,000 ....................................... (re. $18,500,000)
33 For the payment of the costs of mass transportation capital projects
34 and facilities including replacement of buses meeting federal stand-
35 ards for replacement, related bus equipment and the acquisition,
36 design and construction, including engineering and consulting costs,
37 of mass transit bus garages or other mass transportation projects
38 and facilities approved by the commissioner of transportation in a
39 program of projects. Such funding may be part of a total project of
40 which a portion is federally funded but shall not be used in substi-
41 tution for the required non-federal matching shares of the federal-
42 ly-funded portion of the project to which it is added. The moneys
43 hereby appropriated are to be made available for projects undertaken
44 by mass transit systems other than those mass transit operating
45 agencies which receive money from the metropolitan transportation
46 authority dedicated tax fund [(17NP1729)] (17NP1731) ...............
47 20,000,000 ....................................... (re. $20,000,000)
48 By chapter 55, section 1, of the laws of 2016:
737 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the payment of the costs of mass transportation capital projects
2 and facilities including replacement of buses meeting federal stand-
3 ards for replacement, related bus equipment and the acquisition,
4 design and construction, including engineering and consulting costs,
5 of mass transit bus garages or other mass transportation projects
6 and facilities approved by the commissioner of transportation in a
7 program of projects. Such funding may be part of a total project of
8 which a portion is federally funded but shall not be used in substi-
9 tution for the required non-federal matching shares of the federal-
10 ly-funded portion of the project to which it is added. The moneys
11 hereby appropriated are to be made available for projects undertaken
12 by mass transit systems other than those mass transit operating
13 agencies which receive money from the metropolitan transportation
14 authority dedicated tax fund [(17NM1629)] (17NM1631) ...............
15 18,500,000 ....................................... (re. $18,500,000)
16 By chapter 53, section 1, of the laws of 2015, as amended by chapter 55,
17 section 1, of the laws of 2016:
18 For the payment of the costs of mass transportation capital projects
19 and facilities including replacement of buses meeting federal stand-
20 ards for replacement, related bus equipment and the acquisition,
21 design and construction, including engineering and consulting costs,
22 of mass transit bus garages or other mass transportation projects
23 and facilities approved by the commissioner of transportation in a
24 program of projects. Such funding may be part of a total project of
25 which a portion is federally funded but shall not be used in substi-
26 tution for the required non-federal matching shares of the federal-
27 ly-funded portion of the project to which it is added. The moneys
28 hereby appropriated are to be made available for projects undertaken
29 by mass transit systems other than those mass transit operating
30 agencies which receive money from the metropolitan transportation
31 authority dedicated tax fund [(17NM1529)] (17NM1531) ...............
32 18,500,000 ....................................... (re. $18,500,000)
33 By chapter 53, section 1, of the laws of 2014, as amended by chapter 55,
34 section 1, of the laws of 2016:
35 For the payment of the costs of mass transportation capital projects
36 and facilities including replacement of buses meeting federal stand-
37 ards for replacement, related bus equipment and the acquisition,
38 design and construction, including engineering and consulting costs,
39 of mass transit bus garages or other mass transportation projects
40 and facilities approved by the commissioner of transportation in a
41 program of projects. Such funding may be part of a total project of
42 which a portion is federally funded but shall not be used in substi-
43 tution for the required non-federal matching shares of the federal-
44 ly-funded portion of the project to which it is added. The moneys
45 hereby appropriated are to be made available for projects undertaken
46 by mass transit systems other than those mass transit operating
47 agencies which receive money from the metropolitan transportation
48 authority dedicated tax fund [(17NM1429)] (17NM1431) ...............
49 18,500,000 ....................................... (re. $18,500,000)
738 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2013, as
2 amended by chapter 55, section 1, of the laws of 2016, is hereby
3 amended and reappropriated to read:
4 For the payment of the costs of mass transportation capital projects
5 and facilities including replacement of buses meeting federal stand-
6 ards for replacement, related bus equipment and the acquisition,
7 design and construction, including engineering and consulting costs,
8 of mass transit bus garages or other mass transportation projects
9 and facilities approved by the commissioner of transportation in a
10 program of projects. Such funding may be part of a total project of
11 which a portion is federally funded but shall not be used in substi-
12 tution for the required non-federal matching shares of the federal-
13 ly-funded portion of the project to which it is added. The moneys
14 hereby appropriated are to be made available for projects undertaken
15 by mass transit systems other than those mass transit operating
16 agencies which receive money from the metropolitan transportation
17 authority dedicated tax fund [(17NM1329)] (17NM1331) ...............
18 [18,500,000] 7,667,146 ............................ (re. $7,411,000)
19 By chapter 54, section 1, of the laws of 2012, as amended by chapter 55,
20 section 1, of the laws of 2016:
21 For the payment of the costs of mass transportation capital projects
22 and facilities including replacement of buses meeting federal stand-
23 ards for replacement, related bus equipment and the acquisition,
24 design and construction, including engineering and consulting costs,
25 of mass transit bus garages or other mass transportation projects
26 and facilities approved by the commissioner of transportation in a
27 program of projects. Such funding may be part of a total project of
28 which a portion is federally funded but shall not be used in substi-
29 tution for the required non-federal matching shares of the federal-
30 ly-funded portion of the project to which it is added. The moneys
31 hereby appropriated are to be made available for projects undertaken
32 by mass transit systems other than those mass transit operating
33 agencies which receive money from the metropolitan transportation
34 authority dedicated tax fund [(17NM1229)] (17NM1231) ...............
35 18,500,000 ....................................... (re. $18,500,000)
36 By chapter 54, section 1, of the laws of 2011, as amended by chapter 55,
37 section 1, of the laws of 2016:
38 For the payment of the costs of mass transportation capital projects
39 and facilities including replacement of buses meeting federal stand-
40 ards for replacement, related bus equipment and the acquisition,
41 design and construction, including engineering and consulting costs,
42 of mass transit bus garages or other mass transportation projects
43 and facilities approved by the commissioner of transportation in a
44 program of projects. Such funding may be part of a total project of
45 which a portion is federally funded but shall not be used in substi-
46 tution for the required non-federal matching shares of the federal-
47 ly-funded portion of the project to which it is added. The moneys
48 hereby appropriated are to be made available for projects undertaken
49 by mass transit systems other than those mass transit operating
50 agencies which receive money from the metropolitan transportation
739 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority dedicated tax fund [(17NM1129)] (17NM1131) ...............
2 18,500,000 ....................................... (re. $18,500,000)
3 By chapter 55, section 1, of the laws of 2010, as amended by chapter 55,
4 section 1, of the laws of 2016:
5 For the payment of the costs of mass transportation capital projects
6 and facilities including replacement of buses meeting federal stand-
7 ards for replacement, related bus equipment and the acquisition,
8 design and construction, including engineering and consulting costs,
9 of mass transit bus garages or other mass transportation projects
10 and facilities approved by the commissioner of transportation in a
11 program of projects. Such funding may be part of a total project of
12 which a portion is federally funded but shall not be used in substi-
13 tution for the required non-federal matching shares of the federal-
14 ly-funded portion of the project to which it is added. The moneys
15 hereby appropriated are to be made available for projects undertaken
16 by mass transit systems other than those mass transit operating
17 agencies which receive money from the metropolitan transportation
18 authority dedicated tax fund [(17NM1029)] (17NM1031) ...............
19 18,500,000 ....................................... (re. $18,500,000)
20 By chapter 55, section 1, of the laws of 2009, as amended by chapter 55,
21 section 1, of the laws of 2016:
22 For the payment of the costs of mass transportation capital projects
23 and facilities including replacement of buses meeting federal stand-
24 ards for replacement, related bus equipment and the acquisition,
25 design and construction, including engineering and consulting costs,
26 of mass transit bus garages or other mass transportation projects
27 and facilities approved by the commissioner of transportation in a
28 program of projects. Such funding may be part of a total project of
29 which a portion is federally funded but shall not be used in substi-
30 tution for the required non-federal matching shares of the federal-
31 ly-funded portion of the project to which it is added. The moneys
32 hereby appropriated are to be made available for projects undertaken
33 by mass transit systems other than those mass transit operating
34 agencies which receive money from the metropolitan transportation
35 authority dedicated tax fund [(17NM0929)] (17NM0931) ...............
36 21,000,000 ....................................... (re. $21,000,000)
37 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
38 section 1, of the laws of 2016:
39 For the payment of the costs of mass transportation capital projects
40 and facilities including replacement of buses meeting federal stand-
41 ards for replacement, related bus equipment and the acquisition,
42 design and construction, including engineering and consulting costs,
43 of mass transit bus garages or other mass transportation projects
44 and facilities approved by the commissioner of transportation in a
45 program of projects. Such funding may be part of a total project of
46 which a portion is federally funded but shall not be used in substi-
47 tution for the required non-federal matching shares of the federal-
48 ly-funded portion of the project to which it is added. The moneys
49 hereby appropriated are to be made available for projects undertaken
740 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 by mass transit systems other than those mass transit operating
2 agencies which receive money from the metropolitan transportation
3 authority dedicated tax fund [(17NM0829)] (17NM0831) ...............
4 21,000,000 ....................................... (re. $21,000,000)
5 The appropriation made by chapter 55, section 1, of the laws of 2007, as
6 amended by chapter 55, section 1, of the laws of 2016, is hereby
7 amended and reappropriated to read:
8 For the payment of the costs of mass transportation capital projects
9 and facilities including replacement of buses meeting federal stand-
10 ards for replacement, related bus equipment and the acquisition,
11 design and construction, including engineering and consulting costs,
12 of mass transit bus garages or other mass transportation projects
13 and facilities approved by the commissioner of transportation in a
14 program of projects. Such funding may be part of a total project of
15 which a portion is federally funded but shall not be used in substi-
16 tution for the required non-federal matching shares of the federal-
17 ly-funded portion of the project to which it is added. The moneys
18 hereby appropriated are to be made available for projects undertaken
19 by mass transit systems other than those mass transit operating
20 agencies which receive money from the metropolitan transportation
21 authority dedicated tax fund [(17NM0729)] (17NM0731) ...............
22 [16,000,000] 13,577,598 .......................... (re. $13,250,000)
23 For the payment of the costs of clean air-related mass transportation
24 capital infrastructure projects, designed to achieve significant
25 environmental benefit including but not limited to the acquisition
26 of clean fuel buses. The moneys hereby appropriated are to be made
27 available for projects undertaken by mass transit systems other than
28 those mass transit operating agencies which receive money from the
29 metropolitan transportation authority dedicated tax fund
30 [(17CA0729)] (17CA0731) ... 17,500,000 ........... (re. $17,500,000)
31 The appropriation made by chapter 55, section 1, of the laws of 2006, as
32 amended by chapter 55, section 1, of the laws of 2016, is hereby
33 amended and reappropriated to read:
34 For the payment of the costs of mass transportation capital projects
35 and facilities including replacement of buses meeting federal stand-
36 ards for replacement, related bus equipment and the acquisition,
37 design and construction, including engineering and consulting costs,
38 of mass transit bus garages or other mass transportation projects
39 and facilities approved by the commissioner of transportation in a
40 program of projects. Such funding may be part of a total project of
41 which a portion is federally funded but shall not be used in substi-
42 tution for the required non-federal matching shares of the federal-
43 ly-funded portion of the project to which it is added. The moneys
44 hereby appropriated are to be made available for projects undertaken
45 by mass transit systems other than those mass transit operating
46 agencies which receive money from the metropolitan transportation
47 authority dedicated tax fund [(17NM0629)] (17NM0631) ...............
48 [16,000,000] 4,456,030 ............................ (re. $4,451,000)
741 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 55, section 1, of the laws of 2005, as
2 amended by chapter 55, section 1, of the laws of 2016, is hereby
3 amended and reappropriated to read:
4 For the payment of the costs of mass transportation capital projects
5 and facilities including replacement of buses meeting federal stand-
6 ards for replacement, related bus equipment and the acquisition,
7 design and construction, including engineering and consulting costs,
8 of mass transit bus garages or other mass transportation projects
9 and facilities approved by the commissioner of transportation in a
10 program of projects. Such funding may be part of a total project of
11 which a portion is federally funded but shall not be used in substi-
12 tution for the required non-federal matching shares of the federal-
13 ly-funded portion of the project to which it is added. The moneys
14 hereby appropriated are to be made available for projects undertaken
15 by mass transit systems other than those mass transit operating
16 agencies which receive money from the metropolitan transportation
17 authority dedicated tax fund [(17NM0529)] (17NM0531) ...............
18 [16,000,000] 3,441,336 ............................ (re. $3,441,000)
19 The appropriation made by chapter 55, section 1, of the laws of 2004, as
20 amended by chapter 55, section 1, of the laws of 2016, is hereby
21 amended and reappropriated to read:
22 For the payment of the costs of mass transportation capital projects
23 and facilities including replacement of buses meeting federal stand-
24 ards for replacement, related bus equipment and the acquisition,
25 design and construction, including engineering and consulting costs,
26 of mass transit bus garages or other mass transportation projects
27 and facilities approved by the commissioner of transportation in a
28 program of projects. Such funding may be part of a total project of
29 which a portion is federally funded but shall not be used in substi-
30 tution for the required non-federal matching shares of the federal-
31 ly-funded portion of the project to which it is added. The moneys
32 hereby appropriated are to be made available for projects undertaken
33 by mass transit systems other than those mass transit operating
34 agencies which receive money from the metropolitan transportation
35 authority dedicated tax fund [(17NM0429)] (17NM0431) ...............
36 [16,000,000] 1,732,542 ............................ (re. $1,704,000)
37 The appropriation made by chapter 55, section 1, of the laws of 2003, as
38 amended by chapter 55, section 1, of the laws of 2016, is hereby
39 amended and reappropriated to read:
40 For the payment of the costs of mass transportation capital projects
41 and facilities including replacement of buses meeting federal stand-
42 ards for replacement, related bus equipment and the acquisition,
43 design and construction, including engineering and consulting costs,
44 of mass transit bus garages or other mass transportation projects
45 and facilities approved by the commissioner of transportation in a
46 program of projects. Such funding may be part of a total project of
47 which a portion is federally funded but shall not be used in substi-
48 tution for the required non-federal matching shares of the federal-
49 ly-funded portion of the project to which it is added. The moneys
50 hereby appropriated are to be made available for projects undertaken
742 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 by mass transit systems other than those mass transit operating
2 agencies which receive money from the metropolitan transportation
3 authority dedicated tax fund [(17NM0329)] (17NM0331) ...............
4 [14,000,000] 715,460 ................................ (re. $715,000)
5 The appropriation made by chapter 55, section 1, of the laws of 2002, as
6 amended by chapter 55, section 1, of the laws of 2016, is hereby
7 amended and reappropriated to read:
8 For the payment of the costs of mass transportation capital projects
9 and facilities including replacement of buses meeting federal stand-
10 ards for replacement, related bus equipment and the acquisition,
11 design and construction, including engineering and consulting costs,
12 of mass transit bus garages or other mass transportation projects
13 and facilities approved by the commissioner of transportation in a
14 program of projects. Such funding may be part of a total project of
15 which a portion is federally funded but shall not be used in substi-
16 tution for the required non-federal matching shares of the federal-
17 ly-funded portion of the project to which it is added. The moneys
18 hereby appropriated are to be made available for projects undertaken
19 by mass transit systems other than those mass transit operating
20 agencies which receive money from the metropolitan transportation
21 authority dedicated tax fund [(17NM0229)] (17NM0231) ...............
22 [14,000,000] 713,410 ................................ (re. $713,000)
23 The appropriation made by chapter 55, section 1, of the laws of 2001, as
24 amended by chapter 55, section 1, of the laws of 2016, is hereby
25 amended and reappropriated to read:
26 For the payment of the costs of mass transportation capital projects
27 and facilities including replacement of buses meeting federal stand-
28 ards for replacement, related bus equipment and the acquisition,
29 design and construction, including engineering and consulting costs,
30 of mass transit bus garages or other mass transportation projects
31 and facilities approved by the commissioner of transportation in a
32 program of projects. Such funding may be part of a total project of
33 which a portion is federally funded but shall not be used in substi-
34 tution for the required non-federal matching shares of the federal-
35 ly-funded portion of the project to which it is added. The moneys
36 hereby appropriated are to be made available for projects undertaken
37 by mass transit systems other than those mass transit operating
38 agencies which receive money from the metropolitan transportation
39 authority dedicated tax fund [(17NM0129)] (17NM0131) ...............
40 [12,000,000] 210,034 ................................ (re. $210,000)
41 The appropriation made by chapter 55, section 1, of the laws of 2000, as
42 amended by chapter 55, section 1, of the laws of 2016, is hereby
43 amended and reappropriated to read:
44 For the payment of the costs of mass transportation capital projects
45 and facilities including replacement of buses meeting federal stand-
46 ards for replacement, related bus equipment and the acquisition,
47 design and construction, including engineering and consulting costs,
48 of mass transit bus garages or other mass transportation projects
49 and facilities approved by the commissioner of transportation in a
743 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 program of projects. Such funding may be part of a total project of
2 which a portion is federally funded but shall not be used in substi-
3 tution for the required non-federal matching shares of the federal-
4 ly-funded portion of the project to which it is added. The moneys
5 hereby appropriated are to be made available for projects undertaken
6 by mass transit systems other than those mass transit operating
7 agencies which receive money from the metropolitan transportation
8 authority dedicated tax fund [(17NM0029)] (17NM0031) ...............
9 [12,000,000] 79,647 .................................. (re. $79,000)
10 The appropriation made by chapter 55, section 1, of the laws of 1999, as
11 amended by chapter 55, section 1, of the laws of 2016, is hereby
12 amended and reappropriated to read:
13 For the payment of the costs of mass transportation capital projects
14 and facilities including replacement of buses meeting federal stand-
15 ards for replacement, related bus equipment and the acquisition,
16 design and construction, including engineering and consulting costs,
17 of mass transit bus garages or other mass transportation projects
18 and facilities approved by the commissioner of transportation in a
19 program of projects. Such funding may be part of a total project of
20 which a portion is federally funded but shall not be used in substi-
21 tution for the required non-federal matching shares of the federal-
22 ly-funded portion of the project to which it is added. The moneys
23 hereby appropriated are to be made available for projects undertaken
24 by mass transit systems other than those mass transit operating
25 agencies which receive money from the metropolitan transportation
26 authority dedicated tax fund [(17NM9929)] (17NM9931) ...............
27 [12,000,000] 2,516,669 ............................ (re. $2,516,000)
28 The appropriation made by chapter 55, section 1, of the laws of 1998, as
29 amended by chapter 55, section 1, of the laws of 2016, is hereby
30 amended and reappropriated to read:
31 For the payment of the costs of mass transportation capital projects
32 and facilities including replacement of buses meeting federal stand-
33 ards for replacement, related bus equipment and the acquisition,
34 design and construction, including engineering and consulting costs,
35 of mass transit bus garages or other mass transportation projects
36 and facilities approved by the commissioner of transportation in a
37 program of projects. Such funding may be part of a total project of
38 which a portion is federally funded but shall not be used in substi-
39 tution for the required non-federal matching shares of the federal-
40 ly-funded portion of the project to which it is added. The moneys
41 hereby appropriated are to be made available for projects undertaken
42 by mass transit systems other than those mass transit operating
43 agencies which receive money from the metropolitan transportation
44 authority dedicated tax fund [(17NM9829)] (17NM9831) ...............
45 [10,000,000] 107,917 ................................ (re. $107,000)
46 The appropriation made by chapter 55, section 1, of the laws of 1997, as
47 amended by chapter 55, section 1, of the laws of 2016, is hereby
48 amended and reappropriated to read:
744 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the payment of the costs of mass transportation capital projects
2 and facilities including replacement of buses meeting federal stand-
3 ards for replacement, related bus equipment and the acquisition,
4 design and construction, including engineering and consulting costs,
5 of mass transit bus garages or other mass transportation projects
6 and facilities approved by the commissioner of transportation in a
7 program of projects. Such funding may be part of a total project of
8 which a portion is federally funded but shall not be used in substi-
9 tution for the required non-federal matching shares of the federal-
10 ly-funded portion of the project to which it is added. The moneys
11 hereby appropriated are to be made available for projects undertaken
12 by mass transit systems other than those mass transit operating
13 agencies which receive money from the metropolitan transportation
14 authority dedicated tax fund [(17NM9729)] (17NM9731) ...............
15 [16,000,000] 9,604 .................................... (re. $9,000)
16 Capital Projects Funds - Other
17 Dedicated Highway and Bridge Trust Fund
18 Rail Service Preservation Purpose
19 By chapter 54, section 1, of the laws of 2017:
20 For the payment of the costs, including the payment of liabilities
21 incurred prior to April 1, 2017, of the construction and improvement
22 of passenger rail, freight rail, and, notwithstanding any inconsist-
23 ent provisions of law, for port capital facilities outside the
24 jurisdiction of the port authority of New York and New Jersey,
25 including but not limited to the acquisition, construction, recon-
26 struction, improvement or rehabilitation of railroad or port capital
27 facilities, and any capital improvement used in connection here-
28 with, and for the acquisition of real property or interests in real
29 property required or expected to be required therefor (17161741) ...
30 10,000,000 ....................................... (re. $10,000,000)
31 Notwithstanding the provisions of section 89-b of the state finance
32 law, for contractual agreements entered into for rail passenger
33 service (17171741) ... 44,330,000 ................ (re. $44,330,000)
34 By chapter 55, section 1, of the laws of 2016:
35 For the payment of the costs, including the payment of liabilities
36 incurred prior to April 1, 2016, of the construction and improvement
37 of passenger rail, freight rail, and, notwithstanding any inconsist-
38 ent provisions of law, for port capital facilities outside the
39 jurisdiction of the port authority of New York and New Jersey,
40 including but not limited to the acquisition, construction, recon-
41 struction, improvement or rehabilitation of railroad or port capital
42 facilities, and any capital improvement used in connection herewith,
43 and for the acquisition of real property or interests in real prop-
44 erty required or expected to be required therefor (17161641) ...
45 10,000,000 ....................................... (re. $10,000,000)
46 Notwithstanding the provisions of section 89-b of the state finance
47 law, for contractual agreements entered into for rail passenger
48 service (17171641) ... 44,330,000 ................ (re. $30,034,000)
745 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2015:
2 For the payment of the costs, including the payment of liabilities
3 incurred prior to April 1, 2015, of the construction and improvement
4 of passenger rail, freight rail, and, notwithstanding any inconsist-
5 ent provisions of law, for port capital facilities outside the
6 jurisdiction of the port authority of New York and New Jersey,
7 including but not limited to the acquisition, construction, recon-
8 struction, improvement or rehabilitation of railroad or port capital
9 facilities, and any capital improvement used in connection herewith,
10 and for the acquisition of real property or interests in real prop-
11 erty required or expected to be required therefor (17161541) ...
12 10,000,000 ........................................ (re. $9,950,000)
13 Notwithstanding the provisions of section 89-b of the state finance
14 law, for contractual agreements entered into for rail passenger
15 service (17171541) ... 44,330,000 ................ (re. $12,836,000)
16 By chapter 54, section 1, of the laws of 2014:
17 Notwithstanding the provisions of section 89-b of the state finance
18 law, for the construction and improvement of passenger and rail
19 freight projects including, but not limited to, the acquisition,
20 construction, reconstruction, improvement or rehabilitation of any
21 railroad capital facility and any capital improvement used in
22 connection herewith, and for the acquisition of real property or
23 interests in real property required or expected to be required
24 therefor (17161441) ... 10,000,000 ............... (re. $5,589,000)
25 Notwithstanding the provisions of section 89-b of the state finance
26 law, for contractual agreements entered into for rail passenger
27 service (17171441) ... 44,330,000 ................. (re. $4,639,000)
28 By chapter 54, section 1, of the laws of 2013:
29 Notwithstanding the provisions of section 89-b of the state finance
30 law, for the construction and improvement of passenger and rail
31 freight projects including, but not limited to, the acquisition,
32 construction, reconstruction, improvement or rehabilitation of any
33 railroad capital facility and any capital improvement used in
34 connection herewith, and for the acquisition of real property or
35 interests in real property required or expected to be required
36 therefor (17161341) ... 10,000,000 ................ (re. $4,020,000)
37 Notwithstanding the provisions of section 89-b of the state finance
38 law, for contractual agreements entered into for rail passenger
39 service (17171341) ... 44,330,000 ................. (re. $2,905,000)
40 By chapter 54, section 1, of the laws of 2012:
41 Notwithstanding the provisions of section 89-b of the state finance
42 law, for the construction and improvement of passenger and rail
43 freight projects including, but not limited to, the acquisition,
44 construction, reconstruction, improvement or rehabilitation of any
45 railroad capital facility and any capital improvement used in
46 connection herewith, for contractual agreements entered into for
47 rail passenger service, and for the acquisition of real property or
48 interests in real property required or expected to be required
49 therefor (17161241) ... 26,620,000 ............... (re. $14,607,000)
746 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2011:
2 Notwithstanding the provisions of section 89-b of the state finance
3 law, for the construction and improvement of passenger and rail
4 freight projects including, but not limited to, the acquisition,
5 construction, reconstruction, improvement or rehabilitation of any
6 railroad capital facility and any capital improvement used in
7 connection herewith, for contractual agreements entered into for
8 rail passenger service, and for the acquisition of real property or
9 interests in real property required or expected to be required
10 therefor (17161141) ... 16,930,000 ................ (re. $6,458,000)
11 By chapter 55, section 1, of the laws of 2010:
12 Notwithstanding the provisions of section 89-b of the state finance
13 law, for the construction and improvement of passenger and rail
14 freight projects including, but not limited to, the acquisition,
15 construction, reconstruction, improvement or rehabilitation of any
16 railroad capital facility and any capital improvement used in
17 connection herewith, for contractual agreements entered into for
18 rail passenger service, and for the acquisition of real property or
19 interests in real property required or expected to be required
20 therefor (17161041) ... 15,300,000 ................ (re. $1,417,000)
21 By chapter 55, section 1, of the laws of 2009:
22 Notwithstanding the provisions of section 89-b of the state finance
23 law, for the construction and improvement of passenger and rail
24 freight projects including, but not limited to, the acquisition,
25 construction, reconstruction, improvement or rehabilitation of any
26 railroad capital facility and any capital improvement used in
27 connection herewith, for contractual agreements entered into for
28 rail passenger service, and for the acquisition of real property or
29 interests in real property required or expected to be required
30 therefor (17150941) ... 7,500,000 ................. (re. $1,711,000)
31 By chapter 55, section 1, of the laws of 2008:
32 Notwithstanding the provisions of section 89-b of the state finance
33 law, for the construction and improvement of passenger and rail
34 freight projects including, but not limited to, the acquisition,
35 construction, reconstruction, improvement or rehabilitation of any
36 railroad capital facility and any capital improvement used in
37 connection herewith, for contractual agreements entered into for
38 rail passenger service, and for the acquisition of real property or
39 interests in real property required or expected to be required
40 therefor (17150841) ... 20,000,000 ................ (re. $5,475,000)
41 By chapter 55, section 1, of the laws of 2007:
42 Notwithstanding the provisions of section 89-b of the state finance
43 law, for the construction and improvement of passenger and rail
44 freight projects including, but not limited to, the acquisition,
45 construction, reconstruction, improvement or rehabilitation of any
46 railroad capital facility and any capital improvement used in
47 connection herewith, for contractual agreements entered into for
48 rail passenger service, and for the acquisition of real property or
747 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 interests in real property required or expected to be required
2 therefor (17150741) ... 20,000,000 ................ (re. $2,242,000)
3 By chapter 55, section 1, of the laws of 2006:
4 Notwithstanding the provisions of section 89-b of the state finance
5 law, for the construction and improvement of passenger and rail
6 freight projects including, but not limited to, the acquisition,
7 construction, reconstruction, improvement or rehabilitation of any
8 railroad capital facility and any capital improvement used in
9 connection herewith, for contractual agreements entered into for
10 rail passenger service, and for the acquisition of real property or
11 interests in real property required or expected to be required
12 therefor (17150641) ... 20,000,000 ................ (re. $3,317,000)
13 By chapter 55, section 1, of the laws of 2005:
14 Notwithstanding the provisions of section 89-b of the state finance
15 law, for the construction and improvement of passenger and rail
16 freight projects including, but not limited to, the acquisition,
17 construction, reconstruction, improvement or rehabilitation of any
18 railroad capital facility and any capital improvement used in
19 connection herewith, for contractual agreements entered into for
20 rail passenger service, and for the acquisition of real property or
21 interests in real property required or expected to be required
22 therefor (17150541) ... 20,000,000 .................. (re. $532,000)
23 By chapter 55, section 1, of the laws of 2004:
24 Notwithstanding the provisions of section 89-b of the state finance
25 law, for the construction and improvement of passenger and rail
26 freight projects including, but not limited to, the acquisition,
27 construction, reconstruction, improvement or rehabilitation of any
28 railroad capital facility and any capital improvement used in
29 connection herewith, for contractual agreements entered into for
30 rail passenger service, and for the acquisition of real property or
31 interests in real property required or expected to be required
32 therefor (17150441) ... 20,000,000 ................ (re. $3,466,000)
33 By chapter 55, section 1, of the laws of 2003:
34 Notwithstanding the provisions of section 89-b of the state finance
35 law, for the construction and improvement of passenger and rail
36 freight projects including, but not limited to, the acquisition,
37 construction, reconstruction, improvement or rehabilitation of any
38 railroad capital facility and any capital improvement used in
39 connection herewith, for contractual agreements entered into for
40 rail passenger service, and for the acquisition of real property or
41 interests in real property required or expected to be required
42 therefor (17150341) ... 20,000,000 ................ (re. $1,851,000)
43 By chapter 55, section 1, of the laws of 2000:
44 For the construction and improvement of passenger and rail freight
45 projects including, but not limited to, the acquisition,
46 construction, reconstruction, improvement or rehabilitation of any
47 railroad capital facility and any capital improvement used in
748 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 connection herewith, and for the acquisition of real property or
2 interests in real property required or expected to be required
3 therefore (17150041) ... 10,000,000 ................. (re. $557,000)
4 By chapter 55, section 1, of the laws of 1999, as amended by chapter
5 295, part A, section 1, of the laws of 2001:
6 For the state share of the construction and improvement of rail
7 freight facilities identified by the department of transportation in
8 a rail freight capital needs survey, including, but not limited to,
9 the acquisition, construction, reconstruction, improvement or reha-
10 bilitation of any railroad capital facility and any capital improve-
11 ment used in connection herewith, and for the acquisition of real
12 property or interests in real property required or expected to be
13 required therefore, in accordance with the following schedule.
14 Project costs funded from this appropriation shall not exceed 80
15 percent of total project costs. In addition, projects to be funded
16 from this appropriation shall comply with eligibility criteria
17 established in program guidelines to be issued by the commissioner
18 of transportation.
19 The items shown in the project schedule below shall be for projects
20 with a common purpose and may be interchanged without limitation
21 subject to the approval of the director of the budget (17159941)
22 ... ..... 13,000,000 .............................. (re. $538,000)
23 Capital Projects Funds - Federal
24 Federal Capital Projects Fund
25 Mass Transportation and Rail Freight Purpose
26 RAIL AND RAPID TRANSIT
27 By chapter 54, section 1, of the laws of 1993, as added by chapter 259,
28 section 4, of the laws of 1993:
29 For payment of the federal share of high speed ground transportation
30 projects including high speed conventional rail, very high speed
31 rail and magnetic levitation systems. The moneys hereby appropriated
32 shall be used for the federal share of costs of any program aspect
33 including, but not limited to, research, development, study, demon-
34 stration, implementation, operation, real property acquisition,
35 construction, reconstruction, improvement and rehabilitation of any
36 capital facility (17419312) ... ..................................
37 20,000,000 ....................................... (re. $12,309,000)
38 RAIL SERVICE PRESERVATION
39 By chapter 257, section 8, of the laws of 1975, as amended by chapter
40 54, section 5, of the laws of 1982:
41 The sum of fifty million dollars ($50,000,000) or so much thereof as
42 may be necessary to accomplish the purpose designated, is hereby
43 appropriated to the department of transportation from the capital
44 projects fund in accordance with section ninety-three of the state
45 finance law for payment by the state of the share of the federal
46 government for acquisition, construction, reconstruction, improve-
749 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ment or rehabilitation by the state or a municipality of any rail-
2 road capital facility and any capital equipment used in connection
3 therewith and for branch line operation and maintenance costs pursu-
4 ant to the provisions of section fourteen-d or article ten-a of the
5 transportation law (01393212) ... ............... (re. $7,264,000)
6 MASS TRANSPORTATION AND RAIL FREIGHT--BONDABLE (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund - Infrastructure Renewable (Bondable)
9 Mass Transportation and Rail Freight Purpose
10 RAIL AND RAPID TRANSIT
11 By chapter 998, section 4, of the laws of 1983, as amended by chapter
12 54, section 3, of the laws of 1984:
13 For the cost of the preparation of designs, plans, specifications and
14 estimates and for the acquisition of property and rehabilitation
15 projects, for railroad capital facilities, mass transportation capi-
16 tal projects, excluding projects of the New York city transit
17 authority, its subsidiaries, and the commuter railroads under the
18 jurisdiction of the metropolitan transportation authority, notwith-
19 standing any inconsistent provisions of law provided however that
20 all such costs shall be made pursuant to the provisions of the
21 rebuild New York through transportation infrastructure renewal bond
22 act of 1983 and such costs shall be reimbursed from the infrastruc-
23 ture renewal bond fund (03064812) ................... (re. $178,000)
24 Capital Projects Funds - Other
25 Capital Projects Fund - Infrastructure Renewable (Bondable)
26 Omnibus and Transit Bondable Purpose
27 By chapter 54, section 1, of the laws of 1990:
28 For payment to the department of transportation pursuant to the
29 provisions of the rebuild New York through transportation infras-
30 tructure renewal bond act of 1983, for state aid to the Niagara
31 Frontier Transportation Authority for the preparation of designs,
32 plans, specifications and estimates, for the acquisition,
33 construction, reconstruction and improvement of mass transportation
34 capital projects including the acquisition of real property and
35 liabilities incurred prior to April 1, 1990 (17199040) .............
36 1,840,000 ............................................ (re. $18,000)
37 By chapter 54, section 1, of the laws of 1988:
38 For payment to the department of transportation pursuant to the
39 provisions of the rebuild New York through transportation infras-
40 tructure renewal bond act of 1983, for state aid to municipal corpo-
41 rations for the preparation of designs, plans, specifications and
42 estimates, for the acquisition, construction, reconstruction and
43 improvement of mass transportation capital projects including the
44 acquisition of real property and liabilities incurred prior to April
45 1, 1988, in accordance with the schedule shown below. The items
750 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 shown in the project schedule below shall be for projects with a
2 common purpose and may be interchanged without limitation subject to
3 the approval of the director of the budget.
4 Prior to requesting approval of a certificate of approval of avail-
5 ability for the moneys hereby appropriated, the commissioner of
6 transportation shall certify that each project progressed under the
7 program listed in the schedule below has received federal approval
8 and the federally authorized level of financial assistance
9 (17198840) ... ..... 10,045,000 ................... (re. $859,000)
10 By chapter 54, section 1, of the laws of 1986:
11 For payment to the department of transportation pursuant to the
12 provisions of the rebuild New York through transportation infras-
13 tructure renewal bond act of 1983, for state aid to municipal corpo-
14 rations for the preparation of designs, plans, specifications and
15 estimates, for the acquisition, construction, reconstruction and
16 improvement of mass transportation capital projects including the
17 acquisition of real property and liabilities incurred prior to April
18 one, nineteen hundred eighty-six, in accordance with the schedule
19 shown below. The items shown in the project schedule below shall be
20 for projects with a common purpose and may be interchanged without
21 limitation subject to the approval of the director of the budget.
22 Prior to requesting approval of a certificate of approval of avail-
23 ability for the moneys hereby appropriated, the commissioner shall
24 certify that each omnibus project progressed under the program list-
25 ed in the schedule below has received federal approval and the
26 federally authorized level of financial assistance (17198640)
27 ... ..... 5,800,000 ............................... (re. $315,000)
28 By chapter 54, section 1, of the laws of 1984, as amended by chapter 54,
29 section 3, of the laws of 1986:
30 For payment to the department of transportation pursuant to the
31 provisions of the rebuild New York through transportation infras-
32 tructure renewal bond act of 1983, notwithstanding any inconsistent
33 provisions of law: (1) on behalf of the Niagara Frontier Transporta-
34 tion Authority to the extent needed to match federal funds to
35 finance the state share of construction of the Buffalo light rail
36 rapid transit (LRRT) project including the acquisition of real prop-
37 erty and to match local funds for the acquisition of property for a
38 possible Tonawanda extension of the Buffalo light rail rapid transit
39 system and, (2) for state aid to municipal corporations for the
40 acquisition, construction, reconstruction and improvement of Mass
41 Transportation Omnibus projects including the acquisition of real
42 property, in accordance with the following schedule. No part of this
43 appropriation shall be available until the commissioner of transpor-
44 tation shall certify to the director of the budget that the federal
45 share of costs has been approved for the purposes authorized and
46 that the local share is available for the acquisition of property
47 for a possible Tonawanda extension of the Buffalo light rail rapid
48 transit system.
49 The moneys hereby appropriated, when made available pursuant to a
50 certificate of approval of availability issued by the director of
751 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the budget, shall be paid from the state treasury on the warrant of
2 the state comptroller on vouchers approved by the commissioner of
3 transportation (17148440) ... ..................... (re. $930,000)
4 Capital Projects Funds - Other
5 Capital Projects Fund - Infrastructure Renewable (Bondable)
6 Rail Service Preservation Purpose
7 By chapter 54, section 1, of the laws of 1994:
8 For payment of the state share of the costs of acquisition,
9 construction, reconstruction, improvement or rehabilitation of any
10 railroad capital facility and any capital improvement used in
11 connection therewith, for the acquisition of real property or inter-
12 ests in real property required or expected to be required therefore,
13 pursuant to the rebuild New York through Transportation Infrastruc-
14 ture Renewal Bond Act of 1983 notwithstanding any inconsistent
15 provisions of law and pursuant to the provisions of section 14-d of
16 the transportation law and including all costs incidental thereto
17 (17159441) ... 1,390,000 ............................. (re. $43,000)
18 By chapter 54, section 1, of the laws of 1984, as amended by chapter 54,
19 section 3, of the laws of 1985:
20 For payment of the state share of the costs of the acquisition,
21 construction, reconstruction, improvement or rehabilitation of any
22 railroad capital facility and any capital improvement used in
23 connection therewith, for the acquisition of real property or inter-
24 ests in real property required or expected to be required therefor,
25 pursuant to rebuild New York through the transportation bond act of
26 1983 notwithstanding any inconsistent provisions of law and pursuant
27 to the provisions of section fourteen-d of the transportation law,
28 as the commissioner may elect for the purpose of improving freight
29 service, and including all costs incidental thereto in accordance
30 with the following schedule (17158441) ... ........ (re. $339,000)
31 MULTI-MODAL (CCP)
32 Capital Projects Funds - Other
33 Dedicated Highway and Bridge Trust Fund
34 Multi-Modal Purpose
35 By chapter 55, section 1, of the laws of 2000:
36 For the cost of multi-modal projects designated as part of the multi-
37 modal program established by section 14-k of the transportation law
38 and in accordance with a memorandum of understanding among the
39 governor, the majority leader of the senate, and the speaker of the
40 assembly, or their designees (17M100MR) ............................
41 150,000,000 ...................................... (re. $33,175,000)
42 MUNICIPAL HIGHWAY - RAILROAD CROSSING ALTERATIONS (CCP)
43 Capital Projects Funds - Other
44 Dedicated Highway and Bridge Trust Fund
752 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Railroad Crossing Alteration Purpose
2 By chapter 54, section 1, of the laws of 1988:
3 For payment of the state share of the cost of the reconstruction or
4 removal of existing highway-railway grade crossing or grade sepa-
5 ration structures, pursuant to the provisions of section 91 of the
6 railroad law, and in accordance with the schedule below (17108826)
7 ... ..... 1,700,000 ............................... (re. $443,000)
8 By chapter 54, section 1, of the laws of 1986:
9 For payment of the state share of the cost of the reconstruction or
10 removal of existing highway-railway grade crossing or grade sepa-
11 ration structures, pursuant to the provisions of section ninety-one
12 of the railroad law, and in accordance with the schedule below.
13 Project costs funded from this appropriation may include, but shall
14 not be limited to, preliminary planning and feasibility studies;
15 survey and design; acquisition of property; reconstruction and
16 removal; materials testing; the contract engineering services
17 provided by private firms; and the payment of liabilities incurred
18 prior to April one, nineteen hundred eighty-six.
19 Prior to requesting approval of a certificate of approval of avail-
20 ability for the moneys hereby appropriated, the commissioner of
21 transportation shall certify that he has applied for and made
22 reasonable efforts to secure federal assistance for each project
23 authorized herein. Any such federal assistance received shall be
24 used to reduce the total project cost prior to the calculation of
25 the state and local shares in accordance with section ninety-one of
26 the railroad law.
27 The items shown in the project schedule below shall be for projects
28 with a common purpose and may be interchanged without limitation
29 subject to the approval of the director of the division of the budg-
30 et (17108626) ... ..... 2,500,000 ............... (re. $1,124,000)
31 NEW YORK STATE AGENCY FUND (CCP)
32 Fiduciary Funds
33 Miscellaneous New York State Agency Fund
34 Border Crossing Studies and Activities Accounts
35 Highway Facilities Purpose
36 By chapter 55, section 1, of the laws of 2002:
37 For that portion of liabilities incurred by the department of trans-
38 portation on behalf of entities other than state departments or
39 agencies pursuant to the highway law or transportation law for
40 border crossing studies and activities (17500211) ..................
41 2,000,000 ......................................... (re. $2,000,000)
42 Fiduciary Funds
43 Miscellaneous New York State Agency Fund
44 Highway Costs Improvement Accounts
45 Non-Federal Aided Highway Purpose
753 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For that portion of liabilities incurred by the department of trans-
3 portation on behalf of entities other than state departments or
4 agencies pursuant to the highway law or transportation law
5 (17501722) ... 50,000,000 ........................ (re. $50,000,000)
6 By chapter 55, section 1, of the laws of 2016:
7 For that portion of liabilities incurred by the department of trans-
8 portation on behalf of entities other than state departments or
9 agencies pursuant to the highway law or transportation law
10 (17501622) ... 50,000,000 ........................ (re. $50,000,000)
11 By chapter 54, section 1, of the laws of 2015:
12 For that portion of liabilities incurred by the department of trans-
13 portation on behalf of entities other than state departments or
14 agencies pursuant to the highway law or transportation law
15 (17501522) ... 50,000,000 ........................ (re. $31,924,000)
16 By chapter 54, section 1, of the laws of 2014:
17 For that portion of liabilities incurred by the department of trans-
18 portation on behalf of entities other than state departments or
19 agencies pursuant to the highway law or transportation law
20 (17501422) ... 50,000,000 ........................ (re. $50,000,000)
21 By chapter 54, section 1, of the laws of 2013:
22 For that portion of liabilities incurred by the department of trans-
23 portation on behalf of entities other than state departments or
24 agencies pursuant to the highway law or transportation law
25 (17501322) ... 50,000,000 ........................ (re. $27,329,000)
26 By chapter 54, section 1, of the laws of 2012:
27 For that portion of liabilities incurred by the department of trans-
28 portation on behalf of entities other than state departments or
29 agencies pursuant to the highway law or transportation law
30 (17501222) ... 50,000,000 ........................ (re. $33,985,000)
31 By chapter 54, section 1, of the laws of 2011:
32 For that portion of liabilities incurred by the department of trans-
33 portation on behalf of entities other than state departments or
34 agencies pursuant to the highway law or transportation law
35 (17501122) ... 50,000,000 ........................ (re. $25,533,000)
36 By chapter 55, section 1, of the laws of 2010:
37 For that portion of liabilities incurred by the department of trans-
38 portation on behalf of entities other than state departments or
39 agencies pursuant to the highway law or transportation law
40 (17501022) ... 50,000,000 ........................ (re. $21,267,000)
41 By chapter 55, section 1, of the laws of 2009:
42 For that portion of liabilities incurred by the department of trans-
43 portation on behalf of entities other than state departments or
754 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 agencies pursuant to the highway law or transportation law
2 (17500922) ... 50,000,000 ........................ (re. $18,679,000)
3 By chapter 55, section 1, of the laws of 2008:
4 For that portion of liabilities incurred by the department of trans-
5 portation on behalf of entities other than state departments or
6 agencies pursuant to the highway law or transportation law
7 (17500822) ... 50,000,000 ........................ (re. $22,402,000)
8 By chapter 55, section 1, of the laws of 2007:
9 For that portion of liabilities incurred by the department of trans-
10 portation on behalf of entities other than state departments or
11 agencies pursuant to the highway law or transportation law
12 (17500722) ... 50,000,000 ........................ (re. $11,158,000)
13 By chapter 55, section 1, of the laws of 2006:
14 For that portion of liabilities incurred by the department of trans-
15 portation on behalf of entities other than state departments or
16 agencies pursuant to the highway law or transportation law
17 (17500622) ... 50,000,000 ........................ (re. $39,489,000)
18 By chapter 55, section 1, of the laws of 2005:
19 For that portion of liabilities incurred by the department of trans-
20 portation on behalf of entities other than state departments or
21 agencies pursuant to the highway law or transportation law
22 (17500522) ... 50,000,000 ........................ (re. $32,349,000)
23 By chapter 55, section 1, of the laws of 2004:
24 For that portion of liabilities incurred by the department of trans-
25 portation on behalf of entities other than state departments or
26 agencies pursuant to the highway law or transportation law
27 (17500422) ... 50,000,000 ........................ (re. $10,042,000)
28 By chapter 55, section 1, of the laws of 2003:
29 For that portion of liabilities incurred by the department of trans-
30 portation on behalf of entities other than state departments or
31 agencies pursuant to the highway law or transportation law
32 (17500322) ... 50,000,000 ........................ (re. $37,193,000)
33 By chapter 55, section 1, of the laws of 2002:
34 For that portion of liabilities incurred by the department of trans-
35 portation on behalf of entities other than state departments or
36 agencies pursuant to the highway law or transportation law
37 (17500222) ... 50,000,000 ......................... (re. $8,903,000)
38 By chapter 55, section 1, of the laws of 2001:
39 For that portion of liabilities incurred by the department of trans-
40 portation on behalf of entities other than state departments or
41 agencies pursuant to the highway law or transportation law
42 (17500122) ... 50,000,000 ......................... (re. $7,049,000)
43 By chapter 55, section 1, of the laws of 2000:
755 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For that portion of liabilities incurred by the department of trans-
2 portation on behalf of entities other than state departments or
3 agencies pursuant to the highway law or transportation law
4 (17500022) ... 50,000,000 ........................ (re. $15,837,000)
5 By chapter 55, section 1, of the laws of 1999:
6 For that portion of liabilities incurred by the department of trans-
7 portation on behalf of entities other than state departments or
8 agencies pursuant to the highway law or transportation law
9 (17509922) ... 50,000,000 ........................ (re. $11,800,000)
10 NEW YORK WORKS (CCP)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Aviation Purpose
14 By chapter 54, section 1, of the laws of 2017:
15 For state aid to municipal corporations and private airports as
16 authorized by section 14-h of the transportation law and for payment
17 of the cost of projects at Stewart and Republic airports, for the
18 acquisition, construction, reconstruction, and improvement of
19 airport or aviation capital projects, including the acquisition of
20 real property and liabilities incurred prior to April 1, 2017. Prior
21 to requesting approval of a certificate of approval of availability
22 for moneys appropriated, the commissioner of transportation shall
23 certify that each airport or aviation project progressed under the
24 program, other than state owned airports, has received federal
25 approval and the federally authorized level of financial assistance.
26 Funds from this appropriation may also be utilized for grants to
27 municipal corporations and private airports for the cost of projects
28 authorized by section 14-l of the transportation law, including the
29 acquisition of real property and liabilities incurred prior to April
30 1, 2017 (17551714) ... 12,500,000 ................ (re. $12,500,000)
31 For additional state aid to municipal corporations and private
32 airports as authorized by section 14-h of the transportation law and
33 for payment of the cost of projects at Stewart and Republic
34 airports, for the acquisition, construction, reconstruction, and
35 improvement of airport or aviation capital projects, including the
36 acquisition of real property and liabilities incurred prior to April
37 1, 2017. Prior to requesting approval of a certificate of approval
38 of availability for moneys appropriated, the commissioner of trans-
39 portation shall certify that each airport or aviation project
40 progressed under the program, other than state owned airports, has
41 received federal approval and the federally authorized level of
42 financial assistance. Funds from this appropriation may also be
43 utilized for grants to municipal corporations and private airports
44 for the cost of projects authorized by section 14-1 of the transpor-
45 tation law, including the acquisition of real property and liabil-
46 ities incurred prior to April 1, 2017 (17561714) ...................
47 10,000,000 ....................................... (re. $10,000,000)
756 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2016:
2 For state aid to municipal corporations and private airports as
3 authorized by section 14-h of the transportation law and for payment
4 of the cost of projects at Stewart and Republic airports, for the
5 acquisition, construction, reconstruction, and improvement of
6 airport or aviation capital projects, including the acquisition of
7 real property and liabilities incurred prior to April 1, 2016.
8 Prior to requesting approval of a certificate of approval of avail-
9 ability for moneys appropriated, the commissioner of transportation
10 shall certify that each airport or aviation project progressed under
11 the program, other than state owned airports, has received federal
12 approval and the federally authorized level of financial assistance.
13 Funds from this appropriation may also be utilized for grants to
14 municipal corporations and private airports for the cost of projects
15 authorized by section 14-l of the transportation law, including the
16 acquisition of real property and liabilities incurred prior to April
17 1, 2016 (17551614) ... 12,500,000 ................ (re. $12,500,000)
18 For state aid to municipal corporations, public authorities or public
19 benefit corporations, except a bi-state authority, and other owners
20 of public-use airports located in counties or cities with a popu-
21 lation of less than one million; for projects related to passenger
22 air service, cargo service, and commercial development, including
23 but not limited to the acquisition of real property; preparation of
24 designs, plans, specifications and estimates; environmental impact
25 statements; construction; construction management and supervision;
26 the contract services provided by private firms; demolition; recon-
27 struction; and improvement of airport or aviation-related facili-
28 ties. Eligible project costs may also include measures to enhance
29 connections to airports through roadway redesign; increased parking;
30 improved public transportation service; and liabilities incurred
31 prior to April 1, 2016 (17AC1614) ..................................
32 200,000,000 ..................................... (re. $199,977,000)
33 By chapter 54, section 1, of the laws of 2015:
34 For state aid to municipal corporations and private airports as
35 authorized by section 14-h of the transportation law and for payment
36 of the cost of projects at Stewart and Republic airports, for the
37 acquisition, construction, reconstruction, and improvement of
38 airport or aviation capital projects, including the acquisition of
39 real property and liabilities incurred prior to April 1, 2015.
40 Prior to requesting approval of a certificate of approval of avail-
41 ability for moneys appropriated, the commissioner of transportation
42 shall certify that each airport or aviation project progressed under
43 the program, other than state owned airports, has received federal
44 approval and the federally authorized level of financial assistance.
45 Funds from this appropriation may also be utilized for grants to
46 municipal corporations and private airports for the cost of projects
47 authorized by section 14-l of the transportation law, including the
48 acquisition of real property and liabilities incurred prior to April
49 1, 2015 (17551514) ... 10,000,000 ................. (re. $9,964,000)
50 By chapter 54, section 1, of the laws of 2014:
757 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For state aid to municipal corporations and private airports as
2 authorized by section 14-h of the transportation law and for payment
3 of the cost of projects at Stewart and Republic airports, for the
4 acquisition, construction, reconstruction, and improvement of
5 airport or aviation capital projects, including the acquisition of
6 real property and liabilities incurred prior to April 1, 2014.
7 Prior to requesting approval of a certificate of approval of avail-
8 ability for moneys appropriated, the commissioner of transportation
9 shall certify that each airport or aviation project progressed under
10 the program, other than state owned airports, has received federal
11 approval and the federally authorized level of financial assistance.
12 Funds from this appropriation may also be utilized for grants to
13 municipal corporations and private airports for the cost of projects
14 authorized by section 14-l of the transportation law, including the
15 acquisition of real property and liabilities incurred prior to April
16 1, 2014 (17551414) ... 10,000,000 ................. (re. $6,986,000)
17 By chapter 54, section 1, of the laws of 2013:
18 For state aid to municipal corporations and private airports as
19 authorized by section 14-h of the transportation law and for payment
20 of the cost of projects at Stewart and Republic airports, for the
21 acquisition, construction, reconstruction, and improvement of
22 airport or aviation capital projects, including the acquisition of
23 real property and liabilities incurred prior to April 1, 2013.
24 Prior to requesting approval of a certificate of approval of avail-
25 ability for moneys appropriated, the commissioner of transportation
26 shall certify that each airport or aviation project progressed under
27 the program, other than state owned airports, has received federal
28 approval and the federally authorized level of financial assistance.
29 Funds from this appropriation may also be utilized for grants to
30 municipal corporations and private airports for the cost of projects
31 authorized by section 14-l of the transportation law, including the
32 acquisition of real property and liabilities incurred prior to April
33 1, 2013 (17551314) ... 10,000,000 ................. (re. $3,708,000)
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Non-Federal Aided Highway Purpose
37 By chapter 54, section 1, of the laws of 2017:
38 Transportation infrastructure and facilities in the five-year depart-
39 ment of transportation plan for 2015-16 through 2019-20, for the
40 payment of costs, including the payment of liabilities incurred
41 prior to April 1, 2017, of transportation infrastructure projects,
42 including but not limited to, state and local roads and bridges;
43 airport, freight and passenger rail, port and transit projects or
44 multi-modal facilities, including work appurtenant and ancillary
45 thereto. Project costs funded from this appropriation may include
46 but shall not be limited to construction, reconstruction, recondi-
47 tioning and preservation, the acquisition of property, and engineer-
48 ing services, including personal services, nonpersonal services,
49 fringe benefits, the contract services provided by private firms,
758 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 and reimbursements to the dedicated highway and bridge trust fund
2 and capital projects funds, for activities including but not limited
3 to, the preparation of designs, plans, specifications and estimates;
4 construction management and supervision; and appraisals, surveys,
5 testing and environmental impact statements for transportation
6 infrastructure projects (17991722) .................................
7 503,175,000 ..................................... (re. $503,175,000)
8 For the payment of the costs, which shall be reimbursed from bond
9 proceeds, including the payment of liabilities incurred prior to
10 April 1, 2017, of state highways, parkways, bridges, the New York
11 State Thruway, Indian reservation roads, and facilities, including
12 work appurtenant and ancillary thereto. Project costs funded from
13 this appropriation may include but shall not be limited to
14 construction, reconstruction, reconditioning and preservation, and
15 the acquisition of property, and for engineering services, including
16 personal services, nonpersonal services, fringe benefits, and the
17 contract services provided by private firms, and including but not
18 limited to the preparation of designs, plans, specifications and
19 estimates; construction management and supervision; and appraisals,
20 surveys, testing and environmental impact statements for transporta-
21 tion projects (17JS1722) ... 327,528,000 ........ (re. $327,528,000)
22 For the payment of the costs, which shall be reimbursed from bond
23 proceeds, including the payment of liabilities incurred prior to
24 April 1, 2017, of state highways, parkways, bridges, and facilities,
25 including work appurtenant and ancillary thereto, to improve access
26 to and from the John F. Kennedy International Airport, including
27 capacity improvements to the interchange between the Grand Central
28 Parkway, Union Turnpike, Jackie Robinson Parkway and the Van Wyck
29 Expressway and expansion of the Van Wyck Expressway. Project costs
30 funded from this appropriation may include but shall not be limited
31 to construction, reconstruction, reconditioning and preservation,
32 and the acquisition of property, and for engineering services,
33 including personal services, nonpersonal services, fringe benefits,
34 and the contract services provided by private firms, and including
35 but not limited to the preparation of designs, plans, specifications
36 and estimates; construction management and supervision; and
37 appraisals, surveys, testing and environmental impact statements for
38 transportation projects (17JK1722) .................................
39 564,000,000 ..................................... (re. $564,000,000)
40 Transportation infrastructure and facilities of regional and community
41 importance to be accelerated in a manner consistent with the Depart-
42 ment's planning and engineering processes and pursuant to plans
43 provided by the speaker of the assembly and the temporary president
44 and majority leader of the senate, and posted to the Department's
45 public-facing website: for the payment of costs, including the
46 payment of liabilities incurred prior to April 1, 2017, of transpor-
47 tation infrastructure projects, including but not limited to, state
48 and local roads and bridges; airport, freight and passenger rail,
49 port and transit projects or multi-modal facilities, including work
50 appurtenant and ancillary thereto. Project costs funded from this
51 appropriation may include but shall not be limited to construction,
52 reconstruction, reconditioning and preservation, the acquisition of
759 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 property, and engineering services, including personal services,
2 nonpersonal services, fringe benefits, the contract services
3 provided by private firms, and reimbursements to the dedicated high-
4 way and bridge trust fund and capital projects funds, for activities
5 including but not limited to, the preparation of designs, plans,
6 specifications and estimates; construction management and super-
7 vision; and appraisals, surveys, testing and environmental impact
8 statements for transportation infrastructure projects (17RE1722) ...
9 130,000,000 ..................................... (re. $130,000,000)
10 For the payment of the costs, which shall be reimbursed from bond
11 proceeds, including the payment of liabilities incurred prior to
12 April 1, 2017, of state and local bridges, including work appurten-
13 ant and ancillary thereto. Project costs funded from this appropri-
14 ation may include but shall not be limited to construction, recon-
15 struction, reconditioning and preservation, and the acquisition of
16 property, and for engineering services, including personal services,
17 nonpersonal services, fringe benefits, and the contract services
18 provided by private firms, and including but not limited to the
19 preparation of designs, plans, specifications and estimates;
20 construction management and supervision; and appraisals, surveys,
21 testing and environmental impact statements for transportation
22 projects (17BR1722) ... 150,000,000 ............. (re. $150,000,000)
23 The appropriation made by chapter 55, section 1, of the laws of 2016, is
24 hereby amended and reappropriated to read:
25 Transportation infrastructure and facilities in the five-year depart-
26 ment of transportation plan for 2015-16 through 2019-20, for the
27 payment of costs, including the payment of liabilities incurred
28 prior to April 1, 2016, of transportation infrastructure projects,
29 including but not limited to, state and local roads and bridges;
30 airport, freight and passenger rail, port and transit projects or
31 multi-modal facilities, including work appurtenant and ancillary
32 thereto. Project costs funded from this appropriation may include
33 but shall not be limited to construction, reconstruction, recondi-
34 tioning and preservation, the acquisition of property, and engineer-
35 ing services, including personal services, nonpersonal services,
36 fringe benefits, the contract services provided by private firms,
37 and reimbursements to the dedicated highway and bridge trust fund
38 and capital projects funds, for activities including but not limited
39 to, the preparation of designs, plans, specifications and estimates;
40 construction management and supervision; and appraisals, surveys,
41 testing and environmental impact statements for transportation
42 infrastructure projects (17991622) .................................
43 84,475,000 ....................................... (re. $84,475,000)
44 For the payment of the costs, which shall be reimbursed from bond
45 proceeds, including the payment of liabilities incurred prior to
46 April 1, 2016, of state highways, parkways, bridges, the New York
47 State Thruway, Indian reservation roads, and facilities, including
48 work appurtenant and ancillary thereto. Project costs funded from
49 this appropriation may include but shall not be limited to
50 construction, reconstruction, reconditioning and preservation, and
51 the acquisition of property, and for engineering services, including
760 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 personal services, nonpersonal services, fringe benefits, and the
2 contract services provided by private firms, and including but not
3 limited to the preparation of designs, plans, specifications and
4 estimates; construction management and supervision; and appraisals,
5 surveys, testing and environmental impact statements for transporta-
6 tion projects (17JS1622) ...........................................
7 208,354,000 ..................................... (re. $138,237,000)
8 For the payment of the costs, which shall be reimbursed from bond
9 proceeds, including the payment of liabilities incurred prior to
10 April 1, 2016, of state highways, parkways, bridges, the New York
11 State Thruway, Indian reservation roads, and facilities, transit
12 projects, including work appurtenant and ancillary thereto. Project
13 costs funded from this appropriation may include but shall not be
14 limited to construction, reconstruction, reconditioning and preser-
15 vation, and the acquisition of property, and for engineering
16 services, including personal services, nonpersonal services, fringe
17 benefits, and the contract services provided by private firms, and
18 including but not limited to the preparation of designs, plans,
19 specifications and estimates; construction management and super-
20 vision; and appraisals, surveys, testing and environmental impact
21 statements for transportation projects (17LA1622) ..................
22 150,000,000 ..................................... (re. $149,833,000)
23 For the payment of the costs, which shall be reimbursed from bond
24 proceeds, including the payment of liabilities incurred prior to
25 April 1, 2016, of state and local bridges, including work appurten-
26 ant and ancillary thereto. Project costs funded from this appropri-
27 ation may include but shall not be limited to construction, recon-
28 struction, reconditioning and preservation, and the acquisition of
29 property, and for engineering services, including personal services,
30 nonpersonal services, fringe benefits, and the contract services
31 provided by private firms, and including but not limited to the
32 preparation of designs, plans, specifications and estimates;
33 construction management and supervision; and appraisals, surveys,
34 testing and environmental impact statements for transportation
35 projects (17BR1622) ... 150,000,000 ............. (re. $131,763,000)
36 By chapter 54, section 1, of the laws of 2015:
37 For the payment of the costs, which shall be reimbursed from bond
38 proceeds, including the payment of liabilities incurred prior to
39 April 1, 2015, of state highways, parkways, bridges, the New York
40 State Thruway, Indian reservation roads, and facilities, including
41 work appurtenant and ancillary thereto. Project costs funded from
42 this appropriation may include but shall not be limited to
43 construction, reconstruction, reconditioning and preservation, and
44 the acquisition of property, and for engineering services, including
45 personal services, nonpersonal services, fringe benefits, and the
46 contract services provided by private firms, and including but not
47 limited to the preparation of designs, plans, specifications and
48 estimates; construction management and supervision; and appraisals,
49 surveys, testing and environmental impact statements for transporta-
50 tion projects (17JS1522) ... 200,000,000 ......... (re. $53,821,000)
761 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the payment of the costs, which shall be reimbursed from bond
2 proceeds, including the payment of liabilities incurred prior to
3 April 1, 2015, of state highways, parkways, bridges, the New York
4 State Thruway, Indian reservation roads, and facilities, including
5 work appurtenant and ancillary thereto. Project costs funded from
6 this appropriation may include but shall not be limited to
7 construction, reconstruction, reconditioning and preservation, and
8 the acquisition of property, and for engineering services, including
9 personal services, nonpersonal services, fringe benefits, and the
10 contract services provided by private firms, and including but not
11 limited to the preparation of designs, plans, specifications and
12 estimates; construction management and supervision; and appraisals,
13 surveys, testing and environmental impact statements for transporta-
14 tion projects (17LA1522) ... 100,000,000 ......... (re. $84,145,000)
15 For the payment of the costs, which shall be reimbursed from bond
16 proceeds, including the payment of liabilities incurred prior to
17 April 1, 2015, of state and local bridges, including work appurten-
18 ant and ancillary thereto. Project costs funded from this appropri-
19 ation may include but shall not be limited to construction, recon-
20 struction, reconditioning and preservation, and the acquisition of
21 property, and for engineering services, including personal services,
22 nonpersonal services, fringe benefits, and the contract services
23 provided by private firms, and including but not limited to the
24 preparation of designs, plans, specifications and estimates;
25 construction management and supervision; and appraisals, surveys,
26 testing and environmental impact statements for transportation
27 projects (17BR1522) ... 150,000,000 ............. (re. $105,571,000)
28 By chapter 54, section 1, of the laws of 2014:
29 For the payment of the costs, including the payment of liabilities
30 incurred prior to April 1, 2014, of state highways, parkways, bridg-
31 es, the New York State Thruway, Indian reservation roads, and facil-
32 ities, including work appurtenant and ancillary thereto. Project
33 costs funded from this appropriation may include but shall not be
34 limited to construction, reconstruction, reconditioning and preser-
35 vation, and the acquisition of property, and for engineering
36 services, including personal services, nonpersonal services, fringe
37 benefits, and the contract services provided by private firms, and
38 including but not limited to the preparation of designs, plans,
39 specifications and estimates; construction management and super-
40 vision; and appraisals, surveys, testing and environmental impact
41 statements for transportation projects (17191422) ..................
42 155,000,000 ...................................... (re. $27,070,000)
43 By chapter 54, section 1, of the laws of 2013:
44 For the payment of the costs, including the payment of liabilities
45 incurred prior to April 1, 2013, of state highways, parkways, bridg-
46 es, the New York State Thruway, Indian reservation roads, and facil-
47 ities, including work appurtenant and ancillary thereto. Project
48 costs funded from this appropriation may include but shall not be
49 limited to construction, reconstruction, reconditioning and preser-
50 vation, and the acquisition of property, and for engineering
762 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 services, including personal services, nonpersonal services, fringe
2 benefits, and the contract services provided by private firms, and
3 including but not limited to the preparation of designs, plans,
4 specifications and estimates; construction management and super-
5 vision; and appraisals, surveys, testing and environmental impact
6 statements for transportation projects (17191322) ..................
7 155,000,000 ...................................... (re. $39,934,000)
8 By chapter 54, section 1, of the laws of 2012:
9 For the payment of capital costs, including acquisition of real prop-
10 erty, engineering services, and the payment of liabilities incurred
11 prior to April 1, 2012, relating to the construction, reconstruction
12 and improvement of Buffalo and Fort Erie Public Bridge Authority
13 facilities, including work on any appurtenant and ancillary state,
14 local or public authority facilities necessary for improvement of
15 the Peace Bridge Plaza (17191222) ... 15,000,000 ..... (re. $41,000)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Non-MTA [Capital] Transit Purpose
19 By chapter 54, section 1, of the laws of 2017:
20 For the costs of mass transportation capital projects and facilities
21 including replacement of buses meeting federal standards for
22 replacement, related bus equipment and the acquisition, design and
23 construction, including engineering and consulting costs, of mass
24 transit bus garages or other mass transportation projects and facil-
25 ities approved by the commissioner of transportation in a program of
26 projects. Such funding may be part of a total project of which a
27 portion is federally funded but shall not be used in substitution
28 for the required non-federal matching shares of the federally-funded
29 portion of the project to which it is added. The moneys hereby
30 appropriated are to be made available for projects undertaken by
31 mass transit systems other than those mass transit operating agen-
32 cies which receive money from the metropolitan transportation
33 authority dedicated tax fund [(17551729)] (17551731) ...............
34 27,500,000 ....................................... (re. $27,500,000)
35 By chapter 55, section 1, of the laws of 2016:
36 For the costs of mass transportation capital projects and facilities
37 including replacement of buses meeting federal standards for
38 replacement, related bus equipment and the acquisition, design and
39 construction, including engineering and consulting costs, of mass
40 transit bus garages or other mass transportation projects and facil-
41 ities approved by the commissioner of transportation in a program of
42 projects. Such funding may be part of a total project of which a
43 portion is federally funded but shall not be used in substitution
44 for the required non-federal matching shares of the federally-funded
45 portion of the project to which it is added. The moneys hereby
46 appropriated are to be made available for projects undertaken by
47 mass transit systems other than those mass transit operating agen-
48 cies which receive money from the metropolitan transportation
763 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority dedicated tax fund [(17551629)] (17551631) ...............
2 27,500,000 ....................................... (re. $27,500,000)
3 By chapter 54, section 1, of the laws of 2015:
4 For the costs of mass transportation capital projects and facilities
5 including replacement of buses meeting federal standards for
6 replacement, related bus equipment and the acquisition, design and
7 construction, including engineering and consulting costs, of mass
8 transit bus garages or other mass transportation projects and facil-
9 ities approved by the commissioner of transportation in a program of
10 projects. Such funding may be part of a total project of which a
11 portion is federally funded but shall not be used in substitution
12 for the required non-federal matching shares of the federallyfunded
13 portion of the project to which it is added. The moneys hereby
14 appropriated are to be made available for projects undertaken by
15 mass transit systems other than those mass transit operating agen-
16 cies which receive money from the metropolitan transportation
17 authority dedicated tax fund [(17551529)] (17551531) ...............
18 5,000,000 ......................................... (re. $5,000,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For the costs of mass transportation capital projects and facilities
21 including replacement of buses meeting federal standards for
22 replacement, related bus equipment and the acquisition, design and
23 construction, including engineering and consulting costs, of mass
24 transit bus garages or other mass transportation projects and facil-
25 ities approved by the commissioner of transportation in a program of
26 projects. Such funding may be part of a total project of which a
27 portion is federally funded but shall not be used in substitution
28 for the required non-federal matching shares of the federallyfunded
29 portion of the project to which it is added. The moneys hereby
30 appropriated are to be made available for projects undertaken by
31 mass transit systems other than those mass transit operating agen-
32 cies which receive money from the metropolitan transportation
33 authority dedicated tax fund [(17551429)] (17551431) ...............
34 5,000,000 ......................................... (re. $5,000,000)
35 By chapter 54, section 1, of the laws of 2013:
36 For the costs of mass transportation capital projects and facilities
37 including replacement of buses meeting federal standards for
38 replacement, related bus equipment and the acquisition, design and
39 construction, including engineering and consulting costs, of mass
40 transit bus garages or other mass transportation projects and facil-
41 ities approved by the commissioner of transportation in a program of
42 projects. Such funding may be part of a total project of which a
43 portion is federally funded but shall not be used in substitution
44 for the required non-federal matching shares of the federallyfunded
45 portion of the project to which it is added. The moneys hereby
46 appropriated are to be made available for projects undertaken by
47 mass transit systems other than those mass transit operating agen-
48 cies which receive money from the metropolitan transportation
764 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority dedicated tax fund [(17551329)] (17551331) ...............
2 5,000,000 ......................................... (re. $1,618,000)
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Preparation of Plans Purpose
6 Design and Construction
7 By chapter 54, section 1, of the laws of 2013:
8 For engineering services, including personal services, nonpersonal
9 services, fringe benefits, and the contract services provided by
10 private firms, and including but not limited to the preparation of
11 designs, plans, specifications and estimates; construction manage-
12 ment and supervision; and appraisals, surveys, testing, and environ-
13 mental impact statements for transportation projects (17551330) ....
14 45,000,000 ........................................ (re. $5,438,000)
15 Capital Projects Funds - Other
16 Capital Projects Fund
17 Rail Service Preservation Purpose
18 By chapter 54, section 1, of the laws of 2017:
19 For the construction and improvement of rail freight projects includ-
20 ing, but not limited to, the acquisition, construction, recon-
21 struction, improvement or rehabilitation of any railroad capital
22 facility and any capital improvement used in connection herewith,
23 and for the acquisition of real property or interests in real prop-
24 erty required or expected to be required therefor.
25 Of this appropriation, the amount of up to $3,000,000 will be provided
26 to the metropolitan transportation authority for costs associated
27 with implementing a program to upgrade diesel train engines owned by
28 the Long Island Rail Road to improve emissions standards, and the
29 amount of up to $1,000,000 for other diesel train engine retrofit
30 uses (17551741) ... 17,500,000 ................... (re. $17,500,000)
31 By chapter 55, section 1, of the laws of 2016:
32 For the construction and improvement of rail freight projects includ-
33 ing, but not limited to, the acquisition, construction, recon-
34 struction, improvement or rehabilitation of any railroad capital
35 facility and any capital improvement used in connection herewith,
36 and for the acquisition of real property or interests in real prop-
37 erty required or expected to be required therefor. Of this appropri-
38 ation, the amount of up to $3,000,000 will be provided to the metro-
39 politan transportation authority for costs associated with
40 implementing a program to upgrade diesel train engines owned by the
41 Long Island Rail Road to improve emissions standards, and the amount
42 of up to $1,000,000 for other diesel train engine retrofit uses
43 (17551641) ... 17,500,000 ........................ (re. $17,500,000)
44 By chapter 54, section 1, of the laws of 2015:
765 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the construction and improvement of rail freight projects includ-
2 ing, but not limited to, the acquisition, construction, recon-
3 struction, improvement or rehabilitation of any railroad capital
4 facility and any capital improvement used in connection herewith,
5 and for the acquisition of real property or interests in real prop-
6 erty required or expected to be required therefor. Of this appropri-
7 ation, the amount of up to $3,000,000 will be provided to the metro-
8 politan transportation authority for costs associated with
9 implementing a program to upgrade diesel train engines owned by the
10 Long Island Rail Road to improve emissions standards, and the amount
11 of up to $1,000,000 for other diesel train engine retrofit uses
12 (17551541) ... 10,000,000 ........................ (re. $10,000,000)
13 By chapter 54, section 1, of the laws of 2014:
14 For the construction and improvement of rail freight projects includ-
15 ing, but not limited to, the acquisition, construction, recon-
16 struction, improvement or rehabilitation of any railroad capital
17 facility and any capital improvement used in connection herewith,
18 and for the acquisition of real property or interests in real prop-
19 erty required or expected to be required therefor. Of this appropri-
20 ation, the amount of up to $3,000,000 will be provided to the metro-
21 politan transportation authority for costs associated with
22 implementing a program to upgrade diesel train engines owned by the
23 Long Island Rail Road to improve emissions standards, and the amount
24 of up to $1,000,000 for other diesel train engine retrofit uses
25 (17551441) ... 10,000,000 ......................... (re. $3,772,000)
26 By chapter 54, section 1, of the laws of 2013:
27 For the construction and improvement of rail freight projects includ-
28 ing, but not limited to, the acquisition, construction, recon-
29 struction, improvement or rehabilitation of any railroad capital
30 facility and any capital improvement used in connection herewith,
31 and for the acquisition of real property or interests in real prop-
32 erty required or expected to be required therefor. Of this appropri-
33 ation, the amount of up to $3,000,000 will be provided to the metro-
34 politan transportation authority for costs associated with
35 implementing a one year pilot program to upgrade diesel train
36 engines owned by the Long Island Rail Road to improve emissions
37 standards (17551341) ... 10,000,000 ............... (re. $2,690,000)
38 Capital Projects Funds - Other
39 Dedicated Highway and Bridge Trust Fund
40 Non-Federal Aided Highway Purpose
41 By chapter 54, section 1, of the laws of 2012:
42 For the payment of the costs, including the payment of liabilities
43 incurred prior to April 1, 2012, of state and local highways, park-
44 ways, bridges, the New York State Thruway, Indian reservation roads,
45 and facilities for which the responsibility is vested with the state
46 department of transportation, including work appurtenant and ancil-
47 lary thereto. Project costs funded from this appropriation may
48 include but shall not be limited to construction, reconstruction,
766 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 reconditioning and preservation, and the acquisition of property;
2 for personal services, fringe benefits, nonpersonal services, and
3 contract services provided by private firms for activities including
4 but not limited to the preparation of designs, plans, specifications
5 and estimates; construction management and supervision; and
6 appraisals, surveys, testing, and environmental impact statements
7 for transportation projects (17101222) .............................
8 232,049,000 ...................................... (re. $45,683,000)
9 Capital Projects Funds - Federal
10 Federal Capital Projects Fund
11 Federal Aid Highways Purpose
12 By chapter 54, section 1, of the laws of 2012:
13 For the federal share, from any federal agency under any federal
14 program, of state transportation projects, including both state
15 system and local system projects, and including but not limited to
16 construction, reconstruction, reconditioning and preservation, and
17 the acquisition of property; for personal services, fringe benefits,
18 nonpersonal services, and contract services provided by private
19 firms for activities including but not limited to the preparation of
20 designs, plans, specifications and estimates; construction manage-
21 ment and supervision; and appraisals, surveys, testing, and environ-
22 mental impact statements for transportation projects; for the
23 payment of liabilities incurred prior to April 1, 2012 and for any
24 other such purposes as specified in section 89-b of the state
25 finance law as amended (17041220) ..................................
26 916,751,000 ...................................... (re. $14,240,000)
27 NON-FEDERALLY AIDED HIGHWAY CAPITAL PROJECTS (CCP)
28 Capital Projects Funds - Other
29 Capital Projects Fund
30 Highway Maintenance Purpose
31 By chapter 55, section 1, of the laws of 2007:
32 For the payment of the costs of diesel emissions reduction activities
33 and equipment, including but not limited to retrofit and acquisition
34 of low emission vehicles and equipment to achieve the maximum envi-
35 ronmental benefit in non-attainment areas as designated by the
36 United States environmental protection agency in accordance with the
37 clean air act (170807HM) ... 3,000,000 ............... (re. $74,000)
38 Capital Projects Funds - Other
39 Dedicated Highway and Bridge Trust Fund
40 Aviation Purpose Account
41 Aviation Purpose
42 By chapter 54, section 1, of the laws of 2017:
43 For Aviation Bureau including personal services, nonpersonal services,
44 fringe benefits and the contract services provided by private firms.
767 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any other provision of law to the contrary, the OGS
2 Interchange and Transfer Authority and the IT Interchange and Trans-
3 fer Authority as defined in the 2017-18 state fiscal year state
4 operations appropriation for the budget division program of the
5 division of the budget, are deemed fully incorporated herein and a
6 part of this appropriation as if fully stated.
7 Personal service (17011714) ... 700,000 ............... (re. $700,000)
8 Nonpersonal service (17041714) ... 25,000 .............. (re. $25,000)
9 Fringe benefits (17081714) ... 430,000 ................ (re. $430,000)
10 Indirect costs (17091714) ... 21,000 ................... (re. $21,000)
11 Capital Projects Funds - Other
12 Dedicated Highway and Bridge Trust Fund
13 Highway Maintenance Purpose
14 By chapter 54, section 1, of the laws of 2017:
15 For the payment of costs, including the payment of liabilities
16 incurred prior to April 1, 2017, of snow and ice control on state
17 highways and preventive maintenance on state roads and bridges as
18 defined in paragraph (a) of subdivision 1 of section 10-d of the
19 highway law, including personal services, nonpersonal services,
20 fringe benefits and contractual services provided by private firms
21 and municipalities, but not including the costs of heavy equipment.
22 Personal service (170117HM) ... 258,735,000 ....... (re. $161,044,000)
23 Nonpersonal service (170417HM) ... 241,000,000 .... (re. $210,444,000)
24 Fringe benefits (170817HM) ... 159,070,000 ........ (re. $115,848,000)
25 Indirect costs (170917HM) ... 7,633,000 ............. (re. $5,778,000)
26 For the payment of the costs of heavy equipment, including the payment
27 of liabilities incurred prior to April 1, 2017.
28 Nonpersonal service (170517HM) ... 37,829,000 ...... (re. $36,899,000)
29 By chapter 55, section 1, of the laws of 2016:
30 For the payment of costs, including the payment of liabilities
31 incurred prior to April 1, 2016, of snow and ice control on state
32 highways and preventive maintenance on state roads and bridges as
33 defined in paragraph (a) of subdivision 1 of section 10-d of the
34 highway law, including personal services, nonpersonal services,
35 fringe benefits and contractual services provided by private firms
36 and municipalities, but not including the costs of heavy equipment.
37 Personal service (170116HM) ... 255,443,000 ........ (re. $20,591,000)
38 Nonpersonal service (170416HM) ... 240,000,000 ..... (re. $44,372,000)
39 Fringe benefits (170816HM) ... 143,610,000 ............. (re. $26,000)
40 Indirect costs (170916HM) ... 6,846,000 ............... (re. $294,000)
41 For the payment of the costs of heavy equipment, including the payment
42 of liabilities incurred prior to April 1, 2016.
43 Nonpersonal service (170516HM) ... 36,727,000 ...... (re. $12,257,000)
44 The appropriation made by chapter 54, section 1, of the laws of 2015, is
45 hereby amended and reappropriated to read:
46 For the payment of costs, including the payment of liabilities
47 incurred prior to April 1, 2015, of snow and ice control on state
48 highways and preventive maintenance on state roads and bridges as
768 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 defined in paragraph (a) of subdivision 1 of section 10-d of the
2 highway law, including personal services, nonpersonal services,
3 fringe benefits and contractual services provided by private firms
4 and municipalities, but not including the costs of heavy equipment.
5 Personal service (170115HM) ... 253,110,000 ............. (re. $2,000)
6 Nonpersonal service (170415HM) ... 235,648,000 ..... (re. $10,446,000)
7 Fringe benefits (170815HM) ... 141,438,000 .......... (re. $8,581,000)
8 Indirect costs (170915HM) ... 6,404,000 ............... (re. $393,000)
9 For the payment of the costs of heavy equip- ment, including the
10 payment of liabilities incurred prior to April 1, 2015.
11 Nonpersonal service (170515HM) ... 35,657,000 .......... (re. $98,000)
12 For the operating and capital costs of the Wells Bridge highway rest
13 area/text stop located on Interstate 88 westbound between exits 11
14 and 12 in Delaware County (17WB15HM) 2,500,000 .... (re. $1,291,000)
15 For the capital costs of the [Glens Falls] highway rest [area/text
16 stop] areas/text stops located on Interstate 87 [northbound between
17 exits 17 and 18] in Warren [County] and Essex Counties (17GF15HM)
18 ... 1,000,000 ....................................... (re. $710,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For the payment of costs, including the payment of liabilities
21 incurred prior to April 1, 2014, of snow and ice control on state
22 highways and preventive maintenance on state roads and bridges as
23 defined in paragraph (a) of subdivision 1 of section 10-d of the
24 highway law, including personal services, nonpersonal services,
25 fringe benefits and contractual services provided by private firms
26 and municipalities, but not including the costs of heavy equipment.
27 Personal service (170114HM) ... 249,824,000 ........... (re. $399,000)
28 Nonpersonal service (170414HM) ... 222,000,000 ...... (re. $1,371,000)
29 Fringe benefits (170814HM) ... 142,051,000 .......... (re. $1,018,000)
30 Indirect costs (170914HM) ... 6,996,000 ................ (re. $50,000)
31 For the payment of the costs of heavy equipment, including the payment
32 of liabilities incurred prior to April 1, 2014.
33 Nonpersonal service (170514HM) ... 40,000,000 ....... (re. $5,397,000)
34 For the operating and capital costs of the Worcester highway rest
35 area/text stop located on Interstate 88 eastbound between exits 18
36 and 19 in Otsego County (17RA14HM) ... 1,200,000 ..... (re. $68,000)
37 By chapter 54, section 1, of the laws of 2013:
38 For the payment of costs, including the payment of liabilities
39 incurred prior to April 1, 2013, of snow and ice control on state
40 highways and preventive maintenance on state roads and bridges as
41 defined in paragraph (a) of subdivision 1 of section 10-d of the
42 highway law, including personal services, nonpersonal services,
43 fringe benefits and contractual services provided by private firms
44 and municipalities, but not including the costs of heavy equipment.
45 Nonpersonal service (170413HM) ... 195,880,000 ........ (re. $646,000)
46 For the payment of the costs of heavy equipment, including the payment
47 of liabilities incurred prior to April 1, 2013.
48 Nonpersonal service (170513HM) ... 49,070,000 ...... (re. $20,751,000)
49 By chapter 54, section 1, of the laws of 2012:
769 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the payment of costs, including the payment of liabilities
2 incurred prior to April 1, 2012, of snow and ice control on state
3 highways and preventive maintenance on state roads and bridges as
4 defined in paragraph (a) of subdivision 1 of section 10-d of the
5 highway law, including personal services, nonpersonal services,
6 fringe benefits and contractual services provided by private firms
7 and municipalities.
8 Personal service (170112HM) ... 234,144,000 ........... (re. $521,000)
9 Nonpersonal service (170412HM) ... 244,950,000 ........ (re. $137,000)
10 Fringe benefits (170812HM) ... 121,006,000 .......... (re. $2,127,000)
11 Indirect costs (170912HM) ... 6,298,000 ............... (re. $110,000)
12 By chapter 54, section 1, of the laws of 2011:
13 For the payment of costs, including the payment of liabilities
14 incurred prior to April 1, 2011, of snow and ice control on state
15 highways and preventive maintenance on state roads and bridges as
16 defined in paragraph (a) of subdivision 1 of section 10-d of the
17 highway law, including personal services, nonpersonal services,
18 fringe benefits and contractual services provided by private firms
19 and municipalities.
20 The items shown in the schedule below shall be for projects with a
21 common purpose and may be interchanged without limitation subject to
22 the approval of the director of the budget (170411HM) ..............
23 614,652,000 ...................................... (re. $60,044,000)
24 PERSONAL SERVICE
25 Personal service--regular ...... 204,261,000
26 Temporary service ................ 2,700,000
27 Holiday/overtime compensation ... 22,500,000
28 --------------
29 Amount available for person-
30 al service ................. 229,461,000
31 --------------
32 NONPERSONAL SERVICE
33 Supplies and materials ......... 140,747,000
34 Travel ............................. 900,000
35 Contractual services ............ 81,000,000
36 Equipment ....................... 13,500,000
37 Fringe benefits ................ 123,475,000
38 Indirect costs ................... 7,929,000
39 --------------
40 Amount available for nonper-
41 sonal service .............. 367,551,000
42 --------------
43 For the purchase of transpor-
44 tation related equipment,
45 including the cost of all
46 vehicles under 8,500 pounds:
770 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Contractual services ............... 180,000
2 Equipment ....................... 17,460,000
3 --------------
4 Amount available for nonper-
5 sonal service ............... 17,640,000
6 --------------
7 614,652,000
8 ==============
9 By chapter 55, section 1, of the laws of 2010:
10 For the payment of costs, including the payment of liabilities
11 incurred prior to April 1, 2010, of snow and ice control on state
12 highways and preventive maintenance on state roads and bridges as
13 defined in paragraph (a) of subdivision 1 of section 10-d of the
14 highway law, including personal services, nonpersonal services,
15 fringe benefits and contractual services provided by private firms
16 and municipalities.
17 The items shown in the schedule below shall be for projects with a
18 common purpose and may be interchanged without limitation subject to
19 the approval of the director of the budget (170410HM) ..............
20 668,346,000 ....................................... (re. $9,346,000)
21 PERSONAL SERVICE
22 Personal service--regular ...... 226,956,000
23 Temporary service ................ 3,000,000
24 Holiday/overtime compensation ... 25,000,000
25 --------------
26 Amount available for person-
27 al service ................. 254,956,000
28 --------------
29 NONPERSONAL SERVICE
30 Supplies and materials ......... 156,386,000
31 Travel ........................... 1,000,000
32 Contractual services ............ 90,000,000
33 Equipment ....................... 15,000,000
34 Fringe benefits ................ 123,475,000
35 Indirect costs ................... 7,929,000
36 --------------
37 Amount available for nonper-
38 sonal service .............. 393,790,000
39 --------------
40 MAINTENANCE UNDISTRIBUTED
41 For the purchase of transpor-
42 tation related equipment,
43 including the cost of all
44 vehicles under 8,500 pounds ... 19,600,000
771 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NONPERSONAL SERVICE
2 Contractual services ............... 200,000
3 Equipment ....................... 19,400,000
4 --------------
5 Amount available for nonper-
6 sonal service ............... 19,600,000
7 --------------
8 668,346,000
9 ==============
10 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
11 section 1, of the laws of 2011:
12 For the payment of costs, including the payment of liabilities
13 incurred prior to April 1, 2009, of snow and ice control on state
14 highways and preventive maintenance on state roads and bridges as
15 defined in paragraph (a) of subdivision 1 of section 10-d of the
16 highway law, including personal services, nonpersonal services,
17 fringe benefits and contractual services provided by private firms
18 and municipalities.
19 The items shown in the schedule below shall be for projects with a
20 common purpose and may be interchanged without limitation subject to
21 the approval of the director of the budget (170409HM) ..............
22 664,757,267 ...................................... (re. $36,886,000)
23 PERSONAL SERVICE
24 Personal service--regular ...... 215,326,267
25 Temporary service ................ 3,000,000
26 Holiday/overtime compensation ... 30,000,000
27 --------------
28 Amount available for person-
29 al service ................. 248,326,267
30 --------------
31 NONPERSONAL SERVICE
32 Supplies and materials ......... 161,375,000
33 Travel ........................... 1,500,000
34 Contractual services ............ 90,000,000
35 Equipment ....................... 15,000,000
36 Fringe benefits ................ 109,139,000
37 Indirect costs ................... 8,556,000
38 --------------
39 Amount available for nonper-
40 sonal service .............. 385,570,000
41 --------------
42 MAINTENANCE UNDISTRIBUTED
43 For the purchase of transpor-
44 tation related equipment,
772 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 including the cost of all
2 vehicles under 8,500 pounds ... 19,600,000
3 NONPERSONAL SERVICE
4 Contractual services ............... 200,000
5 Equipment ....................... 19,400,000
6 --------------
7 Amount available for nonper-
8 sonal service ............... 19,600,000
9 --------------
10 For costs associated with the
11 contract maintenance and
12 operation of interstate 84,
13 the department of transpor-
14 tation and the thruway
15 authority are hereby author-
16 ized and empowered to enter
17 into an annual contract for
18 the thruway authority solely
19 to perform such maintenance
20 and operation on behalf of
21 the department, notwith-
22 standing any other provision
23 of law, provided such
24 contract shall include the
25 same indemnification and
26 hold harmless clauses for
27 the thruway authority that
28 are provided to munici-
29 palities pursuant to subdi-
30 vision 2-a of section 12 of
31 the highway law ............... 11,261,000
32 --------------
33 NONPERSONAL SERVICE
34 Contractual services ............ 11,261,000
35 --------------
36 Amount available for nonper-
37 sonal service ............... 11,261,000
38 --------------
39 664,757,267
40 ==============
41 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
42 section 1, of the laws of 2010:
43 For the payment of costs, including the payment of liabilities
44 incurred prior to April 1, 2008, of snow and ice control on state
45 highways and preventive maintenance on state roads and bridges as
46 defined in paragraph (a) of subdivision 1 of section 10-d of the
773 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 highway law, including personal services, nonpersonal services,
2 fringe benefits and contractual services provided by private firms
3 and municipalities.
4 The items shown in the schedule below shall be for projects with a
5 common purpose and may be interchanged without limitation subject to
6 the approval of the director of the budget (170408HM) ..............
7 614,421,000 ....................................... (re. $1,125,000)
8 PERSONAL SERVICE
9 Personal service--regular ...... 231,213,000
10 Temporary service ................ 2,259,000
11 Holiday/overtime compensation ... 27,392,000
12 --------------
13 Amount available for person-
14 al service ................. 260,864,000
15 --------------
16 NONPERSONAL SERVICE
17 Supplies and materials ......... 118,595,000
18 Travel ........................... 1,435,000
19 Contractual services ............ 77,787,000
20 Equipment ....................... 13,747,000
21 Fringe benefits ................ 103,050,000
22 Indirect costs ................... 8,710,000
23 --------------
24 Amount available for nonper-
25 sonal service .............. 323,324,000
26 --------------
27 MAINTENANCE UNDISTRIBUTED
28 For the purchase of transpor-
29 tation related equipment,
30 including the cost of all
31 vehicles under 8,500 pounds ... 19,300,000
32 NONPERSONAL SERVICE
33 Contractual services ............... 193,000
34 Equipment ....................... 19,107,000
35 --------------
36 Amount available for nonper-
37 sonal service ............... 19,300,000
38 --------------
39 For costs associated with the
40 contract maintenance and
41 operation of interstate 84,
42 the department of transpor-
43 tation and the thruway
774 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 authority are hereby author-
2 ized and empowered to enter
3 into an annual contract for
4 the thruway authority solely
5 to perform such maintenance
6 and operation on behalf of
7 the department, notwith-
8 standing any other provision
9 of law, provided such
10 contract shall include the
11 same indemnification and
12 hold harmless clauses for
13 the thruway authority that
14 are provided to munici-
15 palities pursuant to subdi-
16 vision 2-a of section 12 of
17 the highway law ............... 10,933,000
18 --------------
19 NONPERSONAL SERVICE
20 Contractual services ............ 10,933,000
21 --------------
22 Amount available for nonper-
23 sonal service ............... 10,933,000
24 --------------
25 614,421,000
26 ==============
27 By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
28 section 1, of the laws of 2010:
29 For the payment of costs, including the payment of liabilities
30 incurred prior to April 1, 2007, of snow and ice control on state
31 highways and preventive maintenance on state roads and bridges as
32 defined in paragraph (a) of subdivision 1 of section 10-d of the
33 highway law, including personal services, nonpersonal services,
34 fringe benefits and contractual services provided by private firms
35 and municipalities.
36 The items shown in the schedule below shall be for projects with a
37 common purpose and may be interchanged without limitation subject to
38 the approval of the director of the budget (170407HM) ..............
39 573,779,500 ......................................... (re. $237,000)
40 PERSONAL SERVICE
41 Personal service--regular ...... 194,220,000
42 Temporary service ................ 2,215,000
43 Holiday/overtime compensation ... 26,861,000
44 --------------
45 Amount available for person-
46 al service ................. 223,296,000
47 --------------
775 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NONPERSONAL SERVICE
2 Supplies and materials ......... 120,805,000
3 Travel ........................... 1,377,000
4 Contractual services ............ 73,203,000
5 Equipment ....................... 12,711,000
6 Fringe benefits ................. 85,721,000
7 Indirect costs .................. 26,002,000
8 --------------
9 Amount available for nonper-
10 sonal service .............. 319,819,000
11 --------------
12 MAINTENANCE UNDISTRIBUTED
13 For the purchase of transpor-
14 tation related equipment,
15 including the cost of all
16 vehicles under 8,500 pounds ... 19,100,000
17 NONPERSONAL SERVICE
18 Contractual services ............... 191,000
19 Equipment ....................... 18,909,000
20 --------------
21 Amount available for nonper-
22 sonal service ............... 19,100,000
23 --------------
24 For costs associated with the
25 contract maintenance and
26 operation of interstate 84,
27 the department of transpor-
28 tation and the thruway
29 authority are hereby author-
30 ized and empowered to enter
31 into an annual contract for
32 the thruway authority solely
33 to perform such maintenance
34 and operation on behalf of
35 the department, notwith-
36 standing any other provision
37 of law, provided such
38 contract shall include the
39 same indemnification and
40 hold harmless clauses for
41 the thruway authority that
42 are provided to munici-
43 palities pursuant to subdi-
44 vision 2-a of section 12 of
45 the highway law ............... 11,565,000
46 --------------
776 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NONPERSONAL SERVICE
2 Contractual services ............ 11,565,000
3 --------------
4 Amount available for nonper-
5 sonal service ............... 11,565,000
6 --------------
7 573,779,500
8 ==============
9 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
10 section 1, of the laws of 2007:
11 For the payment of costs, including the payment of liabilities
12 incurred prior to April 1, 2006, of snow and ice control on state
13 highways and preventive maintenance on state roads and bridges as
14 defined in paragraph (a) of subdivision 1 of section 10-d of the
15 highway law, including personal services, nonpersonal services,
16 fringe benefits and contractual services provided by private firms
17 and municipalities.
18 The items shown in the schedule below shall be for projects with a
19 common purpose and may be interchanged without limitation subject to
20 the approval of the director of the budget (170406HM) ... ........
21 528,118,000 ....................................... (re. $3,104,000)
22 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
23 section 1, of the laws of 2007:
24 For the payment of costs, including the payment of liabilities
25 incurred prior to April 1, 2005, of snow and ice control on state
26 highways and preventive maintenance on state roads and bridges as
27 defined in paragraph (a) of subdivision 1 of section 10-d of the
28 highway law, including personal services, nonpersonal services,
29 fringe benefits and contractual services provided by private firms
30 and municipalities. Such costs shall not include the costs of vehi-
31 cles under 8,500 pounds without the prior approval of the director
32 of the budget.
33 The items shown in the schedule below shall be for projects with a
34 common purpose and may be interchanged without limitation subject to
35 the approval of the director of the budget (170405HM) ... ........
36 479,947,000 ......................................... (re. $712,000)
37 Capital Projects Funds - Other
38 Dedicated Highway and Bridge Trust Fund
39 Industrial Access Purpose
40 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
41 section 1, of the laws of 2010:
42 For the construction or improvement of highway, bridge and rail
43 freight projects related to industrial access, including the acqui-
44 sition of property and the payment of liabilities incurred prior to
45 April 1, 2004. For the cost of the contract services provided by
46 private firms, including but not limited to the preparation of
47 designs, plans, specifications and estimates; construction manage-
777 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ment and supervision; and appraisals, surveys, testing and environ-
2 mental impact statements for transportation projects. No funds shall
3 be allocated for such purposes until the commissioner of transporta-
4 tion enters into an agreement subject to the approval of the direc-
5 tor of the budget with any public or private entity for the repay-
6 ment of 40 percent of each project's costs disbursed from such
7 funds. Such agreement shall require repayment within 5 years of the
8 date of acceptance of the project by the department of transporta-
9 tion except that the repayment may occur over a period of up to 10
10 years when total project costs exceed $1,000,000. All projects must
11 be approved by the director of the budget prior to the obligation of
12 the moneys so appropriated.
13 The moneys so appropriated shall be made available pursuant to rules
14 and regulations promulgated by the commissioner of transportation
15 establishing the maximum amount of assistance to be provided for
16 each project and the information that must be provided by the entity
17 requesting assistance, establishing criteria for providing assist-
18 ance from the moneys so appropriated and including standards for
19 receiving of assistance including but not limited to the number of
20 jobs created or maintained by the transportation improvement.
21 Notwithstanding any inconsistent provision of law, the commissioner of
22 transportation may waive the requirement to repay 40 percent of the
23 cost of a project provided that private funds are dedicated to the
24 cost of such industrial access project and related economic develop-
25 ment for at least 40 percent of the total cost of the industrial
26 access project and related economic development and the industrial
27 access portion of such project's cost is greater than $2,000,000
28 (17060479) ... 5,400,000 .......................... (re. $1,972,000)
29 By chapter 55, section 1, of the laws of 2003:
30 For the construction or improvement of highway, bridge and rail
31 freight projects related to industrial access, including the acqui-
32 sition of property and the payment of liabilities incurred prior to
33 April 1, 2003. For the cost of the contract services provided by
34 private firms, including but not limited to the preparation of
35 designs, plans, specifications and estimates; construction manage-
36 ment and supervision; and appraisals, surveys, testing and environ-
37 mental impact statements for transportation projects. No funds shall
38 be allocated for such purposes until the commissioner of transporta-
39 tion enters into an agreement subject to the approval of the direc-
40 tor of the budget with any public or private entity for the repay-
41 ment of 40 percent of each project's costs disbursed from such
42 funds. Such agreement shall require repayment within 5 years of the
43 date of acceptance of the project by the department of transporta-
44 tion except that the repayment may occur over a period of up to 10
45 years when total project costs exceed $1,000,000. All projects must
46 be approved by the director of the budget prior to the obligation of
47 the moneys so appropriated.
48 The moneys so appropriated shall be made available pursuant to rules
49 and regulations promulgated by the commissioner of transportation
50 establishing the maximum amount of assistance to be provided for
51 each project and the information that must be provided by the entity
778 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 requesting assistance, establishing criteria for providing assist-
2 ance from the moneys so appropriated and including standards for
3 receiving of assistance including but not limited to the number of
4 jobs created or maintained by the transportation improvement.
5 Notwithstanding any inconsistent provision of law, the commissioner of
6 transportation may waive the requirement to repay 40 percent of the
7 cost of a project provided that private funds are dedicated to the
8 cost of such industrial access project and related economic develop-
9 ment for at least 40 percent of the total cost of the industrial
10 access project and related economic development and the industrial
11 access portion of such project's cost is greater than $2,000,000
12 (17060379) ... 9,000,000 .......................... (re. $3,140,000)
13 By chapter 55, section 1, of the laws of 2002:
14 For the construction or improvement of highway, bridge and rail
15 freight projects related to industrial access, including the acqui-
16 sition of property and the payment of liabilities incurred prior to
17 April 1, 2002. For the payment of reimbursements to the engineering
18 services fund for the cost of the contract services provided by
19 private firms, including but not limited to the preparation of
20 designs, plans, specifications and estimates; construction manage-
21 ment and supervision; and appraisals, surveys, testing and environ-
22 mental impact statements for transportation projects. No funds shall
23 be allocated for such purposes until the commissioner of transporta-
24 tion enters into an agreement subject to the approval of the direc-
25 tor of the budget with any public or private entity for the repay-
26 ment of 40 percent of each project's costs disbursed from such
27 funds. Such agreement shall require repayment within 5 years of the
28 date of acceptance of the project by the department of transporta-
29 tion except that the repayment may occur over a period of up to 10
30 years when total project costs exceed $1,000,000. All projects must
31 be approved by the director of the budget prior to the obligation of
32 the moneys so appropriated.
33 The moneys so appropriated shall be made available pursuant to rules
34 and regulations promulgated by the commissioner of transportation
35 establishing the maximum amount of assistance to be provided for
36 each project and the information that must be provided by the entity
37 requesting assistance, establishing criteria for providing assist-
38 ance from the moneys so appropriated and including standards for
39 receiving of assistance including but not limited to the number of
40 jobs created or maintained by the transportation improvement.
41 Notwithstanding any inconsistent provision of law, the commissioner of
42 transportation may waive the requirement to repay 40 percent of the
43 cost of a project provided that private funds are dedicated to the
44 cost of such industrial access project and related economic develop-
45 ment for at least 40 percent of the total cost of the industrial
46 access project and related economic development and the industrial
47 access portion of such project's cost is greater than $2,000,000
48 (17060279) ... 9,000,000 ............................ (re. $291,000)
49 For the construction or improvement of highway, bridge and rail
50 freight projects related to industrial access, including the acqui-
51 sition of property and the payment of liabilities incurred prior to
779 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 April 1, 2002. For the payment of reimbursements to the engineering
2 services fund for the cost of the contract services provided by
3 private firms, including but not limited to the preparation of
4 designs, plans, specifications and estimates; construction manage-
5 ment and supervision; and appraisals, surveys, testing and environ-
6 mental impact statements for transportation projects. No funds shall
7 be allocated for such purposes until the commissioner of transporta-
8 tion enters into an agreement subject to the approval of the direc-
9 tor of the budget with any public or private entity for the repay-
10 ment of 40 percent of each project's costs disbursed from such
11 funds. Such agreement shall require repayment within 5 years of the
12 date of acceptance of the project by the department of transporta-
13 tion except that the repayment may occur over a period of up to 10
14 years when total project costs exceed $1,000,000. All projects must
15 be approved by the director of the budget prior to the obligation of
16 the moneys so appropriated.
17 The moneys so appropriated shall be made available pursuant to rules
18 and regulations promulgated by the commissioner of transportation
19 establishing the maximum amount of assistance to be provided for
20 each project and the information that must be provided by the entity
21 requesting assistance, establishing criteria for providing assist-
22 ance from the moneys so appropriated and including standards for
23 receiving of assistance including but not limited to the number of
24 jobs created or maintained by the transportation improvement.
25 For the payment of the costs of projects from this appropriation as
26 set forth in a memorandum of understanding between the majority
27 leader of the senate and the speaker of the assembly or their desig-
28 nee.
29 Notwithstanding any inconsistent provision of law, the commissioner of
30 transportation may waive the requirement to repay 40 percent of the
31 cost of a project provided that private funds are dedicated to the
32 cost of such industrial access project and related economic develop-
33 ment for at least 40 percent of the total cost of the industrial
34 access project and related economic development and the industrial
35 access portion of such project's cost is greater than $2,000,000
36 (17070279) ... 6,000,000 .......................... (re. $6,000,000)
37 By chapter 55, section 1, of the laws of 2000:
38 For the construction or improvement of highway, bridge and rail
39 freight projects related to industrial access, including the acqui-
40 sition of property and the payment of liabilities incurred prior to
41 April 1, 2000. For the payment of reimbursements to the engineering
42 services fund for the cost of the contract services provided by
43 private firms, including but not limited to the preparation of
44 designs, plans, specifications and estimates; construction manage-
45 ment and supervision; and appraisals, surveys, testing and environ-
46 mental impact statements for transportation projects. No funds shall
47 be allocated for such purposes until the commissioner of transporta-
48 tion enters into an agreement subject to the approval of the direc-
49 tor of the budget with any public or private entity for the repay-
50 ment of 40 percent of each project's costs disbursed from such
51 funds. Such agreement shall require repayment within 5 years of the
780 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 date of acceptance of the project by the department of transporta-
2 tion except that the repayment may occur over a period of up to 10
3 years when total project costs exceed $1,000,000. All projects must
4 be approved by the director of the budget prior to the obligation of
5 the moneys so appropriated.
6 The moneys so appropriated shall be made available pursuant to rules
7 and regulations promulgated by the commissioner of transportation
8 establishing the maximum amount of assistance to be provided for
9 each project and the information that must be provided by the entity
10 requesting assistance, establishing criteria for providing assist-
11 ance from the moneys so appropriated and including standards for
12 receiving of assistance including but not limited to the number of
13 jobs created or maintained by the transportation improvement.
14 Notwithstanding any inconsistent provision of law, the commissioner of
15 transportation may waive the requirement to repay 40 percent of the
16 cost of a project provided that private funds are dedicated to the
17 cost of such industrial access project and related economic develop-
18 ment for at least 40 percent of the total cost of the industrial
19 access project and related economic development and the industrial
20 access portion of such project's cost is greater than $2,000,000
21 (17060079) ... 15,000,000 ............................ (re. $82,000)
22 By chapter 55, section 1, of the laws of 1999:
23 For the construction or improvement of highway, bridge and rail
24 freight projects related to industrial access, including the acqui-
25 sition of property and the payment of liabilities incurred prior to
26 April 1, 1999. For the payment of reimbursements to the engineering
27 services fund for the cost of the contract services provided by
28 private firms, including but not limited to the preparation of
29 designs, plans, specifications and estimates; construction manage-
30 ment and supervision; and appraisals, surveys, testing and environ-
31 mental impact statements for transportation projects. No funds shall
32 be allocated for such purposes until the commissioner of transporta-
33 tion enters into an agreement subject to the approval of the direc-
34 tor of the budget with any public or private entity for the repay-
35 ment of 40 percent of each project's costs disbursed from such
36 funds. Such agreement shall require repayment within 5 years of the
37 date of acceptance of the project by the department of transporta-
38 tion except that the repayment may occur over a period of up to 10
39 years when total project costs exceed $1,000,000. All projects must
40 be approved by the director of the budget prior to the obligation of
41 the moneys so appropriated.
42 The moneys so appropriated shall be made available pursuant to rules
43 and regulations promulgated by the commissioner of transportation
44 establishing the maximum amount of assistance to be provided for
45 each project and the information that must be provided by the entity
46 requesting assistance, establishing criteria for providing assist-
47 ance from the moneys so appropriated and including standards for
48 receiving of assistance including but not limited to the number of
49 jobs created or maintained by the transportation improvement.
50 Notwithstanding any inconsistent provision of law, the commissioner of
51 transportation may waive the requirement to repay 40 percent of the
781 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 cost of a project provided that private funds are dedicated to the
2 cost of such industrial access project and related economic develop-
3 ment for at least 40 percent of the total cost of the industrial
4 access project and related economic development and the industrial
5 access portion of such project's cost is greater than $2,000,000
6 (17069979) ... 15,000,000 ........................... (re. $321,000)
7 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
8 section 1, of the laws of 2000:
9 For the construction or improvement of highway, bridge and rail
10 freight projects related to industrial access, including the acqui-
11 sition of property and the payment of liabilities incurred prior to
12 April 1, 1999. For the payment of reimbursements to the engineering
13 services fund for the cost of the contract services provided by
14 private firms, including but not limited to the preparation of
15 designs, plans, specifications and estimates; construction manage-
16 ment and supervision; and appraisals, surveys, testing and environ-
17 mental impact statements for transportation projects. No funds shall
18 be allocated for such purposes until the commissioner of transporta-
19 tion enters into an agreement subject to the approval of the direc-
20 tor of the budget with any public or private entity for the repay-
21 ment of 40 percent of each project's costs disbursed from such
22 funds. Such agreement shall require repayment within 5 years of the
23 date of acceptance of the project by the department of transporta-
24 tion except that the repayment may occur over a period of up to 10
25 years when total project costs exceed $1,000,000. All projects must
26 be approved by the director of the budget prior to the obligation of
27 the moneys so appropriated.
28 The moneys so appropriated shall be made available pursuant to rules
29 and regulations promulgated by the commissioner of transportation
30 establishing the maximum amount of assistance to be provided for
31 each project and the information that must be provided by the entity
32 requesting assistance, establishing criteria for providing assist-
33 ance from the moneys so appropriated and including standards for
34 receiving of assistance including but not limited to the number of
35 jobs created or maintained by the transportation improvement.
36 For the payment of the costs of projects from this appropriation as
37 set forth in a memorandum of understanding between the majority
38 leader of the senate and the speaker of the assembly or their desig-
39 nees.
40 Notwithstanding any inconsistent provision of law, the commissioner of
41 transportation may waive the requirement to repay 40 percent of the
42 cost of a project provided that private funds are dedicated to the
43 cost of such industrial access project and related economic develop-
44 ment for at least 40 percent of the total cost of the industrial
45 access project and related economic development and the industrial
46 access portion of such project's cost is greater than $2,000,000
47 (17079979) ... 10,000,000 ......................... (re. $1,574,000)
48 By chapter 55, section 1, of the laws of 1998:
49 For the construction or improvement of highway, bridge and rail
50 freight projects related to industrial access, including the acqui-
782 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sition of property and the payment of liabilities incurred prior to
2 April 1, 1998. For the payment of reimbursements to the engineering
3 services fund for the cost of the contract services provided by
4 private firms, including but not limited to the preparation of
5 designs, plans, specifications and estimates; construction manage-
6 ment and supervision; and appraisals, surveys, testing and environ-
7 mental impact statements for transportation projects. No funds shall
8 be allocated for such purposes until the commissioner of transporta-
9 tion enters into an agreement subject to the approval of the direc-
10 tor of the budget with any public or private entity for the repay-
11 ment of 40 percent of each project's costs disbursed from such
12 funds. Such agreement shall require repayment within 5 years of the
13 date of acceptance of the project by the department of transporta-
14 tion except that the repayment may occur over a period of up to 10
15 years when total project costs exceed $1,000,000. All projects must
16 be approved by the director of the budget prior to the obligation of
17 the moneys so appropriated.
18 The moneys so appropriated shall be made available pursuant to rules
19 and regulations promulgated by the commissioner of transportation
20 establishing the maximum amount of assistance to be provided for
21 each project and the information that must be provided by the entity
22 requesting assistance, establishing criteria for providing assist-
23 ance from the moneys so appropriated and including standards for
24 receiving of assistance including but not limited to the number of
25 jobs created or maintained by the transportation improvement.
26 Notwithstanding any inconsistent provision of law, the commissioner of
27 transportation may waive the requirement to repay 40 percent of the
28 cost of a project provided that private funds are dedicated to the
29 cost of such industrial access project and related economic develop-
30 ment for at least 40 percent of the total cost of the industrial
31 access project and related economic development and the industrial
32 access portion of such project's cost is greater than $2,000,000
33 (17069879) ... 5,000,000 ............................ (re. $244,000)
34 Capital Projects Funds - Other
35 Dedicated Highway and Bridge Trust Fund
36 Multi-Modal Purpose
37 By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
38 section 5, of the laws of 2006:
39 For the cost of multi-modal projects designated as part of the multi-
40 modal program established by section 14-k of the transportation law
41 and in accordance with the 2005 memorandum of understanding among
42 the governor, the majority leader of the senate, and the speaker of
43 the assembly, or their designees. Notwithstanding any other incon-
44 sistent provision of law, funds allocated and made available from
45 this appropriation in state fiscal years 2006-07 through 2009-10
46 shall not exceed $50,000,000 annually pursuant to section viii of
47 the 2005 transportation memorandum of understanding (17MM06MR) .....
48 200,000,000 ..................................... (re. $152,500,000)
49 By chapter 55, section 1, of the laws of 2005:
783 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the cost of multi-modal projects designated as part of the multi-
2 modal program established by section 14-k of the transportation law
3 and in accordance with a memorandum of understanding among the
4 governor, the majority leader of the senate, and the speaker of the
5 assembly, or their designees (17MM05MR) ............................
6 150,000,000 ...................................... (re. $13,821,000)
7 Capital Projects Funds - Other
8 Dedicated Highway and Bridge Trust Fund
9 Non-Federal Aided Highway Purpose
10 By chapter 54, section 1, of the laws of 2017:
11 For the payment of the costs, including the payment of liabilities
12 incurred prior to April 1, 2017, of state highways, parkways, bridg-
13 es, the New York State Thruway, Indian reservation roads, and facil-
14 ities for which the responsibility is vested with the state depart-
15 ment of transportation including work appurtenant and ancillary
16 thereto, for the state share of federally authorized high speed rail
17 improvement projects, and for the cost of administrative services of
18 the department of transportation and the cost of services provided
19 by private firms; including the costs of preventive maintenance on
20 state roads and bridges as defined in paragraph (a) of subdivision 1
21 of section 10-d of the highway law for contractual preventive main-
22 tenance services provided by private firms; and including but not
23 limited to the preparation of designs, plans, specifications and
24 estimates; construction management and supervision, and appraisals,
25 surveys, testing and environmental impact statements for transporta-
26 tion projects. Project costs funded from this appropriation may
27 include but shall not be limited to construction, reconstruction,
28 reconditioning and preservation, and preventive maintenance. Up to
29 $5,000,000 of this appropriation may be used for traffic maintenance
30 and traffic protection services provided by the division of state
31 police.
32 With the approval of the director of the budget, the commissioner of
33 transportation is authorized to enter into agreements with any muni-
34 cipality to finance local bridge projects through state non-federal-
35 ly aided highway funds appropriated herein when the use of federal
36 aid funds for such local bridge projects would not be cost effective
37 and the federal aid and state matching funds saved as a result of
38 the use of non federal aid funds for local bridge projects are made
39 available for bridge projects on the state highway system. The
40 total amount of non-federally aided highway funds made available for
41 local bridge projects from this appropriation shall not exceed
42 $2,500,000 in state fiscal year 2017-18.
43 Personal service (17011722) ... 5,000,000 ........... (re. $5,000,000)
44 Nonpersonal service (17041722) ... 20,000,000 ...... (re. $17,905,000)
45 Capital projects (17081722) ... 408,443,000 ....... (re. $398,972,000)
46 For the payment of the costs, including the payment of liabilities
47 incurred prior to April 1, 2017, of the acquisition of property
48 related to construction, reconstruction, reconditioning and preser-
49 vation, and preventive maintenance of state highways, parkways,
50 bridges, the New York State Thruway, Indian reservation roads, and
784 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 facilities for which the responsibility is vested with the state
2 department of transportation (17091722) ............................
3 22,000,000 ....................................... (re. $21,996,000)
4 By chapter 55, section 1, of the laws of 2016:
5 For the payment of the costs, including the payment of liabilities
6 incurred prior to April 1, 2016, of state highways, parkways, bridg-
7 es, the New York State Thruway, Indian reservation roads, and facil-
8 ities for which the responsibility is vested with the state depart-
9 ment of transportation including work appurtenant and ancillary
10 thereto, for the state share of federally authorized high speed rail
11 improvement projects, and for the cost of administrative services of
12 the department of transportation and the cost of services provided
13 by private firms; including the costs of preventive maintenance on
14 state roads and bridges as defined in paragraph (a) of subdivision 1
15 of section 10-d of the highway law for contractual preventive main-
16 tenance services provided by private firms; and including but not
17 limited to the preparation of designs, plans, specifications and
18 estimates; construction management and supervision, and appraisals,
19 surveys, testing and environmental impact statements for transporta-
20 tion projects. Project costs funded from this appropriation may
21 include but shall not be limited to construction, reconstruction,
22 reconditioning and preservation, and preventive maintenance. Up to
23 $5,000,000 of this appropriation may be used for traffic maintenance
24 and traffic protection services provided by the division of state
25 police.
26 With the approval of the director of the budget, the commissioner of
27 transportation is authorized to enter into agreements with any muni-
28 cipality to finance local bridge projects through state nonfederally
29 aided highway funds appropriated herein when the use of federal aid
30 funds for such local bridge projects would not be cost effective and
31 the federal aid and state matching funds saved as a result of the
32 use of non federal aid funds for local bridge projects are made
33 available for bridge projects on the state highway system. The
34 total amount of non-federally aided highway funds made available for
35 local bridge projects from this appropriation shall not exceed
36 $2,500,000 in state fiscal year 2016-17.
37 Personal service (17011622) ... 5,000,000 ............. (re. $430,000)
38 Nonpersonal service (17041622) ... 20,000,000 ....... (re. $6,551,000)
39 Capital projects (17081622) ... 436,487,000 ....... (re. $226,027,000)
40 For the payment of the costs, including the payment of liabilities
41 incurred prior to April 1, 2016, of the acquisition of property
42 related to construction, reconstruction, reconditioning and preser-
43 vation, and preventive maintenance of state highways, parkways,
44 bridges, the New York State Thruway, Indian reservation roads, and
45 facilities for which the responsibility is vested with the state
46 department of transportation (17091622) ............................
47 24,562,000 ....................................... (re. $12,889,000)
48 By chapter 54, section 1, of the laws of 2015:
49 For the payment of the costs, including the payment of liabilities
50 incurred prior to April 1, 2015, of state highways, parkways, bridg-
785 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 es, the New York State Thruway, Indian reservation roads, and facil-
2 ities for which the responsibility is vested with the state depart-
3 ment of transportation including work appurtenant and ancillary
4 thereto, for the state share of federally authorized high speed rail
5 improvement projects, and for the cost of administrative services of
6 the department of transportation and the cost of services provided
7 by private firms; including the costs of preventive maintenance on
8 state roads and bridges as defined in paragraph (a) of subdivision 1
9 of section 10-d of the highway law for contractual preventive main-
10 tenance services provided by private firms; and including but not
11 limited to the preparation of designs, plans, specifications and
12 estimates; construction management and supervision, and appraisals,
13 surveys, testing and environmental impact statements for transporta-
14 tion projects. Project costs funded from this appropriation may
15 include but shall not be limited to construction, reconstruction,
16 reconditioning and preservation, and preventive maintenance. Up to
17 $5,000,000 of this appropriation may be used for traffic maintenance
18 and traffic protection services provided by the division of state
19 police.
20 With the approval of the director of the budget, the commissioner of
21 transportation is authorized to enter into agreements with any muni-
22 cipality to finance local bridge projects through state nonfederally
23 aided highway funds appropriated herein when the use of federal aid
24 funds for such local bridge projects would not be cost effective and
25 the federal aid and state matching funds saved as a result of the
26 use of nonfederal aid funds for local bridge projects are made
27 available for bridge projects on the state highway system. The
28 total amount of non-federally aided highway funds made available for
29 local bridge projects from this appropriation shall not exceed
30 $2,500,000 in state fiscal year 2015-16.
31 Personal service (17011522) ... 5,000,000 .............. (re. $99,000)
32 Nonpersonal service (17041522) ... 20,000,000 ....... (re. $4,494,000)
33 Capital projects (17081522) ... 413,251,000 ........ (re. $93,168,000)
34 For the payment of the costs, including the payment of liabilities
35 incurred prior to April 1, 2015, of the acquisition of property
36 related to construction, reconstruction, reconditioning and preser-
37 vation, and preventive maintenance of state highways, parkways,
38 bridges, the New York State Thruway, Indian reservation roads, and
39 facilities for which the responsibility is vested with the state
40 department of transportation.
41 Capital projects (17091522) ... 23,431,000 ......... (re. $13,513,000)
42 By chapter 54, section 1, of the laws of 2014:
43 For the payment of the costs, including the payment of liabilities
44 incurred prior to April 1, 2014, of the acquisition of property
45 related to construction, reconstruction, reconditioning and preser-
46 vation, and preventive maintenance of state highways, parkways,
47 bridges, the New York State Thruway, Indian reservation roads, and
48 facilities for which the responsibility is vested with the state
49 department of transportation.
50 Capital projects (17091422) ... 27,690,000 .......... (re. $3,925,000)
786 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2014, as amended by chapter 55,
2 section 1, of the laws of 2016:
3 For the payment of the costs, including the payment of liabilities
4 incurred prior to April 1, 2014, of state highways, parkways, bridg-
5 es, the New York State Thruway, Indian reservation roads, and facil-
6 ities for which the responsibility is vested with the state depart-
7 ment of transportation including work appurtenant and ancillary
8 thereto, for the state share of federally authorized high speed rail
9 improvement projects, and for the cost of administrative services of
10 the department of transportation and the cost of services provided
11 by private firms; including the costs of preventive maintenance on
12 state roads and bridges as defined in paragraph (a) of subdivision 1
13 of section 10-d of the highway law for contractual preventive main-
14 tenance services provided by private firms; and including but not
15 limited to the preparation of designs, plans, specifications and
16 estimates; construction management and supervision, and appraisals,
17 surveys, testing and environmental impact statements for transporta-
18 tion projects. Project costs funded from this appropriation may
19 include but shall not be limited to construction, reconstruction,
20 reconditioning and preservation, and preventive maintenance. Up to
21 $5,000,000 of this appropriation may be used for traffic maintenance
22 and traffic protection services provided by the division of state
23 police.
24 With the approval of the director of the budget, the commissioner of
25 transportation is authorized to enter into agreements with any muni-
26 cipality to finance local bridge projects through state nonfederally
27 aided highway funds appropriated herein when the use of federal aid
28 funds for such local bridge projects would not be cost effective and
29 the federal aid and state matching funds saved as a result of the
30 use of nonfederal aid funds for local bridge projects are made
31 available for bridge projects on the state highway system. The total
32 amount of non-federally aided highway funds made available for local
33 bridge projects from this appropriation shall not exceed $2,500,000
34 in state fiscal year 2014-15.
35 Personal service (17011422) ... 6,000,000 ............. (re. $879,000)
36 Nonpersonal service (17041422) ... 27,000,000 ......... (re. $633,000)
37 Capital projects (17081422) ... 474,079,000 ........ (re. $64,939,000)
38 By chapter 54, section 1, of the laws of 2013:
39 For the payment of the costs, including the payment of liabilities
40 incurred prior to April 1, 2013, of the acquisition of property
41 related to construction, reconstruction, reconditioning and preser-
42 vation, and preventive maintenance of state highways, parkways,
43 bridges, the New York State Thruway, Indian reservation roads, and
44 facilities for which the responsibility is vested with the state
45 department of transportation.
46 Capital projects (17091322) ... 29,175,000 .......... (re. $8,574,000)
47 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
48 section 1, of the laws of 2015:
49 For the payment of the costs, including the payment of liabilities
50 incurred prior to April 1, 2013, of state highways, parkways, bridg-
787 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 es, the New York State Thruway, Indian reservation roads, and facil-
2 ities for which the responsibility is vested with the state depart-
3 ment of transportation including work appurtenant and ancillary
4 thereto, for the state share of federally authorized high speed rail
5 improvement projects, and for the cost of administrative services of
6 the department of transportation and the cost of services provided
7 by private firms; including the costs of preventive maintenance on
8 state roads and bridges as defined in paragraph (a) of subdivision 1
9 of section 10-d of the highway law for contractual preventive main-
10 tenance services provided by private firms; and including but not
11 limited to the preparation of designs, plans, specifications and
12 estimates; construction management and supervision, and appraisals,
13 surveys, testing and environmental impact statements for transporta-
14 tion projects. Project costs funded from this appropriation may
15 include but shall not be limited to construction, reconstruction,
16 reconditioning and preservation, and preventive maintenance. Up to
17 $3,000,000 of this appropriation may be used for traffic maintenance
18 and traffic protection services provided by the division of state
19 police.
20 With the approval of the director of the budget, the commissioner of
21 transportation is authorized to enter into agreements with any muni-
22 cipality to finance local bridge projects through state nonfederally
23 aided highway funds appropriated herein when the use of federal aid
24 funds for such local bridge projects would not be cost effective and
25 the federal aid and state matching funds saved as a result of the
26 use of nonfederal aid funds for local bridge projects are made
27 available for bridge projects on the state highway system. The
28 total amount of non-federally aided highway funds made available for
29 local bridge projects from this appropriation shall not exceed
30 $2,500,000 in state fiscal year 2013-14.
31 Personal service (17011322) ... 4,000,000 ............. (re. $501,000)
32 Nonpersonal service (17041322) ... 19,000,000 ....... (re. $3,651,000)
33 Capital projects (17081322) ... 553,121,000 ....... (re. $108,478,000)
34 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
35 section 1, of the laws of 2013:
36 For the payment of the costs, including the payment of liabilities
37 incurred prior to April 1, 2012, of state highways, parkways, bridg-
38 es, the New York State Thruway, Indian reservation roads, and facil-
39 ities for which the responsibility is vested with the state depart-
40 ment of transportation including work appurtenant and ancillary
41 thereto, for the state share of federally authorized high speed rail
42 improvement projects, and for the cost of administrative services of
43 the department of transportation and the cost of services provided
44 by private firms; including the costs of preventive maintenance on
45 state roads and bridges as defined in paragraph (a) of subdivision 1
46 of section 10-d of the highway law for contractual preventive main-
47 tenance services provided by private firms; and including but not
48 limited to the preparation of designs, plans, specifications and
49 estimates; construction management and supervision, and appraisals,
50 surveys, testing and environmental impact statements for transporta-
51 tion projects. Project costs funded from this appropriation may
788 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 include but shall not be limited to construction, reconstruction,
2 reconditioning and preservation, preventive maintenance, and the
3 acquisition of property.
4 With the approval of the director of the budget, the commissioner of
5 transportation is authorized to enter into agreements with any muni-
6 cipality to finance local bridge projects through state nonfederally
7 aided highway funds appropriated herein when the use of federal aid
8 funds for such local bridge projects would not be cost effective and
9 the federal aid and state matching funds saved as a result of the
10 use of nonfederal aid funds for local bridge projects are made
11 available for bridge projects on the state highway system. The
12 total amount of non-federally aided highway funds made available for
13 local bridge projects from this appropriation shall not exceed
14 $2,500,000 in state fiscal year 2012-13.
15 Personal service (17011222) ... 2,000,000 ........... (re. $1,079,000)
16 Nonpersonal service (17041222) ... 15,100,000 ......... (re. $708,000)
17 Capital projects (17081222) ... 508,950,000 ........ (re. $31,185,000)
18 By chapter 54, section 1, of the laws of 2011:
19 For the payment of the costs, including the payment of liabilities
20 incurred prior to April 1, 2011, of state highways, parkways, bridg-
21 es, the New York State Thruway, Indian reservation roads, and facil-
22 ities for which the responsibility is vested with the state depart-
23 ment of transportation including work appurtenant and ancillary
24 thereto, for the state share of federally authorized high speed rail
25 improvement projects, and for the cost of administrative services of
26 the department of transportation and the cost of services provided
27 by private firms; including the costs of preventive maintenance on
28 state roads and bridges as defined in paragraph (a) of subdivision 1
29 of section 10-d of the highway law for contractual preventive main-
30 tenance services provided by private firms; and including but not
31 limited to the preparation of designs, plans, specifications and
32 estimates; construction management and supervision, and appraisals,
33 surveys, testing and environmental impact statements for transporta-
34 tion projects. Project costs funded from this appropriation may
35 include but shall not be limited to construction, reconstruction,
36 reconditioning and preservation, preventive maintenance, and the
37 acquisition of property. With the approval of the director of the
38 budget, the commissioner of transportation is authorized to enter
39 into agreements with any municipality to finance local bridge
40 projects through state non-federally aided highway funds appropri-
41 ated herein when the use of federal aid funds for such local bridge
42 projects would not be cost effective and the federal aid and state
43 matching funds saved as a result of the use of non-federal aid funds
44 for local bridge projects are made available for bridge projects on
45 the state highway system. The total amount of non-federally aided
46 highway funds made available for local bridge projects from this
47 appropriation shall not exceed $2,500,000 in state fiscal year
48 2011-12.
49 The items shown in the schedule below shall be for projects with a
50 common purpose and may be interchanged without limitation subject to
789 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the approval of the director of the budget (17021122) ..............
2 526,050,000 ...................................... (re. $37,005,000)
3 PERSONAL SERVICE
4 Personal service--regular ........ 1,500,000
5 Holiday/overtime compensation ...... 500,000
6 --------------
7 Amount available for person-
8 al service ................... 2,000,000
9 --------------
10 NONPERSONAL SERVICE
11 Supplies and materials ........... 2,000,000
12 Travel .............................. 10,000
13 Contractual services ............. 7,000,000
14 Equipment ........................ 3,990,000
15 --------------
16 Amount available for nonper-
17 sonal service ............... 13,000,000
18 --------------
19 CAPITAL PROJECTS
20 Highway and Bridge
21 Construction and Preventive
22 Maintenance .................. 486,000,000
23 --------------
24 Right of Way Acquisition ........ 25,050,000
25 --------------
26 Amount available for capital
27 projects ................... 511,050,000
28 --------------
29 526,050,000
30 ==============
31 By chapter 55, section 1, of the laws of 2010:
32 For the payment of the costs, including the payment of liabilities
33 incurred prior to April 1, 2010, of state highways, parkways, bridg-
34 es, the New York State Thruway, Indian reservation roads, and facil-
35 ities for which the responsibility is vested with the state depart-
36 ment of transportation including work appurtenant and ancillary
37 thereto, for the state share of federally authorized high speed rail
38 improvement projects, and for the cost of administrative services of
39 the department of transportation and the cost of services provided
40 by private firms; including the costs of preventive maintenance on
41 state roads and bridges as defined in paragraph (a) of subdivision 1
42 of section 10-d of the highway law for contractual preventive main-
43 tenance services provided by private firms; and including but not
44 limited to the preparation of designs, plans, specifications and
45 estimates; construction management and supervision, and appraisals,
790 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 surveys, testing and environmental impact statements for transporta-
2 tion projects. Project costs funded from this appropriation may
3 include but shall not be limited to construction, reconstruction,
4 reconditioning and preservation, preventive maintenance, and the
5 acquisition of property.
6 With the approval of the director of the budget, the commissioner of
7 transportation is authorized to enter into agreements with any muni-
8 cipality to finance local bridge projects through state nonfederally
9 aided highway funds appropriated herein when the use of federal aid
10 funds for such local bridge projects would not be cost effective and
11 the federal aid and state matching funds saved as a result of the
12 use of nonfederal aid funds for local bridge projects are made
13 available for bridge projects on the state highway system. The total
14 amount of non-federally aided highway funds made available for local
15 bridge projects from this appropriation shall not exceed $2,500,000
16 in state fiscal year 2010-11.
17 The items shown in the schedule below shall be for projects with a
18 common purpose and may be interchanged without limitation subject to
19 the approval of the director of the budget (17021022) ..............
20 526,050,000 ....................................... (re. $6,267,000)
21 SCHEDULE
22 PERSONAL SERVICE
23 Personal service--regular ........ 1,500,000
24 Holiday/overtime compensation ...... 500,000
25 --------------
26 Amount available for person-
27 al service ................... 2,000,000
28 --------------
29 NONPERSONAL SERVICE
30 Supplies and materials ........... 2,000,000
31 Travel .............................. 10,000
32 Contractual services ............. 7,000,000
33 Equipment ........................ 3,990,000
34 --------------
35 Amount available for nonper-
36 sonal service ............... 13,000,000
37 --------------
38 MAINTENANCE UNDISTRIBUTED
39 Highway and Bridge
40 Construction and Preventive
41 Maintenance .................. 486,000,000
42 --------------
43 Right of Way Acquisition ........ 25,050,000
44 --------------
791 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Amount available for mainte-
2 nance undistributed ........ 511,050,000
3 --------------
4 526,050,000
5 ==============
6 By chapter 55, section 1, of the laws of 2009:
7 For the payment of the costs, including the payment of liabilities
8 incurred prior to April 1, 2009, of state highways, parkways, bridg-
9 es, the New York State Thruway, Indian reservation roads, and facil-
10 ities for which the responsibility is vested with the state depart-
11 ment of transportation including work appurtenant and ancillary
12 thereto, the cost of administrative services of the department of
13 transportation and the cost of services provided by private firms;
14 including the costs of preventive maintenance on state roads and
15 bridges as defined in paragraph (a) of subdivision 1 of section 10-d
16 of the highway law for contractual preventive maintenance services
17 provided by private firms; and including but not limited to the
18 preparation of designs, plans, specifications and estimates;
19 construction management and supervision, and appraisals, surveys,
20 testing and environmental impact statements for transportation
21 projects. Project costs funded from this appropriation may include
22 but shall not be limited to construction, reconstruction, recondi-
23 tioning and preservation, preventive maintenance, and the acquisi-
24 tion of property.
25 With the approval of the director of the budget, the commissioner of
26 transportation is authorized to enter into agreements with any muni-
27 cipality to finance local bridge projects through state nonfederally
28 aided highway funds appropriated herein when the use of federal aid
29 funds for such local bridge projects would not be cost effective and
30 the federal aid and state matching funds saved as a result of the
31 use of nonfederal aid funds for local bridge projects are made
32 available for bridge projects on the state highway system. The total
33 amount of non-federally aided highway funds made available for local
34 bridge projects from this appropriation shall not exceed $2,500,000
35 in state fiscal year 2009-10.
36 The items shown in the schedule below shall be for projects with a
37 common purpose and may be interchanged without limitation subject to
38 the approval of the director of the budget (17020922) ..............
39 516,550,000 ...................................... (re. $26,956,000)
40 SCHEDULE
41 PERSONAL SERVICE
42 Personal service--regular ........ 1,000,000
43 Holiday/overtime compensation .... 1,000,000
44 --------------
45 Amount available for person-
46 al service ................... 2,000,000
47 --------------
792 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NONPERSONAL SERVICE
2 Supplies and materials ........... 1,000,000
3 Travel .............................. 10,000
4 Contractual services ............. 8,000,000
5 Equipment ........................ 3,990,000
6 --------------
7 Amount available for nonper-
8 sonal service ............... 13,000,000
9 --------------
10 MAINTENANCE UNDISTRIBUTED
11 Highway and Bridge Construcion
12 and Preventive Maintenance ... 476,000,000
13 --------------
14 Right of Way Acquisition ........ 25,550,000
15 --------------
16 Amount available for mainte-
17 nance undistributed ........ 501,550,000
18 --------------
19 516,550,000
20 ==============
21 By chapter 55, section 1, of the laws of 2008:
22 For the payment of the costs, including the payment of liabilities
23 incurred prior to April 1, 2008, of state highways, parkways, bridg-
24 es, the New York State Thruway, Indian reservation roads, and facil-
25 ities for which the responsibility is vested with the state depart-
26 ment of transportation including work appurtenant and ancillary
27 thereto, the cost of administrative services of the department of
28 transportation and the cost of services provided by private firms;
29 including the costs of preventive maintenance on state roads and
30 bridges as defined in paragraph (a) of subdivision 1 of section 10-d
31 of the highway law for contractual preventive maintenance services
32 provided by private firms; and including but not limited to the
33 preparation of designs, plans, specifications and estimates;
34 construction management and supervision, and appraisals, surveys,
35 testing and environmental impact statements for transportation
36 projects. Project costs funded from this appropriation may include
37 but shall not be limited to construction, reconstruction, recondi-
38 tioning and preservation, preventive maintenance, and the acquisi-
39 tion of property.
40 With the approval of the director of the budget, the commissioner of
41 transportation is authorized to enter into agreements with any muni-
42 cipality to finance local bridge projects through state nonfederally
43 aided highway funds appropriated herein when the use of federal aid
44 funds for such local bridge projects would not be cost effective and
45 the federal aid and state matching funds saved as a result of the
46 use of nonfederal aid funds for local bridge projects are made
47 available for bridge projects on the state highway system. The total
48 amount of non-federally aided highway funds made available for local
793 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 bridge projects from this appropriation shall not exceed $2,500,000
2 in state fiscal year 2008-09.
3 The items shown in the schedule below shall be for projects with a
4 common purpose and may be interchanged without limitation subject to
5 the approval of the director of the budget (17020822 ...............
6 539,352,000 ...................................... (re. $18,783,000)
7 SCHEDULE
8 PERSONAL SERVICE
9 Personal service--regular .......... 926,000
10 Holiday/overtime compensation .... 1,074,000
11 --------------
12 Amount available for person-
13 al service ................... 2,000,000
14 --------------
15 NONPERSONAL SERVICE
16 Supplies and materials ........... 1,283,000
17 Travel ............................... 3,000
18 Contractual services ............. 7,833,000
19 Equipment ........................ 3,881,000
20 --------------
21 Amount available for nonper-
22 sonal service ............... 13,000,000
23 --------------
24 MAINTENANCE UNDISTRIBUTED
25 Highway and Bridge Construcion
26 and Preventive Maintenance ... 524,352,000
27 --------------
28 Amount available for mainte-
29 nance undistributed ........ 524,352,000
30 --------------
31 539,352,000
32 ==============
33 By chapter 55, section 1, of the laws of 2007:
34 For the payment of the costs, including the payment of liabilities
35 incurred prior to April 1, 2007, of state highways, parkways, bridg-
36 es, the New York State Thruway, Indian reservation roads, and facil-
37 ities for which the responsibility is vested with the state depart-
38 ment of transportation including work appurtenant and ancillary
39 thereto, the cost of administrative services of the department of
40 transportation and the cost of services provided by private firms;
41 including the costs of preventive maintenance on state roads and
42 bridges as defined in paragraph (a) of subdivision 1 of section 10-d
43 of the highway law for contractual preventive maintenance services
44 provided by private firms; and including but not limited to the
794 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 preparation of designs, plans, specifications and estimates;
2 construction management and supervision, and appraisals, surveys,
3 testing and environmental impact statements for transportation
4 projects. Project costs funded from this appropriation may include
5 but shall not be limited to construction, reconstruction, recondi-
6 tioning and preservation, preventive maintenance, and the acquisi-
7 tion of property.
8 With the approval of the director of the budget, the commissioner of
9 transportation is authorized to enter into agreements with any muni-
10 cipality to finance local bridge projects through state nonfederally
11 aided highway funds appropriated herein when the use of federal aid
12 funds for such local bridge projects would not be cost effective and
13 the federal aid and state matching funds saved as a result of the
14 use of nonfederal aid funds for local bridge projects are made
15 available for bridge projects on the state highway system. The total
16 amount of non-federally aided highway funds made available for local
17 bridge projects from this appropriation shall not exceed $2,500,000
18 in state fiscal year 2007-2008.
19 The items shown in the schedule below shall be for projects with a
20 common purpose and may be interchanged without limitation subject to
21 the approval of the director of the budget (17020722) ..............
22 520,505,000 ....................................... (re. $3,452,000)
23 SCHEDULE
24 PERSONAL SERVICE
25 Personal service--regular .......... 463,000
26 Holiday/overtime compensation ...... 537,000
27 --------------
28 Amount available for person-
29 al service ................... 1,000,000
30 --------------
31 NONPERSONAL SERVICE
32 Supplies and materials ........... 1,184,000
33 Travel ............................... 3,000
34 Contractual services ............. 7,231,000
35 Equipment ........................ 3,582,000
36 --------------
37 Amount available for nonper-
38 sonal service ............... 12,000,000
39 --------------
40 MAINTENANCE UNDISTRIBUTED
41 Highway and Bridge
42 Construction and Preventive
43 Maintenance .................. 507,505,000
44 --------------
795 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Amount available for mainte-
2 nance undistributed ........ 507,505,000
3 --------------
4 520,505,000
5 ==============
6 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
7 section 1, of the laws of 2008:
8 For the payment of the costs, including the payment of liabilities
9 incurred prior to April 1, 2006, of state highways, parkways, bridg-
10 es, the New York State Thruway, Indian reservation roads, and facil-
11 ities for which the responsibility is vested with the state depart-
12 ment of transportation including work appurtenant and ancillary
13 thereto, the cost of administrative services of the department of
14 transportation and the cost of services provided by private firms;
15 including the costs of preventive maintenance on state roads and
16 bridges as defined in paragraph (a) of subdivision 1 of section 10-d
17 of the highway law for contractual preventive maintenance services
18 provided by private firms; and including but not limited to the
19 preparation of designs, plans, specifications and estimates;
20 construction management and supervision, and appraisals, surveys,
21 testing and environmental impact statements for transportation
22 projects. Project costs funded from this appropriation may include
23 but shall not be limited to construction, reconstruction, recondi-
24 tioning and preservation, preventive maintenance, and the acquisi-
25 tion of property.
26 With the approval of the director of the budget, the commissioner of
27 transportation is authorized to enter into agreements with any muni-
28 cipality to finance local bridge projects through state nonfederally
29 aided highway funds appropriated herein when the use of federal aid
30 funds for such local bridge projects would not be cost effective and
31 the federal aid and state matching funds saved as a result of the
32 use of nonfederal aid funds for local bridge projects are made
33 available for bridge projects on the state highway system. The total
34 amount of non-federally aided highway funds made available for local
35 bridge projects from this appropriation shall not exceed $2,500,000
36 in state fiscal year 2006-2007.
37 The items shown in the schedule below shall be for projects with a
38 common purpose and may be interchanged without limitation subject to
39 the approval of the director of the budget (17020622) ..............
40 667,502,000 ....................................... (re. $6,895,000)
41 SCHEDULE
42 Highway and Bridge
43 Construction ................. 457,502,000
44 --------------
45 Preventive Maintenance ......... 210,000,000
46 --------------
47 667,502,000
48 ==============
796 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
2 section 1, of the laws of 2007:
3 For the payment of the costs, including the payment of liabilities
4 incurred prior to April 1, 2005, of state high ways, parkways,
5 bridges, the New York State Thruway, Indian reservation roads, and
6 facilities for which the responsibility is vested with the state
7 department of transportation including work appurtenant and ancil-
8 lary thereto, the cost of administrative services of the department
9 of transportation and the cost of services provided by private
10 firms; including the costs of preventive maintenance on state roads
11 and bridges as defined in paragraph (a) of subdivision 1 of section
12 10-d of the highway law for contractual preventive maintenance
13 services provided by private firms; and including but not limited to
14 the preparation of designs, plans, specifications and estimates;
15 construction management and supervision, and appraisals, surveys,
16 testing and environmental impact statements for transportation
17 projects. Project costs funded from this appropriation may include
18 but shall not be limited to construction, reconstruction, recondi-
19 tioning and preservation, preventive maintenance, and the acquisi-
20 tion of property.
21 The funds made available through this appropriation shall be utilized
22 for the payment of the costs of eligible projects in accordance with
23 a memorandum of understanding entered into between the governor, the
24 majority leader of the senate and the speaker of the assembly, or
25 their designees.
26 With the approval of the director of the budget, the commissioner of
27 transportation is authorized to enter into agreements with any muni-
28 cipality to finance local bridge projects through state nonfederally
29 aided highway funds appropriated herein when the use of federal aid
30 funds for such local bridge projects would not be cost effective and
31 the federal aid and state matching funds saved as a result of the
32 use of nonfederal aid funds for local bridge projects are made
33 available for bridge projects on the state highway system. The total
34 amount of non-federally aided highway funds made available for local
35 bridge projects from this appropriation shall not exceed $2,500,000
36 in state fiscal year 2005-2006.
37 The items shown in the schedule below shall be for projects with a
38 common purpose and may be interchanged without limitation subject to
39 the approval of the director of the budget (17020522) ... ........
40 604,125,000 ....................................... (re. $3,467,000)
41 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
42 section 1, of the laws of 2006:
43 For the payment of the costs, including the payment of liabilities
44 incurred prior to April 1, 2004, of state highways, parkways, bridg-
45 es, the New York State Thruway, Indian reservation roads, and facil-
46 ities for which the responsibility is vested with the state depart-
47 ment of transportation including work appurtenant and ancillary
48 thereto, the cost of administrative services of the department of
49 transportation and the cost of services provided by private firms,
50 including but not limited to the preparation of designs, plans,
51 specifications and estimates; construction management and super-
797 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 vision; and appraisals, surveys, testing and environmental impact
2 statements for transportation projects. Project costs funded from
3 this appropriation may include but shall not be limited to
4 construction, reconstruction, reconditioning and preservation, and
5 the acquisition of property.
6 With the approval of the director of the budget, the commissioner of
7 transportation is authorized to enter into agreements with any muni-
8 cipality to finance local bridge projects through state nonfederally
9 aided highway funds appropriated herein when the use of federal aid
10 funds for such local bridge projects would not be cost effective and
11 the federal aid and state matching funds saved as a result of the
12 use of non-federal aid funds for local bridge projects are made
13 available for bridge projects on the state highway system. The total
14 amount of non-federally aided highway funds made available for local
15 bridge projects from this appropriation shall not exceed $2,500,000
16 in state fiscal year 2004-2005 (17020422) ..........................
17 380,000,000 ...................................... (re. $27,769,000)
18 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
19 section 1, of the laws of 2007:
20 For the payment of costs, including the payment of liabilities
21 incurred prior to April 1, 2004, of preventive maintenance on state
22 roads and bridges as defined in paragraph (a) of subdivision 1 of
23 section 10-d of the highway law including personal services, nonper-
24 sonal services, fringe benefits and the contractual services
25 provided by private firms. Such costs shall not include the costs of
26 vehicles under 8,500 pounds without the prior approval of the direc-
27 tor of the budget.
28 The items shown in the schedule below shall be for projects with a
29 common purpose and may be interchanged without limitation subject to
30 the approval of the director of the budget (17040422) ... ........
31 331,260,000 ....................................... (re. $1,107,000)
32 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
33 section 1, of the laws of 2005:
34 For the payment of the costs, including the payment of liabilities
35 incurred prior to April 1, 2003, of state highways, parkways, bridg-
36 es, the New York State Thruway, Indian reservation roads, and facil-
37 ities for which the responsibility is vested with the state depart-
38 ment of transportation including work appurtenant and ancillary
39 thereto, the cost of administrative services of the department of
40 transportation and the cost of services provided by private firms,
41 including but not limited to the preparation of designs, plans,
42 specifications and estimates; construction management and super-
43 vision; and appraisals, surveys, testing and environmental impact
44 statements for transportation projects. Project costs funded from
45 this appropriation may include but shall not be limited to
46 construction, reconstruction, reconditioning and preservation, and
47 the acquisition of property.
48 With the approval of the director of the budget, the commissioner of
49 transportation is authorized to enter into agreements with any muni-
50 cipality to finance local bridge projects through state nonfederally
798 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 aided highway funds appropriated herein when the use of federal aid
2 funds for such local bridge projects would not be cost effective and
3 the federal aid and state matching funds saved as a result of the
4 use of non-federal aid funds for local bridge projects are made
5 available for bridge projects on the state highway system. The total
6 amount of non-federally aided highway funds made available for local
7 bridge projects from this appropriation shall not exceed $2,500,000
8 in state fiscal year 2003-2004 (17020322) ..........................
9 370,000,000 ....................................... (re. $4,025,000)
10 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
11 section 1, of the laws of 2005:
12 For the payment of costs, including the payment of liabilities
13 incurred prior to April 1, 2003, of preventive maintenance on state
14 roads and bridges as defined in paragraph (a) of subdivision 1 of
15 section 10-d of the highway law including personal services, nonper-
16 sonal services, fringe benefits and the contractual services
17 provided by private firms. Such costs shall not include the costs of
18 vehicles under 8,500 pounds without the prior approval of the direc-
19 tor of the budget.
20 The items shown in the schedule below shall be for projects with a
21 common purpose and may be interchanged without limitation subject to
22 the approval of the director of the budget (17040322) ... ........
23 317,684,000 ....................................... (re. $2,106,000)
24 By chapter 55, section 1, of the laws of 2002, as amended by chapter 55,
25 section 1, of the laws of 2009:
26 For the payment of the costs, including the payment of liabilities
27 incurred prior to April 1, 2002, of state highways, parkways, bridg-
28 es, the New York State Thruway, Indian reservation roads, and facil-
29 ities for which the responsibility is vested with the state depart-
30 ment of transportation including work appurtenant and ancillary
31 thereto and the payment of reimbursements to the engineering
32 services fund for the cost of administrative services of the depart-
33 ment of transportation and the cost of services provided by private
34 firms, including but not limited to the preparation of designs,
35 plans, specifications and estimates; construction management and
36 supervision; and appraisals, surveys, testing and environmental
37 impact statements for transportation projects. Project costs funded
38 from this appropriation may include but shall not be limited to
39 construction, reconstruction, reconditioning and preservation, and
40 the acquisition of property.
41 With the approval of the director of the budget, the commissioner of
42 transportation is authorized to enter into agreements with any muni-
43 cipality to finance local bridge projects through state nonfederally
44 aided highway funds appropriated herein when the use of federal aid
45 funds for such local bridge projects would not be cost effective and
46 the federal aid and state matching funds saved as a result of the
47 use of non-federal aid funds for local bridge projects are made
48 available for bridge projects on the state highway system. The total
49 amount of non-federally aided highway funds made available for local
50 bridge projects from this appropriation shall not exceed $2,500,000
799 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 in state fiscal year 2002-2003 (17020222) ..........................
2 1,042,107,000 ..................................... (re. $2,470,000)
3 By chapter 55, section 1, of the laws of 2002, as amended by chapter 55,
4 section 1, of the laws of 2009:
5 For the payment of costs, including the payment of liabilities
6 incurred prior to April 1, 2002, of preventive maintenance on state
7 roads and bridges as defined in paragraph (a) of subdivision 1 of
8 section 10-d of the highway law including personal services, nonper-
9 sonal services, fringe benefits and the contractual services
10 provided by private firms. Such costs shall not include the costs of
11 vehicles under 8,500 pounds without the prior approval of the direc-
12 tor of the budget (17040222) ... 330,132,036 ..... (re. $20,517,000)
13 SCHEDULE
14 Personal service .............................. 47,600,000
15 Nonpersonal service ........................... 41,391,000
16 Maintenance undistributed
17 For expenses of highway maintenance ........... 87,193,000
18 For the costs of the contract services
19 provided by private firms performing
20 preventive maintenance ..................... 153,948,036
21 --------------
22 Available for maintenance undistributed .... 245,153,036
23 --------------
24 330,132,036
25 ==============
26 By chapter 55, section 1, of the laws of 2001, as amended by chapter 55,
27 section 1, of the laws of 2003:
28 For the payment of the costs, including the payment of liabilities
29 incurred prior to April 1, 2001, of state highways, parkways, bridg-
30 es, the New York State Thruway, Indian reservation roads, and facil-
31 ities for which the responsibility is vested with the state depart-
32 ment of transportation including work appurtenant and ancillary
33 thereto and the payment of reimbursements to the engineering
34 services fund for the cost of administrative services of the depart-
35 ment of transportation and the cost of services provided by private
36 firms, including but not limited to the preparation of designs,
37 plans, specifications and estimates; construction management and
38 supervision; and appraisals, surveys, testing and environmental
39 impact statements for transportation projects. Project costs funded
40 from this appropriation may include but shall not be limited to
41 construction, reconstruction, reconditioning and preservation, and
42 the acquisition of property.
43 With the approval of the director of the budget, the commissioner of
44 transportation is authorized to enter into agreements with any muni-
45 cipality to finance local bridge projects through state nonfederally
46 aided highway funds appropriated herein when the use of federal aid
47 funds for such local bridge projects would not be cost effective and
48 the federal aid and state matching funds saved as a result of the
800 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 use of non-federal aid funds for local bridge projects are made
2 available for bridge projects on the state highway system. The total
3 amount of non-federally aided highway funds made available for local
4 bridge projects from this appropriation shall not exceed $2,500,000
5 in state fiscal year 2001-2002 (17020122) ..........................
6 1,069,754,000 ................................... (re. $128,217,000)
7 For the payment of costs, including the payment of liabilities
8 incurred prior to April 1, 2001, of preventive maintenance on state
9 roads and bridges as defined in paragraph (a) of subdivision 1 of
10 section 10-d of the highway law including personal services, nonper-
11 sonal services, fringe benefits and the contractual services
12 provided by private firms. Such costs shall not include the costs of
13 vehicles under 8,500 pounds without the prior approval of the direc-
14 tor of the budget (17040122) ... 330,864,000 ..... (re. $14,693,000)
15 By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
16 section 1, of the laws of 2003:
17 For the payment of the costs, including the payment of liabilities
18 incurred prior to April 1, 2000, of state highways, parkways, bridg-
19 es, the New York State Thruway, Indian reservation roads, and facil-
20 ities for which the responsibility is vested with the state depart-
21 ment of transportation including work appurtenant and ancillary
22 thereto and the payment of reimbursements to the engineering
23 services fund for the cost of administrative services of the depart-
24 ment of transportation and the cost of services provided by private
25 firms, including but not limited to the preparation of designs,
26 plans, specifications and estimates; construction management and
27 supervision; and appraisals, surveys, testing and environmental
28 impact statements for transportation projects. Project costs funded
29 from this appropriation may include but shall not be limited to
30 construction, reconstruction, reconditioning and preservation, and
31 the acquisition of property.
32 With the approval of the director of the budget, the commissioner of
33 transportation is authorized to enter into agreements with any muni-
34 cipality to finance local bridge projects through state nonfederally
35 aided highway funds appropriated herein when the use of federal aid
36 funds for such local bridge projects would not be cost effective and
37 the federal aid and state matching funds saved as a result of the
38 use of non-federal aid funds for local bridge projects are made
39 available for bridge projects on the state highway system. The total
40 amount of non-federally aided highway funds made available for local
41 bridge projects from this appropriation shall not exceed $2,500,000
42 in state fiscal year 2000-2001 (17020022) ..........................
43 943,841,000 ....................................... (re. $4,535,000)
44 For the payment of costs, including the payment of liabilities
45 incurred prior to April 1, 2000, of preventive maintenance on state
46 roads and bridges as defined in paragraph (a) of subdivision 1 of
47 section 10-d of the highway law including personal services, nonper-
48 sonal services, fringe benefits and the contractual services
49 provided by private firms (17040022) ...............................
50 328,297,000 ......................................... (re. $139,000)
801 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 1999:
2 For the payment of the costs, including the payment of liabilities
3 incurred prior to April 1, 1999, of state highways, parkways, bridg-
4 es, the New York State Thruway, Indian reservation roads, and facil-
5 ities for which the responsibility is vested with the state depart-
6 ment of transportation including work appurtenant and ancillary
7 thereto and the payment of reimbursements to the engineering
8 services fund for the cost of administrative services of the depart-
9 ment of transportation and the cost of services provided by private
10 firms, including but not limited to the preparation of designs,
11 plans, specifications and estimates; construction management and
12 supervision; and appraisals, surveys, testing and environmental
13 impact statements for transportation projects. Project costs funded
14 from this appropriation may include but shall not be limited to
15 construction, reconstruction, reconditioning and preservation, and
16 the acquisition of property.
17 With the approval of the director of the budget, the commissioner of
18 transportation is authorized to enter into agreements with any muni-
19 cipality to finance local bridge projects through state nonfederally
20 aided highway funds appropriated herein when the use of federal aid
21 funds for such local bridge projects would not be cost effective and
22 the federal aid and state matching funds saved as a result of the
23 use of nonfederal aid funds for local bridge projects are made
24 available for bridge projects on the state highway system. The total
25 amount of non-federally aided highway funds made available for local
26 bridge projects from this appropriation shall not exceed $2,500,000
27 in state fiscal year 1999-2000 (17029922) ..........................
28 845,000,000 ....................................... (re. $7,569,000)
29 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
30 section 1, of the laws of 2003:
31 For the payment of the costs, including the payment of liabilities
32 incurred prior to April 1, 1999, of state highways, parkways, bridg-
33 es, the New York State Thruway, Indian reservation roads, and facil-
34 ities for which the responsibility is vested with the state depart-
35 ment of transportation including work appurtenant and ancillary
36 thereto and the payment of reimbursements to the engineering
37 services fund for the cost of administrative services of the depart-
38 ment of transportation and the cost of services provided by private
39 firms, including but not limited to the preparation of designs,
40 plans, specifications and estimates; construction management and
41 supervision; and appraisals, surveys, testing and environmental
42 impact statements for transportation projects. Project costs funded
43 from this appropriation may include but shall not be limited to
44 construction, reconstruction, reconditioning and preservation, and
45 the acquisition of property (17029922) .............................
46 151,332,000 ........................................... (re. $1,000)
47 For the payment of costs, including the payment of liabilities
48 incurred prior to April 1, 1999, of preventive maintenance on state
49 roads and bridges as defined in paragraph (a) of subdivision 1 of
50 section 10-d of the highway law including personal services, nonper-
51 sonal services, fringe benefits and the contractual services
802 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 provided by private firms (17049922) ...............................
2 346,818,000 ......................................... (re. $596,000)
3 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
4 section 1, of the laws of 2003:
5 For the payment of the costs, including the payment of liabilities
6 incurred prior to April 1, 1998, of state highways, parkways, bridg-
7 es, the New York State Thruway, Indian reservation roads, and facil-
8 ities for which the responsibility is vested with the state depart-
9 ment of transportation including work appurtenant and ancillary
10 thereto and the payment of reimbursements to the engineering
11 services fund for the cost of administrative services of the depart-
12 ment of transportation and the cost of services provided by private
13 firms, including but not limited to the preparation of designs,
14 plans, specifications and estimates; construction management and
15 supervision; and appraisals, surveys, testing and environmental
16 impact statements for transportation projects (17029822) ...........
17 1,165,139,000 ..................................... (re. $6,034,000)
18 For the payment of costs, including the payment of liabilities
19 incurred prior to April 1, 1998, of preventive maintenance on state
20 roads and bridges as defined in paragraph (a) of subdivision 1 of
21 section 10-d of the highway law including personal services, nonper-
22 sonal services, fringe benefits and the contractual services
23 provided by private firms (17049822) ...............................
24 345,011,000 ....................................... (re. $2,153,000)
25 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
26 section 1, of the laws of 2007:
27 For the payment of the costs, including the payment of liabilities
28 incurred prior to April 1, 1997, of state highways, parkways, bridg-
29 es, the New York State Thruway, Indian reservation roads, and facil-
30 ities for which the responsibility is vested with the state depart-
31 ment of transportation including work appurtenant and ancillary
32 thereto and the payment of reimbursements to the engineering
33 services fund for the cost of administrative services of the depart-
34 ment of transportation and the cost of services provided by private
35 firms, including but not limited to the preparation of designs,
36 plans, specifications and estimates; construction management and
37 supervision; and appraisals, surveys, testing and environmental
38 impact statements for transportation projects. Project costs funded
39 from this appropriation may include but shall not be limited to
40 construction, reconstruction, reconditioning and preservation, and
41 the acquisition of property.
42 With the approval of the director of the budget, the commissioner of
43 transportation is authorized to enter into agreements with any muni-
44 cipality to finance local bridge projects through state nonfederally
45 aided highway funds appropriated herein when the use of federal aid
46 funds for such local bridge projects would not be cost effective and
47 the federal aid and state matching funds saved as a result of the
48 use of nonfederal aid funds for local bridge projects are made
49 available for bridge projects on the state highway system. The total
50 amount of non-federally aided highway funds made available for local
803 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 bridge projects from this appropriation shall not exceed $2,500,000
2 in state fiscal year 1997-98 (17029722) ............................
3 915,748,000 ....................................... (re. $4,213,000)
4 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
5 section 1, of the laws of 2007:
6 For the payment of costs, including the payment of liabilities
7 incurred prior to April 1, 1997, of preventive maintenance on state
8 roads and bridges as defined in paragraph (a) of subdivision 1 of
9 section 10-d of the highway law including personal services, nonper-
10 sonal services, fringe benefits and the contractual services
11 provided by private firms.
12 The items shown in the project schedule below shall be for projects
13 with a common purpose and may be interchanged without limitation
14 subject to the approval of the director of the budget (17049722)
15 ... ..... 278,668,000 ........................... (re. $1,872,000)
16 By chapter 55, section 1, of the laws of 1996, as amended by chapter
17 295, part A, section 1, of the laws of 2001:
18 For the payment of the costs, including the payment of liabilities
19 incurred prior to April 1, 1996, of state highways, parkways, bridg-
20 es, the New York State Thruway, Indian reservation roads, and facil-
21 ities for which the responsibility is vested with the state depart-
22 ment of transportation including work appurtenant and ancillary
23 thereto and the payment of reimbursements to the engineering
24 services fund for the cost of administrative services of the depart-
25 ment of transportation and the cost of services provided by private
26 firms, including but not limited to the preparation of designs,
27 plans, specifications and estimates; construction management and
28 supervision; and appraisals, surveys, testing and environmental
29 impact statements for transportation projects (17029622) ... .....
30 779,430,000 ......................................... (re. $952,000)
31 By chapter 54, section 1, of the laws of 1995, as amended by chapter 55,
32 section 1, of the laws of 2003:
33 For the payment of the costs, including the payment of liabilities
34 incurred prior to April 1, 1995, of state highways, parkways, bridg-
35 es, the New York State Thruway, Indian reservation roads, and facil-
36 ities for which the responsibility is vested with the state depart-
37 ment of transportation including work appurtenant and ancillary
38 thereto and the payment of reimbursements to the engineering
39 services fund for the cost of administrative services of the depart-
40 ment of transportation and the cost of services provided by private
41 firms, including but not limited to the preparation of designs,
42 plans, specifications and estimates; construction management and
43 supervision; and appraisals, surveys, testing and environmental
44 impact statements for transportation projects. Project costs funded
45 from this appropriation may include but shall not be limited to
46 construction, reconstruction, reconditioning and preservation, and
47 the acquisition of property.
48 With the approval of the director of the budget, the commissioner of
49 transportation is authorized to enter into agreements with any muni-
804 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 cipality to finance local bridge projects through state nonfederally
2 aided highway funds appropriated herein when the use of federal aid
3 funds for such local bridge projects would not be cost effective and
4 the federal aid and state matching funds saved as a result of the
5 use of non-federal aid funds for local bridge projects are made
6 available for bridge projects on the state highway system. The total
7 amount of non-federally aided highway funds made available for local
8 bridge projects from this appropriation shall not exceed $2,500,000
9 in state fiscal year 1995-96 (17029522) ............................
10 880,323,000 ...................................... (re. $21,803,000)
11 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
12 section 1, of the laws of 1996:
13 For the payment of the costs, including the payment of liabilities
14 incurred prior to April 1, 1994, of state highways, parkways, bridg-
15 es, the New York State Thruway, Indian reservation roads, and facil-
16 ities for which the responsibility is vested with the state depart-
17 ment of transportation including work appurtenant and ancillary
18 thereto and the payment of reimbursements to the engineering
19 services fund for the cost of administrative services of the depart-
20 ment of transportation and the cost of services provided by private
21 firms, including but not limited to the preparation of designs,
22 plans, specifications and estimates; construction management and
23 supervision; and appraisals, surveys, testing and environmental
24 impact statements for transportation projects. Project costs funded
25 from this appropriation may include but shall not be limited to
26 construction, reconstruction, reconditioning and preservation, and
27 the acquisition of property.
28 With the approval of the director of the budget, the commissioner of
29 transportation is authorized to enter into agreements with any muni-
30 cipality to finance local bridge projects through state nonfederally
31 aided highway funds appropriated herein when the use of federal aid
32 funds for such local bridge projects would not be cost effective and
33 the federal aid and state matching funds saved as a result of the
34 use of non-federal aid funds for local bridge projects are made
35 available for bridge projects on the state highway system. The total
36 amount of non-federally aided highway funds made available for local
37 bridge projects from this appropriation shall not exceed $2,500,000
38 in state fiscal year 1994-95 (17029422) ... .......................
39 1,095,524,000 ..................................... (re. $9,581,000)
40 By chapter 54, section 1, of the laws of 1993, as amended by chapter
41 295, part A, section 1, of the laws of 2001:
42 For the payment of the costs, including the payment of liabilities
43 incurred prior to April 1, 1993, of state highways, parkways, bridg-
44 es, the New York State Thruway, Indian reservation roads, and facil-
45 ities for which the responsibility is vested with the state depart-
46 ment of transportation including work appurtenant and ancillary
47 thereto. Project costs funded from this appropriation may include
48 but shall not be limited to construction, reconstruction, recondi-
49 tioning and preservation, and the acquisition of property.
805 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 With the approval of the director of the budget, the commissioner of
2 transportation is authorized to enter into agreements with any muni-
3 cipality to finance local bridge projects through state nonfederally
4 aided highway funds appropriated herein when the use of federal aid
5 funds for such local bridge projects would not be cost effective.
6 Federal aid and state matching funds saved as a result of the use of
7 non-federal aid funds for local bridge projects shall be made avail-
8 able for bridge projects on the state highway system. The total
9 amount of non-federally aided highway funds made available to local
10 bridge projects shall not exceed $2,500,000 in state fiscal year
11 1993-94.
12 For the payment of reimbursements to the engineering services fund for
13 the cost of administrative services of the department of transporta-
14 tion and the cost of services provided by private firms, including
15 but not limited to the preparation of designs, plans, specifications
16 and estimates; construction management and supervision; and
17 appraisals, surveys, testing and environmental impact statements for
18 transportation projects (17029322) ... ...........................
19 1,042,787,000 ..................................... (re. $3,753,000)
20 By chapter 54, section 1, of the laws of 1992:
21 For the payment of the costs, including the payment of liabilities
22 incurred prior to April 1, 1992, of state highways, parkways, bridg-
23 es, the New York State Thruway, Indian reservation roads, and facil-
24 ities for which the responsibility is vested with the state depart-
25 ment of transportation including work appurtenant and ancillary
26 thereto. Project costs funded from this appropriation may include
27 but shall not be limited to construction, reconstruction, recondi-
28 tioning and preservation, and the acquisition of property.
29 With the approval of the director of the budget, the commissioner of
30 transportation is authorized to enter into agreements with any muni-
31 cipality to finance local bridge projects through state nonfederally
32 aided highway funds appropriated herein when the use of federal aid
33 funds for such local bridge projects would not be cost effective.
34 Federal aid and state matching funds saved as a result of the use of
35 non-federal aid funds for local bridge projects shall be made avail-
36 able for bridge projects on the state highway system. The total
37 amount of non-federally aided highway funds made available to local
38 bridge projects shall not exceed $2,500,000 in state fiscal year
39 1992-93.
40 For the payment of reimbursements to the engineering services fund for
41 the cost of the contract services provided by private firms, includ-
42 ing but not limited to the preparation of designs, plans, specifica-
43 tions and estimates; construction management and supervision; and
44 appraisals, surveys, testing and environmental impact statements for
45 transportation projects (17029222) ... ...........................
46 208,855,000 ....................................... (re. $8,632,000)
47 Capital Projects Funds - Other
48 Dedicated Highway and Bridge Trust Fund
49 Preparation of Plans Purpose
806 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Capital Project Management and Traffic and Safety
2 By chapter 54, section 1, of the laws of 2017:
3 For capital project management and traffic and safety, including
4 personal services, nonpersonal services, fringe benefits, and the
5 contract services provided by private firms.
6 Personal service (17P11730) ... 43,426,000 ......... (re. $26,747,000)
7 Nonpersonal service (17P41730) ... 122,000 ............. (re. $92,000)
8 Fringe benefits (17P81730) ... 26,393,000 .......... (re. $19,270,000)
9 Indirect costs (17P91730) ... 1,462,000 ............. (re. $1,064,000)
10 By chapter 55, section 1, of the laws of 2016:
11 For capital project management and traffic and safety, including
12 personal services, nonpersonal services, fringe benefits, and the
13 contract services provided by private firms.
14 Personal service (17P11630) ... 41,359,000 .......... (re. $3,944,000)
15 Nonpersonal service (17P41630) ... 122,000 ............. (re. $52,000)
16 Indirect costs (17P91630) ... 1,303,000 ................ (re. $28,000)
17 By chapter 54, section 1, of the laws of 2015:
18 For capital project management and traffic and safety, including
19 personal services, nonpersonal services, fringe benefits, and the
20 contract services provided by private firms.
21 Nonpersonal service (17P41530) ... 120,000 ............. (re. $35,000)
22 Fringe benefits (17P81530) ... 22,597,000 ............. (re. $657,000)
23 Indirect costs (17P91530) ... 1,293,000 ................ (re. $37,000)
24 By chapter 54, section 1, of the laws of 2014:
25 For capital project management and traffic and safety, including
26 personal services, nonpersonal services, fringe benefits, and the
27 contract services provided by private firms.
28 Personal service (17P11430) ... 40,295,000 ............ (re. $203,000)
29 Nonpersonal service (17P41430) ... 117,000 ............. (re. $40,000)
30 Fringe benefits (17P81430) ... 22,569,000 ........... (re. $1,202,000)
31 Indirect costs (17P91430) ... 1,253,000 ................ (re. $67,000)
32 By chapter 54, section 1, of the laws of 2013:
33 For capital project management and traffic and safety, including
34 personal services, nonpersonal services, fringe benefits, and the
35 contract services provided by private firms.
36 Nonpersonal service (17P41330) ... 114,000 ............. (re. $16,000)
37 Fringe benefits (17P81330) ... 22,042,000 ............. (re. $905,000)
38 Indirect costs (17P91330) ... 1,296,000 ................ (re. $53,000)
39 By chapter 54, section 1, of the laws of 2012:
40 For capital project management and traffic and safety, including
41 personal services, nonpersonal services, fringe benefits, and the
42 contract services provided by private firms.
43 Nonpersonal service (17P41230) ... 111,000 ............. (re. $25,000)
44 Fringe benefits (17P81230) ... 19,320,000 .............. (re. $96,000)
45 Indirect costs (17P91230) ... 1,207,000 ............... (re. $195,000)
807 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2011:
2 For capital project management and traffic and safety, including
3 personal services, nonpersonal services, fringe benefits and the
4 contract services provided by private firms (17H21130) .............
5 58,657,000 .......................................... (re. $259,000)
6 PERSONAL SERVICE
7 Personal service--regular ....... 38,037,000
8 Holiday/overtime compensation ...... 919,000
9 --------------
10 Amount available for person-
11 al service .................. 38,956,000
12 --------------
13 NONPERSONAL SERVICE
14 Supplies and materials .............. 61,000
15 Travel ............................. 121,000
16 Contractual services ................ 57,000
17 Equipment ........................... 15,000
18 Fringe benefits ................. 18,068,000
19 Indirect costs ................... 1,379,000
20 --------------
21 Amount available for nonper-
22 sonal service ............... 19,701,000
23 --------------
24 58,657,000
25 ==============
26 By chapter 55, section 1, of the laws of 2010:
27 For capital project management and traffic and safety, including
28 personal services, nonpersonal services, fringe benefits and the
29 contract services provided by private firms (17H21030) .............
30 63,140,000 ........................................ (re. $3,505,000)
31 PERSONAL SERVICE
32 Personal service--regular ....... 40,846,000
33 Holiday/overtime compensation ...... 919,000
34 --------------
35 Amount available for person-
36 al service .................. 41,765,000
37 --------------
38 NONPERSONAL SERVICE
39 Supplies and materials .............. 61,000
40 Travel ............................. 121,000
41 Contractual services ................ 57,000
808 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Equipment ........................... 15,000
2 Fringe benefits ................. 19,630,000
3 Indirect costs ................... 1,491,000
4 --------------
5 Amount available for nonper-
6 sonal service ............... 21,375,000
7 --------------
8 63,140,000
9 ==============
10 By chapter 55, section 1, of the laws of 2009:
11 For capital project management and traffic and safety, including
12 personal services, nonpersonal services, fringe benefits and the
13 contract services provided by private firms (17H20930) .............
14 66,084,000 ........................................ (re. $3,703,000)
15 PERSONAL SERVICE
16 Personal service--regular ....... 42,143,000
17 Holiday/overtime compensation ...... 961,000
18 --------------
19 Amount available for person-
20 al service .................. 43,104,000
21 --------------
22 NONPERSONAL SERVICE
23 Supplies and materials ..............280,000
24 Travel ............................. 321,000
25 Contractual services ............... 154,000
26 Equipment ........................... 19,000
27 Fringe benefits ................. 20,469,000
28 Indirect costs ................... 1,737,000
29 --------------
30 Amount available for nonper-
31 sonal service ............... 22,980,000
32 --------------
33 66,084,000
34 ==============
35 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
36 section 1, of the laws of 2010:
37 For capital project management and traffic and safety, including
38 personal services, nonpersonal services, fringe benefits and the
39 contract services provided by private firms (17H20830) .............
40 62,658,500 .......................................... (re. $490,000)
41 PERSONAL SERVICE
42 Personal service--regular ....... 32,473,500
43 Holiday/overtime compensation ...... 906,000
44 --------------
809 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Amount available for person-
2 al service .................. 33,359,500
3 --------------
4 NONPERSONAL SERVICE
5 Supplies and materials ............. 325,000
6 Travel ............................. 422,000
7 Contractual services ............ 10,531,000
8 Equipment ........................... 92,000
9 Fringe benefits ................. 16,334,000
10 Indirect costs ................... 1,575,000
11 --------------
12 Amount available for nonper-
13 sonal service ............... 29,279,000
14 --------------
15 62,658,500
16 ==============
17 By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
18 section 1, of the laws of 2008:
19 For capital project management and traffic and safety, including
20 personal services, nonpersonal services, fringe benefits and the
21 contract services provided by private firms (17H20730) .............
22 57,086,000 ........................................ (re. $1,740,000)
23 PERSONAL SERVICE
24 Personal service--regular ....... 30,191,000
25 Holiday/overtime compensation ...... 940,000
26 --------------
27 Amount available for person-
28 al service .................. 31,131,000
29 --------------
30 NONPERSONAL SERVICE
31 Supplies and materials ............. 273,000
32 Travel ............................. 320,000
33 Contractual services ............. 7,682,000
34 Equipment ........................... 29,000
35 Fringe benefits ................. 16,341,000
36 Indirect costs ................... 1,310,000
37 --------------
38 Amount available for nonper-
39 sonal service ............... 25,955,000
40 --------------
41 57,086,000
42 ==============
43 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
44 section 1, of the laws of 2008:
810 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For capital project management and traffic and safety, including
2 personal services, nonpersonal services, fringe benefits and the
3 contract services provided by private firms (17H20630) .............
4 52,413,000 .......................................... (re. $576,000)
5 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
6 section 1, of the laws of 2007:
7 For capital project management and traffic and safety, including
8 personal services, nonpersonal services, fringe benefits and the
9 contract services provided by private firms (17H20530) .............
10 55,870,000 .......................................... (re. $735,000)
11 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
12 section 1, of the laws of 2006:
13 For capital project management and traffic and safety, including
14 personal services, nonpersonal services, fringe benefits and the
15 contract services provided by private firms (17H20430) .............
16 53,599,000 .......................................... (re. $377,000)
17 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
18 section 1, of the laws of 2005:
19 For capital project management and traffic and safety, including
20 personal services, nonpersonal services, fringe benefits and the
21 contract services provided by private firms (17H20330) .............
22 51,693,000 .......................................... (re. $906,000)
23 Department Management and Administration
24 By chapter 54, section 1, of the laws of 2017:
25 For department management and administration including personal
26 services, nonpersonal services, fringe benefits and the contract
27 services provided by private firms.
28 Notwithstanding any other provision of law to the contrary, the OGS
29 Interchange and Transfer Authority and the IT Interchange and Trans-
30 fer Authority as defined in the 2017-18 state fiscal year state
31 operations appropriation for the budget division program of the
32 division of the budget, are deemed fully incorporated herein and a
33 part of this appropriation as if fully stated.
34 Personal service (17A11730) ... 30,591,000 ......... (re. $17,745,000)
35 Nonpersonal service (17A41730) ... 33,363,000 ...... (re. $27,501,000)
36 Fringe benefits (17A81730) ... 18,807,000 .......... (re. $13,303,000)
37 Indirect costs (17A91730) ... 902,000 ................. (re. $666,000)
38 By chapter 55, section 1, of the laws of 2016:
39 For department management and administration including personal
40 services, nonpersonal services, fringe benefits and the contract
41 services provided by private firms.
42 Notwithstanding any other provision of law to the contrary, the OGS
43 Interchange and Transfer Authority and the IT Interchange and Trans-
44 fer Authority as defined in the 2016-17 state fiscal year state
45 operations appropriation for the budget division program of the
811 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 division of the budget, are deemed fully incorporated herein and a
2 part of this appropriation as if fully stated.
3 Personal service (17A11630) ... 31,238,000 ............ (re. $781,000)
4 Nonpersonal service (17A41630) ... 31,919,000 ...... (re. $11,469,000)
5 Indirect costs (17A91630) ... 837,000 .................. (re. $14,000)
6 By chapter 54, section 1, of the laws of 2015:
7 For department management and administration including personal
8 services, nonpersonal services, fringe benefits and the contract
9 services provided by private firms.
10 Notwithstanding any other provision of law to the contrary, the OGS
11 Interchange and Transfer Authority and the IT Interchange and Trans-
12 fer Authority as defined in the 2015-16 state fiscal year state
13 operations appropriation for the budget division program of the
14 division of the budget, are deemed fully incorporated herein and a
15 part of this appropriation as if fully stated.
16 Nonpersonal service (17A41530) ... 31,919,000 ...... (re. $10,153,000)
17 Fringe benefits (17A81530) ... 17,442,000 .............. (re. $56,000)
18 Indirect costs (17A91530) ... 790,000 .................. (re. $11,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For department management and administration including personal
21 services, nonpersonal services, fringe benefits and the contract
22 services provided by private firms.
23 Notwithstanding any other provision of law to the contrary, the OGS
24 Interchange and Transfer Authority and the IT Interchange and Trans-
25 fer Authority as defined in the 2014-15 state fiscal year state
26 operations appropriation for the budget division program of the
27 division of the budget, are deemed fully incorporated herein and a
28 part of this appropriation as if fully stated.
29 Nonpersonal service (17A41430) ... 27,982,000 ....... (re. $1,619,000)
30 Fringe benefits (17A81430) ... 17,143,000 ............. (re. $303,000)
31 Indirect costs (17A91430) ... 844,000 .................. (re. $15,000)
32 By chapter 54, section 1, of the laws of 2013:
33 For department management and administration including personal
34 services, nonpersonal services, fringe benefits and the contract
35 services provided by private firms.
36 Notwithstanding any other provision of law to the contrary, the OGS
37 Interchange and Transfer Authority and the IT Interchange and Trans-
38 fer Authority as defined in the 2013-14 state fiscal year state
39 operations appropriation for the budget division program of the
40 division of the budget, are deemed fully incorporated herein and a
41 part of this appropriation as if fully stated.
42 Nonpersonal service (17A41330) ... 33,102,000 ......... (re. $360,000)
43 Fringe benefits (17A81330) ... 21,331,000 ............. (re. $315,000)
44 Indirect costs (17A91330) ... 1,196,000 ................ (re. $16,000)
45 By chapter 54, section 1, of the laws of 2012:
46 For department management and administration including personal
47 services, nonpersonal services, fringe benefits and the contract
48 services provided by private firms.
812 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding any other provision of law to the contrary, the OGS
2 Interchange and Transfer Authority, the IT Interchange and Transfer
3 Authority, and the Call Center Interchange and Transfer Authority as
4 defined in the 2012-13 state fiscal year state operations appropri-
5 ation for the budget division program of the division of the budget,
6 are deemed fully incorporated herein and a part of this appropri-
7 ation as if fully stated.
8 Nonpersonal service (17A41230) ... 40,300,000 ......... (re. $369,000)
9 By chapter 54, section 1, of the laws of 2011:
10 For department management and administration including personal
11 services, nonpersonal services, fringe benefits and the contract
12 services provided by private firms (17H51130) ......................
13 112,348,000 ...................................... (re. $12,474,000)
14 PERSONAL SERVICE
15 Personal service--regular ....... 42,593,000
16 Temporary service .................. 824,000
17 Holiday/overtime compensation .... 1,261,000
18 --------------
19 Amount available for person-
20 al service .................. 44,678,000
21 NONPERSONAL SERVICE
22 Supplies and materials ........... 1,845,000
23 Travel ........................... 4,570,000
24 Contractual services ............ 35,957,000
25 Equipment .......................... 180,000
26 Fringe benefits ................. 23,332,000
27 Indirect costs ................... 1,786,000
28 --------------
29 Amount available for nonper-
30 sonal service ............... 67,670,000
31 --------------
32 112,348,000
33 ==============
34 By chapter 55, section 1, of the laws of 2010:
35 For department management and administration including personal
36 services, nonpersonal services, fringe benefits and the contract
37 services provided by private firms (17H51030) ......................
38 122,040,000 ...................................... (re. $11,367,000)
39 PERSONAL SERVICE
40 Personal service--regular ....... 47,325,000
41 Temporary service .................. 916,000
42 Holiday/overtime compensation .... 1,401,000
43 --------------
813 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Amount available for person-
2 al service .................. 49,642,000
3 --------------
4 NONPERSONAL SERVICE
5 Supplies and materials ........... 2,050,000
6 Travel ........................... 5,078,000
7 Contractual services ............ 39,952,000
8 Equipment .......................... 200,000
9 Fringe benefits ................. 23,332,000
10 Indirect costs ................... 1,786,000
11 --------------
12 Amount available for nonper-
13 sonal service ............... 72,398,000
14 --------------
15 122,040,000
16 ==============
17 By chapter 55, section 1, of the laws of 2009, as amended by chapter 55,
18 section 1, of the laws of 2010:
19 For department management and administration including personal
20 services, nonpersonal services, fringe benefits and the contract
21 services provided by private firms (17H50930) ......................
22 122,554,000 ....................................... (re. $4,046,000)
23 PERSONAL SERVICE
24 Personal service--regular ....... 47,005,000
25 Temporary service .................. 911,000
26 Holiday/overtime compensation .... 1,394,000
27 --------------
28 Amount available for person-
29 al service .................. 49,310,000
30 --------------
31 NONPERSONAL SERVICE
32 Supplies and materials ........... 2,506,000
33 Travel ........................... 5,622,000
34 Contractual services ............ 40,222,000
35 Equipment .......................... 427,000
36 Fringe benefits ................. 22,538,000
37 Indirect costs ................... 1,929,000
38 --------------
39 Amount available for nonper-
40 sonal service ............... 73,244,000
41 --------------
42 122,554,000
43 ==============
44 Design and Construction
814 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For engineering services, including personal services, nonpersonal
3 services, and fringe benefits, including, but not limited to, the
4 preparation of designs, plans, specifications and estimates;
5 construction management and supervision; and appraisals, surveys,
6 testing, and environmental impact statements for transportation
7 projects, and for suballocation of $575,000 to the office of the
8 inspector general.
9 Notwithstanding any other provision of law to the contrary, the OGS
10 Interchange and Transfer Authority and the IT Interchange and Trans-
11 fer Authority as defined in the 2017-18 state fiscal year state
12 operations appropriation for the budget division program of the
13 division of the budget, are deemed fully incorporated herein and a
14 part of this appropriation as if fully stated.
15 Personal service (17E11730) ... 248,470,000 ....... (re. $168,719,000)
16 Nonpersonal service (17E41730) ... 10,741,000 ....... (re. $9,082,000)
17 Fringe benefits (17E81730) ... 123,448,000 ......... (re. $91,012,000)
18 Indirect costs (17E91730) ... 6,838,000 ............. (re. $4,978,000)
19 For the costs of the contract services provided by private firms
20 including, but not limited to, the preparation of designs, plans,
21 specifications and estimates; construction management and super-
22 vision; and appraisals, surveys, testing, and environmental impact
23 statements for transportation projects.
24 Nonpersonal service (17EP1730) ... 199,520,000 .... (re. $195,459,000)
25 By chapter 55, section 1, of the laws of 2016:
26 For engineering services, including personal services, nonpersonal
27 services, and fringe benefits, including, but not limited to, the
28 preparation of designs, plans, specifications and estimates;
29 construction management and supervision; and appraisals, surveys,
30 testing, and environmental impact statements for transportation
31 projects, and for suballocation of $575,000 to the office of the
32 inspector general.
33 Notwithstanding any other provision of law to the contrary, the OGS
34 Interchange and Transfer Authority and the IT Interchange and Trans-
35 fer Authority as defined in the 2016-17 state fiscal year state
36 operations appropriation for the budget division program of the
37 division of the budget, are deemed fully incorporated herein and a
38 part of this appropriation as if fully stated.
39 Personal service (17E11630) ... 244,387,000 ........ (re. $68,438,000)
40 Nonpersonal service (17E41630) ... 10,565,000 ....... (re. $5,197,000)
41 Fringe benefits (17E81630) ... 111,895,000 ............ (re. $304,000)
42 Indirect costs (17E91630) ... 6,320,000 ............... (re. $210,000)
43 For the costs of the contract services provided by private firms
44 including, but not limited to, the preparation of designs, plans,
45 specifications and estimates; construction management and super-
46 vision; and appraisals, surveys, testing, and environmental impact
47 statements for transportation projects.
48 Nonpersonal service (17EP1630) ... 198,564,000 .... (re. $150,330,000)
49 By chapter 54, section 1, of the laws of 2015:
815 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For engineering services, including personal services, nonpersonal
2 services, and fringe benefits, including, but not limited to, the
3 preparation of designs, plans, specifications and estimates;
4 construction management and supervision; and appraisals, surveys,
5 testing, and environmental impact statements for transportation
6 projects, and for suballocation of $175,000 to the office of the
7 inspector general.
8 Nonpersonal service (17E41530) ... 10,413,000 ....... (re. $1,731,000)
9 Fringe benefits (17E81530) ... 109,621,000 .......... (re. $5,646,000)
10 Indirect costs (17E91530) ... 6,269,000 ............... (re. $344,000)
11 For the costs of the contract services provided by private firms
12 including, but not limited to, the preparation of designs, plans,
13 specifications and estimates; construction management and super-
14 vision; and appraisals, surveys, testing, and environmental impact
15 statements for transportation projects.
16 Nonpersonal service (17EP1530) ... 137,778,000 ..... (re. $37,919,000)
17 By chapter 54, section 1, of the laws of 2014:
18 For engineering services, including personal services, nonpersonal
19 services, and fringe benefits, including, but not limited to, the
20 preparation of designs, plans, specifications and estimates;
21 construction management and supervision; and appraisals, surveys,
22 testing, and environmental impact statements for transportation
23 projects, and for suballocation of $175,000 to the office of the
24 inspector general.
25 Nonpersonal service (17E41430) ... 10,159,000 ......... (re. $305,000)
26 Fringe benefits (17E81430) ... 111,819,000 .......... (re. $6,992,000)
27 Indirect costs (17E91430) ... 6,209,000 ............... (re. $388,000)
28 For the costs of the contract services provided by private firms
29 including, but not limited to, the preparation of designs, plans,
30 specifications and estimates; construction management and super-
31 vision; and appraisals, surveys, testing, and environmental impact
32 statements for transportation projects.
33 Nonpersonal service (17EP1430) ... 118,015,000 ..... (re. $17,170,000)
34 By chapter 54, section 1, of the laws of 2013:
35 For engineering services, including personal services, nonpersonal
36 services, and fringe benefits, including, but not limited to, the
37 preparation of designs, plans, specifications and estimates;
38 construction management and supervision; and appraisals, surveys,
39 testing, and environmental impact statements for transportation
40 projects, and for suballocation of $175,000 to the office of the
41 inspector general.
42 Nonpersonal service (17E41330) ... 9,911,000 .......... (re. $279,000)
43 Fringe benefits (17E81330) ... 108,498,000 .......... (re. $3,054,000)
44 Indirect costs (17E91330) ... 6,380,000 ................ (re. $67,000)
45 For the costs of the contract services provided by private firms
46 including, but not limited to, the preparation of designs, plans,
47 specifications and estimates; construction management and super-
48 vision; and appraisals, surveys, testing, and environmental impact
49 statements for transportation projects.
50 Nonpersonal service (17EP1330) ... 119,003,000 ..... (re. $17,635,000)
816 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
2 section 1, of the laws of 2015:
3 For engineering services, including personal services, nonpersonal
4 services, fringe benefits and the contract services provided by
5 private firms, including, but not limited to, the preparation of
6 designs, plans, specifications and estimates; construction manage-
7 ment and supervision; and appraisals, surveys, testing, and environ-
8 mental impact statements for transportation projects, and for subal-
9 location of $175,000 to the office of the inspector general.
10 Nonpersonal service (17E41230) ... 172,203,000 ..... (re. $23,332,000)
11 Indirect costs (17E91230) ... 5,941,000 ............... (re. $475,000)
12 By chapter 54, section 1, of the laws of 2011:
13 For engineering services, including personal services, nonpersonal
14 services, fringe benefits and the contract services provided by
15 private firms, including, but not limited to, the preparation of
16 designs, plans, specifications and estimates; construction manage-
17 ment and supervision; and appraisals, surveys, testing, and environ-
18 mental impact statements for transportation projects, and for subal-
19 location of $175,000 to the office of the inspector general
20 (17H11130) ... 469,901,000 ....................... (re. $21,729,000)
21 PERSONAL SERVICE
22 Personal service--regular ...... 185,850,000
23 Temporary service ................ 5,280,000
24 Holiday/overtime compensation .... 3,985,000
25 --------------
26 Amount available for person-
27 al for service ............. 195,115,000
28 --------------
29 NONPERSONAL SERVICE
30 Supplies and materials ............. 802,000
31 Travel ........................... 5,959,000
32 Contractual services ............. 1,577,000
33 Equipment ........................... 80,000
34 Fringe benefits ................. 90,493,000
35 Indirect costs ................... 6,907,000
36 --------------
37 Amount available for nonper-
38 sonal service .............. 105,818,000
39 --------------
40 CAPITAL PROJECTS
41 For the costs of the contract
42 services provided by private
43 firms including, but not
44 limited to, the preparation
45 of designs, plans, specifi-
817 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 cations and estimates;
2 construction management and
3 supervision; and appraisals,
4 surveys, testing, and envi-
5 ronmental impact statements
6 for transportation projects:
7 Preliminary Design .............. 53,827,000
8 Construction Inspection ......... 65,280,000
9 Bridge Inspection ............... 15,958,000
10 Other Consultant Services ....... 33,903,000
11 --------------
12 168,968,000
13 --------------
14 Amount available for capital
15 projects ................... 168,968,000
16 --------------
17 469,901,000
18 ==============
19 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
20 section 1, of the laws of 2012:
21 For engineering services, including personal services, nonpersonal
22 services, fringe benefits and the contract services provided by
23 private firms, including, but not limited to, the preparation of
24 designs, plans, specifications and estimates; construction manage-
25 ment and supervision; and appraisals, surveys, testing, and environ-
26 mental impact statements for transportation projects (17H11030) ....
27 487,035,000 ...................................... (re. $13,056,000)
28 PERSONAL SERVICE
29 Personal service--regular ...... 190,168,000
30 Temporary service ................ 4,737,000
31 Holiday/overtime compensation .... 6,711,000
32 --------------
33 Amount available for person-
34 al service ................. 201,616,000
35 --------------
36 NONPERSONAL SERVICE
37 Supplies and materials ............. 876,000
38 Travel ........................... 6,657,000
39 Contractual services ............. 1,554,000
40 Equipment .......................... 310,000
41 Fringe benefits ................. 94,760,000
42 Indirect costs ................... 7,256,000
43 --------------
44 Amount available for nonper-
45 sonal service .............. 111,413,000
46 --------------
818 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 MAINTENANCE UNDISTRIBUTED
2 For suballocation of $175,000
3 to the office of the inspec-
4 tor general for services and
5 expenses in accordance with
6 the following:
7 Supplies and materials .............. 44,000
8 Travel .............................. 44,000
9 Contractual services ................ 44,000
10 Equipment ........................... 43,000
11 --------------
12 175,000
13 --------------
14 For the costs of the
15 contract services provided
16 by private firms includ-
17 ing, but not limited to,
18 the preparation of
19 designs, plans, specifica-
20 tions and estimates;
21 construction management
22 and supervision; and
23 appraisals, surveys, test-
24 ing, and environmental
25 impact statements for
26 transportation projects:
27 Preliminary Design .............. 55,260,000
28 Construction Inspection ......... 67,018,000
29 Bridge Inspection ............... 16,383,000
30 Other Consultant Services ....... 34,805,000
31 --------------
32 173,466,000
33 --------------
34 Amount available for mainte-
35 nance undistributed ........ 173,641,000
36 --------------
37 486,670,000
38 ==============
39 By chapter 55, section 1, of the laws of 2009, as amended by chapter 55,
40 section 1, of the laws of 2010:
41 For engineering services, including personal services, nonpersonal
42 services, fringe benefits and the contract services provided by
43 private firms, including, but not limited to, the preparation of
44 designs, plans, specifications and estimates; construction manage-
45 ment and supervision; and appraisals, surveys, testing, and environ-
46 mental impact statements for transportation projects (17H10930)
47 ... ... 497,742,000 ............................ (re. $21,385,000)
819 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 PERSONAL SERVICE
2 Personal service--regular ...... 194,006,000
3 Temporary service ................ 4,024,000
4 Holiday/overtime compensation .... 6,208,000
5 --------------
6 Amount available for person-
7 al service ................. 204,238,000
8 --------------
9 NONPERSONAL SERVICE
10 Supplies and materials ............. 412,000
11 Travel ............................. 928,000
12 Contractual services ............. 6,367,000
13 Equipment ........................ 1,995,000
14 Fringe benefits ................. 85,064,000
15 Indirect costs ................... 7,992,000
16 --------------
17 Amount available for nonper-
18 sonal service .............. 102,758,000
19 --------------
20 MAINTENANCE UNDISTRIBUTED
21 For suballocation of
22 $175,000 to the office of
23 the inspector general for
24 services and expenses in
25 accordance with the
26 following:
27 Supplies and materials .............. 44,000
28 Travel .............................. 44,000
29 Contractual services ................ 44,000
30 Equipment ........................... 43,000
31 --------------
32 175,000
33 --------------
34 For the costs of the contract services
35 provided by private firms including, but
36 not limited to, the preparation of
37 designs, plans, specifications and esti-
38 mates; construction management and
39 supervision; and appraisals, surveys,
40 testing, and environmental impact state-
41 ments for transportation projects:
820 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Preliminary Design .............. 60,709,000
2 Construction Inspection ......... 73,627,000
3 Bridge Inspection ............... 17,998,000
4 Other Consultant Services ....... 38,237,000
5 --------------
6 190,571,000
7 --------------
8 Amount available for mainte-
9 nance undistributed ........ 190,746,000
10 --------------
11 497,742,000
12 ==============
13 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
14 section 1, of the laws of 2010:
15 For engineering services, including personal services, nonpersonal
16 services, fringe benefits and the contract services provided by
17 private firms, including, but not limited to, the preparation of
18 designs, plans, specifications and estimates; construction manage-
19 ment and supervision; and appraisals, surveys, testing, and environ-
20 mental impact statements for transportation projects (17H10830) ....
21 677,702,000 ...................................... (re. $43,067,000)
22 PERSONAL SERVICE
23 Personal service--regular ...... 244,058,000
24 Temporary service ................ 3,100,000
25 Holiday/overtime compensation .... 8,077,000
26 --------------
27 Amount available for person-
28 al service ................. 255,235,000
29 --------------
30 NONPERSONAL SERVICE
31 Supplies and materials ........... 2,976,000
32 Travel .......................... 10,370,000
33 Contractual services ............ 44,067,000
34 Equipment ........................ 3,976,000
35 Fringe benefits ................ 110,019,000
36 Indirect costs .................. 10,608,000
37 --------------
38 Amount available for nonper-
39 sonal service .............. 182,016,000
40 --------------
41 MAINTENANCE UNDISTRIBUTED
42 For suballocation of
43 $192,000 to the office of
44 the inspector general for
45 services and expenses in
821 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 accordance with the
2 following:
3 Supplies and materials .............. 48,000
4 Travel .............................. 48,000
5 Contractual services ................ 48,000
6 Equipment ........................... 48,000
7 --------------
8 192,000
9 --------------
10 For the costs of the contract services
11 provided by private firms including, but
12 not limited to, the preparation of
13 designs, plans, specifications and esti-
14 mates; construction management and
15 supervision; and appraisals, surveys,
16 testing, and environmental impact state-
17 ments for transportation projects:
18 Preliminary Design .............. 76,538,000
19 Construction Inspection ......... 92,824,000
20 Bridge Inspection ............... 22,691,000
21 Other Consultant Services ....... 48,206,000
22 --------------
23 240,259,000
24 --------------
25 Amount available for mainte-
26 nance undistributed ........ 240,451,000
27 --------------
28 677,702,000
29 ==============
30 By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
31 section 1, of the laws of 2008:
32 For engineering services, including personal services, nonpersonal
33 services, fringe benefits and the contract services provided by
34 private firms, including, but not limited to, the preparation of
35 designs, plans, specifications and estimates; construction manage-
36 ment and supervision; and appraisals, surveys, testing, and environ-
37 mental impact statements for transportation projects (17H10730) ....
38 672,105,000 ...................................... (re. $24,636,000)
39 PERSONAL SERVICE
40 Personal service--regular ...... 227,962,000
41 Temporary service ................ 5,156,000
42 Holiday/overtime compensation .... 8,234,000
43 --------------
44 Amount available for person-
45 al service ................. 241,352,000
46 --------------
822 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NONPERSONAL SERVICE
2 Supplies and materials ........... 2,475,000
3 Travel ........................... 6,638,000
4 Contractual services ............ 49,926,000
5 Equipment ........................ 7,869,000
6 Fringe benefits ................ 116,111,000
7 Indirect costs ................... 9,305,000
8 --------------
9 Amount available for nonper-
10 sonal service .............. 192,324,000
11 --------------
12 MAINTENANCE UNDISTRIBUTED
13 For suballocation of
14 $192,000 to the office of
15 the inspector general for
16 services and expenses in
17 accordance with the
18 following:
19 Supplies and materials .............. 48,000
20 Travel .............................. 48,000
21 Contractual services ................ 48,000
22 Equipment ........................... 48,000
23 --------------
24 192,000
25 --------------
26 For the costs of the contract services
27 provided by private firms including, but
28 not limited to, the preparation of
29 designs, plans, specifications and esti-
30 mates; construction management and
31 supervision; and appraisals, surveys,
32 testing, and environmental impact state-
33 ments for transportation projects:
34 Preliminary Design .............. 75,894,000
35 Construction Inspection ......... 92,043,000
36 Bridge Inspection ............... 22,500,000
37 Other Consultant Services ....... 47,800,000
38 --------------
39 238,237,000
40 --------------
41 Amount available for mainte-
42 nance undistributed ........ 238,429,000
43 --------------
44 672,105,000
45 ==============
823 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
2 section 1, of the laws of 2008:
3 For engineering services, including personal services, nonpersonal
4 services, fringe benefits and the contract services provided by
5 private firms, including, but not limited to, the preparation of
6 designs, plans, specifications and estimates; construction manage-
7 ment and supervision; and appraisals, surveys, testing, and environ-
8 mental impact statements for transportation projects.
9 For suballocation of $192,000 to the office of inspector general for
10 services and expenses including fringe benefits (17H10630) .........
11 650,996,000 ...................................... (re. $20,873,000)
12 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
13 section 1, of the laws of 2010:
14 For engineering services, including personal services, nonpersonal
15 services, fringe benefits and the contract services provided by
16 private firms, including, but not limited to, the preparation of
17 designs, plans, specifications and estimates; construction manage-
18 ment and supervision; and appraisals, surveys, testing, and environ-
19 mental impact statements for transportation projects.
20 For suballocation of $192,000 to the office of inspector general for
21 services and expenses including fringe benefits (17H10530) .........
22 544,571,000 ...................................... (re. $12,079,000)
23 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
24 section 1, of the laws of 2006:
25 For engineering services, including personal services, nonpersonal
26 services, fringe benefits and the contract services provided by
27 private firms, including, but not limited to, the preparation of
28 designs, plans, specifications and estimates; construction manage-
29 ment and supervision; and appraisals, surveys, testing, and environ-
30 mental impact statements for transportation projects.
31 For suballocation of $192,000 to the office of inspector general for
32 services and expenses including fringe benefits (17H10430) .........
33 514,002,000 ....................................... (re. $8,376,000)
34 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
35 section 1, of the laws of 2006:
36 For engineering services, including personal services, nonpersonal
37 services, fringe benefits and the contract services provided by
38 private firms, including, but not limited to, the preparation of
39 designs, plans, specifications and estimates; construction manage-
40 ment and supervision; and appraisals, surveys, testing, and environ-
41 mental impact statements for transportation projects.
42 For suballocation of $192,000 to the office of inspector general for
43 services and expenses including fringe benefits (17H10330) .........
44 512,475,000 ...................................... (re. $17,937,000)
45 Information Technology Projects
46 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
47 section 1, of the laws of 2010:
824 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For federally eligible costs of information technology projects,
2 including personal services, nonpersonal services, fringe benefits
3 and contract services provided by private firms (17H40830) .........
4 15,000,000 ....................................... (re. $15,000,000)
5 PERSONAL SERVICE
6 Personal service--regular ........ 1,000,000
7 --------------
8 Amount available for person-
9 al service ................... 1,000,000
10 --------------
11 NONPERSONAL SERVICE
12 Contractual services ............ 13,488,000
13 Fringe benefits .................... 477,000
14 Indirect costs ...................... 35,000
15 --------------
16 Amount available for nonper-
17 sonal service ............... 14,000,000
18 --------------
19 15,000,000
20 ==============
21 By chapter 55, section 1, of the laws of 2007:
22 For federally eligible costs of information technology projects,
23 including personal services, nonpersonal services, fringe benefits
24 and contract services provided by private firms (17H40730) .........
25 15,000,000 ....................................... (re. $15,000,000)
26 PERSONAL SERVICE
27 Personal service--regular ........ 1,000,000
28 --------------
29 Amount available for person-
30 al service ................... 1,000,000
31 --------------
32 NONPERSONAL SERVICE
33 Contractual services ............ 13,488,000
34 Fringe benefits .................... 477,000
35 Indirect costs ...................... 35,000
36 --------------
37 Amount available for nonper-
38 sonal service ............... 14,000,000
39 --------------
40 15,000,000
41 ==============
42 Real Estate
825 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For real estate services, including personal services, nonpersonal
3 services, fringe benefits and the contract services provided by
4 private firms.
5 Notwithstanding any other provision of law to the contrary, the OGS
6 Interchange and Transfer Authority and the IT Interchange and Trans-
7 fer Authority as defined in the 2017-18 state fiscal year state
8 operations appropriation for the budget division program of the
9 division of the budget, are deemed fully incorporated herein and a
10 part of this appropriation as if fully stated.
11 Personal service (17R11730) ... 12,055,000 .......... (re. $7,782,000)
12 Nonpersonal service (17R41730) ... 302,000 ............ (re. $239,000)
13 Fringe benefits (17R81730) ... 7,357,000 ............ (re. $5,601,000)
14 Indirect costs (17R91730) ... 407,000 ................. (re. $307,000)
15 By chapter 55, section 1, of the laws of 2016:
16 For real estate services, including personal services, nonpersonal
17 services, fringe benefits and the contract services provided by
18 private firms.
19 Notwithstanding any other provision of law to the contrary, the OGS
20 Interchange and Transfer Authority and the IT Interchange and Trans-
21 fer Authority as defined in the 2016-17 state fiscal year state
22 operations appropriation for the budget division program of the
23 division of the budget, are deemed fully incorporated herein and a
24 part of this appropriation as if fully stated.
25 Personal service (17R11630) ... 11,604,000 .......... (re. $1,842,000)
26 Nonpersonal service (17R41630) ... 177,000 ............. (re. $29,000)
27 Fringe benefits (17R81630) ... 6,471,000 .............. (re. $225,000)
28 Indirect costs (17R91630) ... 366,000 .................. (re. $25,000)
29 By chapter 54, section 1, of the laws of 2015:
30 For real estate services, including personal services, nonpersonal
31 services, fringe benefits and the contract services provided by
32 private firms.
33 Nonpersonal service (17R41530) ... 174,000 .............. (re. $4,000)
34 Fringe benefits (17R81530) ... 6,340,000 .............. (re. $306,000)
35 Indirect costs (17R91530) ... 363,000 .................. (re. $19,000)
36 By chapter 54, section 1, of the laws of 2014:
37 For real estate services, including personal services, nonpersonal
38 services, fringe benefits and the contract services provided by
39 private firms.
40 Personal service (17R11430) ... 11,337,000 ............ (re. $133,000)
41 Nonpersonal service (17R41430) ... 170,000 .............. (re. $5,000)
42 Fringe benefits (17R81430) ... 6,350,000 .............. (re. $568,000)
43 Indirect costs (17R91430) ... 353,000 .................. (re. $32,000)
44 By chapter 54, section 1, of the laws of 2013:
45 For real estate services, including personal services, nonpersonal
46 services, fringe benefits and the contract services provided by
47 private firms.
48 Personal service (17R11330) ... 10,998,000 ............ (re. $175,000)
826 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Nonpersonal service (17R41330) ... 166,000 .............. (re. $5,000)
2 Fringe benefits (17R81330) ... 6,191,000 .............. (re. $190,000)
3 Indirect costs (17R91330) ... 364,000 .................. (re. $11,000)
4 By chapter 54, section 1, of the laws of 2012:
5 For real estate services, including personal services, nonpersonal
6 services, fringe benefits and the contract services provided by
7 private firms.
8 Nonpersonal service (17R41230) ... 162,000 .............. (re. $3,000)
9 By chapter 54, section 1, of the laws of 2011:
10 For real estate services, including personal services, nonpersonal
11 services, fringe benefits and the contract services provided by
12 private firms (17H31130) ... 16,956,000 ............. (re. $505,000)
13 PERSONAL SERVICE
14 Personal service--regular ....... 11,074,000
15 Holiday/overtime compensation ....... 10,000
16 --------------
17 Amount available for person-
18 al service .................. 11,084,000
19 --------------
20 NONPERSONAL SERVICE
21 Supplies and materials .............. 85,000
22 Travel ............................. 162,000
23 Contractual services ................ 91,000
24 Equipment ............................ 1,000
25 Fringe benefits .................. 5,141,000
26 Indirect costs ..................... 392,000
27 --------------
28 Amount available for nonper-
29 sonal service ................ 5,872,000
30 --------------
31 16,956,000
32 ==============
33 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
34 section 1, of the laws of 2012:
35 For real estate services, including personal services, nonpersonal
36 services, fringe benefits and the contract services provided by
37 private firms (17H31030) ... 20,183,000 ........... (re. $2,045,000)
38 PERSONAL SERVICE
39 Personal service--regular ....... 13,355,000
40 Holiday/overtime compensation ....... 20,000
41 --------------
42 Amount available for person-
43 al service .................. 13,375,000
827 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 --------------
2 NONPERSONAL SERVICE
3 Supplies and materials .............. 90,000
4 Travel ............................. 172,000
5 Contractual services ................ 96,000
6 Equipment ........................... 48,000
7 Fringe benefits .................. 6,286,000
8 Indirect costs ..................... 481,000
9 --------------
10 Amount available for nonper-
11 sonal service ................ 7,173,000
12 --------------
13 20,548,000
14 ==============
15 By chapter 55, section 1, of the laws of 2009:
16 For real estate services, including personal services, nonpersonal
17 services, fringe benefits and the contract services provided by
18 private firms (17H30930) ... 20,441,000 ........... (re. $1,212,000)
19 PERSONAL SERVICE
20 Personal service--regular ....... 13,197,000
21 Holiday/overtime compensation ....... 31,000
22 --------------
23 Amount available for person-
24 al service .................. 13,228,000
25 --------------
26 NONPERSONAL SERVICE
27 Supplies and materials ............. 84,000
28 Travel ............................. 193,000
29 Contractual services ................ 65,000
30 Equipment ........................... 57,000
31 Fringe benefits .................. 6,281,000
32 Indirect costs ..................... 533,000
33 --------------
34 Amount available for nonper-
35 sonal service ................ 7,213,000
36 --------------
37 20,441,000
38 ==============
39 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
40 section 1, of the laws of 2010:
41 For real estate services, including personal services, nonpersonal
42 services, fringe benefits and the contract services provided by
43 private firms (17H30830) ... 19,810,000 ............. (re. $220,000)
828 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 PERSONAL SERVICE
2 Personal service--regular ....... 11,031,000
3 Holiday/overtime compensation ....... 32,000
4 --------------
5 Amount available for person-
6 al service .................. 11,063,000
7 --------------
8 NONPERSONAL SERVICE
9 Supplies and materials ............. 748,000
10 Travel ........................... 1,285,000
11 Contractual services ............. 1,327,000
12 Equipment ........................... 37,000
13 Fringe benefits .................. 5,039,000
14 Indirect costs ..................... 311,000
15 --------------
16 Amount available for nonper-
17 sonal service ................ 8,747,000
18 --------------
19 19,810,000
20 ==============
21 By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
22 section 1, of the laws of 2008:
23 For real estate services, including personal services, nonpersonal
24 services, fringe benefits and the contract services provided by
25 private firms (17H30730) ... 19,345,000 ........... (re. $1,064,000)
26 PERSONAL SERVICE
27 Personal service--regular ....... 13,557,000
28 Holiday/overtime compensation ....... 16,000
29 --------------
30 Amount available for person-
31 al service .................. 13,573,000
32 --------------
33 NONPERSONAL SERVICE
34 Supplies and materials ............. 101,000
35 Travel ............................. 152,000
36 Contractual services ............... 156,000
37 Equipment ........................... 13,000
38 Fringe benefits .................. 4,953,000
39 Indirect costs ..................... 397,000
40 --------------
41 Amount available for nonper-
42 sonal service ................ 5,772,000
43 --------------
44 19,345,000
829 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ==============
2 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
3 section 1, of the laws of 2007:
4 For real estate services, including personal services, nonpersonal
5 services, fringe benefits and the contract services provided by
6 private firms (17H30530) ... 14,179,000 ............. (re. $312,000)
7 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
8 section 1, of the laws of 2006:
9 For real estate services, including personal services, nonpersonal
10 services, fringe benefits and the contract services provided by
11 private firms (17H30430) ... 14,117,000 ............. (re. $351,000)
12 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
13 section 1, of the laws of 2005:
14 For real estate services, including personal services, nonpersonal
15 services, fringe benefits and the contract services provided by
16 private firms (17H30330) ... 13,791,000 ............. (re. $295,000)
17 Capital Projects Funds - Other
18 Dedicated Highway and Bridge Trust Fund
19 Preventive Maintenance Purpose
20 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
21 section 1, of the laws of 1996:
22 For preventive maintenance on state roads and bridges as defined in
23 paragraph (a) of subdivision 1 of section 10-d of the highway law
24 including personal services, nonpersonal services, fringe benefits
25 and the contractual services provided by private firms (170594PM)
26 ... ..... 278,439,000 ........................... (re. $8,688,000)
27 Capital Projects Funds - Other
28 Dedicated Highway and Bridge Trust Fund
29 Public Transportation Purpose
30 Bus Safety
31 By chapter 54, section 1, of the laws of 2017:
32 For the payment of personal services and fringe benefits of state
33 forces.
34 Personal service (170117PT) ... 6,477,000 ........... (re. $4,021,000)
35 Fringe benefits (170817PT) ... 3,982,000 ............ (re. $2,942,000)
36 Indirect costs (170917PT) ... 191,000 ................. (re. $147,000)
37 By chapter 55, section 1, of the laws of 2016:
38 For the payment of personal services and fringe benefits of state
39 forces.
40 Personal service (170116PT) ... 6,033,000 ............. (re. $403,000)
41 Fringe benefits (170816PT) ... 3,392,000 ............... (re. $35,000)
42 Indirect costs (170916PT) ... 162,000 ................... (re. $3,000)
830 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2015:
2 For the payment of personal services and fringe benefits of state
3 forces.
4 Fringe benefits (170815PT) ... 3,356,000 .............. (re. $103,000)
5 Indirect costs (170915PT) ... 152,000 ................... (re. $5,000)
6 By chapter 54, section 1, of the laws of 2014:
7 For the payment of personal services and fringe benefits of state
8 forces.
9 Personal service (170114PT) ... 5,906,000 .............. (re. $89,000)
10 Fringe benefits (170814PT) ... 3,359,000 .............. (re. $238,000)
11 Indirect costs (170914PT) ... 166,000 .................. (re. $12,000)
12 By chapter 54, section 1, of the laws of 2013:
13 For the payment of personal services and fringe benefits of state
14 forces in the office of passenger and freight transportation.
15 Fringe benefits (170813PT) ... 3,133,000 ............... (re. $68,000)
16 Indirect costs (170913PT) ... 176,000 ................... (re. $3,000)
17 By chapter 54, section 1, of the laws of 2012:
18 For the payment of personal services and fringe benefits of state
19 forces in the office of passenger and freight transportation.
20 Personal service (170112PT) ... 5,670,000 ............. (re. $117,000)
21 Fringe benefits (170812PT) ... 2,931,000 ............... (re. $20,000)
22 By chapter 55, section 1, of the laws of 2010:
23 For the payment of personal services and fringe benefits of state
24 forces in the office of passenger and freight transportation
25 (170110PT) ... 8,885,000 ............................ (re. $607,000)
26 SCHEDULE
27 PERSONAL SERVICE
28 Personal service--regular ........ 5,762,000
29 Holiday/overtime compensation ...... 100,000
30 --------------
31 Amount available for person-
32 al service ................... 5,862,000
33 --------------
34 NONPERSONAL SERVICE
35 Fringe benefits .................. 2,839,000
36 Indirect costs ..................... 184,000
37 --------------
38 Amount available for nonper-
39 sonal service ................ 3,023,000
40 --------------
41 8,885,000
42 ==============
831 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Motor Carrier Safety
2 By chapter 54, section 1, of the laws of 2017:
3 For motor carrier safety, including personal services, nonpersonal
4 services, and fringe benefits.
5 Notwithstanding any other provision of law to the contrary, the OGS
6 Interchange and Transfer Authority, and the IT Interchange and
7 Transfer Authority as defined in the 2017-18 state fiscal year state
8 operations appropriation for the budget division program of the
9 division of the budget, are deemed fully incorporated herein and a
10 part of this appropriation as if fully stated.
11 Personal service (172117PT) ... 3,430,000 ........... (re. $2,299,000)
12 Nonpersonal service (172417PT) ... 1,531,000 ........ (re. $1,427,000)
13 Fringe benefits (172817PT) ... 2,109,000 ............ (re. $1,633,000)
14 Indirect costs (172917PT) ... 101,000 .................. (re. $81,000)
15 By chapter 55, section 1, of the laws of 2016:
16 For motor carrier safety, including personal services, nonpersonal
17 services, and fringe benefits.
18 Notwithstanding any other provision of law to the contrary, the OGS
19 Interchange and Transfer Authority and the IT Interchange and Trans-
20 fer Authority as defined in the 2016-17 state fiscal year state
21 operations appropriation for the budget division program of the
22 division of the budget, are deemed fully incorporated herein and a
23 part of this appropriation as if fully stated.
24 Personal service (172116PT) ... 3,347,000 ............. (re. $960,000)
25 Nonpersonal service (172416PT) ... 1,531,000 ........ (re. $1,212,000)
26 Fringe benefits (172816PT) ... 1,882,000 .............. (re. $418,000)
27 Indirect costs (172916PT) ... 90,000 ................... (re. $28,000)
28 By chapter 54, section 1, of the laws of 2015:
29 For motor carrier safety, including personal services, nonpersonal
30 services, and fringe benefits.
31 Notwithstanding any other provision of law to the contrary, the OGS
32 Interchange and Transfer Authority and the IT Interchange and Trans-
33 fer Authority as defined in the 2015-16 state fiscal year state
34 operations appropriation for the budget division program of the
35 division of the budget, are deemed fully incorporated herein and a
36 part of this appropriation as if fully stated.
37 Personal service (172115PT) ... 3,175,000 ........... (re. $1,279,000)
38 Nonpersonal service (172415PT) ... 1,531,000 .......... (re. $516,000)
39 Fringe benefits (172815PT) ... 1,774,000 .............. (re. $478,000)
40 Indirect costs (172915PT) ... 81,000 ................... (re. $29,000)
41 By chapter 54, section 1, of the laws of 2014:
42 For motor carrier safety, including personal services, nonpersonal
43 services, and fringe benefits.
44 Notwithstanding any other provision of law to the contrary, the OGS
45 Interchange and Transfer Authority and the IT Interchange and Trans-
46 fer Authority as defined in the 2014-15 state fiscal year state
47 operations appropriation for the budget division program of the
832 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 division of the budget, are deemed fully incorporated herein and a
2 part of this appropriation as if fully stated.
3 Personal service (172114PT) ... 2,949,000 ............. (re. $215,000)
4 Nonpersonal service (172414PT) ... 1,905,000 ........ (re. $1,125,000)
5 Indirect costs (172914PT) ... 83,000 ................... (re. $12,000)
6 Rail Safety
7 By chapter 54, section 1, of the laws of 2017:
8 For rail safety, including personal services, nonpersonal services,
9 and fringe benefits.
10 Personal service (171117PT) ... 674,000 ............... (re. $436,000)
11 Nonpersonal service (171417PT) ... 87,000 .............. (re. $73,000)
12 Fringe benefits (171817PT) ... 414,000 ................ (re. $314,000)
13 Indirect costs (171917PT) ... 20,000 ................... (re. $16,000)
14 By chapter 55, section 1, of the laws of 2016:
15 For rail safety, including personal services, nonpersonal services,
16 and fringe benefits.
17 Personal service (171116PT) ... 674,000 ............... (re. $173,000)
18 Nonpersonal service (171416PT) ... 87,000 .............. (re. $37,000)
19 Fringe benefits (171816PT) ... 379,000 ................. (re. $36,000)
20 Indirect costs (171916PT) ... 18,000 .................... (re. $3,000)
21 By chapter 54, section 1, of the laws of 2015:
22 For rail safety, including personal services, nonpersonal services,
23 and fringe benefits.
24 Personal service (171115PT) ... 674,000 ................ (re. $87,000)
25 Nonpersonal service (171415PT) ... 87,000 .............. (re. $56,000)
26 Fringe benefits (171815PT) ... 377,000 ................. (re. $81,000)
27 Indirect costs (171915PT) ... 17,000 .................... (re. $4,000)
28 By chapter 54, section 1, of the laws of 2014:
29 For rail safety, including personal services, nonpersonal services,
30 and fringe benefits.
31 Personal service (171114PT) ... 702,000 ............... (re. $118,000)
32 Nonpersonal service (171414PT) ... 66,000 .............. (re. $19,000)
33 Fringe benefits (171814PT) ... 399,000 ................. (re. $96,000)
34 Indirect costs (171914PT) ... 19,000 .................... (re. $4,000)
35 Capital Projects Funds - Other
36 Dedicated Highway and Bridge Trust Fund
37 Snow and Ice Control Purpose
38 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
39 section 1, of the laws of 2006:
40 For the payment of costs, including the payment of liabilities
41 incurred prior to April 1, 2004, of control of snow and ice on state
42 highways including personal services, nonpersonal services, fringe
43 benefits and the contractual services provided by municipalities.
44 The items shown in the schedule below shall be for projects with a
45 common purpose and may be interchanged without limitation subject to
833 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the approval of the director of the budget (170104SN) ... ........
2 224,681,000 ......................................... (re. $541,000)
3 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
4 section 1, of the laws of 2005:
5 For the payment of costs, including the payment of liabilities
6 incurred prior to April 1, 2003, of control of snow and ice on state
7 highways including personal services, nonpersonal services, fringe
8 benefits and the contractual services provided by municipalities.
9 The items shown in the schedule below shall be for projects with a
10 common purpose and may be interchanged without limitation subject to
11 the approval of the director of the budget (170103SN) ... ........
12 225,842,000 ....................................... (re. $4,050,000)
13 By chapter 55, section 1, of the laws of 2002, as amended by chapter 55,
14 section 1, of the laws of 2004:
15 For the payment of costs, including the payment of liabilities
16 incurred prior to April 1, 2002, of control of snow and ice on state
17 highways including personal services, nonpersonal services, fringe
18 benefits and the contractual services provided by municipalities.
19 The items shown in the schedule below shall be for projects with a
20 common purpose and may be interchanged without limitation subject to
21 the approval of the director of the budget (170102SN) ... ........
22 223,022,964 .......................................... (re. $67,000)
23 Capital Projects Funds - Other
24 Dedicated Highway and Bridge Trust Fund
25 Southern Tier Expressway Purpose
26 By chapter 54, section 1, of the laws of 1985:
27 For the cost of construction including land acquisition, surveys,
28 design and contract engineering for the Southern Tier Expressway as
29 defined in section 340-c of the Highway Law (17348590) .............
30 ................................................... (re. $2,149,000)
31 OTHER HIGHWAY AID (CCP)
32 Capital Projects Funds - Other
33 Dedicated Highway and Bridge Trust Fund
34 Highway Aid Purpose
35 By chapter 54, section 1, of the laws of 1993:
36 For construction of sound abatement barriers on a section of the
37 northbound side of the New England Thruway (Interstate 95) from the
38 Bronx line through the Town of Pelham, Westchester County (17369321)
39 ... 1,150,000 ..................................... (re. $1,150,000)
40 OTHER TRANSPORTATION AID (CCP)
41 Capital Projects Funds - Other
42 Capital Projects Fund
43 Highway Aid Purpose
834 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2017:
2 For capital grants to municipalities under the municipal streets and
3 highways program for repayment of eligible costs of federal aid
4 municipal street and highway projects pursuant to section 15 of
5 chapter 329 of the laws of 1991, as added by section 9 of chapter
6 330 of the laws of 1991, as amended. The department of transporta-
7 tion shall provide such information to the municipalities as may be
8 necessary to maintain the federal tax exempt status of any bonds,
9 notes, or other obligations issued by such municipalities to provide
10 for the non-federal share of the cost of projects pursuant to chap-
11 ter 330 of the laws of 1991 or section 80-b of the highway law
12 (17MA1721) ... 39,700,000 ........................ (re. $39,595,000)
13 For capital grants to municipalities under the consolidated local
14 street and highway improvement program:
15 The sum of $379,300,000 to counties, cities, towns and villages for
16 reimbursement of eligible costs of local highway and bridge projects
17 pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
18 as added by section 9 of chapter 330 of the laws of 1991, as
19 amended. For the purposes of computing allocations to munici-
20 palities, the amount distributed pursuant to section 16 of chapter
21 329 of the laws of 1991 shall be deemed to be $125,540,000.
22 The amount distributed pursuant to section 16-a of chapter 329 of the
23 laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
24 provisions of any general or special law, the amounts deemed
25 distributed in accordance with section 16 of chapter 329 of the laws
26 of 1991 shall be adjusted so that such amounts will not be less than
27 86.579 percent of the "funding level" as defined in subdivision 5 of
28 section 10-c of the highway law for each such municipality. In order
29 to achieve the objectives of section 16 of chapter 329 of the laws
30 of 1991, to the extent necessary, the amounts in excess of 86.579
31 percent of the funding level to be deemed distributed to each muni-
32 cipality under this subdivision shall be reduced in equal propor-
33 tion.
34 The sum of $58,797,000 to municipalities for reimbursement of eligible
35 costs of local highway and bridge projects pursuant to sections 16
36 and 16-a of chapter 329 of the laws of 1991, as added by section 9
37 of chapter 330 of the laws of 1991, as amended. For the purposes of
38 computing allocations to municipalities, the amount distributed
39 pursuant to section 16 of chapter 329 of the laws of 1991 shall be
40 deemed to be $19,460,000. The amount distributed pursuant to section
41 16-a of chapter 329 of the laws of 1991 shall be deemed to be
42 $39,337,000. Notwithstanding the provisions of any general or
43 special law, the amounts deemed distributed in accordance with
44 section 16 of chapter 329 of the laws of 1991 shall be adjusted so
45 that such amounts will not be less than 13.421 percent of the "fund-
46 ing level" as defined in subdivision 5 of section 10-c of the high-
47 way law for each such municipality. In order to achieve the objec-
48 tives of section 16 of chapter 329 of the laws of 1991, to the
49 extent necessary, the amounts in excess of 13.421 percent of the
50 funding level to be deemed distributed to each municipality under
51 this paragraph shall be reduced in equal proportion. To the extent
52 that the total of remaining payment allocations calculated herein
835 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 varies from $58,797,000, the payment amounts to each locality shall
2 be adjusted by a uniform percentage so that the total payments equal
3 $58,797,000.
4 Payments shall be made on the fifteenth day of June, September, Decem-
5 ber and March (17CH1721) ... 438,097,000 ........ (re. $436,906,000)
6 For capital capital grants to municipalities for extreme winter recov-
7 ery:
8 The sum of $65,000,000 to municipalities for reimbursement of eligible
9 costs of local highway and bridge projects pursuant to section 16-a
10 of chapter 329 of the laws of 1991, as added by section 9 of chapter
11 330 of the laws of 1991, as amended. For the purposes of computing
12 allocations to municipalities, the amount distributed pursuant to
13 section 16-a of chapter 329 of the laws of 1991 shall be deemed to
14 be $65,000,000. To the extent that the total of payment allocations
15 calculated herein varies from $65,000,000, the payment amounts to
16 each locality shall be adjusted by a uniform percentage so that the
17 total payments equal $65,000,000.
18 Payments shall be made on the fifteenth day of June, September, Decem-
19 ber and March (17EW1721) ... 65,000,000 .......... (re. $64,242,000)
20 By chapter 55, section 1, of the laws of 2016:
21 For capital grants to municipalities under the municipal streets and
22 highways program for repayment of eligible costs of federal aid
23 municipal street and highway projects pursuant to section 15 of
24 chapter 329 of the laws of 1991, as added by section 9 of chapter
25 330 of the laws of 1991, as amended. The department of transporta-
26 tion shall provide such information to the municipalities as may be
27 necessary to maintain the federal tax exempt status of any bonds,
28 notes, or other obligations issued by such municipalities to provide
29 for the non-federal share of the cost of projects pursuant to chap-
30 ter 330 of the laws of 1991 or section 80-b of the highway law
31 (17MA1621) ... 39,700,000 ........................ (re. $39,700,000)
32 For capital grants to municipalities under the consolidated local
33 street and highway improvement program:
34 The sum of $379,300,000 to counties, cities, towns and villages for
35 reimbursement of eligible costs of local highway and bridge projects
36 pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
37 as added by section 9 of chapter 330 of the laws of 1991, as
38 amended. For the purposes of computing allocations to munici-
39 palities, the amount distributed pursuant to section 16 of chapter
40 329 of the laws of 1991 shall be deemed to be $125,540,000. The
41 amount distributed pursuant to section 16-a of chapter 329 of the
42 laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
43 provisions of any general or special law, the amounts deemed
44 distributed in accordance with section 16 of chapter 329 of the laws
45 of 1991 shall be adjusted so that such amounts will not be less than
46 86.579 percent of the "funding level" as defined in subdivision 5 of
47 section 10-c of the highway law for each such municipality. In order
48 to achieve the objectives of section 16 of chapter 329 of the laws
49 of 1991, to the extent necessary, the amounts in excess of 86.579
50 percent of the funding level to be deemed distributed to each muni-
836 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 cipality under this subdivision shall be reduced in equal propor-
2 tion.
3 The sum of $58,797,000 to municipalities for reimbursement of eligible
4 costs of local highway and bridge projects pursuant to sections 16
5 and 16-a of chapter 329 of the laws of 1991, as added by section 9
6 of chapter 330 of the laws of 1991, as amended. For the purposes of
7 computing allocations to municipalities, the amount distributed
8 pursuant to section 16 of chapter 329 of the laws of 1991 shall be
9 deemed to be $19,460,000. The amount distributed pursuant to section
10 16-a of chapter 329 of the laws of 1991 shall be deemed to be
11 $39,337,000. Notwithstanding the provisions of any general or
12 special law, the amounts deemed distributed in accordance with
13 section 16 of chapter 329 of the laws of 1991 shall be adjusted so
14 that such amounts will not be less than 13.421 percent of the "fund-
15 ing level" as defined in subdivision 5 of section 10-c of the high-
16 way law for each such municipality. In order to achieve the objec-
17 tives of section 16 of chapter 329 of the laws of 1991, to the
18 extent necessary, the amounts in excess of 13.421 percent of the
19 funding level to be deemed distributed to each municipality under
20 this paragraph shall be reduced in equal proportion. To the extent
21 that the total of remaining payment allocations calculated herein
22 varies from $58,797,000, the payment amounts to each locality shall
23 be adjusted by a uniform percentage so that the total payments equal
24 $58,797,000.
25 Payments shall be made on the fifteenth day of June, September, Decem-
26 ber and March (17CH1621) ... 438,097,000 ........ (re. $100,184,000)
27 By chapter 54, section 1, of the laws of 2015:
28 For capital grants to municipalities under the municipal streets and
29 highways program for repayment of eligible costs of federal aid
30 municipal street and highway projects pursuant to section 15 of
31 chapter 329 of the laws of 1991, as added by section 9 of chapter
32 330 of the laws of 1991, as amended. The department of transporta-
33 tion shall provide such information to the municipalities as may be
34 necessary to maintain the federal tax exempt status of any bonds,
35 notes, or other obligations issued by such municipalities to provide
36 for the non-federal share of the cost of projects pursuant to chap-
37 ter 330 of the laws of 1991 or section 80-b of the highway law
38 (17MA1521) ... 39,700,000 ........................ (re. $39,700,000)
39 For capital grants to municipalities under the consolidated local
40 street and highway improvement program:
41 The sum of $379,300,000 to counties, cities, towns and villages for
42 reimbursement of eligible costs of local highway and bridge projects
43 pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
44 as added by section 9 of chapter 330 of the laws of 1991, as
45 amended. For the purposes of computing allocations to munici-
46 palities, the amount distributed pursuant to section 16 of chapter
47 329 of the laws of 1991 shall be deemed to be $125,540,000. The
48 amount distributed pursuant to section 16-a of chapter 329 of the
49 laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
50 provisions of any general or special law, the amounts deemed
51 distributed in accordance with section 16 of chapter 329 of the laws
837 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of 1991 shall be adjusted so that such amounts will not be less than
2 86.579 percent of the "funding level" as defined in subdivision 5 of
3 section 10-c of the highway law for each such municipality. In order
4 to achieve the objectives of section 16 of chapter 329 of the laws
5 of 1991, to the extent necessary, the amounts in excess of 86.579
6 percent of the funding level to be deemed distributed to each muni-
7 cipality under this subdivision shall be reduced in equal propor-
8 tion.
9 The sum of $58,797,000 to municipalities for reimbursement of eligible
10 costs of local highway and bridge projects pursuant to sections 16
11 and 16-a of chapter 329 of the laws of 1991, as added by section 9
12 of chapter 330 of the laws of 1991, as amended. For the purposes of
13 computing allocations to municipalities, the amount distributed
14 pursuant to section 16 of chapter 329 of the laws of 1991 shall be
15 deemed to be $19,460,000. The amount distributed pursuant to section
16 16-a of chapter 329 of the laws of 1991 shall be deemed to be
17 $39,337,000. Notwithstanding the provisions of any general or
18 special law, the amounts deemed distributed in accordance with
19 section 16 of chapter 329 of the laws of 1991 shall be adjusted so
20 that such amounts will not be less than 13.421 percent of the "fund-
21 ing level" as defined in subdivision 5 of section 10-c of the high-
22 way law for each such municipality. In order to achieve the objec-
23 tives of section 16 of chapter 329 of the laws of 1991, to the
24 extent necessary, the amounts in excess of 13.421 percent of the
25 funding level to be deemed distributed to each municipality under
26 this paragraph shall be reduced in equal proportion. To the extent
27 that the total of remaining payment allocations calculated herein
28 varies from $58,797,000, the payment amounts to each locality shall
29 be adjusted by a uniform percentage so that the total payments equal
30 $58,797,000.
31 Payments shall be made on the fifteenth day of June, September, Decem-
32 ber and March (17CH1521) ... 438,097,000 ......... (re. $10,663,000)
33 For capital grants to municipalities for extreme winter recovery:
34 The sum of $50,000,000 to municipalities for reimbursement of eligible
35 costs of local highway and bridge projects pursuant to section 16-a
36 of chapter 329 of the laws of 1991, as added by section 9 of chapter
37 330 of the laws of 1991, as amended. For the purposes of computing
38 allocations to municipalities, the amount distributed pursuant to
39 section 16-a of chapter 329 of the laws of 1991 shall be deemed to
40 be $50,000,000. To the extent that the total of payment allocations
41 calculated herein varies from $50,000,000, the payment amounts to
42 each locality shall be adjusted by a uniform percentage so that the
43 total payments equal $50,000,000.
44 Payments shall be made on the fifteenth day of June, September, Decem-
45 ber and March (17EW1521) ... 50,000,000 ........... (re. $1,732,000)
46 By chapter 54, section 1, of the laws of 2014:
47 For capital grants to municipalities under the municipal streets and
48 highways program for repayment of eligible costs of federal aid
49 municipal street and highway projects pursuant to section 15 of
50 chapter 329 of the laws of 1991, as added by section 9 of chapter
51 330 of the laws of 1991, as amended. The department of transporta-
838 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion shall provide such information to the municipalities as may be
2 necessary to maintain the federal tax exempt status of any bonds,
3 notes, or other obligations issued by such municipalities to provide
4 for the non-federal share of the cost of projects pursuant to chap-
5 ter 330 of the laws of 1991 or section 80-b of the highway law
6 (17MA1421) ... 39,700,000 ........................ (re. $39,244,000)
7 For capital grants to municipalities under the consolidated local
8 street and highway improvement program:
9 The sum of $379,300,000 to counties, cities, towns and villages for
10 reimbursement of eligible costs of local highway and bridge projects
11 pursuant to sections 16 and 16-a of chapter 329 of the laws of 1991,
12 as added by section 9 of chapter 330 of the laws of 1991, as
13 amended. For the purposes of computing allocations to munici-
14 palities, the amount distributed pursuant to section 16 of chapter
15 329 of the laws of 1991 shall be deemed to be $125,540,000. The
16 amount distributed pursuant to section 16-a of chapter 329 of the
17 laws of 1991 shall be deemed to be $253,760,000. Notwithstanding the
18 provisions of any general or special law, the amounts deemed
19 distributed in accordance with section 16 of chapter 329 of the laws
20 of 1991 shall be adjusted so that such amounts will not be less than
21 86.579 percent of the "funding level" as defined in subdivision 5 of
22 section 10-c of the highway law for each such municipality. In order
23 to achieve the objectives of section 16 of chapter 329 of the laws
24 of 1991, to the extent necessary, the amounts in excess of 86.579
25 percent of the funding level to be deemed distributed to each muni-
26 cipality under this subdivision shall be reduced in equal propor-
27 tion.
28 The sum of $58,797,000 to municipalities for reimbursement of eligible
29 costs of local highway and bridge projects pursuant to sections 16
30 and 16-a of chapter 329 of the laws of 1991, as added by section 9
31 of chapter 330 of the laws of 1991, as amended. For the purposes of
32 computing allocations to municipalities, the amount distributed
33 pursuant to section 16 of chapter 329 of the laws of 1991 shall be
34 deemed to be $19,460,000. The amount distributed pursuant to section
35 16-a of chapter 329 of the laws of 1991 shall be deemed to be
36 $39,337,000. Notwithstanding the provisions of any general or
37 special law, the amounts deemed distributed in accordance with
38 section 16 of chapter 329 of the laws of 1991 shall be adjusted so
39 that such amounts will not be less than 13.421 percent of the "fund-
40 ing level" as defined in subdivision 5 of section 10-c of the high-
41 way law for each such municipality. In order to achieve the objec-
42 tives of section 16 of chapter 329 of the laws of 1991, to the
43 extent necessary, the amounts in excess of 13.421 percent of the
44 funding level to be deemed distributed to each municipality under
45 this paragraph shall be reduced in equal proportion. To the extent
46 that the total of remaining payment allocations calculated herein
47 varies from $58,797,000, the payment amounts to each locality shall
48 be adjusted by a uniform percentage so that the total payments equal
49 $58,797,000.
50 Payments shall be made on the fifteenth day of June, September, Decem-
51 ber and March (17CH1421) ... 438,097,000 .......... (re. $3,044,000)
839 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For capital grants to municipalities pursuant to annual program
2 authorizations enacted and effective prior to April 1, 2014, in
3 relation to the suburban highway improvement program in sections
4 10-f and 10-g of the highway law. Notwithstanding any contrary
5 provision of law contained in such annual program authorization,
6 payments pursuant to this appropriation shall be made from the state
7 capital projects fund (17SH1421) ... 1,700,000 .... (re. $1,700,000)
8 For capital grants to municipalities for extreme winter recovery:
9 The sum of $40,000,000 to municipalities for reimbursement of eligible
10 costs of local highway and bridge projects pursuant to section 16-a
11 of chapter 329 of the laws of 1991, as added by section 9 of chapter
12 330 of the laws of 1991, as amended. For the purposes of computing
13 allocations to municipalities, the amount distributed pursuant to
14 section 16-a of chapter 329 of the laws of 1991 shall be deemed to
15 be $40,000,000. To the extent that the total of payment allocations
16 calculated herein varies from $40,000,000, the payment amounts to
17 each locality shall be adjusted by a uniform percentage so that the
18 total payments equal $40,000,000.
19 Payments shall be made on the fifteenth day of June, September, Decem-
20 ber and March (17EW1421) ... 40,000,000 ............. (re. $794,000)
21 By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
22 section 1, of the laws of 2015:
23 For capital grants to municipalities pursuant to annual program
24 authorizations enacted and effective prior to April 1, 2014 under
25 the municipal streets and highways program for repayment of eligible
26 costs of federal aid municipal street and highway projects pursuant
27 to section 15 of chapter 329 of the laws of 1991, as added by
28 section 9 of chapter 330 of the laws of 1991, as amended. The
29 department of transportation shall provide such information to the
30 municipalities as may be necessary to maintain the federal tax
31 exempt status of any bonds, notes, or other obligations issued by
32 such municipalities to provide for the non-federal share of the cost
33 of projects pursuant to chapter 330 of the laws of 1991 or section
34 80-b of the highway law (17MR1421) .................................
35 217,097,000 ...................................... (re. $76,551,000)
36 For capital grants to municipalities pursuant to annual program
37 authorizations enacted and effective prior to April 1, 2014, in
38 relation to the consolidated local street and highway improvement
39 program in section 10-c of the highway law and sections 16 and 16-a
40 of chapter 329 of the laws of 1991. Notwithstanding any contrary
41 provision of law contained in such annual program authorization,
42 payments pursuant to this appropriation shall be made from the state
43 capital projects fund.
44 Payments shall be made on the fifteenth day of June, September, Decem-
45 ber and March (17CR1421) ... 110,803,000 .......... (re. $2,137,000)
46 For capital grants to municipalities pursuant to annual program
47 authorizations enacted and effective prior to April 1, 2014, in
48 relation to the multi-modal program in section 14-k of the transpor-
49 tation law. Notwithstanding any contrary provision of law contained
50 in such annual program authorization, payments pursuant to this
840 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 appropriation shall be made from the state capital projects fund
2 (17MM1421) ... 47,123,000 ........................ (re. $41,394,000)
3 Capital Projects Funds - Federal
4 Federal Capital Projects Fund
5 Mass Transportation and Rail Freight Purpose
6 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
7 section 1, of the laws of 2013:
8 For payment of eligible costs for the federal share of capital assist-
9 ance for intercity passenger rail corridors, congestion relief, and
10 high-speed rail corridor development funded by the Passenger Rail
11 Investment and Improvement Act of 2008 and any successor legislation
12 (17011012) ... 100,000,000 ....................... (re. $69,187,000)
13 PORT DEVELOPMENT BONDABLE (CCP)
14 Capital Projects Funds - Other
15 Capital Projects Fund - Infrastructure Renewal Bondable
16 Port Development Purpose
17 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
18 section 3, of the laws of 1990:
19 For the preparation of designs, plans, specifications and estimates,
20 for the contract engineering services provided by private firms, for
21 construction, reconstruction, rehabilitation, and for the acquisi-
22 tion of real property, for port facilities under the jurisdiction of
23 the Niagara Frontier Transportation Authority and the Port of Oswego
24 Authority, including the payment of liabilities incurred prior to
25 April 1, 1988, pursuant to the provisions of the rebuild New York
26 through transportation infrastructure renewal bond act of 1983
27 (17278815) ... ..... 1,495,000 ..................... (re. $47,000)
28 By chapter 54, section 1, of the laws of 1986:
29 For the preparation of designs, plans, specifications and estimates,
30 for the contract engineering services provided by private firms, for
31 construction, reconstruction, rehabilitation, and for the acquisi-
32 tion of real property, for port facilities under the jurisdiction of
33 the Albany Port District Commission, the Ogdensburg Bridge and Port
34 Authority, the Port of Oswego Authority, including the payment of
35 liabilities incurred prior to April one, nineteen hundred eighty-
36 six, pursuant to the provisions of the rebuild New York through
37 transportation infrastructure renewal bond act of 1983, and in
38 accordance with the schedule shown below. The items in the project
39 schedule below shall be for projects with a common purpose and may
40 be interchanged without limitation subject to the approval of the
41 director of the division of the budget (17278615) ..................
42 3,840,000 ............................................. (re. $5,000)
43 By chapter 54, section 1, of the laws of 1985:
44 For construction, reconstruction, rehabilitation, and for the acquisi-
45 tion of real property, for port facilities under the jurisdiction of
841 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 the Albany Port District Commission, the Ogdensburg Bridge and Port
2 Authority, the Port of Oswego Authority, the Niagara Frontier Trans-
3 portation Authority, including the payment of liabilities incurred
4 prior to April one, nineteen hundred eighty-five, pursuant to the
5 provisions of the rebuild New York through transportation infras-
6 tructure renewal bond act of 1983, notwithstanding any inconsistent
7 provisions of law, and in accordance with the schedule shown below.
8 The items in the project schedule below shall be for projects with a
9 common purpose and may be interchanged without limitation subject to
10 the approval of the director of the division of the budget
11 (17198515) ... ........................................ (re. $3,000)
12 PRIORITY BOND ACT PROJECTS (CCP)
13 Capital Projects Funds - Other
14 Capital Projects Fund - Infrastructure Renewal (Bondable)
15 Priority Bond Act Purpose
16 By chapter 54, section 1, of the laws of 1984, as amended by chapter
17 259, section 6, of the laws of 1993:
18 For the costs pursuant to the provisions of the rebuild New York
19 through transportation infrastructure renewal bond act of 1983, of
20 the cost of capital projects to be reimbursed from bond fund
21 proceeds for the improvement of highways, parkways, commuter parking
22 facilities, and other highway facilities including bridges, other
23 structures, and appurtenances.
24 Project costs funded from this appropriation may include, but shall
25 not necessarily be limited to, preliminary planning and feasibility
26 studies; survey and design; acquisition of property, construction,
27 reconstruction, reconditioning and preservation; the contract engi-
28 neering services provided by private firms. No expenditures shall be
29 made from this appropriation for personal services and expenses
30 other than consulting services.
31 The items in the schedule below are projects with a common purpose and
32 as such, may be interchanged without limitation.
33 Notwithstanding any other provision of the law, the commissioner of
34 transportation is authorized to acquire all necessary land not on
35 the state highway system for the purpose of highway projects at the
36 request of the locality under whose jurisdiction the project is
37 constructed or reconstructed.
38 Funds from this appropriation may be made available for the payment of
39 liabilities incurred prior to April one, nineteen hundred eighty-
40 four but not for the payment of liabilities incurred prior to Novem-
41 ber eight, nineteen hundred eighty-three (17288424) ... ..........
42 ................................................... (re. $7,056,000)
43 RAIL FREIGHT (CCP)
44 Capital Projects Funds - Other
45 Capital Projects Fund
46 Mass Transportation and Rail Freight Purpose
842 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 2, of the laws of 1992:
2 For advance payment of the Port Authority of New York and New Jersey's
3 share of the cost of acquisition and construction of the South Bronx
4 oak point link subject to a written repayment agreement entered into
5 by the Authority and the commissioner of transportation and approved
6 by the director of the budget, such repayment agreement to include a
7 repayment schedule which states the date or dates on which the
8 authority will be notified of advance payments made and the date or
9 dates on which the advance shall be repaid to the state and such
10 other terms and conditions as determined by the director of the
11 budget. The authority shall reimburse the State of New York in full
12 for all moneys advanced by the state from this appropriation within
13 30 days of the date of such notification (17779212) ................
14 64,050,000 ....................................... (re. $17,433,000)
15 For advance payment of the city of New York's share of the cost of
16 acquisition and construction of the South Bronx oak point link
17 subject to a written repayment agreement entered into by the city of
18 New York and the commissioner of transportation and approved by the
19 director of the budget, such repayment agreement to include a repay-
20 ment schedule which states the date or dates on which the city will
21 be notified of advance payments made and the date or dates on which
22 the advance shall be repaid to the state and such other terms and
23 conditions as determined by the director of the budget. The commis-
24 sioner of transportation, or such other person as the commissioner
25 shall designate, shall notify the city of New York in accordance
26 with a schedule to be determined in the repayment agreement of
27 payments made from this appropriation for the construction of the
28 South Bronx oak point link. The city of New York shall reimburse the
29 state of New York in full for all moneys advanced by the state from
30 this appropriation within 30 days of the date of such notification.
31 In the event that the city shall fail to make payment to the state for
32 any payment due and owing in accordance with the repayment agreement
33 entered into by the commissioner and the city of New York, the
34 commissioner or such other person as the commissioner shall desig-
35 nate shall certify to the state comptroller the amount due and owing
36 the state at the end of each period as specified in the repayment
37 agreement for which such amounts have been advanced by the state
38 from this appropriation and the state comptroller shall withhold an
39 equivalent amount from the next succeeding state aid allocated to
40 the city from highway aid, the motor fuel tax and the motor vehicle
41 registration fee distributed pursuant to section 10-c of the highway
42 law, or per capita local assistance pursuant to section 54 of the
43 state finance law subject to the following limitations: prior to
44 withholding amounts due the state from the city, the comptroller
45 shall pay in full any amount due the state of New York municipal
46 bond bank agency, on account of the city's obligation to such agen-
47 cy; the city university construction fund, pursuant to the
48 provisions of the city university construction fund act, the New
49 York city housing development corporation, pursuant to the
50 provisions of the New York city housing development corporation act
51 (article 12 of the private housing finance law); the transit
52 construction fund, pursuant to the provisions of title 9-a of arti-
843 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 cle 5 of the public authorities law; and, pursuant to section 92-e
2 of the state finance law, any amounts necessary for payments to
3 holders of bonds or notes as certified by the municipal assistance
4 corporation for the city of New York created under article 10 of the
5 public authorities law. The comptroller shall give the director of
6 the budget notification of any such payment. Such amount or amounts
7 so withheld by the state comptroller shall be used for the repayment
8 of the state advances hereby authorized. When such amount or amounts
9 are received by the state, it shall credit such amounts against any
10 amounts due and owing by the city on whose account such was withheld
11 and paid (17789212) ... 18,210,000 ................ (re. $3,927,000)
12 The appropriation made by chapter 54, section 1, of the laws of 1992, as
13 amended by chapter 55, section 1, of the laws of 2016, is hereby
14 amended and reappropriated to read:
15 For payment of the state share of the cost of acquisition and
16 construction of the South Bronx oak point link subject to agreements
17 entered into by the commissioner of transportation with the Port
18 Authority of New York and New Jersey and the city of New York and
19 approved by the director of the budget, and to remove clearance
20 restrictions north of Highbridge yard (17OP9212) ...................
21 [11,040,000] 1,291,890 ............................ (re. $1,291,000)
22 Capital Projects Funds - Other
23 Capital Projects Fund - Infrastructure Renewal (Bondable)
24 Rail Service Preservation Purpose
25 By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
26 section 3, of the laws of 1992:
27 For payment of the state share of the costs of the acquisition,
28 construction, reconstruction, improvement or rehabilitation of any
29 railroad capital facility and any capital improvement used in
30 connection therewith, for the acquisition of real property or inter-
31 ests in real property required or expected to be required therefor,
32 pursuant to the provisions of the rebuild New York through the
33 transportation infrastructure renewal bond act of 1983, notwith-
34 standing any inconsistent provisions of law, and pursuant to the
35 provisions of section fourteen-d of the transportation law, as the
36 commissioner may elect for the purpose of improving freight service,
37 and including all costs incidental thereto in accordance with the
38 following schedule.
39 The items shown in the project schedule below shall be for projects
40 with a common purpose and may be interchanged without limitation
41 subject to the approval of the director of the division of the budg-
42 et (17148541) ... ..... 21,000,000 ................ (re. $120,000)
43 RAIL PRESERVATION AND DEVELOPMENT FUND (CCP)
44 Capital Projects Funds - Other
45 Rail Preservation And Development Fund
46 Bond Proceeds Purpose
844 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 8, of the laws of 1980, as amended by chapter 55,
2 section 1, of the laws of 1996:
3 The sum of four hundred million dollars ($400,000,000) or so much
4 thereof as may be necessary is hereby appropriated from the rail
5 preservation and development fund pursuant to the energy conserva-
6 tion through improved transportation bond act of nineteen hundred
7 seventy-nine for payment to the capital projects fund for disburse-
8 ments from such fund pursuant to an appropriation for acquisition,
9 construction, reconstruction, establishment, improvement and reha-
10 bilitation of urban, commuter and intercity rail passenger and rapid
11 transit systems and rail freight capital facilities, for the acqui-
12 sition of real property and interests in real property required or
13 expected to be required therefor and for any capital equipment to be
14 used in connection therewith, including all costs incidental there-
15 to.
16 Notwithstanding the provisions of any general or special law, no
17 moneys shall be available from the rail preservation and development
18 fund until a certificate of approval of availability shall have been
19 issued by the director of the budget, and a copy of such certificate
20 filed with the state comptroller, the chairman of the senate finance
21 committee and the chairman of the assembly ways and means committee.
22 Such certificate may be amended from time to time by the director of
23 the budget, and a copy of each such amendment shall be filed with
24 the state comptroller, the chairman of the senate finance committee
25 and the chairman of the assembly ways and means committee. The
26 director of the budget is hereby authorized to designate to the
27 state comptroller specific appropriations made from the projects
28 fund for purposes for which rail preservation and development fund
29 expenditures are authorized. The state comptroller shall at the
30 commencement of each month certify to the director of the budget,
31 the chairman of the senate finance committee and the chairman of the
32 assembly ways and means committee, the amounts disbursed from the
33 appropriations designated by the director of the budget from the
34 capital projects fund for these disbursements pursuant to appropri-
35 ations from such fund for such purposes for the month preceding such
36 certification and such certifications shall not exceed in the aggre-
37 gate the moneys hereby appropriated (01371310) ...... (re. $149,000)
38 By chapter 50, section 1, of the laws of 1980, as amended by chapter 55,
39 section 1, of the laws of 1996:
40 The sum of one hundred million dollars ($100,000,000) or so much ther-
41 eof as may be necessary is hereby appropriated from the rail preser-
42 vation and development fund pursuant to the energy conservation
43 through improved transportation bond act of nineteen hundred seven-
44 ty-nine for payment to the local assistance account for disburse-
45 ments from such fund pursuant to an appropriation for the recon-
46 struction, improvement, reconditioning and preservation of highways
47 and bridges of the state highway system, for the acquisition of real
48 property and interest in real property required or expected to be
49 required therefor by any county, city, town or village, or two or
50 more of the foregoing acting jointly.
845 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Notwithstanding the provisions of any general or special law, no
2 moneys shall be available from the rail preservation and development
3 fund until a certificate of approval of availability shall have been
4 issued by the director of the budget, and a copy of such certificate
5 filed with the state comptroller, the chairman of the senate finance
6 committee, and the chairman of the assembly ways and means commit-
7 tee. Such certificate may be amended from time to time by the direc-
8 tor of the budget, and a copy of each such amendment shall be filed
9 with the state comptroller, the chairman of the senate finance
10 committee and the chairman of the assembly ways and means committee.
11 The director of the budget is hereby authorized to designate to the
12 state comptroller specific appropriations made from the local
13 assistance fund for purposes for which rail preservation and devel-
14 opment fund expenditures are authorized. The state comptroller shall
15 at the commencement of each month certify to the director of the
16 budget, the chairman of the senate finance committee and the chair-
17 man of the assembly ways and means committee, the amounts disbursed
18 from the appropriations designated by the director of the budget
19 from the local assistance account for these disbursements pursuant
20 to appropriations from such fund for such purposes for the month
21 preceding such certification and such certification shall not exceed
22 in the aggregate the moneys hereby appropriated (01371210) .........
23 ...................................................... (re. $15,000)
24 REBUILD AND RENEW NEW YORK TRANSPORTATION (CCP)
25 Capital Projects Funds - Other
26 Rebuild and Renew New York Transportation Fund
27 Bond Proceeds Purpose
28 By chapter 55, section 1, of the laws of 2005:
29 The sum of $2,900,000,000, or so much thereof as may be necessary and
30 available, is hereby appropriated from the rebuild and renew New
31 York transportation fund as established by section 97-eeee of the
32 state finance law in accordance with the provisions of such section,
33 for payment to the capital projects fund in order to reimburse such
34 fund for disbursements certified by the state comptroller as bonda-
35 ble under the provisions of the rebuild and renew New York transpor-
36 tation bond act of 2005.
37 The director of the budget is hereby authorized to designate to the
38 state comptroller specific appropriations made from the capital
39 projects fund for purposes for which rebuild and renew New York
40 transportation fund expenditures are authorized. The state comp-
41 troller shall at the commencement of each month certify to the
42 director of the budget, the chairman of the senate finance commit-
43 tee, and the chairman of the assembly ways and means committee, the
44 amounts disbursed from the appropriations so designated by the
45 director of the budget from the capital projects fund for such
46 purposes for the month preceding such certification and such certif-
47 ications shall not exceed in the aggregate the moneys hereby appro-
48 priated. A copy of each such certificate shall also be delivered to
846 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 state departments and agencies to which such capital projects fund
2 appropriations are made available.
3 Notwithstanding the provisions of any general or special law, no
4 moneys shall be available from the rebuild and renew New York trans-
5 portation fund until a certificate of approval of availability shall
6 have been issued by the director of the budget, and a copy of such
7 certificate of approval filed with the state comptroller, the chair-
8 man of the senate finance committee and the chairman of the assembly
9 ways and means committee. Such certificate may be amended from time
10 to time by the director of the budget, and a copy of each such
11 amendment shall be filed with the state comptroller, the chairman of
12 the senate finance committee and the chairman of the assembly ways
13 and means committee (17010510) .....................................
14 2,900,000,000 ................................... (re. $512,603,000)
15 ROAD AND BRIDGE IMPROVEMENTS (BONDABLE) (CCP)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Federal Aid Highways Purpose
19 By chapter 54, section 1, of the laws of 1990:
20 For the state share of highway projects to be reimbursed from the
21 accelerated capacity and transportation improvements fund pursuant
22 to the provisions of the accelerated capacity and transportation
23 improvements of the nineties bond act (17E19020) ...................
24 10,300,000 .......................................... (re. $188,000)
25 By chapter 54, section 1, of the laws of 1989:
26 For the state share of highway projects to be reimbursed from the
27 accelerated capacity and transportation improvements fund pursuant
28 to the provisions of that bond act (17E18920) ......................
29 10,300,000 ........................................... (re. $29,000)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Highway Facilities Purpose
33 By chapter 54, section 1, of the laws of 1992:
34 For the costs, pursuant to the provisions of the accelerated capacity
35 and transportation improvements of the nineties bond act, of capital
36 projects, advanced with or without federal aid, to be reimbursed
37 from bond fund proceeds for the improvement of state highways, thru-
38 ways and other highway facilities including bridges, other struc-
39 tures, and appurtenances.
40 For 80 percent of the costs of capital local bridge projects advanced
41 pursuant to the provisions of the accelerated capacity and transpor-
42 tation improvements of the nineties bond act. The remaining 20
43 percent share of project costs shall be paid by the municipality
44 under whose jurisdiction the project is constructed, reconstructed
45 or rehabilitated.
847 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Project costs funded from this appropriation may include, but shall
2 not be limited to, construction, reconstruction, reconditioning and
3 preservation, and the acquisition of property.
4 For the payment of reimbursements to the engineering services fund for
5 the cost of the engineering services of the department of transpor-
6 tation, including fringe benefits, and the contract services
7 provided by private firms, for activities including but not limited
8 to the preparation of designs, plans, specifications and estimates;
9 construction management and supervision; and appraisals, surveys,
10 testing and environmental impact statements for transportation
11 projects.
12 Notwithstanding any other provision of law, the commissioner of trans-
13 portation is authorized to acquire any necessary land not on the
14 state highway system for the purpose of local bridge projects
15 financed through this appropriation at the request of the locality
16 under whose jurisdiction the project is constructed, reconstructed
17 or rehabilitated. The items shown in the project schedule below
18 shall be for projects with a common purpose and may be interchanged
19 without limitation subject to the approval of the director of the
20 budget.
21 Funds from this appropriation may be made available for the payment of
22 liabilities incurred prior to April 1, 1992 (17F19222) .............
23 514,165,000 ....................................... (re. $9,164,000)
24 By chapter 54, section 1, of the laws of 1991:
25 For the costs, pursuant to the provisions of the accelerated capacity
26 and transportation improvements of the nineties bond act, of capital
27 projects, advanced with or without federal aid, to be reimbursed
28 from bond fund proceeds for the improvement of state highways, thru-
29 ways and other highway facilities including bridges, other struc-
30 tures, and appurtenances.
31 For 80 percent of the costs of capital local bridge projects advanced
32 pursuant to the provisions of the accelerated capacity and transpor-
33 tation improvements of the nineties bond act. The remaining 20
34 percent share of project costs shall be paid by the municipality
35 under whose jurisdiction the project is constructed, reconstructed
36 or rehabilitated.
37 Project costs funded from this appropriation may include, but shall
38 not be limited to, construction, reconstruction, reconditioning and
39 preservation, and the acquisition of property.
40 For the payment of reimbursements to the engineering services fund for
41 the cost of the engineering services of the department of transpor-
42 tation, including fringe benefits, and the contract services
43 provided by private firms, for activities including but not limited
44 to the preparation of designs, plans, specifications and estimates;
45 construction management and supervision; and appraisals, surveys,
46 testing and environmental impact statements for transportation
47 projects.
48 Notwithstanding any other provision of law, the commissioner of trans-
49 portation is authorized to acquire any necessary land not on the
50 state highway system for the purpose of local bridge projects
51 financed through this appropriation at the request of the locality
848 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 under whose jurisdiction the project is constructed, reconstructed
2 or rehabilitated.
3 The items shown in the project schedule below shall be for projects
4 with a common purpose and may be interchanged without limitation
5 subject to the approval of the director of the division of the budg-
6 et.
7 Funds from this appropriation may be made available for the payment of
8 liabilities incurred prior to April 1, 1991 (17F19122) ... .......
9 660,400,000 ....................................... (re. $7,119,000)
10 For the costs, pursuant to the provisions of the accelerated capacity
11 and transportation improvements of the nineties bond act, of capital
12 projects, advanced with or without federal aid, to be reimbursed
13 from bond fund proceeds for the improvement of state highways, thru-
14 ways and other highway facilities including bridges, other struc-
15 tures, and appurtenances.
16 Project costs funded from this appropriation may include, but shall
17 not be limited to, construction, reconstruction, reconditioning and
18 preservation, and the acquisition of property.
19 For the payment of reimbursements to the engineering services fund for
20 the cost of the engineering services of the department of transpor-
21 tation, including fringe benefits, and the contract services
22 provided by private firms, for activities including but not limited
23 to the preparation of designs, plans, specifications and estimates;
24 construction management and supervision; and appraisals, surveys,
25 testing and environmental impact statements for transportation
26 projects.
27 Notwithstanding any other provision of law, the commissioner of trans-
28 portation is authorized to acquire any necessary land not on the
29 state highway system for the purpose of local bridge projects
30 financed through this appropriation at the request of the locality
31 under whose jurisdiction the project is constructed, reconstructed
32 or rehabilitated.
33 The items shown in the project schedule below shall be for projects
34 with a common purpose and may be interchanged without limitation
35 subject to the approval of the director of the division of the budg-
36 et.
37 Funds from this appropriation may be made available for the payment of
38 liabilities incurred prior to April 1, 1991 (17F19122) ... .....
39 1,716,000 ......................................... (re. $1,716,000)
40 By chapter 54, section 1, of the laws of 1990, as amended by chapter
41 947, section 6, of the laws of 1990:
42 For the costs, pursuant to the provisions of the accelerated capacity
43 and transportation improvements of the nineties bond act, of capital
44 projects to be reimbursed from bond fund proceeds for the improve-
45 ment of state highways, thruways and other highway facilities
46 including bridges, other structures, and appurtenances.
47 Notwithstanding any other provisions of law, the New York State Thru-
48 way shall be considered a state highway for the purposes of this
49 appropriation. Prior to the approval of a certificate of approval of
50 availability for projects advanced by the New York State Thruway
51 Authority, the director of the budget shall approve a repayment
849 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 agreement between the department of transportation and the New York
2 State Thruway Authority. The state comptroller is hereby authorized
3 and directed to deposit repayments from the Thruway Authority pursu-
4 ant to such agreement to the credit of the capital projects fund.
5 For 80 percent of the costs of capital local bridge projects advanced
6 pursuant to the provisions of the accelerated capacity and transpor-
7 tation improvements of the nineties bond act. The remaining 20
8 percent share of project costs shall be paid by the municipality
9 under whose jurisdiction the project is constructed, reconstructed
10 or rehabilitated.
11 Project costs funded from this appropriation may include, but shall
12 not be limited to, construction, reconstruction, reconditioning and
13 preservation, and the acquisition of property.
14 For the payment of reimbursements to the engineering services fund for
15 the cost of the engineering services of the department of transpor-
16 tation, including fringe benefits, and the contract services
17 provided by private firms, for activities including but not limited
18 to the preparation of designs, plans, specifications and estimates;
19 construction management and supervision; and appraisals, surveys,
20 testing and environmental impact statements for transportation
21 projects.
22 Notwithstanding any other provision of law, the commissioner of trans-
23 portation is authorized to acquire any necessary land not on the
24 state highway system for the purpose of local bridge projects
25 financed through this appropriation at the request of the locality
26 under whose jurisdiction the project is constructed, reconstructed
27 or rehabilitated.
28 The items shown in the project schedule below shall be for projects
29 with a common purpose and may be interchanged without limitation
30 subject to the approval of the director of the division of the budg-
31 et.
32 Funds from this appropriation may be made available for the payment of
33 liabilities incurred prior to April 1, 1990 (17F19022) ... .....
34 617,900,000 ....................................... (re. $2,586,000)
35 By chapter 54, section 1, of the laws of 1989:
36 For the costs, pursuant to the provisions of the accelerated capacity
37 and transportation improvements of the nineties bond act of 1988, of
38 capital projects to be reimbursed from bond fund proceeds for the
39 improvement of state highways, and other highway facilities includ-
40 ing bridges, other structures, and appurtenances.
41 For 80 percent of the costs of capital local bridge projects advanced
42 pursuant to the provisions of the accelerated capacity and transpor-
43 tation improvements of the nineties bond act of 1988. The remaining
44 20 percent share of project costs shall be paid by the municipality
45 under whose jurisdiction the project is constructed, reconstructed
46 or rehabilitated.
47 Project costs funded from this appropriation may include, but shall
48 not be limited to, construction, reconstruction, reconditioning and
49 preservation, and the acquisition of property.
50 For the payment of reimbursements to the engineering services fund for
51 the cost of the engineering services of the department of transpor-
850 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tation, including fringe benefits, and the contract services
2 provided by private firms, for activities including but not limited
3 to the preparation of designs, plans, specifications and estimates;
4 construction management and supervision; and appraisals, surveys,
5 testing and environmental impact statements for transportation
6 projects.
7 Notwithstanding any other provision of law, the commissioner of trans-
8 portation is authorized to acquire any necessary land not on the
9 state highway system for the purpose of local bridge projects
10 financed through this appropriation at the request of the locality
11 under whose jurisdiction the project is constructed, reconstructed
12 or rehabilitated.
13 The items shown in the project schedule below shall be for projects
14 with a common purpose and may be interchanged without limitation
15 subject to the approval of the director of the division of the budg-
16 et.
17 Funds from this appropriation may be made available for the payment of
18 liabilities incurred prior to April 1, 1989 (17F18911) ... .....
19 715,219,000 ......................................... (re. $838,000)
20 By chapter 261, section 57, of the laws of 1988, as amended by chapter
21 54, section 3, of the laws of 1989:
22 The sum of four hundred seventy million dollars ($470,000,000), is
23 hereby appropriated from the capital projects fund to the department
24 of transportation for the cost of state highway capital projects
25 advanced with or without federal aid including bridges, other struc-
26 tures and appurtenances and municipal bridge improvements advanced
27 pursuant to the accelerated capacity and transportation improvements
28 of the nineties bond act. This appropriation shall be reimbursed
29 from proceeds from the issuance of bonds pursuant to section fifty
30 of chapter 261, of the laws of nineteen hundred eighty-eight.
31 Project costs funded from this appropriation may include, but shall
32 not be limited to, preliminary planning and feasibility studies;
33 survey and design; acquisition of property; construction, recon-
34 struction, capacity improvement, replacement, reconditioning and
35 preservation; the supervision and inspection thereof; and the cost
36 of engineering services provided by private firms. No expenditure
37 shall be made from this appropriation for personal services and
38 expenses other than consulting services.
39 Notwithstanding the provisions of any general or special law, no
40 moneys shall be available from the accelerated capacity and trans-
41 portation improvements fund until a certificate of approval of
42 availability shall have been issued by the director of the budget,
43 and a copy of such certificate filed with the state comptroller, the
44 chairman of the senate finance committee and the chairman of the
45 assembly ways and means committee. Such certificate may be amended
46 from time to time by the director of the budget, and a copy of each
47 such amendment shall be filed with the state comptroller, the chair-
48 man of the senate finance committee and the chairman of the assembly
49 ways and means committee (17658811) ................................
50 470,000,000 ....................................... (re. $1,369,000)
851 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 SMALL AND MINORITY AND WOMEN OWNED SMALL BUSINESS ASSISTANCE (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Mass Transit Purpose
5 By chapter 54, section 1, of the laws of 1993, as amended by chapter 55,
6 section 1, of the laws of 2016:
7 For services and expenses of a bonding guarantee assistance program
8 for transportation-related purposes pursuant to section 1838 of the
9 public authorities law enacted pursuant to chapter 56 of the laws of
10 1993. The director of the budget may apportion all or a portion of
11 these funds to the job development authority (17BG93MT) ............
12 3,500,000 ......................................... (re. $3,500,000)
13 For services and expenses of a revolving fund for working capital
14 loans to small and minority and women-owned firms engaged in trans-
15 portation construction and reconstruction projects. The director of
16 the budget may apportion all or a portion of these funds to the
17 urban development corporation (17WC93MT) ...........................
18 1,500,000 ......................................... (re. $1,500,000)
19 Capital Projects Funds - Other
20 Dedicated Highway and Bridge Trust Fund
21 Non-Federal Aided Highway Purpose
22 By chapter 54, section 1, of the laws of 1993, as amended by chapter
23 259, section 4, of the laws of 1993:
24 For services and expenses of a bonding guarantee assistance program
25 for transportation related purposes pursuant to section 1838 of the
26 public authorities law enacted pursuant to chapter 56 of the laws of
27 1993. The director of the budget may apportion all or a portion of
28 such funds to the job development authority (17309322) .............
29 3,500,000 ......................................... (re. $3,500,000)
30 SPECIAL RAIL AND AVIATION PROGRAM (CCP)
31 Capital Projects Funds - Other
32 Capital Projects Fund
33 Rail Service Preservation Purpose
34 The appropriation made by chapter 55, section 1, of the laws of 1996, as
35 amended by chapter 55, section 1, of the laws of 2016, is hereby
36 amended and reappropriated to read:
37 For the payment of the costs of construction, reconstruction, improve-
38 ment, reconditioning and preservation of rail freight and rail
39 passenger facilities, pursuant to the provisions of section 14-j of
40 the transportation law, including, but not limited to, preparation
41 of designs, plans and specifications, and acquisition of real prop-
42 erty pursuant to a memorandum of understanding entered into pursuant
43 to chapter 56 of the laws of 1993 (17SR9641) .......................
44 [7,500,000] 4,137,720 ............................. (re. $4,137,000)
852 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 1995, as
2 amended by chapter 55, section 1, of the laws of 2016, is hereby
3 amended and reappropriated to read:
4 For the payment of the costs of construction, reconstruction, improve-
5 ment, reconditioning and preservation of rail freight and rail
6 passenger facilities, pursuant to the provisions of section 14-j of
7 the transportation law, including, but not limited to, preparation
8 of designs, plans and specifications, and acquisition of real prop-
9 erty notwithstanding any general or special law (17SR9541) .........
10 [7,500,000] 114,275 .................................. (re. $41,000)
11 The appropriation made by chapter 54, section 1, of the laws of 1995, as
12 amended by chapter 55, section 1, of the laws of 2016, is hereby
13 amended and reappropriated to read:
14 For the payment of the costs of construction, reconstruction, improve-
15 ment, reconditioning and preservation of rail freight and rail
16 passenger facilities, pursuant to the provisions of section 14-j of
17 the transportation law and in accordance with the schedule below,
18 including but not limited to, preparation of designs, plans and
19 specifications, and acquisition of real property (17SP9541) ........
20 [5,000,000] 474,243 ................................. (re. $474,000)
21 project schedule
22 For services and expenses of the Amsterdam
23 Local Waterfront Revitalization Project
24 including but not limited to the
25 construction of an access route traversing
26 Conrail tracks ............................... 1,000,000
27 For payment to Alcibiades Ltd. for services
28 and expenses of the Livonia, Avon, and
29 Lakeville Railroad, Rochester Cluster
30 South project including but not limited to
31 the rehabilitation of track and structures ..... 817,000
32 For payment to the City of Rochester for
33 services and expenses of the Rochester
34 Alternate Transportation Systems Study for
35 the study of feasible alternative modes of
36 transportation in the Rochester area
37 including but not limited to light rail ........ 300,000
38 For payment to the City of Rochester for
39 services and expenses of the Buffalo
40 Road/West Avenue and Chili Avenue projects
41 including but not limited to the partial
42 removal of a bridge, lighting, bridge
43 abutments and safety improvements to the
44 railroad under pass ............................ 600,000
45 For payment to the City of Rochester for
46 services and expenses of the state/St.
47 Paul Railroad Underpass Improvement
48 project including but not limited to safe-
49 ty enhancements ................................. 83,000
853 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment to the Onondaga County Indus-
2 trial Development Agency for design and
3 installation of new trackage and station
4 platforms, track realignment, track reha-
5 bilitation, track removal, and other
6 related work, including bridgework and
7 right-of-way purchases for the Syracuse
8 Intermodal Center ............................ 1,500,000
9 For payment to the Onondaga County Indus-
10 trial Development Agency for services and
11 expenses of the Syracuse Intermodal Center
12 including but not limited to construction ...... 400,000
13 For payment to the Central New York Regional
14 Transportation Authority for services and
15 expenses of the Syracuse Intermodal Center
16 including but not limited to rail improve-
17 ments .......................................... 300,000
18 TRANSPORTATION BONDABLE (CCP)
19 Capital Projects Funds - Other
20 Capital Projects Fund - Rebuild and Renew (Bondable)
21 Aviation Purpose
22 By chapter 55, section 1, of the laws of 2009:
23 For the costs, pursuant to the rebuild and renew New York transporta-
24 tion bond act of 2005 and article 22 of the transportation law, of
25 capital projects to be reimbursed from bond fund proceeds for the
26 planning and design, construction, reconstruction, replacement,
27 improvement, reconditioning, rehabilitation and preservation,
28 including the acquisition of real property and interests therein
29 required or expected to be required in connection therewith, of
30 airports and aviation facilities, equipment and related projects
31 exclusive of those airports and facilities under the jurisdiction of
32 the port authority of New York and New Jersey or operated by the
33 state of New York.
34 Costs may include highways and bridges either on or off the state
35 highway system necessary or reasonably expected to be necessary as a
36 project component or incidental to projects otherwise authorized
37 herein and by the rebuild and renew New York transportation bond act
38 of 2005.
39 For payment of engineering services, including reimbursements to the
40 dedicated highway and bridge trust fund of the department of trans-
41 portation, including but not limited to personal services, nonper-
42 sonal services, fringe benefits, and the contract services provided
43 by private firms, for activities including but not limited to the
44 preparation of designs, plans, specifications and estimates;
45 construction management and supervision; and appraisals, surveys,
46 testing and environmental impact statements for transportation.
47 For the payment of liabilities incurred prior to April 1, 2009
48 (17030914) ... 16,400,000 ......................... (re. $2,394,000)
854 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2008:
2 For the costs, pursuant to the rebuild and renew New York transporta-
3 tion bond act of 2005 and article 22 of the transportation law, of
4 capital projects to be reimbursed from bond fund proceeds for the
5 planning and design, construction, reconstruction, replacement,
6 improvement, reconditioning, rehabilitation and preservation,
7 including the acquisition of real property and interests therein
8 required or expected to be required in connection therewith, of
9 airports and aviation facilities, equipment and related projects
10 exclusive of those airports and facilities under the jurisdiction of
11 the port authority of New York and New Jersey or operated by the
12 state of New York.
13 Costs may include highways and bridges either on or off the state
14 highway system necessary or reasonably expected to be necessary as a
15 project component or incidental to projects otherwise authorized
16 herein and by the rebuild and renew New York transportation bond act
17 of 2005.
18 For payment of engineering services, including reimbursements to the
19 dedicated highway and bridge trust fund of the department of trans-
20 portation, including but not limited to personal services, nonper-
21 sonal services, fringe benefits, and the contract services provided
22 by private firms, for activities including but not limited to the
23 preparation of designs, plans, specifications and estimates;
24 construction management and supervision; and appraisals, surveys,
25 testing and environmental impact statements for transportation.
26 For the payment of liabilities incurred prior to April 1, 2008
27 (17030814) ... 15,000,000 ......................... (re. $3,742,000)
28 By chapter 55, section 1, of the laws of 2007:
29 For the costs, pursuant to the rebuild and renew New York transporta-
30 tion bond act of 2005 and article 22 of the transportation law, of
31 capital projects to be reimbursed from bond fund proceeds for the
32 planning and design, construction, reconstruction, replacement,
33 improvement, reconditioning, rehabilitation and preservation,
34 including the acquisition of real property and interests therein
35 required or expected to be required in connection therewith, of
36 airports and aviation facilities, equipment and related projects
37 exclusive of those airports and facilities under the jurisdiction of
38 the port authority of New York and New Jersey or operated by the
39 state of New York. Costs may include highways and bridges either on
40 or off the state highway system necessary or reasonably expected to
41 be necessary as a project component or incidental to projects other-
42 wise authorized herein and by the rebuild and renew New York trans-
43 portation bond act of 2005.
44 For payment of engineering services, including reimbursements to the
45 dedicated highway and bridge trust fund of the department of trans-
46 portation, including but not limited to personal services, nonper-
47 sonal services, fringe benefits, and the contract services provided
48 by private firms, for activities including but not limited to the
49 preparation of designs, plans, specifications and estimates;
50 construction management and supervision; and appraisals, surveys,
51 testing and environmental impact statements for transportation.
855 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the payment of liabilities incurred prior to April 1, 2007
2 (17030714) ... 15,000,000 ......................... (re. $1,776,000)
3 By chapter 55, section 1, of the laws of 2006:
4 For the costs, pursuant to the rebuild and renew New York transporta-
5 tion bond act of 2005 and article 22 of the transportation law, of
6 capital projects to be reimbursed from bond fund proceeds for the
7 planning and design, construction, reconstruction, replacement,
8 improvement, reconditioning, rehabilitation and preservation,
9 including the acquisition of real property and interests therein
10 required or expected to be required in connection therewith, of
11 airports and aviation facilities, equipment and related projects
12 exclusive of those airports and facilities under the jurisdiction of
13 the port authority of New York and New Jersey or operated by the
14 state of New York.
15 Costs may include highways and bridges either on or off the state
16 highway system necessary or reasonably expected to be necessary as a
17 project component or incidental to projects otherwise authorized
18 herein and by the rebuild and renew New York transportation bond act
19 of 2005.
20 For payment of engineering services, including reimbursements to the
21 dedicated highway and bridge trust fund of the department of trans-
22 portation, including but not limited to personal services, nonper-
23 sonal services, fringe benefits, and the contract services provided
24 by private firms, for activities including but not limited to the
25 preparation of designs, plans, specifications and estimates;
26 construction management and supervision; and appraisals, surveys,
27 testing and environmental impact statements for transportation.
28 For the payment of liabilities incurred prior to April 1, 2006
29 (17030614) ... 15,000,000 ........................... (re. $636,000)
30 By chapter 55, section 1, of the laws of 2005:
31 For the costs, pursuant to the rebuild and renew New York transporta-
32 tion bond act of 2005 and article 22 of the transportation law, of
33 capital projects to be reimbursed from bond fund proceeds for the
34 planning and design, construction, reconstruction, replacement,
35 improvement, reconditioning, rehabilitation and preservation,
36 including the acquisition of real property and interests therein
37 required or expected to be required in connection therewith, of
38 airports and aviation facilities, equipment and related projects
39 exclusive of those airports and facilities under the jurisdiction of
40 the port authority of New York and New Jersey or operated by the
41 state of New York.
42 The funds made available through this appropriation shall be utilized
43 for the payment of the costs of eligible projects in accordance with
44 a memorandum of understanding entered into between the governor, the
45 majority leader of the senate and the speaker of the assembly, or
46 their designees, pursuant to article 22 of the transportation law.
47 Costs may include highways and bridges either on or off the state
48 highway system necessary or reasonably expected to be necessary as a
49 project component or incidental to projects otherwise authorized
856 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 herein and by the rebuild and renew New York transportation bond act
2 of 2005.
3 For engineering services of the department of transportation, includ-
4 ing personal services, nonpersonal services, fringe benefits and the
5 contract services provided by private firms, including, but not
6 limited to, the preparation of designs, plans, specifications and
7 estimates; construction management and supervision; and appraisals,
8 surveys, testing and environmental impact statements for transporta-
9 tion.
10 No part of this appropriation shall be made available for the payment
11 of liabilities incurred prior to the approval of the rebuild and
12 renew New York transportation bond act of 2005 by the voters at the
13 general election to be held in November of 2005 (17030514) .........
14 15,000,000 ........................................ (re. $1,486,000)
15 Capital Projects Funds - Other
16 Capital Projects Fund - Rebuild and Renew (Bondable)
17 Canals and Waterways Purpose
18 By chapter 55, section 1, of the laws of 2009:
19 For the costs, pursuant to the provisions of the rebuild and renew New
20 York transportation bond act of 2005 and article 22 of the transpor-
21 tation law, of capital projects to be reimbursed from bond fund
22 proceeds for the planning and design, construction, reconstruction,
23 replacement, improvement, reconditioning, rehabilitation and preser-
24 vation, including the acquisition of real property and interests
25 therein required or expected to be required in connection therewith,
26 of: the canal system and appurtenances thereto; moveable bridges
27 that cross over the canal system; and pedestrian and/or bicycle
28 trails, pathways and bridges serving transportation needs. Costs may
29 include highways and bridges either on or off the state highway
30 system necessary or reasonably expected to be necessary as a project
31 component or incidental to projects otherwise authorized herein and
32 by the rebuild and renew New York transportation bond act of 2005.
33 For payment of engineering services, including reimbursements to the
34 dedicated highway and bridge trust fund of the department of trans-
35 portation, including but not limited to personal services, nonper-
36 sonal services, fringe benefits, and the contract services provided
37 by private firms, for activities including but not limited to the
38 preparation of designs, plans, specifications and estimates;
39 construction management and supervision; and appraisals, surveys,
40 testing and environmental impact statements for transportation
41 projects, and to the canal corporation for the cost of the engineer-
42 ing services of the corporation or the thruway authority, including
43 fringe benefits, and the contract services provided by private
44 firms, for activities including but not limited to the preparation
45 of designs, plans, specifications and estimates; construction
46 management and supervision; and appraisals, surveys, testing and
47 environmental impact statements for transportation projects.
48 For the payment of liabilities incurred prior to April 1, 2009
49 (17020916) ... 10,000,000 ......................... (re. $8,852,000)
857 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2008:
2 For the costs, pursuant to the provisions of the rebuild and renew New
3 York transportation bond act of 2005 and article 22 of the transpor-
4 tation law, of capital projects to be reimbursed from bond fund
5 proceeds for the planning and design, construction, reconstruction,
6 replacement, improvement, reconditioning, rehabilitation and preser-
7 vation, including the acquisition of real property and interests
8 therein required or expected to be required in connection therewith,
9 of: the canal system and appurtenances thereto; moveable bridges
10 that cross over the canal system; and pedestrian and/or bicycle
11 trails, pathways and bridges serving transportation needs. Costs may
12 include highways and bridges either on or off the state highway
13 system necessary or reasonably expected to be necessary as a project
14 component or incidental to projects otherwise authorized herein and
15 by the rebuild and renew New York transportation bond act of 2005.
16 For payment of engineering services, including reimbursements to the
17 dedicated highway and bridge trust fund of the department of trans-
18 portation, including but not limited to personal services, nonper-
19 sonal services, fringe benefits, and the contract services provided
20 by private firms, for activities including but not limited to the
21 preparation of designs, plans, specifications and estimates;
22 construction management and supervision; and appraisals, surveys,
23 testing and environmental impact statements for transportation
24 projects, and to the canal corporation for the cost of the engineer-
25 ing services of the corporation or the thruway authority, including
26 fringe benefits, and the contract services provided by private
27 firms, for activities including but not limited to the preparation
28 of designs, plans, specifications and estimates; construction
29 management and supervision; and appraisals, surveys, testing and
30 environmental impact statements for transportation projects.
31 For the payment of liabilities incurred prior to April 1, 2008
32 (17020816) ... 10,000,000 ......................... (re. $2,383,000)
33 By chapter 55, section 1, of the laws of 2007:
34 For the costs, pursuant to the provisions of the rebuild and renew New
35 York transportation bond act of 2005 and article 22 of the transpor-
36 tation law, of capital projects to be reimbursed from bond fund
37 proceeds for the planning and design, construction, reconstruction,
38 replacement, improvement, reconditioning, rehabilitation and preser-
39 vation, including the acquisition of real property and interests
40 therein required or expected to be required in connection therewith,
41 of: the canal system and appurtenances thereto; moveable bridges
42 that cross over the canal system; and pedestrian and/or bicycle
43 trails, pathways and bridges serving transportation needs. Costs may
44 include highways and bridges either on or off the state highway
45 system necessary or reasonably expected to be necessary as a project
46 component or incidental to projects otherwise authorized herein and
47 by the rebuild and renew New York transportation bond act of 2005.
48 For payment of engineering services, including reimbursements to the
49 dedicated highway and bridge trust fund of the department of trans-
50 portation, including but not limited to personal services, nonper-
51 sonal services, fringe benefits, and the contract services provided
858 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 by private firms, for activities including but not limited to the
2 preparation of designs, plans, specifications and estimates;
3 construction management and supervision; and appraisals, surveys,
4 testing and environmental impact statements for transportation
5 projects, and to the canal corporation for the cost of the engineer-
6 ing services of the corporation or the thruway authority, including
7 fringe benefits, and the contract services provided by private
8 firms, for activities including but not limited to the preparation
9 of designs, plans, specifications and estimates; construction
10 management and supervision; and appraisals, surveys, testing and
11 environmental impact statements for transportation projects.
12 For the payment of liabilities incurred prior to April 1, 2007
13 (17020716) ... 10,000,000 ......................... (re. $4,054,000)
14 By chapter 55, section 1, of the laws of 2006:
15 For the costs, pursuant to the provisions of the rebuild and renew New
16 York transportation bond act of 2005 and article 22 of the transpor-
17 tation law, of capital projects to be reimbursed from bond fund
18 proceeds for the planning and design, construction, reconstruction,
19 replacement, improvement, reconditioning, rehabilitation and preser-
20 vation, including the acquisition of real property and interests
21 therein required or expected to be required in connection therewith,
22 of: the canal system and appurtenances thereto; moveable bridges
23 that cross over the canal system; and pedestrian and/or bicycle
24 trails, pathways and bridges serving transportation needs. Costs may
25 include highways and bridges either on or off the state highway
26 system necessary or reasonably expected to be necessary as a project
27 component or incidental to projects otherwise authorized herein and
28 by the rebuild and renew New York transportation bond act of 2005.
29 For payment of engineering services, including reimbursements to the
30 dedicated highway and bridge trust fund of the department of trans-
31 portation, including but not limited to personal services, nonper-
32 sonal services, fringe benefits, and the contract services provided
33 by private firms, for activities including but not limited to the
34 preparation of designs, plans, specifications and estimates;
35 construction management and supervision; and appraisals, surveys,
36 testing and environmental impact statements for transportation
37 projects, and to the canal corporation for the cost of the engineer-
38 ing services of the corporation or the thruway authority, including
39 fringe benefits, and the contract services provided by private
40 firms, for activities including but not limited to the preparation
41 of designs, plans, specifications and estimates; construction
42 management and supervision; and appraisals, surveys, testing and
43 environmental impact statements for transportation projects.
44 For the payment of liabilities incurred prior to April 1, 2006
45 (17020616) ... 10,000,000 ........................... (re. $850,000)
46 Capital Projects Funds - Other
47 Capital Projects Fund - Rebuild and Renew (Bondable)
48 Highway Facilities Purpose
49 By chapter 55, section 1, of the laws of 2009:
859 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For the costs, pursuant to the provisions of the rebuild and renew New
2 York transportation bond act of 2005 and article 22 of the transpor-
3 tation law, of capital projects to be reimbursed from bond fund
4 proceeds for the planning and design, construction, reconstruction,
5 replacement, improvement, reconditioning, rehabilitation and preser-
6 vation, including the acquisition of real property and interests
7 therein required or expected to be required in connection therewith,
8 of: state highways, bridges and parkways; border crossing enhance-
9 ments either on or off the state highway system; and the improvement
10 and/or elimination of highway-railroad grade crossings either on or
11 off the state highway system.
12 For payment of engineering services, including reimbursements to the
13 dedicated highway and bridge trust fund of the department of trans-
14 portation, including but not limited to personal services, nonper-
15 sonal services, fringe benefits, and the contract services provided
16 by private firms, for activities including but not limited to the
17 preparation of designs, plans, specifications and estimates;
18 construction management and supervision; and appraisals, surveys,
19 testing and environmental impact statements for transportation
20 projects.
21 For the payment of liabilities incurred prior to April 1, 2009
22 (17010911) ... 168,600,000 ........................ (re. $4,066,000)
23 By chapter 55, section 1, of the laws of 2008:
24 For the costs, pursuant to the provisions of the rebuild and renew New
25 York transportation bond act of 2005 and article 22 of the transpor-
26 tation law, of capital projects to be reimbursed from bond fund
27 proceeds for the planning and design, construction, reconstruction,
28 replacement, improvement, reconditioning, rehabilitation and preser-
29 vation, including the acquisition of real property and interests
30 therein required or expected to be required in connection therewith,
31 of: state highways, bridges and parkways; border crossing enhance-
32 ments either on or off the state highway system; and the improvement
33 and/or elimination of highway-railroad grade crossings either on or
34 off the state highway system.
35 For payment of engineering services, including reimbursements to the
36 dedicated highway and bridge trust fund of the department of trans-
37 portation, including but not limited to personal services, nonper-
38 sonal services, fringe benefits, and the contract services provided
39 by private firms, for activities including but not limited to the
40 preparation of designs, plans, specifications and estimates;
41 construction management and supervision; and appraisals, surveys,
42 testing and environmental impact statements for transportation
43 projects.
44 For the payment of liabilities incurred prior to April 1, 2008
45 (17010811) ... 275,000,000 ........................ (re. $2,655,000)
46 By chapter 55, section 1, of the laws of 2007:
47 For the costs, pursuant to the provisions of the rebuild and renew New
48 York transportation bond act of 2005 and article 22 of the transpor-
49 tation law, of capital projects to be reimbursed from bond fund
50 proceeds for the planning and design, construction, reconstruction,
860 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 replacement, improvement, reconditioning, rehabilitation and preser-
2 vation, including the acquisition of real property and interests
3 therein required or expected to be required in connection therewith,
4 of: state highways, bridges and parkways; border crossing enhance-
5 ments either on or off the state highway system; and the improvement
6 and/or elimination of highway-railroad grade crossings either on or
7 off the state highway system.
8 For payment of engineering services, including reimbursements to the
9 dedicated highway and bridge trust fund of the department of trans-
10 portation, including but not limited to personal services, nonper-
11 sonal services, fringe benefits, and the contract services provided
12 by private firms, for activities including but not limited to the
13 preparation of designs, plans, specifications and estimates;
14 construction management and supervision; and appraisals, surveys,
15 testing and environmental impact statements for transportation
16 projects.
17 For the payment of liabilities incurred prior to April 1, 2007
18 (17010711) ... 290,000,000 ........................ (re. $6,711,000)
19 By chapter 55, section 1, of the laws of 2006:
20 For the costs, pursuant to the provisions of the rebuild and renew New
21 York transportation bond act of 2005 and article 22 of the transpor-
22 tation law, of capital projects to be reimbursed from bond fund
23 proceeds for the planning and design, construction, reconstruction,
24 replacement, improvement, reconditioning, rehabilitation and preser-
25 vation, including the acquisition of real property and interests
26 therein required or expected to be required in connection therewith,
27 of: state highways, bridges and parkways; border crossing enhance-
28 ments either on or off the state highway system; and the improvement
29 and/or elimination of highway-railroad grade crossings either on or
30 off the state highway system.
31 For payment of engineering services, including reimbursements to the
32 dedicated highway and bridge trust fund of the department of trans-
33 portation, including but not limited to personal services, nonper-
34 sonal services, fringe benefits, and the contract services provided
35 by private firms, for activities including but not limited to the
36 preparation of designs, plans, specifications and estimates;
37 construction management and supervision; and appraisals, surveys,
38 testing and environmental impact statements for transportation
39 projects.
40 For the payment of liabilities incurred prior to April 1, 2006
41 (17010611) ... 235,000,000 ........................ (re. $1,057,000)
42 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
43 section 1, of the laws of 2006:
44 For the costs, pursuant to the provisions of the rebuild and renew New
45 York transportation bond act of 2005 and article 22 of the transpor-
46 tation law, of capital projects to be reimbursed from bond fund
47 proceeds for the planning and design, construction, reconstruction,
48 replacement, improvement, reconditioning, rehabilitation and preser-
49 vation, including the acquisition of real property and interests
50 therein required or expected to be required in connection therewith,
861 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of: state highways, bridges and parkways; border crossing enhance-
2 ments either on or off the state highway system; and the improvement
3 and/or elimination of highway-railroad grade crossings either on or
4 off the state highway system.
5 For engineering services, including personal services, nonpersonal
6 services, fringe benefits and the contract services provided by
7 private firms, including, but not limited to, the preparation of
8 designs, plans, specifications and estimates; construction manage-
9 ment and supervision; and appraisals, surveys, testing and environ-
10 mental impact statements for transportation projects.
11 For capital project management and traffic and safety, including
12 personal services, nonpersonal services, fringe benefits and the
13 contract services provided by private firms.
14 For real estate services, including personal services, nonpersonal
15 services, fringe benefits and the contract services provided by
16 private firms.
17 No part of this appropriation shall be made available for the payment
18 of liabilities incurred prior to the approval of the rebuild and
19 renew New York transportation bond act of 2005 by the voters at the
20 general election to be held in November of 2005 (17010511) .........
21 170,000,000 ....................................... (re. $3,508,000)
22 Capital Projects Funds - Other
23 Capital Projects Fund - Rebuild and Renew (Bondable)
24 Mass Transit Purpose
25 By chapter 55, section 1, of the laws of 2009:
26 For the costs, pursuant to the provisions of the rebuild and renew New
27 York transportation bond act of 2005 and article 22 of the transpor-
28 tation law, of capital projects to be reimbursed from bond fund
29 proceeds for the planning and design, acquisition, construction,
30 reconstruction, replacement, improvement, reconditioning, rehabili-
31 tation and preservation, including the acquisition of real property
32 and interests therein required or expected to be required in
33 connection therewith, of: omnibus, mass transit and rapid transit
34 systems, facilities and equipment, including facilities used jointly
35 by commuter railroad companies and freight railroad companies, but
36 otherwise exclusive of those operated by or under the jurisdiction
37 of the metropolitan transportation authority and its subsidiaries,
38 the New York City transit authority and its subsidiaries and the
39 Triborough bridge and tunnel authority; intermodal passenger facili-
40 ties and equipment; and marine terminals and marine transportation
41 facilities exclusive of those under the jurisdiction of the port
42 authority of New York and New Jersey or the canal corporation.
43 Costs may include highways and bridges either on or off the state
44 highway system necessary or reasonably expected to be necessary as a
45 project component or incidental to projects otherwise authorized
46 herein and by the rebuild and renew New York transportation bond act
47 of 2005.
48 For payment of engineering services, including reimbursements to the
49 dedicated highway and bridge trust fund of the department of trans-
50 portation, including but not limited to personal services, nonper-
862 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sonal services, fringe benefits, and the contract services provided
2 by private firms, for activities including but not limited to the
3 preparation of designs, plans, specifications and estimates;
4 construction management and supervision; and appraisals, surveys,
5 testing and environmental impact statements for transportation.
6 For the payment of liabilities incurred prior to April 1, 2009
7 (170509MT) ... 10,000,000 ........................ (re. $10,000,000)
8 By chapter 55, section 1, of the laws of 2008:
9 For the costs, pursuant to the provisions of the rebuild and renew New
10 York transportation bond act of 2005 and article 22 of the transpor-
11 tation law, of capital projects to be reimbursed from bond fund
12 proceeds for the planning and design, acquisition, construction,
13 reconstruction, replacement, improvement, reconditioning, rehabili-
14 tation and preservation, including the acquisition of real property
15 and interests therein required or expected to be required in
16 connection therewith, of: omnibus, mass transit and rapid transit
17 systems, facilities and equipment, including facilities used jointly
18 by commuter railroad companies and freight railroad companies, but
19 otherwise exclusive of those operated by or under the jurisdiction
20 of the metropolitan transportation authority and its subsidiaries,
21 the New York City transit authority and its subsidiaries and the
22 Triborough bridge and tunnel authority; intermodal passenger facili-
23 ties and equipment; and marine terminals and marine transportation
24 facilities exclusive of those under the jurisdiction of the port
25 authority of New York and New Jersey or the canal corporation.
26 Costs may include highways and bridges either on or off the state
27 highway system necessary or reasonably expected to be necessary as a
28 project component or incidental to projects otherwise authorized
29 herein and by the rebuild and renew New York transportation bond act
30 of 2005.
31 For payment of engineering services, including reimbursements to the
32 dedicated highway and bridge trust fund of the department of trans-
33 portation, including but not limited to personal services, nonper-
34 sonal services, fringe benefits, and the contract services provided
35 by private firms, for activities including but not limited to the
36 preparation of designs, plans, specifications and estimates;
37 construction management and supervision; and appraisals, surveys,
38 testing and environmental impact statements for transportation.
39 For the payment of liabilities incurred prior to April 1, 2008
40 (170508MT) ... 10,000,000 ......................... (re. $5,077,000)
41 By chapter 55, section 1, of the laws of 2007:
42 For the costs, pursuant to the provisions of the rebuild and renew New
43 York transportation bond act of 2005 and article 22 of the transpor-
44 tation law, of capital projects to be reimbursed from bond fund
45 proceeds for the planning and design, acquisition, construction,
46 reconstruction, replacement, improvement, reconditioning, rehabili-
47 tation and preservation, including the acquisition of real property
48 and interests therein required or expected to be required in
49 connection therewith, of: omnibus, mass transit and rapid transit
50 systems, facilities and equipment, including facilities used jointly
863 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 by commuter railroad companies and freight railroad companies, but
2 otherwise exclusive of those operated by or under the jurisdiction
3 of the metropolitan transportation authority and its subsidiaries,
4 the New York City transit authority and its subsidiaries and the
5 Triborough bridge and tunnel authority; intermodal passenger facili-
6 ties and equipment; and marine terminals and marine transportation
7 facilities exclusive of those under the jurisdiction of the port
8 authority of New York and New Jersey or the canal corporation.
9 Costs may include highways and bridges either on or off the state
10 highway system necessary or reasonably expected to be necessary as a
11 project component or incidental to projects otherwise authorized
12 herein and by the rebuild and renew New York transportation bond act
13 of 2005.
14 For payment of engineering services, including reimbursements to the
15 dedicated highway and bridge trust fund of the department of trans-
16 portation, including but not limited to personal services, nonper-
17 sonal services, fringe benefits, and the contract services provided
18 by private firms, for activities including but not limited to the
19 preparation of designs, plans, specifications and estimates;
20 construction management and supervision; and appraisals, surveys,
21 testing and environmental impact statements for transportation.
22 For the payment of liabilities incurred prior to April 1, 2007
23 (170507MT) ... 10,000,000 ......................... (re. $4,830,000)
24 By chapter 55, section 1, of the laws of 2006:
25 For the costs, pursuant to the provisions of the rebuild and renew New
26 York transportation bond act of 2005 and article 22 of the transpor-
27 tation law, of capital projects to be reimbursed from bond fund
28 proceeds for the planning and design, acquisition, construction,
29 reconstruction, replacement, improvement, reconditioning, rehabili-
30 tation and preservation, including the acquisition of real property
31 and interests therein required or expected to be required in
32 connection therewith, of: omnibus, mass transit and rapid transit
33 systems, facilities and equipment, including facilities used jointly
34 by commuter railroad companies and freight railroad companies, but
35 otherwise exclusive of those operated by or under the jurisdiction
36 of the metropolitan transportation authority and its subsidiaries,
37 the New York City transit authority and its subsidiaries and the
38 Triborough bridge and tunnel authority; intermodal passenger facili-
39 ties and equipment; and marine terminals and marine transportation
40 facilities exclusive of those under the jurisdiction of the port
41 authority of New York and New Jersey or the canal corporation.
42 Costs may include highways and bridges either on or off the state
43 highway system necessary or reasonably expected to be necessary as a
44 project component or incidental to projects otherwise authorized
45 herein and by the rebuild and renew New York transportation bond act
46 of 2005.
47 For payment of engineering services, including reimbursements to the
48 dedicated highway and bridge trust fund of the department of trans-
49 portation, including but not limited to personal services, nonper-
50 sonal services, fringe benefits, and the contract services provided
51 by private firms, for activities including but not limited to the
864 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 preparation of designs, plans, specifications and estimates;
2 construction management and supervision; and appraisals, surveys,
3 testing and environmental impact statements for transportation.
4 For the payment of liabilities incurred prior to April 1, 2006
5 (170506MT) ... 10,000,000 ......................... (re. $5,447,000)
6 By chapter 55, section 1, of the laws of 2005:
7 For the costs, pursuant to the provisions of the rebuild and renew New
8 York transportation bond act of 2005 and article 22 of the transpor-
9 tation law, of capital projects to be reimbursed from bond fund
10 proceeds for the planning and design, acquisition, construction,
11 reconstruction, replacement, improvement, reconditioning, rehabili-
12 tation and preservation, including the acquisition of real property
13 and interests therein required or expected to be required in
14 connection therewith, of: omnibus, mass transit and rapid transit
15 systems, facilities and equipment, including facilities used jointly
16 by commuter railroad companies and freight railroad companies, but
17 otherwise exclusive of those operated by or under the jurisdiction
18 of the metropolitan transportation authority and its subsidiaries,
19 the New York City transit authority and its subsidiaries and the
20 Triborough bridge and tunnel authority; intermodal passenger facili-
21 ties and equipment; and marine terminals and marine transportation
22 facilities exclusive of those under the jurisdiction of the port
23 authority of New York and New Jersey or the canal corporation.
24 Costs may include highways and bridges either on or off the state
25 highway system necessary or reasonably expected to be necessary as a
26 project component or incidental to projects otherwise authorized
27 herein and by the rebuild and renew New York transportation bond act
28 of 2005.
29 For engineering services of the department of transportation, includ-
30 ing personal services, nonpersonal services, fringe benefits and the
31 contract services provided by private firms, including, but not
32 limited to, the preparation of designs, plans, specifications and
33 estimates; construction management and supervision; and appraisals,
34 surveys, testing and environmental impact statements for transporta-
35 tion.
36 No part of this appropriation shall be made available for the payment
37 of liabilities incurred prior to the approval of the rebuild and
38 renew New York transportation bond act of 2005 by the voters at the
39 general election to be held in November of 2005 (170505MT) .........
40 10,000,000 ........................................ (re. $5,447,000)
41 Capital Projects Funds - Other
42 Capital Projects Fund - Rebuild and Renew (Bondable)
43 Rail and Port Purpose
44 By chapter 55, section 1, of the laws of 2009:
45 For the costs, pursuant to the provisions of the rebuild and renew New
46 York transportation bond act of 2005 and article 22 of the transpor-
47 tation law, of capital projects to be reimbursed from bond fund
48 proceeds for the planning and design, construction, reconstruction,
49 replacement, improvement, reconditioning, rehabilitation and preser-
865 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 vation, including the acquisition of real property and interests
2 therein required or expected to be required in connection therewith,
3 of: intercity passenger rail and freight rail facilities and equip-
4 ment; ports, marine terminals and marine transportation facilities
5 exclusive of those under the jurisdiction of the port authority of
6 New York and New Jersey or the canal corporation; and intermodal
7 passenger and freight facilities and equipment.
8 Costs may include highways and bridges either on or off the state
9 highway system necessary or reasonably expected to be necessary as a
10 project component or incidental to projects otherwise authorized
11 herein and by the rebuild and renew New York transportation bond act
12 of 2005.
13 For payment of engineering services, including reimbursements to the
14 dedicated highway and bridge trust fund of the department of trans-
15 portation, including but not limited to personal services, nonper-
16 sonal services, fringe benefits, and the contract services provided
17 by private firms, for activities including but not limited to the
18 preparation of designs, plans, specifications and estimates;
19 construction management and supervision; and appraisals, surveys,
20 testing and environmental impact statements for transportation.
21 For the payment of liabilities incurred prior to April 1, 2009
22 (17040915) ... 27,000,000 ......................... (re. $5,758,000)
23 By chapter 55, section 1, of the laws of 2008:
24 For the costs, pursuant to the provisions of the rebuild and renew New
25 York transportation bond act of 2005 and article 22 of the transpor-
26 tation law, of capital projects to be reimbursed from bond fund
27 proceeds for the planning and design, construction, reconstruction,
28 replacement, improvement, reconditioning, rehabilitation and preser-
29 vation, including the acquisition of real property and interests
30 therein required or expected to be required in connection therewith,
31 of: intercity passenger rail and freight rail facilities and equip-
32 ment; ports, marine terminals and marine transportation facilities
33 exclusive of those under the jurisdiction of the port authority of
34 New York and New Jersey or the canal corporation; and intermodal
35 passenger and freight facilities and equipment.
36 Costs may include highways and bridges either on or off the state
37 highway system necessary or reasonably expected to be necessary as a
38 project component or incidental to projects otherwise authorized
39 herein and by the rebuild and renew New York transportation bond act
40 of 2005.
41 For payment of engineering services, including reimbursements to the
42 dedicated highway and bridge trust fund of the department of trans-
43 portation, including but not limited to personal services, nonper-
44 sonal services, fringe benefits, and the contract services provided
45 by private firms, for activities including but not limited to the
46 preparation of designs, plans, specifications and estimates;
47 construction management and supervision; and appraisals, surveys,
48 testing and environmental impact statements for transportation.
49 For the payment of liabilities incurred prior to April 1, 2008
50 (17040815) ... 27,000,000 ......................... (re. $2,621,000)
866 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 55, section 1, of the laws of 2007:
2 For the costs, pursuant to the provisions of the rebuild and renew New
3 York transportation bond act of 2005 and article 22 of the transpor-
4 tation law, of capital projects to be reimbursed from bond fund
5 proceeds for the planning and design, construction, reconstruction,
6 replacement, improvement, reconditioning, rehabilitation and preser-
7 vation, including the acquisition of real property and interests
8 therein required or expected to be required in connection therewith,
9 of: intercity passenger rail and freight rail facilities and equip-
10 ment; ports, marine terminals and marine transportation facilities
11 exclusive of those under the jurisdiction of the port authority of
12 New York and New Jersey or the canal corporation; and intermodal
13 passenger and freight facilities and equipment.
14 Costs may include highways and bridges either on or off the state
15 highway system necessary or reasonably expected to be necessary as a
16 project component or incidental to projects otherwise authorized
17 herein and by the rebuild and renew New York transportation bond act
18 of 2005.
19 For payment of engineering services, including reimbursements to the
20 dedicated highway and bridge trust fund of the department of trans-
21 portation, including but not limited to personal services, nonper-
22 sonal services, fringe benefits, and the contract services provided
23 by private firms, for activities including but not limited to the
24 preparation of designs, plans, specifications and estimates;
25 construction management and supervision; and appraisals, surveys,
26 testing and environmental impact statements for transportation.
27 For the payment of liabilities incurred prior to April 1, 2007
28 (17040715) ... 27,000,000 ......................... (re. $1,739,000)
29 By chapter 55, section 1, of the laws of 2006:
30 For the costs, pursuant to the provisions of the rebuild and renew New
31 York transportation bond act of 2005 and article 22 of the transpor-
32 tation law, of capital projects to be reimbursed from bond fund
33 proceeds for the planning and design, construction, reconstruction,
34 replacement, improvement, reconditioning, rehabilitation and preser-
35 vation, including the acquisition of real property and interests
36 therein required or expected to be required in connection therewith,
37 of: intercity passenger rail and freight rail facilities and equip-
38 ment; ports, marine terminals and marine transportation facilities
39 exclusive of those under the jurisdiction of the port authority of
40 New York and New Jersey or the canal corporation; and intermodal
41 passenger and freight facilities and equipment.
42 Costs may include highways and bridges either on or off the state
43 highway system necessary or reasonably expected to be necessary as a
44 project component or incidental to projects otherwise authorized
45 herein and by the rebuild and renew New York transportation bond act
46 of 2005.
47 For payment of engineering services, including reimbursements to the
48 dedicated highway and bridge trust fund of the department of trans-
49 portation, including but not limited to personal services, nonper-
50 sonal services, fringe benefits, and the contract services provided
51 by private firms, for activities including but not limited to the
867 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 preparation of designs, plans, specifications and estimates;
2 construction management and supervision; and appraisals, surveys,
3 testing and environmental impact statements for transportation.
4 For the payment of liabilities incurred prior to April 1, 2006
5 (17040615) ... 27,000,000 ......................... (re. $1,783,000)
6 By chapter 55, section 1, of the laws of 2005:
7 For the costs, pursuant to the provisions of the rebuild and renew New
8 York transportation bond act of 2005 and article 22 of the transpor-
9 tation law, of capital projects to be reimbursed from bond fund
10 proceeds for the planning and design, construction, reconstruction,
11 replacement, improvement, reconditioning, rehabilitation and preser-
12 vation, including the acquisition of real property and interests
13 therein required or expected to be required in connection therewith,
14 of: intercity passenger rail and freight rail facilities and equip-
15 ment; ports, marine terminals and marine transportation facilities
16 exclusive of those under the jurisdiction of the port authority of
17 New York and New Jersey or the canal corporation; and intermodal
18 passenger and freight facilities and equipment.
19 Costs may include highways and bridges either on or off the state
20 highway system necessary or reasonably expected to be necessary as a
21 project component or incidental to projects otherwise authorized
22 herein and by the rebuild and renew New York transportation bond act
23 of 2005.
24 For engineering services of the department of transportation, includ-
25 ing personal services, nonpersonal services, fringe benefits and the
26 contract services provided by private firms, including, but not
27 limited to, the preparation of designs, plans, specifications and
28 estimates; construction management and supervision; and appraisals,
29 surveys, testing and environmental impact statements for transporta-
30 tion.
31 The funds made available through this appropriation shall be utilized
32 for the payment of the costs of eligible projects in accordance with
33 a memorandum of understanding entered into between the governor, the
34 majority leader of the senate and the speaker of the assembly, or
35 their designees, pursuant to article 22 of the transportation law.
36 No part of this appropriation shall be made available for the payment
37 of liabilities incurred prior to the approval of the rebuild and
38 renew New York transportation bond act of 2005 by the voters at the
39 general election to be held in November of 2005 (17040515) .........
40 27,000,000 ........................................ (re. $3,406,000)
41 TRANSPORTATION INFRASTRUCTURE RENEWAL BOND FUND (CCP)
42 Capital Projects Funds - Other
43 Transportation Infrastructure Renewal Bond Fund
44 Bond Proceeds Purpose
45 By chapter 54, section 1, of the laws of 1993, as amended by chapter 55,
46 section 1, of the laws of 1996:
47 The sum of $810,000, or so much thereof as may be necessary, is hereby
48 appropriated from the transportation infrastructure renewal fund as
868 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 established by section 74 of the state finance law in accordance
2 with the provisions of section 7 of chapter 836 of the laws of 1983
3 for payment, notwithstanding the provisions of any law, to the capi-
4 tal projects fund, in order to reimburse such fund for disbursements
5 certified by the state comptroller as bondable under the provisions
6 of the rebuild New York through transportation infrastructure
7 renewal bond act of 1983 for payment from the port, marine terminal,
8 canal and waterway account.
9 The director of the budget is hereby authorized to designate to the
10 state comptroller specific appropriations made from the capital
11 projects fund for purposes for which transportation infrastructure
12 renewal fund expenditures are authorized. The state comptroller
13 shall at the commencement of each month certify to the director of
14 the budget, the chairman of the senate finance committee, and the
15 chairman of the assembly ways and means committee, the amounts
16 disbursed from the appropriations so designated by the director of
17 the budget from the capital projects fund for such purposes for the
18 month preceding such certification and such certification shall not
19 exceed in the aggregate the moneys hereby appropriated. A copy of
20 each such certificate shall also be delivered to state departments
21 and agencies to which such capital projects fund appropriations are
22 made available.
23 Notwithstanding the provisions of any general or special law, no
24 moneys shall be available from the transportation infrastructure
25 renewal fund until a certificate of approval of availability shall
26 have been issued by the director of the budget, and a copy of such
27 certificate of approval filed with the state comptroller, the chair-
28 man of the senate finance committee and the chairman of the assembly
29 ways and means committee. Such certificate may be amended from time
30 to time by the director of the budget, and a copy of each such
31 amendment shall be filed with the state comptroller, the chairman of
32 the senate finance committee and the chairman of the assembly ways
33 and means committee (71119310) ... 810,000 .......... (re. $637,000)
34 By chapter 54, section 1, of the laws of 1989, as amended by chapter 55,
35 section 1, of the laws of 1996:
36 The sum of $2,800,000, or so much thereof as may be necessary, is
37 hereby appropriated from the transportation infrastructure renewal
38 fund as established by section 74 of the state finance law in
39 accordance with the provisions of section 7 of chapter 836 of the
40 laws of 1983 for payment, notwithstanding the provisions of any law,
41 to the capital projects fund, in order to reimburse such funds for
42 disbursements certified by the state comptroller as bondable under
43 the provisions of the rebuild New York through transportation
44 infrastructure renewal bond act of 1983 (71A58910) .................
45 2,800,000 ......................................... (re. $2,800,000)
46 By chapter 54, section 1, of the laws of 1988, as amended by chapter 55,
47 section 1, of the laws of 1996:
48 The sum of $116,580,000 or so much thereof as may be necessary, is
49 hereby appropriated from the transportation infrastructure renewal
50 bond fund as established by section 74 of the state finance law in
869 12654-10-8
DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 accordance with the provisions of section 7 of chapter 836 of the
2 laws of 1983 for payment, notwithstanding the provisions of any law,
3 to the capital projects fund, in order to reimburse such funds for
4 disbursements certified by the state comptroller as bondable under
5 the provisions of the rebuild New York through transportation
6 infrastructure renewal bond act of 1983 (71A58810) .................
7 116,580,000 ...................................... (re. $25,712,000)
870 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 1,265,305,000 7,040,514,000
6 ---------------- ----------------
7 All Funds ........................ 1,265,305,000 7,040,514,000
8 ================ ================
9 ECONOMIC DEVELOPMENT (CCP) ............................... 1,265,305,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Economic Development Purpose
14 Notwithstanding any inconsistent provision
15 of law, for services and expenses, loans,
16 grants, and costs associated with program
17 administration, of projects and purposes
18 authorized below, including the payment of
19 liabilities incurred prior to April 1,
20 2018. All or a portion of the funds appro-
21 priated hereby may be suballocated or
22 transferred to any department, agency, or
23 public authority, according to the follow-
24 ing:
25 The sum of $5,000,000 is hereby appropriated
26 for services and expenses of the Clark-
27 son-Trudeau partnership to grow the
28 biotech industry in the north country
29 (91081809) ................................... 5,000,000
30 The sum of $2,305,000 is hereby appropriated
31 for services and expenses related to the
32 retention of professional football in
33 Western New York (91031809) .................. 2,305,000
34 The sum of $8,000,000 is hereby appropriated
35 for services and expenses, loans, and
36 grants, related to the market New York
37 program, including but not limited to,
38 projects that enhance or promote regional
39 attractions in the state of New York
40 (91361809) ................................... 8,000,000
41 The sum of $200,000,000 is hereby appropri-
42 ated for the New York Works Economic
43 Development Fund. Funds appropriated here-
44 in shall be for services and expenses,
45 loans, and grants, related to the New York
46 Works Economic Development Fund (91131809) . 200,000,000
871 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS 2018-19
1 The sum of $150,000,000 is hereby appropri-
2 ated for the regional economic development
3 council initiative. Funding will be pursu-
4 ant to a plan developed by the chief exec-
5 utive officer of the New York state urban
6 development corporation and based in part
7 on a competitive selection process among
8 the regional economic development councils
9 and will support initiatives based on
10 anticipated economic development benefits.
11 Such moneys will be awarded by the New
12 York state urban development corporation
13 at its discretion (91151809) ............... 150,000,000
14 The sum of $600,000,000 is hereby appropri-
15 ated for services and expenses of a life
16 sciences laboratory and public health
17 initiative in the Capital District to
18 develop life science research, innovation,
19 and infrastructure, including but not
20 limited to the acquisition of real proper-
21 ty, preparation of plans, design,
22 construction, renovation, administration,
23 and other costs incidental thereto,
24 including the payment of liabilities
25 incurred prior to April 1, 2018. All or a
26 portion of the funds appropriated hereby
27 may be suballocated or transferred to any
28 department, agency, or public authority
29 (91251809) ................................. 600,000,000
30 The sum of $300,000,000 is hereby appropri-
31 ated for the High Technology Innovation
32 and Economic Development Infrastructure
33 Program. Funds appropriated herein shall
34 be for services and expenses, loans,
35 grants and costs of program adminis-
36 tration, including but not limited to
37 projects, purposes and other initiatives
38 that foster research and development of
39 innovative technologies, leverage private
40 investment in advanced science and tech-
41 nology economic development initiatives,
42 infrastructure, manufacturing, and other
43 economic development initiatives that
44 leverage private investment in regional
45 projects that create or retain jobs. Funds
46 shall be available for, but not limited to
47 the acquisition of real property, prepara-
48 tion of plans, design, construction, reno-
49 vation, purchase and installation of
50 equipment, costs associated with program
51 implementation and other costs incidental
52 thereto, including the payment of liabil-
872 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS 2018-19
1 ities incurred prior to April 1, 2018. All
2 or a portion of this appropriation may be
3 suballocated or transferred to any depart-
4 ment, agency, or public authority
5 (91191809) ................................. 300,000,000
873 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ECONOMIC DEVELOPMENT (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Economic Development Purpose
5 The appropriation made by chapter 54, section 1, of the laws of 2017, is
6 hereby amended and reappropriated to read:
7 Notwithstanding any inconsistent provision of law, for services and
8 expenses, loans, grants, and costs associated with program adminis-
9 tration, of projects and purposes authorized below, including the
10 payment of liabilities incurred prior to April 1, 2017. All or a
11 portion of the funds appropriated hereby may be suballocated or
12 transferred to any department, agency, or public authority, accord-
13 ing to the following:
14 The sum of $5,000,000 is hereby appropriated for services and expenses
15 of the Clarkson-Trudeau partnership to grow the biotech industry in
16 the north country (91081709) ... 5,000,000 ........ (re. $5,000,000)
17 The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
18 challenge grant program, notwithstanding any inconsistent provision
19 of law, shall be available to all colleges, universities and commu-
20 nity colleges as defined by section 350 of the education law. NY
21 SUNY 2020 plans shall be developed in consultation with the regional
22 economic development councils and funding will be subject to the
23 approval of a NY SUNY 2020 plan or plans by the governor and the
24 chancellor of the state university of New York. The determination of
25 grant awards shall take into consideration the extent to which
26 plans: (1) use technology, including but not limited to the expan-
27 sion of on-line learning, to improve academic success and job oppor-
28 tunities for students; (2) leverage economic and academic opportu-
29 nities through the START-UP NY program; and (3) provide experiential
30 learning opportunities that connect students to the workforce
31 (91111709) ... 55,000,000 ........................ (re. $55,000,000)
32 The sum of $55,000,000 is hereby appropriated for the NY CUNY 2020
33 challenge grant program, notwithstanding any inconsistent provision
34 of law, shall be available to all colleges, universities and commu-
35 nity colleges as defined by section 6202 of the education law. NY
36 CUNY 2020 plans shall be developed in consultation with the regional
37 economic development councils and funding will be subject to the
38 approval of a NY CUNY 2020 plan or plans by the governor and the
39 chancellor of the city university of New York. The determination of
40 grant awards shall take into consideration the extent to which
41 plans: (1) use technology, including but not limited to the expan-
42 sion of on-line learning, to improve academic success and job oppor-
43 tunities for students; (2) leverage economic and academic opportu-
44 nities through the START-UP NY program; and (3) provide experiential
45 learning opportunities that connect students to the workforce
46 (91121709) ... 55,000,000 ........................ (re. $55,000,000)
47 The sum of $33,000,000 is hereby appropriated for services and
48 expenses of the New York power electronics manufacturing consortium
49 to develop and commercialize the use of wide bandgap power electron-
50 ic devices (91021709) ... 33,000,000 ............. (re. $10,000,000)
874 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The sum of $2,278,000 is hereby appropriated for services and expenses
2 related to the retention of professional football in Western New
3 York (91031709) ... 2,278,000 ....................... (re. $168,000)
4 The sum of $8,000,000 is hereby appropriated for services and
5 expenses, loans, and grants, related to the market New York program,
6 including but not limited to, projects that enhance or promote
7 regional attractions in the state of New York (91361709) ...........
8 8,000,000 ......................................... (re. $8,000,000)
9 The sum of $200,000,000 is hereby appropriated for the New York Works
10 Economic Development Fund. Funds appropriated herein shall be for
11 services and expenses, loans, and grants, related to the New York
12 Works Economic Development Fund (91401709) .........................
13 200,000,000 ..................................... (re. $193,002,000)
14 The sum of $150,000,000 is hereby appropriated for the regional
15 economic development council initiative. Funding will be pursuant to
16 a plan developed by the chief executive officer of the New York
17 state urban development corporation and based in part on a compet-
18 itive selection process among the regional economic development
19 councils and will support initiatives based on anticipated economic
20 development benefits. Such moneys will be awarded by the New York
21 state urban development corporation at its discretion[. Notwith-
22 standing section 40 of the state finance law or any provision of the
23 law to the contrary, this appropriation shall lapse on September 15,
24 2018] (91191709) ... 150,000,000 ................ (re. $150,000,000)
25 The sum of $10,000,000 is hereby appropriated for services and
26 expenses related to the cultural, arts and public spaces fund,
27 including, but not limited to, projects that enhance or promote
28 business development and increase tourism. All or a portion of the
29 funds appropriated hereby may be suballocated or transferred to the
30 New York state council on the arts (91351709) ......................
31 10,000,000 ....................................... (re. $10,000,000)
32 The sum of $108,000,000 is hereby appropriated for services and
33 expenses, loans, grants, and costs associated with the redevelopment
34 of the Kingsbridge armory into the Kingsbridge National Ice Center
35 (91231709) ... 108,000,000 ...................... (re. $108,000,000)
36 The sum of $700,000,000 is hereby appropriated for services and
37 expenses related to the Moynihan station development project
38 (91221709) ... 700,000,000 ...................... (re. $424,183,000)
39 The sum of $207,500,000 is hereby appropriated for the SUNY Polytech-
40 nic Strategic Projects Program. Funds appropriated herein shall be
41 for services and expenses, loans, and grants, including liabilities
42 incurred prior to April 1, 2017, related to strategic economic
43 development projects and initiatives of the SUNY Polytechnic Insti-
44 tute Colleges of Nanoscale Science and Engineering to ensure the
45 completion of ongoing projects and initiatives that create or retain
46 jobs or support innovation, including but not limited to advanced
47 photonics research and manufacturing in Rochester, a semiconductor
48 research and development partnership at the SUNY Polytechnic Insti-
49 tute Colleges of Nanoscale Science and Engineering in Albany,
50 projects and activities in support of AIM photonics located at the
51 SUNY Polytechnic Institute Colleges of Nanoscale Science and Engi-
52 neering in Albany and the global 450mm consortium. Funds from this
875 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 appropriation shall be available for, but not limited to, services
2 and expenses of the SUNY Polytechnic Institute Colleges of Nanoscale
3 Science and Engineering, Fuller Road Management Corporation and Fort
4 Schuyler Management Corporation in connection with such economic
5 development projects and initiatives. The availability of funds
6 from this appropriation shall be subject to approval of the director
7 of the division of the budget and the chief executive officer of the
8 New York state urban development corporation[. Notwithstanding
9 section 40 of the state finance law or any provision of the law to
10 the contrary, this appropriation shall lapse on September 15, 2019]
11 (91281709) ... 207,500,000 ...................... (re. $124,159,000)
12 The sum of up to $2,000,000 is hereby appropriated for services and
13 expenses related to upgrades to the City of Auburn and Town of Owas-
14 co drinking water treatment systems to effectively remove toxins
15 associated with harmful algal blooms from the finished drinking
16 water (91211709) ... 2,000,000 .................... (re. $1,000,000)
17 The sum of $70,000,000 is hereby appropriated for services and
18 expenses of the restore New York's communities initiative pursuant
19 to section 16-n of the New York state urban development corporation
20 act; provided however, notwithstanding any law to the contrary, that
21 such allocation and distribution is subject to the approval by the
22 director of the budget of a plan for such program submitted by the
23 administering department, agency, or public authority (91411709) ...
24 70,000,000 ....................................... (re. $70,000,000)
25 The sum of $150,000,000 is hereby appropriated for services and
26 expenses of a life sciences laboratory public health initiative in
27 the Capital District pursuant to a plan developed by the chief exec-
28 utive officer of the New York state urban development corporation
29 jointly with the commissioner of health to develop life science
30 research, innovation, and infrastructure including but not limited
31 to the preparation of plans, design, construction, renovation, and
32 other costs incidental thereto, including the payment of liabilities
33 incurred prior to April 1, 2017. Notwithstanding section 51 of the
34 public authorities law, such plan shall be reviewed and approved by
35 New York state public authorities control board. Prior to any award,
36 the New York state public authorities control board shall review and
37 approve any construction project in excess of five millions dollars
38 funded from this appropriation. All or a portion of the funds appro-
39 priated hereby may be suballocated or transferred to any department,
40 agency, or public authority (91241709) .............................
41 150,000,000 ..................................... (re. $148,863,000)
42 The sum of $20,000,000 is hereby appropriated for the acquisition of
43 heavy equipment utilized for snow and ice control on state highways
44 and preventive maintenance on state roads and bridges, including but
45 not limited to the acquisition and installation of equipment inci-
46 dental thereto. All or a portion of the funds appropriated hereby
47 may be suballocated or transferred to any department, agency, or
48 public authority (91451709) ... 20,000,000 ....... (re. $20,000,000)
49 The sum of $65,000,000 is hereby appropriated for services and
50 expenses, loans, grants, and costs associated with economic develop-
51 ment and infrastructure projects, provided however that up to
52 $45,000,000 shall be available from this appropriation for reno-
876 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 vations to LIRR stations, including but no limited to Great Neck,
2 Valley Stream, Merrick, Bellmore, Baldwin, Deer Park, Syosset,
3 Northport and Stoney Brook. In addition, up to $20,000,000 shall be
4 available from this appropriation for the LIRR Brookhaven connection
5 project. All or a portion of the funds appropriated hereby may be
6 suballocated or transferred to any department, agency, or public
7 authority (91461709) ........... 65,000,000 ...... (re. $65,000,000)
8 The appropriation made by chapter 55, section 1, of the laws of 2016, as
9 amended by chapter 54, section 1, of the laws of 2017, is hereby
10 amended and reappropriated to read:
11 Notwithstanding any inconsistent provision of law, for services and
12 expenses, loans, grants, and costs associated with program adminis-
13 tration, of projects and purposes authorized below, including the
14 payment of liabilities incurred prior to April 1, 2016. All or a
15 portion of the funds appropriated hereby may be suballocated or
16 transferred to any department, agency, or public authority, accord-
17 ing to the following:
18 The sum of $12,000,000 is hereby appropriated for services and
19 expenses of the Clarkson-Trudeau partnership to grow the biotech
20 industry in the north country (91081609) ...........................
21 12,000,000 ........................................ (re. $3,624,000)
22 The sum of $10,000,000 is hereby appropriated for services and
23 expenses of the Brookhaven National Laboratory (91071609) ..........
24 10,000,000 ....................................... (re. $10,000,000)
25 The sum of $685,500,000 is hereby appropriated for services and
26 expenses of high technology manufacturing projects in Chautauqua and
27 Erie County including, notwithstanding anything in law to the
28 contrary, the reimbursement of expenditures for high technology
29 manufacturing projects in Chautauqua County appropriated herein made
30 from an appropriation made by chapter 55, section 1, of the laws of
31 2016 for state and municipal facilities (91061609) .................
32 685,500,000 ..................................... (re. $242,974,000)
33 The sum of $638,000,000 is hereby appropriated for services and
34 expenses of economic development projects at Nano Utica and at other
35 locations in Oneida County (91041609) ..............................
36 638,000,000 ..................................... (re. $520,223,000)
37 The sum of $125,000,000 is hereby appropriated for services and
38 expenses of an industrial scale research and development facility
39 operated by SUNY Polytechnic Institute Colleges of Nanoscale Science
40 and Engineering in Clinton County (91141609) .......................
41 125,000,000 ...................................... (re. $45,950,000)
42 The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
43 challenge grant program, notwithstanding any inconsistent provision
44 of law, shall be available to all colleges, universities and commu-
45 nity colleges as defined by section 350 of the education law. NY
46 SUNY 2020 plans shall be developed in consultation with the regional
47 economic development councils and funding will be subject to the
48 approval of a NY SUNY 2020 plan or plans by the governor and the
49 chancellor of the state university of New York. The determination of
50 grant awards shall take into consideration the extent to which
51 plans: (1) use technology, including but not limited to the expan-
877 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sion of on-line learning, to improve academic success and job oppor-
2 tunities for students; (2) leverage economic and academic opportu-
3 nities through the START-UP NY program; and (3) provide experiential
4 learning opportunities that connect students to the workforce;
5 provided further, a portion of the funds appropriated herein may be
6 utilized to complete existing NY SUNY 2020 projects at the universi-
7 ty at Buffalo and Stony Brook university (91111609) ................
8 55,000,000 ....................................... (re. $55,000,000)
9 The sum of $55,000,000 is hereby appropriated for the NY CUNY 2020
10 challenge grant program, notwithstanding any inconsistent provision
11 of law, shall be available to all colleges, universities and commu-
12 nity colleges as defined by section 6202 of the education law. NY
13 CUNY 2020 plans shall be developed in consultation with the regional
14 economic development councils and funding will be subject to the
15 approval of a NY CUNY 2020 plan or plans by the governor and the
16 chancellor of the city university of New York. The determination of
17 grant awards shall take into consideration the extent to which
18 plans: (1) use technology, including but not limited to the expan-
19 sion of on-line learning, to improve academic success and job oppor-
20 tunities for students; (2) leverage economic and academic opportu-
21 nities through the START-UP NY program; and (3) provide experiential
22 learning opportunities that connect students to the workforce
23 (91121609) ... 55,000,000 ........................ (re. $55,000,000)
24 The sum of $2,251,000 is hereby appropriated for services and expenses
25 related to the retention of professional football in Western New
26 York (91031609) ... 2,251,000 ....................... (re. $141,000)
27 The sum of $8,000,000 is hereby appropriated for services and
28 expenses, loans, and grants, related to the market New York program,
29 including but not limited to, projects that enhance or promote
30 regional attractions in the state of New York (91201609) ...........
31 8,000,000 ......................................... (re. $7,766,000)
32 The sum of $199,000,000 is hereby appropriated for the New York Works
33 Economic Development Fund. Funds appropriated herein shall be for
34 services and expenses, loans, and grants, related to the New York
35 Works Economic Development Fund (91011609) .........................
36 199,000,000 ..................................... (re. $167,863,000)
37 The sum of $150,000,000 is hereby appropriated for the regional
38 economic development council initiative. [Funds appropriated herein
39 shall be available during the 2016-17 and 2017-18 state fiscal years
40 for services and expenses, loans, and grants.] Funding will be
41 pursuant to a plan developed by the chief executive officer of the
42 New York state urban development corporation and based in part on a
43 competitive selection process among the regional economic develop-
44 ment councils and will support initiatives based on anticipated
45 economic development benefits. Such moneys will be awarded by the
46 New York state urban development corporation at its discretion[.
47 Notwithstanding section 40 of the state finance law or any provision
48 of the law to the contrary, this appropriation shall lapse on
49 September 15, 2018] (91191609) .....................................
50 150,000,000 ..................................... (re. $149,400,000)
51 The sum of $30,000,000 is hereby appropriated for additional upstate
52 revitalization initiative projects. Funds appropriated herein shall
878 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 be for services and expenses, loans, grants, workforce development,
2 business and tourism plan development, costs associated with program
3 administration, and the payment of personal services, nonpersonal
4 services and contract services provided by private firms to support
5 economic development projects. Funding will be pursuant to a plan
6 developed by the chief executive officer of the New York state urban
7 development corporation and will support initiatives based on antic-
8 ipated job creation and economic development benefits. Funds shall
9 not be available from this appropriation for projects within regions
10 that were Upstate Revitalization Initiative 2015 Best Plan Awardees
11 or eligible to receive funding from the Buffalo Regional Innovation
12 Cluster Program. Such moneys will be awarded by the New York state
13 urban development corporation at its discretion (91161609) .........
14 30,000,000 ....................................... (re. $30,000,000)
15 The sum of $20,000,000 is hereby appropriated for services and
16 expenses of Oakdale merge on Sunrise Highway (NYS Rte. 27 and NYS
17 Rte. 27-A over the Connetquot River) to conduct a multi-year study
18 and complete the process of widening bridges and roads to accommo-
19 date traffic flow. All or a portion of the funds appropriated hereby
20 may be suballocated or transferred to any department, agency, or
21 public authority (91211609) ... 20,000,000 ....... (re. $20,000,000)
22 By chapter 55, section 1, of the laws of 2007:
23 For services and expenses of redevelopment initiatives at the Harriman
24 Research and Technology Park (91030709) ............................
25 7,500,000 ......................................... (re. $5,562,000)
26 Arts and Cultural Projects
27 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
28 section 1, of the laws of 2011:
29 The sum of $18,000,000 is hereby appropriated for the New York state
30 arts and cultural capital grants program, as authorized pursuant to
31 a chapter of the laws of 2008, to support the preservation and
32 expansion of cultural institutions in New York state, subject to a
33 plan approved by the director of the budget. All or a portion of the
34 funds appropriated hereby may be suballocated or transferred to any
35 department, agency, or public authority (91050809) .................
36 18,000,000 ........................................ (re. $5,000,000)
37 Binghamton University School of Pharmacy
38 By chapter 54, section 1, of the laws of 2015:
39 The sum of $25,000,000 is hereby appropriated for services and
40 expenses of studies, site acquisitions, planning, design,
41 construction, reconstruction, renovation, and equipment necessary to
42 establish a school of pharmacy at the state university of New York
43 at Binghamton. Amounts appropriated herein shall be in addition to
44 $25,000,000 appropriated in the state university of New York capital
45 projects budget. All or a portion of the funds appropriated hereby
46 may be suballocated or transferred to any department, agency, or
47 public authority (91041509) ... 25,000,000 ........ (re. $1,244,000)
879 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Cornell University College of Veterinary Medicine
2 By chapter 54, section 1, of the laws of 2015:
3 The sum of $19,000,000 is hereby appropriated for services and
4 expenses of the cornell university college of veterinary medicine,
5 including the payment of liabilities incurred prior to April 1,
6 2015. All or a portion of the funds appropriated hereby may be
7 suballocated or transferred to any department, agency, or public
8 authority (91051509) ... 19,000,000 ............... (re. $7,777,000)
9 By chapter 54, section 1, of the laws of 2014:
10 The sum of $5,000,000 is hereby appropriated for services and expenses
11 of the cornell university college of veterinary medicine, including
12 the payment of liabilities incurred prior to April 1, 2014. All or a
13 portion of the funds appropriated hereby may be suballocated or
14 transferred to any department, agency, or public authority
15 (91051409) ... 5,000,000 ............................ (re. $186,000)
16 Downstate Regional Projects
17 By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
18 section 5, of the laws of 2008:
19 The sum of $35,000,000 is hereby appropriated for downstate regional
20 projects including but not limited to those listed in the schedule
21 below, subject to a plan submitted by the chairman of the New York
22 state urban development corporation and approved by the director of
23 the budget. All or a portion of the funds appropriated hereby may be
24 suballocated or transferred to any department, agency, or public
25 authority (91090809) ... 35,000,000 ............... (re. $5,106,000)
26 Project Schedule
27 PROJECT AMOUNT
28 --------------------------------------------
29 SUNY Stony Brook Energy
30 Research Center ............... 10,000,000
31 Lower Hudson Valley Infras-
32 tructure and Waterfront
33 Development ................... 10,000,000
34 Cold Spring Harbor Laboratory .... 5,000,000
35 Hudson Valley Solar Energy
36 Consortium ..................... 5,000,000
37 Hudson Valley Semiconductor
38 Manufacturing .................. 5,000,000
39 --------------
40 Total ....................... 35,000,000
41 ==============
42 Downstate Revitalization Fund
43 By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
44 section 5, of the laws of 2008:
880 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The sum of $35,000,000 is hereby appropriated for the downstate revi-
2 talization fund, as authorized pursuant to a chapter of the laws of
3 2008, and subject to a plan submitted by the chairman of the New
4 York state urban development corporation and approved by the direc-
5 tor of the budget. All or a portion of the funds appropriated hereby
6 may be suballocated or transferred to any department, agency, or
7 public authority (91010809) ... 35,000,000 ....... (re. $11,642,000)
8 Economic and Community Development Projects
9 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
10 section 1, of the laws of 2011:
11 The sum of $32,148,000 is hereby appropriated for the New York state
12 economic and community development program, as authorized pursuant
13 to a chapter of the laws of 2008, subject to a plan approved by the
14 director of the budget. All or a portion of the funds appropriated
15 hereby may be suballocated or transferred to any department, agency,
16 or public authority (91070809) ... 32,148,000 ..... (re. $4,059,000)
17 Economic Development Fund
18 By chapter 54, section 1, of the laws of 2012, as transferred by chapter
19 54, section 1, of the laws of 2014:
20 For services and expenses of the empire state economic development
21 fund (91021209) ... 20,000,000 ................... (re. $16,439,000)
22 Economic Transformation Program
23 By chapter 54, section 1, of the laws of 2014:
24 The sum of $32,000,000 is hereby appropriated for the economic trans-
25 formation program. Funds appropriated herein shall be available for
26 services and expenses, loans, and grants. Funding will be used to
27 support initiatives, services and expenses of communities impacted
28 by the closure of New York state correctional and juvenile justice
29 facilities. All or a portion of the funds appropriated hereby may be
30 suballocated or transferred to any department, agency, or public
31 authority (91041409) ... 32,000,000 .............. (re. $32,000,000)
32 Empire State Economic Development Fund
33 By chapter 54, section 1, of the laws of 2013:
34 The sum of $12,000,000 is hereby appropriated for services and
35 expenses of the empire state economic development fund, including
36 the payment of liabilities incurred prior to April 1, 2013. All or a
37 portion of the funds appropriated hereby may be suballocated or
38 transferred to any department, agency, or public authority
39 (91171309) ... 12,000,000 ........................ (re. $12,000,000)
40 NY 2020 Challenge Grant Program
41 By chapter 54, section 1, of the laws of 2015:
881 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
2 challenge grant program, notwithstanding any inconsistent provision
3 of law, shall be available to all colleges, universities and commu-
4 nity colleges as defined by section 350 of the education law. NY
5 SUNY 2020 plans shall be developed in consultation with the regional
6 economic development councils and funding will be subject to the
7 approval of a NY SUNY 2020 plan or plans by the governor and the
8 chancellor of the state university of New York. The determination of
9 grant awards shall take into consideration the extent to which
10 plans: (1) use technology, including but not limited to the expan-
11 sion of on-line learning, to improve academic success and job oppor-
12 tunities for students; (2) leverage economic and academic opportu-
13 nities through the START-UP NY program; and (3) provide experiential
14 learning opportunities that connect students to the workforce. All
15 or a portion of the funds appropriated hereby may be suballocated or
16 transferred to any department, agency, or public authority
17 (91111509) ... 55,000,000 ........................ (re. $55,000,000)
18 The sum of $55,000,000 is hereby appropriated for the NY CUNY 2020
19 challenge grant program, notwithstanding any inconsistent provision
20 of law, shall be available to all colleges, universities and commu-
21 nity colleges as defined by section 6202 of the education law. NY
22 CUNY 2020 plans shall be developed in consultation with the regional
23 economic development councils and funding will be subject to the
24 approval of a NY CUNY 2020 plan or plans by the governor and the
25 chancellor of the city university of New York. The determination of
26 grant awards shall take into consideration the extent to which
27 plans: (1) use technology, including but not limited to the expan-
28 sion of on-line learning, to improve academic success and job oppor-
29 tunities for students; (2) leverage economic and academic opportu-
30 nities through the START-UP NY program; and (3) provide experiential
31 learning opportunities that connect students to the workforce. All
32 or a portion of the funds appropriated hereby may be suballocated or
33 transferred to any department, agency, or public authority
34 (91121509) ... 55,000,000 ........................ (re. $55,000,000)
35 By chapter 54, section 1, of the laws of 2014:
36 The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
37 challenge grant program, notwithstanding any inconsistent provision
38 of law, shall be available to all colleges, universities and commu-
39 nity colleges as defined by section 350 of the education law. NY
40 SUNY 2020 plans shall be developed in consultation with the regional
41 economic development councils and funding will be subject to the
42 approval of a NY SUNY 2020 plan or plans by the governor and the
43 chancellor of the state university of New York. The determination of
44 grant awards shall take into consideration the extent to which
45 plans: (1) use technology, including but not limited to the expan-
46 sion of on-line learning, to improve academic success and job oppor-
47 tunities for students; (2) leverage economic and academic opportu-
48 nities through the START-UP NY program; and (3) provide experiential
49 learning opportunities that connect students to the workforce. All
50 or a portion of the funds appropriated hereby may be suballocated or
882 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 transferred to any department, agency, or public authority
2 (91111409) ... 55,000,000 ........................ (re. $45,590,000)
3 The sum of $55,000,000 is hereby appropriated for the NY CUNY 2020
4 challenge grant program, notwithstanding any inconsistent provision
5 of law, shall be available to all colleges, universities and commu-
6 nity colleges as defined by section 6202 of the education law. NY
7 CUNY 2020 plans shall be developed in consultation with the regional
8 economic development councils and funding will be subject to the
9 approval of a NY CUNY 2020 plan or plans by the governor and the
10 chancellor of the city university of New York. The determination of
11 grant awards shall take into consideration the extent to which
12 plans: (1) use technology, including but not limited to the expan-
13 sion of on-line learning, to improve academic success and job oppor-
14 tunities for students; (2) leverage economic and academic opportu-
15 nities through the START-UP NY program; and (3) provide experiential
16 learning opportunities that connect students to the workforce. All
17 or a portion of the funds appropriated hereby may be suballocated or
18 transferred to any department, agency, or public authority
19 (91121409) ... 55,000,000 ........................ (re. $55,000,000)
20 NY-SUNY 2020 Challenge Grant Program
21 By chapter 54, section 1, of the laws of 2013:
22 The sum of $55,000,000 is hereby appropriated for the NY SUNY 2020
23 challenge grant program, notwithstanding any inconsistent provision
24 of law, shall be available to all colleges, universities and commu-
25 nity colleges as defined by section 350 of the Education Law, except
26 that no funds shall be made available from this appropriation for
27 university centers as defined by subdivision 7 of section 350 of the
28 education law. NY SUNY 2020 plans shall be developed in consultation
29 with the regional economic development councils and funding will be
30 subject to the approval of a NY SUNY 2020 plan or plans by the
31 governor and the chancellor of the state university of New York.
32 All or a portion of the funds appropriated hereby may be suballo-
33 cated or transferred to any department, agency, or public authority
34 (91121309) ... 55,000,000 ........................ (re. $30,358,000)
35 The sum of $55,000,000 is hereby appropriated for the NY CUNY 2020
36 challenge grant program, notwithstanding any inconsistent provision
37 of law, shall be available to all colleges, universities and commu-
38 nity colleges as defined by section 6202 of the Education Law. NY
39 CUNY 2020 plans shall be developed in consultation with the regional
40 economic development councils and funding will be subject to the
41 approval of a NY CUNY 2020 plan or plans by the governor and the
42 chancellor of the city university of New York. All or a portion of
43 the funds appropriated hereby may be suballocated or transferred to
44 any department, agency, or public authority (91131309) .............
45 55,000,000 ....................................... (re. $44,780,000)
46 By chapter 54, section 1, of the laws of 2012:
47 The sum of $80,000,000 is hereby appropriated for the NY-SUNY 2020
48 challenge grant program, as authorized pursuant to chapter 260 of
49 the laws of 2011. Funding will be subject to the approval of a
883 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 NY-SUNY 2020 plan or plans by the governor and the chancellor of the
2 state university of New York. All or a portion of the funds appro-
3 priated hereby may be suballocated or transferred to any department,
4 agency, or public authority (91121209) .............................
5 80,000,000 ....................................... (re. $29,221,000)
6 Nano Utica Project
7 By chapter 54, section 1, of the laws of 2014:
8 The sum of $180,000,000 is hereby appropriated for services and
9 expenses related to a nano Utica project, including the payment of
10 liabilities incurred prior to April 1, 2014. All or a portion of the
11 funds appropriated hereby may be suballocated or transferred to any
12 department, agency, or public authority (91071409) .................
13 180,000,000 ..................................... (re. $120,000,000)
14 Onondaga County Revitalization Projects
15 By chapter 54, section 1, of the laws of 2014:
16 The sum of $30,000,000 is hereby appropriated for services and
17 expenses related to economic development and infrastructure improve-
18 ments that encourage the revitalization of Onondaga lake and its
19 surrounding communities, including the payment of liabilities
20 incurred prior to April 1, 2014. All or a portion of the funds
21 appropriated hereby may be suballocated or transferred to any
22 department, agency, or public authority (91021409) .................
23 30,000,000 ....................................... (re. $30,000,000)
24 Transformative Investment Program
25 The appropriation made by chapter 54, section 1, of the laws of 2015, as
26 amended by chapter 54, section 1, of the laws of 2017, is hereby
27 amended and reappropriated to read:
28 The sum of $400,000,000 is hereby appropriated for the payment, over a
29 multi-year period, of capital costs of regionally significant
30 economic development initiatives that create or retain private
31 sector jobs, including but not limited to those listed in the sched-
32 ule below. Funds shall not be available from this appropriation for
33 projects within regions that are eligible to receive funding from
34 the Upstate Revitalization Initiative or the Buffalo Regional Inno-
35 vation Cluster Program. Funds appropriated herein shall be available
36 for project costs, services, expenses, loans and grants that cata-
37 lyze private investment, grow commercial and residential tax bases
38 and enhance the environment and quality of life for New York State
39 residents. Investment purposes may include, but shall not be limited
40 to, support of manufacturing, agriculture, business parks, community
41 anchor facilities, county and local fairgrounds, advanced technolo-
42 gy, biotechnology and biomedical facilities, and main street revi-
43 talization. The portion of any such project funded by this appropri-
44 ation shall be no less than $5,000,000. The items shown in the
45 schedule below shall be for projects with a common purpose and may
46 be interchanged without limitation subject to the approval of the
884 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 director of the budget. All or a portion of the funds may be subal-
2 located or transferred to any department, agency, or public authori-
3 ty (91161509) ... 400,000,000 ................... (re. $400,000,000)
4 Project Schedule
5 PROJECT AMOUNT
6 --------------------------------------------
7 NSLIJ, Feinstein Institute of
8 Medical Research: Center
9 for Bioelectronic Medicine
10 (CBEM) - [Nassau Hub ......... 50,000,000]
11 Manhasset ..................... 30,000,000
12 Hofstra University: School of
13 Engineering and Applied
14 Sciences (SEAS) ............... 25,000,000
15 Cold Spring Harbor Lab: Center
16 for Therapeutics Research
17 (CTR) ......................... 25,000,000
18 Commercialization and research
19 and development projects at
20 Stony Brook University
21 pursuant to a plan developed
22 by Stony Brook University
23 and submitted to the chief
24 executive officer of the New
25 York state urban development
26 corporation for approval ...... 75,000,000
27 Renovation and expansion of
28 MacArthur airport ............. 20,000,000
29 Smithtown Business District
30 Sewer Improvement Area ........ 20,000,000
31 Kings Park Waste Water Treat-
32 ment Facility ................. 20,000,000
33 Cryo-electron Microscopy
34 (CryoEM) facility at the
35 Brookhaven National Labora-
36 tory .......................... 15,000,000
37 Great Neck Water Pollution
38 Control District ...............12,290,000
39 All other projects ............ [150,000,000] 157,710,000
40 --------------
41 Total ...................... 400,000,000
42 ==============
43 Upstate Agricultural Economic Development Fund
44 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
45 section 1, of the laws of 2011:
46 The sum of $25,000,000 is hereby appropriated for the upstate agricul-
47 tural economic development fund, as authorized pursuant to a chapter
48 of the laws of 2008, subject to a plan submitted by the chairman of
49 the upstate empire state development corporation in consultation
885 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 with the commissioner of the department of agriculture and markets
2 and approved by the director of the budget. All or a portion of the
3 funds appropriated hereby may be suballocated or transferred to any
4 department, agency, or public authority (91030809) .................
5 25,000,000 ....................................... (re. $10,291,000)
6 Upstate City-by-City Projects
7 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
8 section 1, of the laws of 2011:
9 The sum of $22,037,000 is hereby appropriated for upstate city-by-city
10 projects subject to a plan submitted by the chairman of the upstate
11 empire state development corporation and approved by the director of
12 the budget. All or a portion of the funds appropriated hereby may be
13 suballocated or transferred to any department, agency, or public
14 authority (91110809) ... 22,037,000 .................. (re. $77,000)
15 By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
16 section 5, of the laws of 2008:
17 The sum of $115,000,000 is hereby appropriated for upstate city-by-
18 city projects including but not limited to those listed in the sche-
19 dule below, subject to a plan submitted by the chairman of the
20 upstate empire state development corporation and approved by the
21 director of the budget. All or a portion of the funds appropriated
22 hereby may be suballocated or transferred to any department, agency,
23 or public authority (91100809) ... 115,000,000 .... (re. $8,652,000)
24 Project Schedule
25 PROJECT AMOUNT
26 --------------------------------------------
27 Midtown Plaza/Paetec ............ 55,000,000
28 University of Rochester --
29 Translational Research ........ 25,000,000
30 Syracuse Connective Corridor .... 10,000,000
31 Fort Drum -- Infrastructure
32 Improvements .................. 10,000,000
33 City of Buffalo -- Revitaliza-
34 tion Efforts .................. 15,000,000
35 --------------
36 Total ...................... 115,000,000
37 ==============
38 Upstate Regional Blueprint Fund
39 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
40 section 1, of the laws of 2011:
41 The sum of $117,265,000 is hereby appropriated for the upstate
42 regional blueprint fund, as authorized pursuant to a chapter of the
43 laws of 2008, subject to a plan submitted by the chairman of the
44 upstate empire state development corporation and approved by the
45 director of the budget. All or a portion of the funds appropriated
886 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 hereby may be suballocated or transferred to any department, agency,
2 or public authority (91020809) ... 117,265,000 ... (re. $14,146,000)
3 Western New York Economic Development Projects
4 By chapter 54, section 1, of the laws of 2015:
5 The sum of $2,223,000 is hereby appropriated for services and expenses
6 related to the retention of professional football in Western New
7 York, including the payment of liabilities incurred prior to April
8 1, 2015. All or a portion of the funds appropriated hereby may be
9 suballocated or transferred to any department, agency, or public
10 authority (91031509) ... 2,223,000 ................... (re. $95,000)
11 By chapter 54, section 1, of the laws of 2014:
12 The sum of $680,000,000 is hereby appropriated for the Buffalo
13 regional innovation cluster. Funds appropriated herein shall be for
14 services and expenses, loans, grants, workforce development, busi-
15 ness and tourism plan development, and the payment of personal
16 services, nonpersonal services and contract services provided by
17 private firms to support economic development projects within the
18 city of Buffalo or surrounding environs, including the payment of
19 liabilities incurred prior to April 1, 2014. Provided however, that
20 up to $33,000,000 is provided to Western NY STAMP. No monies for
21 Western NY STAMP shall be disbursed prior to approval by the chief
22 executive officer of the New York state urban development corpo-
23 ration of a business plan that identifies regionally significant
24 projects, as defined in economic development law, article 17,
25 section 352, subdivision 14, at Western NY STAMP. All or a portion
26 of the funds appropriated hereby may be suballocated or transferred
27 to any department, agency, or public authority (91131409) ..........
28 680,000,000 ..................................... (re. $251,246,000)
29 The sum of $2,195,000 is hereby appropriated for services and expenses
30 related to the retention of professional football in Western New
31 York, including the payment of liabilities incurred prior to April
32 1, 2014. All or a portion of the funds appropriated hereby may be
33 suballocated or transferred to any department, agency, or public
34 authority (91151409) ... 2,195,000 ................... (re. $28,000)
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Regional Development Purpose
38 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
39 section 1, of the laws of 2013:
40 The sum of $130,550,000 is hereby appropriated for the regional
41 economic development council initiative. Funds appropriated herein
42 shall be available for services and expenses, loans, and grants.
43 Funding will be pursuant to a plan developed by the chair of the New
44 York state urban development corporation and based in part on a
45 competitive selection process among the regional economic develop-
46 ment councils and will support initiatives based on anticipated
47 economic development benefits. Such moneys will be awarded by the
887 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 New York state urban development corporation at its discretion. All
2 or a portion of the funds appropriated hereby may be suballocated or
3 transferred to any department, agency, or public authority
4 (910211A3) ... 130,550,000 ....................... (re. $61,403,000)
5 Economic Transformation Program
6 By chapter 54, section 1, of the laws of 2011, as amended by chapter 54,
7 section 1, of the laws of 2013:
8 The sum of $50,000,000 is hereby appropriated for the economic trans-
9 formation program. Funds appropriated herein shall be available for
10 services and expenses, loans, and grants. Funding will be used to
11 support initiatives, services and expenses of communities impacted
12 by the closure of New York state prison, correctional and juvenile
13 justice facilities, pursuant to a plan developed by the chair of the
14 New York state urban development corporation. The regional economic
15 development council representing the impacted community shall make
16 non-binding recommendations to the chair consistent with the execu-
17 tive order establishing such council. All or a portion of the funds
18 appropriated hereby may be suballocated or transferred to any
19 department, agency, or public authority (910311A3) .................
20 50,000,000 ....................................... (re. $17,561,000)
21 Capital Projects Funds - Other
22 Dedicated Infrastructure Investment Fund
23 Infrastructure Investment Account
24 Economic Development Purpose
25 By chapter 54, section 1, of the laws of 2017:
26 The sum of $400,000,000 is hereby appropriated for the second phase of
27 the Buffalo regional innovation cluster initiative. Funds appropri-
28 ated herein shall be for services, expenses, loans, grants, and
29 costs associated with program administration to support economic
30 development projects within the city of Buffalo or surrounding envi-
31 rons, including the payment of liabilities incurred prior to April
32 1, 2017. All or a portion of the funds appropriated hereby may be
33 suballocated or transferred to any department, agency, or public
34 authority (91311709) ... 400,000,000 ............ (re. $399,000,000)
35 The sum of $320,000,000 is hereby appropriated for services and
36 expenses, loans, grants, and costs associated with program adminis-
37 tration of a life sciences initiative which shall include but not be
38 limited to investments in agricultural biotechnology, biogenerics,
39 bioinformatics, biomedical engineering, biopharmaceuticals, academic
40 medical centers, biotechnology, chemical synthesis, chemistry tech-
41 nology, medical diagnostics, genomics, medical image analysis,
42 marine biology, medical devices, medical nanotechnology, natural
43 product pharmaceuticals, proteomics, regenerative medicine, RNA
44 interference, stem cell research, medical and neurological clinical
45 trials, health robotics and veterinary science. Eligible costs of
46 such initiative may include but not be limited to laboratory space,
47 equipment, technology, research and development, venture capital
48 investments and other costs in support of a comprehensive life
888 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 sciences cluster strategy, including the payment of liabilities
2 incurred prior to April 1, 2017, provided, however, that the total
3 annual amount in venture capital investments made from this appro-
4 priation shall not exceed $10,000,000 annually. In addition, the
5 sum of $20,000,000 shall be available from this appropriation for
6 bioscience research labs and academic medical centers. Funding will
7 be pursuant to a plan developed by the chief executive officer of
8 the New York state urban development corporation which shall take
9 into consideration regional balance and anticipated job retention,
10 job creation and regional economic development benefits (91321709)
11 ... 320,000,000 ................................. (re. $320,000,000)
12 NEW YORK STATE CAPITAL ASSISTANCE PROGRAM (CCP)
13 Capital Projects Funds - Other
14 Capital Projects Fund
15 Economic Development Purpose
16 By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
17 section 5, of the laws of 2008:
18 The sum of $350,000,000 is hereby appropriated for the New York State
19 Capital Assistance Program, as authorized pursuant to a chapter of
20 the laws of 2008.
21 All or a portion of the funds may be suballocated or transferred to
22 any department, agency or public authority (91150809) ..............
23 350,000,000 ..................................... (re. $165,501,000)
24 Capital Projects Funds - Other
25 Capital Projects Fund
26 Regional Development Purpose
27 By chapter 55, section 1, of the laws of 2000, as amended by chapter
28 684, section 2, of the laws of 2003:
29 For economic development projects which will facilitate the creation
30 and retention of jobs or increase business activity within downtown
31 Buffalo, the Buffalo inner harbor area, or surrounding environs.
32 Notwithstanding any other provision of law to the contrary, such
33 projects shall be determined pursuant to a memorandum of understand-
34 ing to be executed by the governor, the temporary president of the
35 senate and the speaker of the assembly. The funds appropriated here-
36 by may be suballocated to any department, agency or public authori-
37 ty. Eligible project(s) shall include, but not be limited to Haupt-
38 man-Woodward Medical Research Institute; Buffalo Medical Campus;
39 University of Buffalo - Center of Excellence in Bioinformatics;
40 Roswell Park Cancer Institute Corporation; and other projects relat-
41 ing to historic preservation, cultural facilities and transportation
42 projects (91AD00A3) ... 50,000,000 ................... (re. $50,000)
43 NEW YORK STATE ECONOMIC DEVELOPMENT ASSISTANCE PROGRAM (CCP)
44 Capital Projects Funds - Other
45 Capital Projects Fund
889 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Economic Development Purpose
2 By chapter 55, section 1, of the laws of 2008, as added by chapter 53,
3 section 5, of the laws of 2008:
4 The sum of $350,000,000 is hereby appropriated for the New York State
5 Economic Development Assistance Program, as authorized pursuant to a
6 chapter of the laws of 2008.
7 All or a portion of the funds appropriated hereby may be suballocated
8 or transferred to any department, agency, or public authority
9 (91140809) ... 350,000,000 ....................... (re. $82,323,000)
10 NEW YORK WORKS (CCP)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Economic Development Purpose
14 Buffalo Regional Innovation Cluster
15 By chapter 54, section 1, of the laws of 2012:
16 The sum of $75,000,000 is hereby appropriated for the Buffalo Regional
17 Innovation Cluster. Funds appropriated herein shall be for services
18 and expenses, loans, and grants, to support economic development
19 projects within the city of Buffalo or surrounding environs. All or
20 a portion of the funds appropriated hereby may be suballocated or
21 transferred to any department, agency, or public authority
22 (91211209) ... 75,000,000 ......................... (re. $1,064,000)
23 New York Works Economic Development Fund
24 By chapter 54, section 1, of the laws of 2015:
25 The sum of $45,000,000 is hereby appropriated for the New York Works
26 Economic Development Fund. Funds appropriated herein shall be for
27 services and expenses, loans, and grants, related to the New York
28 Works Economic Development Fund, including the payment of liabil-
29 ities incurred prior to April 1, 2015. All or a portion of the funds
30 appropriated hereby may be suballocated or transferred to any
31 department, agency, or public authority (91101509) .................
32 45,000,000 ....................................... (re. $20,000,000)
33 By chapter 54, section 1, of the laws of 2012:
34 The sum of $75,000,000 is hereby appropriated for the New York Works
35 Economic Development Fund. Funds appropriated herein shall be for
36 services and expenses, loans, and grants, related to the New York
37 Works Economic Development Fund. All or a portion of the funds
38 appropriated hereby may be suballocated or transferred to any
39 department, agency, or public authority (91151209) .................
40 75,000,000 ....................................... (re. $24,448,000)
41 Capital Projects Funds - Other
42 Capital Projects Fund
43 Regional Development Purpose
890 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The appropriation made by chapter 54, section 1, of the laws of 2015, as
2 amended by chapter 54, section 1, of the laws of 2017, is hereby
3 amended and reappropriated to read:
4 The sum of $150,000,000 is hereby appropriated for the regional
5 economic development council initiative. Funds appropriated herein
6 shall be available [during the 2015-16 and 2016-17 state fiscal
7 years] for services and expenses, loans, and grants. Funding will be
8 pursuant to a plan developed by the chief executive officer of the
9 New York state urban development corporation and based in part on a
10 competitive selection process among the regional economic develop-
11 ment councils and will support initiatives based on anticipated
12 economic development benefits. Such moneys will be awarded by the
13 New York state urban development corporation at its discretion. All
14 or a portion of the funds appropriated hereby may be suballocated or
15 transferred to any department, agency, or public authority
16 (911415A3) ... 150,000,000 ...................... (re. $140,365,000)
17 The appropriation made by chapter 54, section 1, of the laws of 2014, as
18 amended by chapter 55, section 1, of the laws of 2016, is hereby
19 amended and reappropriated to read:
20 The sum of $150,000,000 is hereby appropriated for the regional
21 economic development council initiative. Funds appropriated herein
22 shall be available [during the 2014-15 and 2015-16 state fiscal
23 years] for services and expenses, loans, and grants. Funding will be
24 pursuant to a plan developed by the chief executive officer of the
25 New York state urban development corporation and based in part on a
26 competitive selection process among the regional economic develop-
27 ment councils and will support initiatives based on anticipated
28 economic development benefits. Such moneys will be awarded by the
29 New York state urban development corporation at its discretion. All
30 or a portion of the funds appropriated hereby may be suballocated or
31 transferred to any department, agency, or public authority
32 (911414A3) ... 150,000,000 ...................... (re. $120,669,000)
33 The appropriation made by chapter 54, section 1, of the laws of 2013, as
34 amended by chapter 54, section 1, of the laws of 2015, is hereby
35 amended and reappropriated to read:
36 The sum of $150,000,000 is hereby appropriated for the regional
37 economic development council initiative. Funds appropriated herein
38 shall be available [during the 2013-14 and 2014-15 state fiscal
39 years] for services and expenses, loans, and grants. Funding will be
40 pursuant to a plan developed by the chief executive officer of the
41 New York state urban development corporation and based in part on a
42 competitive selection process among the regional economic develop-
43 ment councils and will support initiatives based on anticipated
44 economic development benefits.
45 Such moneys will be awarded by the New York state urban development
46 corporation at its discretion. All or a portion of the funds appro-
47 priated hereby may be suballocated or transferred to any department,
48 agency, or public authority (911413A3) .............................
49 150,000,000 ..................................... (re. $102,624,000)
891 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
2 section 1, of the laws of 2013:
3 The sum of $150,000,000 is hereby appropriated for the regional
4 economic development council initiative. Funds appropriated herein
5 shall be for services and expenses, loans, and grants. Funding will
6 be pursuant to a plan developed by the chief executive officer of
7 the New York state urban development corporation and based in part
8 on a competitive selection process among the regional economic
9 development councils and will support initiatives based on antic-
10 ipated economic development benefits. Such moneys will be awarded by
11 the New York state urban development corporation at its discretion.
12 All or a portion of the funds appropriated hereby may be suballo-
13 cated or transferred to any department, agency, or public authority
14 (911412A3) ... 150,000,000 ....................... (re. $69,925,000)
15 REGIONAL DEVELOPMENT (CCP)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Regional Development Purpose
19 Community Revitalization Projects
20 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
21 section 1, of the laws of 2011:
22 The sum of $292,385,000 is hereby appropriated for the Restore New
23 York Communities Initiative, however, that of such amount, no more
24 than $50,000,000 shall be disbursed prior to April 1, 2007 and no
25 more than $150,000,000 shall be disbursed prior to April 1, 2008
26 (911106A3) ... 292,385,000 ....................... (re. $75,435,000)
27 Cultural Facilities Projects
28 By chapter 55, section 1, of the laws of 2006, as amended by chapter
29 108, section 5, of the laws of 2006:
30 The sum of $143,000,000 is hereby appropriated for projects that
31 improve arts or cultural facilities including but not limited to
32 those listed in the schedule below, subject to a plan submitted by
33 the chairman of the New York state urban development corporation and
34 approved by the director of the budget. All or a portion of the
35 funds appropriated hereby may be suballocated or transferred to any
36 department, agency, or public authority (910306A3) .................
37 143,000,000 ....................................... (re. $1,371,000)
38 Project Schedule
39 PROJECT AMOUNT
40 --------------------------------------------
41 Museum of Natural History ....... 18,000,000
42 World Trade Center Visitor
43 Orientation and Education
44 Center ........................ 57,000,000
45 Adirondack Natural History
892 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Museum ......................... 6,500,000
2 New York City Public Library .... 12,000,000
3 New York Historical Society ...... 5,500,000
4 Old Fort Niagara ................. 1,000,000
5 Lincoln Center .................. 15,000,000
6 Stanley Theater .................. 1,000,000
7 Museum of Jewish Heritage ....... 10,000,000
8 Albany Institute of History
9 and Art ........................ 1,000,000
10 Thirteen/WNET New York ........... 1,000,000
11 Whitney Museum of America Art ... 15,000,000
12 --------------
13 Total ...................... 143,000,000
14 ==============
15 Economic Development/Other Projects
16 By chapter 55, section 1, of the laws of 2006, as amended by chapter
17 108, section 5, of the laws of 2006:
18 The sum of $269,500,000 is hereby appropriated for economic develop-
19 ment projects including but not limited to those listed in the sche-
20 dule below, subject to a plan submitted by the chairman of the New
21 York state urban development corporation and approved by the direc-
22 tor of the budget. All or a portion of the funds appropriated hereby
23 may be suballocated or transferred to any department, agency, or
24 public authority (910106A3) ... 269,500,000 ....... (re. $3,695,000)
25 Project Schedule
26 PROJECT AMOUNT
27 --------------------------------------------
28 Albany Convention Center ........ 75,000,000
29 Canal Corporation - new initi-
30 atives ........................ 10,000,000
31 Hudson River Park ............... 11,000,000
32 Rivers and Estuaries Center ..... 25,000,000
33 Historic Hudson Valley ........... 5,000,000
34 Plattsburgh International
35 Airport ........................ 5,000,000
36 Plattsburgh Aeronautical
37 Institute ...................... 1,200,000
38 Governor's Island ............... 22,500,000
39 Department of Environmental
40 Conservation Fish Hatcheries ... 3,000,000
41 Roswell Park Cancer Institute ... 18,000,000
42 Lower Manhattan Energy Inde-
43 pendence Initiative ........... 25,000,000
44 Atlantic Yards Railway Rede-
45 velopment ..................... 34,000,000
46 Delphi Harrison ................. 25,000,000
47 Other ............................ 9,800,000
48 --------------
49 Total ........................ 269,500,000
893 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ==============
2 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
3 section 1, of the laws of 2017:
4 The sum of $603,050,000 is hereby appropriated for economic develop-
5 ment projects, university development projects, homeland security
6 projects, environmental projects, public recreation projects and
7 arts and cultural facility improvement projects, including but not
8 limited to those listed in the schedule below. All or a portion of
9 the funds appropriated herein may be suballocated or transferred to
10 any department, agency or public authority (910606A3) ..............
11 603,050,000 ...................................... (re. $76,728,000)
12 Project Schedule
13 PROJECT AMOUNT
14 --------------------------------------------
15 City of Yonkers Saw Mill River
16 Redevelopment .................. 8,000,000
17 NYS Applied Science Center of
18 Innovation and Excellence in
19 Homeland Security ............. 25,000,000
20 Renaissance Square Project
21 and/or other economic devel-
22 opment projects ............... 18,000,000
23 Renaissance Square Project
24 which may include the reha-
25 bilitation of the Eastman
26 Theatre and/or other
27 performance venues ............ 18,000,000
28 Schenectady Superconductivity
29 Partnership .................... 2,000,000
30 Kingston Business Park ........... 1,000,000
31 Public Safety Training Center .... 2,500,000
32 Chemung County IDA/Academic
33 and Career Advancement
34 Center ......................... 5,000,000
35 Comprehensive Emergency Shel-
36 tering Program on Long
37 Island ......................... 2,500,000
38 Clarkson University - Walker
39 Center ......................... 1,000,000
40 Atlantic Yards Railway Rede-
41 velopment ..................... 33,000,000
42 Atlantic Yards Railway - Nets
43 Project ....................... 33,000,000
44 Buffalo Building Demolition ...... 5,000,000
45 Buffalo Lakeside Commerce Park ... 5,000,000
46 East River Bioscience Park ...... 12,000,000
47 Albany College of
48 Pharmacy/Pharmaceutical
49 Center ......................... 2,000,000
50 Science and Technology Center
894 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 at Utica College ................. 675,000
2 City of Utica/East Government
3 Parking District or for
4 other projects of the Upper
5 Mohawk Valley Memorial Audi-
6 torium Authority ............... 1,500,000
7 Upper Mohawk Valley Memorial
8 Auditorium Authority ........... 2,000,000
9 State University of New York
10 at Stony Brook Brookhaven
11 National Laboratory Super-
12 computer ...................... 26,000,000
13 Brooklyn Museum - Third Floor
14 Beaux Arts Court ............... 7,500,000
15 Foothills Performing Arts
16 Center ......................... 4,000,000
17 Syracuse University Restore
18 Center for Environmental
19 Biotechnology .................. 5,000,000
20 Fredonia Agricultural Exper-
21 imental Station - Cornell
22 University ..................... 3,359,000
23 Rochester Rhinos Soccer Stadi-
24 um ............................. 5,000,000
25 Canisius College - Interdisci-
26 plinary Science Center ......... 3,000,000
27 Buffalo Niagara Medical Campus ... 5,200,000
28 Lower Manhattan 21st Century
29 Communications ................ 13,600,000
30 Lincoln Center ................... 7,500,000
31 Buffalo State College - New
32 Technology Building ........... 40,330,000
33 Rochester and Buffalo Educa-
34 tional Opportunity Center
35 Facilities .................... 28,000,000
36 Advanced Energy Research and
37 Technology Center on Long
38 Island ........................ 35,000,000
39 Of the amounts appropriated
40 herein $14,000,000 shall be
41 made available to the Luther
42 Forest Technology Campus
43 infrastructure and
44 $10,000,000 shall be made
45 available to Uptown and
46 Downtown Campus, University
47 at Albany ..................... 24,000,000
48 SUNY Fredonia - Science Center .. 10,000,000
49 The Putnam Community Founda-
50 tion ........................... 2,000,000
51 Hudson Valley Domestic
52 Preparedness, Response and
895 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Recovery Initiative ............ 4,000,000
2 Center for Lithography Devel-
3 opment ........................ 12,000,000
4 State University of New York
5 at Fredonia-Science Center .... 12,000,000
6 Westchester Community College
7 Master Plan Projects ........... 6,000,000
8 Bethel Woods Performing Arts
9 Center ......................... 1,000,000
10 To Long Island Bus for the
11 purchase of hybrid buses ....... 3,000,000
12 Suffolk Community College ........ 3,000,000
13 Queensborough Public Library ..... 6,000,000
14 State University of New York
15 at New Paltz-Old Main Reno-
16 vation ......................... 3,000,000
17 East River Bioscience Park ...... 11,000,000
18 Art Park and Company ............. 2,500,000
19 Landmark Theatre ................. 8,500,000
20 Rochester Parking Garage ......... 8,000,000
21 Hunts Point Cooperative Market ... 2,000,000
22 Office of Court Administra-
23 tion-Court Officers Academy .... 1,000,000
24 Buffalo Mainstreet ............... 8,000,000
25 Hispanic Federation .............. 2,000,000
26 Manhattan Youth Building ......... 3,100,000
27 Brooklyn Museum .................. 4,500,000
28 Boricua College .................. 2,000,000
29 Schenectady Metroplex Redevel-
30 opment ......................... 2,000,000
31 Channel 13 ....................... 1,250,000
32 Educational Alliance ............. 3,150,000
33 Brooklyn Public Library .......... 3,000,000
34 Osborne Association - Reno-
35 vation of the former Fulton
36 Correctional Facility .......... 3,000,000
37 New York City Department of
38 Parks and Recreation - Van
39 Cortlandt Park pedestrian
40 bridge ......................... 3,000,000
41 For services and expenses of
42 Nassau County .................. 2,000,000
43 Other projects to be deter-
44 mined pursuant to a plan to
45 be developed by the director
46 of the budget in consulta-
47 tion with the speaker of the
48 assembly ...................... 12,736,000
49 Other projects to be deter-
50 mined pursuant to a plan to
51 be developed by the director
52 of the budget in consulta-
896 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tion with the temporary
2 president of the senate ....... 73,650,000
3 --------------
4 Total ...................... 603,050,000
5 ==============
6 Energy/Environmental Projects
7 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
8 section 1, of the laws of 2007:
9 The sum of $15,000,000 is hereby appropriated for services and
10 expenses of the New York investment in conservation and efficiency
11 pilot program. Such funds appropriated shall be suballocated or
12 transferred to New York energy research and development authority
13 (911006A3) ... 15,000,000 ........................ (re. $15,000,000)
14 The sum of $30,000,000 is hereby appropriated for projects including,
15 but not limited to, renewable fuels, flexible fuel vehicles, hybrid
16 electric vehicles, plug-in hybrid electric vehicles, and other
17 research and development regarding fuel diversification and energy
18 efficiency in the transportation sector. All or a portion of the
19 funds appropriated hereby may be suballocated or transferred to any
20 department, agency, or public authority (910406A3) .................
21 30,000,000 ........................................ (re. $8,524,000)
22 By chapter 55, section 1, of the laws of 2006, as added by chapter 53,
23 section 3, of the laws of 2006:
24 The sum of $20,000,000 is hereby appropriated for a competitive solic-
25 itation for construction of a pilot cellulosic ethanol refinery.
26 All or a portion of the funds appropriated hereby may be suballo-
27 cated or transferred to any department, agency, or public authority
28 (910506A3) ... 20,000,000 ......................... (re. $6,867,000)
29 University Development Projects
30 By chapter 55, section 1, of the laws of 2006, as amended by chapter
31 108, section 5, of the laws of 2006:
32 The sum of $201,500,000 is hereby appropriated for university develop-
33 ment projects including but not limited to those listed in the sche-
34 dule below, subject to a plan submitted by the chairman of the New
35 York state urban development corporation and approved by the direc-
36 tor of the budget. All or a portion of the funds appropriated hereby
37 may be suballocated or transferred to any department, agency, or
38 public authority (910206A3) ... 201,500,000 ....... (re. $1,386,000)
39 Project Schedule
40 PROJECT AMOUNT
41 --------------------------------------------
42 University at Buffalo --
43 Krabbe Disease Research ........ 6,000,000
44 Columbia University - Nano
45 Facility ...................... 10,000,000
46 Columbia University - Cancer
897 12654-10-8
NEW YORK STATE URBAN DEVELOPMENT CORPORATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Center ........................ 12,000,000
2 Fordham University .............. 10,000,000
3 Syracuse Center of Excellence ... 10,000,000
4 Energy Recovery Linac Project
5 at Cornell University ......... 12,000,000
6 Clarkson University .............. 5,000,000
7 Paul Smith's College ............. 1,500,000
8 University at Albany -- Insti-
9 tute for Nanoelectronics
10 Discovery and Exploration
11 (INDEX) ....................... 75,000,000
12 New York State Veterinary
13 Diagnostic Laboratory ......... 50,000,000
14 Brooklyn Army Terminal ........... 6,000,000
15 East River Bioscience Park ....... 4,000,000
16 --------------
17 Total ........................ 201,500,000
18 ==============
19 UPSTATE REVITALIZATION (CCP)
20 Capital Projects Funds - Other
21 Dedicated Infrastructure Investment Fund
22 Infrastructure Investment Account
23 Upstate Revitalization Purpose
24 By chapter 54, section 1, of the laws of 2015:
25 The sum of $1,500,000,000 is hereby appropriated for the upstate revi-
26 talization initiative. Funds appropriated herein shall be for
27 services and expenses, loans, grants, workforce development, busi-
28 ness and tourism plan development, costs associated with program
29 administration, and the payment of personal services, nonpersonal
30 services and contract services provided by private firms to support
31 economic development projects, including the payment of liabilities
32 incurred prior to April 1, 2015. Funding will be pursuant to a plan
33 developed by the chief executive officer of the New York state urban
34 development corporation and based on a competitive selection process
35 among the regional economic development councils (R.E.D.C's) and
36 will support initiatives based on anticipated job creation and
37 economic development benefits. Such moneys will be awarded by the
38 New York state urban development corporation at its discretion. All
39 or a portion of the funds appropriated hereby may be suballocated or
40 transferred to any department, agency, or public authority
41 (910115UR) ... 1,500,000,000 .................. (re. $1,320,760,000)
898 12654-10-8
WORKERS' COMPENSATION BOARD
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Fund - Other....... 20,000,000 51,536,000
6 ---------------- ----------------
7 All Funds......................... 20,000,000 51,536,000
8 ================ ================
9 INFORMATION TECHNOLOGY PROGRAM (CCP) ........................ 20,000,000
10 --------------
11 Capital Projects Funds - Other
12 Miscellaneous Capital Projects Fund
13 Program Improvement/Change Purpose
14 For services and expenses related to the
15 acquisition and development of technology,
16 including but not limited to equipment,
17 software and services (35011808) ............ 20,000,000
899 12654-10-8
WORKERS' COMPENSATION BOARD
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 INFORMATION TECHNOLOGY PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Miscellaneous Capital Projects Fund
4 Program Improvement/Change Purpose
5 By chapter 54, section 1, of the laws of 2015:
6 For services and expenses related to the acquisition and development
7 of technology, including but not limited to equipment, software and
8 services (35011508) ... 60,000,000 ............... (re. $51,536,000)
900 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 10,000,000 10,000,000
6 ---------------- ----------------
7 All Funds ........................ 10,000,000 10,000,000
8 ================ ================
9 The sum of $10,000,000 is hereby appropri-
10 ated for payments and grants, including up
11 to $200,000 in costs associated with
12 program administration to eligible nonpro-
13 fit arts and cultural organizations for
14 the arts and cultural facilities improve-
15 ment program. Such program shall provide
16 for targeted investment for capital
17 projects in such eligible arts or cultural
18 facilities to improve the quality, effi-
19 ciency, and accessibility of arts and
20 cultural organizations that benefit New
21 Yorkers. Provided that such investments
22 may include, but are not limited to: reno-
23 vations or expansions of space that is
24 open to the public; modifications to
25 provide for sustainable, energy efficient
26 spaces that would result in overall energy
27 and cost savings; technology and other
28 equipment that will benefit the public;
29 and accessibility renovations.
30 Up to $5,000,000 in funding from this appro-
31 priation shall be made available through a
32 competitive process to be determined
33 exclusively by the New York state council
34 on the arts. The determination of this
35 competitive process and guidelines shall
36 be limited to the New York state council
37 on the arts in consultation with the
38 dormitory authority of the state of New
39 York. The guidelines for the program and
40 competitive process shall ensure that such
41 funding is made available for uses
42 throughout the state and takes into
43 account regional distribution, supports a
44 range of grant awards including a minimum
45 grant of $50,000, consideration of a waiv-
46 er of match requirements for organizations
47 as deemed appropriate by the New York
901 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS 2018-19
1 state council on the arts, and shall be
2 subject to the approval of the director of
3 the budget. Notwithstanding any inconsist-
4 ent provision of law, the dormitory
5 authority shall be authorized to adminis-
6 ter this program and designated state
7 agencies shall provide all necessary
8 assistance.
9 Up to $5,000,000 in funding from this appro-
10 priation shall be made available through a
11 competitive process that shall include
12 representatives from state agencies to be
13 determined by the director of the budget
14 and the guidelines for the program and
15 competitive process shall also ensure that
16 such funding is made available for uses
17 throughout the state and takes into
18 account regional distribution, and shall
19 be subject to the approval of the director
20 of the budget. Such representatives from
21 state agencies shall include, but not be
22 limited to, the New York state council on
23 the arts, and for purposes of this appro-
24 priation shall also include the dormitory
25 authority of the state of New York.
26 Notwithstanding any inconsistent provision
27 of law, the dormitory authority shall be
28 authorized to administer this program and
29 designated state agencies shall provide
30 all necessary assistance.
31 Notwithstanding any inconsistent provision
32 of law, all or a portion of the funds
33 appropriated herein may be suballocated or
34 transferred to any department, agency, or
35 public authority (ACNP1808) ................. 10,000,000
902 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ARTS AND CULTURAL FACILITIES IMPROVEMENT (CCP)
2 Capital Projects Fund - Other
3 Capital Projects Fund
4 Program Improvement/Change Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 The sum of $10,000,000 is hereby appropriated for payments and grants
7 to eligible nonprofit arts and cultural organizations for the arts
8 and cultural facilities improvement program. Such program shall
9 provide for targeted investment for capital projects in such eligi-
10 ble arts or cultural facilities to improve the quality, efficiency,
11 and accessibility of arts and cultural organizations that benefit
12 New Yorkers. Provided that such investments may include, but are not
13 limited to: renovations or expansions of space that is open to the
14 public; modifications to provide for sustainable, energy efficient
15 spaces that would result in overall energy and cost savings; tech-
16 nology and other equipment that will benefit the public; and acces-
17 sibility renovations.
18 Funding from this appropriation shall be made available through a
19 competitive process that shall include representatives from state
20 agencies to be determined by the director of the budget and the
21 guidelines for the program and competitive process shall also ensure
22 that such funding is made available for uses throughout the state
23 and takes into account regional distribution, and shall be subject
24 to the approval of the director of the budget. Such representatives
25 from state agencies shall include, but not be limited to, the New
26 York state council on the arts, and for purposes of this appropri-
27 ation shall also include the dormitory authority of the state of New
28 York. Notwithstanding any inconsistent provision of law, the dormi-
29 tory authority shall be authorized to administer this program and
30 designated state agencies shall provide all necessary assistance.
31 Notwithstanding any inconsistent provision of law, all or a portion of
32 the funds appropriated herein may be suballocated or transferred to
33 any department, agency, or public authority (ACNP1708) .............
34 10,000,000 ....................................... (re. $10,000,000)
903 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
COMMUNITY ENHANCEMENT FACILITIES ASSISTANCE PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 COMMUNITY ENHANCEMENT FACILITIES ASSISTANCE (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Community Enhancement Purpose
5 The appropriation made by chapter 55, section 2, of the laws of 1997, as
6 amended by chapter 54, section 1, of the laws of 2011, is hereby
7 amended and reappropriated to read:
8 The sum of $423,500,000 is hereby appropriated, in accordance with
9 chapter 432 of the laws of 1997 establishing the community enhance-
10 ment facilities assistance program, for community enhancement facil-
11 ities assistance projects. Eligible community enhancement facilities
12 assistance project(s) shall include, but not be limited to economic
13 development projects to be located within the county of Nassau
14 ($15,000,000), provided that the allocation made available to the
15 Governor, as authorized by paragraph one of the memorandum of under-
16 standing governing administration of the community enhancement
17 facilities assistance program, shall be reduced by $1,500,000 to
18 $140,166,666.
19 [No moneys of the state in the state treasury or any of its funds
20 shall be available for payments pursuant to this appropriation.]
21 Funding for community enhancement facilities assistance projects
22 [shall] may be provided from the proceeds of bonds or notes issued
23 in accordance with chapter 432 of the laws of 1997 authorizing the
24 issuance of bonds and notes for community enhancement facilities
25 projects. All or a portion of the funds appropriated hereby may be
26 suballocated or transferred to any department, agency, or public
27 authority (91CF97A3) ... 423,500,000 ............. (re. $44,323,000)
904 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT - CAPITAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other ..... 0 173,598,000
3 ---------------- ----------------
4 All Funds ........................ 0 173,598,000
5 ================ ================
6 REGIONAL DEVELOPMENT (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Regional Development Purpose
10 By chapter 55, section 1, of the laws of 2004, as transferred by chapter
11 54, section 1, of the laws of 2012:
12 For services and expenses of the following purposes, pursuant to a
13 memorandum of understanding to be executed by the governor, the
14 temporary president of the senate and the speaker of the assembly:
15 the Empire Opportunity Fund, as established pursuant to Part T of
16 chapter 84 of the laws of 2002; Rebuilding the Empire State Through
17 Opportunities in Regional Economies (RESTORE) New York, as estab-
18 lished pursuant to Part T of chapter 84 of the laws of 2002; and the
19 Community Capital Assistance Program, as established pursuant to
20 Part T of chapter 84 of the laws of 2002, provided that the allo-
21 cation made available to the governor, as authorized by paragraph
22 one of the memorandum of understanding governing administration of
23 the above named programs, shall be reduced by $6,675,000 to
24 $118,325,000.
25 Notwithstanding any other inconsistent provision of law, none of the
26 funds appropriated hereto, as delineated in the below project sched-
27 ule, may be interchanged among project purposes. All or a portion of
28 the funds appropriated hereby may be suballocated or transferred to
29 any department, agency, or public authority. Notwithstanding any
30 other inconsistent provision of law, this appropriation may not be
31 disbursed prior to the enactment of an appropriation for the expend-
32 iture from the community projects fund and the execution of a memo-
33 randum of understanding for the allocation and transfer of funds
34 into various accounts pursuant to section 99-d of the state finance
35 law (71E404A3) ... 243,325,000 ................... (re. $69,307,000)
36 Project Schedule
37 PROJECT AMOUNT
38 Empire Opportunity Fund ...................... 118,325,000
39 Community Capital Assistance Program .......... 62,500,000
40 Rebuilding the Empire State Through Opportu-
41 nities in Regional Economies (RESTORE) New
42 York, and the Community Capital Assistance
43 Program ..................................... 62,500,000
44 --------------
45 243,325,000
905 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT - CAPITAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ==============
2 By chapter 55, section 2, of the laws of 2002, as amended by chapter 54,
3 section 1, of the laws of 2014:
4 For services and expenses of the following purposes, pursuant to a
5 memorandum of understanding to be executed by the governor, the
6 temporary president of the senate and the speaker of the assembly:
7 Centers of Excellence, as established pursuant to chapter 84 of the
8 laws of 2002; the Empire Opportunity Fund, as established pursuant
9 to chapter 84 of the laws of 2002; Gen*NY*sis, as established pursu-
10 ant to chapter 84 of the laws of 2002; Rebuilding the Empire State
11 Through Opportunities in Regional Economies (RESTORE) New York, as
12 established pursuant to chapter 84 of the laws of 2002; for trans-
13 portation capital projects in accordance with the provisions of
14 subdivisions 3 and 4 of section 14-k of the transportation law, and
15 sections 89-b and 89-c of the state finance law; and the Community
16 Capital Assistance Program, as established pursuant to chapter 84 of
17 the laws of 2002, provided that the allocation made available to the
18 governor, as authorized by paragraph seven of the memorandum of
19 understanding governing administration of the above named programs,
20 shall be reduced by $10,300,000 to $289,700,000.
21 No moneys of the state in the state treasury or any of its funds shall
22 be available for payments pursuant to this appropriation. Funding
23 for the purposes delineated in this appropriation shall be provided
24 from the proceeds of bonds or notes issued pursuant to chapter 84 of
25 the laws of 2002. Notwithstanding any other inconsistent provision
26 of law, none of the funds appropriated hereto, as delineated in the
27 below project schedule, may be inter changed among project purposes.
28 All or a portion of the funds appropriated hereby may be suballo-
29 cated or transferred to any department, agency, or public authority
30 (71E102A3) ... 589,700,000 ..................... (re. $104,291,000)
31 Project Schedule
32 PROJECT AMOUNT
33 --------------------------------------------
34 Centers of Excellence, and
35 Empire Opportunity Fund ...... 289,700,000
36 Gen*NY*sis, Transportation
37 Capital Projects, and the
38 Community Capital Assistance
39 Program ...................... 150,000,000
40 Rebuilding the Empire State
41 Through Opportunities in
42 Regional Economies (RESTORE)
43 New York, Transportation
44 Capital Projects, and the
45 Community Capital Assistance
46 Program ...................... 150,000,000
47 --------------
48 Total ........................ 589,700,000
906 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT - CAPITAL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ==============
907 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ECONOMIC DEVELOPMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other ..... 0 76,011,000
3 ---------------- ----------------
4 All Funds ........................ 0 76,011,000
5 ================ ================
6 ECONOMIC DEVELOPMENT PROGRAM (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Economic Development Purpose
10 By chapter 55, section 1, of the laws of 2005, as added by chapter 162,
11 section 4, of the laws of 2005:
12 The sum of $75,000,000 is hereby appropriated to the New York State
13 economic development program (CCP) out of any moneys in the state
14 treasury in the general fund to the credit of the capital projects
15 fund, not otherwise appropriated, and made immediately available,
16 for the purpose of economic development projects outside cities with
17 a population of one million or more pursuant to a memorandum of
18 understanding to be executed by the governor, the temporary presi-
19 dent of the senate and the speaker of the assembly.
20 All or portions of the funds appropriated hereby may be suballocated
21 or transferred to any department, agency, or public authority
22 (DP000509) ... 75,000,000 ........................ (re. $63,543,000)
23 By chapter 3, section 29, of the laws of 2004, as amended by chapter 54,
24 section 1, of the laws of 2011:
25 The sum of three hundred forty-five million seven hundred fifty thou-
26 sand dollars ($345,750,000), or so much thereof as may be necessary,
27 is hereby appropriated to the New York state economic development
28 program (CCP) out of any moneys in the state treasury in the general
29 fund to the credit of the capital projects fund, not otherwise
30 appropriated, and made immediately available, for the purpose of
31 economic development projects outside cities with a population of
32 one million or more pursuant to a memorandum of understanding to be
33 executed by the governor, the temporary president of the senate and
34 the speaker of the assembly, provided that the allocation made
35 available to the governor, as authorized by paragraph one of the
36 memorandum of understanding governing administration of the New York
37 state economic development program, shall be reduced by $4,250,000
38 to $162,416,000.
39 All or a portion of the funds appropriated hereby may be suballocated
40 or transferred to any department, agency, or public authority
41 (DP010409) ... 345,750,000 ....................... (re. $12,468,000)
908 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGH TECHNOLOGY AND DEVELOPMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 HIGH TECHNOLOGY AND DEVELOPMENT (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Regional Development Purpose
5 By chapter 55, section 1, of the laws of 2005, as transferred by chapter
6 54, section 1, of the laws of 2012:
7 For services and expenses of the New York state technology and devel-
8 opment program pursuant to a memorandum of understanding to be
9 executed by the governor, the temporary president of the senate, and
10 the speaker of the assembly, provided that the allocation made
11 available to the governor, as authorized by paragraphs one and three
12 of the memorandum of understanding governing administration of the
13 New York state technology and development program, shall be reduced
14 by $1,000,000 to $93,054,000.
15 All or a portion of the funds appropriated hereby may be suballocated
16 to any department, agency, or public authority (TD0005RD) ..........
17 249,000,000 ...................................... (re. $75,456,000)
909 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS PROGRAM
CAPITAL PROJECTS 2018-19
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 30,000,000 104,000,000
6 ---------------- ----------------
7 All Funds ........................ 30,000,000 104,000,000
8 ================ ================
9 HIGHER EDUCATION CAPITAL MATCHING GRANTS (CCP) .............. 30,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Capital Matching Grants Purpose
14 The sum of $30,000,000 is hereby appropri-
15 ated for the higher education facilities
16 capital matching grants program. Awards
17 and grants shall be administered by the
18 New York state higher education capital
19 matching grant board created pursuant to
20 part U of chapter 63 of the laws of 2005
21 as amended (MG0918MG) ....................... 30,000,000
910 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 HIGHER EDUCATION CAPITAL MATCHING GRANTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Capital Matching Grants Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 The sum of $30,000,000 is hereby appropriated for the higher education
7 facilities capital matching grants program. Awards and grants shall
8 be administered by the New York state higher education capital
9 matching grant board created pursuant to part U of chapter 63 of the
10 laws of 2005 as amended (MG0816MG) .................................
11 30,000,000 ....................................... (re. $30,000,000)
12 By chapter 54, section 1, of the laws of 2015:
13 The sum of $30,000,000 is hereby appropriated for the higher education
14 facilities capital matching grants program. Awards and grants shall
15 be administered by the New York state higher education capital
16 matching grant board created pursuant to part U of chapter 63 of the
17 laws of 2005 as amended (MG0815MG) .................................
18 30,000,000 ....................................... (re. $30,000,000)
19 By chapter 54, section 1, of the laws of 2014:
20 The sum of $30,000,000 is hereby appropriated for the higher education
21 facilities capital matching grants program. Awards and grants shall
22 be administered by the New York state higher education capital
23 matching grant board created pursuant to part U of chapter 63 of the
24 laws of 2005 as amended (MG0814MG) .................................
25 30,000,000 ....................................... (re. $30,000,000)
26 By chapter 53, section 1, of the laws of 2005, as amended by chapter 54,
27 section 1, of the laws of 2013:
28 The sum of $150,000,000 is hereby appropriated for the higher educa-
29 tion facilities capital matching grants program. Awards and grants
30 shall be administered by the New York state higher education capital
31 matching grant board created pursuant to part U of chapter 63 of the
32 laws of 2005 as amended (MG0805MG) .................................
33 150,000,000 ...................................... (re. $14,400,000)
911 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
HUDSON RIVER VALLEY GREENWAY COMMUNITIES COUNCIL
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 EMPIRE STATE TRAIL (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Environment and Recreation Purpose
5 By chapter 54, section 1, of the laws of 2017:
6 For the costs and expenses, including personal services, nonpersonal
7 services, fringe benefits and indirect costs of projects related to
8 improvements, alterations, rehabilitation and completion of the
9 Empire State Trail network in the hudson river valley, champlain
10 valley and along the erie canal, including the payment of liabil-
11 ities incurred prior to April 1, 2017. All or a portion of the funds
12 appropriated herein may be suballocated or transferred to any
13 department, agency or public authority (80ET17ER) ..................
14 123,000,000 ..................................... (re. $118,500,000)
912 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
JACOB JAVITS CONVENTION CENTER
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 JACOB JAVITS CONVENTION CENTER (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Economic Development Purpose
5 By chapter 55, section 1, of the laws of 2005:
6 For services and expenses of the Jacob Javits Convention Center expan-
7 sion project, as authorized pursuant to chapter 3 of the laws of
8 2004. Any disbursements made pursuant to this appropriation shall be
9 reimbursed with the proceeds of bonds authorized pursuant to chapter
10 3 of the laws of 2004 to finance the Jacob Javits Convention Center
11 expansion project. All or a portion of the funds appropriated hereby
12 may be suballocated or transferred to any department, agency, or
13 public authority (CC000509) ... 350,000,000 ..... (re. $350,000,000)
913 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other ..... 0 120,000,000
3 ---------------- ----------------
4 All Funds ........................ 0 120,000,000
5 ================ ================
6 NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund - Authority Bonds
9 Preservation of Facilities Purpose
10 By chapter 54, section 1, of the laws of 2017:
11 The sum of $20,000,000 is hereby appropriated for payments and grants
12 to eligible nonprofit human services organizations for the nonprofit
13 infrastructure capital investment program. Such program shall
14 provide for targeted investment for capital projects in such eligi-
15 ble nonprofit human services organizations to improve the quality,
16 efficiency, and accessibility of nonprofit human services organiza-
17 tions that serve New Yorkers. Provided that such investments
18 include, but are not limited to: technology upgrades related to
19 improving electronic records, data analysis, or confidentiality;
20 renovations or expansions of space used for direct program services;
21 modifications to provide for sustainable, energy efficient spaces
22 that would result in overall energy and cost savings; and accessi-
23 bility renovations. Provided further that such eligible nonprofit
24 human services organizations are those which provide direct services
25 to New Yorkers through state contracts, state authorized payments,
26 and/or state payment rates. Provided further that nothing herein
27 shall preclude a nonprofit human services organization that is
28 otherwise eligible and that is located in publicly owned property
29 from receiving a grant as long as such purpose and project would be
30 otherwise eligible and such grant is not used for building or prop-
31 erty maintenance or improvements, structural maintenance or improve-
32 ments, or building systems maintenance or improvements. Funding from
33 this appropriation shall be made available through a competitive
34 process that shall include representatives from multiple state agen-
35 cies to be determined by the director of the budget and the guide-
36 lines for the program and competitive process and such process shall
37 also ensure that such funding is made available for uses throughout
38 the state, and shall be subject to the approval of the director of
39 the budget. Provided further that such proposals submitted by eligi-
40 ble nonprofit human services organizations shall include, at a mini-
41 mum, the following: the amount of funds requested in relation to
42 the size and scope of the proposed project and the number of clients
43 who will benefit; a detailed description of the project, including
44 projected costs including the sources and uses of funds, project
45 completion timeline, and funds necessary at each stage of project
46 completion; the extent to which the proposed project reflects a
914 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 necessary improvement or upgrade to continue to serve the nonprofit
2 human services organization's target population, or a population
3 they would be able to serve if such improvements or upgrades were
4 made; a statement that as of the effective date of this chapter,
5 construction had not begun and equipment had not been purchased for
6 such project; and if applicable, a statement whether the project has
7 received all necessary regulatory approvals or can demonstrate a
8 reasonable expectation that such approvals will be secured. Such
9 representatives from state agencies shall include, but not be limit-
10 ed to, the Office of Children and Family Services, the Office of
11 Temporary and Disability Assistance, the Office for People with
12 Developmental Disabilities, the Office of Mental Health, and for
13 purposes of this appropriation, shall also include the Dormitory
14 Authority of the State of New York and, notwithstanding any incon-
15 sistent provision of law, the Dormitory Authority shall be author-
16 ized to administer this program. All or a portion of the funds
17 appropriated herein may be suballocated or transferred to any
18 department, agency, or public authority (92NP1703) .................
19 20,000,000 ....................................... (re. $20,000,000)
20 By chapter 55, section 1, of the laws of 2016:
21 The sum of $50,000,000 is hereby appropriated for payments and grants
22 to eligible nonprofit human services organizations for the nonprofit
23 infrastructure capital investment program. Such program shall
24 provide for targeted investment for capital projects in such eligi-
25 ble nonprofit human services organizations to improve the quality,
26 efficiency, and accessibility of nonprofit human services organiza-
27 tions that serve New Yorkers. Provided that such investments
28 include, but are not limited to: technology upgrades related to
29 improving electronic records, data analysis, or confidentiality;
30 renovations or expansions of space used for direct program services;
31 modifications to provide for sustainable, energy efficient spaces
32 that would result in overall energy and cost savings; and accessi-
33 bility renovations. Provided further that such eligible nonprofit
34 human services organizations are those which provide direct services
35 to New Yorkers through state contracts, state authorized payments,
36 and/or state payment rates. Provided further that nothing herein
37 shall preclude a nonprofit human services organization that is
38 otherwise eligible and that is located in publicly owned property
39 from receiving a grant as long as such purpose and project would be
40 otherwise eligible and such grant is not used for building or prop-
41 erty maintenance or improvements, structural maintenance or improve-
42 ments, or building systems maintenance or improvements. Funding from
43 this appropriation shall be made available through a competitive
44 process that shall include representatives from multiple state agen-
45 cies to be determined by the director of the budget and the guide-
46 lines for the program and competitive process and such process shall
47 also ensure that such funding is made available for uses throughout
48 the state, and shall be subject to the approval of the director of
49 the budget. Provided further that such proposals submitted by eligi-
915 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ble nonprofit human services organizations shall include, at a mini-
2 mum, the following: the amount of funds requested in relation to the
3 size and scope of the proposed project and the number of clients who
4 will benefit; a detailed description of the project, including
5 projected costs including the sources and uses of funds, project
6 completion timeline, and funds necessary at each stage of project
7 completion; the extent to which the proposed project reflects a
8 necessary improvement or upgrade to continue to serve the nonprofit
9 human services organization's target population, or a population
10 they would be able to serve if such improvements or upgrades were
11 made; a statement that as of the effective date of this chapter,
12 construction had not begun and equipment had not been purchased for
13 such project; and if applicable, a statement whether the project has
14 received all necessary regulatory approvals or can demonstrate a
15 reasonable expectation that such approvals will be secured. Such
16 representatives from state agencies shall include, but not be limit-
17 ed to, the Office of Children and Family Services, the Office of
18 Temporary and Disability Assistance, the Office for People with
19 Developmental Disabilities, the Office of Mental Health, and for
20 purposes of this appropriation, shall also include the Dormitory
21 Authority of the State of New York and, notwithstanding any incon-
22 sistent provision of law, the Dormitory Authority shall be author-
23 ized to administer this program. All or a portion of the funds
24 appropriated herein may be suballocated or transferred to any
25 department, agency, or public authority (92NP1603) .................
26 50,000,000 ....................................... (re. $50,000,000)
27 By chapter 54, section 1, of the laws of 2015:
28 The sum of $50,000,000 is hereby appropriated for payments and grants
29 to eligible nonprofit human services organizations for the nonprofit
30 infrastructure capital investment program. Such program shall
31 provide for targeted investment for capital projects in such eligi-
32 ble nonprofit human services organizations to improve the quality,
33 efficiency, and accessibility of nonprofit human services organiza-
34 tions that serve New Yorkers. Provided that such investments
35 include, but are not limited to: technology upgrades related to
36 improving electronic records, data analysis, or confidentiality;
37 renovations or expansions of space used for direct program services;
38 modifications to provide for sustainable, energy efficient spaces
39 that would result in overall energy and cost savings; and accessi-
40 bility renovations. Provided further that such eligible nonprofit
41 human services organizations are those which provide direct services
42 to New Yorkers through state contracts, state authorized payments,
43 and/or state payment rates. Funding from this appropriation shall be
44 made available through a competitive process that shall include
45 representatives from multiple state agencies to be determined by the
46 director of the budget and the guidelines for the program and
47 competitive process and such process shall also ensure that such
48 funding is made available for uses throughout the state, and shall
49 be subject to the approval of the director of the budget. Provided
916 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 further that such proposals submitted by eligible nonprofit human
2 services organizations shall include, at a minimum, the following:
3 the amount of funds requested in relation to the size and scope of
4 the proposed project and the number of clients who will benefit; a
5 detailed description of the project, including projected costs
6 including the sources and uses of funds, project completion time-
7 line, and funds necessary at each stage of project completion; the
8 extent to which the proposed project reflects a necessary improve-
9 ment or upgrade to continue to serve the nonprofit human services
10 organization's target population, or a population they would be able
11 to serve if such improvements or upgrades were made; a statement
12 that as of the effective date of this chapter, construction had not
13 begun and equipment had not been purchased for such project; and if
14 applicable, a statement whether the project has received all neces-
15 sary regulatory approvals or can demonstrate a reasonable expecta-
16 tion that such approvals will be secured. Such representatives from
17 state agencies shall include, but not be limited to, the Office of
18 Children and Family Services, the Office of Temporary and Disability
19 Assistance, the Office for People with Developmental Disabilities,
20 the Office of Mental Health, and for purposes of this appropriation,
21 shall also include the Dormitory Authority of the State of New York
22 and, notwithstanding any inconsistent provision of law, the Dormito-
23 ry Authority shall be authorized to administer this program. All or
24 a portion of the funds appropriated herein may be suballocated or
25 transferred to any department, agency, or public authority
26 (92NP1503) ... 50,000,000 ........................ (re. $50,000,000)
917 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
REGIONAL ECONOMIC DEVELOPMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 REGIONAL DEVELOPMENT (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Regional Development Purpose
5 By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
6 section 1, of the laws of 2011:
7 For services and expenses of the regional economic development program
8 pursuant to a memorandum of understanding to be executed by the
9 governor, the temporary president of the senate, and the speaker of
10 the assembly, provided that the allocation made available to the
11 governor, as authorized by paragraph one of the memorandum of under-
12 standing governing administration of the regional economic develop-
13 ment program, shall be reduced by $250,000 to $42,610,000.
14 All or a portion of the funds appropriated hereby may be suballocated
15 to any department, agency, or public authority (ED0005RE) ..........
16 89,750,000 ....................................... (re. $13,049,000)
918 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
ROOSEVELT ISLAND OPERATING CORPORATION
CAPITAL PROJECTS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other...... 25,028,000 0
3 ---------------- ----------------
4 All Funds......................... 25,028,000 0
5 ================ ================
6 ROOSEVELT ISLAND CAPITAL PROGRAM (CCP) ...................... 25,028,000
7 --------------
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 New Facilities Purpose
11 In support of a comprehensive, multi-year
12 capital program for capital improvements
13 on Roosevelt Island, to be administered by
14 the Roosevelt Island operating corpo-
15 ration, established by chapter 899 of the
16 laws of 1984. Notwithstanding any other
17 law to the contrary, the amounts appropri-
18 ated herein may be suballocated to any
19 state department, agency, or public
20 authority for the purposes stated herein.
21 No funds shall be expended, suballocated,
22 disbursed or transferred from this appro-
23 priation until the director of the budget
24 has approved a spending plan submitted by
25 the Roosevelt Island operating corporation
26 in such detail as required by the director
27 of the budget (71011807) .................... 25,028,000
919 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other ..... 0 3,819,847,000
3 ---------------- ----------------
4 All Funds ........................ 0 3,819,847,000
5 ================ ================
6 NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT (CCP)
7 Capital Projects Funds - Other
8 Dedicated Infrastructure Investment Fund
9 Infrastructure Investment Account
10 Special Infrastructure Purpose
11 By chapter 54, section 1, of the laws of 2017:
12 For services and expenses, loans, grants, and costs associated with
13 program administration, of projects and purposes author- ized by
14 section 93-b of the state finance law to receive funding from the
15 dedicated infrastructure investment fund - infrastructure investment
16 account, including the payment of liabilities incurred prior to
17 April 1, 2017; provided however, that loans or grants under this
18 appropriation to a private corporation, association or enterprise
19 shall only be made or given by a public corporation or authority.
20 All or a portion of the funds appropriated hereby may be suballo-
21 cated or transferred to any department, agency, or public authority,
22 according to the following:
23 To prepare for, prevent, deter, or respond to acts of terrorism;
24 natural or man-made disasters, including severe weather events;
25 risks to public safety, health, and/or other emergencies (93SC17SP)
26 ... 100,000,000 .................................. (re. $77,655,000)
27 By chapter 55, section 1, of the laws of 2016, as amended by chapter 54,
28 section 1, of the laws of 2017:
29 For services and expenses, loans, grants, and costs associated with
30 program administration, of projects and purposes authorized by
31 section 93-b of the state finance law to receive funding from the
32 dedicated infrastructure investment fund - infrastructure investment
33 account, including the payment of liabilities incurred prior to
34 April 1, 2016; provided however, that loans or grants under this
35 appropriation to a private corporation, association or enterprise
36 shall only be made or given by a public corporation or authority.
37 All or a portion of the funds appropriated hereby may be suballo-
38 cated or transferred to any department, agency, or public authority,
39 according to the following:
40 Thruway stabilization program, for the payment of costs related to the
41 New NY bridge and bridge-related transportation improvements, and
42 for other costs of the thruway authority including, but not limited
43 to, its core capital program, for the purposes of principal, inter-
44 est, and related expenses, and/or for retiring or defeasing bonds
45 previously issued by the New York State Thruway Authority, including
920 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 any accrued interest or other expenses related thereto. Costs may
2 include, but not be limited to, construction, reconstruction, recon-
3 ditioning and preservation, including work appurtenant and ancillary
4 thereto, may include the acquisition of property, and may include
5 engineering services, including but not limited to the preparation
6 of designs, plans, specifications and estimates; construction
7 management and supervision; appraisals, surveys, testing and envi-
8 ronmental impact statements; personal services, nonpersonal
9 services, fringe and indirect costs and the services provided by
10 private firms (930616SP) ... 700,000,000 ........ (re. $700,000,000)
11 Transportation infrastructure and facilities in the five-year depart-
12 ment of transportation plan for 2015-16 through 2019-20, for the
13 payment of costs, including the payment of liabilities incurred
14 prior to April 1, 2016, of transportation infrastructure projects,
15 including but not limited to, state and local roads and bridges;
16 airport, freight and passenger rail, port and transit projects or
17 multi-modal facilities, including work appurtenant and ancillary
18 thereto. Project costs funded from this appropriation may include
19 but shall not be limited to construction, reconstruction, recondi-
20 tioning and preservation, the acquisition of property, and engineer-
21 ing services, including personal services, nonpersonal services,
22 fringe benefits, the contract services provided by private firms,
23 and reimbursements to the dedicated highway and bridge trust fund
24 and capital projects funds, for activities including but not limited
25 to, the preparation of designs, plans, specifications and estimates;
26 construction management and supervision; and appraisals, surveys,
27 testing and environmental impact statements for transportation
28 infrastructure projects. Notwithstanding section 93 of the state
29 finance law or any other law, rule or regulation to the contrary,
30 all or a portion of the funds appropriated herein may be (i) inter-
31 changed, (ii) suballocated to the Department of Transportation, or
32 (iii) transferred from this appropriation to any other capital
33 projects appropriation or appropriations of the Department of Trans-
34 portation (931316SP) ... 200,000,000 ............ (re. $113,155,000)
35 The sum of $170,000,000 is hereby appropriated for additional upstate
36 revitalization initiative projects. Funds appropriated herein shall
37 be for services and expenses, loans, grants, workforce development,
38 business and tourism plan development, costs associated with program
39 administration, and the payment of personal services, nonpersonal
40 services and contract services provided by private firms to support
41 economic development projects. Funding will be pursuant to a plan
42 developed by the chief executive officer of the New York state urban
43 development corporation and will support initiatives based on antic-
44 ipated job creation and economic development benefits. Funds shall
45 not be available from this appropriation for projects within regions
46 that were Upstate Revitalization Initiative 2015 Best Plan Awardees
47 or eligible to receive funding from the Buffalo Regional Innovation
48 Cluster Program. Such moneys will be awarded by the New York state
49 urban development corporation at its discretion (931216SP) .........
50 170,000,000 ..................................... (re. $170,000,000)
921 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 The sum of $85,000,000 is hereby appropriated for services and
2 expenses, loans, grants, and costs associated with economic develop-
3 ment or infrastructure projects (931416SP) .........................
4 85,000,000 ....................................... (re. $85,000,000)
5 Notwithstanding any inconsistent provision of law, the sum of
6 $1,000,000,000 is hereby appropriated for services and expenses,
7 grants and loans associated with the Jacob Javits Convention Center
8 expansion project (931516SP) .......................................
9 1,000,000,000 ................................... (re. $951,480,000)
10 For services and expenses related to the empire state poverty
11 reduction initiative. Funds appropriated herein shall be made avail-
12 able for sixteen local anti-poverty task forces in municipalities,
13 or a borough, with high rates of poverty as determined by the U.S.
14 Census Bureau's 2010-14 American Community Survey Five-year Esti-
15 mate: Albany, the Bronx, Binghamton, Buffalo, Elmira, Hempstead,
16 Jamestown, Newburgh, Niagara Falls, Oneonta, Oswego, Rochester,
17 Syracuse, Troy, Utica and Watertown. Provided that, except in muni-
18 cipalities where a state-funded anti-poverty task force or initi-
19 ative already exists and is receiving or has received State funding
20 for such purpose, the mayor of each municipality, or in the case of
21 the Bronx, the borough president, will select a not-for-profit
22 organization that provides services in the municipality, or in the
23 case of the Bronx, the borough, to serve as the local coordinator of
24 each such local task force. Provided further that, except in munici-
25 palities where a state-funded antipoverty task force or initiative
26 already exists and is receiving or has received funding, each such
27 taskforce shall make efforts to be comprised of, but not limited to,
28 the following members: representatives from municipal, county,
29 and/or state government; individuals who have lived in or currently
30 live in households in poverty; individuals and advocates represent-
31 ing local not-for-profit and community organizations; represen-
32 tatives from local school districts; and representatives from local
33 social services districts. Of the funds appropriated herein, the
34 amount available for each local anti-poverty task force shall be
35 determined based on the number of people in each municipality, or a
36 borough, who are living in poverty as determined by the U.S. Census
37 Bureau's 2010-14 American Community Survey Five-year Estimate
38 provided that each local anti-poverty task force shall be eligible
39 to receive funding in the following amounts: municipalities with
40 fewer than 5,000 individuals in poverty shall each be eligible to
41 receive $500,000; municipalities with between 5,000 and 10,000 indi-
42 viduals in poverty shall each be eligible to receive $1,000,000;
43 municipalities with between 10,000 and 40,000 individuals in poverty
44 shall each be eligible to receive $1,500,000; and municipalities, or
45 a borough, with more than 40,000 individuals in poverty shall each
46 be eligible to receive $2,750,000. Funds appropriated herein shall
47 be available to support the work of each anti-poverty task force and
48 such work shall be divided into two phases. During the first phase,
49 the mayor of the municipality, or in the case of the Bronx, the
50 borough president, will select a not-for-profit organization that
922 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 has demonstrated successful performance working with community
2 stakeholders and achieving objectives specified herein, to coordi-
3 nate the local antipoverty task force. The not-for-profit organiza-
4 tion serving as coordinator will assemble the antipoverty task force
5 using the criteria outlined above. Provided further that, with guid-
6 ance and oversight of the commissioner of the office of temporary
7 and disability assistance, each local anti-poverty task force shall
8 use data to identify high need issues and neighborhoods within the
9 municipality, or in the case of the Bronx, the borough; identify
10 problems that are common in neighborhoods throughout the munici-
11 pality, or in the case of the Bronx, the borough; receive input from
12 local residents; use data and resident input to select one or more
13 focus areas related to either one or more issues or one or more
14 neighborhoods; and develop a plan for how funding will be targeted
15 toward the identified issues or neighborhoods. Such focus areas may
16 include, but are not limited to childhood poverty and homelessness.
17 Activities included in such plan may include, but are not limited
18 to: providing public assistance recipients opportunities to partic-
19 ipate in enhanced work activities that either provide recognized
20 credentialing or enhanced career readiness or job training for
21 better linkage to potential employment; assisting families in pover-
22 ty through services provided to parents and children; and addressing
23 chronic homelessness or housing insecurity. Such plan must include
24 measurable objectives and a timeframe for completion and shall be
25 submitted for approval to the commissioner of the office of tempo-
26 rary and disability assistance. Of the total amount made available
27 to each anti-poverty task force, the lesser of $300,000 or 20
28 percent of the total award may be used to carry out planning and
29 administration, provided however, that the amount used for planning
30 and administration may exceed such limitation if such amount is
31 approved by the commissioner of the office of temporary and disabil-
32 ity assistance as part of the plan required herein. Upon receiving
33 approval from the commissioner of the office of temporary and disa-
34 bility assistance, each such anti-poverty task force shall commence
35 the second phase of its work, which will support the implementation
36 of the plan developed during the first phase. Funding appropriated
37 herein shall be made available to the not-for-profit organization
38 serving as coordinator and its use shall be restricted to purposes
39 or initiatives that do not necessitate ongoing state financial
40 support. Such anti-poverty task forces shall be encouraged to secure
41 match funding from private sector and foundation sources to supple-
42 ment the funds appropriated herein and provided further that any
43 funding provided from this appropriation shall not be used to
44 supplant funding for programs already in existence. Such funds may
45 be made available pursuant to a plan approved by the director of the
46 budget (931A16SP) ... 25,000,000 ................. (re. $23,720,000)
47 Notwithstanding any inconsistent provision of law, in support of a
48 comprehensive statewide multi-year housing program to prevent and
49 address homelessness across the State, funds appropriated herein may
50 be used in conjunction with other resources made available as part
923 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 of the state fiscal year 2016-17 and 2017-18 local assistance, capi-
2 tal and state operations budget to support various programs to
3 support homeless individuals and youth or individuals and youth at
4 risk of becoming homeless, including but not limited to, a statewide
5 multiagency supportive housing program to provide housing and
6 support services for vulnerable New Yorkers including but not limit-
7 ed to seniors, veterans, victims of domestic violence, formerly
8 incarcerated individuals, individuals diagnosed with HIV/AIDS and
9 homeless individuals with copresenting health conditions, eligible
10 services to runaway and homeless youth, and for services to meet the
11 emergency needs of homeless individuals and families (931116SP) ....
12 50,000,000 ....................................... (re. $49,948,000)
13 Municipal consolidation competition, for payments for capital and
14 other expenses related to the implementation of: consolidations,
15 dissolutions, mergers, or other permanent changes in governing
16 structures; shared services, cooperation agreements, or other effi-
17 ciencies; or other actions that reduce operational costs or property
18 tax burdens on a permanent basis, as selected through a competitive
19 application process developed by the secretary of state (931016SP)
20 ... 20,000,000 ................................... (re. $20,000,000)
21 By chapter 54, section 1, of the laws of 2015, as amended by chapter 55,
22 section 1, of the laws of 2016:
23 For services and expenses, loans, grants, and costs associated with
24 program administration, of projects and purposes authorized by
25 section 93-b of the state finance law to receive funding from the
26 dedicated infrastructure investment fund - infrastructure investment
27 account, including the payment of liabilities incurred prior to
28 April 1, 2015; provided however, that loans or grants under this
29 appropriation to a private corporation, association or enterprise
30 shall only be made or given by a public corporation or authority;
31 and provided further however, notwithstanding the foregoing, and
32 notwithstanding section 163 of the state finance law or any other
33 law to the contrary, grants may also be given under this appropri-
34 ation by the department of agriculture and markets to farm owners
35 and related industries, not for profit conservation organizations
36 and local governments to protect, maintain, develop and grow farm,
37 agricultural and related industries located in the southern tier and
38 hudson valley, as defined by the commissioner of agriculture and
39 markets. All or a portion of the funds appropriated hereby may be
40 suballocated or transferred to any department, agency, or public
41 authority, according to the following:
42 New NY broadband initiative, to support the development of infrastruc-
43 ture to bring high-speed internet access to unserved and underserved
44 regions throughout the state, and to support the development of
45 other telecommunications infrastructure; provided however that
46 priority shall be given to projects that bring high-speed internet
47 access to unserved areas of the state, public libraries, and educa-
48 tional opportunity centers; provided further that the New York state
49 urban development corporation shall submit a report before June 30,
924 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 2016 to the director of the division of the budget, the temporary
2 president of the senate, the speaker of the assembly, the minority
3 leader of the senate and the minority leader of the assembly detail-
4 ing: (a) the total amount of public funds committed by this program
5 annually; (b) total amount of private funds committed annually and,
6 if applicable, the amount of such funds that has been invested by
7 such parties; (c) the location of each area receiving investments
8 under this program and the goals for each such area; (d) planned
9 future investments by both public and private parties; and (e) such
10 other information as the corporation deems necessary (930115SP) ...
11 500,000,000 ..................................... (re. $491,176,000)
12 Municipal restructuring, for payments to local governments, school
13 districts, and other municipal entities for capital and other
14 expenses related to the implementation of local government and
15 school district shared services, cooperation agreements, mergers,
16 and other actions that reduce operational costs and related property
17 tax burdens on a permanent basis, as selected through an application
18 process developed by the secretary of state, provided, however, that
19 school districts' expenditures of the funds appropriated herein
20 shall not be eligible for aid under any provision of the education
21 law; for payments related to a downtown revitalization program
22 designed and executed by the department of state and the division of
23 housing and community renewal for transformative housing, economic
24 development, transportation and community projects including those
25 designed to increase the property tax base, of which up to $500,000
26 may be made available to fund projects consistent with the purposes
27 of the healthy food / healthy communities initiative pursuant to
28 section 16-s of the urban development corporation act, provided such
29 projects are included in a strategic plan submitted for funding
30 under the downtown revitalization program; and for payments of
31 grants, awards, and aid provided through the local government effi-
32 ciency grant program, the citizen empowerment tax credit, local
33 government citizens reorganization empowerment grant program, and
34 the local government performance and efficiency program, as author-
35 ized by section 54 of the state finance law (930215SP) .............
36 150,000,000 ..................................... (re. $138,506,000)
37 Grants to essential health care providers shall be available upon
38 determination of the commissioner of health without a competitive
39 bid or request for proposal process to support debt retirement and
40 capital projects or non-capital projects that facilitate health care
41 transformation, including mergers, consolidation, acquisition or
42 other significant corporate restructuring activities intended to
43 create a financially sustainable system of care that promotes a
44 patient-centered model of health care delivery. Grants shall not be
45 available to support general operating expenses. For purposes of
46 this appropriation, an essential health care provider is a hospital
47 or hospital system that, in the discretion of the commissioner of
48 health, offers health services within a defined and isolated
49 geographic region where such services would otherwise be unavailable
925 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 to the population of such region (930315SP) ........................
2 355,000,000 ..................................... (re. $186,650,000)
3 The sum of $19,500,000 is hereby appropriated to support a community
4 health care revolving capital fund as authorized by section twenty
5 eight hundred fifteen-a of the public health law (93H215SP) ........
6 19,500,000 ....................................... (re. $19,500,000)
7 For the acquisition of information technology systems, electronic
8 health records, billing systems, or other hardware as well as any
9 other infrastructure costs associated with the inclusion of behav-
10 ioral health services in the medicaid managed care benefit package.
11 Such funds shall be available to not-for-profit agencies licensed,
12 certified or approved by the office of mental health, the office for
13 alcoholism and substance abuse services, or the office for people
14 with developmental disabilities. A portion of these funds may be
15 used to support training and technical assistance during the transi-
16 tion period (93H315SP) ... 10,000,000 ............... (re. $504,000)
17 To prepare for, prevent, deter, or respond to acts of terrorism;
18 natural or man-made disasters, including severe weather events;
19 risks to public safety, health, and/or other emergencies. Of the
20 amounts appropriated herein, $10,000,000 shall be available for
21 grants to local governments and local law enforcement agencies to
22 support the provision of safety and other related equipment. Such
23 funds shall be allocated pursuant to a plan prepared by the commis-
24 sioner of criminal justice services in consultation with the super-
25 intendent of state police and approved by the director of the budget
26 (930415SP) ... 150,000,000 ....................... (re. $11,398,000)
27 Penn station access, for the payment of costs of the metropolitan
28 transportation authority or metro-north commuter railroad company
29 for capital projects to link the metro-north commuter railroad
30 directly to Penn Station and to improve transportation access along
31 its corridor, including construction of new stations in the Bronx,
32 including but not limited to planning and design, acquisition,
33 construction, reconstruction, replacement, improvement, recondition-
34 ing, rehabilitation and preservation, including the acquisition of
35 real property and interests therein required or expected to be
36 required in connection therewith, for commuter railroad facilities
37 and related equipment (930515SP) ...................................
38 250,000,000 ..................................... (re. $250,000,000)
39 Thruway stabilization program, for the payment of costs related to the
40 New NY bridge and bridge-related transportation improvements, and
41 for other costs of the thruway authority including, but not limited
42 to, its core capital program. Costs may include, but not be limited
43 to, construction, reconstruction, reconditioning and preservation,
44 including work appurtenant and ancillary thereto, may include the
45 acquisition of property, and may include engineering services,
46 including but not limited to the preparation of designs, plans,
47 specifications and estimates; construction management and super-
48 vision; appraisals, surveys, testing and environmental impact state-
49 ments; personal services, nonpersonal services, fringe and indirect
50 costs and the services provided by private firms. Provided, however
926 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 that funds shall not be made available from this appropriation
2 unless the New York state thruway authority has submitted a plan to
3 the Governor, the Speaker of the Assembly and the President Pro
4 Tempore of the Senate that describes the portions of funding appro-
5 priated herein that will be used for costs related to the New NY
6 Bridge, bridge-related transportation improvements and the Thruway
7 core capital program. In addition, the authority shall annually
8 provide, on or before July first of each year, a report detailing
9 the amount of funding from this appropriation used for each project
10 funded in the previous calendar year and the total amount of funding
11 from this appropriation spent on each project up to the end of the
12 previous calendar year (930615SP) ..................................
13 1,285,000,000 ................................... (re. $290,373,000)
14 For services and expenses, loans, grants, and costs associated with
15 transformative economic development projects. $150,000,000 is
16 authorized for such projects to be reviewed, evaluated and approved
17 by the New York state urban development corporation, including but
18 not limited to those listed in the schedule below. A proposed
19 project must demonstrate that the investment of public funds will
20 catalyze private investment resulting in significant economic devel-
21 opment reflected in the creation of temporary and permanent jobs,
22 the growth of the commercial and residential tax base or an enhance-
23 ment of the environment and quality of life for residents of Nassau
24 or Suffolk County. The items shown in the schedule below shall be
25 for projects with a common purpose and may be interchanged without
26 limitation subject to the approval of the director of the budget
27 (930715SP) ... 150,000,000 ...................... (re. $147,750,000)
28 Project Schedule
29 PROJECT AMOUNT
30 --------------------------------------------
31 Nassau Hub ...................... 85,000,000
32 Ronkonkoma Hub .................. 50,000,000
33 Stony Brook/ Brookhaven Labs .... 15,000,000
34 --------------
35 Total ........................ 150,000,000
36 ==============
37 Infrastructure improvements, to support transportation, upstate trans-
38 it, rail, airport, port and other infrastructure improvements or
39 economic development projects (930815SP) ...........................
40 115,000,000 ...................................... (re. $65,431,000)
41 Notwithstanding section 163 of the state finance law or any law to the
42 contrary, for services and expenses of the southern tier agricul-
43 tural industry enhancement and hudson valley farmland protection
44 programs, including but not limited to grants or payments to farm
45 owners and related industries, not for profit conservation organiza-
46 tions and local governments, to protect, maintain, develop and grow
47 farm, agricultural and related industries located in the southern
927 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
NEW YORK STATE SPECIAL INFRASTRUCTURE ACCOUNT
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 tier and hudson valley, as defined by the commissioner of agricul-
2 ture and markets (930915SP) ... 50,000,000 ....... (re. $27,601,000)
928 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other...... 475,000,000 1,591,263,000
3 ---------------- ----------------
4 All Funds ........................ 475,000,000 1,591,263,000
5 ================ ================
6 STATE AND MUNICIPAL FACILITIES PROGRAM (CCP) ............... 475,000,000
7 --------------
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 State and Municipal Facilities Purpose
11 For payment of the capital costs of
12 construction, improvement, rehabilitation
13 or reconstruction of facilities owned by
14 eligible entities; the acquisition of
15 capital facilities and assets by eligible
16 entities, including fixed capital assets;
17 the acquisition by eligible entities of
18 equipment and other capital assets,
19 including vehicles, in support of health,
20 safety, technology, or innovation; the
21 acquisition by an eligible entity of capi-
22 tal assets with a useful life of not less
23 than ten years purchased for the sole
24 purpose of preserving and protecting
25 infrastructure that is owned, controlled
26 or appurtenant to an eligible entity,
27 including but not limited to heavy duty
28 road maintenance and construction vehi-
29 cles, pavers, snow plows, street sweepers
30 and heavy duty fire, emergency response
31 and law enforcement vehicles; economic
32 development projects sponsored by the
33 state or municipal corporations, as
34 defined in section 2 of the general munic-
35 ipal law, that will create or retain jobs
36 in New York state as certified by the
37 commissioner of the department of economic
38 development; or environmental projects
39 sponsored by the state or municipal corpo-
40 rations as defined in section 2 of the
41 general municipal law. Eligible entities
42 shall consist of the state; municipal
43 corporations as defined in section 2 of
44 the general municipal law; sanitation
45 districts; special districts; water and
46 sewer districts; the Metropolitan Trans-
929 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS 2018-19
1 portation Authority or any other public
2 benefit corporation established pursuant
3 to titles 11, 11-A, 11-B, 11-C, or 11-D of
4 the public authorities law; a public bene-
5 fit corporation as defined in section 4 of
6 chapter 1016 of the laws of 1969; a
7 college or university established pursuant
8 to section 352 of the education law,
9 section 6203 of the education law or
10 section 6302 of the education law; an
11 independent not-for-profit institution of
12 higher education as defined in subdivision
13 2 of section 6401 of the education law;
14 public school districts; public housing
15 authorities; public libraries and library
16 systems chartered by the regents of the
17 state of New York or established by an act
18 of the legislature; public park conservan-
19 cies or not-for-profit corporations organ-
20 ized for the purpose of investing in parks
21 owned by the state or municipal corpo-
22 rations, as defined in section 2 of the
23 general municipal law; not-for-profit fire
24 districts, fire commissions, fire compa-
25 nies, fire departments, volunteer rescue
26 and ambulance squads; special act school
27 districts, schools for the blind and deaf
28 and other students with disabilities
29 subject to article 85 of the education
30 law, and private schools for students with
31 disabilities authorized pursuant to chap-
32 ter 853 of the laws of 1976; and any other
33 not-for-profit corporation or other not-
34 for-profit entity.
35 Costs may include, but shall not be limited
36 to engineering services, construction,
37 project management, right-of-way acquisi-
38 tion, and work appurtenant and ancillary
39 thereto. No funds from this appropriation
40 may be used as a required match or be
41 considered a local share to other state
42 programs or to leverage state aid or
43 grants including but not limited to the
44 apportionment of aid under the education
45 law. Notwithstanding any provision of law
46 to the contrary, funds appropriated herein
47 may be subject to the approval of the
48 director of the budget, be (i) inter-
49 changed, (ii) transferred from this appro-
50 priation to any other appropriation or any
930 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS 2018-19
1 state department, agency or public benefit
2 corporation, or (iii) suballocated to any
3 other state department, agency or public
4 benefit corporation, to achieve this
5 purpose (SM0118SM) ......................... 385,000,000
6 For payment of the capital costs of
7 construction, improvement, rehabilitation
8 or reconstruction of facilities owned by
9 eligible entities; the acquisition of
10 capital facilities and assets by eligible
11 entities, including fixed capital assets;
12 the acquisition by eligible entities of
13 equipment and other capital assets,
14 including vehicles, in support of health,
15 safety, technology, or innovation; the
16 acquisition by an eligible entity of capi-
17 tal assets with a useful life of not less
18 than ten years purchased for the sole
19 purpose of preserving and protecting
20 infrastructure that is owned, controlled
21 or appurtenant to an eligible entity,
22 including but not limited to heavy duty
23 road maintenance and construction vehi-
24 cles, pavers, snow plows, street sweepers
25 and heavy duty fire, emergency response
26 and law enforcement vehicles; economic
27 development projects sponsored by the
28 state or municipal corporations, as
29 defined in section 2 of the general munic-
30 ipal law, that will create or retain jobs
31 in New York state as certified by the
32 commissioner of the department of economic
33 development; or environmental projects
34 sponsored by the state or municipal corpo-
35 rations as defined in section 2 of the
36 general municipal law. Eligible entities
37 shall consist of the state; municipal
38 corporations as defined in section 2 of
39 the general municipal law; sanitation
40 districts; special districts; water and
41 sewer districts; the Metropolitan Trans-
42 portation Authority or any other public
43 benefit corporation established pursuant
44 to titles 11, 11-A, 11-B, 11-C, or 11-D of
45 the public authorities law; a public bene-
46 fit corporation as defined in section 4 of
47 chapter 1016 of the laws of 1969; a
48 college or university established pursuant
49 to section 352 of the education law,
50 section 6203 of the education law or
931 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS 2018-19
1 section 6302 of the education law; an
2 independent not-for-profit institution of
3 higher education as defined in subdivision
4 2 of section 6401 of the education law;
5 public school districts; public housing
6 authorities; public libraries and library
7 systems chartered by the regents of the
8 state of New York or established by an act
9 of the legislature; public park conservan-
10 cies or not for profit corporations organ-
11 ized for the purpose of investing in parks
12 owned by the state or municipal corpo-
13 rations, as defined in section 2 of the
14 general municipal law; not for profit fire
15 districts, fire commissions, fire compa-
16 nies, fire departments, volunteer rescue
17 and ambulance squads; special act school
18 districts, schools for the blind and deaf
19 and other students with disabilities
20 subject to article 85 of the education
21 law, and private schools for students with
22 disabilities authorized pursuant to chap-
23 ter 853 of the laws of 1976.
24 Costs may include, but shall not be limited
25 to engineering services, construction,
26 project management, right-of-way acquisi-
27 tion, and work appurtenant and ancillary
28 thereto. No funds from this appropriation
29 may be used as a required match or be
30 considered a local share to other state
31 programs or to leverage state aid or
32 grants including but not limited to the
33 apportionment of aid under the education
34 law. Notwithstanding any provision of law
35 to the contrary, funds appropriated herein
36 may, subject to the approval of the direc-
37 tor of the budget, be (i) interchanged,
38 (ii) transferred from this appropriation
39 to any other appropriation of any state
40 department, agency or public benefit
41 corporation, or (iii) suballocated to any
42 other state department, agency or public
43 benefit corporation, to achieve this
44 purpose. Notwithstanding the foregoing,
45 any limitations contained therein or any
46 other inconsistent provision of law, funds
47 from this appropriation shall be avail-
48 able, including for payment of liabilities
49 incurred or payments made prior to April
50 1, 2018, for any purpose, individual, or
932 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS 2018-19
1 entity authorized under the Lake Ontario-
2 St. Lawrence Seaway flood relief and
3 recovery grant program established pursu-
4 ant to chapter 85 of the laws of 2017, as
5 amended by chapter 61 of the laws of 2017,
6 as amended by a chapter of the laws of
7 2018, in an amount equal to $40,000,000
8 subject to the approval of the director of
9 the budget (SM0218SM) ....................... 90,000,000
933 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 STATE AND MUNICIPAL FACILITIES PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 State and Municipal Facilities Purpose
5 The appropriation made by chapter 54, section 1, of the laws of 2017, as
6 amended by chapter 61, section 1 of Part K, of the laws of 2017, is
7 hereby amended and reappropriated to read:
8 For payment of the capital costs of construction, improvement, reha-
9 bilitation or reconstruction of facilities owned by eligible enti-
10 ties; the acquisition of capital facilities and assets by eligible
11 entities, including fixed capital assets; the acquisition by eligi-
12 ble entities of equipment and other capital assets, including vehi-
13 cles, in support of health, safety, technology, or innovation; the
14 acquisition by an eligible entity of capital assets with a useful
15 life of not less than ten years purchased for the sole purpose of
16 preserving and protecting infrastructure that is owned, controlled
17 or appurtenant to an eligible entity, including but not limited to
18 heavy duty road maintenance and construction vehicles, pavers, snow
19 plows, street sweepers and heavy duty fire, emergency response and
20 law enforcement vehicles; economic development projects sponsored by
21 the state or municipal corporations, as defined in section 2 of the
22 general municipal law, that will create or retain jobs in New York
23 state as certified by the commissioner of the department of economic
24 development; or environmental projects sponsored by the state or
25 municipal corporations as defined in section 2 of the general munic-
26 ipal law. Eligible entities shall consist of the state; municipal
27 corporations as defined in section 2 of the general municipal law;
28 sanitation districts; special districts; water and sewer districts;
29 the Metropolitan Transportation Authority or any other public bene-
30 fit corporation established pursuant to titles 11, 11-A, 11-B, 11-C,
31 or 11-D of the public authorities law; a public benefit corporation
32 as defined in section 4 of chapter 1016 of the laws of 1969; a
33 college or university established pursuant to section 352 of the
34 education law, section 6203 of the education law or section 6302 of
35 the education law; an independent not-for-profit institution of
36 higher education as defined in subdivision 2 of section 6401 of the
37 education law; public school districts; public housing authorities;
38 public libraries and library systems chartered by the regents of the
39 state of New York or established by an act of the legislature;
40 public park conservancies or not for profit corporations organized
41 for the purpose of investing in parks owned by the state or munici-
42 pal corporations, as defined in section 2 of the general municipal
43 law; not for profit fire districts, fire commissions, fire compa-
44 nies, fire departments, volunteer rescue and ambulance squads; and
45 special act school districts, schools for the blind and deaf and
46 other students with disabilities subject to article 85 of the educa-
47 tion law, and private schools for students with disabilities author-
48 ized pursuant to chapter 853 of the laws of 1976.
934 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Costs may include, but shall not be limited to engineering services,
2 construction, project management, right-of-way acquisition, and work
3 appurtenant and ancillary thereto. No funds from this appropriation
4 may be used as a required match or be considered a local share to
5 other state programs or to leverage state aid or grants including
6 but not limited to the apportionment of aid under the education law.
7 Notwithstanding any provision of law to the contrary, funds appro-
8 priated herein may, subject to the approval of the director of the
9 budget, be (i) interchanged, (ii) transferred from this appropri-
10 ation to any other appropriation of any state department, agency or
11 public benefit corporation, or (iii) suballocated to any other state
12 department, agency or public benefit corporation, to achieve this
13 purpose. Notwithstanding the foregoing, any limitations contained
14 therein or any other inconsistent provision of law, funds from this
15 appropriation shall also be available, including for payment of
16 liabilities incurred or payments made prior to April 1, 2017, (i)
17 for any purpose, individual, or entity authorized under the Lake
18 Ontario-St. Lawrence Seaway flood relief and recovery grant program
19 established pursuant to a chapter of the laws of 2017, subject to
20 the approval of the director of the budget, and (ii) for payment of
21 the costs of other storm recovery and mitigation projects, not to
22 exceed 10,000,000 dollars in the aggregate to municipalities and
23 special districts in (a) the counties of Chautauqua, Cattaraugus and
24 Allegany for damages sustained as a result of a severe storm and
25 flooding which occurred July 14 and 15, 2015, in an amount not less
26 than 6,800,000 dollars or (b) the county of Monroe for damages
27 resulting from a severe storm which occurred March 8 and 9, 2017, in
28 an amount not to exceed 2,000,000 dollars subject to the approval of
29 the director of the budget (SM0117SM) ..............................
30 398,500,000 ..................................... (re. $398,500,000)
31 The appropriation made by chapter 55, section 1, of the laws of 2016, as
32 amended by chapter 54, section 1, of the laws of 2017, is hereby
33 amended and reappropriated to read:
34 For payment of the capital costs of construction, improvement, reha-
35 bilitation or reconstruction of facilities owned by eligible enti-
36 ties; the acquisition of capital facilities and assets by eligible
37 entities, including fixed capital assets; the acquisition by eligi-
38 ble entities of equipment and other capital assets, including vehi-
39 cles, in support of health, safety, technology, or innovation; the
40 acquisition by an eligible entity of capital assets with a useful
41 life of not less than ten years purchased for the sole purpose of
42 preserving and protecting infrastructure that is owned, controlled
43 or appurtenant to an eligible entity, including but not limited to
44 heavy duty road maintenance and construction vehicles, pavers, snow
45 plows, street sweepers and heavy duty fire, emergency response and
46 law enforcement vehicles; economic development projects sponsored by
47 the state or municipal corporations, as defined in section 2 of the
48 general municipal law, that will create or retain jobs in New York
49 state as certified by the commissioner of the department of economic
935 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 development; or environmental projects sponsored by the state or
2 municipal corporations as defined in section 2 of the general munic-
3 ipal law. Eligible entities shall consist of the state; municipal
4 corporations as defined in section 2 of the general municipal law;
5 sanitation districts; special districts; water and sewer districts;
6 the Metropolitan Transportation Authority or any other public bene-
7 fit corporation established pursuant to titles 11, 11-A, 11-B, 11-C,
8 or 11-D of the public authorities law; a public benefit corporation
9 as defined in section 2 of chapter 1016 of the laws of 1969; a
10 college or university established pursuant to section 352 of the
11 education law, section 6203 of the education law or section 6302 of
12 the education law; an independent not-for-profit institution of
13 higher education as defined in subdivision 2 of section 6401 of the
14 education law; public school districts; public housing authorities;
15 public libraries and library systems chartered by the regents of the
16 state of New York or established by an act of the legislature;
17 public park conservancies or not for profit corporations organized
18 for the purpose of investing in parks owned by the state or munici-
19 pal corporations, as defined in section 2 of the general municipal
20 law; and not for profit fire districts, fire commissions, fire
21 companies, fire departments, volunteer rescue and ambulance squads;
22 and special act school districts, schools for the blind and deaf and
23 other students with disabilities subject to article 85 of the educa-
24 tion law, and private schools for students with disabilities author-
25 ized pursuant to chapter 853 of the laws of 1976. Costs may include,
26 but shall not be limited to engineering services, construction,
27 project management, right-of-way acquisition, and work appurtenant
28 and ancillary thereto. No funds from this appropriation may be used
29 as a required match or be considered a local share to other state
30 programs or to leverage state aid or grants including but not limit-
31 ed to the apportionment of aid under the education law. Notwith-
32 standing any provision of law to the contrary, funds appropriated
33 herein may, subject to the approval of the director of the budget,
34 be (i) interchanged, (ii) transferred from this appropriation to any
35 other appropriation of any state department, agency or public bene-
36 fit corporation, or (iii) suballocated to any other state depart-
37 ment, agency or public benefit corporation, to achieve this purpose
38 (SM0116SM) ... 385,000,000 ...................... (re. $341,426,000)
39 The appropriation made by chapter 54, section 1, of the laws of 2015, as
40 amended by chapter 54, section 1, of the laws of 2017, is hereby
41 amended and reappropriated to read:
42 For payment of the capital costs of construction, improvement, reha-
43 bilitation or reconstruction of facilities owned by eligible enti-
44 ties; the acquisition of capital facilities and assets by eligible
45 entities, including fixed capital assets; the acquisition by eligi-
46 ble entities of equipment and other capital assets, including vehi-
47 cles, in support of health, safety, technology, or innovation; the
48 acquisition by an eligible entity of capital assets with a useful
49 life of not less than ten years purchased for the sole purpose of
936 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 preserving and protecting infrastructure that is owned, controlled
2 or appurtenant to an eligible entity, including but not limited to
3 heavy duty road maintenance and construction vehicles, pavers, snow
4 plows, street sweepers and heavy duty fire, emergency response and
5 law enforcement vehicles; economic development projects sponsored by
6 the state or municipal corporations, as defined in section 2 of the
7 general municipal law, that will create or retain jobs in New York
8 state as certified by the commissioner of the department of economic
9 development; or environmental projects sponsored by the state or
10 municipal corporations as defined in section 2 of the general munic-
11 ipal law. Eligible entities shall consist of the state; municipal
12 corporations as defined in section 2 of the general municipal law;
13 sanitation districts; special districts; water and sewer districts;
14 the Metropolitan Transportation Authority or any other public bene-
15 fit corporation established pursuant to titles 11, 11-A, 11-B, 11-C,
16 or 11-D of the public authorities law; a public benefit corporation
17 as defined in section 2 of chapter 1016 of the laws of 1969; a
18 college or university established pursuant to section 352 of the
19 education law, section 6203 of the education law or section 6302 of
20 the education law; an independent not-for-profit institution of
21 higher education as defined in subdivision 2 of section 6401 of the
22 education law; public school districts; public housing authorities;
23 public libraries and library systems chartered by the regents of the
24 state of New York or established by an act of the legislature;
25 public park conservancies or not for profit corporations organized
26 for the purpose of investing in parks owned by the state or munici-
27 pal corporations, as defined in section 2 of the general municipal
28 law; and not for profit fire districts, fire commissions, fire
29 companies, fire departments, volunteer rescue and ambulance squads;
30 and special act school districts, schools for the blind and deaf and
31 other students with disabilities subject to article 85 of the educa-
32 tion law, and private schools for students with disabilities author-
33 ized pursuant to chapter 853 of the laws of 1976. Costs may include,
34 but shall not be limited to engineering services, construction,
35 project management, right-of-way acquisition, and work appurtenant
36 and ancillary thereto. No funds from this appropriation may be used
37 as a required match or be considered a local share to other state
38 programs or to leverage state aid or grants including but not limit-
39 ed to the apportionment of aid under the education law. Notwith-
40 standing any provision of law to the contrary, funds appropriated
41 herein may, subject to the approval of the director of the budget,
42 be (i) interchanged, (ii) transferred from this appropriation to any
43 other appropriation of any state department, agency or public bene-
44 fit corporation, or (iii) suballocated to any other state depart-
45 ment, agency or public benefit corporation, to achieve this purpose
46 (SM0115SM) ... 385,000,000 ...................... (re. $261,801,000)
47 The appropriation made by chapter 54, section 1, of the laws of 2014, as
48 amended by chapter 54, section 1, of the laws of 2017, is hereby
49 amended and reappropriated to read:
937 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 For payment of the capital costs of construction, improvement, reha-
2 bilitation or reconstruction of facilities owned by eligible enti-
3 ties; the acquisition of capital facilities and assets by eligible
4 entities, including fixed capital assets; the acquisition by eligi-
5 ble entities of equipment and other capital assets, including vehi-
6 cles, in support of health, and safety, technology, or innovation;
7 the acquisition by an eligible entity of capital assets with a
8 useful life of not less than ten years purchased for the sole
9 purpose of preserving and protecting infrastructure that is owned,
10 controlled or appurtenant to an eligible entity, including but not
11 limited to heavy duty road maintenance and construction vehicles,
12 pavers, snowplows, street sweepers and heavy duty fire, emergency
13 response and law enforcement vehicles; economic development projects
14 sponsored by the state or municipal corporations, as defined in
15 section 2 of the general municipal law, that will create or retain
16 jobs in New York state as certified by the commissioner of the
17 department of economic development; or environmental projects spon-
18 sored by the state or municipal corporations as defined in section 2
19 of the general municipal law. Eligible entities shall consist of the
20 state; municipal corporations as defined in section 2 of the general
21 municipal law; sanitation districts; special districts; water and
22 sewer districts; the Metropolitan Transportation Authority or any
23 other public benefit corporation established pursuant to titles 11,
24 11-A, 11-B, 11-C, or 11-D of the public authorities law; a public
25 benefit corporation as defined in section 2 of chapter 1016 of the
26 laws of 1969; a college or university established pursuant to
27 section 352 of the education law, section 6203 of the education law
28 or section 6302 of the education law; an independent not-for-profit
29 institution of higher education as defined in subdivision 2 of
30 section 6401 of the education law; public school districts; public
31 housing authorities; public libraries and library systems chartered
32 by the regents of the state of New York or established by an act of
33 the legislature; public park conservancies or not for profit corpo-
34 rations organized for the purpose of investing in parks owned by the
35 state or municipal corporations, as defined in section 2 of the
36 general municipal law; and not for profit fire districts, fire
37 commissions, fire companies, fire departments, volunteer rescue and
38 ambulance squads; and special act school districts, schools for the
39 blind and deaf and other students with disabilities subject to arti-
40 cle 85 of the education law, and private schools for students with
41 disabilities authorized pursuant to chapter 853 of the laws of 1976.
42 Costs may include, but shall not be limited to engineering services,
43 construction, project management, right-of-way acquisition, and work
44 appurtenant and ancillary thereto. No funds from this appropriation
45 may be used as a required match or be considered a local share to
46 other state programs or to leverage state aid or grants including
47 but not limited to the apportionment of aid under the education law.
48 Notwithstanding any provision of law to the contrary, funds appro-
49 priated herein may, subject to the approval of the director of the
50 budget, be (i) interchanged, (ii) transferred from this appropri-
938 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 ation to any other appropriation of any state department, agency or
2 public benefit corporation, or (iii) suballocated to any other state
3 department, agency or public benefit corporation, to achieve this
4 purpose (SM0114SM) ... 385,000,000 ............. (re. $335,000,000)
5 The appropriation made by chapter 54, section 1, of the laws of 2013, as
6 amended by chapter 54, section 1, of the laws of 2017, is hereby
7 amended and reappropriated to read:
8 For payment of the capital costs of construction, improvement, reha-
9 bilitation or reconstruction of facilities owned by eligible enti-
10 ties; the acquisition of capital facilities and assets by eligible
11 entities, including fixed capital assets; the acquisition by eligi-
12 ble entities of equipment and other capital assets, including vehi-
13 cles, in support of health, safety, technology, or innovation; the
14 acquisition by an eligible entity of capital assets with a useful
15 life of not less than ten years purchased for the sole purpose of
16 preserving and protecting infrastructure that is owned, controlled
17 or appurtenant to an eligible entity, including but not limited to
18 heavy duty road maintenance and construction vehicles, pavers, snow
19 plows, street sweepers and heavy duty fire, emergency response and
20 law enforcement vehicles; economic development projects sponsored by
21 the state or municipal corporations, as defined in section 2 of the
22 general municipal law, that will create or retain jobs in New York
23 state as certified by the commissioner of the department of economic
24 development; or environmental projects sponsored by the state or
25 municipal corporations as defined in section 2 of the general munic-
26 ipal law. Eligible entities shall consist of the state; municipal
27 corporations as defined in section 2 of the general municipal law;
28 sanitation districts; special districts; water and sewer districts;
29 the Metropolitan Transportation Authority or any other public bene-
30 fit corporation established pursuant to titles 11, 11-A, 11-B, 11-C,
31 or 11-D of the public authorities law; a public benefit corporation
32 as defined in section 2 of chapter 1016 of the laws of 1969; a
33 college or university established pursuant to section 352 of the
34 education law, section 6203 of the education law or section 6302 of
35 the education law; an independent not-for-profit institution of
36 higher education as defined in subdivision 2 of section 6401 of the
37 education law; public school districts; public housing authorities;
38 public libraries and library systems chartered by the regents of the
39 state of New York or established by an act of the legislature;
40 public park conservancies or not for profit corporations organized
41 for the purpose of investing in parks owned by the state or munici-
42 pal corporations, as defined in section 2 of the general municipal
43 law; and not for profit fire districts, fire commissions, fire
44 companies, fire departments, volunteer rescue and ambulance squads;
45 and special act school districts, schools for the blind and deaf and
46 other students with disabilities subject to article 85 of the educa-
47 tion law, and private schools for students with disabilities author-
48 ized pursuant to chapter 853 of the laws of 1976. Costs may include,
49 but shall not be limited to engineering services, construction,
939 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE AND MUNICIPAL FACILITIES PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 project management, right-of-way acquisition, and work appurtenant
2 and ancillary thereto. No funds from this appropriation may be used
3 as a required match or be considered a local share to other state
4 programs or to leverage state aid or grants including but not limit-
5 ed to the apportionment of aid under the education law. Notwith-
6 standing any provision of law to the contrary, funds appropriated
7 herein may, subject to the approval of the director of the budget,
8 be (i) interchanged, (ii) transferred from this appropriation to any
9 other appropriation of any state department, agency or public bene-
10 fit corporation, or (iii) suballocated to any other state depart-
11 ment, agency or public benefit corporation, to achieve this purpose
12 (SM1013SM) ... 385,000,000 ...................... (re. $254,536,000)
940 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STATE EQUIPMENT FINANCE PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Other ..... 0 99,463,000
3 ---------------- ----------------
4 All Funds ........................ 0 99,463,000
5 ================ ================
6 PROGRAM CHANGES AND EXPANSION (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Program Improvement/Change Purpose
10 By chapter 54, section 1, of the laws of 2011:
11 For the costs of the purchase of equipment or the creation or improve-
12 ment of information technology systems and related research and
13 development to be financed as authorized pursuant to article 5-A of
14 the state finance law. All or a portion of the funds appropriated
15 hereby may be suballocated or transferred to any department, agency,
16 or public authority (2P111108) ... 92,751,000 .... (re. $17,571,000)
17 By chapter 50, section 1, of the laws of 2010:
18 For the costs of the purchase of equipment or the creation or improve-
19 ment of information technology systems and related research and
20 development to be financed as authorized pursuant to article 5-A of
21 the state finance law. All or a portion of the funds appropriated
22 hereby may be suballocated or transferred to any department, agency,
23 or public authority (2P101008) ... 187,285,000 ... (re. $33,510,000)
24 By chapter 50, section 1, of the laws of 2009:
25 For the costs of the purchase of equipment or the creation or improve-
26 ment of information technology systems and related research and
27 development to be financed as authorized pursuant to article 5-A of
28 the state finance law. All or a portion of the funds appropriated
29 hereby may be suballocated or transferred to any department, agency,
30 or public authority (2P090908) ... 129,800,000 ... (re. $36,585,000)
31 By chapter 50, section 1, of the laws of 2008:
32 For the costs of the purchase of equipment or the creation or improve-
33 ment of information technology systems and related research and
34 development to be financed as authorized pursuant to article 5-A of
35 the state finance law. All or a portion of the funds appropriated
36 hereby may be suballocated or transferred to any department, agency,
37 or public authority (2P080808) ... 141,000,000 ... (re. $11,797,000)
941 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
STRATEGIC INVESTMENT PROGRAM
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 STRATEGIC INVESTMENT PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Strategic Investment Program Purpose
5 By chapter 55, section 1, of the laws of 2000, as amended by chapter 54,
6 section 1, of the laws of 2011:
7 The sum of $215,650,000 is hereby appropriated for environmental
8 projects, including the preservation of historically significant
9 places in New York state, and projects to conserve, acquire, develop
10 or improve parklands, parks or public recreation areas; economic
11 development projects which will facilitate the creation or retention
12 of jobs or increase business activity within a municipality or
13 region of the state; higher education projects; projects to estab-
14 lish new or rehabilitate existing business incubator facilities to
15 accommodate emerging or small high technology companies; arts or
16 cultural projects, provided that the allocation made available to
17 the Governor as authorized by paragraph one of the memorandum of
18 understanding governing administration of the strategic investment
19 program, shall be reduced by $9,350,000 to $65,650,000.
20 Individual projects funded from this appropriation shall be for
21 $250,000 or more and funds appropriated hereby may be suballocated
22 to any department, agency, or public authority (71SI00SI) ..........
23 215,650,000 ...................................... (re. $78,104,000)
24 Project Schedule
25 PROJECT AMOUNT
26 --------------------------------------------
27 Environmental ................... 63,750,000
28 Economic Development ............ 69,400,000
29 Higher Education/High Technol-
30 ogy Incubator ................. 43,750,000
31 Arts/Cultural ................... 38,750,000
32 --------------
33 Total ...................... 215,650,000
34 ==============
942 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
WORLD TRADE CENTER -- DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 APPROPRIATIONS REAPPROPRIATIONS
2 Capital Projects Funds - Federal.... 0 153,728,000
3 ---------------- ----------------
4 All Funds ........................ 0 153,728,000
5 ================ ================
6 WORLD TRADE CENTER PROGRAM (CCP)
7 Capital Projects Funds - Federal
8 Federal Capital Projects Fund
9 Federal Aid Highways Purpose
10 By chapter 50, section 1, of the laws of 2006:
11 To the department of transportation for the federal share of transpor-
12 tation projects related to service in Lower Manhattan related to the
13 September 11, 2001 attack on the New York City World Trade Center,
14 including but not limited to construction, reconstruction, recondi-
15 tioning and preservation of highways, bridges, ferry and other
16 transportation facilities; the acquisition of property; payment for
17 engineering services including, but not limited to costs of personal
18 services, non-personal services and fringe benefits of the depart-
19 ment of transportation, and contract services provided by private
20 firms; appraisals, surveys, testing, and environmental impact state-
21 ments for transportation projects; the payment of liabilities
22 incurred prior to April 1, 2006 and any other transportation costs
23 incurred as part of the recovery from the attack on the World Trade
24 Center. The funds appropriated hereby shall be used in accordance
25 with applicable federal transportation statutes and regulations and
26 may be suballocated for transportation purposes (2CWT0620) .........
27 265,000,000 ...................................... (re. $37,623,000)
28 By chapter 50, section 1, of the laws of 2002:
29 To the department of transportation for the federal share of transpor-
30 tation projects related to service in Lower Manhattan related to the
31 September 11, 2001 attack on the New York City World Trade Center,
32 including but not limited to construction, reconstruction, recondi-
33 tioning and preservation of highways, bridges, ferry and other
34 transportation facilities; the acquisition of property; payment for
35 engineering services including, but not limited to costs of personal
36 services, non-personal services and fringe benefits of the depart-
37 ment of transportation, and contract services provided by private
38 firms; appraisals, surveys, testing, and environmental impact state-
39 ments for transportation projects; the payment of liabilities
40 incurred prior to April 1, 2002 and any other transportation costs
41 incurred as part of the recovery from the attack on the World Trade
42 Center. The funds appropriated hereby shall be used in accordance
43 with applicable federal transportation statutes and regulations and
44 may be suballocated for transportation purposes to the Metropolitan
943 12654-10-8
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES
WORLD TRADE CENTER -- DEPARTMENT OF TRANSPORTATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2018-19
1 Transportation Authority. (17WT0220) ...............................
2 342,000,000 ..................................... (re. $116,105,000)
944 12654-10-8
1 § 2. Section 1 of a chapter of the laws of 2018, enacting the aid to
2 localities budget, is amended by repealing the items herein below set
3 forth in brackets and by adding to such section the other items under-
4 scored in this section.
5 EDUCATION DEPARTMENT
6 AID TO LOCALITIES 2018-19
7 For payment according to the following schedule, net of
8 disallowances, refunds, reimbursements and credits:
9 APPROPRIATIONSREAPPROPRIATIONS
10 General Fund ....................... 25,236,309,7501,650,676,780
11 Special Revenue Funds - Federal .... 4,541,043,0007,571,222,000
12 Special Revenue Funds - Other ...... 5,706,308,000759,735,000
13 ---------------- ----------------
14 All Funds ........................ 35,483,660,7509,981,633,780
15 ================ ================
16 SCHEDULE
17 ADULT CAREER AND CONTINUING EDUCATION SERVICES PROGRAM ..... 228,685,000
18 --------------
19 General Fund
20 Local Assistance Account - 10000
21 For case services provided on or after Octo-
22 ber 1, 2016 to disabled individuals in
23 accordance with economic eligibility
24 criteria developed by the department
25 (21713) ..................................... 54,000,000
26 For services and expenses of independent
27 living centers (21856) ...................... 13,361,000
28 For college readers aid payments (21854) ......... 294,000
29 For services and expenses of supported
30 employment and integrated employment
31 opportunities provided on or after October
32 1, 2016:
33 For services and expenses of programs
34 providing or leading to the provision of
35 time-limited services or long-term support
36 services (21741) ............................ 15,160,000
37 For grants to schools for programs involving
38 literacy and basic education for public
39 assistance recipients for the 2018-19
40 school year for those programs adminis-
41 tered by the state education department
42 (23411) ...................................... 1,843,000
43 For competitive grants for adult
44 literacy/education aid to public and
45 private not-for-profit agencies, including
46 but not limited to, 2 and 4 year colleges,
47 community based organizations, libraries,
945 12654-10-8
1 and volunteer literacy organizations and
2 institutions which meet quality standards
3 promulgated by the commissioner of educa-
4 tion to provide programs of basic litera-
5 cy, high school equivalency, and English
6 as a second language to persons 16 years
7 of age or older for the remaining payments
8 of the 2017-18 school year and for the
9 2018-19 school year, provided further that
10 no more than $300,000 shall be available
11 for remaining payments for the 2017-18
12 school year (23410) .......................... 6,293,000
13 For additional competitive grants for adult
14 literacy/education aid to public and
15 private not-for-profit agencies, including
16 but not limited to, 2 and 4 year colleges,
17 community based organizations, libraries,
18 and volunteer literacy organizations and
19 institutions which meet quality standards
20 promulgated by the commissioner of educa-
21 tion to provide programs of basic litera-
22 cy, high school equivalency, and English
23 as a second language to persons 16 years
24 of age or older for the remaining payments
25 of the 2017-18 school year and for the
26 2018-19 school year, provided further that
27 no more than $300,000 shall be available
28 for remaining payments for the 2017-18
29 school year .................................. 1,500,000
30 --------------
31 Program account subtotal .................. 92,451,000
32 --------------
33 Special Revenue Funds - Federal
34 Federal Education Fund
35 Federal Department of Education Account - 25210
36 For case services provided to individuals
37 with disabilities (21713) ................... 70,000,000
38 For the independent living program (21856) ..... 2,572,000
39 For the supported employment program (21741) ... 2,500,000
40 For grants to schools and other eligible
41 entities for adult basic education, liter-
42 acy, and civics education pursuant to the
43 workforce investment act (21734) ............ 48,704,000
44 --------------
45 Program account subtotal ................. 123,776,000
46 --------------
47 Special Revenue Funds - Other
48 Miscellaneous Special Revenue Fund
49 VESID Social Security Account - 22001
50 For the rehabilitation of social security
51 disability beneficiaries (21852) ............ 11,760,000
52 --------------
946 12654-10-8
1 Program account subtotal .................. 11,760,000
2 --------------
3 Special Revenue Funds - Other
4 Vocational Rehabilitation Fund
5 Vocational Rehabilitation Account - 23051
6 For services and expenses of the special
7 workers' compensation program (21852) .......... 698,000
8 --------------
9 Program account subtotal ..................... 698,000
10 --------------
11 CULTURAL EDUCATION PROGRAM ................................. 125,161,000
12 --------------
13 General Fund
14 Local Assistance Account - 10000
15 Aid to public libraries including aid to New
16 York public library (NYPL) and NYPL's
17 science industry and business library.
18 Provided that, notwithstanding any
19 provision of law, rule or regulation to
20 the contrary, such aid, and the state's
21 liability therefor, shall represent
22 fulfillment of the state's obligation for
23 this program (21846) ........................ 91,627,000
24 For additional aid to public libraries ......... 5,000,000
25 For services and expenses of the Schomburg
26 Center for Research in Black Culture ........... 250,000
27 For services and expenses of the Langston
28 Hughes Community Library and Cultural
29 Center of Queens Library ........................ 75,000
30 Aid to educational television and radio.
31 Notwithstanding any provision of law, rule
32 or regulation to the contrary, the amount
33 appropriated herein shall represent
34 fulfillment of the state's obligation for
35 this program (21848) ........................ 14,002,000
36 --------------
37 Program account subtotal ................. 110,954,000
38 --------------
39 Special Revenue Funds - Federal
40 Federal Miscellaneous Operating Grants Fund
41 Federal Operating Grants Account - 25456
42 For aid to public libraries pursuant to
43 various federal laws including the library
44 services technology act (21851) .............. 5,400,000
45 --------------
46 Program account subtotal ................... 5,400,000
47 --------------
48 Special Revenue Funds - Other
947 12654-10-8
1 New York State Local Government Records Management
2 Improvement Fund
3 Local Government Records Management Account - 20501
4 Grants to individual local governments or
5 groups of cooperating local governments as
6 provided in section 57.35 of the arts and
7 cultural affairs law (21849) ................. 8,346,000
8 Aid for documentary heritage grants and aid
9 to eligible archives, libraries, histor-
10 ical societies, museums, and to certain
11 organizations including the state educa-
12 tion department that provide services to
13 such programs (21850) .......................... 461,000
14 --------------
15 Program account subtotal ................... 8,807,000
16 --------------
17 OFFICE OF HIGHER EDUCATION AND THE PROFESSIONS PROGRAM ..... 129,869,850
18 --------------
19 General Fund
20 Local Assistance Account - 10000
21 For liberty partnerships program awards as
22 prescribed by section 612 of the education
23 law as added by chapter 425 of the laws of
24 1988. Notwithstanding any other section of
25 law to the contrary, funding for such
26 programs in the 2018-19 fiscal year shall
27 be limited to the amount appropriated
28 herein (21830) .............................. 15,301,860
29 For additional liberty partnerships program
30 awards as prescribed by section 612 of the
31 education law as added by chapter 425 of
32 the laws of 1988. Notwithstanding any
33 other section of law to the contrary,
34 funding for such programs in the 2018-19
35 fiscal year shall be limited to the amount
36 appropriated herein .......................... 3,060,000
37 Unrestricted aid to independent colleges and
38 universities, notwithstanding any other
39 section of law to the contrary, aid other-
40 wise due and payable in the 2018-19 fiscal
41 year shall be limited to the amount appro-
42 priated herein (21831) ...................... 10,539,000
43 For additional unrestricted aid to independ-
44 ent colleges and universities, notwith-
45 standing any other section of law to the
46 contrary, aid otherwise due and payable in
47 the 2018-19 fiscal year shall be limited
48 to the amount appropriated herein (21831) ... 24,590,000
49 For higher education opportunity program
50 awards. Funds appropriated herein shall be
51 used by independent colleges to expand
52 opportunities for the educationally and
948 12654-10-8
1 economically disadvantaged at independent
2 institutions of higher learning (21832) ..... 29,605,920
3 For additional higher education opportunity
4 program awards. Funds appropriated herein
5 shall be used by independent colleges to
6 expand opportunities for the educationally
7 and economically disadvantaged at inde-
8 pendent institutions of higher learning ...... 5,921,000
9 For science and technology entry program
10 (STEP) awards (21834) ....................... 13,176,180
11 For additional science and technology entry
12 program (STEP) awards ........................ 2,635,000
13 For collegiate science and technology entry
14 program (CSTEP) awards (21835) ............... 9,984,890
15 For additional collegiate science and tech-
16 nology entry program (CSTEP) awards .......... 1,997,000
17 For teacher opportunity corps program awards
18 (21837) ........................................ 450,000
19 For services and expenses of a foster youth
20 initiative to ensure support is available
21 through current post-secondary opportunity
22 programs at public and independent insti-
23 tutions for foster youth including summer
24 transition programs, and to provide foster
25 youth with financial aid outreach, coun-
26 seling services, and direct financial
27 support. Provided however, a portion of
28 these funds may be used to provide supple-
29 mental housing and meals for foster youth
30 not currently enrolled in a post-secon-
31 dary opportunity program at SUNY. A
32 portion of these funds may be suballocated
33 to other state departments, agencies, the
34 State University of New York, and the City
35 University of New York. Notwithstanding
36 any law, rule, or regulation to the
37 contrary, funds provided to the State
38 University of New York may be utilized to
39 support state-operated campuses, statutory
40 colleges, or community colleges as appro-
41 priate (55913) ............................... 1,500,000
42 For additional services and expenses of a
43 foster youth initiative to ensure support
44 is available through current post-secon-
45 dary opportunity programs at public and
46 independent institutions for foster youth
47 including summer transition programs, and
48 to provide foster youth with financial aid
49 outreach, counseling services, and direct
50 financial support. Provided however, a
51 portion of these funds may be used to
52 provide supplemental housing and meals for
53 foster youth not currently enrolled in a
54 post-secondary opportunity program at
55 SUNY. A portion of these funds may be
56 suballocated to other state departments,
949 12654-10-8
1 agencies, the State University of New
2 York, and the City University of New York.
3 Notwithstanding any law, rule, or regu-
4 lation to the contrary, funds provided to
5 the State University of New York may be
6 utilized to support state-operated campus-
7 es, statutory colleges, or community
8 colleges as appropriate ...................... 4,500,000
9 For state financial assistance to expand
10 high needs nursing programs at private
11 colleges and universities in accordance
12 with section 6401-a of the education law
13 (21838) ........................................ 941,000
14 For services and expenses of the national
15 board for professional teaching standards
16 certification grant program for the 2018-
17 19 school year (21785) ......................... 368,000
18 Financial aid for students at Utica College ...... 300,000
19 --------------
20 Program account subtotal ................. 124,869,850
21 --------------
22 Special Revenue Funds - Federal
23 Federal Education Fund
24 Federal Department of Education Account - 25210
25 For grants to schools and other eligible
26 entities for programs pursuant to various
27 federal laws including, but not limited
28 to: title II supporting effective instruc-
29 tion.
30 Notwithstanding any provision of law to the
31 contrary, funds appropriated herein may be
32 suballocated, subject to the approval of
33 the director of the budget, to any state
34 agency or department, and interchanged to
35 other accounts, to accomplish the purpose
36 of this appropriation. A portion of this
37 appropriation may be interchanged to other
38 accounts, as needed to accomplish the
39 intent of this appropriation (23419) ......... 5,000,000
40 --------------
41 Program account subtotal ................... 5,000,000
42 --------------
43 OFFICE OF MANAGEMENT SERVICES PROGRAM ........................ 5,214,000
44 --------------
45 Special Revenue Funds - Other
46 Combined Expendable Trust Fund
47 Grants Account - 20191
48 For services and expenses related to the
49 administration of funds, including grants
50 to local recipients, paid to the education
51 department from private foundations,
950 12654-10-8
1 corporations and individuals and from
2 public or private funds received as
3 payment in lieu of honorarium for services
4 rendered by employees which are related to
5 such employees' official duties or respon-
6 sibilities.
7 Provided further that, notwithstanding any
8 inconsistent provision of law, funds
9 appropriated herein may be transferred to
10 any other combined expendable trust fund,
11 subject to the approval of the director of
12 the budget, as needed to accomplish the
13 intent of this appropriation (21744) ......... 5,214,000
14 --------------
15 OFFICE OF PREKINDERGARTEN THROUGH GRADE TWELVE EDUCATION
16 PROGRAM ............................................. 32,527,121,900
17 --------------
18 General Fund
19 Local Assistance Account - 10000
20 Notwithstanding any inconsistent provision
21 of law, for general support for public
22 schools for the 2018-19 state fiscal year,
23 including aid for such school year payable
24 pursuant to section 3609-d of the educa-
25 tion law, as provided herein.
26 Notwithstanding any provision of law to the
27 contrary, foundation aid payable in the
28 2018-19 school year shall equal the sum of
29 (1) the foundation aid base plus (2) the
30 greater of (i) the 2018-19 school year
31 phase-in increase or (ii) the 2018-19
32 school year additional increase or (iii)
33 the 2018-19 school year due minimum plus
34 (3) the executive foundation aid increase,
35 as defined in this paragraph, provided
36 that any city school district in a city
37 with a population of 125,000 or more shall
38 only be eligible for the 2018-19 school
39 year phase-in increase.
40 For the purposes of this paragraph:
41 (i) "Foundation aid remaining" shall mean
42 the positive difference, if any, of (1)
43 the product of the total aidable founda-
44 tion pupil units computed pursuant to
45 paragraph g of subdivision 2 of section
46 3602 of the education law multiplied by
47 the district's selected foundation aid
48 less (2) the total foundation aid base
49 computed pursuant to paragraph j of subdi-
50 vision 1 of section 3602 of the education
51 law.
52 (ii) The "2018-19 school year phase-in
53 increase" shall be equal to the product of
951 12654-10-8
1 foundation aid remaining multiplied by the
2 greater of the following phase-in percent-
3 ages: (A) 0.01848; (B) for school
4 districts where (1) the quotient arrived
5 at when dividing foundation aid remaining
6 by total foundation aid is greater than
7 0.5 and (2) where the difference of the
8 three year average free and reduced price
9 lunch percent for the current year less
10 such average for the base year is greater
11 than 0.04, 0.04599; (C) For school
12 districts that were designated as small
13 city school districts or central school
14 districts whose boundaries include a
15 portion of a small city for the school aid
16 computer listing produced by the commis-
17 sioner in support of the enacted budget
18 for the 2014-15 school year and entitled
19 "SA1415", 0.03498; (D) For a city school
20 district in a city with a population of
21 1,000,000 or more, 0.0793; (E) For a city
22 school district in a city with a popu-
23 lation of more than 250,000 but less than
24 1,000,000 as of the most recent federal
25 decennial census, 0.0803; (F) For a city
26 school district in a city with a popu-
27 lation of more than 200,000 but less than
28 250,000 as of the most recent federal
29 decennial census, 0.0588; (G) For a city
30 school district in a city with a popu-
31 lation of more than 150,000 but less than
32 200,000 as of the most recent federal
33 decennial census, 0.072; (H) For a city
34 school district in a city with a popu-
35 lation of more than 125,000 but less than
36 150,000 as of the most recent federal
37 decennial census, 0.1; or (I) For a school
38 district where the quotient arrived at
39 when dividing foundation aid remaining by
40 total foundation aid is greater than 0.4,
41 0.032.
42 (ii) The "2018-19 school year additional
43 increase" shall equal the greater of: (A)
44 For school districts where the quotient
45 arrived at when dividing the English
46 language learner count pursuant to para-
47 graph o of subdivision 1 of section 3602
48 of the education law by public school
49 district enrollment for the base year
50 pursuant to paragraph n of subdivision 1
51 of such section is greater than 0.03, the
52 product of such public school district
53 enrollment multiplied by the ELL factor
54 multiplied by $28.92, where the "ELL
55 factor" shall equal the difference of 3
56 less the lesser of the combined wealth
952 12654-10-8
1 ratio for total foundation aid computed
2 pursuant to subparagraph 2 of paragraph c
3 of subdivision 3 of section 3602 of the
4 education law or 1.0; (B) For school
5 districts with a sparsity factor computed
6 pursuant to paragraph r of subdivision 1
7 of section 3602 of the education law that
8 is greater than zero, the product of the
9 FRPL factor multiplied by the CWR factor
10 multiplied by the public school district
11 enrollment for the base year pursuant to
12 paragraph n of subdivision 1 of section
13 3602 of the education law multiplied by
14 $137.97, where the "FRPL factor" shall
15 equal the sum of 0.5 plus the greater of
16 the three year average free and reduced
17 price lunch percent computed pursuant to
18 subparagraph (ii) of paragraph p of subdi-
19 vision 1 of section 3602 of the education
20 law for the current year or such average
21 for the base year, and where the "CWR
22 factor" shall equal (i) for school
23 districts with a combined wealth ratio for
24 total foundation aid computed pursuant to
25 subparagraph 2 of paragraph c of subdivi-
26 sion 3 of section 3602 of the education
27 law less than 0.49, 1.75, (ii) for school
28 districts with a combined wealth ratio for
29 total foundation aid computed pursuant to
30 subparagraph 2 of paragraph c of subdivi-
31 sion 3 of section 3602 of the education
32 law greater than or equal to 0.49 but less
33 than 1.0, 1.0, or (iii) for school
34 districts with a combined wealth ratio for
35 total foundation aid computed pursuant to
36 subparagraph 2 of paragraph c of subdivi-
37 sion 3 of section 3602 of the education
38 law greater than or equal to 1.0, 0.75; or
39 (C) For school districts (1) where the
40 difference of the three year average free
41 and reduced price lunch percent for the
42 current year less such average for the
43 base year is greater than 0.0105, (2) with
44 a combined wealth ratio for total founda-
45 tion aid computed pursuant to subparagraph
46 2 of paragraph c of subdivision 3 of
47 section 3602 of the education law less
48 than 0.91, and (3) where the quotient
49 arrived at when dividing the foundation
50 aid remaining by the total foundation aid
51 is greater than 0.23, the product of the
52 public school district enrollment for the
53 current base year pursuant to paragraph n
54 of subdivision 1 of section 3602 of the
55 education law multiplied by $121.75.
953 12654-10-8
1 (iii) The "2018-19 school year due minimum"
2 shall equal the greater of: (A) The posi-
3 tive difference of the product of the
4 foundation aid base multiplied by 0.019
5 less the executive foundation aid
6 increase; or (B) The product of the execu-
7 tive foundation aid increase multiplied by
8 0.18.
9 (iv) The "executive foundation aid increase"
10 shall be equal to the difference of (A)
11 the amounts set forth for each school
12 district as "FOUNDATION AID" under the
13 heading "2018-19 ESTIMATED AIDS" in the
14 school aid computer listing produced by
15 the commissioner in support of the execu-
16 tive budget request for the 2018-19 school
17 year and entitled "BT181-9" less (B) the
18 amounts set forth for each school district
19 as "FOUNDATION AID" under the heading
20 "2017-18 BASE YEAR AIDS" in such computer
21 listing.
22 Notwithstanding any inconsistent provision
23 of law, the community schools increase
24 shall be added to the community schools
25 aid set-aside for the 2018-19 school year
26 pursuant to paragraph e of subdivision 4
27 of section 3602 of the education law, and
28 a school district shall use such community
29 schools increase to support the transfor-
30 mation of school buildings into community
31 hubs to deliver co-located or school-
32 linked academic, health, mental health
33 services and personnel, after school
34 programming, dual language programs,
35 nutrition, counseling, legal and/or other
36 services to students and their families,
37 including but not limited to providing a
38 community school site coordinator and
39 programs for English language learners, or
40 to support other costs incurred to maxi-
41 mize students' academic achievement.
42 Notwithstanding any inconsistent provision
43 of law, no school district shall be eligi-
44 ble for an apportionment of general
45 support for public schools from the funds
46 appropriated for the 2018-19 school year
47 in excess of the amount apportioned to
48 such school district in the base year, as
49 defined in subdivision 1 of section 3602
50 of the education law, unless such school
51 district has submitted documentation that
52 has been approved by the commissioner of
53 education by September 1 of the current
54 year demonstrating that it has fully
55 implemented the standards and procedures
56 for conducting annual teacher and princi-
954 12654-10-8
1 pal evaluations of teachers and principals
2 in accordance with the requirements of
3 section 3012-d of the education law and
4 the regulations issued by the commission-
5 er. Provided further that any apportion-
6 ment withheld pursuant to this appropri-
7 ation shall not occur prior to April 1 of
8 the current year and shall not have any
9 effect on the base year calculation for
10 use in the subsequent school year.
11 Provided further that, if any payments of
12 ineligible amounts pursuant to the imme-
13 diately preceding paragraph of this appro-
14 priation were made, the total amount of
15 such payments shall be deducted from
16 future payments to the school district;
17 provided further that, if the amount of
18 the deduction is greater than the sum of
19 the amounts available for such deductions
20 in the applicable school year, the remain-
21 der of the deduction shall be withheld
22 from payments from funds appropriated
23 herein scheduled to be made to the school
24 district pursuant to section 3609-a of the
25 education law for the subsequent school
26 year.
27 Notwithstanding any inconsistent provision
28 of law, for a school district (a) located
29 in a city with a population of more than
30 1,000,000 or (b) which contains at least
31 four schools as reported in the school
32 report card database produced by the
33 commissioner for the 2016-17 school year
34 and which receives at least 50 percent of
35 total revenue from state aid as reported
36 in the fiscal profiles master files report
37 produced by the commissioner concerning
38 data on school district expenditures and
39 revenues for the 2015-16 school year, the
40 apportionment of general support for
41 public schools for the 2018-19 school year
42 in excess of the amount apportioned to
43 such school district in the 2017-18 school
44 year shall be withheld until (i) such
45 school district has submitted to the
46 commissioner of education and the director
47 of the budget a detailed statement of the
48 total funding allocation for each school
49 in the district for the 2018-19 school
50 year, in a statewide uniform form devel-
51 oped by the director of the budget, in
52 consultation with the commissioner, and
53 (ii) the commissioner and the director of
54 the budget issue a determination of
55 compliance in writing of such school
56 district's statement of total funding
955 12654-10-8
1 allocation as required by subdivision 1 of
2 section 3614 of the education law.
3 Provided further that such school districts
4 shall adhere to and complete the
5 prescribed form accurately and fully, and
6 shall make such statement publicly avail-
7 able and on the district website.
8 Provided further that the director of the
9 budget shall request in such form only
10 information that is known to, or may be
11 ascertained or estimated by, the district.
12 Provided further that each such local educa-
13 tional agency shall include in such state-
14 ment the approach used to allocate funds
15 to each school and that such statement
16 shall include but not be limited to sepa-
17 rate entries for each individual school,
18 demographic data for the school, per pupil
19 funding level, source of funds, and
20 uniform decision rules regarding allo-
21 cation of centralized spending to individ-
22 ual schools from all funding sources.
23 Provided further that within 30 days of
24 submission of such statement by a school
25 district, the commissioner and director of
26 the budget shall review such statement and
27 determine whether the statement is
28 complete and is in the format required. If
29 such statement is determined to be
30 complete and in the format required, a
31 written acknowledgement of such shall be
32 sent to the school district. If no deter-
33 mination is made by the commissioner and
34 the director of the budget within 30 days
35 of submission of the statement, such
36 statement shall be deemed approved.
37 Should the commissioner or the director of
38 the budget request additional information
39 from the school district to determine
40 completeness, the deadline shall be
41 extended by 30 days from the date of
42 submission of the additional requested
43 information. If the commissioner or direc-
44 tor of the budget determine a school
45 district's spending statement to be
46 noncompliant, such school district shall
47 be allowed to submit a revised spending
48 statement at any time.
49 Provided further that if a school district
50 fails to submit a statement that is
51 complete and in the format required by the
52 first day of such school year or if the
53 commissioner or director of the budget
54 determine the school district's spending
55 statement to be noncompliant, a written
56 explanation shall be provided and the
956 12654-10-8
1 school district will have 30 days to cure.
2 If the school district does not cure with-
3 in 30 days, the comptroller of the city in
4 which such school district is situated, or
5 if the city does not have an elected comp-
6 troller the chief financial officer of the
7 city, or for school districts not located
8 in a city, the chief financial officer of
9 the town in which the majority of the
10 school district is situated shall be
11 authorized, at his or her discretion, to
12 obtain appropriate information from the
13 school district, and shall be authorized
14 to complete such form and submit such
15 statement to the director of the budget
16 and the commissioner for approval.
17 Provided further that where the comptroller
18 or chief financial officer exercises the
19 authority to submit such form, such
20 submission shall occur within 60 days
21 following notification of the school
22 district's failure to cure.
23 Provided further that nothing in the preced-
24 ing paragraph shall preclude a school
25 district from submitting a spending state-
26 ment for approval by the director of the
27 budget and the commissioner at any time.
28 Provided further that nothing in this appro-
29 priation shall alter or suspend statutory
30 school district budget and voting require-
31 ments.
32 Provided further that any apportionment
33 withheld pursuant to this appropriation
34 shall not have any effect on the base year
35 calculation for use in the subsequent
36 school year.
37 Provided further that notwithstanding any
38 inconsistent provision of law, for the
39 purposes of this appropriation and of
40 calculating the allocable growth amount
41 for the 2018-19 school year pursuant to
42 paragraph gg of subdivision 1 of section
43 3602 of the education law, the allowable
44 growth amount shall equal the sum of (i)
45 the product of the positive difference of
46 the personal income growth index minus
47 one, multiplied by the statewide total of
48 the sum of (1) the apportionments due and
49 owing during the base year to school
50 districts and boards of cooperative educa-
51 tional services from the general support
52 for public schools as computed based on an
53 electronic data file used to produce the
54 school aid computer listing produced by
55 the commissioner in support of the enacted
56 budget for the base year, excluding any
957 12654-10-8
1 such apportionments appropriated for such
2 purpose from the commercial gaming revenue
3 fund plus (2) the competitive awards
4 amount for the base year, and (ii)
5 $528,981,000.
6 Provided further that notwithstanding any
7 provision of law to the contrary, the
8 competitive awards amount for purposes of
9 calculating the allocable growth amount
10 shall be $50,000,000 for the 2018-19
11 school year.
12 Provided further that notwithstanding any
13 provision of law to the contrary, for the
14 2018-19 school year, the apportionments
15 computed pursuant to subdivisions 5-a, 12
16 and 16 of section 3602 of the education
17 law shall equal the amounts set forth,
18 respectively, for such school district as
19 "SUPPLEMENTAL PUB EXCESS COST", "ACADEMIC
20 ENHANCEMENT" and "HIGH TAX AID" under the
21 heading "2017-18 ESTIMATED AIDS" in the
22 school aid computer listing produced by
23 the commissioner of education in support
24 of the enacted budget for the 2017-18
25 school year and entitled "SA171-8".
26 Provided further that to the extent required
27 by federal law, each board of cooperative
28 educational services receiving a payment
29 pursuant to section 3609-d of the educa-
30 tion law in the 2018-19 school year shall
31 be required to set aside from such payment
32 an amount not less than the amount of
33 state aid received pursuant to subdivision
34 5 of section 1950 of the education law in
35 the base year that was attributable to
36 cooperative services agreements (CO-SERs)
37 for career education, as determined by the
38 commissioner of education, and shall be
39 required to use such amount to support
40 career education programs in the current
41 year.
42 Provided further that, notwithstanding any
43 inconsistent provision of law, subject to
44 the approval of the director of the budg-
45 et, funds appropriated herein may be
46 interchanged with any other item of appro-
47 priation for general support for public
48 schools within the general fund local
49 assistance account office of prekindergar-
50 ten through grade twelve education
51 program. Notwithstanding any provision of
52 law to the contrary, funds appropriated
53 herein shall be available for payment of
54 liabilities heretofore accrued or hereaft-
55 er to accrue.
958 12654-10-8
1 Notwithstanding any other law, rule or regu-
2 lation to the contrary, funds appropriated
3 herein shall be available for payment of
4 financial assistance net of any disallow-
5 ances, refunds, reimbursement and credits,
6 and may be suballocated to other depart-
7 ments and agencies to accomplish the
8 intent of this appropriation subject to
9 the approval of the director of the budg-
10 et. Notwithstanding any provision of law
11 to the contrary, this appropriation shall
12 supersede and replace any appropriation
13 for this item covering fiscal year 2018-19
14 set forth in chapter 53 of the laws of
15 2017 (21701) ............................ 15,077,196,000
16 For remaining 2017-18 and prior school year
17 obligations, including aid for such school
18 years payable pursuant to section 3609-d
19 of the education law, provided that
20 notwithstanding any provision of law to
21 the contrary subject to the approval of
22 the director of the budget, funds appro-
23 priated herein may be interchanged with
24 any other item of appropriation for gener-
25 al support for public schools within the
26 general fund local assistance account
27 office of prekindergarten through grade
28 twelve education program.
29 Notwithstanding any other law, rule or regu-
30 lation to the contrary, funds appropriated
31 herein shall be available for payment of
32 financial assistance net of any disallow-
33 ances, refunds, reimbursement and credits,
34 and may be suballocated to other depart-
35 ments and agencies to accomplish the
36 intent of this appropriation subject to
37 the approval of the director of the budg-
38 et. Notwithstanding any provision of law
39 to the contrary, funds appropriated herein
40 shall be available for payment of liabil-
41 ities heretofore accrued or hereafter to
42 accrue. Notwithstanding any provision of
43 law to the contrary, this appropriation
44 shall supersede and replace any appropri-
45 ation for this item covering fiscal year
46 2018-19 set forth in chapter 53 of the
47 laws of 2017 (21882) ..................... 7,286,150,000
48 Funds appropriated herein shall be available
49 for reimbursement for the education of
50 homeless children and youth for the 2018-
51 19 school year pursuant to section 3209 of
52 the education law, including reimbursement
53 for expenditures for the transportation of
54 homeless children pursuant to paragraph b
55 of subdivision 4 of section 3209 of the
56 education law, up to the amount of the
959 12654-10-8
1 approved costs of the most cost-effective
2 mode of transportation, in accordance with
3 a plan prepared by the commissioner of
4 education and approved by the director of
5 the budget provided that in the 2018-19
6 state fiscal year the sum of $30,000 may
7 be transferred to the credit of the state
8 purposes account of the state education
9 department to carry out the purposes of
10 such section relating to reimbursement of
11 youth shelters transporting such pupils
12 and provided further that, notwithstanding
13 any inconsistent provision of law, subject
14 to the approval of the director of the
15 budget, funds appropriated herein may be
16 interchanged with any other item of appro-
17 priation for general support for public
18 schools within the general fund local
19 assistance account office of prekindergar-
20 ten through grade twelve education
21 program.
22 Notwithstanding any other law, rule or regu-
23 lation to the contrary, funds appropriated
24 herein shall be available for payment of
25 financial assistance net of any disallow-
26 ances, refunds, reimbursement and credits,
27 and may be suballocated to other depart-
28 ments and agencies to accomplish the
29 intent of this appropriation subject to
30 the approval of the director of the budg-
31 et. Notwithstanding any provision of law
32 to the contrary, funds appropriated herein
33 shall be available for payment of liabil-
34 ities heretofore accrued or hereafter to
35 accrue.
36 Notwithstanding any provision of law to the
37 contrary, this appropriation shall super-
38 sede and replace any appropriation for
39 this item covering fiscal year 2018-19 set
40 forth in chapter 53 of the laws of 2017
41 (21746) ..................................... 21,158,000
42 Funds appropriated herein shall be available
43 during the 2018-19 school year for bilin-
44 gual education grants to school districts,
45 boards of cooperative educational
46 services, colleges and universities, and
47 an entity, chosen through a competitive
48 procurement process, to assist schools and
49 districts to conduct self assessments to
50 identify areas that need to be strength-
51 ened and to ensure compliance with the
52 various federal, state and local laws that
53 govern limited English proficiency and
54 English language learning education,
55 provided, however, that the sum of such
56 grants shall not exceed $15,500,000 for
960 12654-10-8
1 the 2018-19 school year, and provided
2 further that, notwithstanding any incon-
3 sistent provision of law, subject to the
4 approval of the director of the budget,
5 funds appropriated herein may be inter-
6 changed with any other item of appropri-
7 ation for general support for public
8 schools within the general fund local
9 assistance account office of prekindergar-
10 ten through grade twelve education
11 program.
12 Notwithstanding any other law, rule or regu-
13 lation to the contrary, funds appropriated
14 herein shall be available for payment of
15 financial assistance net of any disallow-
16 ances, refunds, reimbursement and credits,
17 and may be suballocated to other depart-
18 ments and agencies to accomplish the
19 intent of this appropriation subject to
20 the approval of the director of the budg-
21 et. Notwithstanding any provision of law
22 to the contrary, funds appropriated herein
23 shall be available for payment of liabil-
24 ities heretofore accrued or hereafter to
25 accrue. Notwithstanding any provision of
26 law to the contrary, this appropriation
27 shall supersede and replace any appropri-
28 ation for this item covering fiscal year
29 2018-19 set forth in chapter 53 of the
30 laws of 2017 (21747) ........................ 10,850,000
31 For an additional $2,000,000 in the 2018-19
32 school year to support billingual educa-
33 tion ......................................... 1,400,000
34 Funds appropriated herein shall be available
35 in the 2018-19 school year for school
36 districts and boards of cooperative educa-
37 tional services applications for funding
38 of approved learning technology programs
39 approved by the commissioner of education,
40 including services benefiting nonpublic
41 school students, pursuant to regulations
42 promulgated by the commissioner of educa-
43 tion and approved by the director of the
44 budget. Provided, however, that the sum of
45 such grants shall not exceed $3,285,000
46 for the 2018-19 school year, and provided
47 further that, notwithstanding any incon-
48 sistent provision of law, subject to the
49 approval of the director of the budget,
50 funds appropriated herein may be inter-
51 changed with any other item of appropri-
52 ation for general support for public
53 schools within the general fund local
54 assistance account office of prekindergar-
55 ten through grade twelve education
56 program.
961 12654-10-8
1 Notwithstanding any other law, rule or regu-
2 lation to the contrary, funds appropriated
3 herein shall be available for payment of
4 financial assistance net of any disallow-
5 ances, refunds, reimbursement and credits,
6 and may be suballocated to other depart-
7 ments and agencies to accomplish the
8 intent of this appropriation subject to
9 the approval of the director of the budg-
10 et. Notwithstanding any provision of law
11 to the contrary, funds appropriated herein
12 shall be available for payment of liabil-
13 ities heretofore accrued or hereafter to
14 accrue. Notwithstanding any provision of
15 law to the contrary, this appropriation
16 shall supersede and replace any appropri-
17 ation for this item covering fiscal year
18 2018-19 set forth in chapter 53 of the
19 laws of 2017 (21748) ......................... 2,300,000
20 Funds appropriated herein shall be available
21 for the voluntary interdistrict urban-su-
22 burban transfer program aid pursuant to
23 subdivision 15 of section 3602 of the
24 education law for the 2018-19 school year,
25 provided that notwithstanding any incon-
26 sistent provision of law, subject to the
27 approval of the director of the budget,
28 funds appropriated herein may be inter-
29 changed with any other item of appropri-
30 ation for general support for public
31 schools within the general fund local
32 assistance account office of prekindergar-
33 ten through grade twelve education
34 program.
35 Notwithstanding any other law, rule or regu-
36 lation to the contrary, funds appropriated
37 herein shall be available for payment of
38 financial assistance net of any disallow-
39 ances, refunds, reimbursement and credits,
40 and may be suballocated to other depart-
41 ments and agencies to accomplish the
42 intent of this appropriation subject to
43 the approval of the director of the budg-
44 et. Notwithstanding any provision of law
45 to the contrary, funds appropriated herein
46 shall be available for payment of liabil-
47 ities heretofore accrued or hereafter to
48 accrue. Notwithstanding any provision of
49 law to the contrary, this appropriation
50 shall supersede and replace any appropri-
51 ation for this item covering fiscal year
52 2018-19 set forth in chapter 53 of the
53 laws of 2017 (21749) ......................... 5,142,000
54 Funds appropriated herein shall be available
55 for additional apportionments of building
56 aid for school districts educating pupils
962 12654-10-8
1 residing on Indian reservations calculated
2 pursuant to subdivision 6-a of section
3 3602 of the education law for the 2018-19
4 school year provided that, notwithstanding
5 any inconsistent provision of law, subject
6 to the approval of the director of the
7 budget, funds appropriated herein may be
8 interchanged with any other item of appro-
9 priation for general support for public
10 schools within the general fund local
11 assistance account office of prekindergar-
12 ten through grade twelve education
13 program.
14 Notwithstanding any other law, rule or regu-
15 lation to the contrary, funds appropriated
16 herein shall be available for payment of
17 financial assistance net of any disallow-
18 ances, refunds, reimbursement and credits,
19 and may be suballocated to other depart-
20 ments and agencies to accomplish the
21 intent of this appropriation subject to
22 the approval of the director of the budg-
23 et. Notwithstanding any provision of law
24 to the contrary, funds appropriated herein
25 shall be available for payment of liabil-
26 ities heretofore accrued or hereafter to
27 accrue. Notwithstanding any provision of
28 law to the contrary, this appropriation
29 shall supersede and replace any appropri-
30 ation for this item covering fiscal year
31 2018-19 set forth in chapter 53 of the
32 laws of 2017 (21750) ......................... 3,500,000
33 Funds appropriated herein shall be available
34 during the 2018-19 school year for the
35 education of youth incarcerated in county
36 correctional facilities pursuant to subdi-
37 vision 13 of section 3602 of the education
38 law, provided that notwithstanding any
39 inconsistent provision of law, subject to
40 the approval of the director of the budg-
41 et, funds appropriated herein may be
42 interchanged with any other item of appro-
43 priation for general support for public
44 schools within the general fund local
45 assistance account office of prekindergar-
46 ten through grade twelve education
47 program.
48 Notwithstanding any other law, rule or regu-
49 lation to the contrary, funds appropriated
50 herein shall be available for payment of
51 financial assistance net of any disallow-
52 ances, refunds, reimbursement and credits,
53 and may be suballocated to other depart-
54 ments and agencies to accomplish the
55 intent of this appropriation subject to
56 the approval of the director of the budg-
963 12654-10-8
1 et. Notwithstanding any provision of law
2 to the contrary, funds appropriated herein
3 shall be available for payment of liabil-
4 ities heretofore accrued or hereafter to
5 accrue. Notwithstanding any provision of
6 law to the contrary, this appropriation
7 shall supersede and replace any appropri-
8 ation for this item covering fiscal year
9 2018-19 set forth in chapter 53 of the
10 laws of 2017 (21751) ........................ 11,200,000
11 Funds appropriated herein shall be available
12 for the 2018-19 school year for the educa-
13 tion of students who reside in a school
14 operated by the office of mental health or
15 the office for people with developmental
16 disabilities pursuant to subdivision 5 of
17 section 3202 of the education law,
18 provided that notwithstanding any incon-
19 sistent provision of law, subject to the
20 approval of the director of the budget,
21 funds appropriated herein may be inter-
22 changed with any other item of appropri-
23 ation for general support for public
24 schools within the general fund local
25 assistance account office of prekindergar-
26 ten through grade twelve education
27 program.
28 Notwithstanding any other law, rule or regu-
29 lation to the contrary, funds appropriated
30 herein shall be available for payment of
31 financial assistance net of any disallow-
32 ances, refunds, reimbursement and credits,
33 and may be suballocated to other depart-
34 ments and agencies to accomplish the
35 intent of this appropriation subject to
36 the approval of the director of the budg-
37 et. Notwithstanding any provision of law
38 to the contrary, funds appropriated herein
39 shall be available for payment of liabil-
40 ities heretofore accrued or hereafter to
41 accrue. Notwithstanding any provision of
42 law to the contrary, this appropriation
43 shall supersede and replace any appropri-
44 ation for this item covering fiscal year
45 2018-19 set forth in chapter 53 of the
46 laws of 2017 (21752) ........................ 37,975,000
47 Funds appropriated herein shall be available
48 for building aid payable in the 2018-19
49 school years to special act school
50 districts, provided that, subject to the
51 approval of the director of the budget,
52 such funds may be used for payments to the
53 dormitory authority on behalf of eligible
54 special act school districts pursuant to
55 chapter 737 of the laws of 1988 provided
56 that, notwithstanding any inconsistent
964 12654-10-8
1 provision of law, subject to the approval
2 of the director of the budget, funds
3 appropriated herein may be interchanged
4 with any other item of appropriation for
5 general support for public schools within
6 the general fund local assistance account
7 office of prekindergarten through grade
8 twelve education program.
9 Notwithstanding any other law, rule or regu-
10 lation to the contrary, funds appropriated
11 herein shall be available for payment of
12 financial assistance net of any disallow-
13 ances, refunds, reimbursement and credits,
14 and may be suballocated to other depart-
15 ments and agencies to accomplish the
16 intent of this appropriation subject to
17 the approval of the director of the budg-
18 et. Notwithstanding any provision of law
19 to the contrary, funds appropriated herein
20 shall be available for payment of liabil-
21 ities heretofore accrued or hereafter to
22 accrue. Notwithstanding any provision of
23 law to the contrary, this appropriation
24 shall supersede and replace any appropri-
25 ation for this item covering fiscal year
26 2018-19 set forth in chapter 53 of the
27 laws of 2017 (21753) ......................... 1,890,000
28 Funds appropriated herein shall be available
29 for school bus driver training grants,
30 provided that for aid payable in the
31 2018-19 school year, the commissioner of
32 education shall allocate school bus driver
33 training grants, not to exceed $400,000 in
34 the 2018-19 school year, to school
35 districts and boards of cooperative educa-
36 tional services pursuant to sections
37 3650-a, 3650-b and 3650-c of the education
38 law, or for contracts directly with not-
39 for-profit educational organizations for
40 the purposes of this appropriation,
41 provided that notwithstanding any incon-
42 sistent provision of law, subject to the
43 approval of the director of the budget,
44 funds appropriated herein may be inter-
45 changed with any other item of appropri-
46 ation for general support for public
47 schools within the general fund local
48 assistance account office of prekindergar-
49 ten through grade twelve education
50 program.
51 Notwithstanding any other law, rule or regu-
52 lation to the contrary, funds appropriated
53 herein shall be available for payment of
54 financial assistance net of any disallow-
55 ances, refunds, reimbursement and credits,
56 and may be suballocated to other depart-
965 12654-10-8
1 ments and agencies to accomplish the
2 intent of this appropriation subject to
3 the approval of the director of the budg-
4 et. Notwithstanding any provision of law
5 to the contrary, funds appropriated herein
6 shall be available for payment of liabil-
7 ities heretofore accrued or hereafter to
8 accrue. Notwithstanding any provision of
9 law to the contrary, this appropriation
10 shall supersede and replace any appropri-
11 ation for this item covering fiscal year
12 2018-19 set forth in chapter 53 of the
13 laws of 2017 (21754) ........................... 280,000
14 Funds appropriated herein shall be available
15 for services and expenses of a $2,000,000
16 teacher mentor intern program in the
17 2018-19 school year, provided that,
18 notwithstanding any inconsistent provision
19 of law, subject to the approval of the
20 director of the budget, funds appropriated
21 herein may be interchanged with any other
22 item of appropriation for general support
23 for public schools within the general fund
24 local assistance account office of prekin-
25 dergarten through grade twelve education
26 program.
27 Notwithstanding any other law, rule or regu-
28 lation to the contrary, funds appropriated
29 herein shall be available for payment of
30 financial assistance net of any disallow-
31 ances, refunds, reimbursement and credits,
32 and may be suballocated to other depart-
33 ments and agencies to accomplish the
34 intent of this appropriation subject to
35 the approval of the director of the budg-
36 et. Notwithstanding any provision of law
37 to the contrary, funds appropriated herein
38 shall be available for payment of liabil-
39 ities heretofore accrued or hereafter to
40 accrue. Notwithstanding any provision of
41 law to the contrary, this appropriation
42 shall supersede and replace any appropri-
43 ation for this item covering fiscal year
44 2018-19 set forth in chapter 53 of the
45 laws of 2017 (23485) ......................... 1,400,000
46 Funds appropriated herein shall be available
47 for services and expenses of a $12,000,000
48 special academic improvement grants
49 program in the 2018-19 school year payable
50 pursuant to subdivision 11 of section 3641
51 of the education law, provided that
52 notwithstanding any provisions of law to
53 the contrary, such funds shall be paid in
54 accordance with a schedule developed by
55 the commissioner of education and approved
56 by the director of the budget provided
966 12654-10-8
1 that, notwithstanding any inconsistent
2 provision of law, subject to the approval
3 of the director of the budget, funds
4 appropriated herein may be interchanged
5 with any other item of appropriation for
6 general support for public schools within
7 the general fund local assistance account
8 office of prekindergarten through grade
9 twelve education program.
10 Notwithstanding any other law, rule or regu-
11 lation to the contrary, funds appropriated
12 herein shall be available for payment of
13 financial assistance net of any disallow-
14 ances, refunds, reimbursement and credits,
15 and may be suballocated to other depart-
16 ments and agencies to accomplish the
17 intent of this appropriation subject to
18 the approval of the director of the budg-
19 et. Notwithstanding any provision of law
20 to the contrary, funds appropriated herein
21 shall be available for payment of liabil-
22 ities heretofore accrued or hereafter to
23 accrue. Notwithstanding any provision of
24 law to the contrary, this appropriation
25 shall supersede and replace any appropri-
26 ation for this item covering fiscal year
27 2018-19 set forth in chapter 53 of the
28 laws of 2017 (21755) ......................... 8,400,000
29 For the education of Native Americans in the
30 2018-19 or prior school years. Funds
31 appropriated herein shall be considered
32 general support for public schools and
33 shall be paid in accordance with a sched-
34 ule developed by the commissioner of
35 education and approved by the director of
36 the budget. Notwithstanding any provision
37 of law to the contrary, subject to the
38 approval of the director of the budget,
39 funds appropriated herein may be inter-
40 changed with any other item of appropri-
41 ation for general support for public
42 schools within the general fund local
43 assistance account office of prekindergar-
44 ten through grade twelve education
45 program.
46 Notwithstanding any other law, rule or regu-
47 lation to the contrary, funds appropriated
48 herein shall be available for payment of
49 financial assistance, net of any disallow-
50 ances, refunds, reimbursements and cred-
51 its, and may be suballocated to other
52 departments and agencies to accomplish the
53 intent of this appropriation subject to
54 approval of the director of the budget.
55 Notwithstanding any provision of law to the
56 contrary, funds appropriated herein shall
967 12654-10-8
1 be available for payment of liabilities
2 heretofore accrued or hereafter to accrue.
3 Notwithstanding any provision of law to the
4 contrary, this appropriation shall super-
5 sede and replace any appropriation for
6 this item covering fiscal year 2018-19 set
7 forth in chapter 53 of the laws of 2017
8 (21756) ..................................... 32,846,000
9 For school health services grants to public
10 schools totaling $13,840,000 in the 2018-
11 19 school year; provided that, notwith-
12 standing any provisions of law to the
13 contrary, in addition to any other appor-
14 tionment, such grants shall only be paya-
15 ble to any city school district in a city
16 having a population in excess of 125,000,
17 and less than 1,000,000 inhabitants, and
18 such district shall be eligible to receive
19 the same amount it was eligible to receive
20 for the 2010-11 school year. Funds appro-
21 priated herein shall be considered general
22 support for public schools and shall be
23 paid in accordance with a schedule devel-
24 oped by the commissioner of education and
25 approved by the director of the budget.
26 Notwithstanding any provision of law to the
27 contrary, subject to the approval of the
28 director of the budget, funds appropriated
29 herein may be interchanged with any other
30 item of appropriation for general support
31 for public schools within the general fund
32 local assistance account office of prekin-
33 dergarten through grade twelve education
34 program. Notwithstanding any other law,
35 rule or regulation to the contrary, funds
36 appropriated herein shall be available for
37 payment of financial assistance, net of
38 any disallowances, refunds, reimbursements
39 and credits, and may be suballocated to
40 other departments and agencies to accom-
41 plish the intent of this appropriation
42 subject to the approval of the director of
43 the budget. Notwithstanding any provision
44 of law to the contrary, funds appropriated
45 herein shall be available for payment of
46 liabilities heretofore accrued or hereaft-
47 er to accrue. Notwithstanding any
48 provision of law to the contrary, this
49 appropriation shall supersede and replace
50 any appropriation for this item covering
51 fiscal year 2018-19 set forth in chapter
52 53 of the laws of 2017 (21757) ............... 9,688,000
53 For additional school health services grants
54 to the Buffalo City School District for
55 the 2018-19 school year ...................... 1,200,000
56 For additional school health services grants
968 12654-10-8
1 to the Rochester City School District for
2 the 2018-19 school year ...................... 1,200,000
3 For the teachers of tomorrow awards to
4 school districts for the 2018-19 school
5 year in the amount of $25,000,000,
6 provided that $5,000,000 of this total
7 amount in such school year shall be made
8 available for a program to be developed by
9 the commissioner of education to attract
10 qualified teachers that have received or
11 will receive a transitional certificate
12 and agree to teach mathematics, science,
13 or bilingual education in a low performing
14 school, further provided that of this
15 $5,000,000, a total of up to $500,000 in
16 each such school year shall be made avail-
17 able for demonstration programs in the
18 Yonkers and Syracuse city school districts
19 to increase the number of teachers in such
20 districts who teach math, science and
21 related areas and who have such a transi-
22 tional certificate, and provided further
23 that notwithstanding any inconsistent
24 provision of law of this $5,000,000, a
25 total of $1,000,000 shall be made avail-
26 able as a matching grant to colleges and
27 universities to support programs designed
28 to recruit and train math and science
29 teachers based on a proven national model
30 that results in improved student achieve-
31 ment and enhanced teacher retention in the
32 classroom.
33 Funds appropriated herein shall be consid-
34 ered general support for public schools.
35 Notwithstanding any provision of law to
36 the contrary, funds appropriated herein
37 may be interchanged with any other item of
38 appropriation for general support for
39 public schools within the general fund
40 local assistance account office of prekin-
41 dergarten through grade twelve education
42 program.
43 Notwithstanding any other law, rule or regu-
44 lation to the contrary, funds appropriated
45 herein shall be available for payment of
46 financial assistance, net of any disallow-
47 ances, refunds, reimbursements and cred-
48 its, may be suballocated to other depart-
49 ments and agencies to accomplish the
50 intent of this appropriation subject to
51 approval of the director of the budget.
52 Notwithstanding any provision of law to
53 the contrary, funds appropriated herein
54 shall be available for payment of liabil-
55 ities heretofore accrued or hereafter to
56 accrue. Notwithstanding any provision of
969 12654-10-8
1 law to the contrary, this appropriation
2 shall supersede and replace any appropri-
3 ation for this item covering fiscal year
4 2018-19 set forth in chapter 53 of the
5 laws of 2017 (21759) ........................ 17,500,000
6 For payment of employment preparation educa-
7 tion aid for the 2018-19 school year
8 pursuant to paragraph e of subdivision 11
9 of section 3602 of the education law.
10 Notwithstanding any provision of law to the
11 contrary, funds appropriated herein may be
12 suballocated, subject to the approval of
13 the director of the budget, to other
14 departments and agencies to accomplish the
15 intent of this appropriation and subject
16 to the approval of the director of the
17 budget, such funds shall be available to
18 the department net of disallowances,
19 refunds, reimbursements and credits.
20 Funds appropriated herein shall be consid-
21 ered general support for public schools.
22 Notwithstanding any provision of law to
23 the contrary, funds appropriated herein
24 may be interchanged with any other item of
25 appropriation for general support for
26 public schools within the general fund
27 local assistance account office of prekin-
28 dergarten through grade twelve education
29 program. Notwithstanding any provision of
30 law to the contrary, funds appropriated
31 herein shall be available for payment of
32 liabilities heretofore accrued or hereaft-
33 er to accrue. Notwithstanding any
34 provision of law to the contrary, this
35 appropriation shall supersede and replace
36 any appropriation for this item covering
37 fiscal year 2018-19 set forth in chapter
38 53 of the laws of 2017 (21762) .............. 96,000,000
39 For reimbursement of supplemental basic
40 tuition payments to charter schools made
41 by school districts in the 2017-18 school
42 year, as defined by paragraph a of subdi-
43 vision 1 of section 2856 of the education
44 law (55907) ................................ 139,000,000
45 For charter schools facilities aid for the
46 2017-18 school year pursuant to subdivi-
47 sion 6-g of section 3602 of the education
48 law .......................................... 6,100,000
49 For additional grants in aid to certain
50 school districts, public libraries, and
51 not-for-profit institutions. Notwithstand-
52 ing any provision of law to the contrary,
53 this appropriation shall be allocated only
54 pursuant to a plan setting forth an item-
55 ized list of grantees with the amount to
56 be received by each, or the methodology
970 12654-10-8
1 for allocating this appropriation. Such
2 plan shall be subject to the approval of
3 the temporary president of the senate and
4 the director of the budget and thereafter
5 shall be included in a resolution calling
6 for the expenditure of such monies, which
7 resolution must be approved by a majority
8 vote of all members elected to the senate
9 upon a roll call vote. Provided, however,
10 that funds appropriated herein shall be
11 made available on or after April 1, 2019.
12 Notwithstanding section 40 of the state
13 finance law or any provision of law to the
14 contrary, this appropriation shall lapse
15 on March 31, 2020 ........................... 40,000,000
16 For additional grants in aid to certain
17 school districts, public libraries, and
18 not-for-profit institutions. Notwithstand-
19 ing section twenty-four of the state
20 finance law or any provision of law to the
21 contrary, funds from this appropriation
22 shall be allocated only pursuant to a plan
23 (i) approved by the speaker of the assem-
24 bly and the director of the budget which
25 sets forth either an itemized list of
26 grantees with the amount to be received by
27 each, or the methodology for allocating
28 such appropriation, and (ii) which is
29 thereafter included in an assembly resol-
30 ution calling for the expenditure of such
31 funds, which resolution must be approved
32 by a majority vote of all members elected
33 to the assembly upon a roll call vote,
34 provided, however, that no more than
35 $25,000,000 of the funds appropriated
36 herein shall be made available prior to
37 April 1, 2019 ............................... 40,000,000
38 For additional empire state after-school
39 grants; provided that $35,000,000 of the
40 amount appropriated herein shall support
41 the continuation of awards made based on
42 responses to the empire state after-school
43 program request for proposals pursuant to
44 chapter 53 of the laws of 2017; and
45 provided further that $10,000,000 of the
46 amount appropriated herein shall be
47 awarded pursuant to a plan developed by
48 the office of children and family services
49 in consultation with the commissioner of
50 education and approved by the director of
51 the budget, to support the establishment
52 and/or expansion of after-school programs
53 by school districts or not-for-profit
54 community-based organizations (A) located
55 in school districts eligible to partic-
56 ipate in the empire state after-school
971 12654-10-8
1 program pursuant to chapter 53 of the laws
2 of 2017, or (B) located in a school
3 district with high rates of student home-
4 lessness, or (C) located in a school
5 district in at-risk areas in Nassau County
6 or Suffolk County identified by the office
7 of children and family services, division
8 of criminal justice services, division of
9 state police, county executive, or local
10 law enforcement, or (D) located in high-
11 need school districts in Nassau County or
12 Suffolk County.
13 Provided that such grants shall be awarded
14 based on factors including, but not limit-
15 ed to, the following: (i) measures of
16 school district need, (ii) measures of the
17 need of students to be served, (iii) the
18 applicant's proposal to target the
19 highest-need schools and students, (iv)
20 the applicant's program design to meet the
21 specific needs of students, including
22 homeless students or students displaced by
23 natural disasters, and (v) proposal quali-
24 ty.
25 Provided, further, that $2,000,000 of such
26 funds shall be initially made available to
27 applicants (A) located in a school
28 district in at-risk areas in Nassau County
29 or Suffolk County identified by the office
30 of children and family services, division
31 of criminal justice services, division of
32 state police, county executive, or local
33 law enforcement, or (B) located in high-
34 need school districts in Nassau County or
35 Suffolk County.
36 Provided, further, that an empire state
37 after-school grant shall equal the product
38 of (i) the approved number of students
39 served in such program and (ii) $1,600;
40 provided, however, that no applicant shall
41 receive a grant in excess of the total
42 actual grant expenditures incurred by the
43 applicant in the current school year as
44 approved by the office of children and
45 family services.
46 Provided, further, a school district shall
47 agree to adopt approved quality indicators
48 including, but not limited to, valid and
49 reliable measures of environmental quali-
50 ty, and the quality of staff-student
51 interactions and student outcomes.
52 Provided, further, that no school district
53 shall receive more than 40 percent of the
54 total empire state after-school program
55 grant allocation. Notwithstanding any
56 provision of law to the contrary, upon
972 12654-10-8
1 approval of the director of the budget,
2 the funds appropriated herein may be
3 suballocated, interchanged, transferred or
4 otherwise made available to the office of
5 children and family services for the sole
6 purpose of administering such grants.
7 Notwithstanding any provision of law to the
8 contrary, $10,000,000 of the funds appro-
9 priated herein, plus any other amounts so
10 designated in other items of appropriation
11 within the general fund local assistance
12 account office of prekindergarten through
13 grade twelve education program, shall
14 constitute the competitive awards amount
15 authorized for the 2018-19 school year ...... 45,000,000
16 For additional grants for prekindergarten;
17 provided that $5,000,000 of the amount
18 appropriated herein shall support the
19 continuation of awards made based on
20 responses to the additional grants for the
21 expanded prekindergarten for three- and
22 four-year old students in high-need school
23 districts request for proposals pursuant
24 to chapter 53 of the laws of 2017; and
25 provided further that $15,000,000 of such
26 grants shall be awarded pursuant to subdi-
27 vision 18 of section 3602-e of the educa-
28 tion law, based on a request for proposals
29 developed by the commissioner of education
30 and approved by the director of the budg-
31 et, to school districts to establish new
32 full-day and half-day prekindergarten
33 placements for three-year-olds and four-
34 year-olds; provided, further, that such
35 grants shall only be used to supplement,
36 not supplant existing prekindergarten
37 programs; and provided, further, that any
38 portion of the funds appropriated herein
39 that is not awarded shall remain available
40 for subsequent awards in the 2019-20
41 school year or for full-day and half-day
42 prekindergarten grants to be awarded in
43 subsequent school years.
44 Provided, further, that such grants from
45 funds appropriated herein shall be awarded
46 based on factors including, but not limit-
47 ed to, the following: (i) measures of
48 school district need, (ii) measures of the
49 need of students to be served by the
50 school district, (iii) the school
51 district's proposal to target the
52 highest-need schools and students, (iv)
53 the extent to which the district's
54 proposal would prioritize funds to maxi-
55 mize the total number of eligible children
56 in the district served in prekindergarten
973 12654-10-8
1 programs, (v) the school district's
2 proposal to include students of all learn-
3 ing and physical abilities in integrated
4 settings and (vi) proposal quality;
5 provided further that preference for the
6 2018-19 awards shall be given to high-need
7 school districts without a current state-
8 funded prekindergarten program.
9 Provided, however, that full-day and half-
10 day prekindergarten grants appropriated
11 herein shall only be available to support
12 programs (i) that provide instruction for
13 at least five hours per school day for
14 full-day prekindergarten programs and at
15 least two and one-half hours per school
16 day for half-day prekindergarten programs;
17 (ii) that agree to offer instruction
18 consistent with applicable New York state
19 prekindergarten early learning standards;
20 and (iii) that otherwise comply with all
21 of the same rules and requirements as
22 universal prekindergarten programs pursu-
23 ant to section 3602-e of the education law
24 except as modified herein; provided that
25 notwithstanding paragraph c of subdivision
26 1 of section 3602-e of the education law
27 notwithstanding, for the purposes of this
28 appropriation, an eligible child shall be
29 a resident child who is three years of age
30 on or before December first of the year in
31 which he or she is enrolled.
32 Provided, further, that as a condition of
33 eligibility for receipt of such funding
34 for three-year-olds, a school district
35 must currently offer a prekindergarten
36 program for four-year-old children, or
37 children who would otherwise be eligible
38 under paragraph c of subdivision 1 of
39 section 3602-e of the education law;
40 provided, further, that a school district
41 may apply for only as many full-day or
42 half-day placements for three-year-old
43 children as it currently offers for four-
44 year-old children, or children who would
45 otherwise be eligible under paragraph c of
46 subdivision 1 of section 3602-e of the
47 education law.
48 Provided, further, that a school district's
49 grant shall equal the product of (A) (i)
50 two multiplied by the approved number of
51 new full-day prekindergarten placements
52 plus (ii) the approved number of half-day
53 prekindergarten placement conversions and
54 the approved number of new half-day prek-
55 indergarten placements, and (B) the
56 district's selected aid per prekindergar-
974 12654-10-8
1 ten pupil pursuant to subparagraph i of
2 paragraph b of subdivision 10 of section
3 3602-e of the education law; provided,
4 however, that no district shall receive a
5 grant in excess of the total actual grant
6 expenditures incurred by the district in
7 the current school year as approved by the
8 commissioner.
9 Provided, further, a school district shall
10 agree to adopt approved quality indicators
11 within two years, including, but not
12 limited to, valid and reliable measures of
13 environmental quality, the quality of
14 teacher-student interactions and child
15 outcomes, and ensure that any such assess-
16 ment of child outcomes shall not be used
17 to make high-stakes educational decisions
18 for individual children.
19 Notwithstanding any provision of law to the
20 contrary, $15,000,000 of the funds appro-
21 priated herein, plus any other amounts so
22 designated in other items of appropriation
23 within the general fund local assistance
24 account office of prekindergarten through
25 grade twelve education program, shall
26 constitute the competitive awards amount
27 authorized for the 2018-19 school year ...... 20,000,000
28 For early college high school grants, pursu-
29 ant to a plan developed by the commission-
30 er of education and approved by the direc-
31 tor of the budget, provided that such plan
32 shall prioritize programs serving students
33 in schools with graduation rates below the
34 state average, which are not currently
35 engaged in a school-wide turnaround plan.
36 Provided further that school districts
37 awarded such grants shall agree to offer
38 opportunities for every student in the
39 school to graduate with at least one
40 college credit, through programs including
41 but not limited to an early college high
42 school, dual enrollment, or advanced
43 placement courses.
44 Provided further that a portion of the
45 payments to early college high school
46 programs awarded funding from this appro-
47 priation shall be made on a sliding scale
48 based upon the number of college credits
49 earned annually by participating students,
50 consistent with guidelines established by
51 the commissioner, provided that the maxi-
52 mum annual grant award shall be $500,000,
53 and provided further that such maximum may
54 be increased by $100,000 if the program
55 partners with an employer in an industry
56 identified as having a very favorable job
975 12654-10-8
1 outlook according to department of labor
2 projections. Provided further that in
3 connection with such guidelines, the
4 commissioner shall execute a memorandum of
5 understanding with the state university of
6 New York and the city university of New
7 York to develop common data collection,
8 sharing and reporting mechanisms based on
9 student-level data for students enrolled
10 in early college high school programs.
11 Notwithstanding any provision of law to the
12 contrary, higher education partners
13 participating in an early college high
14 school program, or the entity/entities
15 responsible for setting tuition at the
16 institution, shall be authorized to set a
17 reduced rate of tuition and/or fees, or to
18 waive tuition and/or fees entirely, for
19 students enrolled in such an early college
20 high school program with no reduction in
21 other state, local or other support for
22 such students earning college credit that
23 such higher education partner would other-
24 wise be eligible to receive.
25 Notwithstanding any provision of law to the
26 contrary, the funds appropriated herein,
27 plus any other amounts so designated in
28 other items of appropriation within the
29 general fund local assistance account
30 office of pre-kindergarten through grade
31 twelve education program, shall constitute
32 the competitive awards amount authorized
33 for the 2018-19 school year .................. 9,000,000
34 For the smart start computer science
35 program, pursuant to a plan developed by
36 the commissioner of education and approved
37 by the director of the budget, provided
38 that such plan shall prioritize awards to
39 high need school districts. Provided
40 further that such funds shall be used to
41 provide professional development and
42 support, offered by qualified non-profit
43 partners or institutions of higher educa-
44 tion, to increase expertise in computer
45 science, engineering, or educational tech-
46 nology among teachers in grades K-8 to
47 allow such teachers to become in-house
48 experts in the school. Provided further
49 that such funds shall only be used to
50 supplement, and not supplant, current
51 local expenditures of federal, state or
52 local funds.
53 Provided, further, that no district shall
54 receive a grant in excess of the total
55 actual grant expenditures incurred by the
56 district in the current school year as
976 12654-10-8
1 approved by the commissioner. Provided,
2 further, that no school district shall
3 receive more than 40 percent of the total
4 grant allocation.
5 Provided further that school districts
6 receiving such grants shall agree to part-
7 ner with their respective regional econom-
8 ic development council to tailor the
9 program to regional business or future
10 employer needs.
11 Notwithstanding any provision of law to the
12 contrary, the funds appropriated herein,
13 plus any other amounts so designated in
14 other items of appropriation within the
15 general fund local assistance account
16 office of pre-kindergarten through grade
17 twelve education program, shall constitute
18 the competitive awards amount authorized
19 for the 2018-19 school year .................. 6,000,000
20 For services and expenses to subsidize the
21 remaining cost of advanced placement and
22 international baccalaureate exam fees for
23 low-income students, as determined by free
24 and reduced price lunch eligibility,
25 pursuant to a plan developed by the
26 commissioner of education and approved by
27 the director of the budget.
28 Notwithstanding any provision of law to the
29 contrary, $2,000,000 of the funds appro-
30 priated herein, plus any other amounts so
31 designated in other items of appropriation
32 within the general fund local assistance
33 account office of prekindergarten through
34 grade twelve education program, shall
35 constitute the competitive awards amount
36 authorized for the 2018-19 school year ....... 4,000,000
37 For grants for the advanced courses access
38 program, provided that such grants shall
39 be awarded to school districts with no or
40 very limited advanced course offerings for
41 students. Provided further, that such
42 grants shall be awarded, based on a
43 request for proposals developed by the
44 commissioner of education and approved by
45 the director of the budget, to school
46 districts to establish advanced placement
47 courses or other equally rigorous advanced
48 courses in subjects including but not
49 limited to English, history, science,
50 mathematics, engineering, computer
51 science, or world languages.
52 Provided, further, that such grants from
53 funds appropriated herein shall be awarded
54 based on factors including, but not limit-
55 ed to, the following: (i) measures of
56 school district need; (ii) the unavail-
977 12654-10-8
1 ability of current advanced course offer-
2 ings; (iii) measures of the need of
3 students to be served by the school
4 district; and (iv) proposal quality.
5 Provided further that, such grants may be
6 used for teacher training and development,
7 materials and supplies, or equipment and
8 services for digital learning. Provided,
9 further, that a school district's grant
10 shall equal the product of $6,000 multi-
11 plied by the number of new advanced cours-
12 es to be created, up to a maximum of
13 $25,000, provided, however, that no
14 district shall receive a grant in excess
15 of the total actual grant expenditures
16 incurred by the district in the current
17 school year as approved by the commission-
18 er and provided further that such grants
19 shall only be used to supplement, not
20 supplant existing funding for advanced
21 courses.
22 Notwithstanding any provision of law to the
23 contrary, the funds appropriated herein,
24 plus any other amounts so designated in
25 other items of appropriation within the
26 general fund local assistance account
27 office of pre-kindergarten through grade
28 twelve education program, shall constitute
29 the competitive awards amount authorized
30 for the 2018-19 school year .................... 500,000
31 For additional master teacher awards,
32 provided that $2,000,000 of the amount
33 appropriated herein shall support awards
34 made to individual high-performing teach-
35 ers in any grade in the field of computer
36 science or a related subject pursuant to
37 chapter 53 of the laws of 2017, and
38 provided further that $1,000,000 of the
39 amount appropriated herein shall support
40 awards to individual high-performing
41 teachers in any grade teaching in school
42 districts designated as high need by the
43 commissioner.
44 Provided further that the funds appropriated
45 herein shall support the award of stipends
46 of $15,000 per annum over four years to
47 such individual teachers, and of related
48 costs, administered by the state universi-
49 ty of New York pursuant to a plan devel-
50 oped in consultation with the commission-
51 er, who shall consult with appropriate
52 state organizations representing K-12
53 public school teachers, and approved by
54 the director of the budget, to build a
55 corps of outstanding teachers in order to
56 improve the quality of instruction at
978 12654-10-8
1 public schools. Such plan for use of fund-
2 ing appropriated herein shall: (i) estab-
3 lish an application process; (ii) include
4 guidelines by which applications from
5 eligible teachers shall be evaluated,
6 which shall include, but not be limited
7 to, achievement of a rating of highly
8 effective on the annual professional
9 performance review; and (iii) provide
10 periodic opportunities for professional
11 development for successful applicants.
12 Provided, further, that priority shall be
13 given to applicants in regions where a
14 similar program is not otherwise offered.
15 Notwithstanding any provision of law to the
16 contrary, upon approval of the director of
17 the budget, the funds appropriated herein
18 may be suballocated, interchanged, trans-
19 ferred or otherwise made available to the
20 state university of New York for the
21 services and expenses of administering
22 such awards. Nothing herein shall be
23 construed to limit the rights of labor
24 organizations representing teachers to
25 collectively bargain terms and conditions
26 pursuant to article 14 of the civil
27 service law.
28 Notwithstanding any provision of law to the
29 contrary, $1,000,000 of the funds appro-
30 priated herein, plus any other amounts so
31 designated in other items of appropriation
32 within the general fund local assistance
33 account office of prekindergarten through
34 grade twelve education program, shall
35 constitute the competitive awards amount
36 authorized for the 2018-19 school year ....... 3,000,000
37 For services and expenses of locally run
38 gang prevention and education programs
39 targeted to middle and high school
40 students. Funds shall be used to provide
41 in-school training and support to help
42 students avoid gang recruitment, peer
43 pressure, violence, and delinquent behav-
44 ior.
45 Notwithstanding any provision of law to the
46 contrary, upon approval of the director of
47 the budget, the funds appropriated herein
48 may be suballocated, interchanged, trans-
49 ferred or otherwise made available to the
50 department of criminal justice services
51 for the services and expenses of adminis-
52 tering such awards.
53 Notwithstanding any provision of law to the
54 contrary, the funds appropriated herein,
55 plus any other amounts so designated in
56 other items of appropriation within the
979 12654-10-8
1 general fund local assistance account
2 office of pre-kindergarten through grade
3 twelve education program, shall constitute
4 the competitive awards amount authorized
5 for the 2018-19 school year .................... 500,000
6 For grants to school districts to allow
7 community schools to expand mental health
8 services and capacity of community school
9 programs. Provided that such grants shall
10 support inclusion of mental health activ-
11 ities in wrap-around services, improving
12 school climate, combating bullying or
13 school violence, and promotion of social-
14 emotional learning. Provided further that
15 such grants shall be awarded to school
16 districts for community schools identified
17 by the commissioner of education as candi-
18 dates for improving school climate or
19 mental health supports, subject to the
20 approval of the director of the budget.
21 Provided further that the maximum grant per
22 community school shall be $25,000,
23 provided however, that no district shall
24 receive a grant in excess of the total
25 actual grant expenditures incurred by the
26 district in the current school year as
27 approved by the commissioner. Provided
28 further that no school district shall
29 receive more than 40 percent of the total
30 grant allocation.
31 Notwithstanding any provision of law to the
32 contrary, the funds appropriated herein,
33 plus any other amounts so designated in
34 other items of appropriation within the
35 general fund local assistance account
36 office of pre-kindergarten through grade
37 twelve education program, shall constitute
38 the competitive awards amount authorized
39 for the 2018-19 school year .................... 250,000
40 For additional services and expenses of a
41 program to develop farm to school initi-
42 atives that will help schools purchase
43 more food from local farmers and expand
44 access to healthy local food for school
45 children. The funds shall be awarded
46 through a competitive process.
47 Notwithstanding any provision of law to the
48 contrary, upon approval of the director of
49 the budget, the funds appropriated herein
50 may be suballocated, interchanged, trans-
51 ferred or otherwise made available to the
52 department of agriculture and markets for
53 the services and expenses of administering
54 such awards.
55 Notwithstanding any provision of law to the
56 contrary, the funds appropriated herein,
980 12654-10-8
1 plus any other amounts so designated in
2 other items of appropriation within the
3 general fund local assistance account
4 office of pre-kindergarten through grade
5 twelve education program, shall constitute
6 the competitive awards amount authorized
7 for the 2018-19 school year .................... 750,000
8 For additional funds to reimburse sponsors
9 of school breakfast programs, including
10 those required to implement a breakfast
11 after the bell program beginning in the
12 2018-19 school year pursuant to a chapter
13 of the laws of 2018, based upon the number
14 of federally reimbursable breakfasts
15 served to students under such program
16 agreements entered into by the state
17 education department and such sponsors, in
18 accordance with the provisions of the
19 "Child Nutrition Act of 1966," P.L.
20 89-642, as amended, in excess of the
21 federal rates of reimbursement. Notwith-
22 standing any provision of law to the
23 contrary, the funds appropriated herein,
24 plus any other amounts so designated in
25 other items of appropriation within the
26 general fund local assistance account
27 office of prekindergarten through grade
28 twelve education program, shall constitute
29 the competitive awards amount authorized
30 for the 2018-19 school year .................. 5,000,000
31 For continuation of early college high
32 school awards made based on responses to
33 the New York state early college high
34 school ECHS program request for proposals
35 pursuant to chapter 53 of the laws of 2017 ... 1,900,000
36 For empire state excellence in teaching
37 awards, provided that such awards shall
38 support stipends of $5,000 to allow indi-
39 vidual high-performing teachers in each
40 region of the state to continue their
41 professional development and educational
42 endeavors.
43 Provided further that stipends shall be used
44 to support expenses including, but not
45 limited to, application and/or certif-
46 ication costs related to the national
47 board professional teacher certification,
48 participation in institutes and/or work-
49 shops, tuition, and/or attendance at a
50 content area convention and/or conference;
51 provided further that such awards shall be
52 administered by the state university of
53 New York pursuant to a plan developed in
54 consultation with the commissioner of
55 education and approved by the director of
56 the budget.
981 12654-10-8
1 Notwithstanding any provision of law to the
2 contrary, upon approval of the director of
3 the budget, the funds appropriated herein
4 may be suballocated, interchanged, trans-
5 ferred or otherwise made available to the
6 state university of New York for the
7 services and expenses of administering
8 such awards. Nothing herein shall be
9 construed to limit the rights of labor
10 organizations representing teachers to
11 collectively bargain terms and conditions
12 pursuant to article 14 of the civil
13 service law .................................... 400,000
14 For the continuation of school-wide extended
15 learning grants to school districts or
16 school districts in collaboration with
17 not-for-profit community-based organiza-
18 tions, provided that funds shall be used
19 pursuant to the guidelines set forth and
20 the awards made pursuant to chapter 53 of
21 the laws of 2013 ............................ 21,590,000
22 For the continuation of pathways in technol-
23 ogy early college high school (P-TECH)
24 program grants. Provided that the funds
25 appropriated herein shall be made avail-
26 able as follows: $5,680,000 for grants
27 awarded based on responses to the 2013-20
28 NYS pathways in technology early college
29 high schools request for proposals, pursu-
30 ant to chapter 53 of the laws of 2013;
31 $4,180,000 for grants awarded based on
32 responses to the 2014-21 NYS pathways in
33 technology early college high schools
34 request for proposals, pursuant to chapter
35 53 of the laws of 2014; $2,480,000 for
36 grants awarded based on responses to the
37 2015-2022 NYS pathways in technology early
38 college high schools request for
39 proposals, pursuant to chapter 53 of the
40 laws of 2015; and $1,750,000 for grants
41 awarded based on responses to the
42 2018-2024 NYS pathways in technology early
43 college high school request for proposals,
44 pursuant to chapter 53 of the laws of 2017 .. 14,090,000
45 For the continuation of smart scholars early
46 college high school grants, provided that
47 funds shall be used pursuant to the guide-
48 lines set forth and the awards made pursu-
49 ant to chapter 53 of the laws of 2013 ........ 1,910,000
50 For the continuation of smart transfer early
51 college high school program grants awarded
52 based on responses to the New York state
53 smart transfer ECHS program request for
54 proposals pursuant to chapter 53 of the
55 laws of 2016 ................................... 882,000
982 12654-10-8
1 For reimbursement to the East Ramapo central
2 school district to support students
3 attending public schools in such district,
4 provided that the district is in compli-
5 ance with the requirements set forth in
6 chapter 89 of the laws of 2016.
7 The East Ramapo central school district
8 shall be eligible to receive reimbursement
9 from the funds appropriated herein for its
10 approved expenditures in the 2018-19
11 school year on services to improve and
12 enhance the educational opportunities of
13 students attending the public schools in
14 such district. Such services shall
15 include, but not be limited to, reducing
16 class sizes, expanding academic and
17 enrichment opportunities, establishing and
18 expanding kindergarten programs, expanding
19 extracurricular opportunities and provid-
20 ing student support services, provided,
21 however, transportation services and
22 expenses shall not be eligible for
23 reimbursement from such funds.
24 In order to receive such funds, the school
25 district in consultation with the monitor
26 or monitors pursuant to chapter 89 of the
27 laws of 2016 shall revise its long term
28 strategic academic and fiscal improvement
29 plan by October 1, 2018. Such revised plan
30 shall be submitted to the commissioner for
31 approval and shall include a set of goals
32 with appropriate benchmarks and measurable
33 objectives and identify strategies to
34 address areas where improvements are need-
35 ed in the district, including but not
36 limited to its financial stability,
37 academic opportunities and outcomes,
38 education of students with disabilities,
39 and education of English language lear-
40 ners, and shall ensure compliance with all
41 applicable state and federal laws and
42 regulations. Such revised improvement plan
43 shall also include a comprehensive expend-
44 iture plan that will describe how the
45 funds made available to the district from
46 this appropriation will be spent. Such
47 comprehensive expenditure plan shall
48 ensure that funds supplement, not
49 supplant, expenditures from local, state
50 and federal funds for services provided to
51 public school students, except that such
52 funds may be used to continue services
53 funded pursuant to chapter 89 of the laws
54 of 2016 in prior years. Such expenditure
55 plan shall be revised in consultation with
56 the monitor or monitors appointed by the
983 12654-10-8
1 commissioner. The board of education of
2 the East Ramapo central school district
3 shall conduct a public hearing on the
4 expenditure plan and shall consider the
5 input of the community before adopting
6 such plan. Such expenditure plan shall
7 also be made publicly available and shall
8 be submitted along with comments made by
9 the community to the commissioner for
10 approval once the plan is finalized. Upon
11 review of such improvement plan and such
12 expenditure plan, the commissioner shall
13 approve or deny such plan in writing and,
14 if denied, shall include the reasons
15 therefor. The district in consultation
16 with the monitors may resubmit such plan
17 or plans with any needed modifications
18 thereto.
19 The commissioner shall disburse the funds
20 appropriated herein after receiving satis-
21 factory evidence from the East Ramapo
22 central school district that the district
23 has complied with the approved comprehen-
24 sive expenditure plan and spent such funds
25 pursuant to the approved expenditure plan
26 as set forth in chapter 89 of the laws of
27 2016.
28 The commissioner of education shall have 30
29 days from the receipt of such evidence to
30 confirm whether the school district has
31 complied with the requirements of chapter
32 89 of the laws of 2016 and shall determine
33 whether such funds were spent in conform-
34 ance with the provisions of such chapter.
35 Upon finding compliance and determining
36 that the funds were properly expended, the
37 commissioner shall certify the amount of
38 the approved expenditures to the state
39 comptroller for payment no later than 60
40 days after such determinations. The East
41 Ramapo central school district shall not
42 receive reimbursement for funds authorized
43 herein that are not spent for the direct
44 benefit of students attending public
45 schools in such district in a manner
46 consistent with its approved comprehensive
47 expenditure plan or prior written approval
48 from the commissioner.
49 The board of education in consultation with
50 the monitor or monitors shall submit the
51 school district's proposed budget for the
52 next succeeding school year to the commis-
53 sioner no later than 45 days before the
54 date scheduled for the school district's
55 budget vote. The commissioner shall review
56 the budget to ensure that it, to the
984 12654-10-8
1 greatest extent possible, expands educa-
2 tional programming for students including
3 but not limited to extracurricular activ-
4 ities, course offerings, non-mandated
5 support services, non-mandated art and
6 music classes, programs and services for
7 English language learners and students
8 with disabilities, and maintaining class
9 size. The commissioner shall also review
10 the proposed budget to ensure that it is
11 balanced within the context of revenue and
12 expenditure estimates and mandated
13 programs. The commissioner shall present
14 his or her findings to the board of educa-
15 tion no later than 30 days prior to the
16 date scheduled for the school district's
17 budget vote. The board of education shall
18 make adjustments to the proposed budget
19 consistent with any recommendations made
20 by the commissioner. The school district
21 shall make available on the district's
22 website: the initial proposed budget, the
23 commissioner's findings, and the final
24 proposed budget prior to the date of the
25 school district's budget vote.
26 The monitor or monitors appointed by the
27 commissioner shall quarterly, and the
28 district shall annually provide to the
29 commissioner reports on the fiscal and
30 operational status of the school district
31 to ensure compliance with the budgeting
32 requirements herein. In addition, monitors
33 shall provide an annual report to the
34 commissioner and comptroller on contracts
35 that the district entered into throughout
36 the year. All reports shall be subject to
37 review by the comptroller at the request
38 of the commissioner.
39 In the event the district plans to reduce
40 budget appropriations for programs
41 restored or created under the comprehen-
42 sive expenditure plan or the strategic
43 academic and fiscal improvement plan as
44 well as the sale of school buildings or
45 other real property and capital improve-
46 ment contracts in excess of $100,000, the
47 district shall submit a plan to the
48 commissioner for approval (55949) ............ 1,000,000
49 For additional reimbursement to the East
50 Ramapo central school district to support
51 students attending public schools in such
52 district provided that the district is in
53 compliance with the requirements set forth
54 in chapter 89 of the laws of 2016 ............ 2,000,000
55 For services and expenses of community
56 school regional technical assistance
985 12654-10-8
1 centers for the 2018-19 school year. Funds
2 appropriated herein shall be used to oper-
3 ate three regional centers that shall
4 provide technical assistance to school
5 districts establishing or operating commu-
6 nity school programs, pursuant to a plan
7 developed by the commissioner and approved
8 by the director of the budget. Provided,
9 further, that such plan shall establish a
10 process for selection of nonprofit enti-
11 ties with expertise in community school
12 programs and technical assistance to oper-
13 ate such centers (55962) ..................... 1,200,000
14 For services and expenses of the my broth-
15 er's keeper initiative. A portion of this
16 appropriation may be transferred to any
17 other program or fund within the state
18 education department for these purposes
19 (55928) ..................................... 18,000,000
20 For services and expenses of remaining obli-
21 gations for the 2017-18 school year for
22 support for the operation of targeted
23 pre-kindergarten for those providers not
24 eligible to receive funding pursuant to
25 section 3602-e of the education law and
26 for support for providers continuing to
27 operate such programs in the 2018-19
28 school year. Such funds shall be expended
29 pursuant to a plan developed by the
30 commissioner of education and approved by
31 the director of the budget (21763) ........... 1,303,000
32 For services and expenses of remaining obli-
33 gations of a $20,000,000 teacher resources
34 and computer training centers program for
35 the 2017-18 school year ...................... 6,000,000
36 Funds appropriated herein shall be available
37 for services and expenses of a $14,260,000
38 teacher resources and computer training
39 center program for the 2018-19 school year ... 9,982,000
40 For education of children of migrant workers
41 for the 2018-19 school year (21764) ............. 89,000
42 For the school lunch and breakfast program.
43 Funds for the school lunch and breakfast
44 program shall be expended subject to the
45 limitation of funds available and may be
46 used to reimburse sponsors of non-profit
47 school lunch, breakfast, or other school
48 child feeding programs based upon the
49 number of federally reimbursable break-
50 fasts and lunches served to students under
51 such program agreements entered into by
52 the state education department and such
53 sponsors, in accordance with an act of
54 Congress entitled the "National School
55 Lunch Act," P.L. 79-396, as amended, or
56 the provisions of the "Child Nutrition Act
986 12654-10-8
1 of 1966," P.L. 89-642, as amended, in the
2 case of school breakfast programs to reim-
3 burse sponsors in excess of the federal
4 rates of reimbursement. Notwithstanding
5 any provision of law to the contrary, the
6 moneys hereby appropriated, or so much
7 thereof as may be necessary, are to be
8 available for the purposes herein speci-
9 fied for obligations heretofore accrued or
10 hereafter to accrue for the school years
11 beginning July 1, 2016, July 1, 2017 and
12 July 1, 2018.
13 Notwithstanding any law, rule or regulation
14 to the contrary, the amount appropriated
15 herein represents the maximum amount paya-
16 ble during the 2018-19 state fiscal year
17 for state reimbursement for school lunch
18 and breakfast programs (21702) .............. 34,400,000
19 For additional funds to reimburse sponsors
20 of school lunch programs that have
21 purchased at least 30 percent of their
22 total food products for its school lunch
23 service program from New York State farm-
24 ers, growers, producers, or processors,
25 based upon the number of federally reim-
26 bursable lunches served to students under
27 such program agreements entered into by
28 the state education department and such
29 sponsors, in accordance with the
30 provisions of the "National School Lunch
31 Act," P.L. 79-396, as amended, to reim-
32 burse sponsors in excess of the federal
33 and State rates of reimbursement,
34 provided, that the total State subsidy
35 shall not exceed twenty-five cents per
36 school lunch meal, which shall include any
37 annual state subsidy received by such
38 sponsor under any other provision of State
39 law, provided further that funds appropri-
40 ated herein shall be made available on or
41 after April 1, 2019. Notwithstanding
42 section 40 of the state finance law or any
43 provision of law to the contrary, this
44 appropriation shall lapse on March 31,
45 2020 ........................................ 10,000,000
46 For nonpublic school aid payable in the
47 2018-19 state fiscal year. Provided that
48 nonpublic schools shall continue to
49 receive aid based on either a 5.0/5.5 hour
50 standard instructional day, or another
51 work day as certified by the nonpublic
52 school officials, in accordance with the
53 methodology for computing salary and bene-
54 fits applied by the department in paying
55 aid for the 2012-13 and prior school
56 years. Notwithstanding any provision of
987 12654-10-8
1 law, rule or regulation to the contrary,
2 the amount appropriated herein represents
3 the maximum amount payable during the
4 2018-19 state fiscal year (21769) .......... 111,633,000
5 For aid payable for the 2016-17 school year
6 for additional nonpublic school aid.
7 Notwithstanding any inconsistent provision
8 of law, funds appropriated herein shall be
9 available for payment of aid heretofore
10 accrued and hereafter to accrue (21770) ..... 74,784,000
11 For academic intervention for nonpublic
12 schools based on a plan to be developed by
13 the commissioner of education and approved
14 by the director of the budget (21771) .......... 922,000
15 For services and expenses related to non-
16 public school STEM programs (55964) ......... 15,000,000
17 For additional mandated services and
18 expenses of the costs of complying with
19 the State School Immunization Program
20 (SSIP) for the 2017-18 school year ........... 7,000,000
21 For costs associated with schools for the
22 blind and deaf and other students with
23 disabilities subject to article 85 of the
24 education law, including state aid for
25 blind and deaf pupils in certain insti-
26 tutions to be paid for the purposes
27 provided under section 4204-a of the
28 education law for the education of deaf
29 children under 3 years of age, including
30 transfers to the miscellaneous special
31 revenue fund Rome school for the deaf
32 account pursuant to a plan to be developed
33 by the commissioner and approved by the
34 director of the budget.
35 Of the amounts appropriated herein, up to
36 $84,700,000 shall be available for
37 reimbursement to school districts for the
38 tuition costs of students attending
39 schools for the blind and deaf during the
40 2017-18 school year pursuant to subdivi-
41 sion 2 of section 4204 of the education
42 law and subdivision 2 of section 4207 of
43 the education law, up to $2,500,000 shall
44 be available for debt service on capital
45 construction projects financed through the
46 state dormitory authority, and up to
47 $9,000,000 shall be available for remain-
48 ing allowable purposes.
49 Provided further that, notwithstanding any
50 inconsistent provision of law, upon
51 disbursement of funds appropriated for
52 allowances to schools for the blind and
53 deaf in the individuals with disabilities
54 program special revenue funds-federal/aid
55 to localities for purposes of this appro-
56 priation, funds appropriated herein shall
988 12654-10-8
1 be reduced in an amount equivalent to such
2 disbursement and the portion of this
3 appropriation so affected shall have no
4 further force or effect.
5 Notwithstanding any provision of the law to
6 the contrary, funds appropriated herein
7 shall be available for payment of liabil-
8 ities heretofore accrued or hereafter to
9 accrue and, subject to the approval of the
10 director of the budget, such funds shall
11 be available to the department net of
12 disallowances, refunds, reimbursements and
13 credits (21705) ............................. 96,200,000
14 For costs associated with schools for the
15 blind and deaf and other students with
16 disabilities subject to article 85 of the
17 education law for the 2018-19 school year.
18 Funds appropriated herein shall be
19 distributed directly to the schools for
20 the blind and deaf and other students with
21 disabilities subject to article 85 of the
22 education law based on a three year aver-
23 age of the schools' FTE enrollment (55909) ... 6,900,000
24 For additional costs associated with schools
25 for the blind and deaf and other students
26 with disabilities subject to article 85 of
27 the education law for the 2018-19 school
28 year. Funds appropriated herein shall be
29 distributed directly to the schools for
30 the blind and deaf and other students with
31 disabilities subject to article 85 of the
32 education law based on a three year aver-
33 age of the schools' FTE enrollment ........... 2,300,000
34 For services and expenses of the Henry
35 Viscardi School for the 2018-19 school
36 year ........................................... 903,000
37 For services and expenses of the New York
38 School for the Deaf for the 2018-19 school
39 year ........................................... 903,000
40 For services and expenses of the Mill Neck
41 Manor School for the Deaf for the 2018-19
42 school year .................................... 500,000
43 For July and August programs for school-aged
44 children with handicapping conditions
45 pursuant to section 4408 of the education
46 law. Moneys appropriated herein shall be
47 used as follows: (i) for remaining base
48 year and prior school years obligations,
49 (ii) for the purposes of subdivision 4 of
50 section 3602 of the education law for
51 schools operated under articles 87 and 88
52 of the education law, and (iii) notwith-
53 standing any inconsistent provision of
54 law, for payments made pursuant to this
55 appropriation for current school year
56 obligations, provided, however, that such
989 12654-10-8
1 payments shall not exceed 70 percent of
2 the state aid due for the sum of the
3 approved tuition and maintenance rates and
4 transportation expense provided for here-
5 in; provided, however, that payment of
6 eligible claims shall be payable in the
7 order that such claims have been approved
8 for payment by the commissioner of educa-
9 tion, but in no case shall a single payee
10 draw down more than 45 percent of this
11 appropriation, and provided further that
12 no claim shall be set aside for insuffi-
13 ciency of funds to make a complete
14 payment, but shall be eligible for a
15 partial payment in one year and shall
16 retain its priority date status for subse-
17 quent appropriations designated for such
18 purposes. Notwithstanding any inconsistent
19 provision of law to the contrary, funds
20 appropriated herein shall only be avail-
21 able for liabilities incurred prior to
22 July 1, 2019, shall be used to pay 2017-18
23 school year claims in the first instance,
24 and represent the maximum amount payable
25 during the 2018-19 state fiscal year.
26 Notwithstanding any provision of law to
27 the contrary, funds appropriated herein
28 shall be available for payment of liabil-
29 ities heretofore accrued or hereafter to
30 accrue and, subject to the approval of the
31 director of the budget, such funds shall
32 be available to the department net of
33 disallowances, refunds, reimbursements and
34 credits (21707) ............................ 330,500,000
35 For additional grants to public schools. For
36 grants in aid to local educational agen-
37 cies located in a city with a population
38 over one million which are not eligible
39 for aid pursuant to section 3602 of the
40 education law. The state education depart-
41 ment shall pay directly to each such local
42 educational agency an amount equal to the
43 product of (i) the total number of
44 students enrolled in such local educa-
45 tional agency as reported to the depart-
46 ment on February 1, 2019, multiplied by
47 (ii) the quotient of $22,600,000 divided
48 by the total enrollment of all such local
49 educational agencies. Provided, however,
50 that the funds appropriated herein shall
51 he made available on or after April 1,
52 2019. Notwithstanding section 40 of the
53 state finance law or any provision of law
54 to the contrary, this appropriation shall
55 lapse on March 31, 2020 ..................... 22,600,000
990 12654-10-8
1 For the state's share of the costs of the
2 education of preschool children with disa-
3 bilities pursuant to section 4410 of the
4 education law. Notwithstanding any incon-
5 sistent provision of law to the contrary,
6 the amount appropriated herein shall
7 support a state share of preschool hand-
8 icapped education costs for the 2017-18
9 school year limited to 59.5 percent of
10 such total approved expenditures, and
11 furthermore, notwithstanding any other
12 provision of law, local claims for
13 reimbursement of costs incurred prior to
14 the 2016-17 school year and during the
15 2016-17 school year that have been
16 approved for payment by the education
17 department as of March 31, 2018 shall be
18 the first claims paid from this appropri-
19 ation. Notwithstanding any provision of
20 law to the contrary, funds appropriated
21 herein shall be available for payment of
22 liabilities heretofore accrued or hereaft-
23 er to accrue and, subject to the approval
24 of the director of the budget, such funds
25 shall be available to the department net
26 of disallowances, refunds, reimbursements
27 and credits (21706) ...................... 1,035,000,000
28 Notwithstanding any inconsistent provision
29 of law, funding made available by this
30 appropriation shall support direct salary
31 costs and related fringe benefits associ-
32 ated with any minimum wage increase that
33 takes effect on or after December 31,
34 2016, pursuant to section 652 of the labor
35 law. Organizations eligible for funding
36 made available by this appropriation shall
37 be limited to special act school districts
38 and those that are required to file a
39 consolidated fiscal report with the state
40 education department and provide preschool
41 and school-age special education services
42 under articles 81, 85 and 89 of the educa-
43 tion law. Each eligible organization in
44 receipt of funding made available by this
45 appropriation shall submit written certif-
46 ication, in such form and at such time as
47 the commissioner shall prescribe, attest-
48 ing to how such funding will be or was
49 used for purposes eligible under this
50 appropriation. Notwithstanding any incon-
51 sistent provision of law, and subject to
52 the approval of the director of the budg-
53 et, the amounts appropriated herein may be
54 increased or decreased by interchange or
55 transfer to any local assistance appropri-
991 12654-10-8
1 ation of the state education department
2 (55938) ..................................... 17,180,000
3 Notwithstanding any provision of law to the
4 contrary, the funds appropriated herein,
5 subject to an allocation plan developed by
6 the commissioner of education and approved
7 by the director of the budget, shall be
8 available for the payment of prior year
9 claims and/or fiscal stabilization grants
10 for remaining payments for the 2017-18
11 school year and for payments prior to
12 March 31, 2019 for the 2018-19 school
13 year, provided, however, notwithstanding
14 any provisions of law to the contrary, the
15 New York city school district shall be
16 eligible for a fiscal stabilization grant
17 in the amount of $26,404,000 (21773) ........ 45,068,000
18 For services and expenses of the supportive
19 schools grant program and technical
20 assistance to promote safe and supportive
21 school environments free from bullying,
22 harassment, and discrimination. Up to
23 $300,000 of this appropriation shall be
24 available for the New York center for
25 school safety. A portion of this appropri-
26 ation may be transferred to any other
27 account within the state education depart-
28 ment, as needed to accomplish the intent
29 of this appropriation, provided further
30 that up to five percent of the funds
31 appropriated herein may be transferred to
32 the credit of the state purposes account
33 of the state education department to carry
34 out the purposes of this appropriation ....... 2,000,000
35 For services and expenses of the New York
36 state center for school safety for the
37 2018-19 school year. Funds appropriated
38 herein shall be used to operate a state-
39 wide center and shall be subject to an
40 expenditure plan approved by the director
41 of the budget (21774) .......................... 466,000
42 For services and expenses of the health
43 education program for the 2018-19 school
44 year. Funds appropriated herein shall be
45 available for health-related programs
46 including, but not limited to, those
47 providing instruction and supportive
48 services in comprehensive health education
49 and/or acquired immune deficiency syndrome
50 (AIDS) education. Of the amounts appropri-
51 ated herein, $86,000 shall be available
52 for the program previously operated as the
53 school health demonstration program.
54 Notwithstanding any other provision of law
55 to the contrary, funds appropriated herein
56 may be suballocated, subject to the
992 12654-10-8
1 approval of the director of the budget, to
2 any state agency or department to accom-
3 plish the purpose of this appropriation
4 (21775) ........................................ 691,000
5 For competitive grants for the 2018-19
6 school year for extended day programs and
7 school violence prevention programs pursu-
8 ant to section 2814 of the education law
9 provided, however, notwithstanding any
10 inconsistent provisions of law, eligible
11 entities receiving funds for extended day
12 programs may include not-for-profit organ-
13 izations working in collaboration with a
14 public school or school district (21776) .... 24,344,000
15 For aid payable for the 2018-19 school year
16 for support of county vocational education
17 and extension boards pursuant to section
18 1104 of the education law, provided,
19 however, that notwithstanding any incon-
20 sistent provision of law, rule, or regu-
21 lation, any apportionment of aid shall be
22 based on a quota amounting to one-half of
23 the salary paid each teacher, director,
24 assistant, and supervisor, where such
25 salary is attributable to a course of
26 study first submitted to the commissioner
27 for approval pursuant to section 1103 of
28 the education law on or before July 1,
29 2010, but not to exceed the amount
30 computed by the commissioner based upon an
31 assumed annualized salary equal to ten
32 thousand five hundred dollars per school
33 year on account of the employment of such
34 teacher, director, assistant or supervisor
35 and provided further that payment from
36 this appropriation shall first be made for
37 approved claims for salary expenses for
38 the 2018-19 school year, and any amount
39 remaining after payment of such claims
40 shall be available for payment of unpaid
41 claims for prior school years (21781) .......... 932,000
42 For services and expenses of the primary
43 mental health project at the children's
44 institute for the 2018-19 school year
45 (21778) ........................................ 894,000
46 For services and expenses associated with
47 the math and science high schools for the
48 2018-19 school year in the amount of
49 $1,382,000, provided that such funds shall
50 be allocated equally among those entities
51 that received program funding for the
52 2007-08 school year (21779) .................. 1,382,000
53 For additional services and expenses associ-
54 ated with the Bard High School Early
55 College Queens for the 2018-19 school year ..... 461,000
993 12654-10-8
1 Funds appropriated herein shall be available
2 for educational services and expenses of
3 the Syracuse city school district for the
4 say yes to education program (21800) ........... 350,000
5 For services and expenses of the center for
6 autism and related disabilities at the
7 state university of New York at Albany
8 (21782) ........................................ 740,000
9 For additional services and expenses of the
10 center for autism and related disabilities
11 at the state university of New York at
12 Albany ......................................... 500,000
13 Fenimore Art Museum for services and
14 expenses of National History Day ............... 125,000
15 For postsecondary aid to Native Americans to
16 fund awards to eligible students.
17 Notwithstanding any other provision of law
18 to the contrary, the amount herein made
19 available shall constitute the state's
20 entire obligation for all costs incurred
21 under section 4118 of the education law in
22 state fiscal year 2018-19 (21833) .............. 598,000
23 For additional grants in aid to certain
24 school districts, public libraries, and
25 not-for-profit institutions. Notwith-
26 standing section twenty-four of the state
27 finance law or any provision of law to the
28 contrary, funds from this appropriation
29 shall be allocated only pursuant to a plan
30 (i) approved by the temporary president of
31 the Senate and the director of the budget
32 which sets forth either an itemized list
33 of grantees with the amount to be received
34 by each, or the methodology for allocating
35 such appropriation, and (ii) which is
36 thereafter included in a senate resolution
37 calling for the expenditure of such funds,
38 which resolution must be approved by a
39 majority vote of all members elected to
40 the senate upon a roll call vote ............ 17,848,900
41 For services and expenses of the summer food
42 program for the 2018-19 school year
43 (21784) ...................................... 3,049,000
44 Work Force Education. For partial reimburse-
45 ment of services and expenses per contract
46 hour of work force education conducted by
47 the consortium for worker education (CWE),
48 a private not-for-profit corporation
49 program approved by the commissioner of
50 education that enable adults who are 21
51 years of age or older to obtain or retain
52 employment or improve their work skills
53 capacity to enhance their opportunities
54 for increased earnings and advancement
55 (21801) ..................................... 11,500,000
994 12654-10-8
1 For additional workforce education for the
2 consortium for worker education .............. 1,500,000
3 For services and expenses of the Executive
4 Leadership Institute ........................... 475,000
5 For services and expenses of the Consortium
6 for Worker Education Credential Initiative
7 ................................................ 500,000
8 For services and expenses of the clinically
9 rich intensive teacher institute bilingual
10 extension and english to speakers of other
11 languages program .............................. 770,000
12 For an English Language Learner class
13 reduction pilot program. Such funds shall
14 be used in New York City and the Hudson
15 Valley for initiatives to decrease the
16 size of ELL classes by encouraging more
17 teachers to become dual certified in
18 compliance with applicable law and regu-
19 lations, as well as assisting teachers in
20 learning the characteristics of ELLs,
21 including the stages of language develop-
22 ment, how these stages affect instruction,
23 and approaches to differentiate content
24 and language development for ELLs .............. 500,000
25 For services and expenses of charter schools
26 that were converted from existing public
27 schools ........................................ 500,000
28 For services and expenses related to the
29 development, implementation and operation
30 of charter schools for the 2018-19 school
31 year including an amount sufficient to
32 support administrative/technical support
33 services provided by the charter school
34 institute of the state university of New
35 York, pursuant to a plan submitted by the
36 charter school institute and approved by
37 the board of trustees of the state univer-
38 sity of New York. This appropriation shall
39 only be available for expenditure upon the
40 approval of an expenditure plan by the
41 director of the budget and funds appropri-
42 ated herein shall be transferred to the
43 miscellaneous special revenue fund - char-
44 ter schools stimulus account (21803) ......... 4,837,000
45 For the early college high schools program
46 for the 2018-19 school year, provided,
47 however, that expenditure of funds appro-
48 priated herein shall support the continua-
49 tion and expansion of the early college
50 high schools program pursuant to a plan
51 developed by the commissioner and approved
52 by the director of the budget provided,
53 further, that a portion of the payment to
54 the early college high schools program
55 awarded from this appropriation shall be
56 available on a sliding scale based upon
995 12654-10-8
1 the number of college credits earned annu-
2 ally by participating students consistent
3 with guidelines established by the commis-
4 sioner. Provided further that, notwith-
5 standing any provision of law to the
6 contrary, higher education partners
7 participating in an early college high
8 schools program, or the entity/entities
9 responsible for setting tuition at the
10 institution, shall be authorized to set a
11 reduced rate of tuition and/or fees, or to
12 waive tuition and/or fees entirely, for
13 students enrolled in such early college
14 high schools program with no reduction in
15 other state, local or other support for
16 such students earning college credit that
17 such higher education partner would other-
18 wise be eligible to receive (56139) .......... 1,465,000
19 For services and expenses of a $490,000
20 2018-19 school year program for mentoring
21 and tutoring operated by the Hillside
22 Work-Scholarship Connection program, which
23 is based on model programs proven to be
24 effective in producing outcomes that
25 include, but are not limited to, improved
26 graduation rates, provided that such
27 services shall be provided to students in
28 one or more city school districts located
29 in a city having a population in excess of
30 125,000 and less than 1,000,000 inhabit-
31 ants (21804) ................................... 490,000
32 For services and expenses of a teacher
33 diversity pipeline pilot to assist teacher
34 aides and teaching assistants in attaining
35 the necessary educational and professional
36 credentials to obtain teacher certif-
37 ication ........................................ 500,000
38 For payment of small government assistance
39 to school districts pursuant to subdivi-
40 sion 7 of section 3641 of the education
41 law on or before March 31, 2019 upon audit
42 and warrant of the comptroller in the
43 amount that small government assistance
44 was paid to school districts in state
45 fiscal year 2010-11 (23449) .................. 1,868,000
46 For the payment of supplemental valuation
47 impact grants in the 2018-19 school year
48 for the purpose of providing additional
49 funding for school districts which have
50 experienced a significant financial hard-
51 ship created by an extraordinary change in
52 the taxable property valuation: $500,000
53 shall be provided to the Panama Central
54 School District; $400,000 shall be
55 provided to the Fort Edward Central School
996 12654-10-8
1 District; $300,000 shall be provided to
2 the Liverpool Central School District and
3 $300,000 shall be provided to the New
4 Hartford Central School District ............. 1,500,000
5 For services and expenses of the New York
6 City Community Learning Schools initiative ..... 500,000
7 For purposes of the Just for Kids program at
8 the State University of New York at Albany
9 (56005) ........................................ 235,000
10 For educational services and expenses for
11 DACA (Deferred Action for Childhood
12 Arrivals) eligible out of school youth and
13 young adults (56045) ......................... 1,000,000
14 Less expenditure savings due to the with-
15 holding of a portion of employment prepa-
16 ration education aid due to the city of
17 New York equal to the reimbursement costs
18 of the work force education program from
19 aid payable to such city school district
20 payable on or after April 1, 2018; such
21 moneys shall be credited to the office of
22 pre-kindergarten through grade twelve
23 education general fund-local assistance
24 account and which shall not exceed the
25 amount appropriated herein ................ (11,500,000)
26 For additional expenditure savings due to
27 the additional withholding of a portion of
28 employment preparation education aid due
29 to the city of New York equal to the
30 reimbursement costs of the workforce
31 education program from aid payable to such
32 city school district payable on or after
33 April 1, 2018; such additional moneys
34 shall be credited to the elementary,
35 middle, secondary, and continuing educa-
36 tion general fund local assistance account
37 which shall not exceed the additional
38 amount appropriated herein ................. (1,500,000)
39 --------------
40 Program account subtotal .............. 24,908,034,900
41 --------------
42 Special Revenue Funds - Federal
43 Federal Education Fund
44 Federal Department of Education Account - 25210
45 For grants to schools for specific programs
46 including, but not limited to, grants for
47 purposes under title I of the elementary
48 and secondary education act. Provided
49 further that, notwithstanding any incon-
50 sistent provision of law, the commissioner
51 of education shall provide to the director
52 of the budget, the chairperson of the
53 senate finance committee and the chair-
54 person of the assembly ways and means
997 12654-10-8
1 committee copies of any spending plans
2 and/or budgets submitted to the federal
3 government with respect to the use of any
4 funds appropriated by the federal govern-
5 ment including state grants administered
6 by the Department. Notwithstanding any
7 inconsistent provision of law, a portion
8 of this appropriation may be suballocated
9 to other state departments and agencies,
10 subject to the approval of the director of
11 the budget, as needed to accomplish the
12 intent of this appropriation (21740) ..... 1,771,819,000
13 For grants to schools and other eligible
14 entities for specific programs including,
15 but not limited to, state grants for
16 supporting effective instruction pursuant
17 to title II of the elementary and second-
18 ary education act. Provided further that,
19 notwithstanding any inconsistent provision
20 of law, the commissioner of education
21 shall provide to the director of the budg-
22 et, the chairperson of the senate finance
23 committee and the chairperson of the
24 assembly ways and means committee copies
25 of any spending plans and/or budgets
26 submitted to the federal government with
27 respect to the use of any funds appropri-
28 ated by the federal government including
29 state grants administered by the Depart-
30 ment. Notwithstanding any inconsistent
31 provision of law, a portion of this appro-
32 priation may be suballocated to other
33 state departments and agencies, subject to
34 the approval of the director of the budg-
35 et, as needed to accomplish the intent of
36 this appropriation (23418) ................. 256,841,000
37 For grants to schools and other eligible
38 entities for specific programs including,
39 but not limited to, the English language
40 acquisition program pursuant to title III
41 of the elementary and secondary education
42 act. Provided further that, notwithstand-
43 ing any inconsistent provision of law, the
44 commissioner of education shall provide to
45 the director of the budget, the chair-
46 person of the senate finance committee and
47 the chairperson of the assembly ways and
48 means committee copies of any spending
49 plans and/or budgets submitted to the
50 federal government with respect to the use
51 of any funds appropriated by the federal
52 government including state grants adminis-
53 tered by the Department. Notwithstanding
54 any inconsistent provision of law, a
55 portion of this appropriation may be
56 suballocated to other state departments
998 12654-10-8
1 and agencies, subject to the approval of
2 the director of the budget, as needed to
3 accomplish the intent of this appropri-
4 ation (23417) ............................... 65,331,000
5 For grants to schools and other eligible
6 entities for specific programs including,
7 but not limited to, the 21st century
8 community learning centers, and student
9 support and academic enrichment pursuant
10 to title IV of the elementary and second-
11 ary education act. Provided further that,
12 notwithstanding any inconsistent provision
13 of law, the commissioner of education
14 shall provide to the director of the budg-
15 et, the chairperson of the senate finance
16 committee and the chairperson of the
17 assembly ways and means committee copies
18 of any spending plans and/or budgets
19 submitted to the federal government with
20 respect to the use of any funds appropri-
21 ated by the federal government including
22 state grants administered by the Depart-
23 ment. Notwithstanding any inconsistent
24 provision of law, a portion of this appro-
25 priation may be suballocated to other
26 state departments and agencies, subject to
27 the approval of the director of the budg-
28 et, as needed to accomplish the intent of
29 this appropriation (23416) ................. 132,526,000
30 For grants to schools and other eligible
31 entities for specific programs including,
32 but not limited to, the charter schools
33 program pursuant to title IV of the
34 elementary and secondary education act.
35 Provided further that, notwithstanding any
36 inconsistent provision of law, the commis-
37 sioner of education shall provide to the
38 director of the budget, the chairperson of
39 the senate finance committee and the
40 chairperson of the assembly ways and means
41 committee copies of any spending plans
42 and/or budgets submitted to the federal
43 government with respect to the use of any
44 funds appropriated by the federal govern-
45 ment including state grants administered
46 by the Department. Notwithstanding any
47 inconsistent provision of law, a portion
48 of this appropriation may be suballocated
49 to other state departments and agencies,
50 subject to the approval of the director of
51 the budget, as needed to accomplish the
52 intent of this appropriation (23415) ........ 28,000,000
53 For grants to schools and other eligible
54 entities for specific programs including,
55 but not limited to, the rural education
56 initiative pursuant to title V of the
999 12654-10-8
1 elementary and secondary education act.
2 Provided further that, notwithstanding any
3 inconsistent provision of law, the commis-
4 sioner of education shall provide to the
5 director of the budget, the chairperson of
6 the senate finance committee and the
7 chairperson of the assembly ways and means
8 committee copies of any spending plans
9 and/or budgets submitted to the federal
10 government with respect to the use of any
11 funds appropriated by the federal govern-
12 ment including state grants administered
13 by the Department. Notwithstanding any
14 inconsistent provision of law, a portion
15 of this appropriation may be suballocated
16 to other state departments and agencies,
17 subject to the approval of the director of
18 the budget, as needed to accomplish the
19 intent of this appropriation (23414) ......... 5,000,000
20 For grants to schools and other eligible
21 entities for specific programs including,
22 but not limited to, the homeless education
23 program pursuant to title VII of the
24 McKinney Vento homeless assistance act.
25 Notwithstanding any inconsistent provision
26 of law, a portion of this appropriation
27 may be suballocated to other state depart-
28 ments and agencies, subject to the
29 approval of the director of the budget, as
30 needed to accomplish the intent of this
31 appropriation (23413) ........................ 8,000,000
32 For grants to schools and other eligible
33 entities for specific programs including,
34 but not limited to, the Carl D. Perkins
35 vocational and applied technology educa-
36 tion act (VTEA).
37 Notwithstanding any inconsistent provision
38 of law, a portion of this appropriation
39 may be suballocated to other state depart-
40 ments and agencies, subject to the
41 approval of the director of the budget, as
42 needed to accomplish the intent of this
43 appropriation (23477) ....................... 68,578,000
44 For various grants to schools and other
45 eligible entities. Notwithstanding any
46 inconsistent provision of law, a portion
47 of this appropriation may be suballocated
48 to other state departments and agencies,
49 subject to the approval of the director of
50 the budget, as needed to accomplish the
51 intent of this appropriation (23407) ........ 34,425,000
52 For the education of individuals with disa-
53 bilities including up to $3,000,000 for
54 services and expenses of early childhood
55 direction centers and $500,000 for
56 services and expenses of the center for
1000 12654-10-8
1 autism and related disabilities at the
2 state university of New York at Albany.
3 Notwithstanding any inconsistent provision
4 of law, a portion of the funds appropri-
5 ated herein shall be available, subject to
6 a plan developed by the commissioner of
7 education and approved by the director of
8 the budget, for grants to ensure appropri-
9 ately certified teachers in schools
10 providing special services or programs as
11 defined in paragraphs e, g, i and l of
12 subdivision 2 of section 4401 of the
13 education law to children placed by school
14 districts and in approved preschool
15 programs that provide full and half-day
16 educational programs in accordance with
17 section 4410 of the education law for
18 children placed by school district.
19 Provided further that, in the allocation
20 of funds, priority shall be given to those
21 programs with a demonstrated need to
22 increase the number of certified teachers
23 to comply with state and federal require-
24 ments. Such funds shall be made available
25 for such activities as certification prep-
26 aration, training, assisting schools with
27 personnel shortages and supporting activ-
28 ities that improve the delivery of
29 services to improve results for children
30 with disabilities. Provided further that
31 notwithstanding any inconsistent provision
32 of law, of the funds appropriated herein:
33 up to $10,000,000 shall be available for
34 costs associated with schools operated
35 under article 85 of the education law
36 which otherwise would be payable through
37 the department's general fund aid to
38 localities appropriation, provided further
39 that notwithstanding any inconsistent
40 provision of law, any disbursements
41 against this $10,000,000 shall immediately
42 reduce the amounts appropriated in the
43 education department's general fund aid to
44 localities for costs associated with
45 schools operated under article 85 of the
46 education law by an equivalent amount, and
47 the portion of such general fund appropri-
48 ation so affected shall have no further
49 force or effect. Notwithstanding any
50 provision of the law to the contrary,
51 funds appropriated herein shall be avail-
52 able for payment of liabilities heretofore
53 accrued or hereafter to accrue and,
54 subject to the approval of the director of
55 the budget, such funds shall be available
56 to the department net of disallowances,
1001 12654-10-8
1 refunds, reimbursements and credits.
2 Notwithstanding any inconsistent provision
3 of law, a portion of this appropriation
4 may be suballocated to other state depart-
5 ments and agencies, as needed, to accom-
6 plish the intent of this appropriation
7 (21737) .................................... 815,347,000
8 --------------
9 Program account subtotal ............... 3,185,867,000
10 --------------
11 Special Revenue Funds - Federal
12 Federal Health and Human Services Fund
13 Federal Health and Human Services Account - 25122
14 For grants to schools for specific programs
15 (21742) ...................................... 5,000,000
16 --------------
17 Program account subtotal ................... 5,000,000
18 --------------
19 Special Revenue Funds - Federal
20 Federal Miscellaneous Operating Grants Fund
21 Federal Operating Grants Account - 25456
22 For grants to schools for specific programs
23 (21826) ...................................... 5,000,000
24 --------------
25 Program account subtotal ................... 5,000,000
26 --------------
27 Special Revenue Funds - Federal
28 Federal USDA-Food and Nutrition Services Fund
29 Federal USDA-Food and Nutrition Services Account - 25026
30 For grants to schools and other eligible
31 entities for programs funded through the
32 national school lunch act (21703) ........ 1,211,000,000
33 --------------
34 Program account subtotal ............... 1,211,000,000
35 --------------
36 Special Revenue Funds - Other
37 Charter School Stimulus Fund
38 Charter School Stimulus Account - 20601
39 For services and expenses related to devel-
40 opment, implementation and operation of
41 charter schools, including facility costs
42 and loans to authorized schools, and
43 including funds available for transfer for
44 the administrative/technical support
45 services provided by the charter school
46 institute of the state university of New
47 York. This appropriation shall only be
48 available for expenditure upon the
1002 12654-10-8
1 approval of an expenditure plan by the
2 director of the budget (21700) .............. 20,000,000
3 --------------
4 Program account subtotal .................. 20,000,000
5 --------------
6 Special Revenue Funds - Other
7 Combined Expendable Trust Fund
8 New York State Teen Health Education Account - 20200
9 For teen health education, pursuant to
10 section 99-u of the state finance law
11 (55926) ........................................ 120,000
12 --------------
13 Program account subtotal ..................... 120,000
14 --------------
15 Special Revenue Funds - Other
16 State Lottery Fund
17 State Lottery Account - 20901
18 For general support for public schools for
19 the 2018-19 school year, provided that,
20 notwithstanding any other provision of law
21 to the contrary, in computing the addi-
22 tional lottery grant pursuant to subpara-
23 graph (4) of paragraph b of subdivision 4
24 of section 92-c of the state finance law
25 for the 2018-19 school year, the base
26 grant shall not exceed $2,053,980,000.
27 Notwithstanding any provision of law to
28 the contrary, this appropriation shall
29 supersede and replace any appropriation
30 for this item covering fiscal year 2018-19
31 set forth in chapter 53 of the laws of
32 2017 (21735) ............................. 2,053,980,000
33 For allowances to private schools for the
34 blind and deaf for the 2018-19 school
35 year. Notwithstanding any provision of law
36 to the contrary, this appropriation shall
37 supersede and replace any appropriation
38 for this item covering fiscal year 2018-19
39 set forth in chapter 53 of the laws of
40 2017 (23460) .................................... 20,000
41 For general support for public schools, for
42 the June 2017-18 school year payment.
43 Notwithstanding any provision of law to
44 the contrary, this appropriation shall
45 supersede and replace any appropriation
46 for this item covering fiscal year 2018-19
47 set forth in chapter 53 of the laws of
48 2017 (23495) ............................... 240,000,000
49 --------------
50 Program account subtotal ............... 2,294,000,000
51 --------------
1003 12654-10-8
1 Special Revenue Funds - Other
2 State Lottery Fund
3 VLT Education Account - 20904
4 For general support for public schools for
5 the 2018-19 school year, for grants
6 awarded pursuant to subparagraph (2-a) of
7 paragraph b of subdivision 4 of section
8 92-c of the state finance law. Notwith-
9 standing any provision of law to the
10 contrary, this appropriation shall super-
11 sede and replace any appropriation for
12 this item covering fiscal year 2018-19 set
13 forth in chapter 53 of the laws of 2017
14 (23494) .................................... 906,800,000
15 --------------
16 Program account subtotal ................. 906,800,000
17 --------------
18 SCHOOL TAX RELIEF PROGRAM ................................ 2,458,909,000
19 --------------
20 Special Revenue Funds - Other
21 School Tax Relief Fund
22 School Tax Relief Account - 20551
23 For payments to local governments relating
24 to the school tax relief (STAR) program
25 including state aid pursuant to section
26 1306-a of the real property tax law,
27 except to the extent that such funds shall
28 be applied as an offset against the past-
29 due state tax liabilities of certain prop-
30 erty owners pursuant to section 425 of the
31 real property tax law and section 171-y of
32 the tax law.
33 Up to $5,000,000 of the funds appropriated
34 hereby may be suballocated or transferred
35 to the department of taxation and finance
36 for the purpose of making direct payments
37 to certain property owners from the
38 account established pursuant to subpara-
39 graph (iii) of paragraph (a) of subdivi-
40 sion 14 of section 425 of the real proper-
41 ty tax law (21709) ....................... 2,458,909,000
42 --------------
43 AID TO LOCALITIES - REAPPROPRIATIONS 2018-19
44 ADULT CAREER AND CONTINUING EDUCATION SERVICES PROGRAM
45 General Fund
46 Local Assistance Account - 10000
47 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
48 section 2, of the laws of 2017:
1004 12654-10-8
1 For case services provided on or after October 1, 2015 to disabled
2 individuals in accordance with economic eligibility criteria devel-
3 oped by the department (21713) ... 54,000,000 .... (re. $38,204,000)
4 For services and expenses of independent living centers (21856) ......
5 13,361,000 ........................................ (re. $5,584,000)
6 For college readers aid payments (21854) ... 294,000 .. (re. $294,000)
7 For services and expenses of supported employment and integrated
8 employment opportunities provided on or after October 1, 2015:
9 For services and expenses of programs providing or leading to the
10 provision of time-limited services or long-term support services
11 (21741) ... 15,160,000 ........................... (re. $13,121,000)
12 For grants to schools for programs involving literacy and basic educa-
13 tion for public assistance recipients for the 2017-18 school year
14 for those programs administered by the state education department
15 (23411) ... 1,843,000 ............................. (re. $1,843,000)
16 For competitive grants for adult literacy/ education aid to public and
17 private not-for-profit agencies, including but not limited to, 2 and
18 4 year colleges, community based organizations, libraries, and
19 volunteer literacy organizations and institutions which meet quality
20 standards promulgated by the commissioner of education to provide
21 programs of basic literacy, high school equivalency, and English as
22 a second language to persons 16 years of age or older for the
23 remaining payments of the 2016-17 school year and for the 2017-18
24 school year, provided further that no more than $300,000 shall be
25 available for remaining payments for the 2016-17 school year (23410)
26 ... 6,293,000 ..................................... (re. $5,998,000)
27 By chapter 53, section 1, of the laws of 2016:
28 For case services provided on or after October 1, 2014 to disabled
29 individuals in accordance with economic eligibility criteria devel-
30 oped by the department (21713) ... 54,000,000 ........ (re. $16,000)
31 For college readers aid payments (21854) ... 294,000 .. (re. $294,000)
32 For services and expenses of supported employment and integrated
33 employment opportunities provided on or after October 1, 2014:
34 For services and expenses of programs providing or leading to the
35 provision of time-limited services or long-term support services
36 (21741) ... 15,160,000 ............................ (re. $3,820,000)
37 For grants to schools for programs involving literacy and basic educa-
38 tion for public assistance recipients for the 2016-17 school year
39 for those programs administered by the state education department
40 (23411) ... 1,843,000 ............................... (re. $874,000)
41 For competitive grants for adult literacy/education aid to public and
42 private not-for-profit agencies, including but not limited to, 2 and
43 4 year colleges, community based organizations, libraries, and
44 volunteer literacy organizations and institutions which meet quality
45 standards promulgated by the commissioner of education to provide
46 programs of basic literacy, high school equivalency, and English as
47 a second language to persons 16 years of age or older for the
48 remaining payments of 2015-16 school year and for the 2016-17 school
49 year, provided further that no more than $300,000 shall be available
50 for remaining payments for the 2015-16 school year (23410) .........
51 6,293,000 ......................................... (re. $1,854,000)
52 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
53 section 1, of the laws of 2015:
54 For college readers aid payments (21854) ... 294,000 .. (re. $294,000)
1005 12654-10-8
1 For services and expenses of supported employment and integrated
2 employment opportunities provided on or after October 1, 2013:
3 For services and expenses of programs providing or leading to the
4 provision of time-limited services or long-term support services
5 (21741) ... 15,160,000 .............................. (re. $749,000)
6 For grants to schools for programs involving literacy and basic educa-
7 tion for public assistance recipients for the 2015-16 school year
8 for those programs administered by the state education department
9 (23411) ... 1,843,000 ................................. (re. $7,000)
10 For competitive grants for adult literacy/education aid to public and
11 private not-for-profit agencies, including but not limited to, 2 and
12 4 year colleges, community based organizations, libraries, and
13 volunteer literacy organizations and institutions which meet quality
14 standards promulgated by the commissioner of education to provide
15 programs of basic literacy, high school equivalency, and English as
16 a second language to persons 16 years of age or older for the
17 remaining payments of 2014-15 school year and for the 2015-16 school
18 year, provided further that no more than $300,000 shall be available
19 for remaining payments for the 2014-15 school year (23410) .........
20 5,293,000 ............................................ (re. $44,000)
21 By chapter 53, section 1, of the laws of 2014:
22 For college readers aid payments (21854) ... 294,000 .. (re. $294,000)
23 For services and expenses of supported employment and integrated
24 employment opportunities provided on or after October 1, 2012:
25 For services and expenses of programs providing or leading to the
26 provision of time-limited services or long-term support services
27 (21741) ... 15,160,000 ............................... (re. $50,000)
28 By chapter 53, section 1, of the laws of 2013:
29 For college readers aid payments (21854) ... 294,000 ... (re. $55,000)
30 For services and expenses of supported employment and integrated
31 employment opportunities provided on or after October 1, 2010:
32 For services and expenses of programs providing or leading to the
33 provision of time-limited services or long-term support services ...
34 15,160,000 ........................................... (re. $40,000)
35 For competitive grants for adult literacy/education aid to public and
36 private not-for-profit agencies, including but not limited to, 2 and
37 4 year colleges, community based organizations, libraries, and
38 volunteer literacy organizations and institutions which meet quality
39 standards promulgated by the commissioner of education to provide
40 programs of basic literacy, high school equivalency, and English as
41 a second language to persons 16 years of age or older for the
42 remaining payments of 2012-13 school year and for the 2013-14 school
43 year, provided further that no more than $300,000 shall be available
44 for remaining payments for the 2012-13 school year .................
45 5,293,000 ........................................... (re. $131,000)
46 Special Revenue Funds - Federal
47 Federal Education Fund
48 Federal Department of Education Account - 25210
49 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
50 section 2, of the laws of 2017:
51 For case services provided to individuals with disabilities (21713)
52 ... 70,000,000 ................................... (re. $70,000,000)
1006 12654-10-8
1 For the independent living program (21856) ...........................
2 2,572,000 ......................................... (re. $2,572,000)
3 For the supported employment program (21741) .........................
4 2,500,000 ......................................... (re. $2,500,000)
5 For grants to schools and other eligible entities for adult basic
6 education, literacy, and civics education pursuant to the workforce
7 investment act (21734) ... 48,704,000 ............ (re. $46,805,000)
8 By chapter 53, section 1, of the laws of 2016:
9 For case services provided to individuals with disabilities (21713)
10 ... 70,000,000 ................................... (re. $25,585,000)
11 For the independent living program (21856) ...........................
12 2,572,000 ......................................... (re. $2,250,000)
13 For the supported employment program (21741) .........................
14 2,500,000 ......................................... (re. $2,500,000)
15 For grants to schools and other eligible entities for adult basic
16 education, literacy, and civics education pursuant to the workforce
17 investment act (21734) ... 48,704,000 ............ (re. $24,811,000)
18 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
19 section 1, of the laws of 2015:
20 For case services provided to individuals with disabilities (21713)
21 ... 70,000,000 ................................... (re. $32,698,000)
22 For the independent living program (21856) ...........................
23 2,572,000 ......................................... (re. $2,331,000)
24 For the supported employment program (21741) .........................
25 2,500,000 ......................................... (re. $2,500,000)
26 For grants to schools and other eligible entities for adult basic
27 education, literacy, and civics education pursuant to the workforce
28 investment act (21734) ... 48,704,000 ............ (re. $12,259,000)
29 By chapter 53, section 1, of the laws of 2014:
30 For case services provided to individuals with disabilities ..........
31 70,000,000 ....................................... (re. $34,663,000)
32 For the independent living program ... 2,572,000 .... (re. $2,352,000)
33 For the supported employment program ... 2,500,000 .. (re. $1,312,000)
34 For grants to schools and other eligible entities for adult basic
35 education, literacy, and civics education pursuant to the workforce
36 investment act ... 48,704,000 .................... (re. $13,100,000)
37 By chapter 53, section 1, of the laws of 2013:
38 For case services provided to individuals with disabilities ..........
39 70,000,000 ....................................... (re. $40,000,000)
40 For the independent living program ... 2,572,000 .... (re. $2,248,000)
41 For the supported employment program ... 2,500,000 .. (re. $1,308,000)
42 Special Revenue Funds - Other
43 Miscellaneous Special Revenue Fund
44 VESID Social Security Account - 22001
45 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
46 section 2, of the laws of 2017:
47 For the rehabilitation of social security disability beneficiaries
48 (21852) ... 11,760,000 ........................... (re. $11,567,000)
49 By chapter 53, section 1, of the laws of 2016:
1007 12654-10-8
1 For the rehabilitation of social security disability beneficiaries
2 (21852) ... 11,760,000 ........................... (re. $11,455,000)
3 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
4 section 1, of the laws of 2015:
5 For the rehabilitation of social security disability beneficiaries
6 (21852) ... 11,760,000 ........................... (re. $11,698,000)
7 By chapter 53, section 1, of the laws of 2014:
8 For the rehabilitation of social security disability beneficiaries
9 (21852) ... 11,760,000 ............................ (re. $9,053,000)
10 By chapter 53, section 1, of the laws of 2013:
11 For the rehabilitation of social security disability beneficiaries
12 (21852) ... 11,760,000 ............................ (re. $9,286,000)
13 Special Revenue Funds - Other
14 Vocational Rehabilitation Fund
15 Vocational Rehabilitation Account - 23051
16 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
17 section 2, of the laws of 2017:
18 For services and expenses of the special workers' compensation program
19 (21852) ... 698,000 ................................. (re. $698,000)
20 CULTURAL EDUCATION PROGRAM
21 General Fund
22 Local Assistance Account - 10000
23 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
24 section 2, of the laws of 2017:
25 Aid to public libraries including aid to New York public library
26 (NYPL) and NYPL's science industry and business library. Provided
27 that, notwithstanding any provision of law, rule or regulation to
28 the contrary, such aid, and the state's liability therefor, shall
29 represent fulfillment of the state's obligation for this program
30 (21846) ... 91,627,000 ............................ (re. $5,389,000)
31 For services and expenses of the Langston Hughes Community Library and
32 Cultural Center of Queens Library ... 75,000 ......... (re. $75,000)
33 Aid to educational television and radio. Notwithstanding any provision
34 of law, rule or regulation to the contrary, the amount appropriated
35 herein shall represent fulfillment of the state's obligation for
36 this program (21848) ... 14,002,000 ............... (re. $1,401,000)
37 By chapter 53, section 1, of the laws of 2016:
38 Aid to public libraries including aid to New York public library
39 (NYPL) and NYPL's science industry and business library. Provided
40 that, notwithstanding any provision of law, rule or regulation to
41 the contrary, such aid, and the state's liability therefor, shall
42 represent fulfillment of the state's obligation for this program
43 (21846) ... 91,627,000 ............................... (re. $94,000)
44 Special Revenue Fund - Federal
45 Federal Miscellaneous Operating Grants Fund
46 Federal Operating Grants Account - 25456
1008 12654-10-8
1 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
2 section 2, of the laws of 2017:
3 For aid to public libraries pursuant to various federal laws including
4 the library services technology act (21851) ........................
5 5,400,000 ......................................... (re. $5,400,000)
6 By chapter 53, section 1, of the laws of 2016:
7 For aid to public libraries pursuant to various federal laws including
8 the library services technology act (21851) ........................
9 5,400,000 ......................................... (re. $3,863,000)
10 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
11 section 1, of the laws of 2015:
12 For aid to public libraries pursuant to various federal laws including
13 the library services technology act (21851) ........................
14 5,400,000 ......................................... (re. $2,815,000)
15 Special Revenue Funds - Other
16 New York State Local Government Records Management Improvement Fund
17 Local Government Records Management Account - 20501
18 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
19 section 2, of the laws of 2017:
20 Grants to individual local governments or groups of cooperating local
21 governments as provided in section 57.35 of the arts and cultural
22 affairs law (21849) ... 8,346,000 ................. (re. $7,530,000)
23 Aid for documentary heritage grants and aid to eligible archives,
24 libraries, historical societies, museums, and to certain organiza-
25 tions including the state education department that provide services
26 to such programs (21850) ... 461,000 ................ (re. $435,000)
27 By chapter 53, section 1, of the laws of 2016:
28 Grants to individual local governments or groups of cooperating local
29 governments as provided in section 57.35 of the arts and cultural
30 affairs law (21849) ... 8,346,000 ................. (re. $5,270,000)
31 Aid for documentary heritage grants and aid to eligible archives,
32 libraries, historical societies, museums, and to certain organiza-
33 tions including the state education department that provide services
34 to such programs (21850) ... 461,000 ................ (re. $425,000)
35 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
36 section 1, of the laws of 2015:
37 Grants to individual local governments or groups of cooperating local
38 governments as provided in section 57.35 of the arts and cultural
39 affairs law (21849) ... 8,346,000 ................. (re. $4,375,000)
40 Aid for documentary heritage grants and aid to eligible archives,
41 libraries, historical societies, museums, and to certain organiza-
42 tions including the state education department that provide services
43 to such programs (21850) ... 461,000 ................. (re. $98,000)
44 By chapter 53, section 1, of the laws of 2014:
45 Grants to individual local governments or groups of cooperating local
46 governments as provided in section 57.35 of the arts and cultural
47 affairs law (21849) ... 8,346,000 ................. (re. $2,476,000)
48 Aid for documentary heritage grants and aid to eligible archives,
49 libraries, historical societies, museums, and to certain organiza-
1009 12654-10-8
1 tions including the state education department that provide services
2 to such programs (21850) ... 461,000 ................ (re. $319,000)
3 By chapter 53, section 1, of the laws of 2013:
4 Grants to individual local governments or groups of cooperating local
5 governments as provided in section 57.35 of the arts and cultural
6 affairs law (21849) ... 8,346,000 ................. (re. $3,147,000)
7 Aid for documentary heritage grants and aid to eligible archives,
8 libraries, historical societies, museums, and to certain organiza-
9 tions including the state education department that provide services
10 to such programs (21850) ... 461,000 .................. (re. $1,000)
11 By chapter 53, section 1, of the laws of 2012:
12 Grants to individual local governments or groups of cooperating local
13 governments as provided in section 57.35 of the arts and cultural
14 affairs law ... 8,346,000 ......................... (re. $5,000,000)
15 OFFICE OF HIGHER EDUCATION AND THE PROFESSIONS PROGRAM
16 General Fund
17 Local Assistance Account - 10000
18 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
19 section 2, of the laws of 2017:
20 For liberty partnerships program awards as prescribed by section 612
21 of the education law as added by chapter 425 of the laws of 1988.
22 Notwithstanding any other section of law to the contrary, funding for
23 such programs in the 2017-18 fiscal year shall be limited to the
24 amount appropriated herein (21830) .................................
25 15,301,860 ....................................... (re. $15,301,860)
26 For additional liberty partnerships program awards as prescribed by
27 section 612 of the education law as added by chapter 425 of the laws
28 of 1988. Notwithstanding any other section of law to the contrary,
29 funding for such programs in the 2017-18 fiscal year shall be limit-
30 ed to the amount appropriated herein (21842) .......................
31 3,060,000 ......................................... (re. $3,060,000)
32 For higher education opportunity program awards. Funds appropriated
33 herein shall be used by independent colleges to expand opportunities
34 for the educationally and economically disadvantaged at independent
35 institutions of higher learning (21832) ............................
36 29,605,920 ....................................... (re. $29,605,920)
37 For science and technology entry program (STEP) awards (21834) .......
38 13,176,180 ....................................... (re. $12,858,000)
39 For collegiate science and technology entry program (CSTEP) awards
40 (21835) ... 9,984,890 ............................. (re. $9,377,000)
41 For teacher opportunity corps program awards (21837) .................
42 450,000 ............................................. (re. $450,000)
43 For services and expenses of a foster youth initiative to ensure
44 support is available through current post-secondary opportunity
45 programs at public and independent institutions for foster youth
46 including summer transition programs, and to provide foster youth
47 with financial aid outreach, counseling services, and direct finan-
48 cial support. A portion of these funds may be suballocated to other
49 state departments, agencies, the State University of New York, and
50 the City University of New York (55913) ............................
51 1,500,000 ......................................... (re. $1,500,000)
1010 12654-10-8
1 For additional services and expenses of a foster youth initiative to
2 ensure support is available through current post-secondary opportu-
3 nity programs at public and independent institutions for foster
4 youth including summer transition programs, and to provide foster
5 youth with financial aid outreach, counseling services, and direct
6 financial support. A portion of these funds may be suballocated to
7 other state departments, agencies, the State University of New York,
8 and the City University of New York (55941) ........................
9 3,000,000 ......................................... (re. $3,000,000)
10 For state financial assistance to expand high needs nursing programs
11 at private colleges and universities in accordance with section
12 6401-a of the education law (21838) ... 941,000 ..... (re. $941,000)
13 For services and expenses of the national board for professional
14 teaching standards certification grant program for the 2017-18
15 school year (21785) ... 368,000 ..................... (re. $229,000)
16 By chapter 53, section 1, of the laws of 2016:
17 For liberty partnerships program awards as prescribed by section 612
18 of the education law as added by chapter 425 of the laws of 1988.
19 Notwithstanding any other section of law to the contrary, funding
20 for such programs in the 2016-17 fiscal year shall be limited to the
21 amount appropriated herein (21830) .................................
22 15,301,860 ........................................ (re. $8,599,000)
23 For higher education opportunity program awards. Funds appropriated
24 herein shall be used by independent colleges to expand opportunities
25 for the educationally and economically disadvantaged at independent
26 institutions of higher learning (21832) ............................
27 29,605,920 ....................................... (re. $13,213,000)
28 For science and technology entry program (STEP) awards (21834) .......
29 13,176,180 ........................................ (re. $3,134,000)
30 For collegiate science and technology entry program (CSTEP) awards
31 (21835) ... 9,984,890 ............................. (re. $3,151,000)
32 For teacher opportunity corps program awards (21837) .................
33 450,000 ............................................. (re. $251,000)
34 For services and expenses of a foster youth initiative to ensure
35 support is available through current post-secondary opportunity
36 programs at public and independent institutions for foster youth
37 including summer transition programs, and to provide foster youth
38 with financial aid outreach, counseling services, and direct finan-
39 cial support. A portion of these funds may be suballocated to other
40 state departments, agencies, the State University of New York, and
41 the City University of New York (55913) ............................
42 1,500,000 ........................................... (re. $518,000)
43 For services and expenses of the national board for professional
44 teaching standards certification grant program for the 2016-17
45 school year (21785) ... 368,000 ..................... (re. $163,000)
46 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
47 section 1, of the laws of 2015:
48 For liberty partnerships program awards as prescribed by section 612
49 of the education law as added by chapter 425 of the laws of 1988.
50 Notwithstanding any other section of law to the contrary, funding
51 for such programs in the 2015-16 fiscal year shall be limited to the
52 amount appropriated herein (21830) ... 13,755,860 ... (re. $262,000)
53 For higher education opportunity program awards. Funds appropriated
54 herein shall be used by independent colleges to expand opportunities
1011 12654-10-8
1 for the educationally and economically disadvantaged at independent
2 institutions of higher learning (21832) ............................
3 26,614,920 .......................................... (re. $971,000)
4 For science and technology entry program (STEP)awards (21834) ........
5 11,845,180 .......................................... (re. $167,000)
6 For collegiate science and technology entry program (CSTEP) awards
7 (21835) ... 8,975,890 ............................... (re. $188,000)
8 For teacher opportunity corps program awards (21837) .................
9 450,000 .............................................. (re. $16,000)
10 For services and expenses of a foster youth initiative to ensure
11 support is available through current post-secondary opportunity
12 programs at public and independent institutions for foster youth
13 including summer transition programs, and to provide foster youth
14 with financial aid outreach, counseling services, and direct finan-
15 cial support. A portion of these funds may be suballocated to other
16 state departments, agencies, the State University of New York, and
17 the City University of New York (55913) ............................
18 1,500,000 ............................................ (re. $39,000)
19 For services and expenses of the national board for professional
20 teaching standards certification grant program for the 2015-16
21 school year (21785) ... 368,000 ..................... (re. $318,000)
22 By chapter 53, section 1, of the laws of 2014:
23 For liberty partnerships program awards as prescribed by section 612
24 of the education law as added by chapter 425 of the laws of 1988.
25 Notwithstanding any other section of law to the contrary, funding
26 for such programs in the 2014-15 fiscal year shall be limited to the
27 amount appropriated herein ... 12,918,260 ............ (re. $31,000)
28 For teacher opportunity corps program awards .........................
29 450,000 .............................................. (re. $46,000)
30 For higher education opportunity program awards. Funds appropriated
31 herein shall be used by independent colleges to expand opportunities
32 for the educationally and economically disadvantaged at independent
33 institutions of higher learning (21832) ............................
34 24,996,040 .......................................... (re. $661,000)
35 For services and expenses of the national board for professional
36 teaching standards certification grant program for the 2014-15
37 school year (21785) ... 368,000 ...................... (re. $26,000)
38 By chapter 53, section 1, of the laws of 2014, as amended by chapter 61,
39 section 1, of the laws of 2015:
40 For science and technology entry program (STEP) awards ...............
41 11,125,030 .......................................... (re. $574,000)
42 For collegiate science and technology entry program (CSTEP) awards ...
43 8,429,520 ........................................... (re. $310,000)
44 By chapter 53, section 1, of the laws of 2013:
45 For higher education opportunity program awards. Funds appropriated
46 herein shall be used by independent colleges to expand opportunities
47 for the educationally and economically disadvantaged at independent
48 institutions of higher learning (21832) ............................
49 24,268,000 ........................................ (re. $1,851,000)
50 For science and technology entry program (STEP) awards ...............
51 10,801,000 ........................................... (re. $36,000)
52 For collegiate science and technology entry program (CSTEP) awards ...
53 8,184,000 ............................................. (re. $1,000)
1012 12654-10-8
1 For teacher opportunity corps program awards .........................
2 450,000 ............................................... (re. $7,000)
3 By chapter 53, section 1, of the laws of 2013, as transferred by chapter
4 53, section 1, of the laws of 2014:
5 For services and expenses of the national board for professional
6 teaching standards certificate grant program (56044) ...............
7 250,000 ............................................. (re. $202,000)
8 By chapter 53, section 1, of the laws of 2012:
9 For higher education opportunity program awards. Funds appropriated
10 herein shall be used by independent colleges to expand opportunities
11 for the educationally and economically disadvantaged at independent
12 institutions of higher learning (21832) ............................
13 20,783,000 ........................................ (re. $1,687,000)
14 For science and technology entry program (STEP) awards ...............
15 9,774,000 ............................................ (re. $18,000)
16 For teacher opportunity corps program awards .........................
17 450,000 .............................................. (re. $17,000)
18 For services and expenses of the national board for professional
19 teaching standards certification grant program (21785) .............
20 368,000 ............................................. (re. $144,000)
21 By chapter 53, section 1, of the laws of 2011:
22 For higher education opportunity program awards. Funds appropriated
23 herein shall be used by independent colleges to expand opportunities
24 for the educationally and economically disadvantaged at independent
25 institutions of higher learning ... 20,783,000 ...... (re. $439,000)
26 By chapter 53, section 1, of the laws of 2010:
27 For higher education opportunity program awards. Funds appropriated
28 herein shall be used by independent colleges to expand opportunities
29 for the educationally and economically disadvantaged at independent
30 institutions of higher learning ... 20,783,000 .... (re. $1,233,000)
31 By chapter 53, section 1, of the laws of 2009, as amended by chapter
32 502, section 2, of the laws of 2009:
33 For higher education opportunity program awards. Funds appropriated
34 herein shall be used by independent colleges to expand opportunities
35 for the educationally and economically disadvantaged at independent
36 institutions of higher learning; provided, however, that the amount
37 of this appropriation available for expenditure and disbursement on
38 and after November 1, 2009 shall be reduced by 12.5 percent of the
39 amount that was undisbursed as of November 1, 2009 .................
40 23,752,000 .......................................... (re. $364,000)
41 By chapter 53, section 1, of the laws of 2008, as amended by chapter
42 496, section 3, of the laws of 2008:
43 For higher education opportunity program awards. Funds appropriated
44 herein shall be used by independent colleges to expand opportunities
45 for the educationally and economically disadvantaged at independent
46 institutions of higher learning, provided, however, that the amount
47 of this appropriation available for expenditure and disbursement on
48 and after September 1, 2008 shall be reduced by six percent of the
49 amount that was undisbursed as of August 15, 2008 ..................
50 23,716,000 ........................................... (re. $80,000)
1013 12654-10-8
1 By chapter 53, section 1, of the laws of 2007, as transferred by chapter
2 53, section 1, of the laws of 2011:
3 For services and expenses of the national board for professional
4 teaching standards certification grant program for the 2007-08
5 school year ... 500,000 ............................. (re. $116,000)
6 Special Revenue Funds - Federal
7 Federal Education Fund
8 Federal Department of Education Account - 25210
9 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
10 section 2, of the laws of 2017:
11 For grants to schools and other eligible entities for programs pursu-
12 ant to various federal laws including, but not limited to: title II
13 supporting effective instruction.
14 Notwithstanding any provision of law to the contrary, funds appropri-
15 ated herein may be suballocated, subject to the approval of the
16 director of the budget, to any state agency or department, and
17 interchanged to other accounts, to accomplish the purpose of this
18 appropriation. A portion of this appropriation may be interchanged
19 to other accounts, as needed to accomplish the intent of this appro-
20 priation (23419) ... 5,000,000 .................... (re. $5,000,000)
21 By chapter 53, section 1, of the laws of 2016:
22 For grants to schools and other eligible entities for programs pursu-
23 ant to various federal laws including: title II-A improving teacher
24 quality program.
25 Notwithstanding any provision of law to the contrary, funds appropri-
26 ated herein may be suballocated, subject to the approval of the
27 director of the budget, to any state agency or department, and
28 interchanged to other accounts, to accomplish the purpose of this
29 appropriation. A portion of this appropriation may be interchanged
30 to other accounts, as needed to accomplish the intent of this appro-
31 priation (23419) ... 5,000,000 .................... (re. $2,281,000)
32 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
33 section 1, of the laws of 2015:
34 For grants to schools and other eligible entities for programs pursu-
35 ant to various federal laws including: title II-A improving teacher
36 quality program.
37 Notwithstanding any provision of law to the contrary, funds appropri-
38 ated herein may be suballocated, subject to the approval of the
39 director of the budget, to any state agency or department, and
40 interchanged to other accounts, to accomplish the purpose of this
41 appropriation. A portion of this appropriation may be interchanged
42 to other accounts, as needed to accomplish the intent of this appro-
43 priation (23419) ... 5,000,000 ...................... (re. $858,000)
44 OFFICE OF MANAGEMENT SERVICES PROGRAM
45 Special Revenue Funds - Other
46 Combined Expendable Trust Fund
47 Grants Account - 20191
48 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
49 section 2, of the laws of 2017:
1014 12654-10-8
1 For services and expenses related to the administration of funds,
2 including grants to local recipients, paid to the education depart-
3 ment from private foundations, corporations and individuals and from
4 public or private funds received as payment in lieu of honorarium
5 for services rendered by employees which are related to such employ-
6 ees' official duties or responsibilities.
7 Provided further that, notwithstanding any inconsistent provision of
8 law, funds appropriated herein may be transferred to any other
9 combined expendable trust fund, subject to the approval of the
10 director of the budget, as needed to accomplish the intent of this
11 appropriation (21744) ... 5,214,000 ............... (re. $5,214,000)
12 By chapter 53, section 1, of the laws of 2016:
13 For services and expenses related to the administration of funds,
14 including grants to local recipients, paid to the education depart-
15 ment from private foundations, corporations and individuals and from
16 public or private funds received as payment in lieu of honorarium
17 for services rendered by employees which are related to such employ-
18 ees' official duties or responsibilities (21744) ...................
19 5,214,000 ......................................... (re. $5,214,000)
20 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
21 section 1, of the laws of 2015:
22 For services and expenses related to the administration of funds,
23 including grants to local recipients, paid to the education depart-
24 ment from private foundations, corporations and individuals and from
25 public or private funds received as payment in lieu of honorarium
26 for services rendered by employees which are related to such employ-
27 ees' official duties or responsibilities ...........................
28 5,214,000 ......................................... (re. $5,214,000)
29 OFFICE OF PREKINDERGARTEN THROUGH GRADE TWELVE EDUCATION PROGRAM
30 General Fund
31 Local Assistance Account - 10000
32 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
33 section 2, of the laws of 2017:
34 For reimbursement of supplemental basic tuition payments to charter
35 schools made by school districts in the 2016-17 school year, as
36 defined by paragraph a of subdivision 1 of section 2856 of the
37 education law (55907) ... 64,000,000 ............. (re. $19,714,000)
38 For additional grants in aid to certain school districts, public
39 libraries, and not-for-profit institutions. Notwithstanding any
40 provision of law to the contrary, this appropriation shall be allo-
41 cated only pursuant to a plan setting forth an itemized list of
42 grantees with the amount to be received by each, or the methodology
43 for allocating this appropriation. Such plan shall be subject to the
44 approval of the temporary president of the senate and the director
45 of the budget and thereafter shall be included in a resolution call-
46 ing for the expenditure of such monies, which resolution must be
47 approved by a majority vote of all members elected to the senate
48 upon a roll call vote. Provided, however, that funds appropriated
49 herein shall be made available on or after April 1, 2018. Notwith-
50 standing section 40 of the state finance law or any provision of law
1015 12654-10-8
1 to the contrary, this appropriation shall lapse on March 31, 2019
2 ... 40,000,000 ................................... (re. $40,000,000)
3 For additional grants for the expanded prekindergarten for three- and
4 four-year old students in high-need school districts program;
5 provided that such grants shall be awarded, based on a request for
6 proposals developed by the commissioner of education and approved by
7 the director of the budget, to school districts to establish new
8 full-day and half-day prekindergarten placements for three-year-olds
9 and four-year-olds; provided, further, that such grants shall only
10 be used to supplement, not supplant existing prekindergarten
11 programs; and provided, further, that any portion of the funds
12 appropriated herein that is not awarded shall remain available for
13 subsequent awards in the 2018-19 school year or for full-day and
14 half-day prekindergarten grants to be awarded in subsequent school
15 years.
16 Provided, further, that such grants from funds appropriated herein
17 shall be awarded based on factors including, but not limited to, the
18 following: (i) measures of school district need, (ii) measures of
19 the need of students to be served by each of the school districts,
20 (iii) the school district's proposal to target the highest-need
21 schools and students, (iv) the extent to which the district's
22 proposal would prioritize funds to maximize the total number of
23 eligible children in the district served in prekindergarten
24 programs, and (v) proposal quality; provided further that preference
25 for the 2017-18 awards shall be given to high-need school districts
26 without a current state-funded pre-kindergarten program.
27 Provided, however, that full-day and half-day prekindergarten grants
28 appropriated herein shall only be available to support programs (i)
29 that provide instruction for at least five hours per school day for
30 full-day prekindergarten programs and at least two and one-half
31 hours per school day for half-day prekindergarten programs; (ii)
32 that agree to offer instruction consistent with applicable New York
33 state prekindergarten early learning standards; and (iii) that
34 otherwise comply with all of the same rules and requirements as
35 universal prekindergarten programs pursuant to section 3602-e of the
36 education law except as modified herein; provided that notwithstand-
37 ing paragraph c of subdivision 1 of section 3602-e of the education
38 law notwithstanding, for the purposes of this appropriation, an
39 eligible child shall be a resident child who is three years of age
40 on or before December first of the year in which he or she is
41 enrolled.
42 Provided, further, that as a condition of eligibility for receipt of
43 such funding for three-year-olds, a school district must currently
44 offer a prekindergarten program for four-year-old children, or chil-
45 dren who would otherwise be eligible under paragraph c of subdivi-
46 sion 1 of section 3602-e of the education law; provided, further,
47 that a school district may apply for only as many full-day or half-
48 day placements for three-year-old children as it currently offers
49 for four-year-old children, or children who would otherwise be
50 eligible under paragraph c of subdivision 1 of section 3602-e of the
51 education law.
52 Provided, further, that a school district's grant shall equal the
53 product of (A) (i) two multiplied by the approved number of new
54 full-day prekindergarten placements plus (ii) the approved number of
55 half-day prekindergarten placement conversions and the approved
56 number of new half-day prekindergarten placements, and (B) the
1016 12654-10-8
1 district's selected aid per prekindergarten pupil pursuant to
2 subparagraph i of paragraph b of subdivision 10 of section 3602-e of
3 the education law; provided, however, that no district shall receive
4 a grant in excess of the total actual grant expenditures incurred by
5 the district in the current school year as approved by the commis-
6 sioner.
7 Provided, further, a school district shall agree to adopt approved
8 quality indicators within two years, including, but not limited to,
9 valid and reliable measures of environmental quality, the quality of
10 teacher-student interactions and child outcomes, and ensure that any
11 such assessment of child outcomes shall not be used to make high-
12 stakes educational decisions for individual children.
13 Notwithstanding any provision of law to the contrary, the funds appro-
14 priated herein, plus any other amounts so designated in other items
15 of appropriation within the general fund local assistance account
16 office of pre-kindergarten through grade twelve education program,
17 shall constitute the competitive awards amount authorized for the
18 2017-18 school year (55950) ... 5,000,000 ......... (re. $5,000,000)
19 For empire state after-school grants, pursuant to a plan developed by
20 the office of children and family services in consultation with the
21 commissioner of education and approved by the director of the budg-
22 et, to support the establishment and/or expansion of after-school
23 programs by school districts or school districts in collaboration
24 with not-for-profit community-based organizations (A) located in
25 municipalities participating in the empire state poverty reduction
26 initiative pursuant to chapter 55 of the laws of 2016 or (B) located
27 in counties or school districts with a child poverty rate in excess
28 of 30 percent, or located in a school district with a child poverty
29 count greater than 5,000 but less than 20,000, as determined by the
30 2015 small area income and poverty estimates produced by the United
31 States census bureau.
32 Provided that such grants shall be awarded based on factors including,
33 but not limited to, the following: (i) measures of school district
34 need, (ii) measures of the need of students to be served by each of
35 the school districts, (iii) the school district's proposal to target
36 the highest-need schools and students, and (iv) proposal quality.
37 Provided, further, that a school district's empire state after-school
38 grant shall equal the product of (i) the approved number of students
39 served in such program and (ii) $1,600; provided, however, that no
40 district shall receive a grant in excess of the total actual grant
41 expenditures incurred by the district in the current school year as
42 approved by the office of children and family services.
43 Provided, further, a school district shall agree to adopt approved
44 quality indicators including, but not limited to, valid and reliable
45 measures of environmental quality, and the quality of staff-student
46 interactions and student outcomes. Provided, further, that no school
47 district shall receive more than 40 percent of the total empire
48 state after school program grant allocation. Notwithstanding any
49 provision of law to the contrary, upon approval of the director of
50 the budget, the funds appropriated herein may be suballocated,
51 interchanged, transferred or otherwise made available to the office
52 of children and family services for the sole purpose of administer-
53 ing such grants.
54 Notwithstanding any provision of law to the contrary, the funds appro-
55 priated herein, plus any other amounts so designated in other items
56 of appropriation within the general fund local assistance account
1017 12654-10-8
1 office of pre-kindergarten through grade twelve education program,
2 shall constitute the competitive awards amount authorized for the
3 2017-18 school year (55951) ... 35,000,000 ....... (re. $35,000,000)
4 For early college high school programs, pursuant to a plan developed
5 by the commissioner of education and approved by the director of the
6 budget, provided that such plan shall prioritize programs serving
7 students in high-need school districts and in high schools desig-
8 nated by the commissioner pursuant to paragraph a or b of subdivi-
9 sion 1 of section 211-f of the education law throughout the 2017-18
10 school year; provided further that such plan shall also prioritize
11 programs that lead students to a career in computer science.
12 Provided further that a portion of the payments to early college high
13 school programs awarded funding from this appropriation shall be
14 made on a sliding scale based upon the number of college credits
15 earned annually by participating students, consistent with guide-
16 lines established by the commissioner. Provided further that in
17 connection with such guidelines, the commissioner shall execute a
18 memorandum of understanding with the state university of New York
19 and the city university of New York to develop common data
20 collection, sharing and reporting mechanisms based on student-level
21 data for students enrolled in early college high school programs.
22 Notwithstanding any provision of law to the contrary, higher education
23 partners participating in an early college high school program, or
24 the entity/entities responsible for setting tuition at the institu-
25 tion, shall be authorized to set a reduced rate of tuition and/or
26 fees, or to waive tuition and/or fees entirely, for students
27 enrolled in such an early college high school program with no
28 reduction in other state, local or other support for such students
29 earning college credit that such higher education partner would
30 otherwise be eligible to receive.
31 Notwithstanding any provision of law to the contrary, the funds appro-
32 priated herein, plus any other amounts so designated in other items
33 of appropriation within the general fund local assistance account
34 office of pre-kindergarten through grade twelve education program,
35 shall constitute the competitive awards amount authorized for the
36 2017-18 school year (55953) ... 5,300,000 ......... (re. $5,300,000)
37 For additional master teacher awards to individual high-performing
38 teachers in any grade in the field of computer science or a related
39 subject.
40 Provided further that the funds appropriated herein shall support the
41 award of stipends of $15,000 per annum over four years to such indi-
42 vidual teachers, and of related costs, administered by the state
43 university of New York pursuant to a plan developed in consultation
44 with the commissioner, who shall consult with appropriate state
45 organizations representing K-12 public school teachers, and approved
46 by the director of the budget, to build a corps of outstanding
47 teachers in order to improve the quality of instruction at public
48 schools. Such plan for use of funding appropriated herein shall: (i)
49 establish an application process; (ii) include guidelines by which
50 applications from eligible teachers shall be evaluated, which shall
51 include, but not be limited to, achievement of a rating of highly
52 effective on the annual professional performance review; and (iii)
53 provide periodic opportunities for professional development for
54 successful applicants. Provided, further, that priority shall be
55 given to applicants in regions where a similar program is not other-
56 wise offered.
1018 12654-10-8
1 Notwithstanding any provision of law to the contrary, upon approval of
2 the director of the budget, the funds appropriated herein may be
3 suballocated, interchanged, transferred or otherwise made available
4 to the state university of New York for the services and expenses of
5 administering such awards. Nothing herein shall be construed to
6 limit the rights of labor organizations representing teachers to
7 collectively bargain terms and conditions pursuant to article 14 of
8 the civil service law.
9 Notwithstanding any provision of law to the contrary, the funds appro-
10 priated herein, plus any other amounts so designated in other items
11 of appropriation within the general fund local assistance account
12 office of pre-kindergarten through grade twelve education program,
13 shall constitute the competitive awards amount authorized for the
14 2017-18 school year (55954) ... 2,000,000 ......... (re. $2,000,000)
15 For empire state excellence in teaching awards, provided that such
16 awards shall support stipends of $5,000 to allow individual high-
17 performing teachers in each region of the state to continue their
18 professional development and educational endeavors.
19 Provided further that stipends shall be used to support expenses
20 including, but not limited to, application and/or certification
21 costs related to the national board professional teacher certif-
22 ication, participation in institutes and/or workshops, tuition,
23 and/or attendance at a content area convention and/or conference;
24 provided further that such awards shall be administered by the state
25 university of New York pursuant to a plan developed in consultation
26 with the commissioner of education and approved by the director of
27 the budget.
28 Notwithstanding any provision of law to the contrary, upon approval of
29 the director of the budget, the funds appropriated herein may be
30 suballocated, interchanged, transferred or otherwise made available
31 to the state university of New York for the services and expenses of
32 administering such awards. Nothing herein shall be construed to
33 limit the rights of labor organizations representing teachers to
34 collectively bargain terms and conditions pursuant to article 14 of
35 the civil service law.
36 Notwithstanding any provision of law to the contrary, the funds appro-
37 priated herein, plus any other amounts so designated in other items
38 of appropriation within the general fund local assistance account
39 office of pre-kindergarten through grade twelve education program,
40 shall constitute the competitive awards amount authorized for the
41 2017-18 school year (55955) ... 400,000 ............. (re. $400,000)
42 For services and expenses to support the prevent cyberbullying initi-
43 ative, pursuant to a plan developed by the commissioner of educa-
44 tion, in consultation with the commissioner of children and family
45 services and the commissioner of mental health, and approved by the
46 director of the budget, provided that such plan shall support the
47 prevention of cyberbullying through activities including, but not
48 limited to, public awareness campaigns and school counselor train-
49 ing.
50 Notwithstanding any provision of law to the contrary, upon approval of
51 the director of the budget, the funds appropriated herein may be
52 suballocated, interchanged, transferred or otherwise made available
53 to the office of children and family services or the office of
54 mental health for the sole purpose of administering such program.
55 Notwithstanding any provision of law to the contrary, the funds appro-
56 priated herein, plus any other amounts so designated in other items
1019 12654-10-8
1 of appropriation within the general fund local assistance account
2 office of pre-kindergarten through grade twelve education program,
3 shall constitute the competitive awards amount authorized for the
4 2017-18 school year (55956) ... 300,000 ............. (re. $300,000)
5 For reimbursement to the East Ramapo central school district to
6 support students attending public schools in such district, provided
7 that the district is in compliance with the requirements set forth
8 in chapter 89 of the laws of 2016.
9 The East Ramapo central school district shall be eligible to receive
10 reimbursement from the funds appropriated herein for its approved
11 expenditures in the 2017-18 school year on services to improve and
12 enhance the educational opportunities of students attending the
13 public schools in such district. Such services shall include, but
14 not be limited to, reducing class sizes, expanding academic and
15 enrichment opportunities, establishing and expanding kindergarten
16 programs, expanding extracurricular opportunities and providing
17 student support services, provided, however, transportation services
18 and expenses shall not be eligible for reimbursement from such
19 funds.
20 In order to receive such funds, the school district in consultation
21 with the monitor or monitors pursuant to chapter 89 of the laws of
22 2016 shall revise its long term strategic academic and fiscal
23 improvement plan by October 1, 2017. Such revised plan shall be
24 submitted to the commissioner for approval and shall include a set
25 of goals with appropriate benchmarks and measurable objectives and
26 identify strategies to address areas where improvements are needed
27 in the district, including but not limited to its financial stabili-
28 ty, academic opportunities and outcomes, education of students with
29 disabilities, and education of English language learners, and shall
30 ensure compliance with all applicable state and federal laws and
31 regulations. Such revised improvement plan shall also include a
32 comprehensive expenditure plan that will describe how the funds made
33 available to the district from this appropriation will be spent.
34 Such comprehensive expenditure plan shall ensure that funds supple-
35 ment, not supplant, expenditures from local, state and federal funds
36 for services provided to public school students, except that such
37 funds may be used to continue services funded pursuant to chapter 89
38 of the laws of 2016 in prior years. Such expenditure plan shall be
39 revised in consultation with the monitor or monitors appointed by
40 the commissioner. The board of education of the East Ramapo central
41 school district shall conduct a public hearing on the expenditure
42 plan and shall consider the input of the community before adopting
43 such plan. Such expenditure plan shall also be made publicly avail-
44 able and shall be submitted along with comments made by the communi-
45 ty to the commissioner for approval once the plan is finalized. Upon
46 review of such improvement plan and such expenditure plan, the
47 commissioner shall approve or deny such plan in writing and, if
48 denied, shall include the reasons therefor. The district in consul-
49 tation with the monitors may resubmit such plan or plans with any
50 needed modifications thereto.
51 The commissioner shall disburse the funds appropriated herein after
52 receiving satisfactory evidence from the East Ramapo central school
53 district that the district has complied with the approved comprehen-
54 sive expenditure plan and spent such funds pursuant to the approved
55 expenditure plan as set forth in chapter 89 of the laws of 2016.
1020 12654-10-8
1 The commissioner of education shall have 30 days from the receipt of
2 such evidence to confirm whether the school district has complied
3 with the requirements of chapter 89 of the laws of 2016 and shall
4 determine whether such funds were spent in conformance with the
5 provisions of such chapter. Upon finding compliance and determining
6 that the funds were properly expended, the commissioner shall certi-
7 fy the amount of the approved expenditures to the state comptroller
8 for payment no later than 60 days after such determinations. The
9 East Ramapo central school district shall not receive reimbursement
10 for funds authorized herein that are not spent for the direct bene-
11 fit of students attending public schools in such district in a
12 manner consistent with its approved comprehensive expenditure plan
13 or prior written approval from the commissioner.
14 The board of education in consultation with the monitor or monitors
15 shall submit the school district's proposed budget for the next
16 succeeding school year to the commissioner no later than 45 days
17 before the date scheduled for the school district's budget vote. The
18 commissioner shall review the budget to ensure that it, to the
19 greatest extent possible, expands educational programming for
20 students including but not limited to extracurricular activities,
21 course offerings, non-mandated support services, non-mandated art
22 and music classes, programs and services for English language lear-
23 ners and students with disabilities, and maintaining class size.
24 The commissioner shall also review the proposed budget to ensure
25 that it is balanced within the context of revenue and expenditure
26 estimates and mandated programs. The commissioner shall present his
27 or her findings to the board of education no later than 30 days
28 prior to the date scheduled for the school district's budget vote.
29 The board of education shall make adjustments to the proposed budget
30 consistent with any recommendations made by the commissioner. The
31 school district shall make available on the district's website: the
32 initial proposed budget, the commissioner's findings, and the final
33 proposed budget prior to the date of the school district's budget
34 vote.
35 The monitor or monitors appointed by the commissioner shall quarterly,
36 and the district shall annually provide to the commissioner reports
37 on the fiscal and operational status of the school district to
38 ensure compliance with the budgeting requirements herein. In addi-
39 tion, monitors shall provide an annual report to the commissioner
40 and comptroller on contracts that the district entered into through-
41 out the year. All reports shall be subject to review by the comp-
42 troller at the request of the commissioner.
43 In the event the district plans to reduce budget appropriations for
44 programs restored or created under the comprehensive expenditure
45 plan or the strategic academic and fiscal improvement plan as well
46 as the sale of school buildings or other real property and capital
47 improvement contracts in excess of $100,000, the district shall
48 submit a plan to the commissioner for approval (55949) .............
49 1,000,000 ......................................... (re. $1,000,000)
50 For additional reimbursement to the East Ramapo central school
51 district to support students attending public schools in such
52 district provided that the district is in compliance with the
53 requirements set forth in chapter 89 of the laws of 2016 (55960) ...
54 2,000,000 ......................................... (re. $2,000,000)
55 For services and expenses of independent receivers appointed to manage
56 and operate a failing school or persistently failing school pursuant
1021 12654-10-8
1 to subdivision 2 of section 211-f of the education law, subject to
2 approval of the director of the budget (55961) .....................
3 2,000,000 ......................................... (re. $2,000,000)
4 For services and expenses of community school regional technical
5 assistance centers for the 2017-18 school year. Funds appropriated
6 herein shall be used to operate three regional centers that shall
7 provide technical assistance to school districts establishing or
8 operating community school programs, pursuant to a plan developed by
9 the commissioner and approved by the director of the budget.
10 Provided, further, that such plan shall establish a process for
11 selection of nonprofit entities with expertise in community school
12 programs and technical assistance to operate such centers (55962)
13 ... 1,200,000 ..................................... (re. $1,200,000)
14 For services and expenses of the my brother's keeper initiative. A
15 portion of this appropriation may be transferred to any other
16 program or fund within the state education department for these
17 purposes (55928) ... 18,000,000 .................. (re. $18,000,000)
18 For services and expenses of remaining obligations for the 2016-17
19 school year for support for the operation of targeted prekindergar-
20 ten for those providers not eligible to receive funding pursuant to
21 section 3602-e of the education law and for support for providers
22 continuing to operate such programs in the 2017-18 school year. Such
23 funds shall be expended pursuant to a plan developed by the commis-
24 sioner of education and approved by the director of the budget
25 (21763) ... 1,303,000 ............................. (re. $1,065,000)
26 For services and expenses of remaining obligations of a $14,260,000
27 teacher resources and computer training centers program for the
28 2016-17 school year (55963) ... 4,278,000 ......... (re. $2,622,000)
29 Funds appropriated herein shall be available for services and expenses
30 of a $20,000,000 teacher resources and computer training center
31 program for the 2017-18 school year (23445) ........................
32 14,000,000 ........................................ (re. $9,052,000)
33 For education of children of migrant workers for the 2017-18 school
34 year (21764) ... 89,000 .............................. (re. $89,000)
35 For the school lunch and breakfast program. Funds for the school
36 lunch and breakfast program shall be expended subject to the limita-
37 tion of funds available and may be used to reimburse sponsors of
38 non-profit school lunch, breakfast, or other school child feeding
39 programs based upon the number of federally reimbursable breakfasts
40 and lunches served to students under such program agreements entered
41 into by the state education department and such sponsors, in accord-
42 ance with an act of Congress entitled the "National School Lunch
43 Act," P.L. 79-396, as amended, or the provisions of the "Child
44 Nutrition Act of 1966," P.L. 89-642, as amended, in the case of
45 school breakfast programs to reimburse sponsors in excess of the
46 federal rates of reimbursement. Notwithstanding any provision of law
47 to the contrary, the moneys hereby appropriated, or so much thereof
48 as may be necessary, are to be available for the purposes herein
49 specified for obligations heretofore accrued or hereafter to accrue
50 for the school years beginning July 1, 2015, July 1, 2016 and July
51 1, 2017.
52 Notwithstanding any law, rule or regulation to the contrary, the
53 amount appropriated herein represents the maximum amount payable
54 during the 2017-18 state fiscal year for state reimbursement for
55 school lunch and breakfast programs (21702) ........................
56 34,400,000 ....................................... (re. $29,269,000)
1022 12654-10-8
1 For nonpublic school aid payable in the 2017-18 state fiscal year.
2 Provided that nonpublic schools shall continue to receive aid based
3 on either a 5.0/5.5 hour standard instructional day, or another work
4 day as certified by the nonpublic school officials, in accordance
5 with the methodology for computing salary and benefits applied by
6 the department in paying aid for the 2012-13 and prior school years.
7 Notwithstanding any provision of law, rule or regulation to the
8 contrary, the amount appropriated herein represents the maximum
9 amount payable during the 2017-18 state fiscal year (21769) ........
10 108,382,000 ..................................... (re. $105,915,000)
11 For aid payable for the 2015-16 school year for additional nonpublic
12 school aid. Notwithstanding any inconsistent provision of law, funds
13 appropriated herein shall be available for payment of aid heretofore
14 accrued and hereafter to accrue (21770) ............................
15 72,606,000 ....................................... (re. $14,327,000)
16 For academic intervention for nonpublic schools based on a plan to be
17 developed by the commissioner of education and approved by the
18 director of the budget (21771) ... 922,000 .......... (re. $922,000)
19 For services and expenses related to non-public school STEM programs
20 (55964) ... 5,000,000 ............................. (re. $5,000,000)
21 For additional mandated services and expenses of the costs of comply-
22 ing with the State School Immunization Program (SSIP) for the 2016-
23 17 school year (55965) ... 7,000,000 .............. (re. $7,000,000)
24 For costs associated with schools for the blind and deaf and other
25 students with disabilities subject to article 85 of the education
26 law, including state aid for blind and deaf pupils in certain insti-
27 tutions to be paid for the purposes provided under section 4204-a of
28 the education law for the education of deaf children under 3 years
29 of age, including transfers to the miscellaneous special revenue
30 fund Rome school for the deaf account pursuant to a plan to be
31 developed by the commissioner and approved by the director of the
32 budget.
33 Of the amounts appropriated herein, up to $84,700,000 shall be avail-
34 able for reimbursement to school districts for the tuition costs of
35 students attending schools for the blind and deaf during the 2016-17
36 school year pursuant to subdivision 2 of section 4204 of the educa-
37 tion law and subdivision 2 of section 4207 of the education law, up
38 to $2,500,000 shall be available for debt service on capital
39 construction projects financed through the state dormitory authori-
40 ty, and up to $9,000,000 shall be available for remaining allowable
41 purposes.
42 Provided further that, notwithstanding any inconsistent provision of
43 law, upon disbursement of funds appropriated for allowances to
44 schools for the blind and deaf in the individuals with disabilities
45 program special revenue funds-federal/aid to localities for purposes
46 of this appropriation, funds appropriated herein shall be reduced in
47 an amount equivalent to such disbursement and the portion of this
48 appropriation so affected shall have no further force or effect.
49 Notwithstanding any provision of the law to the contrary, funds appro-
50 priated herein shall be available for payment of liabilities hereto-
51 fore accrued or hereafter to accrue and, subject to the approval of
52 the director of the budget, such funds shall be available to the
53 department net of disallowances, refunds, reimbursements and credits
54 (21705) ... 96,200,000 ............................ (re. $4,951,000)
55 For costs associated with schools for the blind and deaf and other
56 students with disabilities subject to article 85 of the education
1023 12654-10-8
1 law for the 2017-18 school year. Funds appropriated herein shall be
2 distributed directly to the schools for the blind and deaf and other
3 students with disabilities subject to article 85 of the education
4 law based on a three year average of the schools' FTE enrollment
5 (55909) ... 4,600,000 ............................. (re. $4,600,000)
6 For additional costs associated with schools for the blind and deaf
7 and other students with disabilities subject to article 85 of the
8 education law for the 2017-18 school year. Funds appropriated herein
9 shall be distributed directly to the schools for the blind and deaf
10 and other student with disabilities subject to article 85 of the
11 education law based on a three year average of the schools' FTE
12 enrollment ... 2,300,000 .......................... (re. $2,300,000)
13 For July and August programs for school-aged children with handicap-
14 ping conditions pursuant to section 4408 of the education law.
15 Moneys appropriated herein shall be used as follows: (i) for remain-
16 ing base year and prior school years obligations, (ii) for the
17 purposes of subdivision 4 of section 3602 of the education law for
18 schools operated under articles 87 and 88 of the education law, and
19 (iii) notwithstanding any inconsistent provision of law, for
20 payments made pursuant to this appropriation for current school year
21 obligations, provided, however, that such payments shall not exceed
22 70 percent of the state aid due for the sum of the approved tuition
23 and maintenance rates and transportation expense provided for here-
24 in; provided, however, that payment of eligible claims shall be
25 payable in the order that such claims have been approved for payment
26 by the commissioner of education, but in no case shall a single
27 payee draw down more than 45 percent of this appropriation, and
28 provided further that no claim shall be set aside for insufficiency
29 of funds to make a complete payment, but shall be eligible for a
30 partial payment in one year and shall retain its priority date
31 status for subsequent appropriations designated for such purposes.
32 Notwithstanding any inconsistent provision of law to the contrary,
33 funds appropriated herein shall only be available for liabilities
34 incurred prior to July 1, 2018, shall be used to pay 2016-17 school
35 year claims in the first instance, and represent the maximum amount
36 payable during the 2017-18 state fiscal year. Notwithstanding any
37 provision of law to the contrary, funds appropriated herein shall be
38 available for payment of liabilities heretofore accrued or hereafter
39 to accrue and, subject to the approval of the director of the budg-
40 et, such funds shall be available to the department net of disallow-
41 ances, refunds, reimbursements and credits (21707) .................
42 364,500,000 ..................................... (re. $288,163,000)
43 For the state's share of the costs of the education of preschool chil-
44 dren with disabilities pursuant to section 4410 of the education
45 law. Notwithstanding any inconsistent provision of law to the
46 contrary, the amount appropriated herein shall support a state share
47 of preschool handicapped education costs for the 2016-17 school year
48 limited to 59.5 percent of such total approved expenditures, and
49 furthermore, notwithstanding any other provision of law, local
50 claims for reimbursement of costs incurred prior to the 2015-16
51 school year and during the 2015-16 school year that have been
52 approved for payment by the education department as of March 31,
53 2017 shall be the first claims paid from this appropriation.
54 Notwithstanding any provision of law to the contrary, funds appro-
55 priated herein shall be available for payment of liabilities hereto-
56 fore accrued or hereafter to accrue and, subject to the approval of
1024 12654-10-8
1 the director of the budget, such funds shall be available to the
2 department net of disallowances, refunds, reimbursements and credits
3 (21706) ... 1,035,000,000 ....................... (re. $292,534,000)
4 Notwithstanding any inconsistent provision of law, funding made avail-
5 able by this appropriation shall support direct salary costs and
6 related fringe benefits associated with any minimum wage increase
7 that takes effect on or after December 31, 2016, pursuant to section
8 652 of the labor law. Organizations eligible for funding made avail-
9 able by this appropriation shall be limited to special act school
10 districts and those that are required to file a consolidated fiscal
11 report with the state education department and provide preschool and
12 school-age special education services under articles 81, 85 and 89
13 of the education law. Each eligible organization in receipt of fund-
14 ing made available by this appropriation shall submit written
15 certification, in such form and at such time as the commissioner
16 shall prescribe, attesting to how such funding will be or was used
17 for purposes eligible under this appropriation. Notwithstanding any
18 inconsistent provision of law, and subject to the approval of the
19 director of the budget, the amounts appropriated herein may be
20 increased or decreased by interchange or transfer to any local
21 assistance appropriation of the state education department (55938)
22 ... 6,200,000 ..................................... (re. $6,200,000)
23 For services and expenses of the New York state center for school
24 safety for the 2017-18 school year. Funds appropriated herein shall
25 be used to operate a statewide center and shall be subject to an
26 expenditure plan approved by the director of the budget (21774) ....
27 466,000 ............................................. (re. $466,000)
28 For services and expenses of the health education program for the
29 2017-18 school year. Funds appropriated herein shall be available
30 for health-related programs including, but not limited to, those
31 providing instruction and supportive services in comprehensive
32 health education and/or acquired immune deficiency syndrome (AIDS)
33 education. Of the amounts appropriated herein, $86,000 shall be
34 available for the program previously operated as the school health
35 demonstration program. Notwithstanding any other provision of law to
36 the contrary, funds appropriated herein may be suballocated, subject
37 to the approval of the director of the budget, to any state agency
38 or department to accomplish the purpose of this appropriation
39 (21775) ... 691,000 ................................. (re. $466,000)
40 For competitive grants for the 2017-18 school year for extended day
41 programs and school violence prevention programs pursuant to section
42 2814 of the education law provided, however, notwithstanding any
43 inconsistent provisions of law, eligible entities receiving funds
44 for extended day programs may include not-for-profit organizations
45 working in collaboration with a public school or school district
46 (21776) ... 24,344,000 ........................... (re. $23,671,000)
47 For aid payable for the 2017-18 school year for support of county
48 vocational education and extension boards pursuant to section 1104
49 of the education law, provided, however, that notwithstanding any
50 inconsistent provision of law, rule, or regulation, any apportion-
51 ment of aid shall be based on a quota amounting to one-half of the
52 salary paid each teacher, director, assistant, and supervisor, where
53 such salary is attributable to a course of study first submitted to
54 the commissioner for approval pursuant to section 1103 of the educa-
55 tion law on or before July 1, 2010, but not to exceed the amount
56 computed by the commissioner based upon an assumed annualized salary
1025 12654-10-8
1 equal to ten thousand five hundred dollars per school year on
2 account of the employment of such teacher, director, assistant or
3 supervisor and provided further that payment from this appropriation
4 shall first be made for approved claims for salary expenses for the
5 2017-18 school year, and any amount remaining after payment of such
6 claims shall be available for payment of unpaid claims for prior
7 school years (21781) ... 932,000 ... ................ (re. $805,000)
8 For services and expenses of the primary mental health project at the
9 children's institute for the 2017-18 school year (21778) ...........
10 894,000 ............................................. (re. $412,000)
11 For services and expenses associated with the math and science high
12 schools for the 2017-18 school year in the amount of $1,382,000,
13 provided that such funds shall be allocated equally among those
14 entities that received program funding for the 2007-08 school year
15 (21779) ... 1,382,000 ............................. (re. $1,037,000)
16 For additional services and expenses associated with the Bard High
17 School Early College Queens for the 2017-18 school year ............
18 461,000 ............................................. (re. $461,000)
19 Funds appropriated herein shall be available for educational services
20 and expenses of the Syracuse city school district for the say yes to
21 education program (21800) ... 350,000 ............... (re. $350,000)
22 For services and expenses of the center for autism and related disa-
23 bilities at the state university of New York at Albany (21782) .....
24 740,000 ............................................. (re. $740,000)
25 For additional services and expenses of the center for autism and
26 related disabilities at the state university of New York at Albany
27 ... 500,000 ......................................... (re. $500,000)
28 For postsecondary aid to Native Americans to fund awards to eligible
29 students. Notwithstanding any other provision of law to the contra-
30 ry, the amount herein made available shall constitute the state's
31 entire obligation for all costs incurred under section 4118 of the
32 education law in state fiscal year 2017-18 (21833) .................
33 598,000 ............................................. (re. $431,000)
34 For additional grants in aid to certain school districts, public
35 libraries, and not-for-profit institutions. Notwithstanding section
36 24 of the state finance law or any provision of law to the contrary,
37 funds from this appropriation shall be allocated only pursuant to a
38 plan (i) approved by the speaker of the assembly and the director of
39 the budget which sets forth either in an itemized list of grantees
40 with the amount to be received by each, or the methodology for allo-
41 cating such appropriation, and (ii) which is thereafter included in
42 an assembly resolution calling for the expenditure of such funds,
43 which resolution must be approved by a majority vote of all members
44 elected to the assembly upon a roll call vote ......................
45 590,000 ............................................. (re. $590,000)
46 For additional grants in aid to certain school districts, public
47 libraries, and not-for-profit institutions. Notwithstanding section
48 24 of the state finance law or any provision of law to the contrary,
49 funds from this appropriation shall be allocated only pursuant to a
50 plan (i) approved by the temporary president of the senate and the
51 director of the budget which sets forth either in an itemized list
52 of grantees with the amount to be received by each, or the methodol-
53 ogy for allocating such appropriation, and (ii) which is thereafter
54 included in a senate resolution calling for the expenditure of such
55 funds, which resolution must be approved by a majority vote of all
1026 12654-10-8
1 members elected to the senate upon a roll call vote ................
2 18,579,000 ........................................ (re. $8,072,000)
3 For services and expenses of the summer food program for the 2017-18
4 school year (21784) ... 3,049,000 ................... (re. $190,000)
5 Work Force Education. For partial reimbursement of services and
6 expenses per contract hour of work force education conducted by the
7 consortium for worker education (CWE), a private not-for-profit
8 corporation program approved by the commissioner of education that
9 enable adults who are 21 years of age or older to obtain or retain
10 employment or improve their work skills capacity to enhance their
11 opportunities for increased earnings and advancement (21801) .......
12 11,500,000 ........................................ (re. $5,310,000)
13 For the early college high schools program for the 2017-18 school
14 year, provided, however, that expenditure of funds appropriated
15 herein shall support the continuation and expansion of the early
16 college high schools program pursuant to a plan developed by the
17 commissioner and approved by the director of the budget provided,
18 further, that a portion of the payment to the early college high
19 schools program awarded from this appropriation shall be available
20 on a sliding scale based upon the number of college credits earned
21 annually by participating students consistent with guidelines estab-
22 lished by the commissioner. Provided further that, notwithstanding
23 any provision of law to the contrary, higher education partners
24 participating in an early college high schools program, or the
25 entity/entities responsible for setting tuition at the institution,
26 shall be authorized to set a reduced rate of tuition and/or fees, or
27 to waive tuition and/or fees entirely, for students enrolled in such
28 early college high schools program with no reduction in other state,
29 local or other support for such students earning college credit that
30 such higher education partner would otherwise be eligible to receive
31 (56139) ... 1,465,000 ............................. (re. $1,465,000)
32 For services and expenses of a $490,000 2017-18 school year program
33 for mentoring and tutoring operated by the Hillside Work-Scholarship
34 Connection program, which is based on model programs proven to be
35 effective in producing outcomes that include, but are not limited
36 to, improved graduation rates, provided that such services shall be
37 provided to students in one or more city school districts located in
38 a city having a population in excess of 125,000 and less than
39 1,000,000 inhabitants (21804) ... 490,000 ........... (re. $490,000)
40 For payment of small government assistance to school districts pursu-
41 ant to subdivision 7 of section 3641 of the education law on or
42 before March 31, 2018 upon audit and warrant of the comptroller in
43 the amount that small government assistance was paid to school
44 districts in state fiscal year 2010-11 (23449) .....................
45 1,868,000 ............................................. (re. $1,000)
46 For services and expenses of the New York City Community Learning
47 Schools Initiative ... 500,000 ...................... (re. $500,000)
48 For services and expenses of the Executive Leadership Institute ...
49 475,000 ............................................. (re. $475,000)
50 For purposes of the Just for Kids program at the State University of
51 New York at Albany (56005) ... 235,000 .............. (re. $235,000)
52 For Services and Expenses of Humanities New York .....................
53 200,000 ............................................. (re. $200,000)
54 For educational services and expenses for DACA (Deferred Action for
55 Childhood Arrivals) eligible out of school youth and young adults
56 (56045) ... 1,000,000 ............................. (re. $1,000,000)
1027 12654-10-8
1 For services and expenses of the Consortium for Workforce Education
2 Credential Initiative (55967) ... 250,000 ........... (re. $250,000)
3 The appropriation made by chapter 53, section 1, of the laws of 2017, as
4 added by chapter 50, section 2, of the laws of 2017, is hereby
5 amended and reappropriated to read:
6 [For] Fenimore Art Museum for services and expenses of National Histo-
7 ry Day ... 125,000 .................................. (re. $125,000)
8 For [grants to school districts] services and expenses to subsidize
9 the remaining cost of advanced placement exam fees for low-income
10 students, as determined by free and reduced price lunch eligibility,
11 pursuant to a plan developed by the commissioner of education and
12 approved by the director of the budget[, provided such grants shall
13 only be made available to provide a state match to federal title IV
14 funds pursuant to the elementary and secondary education act or
15 other sources of federal or local funding].
16 Notwithstanding any provision of law to the contrary, the funds appro-
17 priated herein, plus any other amounts so designated in other items
18 of appropriation within the general fund local assistance account
19 office of pre-kindergarten through grade twelve education program,
20 shall constitute the competitive awards amount authorized for the
21 2017-18 school year (55952) ... 2,000,000 ......... (re. $2,000,000)
22 By chapter 53, section 1, of the laws of 2016:
23 For the New York City School District to provide assistance targeted
24 toward middle school students who would qualify for the free and
25 reduced price lunch program for the Specialized High School Admis-
26 sion Test in the 2016-17 school year, provided that $250,000 of the
27 amount appropriated herein shall be awarded to the Brooklyn Tech
28 Alumni Foundation for the purposes of increasing the number of
29 underrepresented populations in such schools through test prepara-
30 tion and other support programs (55935) ............................
31 1,000,000 ........................................... (re. $188,000)
32 For the New York City Department of Education to distribute $350,000
33 among specialized high schools requiring the Specialized High
34 Schools Admissions Test for admission to fund outreach coordinators
35 with relevant outreach material at each specialized high school to
36 conduct outreach in underrepresented middle schools, and that
37 $650,000 of the amount appropriated herein shall be distributed
38 among specialized high schools requiring the Specialized High
39 Schools Admissions Test to provide middle school students from
40 underrepresented populations at such schools test preparatory
41 programs in preparation for the Specialized High School Admissions
42 Test in the 2016-2017 school year (55936) ..........................
43 1,000,000 ......................................... (re. $1,000,000)
44 For reimbursement of supplemental basic tuition payments to charter
45 schools made by school districts in the 2015-16 school year, as
46 defined by paragraph a of subdivision 1 of section 2856 of the
47 education law (55907) ... 42,400,000 ................ (re. $685,000)
48 For additional grants in aid to certain school districts, public
49 libraries, and not-for-profit institutions. Notwithstanding any
50 provision of law to the contrary, this appropriation shall be allo-
51 cated only pursuant to a plan setting forth an itemized list of
52 grantees with the amount to be received by each, or the methodology
53 for allocating this appropriation. Such plan shall be subject to the
54 approval of the temporary president of the senate and the director
1028 12654-10-8
1 of the budget and thereafter shall be included in a resolution call-
2 ing for the expenditure of such monies, which resolution must be
3 approved by a majority vote of all members elected to the senate
4 upon a roll call vote. Provided, however, that funds appropriated
5 herein shall be made available on or after April 1, 2017. Notwith-
6 standing section 40 of the state finance law or any provision of law
7 to the contrary, this appropriation shall lapse on March 31, 2018
8 ... 54,820,000 ........................................ (re. $2,000)
9 For community schools grants to school districts with schools desig-
10 nated by the commissioner of education pursuant to paragraphs a or b
11 of subdivision 1 of section 211-f of the education law throughout
12 the 2016-17 school year to support the operating and capital costs
13 associated with the transformation of such schools into community
14 hubs to deliver co-located or school-linked academic, health, mental
15 health, nutrition, counseling, legal and/or other services to
16 students and their families, including but not limited to providing
17 a community school site coordinator, improving parent engagement,
18 providing early childhood education programs, offering professional
19 development specific to the unique needs of students and their fami-
20 lies enrolled in a community school, conducting community-wide needs
21 assessments, creating a steering committee made up of various school
22 and community stakeholders to provide feedback and guidance, and
23 constructing or renovating spaces within such school buildings to
24 serve as health suites, adult education spaces, guidance suites,
25 resource rooms, remedial rooms, parent/community rooms, and career
26 and technical education classrooms. Provided that such grants shall
27 be awarded pursuant to a plan developed by the commissioner of
28 education and approved by the director of the budget. Provided
29 further the commissioner shall promulgate regulations that set forth
30 the requirements for use of such grants including, but not limited
31 to, requiring that such school districts demonstrate substantial
32 parent, teacher, and community engagement in the planning, implemen-
33 tation and operation of a community school. Provided further that of
34 the amount hereby appropriated, $50,000,000 shall support such oper-
35 ating costs and $25,000,000 shall support such capital costs.
36 Provided further that notwithstanding any inconsistent provision of
37 law, any portion of the funds hereby appropriated may be transferred
38 or suballocated without limit by the director of the budget to any
39 other program or fund within the state education department to
40 accomplish the intent of this appropriation (55932) ................
41 75,000,000 ....................................... (re. $75,000,000)
42 For services and expenses of the my brother's keeper initiative. A
43 portion of this appropriation may be transferred to any other
44 program or fund within the state education department for these
45 purposes (55928) ... 18,000,000 .................. (re. $13,179,000)
46 For services and expenses of remaining obligations of a $14,260,000
47 teacher resources and computer training centers program for the
48 2015-16 school year (55927) ... 4,278,000 ........... (re. $712,000)
49 Funds appropriated herein shall be available for services and expenses
50 of a $14,260,000 teacher resources and computer training center
51 program for the 2016-17 school year (23445) ........................
52 9,982,000 ............................................. (re. $4,000)
53 For nonpublic school aid payable in the 2016-17 state fiscal year.
54 Provided that nonpublic schools shall continue to receive aid based
55 on either a 5.0/5.5 hour standard instructional day, or another work
56 day as certified by the nonpublic school officials, in accordance
1029 12654-10-8
1 with the methodology for computing salary and benefits applied by
2 the department in paying aid for the 2012-13 and prior school years.
3 Notwithstanding any provision of law, rule or regulation to the
4 contrary, the amount appropriated herein represents the maximum
5 amount payable during the 2016-17 state fiscal year (21769) ........
6 104,214,000 .......................................... (re. $56,000)
7 For aid payable for the 2014-15 school year for additional nonpublic
8 school aid. Notwithstanding any inconsistent provision of law, funds
9 appropriated herein shall be available for payment of aid heretofore
10 accrued and hereafter to accrue (21770) ............................
11 69,813,000 ........................................ (re. $6,038,000)
12 Notwithstanding any inconsistent provision of law, for additional
13 nonpublic school aid, provided, however, that none of the funds
14 appropriated herein shall be made available until April 1, 2017.
15 Notwithstanding any inconsistent provision of law, funds appropri-
16 ated herein shall be available for payment of aid heretofore accrued
17 and hereafter to accrue. Notwithstanding section 40 of the state
18 finance law or any provision of law to the contrary, this appropri-
19 ation shall remain in full force and effect to the maximum extent
20 allowed by law (55937) ... 60,000,000 ............ (re. $60,000,000)
21 For academic intervention for nonpublic schools based on a plan to be
22 developed by the commissioner of education and approved by the
23 director of the budget (21771) ... 922,000 .......... (re. $922,000)
24 For costs associated with schools for the blind and deaf and other
25 students with disabilities subject to article 85 of the education
26 law, including state aid for blind and deaf pupils in certain insti-
27 tutions to be paid for the purposes provided under section 4204-a of
28 the education law for the education of deaf children under 3 years
29 of age, including transfers to the miscellaneous special revenue
30 fund Rome school for the deaf account pursuant to a plan to be
31 developed by the commissioner and approved by the director of the
32 budget.
33 Of the amounts appropriated herein, up to $84,700,000 shall be avail-
34 able for reimbursement to school districts for the tuition costs of
35 students attending schools for the blind and deaf during the 2015-16
36 school year pursuant to subdivision 2 of section 4204 of the educa-
37 tion law and subdivision 2 of section 4207 of the education law, up
38 to $2,500,000 shall be available for debt service on capital
39 construction projects financed through the state dormitory authori-
40 ty, and up to $9,000,000 shall be available for remaining allowable
41 purposes.
42 Provided further that, notwithstanding any inconsistent provision of
43 law, upon disbursement of funds appropriated for allowances to
44 schools for the blind and deaf in the individuals with disabilities
45 program special revenue funds-federal/aid to localities for purposes
46 of this appropriation, funds appropriated herein shall be reduced in
47 an amount equivalent to such disbursement and the portion of this
48 appropriation so affected shall have no further force or effect.
49 Notwithstanding any provision of the law to the contrary, funds appro-
50 priated herein shall be available for payment of liabilities hereto-
51 fore accrued or hereafter to accrue and, subject to the approval of
52 the director of the budget, such funds shall be available to the
53 department net of disallowances, refunds, reimbursements and credits
54 (21705) ... 96,200,000 ............................ (re. $5,534,000)
55 For July and August programs for school-aged children with handicap-
56 ping conditions pursuant to section 4408 of the education law.
1030 12654-10-8
1 Moneys appropriated herein shall be used as follows: (i) for remain-
2 ing base year and prior school years obligations, (ii) for the
3 purposes of subdivision 4 of section 3602 of the education law for
4 schools operated under articles 87 and 88 of the education law, and
5 (iii) notwithstanding any inconsistent provision of law, for
6 payments made pursuant to this appropriation for current school year
7 obligations, provided, however, that such payments shall not exceed
8 70 percent of the state aid due for the sum of the approved tuition
9 and maintenance rates and transportation expense provided for here-
10 in; provided, however, that payment of eligible claims shall be
11 payable in the order that such claims have been approved for payment
12 by the commissioner of education, but in no case shall a single
13 payee draw down more than 45 percent of this appropriation, and
14 provided further that no claim shall be set aside for insufficiency
15 of funds to make a complete payment, but shall be eligible for a
16 partial payment in one year and shall retain its priority date
17 status for subsequent appropriations designated for such purposes.
18 Notwithstanding any inconsistent provision of law to the contrary,
19 funds appropriated herein shall only be available for liabilities
20 incurred prior to July 1, 2017, shall be used to pay 2015-16 school
21 year claims in the first instance, and represent the maximum amount
22 payable during the 2016-17 state fiscal year. Notwithstanding any
23 provision of law to the contrary, funds appropriated herein shall be
24 available for payment of liabilities heretofore accrued or hereafter
25 to accrue and, subject to the approval of the director of the budg-
26 et, such funds shall be available to the department net of disallow-
27 ances, refunds, reimbursements and credits (21707) .................
28 364,500,000 ...................................... (re. $11,500,000)
29 For the state's share of the costs of the education of preschool chil-
30 dren with disabilities pursuant to section 4410 of the education
31 law. Notwithstanding any inconsistent provision of law to the
32 contrary, the amount appropriated herein shall support a state share
33 of preschool handicapped education costs for the 2015-16 school year
34 limited to 59.5 percent of such total approved expenditures, and
35 furthermore, notwithstanding any other provision of law, local
36 claims for reimbursement of costs incurred prior to the 2014-15
37 school year and during the 2014-15 school year that have been
38 approved for payment by the education department as of March 31,
39 2016 shall be the first claims paid from this appropriation.
40 Notwithstanding any provision of law to the contrary, funds appro-
41 priated herein shall be available for payment of liabilities hereto-
42 fore accrued or hereafter to accrue and, subject to the approval of
43 the director of the budget, such funds shall be available to the
44 department net of disallowances, refunds, reimbursements and credits
45 (21706) ... 1,035,000,000 ....................... (re. $156,498,000)
46 Notwithstanding any inconsistent provision of law, funding made avail-
47 able by this appropriation shall support direct salary costs and
48 related fringe benefits associated with any minimum wage increase
49 that takes effect during the 2016-17 state fiscal year, pursuant to
50 section 652 of the labor law. Organizations eligible for funding
51 made available by this appropriation shall be limited to special act
52 school districts and those that are required to file a consolidated
53 fiscal report with the state education department and provide
54 preschool and school-age special education services under articles
55 81, 85 and 89 of the education law. Each eligible organization in
56 receipt of funding made available by this appropriation shall submit
1031 12654-10-8
1 written certification, in such form and at such time as the commis-
2 sioner shall prescribe, attesting to how such funding will be or was
3 used for purposes eligible under this appropriation. Notwithstanding
4 any inconsistent provision of law, and subject to the approval of
5 the director of the budget, the amounts appropriated herein may be
6 increased or decreased by interchange or transfer without limit to
7 any local assistance appropriation of the state education department
8 (55938) ... 1,100,000 ............................. (re. $1,100,000)
9 For services and expenses of the New York state center for school
10 safety for the 2016-17 school year. Funds appropriated herein shall
11 be used to operate a statewide center and shall be subject to an
12 expenditure plan approved by the director of the budget (21774) ....
13 466,000 ............................................. (re. $107,000)
14 For services and expenses of the health education program for the
15 2016-17 school year. Funds appropriated herein shall be available
16 for health-related programs including, but not limited to, those
17 providing instruction and supportive services in comprehensive
18 health education and/or acquired immune deficiency syndrome (AIDS)
19 education. Of the amounts appropriated herein, $86,000 shall be
20 available for the program previously operated as the school health
21 demonstration program. Notwithstanding any other provision of law to
22 the contrary, funds appropriated herein may be suballocated, subject
23 to the approval of the director of the budget, to any state agency
24 or department to accomplish the purpose of this appropriation
25 (21775) ... 691,000 ................................. (re. $200,000)
26 For competitive grants for the 2016-17 school year for extended day
27 programs and school violence prevention programs pursuant to section
28 2814 of the education law provided, however, notwithstanding any
29 inconsistent provisions of law, eligible entities receiving funds
30 for extended day programs may include not-for-profit organizations
31 working in collaboration with a public school or school district
32 (21776) ... 24,344,000 ............................ (re. $6,191,000)
33 For services and expenses of the primary mental health project at the
34 children's institute for the 2016-17 school year (21778) ...........
35 894,000 ............................................. (re. $132,000)
36 For services and expenses associated with the math and science high
37 schools for the 2016-17 school year in the amount of $1,382,000,
38 provided that such funds shall be allocated equally among those
39 entities that received program funding for the 2007-08 school year
40 (21779) ... 1,382,000 ............................... (re. $170,000)
41 For additional services and expenses for math and science high schools
42 associated with the Bard High School Early College Queens for the
43 2016-17 school year (55939) ... 461,000 .............. (re. $16,000)
44 Funds appropriated herein shall be available for educational services
45 and expenses of the Syracuse city school district for the say yes to
46 education program (21800) ... 350,000 ............... (re. $315,000)
47 For additional grants in aid to certain school districts, public
48 libraries, and not-for-profit institutions. Notwithstanding section
49 twenty-four of the state finance law or any provision of law to the
50 contrary, funds from this appropriation shall be allocated only
51 pursuant to a plan (i) approved by the temporary president of the
52 Senate and the director of the budget which sets forth either an
53 itemized list of grantees with the amount to be received by each, or
54 the methodology for allocating such appropriation, and (ii) which is
55 thereafter included in a senate resolution calling for the expendi-
56 ture of such funds, which resolution must be approved by a majority
1032 12654-10-8
1 vote of all members elected to the senate upon a roll call vote ...
2 24,995,000 ........................................ (re. $4,065,000)
3 For services and expenses of the center for autism and related disa-
4 bilities at the state university of New York at Albany (21782) .....
5 740,000 ............................................. (re. $430,000)
6 For services and expenses of the summer food program for the 2016-17
7 school year (21784) ... 3,049,000 ..................... (re. $4,000)
8 For the early college high schools program for the 2016-17 school
9 year, provided, however, that expenditure of funds appropriated
10 herein shall support the continuation and expansion of the early
11 college high schools program pursuant to a plan developed by the
12 commissioner and approved by the director of the budget provided,
13 further, that a portion of the payment to the early college high
14 schools program awarded from this appropriation shall be available
15 on a sliding scale based upon the number of college credits earned
16 annually by participating students consistent with guidelines estab-
17 lished by the commissioner. Provided further that, notwithstanding
18 any provision of law to the contrary, higher education partners
19 participating in an early college high schools program, or the
20 entity/entities responsible for setting tuition at the institution,
21 shall be authorized to set a reduced rate of tuition and/or fees, or
22 to waive tuition and/or fees entirely, for students enrolled in such
23 early college high schools program with no reduction in other state,
24 local or other support for such students earning college credit that
25 such higher education partner would otherwise be eligible to receive
26 (56139) ... 1,465,000 ............................. (re. $1,137,000)
27 For services and expenses of a $490,000 2016-17 school year program
28 for mentoring and tutoring operated by the Hillside Work-Scholarship
29 Connection program, which is based on model programs proven to be
30 effective in producing outcomes that include, but are not limited
31 to, improved graduation rates, provided that such services shall be
32 provided to students in one or more city school districts located in
33 a city having a population in excess of 125,000 and less than
34 1,000,000 inhabitants (21804) ... 490,000 ........... (re. $490,000)
35 For services and expenses of the Executive Leadership Institute ...
36 475,000 ............................................. (re. $357,000)
37 For payment of small government assistance to school districts pursu-
38 ant to subdivision 7 of section 3641 of the education law on or
39 before March 31, 2017 upon audit and warrant of the comptroller in
40 the amount that small government assistance was paid to school
41 districts in state fiscal year 2010-11 (23449) .....................
42 1,868,000 ............................................. (re. $1,000)
43 For services and expenses of the New York City Community Learning
44 Schools initiative ... 750,000 ...................... (re. $750,000)
45 For the purpose of offsetting advanced placement fees for economically
46 disadvantaged students (55940) ... 500,000 .......... (re. $500,000)
47 For purposes of the Just for Kids program at the State University of
48 New York at Albany (56005) ... 235,000 .............. (re. $235,000)
49 For educational services and expenses for DACA (Deferred Action for
50 Childhood Arrivals) eligible out of school youth and young adults
51 (56045) ... 1,000,000 ............................. (re. $1,000,000)
52 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
53 section 1, of the laws of 2015:
54 For reimbursement of supplemental basic tuition payments to charter
55 schools made by school districts in the 2014-15 school year, as
1033 12654-10-8
1 defined by paragraph a of subdivision 1 of section 2856 of the
2 education law ... 28,260,000 ........................ (re. $442,000)
3 For services and expenses of remaining obligations of a $14,260,000
4 teacher resources and computer training centers program for the
5 2014-15 school year (21712) ... 4,278,000 ........... (re. $319,000)
6 Funds appropriated herein shall be available for services and expenses
7 of a $14,260,000 teacher resources and computer training center
8 program for the 2015-16 school year (23445) ........................
9 9,982,000 ............................................ (re. $36,000)
10 For aid payable for the 2013-14 school year for additional nonpublic
11 school aid. Notwithstanding any inconsistent provision of law, funds
12 appropriated herein shall be available for payment of aid heretofore
13 accrued and hereafter to accrue (21770) ............................
14 47,374,000 ........................................ (re. $1,492,000)
15 For aid payable for additional nonpublic school aid. Notwithstanding
16 any inconsistent provision of law, funds appropriated herein shall
17 be used as part of a multi-year plan recommended by the commissioner
18 to address the prior year liabilities for the Comprehensive Attend-
19 ance Policy program and providing that reimbursement of expenses
20 beginning for the 2011-12 school year shall be calculated based on
21 the parameters used to generate claims for the 2005-06 school year
22 (55908) ... 5,000,000 ............................. (re. $3,541,000)
23 For academic intervention for nonpublic schools based on a plan to be
24 developed by the commissioner of education and approved by the
25 director of the budget (21771) ... 922,000 .......... (re. $922,000)
26 For costs associated with schools for the blind and deaf and other
27 students with disabilities subject to article 85 of the education
28 law, including state aid for blind and deaf pupils in certain insti-
29 tutions to be paid for the purposes provided under section 4204-a of
30 the education law for the education of deaf children under 3 years
31 of age, including transfers to the miscellaneous special revenue
32 fund Rome school for the deaf account pursuant to a plan to be
33 developed by the commissioner and approved by the director of the
34 budget.
35 Of the amounts appropriated herein, up to $84,700,000 shall be avail-
36 able for reimbursement to school districts for the tuition costs of
37 students attending schools for the blind and deaf during the 2014-15
38 school year pursuant to subdivision 2 of section 4204 of education
39 law and subdivision 2 of section 4207 of the education law, up to
40 $2,500,000 shall be available for debt service on capital
41 construction projects financed through the state dormitory authori-
42 ty, and up to $9,000,000 shall be available for remaining allowable
43 purposes.
44 Provided further that, notwithstanding any inconsistent provision of
45 law, upon disbursement of funds appropriated for allowances to
46 schools for the blind and deaf in the individuals with disabilities
47 program special revenue funds-federal/aid to localities for purposes
48 of this appropriation, funds appropriated herein shall be reduced in
49 an amount equivalent to such disbursement and the portion of this
50 appropriation so affected shall have no further force or effect.
51 Notwithstanding any provision of the law to the contrary, funds appro-
52 priated herein shall be available for payment of liabilities hereto-
53 fore accrued or hereafter to accrue and, subject to the approval of
54 the director of the budget, such funds shall be available to the
55 department net of disallowances, refunds, reimbursements and credits
56 ... 96,200,000 .................................... (re. $3,763,000)
1034 12654-10-8
1 For services and expenses of the Henry Viscardi School for the 2015-16
2 School Year ... 903,000 .............................. (re. $73,000)
3 For July and August programs for school-aged children with handicap-
4 ping conditions pursuant to section 4408 of the education law.
5 Moneys appropriated herein shall be used as follows: (i) for remain-
6 ing base year and prior school years obligations, (ii) for the
7 purposes of subdivision 4 of section 3602 of the education law for
8 schools operated under articles 87 and 88 of the education law, and
9 (iii) notwithstanding any inconsistent provision of law, for
10 payments made pursuant to this appropriation for current school year
11 obligations, provided, however, that such payments shall not exceed
12 70 percent of the state aid due for the sum of the approved tuition
13 and maintenance rates and transportation expense provided for here-
14 in; provided, however, that payment of eligible claims shall be
15 payable in the order that such claims have been approved for payment
16 by the commissioner of education, but in no case shall a single
17 payee draw down more than 45 percent of this appropriation, and
18 provided further that no claim shall be set aside for insufficiency
19 of funds to make a complete payment, but shall be eligible for a
20 partial payment in one year and shall retain its priority date
21 status for subsequent appropriations designated for such purposes.
22 Notwithstanding any inconsistent provision of law to the contrary,
23 funds appropriated herein shall only be available for liabilities
24 incurred prior to July 1, 2016, shall be used to pay 2014-15 school
25 year claims in the first instance, and represent the maximum amount
26 payable during the 2015-16 state fiscal year. Notwithstanding any
27 provision of law to the contrary, funds appropriated herein shall be
28 available for payment of liabilities heretofore accrued or hereafter
29 to accrue and, subject to the approval of the director of the budg-
30 et, such funds shall be available to the department net of disallow-
31 ances, refunds, reimbursements and credits .........................
32 364,500,000 ...................................... (re. $11,500,000)
33 For the state's share of the costs of the education of preschool chil-
34 dren with disabilities pursuant to section 4410 of the education
35 law. Notwithstanding any inconsistent provision of law to the
36 contrary, the amount appropriated herein shall support a state share
37 of preschool handicapped education costs for the 2014-15 school year
38 limited to 59.5 percent of such total approved expenditures, and
39 furthermore, notwithstanding any other provision of law, local
40 claims for reimbursement of costs incurred prior to the 2013-14
41 school year and during the 2013-14 school year that have been
42 approved for payment by the education department as of March 31,
43 2015 shall be the first claims paid from this appropriation,
44 provided further that, notwithstanding any provision of law to the
45 contrary, no single payee may draw down more than 51 percent of this
46 appropriation, however, in the event that no other payees' claims
47 received during the current state fiscal year are approved for
48 payment by the commissioner and remain outstanding as of February 1,
49 2016, such limitation shall not apply. Notwithstanding any provision
50 of law to the contrary, funds appropriated herein shall be available
51 for payment of liabilities heretofore accrued or hereafter to accrue
52 and, subject to the approval of the director of the budget, such
53 funds shall be available to the department net of disallowances,
54 refunds, reimbursements and credits ................................
55 1,020,000,000 ................................... (re. $146,504,000)
1035 12654-10-8
1 For services and expenses of the New York state center for school
2 safety for the 2015-16 school year. Funds appropriated herein shall
3 be used to operate a statewide center and shall be subject to an
4 expenditure plan approved by the director of the budget (21774) ....
5 466,000 .............................................. (re. $40,000)
6 For services and expenses of the health education program for the
7 2015-16 school year. Funds appropriated herein shall be available
8 for health-related programs including, but not limited to, those
9 providing instruction and supportive services in comprehensive
10 health education and/or acquired immune deficiency syndrome (AIDS)
11 education. Of the amounts appropriated herein, $86,000 shall be
12 available for the program previously operated as the school health
13 demonstration program. Notwithstanding any other provision of law to
14 the contrary, funds appropriated herein may be suballocated, subject
15 to the approval of the director of the budget, to any state agency
16 or department to accomplish the purpose of this appropriation
17 (21775) ... 691,000 ................................. (re. $285,000)
18 For competitive grants for the 2015-16 school year for extended day
19 programs and school violence prevention programs pursuant to section
20 2814 of the education law provided, however, notwithstanding any
21 inconsistent provisions of law, eligible entities receiving funds
22 for extended day programs may include not-for-profit organizations
23 working in collaboration with a public school or school district
24 (21776) ... 24,344,000 .............................. (re. $703,000)
25 For services and expenses of the primary mental health project at the
26 children's institute for the 2015-16 school year (21778) ...........
27 894,000 ............................................. (re. $127,000)
28 For additional grants in aid to certain school districts, public
29 libraries and not-for-profit institutions. Notwithstanding any
30 provision of law this appropriation shall be allocated only pursuant
31 to a plan setting forth an itemized list of grantees with the amount
32 to be received by each, or the methodology for allocating such
33 appropriation. Such plan shall be subject to the approval of the
34 speaker of the assembly and the director of the budget and thereaft-
35 er shall be included in a resolution calling for the expenditure of
36 such monies, which resolution must be approved by a majority vote of
37 all members elected to the assembly upon a roll call vote ...
38 14,350,000 ........................................... (re. $41,000)
39 For additional grants in aid to certain school districts, public
40 libraries, and not-for-profit institutions. Notwithstanding any
41 provision of law this appropriation shall be allocated only pursuant
42 to a plan setting forth an itemized list of grantees with the amount
43 to be received by each, or the methodology for allocating such
44 appropriation. Such plan shall be subject to the approval of the
45 temporary president of the senate and the director of the budget and
46 thereafter shall be included in a resolution calling for the expend-
47 iture of such monies, which resolution must be approved by a majori-
48 ty vote of all members elected to the senate upon a roll call vote
49 ... 15,500,000 ...................................... (re. $959,000)
50 For services and expenses of the center for autism and related disa-
51 bilities at the state university of New York at Albany (21782) .....
52 740,000 ............................................. (re. $130,000)
53 For services and expenses of the summer food program for the 2015-16
54 school year ... 3,049,000 ........................... (re. $408,000)
55 For the early college high schools program for the 2015-16 school
56 year, provided, however, that expenditure of funds appropriated
1036 12654-10-8
1 herein shall support the continuation and expansion of the early
2 college high schools program pursuant to a plan developed by the
3 commissioner and approved by the director of the budget provided,
4 further, that a portion of the payment to the early college high
5 schools program awarded from this appropriation shall be available
6 on a sliding scale based upon the number of college credits earned
7 annually by participating students consistent with guidelines estab-
8 lished by the commissioner. Provided further that, notwithstanding
9 any provision of law to the contrary, higher education partners
10 participating in an early college high schools program, or the
11 entity/entities responsible for setting tuition at the institution,
12 shall be authorized to set a reduced rate of tuition and/or fees, or
13 to waive tuition and/or fees entirely, for students enrolled in such
14 early college high schools program with no reduction in other state,
15 local or other support for such students earning college credit that
16 such higher education partner would otherwise be eligible to receive
17 (56139) ... 2,000,000 ............................... (re. $636,000)
18 For services and expenses of a $490,000 2015-16 school year program
19 for mentoring and tutoring operated by the Hillside Work-Scholarship
20 Connection program, which is based on model programs proven to be
21 effective in producing outcomes that include, but are not limited
22 to, improved graduation rates, provided that such services shall be
23 provided to students in one or more city school districts located in
24 a city having a population in excess of 125,000 and less than
25 1,000,000 inhabitants (21804) ... 490,000 ........... (re. $490,000)
26 For payment of small government assistance to school districts pursu-
27 ant to subdivision 7 of section 3641 of the education law on or
28 before March 31, 2016 upon audit and warrant of the comptroller in
29 the amount that small government assistance was paid to school
30 districts in state fiscal year 2010-11 ... 1,868,000 .. (re. $1,000)
31 For services and expenses of the New York City Community Learning
32 Schools initiative ... 1,500,000 .................. (re. $1,500,000)
33 For educational services and expenses for DACA (Deferred Action for
34 Childhood Arrivals) eligible out of school youth and young adults
35 (56045) ... 1,000,000 ............................. (re. $1,000,000)
36 By chapter 53, section 1, of the laws of 2015, as amended by chapter 50,
37 section 2, of the laws of 2017:
38 For nonpublic school aid payable in the 2015-16 state fiscal year.
39 Provided that nonpublic schools shall continue to receive aid based
40 on either a 5.0/5.5 hour standard instructional day, or another work
41 day as certified by the nonpublic school officials, in accordance
42 with the methodology for computing salary and benefits applied by
43 the department in paying aid for the 2012-13 and prior school years.
44 Notwithstanding any provision of law, rule or regulation to the
45 contrary, the amount appropriated herein represents the maximum
46 amount payable during the 2015-16 state fiscal year (21769) ........
47 102,273,000 ........................................... (re. $1,000)
48 For persistently failing schools transformation grants to school
49 districts pursuant to a spending plan developed by the commissioner
50 of education and approved by the director of the budget.
51 Eligibility for such grants shall be limited to school districts
52 containing a school or schools designated as persistently failing
53 pursuant to paragraph (b) of subdivision 1 of section 211-f of the
54 education law, provided that separate applications shall be required
55 for each such school for which the school district requests a grant.
1037 12654-10-8
1 Such grants shall support activities including but not limited to the
2 following: (i) use of school buildings as community hubs to deliver
3 co-located or school-linked academic, health, mental health, nutri-
4 tion, counseling, legal and/or other services to students and their
5 families; (ii) expansion, alteration or replacement of the school's
6 curriculum and program offerings; (iii) extension of the school day
7 and/or school year; (iv) professional development of teachers and
8 administrators; (v) mentoring of at-risk students; and (vi) the
9 actual and necessary expenses of the external receiver of the
10 school. Provided that the commissioner shall confirm that any such
11 eligible activity is aligned with the school's approved intervention
12 model, comprehensive education plan or school intervention plan.
13 In determining the amount of such grants, the commissioner shall
14 consider factors including but not limited to the enrollment of the
15 school. Provided that for each of the persistently failing schools,
16 the maximum annual grant in the 2015-16 and 2016-17 school years
17 shall be established by the state education department in the spend-
18 ing plan for such grants. A portion of such grants shall be avail-
19 able by July 1 of each such school year. (55906) ...................
20 75,000,000 ....................................... (re. $44,344,000)
21 By chapter 20, section 1 of subpart B of part B, of the laws of 2015, as
22 amended by chapter 53, section 1, of the laws of 2016:
23 For reimbursement to non-public schools for prior year expenses for
24 performing state-mandated functions, including but not limited to
25 the comprehensive attendance policy program. Provided, further, that
26 up to twenty million dollars ($20,000,000) of the amount appropri-
27 ated herein shall be available to pay additional liabilities of the
28 comprehensive attendance policy program for the 2013-14 and 2014-15
29 school years. Notwithstanding any inconsistent provision of law,
30 funds appropriated herein shall be used for such reimbursement in
31 accordance with a methodology recommended by the commissioner of
32 education to address prior year expenses of non-public schools for
33 such state-mandated functions. Such moneys shall be payable on the
34 audit and warrant of the comptroller on vouchers certified or
35 approved by the commissioner of education in the manner prescribed
36 by law. Notwithstanding section 40 of the state finance law or any
37 provision of law to the contrary, this appropriation shall lapse on
38 March 31, 2017 (55914) ... 250,000,000 ........... (re. $93,825,000)
39 By chapter 53, section 1, of the laws of 2014:
40 Funds appropriated herein shall be available for services and expenses
41 of a $14,260,000 teacher resources and computer training center
42 program for the 2014-15 school year (23445) ........................
43 9,982,000 ............................................. (re. $7,000)
44 For services and expenses of remaining obligations of a $14,260,000
45 teacher resources and computer training centers program for the
46 2013-14 school year (56148) ... 4,278,000 ........... (re. $339,000)
47 For costs associated with schools for the blind and deaf and other
48 students with disabilities subject to article 85 of the education
49 law, including state aid for blind and deaf pupils in certain insti-
50 tutions to be paid for the purposes provided under section 4204-a of
51 the education law for the education of deaf children under 3 years
52 of age, including transfers to the miscellaneous special revenue
53 fund Rome school for the deaf account pursuant to a plan to be
1038 12654-10-8
1 developed by the commissioner and approved by the director of the
2 budget.
3 Of the amounts appropriated herein, up to $84,700,000 shall be avail-
4 able for reimbursement to school districts for the tuition costs of
5 students attending schools for the blind and deaf during the 2013-14
6 school year pursuant to subdivision 2 of section 4204 of education
7 law and subdivision 2 of section 4207 of the education law, up to
8 $2,500,000 shall be available for debt service on capital
9 construction projects financed through the state dormitory authori-
10 ty, and up to $9,000,000 shall be available for remaining allowable
11 purposes.
12 Provided further that, notwithstanding any inconsistent provision of
13 law, upon disbursement of funds appropriated for allowances to
14 schools for the blind and deaf in the individuals with disabilities
15 program special revenue funds-federal/aid to localities for purposes
16 of this appropriation, funds appropriated herein shall be reduced in
17 an amount equivalent to such disbursement and the portion of this
18 appropriation so affected shall have no further force or effect.
19 Notwithstanding any provision of the law to the contrary, funds appro-
20 priated herein shall be available for payment of liabilities hereto-
21 fore accrued or hereafter to accrue and, subject to the approval of
22 the director of the budget, such funds shall be available to the
23 department net of disallowances, refunds, reimbursements and credits
24 ... 96,200,000 .................................... (re. $6,950,000)
25 For July and August programs for school-aged children with handicap-
26 ping conditions pursuant to section 4408 of the education law.
27 Moneys appropriated herein shall be used as follows: (i) for remain-
28 ing base year and prior school years obligations, (ii) for the
29 purposes of subdivision 4 of section 3602 of the education law for
30 schools operated under articles 87 and 88 of the education law, and
31 (iii) notwithstanding any inconsistent provision of law, for
32 payments made pursuant to this appropriation for current school year
33 obligations, provided, however, that such payments shall not exceed
34 70 percent of the state aid due for the sum of the approved tuition
35 and maintenance rates and transportation expense provided for here-
36 in; provided, however, that payment of eligible claims shall be
37 payable in the order that such claims have been approved for payment
38 by the commissioner of education, but in no case shall a single
39 payee draw down more than 45 percent of this appropriation, and
40 provided further that no claim shall be set aside for insufficiency
41 of funds to make a complete payment, but shall be eligible for a
42 partial payment in one year and shall retain its priority date
43 status for subsequent appropriations designated for such purposes.
44 Notwithstanding any inconsistent provision of law to the contrary,
45 funds appropriated herein shall only be available for liabilities
46 incurred prior to July 1, 2015, shall be used to pay 2013-14 school
47 year claims in the first instance, and represent the maximum amount
48 payable during the 2014-15 state fiscal year. Notwithstanding any
49 provision of law to the contrary, funds appropriated herein shall be
50 available for payment of liabilities heretofore accrued or hereafter
51 to accrue and, subject to the approval of the director of the budg-
52 et, such funds shall be available to the department net of disallow-
53 ances, refunds, reimbursements and credits .........................
54 362,500,000 ...................................... (re. $11,500,000)
55 For the state's share of the costs of the education of preschool chil-
56 dren with disabilities pursuant to section 4410 of the education
1039 12654-10-8
1 law. Notwithstanding any inconsistent provision of law to the
2 contrary, the amount appropriated herein shall support a state share
3 of preschool handicapped education costs for the 2013-14 school year
4 limited to 59.5 percent of such total approved expenditures, and
5 furthermore, notwithstanding any other provision of law, local
6 claims for reimbursement of costs incurred prior to the 2012-13
7 school year and during the 2012-13 school year that have been
8 approved for payment by the education department as of March 31,
9 2014 shall be the first claims paid from this appropriation.
10 Notwithstanding any provision of law to the contrary, funds appro-
11 priated herein shall be available for payment of liabilities hereto-
12 fore accrued or hereafter to accrue and, subject to the approval of
13 the director of the budget, such funds shall be available to the
14 department net of disallowances, refunds, reimbursements and credits
15 ... 1,042,500,000 ................................ (re. $33,086,000)
16 For services and expenses of the New York state center for school
17 safety for the 2014-15 school year. Funds appropriated herein shall
18 be used to operate a statewide center and shall be subject to an
19 expenditure plan approved by the director of the budget (21774) ....
20 466,000 .............................................. (re. $93,000)
21 For services and expenses of the health education program for the
22 2014-15 school year. Funds appropriated herein shall be available
23 for health-related programs including, but not limited to, those
24 providing instruction and supportive services in comprehensive
25 health education and/or acquired immune deficiency syndrome (AIDS)
26 education. Of the amounts appropriated herein, $86,000 shall be
27 available for the program previously operated as the school health
28 demonstration program. Notwithstanding any other provision of law to
29 the contrary, funds appropriated herein may be suballocated, subject
30 to the approval of the director of the budget, to any state agency
31 or department to accomplish the purpose of this appropriation
32 (21775) ... 691,000 ................................. (re. $108,000)
33 For additional grants in aid to certain school districts, public
34 libraries and not-for-profit institutions. Notwithstanding any
35 provision of law this appropriation shall be allocated only pursuant
36 to a plan setting forth.an itemized list of grantees with the amount
37 to be received by each, or the methodology for allocating such
38 appropriation. Such plan shall be subject to the approval of the
39 speaker of the assembly and the director of the budget and thereaft-
40 er shall be included in a resolution calling for the expenditure of
41 such monies, which resolution shall be approved by a majority vote
42 of all members elected to the assembly upon a roll call vote ...
43 23,420,000 ....................................... (re. $11,403,000)
44 For additional grants in aid to certain school districts, public
45 libraries, and not-for-profit institutions. Notwithstanding any
46 provision of law this appropriation shall be allocated only pursuant
47 to a plan setting forth an itemized list of grantees with the amount
48 to be received by each, or the methodology for allocating such
49 appropriation. Such plan shall be subject to the approval of the
50 temporary president of the senate and the director of the budget and
51 thereafter shall be included in a resolution calling for he expendi-
52 ture of such monies, which resolution must be approved by a majority
53 vote of all members elected to the senate upon a roll call vote ....
54 19,050,000 .......................................... (re. $347,000)
55 For payment of small government assistance to school districts pursu-
56 ant to subdivision 7 of section 3641 of the education law on or
1040 12654-10-8
1 before March 31, 2015 upon audit and warrant of the comptroller in
2 the amount that small government assistance was paid to school
3 districts in state fiscal year 2010-11 .............................
4 1,868,000 ............................................. (re. $1,000)
5 For services and expenses of the center for autism and related disa-
6 bilities at the state university of New York at Albany (21782) .....
7 740,000 .............................................. (re. $84,000)
8 For services and expenses of Boys and Girls State ....................
9 150,000 ............................................. (re. $150,000)
10 For services and expenses of the Executive Leadership Institute ...
11 475,000 ............................................. (re. $133,000)
12 For the early college high schools program for the 2014-15 school
13 year, provided, however, that expenditure of funds appropriated
14 herein shall support the continuation and expansion of the early
15 college high schools program pursuant to a plan developed by the
16 commissioner and approved by the director of the budget provided,
17 further, that a portion of the payment to the early college high
18 schools program awarded from this appropriation shall be available
19 on a sliding scale based upon the number of college credits earned
20 annually by participating students consistent with guidelines estab-
21 lished by the commissioner. Provided further that, notwithstanding
22 any provision of law to the contrary, higher education partners
23 participating in an early college high schools program, or the
24 entity/entities responsible for setting tuition at the institution,
25 shall be authorized to set a reduced rate of tuition and/or fees, or
26 to waive tuition and/or fees entirely, for students enrolled in such
27 early college high schools program with no reduction in other state,
28 local or other support for such students earning college credit that
29 such higher education partner would otherwise be eligible to receive
30 (56139) ... 2,000,000 ............................... (re. $536,000)
31 For educational services and expenses for DACA (Deferred Action for
32 Childhood Arrivals) eligible out of school youth and young adults
33 (56045) ... 1,000,000 ............................. (re. $1,000,000)
34 The appropriation made by chapter 53, section 1, of the laws of 2014, as
35 amended by chapter 50, section 2, of the laws of 2017, is hereby
36 amended and reappropriated to read:
37 For phase-in of a five-year plan to implement a statewide universal
38 full-day pre-kindergarten program in accordance with section 3602-ee
39 of the education law, for the purpose of incentivizing and funding
40 state-of-the-art innovative pre-kindergarten programs and to encour-
41 age program creativity through competition, provided that of the
42 amounts appropriated herein, three hundred forty million dollars
43 ($340,000,000) per year shall be available to reimburse school
44 districts and/or eligible entities for the cost of awarded programs
45 operating in the 2014-15 through [2018-19] 2019-20 school years;
46 provided further that if the program is oversubscribed in any region
47 or regions of the state, the department shall notify the division of
48 the budget, which shall develop a plan for distribution of available
49 slots within any oversubscribed regions; provided further that, of
50 the annual amount appropriated herein, the subscription for the New
51 York City region is three hundred million dollars ($300,000,000);
52 provided further that up to 25 percent of a school district's and/or
53 eligible entity's awarded funds shall be made available in the final
54 quarter of the year in which services are provided as an advance on
55 subsequent school year liabilities; provided further that funds
1041 12654-10-8
1 appropriated herein shall only be awarded to school districts and/or
2 eligible entities which meet requirements provided for in section
3 3602-ee of the education law. Provided further that, notwithstanding
4 the provisions of section 3602-ee of the education law to the
5 contrary, providers awarded one-time start-up supplemental funds
6 pursuant to a request for proposals process established by the State
7 Education Department for the 2014-2015 school year shall be eligible
8 for all such funds for the 2015-2016 school year to the extent such
9 supplemental funds are used for (1) new and/or conversion universal
10 full-day pre-kindergarten slots, including the incremental addi-
11 tional amounts for existing slots with certified teachers, pursuant
12 to subdivision 14 of section 3602-ee of the education law in the
13 2015-2016 school year, or (2) the incremental additional award per
14 pupil associated with certified teachers.
15 Provided further that the commissioner of education shall evaluate
16 applications and make awards on a competitive basis based on merit
17 and factors including but not limited to (i) curriculum, (ii) family
18 engagement, (iii) learning environment, (iv) staffing patterns, (v)
19 teacher education and experience, (vi) facility quality, (vii) phys-
20 ical well-being, health and nutrition, (viii) partnerships, and (ix)
21 student and community need, in order to ensure quality of early
22 childhood education.
23 Provided further that funds appropriated herein shall only be used to
24 supplement and not supplant current local expenditures of federal,
25 state or local funds on pre-kindergarten programs and the number of
26 placements in such programs from such sources and that current local
27 expenditures shall include any local expenditures of federal, state
28 or local funds used to supplement or extend services provided
29 directly or via contract to eligible children enrolled in a
30 universal pre-kindergarten program in accordance with section 3602-e
31 of the education law. Notwithstanding any provision of law to the
32 contrary, the funds appropriated herein shall only be available for
33 a statewide universal full-day pre-kindergarten program and, as of
34 July 1, [2018] 2019, may be suballocated or transferred to any other
35 appropriation for the sole purpose of administering such program.
36 Notwithstanding any provision of law to the contrary, programs that
37 provide services for fewer than 180 days will be subject to the
38 provisions of subdivision 16 of section 3602-e of the education law.
39 Notwithstanding section 40 of the state finance law or any provision
40 of law to the contrary, this appropriation shall remain in full
41 force and effect to the maximum extent allowed by law (56138) ......
42 1,500,000,000 ................................... (re. $755,241,000)
43 By chapter 53, section 1, of the laws of 2014, as added by chapter 73,
44 section 1 of part D, of the laws of 2016:
45 For nonpublic school aid payable in the 2014-15 state fiscal year.
46 Notwithstanding any provision of law, rule or regulation to the
47 contrary, the amount appropriated herein represents the maximum
48 amount payable during the 2014-15 state fiscal year (21769) ........
49 97,589,000 ........................................... (re. $12,000)
50 For aid payable for the 2012-13 school year for additional nonpublic
51 school aid. Notwithstanding any inconsistent provision of law, funds
52 appropriated herein shall be available for payment of aid heretofore
53 accrued and hereafter to accrue (21770) ............................
54 45,204,000 .......................................... (re. $178,000)
1042 12654-10-8
1 For academic intervention for nonpublic schools based on a plan to be
2 developed by the commissioner of education and approved by the
3 director of the budget (21771) ... 922,000 .......... (re. $922,000)
4 By chapter 53, section 1, of the laws of 2013:
5 For services and expenses of remaining obligations of a $10,220,000
6 teacher resources and computer training centers program for the
7 2012-13 school year (21712) ... 3,066,000 ........... (re. $249,000)
8 Funds appropriated herein shall be available for services and expenses
9 of a $14,260,000 teacher resources and computer training center
10 program for the 2013-14 school year (23445) ........................
11 9,982,000 ............................................ (re. $54,000)
12 Notwithstanding any provision of law, rule or regulation to the
13 contrary, the amount appropriated herein represents the maximum
14 amount payable during the 2013-14 state fiscal year ................
15 94,016,000 ............................................ (re. $1,000)
16 For aid payable for the 2011-12 school year for additional nonpublic
17 school aid. Notwithstanding any inconsistent provision of law, funds
18 appropriated herein shall be available for payment of aid heretofore
19 accrued and hereafter to accrue (21770) ............................
20 34,549,000 ........................................ (re. $1,620,000)
21 For academic intervention for nonpublic schools based on a plan to be
22 developed by the commissioner of education and approved by the
23 director of the budget (21771) ... 922,000 .......... (re. $922,000)
24 For services and expenses of the New York state center for school
25 safety for the 2013-14 school year. Funds appropriated herein shall
26 be used to operate a statewide center and shall be subject to an
27 expenditure plan approved by the director of the budget (21774) ....
28 466,000 ............................................. (re. $466,000)
29 For services and expenses of the health education program for the
30 2013-14 school year. Funds appropriated herein shall be available
31 for health-related programs including, but not limited to, those
32 providing instruction and supportive services in comprehensive
33 health education and/or acquired immune deficiency syndrome (AIDS)
34 education. Of the amounts appropriated herein, $86,000 shall be
35 available for the program previously operated as the school health
36 demonstration program. Notwithstanding any other provision of law to
37 the contrary, funds appropriated herein may be suballocated, subject
38 to the approval of the director of the budget, to any state agency
39 or department to accomplish the purpose of this appropriation
40 (21775) ... 691,000 ................................. (re. $621,000)
41 For costs associated with schools for the blind and deaf and other
42 students with disabilities subject to article 85 of the education
43 law, including state aid for blind and deaf pupils in certain insti-
44 tutions to be paid for the purposes provided under section 4204-a of
45 the education law for the education of deaf children under 3 years
46 of age, including transfers to the miscellaneous special revenue
47 fund Rome school for the deaf account pursuant to a plan to be
48 developed by the commissioner and approved by the director of the
49 budget.
50 Of the amounts appropriated herein, up to $84,700,000 shall be avail-
51 able for reimbursement to school districts for the tuition costs of
52 students attending schools for the blind and deaf during the 2012-13
53 school year pursuant to subdivision 2 of section 4204 of education
54 law and subdivision 2 of section 4207 of the education law, up to
55 $3,400,000 shall be available for debt service on capital
1043 12654-10-8
1 construction projects financed through the state dormitory authori-
2 ty, and up to $9,000,000 shall be available for remaining allowable
3 purposes.
4 Provided further that, notwithstanding any inconsistent provision of
5 law, upon disbursement of funds appropriated for allowances to
6 schools for the blind and deaf in the individuals with disabilities
7 program special revenue funds-federal/aid to localities for purposes
8 of this appropriation, funds appropriated herein shall be reduced in
9 an amount equivalent to such disbursement and the portion of this
10 appropriation so affected shall have no further force or effect.
11 Notwithstanding any provision of the law to the contrary, funds appro-
12 priated herein shall be available for payment of liabilities hereto-
13 fore accrued or hereafter to accrue and, subject to the approval of
14 the director of the budget, such funds shall be available to the
15 department net of disallowances, refunds, reimbursements and credits
16 ... 97,100,000 .................................... (re. $4,853,000)
17 For July and August programs for school-aged children with handicap-
18 ping conditions pursuant to section 4408 of the education law.
19 Moneys appropriated herein shall be used as follows: (i) for remain-
20 ing base year and prior school years obligations, (ii) for the
21 purposes of subdivision 4 of section 3602 of the education law for
22 schools operated under articles 87 and 88 of the education law, and
23 (iii) notwithstanding any inconsistent provision of law, for
24 payments made pursuant to this appropriation for current school year
25 obligations, provided, however, that such payments shall not exceed
26 70 percent of the state aid due for the sum of the approved tuition
27 and maintenance rates and transportation expense provided for here-
28 in; provided, however, that payment of eligible claims shall be
29 payable in the order that such claims have been approved for payment
30 by the commissioner of education, but in no case shall a single
31 payee draw down more than 45 percent of this appropriation, and
32 provided further that no claim shall be set aside for insufficiency
33 of funds to make a complete payment, but shall be eligible for a
34 partial payment in one year and shall retain its priority date
35 status for subsequent appropriations designated for such purposes.
36 Notwithstanding any inconsistent provision of law to the contrary,
37 funds appropriated herein shall only be available for liabilities
38 incurred prior to July 1, 2014, shall be used to pay 2012-13 school
39 year claims in the first instance, and represent the maximum amount
40 payable during the 2013-14 state fiscal year. Notwithstanding any
41 provision of law to the contrary, funds appropriated herein shall be
42 available for payment of liabilities heretofore accrued or hereafter
43 to accrue and, subject to the approval of the director of the budg-
44 et, such funds shall be available to the department net of disallow-
45 ances, refunds, reimbursements and credits .........................
46 321,700,000 ....................................... (re. $1,500,000)
47 For the state's share of the costs of the education of preschool chil-
48 dren with disabilities pursuant to section 4410 of the education
49 law, provided, however, that up to $1,000,000 of the amount appro-
50 priated herein may be made available for grants awarded through a
51 competitive process to municipalities to enhance their oversight of
52 preschool special education programs and providers. Notwithstanding
53 any inconsistent provision of law to the contrary, the amount appro-
54 priated herein shall support a state share of preschool handicapped
55 education costs for the 2012-13 school year limited to 59.5 percent
56 of such total approved expenditures, and furthermore, notwithstand-
1044 12654-10-8
1 ing any other provision of law, local claims for reimbursement of
2 costs incurred prior to the 2011-12 school year and during the
3 2011-12 school year that have been approved for payment by the
4 education department as of March 31, 2013 shall be the first claims
5 paid from this appropriation. Notwithstanding any provision of law
6 to the contrary, funds appropriated herein shall be available for
7 payment of liabilities heretofore accrued or hereafter to accrue
8 and, subject to the approval of the director of the budget, such
9 funds shall be available to the department net of disallowances,
10 refunds, reimbursements and credits ................................
11 983,500,000 ......................................... (re. $300,000)
12 For competitive grants for the 2013-14 school year for extended day
13 programs and school violence prevention programs pursuant to section
14 2814 of the education law provided, however, notwithstanding any
15 inconsistent provisions of law, eligible entities receiving funds
16 for extended day programs may include not-for-profit organizations
17 working in collaboration with a public school or school district
18 (21776) ... 24,344,000 ............................ (re. $3,173,000)
19 For services and expenses associated with the math and science high
20 schools for the 2013-14 school year in the amount of $1,382,000,
21 provided that such funds shall be allocated equally among those
22 entities that received program funding for the 2007-08 school year
23 ... 1,382,000 ....................................... (re. $180,000)
24 Funds appropriated herein shall be available for educational services
25 and expenses of the Syracuse city school district for the say yes to
26 education program (21800) ... 350,000 ................. (re. $2,000)
27 For services and expenses of the center for autism and related disa-
28 bilities at the state university of New York at Albany (21782) .....
29 740,000 .............................................. (re. $42,000)
30 For educational services and expenses for DACA (Deferred Action for
31 Childhood Arrivals) eligible out of school youth and young adults
32 (56045) ... 1,000,000 ............................. (re. $1,000,000)
33 For services and expenses of the New York State Historical Association
34 for National History Day ... 100,000 ................ (re. $100,000)
35 For services and expenses of the Executive Leadership Institute ...
36 150,000 .............................................. (re. $10,000)
37 For services and expenses of the Project Witness Program .............
38 350,000 ............................................. (re. $110,000)
39 For additional grants in aid to certain school districts, public
40 libraries, and not-for-profit institutions. Notwithstanding any
41 provision of law this appropriation shall be allocated only pursuant
42 to a plan setting forth an itemized list of grantees with the amount
43 to be received by each, or the methodology for allocating such
44 appropriation. Such plan shall be subject to the approval of the
45 temporary president of the senate and the director of the budget and
46 thereafter shall be included in a resolution calling for he expendi-
47 ture of such monies, which resolution must be approved by a majority
48 vote of all members elected to the senate upon a roll call vote ...
49 15,109,000 .......................................... (re. $636,000)
50 By chapter 53, section 1, of the laws of 2012:
51 Of the amounts appropriated herein, up to $84,700,000 shall be avail-
52 able for reimbursement to school districts for the tuition costs of
53 students attending schools for the blind and deaf during the 2011-12
54 school year pursuant to subdivision 2 of section 4204 of education
55 law and subdivision 2 of section 4207 of education law, up to
1045 12654-10-8
1 $5,600,000 shall be available for debt service on capital
2 construction projects financed through the state dormitory authori-
3 ty, and up to $9,000,000 shall be available for remaining allowable
4 purposes.
5 Provided further that, notwithstanding any inconsistent provision of
6 law, upon disbursement of funds appropriated for allowances to
7 schools for the blind and deaf in the individuals with disabilities
8 program special revenue funds-federal/aid to localities for purposes
9 of this appropriation, funds appropriated herein shall be reduced in
10 an amount equivalent to such disbursement and the portion of this
11 appropriation so affected shall have no further force or effect.
12 Notwithstanding any provision of the law to the contrary, funds appro-
13 priated herein shall be available for payment of liabilities hereto-
14 fore accrued or hereafter to accrue and, subject to the approval of
15 the director of the budget, such funds shall be available to the
16 department net of disallowances, refunds, reimbursements and credits
17 ... 99,300,000 .................................... (re. $3,540,000)
18 For July and August programs for school-aged children with handicap-
19 ping conditions pursuant to section 4408 of the education law.
20 Moneys appropriated herein shall be used as follows: (i) for remain-
21 ing base year and prior school years obligations, (ii) for the
22 purposes of subdivision 4 of section 3602 of the education law for
23 schools operated under articles 87 and 88 of the education law, and
24 (iii) notwithstanding any inconsistent provision of law, for
25 payments made pursuant to this appropriation for current school year
26 obligations, provided, however, that such payments shall not exceed
27 70 percent of the state aid due for the sum of the approved tuition
28 and maintenance rates and transportation expense provided for here-
29 in; provided, however, that payment of eligible claims shall be
30 payable in the order that such claims have been approved for payment
31 by the commissioner of education, but in no case shall a single
32 payee draw down more than 45 percent of this appropriation, and
33 provided further that no claim shall be set aside for insufficiency
34 of funds to make a complete payment, but shall be eligible for a
35 partial payment in one year and shall retain its priority date
36 status for subsequent appropriations designated for such purposes.
37 Notwithstanding any inconsistent provision of law to the contrary,
38 funds appropriated herein shall only be available for liabilities
39 incurred prior to July 1, 2013, shall be used to pay 2011-12 school
40 year claims in the first instance, and represent the maximum amount
41 payable during the 2012-13 state fiscal year. Notwithstanding any
42 provision of law to the contrary, funds appropriated herein shall be
43 available for payment of liabilities heretofore accrued or hereafter
44 to accrue and, subject to the approval of the director of the budg-
45 et, such funds shall be available to the department net of disallow-
46 ances, refunds, reimbursements and credits .........................
47 321,700,000 ....................................... (re. $1,500,000)
48 For the state's share of the costs of the education of preschool chil-
49 dren with disabilities pursuant to section 4410 of the education
50 law. Notwithstanding any inconsistent provision of law to the
51 contrary, the amount appropriated herein shall support a state share
52 of preschool handicapped education costs for the 2011-12 school year
53 limited to 59.5 percent of such total approved expenditures, and
54 furthermore, notwithstanding any other provision of law, local
55 claims for reimbursement of costs incurred prior to the 2010-11
56 school year and during the 2010-11 school year that have been
1046 12654-10-8
1 approved for payment by the education department as of March 31,
2 2012 shall be the first claims paid from this appropriation.
3 Notwithstanding any provision of law to the contrary, funds appro-
4 priated herein shall be available for payment of liabilities hereto-
5 fore accrued or hereafter to accrue and, subject to the approval of
6 the director of the budget, such funds shall be available to the
7 department net of disallowances, refunds, reimbursements and credits
8 ... 933,600,000 ..................................... (re. $300,000)
9 For payments to school districts required pursuant to section 3609-g
10 of the education law to reimburse school districts for costs associ-
11 ated with the payment of the metropolitan commuter transportation
12 mobility tax. Pursuant to part B of chapter 56 of the laws of 2011,
13 such reimbursement will be made for tax payments made by school
14 districts for periods prior to April 1, 2012 .......................
15 60,000,000 ........................................ (re. $6,873,000)
16 For nonpublic school aid payable in the 2012-13 state fiscal year.
17 Notwithstanding any provision of law, rule or regulation to the
18 contrary, the amount appropriated herein represents the maximum
19 amount payable during the 2012-13 state fiscal year (21769) ........
20 90,400,000 ............................................ (re. $3,000)
21 For aid payable for additional nonpublic school aid. Notwithstanding
22 any inconsistent provision of law, funds appropriated herein shall
23 be available for payment of aid heretofore accrued and hereafter to
24 accrue provided that, notwithstanding any provision of law, rule or
25 regulation to the contrary, the amount appropriated herein repres-
26 ents the maximum amount payable during the 2012-13 state fiscal year
27 (21770) ... 26,220,000 .............................. (re. $125,000)
28 For academic intervention for nonpublic schools based on a plan to be
29 developed by the commissioner of education and approved by the
30 director of the budget (21771) ... 922,000 .......... (re. $922,000)
31 For services and expenses of the New York state center for school
32 safety for the 2012-13 school year. Funds appropriated herein shall
33 be used to operate a state-wide center and shall be subject to an
34 expenditure plan approved by the director of the budget ............
35 466,000 .............................................. (re. $29,000)
36 For services and expenses of the health education program for the
37 2012-13 school year. Funds appropriated herein shall be available
38 for health-related programs including, but not limited to, those
39 providing instruction and supportive services in comprehensive
40 health education and/or acquired immune deficiency syndrome (AIDS)
41 education. Of the amounts appropriated herein, $86,000 shall be
42 available for the program previously operated as the school health
43 demonstration program. Notwithstanding any other provision of law to
44 the contrary, funds appropriated herein may be sub-allocated,
45 subject to the approval of the director of the budget, to any state
46 agency or department to accomplish the purpose of this appropriation
47 ... 691,000 ......................................... (re. $398,000)
48 For competitive grants for the 2012-13 school year for extended day
49 programs and school violence prevention programs pursuant to section
50 2814 of the education law provided, however, notwithstanding any
51 inconsistent provisions of law, eligible entities receiving funds
52 for extended day programs may include not-for-profit organizations
53 working in collaboration with a public school or school district
54 (21776) ... 24,344,000 ............................ (re. $5,608,000)
55 For aid payable for the 2012-13 school year for support of county
56 vocational education and extension boards pursuant to section 1104
1047 12654-10-8
1 of the education law, provided, however, that notwithstanding any
2 inconsistent provision of law, rule, or regulation, any apportion-
3 ment of aid shall be based on a quota amounting to one-half of the
4 salary paid each teacher, director, assistant, and supervisor, where
5 such salary is attributable to a course of study first submitted to
6 the commissioner for approval pursuant to section 1103 of the educa-
7 tion law on or before July 1, 2010, but not to exceed the amount
8 computed by the commissioner based upon an assumed annualized salary
9 equal to ten thousand five hundred dollars per school year on
10 account of the employment of such teacher, director, assistant or
11 supervisor ... 932,000 ............................... (re. $52,000)
12 For services and expenses of the center for autism and related disa-
13 bilities at the state university of New York at Albany (21782) .....
14 490,000 ............................................... (re. $1,000)
15 For additional grants in aid to certain school districts, public
16 libraries, and not-for-profit institutions. Notwithstanding any
17 provision of law this appropriation shall be allocated only pursuant
18 to a plan setting forth an itemized list of grantees with the amount
19 to be received by each, or the methodology for allocating such
20 appropriation. Such plan shall be subject to the approval of the
21 speaker of the assembly and the director of the budget and thereaft-
22 er shall be included in a resolution calling for the expenditure of
23 such monies, which resolution must be approved by a majority vote of
24 all members elected to the assembly upon a roll call vote ...
25 9,121,000 ......................................... (re. $9,121,000)
26 For additional grants in aid to certain school districts, public
27 libraries, and not-for-profit institutions. Notwithstanding any
28 provision of law this appropriation shall be allocated only pursuant
29 to a plan setting forth an itemized list of grantees with the amount
30 to be received by each, or the methodology for allocating such
31 appropriation. Such plan shall be subject to the approval of the
32 temporary president of the senate and the director of the budget and
33 thereafter shall be included in a resolution calling for the expend-
34 iture of such monies, which resolution must be approved by a majori-
35 ty vote of all members elected to the senate upon a roll call vote
36 ... 20,605,000 ...................................... (re. $815,000)
37 For purposes of the North Country Cultural Center for the Arts .......
38 100,000 ............................................. (re. $100,000)
39 For purposes of the missing children program (21806) .................
40 1,000,000 ........................................... (re. $839,000)
41 After School Programs for New York City ..............................
42 1,500,000 ......................................... (re. $1,500,000)
43 By chapter 53, section 1, of the laws of 2011:
44 Funds appropriated herein shall be available for services and expenses
45 of a $20,440,000 teacher resources and computer training centers
46 program for the 2011-12 school year provided that, notwithstanding
47 any inconsistent provision of law, subject to the approval of the
48 director of the budget, funds appropriated herein may be inter-
49 changed with any other item of appropriation for general support for
50 public schools within the general fund local assistance account
51 elementary, middle, secondary and continuing education program.
52 Notwithstanding any other law, rule or regulation to the contrary,
53 funds appropriated herein shall be available for payment of finan-
54 cial assistance net of any disallowances, refunds, reimbursement and
55 credits, and may be suballocated to other departments and agencies
1048 12654-10-8
1 to accomplish the intent of this appropriation subject to the
2 approval of the director of the budget. Notwithstanding any
3 provision of law to the contrary, funds appropriated herein shall be
4 available for payment of liabilities hereafter to accrue ...
5 14,308,000 ........................................ (re. $1,093,000)
6 For services and expenses of remaining obligations for the 2010-11
7 school year for support for the operation of targeted pre-kindergar-
8 ten for those providers not eligible to receive funding pursuant to
9 section 3602-e of the education law and for support for providers
10 continuing to operate such programs in the 2011-12 school year.
11 Such funds shall be expended pursuant to a plan developed by the
12 commissioner of education and approved by the director of the budget
13 ... 1,303,000 ....................................... (re. $978,000)
14 For allowances to schools for the blind and deaf and other students
15 with disabilities subject to article 85 of the education law,
16 including state aid for blind and deaf pupils in certain insti-
17 tutions to be paid for the purposes provided under section 4204-a of
18 the education law for the education of deaf children under 3 years
19 of age, including transfers to the miscellaneous special revenue
20 fund Rome school for the deaf account pursuant to a plan to be
21 developed by the commissioner and approved by the director of the
22 budget.
23 Of the amounts appropriated herein, up to $6,651,000 shall be used for
24 debt service on capital construction projects financed through the
25 state dormitory authority, and up to $13,349,000 shall be available
26 for allowances to schools for the blind and deaf for the residential
27 costs of students at such schools and for remaining allowances for
28 the 2010-11 school year. Provided further that, notwithstanding any
29 inconsistent provision of law, upon disbursement of funds appropri-
30 ated for allowances to schools for the blind and deaf in the indi-
31 viduals with disabilities program special revenue funds-federal/aid
32 to localities for purposes of this appropriation, funds appropriated
33 herein shall be reduced in an amount equivalent to such disbursement
34 and the portion of this appropriation so affected shall have no
35 further force or effect.
36 Notwithstanding any provision of the law to the contrary, funds appro-
37 priated herein shall be available for payment of liabilities hereto-
38 fore accrued or hereafter to accrue and, subject to the approval of
39 the director of the budget, such funds shall be available to the
40 department net of disallowances, refunds, reimbursements and credits
41 ... 20,000,000 ...................................... (re. $382,000)
42 For the state's share of the costs of the education of preschool chil-
43 dren with disabilities pursuant to section 4410 of the education
44 law. Notwithstanding any inconsistent provision of law to the
45 contrary, the amount appropriated herein shall support a state share
46 of preschool handicapped education costs for the 2010-11 school year
47 limited to 59.5 percent of such total approved expenditures, and
48 furthermore, notwithstanding any other provision of law, local
49 claims for reimbursement of costs incurred prior to the 2009-10
50 school year and during the 2009-10 school year that have been
51 approved for payment by the education department as of March 31,
52 2011 shall be the first claims paid from this appropriation.
53 Notwithstanding any provision of law to the contrary, funds appro-
54 priated herein shall be available for payment of liabilities hereto-
55 fore accrued or hereafter to accrue and, subject to the approval of
56 the director of the budget, such funds shall be available to the
1049 12654-10-8
1 department net of disallowances, refunds, reimbursements and credits
2 ... 869,900,000 ..................................... (re. $165,000)
3 For aid payable for the 2011-12 school year for support of county
4 vocational education and extension boards pursuant to section 1104
5 of the education law, provided, however, that notwithstanding any
6 inconsistent provision of law, rule, or regulation, any apportion-
7 ment of aid shall be based on a quota amounting to one-half of the
8 salary paid each teacher, director, assistant, and supervisor, where
9 such salary is attributable to a course of study first submitted to
10 the commissioner for approval pursuant to section 1103 of the educa-
11 tion law on or before July 1, 2010, but not to exceed the amount
12 computed by the commissioner based upon an assumed annualized salary
13 equal to ten thousand five hundred dollars per school year on
14 account of the employment of such teacher, director, assistant or
15 supervisor ... 932,000 ............................... (re. $22,000)
16 For competitive grants for the 2011-12 school year for extended day
17 programs and school violence prevention programs pursuant to section
18 2814 of the education law provided, however, notwithstanding any
19 inconsistent provisions of law, eligible entities receiving funds
20 for extended day programs may include not-for-profit organizations
21 working in collaboration with a public school or school district ...
22 24,344,000 ....................................... (re. $11,273,000)
23 For aid payable for additional nonpublic school aid. Notwithstanding
24 any inconsistent provision of law, funds appropriated herein shall
25 be available for payment of aid heretofore accrued and hereafter to
26 accrue provided that, notwithstanding any provision of law, rule or
27 regulation to the contrary, the amount appropriated herein repres-
28 ents the maximum amount payable during the 2011-12 state fiscal year
29 ... 26,220,000 ........................................ (re. $4,000)
30 For services and expenses of the health education program for the
31 2011-12 school year. Funds appropriated herein shall be available
32 for health-related programs including, but not limited to, those
33 providing instruction and supportive services in comprehensive
34 health education and/or acquired immune deficiency syndrome (AIDS)
35 education. Of the amounts appropriated herein, $86,000 shall be
36 available for the program previously operated as the school health
37 demonstration program. Notwithstanding any other provision of law to
38 the contrary, funds appropriated herein may be suballocated, subject
39 to the approval of the director of the budget, to any state agency
40 or department to accomplish the purpose of this appropriation ......
41 691,000 ............................................. (re. $327,000)
42 For academic intervention for nonpublic schools based on a plan to be
43 developed by the commissioner of education and approved by the
44 director of the budget (21771) ... 922,000 .......... (re. $922,000)
45 For services and expenses of the New York state center for school
46 safety for the 2011-12 school year. Funds appropriated herein shall
47 be used to operate a statewide center and shall be subject to an
48 expenditure plan approved by the director of the budget (21774) ....
49 466,000 ............................................. (re. $270,000)
50 For the smart scholars early college high school program, provided,
51 however that expenditure of funds herein shall be subject to a
52 payment schedule developed by the commissioner and approved by the
53 director of budget (23451) ... 6,000,000 .......... (re. $1,109,000)
1050 12654-10-8
1 The appropriation made by chapter 53, section 1, of the laws of 2011, as
2 amended by chapter 50, section 2, of the laws of 2017, is hereby
3 amended and reappropriated to read:
4 For a school district management efficiency awards program. Funds
5 appropriated herein shall be used to provide competitive awards to
6 school districts based on a plan developed by the commissioner and
7 approved by the director of the budget. Provided that such funds may
8 only be awarded to a school district which demonstrates that it has
9 implemented one or more long term efficiencies within two years
10 prior to a response to a request for proposal or during the current
11 school year in school district management, operations, procurement
12 practices or other cost savings measures and will not result in an
13 increase in cost to the state or the locality and: (i) have resulted
14 or will result in a significant reduction in total operating
15 expenses compared to the prior year and/or significant reductions in
16 the administrative component, or the equivalent, of the school
17 district budget and/or transportation operating expenses and/or
18 transportation capital expenses and/or other non-personal service
19 costs included in the program component of the school district budg-
20 et compared to the prior year; and (ii) are expected to result in
21 substantial and recurring cost savings in total operating expenses
22 and/or recurring significant reductions in administrative expendi-
23 tures, or the equivalent, and/or transportation operating expenses
24 and/or transportation capital expenses and/or other non-personal
25 service costs included in the program component of the school
26 district budget in future years; provided further that, a school
27 district that submits documentation that has been approved by the
28 commissioner by September 1 of 2013 and of each school year in which
29 a payment is made from this appropriation demonstrating that it has
30 fully implemented new standards and procedures for conducting annual
31 professional performance reviews of classroom teachers and building
32 principals to determine teacher and principal effectiveness shall
33 receive bonus points in the scoring of its grant application.
34 Provided further that, notwithstanding any provision of law to the
35 contrary, in addition to the competitive awards amount as defined in
36 paragraph ee of subdivision 1 of section 3602 of the education law,
37 a minimum of $37,500,000 shall be available for the payment of grant
38 awards made in the 2013-14 school year, with additional amounts to
39 be made available in the 2014-15 through [2018-19] 2019-20 state
40 fiscal years as necessary to continue such awards, make an addi-
41 tional round of awards pursuant to subdivision 6-a of section 3641
42 of the education law in the 2014-15 school year not to exceed the
43 amount awarded in the 2013-14 school year pursuant to such subdivi-
44 sion 6-a, and make additional master teachers awards to the extent
45 that the master teachers program authorized herein would not other-
46 wise expend the maximum school year amount authorized herein; and
47 such $37,500,000 shall be made available for $12,500,000 of prekin-
48 dergarten grants, $10,000,000 of school-wide extended learning
49 grants, $7,500,000 of community schools grants, $5,500,000 for a
50 master teacher program and $2,000,000 for the early college high
51 school program; provided, however, the funds appropriated herein for
52 pre-kindergarten grants shall only be available for grants awarded
53 for the 2016-17 school year and prior school years; provided, howev-
54 er, the funds appropriated herein for school-wide extended learning
55 grants shall only be available for grants awarded for the 2017-18
56 school year and prior school years; provided, however, the funds
1051 12654-10-8
1 appropriated herein for the early college high school program shall
2 only be available for grants awarded for the 2017-18 school year and
3 prior school years; provided, however, that no school district shall
4 receive any portion of the funds appropriated herein unless it shall
5 have submitted documentation that has been approved by the commis-
6 sioner by September 1 of 2013 and of each school year in which a
7 payment to such district from this appropriation would otherwise be
8 made demonstrating that it has fully implemented new standards and
9 procedures for conducting annual professional performance reviews of
10 classroom teachers and building principals to determine teacher and
11 principal effectiveness.
12 Provided, further, that notwithstanding any provision of law to the
13 contrary, the $12,500,000 appropriated herein available for full-day
14 and half-day pre-kindergarten grants shall be awarded, based on a
15 request for proposals developed by the commissioner and approved by
16 the director of the budget, to school districts to establish new
17 full-day and half-day pre-kindergarten placements and/or to convert
18 existing half-day pre-kindergarten placements into full-day place-
19 ments; provided that preference shall be granted for full-day place-
20 ments while ensuring that a portion of grants include half-day
21 placements based on eligible applications; and provided, further,
22 that such grants shall only be used to supplement, not supplant
23 existing pre-kindergarten programs, and provided further, however,
24 that any portion of such $12,500,000 that is not awarded shall
25 remain available for subsequent awards in the 2013-14 school year or
26 for full-day and half-day pre-kindergarten grants to be awarded in
27 subsequent school years. Provided, further, that such grants from
28 funds appropriated herein shall be awarded based on factors includ-
29 ing, but not limited to, the following: (i) measures of school
30 district need, (ii) measures of the need of students to be served by
31 each of the school districts, (iii) the school district's proposal
32 to target the highest need schools and students, (iv) the extent to
33 which the district's proposal would prioritize funds to maximize the
34 total number of eligible children in the district served in prekin-
35 dergarten programs, and (v) proposal quality. Provided, however,
36 that full-day and half-day pre-kindergarten grants appropriated
37 herein shall only be available to support programs (i) that provide
38 instruction for at least five hours per school day for full-day
39 pre-kindergarten programs and at least two and one-half hours per
40 school day for half-day pre-kindergarten programs; (ii) that agree
41 to offer instruction consistent with the New York state prekinder-
42 garten foundation for the common core standards within three years;
43 (iii) that ensure that, to the extent community-based providers are
44 part of such program, such providers meet the requirements of para-
45 graphs d-1 and d-2 of subdivision 12 of section 3602-e of the educa-
46 tion law; and (iv) that otherwise comply with all of the same rules
47 and requirements as universal pre-kindergarten programs pursuant to
48 section 3602-e of the education law except as modified herein.
49 Provided, further, that a school district's pre-kindergarten grant
50 shall equal the product of (A) (i) two multiplied by the approved
51 number of new full-day pre-kindergarten placements plus (ii) the
52 approved number of half-day pre-kindergarten placement conversions
53 and new half-day pre-kindergarten placements, and (B) the district's
54 selected aid per pre-kindergarten pupil pursuant to subparagraph i
55 of paragraph b of subdivision 10 of section 3602-e of the education
56 law; provided, however, that no district shall receive a grant in
1052 12654-10-8
1 excess of the total actual grant expenditures incurred by the
2 district in the current school year as approved by the commissioner.
3 Provided, further, that as a condition of eligibility for receipt of
4 such funding, a school district shall agree to adopt approved quali-
5 ty indicators within two years, including, but not limited to, valid
6 and reliable measures of environmental quality, the quality of
7 teacher-student interactions and child outcomes, and ensure that any
8 such assessment of child outcomes shall not be used to make high-
9 stakes educational decisions for individual children. Provided,
10 further, that no school district shall receive more than forty
11 percent of the total pre-kindergarten grant allocation.
12 Provided, further, that notwithstanding any provision of law to the
13 contrary, the $10,000,000 appropriated herein available for school-
14 wide extended learning grants shall be awarded to school districts
15 or school districts in collaboration with not-for-profit community-
16 based organizations based on responses to a request for proposals
17 for planning and implementation grants that is (i) developed by the
18 commissioner; (ii) approved by the director of the budget; and (iii)
19 issued by the commissioner. Provided, further, that such grants
20 shall be awarded based on factors including, but not limited to, the
21 following: (i) the school district's proposal to target the schools
22 and students with the greatest need, and (ii) proposal quality.
23 Provided, further, that to assess proposal quality in order to award
24 implementation grant funding, the commissioner shall take into
25 account factors including, but not limited to: (i) the extent to
26 which the school district's proposal would maximize the use of the
27 additional learning time through a comprehensive restructuring of
28 the school day and/or year, (ii) the extent to which the proposal
29 would provide additional learning time for students in grades six
30 through eight, and (iii) how the additional learning time would be
31 utilized, including, but not limited to, additional time spent on
32 core academics. Provided, however, that no district shall be eligi-
33 ble to receive a school-wide extended learning grant unless its
34 proposal would increase student learning time by at least 25
35 percent. Provided, further, that a school district's schoolwide
36 extended learning implementation grant shall equal its average daily
37 attendance in the school-wide extended learning program multiplied
38 by the expected cost per pupil of the additional learning time;
39 provided, further, that the expected cost per pupil of the addi-
40 tional learning time shall equal the greater of $1,500 or (A) the
41 quotient of (i) the school district's approved operating expense,
42 pursuant to paragraph t of subdivision 1 of section 3602 of the
43 education law, for the year prior to the base year, divided by (ii)
44 the district's public school district enrollment, pursuant to
45 subparagraph (2) of paragraph n of such subdivision, for the year
46 prior to the base year, multiplied by (B) 10 percent (0.10), multi-
47 plied by (C) the quotient of (i) the average of the national consum-
48 er price indexes determined by the United States department of labor
49 for the 12-month period preceding January first of the base year,
50 divided by (ii) the average of the national consumer price indexes
51 determined by the United States department of labor for the 12-month
52 period preceding January first of the year two years prior to the
53 base year; provided, however, that in extraordinary cases the
54 commissioner may award a grant that exceeds the per pupil limit
55 described above; provided further, however, that no district shall
56 receive a grant in excess of the total actual grant expenditures
1053 12654-10-8
1 incurred by the district in the current school year as approved by
2 the commissioner. Provided, further, that no school district shall
3 receive more than forty percent of the total school-wide extended
4 learning grant allocation.
5 Provided, further, that notwithstanding any provision of law to the
6 contrary, the $7,500,000 appropriated herein available for community
7 schools grants shall be awarded, based on a request for proposals
8 (i) developed by the state council on children and families in coor-
9 dination with the commissioner, (ii) approved by the director of the
10 budget and (iii) issued by the commissioner, to school districts, or
11 in a city with a population of one million or more an eligible enti-
12 ty, to improve student outcomes through the implementation of commu-
13 nity schools programs that use school buildings as community hubs to
14 deliver co-located or school-linked academic, health, mental health,
15 nutrition, counseling, legal and/or other services to students and
16 their families. In a city with a population of one million or more,
17 eligible entities shall mean the city school district of the city of
18 New York, or not-for-profit organizations, which shall include not-
19 for-profit community-based organizations. An eligible entity that is
20 a not-for-profit may apply for a community school grant provided
21 that it collaborates with the city school district of the city of
22 New York and receives the approval of the chancellor of the city
23 school district of the city of New York. Provided, further, that
24 such grants shall be awarded based on factors including, but not
25 limited to, the following: (i) measures of school district need,
26 (ii) measures of the need of students to be served by each of the
27 school districts, (iii) the school district's proposal to target the
28 highest need schools and students, (iv) the sustainability of the
29 proposed community schools program, and (v) proposal quality.
30 Provided, further, that to assess proposal quality in order to award
31 such funding, the commissioner shall take into account factors
32 including, but not limited to: (i) the extent to which the school
33 district's proposal would provide such community services through
34 partnerships with local governments and non-profit organizations,
35 (ii) the extent to which the proposal would provide for delivery of
36 such services directly in school buildings, (iii) the extent to
37 which the proposal articulates how such services would facilitate
38 measurable improvement in student and family outcomes, (iv) the
39 extent to which the proposal articulates and identifies how existing
40 funding streams and programs would be used to provide such community
41 services, and (v) the extent to which the proposal ensures the safe-
42 ty of all students, staff and community members in school buildings
43 used as community hubs. Provided, however, that community schools
44 grants appropriated herein shall be paid to school districts in
45 installments upon successful implementation of each phase of a
46 school district's approved proposal. Provided, further, that no
47 school district shall receive more than forty percent of the total
48 community schools grant allocation, and that each individual commu-
49 nity school site shall be limited to a maximum grant of $500,000.
50 Provided, further, that notwithstanding any provision of law to the
51 contrary, the $5,500,000 appropriated herein available for a master
52 teachers program shall support the award of stipends of $15,000 per
53 annum over four years to individual high-performing teachers in
54 math, science and related fields, and of related costs, administered
55 by the state university of New York pursuant to a plan developed in
56 consultation with the commissioner, who shall consult with appropri-
1054 12654-10-8
1 ate state organizations representing K-12 public school teachers and
2 approved by the director of the budget, to build a corps of
3 outstanding math, science and related fields teachers in order to
4 improve the quality of instruction at public secondary schools. Such
5 plan for use of funding appropriated herein shall: (i) establish an
6 application process; (ii) guidelines by which applications from
7 eligible teachers shall be evaluated, which shall include, but not
8 be limited to, achievement of a rating of highly effective on the
9 annual professional performance review; and (iii) provide periodic
10 opportunities for professional development for successful appli-
11 cants. Provided, further, that priority shall be given to applicants
12 in regions of the state where a similar program is not otherwise
13 offered. Notwithstanding any provision of law to the contrary, upon
14 approval of the director of the budget, such $5,500,000 of master
15 teachers program funding may be sub-allocated, interchanged, trans-
16 ferred or otherwise made available to the state university of New
17 York for the services and expenses of administering such program.
18 Nothing herein shall be construed to limit the rights of labor
19 organizations representing teachers to collectively bargain terms
20 and conditions pursuant to article 14 of the civil service law.
21 Provided, further, that notwithstanding any provision of law to the
22 contrary, the $2,000,000 appropriated herein available for the early
23 college high school program shall support the continuation and
24 expansion of such program pursuant to a plan developed by the
25 commissioner and approved by the director of the budget. Provided,
26 however, that a portion of the payments to early college high school
27 programs awarded funding from this appropriation shall be awarded on
28 a sliding scale based upon the number of college credits earned
29 annually by participating students, consistent with guidelines
30 established by the commissioner. Provided further that, notwith-
31 standing any provision of law to the contrary, higher education
32 partners participating in an early college high schools program, or
33 the entity/entities responsible for setting tuition at the institu-
34 tion, shall be authorized to set a reduced rate of tuition and/or
35 fees, or to waive tuition and/or fees entirely, for students
36 enrolled in such early college high schools program with no
37 reduction in other state, local or other support for such students
38 earning college credit that such higher education partner would
39 otherwise be eligible to receive.
40 Provided further that, notwithstanding any provision of law to the
41 contrary, of the amount appropriated herein, a minimum of
42 $12,500,000 per year shall be available in the 2014-15 through
43 [2018-19] 2019-20 school years for the payment of grant awards as
44 follows: $2,500,000 of pathways in technology early college high
45 school program grants and $10,000,000 of teacher excellence fund
46 grants; provided, however, the funds appropriated herein for path-
47 ways in technology early college high school program grants shall
48 only be available for grants awarded for the 2017-18 school year and
49 prior school years; provided further that, notwithstanding any
50 provision of law to the contrary, such $12,500,000, plus any other
51 amounts so designated in other items of appropriation within the
52 general fund local assistance account office of pre-kindergarten
53 through grade twelve education program, shall constitute the compet-
54 itive awards amount authorized for the 2013-14 school year by chap-
55 ter 53 of the laws of 2013.
1055 12654-10-8
1 Provided further that, notwithstanding any provision of law to the
2 contrary, the $2,500,000 appropriated herein available for pathways
3 in technology early college high school (P-TECH) program grants
4 shall be awarded pursuant to a plan developed by the commissioner
5 and approved by the director of the budget, provided that such plan
6 shall include but not be limited to (i) assurances that K-12, higher
7 education and private-sector partners commit to the required
8 elements and responsibilities of a P-TECH program, (ii) provisions
9 to ensure regional diversity of grant recipients, and (iii) priority
10 for P-TECH programs serving students in academically challenged
11 school districts; provided further that the commissioner shall make
12 available the request for proposals for such program on or before
13 May fifteenth and the commissioner shall issue awards on or before
14 August fifteenth; and provided further that a portion of the
15 payments to P-TECH programs awarded funding from this appropriation
16 shall be made on a sliding scale based upon the number of college
17 credits earned annually by participating students, consistent with
18 guidelines established by the commissioner. Provided further that,
19 notwithstanding any provision of law to the contrary, higher educa-
20 tion partners participating in a P-TECH program, or the
21 entity/entities responsible for setting tuition at the institution,
22 shall be authorized to set a reduced rate of tuition and/or fees, or
23 to waive tuition and/or fees entirely, for students enrolled in such
24 P-TECH program with no reduction in other state, local or other
25 support for such students earning college credit that such higher
26 education partner would otherwise be eligible to receive.
27 Provided further that, notwithstanding any provision of law to the
28 contrary, the $10,000,000 appropriated herein available for teacher
29 excellence fund grants shall be awarded to eligible school districts
30 pursuant to a request for proposals based on a plan developed by the
31 commissioner and approved by the director of the budget; provided
32 that such plan shall include an application for award of such grants
33 to such eligible school districts to provide annual teacher excel-
34 lence fund performance awards of up to $20,000 to eligible teachers
35 rated as "highly effective" on the most recent annual professional
36 performance review, in accordance with the requirements of section
37 3012-d of the education law and the regulations of the commissioner,
38 pursuant to such districts' approved applications; provided that in
39 making such grants the commissioner shall prioritize school
40 districts' applications based on factors including but not limited
41 to (i) the extent to which the school district's application would
42 recognize and reward such teachers in school buildings with the
43 greatest academic need, in difficult-to-staff subject or certif-
44 ication areas and grade levels, and at critical points in a teach-
45 er's career in order to encourage highly effective teachers to
46 remain in the classroom, and (ii) the quality of the school
47 district's application; and provided further that the commissioner
48 shall make available the application for such grants on or before
49 May fifteenth and the commissioner shall issue grant awards an
50 agreed-to schedule.
51 Provided further that, notwithstanding any provision of law to the
52 contrary, of the amount appropriated herein, a minimum of
53 $23,500,000 per year shall be available in the 2015-16 through
54 [2018-19] 2019-20 school years for the payment of grant awards as
55 follows: $15,000,000 for pre-kindergarten grants, $2,500,000 for an
56 expanded master teacher program, $1,500,000 of pathways in technolo-
1056 12654-10-8
1 gy early college high school program grants, $1,500,000 for a school
2 district teacher residency program, $1,500,000 for a New York state
3 masters-in-education teacher incentive scholarship program, and
4 $1,500,000 for QUALITYstarsNY; provided, however, the funds appro-
5 priated herein for pathways in technology early college high school
6 program grants shall only be available for grants awarded for the
7 2017-18 school year and prior school years; provided further that,
8 notwithstanding any provision of law to the contrary, such
9 $23,500,000, plus any other amounts so designated in other items of
10 appropriation within the general fund local assistance account
11 office of pre-kindergarten through grade twelve education program,
12 shall constitute the competitive awards amount authorized for the
13 2015-16 school year.
14 Provided, further, that notwithstanding any provision of law to the
15 contrary, the $15,000,000 appropriated herein available for grants
16 to full-day and half-day pre-kindergarten programs for three-year-
17 old and four-year-old children shall be awarded, based on a request
18 for proposals developed by the commissioner and approved by the
19 director of the budget, to school districts to establish new full-
20 day and half-day pre-kindergarten placements for three-year-olds and
21 four-year-olds; provided that such grants shall only be used to
22 supplement, not supplant existing pre-kindergarten programs; and
23 provided further, however, that any portion of such $15,000,000 that
24 is not awarded shall remain available for subsequent awards in the
25 2015-16 school year or for full-day and half-day prekindergarten
26 grants to be awarded in subsequent school years. Provided, further,
27 that such grants from funds appropriated herein shall be awarded
28 based on factors including, but not limited to, the following: (i)
29 measures of school district need, (ii) measures of the need of
30 students to be served by each of the school districts, (iii) the
31 school district's proposal to target the highest need schools and
32 students, (iv) the extent to which the district's proposal would
33 prioritize funds to maximize the total number of eligible children
34 in the district served in pre-kindergarten programs, and (v)
35 proposal quality. Provided, however, that full-day and half-day
36 pre-kindergarten grants appropriated herein shall only be available
37 to support programs (i) that provide instruction for at least five
38 hours per school day for full-day pre-kindergarten programs and at
39 least two and one-half hours per school day for half-day prekinder-
40 garten programs; (ii) that agree to offer instruction consistent
41 with the New York state pre-kindergarten foundation for the common
42 core standards; (iii) that ensure that, to the extent community-
43 based providers are part of such program, such providers meet the
44 requirements of paragraphs d-1 and d-2 of subdivision 12 of section
45 3602-e of the education law; and (iv) that otherwise comply with all
46 of the same rules and requirements as universal prekindergarten
47 programs pursuant to section 3602-e of the education law except as
48 modified herein; provided that notwithstanding paragraph c of subdi-
49 vision 1 of section 3602-e of the education law notwithstanding, for
50 the purposes of this appropriation, an eligible child shall be a
51 resident child who is three years of age on or before December first
52 of the year in which he or she is enrolled. Provided, further, that
53 as a condition of eligibility for receipt of such funding for three-
54 year-olds, a school district must currently offer a prekindergarten
55 program for four-year-old children, or children who would otherwise
56 be eligible under paragraph c of subdivision 1 of section 3602-e of
1057 12654-10-8
1 the education law; provided, further, that a school district may
2 apply for only as many full-day or half-day placements for three-
3 year-old children as it currently offers for four-year-old children,
4 or children who would otherwise be eligible under paragraph c of
5 subdivision 1 of section 3602-e of the education law. Provided,
6 further, that a school district's grant for three-year-old and four-
7 year-old pre-kindergarten shall equal the product of (A) (i) two
8 multiplied by the approved number of new full-day prekindergarten
9 placements plus (ii) the approved number of new half-day prekinder-
10 garten placements, and (B) the district's selected aid per prekin-
11 dergarten pupil pursuant to subparagraph i of paragraph b of subdi-
12 vision 10 of section 3602-e of the education law; provided, however,
13 that no district shall receive a grant in excess of the total actual
14 grant expenditures incurred by the district in the current school
15 year as approved by the commissioner. Provided, further, that as a
16 condition of eligibility for receipt of such funding, a school
17 district shall agree to adopt approved quality indicators within two
18 years, including, but not limited to, valid and reliable measures of
19 environmental quality, the quality of teacher-student interactions
20 and child outcomes, and ensure that any such assessment of child
21 outcomes shall not be used to make high-stakes educational decisions
22 for individual children. Provided, further, that no school district
23 shall receive more than forty percent of the total prekindergarten
24 for three-year-old and four-year-old children grant allocation.
25 Provided, further, that notwithstanding any provision of law to the
26 contrary, the $2,500,000 appropriated herein available for an
27 expanded master teachers program shall support the award of stipends
28 of $15,000 per annum over four years to individual high-performing
29 teachers, and of related costs, administered by the state university
30 of New York pursuant to a plan developed in consultation with the
31 commissioner, who shall consult with appropriate state organizations
32 representing K-12 public school teachers and approved by the direc-
33 tor of the budget, to build a corps of outstanding teachers in order
34 to improve the quality of instruction at public secondary schools.
35 Such plan for use of funding appropriated herein shall: (i) allocate
36 at least 80 percent of such stipends to high-performing teachers in
37 math, science and related fields and up to 20 percent of such
38 stipends to high performing teachers with an extension to their
39 content area certificate in bilingual education or who hold certif-
40 ication in English as a Second Language and high-performing teachers
41 with dual certification in a content area and special education;
42 (ii) establish an application process; (iii) guidelines by which
43 applications from eligible teachers shall be evaluated, which shall
44 include, but not be limited to, achievement of a rating of highly
45 effective on the annual professional performance review; and (iv)
46 provide periodic opportunities for professional development for
47 successful applicants. Provided, further, that priority shall be
48 given to applicants in regions of the state where a similar program
49 is not otherwise offered. Notwithstanding any provision of law to
50 the contrary, upon approval of the director of the budget, such
51 $2,500,000 of master teachers program funding may be suballocated,
52 interchanged, transferred or otherwise made available to the state
53 university of New York for the services and expenses of administer-
54 ing such program. Nothing herein shall be construed to limit the
55 rights of labor organizations representing teachers to collectively
1058 12654-10-8
1 bargain terms and conditions pursuant to article 14 of the civil
2 service law.
3 Provided further that, notwithstanding any provision of law to the
4 contrary, the $1,500,000 appropriated herein available for pathways
5 in technology early college high school (P-TECH) program grants
6 shall be awarded pursuant to a plan developed by the commissioner
7 and approved by the director of the budget, provided that such plan
8 shall include but not be limited to (i) assurances that K-12, higher
9 education and private-sector partners commit to the required
10 elements and responsibilities of a P-TECH program, (ii) provisions
11 to ensure regional diversity of grant recipients, and (iii) priority
12 for P-TECH programs serving students in academically challenged
13 school districts; provided further that the commissioner shall make
14 available the request for proposals for such program on or before
15 May fifteenth and the commissioner shall issue awards on or before
16 August fifteenth; and provided further that a portion of the
17 payments to P-TECH programs awarded funding from this appropriation
18 shall be made on a sliding scale based upon the number of college
19 credits earned annually by participating students, consistent with
20 guidelines established by the commissioner. Provided further that in
21 connection with such guidelines, the commissioner shall execute a
22 memorandum of understanding with the state university of New York
23 and the city university of New York to develop common data
24 collection, sharing and reporting mechanisms based on student-level
25 data for students enrolled in P-TECH and smart scholars early
26 college high school programs. Provided further that, notwithstanding
27 any provision of law to the contrary, higher education partners
28 participating in a P-TECH program, or the entity/entities responsi-
29 ble for setting tuition at the institution, shall be authorized to
30 set a reduced rate of tuition and/or fees, or to waive tuition
31 and/or fees entirely, for students enrolled in such P-TECH program
32 with no reduction in other state, local or other support for such
33 students earning college credit that such higher education partner
34 would otherwise be eligible to receive.
35 Provided, further, that notwithstanding any provision of law to the
36 contrary, the $1,500,000 appropriated herein available for a school
37 district teacher residency program shall be used to provide resident
38 teachers with the professional development and training to make an
39 immediate impact in schools in the state, pursuant to a plan devel-
40 oped by the commissioner and approved by the director of the budget.
41 Provided, further, that such plan shall establish a process for
42 selection of experienced nonprofit entities to manage the program.
43 Provided, further, that no school district shall receive more than
44 forty percent of the total grant allocation.
45 Provided, further, that notwithstanding any provision of law to the
46 contrary, $1,500,000 of the amount appropriated herein shall be made
47 available for payment of New York state masters-in-education teacher
48 incentive scholarship program awards. Provided, further, that eligi-
49 bility for an award under this appropriation shall be limited to
50 students who are matriculated in an approved master's degree in
51 education program at a New York state public institution of higher
52 education leading to a career as a teacher in public elementary or
53 secondary education shall be eligible for an award, provided the
54 applicant: (a) earned an undergraduate degree from a college located
55 in New York state; and (b) was a New York State resident while earn-
56 ing such undergraduate degree; and (c) achieved academic excellence
1059 12654-10-8
1 as an undergraduate student, as defined by the higher education
2 services corporation in regulation; and (d) enrolls in full-time
3 study in an approved master's degree in education program at a New
4 York State public institution of higher education leading to a
5 career as teacher in public elementary or secondary education; and
6 (e) signs a contract with the corporation agreeing to teach in the
7 classroom on a full-time basis for five years in a school located
8 within New York state providing public elementary or secondary
9 education recognized by the board of regents or the university of
10 the state of New York including charter schools authorized pursuant
11 to article 56 of the education law; and (f) complies with the appli-
12 cable provisions of article 13 of education law and all requirements
13 promulgated by the corporation for the administration of the
14 program. Provided, further, that: (a) awards shall be granted to
15 applicants that the corporation has certified are eligible to
16 receive such awards; and (b) up to five hundred awards may be made
17 for the 2015-2016 academic year, provided such awards shall be made
18 to recipients after the successful completion of the term, as
19 defined by the corporation. Provided, further, the corporation shall
20 grant such awards in an amount equal to the annual tuition charged
21 state resident students attending a graduate program full-time at
22 the state university of New York, or actual tuition charged, which-
23 ever is less, for not more than two academic years of full-time
24 graduate study leading to certification as an elementary or second-
25 ary classroom teacher; provided: (i) a student who receives educa-
26 tional grants and/or scholarships that cover the student's full cost
27 of attendance shall not be eligible for an award under this program;
28 (ii) for a student who receives educational grants and/or scholar-
29 ships that cover less than the student's full cost of attendance,
30 such grants and/or scholarships shall not be deemed duplicative of
31 this program and may be held concurrently with an award under this
32 program, provided that the combined benefits do not exceed the
33 student's full cost of attendance; and (iii) an award under this
34 program shall be applied to tuition after the application of all
35 other educational grants and scholarships limited to tuition and
36 shall be reduced in an amount equal to such educational grants
37 and/or scholarships. Provided, further that upon notification of an
38 award under this program, the institution shall defer the amount of
39 tuition equal to the award. No award shall be final until the recip-
40 ient's successful completion of a term has been certified by the
41 institution. A recipient of an award under this program shall not be
42 eligible for an award under the New York state math and science
43 teaching incentive program. Provided, further that awards granted
44 pursuant to this appropriation shall require a contract between the
45 award recipient and the corporation to authorize the corporation to
46 convert to a student loan the full amount of the award given pursu-
47 ant to this appropriation, plus interest, according to a schedule to
48 be determined by the corporation if: (a) two years after the
49 completion of the degree program and receipt of initial certif-
50 ication it is found that a recipient is not teaching in a public
51 school located within New York state providing elementary or second-
52 ary education recognized by the board of regents or the university
53 of the state of New York including charter schools authorized pursu-
54 ant to article 56 of the education law; or (b) a recipient has not
55 taught in a public school located within New York state providing
56 elementary or secondary education recognized by the board of regents
1060 12654-10-8
1 or the university of the state of New York including charter schools
2 authorized pursuant to article 56 of the education law for five of
3 the seven years after the completion of the graduate degree program
4 and receipt of initial certification; or (c) a recipient fails to
5 complete his or her graduate degree program in education; or (d) a
6 recipient fails to receive or maintain his or her teaching certif-
7 icate or license in New York state; or (e) a recipient fails to
8 respond to requests by the corporation for the status of his or her
9 academic or professional progress. Provided, further that the
10 preceding terms and conditions: (a) shall be deferred for any inter-
11 ruption in graduate study or employment as established by the rules
12 and regulations of the corporation; (b) shall be cancelled upon the
13 death of the recipient; and (c) notwithstanding any provision of
14 this appropriation to the contrary, authorize the corporation to
15 provide for the waiver or suspension of any financial obligation
16 which would involve extreme hardship pursuant to rules and regu-
17 lations promulgated by the corporation. Notwithstanding any
18 provision of the law to the contrary, upon approval of the director
19 of the budget, such $1,500,000 of masters-in-education teacher
20 incentive scholarship program funding may be sub-allocated, inter-
21 changed, transferred or otherwise made available to the higher
22 education services corporation for the sole purpose of administering
23 such program.
24 Provided, further, that notwithstanding any provision of law to the
25 contrary, the $1,500,000 appropriated herein available for QUALITYs-
26 tarsNY shall be used, pursuant to a plan approved by the director of
27 the budget, to support implementation of a statewide system to
28 assess, improve, and communicate the level of quality in early
29 education and care settings throughout the state. Notwithstanding
30 any provision of law to the contrary, upon approval of the director
31 of the budget, the $1,500,000 of funding appropriated herein for
32 QUALITYstarsNY may be suballocated, interchanged, transferred or
33 otherwise made available to the office of children and family
34 services for the sole purpose of administering such system.
35 Provided further that, notwithstanding any provision of law to the
36 contrary, of the amount appropriated herein, a minimum of
37 $14,000,000 per year shall be available in the 2016-17 through
38 [2018-19] 2019-20 school years for the payment of grant awards as
39 follows: $11,000,000 for pre-kindergarten grants for three-year-old
40 children, $1,500,000 for early college high school programs,
41 $500,000 for career and technical education programs, and $1,000,000
42 for QUALITYstarsNY; provided, however, the funds appropriated herein
43 for early college high school programs shall only be available for
44 grants awarded for the 2017-18 school year and prior school years;
45 provided further that, notwithstanding any provision of law to the
46 contrary, such $14,000,000, plus any other amounts so designated in
47 other items of appropriation within the general fund local assist-
48 ance account office of pre-kindergarten through grade twelve educa-
49 tion program, shall constitute the competitive awards amount author-
50 ized for the 2016-17 school year.
51 Provided further that, notwithstanding any provision of law to the
52 contrary, the $11,000,000 appropriated herein available for prekin-
53 dergarten grants to full-day and half-day prekindergarten programs
54 for three-year-old children shall be awarded, based on a request for
55 proposals developed by the commissioner and approved by the director
56 of the budget, to school districts to establish new full-day and
1061 12654-10-8
1 half-day prekindergarten placements for three-year-olds; provided
2 that such grants shall only be used to supplement, not supplant
3 existing prekindergarten programs; and provided further, however,
4 that any portion of such $11,000,000 that is not awarded shall
5 remain available for subsequent awards in the 2016-17 school year or
6 for full-day and half-day pre-kindergarten grants to be awarded in
7 subsequent school years. Provided, further, that such grants from
8 funds appropriated herein shall be awarded based on factors includ-
9 ing, but not limited to, the following: (i) measures of school
10 district need, (ii) measures of the need of students to be served by
11 each of the school districts, (iii) the school district's proposal
12 to target the highest need schools and students, (iv) the extent to
13 which the district's proposal would prioritize funds to maximize the
14 total number of eligible children in the district served in prekin-
15 dergarten programs, and (v) proposal quality. Provided, however,
16 that full-day and half-day prekindergarten grants appropriated here-
17 in shall only be available to support programs (i) that provide
18 instruction for at least five hours per school day for full-day
19 pre-kindergarten programs and at least two and one-half hours per
20 school day for half-day prekindergarten programs; (ii) that agree to
21 offer instruction consistent with applicable New York state prekin-
22 dergarten early learning standards; (iii) that ensure that, to the
23 extent community-based providers are part of such program, such
24 providers meet the requirements of paragraphs d-1 and d-2 of subdi-
25 vision 12 of section 3602-e of the education law; and (iv) that
26 otherwise comply with all of the same rules and requirements as
27 universal prekindergarten programs pursuant to section 3602-e of the
28 education law except as modified herein; provided that notwithstand-
29 ing paragraph c of subdivision 1 of section 3602-e of the education
30 law, for the purposes of this appropriation, an eligible child shall
31 be a resident child who is three years of age on or before December
32 first of the year in which he or she is enrolled. Provided, further,
33 that as a condition of eligibility for receipt of such funding, a
34 school district must currently offer a prekindergarten program for
35 four-year-old children, or children who would otherwise be eligible
36 under paragraph c of subdivision 1 of section 3602-e of the educa-
37 tion law; provided, further, that a school district may apply for
38 only as many full-day or half-day placements for three-year-old
39 children as it currently offers for four-year-old children, or chil-
40 dren who would otherwise be eligible under paragraph c of subdivi-
41 sion 1 of section 3602-e of the education law. Provided, further,
42 that a school district's grant for three-year-old prekindergarten
43 shall equal the product of (A) (i) two multiplied by the approved
44 number of new full-day pre-kindergarten placements plus (ii) the
45 approved number of new half-day pre-kindergarten placements, and (B)
46 the district's selected aid per pre-kindergarten pupil pursuant to
47 subparagraph i of paragraph b of subdivision 10 of section 3602-e of
48 the education law; provided, however, that no district shall receive
49 a grant in excess of the total actual grant expenditures incurred by
50 the district in the current school year as approved by the commis-
51 sioner. Provided, further, that as a condition of eligibility for
52 receipt of such funding, a school district shall agree to adopt
53 approved quality indicators within two years, including, but not
54 limited to, valid and reliable measures of environmental quality,
55 the quality of teacher-student interactions and child outcomes, and
56 ensure that any such assessment of child outcomes shall not be used
1062 12654-10-8
1 to make high-stakes educational decisions for individual children.
2 Provided, further, that no school district shall receive more than
3 forty percent of the total pre-kindergarten for three-year-old chil-
4 dren grant allocation.
5 Provided further that, notwithstanding any provision of law to the
6 contrary, the $1,500,000 appropriated herein available for early
7 college high school programs shall be awarded pursuant to a plan
8 developed by the commissioner and approved by the director of the
9 budget, provided that such plan shall ensure regional diversity of
10 grant recipients and prioritize programs serving students in academ-
11 ically challenged school districts; provided further that the
12 commissioner shall make available the request for proposals for such
13 programs on or before May fifteenth and the commissioner shall issue
14 awards on or before August fifteenth; and provided further that a
15 portion of the payments to early college high school programs
16 awarded funding from this appropriation shall be made on a sliding
17 scale based upon the number of college credits earned annually by
18 participating students, consistent with guidelines established by
19 the commissioner. Provided further that in connection with such
20 guidelines, the commissioner shall execute a memorandum of under-
21 standing with the state university of New York and the city univer-
22 sity of New York to develop common data collection, sharing and
23 reporting mechanisms based on student-level data for students
24 enrolled in early college high school programs. Provided further
25 that, notwithstanding any provision of law to the contrary, higher
26 education partners participating in an early college high school
27 program, or the entity/entities responsible for setting tuition at
28 the institution, shall be authorized to set a reduced rate of
29 tuition and/or fees, or to waive tuition and/or fees entirely, for
30 students enrolled in such an early college high school program with
31 no reduction in other state, local or other support for such
32 students earning college credit that such higher education partner
33 would otherwise be eligible to receive.
34 Provided further that, notwithstanding any provision of law to the
35 contrary, the $500,000 appropriated herein available for career and
36 technical education (CTE) programs shall be awarded, pursuant to a
37 plan developed by the commissioner and approved by the director of
38 the budget, to provide CTE programs with support and resources to
39 eliminate barriers to students with special needs and English
40 language learners from participating in such programs, as well as
41 promote gender diversity in CTE programs.
42 Provided, further, that notwithstanding any provision of law to the
43 contrary, the $1,000,000 appropriated herein available for QUALITYs-
44 tarsNY shall be used, pursuant to a plan approved by the director of
45 the budget, to support implementation of a statewide system to
46 assess, improve, and communicate the level of quality in early
47 education and care settings throughout the state. Notwithstanding
48 any provision of law to the contrary, upon approval of the director
49 of the budget, the $1,000,000 of funding appropriated herein for
50 QUALITYstarsNY may be suballocated, interchanged, transferred or
51 otherwise made available to the office of children and family
52 services for the sole purpose of administering such system. Provided
53 that, for the 2016-17 through [2018-19] 2019-20 school years, a
54 portion of these funds shall be used to support programs identified
55 by the office of children and family services, the department of
1063 12654-10-8
1 health and mental hygiene of the city of New York, or the department
2 as needing extraordinary quality support.
3 Provided further that, notwithstanding any inconsistent provision of
4 law, subject to the approval of the director of the budget, funds
5 appropriated herein may be interchanged with the appropriation for
6 School District Performance Improvement grants within the general
7 fund local assistance account office of pre-kindergarten through
8 grade twelve education program.
9 Notwithstanding section 40 of the state finance law or any provision
10 of law to the contrary, this appropriation shall lapse on March 31,
11 2019 (23453) ... 250,000,000 ..................... (re. $65,993,000)
12 Funds appropriated herein shall be used to provide competitive grants
13 pursuant to a request for proposals, developed by the commissioner
14 and approved by the director of budget, to those school districts
15 that are participating in the race to the top program and/or which
16 demonstrate satisfactory progress, as determined by the commission-
17 er, towards implementation of elements such as high quality student
18 assessments; use of data to improve instruction and student perform-
19 ance and provision of professional development to improve teacher
20 performance; and that those eligible districts also demonstrate the
21 most improved academic achievement gains and student outcomes such
22 as establishing or expanding participation in college level or early
23 college programs; and other appropriate measures of student perform-
24 ance; provided further that in determining the amount of the award
25 to be made from the funds appropriated herein for those school
26 districts identified as making the greatest achievement gains and
27 eligible for such award, the maximum grant award available to each
28 school district shall be based upon the size of the district meas-
29 ured by public school enrollment of the district; and provided
30 further that such amount shall be adjusted based upon measures of
31 district need and provided further that no district receiving a
32 grant may be awarded more than forty percent of the total amount
33 awarded; and provided further that any such funds awarded to a
34 school district shall be used to increase student performance,
35 narrow the achievement gap, and increase academic performance in
36 traditionally underserved student groups.
37 Provided further that, notwithstanding any provision of law to the
38 contrary, in addition to the competitive awards amount as defined in
39 paragraph ee of subdivision 1 of section 3602 of the education law,
40 a minimum of $37,500,000 shall be available for the payment of grant
41 awards made in the 2013-14 school year, with additional amounts to
42 be made available in the 2014-15 through [2018-19] 2019-20 state
43 fiscal years as necessary to continue such awards, make an addi-
44 tional round of awards pursuant to subdivision 6-a of section 3641
45 of the education law in the 2014-15 school year not to exceed the
46 amount awarded in the 2013-14 school year pursuant to such subdivi-
47 sion 6-a, and make additional master teachers awards to the extent
48 that the master teachers program authorized herein would not other-
49 wise expend the maximum school year amount authorized herein; and
50 such $37,500,000 shall be made available for $12,500,000 of prekin-
51 dergarten grants, $10,000,000 of school-wide extended learning
52 grants, $7,500,000 of community schools grants, $5,500,000 for a
53 master teacher program and $2,000,000 for the early college high
54 school program; provided, however, the funds appropriated herein for
55 pre-kindergarten grants shall only be available for grants awarded
56 for the 2016-17 school year and prior school years; provided, howev-
1064 12654-10-8
1 er, the funds appropriated herein for school-wide extended learning
2 grants shall only be available for grants awarded for the 2017-18
3 school year and prior school years; provided, however, the funds
4 appropriated herein for the early college high school program shall
5 only be available for grants awarded for the 2017-18 school year and
6 prior school years; provided, however, that no school district shall
7 receive any portion of the funds appropriated herein unless it shall
8 have submitted documentation that has been approved by the commis-
9 sioner by September 1 of 2013 and of each school year in which a
10 payment to such district from this appropriation would otherwise be
11 made demonstrating that it has fully implemented new standards and
12 procedures for conducting annual professional performance reviews of
13 classroom teachers and building principals to determine teacher and
14 principal effectiveness.
15 Provided, further, that notwithstanding any provision of law to the
16 contrary, the $12,500,000 appropriated herein available for full-day
17 and half-day pre-kindergarten grants shall be awarded, based on a
18 request for proposals developed by the commissioner and approved by
19 the director of the budget, to school districts to establish new
20 full-day and half-day pre-kindergarten placements and/or to convert
21 existing half-day pre-kindergarten placements into full-day place-
22 ments; provided that preference shall be granted for full-day place-
23 ments while ensuring that a portion of grants include half-day
24 placements based on eligible applications; and provided, further,
25 that such grants shall only be used to supplement, not supplant
26 existing pre-kindergarten programs, and provided further, however,
27 that any portion of such $12,500,000 that is not awarded shall
28 remain available for subsequent awards in the 2013-14 school year or
29 for full-day and half-day pre-kindergarten grants to be awarded in
30 subsequent school years. Provided, further, that such grants from
31 funds appropriated herein shall be awarded based on factors includ-
32 ing, but not limited to, the following: (i) measures of school
33 district need, (ii) measures of the need of students to be served by
34 each of the school districts, (iii) the school district's proposal
35 to target the highest need schools and students, (iv) the extent to
36 which the district's proposal would prioritize funds to maximize the
37 total number of eligible children in the district served in prekin-
38 dergarten programs, and (v) proposal quality. Provided, however,
39 that full-day and half-day pre-kindergarten grants appropriated
40 herein shall only be available to support programs (i) that provide
41 instruction for at least five hours per school day for full-day
42 pre-kindergarten programs and at least two and one-half hours per
43 school day for half-day pre-kindergarten programs; (ii) that agree
44 to offer instruction consistent with the New York state prekinder-
45 garten foundation for the common core standards within three years;
46 (iii) that ensure that, to the extent community-based providers are
47 part of such program, such providers meet the requirements of para-
48 graphs d-1 and d-2 of subdivision 12 of section 3602-e of the educa-
49 tion law; and (iv) that otherwise comply with all of the same rules
50 and requirements as universal pre-kindergarten programs pursuant to
51 section 3602-e of the education law except as modified herein.
52 Provided, further, that a school district's pre-kindergarten grant
53 shall equal the product of (A) (i) two multiplied by the approved
54 number of new full-day pre-kindergarten placements plus (ii) the
55 approved number of half-day pre-kindergarten placement conversions
56 and new half-day pre-kindergarten placements, and (B) the district's
1065 12654-10-8
1 selected aid per pre-kindergarten pupil pursuant to subparagraph i
2 of paragraph b of subdivision 10 of section 3602-e of the education
3 law; provided, however, that no district shall receive a grant in
4 excess of the total actual grant expenditures incurred by the
5 district in the current school year as approved by the commissioner.
6 Provided, further, that as a condition of eligibility for receipt of
7 such funding, a school district shall agree to adopt approved quali-
8 ty indicators within two years, including, but not limited to, valid
9 and reliable measures of environmental quality, the quality of
10 teacher-student interactions and child outcomes, and ensure that any
11 such assessment of child outcomes shall not be used to make highs-
12 takes educational decisions for individual children. Provided,
13 further, that no school district shall receive more than forty
14 percent of the total pre-kindergarten grant allocation.
15 Provided, further, that notwithstanding any provision of law to the
16 contrary, the $10,000,000 appropriated herein available for school-
17 wide extended learning grants shall be awarded to school districts
18 or school districts in collaboration with not-for-profit community-
19 based organizations based on responses to a request for proposals
20 for planning and implementation grants that is (i) developed by the
21 commissioner; (ii) approved by the director of the budget; and (iii)
22 issued by the commissioner. Provided, further, that such grants
23 shall be awarded based on factors including, but not limited to, the
24 following: (i) the school district's proposal to target the schools
25 and students with the greatest need, and (ii) proposal quality.
26 Provided, further, that to assess proposal quality in order to award
27 implementation grant funding, the commissioner shall take into
28 account factors including, but not limited to: (i) the extent to
29 which the school district's proposal would maximize the use of the
30 additional learning time through a comprehensive restructuring of
31 the school day and/or year, (ii) the extent to which the proposal
32 would provide additional learning time for students in grades six
33 through eight, and (iii) how the additional learning time would be
34 utilized, including, but not limited to, additional time spent on
35 core academics. Provided, however, that no district shall be eligi-
36 ble to receive a school-wide extended learning grant unless its
37 proposal would increase student learning time by at least 25
38 percent. Provided, further, that a school district's schoolwide
39 extended learning implementation grant shall equal its average daily
40 attendance in the school-wide extended learning program multiplied
41 by the expected cost per pupil of the additional learning time;
42 provided, further, that the expected cost per pupil of the addi-
43 tional learning time shall equal the greater of $1,500 or (A) the
44 quotient of (i) the school district's approved operating expense,
45 pursuant to paragraph t of subdivision 1 of section 3602 of the
46 education law, for the year prior to the base year, divided by (ii)
47 the district's public school district enrollment, pursuant to
48 subparagraph (2) of paragraph n of such subdivision, for the year
49 prior to the base year, multiplied by (B) 10 percent (0.10), multi-
50 plied by (C) the quotient of (i) the average of the national consum-
51 er price indexes determined by the United States department of labor
52 for the 12-month period preceding January first of the base year,
53 divided by (ii) the average of the national consumer price indexes
54 determined by the United States department of labor for the 12-month
55 period preceding January first of the year two years prior to the
56 base year; provided, however, that in extraordinary cases the
1066 12654-10-8
1 commissioner may award a grant that exceeds the per pupil limit
2 described above; provided further, however, that no district shall
3 receive a grant in excess of the total actual grant expenditures
4 incurred by the district in the current school year as approved by
5 the commissioner. Provided, further, that no school district shall
6 receive more than forty percent of the total school-wide extended
7 learning grant allocation.
8 Provided, further, that notwithstanding any provision of law to the
9 contrary, the $7,500,000 appropriated herein available for community
10 schools grants shall be awarded, based on a request for proposals
11 (i) developed by the state council on children and families in coor-
12 dination with the commissioner, (ii) approved by the director of the
13 budget and (iii) issued by the commissioner, to school districts, or
14 in a city with a population of one million or more an eligible enti-
15 ty, to improve student outcomes through the implementation of commu-
16 nity schools programs that use school buildings as community hubs to
17 deliver co-located or school-linked academic, health, mental health,
18 nutrition, counseling, legal and/or other services to students and
19 their families. In a city with a population of one million or more,
20 eligible entities shall mean the city school district of the city of
21 New York, or not-for-profit organizations, which shall include not-
22 for-profit community-based organizations. An eligible entity that is
23 a not-for-profit may apply for a community school grant provided
24 that it collaborates with the city school district of the city of
25 New York and receives the approval of the chancellor of the city
26 school district of the city of New York. Provided, further, that
27 such grants shall be awarded based on factors including, but not
28 limited to, the following: (i) measures of school district need,
29 (ii) measures of the need of students to be served by each of the
30 school districts, (iii) the school district's proposal to target the
31 highest need schools and students, (iv) the sustainability of the
32 proposed community schools program, and (v) proposal quality.
33 Provided, further, that to assess proposal quality in order to award
34 such funding, the commissioner shall take into account factors
35 including, but not limited to: (i) the extent to which the school
36 district's proposal would provide such community services through
37 partnerships with local governments and non-profit organizations,
38 (ii) the extent to which the proposal would provide for delivery of
39 such services directly in school buildings, (iii) the extent to
40 which the proposal articulates how such services would facilitate
41 measurable improvement in student and family outcomes, (iv) the
42 extent to which the proposal articulates and identifies how existing
43 funding streams and programs would be used to provide such community
44 services, and (v) the extent to which the proposal ensures the safe-
45 ty of all students, staff and community members in school buildings
46 used as community hubs. Provided, however, that community schools
47 grants appropriated herein shall be paid to school districts in
48 installments upon successful implementation of each phase of a
49 school district's approved proposal. Provided, further, that no
50 school district shall receive more than forty percent of the total
51 community schools grant allocation, and that each individual commu-
52 nity school site shall be limited to a maximum grant of $500,000.
53 Provided, further, that notwithstanding any provision of law to the
54 contrary, the $5,500,000 appropriated herein available for a master
55 teachers program shall support the award of stipends of $15,000 per
56 annum over four years to individual high-performing teachers in
1067 12654-10-8
1 math, science and related fields, and of related costs, administered
2 by the state university of New York pursuant to a plan developed in
3 consultation with the commissioner, who shall consult with appropri-
4 ate state organizations representing K-12 public school teachers,
5 and approved by the director of the budget, to build a corps of
6 outstanding math, science and related fields teachers in order to
7 improve the quality of instruction at public secondary schools. Such
8 plan for use of funding appropriated herein shall: (i) establish an
9 application process; (ii) guidelines by which applications from
10 eligible teachers shall be evaluated, which shall include, but not
11 be limited to, achievement of a rating of highly effective on the
12 annual professional performance review; and (iii) provide periodic
13 opportunities for professional development for successful appli-
14 cants. Provided, further, that priority shall be given to applicants
15 in regions of the state where a similar program is not otherwise
16 offered. Notwithstanding any provision of law to the contrary, upon
17 approval of the director of the budget, such $5,500,000 of master
18 teachers program funding may be sub-allocated, interchanged, trans-
19 ferred or otherwise made available to the state university of New
20 York for the services and expenses of administering such program.
21 Nothing herein shall be construed to limit the rights of labor
22 organizations to collectively bargain terms and conditions pursuant
23 to article 14 of the civil service law.
24 Provided, further, that notwithstanding any provision of law to the
25 contrary, the $2,000,000 appropriated herein available for the early
26 college high school program shall support the continuation and
27 expansion of such program pursuant to a plan developed by the
28 commissioner and approved by the director of the budget. Provided,
29 however, that a portion of the payments to early college high school
30 programs awarded funding from this appropriation shall be awarded on
31 a sliding scale based upon the number of college credits earned
32 annually by participating students, consistent with guidelines
33 established by the commissioner. Provided further that, notwith-
34 standing any provision of law to the contrary, higher education
35 partners participating in an early college high schools program, or
36 the entity/entities responsible for setting tuition at the institu-
37 tion, shall be authorized to set a reduced rate of tuition and/or
38 fees, or to waive tuition and/or fees entirely, for students
39 enrolled in such early college high schools program with no
40 reduction in other state, local or other support for such students
41 earning college credit that such higher education partner would
42 otherwise be eligible to receive.
43 Provided further that, notwithstanding any provision of law to the
44 contrary, of the amount appropriated herein, a minimum of
45 $12,500,000 per year shall be available in the 2014-15 through
46 [2018-19] 2019-20 school years for the payment of grant awards as
47 follows: $2,500,000 of pathways in technology early college high
48 school program grants and $10,000,000 of teacher excellence fund
49 grants; provided, however, the funds appropriated herein for path-
50 ways in technology early college high school program grants shall
51 only be available for grants awarded for the 2017-18 school year and
52 prior school years; provided further that, notwithstanding any
53 provision of law to the contrary, such $12,500,000, plus any other
54 amounts so designated in other items of appropriation within the
55 general fund local assistance account office of pre-kindergarten
56 through grade twelve education program, shall constitute the compet-
1068 12654-10-8
1 itive awards amount authorized for the 2013-14 school year by chap-
2 ter 53 of the laws of 2013.
3 Provided further that, notwithstanding any provision of law to the
4 contrary, the $2,500,000 appropriated herein available for pathways
5 in technology early college high school (P-TECH) program grants
6 shall be awarded pursuant to a plan developed by the commissioner
7 and approved by the director of the budget, provided that such plan
8 shall include but not be limited to (i) assurances that K-12, higher
9 education and private-sector partners commit to the required
10 elements and responsibilities of a P-TECH program, (ii) provisions
11 to ensure regional diversity of grant recipients, and (iii) priority
12 for P-TECH programs serving students in academically challenged
13 school districts; provided further that the commissioner shall make
14 available the request for proposals for such program on or before
15 May fifteenth and the commissioner shall issue awards on or before
16 August fifteenth; and provided further that a portion of the
17 payments to P-TECH programs awarded funding from this appropriation
18 shall be made on a sliding scale based upon the number of college
19 credits earned annually by participating students, consistent with
20 guidelines established by the commissioner. Provided further that,
21 notwithstanding any provision of law to the contrary, higher educa-
22 tion partners participating in a P-TECH program, or the
23 entity/entities responsible for setting tuition at the institution,
24 shall be authorized to set a reduced rate of tuition and/or fees, or
25 to waive tuition and/or fees entirely, for students enrolled in such
26 P-TECH program with no reduction in other state, local or other
27 support for such students earning college credit that such higher
28 education partner would otherwise be eligible to receive.
29 Provided further that, notwithstanding any provision of law to the
30 contrary, the $10,000,000 appropriated herein available for teacher
31 excellence fund grants shall be awarded to eligible school districts
32 pursuant to a request for proposals based on a plan developed by the
33 commissioner and approved by the director of the budget; provided
34 that such plan shall include an application for award of such grants
35 to such eligible school districts to provide annual teacher excel-
36 lence fund performance awards of up to $20,000 to eligible teachers
37 rated as "highly effective" on the most recent annual professional
38 performance review, in accordance with the requirements of section
39 3012-d of the education law and the regulations of the commissioner,
40 pursuant to such districts' approved applications; provided that in
41 making such grants the commissioner shall prioritize school
42 districts' applications based on factors including but not limited
43 to (i) the extent to which the school district's application would
44 recognize and reward such teachers in school buildings with the
45 greatest academic need, in difficult-to-staff subject or certif-
46 ication areas and grade levels, and at critical points in a teach-
47 er's career in order to encourage highly effective teachers to
48 remain in the classroom, and (ii) the quality of the school
49 district's application; and provided further that the commissioner
50 shall make available the application for such grants on or before
51 May fifteenth and the commissioner shall issue grant awards an
52 agreed-to schedule.
53 Provided further that, notwithstanding any provision of law to the
54 contrary, of the amount appropriated herein, a minimum of
55 $23,500,000 per year shall be available in the 2015-16 through
56 [2018-19] 2019-20 school years for the payment of grant awards as
1069 12654-10-8
1 follows: $15,000,000 for pre-kindergarten grants, $2,500,000 for an
2 expanded master teacher program, $1,500,000 of pathways in technolo-
3 gy early college high school program grants, $1,500,000 for a school
4 district teacher residency program, $1,500,000 for a New York state
5 masters-in-education teacher incentive scholarship program, and
6 $1,500,000 for QUALITYstarsNY; provided, however, the funds appro-
7 priated herein for pathways in technology early college high school
8 program grants shall only be available for grants awarded for the
9 2017-18 school year and prior school years; provided further that,
10 notwithstanding any provision of law to the contrary, such
11 $23,500,000, plus any other amounts so designated in other items of
12 appropriation within the general fund local assistance account
13 office of pre-kindergarten through grade twelve education program,
14 shall constitute the competitive awards amount authorized for the
15 2015-16 school year.
16 Provided, further, that notwithstanding any provision of law to the
17 contrary, the $15,000,000 appropriated herein available for grants
18 to full-day and half-day pre-kindergarten programs for three-year-
19 old and four-year-old children shall be awarded, based on a request
20 for proposals developed by the commissioner and approved by the
21 director of the budget, to school districts to establish new full-
22 day and half-day pre-kindergarten placements for three-year-olds and
23 four-year-olds; provided that such grants shall only be used to
24 supplement, not supplant existing pre-kindergarten programs; and
25 provided further, however, that any portion of such $15,000,000 that
26 is not awarded shall remain available for subsequent awards in the
27 2015-16 school year or for full-day and half-day prekindergarten
28 grants to be awarded in subsequent school years. Provided, further,
29 that such grants from funds appropriated herein shall be awarded
30 based on factors including, but not limited to, the following: (i)
31 measures of school district need, (ii) measures of the need of
32 students to be served by each of the school districts, (iii) the
33 school district's proposal to target the highest need schools and
34 students, (iv) the extent to which the district's proposal would
35 prioritize funds to maximize the total number of eligible children
36 in the district served in pre-kindergarten programs, and (v)
37 proposal quality. Provided, however, that full-day and half-day
38 pre-kindergarten grants appropriated herein shall only be available
39 to support programs (i) that provide instruction for at least five
40 hours per school day for full-day pre-kindergarten programs and at
41 least two and one-half hours per school day for half-day prekinder-
42 garten programs; (ii) that agree to offer instruction consistent
43 with the New York state pre-kindergarten foundation for the common
44 core standards; (iii) that ensure that, to the extent community-
45 based providers are part of such program, such providers meet the
46 requirements of paragraphs d-1 and d-2 of subdivision 12 of section
47 3602-e of the education law; and (iv) that otherwise comply with all
48 of the same rules and requirements as universal prekindergarten
49 programs pursuant to section 3602-e of the education law except as
50 modified herein; provided that notwithstanding paragraph c of subdi-
51 vision 1 of section 3602-e of the education law notwithstanding, for
52 the purposes of this appropriation, an eligible child shall be a
53 resident child who is three years of age on or before December first
54 of the year in which he or she is enrolled. Provided, further, that
55 as a condition of eligibility for receipt of such funding for three-
56 year-olds, a school district must currently offer a prekindergarten
1070 12654-10-8
1 program for four-year-old children, or children who would otherwise
2 be eligible under paragraph c of subdivision 1 of section 3602-e of
3 the education law; provided, further, that a school district may
4 apply for only as many full-day or half-day placements for three-
5 year-old children as it currently offers for four-year-old children,
6 or children who would otherwise be eligible under paragraph c of
7 subdivision 1 of section 3602-e of the education law. Provided,
8 further, that a school district's grant for three-year-old and four-
9 year-old pre-kindergarten shall equal the product of (A) (i) two
10 multiplied by the approved number of new full-day prekindergarten
11 placements plus (ii) the approved number of new half-day prekinder-
12 garten placements, and (B) the district's selected aid per prekin-
13 dergarten pupil pursuant to subparagraph i of paragraph b of subdi-
14 vision 10 of section 3602-e of the education law; provided, however,
15 that no district shall receive a grant in excess of the total actual
16 grant expenditures incurred by the district in the current school
17 year as approved by the commissioner. Provided, further, that as a
18 condition of eligibility for receipt of such funding, a school
19 district shall agree to adopt approved quality indicators within two
20 years, including, but not limited to, valid and reliable measures of
21 environmental quality, the quality of teacher-student interactions
22 and child outcomes, and ensure that any such assessment of child
23 outcomes shall not be used to make high-stakes educational decisions
24 for individual children. Provided, further, that no school district
25 shall receive more than forty percent of the total prekindergarten
26 for three-year-old and four-year-old children grant allocation.
27 Provided, further, that notwithstanding any provision of law to the
28 contrary, the $2,500,000 appropriated herein available for an
29 expanded master teachers program shall support the award of stipends
30 of $15,000 per annum over four years to individual high-performing
31 teachers, and of related costs, administered by the state university
32 of New York pursuant to a plan developed in consultation with the
33 commissioner, who shall consult with appropriate state organizations
34 representing K-12 public school teachers and approved by the direc-
35 tor of the budget, to build a corps of outstanding teachers in order
36 to improve the quality of instruction at public secondary schools.
37 Such plan for use of funding appropriated herein shall: (i) allocate
38 at least 80 percent of such stipends to high performing teachers in
39 math, science, and related fields and up to 20 percent of such
40 stipends to high performing teachers with an extension to their
41 content area certificate in bilingual education or who hold certif-
42 ication in English as a Second Language and high-performing teachers
43 with dual certification in a content area and special education;
44 (ii) establish an application process; (iii) guidelines by which
45 applications from eligible teachers shall be evaluated, which shall
46 include, but not be limited to, achievement of a rating of highly
47 effective on the annual professional performance review; and (iv)
48 provide periodic opportunities for professional development for
49 successful applicants. Provided, further, that priority shall be
50 given to applicants in regions of the state where a similar program
51 is not otherwise offered. Notwithstanding any provision of law to
52 the contrary, upon approval of the director of the budget, such
53 $2,500,000 of master teachers program funding may be suballocated,
54 interchanged, transferred or otherwise made available to the state
55 university of New York for the services and expenses of administer-
56 ing such program. Nothing herein shall be construed to limit the
1071 12654-10-8
1 rights of labor organizations representing teachers to collectively
2 bargain terms and conditions pursuant to article 14 of the civil
3 service law.
4 Provided further that, notwithstanding any provision of law to the
5 contrary, the $1,500,000 appropriated herein available for pathways
6 in technology early college high school (P-TECH) program grants
7 shall be awarded pursuant to a plan developed by the commissioner
8 and approved by the director of the budget, provided that such plan
9 shall include but not be limited to (i) assurances that K-12, higher
10 education and private-sector partners commit to the required
11 elements and responsibilities of a P-TECH program, (ii) provisions
12 to ensure regional diversity of grant recipients, and (iii) priority
13 for P-TECH programs serving students in academically challenged
14 school districts; provided further that the commissioner shall make
15 available the request for proposals for such program on or before
16 May fifteenth and the commissioner shall issue awards on or before
17 August fifteenth; and provided further that a portion of the
18 payments to P-TECH programs awarded funding from this appropriation
19 shall be made on a sliding scale based upon the number of college
20 credits earned annually by participating students, consistent with
21 guidelines established by the commissioner. Provided further that in
22 connection with such guidelines, the commissioner shall execute a
23 memorandum of understanding with the state university of New York
24 and the city university of New York to develop common data
25 collection, sharing and reporting mechanisms based on student-level
26 data for students enrolled in P-TECH and smart scholars early
27 college high school programs. Provided further that, notwithstanding
28 any provision of law to the contrary, higher education partners
29 participating in a P-TECH program, or the entity/entities responsi-
30 ble for setting tuition at the institution, shall be authorized to
31 set a reduced rate of tuition and/or fees, or to waive tuition
32 and/or fees entirely, for students enrolled in such P-TECH program
33 with no reduction in other state, local or other support for such
34 students earning college credit that such higher education partner
35 would otherwise be eligible to receive.
36 Provided, further, that notwithstanding any provision of law to the
37 contrary, the $1,500,000 appropriated herein available for a school
38 district teacher residency program shall be used to provide resident
39 teachers with the professional development and training to make an
40 immediate impact in schools in the state, pursuant to a plan devel-
41 oped by the commissioner and approved by the director of the budget.
42 Provided, further, that such plan shall establish a process for
43 selection of experienced nonprofit entities to manage the program.
44 Provided, further, that no school district shall receive more than
45 forty percent of the total grant allocation.
46 Provided, further, that notwithstanding any provision of law to the
47 contrary, $1,500,000 of the amount appropriated herein shall be made
48 available for payment of New York state masters-in-education teacher
49 incentive scholarship program awards. Provided, further, that eligi-
50 bility for an award under this appropriation shall be limited to
51 students who are matriculated in an approved master's degree in
52 education program at a New York state public institution of higher
53 education leading to a career as a teacher in public elementary or
54 secondary education shall be eligible for an award, provided the
55 applicant: (a) earned an undergraduate degree from a college located
56 in New York state; and (b) was a New York State resident while earn-
1072 12654-10-8
1 ing such undergraduate degree; and (c) achieved academic excellence
2 as an undergraduate student, as defined by the higher education
3 services corporation in regulation; and (d) enrolls in full-time
4 study in an approved master's degree in education program at a New
5 York State public institution of higher education leading to a
6 career as teacher in public elementary or secondary education; and
7 (e) signs a contract with the corporation agreeing to teach in the
8 classroom on a full-time basis for five years in a school located
9 within New York state providing public elementary or secondary
10 education recognized by the board of regents or the university of
11 the state of New York including charter schools authorized pursuant
12 to article 56 of the education law; and (f) complies with the appli-
13 cable provisions of article 13 of education law and all requirements
14 promulgated by the corporation for the administration of the
15 program. Provided, further, that: (a) awards shall be granted to
16 applicants that the corporation has certified are eligible to
17 receive such awards; and (b) up to five hundred awards may be made
18 for the 2015-2016 academic year, provided such awards shall be made
19 to recipients after the successful completion of the term, as
20 defined by the corporation. Provided, further, the corporation shall
21 grant such awards in an amount equal to the annual tuition charged
22 state resident students attending a graduate program full-time at
23 the state university of New York, or actual tuition charged, which-
24 ever is less, for not more than two academic years of full-time
25 graduate study leading to certification as an elementary or second-
26 ary classroom teacher; provided: (i) a student who receives educa-
27 tional grants and/or scholarships that cover the student's full cost
28 of attendance shall not be eligible for an award under this program;
29 (ii) for a student who receives educational grants and/or scholar-
30 ships that cover less than the student's full cost of attendance,
31 such grants and/or scholarships shall not be deemed duplicative of
32 this program and may be held concurrently with an award under this
33 program, provided that the combined benefits do not exceed the
34 student's full cost of attendance; and (iii) an award under this
35 program shall be applied to tuition after the application of all
36 other educational grants and scholarships limited to tuition and
37 shall be reduced in an amount equal to such educational grants
38 and/or scholarships. Provided, further that upon notification of an
39 award under this program, the institution shall defer the amount of
40 tuition equal to the award. No award shall be final until the recip-
41 ient's successful completion of a term has been certified by the
42 institution. A recipient of an award under this program shall not be
43 eligible for an award under the New York state math and science
44 teaching incentive program. Provided, further that awards granted
45 pursuant to this appropriation shall require a contract between the
46 award recipient and the corporation to authorize the corporation to
47 convert to a student loan the full amount of the award given pursu-
48 ant to this appropriation, plus interest, according to a schedule to
49 be determined by the corporation if: (a) two years after the
50 completion of the degree program and receipt of initial certif-
51 ication it is found that a recipient is not teaching in a public
52 school located within New York state providing elementary or second-
53 ary education recognized by the board of regents or the university
54 of the state of New York including charter schools authorized pursu-
55 ant to article 56 of the education law; or (b) a recipient has not
56 taught in a public school located within New York state providing
1073 12654-10-8
1 elementary or secondary education recognized by the board of regents
2 or the university of the state of New York including charter schools
3 authorized pursuant to article 56 of the education law for five of
4 the seven years after the completion of the graduate degree program
5 and receipt of initial certification; or (c) a recipient fails to
6 complete his or her graduate degree program in education; or (d) a
7 recipient fails to receive or maintain his or her teaching certif-
8 icate or license in New York state; or (e) a recipient fails to
9 respond to requests by the corporation for the status of his or her
10 academic or professional progress. Provided, further that the
11 preceding terms and conditions: (a) shall be deferred for any inter-
12 ruption in graduate study or employment as established by the rules
13 and regulations of the corporation; (b) shall be cancelled upon the
14 death of the recipient; and (c) notwithstanding any provision of
15 this appropriation to the contrary, authorize the corporation to
16 provide for the waiver or suspension of any financial obligation
17 which would involve extreme hardship pursuant to rules and regu-
18 lations promulgated by the corporation. Notwithstanding any
19 provision of the law to the contrary, upon approval of the director
20 of the budget, such $1,500,000 of masters-in-education teacher
21 incentive scholarship program funding may be sub-allocated, inter-
22 changed, transferred or otherwise made available to the higher
23 education services corporation for the sole purpose of administering
24 such program.
25 Provided, further, that notwithstanding any provision of law to the
26 contrary, the $1,500,000 appropriated herein available for QUALITYs-
27 tarsNY shall be used, pursuant to a plan approved by the director of
28 the budget, to support implementation of a statewide system to
29 assess, improve, and communicate the level of quality in early
30 education and care settings throughout the state. Notwithstanding
31 any provision of law to the contrary, upon approval of the director
32 of the budget, the $1,500,000 of funding appropriated herein for
33 QUALITYstarsNY may be sub-allocated, interchanged, transferred or
34 otherwise made available to the office of children and family
35 services for the sole purpose of administering such system.
36 Provided further that, notwithstanding any provision of law to the
37 contrary, of the amount appropriated herein, a minimum of
38 $14,000,000 per year shall be available in the 2016-17 through
39 [2018-19] 2019-20 school years for the payment of grant awards as
40 follows: $11,000,000 for pre-kindergarten grants for three-year-old
41 children, $1,500,000 for early college high school programs,
42 $500,000 for career and technical education programs, and $1,000,000
43 for QUALITYstarsNY; provided, however, the funds appropriated herein
44 for early college high school programs shall only be available for
45 grants awarded for the 2017-18 school year and prior school years;
46 provided further that, notwithstanding any provision of law to the
47 contrary, such $14,000,000, plus any other amounts so designated in
48 other items of appropriation within the general fund local assist-
49 ance account office of pre-kindergarten through grade twelve educa-
50 tion program, shall constitute the competitive awards amount author-
51 ized for the 2016-17 school year.
52 Provided further that, notwithstanding any provision of law to the
53 contrary, the $11,000,000 appropriated herein available for prekin-
54 dergarten grants to full-day and half-day prekindergarten programs
55 for three-year-old children shall be awarded, based on a request for
56 proposals developed by the commissioner and approved by the director
1074 12654-10-8
1 of the budget, to school districts to establish new full-day and
2 half-day prekindergarten placements for three-year-olds; provided
3 that such grants shall only be used to supplement, not supplant
4 existing prekindergarten programs; and provided further, however,
5 that any portion of such $11,000,000 that is not awarded shall
6 remain available for subsequent awards in the 2016-17 school year or
7 for full-day and half-day pre-kindergarten grants to be awarded in
8 subsequent school years. Provided, further, that such grants from
9 funds appropriated herein shall be awarded based on factors includ-
10 ing, but not limited to, the following: (i) measures of school
11 district need, (ii) measures of the need of students to be served by
12 each of the school districts, (iii) the school district's proposal
13 to target the highest need schools and students, (iv) the extent to
14 which the district's proposal would prioritize funds to maximize the
15 total number of eligible children in the district served in prekin-
16 dergarten programs, and (v) proposal quality. Provided, however,
17 that full-day and half-day prekindergarten grants appropriated here-
18 in shall only be available to support programs (i) that provide
19 instruction for at least five hours per school day for full-day
20 pre-kindergarten programs and at least two and one-half hours per
21 school day for half-day prekindergarten programs; (ii) that agree to
22 offer instruction consistent with applicable New York state prekin-
23 dergarten early learning standards; (iii) that ensure that, to the
24 extent community-based providers are part of such program, such
25 providers meet the requirements of paragraphs d-1 and d-2 of subdi-
26 vision 12 of section 3602-e of the education law; and (iv) that
27 otherwise comply with all of the same rules and requirements as
28 universal prekindergarten programs pursuant to section 3602-e of the
29 education law except as modified herein; provided that notwithstand-
30 ing paragraph c of subdivision 1 of section 3602-e of the education
31 law, for the purposes of this appropriation, an eligible child shall
32 be a resident child who is three years of age on or before December
33 first of the year in which he or she is enrolled. Provided, further,
34 that as a condition of eligibility for receipt of such funding, a
35 school district must currently offer a prekindergarten program for
36 four-year-old children, or children who would otherwise be eligible
37 under paragraph c of subdivision 1 of section 3602-e of the educa-
38 tion law; provided, further, that a school district may apply for
39 only as many full-day or half-day placements for three-year-old
40 children as it currently offers for four-year-old children, or chil-
41 dren who would otherwise be eligible under paragraph c of subdivi-
42 sion 1 of section 3602-e of the education law. Provided, further,
43 that a school district's grant for three-year-old prekindergarten
44 shall equal the product of (A) (i) two multiplied by the approved
45 number of new full-day pre-kindergarten placements plus (ii) the
46 approved number of new half-day pre-kindergarten placements, and (B)
47 the district's selected aid per pre-kindergarten pupil pursuant to
48 subparagraph i of paragraph b of subdivision 10 of section 3602-e of
49 the education law; provided, however, that no district shall receive
50 a grant in excess of the total actual grant expenditures incurred by
51 the district in the current school year as approved by the commis-
52 sioner. Provided, further, that as a condition of eligibility for
53 receipt of such funding, a school district shall agree to adopt
54 approved quality indicators within two years, including, but not
55 limited to, valid and reliable measures of environmental quality,
56 the quality of teacher-student interactions and child outcomes, and
1075 12654-10-8
1 ensure that any such assessment of child outcomes shall not be used
2 to make high-stakes educational decisions for individual children.
3 Provided, further, that no school district shall receive more than
4 forty percent of the total pre-kindergarten for three-year-old chil-
5 dren grant allocation.
6 Provided further that, notwithstanding any provision of law to the
7 contrary, the $1,500,000 appropriated herein available for early
8 college high school programs shall be awarded pursuant to a plan
9 developed by the commissioner and approved by the director of the
10 budget, provided that such plan shall ensure regional diversity of
11 grant recipients and prioritize programs serving students in academ-
12 ically challenged school districts; provided further that the
13 commissioner shall make available the request for proposals for such
14 programs on or before May fifteenth and the commissioner shall issue
15 awards on or before August fifteenth; and provided further that a
16 portion of the payments to early college high school programs
17 awarded funding from this appropriation shall be made on a sliding
18 scale based upon the number of college credits earned annually by
19 participating students, consistent with guidelines established by
20 the commissioner. Provided further that in connection with such
21 guidelines, the commissioner shall execute a memorandum of under-
22 standing with the state university of New York and the city univer-
23 sity of New York to develop common data collection, sharing and
24 reporting mechanisms based on student-level data for students
25 enrolled in early college high school programs. Provided further
26 that, notwithstanding any provision of law to the contrary, higher
27 education partners participating in an early college high school
28 program, or the entity/entities responsible for setting tuition at
29 the institution, shall be authorized to set a reduced rate of
30 tuition and/or fees, or to waive tuition and/or fees entirely, for
31 students enrolled in such an early college high school program with
32 no reduction in other state, local or other support for such
33 students earning college credit that such higher education partner
34 would otherwise be eligible to receive.
35 Provided further that, notwithstanding any provision of law to the
36 contrary, the $500,000 appropriated herein available for career and
37 technical education (CTE) programs shall be awarded, pursuant to a
38 plan developed by the commissioner and approved by the director of
39 the budget, to provide CTE programs with support and resources to
40 eliminate barriers to students with special needs and English
41 language learners from participating in such programs, as well as
42 promote gender diversity in CTE programs.
43 Provided, further, that notwithstanding any provision of law to the
44 contrary, the $1,000,000 appropriated herein available for QUALITYs-
45 tarsNY shall be used, pursuant to a plan approved by the director of
46 the budget, to support implementation of a statewide system to
47 assess, improve, and communicate the level of quality in early
48 education and care settings throughout the state. Notwithstanding
49 any provision of law to the contrary, upon approval of the director
50 of the budget, the $1,000,000 of funding appropriated herein for
51 QUALITYstarsNY may be suballocated, interchanged, transferred or
52 otherwise made available to the office of children and family
53 services for the sole purpose of administering such system. Provided
54 that, for the 2016-17 through [2018-19] 2019-20 school years, a
55 portion of these funds shall be used to support programs identified
56 by the office of children and family services, the department of
1076 12654-10-8
1 health and mental hygiene of the city of New York, or the department
2 as needing extraordinary quality support.
3 Provided further that, notwithstanding any inconsistent provision of
4 law, subject to the approval of the director of the budget, funds
5 appropriated herein may be interchanged with the appropriation for
6 School District Management Efficiency grants within the general fund
7 local assistance account office of pre-kindergarten through grade
8 twelve education program.
9 Notwithstanding section 40 of the state finance law or any provision
10 of law to the contrary, this appropriation shall lapse on March 31,
11 2019 (23452) ... 250,000,000 .................... (re. $100,554,000)
12 By chapter 53, section 1, of the laws of 2011, as amended by chapter 53,
13 section 1, of the laws of 2013:
14 For grants in aid to school districts, libraries, not for profits and
15 educational institutions, notwithstanding any provision of law this
16 appropriation shall be allocated only pursuant to a plan setting
17 forth an itemized list of grantees with the amount to be received by
18 each, or the methodology for allocating such appropriation. Such
19 plan shall be subject to the approval of the temporary president of
20 the senate and the director of the budget and thereafter shall be
21 included in a resolution calling for the expenditure of such monies,
22 which resolution must be approved by a majority vote of all members
23 elected to the senate upon a roll call vote ........................
24 16,226,000 ........................................... (re. $94,000)
25 By chapter 53, section 1, of the laws of 2010, as transferred by chapter
26 53, section 1, of the laws of 2011:
27 For nonpublic school aid payable in the 2010-11 state fiscal year.
28 Notwithstanding any provision of law, rule or regulation to the
29 contrary, the amount appropriated herein represents the maximum
30 amount payable during the 2010-11 state fiscal year (21769) ........
31 80,605,000 ............................................ (re. $2,000)
32 For aid payable for additional nonpublic school aid. Notwithstanding
33 any inconsistent provision of law, funds appropriated herein shall
34 be available for payment of aid heretofore accrued and hereafter to
35 accrue provided that, notwithstanding any provision of law, rule or
36 regulation to the contrary, the amount appropriated herein repres-
37 ents the maximum amount payable during the 2010-11 state fiscal year
38 (21770) ... 28,500,000 ............................... (re. $10,000)
39 For academic intervention for nonpublic schools based on a plan to be
40 developed by the commissioner of education and approved by the
41 director of the budget (21771) ... 922,000 .......... (re. $920,000)
42 For services and expenses of the New York state center for school
43 safety for the 2010-11 school year. Funds appropriated herein shall
44 be used to operate a statewide center and shall be subject to an
45 expenditure plan approved by the director of the budget (21774) ....
46 466,000 ............................................... (re. $4,000)
47 Funds appropriated herein for apportionment by the commissioner to
48 private schools for the blind and deaf for services provided during
49 the 2009-10 school year and thereafter may, in the first instance,
50 be designated as the state share of moneys due to a private school
51 for the blind and deaf pursuant to title XIX of the social security
52 act, on account of school supportive health services provided to
53 students with disabilities in special education programs pursuant to
54 article 89 of the education law and to those pupils who are quali-
1077 12654-10-8
1 fied handicapped persons as defined in the federal rehabilitation
2 act of 1973, as amended. Such state share shall be assigned on
3 behalf of private schools for the blind and deaf to the department
4 of health, as provided herein; the amount designated as such nonfed-
5 eral share may be suballocated by the commissioner to the department
6 of health based on the monthly report of the commissioner of health
7 to the commissioner. The amount to be assigned to the department of
8 health, as determined by the commissioner of health, for any school
9 shall not exceed the federal share of any moneys due to such school
10 pursuant to title XIX. Moneys designated as state share moneys shall
11 be paid to such private schools for the blind and deaf by the
12 department of health based on the submission and approval of claims
13 related to such school supportive health services, in the manner
14 provided by law.
15 Provided further that, notwithstanding any inconsistent provision of
16 law, upon disbursement of funds appropriated for additional allow-
17 ances to private schools for the blind and deaf in the vocational
18 and educational services for individuals with disabilities program
19 special revenue funds-federal/aid to localities, funds appropriated
20 herein shall be reduced in an amount equivalent to such disbursement
21 and the portion of this appropriation so affected shall have no
22 further force or effect. Such reduction in the general fund allow-
23 ances to private schools for the blind and deaf shall be fully
24 offset by the special revenue funds-federal/aid to localities funds
25 appropriated for additional allowances to private schools for the
26 blind and deaf.
27 Notwithstanding any provision of the law to the contrary, funds appro-
28 priated herein shall be available for payment of liabilities hereto-
29 fore accrued or hereafter to accrue and, subject to the approval of
30 the director of the budget, such funds shall be available to the
31 department net of disallowances, refunds, reimbursements and credits
32 ... 112,340,000 ................................... (re. $6,915,000)
33 For July and August programs for school-aged children with handicap-
34 ping conditions pursuant to section 4408 of the education law,
35 provided by private schools for the blind and deaf authorized by
36 article 85 of the education law, pursuant to an allocation plan to
37 be developed by the commissioner and approved by the director of the
38 budget. Notwithstanding any provision of law to the contrary, funds
39 appropriated herein may be interchanged with the general fund appro-
40 priation for the private schools for the blind and deaf, local
41 assistance account, subject to approval of the director of the budg-
42 et. Notwithstanding any provision of law to the contrary, funds
43 appropriated herein shall be available for payment of liabilities
44 heretofore accrued or hereafter to accrue and, subject to the
45 approval of the director of the budget, such funds shall be avail-
46 able to the department net of disallowances, refunds, reimbursements
47 and credits ... 24,000,000 .......................... (re. $200,000)
48 For July and August programs for school-aged children with handicap-
49 ping conditions pursuant to section 4408 of the education law.
50 Moneys appropriated herein shall be used as follows: (i) for remain-
51 ing 2009-10 school year obligations and for obligations for school
52 years prior to the 2009-10 school year provided, however, that of
53 the amounts appropriated herein, payments for obligations for school
54 years prior to the 2009-10 school year shall be limited to
55 $50,000,000 (ii) for such purposes of subdivision 4 of section 3602
56 of the education law for schools operated under articles 87 and 88
1078 12654-10-8
1 of the education law. Provided, however, that notwithstanding any
2 inconsistent provision of law to the contrary, that payment of
3 eligible claims shall be payable in the order that such claims have
4 been approved for payment by the commissioner of education, and
5 provided further that no claim shall be set aside for insufficiency
6 of funds to make a complete payment, but shall be eligible for a
7 partial payment in one year and shall retain its priority date
8 status for subsequent appropriations designated for such purposes.
9 Notwithstanding any inconsistent provision of law to the contrary,
10 funds appropriated herein for liabilities incurred by school
11 districts shall only be available for liabilities incurred prior to
12 July 1, 2010, and shall represent the maximum amount payable during
13 the 2010-11 state fiscal year. Notwithstanding any provision of law
14 to the contrary, funds appropriated herein shall be available for
15 payment of liabilities heretofore accrued or hereafter to accrue
16 and, subject to the approval of the director of the budget, such
17 funds shall be available to the department net of disallowances,
18 refunds, reimbursements and credits. Notwithstanding any other
19 provision of law to the contrary, funds appropriated herein may be
20 suballocated, subject to the approval of the director of the budget,
21 to any state agency or department to accomplish the purpose of this
22 appropriation ... 188,200,000 ....................... (re. $997,000)
23 For services and expenses of the summer food program for the 2010-11
24 school year ... 3,049,000 ............................. (re. $5,000)
25 For aid payable for the 2010-11 school year for support of county
26 vocational education and extension boards pursuant to section 1104
27 of the education law. Notwithstanding any inconsistent provision of
28 law, rule, or regulation, the amount of state reimbursement payable
29 shall be based on annualized salaries and the amount appropriated
30 herein represents the maximum amount payable during the 2010-11
31 state fiscal year ... 932,000 ....................... (re. $128,000)
32 For services and expenses of the health education program for the
33 2010-11 school year. Funds appropriated herein shall be available
34 for health-related programs including, but not limited to, those
35 providing instruction and supportive services in comprehensive
36 health education and/or acquired immune deficiency syndrome (AIDS)
37 education. Of the amounts appropriated herein, $86,000 shall be
38 available for the program previously operated as the school health
39 demonstration program. Notwithstanding any other provision of law to
40 the contrary, funds appropriated herein may be suballocated, subject
41 to the approval of the director of the budget, to any state agency
42 or department to accomplish the purpose of this appropriation ......
43 691,000 ............................................. (re. $291,000)
44 By chapter 53, section 1, of the laws of 2009:
45 For academic intervention for nonpublic schools based on a plan to be
46 developed by the commissioner of education and approved by the
47 director of the budget (21771) ... 922,000 .......... (re. $915,000)
48 For services and expenses of the health education program for the
49 2009-10 school year. Funds appropriated herein shall be available
50 for health-related programs including, but not limited to, those
51 providing instruction and supportive services in comprehensive
52 health education and/or acquired immune deficiency syndrome (AIDS)
53 education ... 691,000 ............................... (re. $267,000)
1079 12654-10-8
1 To the Buffalo City school district for the creation and implementa-
2 tion of the helping involve parents for better schools (HIP) program
3 ... 250,000 ......................................... (re. $186,000)
4 By chapter 53, section 1, of the laws of 2009, as amended by chapter 53,
5 section 1, of the laws of 2012:
6 For additional grants in aid to certain school districts, public
7 libraries and not-for-profit institutions. For grants in aid to
8 school districts, libraries, not for profits and educational insti-
9 tutions, notwithstanding any provision of law this appropriation
10 shall be allocated only pursuant to a plan setting forth an itemized
11 list of grantees with the amount to be received by each, or the
12 methodology for allocating such appropriation. Such plan shall be
13 subject to the approval of the speaker of the assembly and the
14 director of the budget and thereafter shall be included in a resol-
15 ution calling for the expenditure of such monies, which resolution
16 must be approved by a majority vote of all members elected to the
17 assembly upon a roll call vote ... 1,900,000 ...... (re. $1,879,000)
18 For services and expenses of the New York Historical Association .....
19 180,000 ............................................... (re. $6,000)
20 For additional services and expenses of the Center for Autism and
21 related disabilities at the State University of New York at Albany
22 ... 500,000 .......................................... (re. $3,000)
23 For nonpublic school aid payable in the 2009-10 state fiscal year.
24 Notwithstanding any provision of law, rule or regulation to the
25 contrary, the amount appropriated herein represents the maximum
26 amount payable during the 2009-10 state fiscal year (21769) ........
27 80,605,000 ............................................ (re. $6,000)
28 For aid payable for additional nonpublic school aid. Notwithstanding
29 any inconsistent provision of law, funds appropriated herein shall
30 be available for payment of aid heretofore accrued and hereafter to
31 accrue provided that, notwithstanding any provision of law, rule or
32 regulation to the contrary, the amount appropriated herein repres-
33 ents the maximum amount payable during the 2009-10 state fiscal year
34 (21770) ... 30,000,000 ................................ (re. $5,000)
35 For additional aid payable for the 2009-10 school year to schools
36 providing special services or programs as defined in paragraphs e,
37 g, i, and l of subdivision 2 of section 4401 of the education law
38 and approved preschool programs that provide full and half-day
39 educational programs in accordance with section 4410 of the educa-
40 tion law to help prevent excessive instructional staff turnover
41 through a targeted adjustment of compensation for teachers providing
42 direct instructional services to students at such schools. The
43 commissioner of education shall develop an allocation plan, subject
44 to the approval of the director of the budget, that distributes
45 funds appropriated herein among eligible schools ...................
46 2,000,000 ............................................ (re. $52,000)
47 For Special Act School Districts additional costs associated with
48 academic programs ... 1,300,000 ................... (re. $1,286,000)
49 By chapter 53, section 1, of the laws of 2009, as amended by chapter
50 502, section 2, of the laws of 2009:
51 For July and August programs for school-aged children with handicap-
52 ping conditions pursuant to section 4408 of the education law.
53 Moneys appropriated herein shall be used as follows: (i) for remain-
54 ing base year and prior school years obligations, (ii) for the
1080 12654-10-8
1 purposes of subdivision 4 of section 3602 of the education law for
2 schools operated under articles 87 and 88 of the education law, and
3 (iii) notwithstanding any inconsistent provision of law, for
4 payments made pursuant to this appropriation for current school year
5 obligations, provided, however, that such payments shall not exceed
6 70 percent of the state aid due for the sum of the approved tuition
7 and maintenance rates and transportation expense provided for here-
8 in; provided, however, that payment of eligible claims shall be
9 payable in the order that such claims have been approved for payment
10 by the commissioner of education, and provided further that no claim
11 shall be set aside for insufficiency of funds to make a complete
12 payment, but shall be eligible for a partial payment in one year and
13 shall retain its priority date status for subsequent appropriations
14 designated for such purposes. Notwithstanding any inconsistent
15 provision of law to the contrary, funds appropriated herein shall
16 only be available for liabilities incurred prior to July 1, 2010,
17 shall be used to pay 2008-09 school year claims in the first
18 instance, and represent the maximum amount payable during the 2009-
19 10 state fiscal year. Notwithstanding any provision of law to the
20 contrary, funds appropriated herein shall be available for payment
21 of liabilities heretofore accrued or hereafter to accrue and,
22 subject to the approval of the director of the budget, such funds
23 shall be available to the department net of disallowances, refunds,
24 reimbursements and credits; provided, however, that the amount of
25 this appropriation available for expenditure and disbursement on and
26 after November 1, 2009 shall be reduced by 12.5 percent of the
27 amount that was undisbursed as of November 1, 2009 .................
28 260,400,000 ......................................... (re. $750,000)
29 By chapter 53, section 1, of the laws of 2008:
30 For services and expenses of the health education program for the
31 2008-09 school year. Funds appropriated herein shall be available
32 for health-related programs including, but not limited to, those
33 providing instruction and supportive services in comprehensive
34 health education and/or acquired immune deficiency syndrome (AIDS)
35 education, provided, however, that the amount of this appropriation
36 available for expenditure and disbursement on and after September 1,
37 2008 shall be reduced by six percent of the amount that was undis-
38 bursed as of August 15, 2008 ... 735,000 ............ (re. $183,000)
39 For academic intervention for nonpublic schools based on a plan to be
40 developed by the commissioner of education and approved by the
41 director of the budget, provided, however, that the amount of this
42 appropriation available for expenditure and disbursement on and
43 after September 1, 2008 shall be reduced by six percent of the
44 amount that was undisbursed as of August 15, 2008 (21771) ..........
45 980,000 ............................................. (re. $922,000)
46 By chapter 53, section 1, of the laws of 2008, as amended by chapter 53,
47 section 1, of the laws of 2012:
48 For July and August programs for school-aged children with handicap-
49 ping conditions pursuant to section 4408 of the education law.
50 Moneys appropriated herein shall be used as follows: (i) for remain-
51 ing base year and prior school years obligations, (ii) for the
52 purposes of subdivision 4 of section 3602 of the education law for
53 schools operated under articles 87 and 88 of the education law, and
54 (iii) notwithstanding any inconsistent provision of law, for
1081 12654-10-8
1 payments made pursuant to this appropriation for current school year
2 obligations, provided, however, that such payments shall not exceed
3 70 percent of the state aid due for the sum of the approved tuition
4 and maintenance rates and transportation expense provided for here-
5 in; provided, however, that payment of eligible claims shall be
6 payable in the order that such claims have been approved for payment
7 by the commissioner of education, and provided further that no claim
8 shall be set aside for insufficiency of funds to make a complete
9 payment, but shall be eligible for a partial payment in one year and
10 shall retain its priority date status for subsequent appropriations
11 designated for such purposes. Notwithstanding any inconsistent
12 provision of law to the contrary, funds appropriated herein shall
13 only be available for liabilities incurred prior to July 1, 2009,
14 shall be used to pay 2007-08 school year claims in the first
15 instance, and represent the maximum amount payable during the 2008-
16 09 state fiscal year. Notwithstanding any provision of law to the
17 contrary, funds appropriated herein shall be available for payment
18 of liabilities heretofore accrued or hereafter to accrue and,
19 subject to the approval of the director of the budget, such funds
20 shall be available to the department net of disallowances, refunds,
21 reimbursements and credits ... 243,400,000 .......... (re. $843,000)
22 By chapter 53, section 1, of the laws of 2008, as amended by chapter
23 496, section 3, of the laws of 2008:
24 For grants to schools for programs involving literacy and basic educa-
25 tion for public assistance recipients for the 2008-09 school year
26 for those programs administered by the state education department,
27 provided, however, that the amount of this appropriation available
28 for expenditure and disbursement on and after September 1, 2008
29 shall be reduced by six percent of the amount that was undisbursed
30 as of August 15, 2008 ... 1,960,000 ................. (re. $553,000)
31 For nonpublic school aid for the 2008-09 school year program.
32 Notwithstanding any inconsistent provision of law, funds appropri-
33 ated herein shall be available for payment of aid heretofore accrued
34 and hereafter to accrue provided that, notwithstanding any provision
35 of law, rule or regulation to the contrary, reimbursement, and the
36 State's liability for such reimbursement, shall be limited to nine-
37 ty-eight percent of the actual cost incurred by the nonpublic school
38 as approved by the commissioner of education; provided further that
39 on and after September 1, 2008, notwithstanding any inconsistent
40 provision of law, rule or regulation, the amount of state reimburse-
41 ment and liability for costs and activities funded through this
42 appropriation shall be further reduced by six percent of such
43 reduced amount, and that the amount of this appropriation available
44 for expenditure and disbursement on and after such date shall be
45 reduced by six percent of the amount that was undisbursed as of
46 August 15, 2008 (21769) ... 85,750,000 ............ (re. $4,939,000)
47 For aid payable for additional nonpublic school aid. Notwithstanding
48 any inconsistent provision of law, funds appropriated herein shall
49 be available for payment of aid heretofore accrued and hereafter to
50 accrue provided that, notwithstanding any provision of law, rule or
51 regulation to the contrary, reimbursement, and the State's liability
52 for such reimbursement, shall be limited to ninety-eight percent of
53 the actual cost incurred by the nonpublic school as approved by the
54 commissioner of education; provided further that on and after
55 September 1, 2008, notwithstanding any inconsistent provision of
1082 12654-10-8
1 law, rule or regulation, the amount of state reimbursement and
2 liability for costs and activities funded through this appropriation
3 shall be further reduced by six percent of such reduced amount, and
4 that the amount of this appropriation available for expenditure and
5 disbursement on and after such date shall be reduced by six percent
6 of the amount that was undisbursed as of August 15, 2008 ...........
7 47,295,000 ........................................ (re. $3,306,000)
8 By chapter 53, section 1, of the laws of 2007, as amended by chapter 53,
9 section 1, of the laws of 2012:
10 For services and expenses of a $30,200,000 2007-08 school year program
11 for extended day and school violence prevention programs ...........
12 30,200,000 ........................................ (re. $5,938,000)
13 For the state's share of preschool handicapped education costs pursu-
14 ant to section 4410 of the education law. Notwithstanding any
15 inconsistent provision of law to the contrary, the amount appropri-
16 ated herein represents the maximum amount payable during the 2007-08
17 state fiscal year and shall support a state share of preschool hand-
18 icapped education costs for the 2006-07 school year limited to 59.5
19 percent of total expenditures, and furthermore, notwithstanding any
20 other provision of law, local claims for reimbursement of costs
21 incurred prior to the 2005-06 school year and during the 2005-06 and
22 2006-07 school years that have been approved for payment by the
23 education department as of March 31, 2007 shall be the first claims
24 paid from this appropriation. Any local claims for which there may
25 be insufficient appropriation authority for payment in the 2007-08
26 state fiscal year shall be considered as the first claim for payment
27 against all subsequent appropriations designated for such purposes.
28 Notwithstanding any provision of law to the contrary, funds appro-
29 priated herein shall be available for payment of liabilities hereto-
30 fore accrued or hereafter to accrue and, subject to the approval of
31 the director of the budget, such funds shall be available to the
32 department net of disallowances, refunds, reimbursements and credits
33 ... 663,100,000 ...................................... (re. $48,000)
34 For allowances to private schools for the blind and the deaf, includ-
35 ing state aid for blind and deaf pupils in certain institutions to
36 be paid for the purposes provided under article 85 of the education
37 law for the education of deaf children under 3 years of age includ-
38 ing transfers to the miscellaneous special revenue fund Rome school
39 for the deaf account (339E6) pursuant to a plan to be developed by
40 the commissioner and approved by the director of the budget.
41 Notwithstanding any other inconsistent provisions of law, such funds
42 appropriated herein shall be for the New York state pupils approved
43 to attend such schools and whose admissions, attendance and termi-
44 nation therein is in accordance with rules and regulations of the
45 commissioner of education.
46 Of the amounts appropriated herein, up to $6,651,000 shall be used for
47 debt service on capital construction projects financed through the
48 state dormitory authority and $111,449,000 shall be available for
49 allowances to schools for the blind and deaf. Notwithstanding any
50 provision of the law to the contrary, funds appropriated herein
51 shall be available for payment of liabilities heretofore accrued or
52 hereafter to accrue and, subject to the approval of the director of
53 the budget, such funds shall be available to the department net of
54 disallowances, refunds, reimbursements and credits .................
55 118,100,000 ......................................... (re. $277,000)
1083 12654-10-8
1 For the school lunch and breakfast program. Funds for the school lunch
2 and breakfast program shall be expended subject to the limitation of
3 funds available and may be used to reimburse sponsors of non-profit
4 school lunch, breakfast, or other school child feeding programs
5 based upon the number of federally reimbursable breakfasts and
6 lunches served to students under such program agreements entered
7 into by the state education department and such sponsors, in accord-
8 ance with an act of Congress entitled the "National School Lunch
9 Act," P.L. 79-396, as amended, or the provisions of the "Child
10 Nutrition Act of 1966," P.L. 89-642, as amended, in the case of
11 school breakfast programs to reimburse sponsors in excess of the
12 federal rates of reimbursement. Notwithstanding any provision of law
13 to the contrary, the moneys hereby appropriated, or so much thereof
14 as may be necessary, are to be available for the purposes herein
15 specified for obligations heretofore accrued or hereafter to accrue
16 for the school years beginning July 1, 2005, July 1, 2006 and July
17 1, 2007 ... 31,700,000 .............................. (re. $129,000)
18 For academic intervention for nonpublic schools based on a plan to be
19 developed by the commissioner of education and approved by the
20 director of the budget (21771) ... 1,000,000 ...... (re. $1,000,000)
21 For nonpublic school aid for the 2007-08 school year program.
22 Notwithstanding any inconsistent provision of law, funds appropri-
23 ated herein shall be available for payment of aid heretofore accrued
24 and hereafter to accrue (21769) ... 87,500,000 .... (re. $4,918,000)
25 By chapter 53, section 1, of the laws of 2006:
26 For academic intervention for nonpublic schools based on a plan to be
27 developed by the commissioner of education and approved by the
28 director of the budget (21771) ... 1,000,000 ........ (re. $642,000)
29 For nonpublic school aid for the 2006-07 school year program.
30 Notwithstanding any inconsistent provision of law, funds shall be
31 available for payment of aid heretofore accrued and hereafter to
32 accrue (21769) ... 87,500,000 ..................... (re. $7,750,000)
33 For grants in aid to school districts, libraries, not for profits and
34 educational institutions, notwithstanding any provision of law this
35 appropriation shall be allocated only pursuant to a plan setting
36 forth an itemized list of grantees with the amount to be received by
37 each, or the methodology for allocating such appropriation. Such
38 plan shall be subject to the approval of the temporary president of
39 the senate and the director of the budget and thereafter shall be
40 included in a resolution calling for the expenditure of such monies,
41 which resolution must be approved by a majority vote of all members
42 elected to the senate upon a roll call vote ........................
43 250,000 ............................................. (re. $102,000)
44 For additional grants in aid to certain school districts, public
45 libraries and not-for-profit institutions. Such funds shall be
46 apportioned pursuant to subdivision 5 of section 24 of the state
47 finance law ... 12,995,000 .......................... (re. $530,000)
48 For services and expenses associated with the math and science high
49 schools including Tech Valley high school, Bard College, and Nazar-
50 eth College for the 2007-08 school year ............................
51 1,500,000 ........................................... (re. $253,000)
52 For services and expenses associated with three Math and Science High
53 Schools, provided that one such high school shall be located in a
54 City with more than one million inhabitants, one shall be located
55 outside of a city with one million inhabitants, and one shall be the
1084 12654-10-8
1 educational entity created by chapter 757 of the laws of 2005. Each
2 school shall be eligible for a grant up to $500,000 for the costs of
3 providing an enhanced high school curriculum and/or capital improve-
4 ment projects. Such grant may provide for up to twenty-five percent
5 of the operations of the Math and Science High School. School
6 districts shall jointly submit an application with a New York State
7 college or university in order to be eligible for funding pursuant
8 to this appropriation. Such joint application shall detail the coop-
9 erative activities, that the school district and higher educational
10 institution will occur at the Math and Science High School. The
11 enhanced math and science curriculum to be provided by the school
12 located in a city with more than one million inhabitants shall be
13 provided by a school accredited to give its graduates both a New
14 York State Regents diploma and an Associates of Arts degree with
15 more than half of its faculty possessing terminal degrees in their
16 subject area, and all of the science and math classes provided to
17 all of that school's third and fourth year students shall be given
18 for college credit and taught by faculty members who possess an
19 advanced degree in their subject area. Provided however, that the
20 educational entity created by chapter 757 of the laws of 2005 shall
21 not be required to submit a joint application with a New York State
22 college or university (21779) ... 1,500,000 ......... (re. $313,000)
23 For additional grants in aid to certain school districts, public
24 libraries and not-for-profit institutions including seventy percent
25 of a $26,670,000 2006-07 school year teacher resource and computer
26 training center program, seventy percent of a $4,000,000 2006-07
27 school year teacher mentor intern program, and $500,000 for the
28 national board for professional teaching standards program .........
29 81,456,250 ........................................ (re. $8,578,000)
30 By chapter 53, section 1, of the laws of 2005:
31 For nonpublic school aid for the 2005-06 school year program.
32 Notwithstanding any inconsistent provision of law, funds shall be
33 available for payment of aid heretofore accrued and hereafter to
34 accrue (21769) ... 87,500,000 ..................... (re. $6,185,000)
35 For additional grants-in-aid to certain school districts, public
36 libraries and not for profit institutions including 50 percent of a
37 $500,000 school year program for the 2005-06 NYC peer intervention
38 program and 50 percent of a $500,000 school year program for the
39 national board for professional teaching standards certification ...
40 27,110,400 ........................................ (re. $1,020,000)
41 By chapter 53, section 1, of the laws of 2003, as amended by chapter
42 684, section 1, of the laws of 2003:
43 For additional grants in aid to certain school districts, public
44 libraries and not for profit educational institutions, in addition
45 to services and expenses of the teacher resources and computer
46 training centers programs ... 41,498,700 ............ (re. $507,000)
47 By chapter 382, part C, section 1, of the laws of 2001:
48 For fiscal stabilization grants in aid of up to $25,000,000 for the
49 2001-02 school year to certain school districts, public libraries
50 and not-for-profit educational institutions. Notwithstanding any
51 provision of law to the contrary, funds appropriated herein shall be
52 available for payment of aid hereafter to accrue ...................
53 25,000,000 ........................................... (re. $14,000)
1085 12654-10-8
1 Special Revenue Funds - Federal
2 Federal Education Fund
3 Federal Department of Education Account - 25210
4 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
5 section 2, of the laws of 2017:
6 For grants to schools for specific programs including, but not limited
7 to, grants for purposes under title I of the elementary and second-
8 ary education act. Provided further that, notwithstanding any incon-
9 sistent provision of law, the commissioner of education shall
10 provide to the director of the budget, the chairperson of the senate
11 finance committee and the chairperson of the assembly ways and means
12 committee copies of any spending plans and/or budgets submitted to
13 the federal government with respect to the use of any funds appro-
14 priated by the federal government including state grants adminis-
15 tered by the Department. Notwithstanding any inconsistent provision
16 of law, a portion of this appropriation may be suballocated to other
17 state departments and agencies, subject to the approval of the
18 director of the budget, as needed to accomplish the intent of this
19 appropriation (21740) ... 1,771,819,000 ....... (re. $1,766,074,000)
20 For grants to schools and other eligible entities for specific
21 programs including, but not limited to, state grants for supporting
22 effective instruction pursuant to title II of the elementary and
23 secondary education act. Provided further that, notwithstanding any
24 inconsistent provision of law, the commissioner of education shall
25 provide to the director of the budget, the chairperson of the senate
26 finance committee and the chairperson of the assembly ways and means
27 committee copies of any spending plans and/or budgets submitted to
28 the federal government with respect to the use of any funds appro-
29 priated by the federal government including state grants adminis-
30 tered by the Department. Notwithstanding any inconsistent provision
31 of law, a portion of this appropriation may be suballocated to other
32 state departments and agencies, subject to the approval of the
33 director of the budget, as needed to accomplish the intent of this
34 appropriation (23418) ... 256,841,000 ........... (re. $256,346,000)
35 For grants to schools and other eligible entities for specific
36 programs including, but not limited to, the English language acqui-
37 sition program pursuant to title III of the elementary and secondary
38 education act. Provided further that, notwithstanding any inconsist-
39 ent provision of law, the commissioner of education shall provide to
40 the director of the budget, the chairperson of the senate finance
41 committee and the chairperson of the assembly ways and means commit-
42 tee copies of any spending plans and/or budgets submitted to the
43 federal government with respect to the use of any funds appropriated
44 by the federal government including state grants administered by the
45 Department. Notwithstanding any inconsistent provision of law, a
46 portion of this appropriation may be suballocated to other state
47 departments and agencies, subject to the approval of the director of
48 the budget, as needed to accomplish the intent of this appropriation
49 (23417) ... 65,331,000 ........................... (re. $65,133,000)
50 For grants to schools and other eligible entities for specific
51 programs including, but not limited to, the 21st century community
52 learning centers, and student support and academic enrichment pursu-
53 ant to title IV of the elementary and secondary education act.
54 Provided further that, notwithstanding any inconsistent provision of
55 law, the commissioner of education shall provide to the director of
1086 12654-10-8
1 the budget, the chairperson of the senate finance committee and the
2 chairperson of the assembly ways and means committee copies of any
3 spending plans and/or budgets submitted to the federal government
4 with respect to the use of any funds appropriated by the federal
5 government including state grants administered by the Department.
6 Notwithstanding any inconsistent provision of law, a portion of this
7 appropriation may be suballocated to other state departments and
8 agencies, subject to the approval of the director of the budget, as
9 needed to accomplish the intent of this appropriation (23416) ......
10 132,526,000 ...................................... (re. $96,375,000)
11 For grants to schools and other eligible entities for specific
12 programs including, but not limited to, the charter schools program
13 pursuant to title IV of the elementary and secondary education act.
14 Provided further that, notwithstanding any inconsistent provision of
15 law, the commissioner of education shall provide to the director of
16 the budget, the chairperson of the senate finance committee and the
17 chairperson of the assembly ways and means committee copies of any
18 spending plans and/or budgets submitted to the federal government
19 with respect to the use of any funds appropriated by the federal
20 government including state grants administered by the Department.
21 Notwithstanding any inconsistent provision of law, a portion of this
22 appropriation may be suballocated to other state departments and
23 agencies, subject to the approval of the director of the budget, as
24 needed to accomplish the intent of this appropriation (23415) ......
25 28,000,000 ....................................... (re. $28,000,000)
26 For grants to schools and other eligible entities for specific
27 programs including, but not limited to, the rural education initi-
28 ative pursuant to title V of the elementary and secondary education
29 act. Provided further that, notwithstanding any inconsistent
30 provision of law, the commissioner of education shall provide to the
31 director of the budget, the chairperson of the senate finance
32 committee and the chairperson of the assembly ways and means commit-
33 tee copies of any spending plans and/or budgets submitted to the
34 federal government with respect to the use of any funds appropriated
35 by the federal government including state grants administered by the
36 Department. Notwithstanding any inconsistent provision of law, a
37 portion of this appropriation may be suballocated to other state
38 departments and agencies, subject to the approval of the director of
39 the budget, as needed to accomplish the intent of this appropriation
40 (23414) ... 5,000,000 ............................. (re. $4,468,000)
41 For grants to schools and other eligible entities for specific
42 programs including, but not limited to, the homeless education
43 program pursuant to title VII of the McKinney Vento homeless assist-
44 ance act. Notwithstanding any inconsistent provision of law, a
45 portion of this appropriation may be suballocated to other state
46 departments and agencies, subject to the approval of the director of
47 the budget, as needed to accomplish the intent of this appropriation
48 (23413) ... 8,000,000 ............................. (re. $7,981,000)
49 For grants to schools and other eligible entities for specific
50 programs including, but not limited to, the Carl D. Perkins voca-
51 tional and applied technology education act (VTEA).
52 Notwithstanding any inconsistent provision of law, a portion of this
53 appropriation may be suballocated to other state departments and
54 agencies, subject to the approval of the director of the budget, as
55 needed to accomplish the intent of this appropriation (23477) ......
56 68,578,000 ....................................... (re. $68,440,000)
1087 12654-10-8
1 For various grants to schools and other eligible entities. Notwith-
2 standing any inconsistent provision of law, a portion of this appro-
3 priation may be suballocated to other state departments and agen-
4 cies, subject to the approval of the director of the budget, as
5 needed to accomplish the intent of this appropriation (23407) ......
6 34,425,000 ....................................... (re. $34,425,000)
7 For the education of individuals with disabilities including up to
8 $3,000,000 for services and expenses of early childhood direction
9 centers and $500,000 for services and expenses of the center for
10 autism and related disabilities at the state university of New York
11 at Albany. Notwithstanding any inconsistent provision of law, a
12 portion of the funds appropriated herein shall be available, subject
13 to a plan developed by the commissioner of education and approved by
14 the director of the budget, for grants to ensure appropriately
15 certified teachers in schools providing special services or programs
16 as defined in paragraphs e, g, i and l of subdivision 2 of section
17 4401 of the education law to children placed by school districts and
18 in approved preschool programs that provide full and half-day educa-
19 tional programs in accordance with section 4410 of the education law
20 for children placed by school district. Provided further that, in
21 the allocation of funds, priority shall be given to those programs
22 with a demonstrated need to increase the number of certified teach-
23 ers to comply with state and federal requirements. Such funds shall
24 be made available for such activities as certification preparation,
25 training, assisting schools with personnel shortages and supporting
26 activities that improve the delivery of services to improve results
27 for children with disabilities. Provided further that notwithstand-
28 ing any inconsistent provision of law, of the funds appropriated
29 herein: up to $10,000,000 shall be available for costs associated
30 with schools operated under article 85 of the education law which
31 otherwise would be payable through the department's general fund aid
32 to localities appropriation, provided further that notwithstanding
33 any inconsistent provision of law, any disbursements against this
34 $10,000,000 shall immediately reduce the amounts appropriated in the
35 education department's general fund aid to localities for costs
36 associated with schools operated under article 85 of the education
37 law by an equivalent amount, and the portion of such general fund
38 appropriation so affected shall have no further force or effect.
39 Notwithstanding any provision of the law to the contrary, funds
40 appropriated herein shall be available for payment of liabilities
41 heretofore accrued or hereafter to accrue and, subject to the
42 approval of the director of the budget, such funds shall be avail-
43 able to the department net of disallowances, refunds, reimbursements
44 and credits. Notwithstanding any inconsistent provision of law, a
45 portion of this appropriation may be suballocated to other state
46 departments and agencies, as needed, to accomplish the intent of
47 this appropriation (21737) ... 815,347,000 ...... (re. $805,335,000)
48 By chapter 53, section 1, of the laws of 2016:
49 For grants to schools for specific programs including, but not limited
50 to, grants for purposes under title I of the elementary and second-
51 ary education act. Notwithstanding any inconsistent provision of
52 law, a portion of this appropriation may be suballocated to other
53 state departments and agencies, subject to the approval of the
54 director of the budget, as needed to accomplish the intent of this
55 appropriation (21740) ... 1,771,819,000 ......... (re. $973,888,000)
1088 12654-10-8
1 For grants to schools and other eligible entities for state grants for
2 improving teacher quality and mathematics and science partnerships
3 pursuant to title II of the elementary and secondary education act.
4 Notwithstanding any inconsistent provision of law, a portion of this
5 appropriation may be suballocated to other state departments and
6 agencies, subject to the approval of the director of the budget, as
7 needed to accomplish the intent of this appropriation (23418) ......
8 256,841,000 ..................................... (re. $150,000,000)
9 For grants to schools and other eligible entities for English language
10 acquisition program pursuant to title III of the elementary and
11 secondary education act. Notwithstanding any inconsistent provision
12 of law, a portion of this appropriation may be suballocated to other
13 state departments and agencies, subject to the approval of the
14 director of the budget, as needed to accomplish the intent of this
15 appropriation (23417) ... 65,331,000 ............. (re. $60,000,000)
16 For grants to schools and other eligible entities for the 21st century
17 community learning centers pursuant to title IV of the elementary
18 and secondary education act. Notwithstanding any inconsistent
19 provision of law, a portion of this appropriation may be suballo-
20 cated to other state departments and agencies, subject to the
21 approval of the director of the budget, as needed to accomplish the
22 intent of this appropriation (23416) ...............................
23 96,526,000 ....................................... (re. $55,000,000)
24 For grants to schools and other eligible entities for the rural educa-
25 tion initiative pursuant to title VI of the elementary and secondary
26 education act. Notwithstanding any inconsistent provision of law, a
27 portion of this appropriation may be suballocated to other state
28 departments and agencies, subject to the approval of the director of
29 the budget, as needed to accomplish the intent of this appropriation
30 (23414) ... 5,000,000 ............................. (re. $4,283,000)
31 For grants to schools and other eligible entities for homeless educa-
32 tion program pursuant to title X of the elementary and secondary
33 education act. Notwithstanding any inconsistent provision of law, a
34 portion of this appropriation may be suballocated to other state
35 departments and agencies, subject to the approval of the director of
36 the budget, as needed to accomplish the intent of this appropriation
37 (23413) ... 8,000,000 ............................. (re. $6,300,000)
38 For grants to schools and other eligible entities for specific
39 programs including, but not limited to, the Carl D. Perkins voca-
40 tional and applied technology education act (VTEA).
41 Notwithstanding any inconsistent provision of law, a portion of this
42 appropriation may be suballocated to other state departments and
43 agencies, subject to the approval of the director of the budget, as
44 needed to accomplish the intent of this appropriation (23477) ......
45 68,578,000 ....................................... (re. $33,000,000)
46 For various grants to schools and other eligible entities. Notwith-
47 standing any inconsistent provision of law, a portion of this appro-
48 priation may be suballocated to other state departments and agen-
49 cies, subject to the approval of the director of the budget, as
50 needed to accomplish the intent of this appropriation (23407) ......
51 34,425,000 ....................................... (re. $34,425,000)
52 For the education of individuals with disabilities including up to
53 $3,000,000 for services and expenses of early childhood direction
54 centers and $500,000 for services and expenses of the center for
55 autism and related disabilities at the state university of New York
56 at Albany. Notwithstanding any inconsistent provision of law, a
1089 12654-10-8
1 portion of the funds appropriated herein shall be available, subject
2 to a plan developed by the commissioner of education and approved by
3 the director of the budget, for grants to ensure appropriately
4 certified teachers in schools providing special services or programs
5 as defined in paragraphs e, g, i and l of subdivision 2 of section
6 4401 of the education law to children placed by school districts and
7 in approved preschool programs that provide full and half-day educa-
8 tional programs in accordance with section 4410 of the education law
9 for children placed by school district. Provided further that, in
10 the allocation of funds, priority shall be given to those programs
11 with a demonstrated need to increase the number of certified teach-
12 ers to comply with state and federal requirements. Such funds shall
13 be made available for such activities as certification preparation,
14 training, assisting schools with personnel shortages and supporting
15 activities that improve the delivery of services to improve results
16 for children with disabilities. Provided further that notwithstand-
17 ing any inconsistent provision of law, of the funds appropriated
18 herein: (i) $2,000,000 shall be available for payments to schools
19 providing special services or programs as defined in paragraphs e,
20 g, i, and l of subdivision 2 of section 4401 of the education law to
21 help prevent excessive instructional staff turnover through a
22 targeted adjustment of compensation for teachers providing direct
23 instructional services to students at such schools. The commissioner
24 of education shall develop an allocation plan, subject to the
25 approval of the director of the budget, that distributes funds
26 appropriated herein among eligible schools, as defined herein, that
27 qualify based on the following criteria: eligible schools are those
28 that have complied with all applicable requirements for previous
29 grants for this purpose and whose average teacher salary are below
30 the salary provided for similarly qualified teachers in public
31 schools in the region in which such eligible school is located. The
32 allocation to each qualifying school shall be calculated based on
33 the number of weighted full time equivalent (FTE) staff, as defined
34 herein, in the per FTE award amount. The total number of weighted
35 FTE shall be determined by multiplying the actual number of FTE
36 teachers providing classroom instruction at each school, as deter-
37 mined by the commissioner, by: 1) a factor of 2.0 for those schools
38 where average salaries that are 50 percent or less of those in
39 public school located in the same geographic region; 2) a factor of
40 1.5 for those schools where average salaries that are 50 percent and
41 75 percent of public schools located in the same geographic region;
42 or 3) a factor of 1.0 for those schools where the average salaries
43 that are 75-100 percent of public schools located in the same
44 geographic region. The per FTE teacher award amount shall be calcu-
45 lated by dividing the $2,000,000 by the total number of weighted FTE
46 staff; (ii) $2,000,000 shall be available for payments to schools
47 providing special services or programs as defined in paragraphs e,
48 g, i, and l of subdivision 2 of section 4401 of the education law
49 and approved preschool programs in accordance with section 4410 of
50 the education law to help prevent excessive instructional staff
51 turnover through a targeted adjustment of compensation for teachers
52 providing direct instructional services to students at such schools.
53 The commissioner of education shall develop an allocation plan,
54 subject to the approval of the director of the budget, that distrib-
55 utes funds appropriated herein among eligible schools; (iii) up to
56 $10,000,000 shall be available for costs associated with schools
1090 12654-10-8
1 operated under article 85 of the education law which otherwise would
2 be payable through the department's general fund aid to localities
3 appropriation, provided further that notwithstanding any inconsist-
4 ent provision of law, any disbursements against this $10,000,000
5 shall immediately reduce the amounts appropriated in the education
6 department's general fund aid to localities for costs associated
7 with schools operated under article 85 of the education law by an
8 equivalent amount, and the portion of such general fund appropri-
9 ation so affected shall have no further force or effect. Notwith-
10 standing any provision of the law to the contrary, funds appropri-
11 ated herein shall be available for payment of liabilities heretofore
12 accrued or hereafter to accrue and, subject to the approval of the
13 director of the budget, such funds shall be available to the depart-
14 ment net of disallowances, refunds, reimbursements and credits.
15 Notwithstanding any inconsistent provision of law, a portion of this
16 appropriation may be suballocated to other state departments and
17 agencies, as needed, to accomplish the intent of this appropriation
18 (21737) ... 815,347,000 ......................... (re. $268,215,000)
19 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
20 section 1, of the laws of 2015:
21 For grants to schools for specific programs including, but not limited
22 to, grants for purposes under title I of the elementary and second-
23 ary education act. Notwithstanding any inconsistent provision of
24 law, a portion of this appropriation may be suballocated to other
25 state departments and agencies, subject to the approval of the
26 director of the budget, as needed to accomplish the intent of this
27 appropriation (21740) ... 1,771,819,000 ......... (re. $565,000,000)
28 For grants to schools and other eligible entities for state grants for
29 improving teacher quality and mathematics and science partnerships
30 pursuant to title II of the elementary and secondary education act.
31 Notwithstanding any inconsistent provision of law, a portion of this
32 appropriation may be suballocated to other state departments and
33 agencies, subject to the approval of the director of the budget, as
34 needed to accomplish the intent of this appropriation (23418) ......
35 242,841,000 ...................................... (re. $62,000,000)
36 For grants to schools and other eligible entities for English language
37 acquisition program pursuant to title III of the elementary and
38 secondary education act. Notwithstanding any inconsistent provision
39 of law, a portion of this appropriation may be suballocated to other
40 state departments and agencies, subject to the approval of the
41 director of the budget, as needed to accomplish the intent of this
42 appropriation (23417) ... 61,000,000 .............. (re. $4,100,000)
43 For grants to schools and other eligible entities for the 21st century
44 community learning centers pursuant to title IV of the elementary
45 and secondary education act. Notwithstanding any inconsistent
46 provision of law, a portion of this appropriation may be suballo-
47 cated to other state departments and agencies, subject to the
48 approval of the director of the budget, as needed to accomplish the
49 intent of this appropriation (23416) ...............................
50 96,526,000 ....................................... (re. $18,000,000)
51 For grants to schools and other eligible entities for the charter
52 schools program pursuant to title V of the elementary and secondary
53 education act. Notwithstanding any inconsistent provision of law, a
54 portion of this appropriation may be suballocated to other state
55 departments and agencies, subject to the approval of the director of
1091 12654-10-8
1 the budget, as needed to accomplish the intent of this appropriation
2 (23415) ... 28,000,000 ........................... (re. $19,000,000)
3 For grants to schools and other eligible entities for the rural educa-
4 tion initiative pursuant to title VI of the elementary and secondary
5 education act. Notwithstanding any inconsistent provision of law, a
6 portion of this appropriation may be suballocated to other state
7 departments and agencies, subject to the approval of the director of
8 the budget, as needed to accomplish the intent of this appropriation
9 (23414) ... 5,000,000 ............................. (re. $2,000,000)
10 For grants to schools and other eligible entities for homeless educa-
11 tion program pursuant to title X of the elementary and secondary
12 education act. Notwithstanding any inconsistent provision of law, a
13 portion of this appropriation may be suballocated to other state
14 departments and agencies, subject to the approval of the director of
15 the budget, as needed to accomplish the intent of this appropriation
16 (23413) ... 8,000,000 ............................. (re. $3,500,000)
17 For grants to schools and other eligible entities for specific
18 programs including, but not limited to, the Carl D. Perkins voca-
19 tional and applied technology education act (VTEA). Notwithstanding
20 any inconsistent provision of law, a portion of this appropriation
21 may be suballocated to other state departments and agencies, subject
22 to the approval of the director of the budget, as needed to accom-
23 plish the intent of this appropriation (23477) .....................
24 68,578,000 ....................................... (re. $16,000,000)
25 For various grants to schools and other eligible entities. Notwith-
26 standing any inconsistent provision of law, a portion of this appro-
27 priation may be suballocated to other state departments and agen-
28 cies, subject to the approval of the director of the budget, as
29 needed to accomplish the intent of this appropriation (23407) ......
30 29,425,000 ....................................... (re. $10,290,000)
31 For the education of individuals with disabilities including up to
32 $3,000,000 for services and expenses of early childhood direction
33 centers and $500,000 for services and expenses of the center for
34 autism and related disabilities at the state university of New York
35 at Albany. Notwithstanding any inconsistent provision of law, a
36 portion of the funds appropriated herein shall be available, subject
37 to a plan developed by the commissioner of education and approved by
38 the director of the budget, for grants to ensure appropriately
39 certified teachers in schools providing special services or programs
40 as defined in paragraphs e, g, i and l of subdivision 2 of section
41 4401 of the education law to children placed by school districts and
42 in approved preschool programs that provide full and half-day educa-
43 tional programs in accordance with section 4410 of the education law
44 for children placed by school district. Provided further that, in
45 the allocation of funds, priority shall be given to those programs
46 with a demonstrated need to increase the number of certified teach-
47 ers to comply with state and federal requirements. Such funds shall
48 be made available for such activities as certification preparation,
49 training, assisting schools with personnel shortages and supporting
50 activities that improve the delivery of services to improve results
51 for children with disabilities. Provided further that notwithstand-
52 ing any inconsistent provision of law, of the funds appropriated
53 herein: (i) $2,000,000 shall be available for payments to schools
54 providing special services or programs as defined in paragraphs e,
55 g, i, and l of subdivision 2 of section 4401 of the education law to
56 help prevent excessive instructional staff turnover through a
1092 12654-10-8
1 targeted adjustment of compensation for teachers providing direct
2 instructional services to students at such schools. The commissioner
3 of education shall develop an allocation plan, subject to the
4 approval of the director of the budget, that distributes funds
5 appropriated herein among eligible schools, as defined herein, that
6 qualify based on the following criteria: eligible schools are those
7 that have complied with all applicable requirements for previous
8 grants for this purpose and whose average teacher salary are below
9 the salary provided for similarly qualified teachers in public
10 schools in the region in which such eligible school is located. The
11 allocation to each qualifying school shall be calculated based on
12 the number of weighted full time equivalent (FTE) staff, as defined
13 herein, in the per FTE award amount. The total number of weighted
14 FTE shall be determined by multiplying the actual number of FTE
15 teachers providing classroom instruction at each school, as deter-
16 mined by the commissioner, by: 1) a factor of 2.0 for those schools
17 where average salaries that are 50 percent or less of those in
18 public school located in the same geographic region; 2) a factor of
19 1.5 for those schools where average salaries that are 50 percent and
20 75 percent of public schools located in the same geographic region;
21 or 3) a factor of 1.0 for those schools where the average salaries
22 that are 75-100 percent of public schools located in the same
23 geographic region. The per FTE teacher award amount shall be calcu-
24 lated by dividing the $2,000,000 by the total number of weighted FTE
25 staff; (ii) $2,000,000 shall be available for payments to schools
26 providing special services or programs as defined in paragraphs e,
27 g, i, and l of subdivision 2 of section 4401 of the education law
28 and approved preschool programs in accordance with section 4410 of
29 the education law to help prevent excessive instructional staff
30 turnover through a targeted adjustment of compensation for teachers
31 providing direct instructional services to students at such schools.
32 The commissioner of education shall develop an allocation plan,
33 subject to the approval of the director of the budget, that distrib-
34 utes funds appropriated herein among eligible schools; (iii) up to
35 $10,000,000 shall be available for costs associated with schools
36 operated under article 85 of the education law which otherwise would
37 be payable through the department's general fund aid to localities
38 appropriation, provided further that notwithstanding any inconsist-
39 ent provision of law, any disbursements against this $10,000,000
40 shall immediately reduce the amounts appropriated in the education
41 department's general fund aid to localities for costs associated
42 with schools operated under article 85 of the education law by an
43 equivalent amount, and the portion of such general fund appropri-
44 ation so affected shall have no further force or effect. Notwith-
45 standing any provision of the law to the contrary, funds appropri-
46 ated herein shall be available for payment of liabilities heretofore
47 accrued or hereafter to accrue and, subject to the approval of the
48 director of the budget, such funds shall be available to the depart-
49 ment net of disallowances, refunds, reimbursements and credits.
50 Notwithstanding any inconsistent provision of law, a portion of this
51 appropriation may be suballocated to other state departments and
52 agencies, as needed, to accomplish the intent of this appropriation
53 (21737) ... 815,347,000 .......................... (re. $82,416,000)
54 By chapter 53, section 1, of the laws of 2014:
1093 12654-10-8
1 For grants to schools for specific programs including, but not limited
2 to, grants for purposes under title I of the elementary and second-
3 ary education act. Notwithstanding any inconsistent provision of
4 law, a portion of this appropriation may be suballocated to other
5 state departments and agencies, subject to the approval of the
6 director of the budget, as needed to accomplish the intent of this
7 appropriation (21740) ... 1,771,819,000 .......... (re. $31,100,000)
8 For grants to schools and other eligible entities for English language
9 acquisition program pursuant to title III of the elementary and
10 secondary education act. Notwithstanding any inconsistent provision
11 of law, a portion of this appropriation may be suballocated to other
12 state departments and agencies, subject to the approval of the
13 director of the budget, as needed to accomplish the intent of this
14 appropriation (23417) ... 61,000,000 ................ (re. $500,000)
15 For grants to schools and other eligible entities for the charter
16 schools program pursuant to title V of the elementary and secondary
17 education act. Notwithstanding any inconsistent provision of law, a
18 portion of this appropriation may be suballocated to other state
19 departments and agencies, subject to the approval of the director of
20 the budget, as needed to accomplish the intent of this appropriation
21 (23415) ... 28,000,000 ........................... (re. $15,000,000)
22 For various grants to schools and other eligible entities. Notwith-
23 standing any inconsistent provision of law, a portion of this appro-
24 priation may be suballocated to other state departments and agen-
25 cies, subject to the approval of the director of the budget, as
26 needed to accomplish the intent of this appropriation (23407) ......
27 29,425,000 .......................................... (re. $500,000)
28 By chapter 53, section 1, of the laws of 2013:
29 For grants to schools and other eligible entities for the charter
30 schools program pursuant to title V of the elementary and secondary
31 education act. Notwithstanding any inconsistent provision of law, a
32 portion of this appropriation may be suballocated to other state
33 departments and agencies, subject to the approval of the director of
34 the budget, as needed to accomplish the intent of this appropriation
35 (23415) ... 28,000,000 ........................... (re. $12,000,000)
36 Special Revenue Funds - Federal
37 Federal Health and Human Services Fund
38 Federal Health and Human Services Account - 25122
39 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
40 section 2, of the laws of 2017:
41 For grants to schools for specific programs (21742) ..................
42 5,000,000 ......................................... (re. $5,000,000)
43 Special Revenue Funds - Federal
44 Federal USDA-Food and Nutrition Services Fund
45 Federal USDA-Food and Nutrition Services Account - 25026
46 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
47 section 2, of the laws of 2017:
48 For grants to schools and other eligible entities for programs funded
49 through the national school lunch act (21703) ......................
50 1,175,000,000 ................................. (re. $1,175,000,000)
1094 12654-10-8
1 By chapter 53, section 1, of the laws of 2016:
2 For grants to schools and other eligible entities for programs funded
3 through the national school lunch act (21703) ......................
4 1,142,589,000 ................................... (re. $500,000,000)
5 By chapter 53, section 1, of the laws of 2015, as added by chapter 61,
6 section 1, of the laws of 2015:
7 For grants to schools and other eligible entities for programs funded
8 through the national school lunch act (21703) ......................
9 1,109,310,000 .................................... (re. $85,000,000)
10 By chapter 53, section 1, of the laws of 2014:
11 For grants to schools and other eligible entities for programs funded
12 through the national school lunch act (21703) ......................
13 1,077,000,000 ....................................... (re. $100,000)
14 Special Revenue Funds - Other
15 Charter School Stimulus Fund
16 Charter School Stimulus Account - 20601
17 By chapter 53, section 1, of the laws of 2016:
18 For services and expenses related to development, implementation and
19 operation of charter schools, including facility costs and loans to
20 authorized schools, and including funds available for transfer for
21 the administrative/technical support services provided by the char-
22 ter school institute of the state university of New York. This
23 appropriation shall only be available for expenditure upon the
24 approval of an expenditure plan by the director of the budget
25 (21700) ... 20,000,000 ........................... (re. $13,680,000)
26 Special Revenue Funds - Other
27 Combined Expendable Trust Fund
28 New York State Teen Health Education Account - 20200
29 By chapter 53, section 1, of the laws of 2017, as added by chapter 50,
30 section 2, of the laws of 2017:
31 For teen health education, pursuant to section 99-u of the state
32 finance law ... 120,000 ............................. (re. $120,000)
33 By chapter 53, section 1, of the laws of 2016:
34 For teen health education, pursuant to section 99-u of the state
35 finance law ... 120,000 ............................. (re. $120,000)
36 Special Revenue Funds - Other
37 Miscellaneous Special Revenue Fund
38 Commercial Gaming Revenue Account - 23701
39 The appropriation made by chapter 53, section 1, of the laws of 2014, as
40 amended by chapter 50, section 2, of the laws of 2017, is hereby
41 amended and reappropriated to read:
42 For payment, pursuant to section 97-nnnn of the state finance law, of
43 additional aid to school districts otherwise eligible for an appor-
44 tionment pursuant to subdivision 4 of section 3602 of the education
45 law, in order to support elementary and secondary education, which,
46 notwithstanding any provision of law to the contrary, shall for
47 purposes of this appropriation mean support through after-school
1095 12654-10-8
1 programs, gap elimination adjustment restoration apportionments
2 and/or foundation aid; provided that, for the 2014-15 school year,
3 $81,000,000 shall be available from the funds appropriated herein
4 and shall be payable, on or after April 1, 2015, as a portion of the
5 gap elimination adjustment restoration in such year. Provided
6 further that, $81,000,000 of the funds appropriated herein shall be
7 available for the 2015-16 school year and no more than 70 percent of
8 such $81,000,000 shall be available for the 2015-16 state fiscal
9 year. Provided further that, $81,000,000 of the funds appropriated
10 herein shall be available for the 2016-17 school year and no more
11 than 70 percent of such $81,000,000 shall be available for the
12 2016-17 state fiscal year. Provided further that, $81,000,000 of the
13 funds appropriated herein shall be available for the 2017-18 school
14 year and no more than 70 percent of such $81,000,000 shall be avail-
15 able for the 2017-18 state fiscal year. Provided further that, of
16 the funds appropriated herein, no more than $140,040,000 shall be
17 available for the 2018-19 state fiscal year; and provided further
18 that, notwithstanding any provision of law to the contrary, the
19 funds appropriated herein shall only be available to support such
20 purposes and shall not be interchanged with any other item of appro-
21 priation; and provided that notwithstanding section 40 of the state
22 finance law or any provision of law to the contrary, this appropri-
23 ation shall remain in full force and effect to the maximum extent
24 allowed by law (56140) ... 720,000,000 .......... (re. $682,600,000)
25 SCHOOL TAX RELIEF PROGRAM
26 Special Revenue Funds - Other
27 School Tax Relief Fund
28 School Tax Relief Account - 20551
29 By chapter 53, section 1, of the laws of 2016:
30 For payments to local governments and New York city relating to the
31 school tax relief (STAR) program including state aid pursuant to
32 section 1306-a of the real property tax law and section 54-f of the
33 state finance law, except to the extent that such funds shall be
34 applied as an offset against the past-due state tax liabilities of
35 certain property owners pursuant to section 425 of the real property
36 tax law and section 171-y of the tax law, provided however, notwith-
37 standing any other law to the contrary, the monies hereby appropri-
38 ated shall not be disbursed until such time a law or laws are
39 enacted providing that 1) the existing STAR exemption program is
40 closed to new applicants who will receive a new refundable personal
41 income tax (PIT) credit in its place for all periods beginning on or
42 after January 1, 2016; and 2) the state school tax reduction credit
43 authorized by subsection (e) of section 1310 of the tax law is
44 converted into a school tax reduction credit authorized by a new
45 subsection of section 606 of the tax law for all periods beginning
46 on or after January 1, 2016. Up to $5,000,000 of the funds appro-
47 priated hereby may be suballocated or transferred to the department
48 of taxation and finance for the purpose of making direct payments to
49 certain property owners from the account established pursuant to
50 subparagraph (iii) of paragraph (a) of subdivision 14 of section 425
51 of the real property tax law (21709) ...............................
52 3,107,440,000 ................................... (re. $627,038,000)
1096 12654-10-8
1 § 3. This act shall take effect immediately and shall be deemed to
2 have been in full force and effect on and after April 1, 2018, except
3 section two of this act shall take effect on the same date as such chap-
4 ter of the laws of 2018, takes effect.
1097 12654-10-8
TABLE OF CONTENTS
Page
SECTION 1 - STATE AGENCIES ........................................... 1
ADIRONDACK PARK AGENCY ............................................. 3
AGRICULTURE AND MARKETS, DEPARTMENT OF ............................. 4
AUDIT AND CONTROL, DEPARTMENT OF .................................. 13
CITY UNIVERSITY OF NEW YORK ....................................... 15
CORRECTIONS AND COMMUNITY SUPERVISION, DEPARTMENT OF .............. 81
EDUCATION DEPARTMENT .............................................. 91
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY ........................ 105
ENVIRONMENTAL CONSERVATION, DEPARTMENT OF ........................ 107
FAMILY ASSISTANCE, DEPARTMENT OF
CHILDREN AND FAMILY SERVICES, OFFICE OF ........................ 302
TEMPORARY AND DISABILITIES ASSISTANCE, OFFICE OF ............... 321
GENERAL SERVICES, OFFICE OF ...................................... 327
HEALTH, DEPARTMENT OF ............................................ 341
HOMELAND SECURITY AND EMERGENCY SERVICES, DIVISION OF ............ 360
HOUSING AND COMMUNITY RENEWAL, DIVISION OF ....................... 364
HUDSON RIVER PARK TRUST .......................................... 387
INFORMATION TECHNOLOGY SERVICES, OFFICE OF ....................... 390
LAW, DEPARTMENT OF ............................................... 392
MENTAL HYGIENE, DEPARTMENT OF
ALCOHOLISM AND SUBSTANCE ABUSE SERVICES, OFFICE OF ............. 394
MENTAL HEALTH, OFFICE OF ....................................... 413
PEOPLE WITH DEVELOPMENTAL DISABILITIES, OFFICE FOR ............. 447
METROPOLITAN TRANSPORTATION AUTHORITY ............................ 477
MILITARY AND NAVAL AFFAIRS, DIVISION OF .......................... 481
MOTOR VEHICLES, DEPARTMENT OF .................................... 493
1098 12654-10-8
TABLE OF CONTENTS
Page
OLYMPIC REGIONAL DEVELOPMENT AUTHORITY ........................... 495
PARKS, RECREATION AND HISTORIC PRESERVATION, OFFICE OF ........... 497
POWER AUTHORITY, NEW YORK ........................................ 523
STATE, DEPARTMENT OF ............................................. 525
STATE POLICE, DIVISION OF ........................................ 528
STATE UNIVERSITY OF NEW YORK ..................................... 536
TRANSPORTATION, DEPARTMENT OF .................................... 643
URBAN DEVELOPMENT CORPORATION, NEW YORK STATE .................... 870
WORKERS' COMPENSATION BOARD ...................................... 898
MISCELLANEOUS -- ALL STATE DEPARTMENTS AND AGENCIES:
ARTS AND CULTURAL FACILITIES IMPROVEMENT PROGRAM ............... 900
COMMUNITY ENHANCEMENT FACILITIES ASSISTANCE PROGRAM ............ 903
ECONOMIC DEVELOPMENT - CAPITAL ................................. 904
ECONOMIC DEVELOPMENT PROGRAM ................................... 907
HIGH TECHNOLOGY AND DEVELOPMENT PROGRAM ........................ 908
HIGHER EDUCATION FACILITIES CAPITAL MATCHING GRANTS
PROGRAM ...................................................... 909
HUDSON RIVER VALLEY GREENWAY COMMUNITIES COUNCIL ............... 911
JACOB JAVITS CONVENTION CENTER ................................. 912
NONPROFIT INFRASTRUCTURE CAPITAL INVESTMENT PROGRAM ............ 913
REGIONAL ECONOMIC DEVELOPMENT PROGRAM .......................... 917
ROOSEVELT ISLAND OPERATING CORPORATION ......................... 918
SPECIAL INFRASTRUCTURE ACCOUNT, NEW YORK STATE ................. 919
STATE AND MUNICIPAL FACILITIES PROGRAM ......................... 928
STATE EQUIPMENT FINANCE PROGRAM ................................ 940
STRATEGIC INVESTMENT PROGRAM ................................... 941
WORLD TRADE CENTER -- DEPARTMENT OF TRANSPORTATION ............. 942
1099 12654-10-8
TABLE OF CONTENTS
Page
SECTION 2 - CHAPTER AMENDMENT ...................................... 944
SECTION 3 - EFFECTIVE DATE ........................................ 1096