___________
IN SENATE -- A BUDGET BILL, submitted by the Governor pursuant to arti-
cle seven of the Constitution -- read twice and ordered printed, and
when printed to be committed to the Committee on Finance -- committee
discharged, bill amended, ordered reprinted as amended and recommitted
to said committee -- committee discharged, bill amended, ordered
reprinted as amended and recommitted to said committee -- committee
discharged, bill amended, ordered reprinted as amended and recommitted
to said committee -- committee discharged, bill amended, ordered
reprinted as amended and recommitted to said committee
IN ASSEMBLY -- A BUDGET BILL, submitted by the Governor pursuant to
article seven of the Constitution -- read once and referred to the
Committee on Ways and Means -- committee discharged, bill amended,
ordered reprinted as amended and recommitted to said committee --
again reported from said committee with amendments, ordered reprinted
as amended and recommitted to said committee -- again reported from
said committee with amendments, ordered reprinted as amended and
recommitted to said committee -- again reported from said committee
with amendments, ordered reprinted as amended and recommitted to said
committee
AN ACT making appropriations for the support of government; and to amend
a chapter of the laws of 2017 enacting the aid to localities budget
and to amend a chapter of the laws of 2017 enacting the state oper-
ations budget, in relation to the support of government
CAPITAL PROJECTS BUDGET
The People of the State of New York, represented in Senate and Assem-bly, do enact as follows:
1 Section 1. a) The several amounts specified in this chapter for capi-
2 tal projects, or so much thereof as shall be necessary to accomplish the
3 purpose of the appropriations, are appropriated by comprehensive
4 construction programs (hereinafter referred to by the abbreviation CCP),
5 purposes, and projects designated by the appropriations, and authorized
6 to be made available as hereinafter provided to the respective public
EXPLANATION--Matter in italics (underscored) is new; matter in brackets
[] is old law to be omitted.
LBD12554-15-7
2 12554-15-7
1 officers; such appropriations shall be deemed to provide all costs
2 necessary and pertinent to accomplish the intent of the appropriations
3 and are appropriated in accordance with the provisions of section 93 of
4 the state finance law.
5 b) Any amounts specified in this chapter for advances for capital
6 projects, or so much thereof as shall be necessary to accomplish the
7 purpose of the appropriations, are appropriated by comprehensive
8 construction programs (hereinafter referred to by the abbreviation CCP),
9 purposes and projects designated by the appropriations as advances from
10 the capital projects fund in accordance with the provisions of sections
11 40-a and 93 of the state finance law, and are authorized to be paid as
12 hereinafter provided as an advance for a share, part or whole of the
13 cost for such programs, purposes and projects hereinafter specified.
14 c) The several amounts specified in this chapter as capital projects -
15 reappropriations, or so much thereof as shall be sufficient to accom-
16 plish the purpose of the appropriations, as appropriated by comprehen-
17 sive construction programs (hereinafter referred to by the abbreviation
18 CCP), purposes, and projects, being the undisbursed and/or unexpended
19 balances of the prior year's appropriations, are reappropriated and
20 unless otherwise amended or repealed in part or total in this chapter
21 shall continue to be available for the same purposes as the prior appro-
22 priations or as otherwise amended for the fiscal year beginning April 1,
23 2017.
24 The capital projects reappropriations contained in this chapter may be
25 amended by repealing the items set forth in brackets and by adding ther-
26 eto the underscored material. Certain reappropriations in this chapter
27 are shown using abbreviated text, with three leader dots (an ellipsis)
28 followed by three spaces (... ) used to indicate where existing law
29 that is being continued is not shown. However, unless a change is clear-
30 ly indicated by the use of brackets [] for deletions and underscores
31 for additions, the purpose, amounts, funding source and all other
32 aspects pertinent to each item of appropriation shall be as last appro-
33 priated.
34 For the purpose of complying with section 25 of the state finance law,
35 the year, chapter and section of the last act reappropriating a former
36 original appropriation or any part thereof is, unless otherwise indi-
37 cated, chapter 55, section 1, of the laws of 2016 and, for the city
38 university of New York and state university of New York, chapter 53,
39 section 3, of the laws of 2016.
40 d) No moneys appropriated by this chapter shall be available for
41 payment until a certificate of approval has been issued by the director
42 of the budget, who shall file such certificate with the department of
43 audit and control, the chairperson of the senate finance committee and
44 the chairperson of the assembly ways and means committee.
45 e) The appropriations contained in this chapter shall be available for
46 the fiscal year beginning on April 1, 2017 except as otherwise noted.
3 12554-15-7
ADIRONDACK PARK AGENCY
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 APPROPRIATIONS REAPPROPRIATIONS
2 Special Revenue Funds - Other ...... 0 1,500,000
3 ---------------- ----------------
4 All Funds ........................ 0 1,500,000
5 ================ ================
6 MAINTENANCE AND IMPROVEMENTS OF EXISTING FACILITIES (CCP)
7 Special Revenue Funds - Other
8 Combined Expendable Trust Fund
9 Miscellaneous Gifts Account
10 Preservation of Facilities Purpose
11 By chapter 54, section 1, of the laws of 2012:
12 For alterations, rehabilitations and improvements of various facili-
13 ties, including personal service and payment of liabilities incurred
14 prior to April 1, 2012 (13GI1203) ... 500,000 ....... (re. $500,000)
15 By chapter 54, section 1, of the laws of 2011:
16 For alterations, rehabilitations and improvements of various facili-
17 ties, including personal service and payment of liabilities incurred
18 prior to April 1, 2011 (13GI1103) ... 500,000 ....... (re. $500,000)
19 By chapter 55, section 1, of the laws of 2010:
20 For alterations, rehabilitations and improvements of various facili-
21 ties, including personal service and payment of liabilities incurred
22 prior to April 1, 2010 (13GI1003) ... 500,000 ....... (re. $500,000)
4 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 66,215,000 8,858,000
6 ---------------- ----------------
7 All Funds ........................ 66,215,000 8,858,000
8 ================ ================
9 NEW YORK WORKS (CCP) ........................................ 53,215,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Administrative Services Purpose
14 For the purchase and replacement of vehicles
15 and equipment (60VS17AS) ....................... 600,000
16 For services and expenses related to the
17 purchase or replacement of laboratory
18 equipment (60ES17AS) ........................... 115,000
19 Capital Projects Funds - Other
20 Capital Projects Fund
21 Preservation of Facilities Purpose
22 For services and expenses related to New
23 York Works Infrastructure projects for
24 alterations, rehabilitation and improve-
25 ments at the state fair, including
26 personal service and the payment of
27 liabilities incurred prior to April 1,
28 2017. All or a portion of the funds appro-
29 priated hereby may be suballocated or
30 transferred to any department, agency or
31 public authority (60NY1703) .................. 2,500,000
32 For services and expenses related to New
33 York Works Infrastructure projects for
34 alterations, rehabilitation and improve-
35 ments to modernize the state fair, includ-
36 ing personal service and the payment of
37 liabilities incurred prior to April 1,
38 2017. All or a portion of the funds appro-
39 priated hereby may be suballocated or
40 transferred to any department, agency or
41 public authority (60SF1703) ................. 50,000,000
42 STATE FAIR (CCP) ............................................. 3,000,000
43 --------------
5 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2017-18
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Preservation of Facilities Purpose
4 For payment of the costs including personal
5 services, nonpersonal services, fringe
6 benefits and indirect costs, of alter-
7 ations, rehabilitation and improvements
8 including preventive maintenance, replace-
9 ment, refurbishment and energy conserva-
10 tion of various facilities, including the
11 payment of liabilities incurred prior to
12 April 1, 2017 (60MN1703) ..................... 1,000,000
13 Capital Projects Funds - Other
14 Miscellaneous Capital Projects Fund
15 Preservation of Facilities Purpose
16 For payment of the costs including personal
17 services, nonpersonal services, fringe
18 benefits and indirect costs, of alter-
19 ations, rehabilitation and improvements
20 including preventive maintenance, replace-
21 ment, refurbishment and energy conserva-
22 tion of various facilities, including the
23 payment of liabilities incurred prior to
24 April 1, 2017 (60RI1703) ..................... 2,000,000
25 NEW FACILITIES PURPOSE (CCP) ................................ 10,000,000
26 --------------
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 New Facilities Purpose
30 For payment to agricultural or horticultural
31 corporations and county extension service
32 associations that are eligible to receive
33 premium reimbursement pursuant to section
34 286 of the agriculture and markets law for
35 the costs of construction, renovation,
36 alteration, rehabilitation, improvements,
37 installation, acquisition, repair or
38 replacement of fairground buildings,
39 equipment or permanent or temporary facil-
40 ities used to house or promote agricul-
41 ture, excluding parking facilities and
42 signage, to be allocated by the commis-
43 sioner in amounts not to exceed $200,000
44 to such eligible agricultural and horti-
45 cultural corporations or county extension
6 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2017-18
1 services on a non-competitive basis until
2 such funds are exhausted (60LF1703) .......... 5,000,000
3 For grants to municipal and incorporated
4 not-for-profit pounds, shelters and humane
5 societies. Use of the grant funds is
6 restricted to the costs of capital
7 projects including, but not limited to,
8 construction, renovation, rehabilitation,
9 installation, acquisition, or expansion of
10 buildings, equipment, or facilities neces-
11 sary for the secure containment, health,
12 and adequate care of sheltered dogs and
13 cats. These grants shall be allocated by
14 the commissioner on a competitive basis
15 until such funds are extinguished as
16 follows: (a) In municipalities with a
17 population of less than two million, for
18 such pounds, shelters or humane societies
19 that are operated by or under contract for
20 the provision of pound or shelter services
21 with one or more municipalities: projects
22 serving an individual municipality, grants
23 in amounts not less than $50,000 and not
24 more than $200,000, not to exceed fifty
25 percent of the total project cost; and for
26 projects serving two or more munici-
27 palities, grants in amounts not less than
28 $100,000 and not more than $500,000, not
29 to exceed seventy-five percent of the
30 total project cost; (b) In municipalities
31 with a population of more than two
32 million, for such pounds, shelters or
33 humane societies that are operated by or
34 under contract for the provision of pound
35 or shelter services with one or more muni-
36 cipalities, grants in amounts not less
37 than $100,000 and not more than $500,000,
38 not to exceed seventy-five percent of the
39 total project cost; and (c) to the extent
40 such funds have not been extinguished, for
41 projects in underserved municipalities or
42 regions, for such pounds, shelters or
43 humane societies that are not operated by
44 or under contract with one or more munici-
45 palities for the provision of pound or
46 shelter services, grants in amounts not
47 more than $50,000, not to exceed fifty
48 percent of the total project cost. Up to
49 five percent of the total appropriation
50 amount may be made available for the
51 services and expenses of the Department in
7 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS 2017-18
1 relation to these grants, including
2 personal service, non-personal service,
3 fringe benefits, and indirect costs
4 (60AS1703) ................................... 5,000,000
8 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 NEW FACILITIES PURPOSE (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 New Facilities Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For payment to agricultural or horticultural corporations and county
7 extension service associations that are eligible to receive premium
8 reimbursement pursuant to section 286 of the agriculture and markets
9 law for the costs of construction, renovation, alteration, rehabili-
10 tation, improvements, installation, acquisition, repair or replace-
11 ment of fairground buildings, equipment or permanent or temporary
12 facilities used to house or promote agriculture, excluding parking
13 facilities and signage, to be allocated by the commissioner in
14 amounts not to exceed $200,000 to such eligible agricultural and
15 horticultural corporations or county extension services on a non-
16 competitive basis until such funds are exhausted (60LF1603) ........
17 5,000,000 ......................................... (re. $5,000,000)
18 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
19 section 1, of the laws of 2012:
20 For building and equipping the Finger Lakes Community College viticul-
21 ture center in Geneva, and building renovations and equipment in
22 support of food processing and viticulture educational technologies
23 at the New York State Agricultural Experiment Station in Geneva
24 (60010809) ... 8,000,000 ............................. (re. $43,000)
25 By chapter 55, section 1, of the laws of 2006, as amended by chapter 53,
26 section 3, of the laws of 2006:
27 For services and expenses related to the construction of the Cornell
28 Equine Drug Testing laboratory (60020607) ..........................
29 2,000,000 ........................................... (re. $198,000)
30 For services and expenses related to the Fredonia Vineyard Laboratory
31 (60030607) ... 2,000,000 ............................. (re. $28,000)
32 By chapter 55, section 1, of the laws of 2006, as amended by chapter
33 108, section 5, of the laws of 2006:
34 For services and expenses related to the construction of the New York
35 State department of agriculture and markets food laboratory, includ-
36 ing but not limited to the cost of property acquisition, studies,
37 appraisals, surveys, testing, environmental impact statements and
38 for design and construction management services (60010607) .........
39 40,000,000 .......................................... (re. $157,000)
40 NEW YORK WORKS (CCP)
41 Capital Projects Funds - Other
42 Capital Projects Fund
43 Preservation of Facilities Purpose
44 By chapter 55, section 1, of the laws of 2016:
9 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services and expenses related to New York Works Infrastructure
2 projects for alterations, rehabilitation and improvements at the
3 state fair, including personal service and the payment of liabil-
4 ities incurred prior to April 1, 2016. All or a portion of the funds
5 appropriated hereby may be suballocated or transferred to any
6 department, agency or public authority (60NY1603) ..................
7 2,500,000 ......................................... (re. $1,600,000)
8 By chapter 54, section 1, of the laws of 2015:
9 For services and expenses related to New York Works Infrastructure
10 projects for alterations, rehabilitation and improvements at the
11 state fair, including personal service and the payment of liabil-
12 ities incurred prior to April 1, 2015. All or a portion of the funds
13 appropriated hereby may be suballocated or transferred to any
14 department, agency or public authority (60NY1503) ..................
15 2,500,000 ............................................ (re. $58,000)
16 STATE FAIR (CCP)
17 Capital Projects Funds - Other
18 Miscellaneous Capital Projects Fund
19 Preservation of Facilities Purpose
20 By chapter 55, section 1, of the laws of 2016:
21 For payment of the costs including personal services, nonpersonal
22 services, fringe benefits and indirect costs, of alterations, reha-
23 bilitation and improvements including preventive maintenance,
24 replacement, refurbishment and energy conservation of various facil-
25 ities, including the payment of liabilities incurred prior to April
26 1, 2016 (60RI1603) ... 2,000,000 .................. (re. $2,000,000)
27 By chapter 54, section 1, of the laws of 2015:
28 For payment of the costs including personal services, nonpersonal
29 services, fringe benefits and indirect costs, of alterations, reha-
30 bilitation and improvements including preventive maintenance,
31 replacement, refurbishment and energy conservation of various facil-
32 ities, including the payment of liabilities incurred prior to April
33 1, 2015 (60RI1503) ... 2,000,000 .................. (re. $2,000,000)
34 By chapter 54, section 1, of the laws of 2014:
35 For payment of the costs including personal services, nonpersonal
36 services, fringe benefits and indirect costs, of alterations, reha-
37 bilitation and improvements including preventive maintenance,
38 replacement, refurbishment and energy conservation of various facil-
39 ities, including the payment of liabilities incurred prior to April
40 1, 2014 (60RI1403) ... 2,000,000 .................. (re. $2,000,000)
41 By chapter 54, section 1, of the laws of 2013:
42 For payment of the costs including personal services, nonpersonal
43 services, fringe benefits and indirect costs, of alterations, reha-
44 bilitation and improvements including preventive maintenance,
45 replacement, refurbishment and energy conservation of various facil-
10 12554-15-7
DEPARTMENT OF AGRICULTURE AND MARKETS
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ities, including the payment of liabilities incurred prior to April
2 1, 2013 (60RI1303) ... 2,000,000 .................. (re. $2,000,000)
3 By chapter 54, section 1, of the laws of 2012:
4 For payment of the costs including personal services, nonpersonal
5 services, fringe benefits and indirect costs, of alterations, reha-
6 bilitation and improvements including preventive maintenance,
7 replacement, refurbishment and energy conservation of various facil-
8 ities, including the payment of liabilities incurred prior to April
9 1, 2012 (60RI1203) ... 2,000,000 .................. (re. $2,000,000)
10 By chapter 54, section 1, of the laws of 2011:
11 For payment of the costs including personal services, nonpersonal
12 services, fringe benefits and indirect costs, of alterations, reha-
13 bilitation and improvements including preventive maintenance,
14 replacement, refurbishment and energy conservation of various facil-
15 ities, including the payment of liabilities incurred prior to April
16 1, 2011 (60RI1103) ... 2,000,000 .................. (re. $2,000,000)
11 12554-15-7
DEPARTMENT OF AUDIT AND CONTROL
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 IT INITIATIVE PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Program Improvement/Change Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For services and expenses related to the acquisition and development
7 of technology, including but not limited to equipment, software and
8 services (OS011608) ... 6,000,000 ................. (re. $6,000,000)
12 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 401,558,000 2,399,086,000
6 ---------------- ----------------
7 All Funds ........................ 401,558,000 2,399,086,000
8 ================ ================
9 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) ................. 284,222,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Administration Purpose
14 For services and expenses related to alter-
15 ations and improvements to existing facil-
16 ities for capital maintenance, including
17 but not limited to capital design,
18 construction, reconstruction, rehabili-
19 tation, and equipment; for health and
20 safety, preservation of facilities,
21 program improvement or program change,
22 environmental protection, energy conserva-
23 tion, accreditation, facilities for the
24 physically disabled, preventative mainte-
25 nance and related projects, including
26 costs incurred prior to April 1, 2017 and
27 subject to a plan developed and submitted
28 annually by the city university of New
29 York and approved by the director of the
30 budget, and which may include, but not be
31 limited to, projects in the following
32 schedule (30031750) ........................ 224,222,000
33 Project Schedule
34 PROJECT AMOUNT
35 ----------------------------------------------------------
36 (thousands of dollars)
37 Baruch College
38 Campus-wide maintenance to
39 various facilities ............................ 2,511
40 Brooklyn College
41 Campus-wide maintenance to
42 various facilities ............................ 5,433
43 City College
44 Campus-wide maintenance to
13 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2017-18
1 various facilities ............................ 8,136
2 Graduate School and University Center
3 Campus-wide maintenance to
4 various facilities ................................ 25
5 Honors college
6 Campus-wide maintenance to
7 various facilities............................... 25
8 Hunter College
9 Campus-wide maintenance to
10 various facilities ............................ 5,799
11 John Jay College of Criminal Justice
12 Campus-wide maintenance to
13 various facilities ............................. 3,193
14 Lehman College
15 Campus-wide maintenance to
16 various facilities ............................ 2,438
17 Medgar Evers College
18 Campus-wide maintenance to
19 various facilities ............................. 3,096
20 New York City College of Technology
21 Campus-wide maintenance to
22 various facilities ............................ 3,485
23 Queens College
24 Campus-wide maintenance to
25 various facilities ............................ 5,433
26 College of Staten Island
27 Campus-wide maintenance to
28 various facilities ............................. 2,877
29 York College
30 Campus-wide maintenance to
31 various facilities ............................ 3,899
32 For university-wide maintenance or
33 capital improvement costs at senior
34 colleges attributable to the findings of
35 condition surveys for health and safety
36 needs ........................................... 9,270
37 For university-wide maintenance or
38 capital improvement costs at senior
39 colleges attributable to the findings of
40 condition surveys for preservation of
41 facilities needs ................................ 12,463
42 For university-wide maintenance or
43 capital improvement costs at senior
44 colleges attributable to mechanical and
45 infrastructure needs ............................ 7,210
46 For university-wide maintenance or
47 capital improvement costs at senior
48 colleges attributable to ADA needs ............... 6,180
49 For university-wide maintenance or
50 capital improvement costs at senior
14 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2017-18
1 colleges attributable to certificate of
2 occupancy/public assembly needs ................. 2,060
3 For university-wide maintenance or
4 capital improvement costs at senior
5 colleges attributable to energy
6 conservation needs .............................. 4,120
7 For university-wide maintenance or
8 capital improvement costs at senior
9 colleges attributable to science lab
10 upgrade needs .................................... 2,060
11 For university-wide maintenance or
12 capital improvement costs at senior
13 colleges attributable to bathroom
14 facilities upgrade needs ......................... 1,030
15 For university-wide maintenance or
16 capital improvement costs at senior
17 colleges attributable to educational
18 technology initiative needs ..................... 6,695
19 For university-wide maintenance or
20 capital improvement costs at senior
21 colleges attributable to science and
22 technology equipment needs ...................... 5,047
23 For university-wide maintenance or
24 capital improvement costs at senior
25 colleges attributable to CUNY TV
26 renovation needs ................................... 515
27 For university-wide priority capital
28 maintenance or capital improvement
29 projects to support the preservation
30 of facilities .................................. 121,222
31 --------------
32 Total ........................................ 224,222
33 ==============
34 For services and expenses related to alter-
35 ations and improvements to various facili-
36 ties including but not limited to capital
37 design, construction, reconstruction,
38 rehabilitation, and equipment; for health
39 and safety, preservation of facilities,
40 program improvement or program change,
41 environmental protection, energy conserva-
42 tion, accreditation, facilities for the
43 physically disabled, preventative mainte-
44 nance and related projects, including
45 costs incurred prior to April 1, 2017 and
46 subject to a plan developed and submitted
47 annually by the city university of New
48 York and approved by the director of the
49 budget, and which may include, but not be
15 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2017-18
1 limited to, projects in the following
2 schedule (30051750) ......................... 60,000,000
3 Project Schedule
4 PROJECT AMOUNT
5 ----------------------------------------------------------
6 (thousands of dollars)
7 Baruch College
8 Campus-wide projects ............................. 1,260
9 Brooklyn College
10 Campus-wide projects ............................. 8,460
11 City College
12 Campus-wide projects ............................ 15,120
13 Graduate School and University Center
14 Campus-wide projects ................................ 60
15 Honors college
16 Campus-wide projects ................................ 60
17 Hunter College
18 Campus-wide projects ............................. 9,360
19 John Jay College of Criminal Justice
20 Campus-wide projects ............................. 2,940
21 Lehman College
22 Campus-wide projects ............................. 1,080
23 Medgar Evers College
24 Campus-wide projects ............................. 2,700
25 New York City College of Technology
26 Campus-wide projects ............................ 3,660
27 Queens College
28 Campus-wide projects ............................ 8,460
29 College of Staten Island
30 Campus-wide projects ............................. 2,160
31 York College
32 Campus-wide projects ............................ 4,680
33 --------------
34 Total ......................................... 60,000
35 ==============
36 PROJECT ADMINISTRATION (CCP) ................................ 36,983,000
37 --------------
38 Capital Projects Funds - Other
39 Capital Projects Fund
40 Administration Purpose
41 For payment to the dormitory authority of
42 the state of New York, for services and
43 expenses of the authority related to
44 construction activities administered by
45 the authority for the state share of capi-
46 tal projects of the city university of New
16 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS 2017-18
1 York which are appropriated by the state
2 and otherwise authorized by law (30DA1750) .. 21,000,000
3 For payment to the city university
4 construction fund, for services and
5 expenses of the city university
6 construction fund related to construction
7 activities administered by the city
8 university construction fund for the state
9 share of capital projects of the city
10 university of New York which are appropri-
11 ated by the state and otherwise authorized
12 by law (30CF1750) ........................... 15,983,000
17 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP) .................. 80,353,000
5 --------------
6 Capital Projects Funds - Other
7 Capital Projects Fund
8 Administration Purpose
9 For services and expenses for state finan-
10 cial assistance to community colleges for
11 alterations and improvements to various
12 facilities including services and
13 expenses, capital design, construction,
14 reconstruction, rehabilitation and equip-
15 ment; for health and safety, preservation
16 of facilities, new facilities program
17 improvement or program change, environ-
18 mental protection, energy conservation,
19 accreditation, facilities for the phys-
20 ically disabled, and related projects,
21 including costs incurred prior to April 1,
22 2017 subject to an annual plan developed
23 by the city university and approved by the
24 state director of the budget, and which
25 may include, but not be limited to,
26 projects in the following schedule
27 (30CC1750) .................................. 80,353,000
28 Project Schedule
29 ESTIMATED ESTIMATED
30 TOTAL STATE 50 PERCENT
31 & LOCAL SHARE STATE SHARE
32 ----------------------------------------------------------
33 (thousands of dollars)
34 Bronx Community College
35 Critical Maintenance ............. 42,000 21,000
36 Student Success Center............ 14,000 7,000
37 STEM Resource Center ............. 300 150
38 Borough Manhattan Community College
39 Cooling Tower Rehab .............. 3,600 1,800
40 Gymnasium Light Replacement ...... 700 350
41 Hostos Community College
42 One Stop Student Services Center . 7,700 3,850
43 Kingsborough Community College
44 Roof Replacements ................ 2,000 1,000
45 Marina Upgrades .................. 500 250
18 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS 2017-18
1 Science Equipment................. 454 227
2 LaGuardia Community College
3 Center for Career and Employment
4 Training ......................... 6,774 3,387
5 Queensborough Community College
6 Roof Repairs ..................... 2,400 1,200
7 Kitchen and Cafeteria Renovation.. 5,600 2,800
8 For university-wide community college
9 critical maintenance or capital
10 improvement costs attributable to
11 preservation of facilities ...... 60,678 30,339
12 For university-wide community college
13 critical maintenance or capital
14 improvement costs attributable to
15 facilities which support ASAP
16 programs ........................ 14,000 7,000
17 ------- ------
18 Total .......................... 160,706 80,353
19 ======= ======
19 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 By chapter 55, section 1, of the laws of 2016, as amended by chapter 53,
6 section 3, of the laws of 2016:
7 For services and expenses related to alterations and improvements to
8 existing facilities for capital maintenance, including but not
9 limited to capital design, construction, reconstruction, rehabili-
10 tation, and equipment; for health and safety, preservation of facil-
11 ities, program improvement or program change, environmental
12 protection, energy conservation, accreditation, facilities for the
13 physically disabled, preventative maintenance and related projects,
14 including costs incurred prior to April 1, 2016 and subject to a
15 plan developed and submitted annually by the city university of New
16 York and approved by the director of the budget, and which may
17 include, but not be limited to, projects in the following schedule
18 (30031650) ... 103,000,000 ...................... (re. $103,000,000)
19 Project Schedule
20 PROJECT AMOUNT
21 ----------------------------------------------------------
22 (thousands of dollars)
23 Baruch College
24 Campus-wide maintenance to
25 various facilities ............................ 2,511
26 Brooklyn College
27 Campus-wide maintenance to
28 various facilities ............................ 5,433
29 City College
30 Campus-wide maintenance to
31 various facilities ............................ 8,136
32 Graduate School and University Center
33 Campus-wide maintenance to
34 various facilities ................................ 25
35 Honors college
36 Campus-wide maintenance to
37 various facilities............................... 25
38 Hunter College
39 Campus-wide maintenance to
40 various facilities ............................ 5,799
41 John Jay College of Criminal Justice
42 Campus-wide maintenance to
43 various facilities ............................. 3,193
44 Lehman College
45 Campus-wide maintenance to
46 various facilities ............................ 2,438
47 Medgar Evers College
20 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Campus-wide maintenance to
2 various facilities ............................. 3,096
3 New York City College of Technology
4 Campus-wide maintenance to
5 various facilities ............................ 3,485
6 Queens College
7 Campus-wide maintenance to
8 various facilities ............................ 5,433
9 College of Staten Island
10 Campus-wide maintenance to
11 various facilities ............................. 2,877
12 York College
13 Campus-wide maintenance to
14 various facilities ............................ 3,899
15 For university-wide maintenance or
16 capital improvement costs at senior
17 colleges attributable to the findings of
18 condition surveys for health and safety
19 needs ........................................... 9,270
20 For university-wide maintenance or
21 capital improvement costs at senior
22 colleges attributable to the findings of
23 condition surveys for preservation of
24 facilities needs ................................ 12,463
25 For university-wide maintenance or
26 capital improvement costs at senior
27 colleges attributable to mechanical and
28 infrastructure needs ............................ 7,210
29 For university-wide maintenance or
30 capital improvement costs at senior
31 colleges attributable to ADA needs ............... 6,180
32 For university-wide maintenance or
33 capital improvement costs at senior
34 colleges attributable to certificate of
35 occupancy/public assembly needs ................. 2,060
36 For university-wide maintenance or
37 capital improvement costs at senior
38 colleges attributable to energy
39 conservation needs .............................. 4,120
40 For university-wide maintenance or
41 capital improvement costs at senior
42 colleges attributable to science lab
43 upgrade needs .................................... 2,060
44 For university-wide maintenance or
45 capital improvement costs at senior
46 colleges attributable to bathroom
47 facilities upgrade needs ......................... 1,030
48 For university-wide maintenance or
49 capital improvement costs at senior
50 colleges attributable to educational
21 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 technology initiative needs ..................... 6,695
2 For university-wide maintenance or
3 capital improvement costs at senior
4 colleges attributable to science and
5 technology equipment needs ...................... 5,047
6 For university-wide maintenance or
7 capital improvement costs at senior
8 colleges attributable to CUNY TV
9 renovation needs ................................... 515
10 --------------
11 Total ........................................ 103,000
12 ==============
13 For additional services and expenses related to alterations and
14 improvements to existing facilities for capital maintenance, includ-
15 ing but not limited to capital design, construction, reconstruction,
16 rehabilitation, and equipment; for health and safety, preservation
17 of facilities, program improvement or program change, environmental
18 protection, energy conservation, accreditation, facilities for the
19 physically disabled, preventative maintenance and related projects,
20 including costs incurred prior to April 1, 2016 and subject to a
21 plan developed and submitted annually by the city university of New
22 York and approved by the director of the budget, and which may
23 include, but not be limited to, projects in the following schedule
24 (30041650) ... 40,000,000 ........................ (re. $40,000,000)
25 Project Schedule
26 PROJECT AMOUNT
27 ----------------------------------------------------------
28 (thousands of dollars)
29 Baruch College
30 Campus-wide maintenance to
31 various facilities ............................... 378
32 Brooklyn College
33 Campus-wide maintenance to
34 various facilities ............................. 2,538
35 City College
36 Campus-wide maintenance to
37 various facilities ............................. 4,536
38 Graduate School and University Center
39 Campus-wide maintenance to
40 various facilities ................................ 18
41 Honors college
42 Campus-wide maintenance to
43 various facilities................................. 18
44 Hunter College
45 Campus-wide maintenance to
46 various facilities ............................. 2,808
47 John Jay College of Criminal Justice
48 Campus-wide maintenance to
22 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 various facilities ............................... 882
2 Lehman College
3 Campus-wide maintenance to
4 various facilities ............................... 324
5 Medgar Evers College
6 Campus-wide maintenance to
7 various facilities ............................... 810
8 New York City College of Technology
9 Campus-wide maintenance to
10 various facilities ............................. 1,098
11 Queens College
12 Campus-wide maintenance to
13 various facilities ............................. 2,538
14 College of Staten Island
15 Campus-wide maintenance to
16 various facilities ............................... 648
17 York College
18 Campus-wide maintenance to
19 various facilities ............................. 1,404
20 For university-wide maintenance or
21 capital improvement costs at senior
22 colleges attributable to the findings of
23 condition surveys for health and safety
24 needs ............................................ 3,600
25 For university-wide maintenance or
26 capital improvement costs at senior
27 colleges attributable to the findings of
28 condition surveys for preservation of
29 facilities needs ................................. 4,840
30 For university-wide maintenance or
31 capital improvement costs at senior
32 colleges attributable to mechanical and
33 infrastructure needs ............................ 2,800
34 For university-wide maintenance or
35 capital improvement costs at senior
36 colleges attributable to ADA needs ............... 2,400
37 For university-wide maintenance or
38 capital improvement costs at senior
39 colleges attributable to certificate of
40 occupancy/public assembly needs .................... 800
41 For university-wide maintenance or
42 capital improvement costs at senior
43 colleges attributable to energy
44 conservation needs ............................... 1,600
45 For university-wide maintenance or
46 capital improvement costs at senior
47 colleges attributable to science lab
48 upgrade needs ...................................... 800
49 For university-wide maintenance or
50 capital improvement costs at senior
23 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 colleges attributable to bathroom
2 facilities upgrade needs ........................... 400
3 For university-wide maintenance or
4 capital improvement costs at senior
5 colleges attributable to educational
6 technology initiative needs ...................... 2,600
7 For university-wide maintenance or
8 capital improvement costs at senior
9 colleges attributable to science and
10 technology equipment needs ....................... 1,960
11 For university-wide maintenance or
12 capital improvement costs at senior
13 colleges attributable to CUNY TV
14 renovation needs ................................... 200
15 --------------
16 Total ......................................... 40,000
17 ==============
18 By chapter 55, section 1, of the laws of 2016, as amended by chapter 73,
19 section 1 of part M, of the laws of 2016:
20 For additional services and expenses related to alterations and
21 improvements to various facilities for capital projects, including
22 but not limited to capital design, construction, acquisition, recon-
23 struction, rehabilitation, and equipment; for health and safety,
24 preservation of facilities, program improvement or program change,
25 environmental protection, energy conservation, accreditation, facil-
26 ities for the physically disabled, preventative maintenance and
27 related projects, including costs incurred prior to April 1, 2016
28 and subject to a plan developed and submitted by the city university
29 of New York board of trustees and approved by the director of the
30 budget (30051650) ... 20,000,000 ................. (re. $20,000,000)
31 By chapter 54, section 1, of the laws of 2015:
32 For services and expenses related to alterations and improvements to
33 existing facilities for capital maintenance, including but not
34 limited to capital design, construction, reconstruction, rehabili-
35 tation, and equipment; for health and safety, preservation of facil-
36 ities, program improvement or program change, environmental
37 protection, energy conservation, accreditation, facilities for the
38 physically disabled, preventative maintenance and related projects,
39 including costs incurred prior to April 1, 2015 and subject to a
40 plan developed and submitted annually by the city university of New
41 York and approved by the director of the budget, and which may
42 include, but not be limited to, projects in the following schedule
43 (30031550) ... 103,000,000 ...................... (re. $102,628,000)
44 Project Schedule
45 PROJECT AMOUNT
46 ----------------------------------------------------------
24 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 (thousands of dollars)
2 Baruch College
3 Campus-wide maintenance to
4 various facilities ............................ 4,635
5 Brooklyn College
6 Campus-wide maintenance to
7 various facilities ............................ 3,811
8 City College
9 Campus-wide maintenance to
10 various facilities ............................ 5,665
11 Graduate School and University Center
12 Campus-wide maintenance to
13 various facilities ............................. 1,030
14 Honors college
15 Campus-wide maintenance to
16 various facilities.............................. 412
17 Hunter College
18 Campus-wide maintenance to
19 various facilities ............................ 3,914
20 John Jay College of Criminal Justice
21 Campus-wide maintenance to
22 various facilities ............................. 2,163
23 Lehman College
24 Campus-wide maintenance to
25 various facilities ............................ 3,811
26 Medgar Evers College
27 Campus-wide maintenance to
28 various facilities ............................. 3,811
29 New York City College of Technology
30 Campus-wide maintenance to
31 various facilities ............................ 3,811
32 Queens College
33 Campus-wide maintenance to
34 various facilities ............................ 5,665
35 College of Staten Island
36 Campus-wide maintenance to
37 various facilities ............................. 3,811
38 York College
39 Campus-wide maintenance to
40 various facilities ............................ 3,811
41 For university-wide maintenance or
42 capital improvement costs at senior
43 colleges attributable to the findings of
44 condition surveys for health and safety
45 needs ........................................... 8,755
46 For university-wide maintenance or
47 capital improvement costs at senior
48 colleges attributable to the findings of
49 condition surveys for preservation of
25 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 facilities needs ................................ 10,815
2 For university-wide maintenance or
3 capital improvement costs at senior
4 colleges attributable to mechanical and
5 infrastructure needs ............................ 6,695
6 For university-wide maintenance or
7 capital improvement costs at senior
8 colleges attributable to ADA needs ............... 5,150
9 For university-wide maintenance or
10 capital improvement costs at senior
11 colleges attributable to certificate of
12 occupancy/public assembly needs ................. 2,060
13 For university-wide maintenance or
14 capital improvement costs at senior
15 colleges attributable to energy
16 conservation needs .............................. 4,120
17 For university-wide maintenance or
18 capital improvement costs at senior
19 colleges attributable to science lab
20 upgrade needs .................................... 2,060
21 For university-wide maintenance or
22 capital improvement costs at senior
23 colleges attributable to bathroom
24 facilities upgrade needs ......................... 1,030
25 For university-wide maintenance or
26 capital improvement costs at senior
27 colleges attributable to asbestos
28 abatement needs .................................. 1,030
29 For university-wide maintenance or
30 capital improvement costs at senior
31 colleges attributable to educational
32 technology initiative needs ..................... 6,695
33 For university-wide maintenance or
34 capital improvement costs at senior
35 colleges attributable to science and
36 technology equipment needs....................... 7,210
37 For university-wide maintenance or
38 capital improvement costs at senior
39 colleges attributable CUNY TV
40 renovation needs ................................. 1,030
41 --------------
42 Total ........................................ 103,000
43 ==============
44 By chapter 54, section 1, of the laws of 2014:
45 Advances for alterations and improvements to existing facilities for
46 capital critical maintenance, including but not limited to capital
47 design, construction, reconstruction, rehabilitation, and equipment;
48 for health and safety, preservation of facilities, program improve-
49 ment or program change, environmental protection, energy conserva-
26 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 tion, accreditation, facilities for the physically disabled, preven-
2 tative maintenance and related projects, including costs incurred
3 prior to April 1, 2014, and subject to a plan developed and submit-
4 ted annually by the city university of New York and approved by the
5 director of the budget, and which may include, but not be limited
6 to, projects in the following schedule (30031450) ..................
7 206,000,000 ..................................... (re. $190,892,000)
8 Project Schedule
9 PROJECT AMOUNT
10 ----------------------------------------------------------
11 (thousands of dollars)
12 Baruch College
13 Campus-wide critical maintenance to
14 various facilities .............................. 14,000
15 Brooklyn College
16 Campus-wide critical maintenance to
17 various facilities .............................. 12,500
18 City College
19 Campus-wide critical maintenance to
20 various facilities .............................. 17,000
21 Graduate School and University Center
22 Campus-wide critical maintenance to
23 various facilities ............................... 2,000
24 Honors college
25 Campus-wide critical maintenance to
26 various facilities................................ 1,000
27 Hunter College
28 Campus-wide critical maintenance to
29 various facilities .............................. 1,000
30 John Jay College of Criminal Justice
31 Campus-wide critical maintenance to
32 various facilities ............................... 5,000
33 Lehman College
34 Campus-wide critical maintenance to
35 various facilities .............................. 10,000
36 Medgar Evers College
37 Campus-wide critical maintenance to
38 various facilities ...............................10,000
39 New York City College of Technology
40 Campus-wide critical maintenance to
41 various facilities .............................. 8,000
42 Queens College
43 Campus-wide critical maintenance to
44 various facilities .............................. 17,000
45 College of Staten Island
46 Campus-wide critical maintenance to
47 various facilities ...............................10,000
48 York College
49 Campus-wide critical maintenance to
27 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 various facilities .............................. 12,000
2 For university-wide critical maintenance or
3 capital improvement costs at senior
4 colleges attributable to the findings of
5 condition surveys for health and safety
6 needs ........................................... 27,000
7 For university-wide critical maintenance or
8 capital improvement costs at senior
9 colleges attributable to the findings of
10 condition surveys for preservation of
11 facilities needs ................................ 30,000
12 For university-wide critical maintenance or
13 capital improvement costs at senior
14 colleges attributable to mechanical and
15 infrastructure needs ............................ 20,500
16 For university-wide critical maintenance or
17 capital improvement costs at senior
18 colleges attributable to ADA needs ...............10,000
19 For university-wide critical maintenance or
20 capital improvement costs at senior
21 colleges attributable to certificate of
22 occupancy/public assembly needs ................. 5,000
23 For university-wide critical maintenance or
24 capital improvement costs at senior
25 colleges attributable to energy
26 conservation needs .............................. 12,000
27 For university-wide critical maintenance or
28 capital improvement costs at senior
29 colleges attributable to science lab
30 upgrade needs .................................... 8,000
31 For university-wide critical maintenance or
32 capital improvement costs at senior
33 colleges attributable to bathroom
34 facilities upgrade needs ......................... 3,000
35 For university-wide critical maintenance or
36 capital improvement costs at senior
37 colleges attributable to asbestos
38 abatement needs .................................. 1,500
39 For university-wide critical maintenance or
40 capital improvement costs at senior
41 colleges attributable to educational
42 technology initiative needs ..................... 15,000
43 For university-wide critical maintenance or
44 capital improvement costs at senior
45 colleges attributable to science and
46 technology equipment needs........................ 5,000
47 For university-wide critical maintenance or
48 capital improvement costs at senior
49 colleges attributable CUNY TV
28 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 renovation needs ................................. 1,500
2 Less an amount to be allocated by the board
3 of trustees .................................... (52,000)
4 --------------
5 Total ........................................ 206,000
6 ==============
7 Advances for alterations and improvements to various facilities for
8 capital strategic initiatives, including but not limited to capital
9 design, construction, acquisition, reconstruction, rehabilitation,
10 and equipment; for health and safety, preservation of facilities,
11 new facilities, program improvement or program change, environmental
12 protection, energy conservation, accreditation, facilities for the
13 physically disabled, preventative maintenance and related projects,
14 including costs incurred prior to April 1, 2014, and subject to a
15 plan developed and submitted annually by the city university of New
16 York and approved by the director of the budget, and which may
17 include, but not be limited to, projects in the following schedule
18 (30041450) ... 127,000,000 ...................... (re. $127,000,000)
19 Project Schedule
20 PROJECT AMOUNT
21 ----------------------------------------------------------
22 (thousands of dollars)
23 Baruch College
24 17 Lex. Ave Building ............................ 30,000
25 Brooklyn College
26 Roosevelt Hall .................................. 35,000
27 College of Staten Island
28 Interdisciplinary High Performance
29 Computational Center ............................ 10,000
30 Lehman College
31 Nursing Education ............................... 22,000
32 York College
33 Academic Village/Conference Center .............. 30,000
34 --------------
35 Total ........................................ 127,000
36 ==============
37 Notwithstanding any provision of law this appropriation shall be allo-
38 cated only pursuant to a plan setting forth an itemized list of
39 projects with the amount to be received by each, or the methodology
40 for allocating such appropriation. Such plan shall be subject to the
41 approval of the temporary president of the senate and the director
42 of the budget and thereafter shall be included in a resolution call-
43 ing for the expenditure of such monies, which resolution must be
44 approved by a majority vote of all members elected to the senate
45 upon a roll call vote (30051450) ... 67,000,000 .. (re. $67,000,000)
46 By chapter 54, section 1, of the laws of 2012:
29 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Advances for alterations and improvements to various facilities for
2 capital critical maintenance, including but not limited to capital
3 design, construction, acquisition, reconstruction, rehabilitation,
4 and equipment; for health and safety, preservation of facilities,
5 program improvement or program change, environmental protection,
6 energy conservation, accreditation, facilities for the physically
7 disabled, preventative maintenance and related projects, including
8 costs incurred prior to April 1, 2012, and subject to a plan devel-
9 oped and submitted annually by the city university of New York and
10 approved by the director of the budget, and which may include, but
11 not be limited to, projects in the following schedule (30031250) ...
12 284,222,000 ..................................... (re. $263,274,000)
13 Project Schedule
14 PROJECT AMOUNT
15 ----------------------------------------------------------
16 (thousands of dollars)
17 Baruch College
18 Campus-wide critical maintenance to
19 various facilities .............................. 12,000
20 Brooklyn College
21 Campus-wide critical maintenance to
22 various facilities .............................. 15,000
23 City College
24 Campus-wide critical maintenance to
25 various facilities .............................. 12,000
26 Graduate School and University Center
27 Campus-wide critical maintenance to
28 various facilities ............................... 3,000
29 Hunter College
30 Campus-wide critical maintenance to
31 various facilities .............................. 10,000
32 John Jay College of Criminal Justice
33 Campus-wide critical maintenance to
34 various facilities ............................... 9,922
35 Lehman College
36 Campus-wide critical maintenance to
37 various facilities .............................. 10,000
38 Medgar Evers College
39 Campus-wide critical maintenance to
40 various facilities ............................... 6,000
41 New York City College of Technology
42 Campus-wide critical maintenance to
43 various facilities .............................. 15,000
44 Queens College
45 Campus-wide critical maintenance to
46 various facilities .............................. 17,000
47 College of Staten Island
48 Campus-wide critical maintenance to
30 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 various facilities ............................... 9,000
2 York College
3 Campus-wide critical maintenance to
4 various facilities .............................. 10,000
5 For university-wide critical maintenance or
6 capital improvement costs at senior
7 colleges attributable to the findings of
8 condition surveys for health and safety
9 needs ........................................... 36,000
10 For university-wide critical maintenance or
11 capital improvement costs at senior
12 colleges attributable to the findings of
13 condition surveys for preservation of
14 facilities needs ................................ 36,000
15 For university-wide critical maintenance or
16 capital improvement costs at senior
17 colleges attributable to ADA needs ............... 3,000
18 For university-wide critical maintenance or
19 capital improvement costs at senior
20 colleges attributable to certificate of
21 occupancy/public assembly needs ................. 10,000
22 For university-wide critical maintenance or
23 capital improvement costs at senior
24 colleges attributable to energy
25 conservation needs .............................. 10,000
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges attributable to science and
29 technology equipment needs ....................... 5,000
30 For university-wide critical maintenance or
31 capital improvement costs at senior
32 colleges attributable to educational
33 technology initiative needs ..................... 15,000
34 For university-wide critical maintenance or
35 capital improvement costs at senior
36 colleges attributable to science lab
37 upgrade needs ................................... 10,000
38 For university-wide critical maintenance or
39 capital improvement costs at senior
40 colleges attributable to bathroom
41 facilities upgrade needs ......................... 3,300
42 For university-wide critical maintenance or
43 capital improvement costs at senior
44 colleges attributable to asbestos
45 abatement needs .................................. 1,500
46 For university-wide critical maintenance or
47 capital improvement costs at senior
48 colleges attributable to athletic
49 facilities upgrade needs ......................... 1,000
50 For university-wide critical maintenance or
31 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 capital improvement costs at senior
2 colleges attributable CUNY TV
3 renovation needs ................................. 1,500
4 For university-wide critical maintenance or
5 capital improvement costs at senior
6 colleges attributable to mechanical and
7 infrastructure needs ............................ 23,000
8 --------------
9 Total ........................................ 284,222
10 ==============
11 By chapter 54, section 1, of the laws of 2011:
12 Advances for alterations and improvements to various facilities for
13 capital critical maintenance, including but not limited to capital
14 design, construction, acquisition, reconstruction, rehabilitation,
15 and equipment; for health and safety, preservation of facilities,
16 program improvement or program change, environmental protection,
17 energy conservation, accreditation, facilities for the physically
18 disabled, preventative maintenance and related projects, including
19 costs incurred prior to April 1, 2011, and subject to a plan devel-
20 oped and submitted annually by the city university of New York and
21 approved by the director of the budget, and which may include, but
22 not be limited to, projects in the following schedule (30031150) ...
23 284,222,000 ..................................... (re. $206,811,000)
24 Project Schedule
25 PROJECT AMOUNT
26 ----------------------------------------------------------
27 (thousands of dollars)
28 Baruch College
29 Campus-wide critical maintenance to
30 various facilities ............................... 5,000
31 Brooklyn College
32 Campus-wide critical maintenance to
33 various facilities ............................... 7,500
34 City College
35 Campus-wide critical maintenance to
36 various facilities ............................... 6,000
37 Hunter College
38 Campus-wide critical maintenance to
39 various facilities ............................... 7,000
40 John Jay College of Criminal Justice
41 Campus-wide critical maintenance to
42 various facilities ............................... 3,500
43 Lehman College
44 Campus-wide critical maintenance to
45 various facilities ............................... 3,500
46 Medgar Evers College
47 Campus-wide critical maintenance to
32 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 various facilities ............................... 8,000
2 New York City College of Technology
3 Campus-wide critical maintenance to
4 various facilities .............................. 10,000
5 Queens College
6 Campus-wide critical maintenance to
7 various facilities .............................. 12,500
8 College of Staten Island
9 Campus-wide critical maintenance to
10 various facilities ............................... 5,000
11 York College
12 Campus-wide critical maintenance to
13 various facilities ............................... 5,000
14 For university-wide critical maintenance or
15 capital improvement costs at senior
16 colleges attributable to the findings of
17 condition surveys for health and safety
18 needs ........................................... 56,000
19 For university-wide critical maintenance or
20 capital improvement costs at senior
21 colleges attributable to the findings of
22 condition surveys for preservation of
23 facilities needs ................................ 60,000
24 For university-wide critical maintenance or
25 capital improvement costs at senior
26 colleges attributable to ADA needs ............... 1,800
27 For university-wide critical maintenance or
28 capital improvement costs at senior
29 colleges attributable to certificate of
30 occupancy/public assembly needs ................. 10,000
31 For university-wide critical maintenance or
32 capital improvement costs at senior
33 colleges attributable to energy
34 conservation needs .............................. 10,000
35 For university-wide critical maintenance or
36 capital improvement costs at senior
37 colleges attributable to science and
38 technology equipment needs ....................... 5,000
39 For university-wide critical maintenance or
40 capital improvement costs at senior
41 colleges attributable to educational
42 technology initiative needs ..................... 12,000
43 For university-wide critical maintenance or
44 capital improvement costs at senior
45 colleges attributable to science lab
46 upgrade needs .................................... 8,600
47 For university-wide critical maintenance or
48 capital improvement costs at senior
49 colleges attributable to bathroom
33 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 facilities upgrade needs ......................... 1,700
2 For university-wide critical maintenance or
3 capital improvement costs at senior
4 colleges attributable to asbestos
5 abatement needs .................................. 1,700
6 For university-wide critical maintenance or
7 capital improvement costs at senior
8 colleges attributable to athletic
9 facilities upgrade needs ......................... 2,000
10 For university-wide critical maintenance or
11 capital improvement costs at senior
12 colleges attributable CUNY TV
13 renovation needs ................................. 2,422
14 For university-wide critical maintenance or
15 capital improvement costs at senior
16 colleges attributable to mechanical and
17 infrastructure needs ............................ 40,000
18 --------------
19 Total ........................................ 284,222
20 ==============
21 By chapter 53, section 1, of the laws of 2010:
22 Advances for alterations and improvements to various facilities for
23 capital critical maintenance, including but not limited to capital
24 design, construction, acquisition, reconstruction, rehabilitation,
25 and equipment; for health and safety, preservation of facilities,
26 program improvement or program change, environmental protection,
27 energy conservation, accreditation, facilities for the physically
28 disabled, preventative maintenance and related projects, including
29 costs incurred prior to April 1, 2010, and subject to a plan devel-
30 oped and submitted annually by the city university of New York and
31 approved by the director of the budget, and which may include, but
32 not be limited to, projects in the following schedule (30031050) ...
33 284,222,000 ..................................... (re. $117,049,000)
34 Project Schedule
35 PROJECT AMOUNT
36 ----------------------------------------------------------
37 (thousands of dollars)
38 Baruch College
39 Campus-wide critical maintenance to
40 various facilities ............................... 9,400
41 Brooklyn College
42 Campus-wide critical maintenance to
43 various facilities .............................. 14,542
44 City College
45 Campus-wide critical maintenance to
46 various facilities .............................. 22,900
47 Graduate School and University Center
48 Campus-wide critical maintenance to
34 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 various facilities ............................... 1,500
2 Hunter College
3 Campus-wide critical maintenance to
4 various facilities .............................. 18,000
5 John Jay College of Criminal Justice
6 Campus-wide critical maintenance to
7 various facilities .............................. 11,000
8 Lehman College
9 Campus-wide critical maintenance to
10 various facilities ............................... 7,000
11 Medgar Evers College
12 Campus-wide critical maintenance to
13 various facilities .............................. 14,630
14 New York City College of Technology
15 Campus-wide critical maintenance to
16 various facilities .............................. 19,800
17 Queens College
18 Campus-wide critical maintenance to
19 various facilities .............................. 11,550
20 College of Staten Island
21 Campus-wide critical maintenance to
22 various facilities ............................... 8,100
23 York College
24 Campus-wide critical maintenance to
25 various facilities ............................... 6,500
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges attributable to the findings of
29 condition surveys for health and safety
30 needs ........................................... 35,000
31 For university-wide critical maintenance or
32 capital improvement costs at senior
33 colleges attributable to the findings of
34 condition surveys for preservation of
35 facilities needs ................................ 30,000
36 For university-wide critical maintenance or
37 capital improvement costs at senior
38 colleges attributable to ADA needs ............... 1,800
39 For university-wide critical maintenance or
40 capital improvement costs at senior
41 colleges attributable to certificate of
42 occupancy/public assembly needs ................. 10,000
43 For university-wide critical maintenance or
44 capital improvement costs at senior
45 colleges attributable to energy
46 conservation needs .............................. 17,000
47 For university-wide critical maintenance or
48 capital improvement costs at senior
49 colleges attributable to science and
35 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 technology equipment needs ....................... 5,000
2 For university-wide critical maintenance or
3 capital improvement costs at senior
4 colleges attributable to educational
5 technology initiative needs ...................... 5,000
6 For university-wide critical maintenance or
7 capital improvement costs at senior
8 colleges attributable to science lab
9 upgrade needs .................................... 8,600
10 For university-wide critical maintenance or
11 capital improvement costs at senior
12 colleges attributable to bathroom
13 facilities upgrade needs ......................... 1,700
14 For university-wide critical maintenance or
15 capital improvement costs at senior
16 colleges attributable to asbestos
17 abatement needs .................................. 1,700
18 For university-wide critical maintenance or
19 capital improvement costs at senior
20 colleges attributable to athletic
21 facilities upgrade needs ......................... 2,000
22 For university-wide critical maintenance or
23 capital improvement costs at senior
24 colleges attributable CUNY TV
25 renovation needs ................................. 1,500
26 For university-wide critical maintenance or
27 capital improvement costs at senior
28 colleges attributable to mechanical and
29 infrastructure needs ............................ 20,000
30 --------------
31 Total ........................................ 284,222
32 ==============
33 By chapter 53, section 1, of the laws of 2009:
34 Advances for alterations and improvements to various facilities for
35 capital critical maintenance, including but not limited to capital
36 design, construction, acquisition, reconstruction, rehabilitation,
37 and equipment; for health and safety, preservation of facilities,
38 program improvement or program change, environmental protection,
39 energy conservation, accreditation, facilities for the physically
40 disabled, preventative maintenance and related projects, including
41 costs incurred prior to April 1, 2009, and subject to a plan devel-
42 oped and submitted annually by the city university of New York and
43 approved by the director of the budget, and which may include, but
44 not be limited to, projects in the following schedule (30020950) ...
45 284,222,000 ...................................... (re. $99,198,000)
46 Project Schedule
47 PROJECT AMOUNT
48 ----------------------------------------------------------
36 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 (thousands of dollars)
2 Baruch College
3 Campus-wide critical maintenance to
4 various facilities ............................. 2,705
5 Brooklyn College
6 Campus-wide critical maintenance to
7 various facilities ............................. 3,661
8 City College
9 Campus-wide critical maintenance to
10 various facilities ............................ 27,407
11 Hunter College
12 Campus-wide critical maintenance to
13 various facilities ............................ 14,482
14 John Jay College of Criminal Justice
15 Campus-wide critical maintenance to
16 various facilities ............................. 5,681
17 Lehman College
18 Campus-wide critical maintenance to
19 various facilities ............................ 30,000
20 New York City College of Technology
21 Campus-wide critical maintenance to
22 various facilities ............................. 9,400
23 Queens College
24 Campus-wide critical maintenance to
25 various facilities ............................ 35,567
26 College of Staten Island
27 Campus-wide critical maintenance to
28 various facilities ............................. 9,565
29 York College
30 Campus-wide critical maintenance to
31 various facilities ............................. 7,954
32 For university-wide critical maintenance or
33 capital improvement costs at senior
34 colleges attributable to the findings of
35 condition surveys for health and safety
36 needs ........................................... 35,000
37 For university-wide critical maintenance or
38 capital improvement costs at senior
39 colleges attributable to the findings of
40 condition surveys for preservation of
41 facilities needs ................................ 30,000
42 For university-wide critical maintenance or
43 capital improvement costs at senior
44 colleges attributable to ADA needs ............... 1,800
45 For university-wide critical maintenance or
46 capital improvement costs at senior
47 colleges attributable to certificate of
48 occupancy/public assembly needs ................. 10,000
49 For university-wide critical maintenance or
50 capital improvement costs at senior
37 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 colleges attributable to energy
2 conservation needs .............................. 17,000
3 For university-wide critical maintenance or
4 capital improvement costs at senior
5 colleges attributable to science and
6 technology equipment needs ....................... 5,000
7 For university-wide critical maintenance or
8 capital improvement costs at senior
9 colleges attributable to educational
10 technology initiative needs ...................... 5,000
11 For university-wide critical maintenance or
12 capital improvement costs at senior
13 colleges attributable to science lab
14 upgrade needs .................................... 8,600
15 For university-wide critical maintenance or
16 capital improvement costs at senior
17 colleges attributable to bathroom
18 facilities upgrade needs ......................... 1,700
19 For university-wide critical maintenance or
20 capital improvement costs at senior
21 colleges attributable to asbestos
22 abatement needs .................................. 1,700
23 For university-wide critical maintenance or
24 capital improvement costs at senior
25 colleges attributable to athletic
26 facilities upgrade needs ......................... 2,000
27 For university-wide critical maintenance or
28 capital improvement costs at senior
29 colleges attributable to mechanical and
30 infrastructure needs ............................ 20,000
31 --------------
32 Total ........................................ 284,222
33 ==============
34 By chapter 53, section 1, of the laws of 2008:
35 Alterations and improvements to various facilities for minor rehabili-
36 tation, including but not limited to capital design, construction,
37 acquisition, reconstruction, rehabilitation, and equipment; for
38 health and safety, preservation of facilities, program improvement
39 or program change, environmental protection, energy conservation,
40 accreditation, facilities for the physically disabled, preventative
41 maintenance and related projects, including costs incurred prior to
42 April 1, 2008, and subject to a plan submitted annually by the city
43 university of New York and approved by the director of the budget
44 (30080850) ... 23,232,000 ......................... (re. $2,911,000)
45 Advances for alterations and improvements to various facilities for
46 capital critical maintenance, including but not limited to capital
47 design, construction, acquisition, reconstruction, rehabilitation,
48 and equipment; for health and safety, preservation of facilities,
49 program improvement or program change, environmental protection,
38 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 energy conservation, accreditation, facilities for the physically
2 disabled, preventative maintenance and related projects, including
3 costs incurred prior to April 1, 2008, and subject to a plan devel-
4 oped and submitted annually by the city university of New York and
5 approved by the director of the budget, and which may include, but
6 not be limited to, projects in the following schedule (30010850) ...
7 284,222,000 ...................................... (re. $70,176,000)
8 Project Schedule
9 PROJECT AMOUNT
10 ----------------------------------------------
11 (thousands of dollars)
12 Baruch College
13 Campus-wide critical maintenance
14 to various facilities ................ 6,746
15 Brooklyn College
16 Campus-wide critical maintenance
17 to various facilities ............... 10,811
18 City College
19 Campus-wide critical maintenance
20 to various facilities ............... 23,466
21 Graduate School and University Center
22 Campus-wide critical maintenance
23 to various facilities .................. 300
24 Hunter College
25 Campus-wide critical maintenance
26 to various facilities ................ 3,176
27 John Jay College of Criminal Justice
28 Campus-wide critical maintenance
29 to various facilities ................ 6,873
30 Lehman College
31 Campus-wide critical maintenance
32 to various facilities ............... 15,941
33 New York City College of Technology
34 Campus-wide critical maintenance
35 to various facilities ............... 10,800
36 Queens College
37 Campus-wide critical maintenance
38 to various facilities ............... 21,117
39 College of Staten Island
40 Campus-wide critical maintenance
41 to various facilities ............... 18,125
42 York College
43 Campus-wide critical maintenance
44 to various facilities ............... 15,223
45 For university-wide critical
46 maintenance or capital
47 improvement costs at senior
48 colleges attributable to the
49 findings of condition surveys
39 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 for health and safety needs ......... 33,154
2 For university-wide critical
3 maintenance or capital
4 improvement costs at senior
5 colleges attributable to the
6 findings of condition surveys
7 for preservation of facilities
8 needs ............................... 40,001
9 For university-wide critical
10 maintenance or capital
11 improvement costs at senior
12 colleges attributable to ADA
13 needs ................................ 1,989
14 For university-wide critical
15 maintenance or capital
16 improvement costs at senior
17 colleges attributable to science
18 and technology equipment needs ....... 5,000
19 For university-wide critical
20 maintenance or capital
21 improvement costs at senior
22 colleges attributable to
23 certificate of occupancy/public
24 assembly needs ....................... 8,000
25 For university-wide critical
26 maintenance or capital
27 improvement costs at senior
28 colleges attributable to energy
29 conservation needs .................. 18,787
30 For university-wide critical
31 maintenance or capital
32 improvement costs at senior
33 colleges attributable to science
34 lab upgrade needs .................... 9,504
35 For university-wide critical
36 maintenance or capital
37 improvement costs at senior
38 colleges attributable to
39 educational technology initiative
40 needs ............................... 10,000
41 For university-wide critical
42 maintenance or capital
43 improvement costs at senior
44 colleges attributable to bathroom
45 facilities upgrade needs ............. 1,879
46 For university-wide critical
47 maintenance or capital improvement
48 costs at senior colleges
49 attributable to asbestos
40 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 abatement needs ...................... 1,879
2 For university-wide critical
3 maintenance or capital improvement
4 costs at senior colleges
5 attributable to CUNY TV
6 renovations needs .................... 1,450
7 For university-wide critical
8 maintenance or capital improvement
9 costs at senior colleges
10 attributable to mechanical and
11 infrastructure needs ............... 20,000
12 --------------
13 Total .............................. 284,222
14 ==============
15 By chapter 53, section 1, of the laws of 2008, as amended by chapter 53,
16 section 1, of the laws of 2009:
17 Advances for alterations and improvements to various facilities for
18 capital strategic initiatives, including but not limited capital
19 design, construction, acquisition, reconstruction, rehabilitation,
20 and equipment; for health and safety, preservation of facilities,
21 new facilities, program improvement or program change, environmental
22 protection, energy conservation, accreditation, facilities for the
23 physically disabled, preventative maintenance and related projects,
24 including costs incurred prior to April 1, 2008, and subject to a
25 plan developed and submitted annually by the city university of New
26 York and approved by the director of the budget, and which may
27 include, but not be limited to, projects in the following schedule
28 (30060850) ... 1,311,732,000 .................... (re. $343,665,000)
29 Project Schedule
30 PROJECT AMOUNT
31 --------------------------------------------
32 (thousands of dollars)
33 Baruch College
34 17 Lexington Ave. Building
35 Renovation/Field Building
36 Renovation ........................ 40,000
37 Brooklyn College
38 West Quad Building ................ 22,782
39 Roosevelt Hall Science
40 Facility .......................... 52,000
41 Performing Arts Center ............ 29,000
42 Fire Alarm and Security
43 Project ............................ 9,834
44 City College
45 New Science Facility .............. 70,334
46 Marshak Building Interior ......... 10,000
47 School of Architecture
48 Renovation ........................ 10,000
41 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Central Plant Expansion and
2 Distribution ...................... 37,727
3 Hunter College
4 School of Social Work ............ 84,318
5 New Science Lab Building,
6 Phase I .......................... 74,682
7 John Jay College of Criminal Justice
8 John Jay College Building
9 Expansion ....................... 125,000
10 CUNY School of Law
11 New Facility ..................... 50,000
12 Lehman College
13 New Science Facility,
14 Phase II ......................... 20,000
15 Swing Space for New Science
16 Facility ......................... 20,000
17 Media Production Center & Virtual
18 Small Business Assistance Center .. 2,217
19 New York City College of Technology
20 Academic Building I ............. 100,000
21 Educational Technology Initiative ... 250
22 Queens College
23 Louis Armstrong Center ............. 5,000
24 Tennis Courts ...................... 1,500
25 College of Staten Island
26 Center for Computational
27 Science ............................ 6,500
28 Sports and Recreation Center
29 Upgrades ........................... 1,000
30 Campus-wide Site Security & Lighting,
31 Phase II .......................... 12,988
32 York College
33 Student Services Center/Classroom
34 Building ........................... 5,000
35 University-wide
36 CUNY ERP (CUNY FIRST) ............ 142,000
37 Advanced Science Research Center,
38 Phase I, and CCNY New Science
39 Facility ......................... 207,878
40 Project Administration ............ 61,722
41 Operational Changes .............. 110,000
42 --------------
43 Total ........................ 1,311,732
44 ==============
45 By chapter 53, section 1, of the laws of 2007:
46 An advance for alterations and improvements to various facilities
47 including services and expenses, capital design, construction,
48 acquisition, reconstruction, rehabilitation and equipment; including
49 but not limited to health and safety, preservation of facilities,
42 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 new facilities, program improvement or program change, environmental
2 protection, energy conservation, accreditation, facilities for the
3 physically disabled, preventive maintenance and related projects,
4 including costs incurred prior to April 1, 2007, and subject to a
5 plan to be developed and submitted annually by the city university
6 of New York and approved by the state director of the budget, and
7 which may include, but not be limited to, projects in the following
8 schedule (30670750) ... 225,000,000 .............. (re. $37,502,000)
9 Project Schedule
10 AMOUNT
11 ----------------------------------------------------------
12 (thousands of dollars)
13 For the City College Marshak Building,
14 provided however that subdivision (b) of
15 section 6281 of the education law, as
16 amended by chapter 1081 of the laws of
17 1969, shall apply to the dormitory author-
18 ity and/or the city university
19 construction fund, as the letting agency,
20 unless, in its discretion, it determines
21 to utilize a project labor agreement for
22 all work performed in the renovation of
23 the Marshak science building, the city
24 college science facility and the new
25 science research center at city college,
26 which means a prehire collective bargain-
27 ing agreement between the agency and a
28 labor organization establishing the labor
29 organization as the collective bargaining
30 representative for all persons who will
31 perform work pursuant to all contracts for
32 the construction, reconstruction, rehabil-
33 itation or improvement of facilities, and
34 which provides that only contractors and
35 subcontractors who sign a prenegotiated
36 agreement with the labor organization can
37 perform project work, when the record
38 supporting the decision to enter into such
39 an agreement establishes that it is justi-
40 fied by the interests underlying the
41 competitive bidding laws ....................... 30,000
42 For the City College Science Facility,
43 provided however that subdivision (b) of
44 section 6281 of the education law, as
45 amended by chapter 1081 of the laws of
46 1969, shall apply to the dormitory author-
47 ity and/or the city university
48 construction fund, as the letting agency,
49 unless, in its discretion, it determines
43 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 to utilize a project labor agreement for
2 all work performed in the renovation of
3 the Marshak science building, the city
4 college science facility and the new
5 science research center at city college,
6 which means a prehire collective bargain-
7 ing agreement between the agency and a
8 labor organization establishing the labor
9 organization as the collective bargaining
10 representative for all persons who will
11 perform work pursuant to all contracts for
12 the construction, reconstruction, rehabil-
13 itation or improvement of facilities, and
14 which provides that only contractors and
15 subcontractors who sign a prenegotiated
16 agreement with the labor organization can
17 perform project work, when the record
18 supporting the decision to enter into such
19 an agreement establishes that it is justi-
20 fied by the interests underlying the
21 competitive bidding laws ....................... 55,300
22 For the Advanced Science Research Center at
23 City College ................................... 14,500
24 For Central Utilities Plan Expansion at
25 Lehman College ................................. 11,100
26 For the Voorhees Building facade at New York
27 City College of Technology ..................... 14,100
28 For structural repairs at the Pearl Street
29 Building at New York City College of Tech-
30 nology ......................................... 5,000
31 For expansion of the Central Plant at City
32 College ........................................ 30,000
33 For university-wide critical maintenance or
34 capital improvement costs at senior
35 colleges attributable to the findings of
36 condition surveys for health and safety
37 needs .......................................... 20,000
38 For university-wide critical maintenance or
39 capital improvement costs at senior
40 colleges attributable to the findings of
41 condition surveys for preservation of
42 facilities needs ............................... 30,000
43 For university-wide critical maintenance or
44 capital improvement costs at senior
45 colleges to correct deficiencies in the
46 mechanical, electrical and plumbing
47 infrastructure ................................. 15,000
48 --------------
49 Total .......................................... 225,000
50 ==============
44 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 53, section 1, of the laws of 2006, as amended by chapter 53,
2 section 1, of the laws of 2007:
3 An additional advance for alterations and improvements to various
4 facilities including services and expenses, service contracts, memo-
5 randum of understanding, capital design, construction, acquisition,
6 reconstruction, rehabilitation and equipment; for health and safety,
7 preservation of facilities, new facilities, program improvement or
8 program change, technology, environmental protection, energy conser-
9 vation, accreditation, facilities for the physically disabled and
10 related projects including costs incurred prior to April 1, 2006
11 subject to an annual plan developed by the city university of New
12 York which shall include projects in the following schedule
13 (30670650) ... 235,500,000 ....................... (re. $36,934,000)
14 Project Schedule
15 PROJECT AMOUNT
16 ---------------------------------------------------------
17 (thousands of dollars)
18 Brooklyn College
19 The West Quad Project .......................... 12,000
20 Roosevelt Hall ................................. 11,000
21 The Performing Arts Center ..................... 15,000
22 City College
23 School of Architecture (SAUDLA) ................ 8,000
24 Marshak Building ............................... 13,800
25 Science Facility ............................... 57,700
26 College of Staten Island
27 2M Building .................................... 5,000
28 Upgrades, Renovations, Equipment -
29 Various ........................................ 4,000
30 CUNY Law
31 Law Building Renovation, Phase I ............... 500
32 Hunter College
33 Roosevelt House Renovation ..................... 1,000
34 New Science Lab Building ....................... 10,000
35 John Jay
36 Building Expansion ............................. 15,000
37 Lehman College
38 Consolidated Computer Center Phase II .......... 1,000
39 New Science Facility Phase II .................. 10,000
40 Queens College
41 Science Upgrades Phase II ...................... 6,000
42 Louis Armstrong Center ......................... 5,000
43 School of Journalism
44 School of Journalism ........................... 10,000
45 York College
46 Student Services Center ........................ 6,000
47 Campus-wide Site Improvements .................... 7,000
48 An advance for alterations and improvements
49 to various facilities including services
45 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 and expenses, service contracts, memoran-
2 dum of understanding, capital design,
3 construction, acquisition, reconstruction,
4 rehabilitation and equipment; for health
5 and safety, preservation of facilities,
6 new facilities, program improvement or
7 program change, technology, environmental
8 protection, energy conservation, accredi-
9 tation, facilities for the physically
10 disabled and related projects, to be
11 developed by the city university of New
12 York in consultation with the senate
13 majority leader and approved by the direc-
14 tor of budget ............................... 28,500
15 University-wide
16 For health and safety projects ................ 9,000
17 --------------
18 Total ....................................... 235,500
19 ==============
20 By chapter 53, section 1, of the laws of 2005, as amended by chapter
21 162, section 2, of the laws of 2005:
22 An advance for alterations and improvements to various facilities
23 including services and expenses, capital design, construction,
24 acquisition, reconstruction, rehabilitation and equipment; including
25 but not limited to health and safety, preservation of facilities,
26 new facilities, program improvement or program change, environmental
27 protection, energy conservation, accreditation, facilities for the
28 physically disabled, preventive maintenance and related projects,
29 including costs incurred prior to April 1, 2005, and subject to a
30 plan to be developed and submitted annually by the city university
31 of New York and approved by the state director of the budget, and
32 which may include, but not be limited to, projects in the following
33 schedule (30560550) ... 69,000,000 ................ (re. $9,267,000)
34 Project Schedule
35 AMOUNT
36 --------------------------------------------
37 (thousands of dollars)
38 For preliminary planning for
39 the renovation of Brooklyn
40 College's Roosevelt Hall ........... 2,500
41 For the City College Marshak
42 Building, provided however
43 that subdivision (b) of
44 section 6281 of the education
45 law, as amended by chapter
46 1081 of the laws of 1969,
47 shall apply to the dormitory
48 authority and/or the city
46 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 university construction fund,
2 as the letting agency, unless,
3 in its discretion, it deter-
4 mines to utilize a project
5 labor agreement for all work
6 performed in the renovation of
7 the Marshak science building,
8 the city college science
9 facility and the new science
10 research center at City
11 College, which means a prehire
12 collective bargaining agree-
13 ment between the agency and a
14 labor organization establish-
15 ing the labor organization as
16 the collective bargaining
17 representative for all persons
18 who will perform work pursuant
19 to all contracts for the
20 construction, reconstruction,
21 rehabilitation or improvement
22 of facilities, and which
23 provides that only contractors
24 and subcontractors who sign a
25 prenegotiated agreement with
26 the labor organization can
27 perform project work, when the
28 record supporting the decision
29 to enter into such an agree-
30 ment establishes that it is
31 justified by the interests
32 underlying the competitive
33 bidding laws ...................... 10,000
34 For matching grants for
35 Governors Island .................. 15,000
36 For university-wide critical
37 maintenance or capital
38 improvement costs at senior
39 and community colleges includ-
40 ing but not limited to: costs
41 attributable to the findings
42 of condition surveys for
43 health and safety; preserva-
44 tion of facilities and access
45 for the physically disabled;
46 code compliance; emergencies;
47 asbestos removal; energy
48 conservation; fire alarms,
49 sprinklers, electrical
50 distribution and heating and
47 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 cooling system requirements;
2 and other similar campus-wide
3 and systemwide needs, provided
4 however that subdivision (b)
5 of section 6281 of the educa-
6 tion law, as amended by chap-
7 ter 1081 of the laws of 1969,
8 shall apply to the dormitory
9 authority and/or the city
10 university construction fund,
11 as the letting agency, unless,
12 in its discretion, it deter-
13 mines to utilize a project
14 labor agreement for all work
15 performed in the renovation of
16 the Marshak science building,
17 the city college science
18 facility and the new science
19 research center at City
20 College, which means a prehire
21 collective bargaining agree-
22 ment between the agency and a
23 labor organization establish-
24 ing the labor organization as
25 the collective bargaining
26 representative for all persons
27 who will perform work pursuant
28 to all contracts for the
29 construction, reconstruction,
30 rehabilitation or improvement
31 of facilities, and which
32 provides that only contractors
33 and subcontractors who sign a
34 prenegotiated agreement with
35 the labor organization can
36 perform project work, when the
37 record supporting the decision
38 to enter into such an agree-
39 ment establishes that it is
40 justified by the interests
41 underlying the competitive
42 bidding laws ...................... 41,500
43 --------------
44 Total ............................. 69,000
45 ==============
46 By chapter 53, section 1, of the laws of 2005, as amended by chapter 53,
47 section 1, of the laws of 2006:
48 An additional advance for alterations and improvements to various
49 facilities including services and expenses, capital design,
48 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 construction, acquisition, reconstruction, rehabilitation and equip-
2 ment; for health and safety, preservation of facilities, new facili-
3 ties, program improvement or program change, environmental
4 protection, energy conservation, accreditation, facilities for the
5 physically disabled and related projects including costs incurred
6 prior to April 1, 2005 subject to an annual plan developed by the
7 city university of New York which shall include projects in the
8 following schedule (30580550) ... 153,097,000 ....... (re. $398,000)
9 Project Schedule
10 Project Amount
11 --------------------------------------------
12 (thousands of dollars)
13 New York City Technical College
14 Academic Building 1 ................ 50,000
15 Additional Academic Building and
16 Equipment ......................... 1,000
17 Staten Island College
18 Lighting for pedestrian
19 walkways............................ 297
20 Additional Parking Space at lots
21 2 and 3 ............................ 678
22 Refurbishing of Study
23 Alcoves ............................ 198
24 Site Lighting Improvements ........... 223
25 Renovation Building 3M ............. 3,000
26 Brooklyn College
27 Equipment costs of the Environ-
28 mental Analysis Core Ctr ........... 421
29 University Wide
30 For Network Infrastructure
31 Improvements .................... 25,280
32 An advance for alterations and
33 improvements to various
34 facilities including
35 services and expenses, capi-
36 tal design, construction,
37 acquisition, reconstruction,
38 rehabilitation and equip-
39 ment; including but not
40 limited to, health and safe-
41 ty, preservation of facili-
42 ties, new facilities,
43 program improvement or
44 program change, environ-
45 mental protection, energy
46 conservation, accreditation,
47 facilities for the phys-
48 ically disabled, preventive
49 maintenance and related
49 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 projects, to be developed by
2 the city university of New
3 York in consultation with
4 the senate majority leader
5 and approved by the director
6 of budget ......................... 72,000
7 --------------
8 Total ........................ 153,097
9 ==============
10 By chapter 53, section 1, of the laws of 2004, as added by chapter 55,
11 section 4, of the laws of 2004:
12 Alterations and improvements to various facilities including services
13 and expenses, capital design, construction, acquisition, recon-
14 struction, rehabilitation and equipment; for health and safety,
15 preservation of facilities, new facilities, program improvement or
16 program change, environmental protection, energy conservation,
17 accreditation, facilities for the physically disabled, preventive
18 maintenance and related projects, including costs incurred prior to
19 April 1, 2004, and subject to a plan submitted annually by the city
20 university of New York and approved by the director of the budget
21 (30060450) ... 20,000,000 ......................... (re. $3,490,000)
22 By chapter 53, section 1, of the laws of 2004, as amended by chapter
23 162, section 2, of the laws of 2005:
24 An advance for alterations and improvements to various facilities
25 including services and expenses, capital design, construction,
26 acquisition, reconstruction, rehabilitation and equipment; for
27 health and safety, preservation of facilities, new facilities,
28 program improvement or program change, environmental protection,
29 energy conservation, accreditation, facilities for the physically
30 disabled, and related projects, including costs incurred prior to
31 April 1, 2004, and which may include, but not be limited to,
32 projects in the following schedule (30030450) ......................
33 1,095,000,000 ................................... (re. $141,537,000)
34 Project Schedule
35 AMOUNT
36 --------------------------------------------
37 (thousands of dollars)
38 Brooklyn College ................... 23,600
39 -West Quad Building
40 City College ....................... 108,000
41 -Science Facility, provided
42 however that subdivision
43 (b) of section 6281 of the
44 education law, as amended
45 by chapter 1081 of the
46 laws of 1969, shall apply
47 to the dormitory authority
50 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 and/or the city university
2 construction fund, as the
3 letting agency, unless, in
4 its discretion, it deter-
5 mines to utilize a project
6 labor agreement for all
7 work performed in the
8 renovation of the Marshak
9 science building, the city
10 college science facility
11 and the new science
12 research center at City
13 College, which means a
14 prehire collective
15 bargaining agreement
16 between the agency and a
17 labor organization estab-
18 lishing the labor organ-
19 ization as the collective
20 bargaining representative
21 for all persons who will
22 perform work pursuant to
23 all contracts for the
24 construction, recon-
25 struction, rehabilitation
26 or improvement of facili-
27 ties, and which provides
28 that only contractors and
29 subcontractors who sign a
30 prenegotiated agreement
31 with the labor organiza-
32 tion can perform project
33 work, when the record
34 supporting the decision to
35 enter into such an agree-
36 ment establishes that it
37 is justified by the inter-
38 ests underlying the
39 competitive bidding laws
40 -School of Architecture (Phase I)
41 Hunter College ..................... 95,000
42 -Science Lab Building (Phase I)
43 -Roosevelt House Rehabilitation
44 -Visual and Performing Arts Complex
45 John Jay College ................... 130,000
46 -Academic Facility (Phase II)
47 Lehman College ..................... 60,000
48 -Science Facility
49 New York City College
50 of Technology ................. 86,000
51 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 -Academic Complex I
2 Queens College ..................... 30,000
3 -Science Upgrades (Phase I),
4 including $15 million in
5 bond proceeds issued
6 pursuant to a capital
7 appropriation for Queens
8 College in chapter 53 of
9 the laws of 1998
10 Universitywide
11 -For a science research
12 center, excluding furni-
13 ture and equipment which
14 shall be secured from
15 private or other non-
16 state sources, provided
17 however that subdivision
18 (b) of section 6281 of the
19 education law, as amended
20 by chapter 1081 of the
21 laws of 1969, shall apply
22 to the dormitory authority
23 and/or the city university
24 construction fund, as the
25 letting agency, unless, in
26 its discretion, it deter-
27 mines to utilize a project
28 labor agreement for all
29 work performed in the
30 renovation of the Marshak
31 science building, the city
32 college science facility
33 and the new science
34 research center at City
35 College, which means a
36 prehire collective
37 bargaining agreement
38 between the agency and a
39 labor organization estab-
40 lishing the labor organ-
41 ization as the collective
42 bargaining representative
43 for all persons who will
44 perform work pursuant to
45 all contracts for the
46 construction, recon-
47 struction, rehabilitation
48 or improvement of facili-
49 ties, and which provides
50 that only contractors and
52 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 subcontractors who sign a
2 prenegotiated agreement
3 with the labor organiza-
4 tion can perform project
5 work, when the record
6 supporting the decision to
7 enter into such an agree-
8 ment establishes that it
9 is justified by the inter-
10 ests underlying the
11 competitive bidding laws............ 176,000
12 -For science laboratory
13 upgrades............................ 7,000
14 -For condition survey-
15 related health and safety
16 projects ........................... 75,000
17 -For condition survey-
18 related preservation of
19 facilities projects................. 60,000
20 -For condition survey-
21 related projects related
22 to the americans with dis-
23 abilities act....................... 13,000
24 -For asbestos abatement .............. 7,000
25 -For capital staff ................... 41,400
26 -For network infrastructure
27 and telecommunications ............. 40,000
28 -For universitywide critical
29 maintenance or capital im-
30 provement costs for code
31 compliance; emergencies;
32 energy conservation; fire
33 alarms, sprinklers, elec-
34 trical distribution and
35 heating and cooling system
36 requirements; and other
37 similar campuswide and
38 systemwide needs, includ-
39 ing Governors Island................ 143,000
40 ------------
41 Total .............................. 1,095,000
42 ============
43 By chapter 53, section 1, of the laws of 1998, as amended by chapter 53,
44 section 1, of the laws of 1999, for:
45 Alterations and improvements to various facilities including capital
46 design, construction, acquisition, reconstruction, rehabilitation
47 and equipment; for health and safety, preservation of facilities,
48 new facilities, program improvements or program change, environ-
49 mental protection, energy conservation, accreditation, facilities
53 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 for the physically disabled, preventive maintenance and related
2 projects (302198C1) ... 8,200,000 ................... (re. $993,000)
3 Alterations and improvements to provide a parent resource/day care
4 facility in the 17 Lexington Avenue Building at Baruch College
5 (302198C1) ... 1,000,000 ............................ (re. $993,000)
6 Alterations and improvements to CUNY Libraries (302198C1) ............
7 10,800,000 ........................................ (re. $3,000,000)
8 Capital Projects Funds - Other
9 Capital Projects Fund
10 Energy Conservation Purpose
11 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
12 section 3, of the laws of 1992, for:
13 Alterations and improvements for energy conservation (30A58805)
14 ... .... 2,065,000 ................................ (re. $851,000)
15 Capital Projects Funds - Other
16 Capital Projects Fund
17 Facilities for the Physically Disabled Purpose
18 By chapter 54, section 1, of the laws of 1995, for:
19 Alterations and improvements to make facilities accessible to the
20 physically disabled (30149504) ... ...............................
21 1,257,000 ........................................... (re. $577,000)
22 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
23 section 3, of the laws of 1992, for:
24 Alterations and improvements to make facilities accessible to the
25 physically disabled (30048704) ... ...............................
26 1,206,000 ........................................... (re. $321,000)
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Health and Safety Purpose
30 By chapter 54, section 1, of the laws of 1993, for:
31 Alterations and improvements for health and safety pursuant to a plan,
32 based on the results of building condition surveys, to be submitted
33 for approval to the director of the budget on or before July 1,
34 1993. No funds shall be made available until such plan is approved
35 by the director of the budget (30029301) ...........................
36 2,750,000 ........................................... (re. $853,000)
37 By chapter 54, section 1, of the laws of 1992, for:
38 Alterations and improvements for facilities for the physically disa-
39 bled (30A29201) ... ... 1,128,000 ................. (re. $218,000)
40 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
41 section 3, of the laws of 1995, for:
54 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Alterations and improvements for health and safety (30A18901)
2 ... ..... 2,780,000 ................................ (re. $55,000)
3 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
4 section 3, of the laws of 1992, for:
5 Alterations and improvements for health and safety (30A18801)
6 ... ..... 2,308,000 ............................... (re. $201,000)
7 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
8 section 3, of the laws of 1995, for:
9 Alterations and improvements for health and safety (30018701)
10 ... ..... 8,507,000 ................................ (re. $58,000)
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 By chapter 53, section 1, of the laws of 1997:
15 Alterations and improvements for preservation of facilities (30039703)
16 ... ..... 3,300,000 ............................. (re. $2,241,000)
17 By chapter 53, section 1, of the laws of 1996, for:
18 Alterations and improvements to roofs on various buildings at Brooklyn
19 College (30299603) ... 300,000 ...................... (re. $300,000)
20 By chapter 54, section 1, of the laws of 1995, for:
21 Alterations and improvements to roofs on various buildings (30239503)
22 ... ..... 5,933,000 ............................. (re. $3,618,000)
23 By chapter 54, section 1, of the laws of 1994, for:
24 Alterations and improvements to roofs (30039403) .....................
25 5,579,000 ........................................... (re. $275,000)
26 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
27 section 3, of the laws of 1992, for:
28 Alterations and improvements for preservation of facilities (30A39003)
29 ... ..... 9,947,000 ............................... (re. $630,000)
30 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
31 section 3, of the laws of 1994, for:
32 Alterations and improvements for preservation of facilities (30A38803)
33 ... ..... 6,363,000 ............................... (re. $495,000)
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Program Improvement or Program Change Purpose
37 By chapter 54, section 1, of the laws of 1995, for:
38 Alterations and improvements to child care facilities (30289508)
39 ... ..... 1,306,000 ............................. (re. $1,306,000)
55 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
SENIOR COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 54, section 1, of the laws of 1994, for:
2 Planning for master plans, including telecommunications and pre-design
3 project estimates (30389408) ... ... 1,000,000 .... (re. $398,000)
4 PROGRAM CHANGES, EXPANSION AND IMPROVEMENTS (CCP)
5 Capital Projects Fund - Other
6 Capital Projects Fund
7 Program Improvement or Program Change Purpose
8 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
9 section 3, of the laws of 1992, for:
10 Alterations and improvements for program improvements (30A89008)
11 ... ..... 3,331,000 ................................ (re. $77,000)
12 By chapter 54, section 1, of the laws of 1988, as amended by chapter 54,
13 section 3, of the laws of 1995, for:
14 Alterations and improvements for program improvements (30A98808)
15 ... ..... 6,602,000 ............................... (re. $100,000)
56 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 GENERAL MAINTENANCE AND IMPROVEMENTS (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 By chapter 55, section 1, of the laws of 2016, as amended by chapter 53,
6 section 3, of the laws of 2016:
7 For services and expenses for state financial assistance to community
8 colleges for alterations and improvements to various facilities
9 including services and expenses, capital design, construction,
10 reconstruction, rehabilitation and equipment; for health and safety,
11 preservation of facilities, new facilities program improvement or
12 program change, environmental protection, energy conservation,
13 accreditation, facilities for the physically disabled, and related
14 projects, including costs incurred prior to April 1, 2016 subject to
15 an annual plan developed by the city university and approved by the
16 state director of the budget, and which may include, but not be
17 limited to, projects in the following schedule (30CC1650) ..........
18 61,640,000 ....................................... (re. $61,640,000)
19 Project Schedule
20 ESTIMATED ESTIMATED
21 TOTAL STATE 50 PERCENT
22 & LOCAL SHARE STATE SHARE
23 ----------------------------------------------------------
24 (thousands of dollars)
25 Bronx Community College
26 Alumni Locker Room Accessibility . 500 250
27 EOC Headquarter Renovation........ 1,000 500
28 Campus Utility Upgrade ........... 8,000 4,000
29 Gould Library Rotunda Staircase .. 1,330 665
30 Fire Alarm Upgrades .............. 2,908 1,454
31 Lowe Hall ADA Improvements ....... 500 250
32 Borough Manhattan Community College
33 Lighting Controls and Sensors .... 1,552 776
34 Variable Frequency Drives ........ 1,934 967
35 Community Room HVAC .............. 2,700 1,350
36 Perimeter Security Lighting ...... 600 300
37 199 Chambers Upgrade ............. 4,596 2,298
38 Hostos Community College
39 Summer Boiler .................... 206 103
40 Technology Upgrades .............. 430 215
41 Kingsborough Community College
42 Pool Renovations ................. 2,000 1,000
43 Marina Reconstruction ............ 1,500 750
44 LaGuardia Community College
45 Staircase Lighting................ 160 80
46 Center 3 Infrastructure Upgrades . 20,000 10,000
57 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Business and Entrepreneurial
2 Training Center ................ 6,800 3,400
3 M Building Boiler Replacement .... 546 273
4 E and C Building Cooling Towers .. 688 344
5 Chiller Plant .................... 17,964 8,982
6 Queensborough Community College
7 Upgrade Research Labs ............ 3,200 1,600
8 Central Chiller Plant ............ 2,000 1,000
9 Electrical System Upgrade ........ 7,980 3,990
10 Kitchen and Cafeteria Renovation.. 2,000 1,000
11 For university-wide community college
12 critical maintenance or capital
13 improvement costs attributable to
14 health and safety ................ 14,524 7,262
15 For university-wide community college
16 critical maintenance or capital
17 improvement costs attributable to
18 preservation of facilities ....... 17,462 8,731
19 For university-wide community college
20 critical maintenance or capital
21 improvement costs attributable to
22 assistive technology ............. 200 100
23 ------- ------
24 Total .......................... 123,280 61,640
25 ======= ======
26 By chapter 54, section 1, of the laws of 2015:
27 For services and expenses for state financial assistance to community
28 colleges for alterations and improvements to various facilities
29 including services and expenses, capital design, construction,
30 reconstruction, rehabilitation and equipment; for health and safety,
31 preservation of facilities, new facilities program improvement or
32 program change, environmental protection, energy conservation,
33 accreditation, facilities for the physically disabled, and related
34 projects, including costs incurred prior to April 1, 2015 subject to
35 an annual plan developed by the city university and approved by the
36 state director of the budget, and which may include, but not be
37 limited to, projects in the following schedule (30C11550) ..........
38 4,503,000 ......................................... (re. $4,503,000)
39 Project Schedule
40 ESTIMATED ESTIMATED
41 TOTAL STATE 50 PERCENT
42 & LOCAL SHARE STATE SHARE
43 ----------------------------------------------------------
44 (thousands of dollars)
45 Hostos Community College
46 Allied Health and Sciences
47 Building Complex ................. 9,006 4,503
58 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ------- ------
2 Total ............................ 9,006 4,503
3 ======= ======
4 For services and expenses for state financial assistance to community
5 colleges for alterations and improvements to various facilities
6 including services and expenses, capital design, construction,
7 acquisition, reconstruction, rehabilitation and equipment; for
8 health and safety, preservation of facilities, new facilities,
9 program improvement or program change, environmental protection,
10 energy conservation, accreditation, facilities for the physically
11 disabled, and related projects, including costs incurred prior to
12 April 1, 2015 subject to an annual plan developed by the city
13 university and approved by the state director of the budget, and
14 which may include, but not be limited to, projects in the following
15 schedule (30CC1550) ... 16,422,000 ............... (re. $16,422,000)
16 Project Schedule
17 ESTIMATED ESTIMATED
18 TOTAL STATE 50 PERCENT
19 & LOCAL SHARE STATE SHARE
20 ----------------------------------------------------------
21 (thousands of dollars)
22 Bronx Community College
23 Ohio Track and Field Restoration ..... 750 375
24 Monument Hill Restoration ............ 400 200
25 Gould Memorial Library Windows ....... 900 450
26 Bliss Hall ADA Improvements .......... 600 300
27 Computer and Lab Upgrades ............. 70 35
28 Hostos Community College
29 475 Grand Concourse HVAC Upgrades .. 3,000 1,500
30 Kingsborough Community College
31 Pool Upgrades ...................... 2,000 1,000
32 Science and Resiliency Institute .. 10,000 5,000
33 LaGuardia Community College
34 Faculty Offices and Training Center 1,500 750
35 Tech Center .......................... 200 100
36 Queensborough Community College
37 Roof Repairs ....................... 1,700 850
38 Central Kitchen and
39 Cafeteria Renovation ............... 1,100 550
40 For university-wide community college
41 critical maintenance or capital
42 improvement costs attributable to
43 the preservation of facilities ..... 4,064 2,032
44 For university-wide community college
45 critical maintenance or capital
46 improvement costs attributable to
47 accelerated conservation and
59 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 efficiency projects ................ 6,560 3,280
2 ------- ------
3 Total .......................... 32,844 16,422
4 ======= ======
5 By chapter 54, section 1, of the laws of 2014:
6 An advance for state financial assistance to community colleges for
7 alterations and improvements to existing facilities including
8 services and expenses, capital design, construction, reconstruction,
9 rehabilitation and equipment; for health and safety, preservation of
10 facilities, program improvement or program change, environmental
11 protection, energy conservation, accreditation, facilities for the
12 physically disabled, and related projects, including costs incurred
13 prior to April 1, 2014 subject to an annual plan developed by the
14 city university and approved by the state director of the budget,
15 and which may include, but not be limited to, projects in the
16 following schedule (30CC1450) ... 15,628,000 ..... (re. $15,628,000)
17 Project Schedule
18 ESTIMATED ESTIMATED
19 TOTAL STATE 50 PERCENT
20 & LOCAL SHARE STATE SHARE
21 ----------------------------------------------------------
22 (thousands of dollars)
23 Borough of Manhattan Community
24 College
25 Campus-wide critical maintenance
26 to various facilities .............. 3,500 1,750
27 Bronx Community College
28 Campus-wide critical maintenance
29 to various facilities .............. 2,200 1,100
30 Kingsborough Community College
31 Campus-wide critical maintenance
32 to various facilities .............. 3,000 1,500
33 LaGuardia Community College
34 Campus-wide critical maintenance
35 to various facilities .............. 6,000 3,000
36 Queensborough Community College
37 Campus-wide critical maintenance
38 to various facilities .............. 5,500 2,750
39 For university-wide community college
40 critical maintenance or capital
41 improvement costs attributable to
42 the preservation of facilities...... 5,456 2,728
43 For university-wide community college
44 critical maintenance or capital
45 improvement costs attributable to
46 accelerated conservation and
47 efficiency projects................. 5,600 2,800
60 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ------- ------
2 Total .......................... 31,256 15,628
3 ======= ======
4 By chapter 54, section 1, of the laws of 2013:
5 An advance for state financial assistance to community colleges for
6 alterations and improvements to various facilities including
7 services and expenses, capital design, construction, acquisition,
8 reconstruction, rehabilitation and equipment; for health and safety,
9 preservation of facilities, new facilities, program improvement or
10 program change, environmental protection, energy conservation,
11 accreditation, facilities for the physically disabled, and related
12 projects, including costs incurred prior to April 1, 2013 subject to
13 an annual plan developed by the city university and approved by the
14 state director of the budget, and which may include, but not be
15 limited to, projects in the following schedule (30CC1350) ..........
16 8,100,000 ......................................... (re. $6,546,000)
17 Project Schedule
18 ESTIMATED ESTIMATED
19 TOTAL STATE 50 PERCENT
20 & LOCAL SHARE STATE SHARE
21 ----------------------------------------------------------
22 (thousands of dollars)
23 Borough of Manhattan Community
24 College
25 Campus-wide critical maintenance
26 to various facilities .............. 2,000 1,000
27 Bronx Community College
28 Campus-wide critical maintenance
29 to various facilities .............. 2,850 1,425
30 Hostos Community College
31 Campus-wide critical maintenance
32 to various facilities .............. 3,500 1,750
33 Kingsborough Community College
34 Campus-wide critical maintenance
35 to various facilities .............. 1,650 825
36 LaGuardia Community College
37 Campus-wide critical maintenance
38 to various facilities .............. 2,000 1,000
39 Queensborough Community College
40 Campus-wide critical maintenance
41 to various facilities .............. 4,200 2,100
42 ------- ------
43 Total .......................... 16,200 8,100
44 ======= ======
45 By chapter 54, section 1, of the laws of 2012:
46 An advance for state financial assistance to community colleges for
47 alterations and improvements to various facilities including
61 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 services and expenses, capital design, construction, acquisition,
2 reconstruction, rehabilitation and equipment; for health and safety,
3 preservation of facilities, new facilities, program improvement or
4 program change, environmental protection, energy conservation,
5 accreditation, facilities for the physically disabled, and related
6 projects, including costs incurred prior to April 1, 2012 subject to
7 an annual plan developed by the city university and approved by the
8 state director of the budget, and which may include, but not be
9 limited to, projects in the following schedule (30CC1250) ..........
10 26,704,000 ....................................... (re. $17,628,000)
11 Project Schedule
12 ESTIMATED ESTIMATED
13 TOTAL STATE 50 PERCENT
14 & LOCAL SHARE STATE SHARE
15 ----------------------------------------------------------
16 (thousands of dollars)
17 Borough of Manhattan Community
18 College
19 Campus-wide critical maintenance
20 to various facilities ............. 14,400 7,200
21 Bronx Community College
22 Campus-wide critical maintenance
23 to various facilities .............. 6,000 3,000
24 Kingsborough Community College
25 Campus-wide critical maintenance
26 to various facilities .............. 7,500 3,750
27 Health Technologies Education
28 Center ............................. 4,908 2,454
29 LaGuardia Community College
30 Center 3 Facade Replacement ........ 3,800 1,900
31 Campus-wide critical maintenance
32 to various facilities .............. 6,800 3,400
33 Queensborough Community College
34 Central Kitchen/Cafeteria .......... 2,400 1,200
35 Campus-wide critical maintenance
36 to various facilities .............. 7,600 3,800
37 ------- ------
38 Total .......................... 55,408 26,704
39 ======= ======
40 By chapter 54, section 1, of the laws of 2011:
41 An advance for state financial assistance to community colleges for
42 alterations and improvements to various facilities including
43 services and expenses, capital design, construction, acquisition,
44 reconstruction, rehabilitation and equipment; for health and safety,
45 preservation of facilities, new facilities, program improvement or
46 program change, environmental protection, energy conservation,
47 accreditation, facilities for the physically disabled, and related
62 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 projects, including costs incurred prior to April 1, 2011 subject to
2 an annual plan developed by the city university and approved by the
3 state director of the budget which shall include projects in the
4 following schedule (30CC1150) ... 31,239,000 ..... (re. $18,971,000)
5 Project Schedule
6 ESTIMATED ESTIMATED
7 TOTAL STATE 50 PERCENT
8 & LOCAL SHARE STATE SHARE
9 ----------------------------------------------------------
10 (thousands of dollars)
11 Borough of Manhattan Community
12 College
13 Theater Upgrades and
14 Equipment .......................... 3,400 1,700
15 Bronx Community College
16 Campus-wide Roofing,
17 Ph. I .............................. 4,068 2,034
18 Kingsborough Community College
19 Theater Upgrades and Sciences Bldg-
20 Infrastructure...................... 5,150 2,575
21 T2 Building Upgrades................ 7,200 3,600
22 LaGuardia Community College
23 Center 3 Facade, Ph. I ............. 5,000 2,500
24 Center 3 Upgrades .................. 1,000 500
25 Campus Improvements ............... 10,000 5,000
26 Queensborough Community College
27 Central Kitchen/Dining Hall
28 Renovation ......................... 8,660 4,330
29 Upgrade Campus-wide Electrical
30 System, Ph. II .................... 18,000 9,000
31 ------- ------
32 Total ........................... 62,478 31,239
33 ======= ======
34 By chapter 53, section 1, of the laws of 2010:
35 An advance for state financial assistance to community colleges for
36 alterations and improvements to various facilities including
37 services and expenses, capital design, construction, acquisition,
38 reconstruction, rehabilitation and equipment; for health and safety,
39 preservation of facilities, new facilities, program improvement or
40 program change, environmental protection, energy conservation,
41 accreditation, facilities for the physically disabled, and related
42 projects, including costs incurred prior to April 1, 2010 subject to
43 an annual plan developed by the city university and approved by the
44 state director of the budget which shall include projects in the
45 following schedule (30CC1050) ... 34,563,000 ..... (re. $11,386,000)
46 Project Schedule
63 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ESTIMATED ESTIMATED
2 TOTAL STATE 50 PERCENT
3 & LOCAL SHARE STATE SHARE
4 ----------------------------------------------------------
5 (thousands of dollars)
6 Borough of Manhattan Community
7 College
8 Central Plant Upgrades,
9 199 Chambers Street ............. 14,000 7,000
10 Bronx Community College
11 Campus-wide Utility Upgrades,
12 Ph. I ........................... 18,626 9,313
13 Kingsborough Community College
14 Mechanical and Infrastructure
15 Improvements ....................... 4,000 2,000
16 LaGuardia Community College
17 Conference Facility Space .......... 2,000 1,000
18 Center 3 Office Space and
19 Elevators ........................ 2,500 1,250
20 Facility Upgrades ................. 10,000 5,000
21 Queensborough Community College
22 Upgrade Campus-wide Electrical
23 System, Ph. I ................... 18,000 9,000
24 ------- ------
25 Total .......................... 69,126 34,563
26 ======= ======
27 By chapter 53, section 1, of the laws of 2008:
28 State financial assistance to community colleges for alterations and
29 improvements to various facilities for minor rehabilitation, includ-
30 ing but not limited to capital design, construction, acquisition,
31 reconstruction, rehabilitation, and equipment; for health and safe-
32 ty, preservation of facilities, program improvement or program
33 change, environmental protection, energy conservation, accredi-
34 tation, facilities for the physically disabled, preventative mainte-
35 nance and related projects, including costs incurred prior to April
36 1, 2008, and subject to a plan submitted annually by the city
37 university of New York and approved by the director of the budget
38 (30110850) ... 2,750,000 .......................... (re. $2,750,000)
39 By chapter 53, section 1, of the laws of 2008, as amended by chapter
40 496, section 1, of the laws of 2008:
41 Advances for alterations and improvements to various facilities for
42 capital critical maintenance and strategic initiatives, including
43 but not limited to capital design, construction, acquisition, recon-
44 struction, rehabilitation, and equipment; for health and safety,
45 preservation of facilities, new facilities, program improvement or
46 program change, environmental protection, energy conservation,
47 accreditation, facilities for the physically disabled, preventative
48 maintenance and related projects, including costs incurred prior to
64 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 April 1, 2008, and subject to a plan developed and submitted annual-
2 ly by the city university of New York and approved by the director
3 of the budget, and which may include, but not be limited to,
4 projects in the following schedule (30090850) ......................
5 206,908,000 ...................................... (re. $96,826,000)
6 Project Schedule
7 ESTIMATED ESTIMATED
8 TOTAL STATE 50 PERCENT
9 & LOCAL SHARE STATE SHARE
10 ----------------------------------------------------------
11 (thousands of dollars)
12 Borough of Manhattan Community
13 College
14 Fiterman Hall ................... 102,200 51,100
15 Bronx Community College
16 North Instructional Building ..... 24,762 12,381
17 Backflow Prevention Devices ....... 3,400 1,700
18 Campus-wide Roof Replacement ...... 1,932 966
19 Hostos Community College
20 500 Grand Concourse .............. 18,446 9,223
21 Kingsborough Community College
22 Laboratories and Mechanical
23 Infrastructure Upgrade Phase I .... 5,000 2,500
24 Medgar Evers College
25 Academic Building I .............. 68,346 34,173
26 Carroll Street Building .......... 12,000 6,000
27 University-wide
28 CUNY ERP (CUNY FIRST) ............ 27,600 13,800
29 Project Administration ........... 15,430 7,715
30 For university-wide critical main-
31 tenance or capital improvement
32 costs at community colleges
33 attributable to the findings
34 of condition surveys for health
35 and safety needs ................. 35,000 17,500
36 For university-wide critical main-
37 tenance or capital improvement
38 costs at community colleges
39 attributable to the findings
40 of condition surveys for
41 preservation of facilities needs . 35,000 17,500
42 For university-wide critical main-
43 tenance or capital improvement
44 costs at community colleges
45 attributable to ADA needs ........ 15,000 7,500
46 For university-wide critical main-
47 tenance or capital improvement
48 costs at community colleges
65 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 attributable to certificate of
2 occupancy/public assembly needs .. 18,000 9,000
3 For university-wide critical main-
4 tenance or capital improvement
5 costs at community colleges
6 attributable to energy
7 conservation needs ............... 18,000 9,000
8 For university-wide critical main-
9 tenance or capital improvement
10 costs at community colleges
11 attributable to science lab
12 upgrade needs ..................... 7,200 3,600
13 For university-wide critical main-
14 tenance or capital improvement
15 costs at community colleges
16 attributable to educational
17 technology initiative needs ....... 4,000 2,000
18 For university-wide critical main-
19 tenance or capital improvement
20 costs at community colleges
21 attributable to athletic
22 facilities upgrade needs .......... 2,500 1,250
23 ------------ ------------
24 Total ........................... 413,816 206,908
25 ============ ============
26 By chapter 53, section 1, of the laws of 2007:
27 An advance for state financial assistance to community colleges for
28 alterations and improvements to various facilities including
29 services and expenses, capital design, construction, acquisition,
30 reconstruction, rehabilitation and equipment; for health and safety,
31 preservation of facilities, new facilities, program improvement or
32 program change, environmental protection, energy conservation,
33 accreditation, facilities for the physically disabled, and related
34 projects, including costs incurred prior to April 1, 2007 subject to
35 an annual plan developed by the city university and approved by the
36 state director of the budget which shall include projects in the
37 following schedule (30660750) ... 40,800,000 ...... (re. $2,010,000)
38 Project Schedule
39 ESTIMATED ESTIMATED
40 TOTAL STATE 50 PERCENT
41 & LOCAL SHARE STATE SHARE
42 ----------------------------------------------------------
43 (thousands of dollars)
44 Borough of Manhattan Community College
45 Fiterman Hall Replacement ......... 40,000 20,000
46 Bronx Community College
66 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Mechanical Systems Upgrades ........ 1,800 900
2 Medgar Evers
3 Academic Building I ............... 22,000 11,000
4 For University-wide critical
5 maintenance or capital im-
6 provement costs at community
7 colleges attributable to the
8 findings of condition sur-
9 veys for health and safety
10 needs .............................. 4,800 2,400
11 For university-wide critical
12 maintenance or capital im-
13 provement costs at community
14 colleges attributable to the
15 findings of condition sur-
16 veys for preservation of
17 facilities needs ................... 3,000 1,500
18 For university-wide critical
19 maintenance or capital im-
20 provement costs at community
21 colleges to correct defic-
22 iencies in the mechanical,
23 electrical and plumbing
24 infrastructure .................... 10,000 5,000
25 ------- -------
26 Total ............................. 81,600 40,800
27 ======= =======
28 By chapter 53, section 1, of the laws of 2006:
29 An advance for state financial assistance to community colleges for
30 alterations and improvements to various facilities including
31 services and expenses, capital design, construction, acquisition,
32 reconstruction, rehabilitation and equipment; for health and safety,
33 preservation of facilities, new facilities, program improvement or
34 program change, environmental protection, energy conservation,
35 accreditation, facilities for the physically disabled, and related
36 projects, including costs incurred prior to April 1, 2006 subject to
37 an annual plan developed by the city university which shall include
38 projects in the following schedule (30660650).......................
39 8,769,000 ......................................... (re. $1,910,000)
40 Project Schedule
41 ESTIMATED ESTIMATED
42 TOTAL STATE 50 PERCENT
43 & LOCAL SHARE STATE SHARE
44 ----------------------------------------------------------
45 (thousands of dollars)
46 Medgar Evers College
47 Theater ........................... 3,450 1,725
67 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Auditorium ....................... 14,088 7,044
2 ------- ------
3 Total ............................ 17,538 8,769
4 ======= ======
5 By chapter 53, section 1, of the laws of 2006, as amended by chapter
6 108, section 2, of the laws of 2006:
7 Additional advance for state financial assistance to community
8 colleges for alterations and improvements to various facilities
9 including capital design, construction, acquisition, reconstruction,
10 rehabilitation, equipment and personal service costs; for health and
11 safety, preservation of facilities, new facilities, program improve-
12 ment or program change, environmental protection, energy conserva-
13 tion, accreditation, facilities for the physically disabled and
14 related projects including costs incurred prior to April 1, 2006
15 (30660650) ... 66,580,000 ........................ (re. $44,267,000)
16 Project Schedule
17 ESTIMATED ESTIMATED
18 TOTAL STATE 50 PERCENT
19 & LOCAL SHARE STATE SHARE
20 ----------------------------------------------------------
21 (thousands of dollars)
22 Borough of Manhattan Community
23 College
24 Fitterman Hall Replacement ....... 15,000 7,500
25 Chambers Street Renovations
26 Phase II ......................... 14,000 7,000
27 Bronx Community College
28 Mechanical System Upgrades ........ 6,000 3,000
29 Hostos Community College
30 Renovations in 475 Grand Concourse 6,000 3,000
31 Kings Borough Community College
32 Air conditioning T5 ................. 218 109
33 Renovation of former auditorium T2
34 building as learning resource
35 center ............................ 2,000 1,000
36 Air conditioning T4 ................. 942 471
37 Mechanical System Upgrades ........ 6,000 3,000
38 Laguardia Community College
39 Renovations of Center 3 .......... 14,000 7,000
40 Acquisition and Renovation
41 of an Additional Educational
42 Building ......................... 55,000 27,500
43 Medgar Evers
44 Academic I ........................ 8,000 4,000
45 Queensborough Community College
46 Renovation of Science Building .... 6,000 3,000
47 -------- --------
68 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Total ......................... 133,160 66,580
2 ======== ========
3 By chapter 53, section 1, of the laws of 2005, as amended by chapter 62,
4 section 3, of the laws of 2005:
5 An advance for state financial assistance to community colleges for
6 alterations and improvements to various facilities including
7 services and expenses, capital design, construction, acquisition,
8 reconstruction, rehabilitation and equipment; for health and safety,
9 preservation of facilities, new facilities, program improvement or
10 program change, environmental protection, energy conservation,
11 accreditation, facilities for the physically disabled, and related
12 projects, including costs incurred prior to April 1, 2005 subject to
13 an annual plan developed by the city university which shall include
14 projects in the following schedule (30590550) ......................
15 105,849,000 ...................................... (re. $34,957,000)
16 Project Schedule
17 ESTIMATED ESTIMATED
18 TOTAL STATE 50 PERCENT
19 & LOCAL SHARE STATE SHARE
20 ----------------------------------------------------------
21 (thousands of dollars)
22 Queensborough Community College
23 Holocaust Resource Center ......... 3,000 1,500
24 Instruction Building Planning
25 and Design Costs .................. 4,948 2,474
26 Upgrade Campus Wide Electric
27 System ............................ 1,000 500
28 Upgrade Campus Wide Drainage
29 System ............................ 1,000 500
30 Kingsborough Community College
31 Roof Replacement .................. 3,000 1,500
32 Additional Roof Replacement ....... 3,000 1,500
33 Fire Alarm Rehab .................. 6,256 3,128
34 Gymnasium ......................... 6,060 3,030
35 Marine/Academic Center ............ 5,050 2,525
36 Primary Arts Center ................. 850 425
37 Hostos Community College
38 475 Grand Concourse Renovation .... 4,948 2,474
39 Site Acquisition .................... 750 375
40 LaGuardia Community College
41 Center 3 Renovations, Phase II .... 5,346 2,673
42 Department of Humanities
43 Renovation ....................... 17,012 8,506
44 Department of Computer Information
45 Systems .......................... 21,000 10,500
46 Medgar Evers College
69 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Athletic Fields ................... 1,960 980
2 Bronx Community College
3 North Instructional Building ..... 60,962 30,481
4 Mechanical Systems &
5 Infrastructure Upgrade Phase 1 .... 4,074 2,037
6 Borough Manhattan Community College
7 Training Program for Emergency
8 First Response ................... 21,400 10,700
9 North campus building ............. 2,000 1,000
10 Chambers Street Renovation Phase
11 II ................................ 5,506 2,753
12 Universitywide
13 For condition assessment: Health
14 and Safety ........................ 9,762 4,881
15 For condition assessment:
16 Facilities Preservation ........... 3,994 1,997
17 For condition assessment: ADA ..... 3,820 1,910
18 For construction, acquisition,
19 renovation or rehabilitation of
20 facilities including equipment and
21 other necessary incidental costs
22 related to the CUNY Incubator
23 Network .......................... 15,000 7,500
24 ------- -------
25 Total ......................... 211,698 105,849
26 ======= =======
27 By chapter 53, section 1, of the laws of 2003:
28 State financial assistance to community colleges for alterations and
29 improvements to various facilities including services and expenses,
30 capital design, construction, acquisition, reconstruction, rehabili-
31 tation and equipment; for health and safety, preservation of facili-
32 ties, new facilities, program improvement or program change, envi-
33 ronmental protection, energy conservation, accreditation, facilities
34 for the physically disabled, preventive maintenance and related
35 projects, including costs incurred prior to April 1, 2003, and
36 subject to a plan submitted annually by the city university of New
37 York and approved by the state director of the budget (30020350) ...
38 5,000,000 ......................................... (re. $3,711,000)
39 An advance for state financial assistance to community colleges for
40 alterations and improvements to various facilities including
41 services and expenses, capital design, construction, acquisition,
42 reconstruction, rehabilitation and equipment; for health and safety,
43 preservation of facilities, new facilities, program improvement or
44 program change, environmental protection, energy conservation,
45 accreditation, facilities for the physically disabled, and related
46 projects, including costs incurred prior to April 1, 2003, subject
47 to an annual plan developed by the city university and approved by
48 the state director of the budget, and which may include, but not be
70 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 limited to, projects in the following schedule (30050350) ..........
2 50,000,000 ........................................ (re. $9,806,000)
3 Project Schedule
4 AMOUNT
5 --------------------------------------------
6 (thousands of dollars)
7 Medgar Evers College ................ 19,400
8 -Academic Building I
9 University-wide ..................... 30,600
10 -For university-wide critical
11 maintenance or capital im-
12 provement costs attributable
13 to the findings of condition
14 surveys for health and safety,
15 preservation of facilities and
16 access for the physically dis-
17 abled; code compliance; asbes-
18 tos removal; emergencies; en-
19 ergy conservation needs; fire
20 alarms, sprinklers, electrical
21 distribution and heating and
22 cooling system requirements;
23 and other similar campus-wide
24 and system-wide needs
25 ------------
26 Total ........................... 50,000
27 ============
28 By chapter 53, section 1, of the laws of 1998, as amended by chapter 53,
29 section 1, of the laws of 2008:
30 An advance for state financial assistance to community colleges for
31 alterations and improvements to various facilities including capital
32 design, construction, acquisition, reconstruction, rehabilitation
33 and equipment; for health and safety, preservation of facilities,
34 new facilities, program improvement or program change, environmental
35 protection, energy conservation, accreditation, facilities for the
36 physically disabled, and related projects according to the following
37 project schedule (303198C1) ... 109,700,000 ...... (re. $50,432,000)
38 Project Schedule
39 AMOUNT
40 --------------------------------------------
41 (thousands of dollars)
42 For payment of up to one-
43 half of the total capital
44 costs for community
45 colleges for health and
46 safety projects based on
71 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 the results of building
2 condition surveys ............... 1,500
3 For payment of up to one-
4 half of the total capital
5 costs for community
6 colleges for asbestos
7 removal and abatement ........... 1,000
8 For payment of up to one-
9 half of the total capital
10 costs for community
11 colleges for preservation
12 of facilities projects
13 based on the results of
14 building condition surveys ...... 2,000
15 For payment of up to one-
16 half of the total capital
17 costs for community
18 colleges for making
19 facilities accessible to the
20 physically disabled based
21 on the results of building
22 condition surveys ............... 1,000
23 For payment of up to one-
24 half of the total capital
25 costs for community
26 colleges for the
27 telecommunications initiative ... 2,000
28 For payment of up to one-
29 half of the total capital
30 costs for community
31 colleges for energy
32 conservation .................... 1,000
33 For payment of up to one-
34 half of the total capital
35 costs for community
36 colleges for the
37 educational technology
38 equipment initiative ............ 1,500
39 An additional advance for
40 state financial assistance
41 to community colleges for
42 alterations and
43 improvements to various
44 facilities including capital
45 design, construction,
46 acquisition, reconstruction,
47 rehabilitation and
48 equipment; for health and
49 safety, preservation of
50 facilities, new facilities,
72 12554-15-7
CITY UNIVERSITY OF NEW YORK
(APPROPRIATED TO THE CITY UNIVERSITY CONSTRUCTION FUND)
COMMUNITY COLLEGES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 program improvement or
2 program change, environ-
3 mental protection, energy
4 conservation, accredita-
5 tion, facilities for the
6 physically disabled, and
7 related projects according
8 to the following project
9 schedule (303198C1) ............ 99,700
10 --------------
11 Total ......................... 109,700
12 ==============
73 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 401,000,000 521,089,000
6 ---------------- ----------------
7 All Funds ........................ 401,000,000 521,089,000
8 ================ ================
9 FACILITIES MAINTENANCE AND OPERATIONS (CCP) ................. 91,000,000
10 --------------
11 Capital Projects Funds - Other
12 Correctional Facilities Capital Improvement Fund
13 Maintenance and Operations Purpose
14 For the maintenance and operation of various
15 facilities and systems including personal
16 services, fringe benefits and indirect
17 costs. Notwithstanding any other law to
18 the contrary, all or a portion of the
19 funds appropriated herein may be suballo-
20 cated or transferred to any department,
21 agency, or public authority (10FM1703) ...... 91,000,000
22 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP) ... 310,000,000
23 --------------
24 Capital Projects Funds - Other
25 Correctional Facilities Capital Improvement Fund
26 Administration Purpose
27 For the preparation and review of plans,
28 specifications, estimates, studies, plant
29 evaluations, inspections, appraisals and
30 surveys, and legal claims relating to
31 existing or proposed facilities of the
32 department of corrections and community
33 supervision, and payment of personal
34 service and nonpersonal service, including
35 fringe benefits, related to the adminis-
36 tration and security of capital projects
37 provided by the department of corrections
38 and community supervision for new and
39 reappropriated projects (10501750) .......... 17,000,000
40 Capital Projects Funds - Other
41 Correctional Facilities Capital Improvement Fund
42 Environmental Protection or Improvements Purpose
74 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS 2017-18
1 Alterations and improvements, including
2 related departmental administrative costs,
3 for environmental protection or improve-
4 ments including liabilities incurred prior
5 to April 1, 2017 (10061706) ................. 24,000,000
6 Capital Projects Funds - Other
7 Correctional Facilities Capital Improvement Fund
8 Health and Safety Purpose
9 Alterations and improvements, including
10 related departmental administrative costs,
11 for health and safety including liabil-
12 ities incurred prior to April 1, 2017
13 (10011701) .................................. 15,000,000
14 Capital Projects Funds - Other
15 Correctional Facilities Capital Improvement Fund
16 Preservation of Facilities Purpose
17 Alterations and improvements, including
18 related departmental administrative costs,
19 for the preservation of facilities includ-
20 ing liabilities incurred prior to April 1,
21 2017 (10031703) ............................ 141,000,000
22 Alterations and improvements, including
23 related departmental administrative costs,
24 for preventative maintenance that will
25 prolong the useful life of assets includ-
26 ing liabilities incurred prior to April 1,
27 2017 (10M31703) ............................. 15,000,000
28 Capital Projects Funds - Other
29 Correctional Facilities Capital Improvement Fund
30 Program Improvement or Program Change Purpose
31 Alterations and improvements, including
32 related departmental administrative costs,
33 for program improvement or program change
34 including liabilities incurred prior to
35 April 1, 2017 (10081708) .................... 95,000,000
36 Alterations and improvements within the
37 correctional industries program, including
38 related departmental administrative costs,
39 for program improvement or program change
40 including liabilities incurred prior to
41 April 1, 2017 (10IN1708) ..................... 3,000,000
75 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 MAINTENANCE AND IMPROVEMENT OF EXISTING FACILITIES (CCP)
2 Capital Projects Funds - Other
3 Correctional Facilities Capital Improvement Fund
4 Administration Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For the preparation and review of plans, specifications, estimates,
7 studies, plant evaluations, inspections, appraisals and surveys, and
8 legal claims relating to existing or proposed facilities of the
9 department of corrections and community supervision, and payment of
10 personal service and nonpersonal service, including fringe benefits,
11 related to the administration and security of capital projects
12 provided by the department of corrections and community supervision
13 for new and reappropriated projects (10501650) .....................
14 17,000,000 ........................................ (re. $6,368,000)
15 By chapter 54, section 1, of the laws of 2015:
16 For the preparation and review of plans, specifications, estimates,
17 studies, plant evaluations, inspections, appraisals and surveys, and
18 legal claims relating to existing or proposed facilities of the
19 department of corrections and community supervision, and payment of
20 personal service and nonpersonal service, including fringe benefits,
21 related to the administration and security of capital projects
22 provided by the department of corrections and community supervision
23 for new and reappropriated projects (10501550) .....................
24 15,000,000 ........................................ (re. $3,185,000)
25 By chapter 54, section 1, of the laws of 2014:
26 For the preparation and review of plans, specifications, estimates,
27 studies, plant evaluations, inspections, appraisals and surveys, and
28 legal claims relating to existing or proposed facilities of the
29 department of corrections and community supervision, and payment of
30 personal service and nonpersonal service, including fringe benefits,
31 related to the administration and security of capital projects
32 provided by the department of corrections and community supervision
33 for new and reappropriated projects (10501450) .....................
34 15,000,000 ........................................ (re. $2,107,000)
35 By chapter 50, section 1, of the laws of 2009:
36 For the preparation and review of plans, specifications, estimates,
37 studies, plant evaluations, inspections, appraisals and surveys, and
38 legal claims relating to existing or proposed facilities of the
39 department of correctional services, and payment of personal service
40 and nonpersonal service, including fringe benefits, related to the
41 administration and security of capital projects provided by the
42 department of correctional services for new and reappropriated
43 projects (10500950) ... 15,000,000 .................. (re. $250,000)
44 Capital Projects Funds - Other
45 Correctional Facilities Capital Improvement Fund
46 Environmental Protection or Improvements Purpose
76 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2016:
2 Alterations and improvements, including related departmental adminis-
3 trative costs, for environmental protection or improvements includ-
4 ing liabilities incurred prior to April 1, 2016 (10061606) .........
5 62,000,000 ....................................... (re. $53,571,000)
6 By chapter 54, section 1, of the laws of 2013:
7 Alterations and improvements, including related departmental adminis-
8 trative costs, for environmental protection or improvements includ-
9 ing liabilities incurred prior to April 1, 2013 (10061306) .........
10 28,000,000 ........................................ (re. $9,075,000)
11 By chapter 54, section 1, of the laws of 2012:
12 Alterations and improvements, including related departmental adminis-
13 trative costs, for environmental protection or improvements includ-
14 ing liabilities incurred prior to April 1, 2012 (10061206) .........
15 24,000,000 ........................................ (re. $3,399,000)
16 By chapter 54, section 1, of the laws of 2011:
17 Alterations and improvements, including related departmental adminis-
18 trative costs, for environmental protection or improvements includ-
19 ing liabilities incurred prior to April 1, 2011 (10061106) .........
20 24,000,000 .......................................... (re. $766,000)
21 By chapter 50, section 1, of the laws of 2010:
22 Alterations and improvements, including related departmental adminis-
23 trative costs, for environmental protection or improvements includ-
24 ing liabilities incurred prior to April 1, 2010 (10061006) .........
25 24,000,000 ........................................... (re. $25,000)
26 By chapter 50, section 1, of the laws of 2008:
27 Alterations and improvements, including related departmental adminis-
28 trative costs, for environmental protection or improvements includ-
29 ing liabilities incurred prior to April 1, 2008 (10060806) .........
30 25,000,000 ........................................... (re. $36,000)
31 By chapter 50, section 1, of the laws of 2007:
32 Alterations and improvements, including related departmental adminis-
33 trative costs, for environmental protection or improvements includ-
34 ing liabilities incurred prior to April 1, 2007 (10060706) .........
35 16,000,000 ........................................... (re. $10,000)
36 By chapter 50, section 1, of the laws of 2006:
37 Alterations and improvements, including related departmental adminis-
38 trative costs, for environmental protection or improvements includ-
39 ing liabilities incurred prior to April 1, 2006 (10060606) .........
40 14,000,000 ............................................ (re. $7,000)
41 Capital Projects Funds - Other
42 Correctional Facilities Capital Improvement Fund
43 Facilities for the Physically Disabled Purpose
77 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 54, section 1, of the laws of 2000:
2 Alterations and improvements, including related departmental adminis-
3 trative costs, of facilities for the physically disabled including
4 liabilities incurred prior to April 1, 2000 (10A40004) .............
5 2,000,000 ............................................ (re. $74,000)
6 Capital Projects Funds - Other
7 Correctional Facilities Capital Improvement Fund
8 Health and Safety Purpose
9 By chapter 55, section 1, of the laws of 2016:
10 Alterations and improvements, including related departmental adminis-
11 trative costs, for health and safety including liabilities incurred
12 prior to April 1, 2016 (10011601) ..................................
13 23,000,000 ....................................... (re. $23,000,000)
14 By chapter 54, section 1, of the laws of 2013:
15 Alterations and improvements, including related departmental adminis-
16 trative costs, for health and safety including liabilities incurred
17 prior to April 1, 2013 (10011301) ..................................
18 22,000,000 ....................................... (re. $12,820,000)
19 By chapter 54, section 1, of the laws of 2012:
20 Alterations and improvements, including related departmental adminis-
21 trative costs, for health and safety including liabilities incurred
22 prior to April 1, 2012 (10011201) ..................................
23 36,000,000 ........................................ (re. $8,407,000)
24 By chapter 54, section 1, of the laws of 2011:
25 Alterations and improvements, including related departmental adminis-
26 trative costs, for health and safety including liabilities incurred
27 prior to April 1, 2011 (10011101) ..................................
28 16,000,000 ........................................ (re. $1,232,000)
29 By chapter 50, section 1, of the laws of 2010:
30 Alterations and improvements, including related departmental adminis-
31 trative costs, for health and safety including liabilities incurred
32 prior to April 1, 2010 (10011001) ..................................
33 16,000,000 ........................................... (re. $29,000)
34 By chapter 50, section 1, of the laws of 2009:
35 Alterations and improvements, including related departmental adminis-
36 trative costs, for health and safety including liabilities incurred
37 prior to April 1, 2009 (10010901) ..................................
38 16,000,000 .......................................... (re. $571,000)
39 By chapter 50, section 1, of the laws of 2008:
40 Alterations and improvements, including related departmental adminis-
41 trative costs, for health and safety including liabilities incurred
42 prior to April 1, 2008 (10010801) ... 10,000,000 ...... (re. $5,000)
43 By chapter 50, section 1, of the laws of 2007:
78 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Alterations and improvements, including related departmental adminis-
2 trative costs, for health and safety including liabilities incurred
3 prior to April 1, 2007 (10010701) ..................................
4 20,000,000 ........................................... (re. $20,000)
5 By chapter 50, section 1, of the laws of 2006:
6 Alterations and improvements, including related departmental adminis-
7 trative costs, for health and safety including liabilities incurred
8 prior to April 1, 2006 (10010601) ..................................
9 20,000,000 .......................................... (re. $322,000)
10 By chapter 50, section 1, of the laws of 2005:
11 Alterations and improvements, including related departmental adminis-
12 trative costs, for health and safety including liabilities incurred
13 prior to April 1, 2005 (10010501) ... 30,000,000 ..... (re. $11,000)
14 By chapter 50, section 1, of the laws of 2004:
15 Alterations and improvements, including related departmental adminis-
16 trative costs, for health and safety including liabilities incurred
17 prior to April 1, 2004 (10010401) ..................................
18 30,000,000 ........................................... (re. $48,000)
19 By chapter 50, section 1, of the laws of 2003:
20 Alterations and improvements, including related departmental adminis-
21 trative costs, for health and safety including liabilities incurred
22 prior to April 1, 2003 (10010301) ..................................
23 30,000,000 ........................................... (re. $20,000)
24 Capital Projects Funds - Other
25 Correctional Facilities Capital Improvement Fund
26 Medical Facilities Purpose
27 By chapter 54, section 1, of the laws of 2000:
28 For the cost of studies, site acquisitions, planning, design,
29 construction, reconstruction, renovation, and equipment related to
30 the development of medical facilities, departmental administrative
31 costs including liabilities incurred prior to April 1, 2000
32 (10M200MC) ... 15,000,000 ......................... (re. $1,248,000)
33 Capital Projects Funds - Other
34 Correctional Facilities Capital Improvement Fund
35 Preservation of Facilities Purpose
36 By chapter 55, section 1, of the laws of 2016:
37 Alterations and improvements, including related departmental adminis-
38 trative costs, for the preservation of facilities including liabil-
39 ities incurred prior to April 1, 2016 (10031603) ...................
40 92,000,000 ....................................... (re. $87,336,000)
41 For preventive maintenance on state facilities including personal
42 services, non-personal services, fringe benefits and the contractual
43 services provided by private firms, including the payment of liabil-
79 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ities incurred prior to April 1, 2016 (10051603) ...................
2 32,000,000 ....................................... (re. $32,000,000)
3 Alterations and improvements, including related departmental adminis-
4 trative costs, for preventative maintenance that will prolong the
5 useful life of assets including liabilities incurred prior to April
6 1, 2016 (10M31603) ... 15,000,000 ................ (re. $14,755,000)
7 By chapter 54, section 1, of the laws of 2013:
8 Alterations and improvements, including related departmental adminis-
9 trative costs, for the preservation of facilities including liabil-
10 ities incurred prior to April 1, 2013 (10031303) ...................
11 186,000,000 ...................................... (re. $84,032,000)
12 Alterations and improvements, including related departmental adminis-
13 trative costs, for preventative maintenance that will prolong the
14 useful life of assets including liabilities incurred prior to April
15 1, 2013 (10M31303) ... 13,000,000 ................. (re. $9,905,000)
16 By chapter 54, section 1, of the laws of 2012:
17 Alterations and improvements, including related departmental adminis-
18 trative costs, for the preservation of facilities including liabil-
19 ities incurred prior to April 1, 2012 (10031203) ...................
20 174,000,000 ...................................... (re. $29,745,000)
21 Alterations and improvements, including related departmental adminis-
22 trative costs, for preventative maintenance that will prolong the
23 useful life of assets including liabilities incurred prior to April
24 1, 2012 (10M31203) ... 15,000,000 ................. (re. $3,610,000)
25 By chapter 54, section 1, of the laws of 2011:
26 Alterations and improvements, including related departmental adminis-
27 trative costs, for the preservation of facilities including liabil-
28 ities incurred prior to April 1, 2011 (10031103) ...................
29 174,000,000 ...................................... (re. $19,590,000)
30 Alterations and improvements, including related departmental adminis-
31 trative costs, for preventative maintenance that will prolong the
32 useful life of assets including liabilities incurred prior to April
33 1, 2011 (10M31103) ... 15,000,000 ................. (re. $1,094,000)
34 By chapter 50, section 1, of the laws of 2010:
35 Alterations and improvements, including related departmental adminis-
36 trative costs, for the preservation of facilities including liabil-
37 ities incurred prior to April 1, 2010 (10031003) ...................
38 174,000,000 ....................................... (re. $6,527,000)
39 Alterations and improvements, including related departmental adminis-
40 trative costs, for preventative maintenance that will prolong the
41 useful life of assets including liabilities incurred prior to April
42 1, 2010 (10M31003) ... 15,000,000 ................... (re. $125,000)
43 By chapter 50, section 1, of the laws of 2009:
44 Alterations and improvements, including related departmental adminis-
45 trative costs, for the preservation of facilities including liabil-
46 ities incurred prior to April 1, 2009 (10030903) ...................
47 165,000,000 ....................................... (re. $2,244,000)
80 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Alterations and improvements, including related departmental adminis-
2 trative costs, for preventative maintenance that will prolong the
3 useful life of assets including liabilities incurred prior to April
4 1, 2009 (10M30903) ... 15,000,000 .................... (re. $37,000)
5 By chapter 50, section 1, of the laws of 2008:
6 Alterations and improvements, including related departmental adminis-
7 trative costs, for the preservation of facilities including liabil-
8 ities incurred prior to April 1, 2008 (10030803) ...................
9 170,000,000 ....................................... (re. $1,199,000)
10 Alterations and improvements, including related departmental adminis-
11 trative costs, for preventative maintenance that will prolong the
12 useful life of assets including liabilities incurred prior to April
13 1, 2008 (10M30803) ... 15,000,000 ................... (re. $114,000)
14 By chapter 50, section 1, of the laws of 2007:
15 Alterations and improvements, including related departmental adminis-
16 trative costs, for the preservation of facilities including liabil-
17 ities incurred prior to April 1, 2007 (10030703) ...................
18 147,000,000 ......................................... (re. $977,000)
19 Alterations and improvements, including related departmental adminis-
20 trative costs, for preventative maintenance that will prolong the
21 useful life of assets including liabilities incurred prior to April
22 1, 2007 (10M30703) ... 15,000,000 .................... (re. $50,000)
23 By chapter 50, section 1, of the laws of 2006:
24 Alterations and improvements, including related departmental adminis-
25 trative costs, for the preservation of facilities including liabil-
26 ities incurred prior to April 1, 2006 (10030603) ...................
27 137,000,000 ....................................... (re. $1,029,000)
28 Alterations and improvements, including related departmental adminis-
29 trative costs, for preventative maintenance that will prolong the
30 useful life of assets including liabilities incurred prior to April
31 1, 2006 (10M30603) ... 15,000,000 .................... (re. $31,000)
32 For services and expenses associated with improvements and rehabili-
33 tation of the department of correctional services employee housing
34 units at locations including but not limited to Great Meadow in
35 Washington County, and the Willard Drug Treatment Campus in Seneca
36 County, pursuant to a plan developed by the commissioner of the
37 department of correctional services and submitted to the chair of
38 the senate finance committee and the chair of the assembly ways and
39 means committee (10EH0603) ... 1,300,000 ............ (re. $349,000)
40 By chapter 50, section 1, of the laws of 2005:
41 Alterations and improvements, including related departmental adminis-
42 trative costs, for the preservation of facilities including liabil-
43 ities incurred prior to April 1, 2005 (10030503) ...................
44 95,000,000 .......................................... (re. $667,000)
45 Alterations and improvements, including related departmental adminis-
46 trative costs, for preventative maintenance that will prolong the
47 useful life of assets including liabilities incurred prior to April
48 1, 2005 (10M30503) ... 15,000,000 ..................... (re. $3,000)
81 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 50, section 1, of the laws of 2004:
2 Alterations and improvements, including related departmental adminis-
3 trative costs, for the preservation of facilities including liabil-
4 ities incurred prior to April 1, 2004 (10030403) ...................
5 95,000,000 .......................................... (re. $301,000)
6 By chapter 50, section 1, of the laws of 2003:
7 Alterations and improvements, including related departmental adminis-
8 trative costs, for the preservation of facilities including liabil-
9 ities incurred prior to April 1, 2003 (10030303) ...................
10 95,000,000 .......................................... (re. $100,000)
11 Capital Projects Funds - Other
12 Correctional Facilities Capital Improvement Fund
13 Program Improvement or Program Change Purpose
14 By chapter 55, section 1, of the laws of 2016:
15 Alterations and improvements, including related departmental adminis-
16 trative costs, for program improvement or program change including
17 liabilities incurred prior to April 1, 2016 (10081608) .............
18 69,000,000 ....................................... (re. $56,203,000)
19 By chapter 54, section 1, of the laws of 2013:
20 Alterations and improvements, including related departmental adminis-
21 trative costs, for program improvement or program change including
22 liabilities incurred prior to April 1, 2013 (10081308) .............
23 46,000,000 ....................................... (re. $32,261,000)
24 By chapter 54, section 1, of the laws of 2012:
25 Alterations and improvements, including related departmental adminis-
26 trative costs, for program improvement or program change including
27 liabilities incurred prior to April 1, 2012 (10081208) .............
28 56,000,000 ........................................ (re. $3,493,000)
29 By chapter 54, section 1, of the laws of 2011:
30 Alterations and improvements, including related departmental adminis-
31 trative costs, for program improvement or program change including
32 liabilities incurred prior to April 1, 2011 (10081108) .............
33 76,000,000 ........................................ (re. $1,617,000)
34 By chapter 50, section 1, of the laws of 2010:
35 Alterations and improvements, including related departmental adminis-
36 trative costs, for program improvement or program change including
37 liabilities incurred prior to April 1, 2010 (10081008) .............
38 76,000,000 ........................................ (re. $4,407,000)
39 By chapter 50, section 1, of the laws of 2009:
40 Alterations and improvements, including related departmental adminis-
41 trative costs, for program improvement or program change including
42 liabilities incurred prior to April 1, 2009 (10080908) .............
43 90,000,000 ........................................ (re. $3,748,000)
82 12554-15-7
DEPARTMENT OF CORRECTIONS AND COMMUNITY SUPERVISION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 50, section 1, of the laws of 2008:
2 Alterations and improvements, including related departmental adminis-
3 trative costs, for program improvement or program change including
4 liabilities incurred prior to April 1, 2008 (10080808) .............
5 85,000,000 .......................................... (re. $863,000)
6 By chapter 50, section 1, of the laws of 2007:
7 Alterations and improvements, including related departmental adminis-
8 trative costs, for program improvement or program change including
9 liabilities incurred prior to April 1, 2007 (10080708) .............
10 87,000,000 .......................................... (re. $143,000)
11 By chapter 50, section 1, of the laws of 2006:
12 Alterations and improvements, including related departmental adminis-
13 trative costs, for program improvement or program change including
14 liabilities incurred prior to April 1, 2006 (10080608) .............
15 44,000,000 .......................................... (re. $164,000)
16 By chapter 50, section 1, of the laws of 2005:
17 Alterations and improvements, including related departmental adminis-
18 trative costs, for program improvement or program change including
19 liabilities incurred prior to April 1, 2005 (10080508) .............
20 40,000,000 ........................................... (re. $15,000)
21 By chapter 50, section 1, of the laws of 2004:
22 Alterations and improvements, including related departmental adminis-
23 trative costs, for program improvement or program change including
24 liabilities incurred prior to April 1, 2004 (10080408) .............
25 40,000,000 ............................................ (re. $4,000)
83 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 79,400,000 4,131,089,000
6 ---------------- ----------------
7 All Funds ........................ 79,400,000 4,131,089,000
8 ================ ================
9 ADMINISTRATION (CCP) ......................................... 5,400,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Preservation of Facilities Purpose
14 For various minor rehabilitation projects to
15 keep facilities in a safe operating condi-
16 tion subject to a plan developed by the
17 education department and approved by the
18 director of the budget (11021703) ............ 3,400,000
19 Capital Projects Funds - Other
20 Capital Projects Fund
21 Program Improvement/Change Purpose
22 For services and expenses related to the
23 development and implementation of data
24 systems for the education department,
25 including but not limited to facilities
26 management, state aid, and special educa-
27 tion providers. Provided however that the
28 use of funds appropriated herein shall be
29 subject to a plan developed by the educa-
30 tion department in consultation with the
31 office of information technology services
32 and approved by the director of the budget ... 2,000,000
33 LIBRARY CONSTRUCTION (CCP) .................................. 24,000,000
34 --------------
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Program Improvement/Change Purpose
38 For total approved project costs pursuant to
39 section 273-a of the education law, for
40 approved projects, excluding feasibility
41 studies, plans or similar activities, for
42 the acquisition of vacant land and the
84 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2017-18
1 acquisition, construction, renovation or
2 rehabilitation, including leasehold
3 improvements, of buildings of public
4 libraries and library systems chartered by
5 the regents of the state of New York or
6 established by an act of the legislature,
7 subject to distribution provisions in
8 subdivision 5 of section 273-a of the
9 education law on and upon approval by the
10 commissioner (11011708) ..................... 14,000,000
11 For additional total approved project costs
12 pursuant to section 273-a of the education
13 law, for approved projects, excluding
14 feasibility studies, plans or similar
15 activities, for the acquisition of vacant
16 land and the acquisition, construction,
17 renovation or rehabilitation, including
18 leasehold improvements, of buildings of
19 public libraries and library systems char-
20 tered by the regents of the state of New
21 York or established by an act of the
22 legislature, subject to distribution
23 provisions in subdivision 5 of section
24 273-a of the education law on and upon
25 approval by the commissioner ................ 10,000,000
26 NON-PUBLIC SCHOOL TECHNOLOGY PROJECTS (CCP) ................. 25,000,000
27 --------------
28 Capital Projects Funds - Other
29 Capital Projects Fund
30 Program Improvement/Change Purpose
31 For payment of the costs of capital projects
32 undertaken by or on behalf of school
33 districts for the acquisition of smart
34 schools classroom technology to be loaned
35 to children attending a nonpublic school
36 located in the school district, except a
37 nonpublic school to which tuition is paid
38 under articles 85 or 89 of the education
39 law, in accordance with the requirements
40 of section 755 of the education law and
41 guidelines developed by the commissioner
42 of education, in connection with the smart
43 schools investment plans first submitted
44 to the education department prior to April
45 15, 2017 and approved by the smart schools
46 review board pursuant to subdivision 16 of
47 section 3641 of the education law.
48 Each school district shall be eligible to
49 receive an allocation from the funds
85 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2017-18
1 appropriated herein equal to the product
2 of the enrollment of all such nonpublic
3 schools in the 2014-15 school year multi-
4 plied by the per pupil amount, provided
5 that the liability of the state and the
6 amount to be distributed or otherwise
7 expended by the state to provide such
8 loans shall be limited to the amount
9 appropriated herein. The per pupil amount
10 shall equal the quotient of (i) the amount
11 budgeted by such school district in its
12 approved smart schools investment plan for
13 servers, wireless access points and other
14 portable connectivity devices to be
15 acquired as part of a school connectivity
16 project, divided by (ii) the total public
17 and nonpublic school enrollment in such
18 school district in the 2014-15 school
19 year.
20 Provided further that no school district
21 shall be eligible to receive an allocation
22 to support the loan of smart schools
23 classroom technology in an aggregate
24 amount greater than $250 multiplied by the
25 nonpublic school enrollment in the 2014-15
26 school year.
27 Notwithstanding paragraph b of subdivision
28 16 of section 3641 of the education law,
29 the commissioner of education shall
30 distribute funds appropriated pursuant to
31 this paragraph upon approval of an appli-
32 cation made by the school district.
33 Requests to the school district for loan
34 of smart schools classroom technology to
35 be acquired with the funds appropriated
36 herein shall be made in accordance with
37 the requirements of subdivision 3 of
38 section 755 of the education law
39 (11NP1708) .................................. 25,000,000
40 SAFETY AND SECURITY PROJECTS FOR AT RISK FACILITIES (CCP) ... 25,000,000
41 --------------
42 Capital Projects Funds - Other
43 Capital Project Fund
44 Program Improvement/Change Purpose
45 For competitive grants to provide safety and
46 security projects at nonpublic schools,
47 community centers and day care facilities
48 at risk of hate crimes or attacks because
49 of their ideology, beliefs or mission.
86 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS 2017-18
1 Provided that an assessment of facilities
2 at risk may include, but not be limited
3 to, considerations of the vulnerabilities
4 of the organization based on its location
5 and membership, and the potential conse-
6 quences of a hate crime or attack at the
7 facility. The amount appropriated herein
8 may be transferred or suballocated to the
9 division of homeland security and emergen-
10 cy services to accomplish the intent of
11 this appropriation (11HS1708) ............... 25,000,000
87 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ADMINISTRATION (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Preservation of Facilities Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For various minor rehabilitation projects to keep facilities in a safe
7 operating condition subject to a plan developed by the education
8 department and approved by the director of the budget (11021603) ...
9 3,400,000 ......................................... (re. $3,370,000)
10 By chapter 54, section 1, of the laws of 2015:
11 For various minor rehabilitation projects to keep facilities in a safe
12 operating condition subject to a plan developed by the education
13 department and approved by the director of the budget (11021503) ...
14 3,400,000 ......................................... (re. $2,311,000)
15 By chapter 54, section 1, of the laws of 2014:
16 For various minor rehabilitation projects to keep facilities in a safe
17 operating condition subject to a plan developed by the education
18 department and approved by the director of the budget (11021403) ...
19 3,400,000 ......................................... (re. $1,846,000)
20 By chapter 54, section 1, of the laws of 2013:
21 For various minor rehabilitation projects to keep facilities in a safe
22 operating condition, including but not limited to fire alarm system
23 and security system upgrades at the School for the Blind at Batavia,
24 subject to a plan developed by the education department and approved
25 by the director of the budget (11021303) ...........................
26 3,400,000 ......................................... (re. $2,538,000)
27 By chapter 54, section 1, of the laws of 2012:
28 For various minor rehabilitation projects to keep facilities in a safe
29 operating condition subject to a plan developed by the education
30 department and approved by the director of the budget (11021203) ...
31 3,400,000 ........................................... (re. $221,000)
32 By chapter 54, section 1, of the laws of 2011:
33 For various minor rehabilitation projects to keep facilities in a safe
34 operating condition subject to a plan developed by the education
35 department and approved by the director of the budget (11021103) ...
36 3,400,000 ........................................... (re. $629,000)
37 By chapter 53, section 1, of the laws of 2010:
38 For various minor rehabilitation projects to keep facilities in a safe
39 operating condition subject to a plan developed by the education
40 department and approved by the director of the budget (11021003) ...
41 6,800,000 ......................................... (re. $1,453,000)
42 By chapter 53, section 1, of the laws of 2009:
88 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For various minor rehabilitation projects to keep facilities in a safe
2 operating condition subject to a plan developed by the education
3 department and approved by the director of the budget (11020903) ...
4 2,000,000 ........................................... (re. $544,000)
5 By chapter 53, section 1, of the laws of 2008:
6 For various minor rehabilitation projects to keep facilities in a safe
7 operating condition subject to a plan developed by the education
8 department and approved by the director of the budget (11090803) ...
9 1,000,000 ........................................... (re. $168,000)
10 By chapter 53, section 1, of the laws of 2007:
11 For various minor rehabilitation projects to keep facilities in a safe
12 operating condition subject to a plan developed by the education
13 department and approved by the director of the budget (11010703) ...
14 4,900,000 ............................................. (re. $3,000)
15 By chapter 53, section 1, of the laws of 2006:
16 For various minor rehabilitation projects to keep facilities in a safe
17 operating condition subject to a plan developed by the education
18 department and approved by the director of the budget (11020603) ...
19 2,400,000 ............................................. (re. $7,000)
20 Capital Projects Funds - Other
21 Capital Projects Fund
22 Program Improvement/Change Purpose
23 By chapter 100, section 2, of the laws of 2010, as amended by chapter
24 54, section 1, of the laws of 2011:
25 For services and expenses related to implementing a state longitudinal
26 data system including but not limited to the development and
27 purchase of computer hardware, software, and related equipment, such
28 amount shall include expenses to be made by the State University of
29 New York and the City University of New York provided that the
30 amount appropriated herein shall be subject to a plan developed by
31 the education department and approved by the director of the budget.
32 Notwithstanding any other provision of law to the contrary and subject
33 to the approval of the director of the budget, a portion of the
34 funds appropriated herein may be transferred to the State University
35 of New York and City University of New York to carry out the
36 purposes of this appropriation (11031008) ..........................
37 20,400,000 ....................................... (re. $11,130,000)
38 CULTURAL EDUCATION CENTER (CCP)
39 Capital Projects Funds - Other
40 Capital Projects Fund
41 Health and Safety Purpose
42 By chapter 53, section 1, of the laws of 2008:
43 For the construction of an alternate emergency exit in the cultural
44 education center (11010801) ... 2,250,000 ............ (re. $65,000)
89 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For fire safety system upgrades, environmental controls, and the reno-
2 vation of restrooms in the cultural education center (11030801) ....
3 2,500,000 ........................................... (re. $647,000)
4 Capital Projects Funds - Other
5 Capital Projects Fund
6 Preservation of Facilities Purpose
7 By chapter 53, section 1, of the laws of 2004, as amended by chapter 62,
8 section 3, of the laws of 2005:
9 For minor rehabilitation projects to keep facilities in a safe operat-
10 ing condition subject to a plan developed by the education depart-
11 ment and approved by the director of the budget (11020403) .........
12 1,000,000 ............................................ (re. $45,000)
13 By chapter 53, section 1, of the laws of 2002, as amended by chapter 55,
14 section 1, of the laws of 2016:
15 For renovation projects to preserve and revamp the collections and
16 exhibits of the state museum, library and archives subject to a plan
17 approved by the director of the budget (11030203) ..................
18 5,000,000 ......................................... (re. $4,490,000)
19 Capital Projects Funds - Other
20 Capital Projects Fund
21 Program Improvement/Change Purpose
22 By chapter 53, section 1, of the laws of 2008:
23 An advance for projects to enhance the public display of the
24 collections and exhibits of the state museum, library and archives,
25 subject to a plan jointly submitted by the board of the cultural
26 education trust and the state education department and approved by
27 the director of the budget (11020808) ..............................
28 15,000,000 ....................................... (re. $13,757,000)
29 For preservation and stewardship of collections in the cultural educa-
30 tion center, including environmental controls, the preservation of
31 records, and the purchase and installment of map and microform cabi-
32 nets, compact shelving, and museum cabinetry (11060808) ............
33 4,325,000 ......................................... (re. $2,076,000)
34 CULTURAL EDUCATION STORAGE FACILITY (CCP)
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 New Facilities Purpose
38 By chapter 53, section 1, of the laws of 2007, as amended by chapter 55,
39 section 1, of the laws of 2016:
40 Cultural education storage facility. For costs of a new storage facil-
41 ity for the collections of the state museum, library and archives,
42 subject to a plan jointly submitted by the board of the cultural
43 education trust and the cultural education department and approved
44 by the division of the budget provided, however, that a portion of
90 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 the funds appropriated herein may be used to conduct a feasibility
2 study and a land review prior to the submission of such plan
3 (11010707) ... 60,000,000 ........................ (re. $60,000,000)
4 EDUCATION BUILDING (CCP)
5 Capital Projects Funds - Other
6 Capital Projects Fund
7 Health and Safety Purpose
8 By chapter 53, section 1, of the laws of 2008:
9 For mechanical system upgrades in the education building addition,
10 including the installation of a system for humidification control
11 and the modification of the ventilation system (11020801) ..........
12 2,000,000 ............................................. (re. $8,000)
13 Capital Projects Funds - Other
14 Capital Projects Fund
15 Preservation of Facilities Purpose
16 By chapter 53, section 1, of the laws of 2006:
17 For partial roof replacement of the education building and education
18 building addition to keep facilities in a safe operating condition
19 subject to a plan developed by the education department and approved
20 by the director of the budget (11030603) ...........................
21 1,700,000 ........................................... (re. $187,000)
22 LIBRARY CONSTRUCTION (CCP)
23 Capital Projects Funds - Other
24 Capital Projects Fund
25 Program Improvement/Change Purpose
26 By chapter 55, section 1, of the laws of 2016:
27 For total approved project costs pursuant to section 273-a of the
28 education law, for approved projects, excluding feasibility studies,
29 plans or similar activities, for the acquisition of vacant land and
30 the acquisition, construction, renovation or rehabilitation, includ-
31 ing leasehold improvements, of buildings of public libraries and
32 library systems chartered by the regents of the state of New York or
33 established by an act of the legislature, subject to distribution
34 provisions in subdivision 5 of section 273-a of the education law on
35 and upon approval by the commissioner (11011608)....................
36 14,000,000 ....................................... (re. $14,000,000)
37 For additional total approved project costs pursuant to section 273-a
38 of the education law, for approved projects, excluding feasibility
39 studies, plans or similar activities, for the acquisition of vacant
40 land and the acquisition, construction, renovation or rehabili-
41 tation, including leasehold improvements, of buildings of public
42 libraries and library systems chartered by the regents of the state
43 of New York or established by an act of the legislature, subject to
44 distribution provisions in subdivision 5 of section 273-a of the
91 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 education law on and upon approval by the commissioner (11021608)
2 ... 5,000,000 ..................................... (re. $5,000,000)
3 By chapter 54, section 1, of the laws of 2015:
4 For total approved project costs pursuant to section 273-a of the
5 education law, for approved projects, excluding feasibility studies,
6 plans or similar activities, for the acquisition of vacant land and
7 the acquisition, construction, renovation or rehabilitation, includ-
8 ing leasehold improvements, of buildings of public libraries and
9 library systems chartered by the regents of the state of New York or
10 established by an act of the legislature, subject to distribution
11 provisions in subdivision 5 of section 273-a of the education law on
12 and upon approval by the commissioner (11011508) ...................
13 14,000,000 ........................................ (re. $1,416,000)
14 By chapter 54, section 1, of the laws of 2014:
15 For total approved project costs pursuant to section 273-a of the
16 education law, for approved projects, excluding feasibility studies,
17 plans or similar activities, for the acquisition of vacant land and
18 the acquisition, construction, renovation or rehabilitation, includ-
19 ing leasehold improvements, of buildings of public libraries and
20 library systems chartered by the regents of the state of New York or
21 established by an act of the legislature, subject to distribution
22 provisions in subdivision 5 of section 273-a of the education law on
23 and upon approval by the commissioner (11011408) ...................
24 14,000,000 .......................................... (re. $797,000)
25 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
26 section 1, of the laws of 2014:
27 For total approved project costs pursuant to section 273-a of the
28 education law, for approved projects, excluding feasibility studies,
29 plans or similar activities, for the acquisition of vacant land and
30 the acquisition, construction, renovation or rehabilitation, includ-
31 ing leasehold improvements, of buildings of public libraries and
32 library systems chartered by the regents of the state of New York or
33 established by an act of the legislature, subject to distribution
34 provisions in subdivision 5 of section 273-a of the education law on
35 and upon approval by the commissioner (11011308) ...................
36 14,000,000 ........................................... (re. $42,000)
37 SCHOOL FOR THE BLIND - BATAVIA (CCP)
38 Capital Projects Funds - Other
39 Capital Projects Fund
40 Health and Safety Purpose
41 By chapter 53, section 1, of the laws of 2009:
42 For various rehabilitation and renovation projects to keep facilities
43 at the School for the Blind in a safe operating condition subject to
44 a plan developed by the education department and approved by the
45 director of the budget (11030901) ... 800,000 ....... (re. $798,000)
92 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 53, section 1, of the laws of 2008:
2 For security and fire alarm system upgrades, physical plant improve-
3 ments to infrastructure around Severne Hall, backflow prevention
4 devices, and roof replacement on Knight Hall and Hamilton Hall
5 (11050801) ... 2,330,000 ............................ (re. $710,000)
6 SCHOOL FOR THE DEAF - ROME (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Health and Safety Purpose
10 By chapter 53, section 1, of the laws of 2008:
11 For dormitory environmental controls and the replacement of paver
12 stones, manhole covers and catch basins (11040801) .................
13 650,000 ............................................. (re. $138,000)
14 Capital Projects Funds - Other
15 Capital Projects Fund
16 Preservation of Facilities Purpose
17 By chapter 53, section 1, of the laws of 2004:
18 For minor rehabilitation projects to keep facilities in a safe operat-
19 ing condition subject to a plan developed by the education depart-
20 ment and approved by the director of the budget (11050403) .........
21 2,500,000 ............................................. (re. $1,000)
22 SCHOOLS FOR NATIVE AMERICAN RESERVATIONS (CCP)
23 Capital Projects Funds - Other
24 Capital Projects Fund
25 Health and Safety Purpose
26 By chapter 53, section 1, of the laws of 2009:
27 For various rehabilitation and renovation projects to keep facilities
28 at the St. Regis Mohawk Elementary School in a safe operating condi-
29 tion subject to a plan developed by the education department and
30 approved by the director of the budget (11020901) ..................
31 4,000,000 ........................................... (re. $101,000)
32 By chapter 53, section 1, of the laws of 2003:
33 For various rehabilitation and renovation projects to keep facilities
34 at the Tuscarora Elementary School in a safe operating condition
35 subject to a plan developed by the education department and approved
36 by the director of the budget (11020301) ...........................
37 500,000 .............................................. (re. $12,000)
38 Capital Projects Funds - Other
39 Capital Projects Fund
40 Preservation of Facilities Purpose
41 By chapter 53, section 1, of the laws of 2004:
93 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For various rehabilitation and renovation projects to keep facilities
2 at the St. Regis Mohawk Elementary School in a safe operating condi-
3 tion subject to a plan developed by the education department and
4 approved by the director of the budget (11040403) ..................
5 4,500,000 ............................................. (re. $2,000)
6 For various rehabilitation and renovation projects to keep facilities
7 at the Tuscarora Elementary School in a safe operating condition
8 subject to a plan developed by the education department and approved
9 by the director of the budget (11030403) ...........................
10 1,300,000 ............................................. (re. $1,000)
11 SMART SCHOOLS BOND ACT (CCP)
12 Capital Projects Funds - Other
13 Smart Schools Bond Fund
14 Bond Proceeds Purpose
15 By chapter 54, section 1, of the laws of 2014:
16 The sum of $2,000,000,000, or so much thereof as may be necessary and
17 available, is hereby appropriated from the smart schools bond fund
18 as established by section 97-oooo of the state finance law in
19 accordance with the provisions of such section, for payment to the
20 capital projects fund in order to reimburse such fund for disburse-
21 ments certified by the state comptroller as bondable under the
22 provisions of the smart schools bond act of 2014.
23 The director of the budget is hereby authorized to designate to the
24 state comptroller specific appropriations made from the capital
25 projects fund for purposes for which smart schools bond fund expend-
26 itures are authorized. The state comptroller shall at the commence-
27 ment of each month certify to the director of the budget, the chair-
28 man of the senate finance committee, and the chairman of the
29 assembly ways and means committee, the amounts disbursed from the
30 appropriations so designated by the director of the budget from the
31 capital projects fund for such purposes for the month preceding such
32 certification and such certifications shall not exceed in the aggre-
33 gate the moneys hereby appropriated. A copy of each such certificate
34 shall also be delivered to departments, agencies and public authori-
35 ties to which such capital projects fund appropriations are made
36 available.
37 Notwithstanding the provisions of any general or special law, no
38 moneys shall be available from the smart schools bond fund until a
39 certificate of approval of availability shall have been issued by
40 the director of the budget, and a copy of such certificate of
41 approval filed with the state comptroller, the chairman of the
42 senate finance committee and the chairman of the assembly ways and
43 means committee. Such certificate may be amended from time to time
44 by the director of the budget, and a copy of each such amendment
45 shall be filed with the state comptroller, the chairman of the
46 senate finance committee and the chairman of the assembly ways and
47 means committee (11SS1410) ... 2,000,000,000 .. (re. $2,000,000,000)
48 SMART SCHOOLS IMPLEMENTATION (CCP)
94 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Capital Projects Funds - Other
2 Capital Projects Fund - Smart Schools (Bondable)
3 Educational Purpose
4 By chapter 54, section 1, of the laws of 2014:
5 For payment of the costs of capital projects undertaken by or on
6 behalf of school districts as part of such school districts' smart
7 schools investment plans as approved by the smart schools review
8 board, pursuant to the smart schools bond act of 2014 and subdivi-
9 sion 16 of section 3641 of the education law, both enacted as legis-
10 lation submitted by the governor pursuant to article VII of the New
11 York constitution, to be reimbursed from bond fund proceeds for
12 acquisition or installation of educational technology equipment or
13 for design, planning, site acquisition, construction, reconstruction
14 or rehabilitation of pre-kindergarten classroom space; instructional
15 space to replace transportable classroom units, or for high-tech
16 school safety and security projects.
17 Costs of such smart schools projects may include but not be limited to
18 interactive whiteboards; computer servers; desktop, laptop and
19 tablet computers; grants for high-speed broadband and wireless
20 internet connectivity for schools and communities within the school
21 district for enhanced educational opportunity; classroom space to
22 accommodate pre-kindergarten programs; instructional space to
23 replace transportable classroom units; and high-tech school safety
24 and security projects. Pursuant to school districts' approved smart
25 schools investment plans, all or a portion of the funds appropriated
26 hereby may be suballocated or transferred to any department, agency,
27 or public authority.
28 No part of this appropriation shall be made available prior to
29 approval of the smart schools bond act of 2014 by the voters at the
30 general election to be held in November of 2014 (11SR14ED) .........
31 2,000,000,000 ................................. (re. $1,997,576,000)
32 SMART SCHOOLS SPECIAL EDUCATION PROJECTS (CCP)
33 Capital Projects Funds - Other
34 Capital Projects Fund
35 Educational Purpose
36 By chapter 54, section 1, of the laws of 2014:
37 For payment of the costs of capital projects undertaken by or on
38 behalf of special act school districts, state-supported schools for
39 the blind and deaf and approved private special education schools,
40 pursuant to investment plans approved by the smart schools review
41 board established by subdivision 16 of section 3641 of the education
42 law, for acquisition or installation of educational technology
43 equipment. Costs of such projects may include but not be limited to
44 interactive whiteboards; computer servers; desktop, laptop and
45 tablet computers; and high-speed broadband and wireless Internet
46 connectivity; design, planning, site acquisition, construction,
47 reconstruction or rehabilitation of instructional space to replace
48 transportable classroom units; and high-tech school safety and secu-
95 12554-15-7
EDUCATION DEPARTMENT
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 rity projects. This appropriation shall be made available to the
2 same extent as funds are authorized and made available pursuant to
3 the smart schools bond act of 2014 (110014ED) ......................
4 5,000,000 ......................................... (re. $5,000,000)
96 12554-15-7
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 15,575,000 22,108,000
6 ---------------- ----------------
7 All Funds ........................ 15,575,000 22,108,000
8 ================ ================
9 WESTERN NEW YORK NUCLEAR SERVICE CENTER PROGRAM (CCP) ....... 15,575,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Western New York Nuclear Service Center Program Purpose
14 For services and expenses required to meet
15 the New York state energy research and
16 development authority obligations for the
17 western New York nuclear service center,
18 including obligations pursuant to the West
19 Valley demonstration project act (Pub. L.
20 96-368) (03WV1706) .......................... 15,575,000
97 12554-15-7
ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 CLEANER, GREENER COMMUNITIES PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Environmental Protection Purpose
5 By chapter 54, section 1, of the laws of 2013:
6 For capital grants for the cleaner, greener communities program
7 (03CG1306) ... 25,000,000 ........................ (re. $22,108,000)
8 WESTERN NEW YORK NUCLEAR SERVICE CENTER PROGRAM (CCP)
9 Capital Projects Funds - Other
10 Capital Projects Fund
11 Western New York Nuclear Service Center Program Purpose
12 By chapter 55, section 1, of the laws of 2016:
13 For services and expenses required to meet the New York state energy
14 research and development authority obligations for the western New
15 York nuclear service center, including obligations pursuant to the
16 West Valley demonstration project act (Pub. L. 96-368) (03WV1606)
17 ... 13,450,000 .................................... (re. $5,461,000)
18 By chapter 54, section 1, of the laws of 2015:
19 For services and expenses required to meet the New York state energy
20 research and development authority obligations for the western New
21 York nuclear service center, including obligations pursuant to the
22 West Valley demonstration project act (Pub. L. 96-368) (03WV1506)
23 ... 12,500,000 ...................................... (re. $650,000)
24 By chapter 54, section 1, of the laws of 2014:
25 For services and expenses required to meet the New York state energy
26 research and development authority obligations for the western New
27 York nuclear service center, including obligations pursuant to the
28 West Valley demonstration project act (Pub. L. 96-368) (03WV1406)
29 ... 12,100,000 .................................... (re. $2,930,000)
98 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 3,244,400,000 2,550,938,000
6 Capital Projects Funds - Federal ... 190,000,000 617,034,000
7 ---------------- ----------------
8 All Funds ........................ 3,434,400,000 3,167,972,000
9 ================ ================
10 ADMINISTRATION (CCP) ........................................... 500,000
11 --------------
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Administration Purposes
15 For alterations, rehabilitation and improve-
16 ments at education camps and centers
17 including personal service, fringe bene-
18 fits and indirect costs (09ED1750) ............. 500,000
19 ENVIRONMENT AND RECREATION (CCP) ........................... 300,000,000
20 --------------
21 Capital Projects Funds - Other
22 Environmental Protection Fund
23 Environment and Recreation Purpose
24 For services and expenses of projects and
25 purposes authorized by section 92-s of the
26 state finance law to receive funding from
27 the solid waste account in accordance with
28 a programmatic and financial plan to be
29 approved by the director of the budget,
30 including suballocation to other state
31 departments and agencies, according to the
32 following:
33 Non-hazardous landfill closure projects,
34 including $300,000 for Essex county under
35 an agreement with the department of envi-
36 ronmental conservation and $150,000 for
37 Hamilton county under an agreement with
38 the department of environmental conserva-
39 tion (09LC17ER) ................................ 700,000
40 Municipal waste reduction or recycling
41 projects, and $2,000,000 of such amount
42 shall be made available for municipalities
43 and not-for-profit food banks for projects
99 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 for food donation and the recycling of
2 food scraps (09MR17ER) ...................... 14,000,000
3 Secondary materials regional marketing
4 assistance (09SM17ER) .......................... 500,000
5 Pesticide program, not less than $200,000 of
6 which shall be for activities related to
7 Long Island pesticide pollution prevention
8 (09PD17ER) ................................... 1,500,000
9 Notwithstanding any law to the contrary, for
10 the payment of the costs associated with
11 environmental justice projects and
12 programs, including but not limited to:
13 monitoring of air quality; education and
14 outreach; no more than $500,000 for the
15 community garden grant program; not more
16 than $1,000,000 for the connect kids
17 program facilitating access by title 1
18 schools to outdoor recreational activ-
19 ities, public lands and parks; improve-
20 ments to environmental quality; or envi-
21 ronmental job training, in environmental
22 justice, inner city and underserved commu-
23 nities, and which are undertaken by the
24 state, or on behalf of the state by muni-
25 cipalities or not-for-profit corporations;
26 and $3,000,000 of such amount shall be
27 made available for community impact and
28 job training grants; including $500,000 of
29 such amount shall be made available to a
30 not-for-profit organization for the
31 purpose of awarding grants on a compet-
32 itive basis to community groups to build
33 the capacity of such groups, provided that
34 up to ten percent may be made available
35 for administrative costs and/or technical
36 assistance. Community impact and job
37 training grants shall be in or affecting
38 environmental justice communities in an
39 amount of up to $100,000 for community
40 groups for projects that address an envi-
41 ronmental justice community's exposure to
42 multiple environmental harms and risks,
43 including lead exposure and shall include
44 implementation, studies, including air
45 monitoring, to investigate the environ-
46 ment, or related public health issues of
47 the community, research that will be used
48 to expand the knowledge or understanding
49 of the affected community and ways to
50 improve the resiliency of the affected
51 community. The results of the investi-
52 gation shall be disseminated to members of
100 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 the affected community. Community groups
2 eligible for funding shall be located in
3 the same area as the environmental and/or
4 related public health issues to be
5 addressed by the project. Such groups
6 shall be primarily focused on addressing
7 the environmental and/or related public
8 health issues of the residents of the
9 affected community and shall be comprised
10 primarily of members of the affected
11 community (09EJ17ER) ......................... 8,000,000
12 Notwithstanding any law to the contrary, for
13 assessment and recovery of any natural
14 resource damages (09RD17ER) .................. 3,235,000
15 Notwithstanding any law to the contrary, for
16 the pollution prevention institute, and
17 including $100,000 for the department to
18 contract with the Northeast waste manage-
19 ment officials' association for the Inter-
20 state Chemicals Clearing house (09PP17ER) .... 4,000,000
21 Environmental health for assessments, test-
22 ing and actions including but not limited
23 to abatement to address suspected human
24 exposure to chemical, physical and micro-
25 biological agents, including contaminants
26 in drinking water; including up to
27 $500,000 for the CleanSweepNY program; and
28 $1,000,000 to the State University of New
29 York at Stony Brook, directly or through
30 its research foundation, to support
31 research development and any associated
32 testing or pilot projects towards the
33 treatment of water to remove 1,4-dioxane;
34 and $500,000 to land banks to assist with
35 lead abatement; and $2,000,000 for chil-
36 dren's environmental health centers,
37 including school and community childhood
38 lead exposure assessment conducted by such
39 centers and not more than $625,000 for
40 programs to expand and improve access to
41 local, fresh, nutritional food to nutri-
42 tionally underserved neighborhoods in New
43 York State through the Fresh Connect
44 Program (09EH17ER) ........................... 6,500,000
45 Brownfield opportunity area grants as
46 authorized pursuant to section 970-r of
47 the general municipal law (09BO17ER) ......... 2,000,000
48 For services and expenses of projects and
49 purposes authorized by section 92-s of the
50 state finance law to receive funding from
51 the parks, recreation and historic preser-
52 vation account in accordance with a
101 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 programmatic and financial plan to be
2 approved by the director of the budget,
3 including suballocation to other state
4 departments and agencies, according to the
5 following:
6 Local waterfront revitalization programs,
7 notwithstanding any law to the contrary,
8 not less than, $10,000,000 for waterfront
9 revitalization projects which are in or
10 primarily serve areas where demographic
11 and other relevant data for such areas
12 demonstrate that the areas are densely
13 populated and have sustained physical
14 deterioration, decay, neglect, or disin-
15 vestment, or where a substantial propor-
16 tion of the residential population is of
17 low income or is otherwise disadvantaged
18 and is underserved with respect to the
19 existing recreational opportunities in the
20 area including up to $2,000,000 for
21 updates to existing local waterfront revi-
22 talization program plans to mitigate
23 future physical climate risks; and includ-
24 ing $660,000 for Adirondack infrastructure
25 and environmental improvements for the
26 towns of Minerva, Indian Lake and Newcomb
27 and $200,000 for the Niagara River green-
28 way commission (09WR17ER) ................... 16,000,000
29 Parks, recreation and historic preservation
30 projects, notwithstanding any law to the
31 contrary, not less than, $10,000,000 for
32 municipal parks projects which are in or
33 primarily serve areas where demographic
34 and other relevant data for such areas
35 demonstrate that the areas are densely
36 populated and have sustained physical
37 deterioration, decay, neglect or disin-
38 vestment or where a substantial proportion
39 of the residential population is of low
40 income or is otherwise disadvantaged and
41 is underserved with respect to the exist-
42 ing recreational opportunities in the
43 area; and including $250,000 for Tivoli
44 Park, $1,000,000 for the Ulster County
45 rail trail pursuant to initiation of a
46 public planning process; and $1,000,000 to
47 the city of New York for the East River
48 Esplanade 107th Street Pier (09MP17ER) ...... 20,000,000
49 Notwithstanding any law to the contrary, for
50 state parks and land and easement infras-
51 tructure, access and stewardship projects
52 which shall include capital projects: (i)
102 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 on state parks and state lands pursuant to
2 sections 54-0303 and 56-0307 of the envi-
3 ronmental conservation law; (ii) on state
4 parks or state owned lands and easements
5 under the jurisdiction of the department
6 of environmental conservation or the
7 office of parks, recreation and historic
8 preservation for access opportunities for
9 people with disabilities; access to the
10 State Forest Preserve, State reforesta-
11 tion, Wildlife Management areas and
12 conservation easement lands; recreational
13 trail construction and maintenance; Cats-
14 kill and Adirondack camp ground improve-
15 ments to public access and sanitation
16 facilities; environmental education;
17 facility improvements; archeological,
18 historic, cultural and natural resource
19 surveys, forest health surveys, interpre-
20 tation, and inventories, and response to
21 forest pests including southern pine
22 beetle; Forest Preserve and state forest
23 unit management planning; invasive species
24 management; conservation easement public
25 recreation planning; habitat restoration
26 and enhancement; state fish hatchery
27 improvements; state tree nursery improve-
28 ments; water access facilities and safety
29 improvements; public beach facility devel-
30 opment and improvement; public access
31 improvements at day use areas; state
32 historic site exterior restoration; and
33 cabin area and camping facility develop-
34 ment, restoration and reconstruction;
35 (iii) $1,000,000 for Belleayre Mountain
36 ski center projects; (iv) $500,000 from
37 the public access and stewardship allo-
38 cation to Parks & Trails New York for the
39 purpose of awarding grants on a compet-
40 itive basis to local parks and department
41 of environmental conservation friends
42 groups, provided that up to ten percent of
43 such amount may be made available for
44 administrative costs and/or technical
45 assistance; and $250,000 for the Hudson
46 River Valley Trail Grants (09ST17ER) ........ 30,000,000
47 Notwithstanding subdivision 7 of section
48 92-s of the state finance law or any other
49 law to the contrary, for services and
50 expenses of the Hudson River Park Trust
51 for projects related to the development of
52 the Hudson River Park consistent with
103 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 provisions of chapter 592 of the laws of
2 1998, including but not limited to utility
3 infrastructure improvements; provided,
4 however, such funds shall not be available
5 for suballocation to any public benefit
6 corporation or public authority with the
7 exception of the Hudson River Park Trust
8 and shall be available solely for the
9 liabilities incurred by the Hudson River
10 Park Trust or by other state departments
11 or agencies on behalf of the Hudson River
12 Park Trust on or after April 1, 1999.
13 Provided further that, the comptroller is
14 hereby authorized and directed to release
15 monies to the Hudson River Park Trust in
16 amounts set forth in a schedule approved
17 by the director of the budget (09HR17ER)...... 3,200,000
18 Notwithstanding any law to the contrary, for
19 zoos, botanical gardens and aquaria
20 program (09ZB17ER) .......................... 15,000,000
21 Notwithstanding any other provisions of law,
22 for the administration of the programs of
23 section 79-b of the navigation law
24 (09NV17ER) ................................... 2,000,000
25 For services and expenses of projects and
26 purposes authorized by section 92-s of the
27 state finance law to receive funding from
28 the open space account in accordance with
29 a programmatic and financial plan to be
30 approved by the director of the budget,
31 including suballocation to other state
32 departments and agencies, according to the
33 following:
34 Costs related to the acquisition of the
35 following properties: Atlantic Coast, Long
36 Island Sound, Long Island South Shore
37 Estuary Reserve, Peconic Pinelands Mari-
38 time Reserve Projects, Central Pine
39 Barrens, Western Suffolk/Nassau Special
40 Groundwater Protection Areas, Mott Haven-
41 Port Morris Waterfront, Bronx River Green-
42 way, Inner City/Underserved Community
43 Parks, Long Pond, Staten Island Greenbelt,
44 Staten Island Bluebelt, Staten Island Wet
45 Woods, Great Swamp, Plutarch/Black Creek
46 Wetlands Complex, New York Highlands,
47 Shawangunk Mountains Region, Delaware
48 River Highlands, Hudson River
49 Corridor/Hudson River Estuary and Greenway
50 Trail/ Hudson River School Art Trail,
51 Hudson Valley/New York City Foodshed,
52 Catskill Unfragmented Forest, Catskill
104 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 River and Road Corridors, New York City
2 Watershed Lands, Taconic Ridge/Harlem
3 Valley, Albany Pine Bush, Five Rivers
4 Environmental Education Center, Lake
5 George watershed, Lake Champlain
6 watershed, Boeselager forestry, Rensselaer
7 Plateau, Oomsdale Farm and Surrounding
8 Landscape, Turtle Conservation Sites,
9 Region 4 Rail Trail Projects, Susquehanna
10 River Valley Corridor, Saratoga County,
11 Hudson River Projects, Follensby Park,
12 Washington County, Rome Sand Plains, Black
13 Creek Watershed, Tug Hill Core Forests and
14 Headwater Streams, Nelson Swamp, State
15 Park Battlefields, Genny Green Trail/Link
16 Trail, Onondaga Escarpment, State Parks
17 Greenbelt/Tompkins County, Cattaraugus
18 Creek and tributaries, Northern Montezuma
19 Wetlands, Genesee River Corridor, Seneca
20 Army Depot Conservation Area, Lake Erie
21 Tributary Gorges, Buffalo River Watershed,
22 Catharine Valley Complex, High-Tor/Bristol
23 Hills/Bare Hill State Unique Area, Lake
24 Ontario and Lake Erie Shorelines, Islands
25 and Niagara River, Long Island Trails and
26 Greenways, Bronx Harlem Greenway, Harbor
27 Herons Wildlife Complex, Schunnemunk
28 Mountain/Moodna Creek/Woodcock
29 Mountain/Hudson Highlands Connectivity
30 Project, Helderbergs, and Finger Lakes
31 Shorelines and Riparian Zones, Hand Hollow
32 Conservation Area, Northern Flow River
33 Corridors, Black River Valley Corridor,
34 Fort Drum Army Compatible Use Buffer
35 Project, Herkimer Home Viewshed, Inman
36 Gulf, Massawepie Mire, Moose River Corri-
37 dor, St. Lawrence River Islands, Shoreline
38 and Wetlands, Southern Skaneateles Lake
39 Forest and Shoreline, Salmon River Corri-
40 dor, Emerald Necklace, Riparian Buffers,
41 Coastline and Wetland Protection Projects
42 Aimed at Reducing the Impacts of Storms,
43 Storm Surges and Flooding on Human and
44 Natural Communities, Long Distance Trail
45 Corridors, Statewide Small Projects, State
46 Forest, Unique Area Wildlife Management
47 Area Protection, Working Forest Lands,
48 State Park and State Historic Site
49 Protection, (a) notwithstanding any law to
50 the contrary, $1,000,000 from the land
51 acquisition allocation for urban forestry
52 projects provided that no less than
105 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 $500,000 shall be made available for such
2 programs in cities and towns with popu-
3 lations of 65,000 or more; (b) notwith-
4 standing any law to the contrary,
5 $2,500,000 from the land acquisition allo-
6 cation to the land trust alliance for the
7 purpose of awarding grants on a compet-
8 itive basis to local land trusts, provided
9 that up to ten percent of such amount may
10 be made available for administrative costs
11 and/or technical assistance; (c) notwith-
12 standing any law to the contrary, not less
13 than $3,000,000 for land acquisition in
14 department of environmental conservation
15 regions 1, 2 and 3 (09LA17ER) ............... 36,349,000
16 Albany Pine Bush Preserve Commission, with
17 $50,000 to the city of Schenectady for the
18 Woodlawn Preserve (09AP17ER) ................. 2,675,000
19 Long Island Central Pine Barrens Planning
20 (09LP17ER) ................................... 2,000,000
21 Notwithstanding any law to the contrary, for
22 service and expenses of the following
23 commissions: $259,000 for Susquehanna
24 river basin commission; $359,500 for the
25 Delaware river basin commission; $13,900
26 for the Ohio river basin commission;
27 $41,600 for the Interstate environmental
28 commission; and $38,000 for the New
29 England Interstate commission (09EC17ER) ....... 712,000
30 Long Island South Shore Estuary Reserve
31 (09SE17ER) ..................................... 900,000
32 Agricultural non-point source abatement and
33 control projects, notwithstanding any law
34 to the contrary, (a) $1,000,000 shall be
35 made available for services and expenses
36 of the Cornell University Integrated Pest
37 Management program; and (b) $500,000 shall
38 be made available to the Cornell Cooper-
39 ative Extension of Suffolk County for
40 nutrient management planning and implemen-
41 tation activities (09AN17ER) ................ 17,000,000
42 Non-agricultural non-point source abatement
43 and control projects notwithstanding any
44 law to the contrary, $550,000 of such
45 amount shall be made available for Cornell
46 community integrated pest management
47 (09NP17ER) ................................... 7,000,000
48 Agriculture and farmland protection activ-
49 ities, notwithstanding any law to the
50 contrary, up to $1,000,000 shall be made
51 available to the tug hill tomorrow land
52 trust for army compatible use buffer
106 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 program projects around Fort Drum, and up
2 to $87,000 shall be made available to
3 Cornell University for services and
4 expenses of land classification, agricul-
5 ture district mapping and master list of
6 soils (09FP17ER) ............................ 20,000,000
7 Biodiversity stewardship and research;
8 including funding for public New York
9 universities to conduct field studies and
10 research on bidiversity issues and up to
11 $500,000 of this amount to support polli-
12 nator diversity, up to $300,000 of which
13 may be allocated to Cornell University,
14 including research related to the poten-
15 tial adverse impacts of pesticides such as
16 neonicitinoids, pursuant to a contract
17 with the department of agriculture and
18 markets, including the development of bee
19 husbandry best management practices such
20 as pest and pathogen controls; creating
21 diversity of pollinator habitats; research
22 to understand, prevent and recover from
23 pollinator losses; and outreach and educa-
24 tion (09BD17ER) .............................. 1,000,000
25 Notwithstanding any law to the contrary, for
26 the Hudson River Estuary Management Plan
27 prepared pursuant to section 11-0306 of
28 the environmental conservation law,
29 $1,000,000 of which shall be for the
30 Mohawk river action plan (09HE17ER) .......... 5,500,000
31 Notwithstanding any law to the contrary, for
32 the Finger Lakes-Lake Ontario Watershed
33 Protection Alliance (09FL17ER) ............... 2,279,000
34 Notwithstanding any law to the contrary, to
35 the Erie County Soil and Water Conserva-
36 tion District for the Lake Erie Watershed
37 Protection Alliance (09LE17ER) ................. 250,000
38 Notwithstanding any law to the contrary, for
39 the state share of costs of wastewater
40 treatment improvement projects undertaken
41 by municipalities to upgrade municipal
42 systems to meet stormwater, combined sewer
43 overflow, sanitary sewer overflow and
44 wastewater treatment discharge require-
45 ments with priority given to systems that
46 are in violation of title 8 of article 17
47 of the environmental conservation law and
48 aquatic habitat restoration projects
49 undertaken by municipalities and not-for-
50 profit corporations for aquatic habitat
51 restoration projects as defined in subdi-
52 vision 1 of section 56-0101 of the envi-
107 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 ronmental conservation law; including up
2 to $3,000,000 to Suffolk county to provide
3 a 50 percent match for a program developed
4 in consultation with the department for
5 research, development and pilot projects
6 to develop cost effective methods to
7 address nitrogen and pathogen loading from
8 septic system or cesspool effluent or
9 other sources or to support such efforts
10 without a match at the state university of
11 Stony Brook directly or through its
12 research foundation and $1,500,000 for
13 Suffolk county for sewer improvement
14 projects; and including $5,000,000 for
15 Nassau county for the Bay park wastewater
16 treatment plant outfall pipe, associated
17 conveyance systems, nitrogen abatement
18 treatment works, ocean outfall and/or
19 connections, including up to $400,000 from
20 such amount for testing of monitoring
21 wells in Nassau County and including
22 $250,000 from such amount to the Long
23 Island regional planning council for
24 services and expenses related to the Long
25 Island Nitrogen Action Plan; and including
26 $1,000,000 to maximize the availability of
27 drug collection programs for communities
28 throughout the state, including for the
29 purchase and distribution of tamper proof
30 drug collection boxes, and other federally
31 approved drug collection programs provided
32 that participating in the department of
33 environmental conservation's self-audit
34 program shall not be required; and includ-
35 ing $5,000,000 to update source water
36 assessment plans and develop associated
37 water protection programs some or all of
38 which may be allocated to the United
39 States Geological Survey or the New
40 England Interstate Water Pollution Control
41 Commission; and including up to $500,000
42 for the removal and appropriate disposal
43 of firefighting foam containing regulated
44 perfluoronated compounds from municipal
45 fire and emergency response departments;
46 and $1,000,000 for activities related to
47 the cleanup of Scajaquada Creek (09WQ17ER)
48 ............................................. 20,250,000
49 Notwithstanding any law to the contrary for
50 New York ocean and Great Lakes ecosystem
51 conservation projects, consistent with the
52 policy articulated in article 14 of the
108 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 environmental conservation law; including
2 $200,000 to Suffolk county for the Peconic
3 Bay Estuary Program and including $60,000
4 for the Great Lakes commission; and
5 including $250,000 for the Long Island
6 Commission for aquifer protection
7 (09GL17ER) .................................. 15,000,000
8 Notwithstanding any law to the contrary, for
9 the implementation of the recommendations
10 of the invasive species task force
11 prepared pursuant to chapter 324 of the
12 laws of 2003 and for the purposes set
13 forth in chapter 674 of the laws of 2007
14 including not less than $450,000 for Lake
15 George, provided that not less than
16 $6,050,000 be made available for invasive
17 species eradication, including but not
18 limited to southern pine beetle, including
19 up to $500,000 to Cornell University for
20 the control of hemlock wooly adelgid and
21 including grants related to the control
22 and management of invasive species. Such
23 funding for grants shall be provided on a
24 competitive basis in consultation with the
25 New York Invasive Species Council
26 (09IS17ER) .................................. 13,000,000
27 Notwithstanding any law to the contrary, for
28 Soil and Water Conservation District
29 activities as authorized for reimbursement
30 and funding in section 11-a of the soil
31 and water conservation districts law
32 (09SW17ER) ................................... 9,000,000
33 Notwithstanding any law to the contrary, for
34 Agricultural Waste Management projects,
35 including up to $700,000 to Cornell
36 University, in consultation with the
37 department, to continue implementing the
38 dairy acceleration program (09AW17ER) ........ 1,500,000
39 For services and expenses of projects and
40 purposes authorized by section 92-s of the
41 state finance law to receive funding from
42 the climate change mitigation and adapta-
43 tion account in accordance with a program-
44 matic and financial plan to be approved by
45 the director of the budget, including
46 suballocation to other state departments
47 and agencies, according to the following:
48 Notwithstanding any law to the contrary, to
49 address greenhouse gas emissions outside
50 of the power sector including but not
51 limited to the development of statewide
52 greenhouse gas inventories, demonstration
109 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 projects, community engagement and applied
2 research related to the transportation
3 sector or methane and other short-lived
4 climate pollutant sources (09GG17ER) ......... 1,700,000
5 Notwithstanding any law to the contrary, for
6 the department of environmental conserva-
7 tion to fund climate adaptation projects
8 and to provide up to $750,000 to support
9 municipalities incorporation of guidance
10 developed under the community risk and
11 resiliency act into their local planning
12 and ordinances (09SV17ER) ...................... 750,000
13 Notwithstanding any law to the contrary,
14 smart growth program state assistance
15 payments, provided on a competitive basis,
16 to counties, cities, towns, or villages to
17 establish, update or implement comprehen-
18 sive plans in a manner consistent with
19 smart growth; provided, however, that up
20 to 25 percent of such payments may be
21 awarded to not-for-profit organizations
22 for such purposes (09SG17ER) ................. 2,000,000
23 Notwithstanding any law to the contrary for
24 the New York state soil and water conser-
25 vation committee in conjunction with the
26 department of agriculture and markets to
27 develop a pilot climate resilient farms
28 program consistent with agriculture and
29 markets law article 11-a, agricultural
30 environmental management program including
31 up to $400,000 for the Cornell Soil Health
32 Program for research and education to
33 improve soil resiliency to climate vari-
34 ations and mitigate greenhouse gas emis-
35 sions by carbon sequestration; and up to
36 $50,000 in consultation with the depart-
37 ment of taxation and finance, the depart-
38 ment of agriculture and markets and the
39 empire state development corporation, for
40 the study of incentives for carbon seques-
41 tering farming practices which may include
42 tax credits and grants and systems or
43 methods of quantifying carbon sequestra-
44 tion for such incentives (09CR17ER) .......... 2,500,000
45 Climate smart communities projects pursuant
46 to title 15 of article 54 of the environ-
47 mental conservation law including clean
48 vehicle projects; notwithstanding any law
49 to the contrary, including $500,000 for a
50 resiliency planting program; and including
51 $500,000 to implement easily replicated
52 renewable energy projects, including solar
110 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 arrays, heat pumps, and wind turbines
2 across the state in public low income
3 housing in suburban, urban, and rural
4 areas with the goal of advancing employ-
5 ment opportunities for individuals living
6 in environmental justice communities and
7 individuals who have been discharged from
8 state correctional facilities or local
9 jails (09CS17ER) ............................ 12,000,000
10 FACILITIES MAINTENANCE AND OPERATIONS (CCP) .................. 6,000,000
11 --------------
12 Capital Projects Funds - Other
13 Capital Projects Fund
14 Maintenance and Operations Purpose
15 For the maintenance and operation of various
16 facilities and systems including personal
17 services, fringe benefits and indirect
18 costs (09FM17MO) ............................. 6,000,000
19 FISH AND WILDLIFE (CCP) ...................................... 1,500,000
20 --------------
21 Capital Projects Funds - Other
22 Miscellaneous Capital Projects Fund
23 Habitat Conservation and Access Account
24 Fish and Wildlife Purpose
25 For services and expenses, including
26 personal service, non-personal service,
27 fringe benefits and indirect costs related
28 to management, protection and restoration
29 fish and wildlife habitat, and improvement
30 and development of public access for fish
31 and wildlife related recreation (09HC1754) ... 1,500,000
32 LANDS AND FORESTS (CCP) ..................................... 15,000,000
33 --------------
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Lands and Forests Purpose
37 For services and expenses, including
38 personal service, non-personal service,
39 indirect costs and fringe benefits related
40 to the stewardship of newly acquired and
41 existing state lands, for the implementa-
42 tion of Unit Management Plans, costs
43 related to invasive species management
111 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 activities and for the development and
2 implementation of Green Certification for
3 state forests, including suballocation to
4 other state departments and agencies
5 (09LF1753) ................................... 4,000,000
6 For the purchase and replacement of equip-
7 ment and facility improvements, including
8 air monitoring, maintenance of facilities
9 and emergency response in support of
10 public safety, including personal
11 services, fringe benefits and indirect
12 costs (09PS1753) ............................. 1,000,000
13 Capital Projects Funds - Federal
14 Federal Capital Projects Fund
15 Lands and Forests Purpose
16 For the federal share of capital projects
17 pursuant to lands and forests resources
18 purposes including the costs associated
19 with the acquisition of lands under the
20 forest legacy program, including suballo-
21 cation to other state departments and
22 agencies (09FL1753) ......................... 10,000,000
23 MARINE RESOURCES (CCP) ....................................... 5,000,000
24 --------------
25 Capital Projects Funds - Federal
26 Federal Capital Projects Fund
27 Marine Projects Purpose
28 For the federal share of capital projects
29 undertaken pursuant to fish and wildlife
30 and marine resources purposes including
31 the acquisition of property including
32 suballocation to other state departments
33 and agencies (09MR17A1) ...................... 5,000,000
34 NEW YORK WORKS (CCP) ........................................ 70,000,000
35 --------------
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Operational Services Purpose
39 For services, expenses, and indirect costs
40 related to New York Works projects includ-
41 ing but not limited to air monitoring
42 infrastructure investments; remediation of
43 legacy environmental contamination;
44 investments in information technology; dam
112 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 safety projects and the demolition of
2 unsafe structures on state-owned land;
3 state-owned flood protection projects;
4 shore protection projects; state land
5 stewardship, public access and environ-
6 mental and recreation infrastructure
7 projects including, notwithstanding any
8 law to the contrary, projects on lands
9 being sought pursuant to state land acqui-
10 sition policy under article 49 of the
11 environmental conservation law, for which
12 the state provided a letter of intent to
13 the town of North Hudson and Essex county
14 to acquire a conservation easement or
15 other interest and for which the fee owner
16 of any such property authorizes such
17 project; vehicles and equipment; water
18 quality improvement projects, fish hatch-
19 eries; rehabilitation and improvements of
20 various department facilities and systems;
21 and well plugging; including personal
22 service, non-personal service and fringe
23 benefits, including suballocation to other
24 state departments and agencies (09NY1751) ... 70,000,000
25 OPERATIONS (CCP) ............................................ 22,000,000
26 --------------
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Operational Services Purpose
30 For rehabilitation and improvements of vari-
31 ous department facilities and systems
32 including personal service and fringe
33 benefits and indirect costs in accordance
34 with a programmatic and financial plan to
35 be approved by the director of the budget
36 including suballocation to other state
37 departments and agencies (09RI1751) ..........15,000,000
38 For replacement of vehicles and heavy duty
39 construction equipment (09EQ1751) ............ 1,000,000
40 For services and expenses, including
41 personal service and fringe benefits,
42 necessary for projects and purposes
43 required by Executive Order 88, including
44 design, construction, operation and main-
45 tenance of all new buildings, and the
46 development and purchase of energy effi-
47 cient equipment; for remedial activities
48 at state-owned facilities, including the
113 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 compliance with state and federal laws and
2 regulations (09SF1751) ....................... 1,000,000
3 Capital Projects Funds - Other
4 Miscellaneous Capital Projects Fund
5 Operational Services Purpose
6 For services and expenses of the department
7 to complete or remediate a department-re-
8 gulated project using the proceeds speci-
9 fied in the project's required financial
10 security arrangement when the terms of
11 that arrangement must be implemented.
12 Notwithstanding any other provision of law
13 or terms of any financial security instru-
14 ment, any residuals may be available for
15 department capital projects (09431751) ....... 5,000,000
16 RECREATION (CCP) ............................................... 500,000
17 --------------
18 Capital Projects Funds - Other
19 Capital Projects Fund
20 Recreation Purpose
21 For campground modernization and recon-
22 struction including personal services,
23 fringe benefits and indirect costs
24 (09CM1752) ..................................... 500,000
25 SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP) ................. 122,000,000
26 --------------
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Hazardous Waste Purpose
30 For payment by the state, as reimbursement
31 or as an advance from responsible parties
32 or volunteers for remedial and monitoring
33 work at sites contaminated with hazardous
34 waste. No portion of this appropriation
35 shall be available for expenditure until a
36 party or parties either responsible for a
37 site or volunteering to cleanup a site
38 have entered into an agreement with the
39 commissioner of the department of environ-
40 mental conservation or the commissioner's
41 designee, and which agreement is approved
42 by the director of the budget, providing
43 for repayment to the state of an amount
44 equal to the amount disbursed from this
114 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 appropriation. A copy of such agreement
2 shall be filed with the state comptroller,
3 the chairman of the senate finance commit-
4 tee and chairman of the assembly ways and
5 means committee.
6 Notwithstanding any other provision of law
7 to the contrary, the comptroller is
8 authorized to repay settlements or
9 advances for specified remedial and moni-
10 toring projects from this fund with monies
11 of the hazardous waste remedial fund
12 received for such projects pursuant to
13 consent orders and agreements to address
14 sites contaminated with hazardous waste.
15 The director of the budget shall certify to
16 the comptroller the specific portions of
17 this appropriation for which monies have
18 been received pursuant to such consent
19 orders and agreements (09AD17F7) ............ 16,000,000
20 Capital Projects Funds - Other
21 Hazardous Waste Remedial Fund
22 Hazardous Waste Cleanup Account
23 Hazardous Waste Purpose
24 For payment of the state share of the costs
25 of hazardous waste site remediation
26 projects, in accordance with title 13 of
27 article 27 of the environmental conserva-
28 tion law and section 97-b of the state
29 finance law, for projects, and for payment
30 of state costs associated with the remedi-
31 ation of offsite contamination at signif-
32 icant threat sites as provided for in
33 section 27-1411 of the environmental
34 conservation law, including personal
35 service and fringe benefits of the depart-
36 ments of environmental conservation,
37 health and law and including suballo-
38 cations to the departments of health and
39 law and including costs incidental and
40 appurtenant thereto, provided that a
41 portion of such amount may be available
42 for environmental restoration projects in
43 accordance with title 5 of article 56 of
44 the environmental conservation law. None
45 of this appropriation may be expended for
46 any purposes authorized in title 12 of
47 article 27 of the environmental conserva-
48 tion law (09HB17F7) ........................ 100,000,000
49 Capital Projects Funds - Other
115 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 Hazardous Waste Remedial Fund
2 Hazardous Waste Remediation Oversight and Assistance
3 Account
4 Hazardous Waste Purpose
5 For the personal services and fringe bene-
6 fits of the department of environmental
7 conservation including suballocation to
8 the department of health related to the
9 brownfield cleanup program pursuant to
10 title 14 of article 27 of the environ-
11 mental conservation law and the voluntary
12 cleanup program including costs incurred
13 prior to April 1, 2016 (09BC17F7) .............6,000,000
14 SOLID WASTE MANAGEMENT (CCP) ................................ 21,700,000
15 --------------
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Solid Waste Purpose
19 For pre-closure and post-closure costs asso-
20 ciated with Adirondack landfills pursuant
21 to agreements with Essex county (09EX1756) ..... 500,000
22 Capital Projects Funds - Other
23 Miscellaneous Capital Projects Fund
24 New York Environmental Protection and Spill Remediation
25 Account
26 Solid Waste Management Purposes
27 For services and capital expenses associated
28 with costs incurred under Article 12 of
29 the Navigation Law, and for cleanup,
30 investigation, and removal of petroleum
31 spills, including prior year liabilities
32 (09OS1756) .................................. 21,200,000
33 WATER RESOURCES (CCP) .................................... 2,870,200,000
34 --------------
35 Capital Projects Funds - Other
36 Capital Projects Fund
37 Flood Control Purpose
38 For various new and existing flood
39 protection projects including the state
40 share of federal sponsored flood control
41 projects, and the maintenance of existing
42 flood control projects; for coastal
43 erosion hazard area mapping of the state's
116 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 Atlantic Ocean and Great Lakes coastlines
2 and the state share of costs associated
3 with matching federal funds for a state-
4 wide flood plain map modernization
5 program; for the state share of costs
6 associated with the installation and/or
7 reinstallation, upgrade, monitoring and
8 maintenance of a statewide network of
9 stream flow gauges, including personal
10 service, non-personal service, fringe
11 benefits and indirect costs, including
12 suballocation to other state departments
13 and agencies (09FL1763) ...................... 2,000,000
14 For an advance payment by the state for the
15 local costs of various shore protection
16 projects. No portion of this appropriation
17 shall be available until the respective
18 municipality has entered into an agreement
19 with the commissioner of the department of
20 environmental conservation, and such
21 agreement is approved by the director of
22 the budget (09AD1763) ........................ 3,000,000
23 Capital Projects Funds - Other
24 Capital Projects Fund
25 Water Resources Purpose
26 An advance for costs incurred relating to
27 work required for the safety of dams and
28 other structures impounding water, to be
29 reimbursed in accordance with section
30 15-0507 of the environmental conservation
31 law (09DA1757) ................................. 500,000
32 For payment of a portion of the state's
33 match for federal capitalization grants
34 for the water pollution control revolving
35 fund (09RF1757) ............................. 35,000,000
36 For the state's share of shore protection or
37 costal erosion projects, including the
38 Army Corp of Engineers South Shore of
39 Staten Island Project (09SI1757) ........... 151,000,000
40 For services and expenses including personal
41 service, fringe benefits, and nonpersonal
42 service for the water pollution control
43 revolving fund and related water quality
44 activities including suballocation to
45 other state departments and agencies
46 (09SR1757) ................................... 3,500,000
47 For services and expenses including personal
48 service, fringe benefits, and nonpersonal
49 service for the Excelsior Conservation
50 Corps program including suballocation to
117 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 other state departments and agencies
2 (09CC1757) ..................................... 200,000
3 The sum of $2,500,000,000 is hereby appro-
4 priated for the capital costs of clean
5 water infrastructure projects, including
6 services, expenses, and indirect costs, as
7 follows: not less than $1,000,000,000 to
8 the environmental facilities corporation
9 for projects authorized by the New York
10 state water infrastructure improvement act
11 of 2017; not less than $150,000,000 to the
12 environmental facilities corporation for
13 New York state intermunicipal water
14 infrastructure projects pursuant to
15 section 1285-s of the public authorities
16 law; not less than $245,000,000 for water
17 quality improvement projects, including
18 nonagricultural nonpoint source abatement
19 and control projects, municipal wastewater
20 treatment projects, and municipal separate
21 storm sewer system projects, and including
22 up to $25,000,000 of such amount for
23 projects for the proper management of road
24 salt; up to $50,000,000 for green infras-
25 tructure projects; $110,000,000 for land
26 acquisition projects for source water
27 protection pursuant to title 33 of article
28 15 of the environmental conservation law,
29 including suballocation to the department
30 of agriculture and markets; up to
31 $50,000,000 for suballocation to the
32 department of agriculture and markets for
33 state assistance payments, services, and
34 expenses to soil and water conservation
35 districts for the cost of water quality
36 protection projects awarded on a compet-
37 itive basis prioritizing financial need
38 and hardship, intended to assist concen-
39 trated animal feeding operations; up to
40 $130,000,000 for transfer to the hazardous
41 waste remedial fund for the remediation of
42 sites; not less than $20,000,000 for
43 suballocation to the department of health
44 for replacement of lead drinking water
45 service lines pursuant to section 1114 of
46 the public health law; $200,000,000 for
47 New York City for water quality projects
48 located within the New York City
49 watershed; not less than $75,000,000 to
50 the environmental facilities corporation
51 for a program to upgrade or replace septic
52 systems and cesspools pursuant to section
118 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS 2017-18
1 1285-u of the public authorities law; up
2 to $10,000,000 to the environmental facil-
3 ities corporation for water infrastructure
4 emergency assistance pursuant to section
5 1285-t of the public authorities law;
6 $100,000,000 to the environmental facili-
7 ties corporation to support municipal
8 water quality infrastructure programs
9 which may otherwise not qualify for state
10 support, or may require additional state
11 support; and up to $10,000,000 for the
12 development of information technology
13 systems related to water quality pursuant
14 to section 3-0315 of the environmental
15 conservation law (09CW1757) .............. 2,500,000,000
16 Capital Projects Funds - Federal
17 Federal Capital Projects Fund
18 Water Resources Purpose
19 For federal capitalization grants for the
20 water pollution control revolving fund
21 (09SF1757) ................................. 175,000,000
119 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ADMINISTRATION (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Administration Purpose
5 By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
6 section 1, of the laws of 2015:
7 For services and expenses including personal service, fringe benefits
8 and indirect costs relating to the maintenance and upgrade of the
9 department's information technology infrastructure, including but
10 not limited to the improved resiliency of the existing computer
11 systems environment, business continuance, equipment and infrastruc-
12 ture related to the DEC automated licensing system (DECALS) and
13 improvements necessary for compliance with statewide cyber security
14 requirements including suballocation to other state departments and
15 agencies (09CS1450) ... 2,000,000 ................. (re. $2,000,000)
16 By chapter 54, section 1, of the laws of 2013:
17 For alterations, rehabilitation and improvements at education camps
18 and centers including personal service, fringe benefits and indirect
19 costs (09ED1350) ... 1,000,000 ...................... (re. $649,000)
20 By chapter 54, section 1, of the laws of 2013, as amended by chapter 54,
21 section 1, of the laws of 2015:
22 For services and expenses including personal service, fringe benefits
23 and indirect costs relating to the maintenance and upgrade of the
24 department's information technology infrastructure, including but
25 not limited to the improved resiliency of the existing computer
26 systems environment, business continuance, equipment and infrastruc-
27 ture related to the DEC automated licensing system (DECALS) and
28 improvements necessary for compliance with statewide cyber security
29 requirements including suballocation to other state departments and
30 agencies (09CS1350) ... 4,000,000 ................. (re. $4,000,000)
31 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
32 section 1, of the laws of 2015:
33 For services and expenses including personal service, fringe benefits
34 and indirect costs relating to the maintenance and upgrade of the
35 department's information technology infrastructure, including but
36 not limited to the improved resiliency of the existing computer
37 systems environment, business continuance, equipment and infrastruc-
38 ture related to the DEC automated licensing system (DECALS) and
39 improvements necessary for compliance with statewide cyber security
40 requirements including suballocation to other state departments and
41 agencies (09CS1250) ... 1,000,000 ................. (re. $1,000,000)
42 By chapter 55, section 1, of the laws of 2010:
43 For alterations, rehabilitation and improvements at education camps
44 and centers including personal services and fringe benefits and
45 indirect costs (09ED1050) ... 600,000 ............... (re. $405,000)
120 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2009, as amended by chapter 54,
2 section 1, of the laws of 2015:
3 For services and expenses including personal services and fringe bene-
4 fits and indirect costs relating to the maintenance and upgrade of
5 the department's information technology infrastructure, including
6 but not limited to the improved resiliency of the existing computer
7 systems environment, business continuance, equipment and infrastruc-
8 ture related to the DEC automated licensing system (DECALS) and
9 improvements necessary for compliance with statewide cyber security
10 requirements including suballocation to other state departments and
11 agencies (09CS0950) ... 3,500,000 ................. (re. $2,562,000)
12 By chapter 55, section 1, of the laws of 2008, as amended by chapter 54,
13 section 1, of the laws of 2015:
14 For services and expenses including personal services and fringe bene-
15 fits relating to the maintenance and upgrade of the department's
16 information technology infrastructure, including but not limited to
17 the improved resiliency of the existing computer systems environ-
18 ment, business continuance, equipment and infrastructure related to
19 the DEC automated licensing system (DECALS) and improvements neces-
20 sary for compliance with statewide cyber security requirements
21 including suballocation to other state departments and agencies
22 (09CS0850) ... 3,500,000 ............................ (re. $150,000)
23 AIR RESOURCES (CCP)
24 Special Revenue Funds - Other
25 Clean Air Fund
26 Mobile Source Account
27 Air Resources Purpose
28 By chapter 54, section 1, of the laws of 2002:
29 For services and expenses relating to the implementation and adminis-
30 tration of the clean air mobile source program (09MO0255) ..........
31 3,000,000 ......................................... (re. $2,033,000)
32 By chapter 54, section 1, of the laws of 2001:
33 For services and expenses relating to the implementation and adminis-
34 tration of the clean air mobile source program (09MO0155) ..........
35 3,000,000 ........................................... (re. $370,000)
36 By chapter 55, section 1, of the laws of 2000:
37 For services and expenses relating to the implementation and adminis-
38 tration of the clean air mobile source program (09MO0055) ..........
39 3,000,000 ........................................... (re. $507,000)
40 By chapter 55, section 1, of the laws of 1999:
41 For services and expenses relating to the implementation and adminis-
42 tration of the clean air mobile source program (09MO9955) ..........
43 3,000,000 ............................................ (re. $97,000)
44 Special Revenue Funds - Other
121 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Clean Air Fund
2 Operating Permit Program Account
3 Air Resources Purpose
4 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
5 section 1, of the laws of 1999:
6 For services and expenses relating to the implementation and adminis-
7 tration of the clean air operating permit program (09OP9855) .......
8 1,000,000 ......................................... (re. $1,000,000)
9 AIR RESOURCES - CLEAN WATER/CLEAN AIR (CCP)
10 Capital Projects Funds - Other
11 Capital Projects Fund
12 Air Resources Purpose
13 Air Quality Improvement Projects
14 By chapter 54, section 1, of the laws of 2002:
15 For state assistance payments for the state share of the costs of air
16 quality/green growth projects in accordance with the provisions of
17 title 6 of article 56 of the environmental conservation law for
18 project costs, including costs incidental and appurtenant thereto
19 and for payment of reimbursements to the clean water/clean air
20 implementation fund for services and expenses of state departments
21 and agencies, including fringe benefits, hereinafter referred to as
22 "Air Quality Project Disbursements". The moneys appropriated herein
23 may be suballocated to any state department or agency. Further,
24 moneys herein appropriated may be suballocated only to public
25 authorities and public benefit corporations specifically authorized
26 by title 6 of article 56 of the environmental conservation law to
27 enter into contracts for state assistance payments for the state
28 share of costs for air quality projects, provided however, that
29 moneys herein appropriated pursuant to subdivision 1 of section
30 56-0603 of the environmental conservation law for state clean-fueled
31 vehicles projects may be suballocated to any public authority or
32 public benefit corporation and moneys herein appropriated pursuant
33 to section 56-0607 of the environmental conservation law for other
34 air quality projects may be suballocated to the environmental facil-
35 ities corporation. Notwithstanding any other provision of law to the
36 contrary, the moneys hereby appropriated shall be available for
37 state air quality improvement projects in accordance with title 6 of
38 article 56 of the environmental conservation law upon the issuance
39 of a certificate of approval of availability by the director of the
40 division of the budget. The state comptroller shall at the commence-
41 ment of each month certify to the director of the division of the
42 budget, the commissioner of environmental conservation, the chairman
43 of the senate finance committee, and the chairman of the assembly
44 ways and means committee, the amounts disbursed from this appropri-
45 ation for "Air Quality Improvement Disbursements" for the month
46 preceding such certification (09BA0255) ............................
47 6,000,000 ......................................... (re. $1,588,000)
122 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Project Schedule
2 PROJECT AMOUNT
3 --------------------------------------------
4 (thousands of dollars)
5 Clean-fueled buses projects .......... 4,000
6 State clean-fueled vehicles
7 projects ........................... 2,000
8 --------------
9 Total ............................ 6,000
10 ==============
11 By chapter 55, section 1, of the laws of 2000:
12 For state assistance payments for the state share of the costs of air
13 quality/green growth projects in accordance with the provisions of
14 title 6 of article 56 of the environmental conservation law for
15 project costs, including costs incidental and appurtenant thereto
16 and for payment of reimbursements to the clean water/clean air
17 implementation fund for services and expenses of state departments
18 and agencies, including fringe benefits, hereinafter referred to as
19 "Air Quality Project Disbursements". The moneys appropriated herein
20 may be suballocated to any state department or agency. Further,
21 moneys herein appropriated may be suballocated only to public
22 authorities and public benefit corporations specifically authorized
23 by title 6 of article 56 of the environmental conservation law to
24 enter into contracts for state assistance payments for the state
25 share of costs for air quality projects, provided however, that
26 moneys herein appropriated pursuant to subdivision 1 of section
27 56-0603 of the environmental conservation law for state clean-fueled
28 vehicles projects may be suballocated to any public authority or
29 public benefit corporation and moneys herein appropriated pursuant
30 to section 56-0607 of the environmental conservation law for other
31 air quality projects may be suballocated to the environmental facil-
32 ities corporation. Notwithstanding any other provision of law to the
33 contrary, the moneys hereby appropriated shall be available for
34 state air quality improvement projects in accordance with title 6 of
35 article 56 of the environmental conservation law upon the issuance
36 of a certificate of approval of availability by the director of the
37 division of the budget. The state comptroller shall at the commence-
38 ment of each month certify to the director of the division of the
39 budget, the commissioner of environmental conservation, the chairman
40 of the senate finance committee, and the chairman of the assembly
41 ways and means committee, the amounts disbursed from this appropri-
42 ation for "Air Quality Improvement Disbursements" for the month
43 preceding such certification (09BA0055) ............................
44 26,000,000 .......................................... (re. $102,000)
45 Project Schedule
46 PROJECT AMOUNT
47 --------------------------------------------
48 (thousands of dollars)
49 State clean-fueled vehicles
123 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 projects ........................... 2,000
2 Clean-fueled buses projects .......... 4,000
3 Clean air for schools projects ...... 20,000
4 --------------
5 Total ............................. 26,000
6 ==============
7 By chapter 55, section 1, of the laws of 1999:
8 For state assistance payments for the state share of the costs of air
9 quality/green growth projects in accordance with the provisions of
10 title 6 of article 56 of the environmental conservation law for
11 project costs, including costs incidental and appurtenant thereto
12 and for payment of reimbursements to the clean water/clean air
13 implementation fund for services and expenses of state departments
14 and agencies, including fringe benefits, hereinafter referred to as
15 "Air Quality Project Disbursements". The moneys appropriated herein
16 may be suballocated to any state department or agency. Further,
17 moneys herein appropriated may be suballocated only to public
18 authorities and public benefit corporations specifically authorized
19 by title 6 of article 56 of the environmental conservation law to
20 enter into contracts for state assistance payments for the state
21 share of costs for air quality projects, provided however, that
22 moneys herein appropriated pursuant to subdivision 1 of section
23 56-0603 of the environmental conservation law for state clean-fueled
24 vehicles projects may be suballocated to any public authority or
25 public benefit corporation and moneys herein appropriated pursuant
26 to section 56-0607 of the environmental conservation law for other
27 air quality projects may be suballocated to the environmental facil-
28 ities corporation. Notwithstanding any other provision of law to the
29 contrary, the moneys hereby appropriated shall be available for
30 state air quality improvement projects in accordance with title 6 of
31 article 56 of the environmental conservation law upon the issuance
32 of a certificate of approval of availability by the director of the
33 division of the budget. The state comptroller shall at the commence-
34 ment of each month certify to the director of the division of the
35 budget, the commissioner of environmental conservation, the chairman
36 of the senate finance committee, and the chairman of the assembly
37 ways and means committee, the amounts disbursed from this appropri-
38 ation for "Air Quality Improvement Disbursements" for the month
39 preceding such certification (09BA9955) ............................
40 37,000,000 ........................................... (re. $38,000)
41 Project Schedule
42 PROJECT AMOUNT
43 -------------------------------------------
44 (thousands of dollars)
45 State clean-fueled vehicles
46 projects ........................... 4,000
47 Clean-fueled buses projects .......... 8,000
48 Clean air for schools projects ...... 25,000
49 --------------
50 Total ............................. 37,000
124 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ==============
2 By chapter 55, section 1, of the laws of 1998:
3 For state assistance payments for the state share of the costs of air
4 quality/green growth projects in accordance with the provisions of
5 title 6 of article 56 of the environmental conservation law for
6 project costs, including costs incidental and appurtenant thereto
7 and for payment of reimbursements to the clean water/clean air
8 implementation fund for services and expenses of state departments
9 and agencies, including fringe benefits, hereinafter referred to as
10 "Air Quality Project Disbursements". The moneys appropriated herein
11 may be suballocated to any state department or agency. Further,
12 moneys herein appropriated may be suballocated only to public
13 authorities and public benefit corporations specifically authorized
14 by title 6 of article 56 of the environmental conservation law to
15 enter into contracts for state assistance payments for the state
16 share of costs for air quality projects, provided however, that
17 moneys herein appropriated pursuant to paragraph one of section
18 56-0603 of the environmental conservation law for state clean-fueled
19 vehicles projects may be suballocated to any public authority or
20 public benefit corporation and moneys herein appropriated pursuant
21 to section 56-0607 of the environmental conservation law for other
22 air quality projects may be suballocated to the environmental facil-
23 ities corporation. Notwithstanding the provisions of any general or
24 special law, the moneys hereby appropriated shall be available for
25 state air quality improvement projects in accordance with title 6 of
26 article 56 of the environmental conservation law upon the issuance
27 of a certificate of approval of availability by the director of the
28 division of the budget. The state comptroller shall at the commence-
29 ment of each month certify to the director of the division of the
30 budget, the commissioner of environmental conservation, the chairman
31 of the senate finance committee, and the chairman of the assembly
32 ways and means committee the amounts disbursed from this appropri-
33 ation for "Air Quality Improvement Disbursements" for the month
34 preceding such certification (09BA9855) ............................
35 44,000,000 ........................................ (re. $3,121,000)
36 project schedule
37 PROJECT AMOUNT
38 --------------------------------------------
39 (thousands of dollars)
40 State clean-fueled vehicles
41 projects ........................... 6,000
42 Clean-fueled buses projects ......... 10,000
43 Other air quality projects ........... 3,000
44 Clean air for schools projects ...... 10,000
45 Clean air for schools projects ...... 15,000
46 --------------
47 Total ............................. 44,000
48 ==============
49 By chapter 55, section 1, of the laws of 1997:
125 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For state assistance payments for the state share of the costs of air
2 quality/green growth projects in accordance with the provisions of
3 title 6 of article 56 of the environmental conservation law for
4 project costs, including costs incidental and appurtenant thereto
5 and for payment of reimbursements to the clean water/clean air
6 implementation fund for services and expenses of state departments
7 and agencies, including fringe benefits, hereinafter referred to as
8 "Air Quality Project Disbursements". The moneys appropriated herein
9 may be suballocated to any state department or agency. Further,
10 moneys herein appropriated may be suballocated only to public
11 authorities and public benefit corporations specifically authorized
12 by title 6 of article 56 of the environmental conservation law to
13 enter into contracts for state assistance payments for the state
14 share of costs for air quality projects, provided however, that
15 moneys herein appropriated pursuant to paragraph one of section
16 56-0603 of the environmental conservation law for state clean-fueled
17 vehicles projects may be suballocated to any public authority or
18 public benefit corporation and moneys herein appropriated pursuant
19 to section 56-0607 of the environmental conservation law for other
20 air quality projects may be suballocated to the environmental facil-
21 ities corporation. Notwithstanding the provisions of any general or
22 special law, the moneys hereby appropriated shall be available for
23 state air quality improvement projects in accordance with title 6 of
24 article 56 of the environmental conservation law upon the issuance
25 of a certificate of approval of availability by the director of the
26 division of the budget. The state comptroller shall at the commence-
27 ment of each month certify to the director of the division of the
28 budget, the commissioner of environmental conservation, the chairman
29 of the senate finance committee, and the chairman of the assembly
30 ways and means committee the amounts disbursed from this appropri-
31 ation for "Air Quality Improvement Disbursements" for the month
32 preceding such certification (09BA9755) ............................
33 80,000,000 ....................................... (re. $22,568,000)
34 project schedule
35 PROJECT AMOUNT
36 --------------------------------------------
37 (thousands of dollars)
38 State clean-fueled vehicles
39 projects ........................... 4,000
40 Clean-fueled buses projects .......... 4,000
41 Other air quality projects .......... 17,000
42 Clean air for schools projects ...... 25,000
43 Environmental compliance
44 assistance projects - air
45 quality ........................... 30,000
46 --------------
47 Total ............................. 80,000
48 ==============
49 AIR RESOURCES - EQBA (CCP)
126 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Capital Projects Funds - Other
2 Capital Projects Fund - EQBA (Bondable)
3 Air Resources Purpose
4 Municipal Air Quality Improvement Projects
5 By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
6 section 1, of the laws of 2003:
7 For payment of the costs of state air quality improvement projects
8 including suballocation to other state departments and agencies
9 (09720255) ... 5,810,000 .......................... (re. $5,782,000)
10 By chapter 54, section 1, of the laws of 1983, as amended by chapter 55,
11 section 1, of the laws of 1996:
12 For the state share of the cost of municipal air quality improvement
13 projects, including the payment of liabilities incurred prior to
14 April one, nineteen hundred eighty-three (02878655) ... ..........
15 15,689,000 ............................................ (re. $8,000)
16 By chapter 54, section 3, of the laws of 1981, as amended by chapter 54,
17 section 3, of the laws of 1993:
18 For the state share of the cost of municipal air quality improvement
19 projects, including the payment of liabilities incurred prior to
20 April 1, 1981 (00333755) ... ..... 20,222,000 ....... (re. $2,000)
21 By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
22 section 3, of the laws of 1982, for:
23 The state share of the cost of municipal air quality improvement
24 projects, including the payment of liabilities incurred prior to
25 April 1, 1975 (00320655) ... ........................ (re. $2,000)
26 By chapter 54, section 1, of the laws of 1974, as amended by chapter 54,
27 section 3, of the laws of 1988, for:
28 The state share of the cost of municipal air quality improvement
29 projects including the payment of liabilities incurred prior to
30 April 1, 1974 (00319455) ... ..... 15,483,930 ....... (re. $1,000)
31 By chapter 673, section 4, of the laws of 1973, as amended by chapter
32 54, section 3, of the laws of 1989, for:
33 The state share of the cost of municipal air quality improvement
34 projects (00319055) ... ..... 15,230,931 .......... (re. $342,000)
35 State Air Quality Improvement Projects
36 By chapter 54, section 1, of the laws of 1987:
37 For payment of the cost of State air quality improvement projects,
38 including the payment of liabilities incurred prior to April 1, 1987
39 (09A18755) ... ..... 2,588,000 .................... (re. $528,000)
40 CLEAN WATER/CLEAN AIR BOND FUND (CCP)
41 Capital Projects Funds - Other
127 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Clean Water/Clean Air Bond Fund
2 Bond Proceeds Purpose
3 By chapter 55, section 1, of the laws of 1997:
4 The sum of $1,475,000,000 or so much thereof as may be necessary is
5 hereby appropriated from the clean water/clean air bond fund as
6 established by section 97-aaa of the state finance law for payment
7 to the capital projects fund for disbursements from such fund as
8 certified by the state comptroller as: "Safe Drinking Water Project
9 Disbursements", "Clean Water Project Disbursements", "Solid Waste
10 Project Disbursements", "Environmental Restoration Project Disburse-
11 ments", and "Air Quality Project Disbursements".
12 The director of the budget shall designate to the state comptroller
13 appropriations made from the capital projects fund which are eligi-
14 ble for reimbursement from the clean air/clean water bond fund. The
15 state comptroller shall at the commencement of each month certify to
16 the director of the budget, the chairman of the senate finance
17 committee, and the chairman of the assembly ways and means commit-
18 tee, the amounts disbursed from such appropriations.
19 No moneys shall be available from the clean water/clean air bond fund
20 until a certificate of approval of availability shall have been
21 issued by the director of the budget, and a copy of such certificate
22 of approval filed with the chairman of the senate finance committee
23 and the chairman of the assembly ways and means committee (09019710)
24 ... 1,475,000,000 ............................... (re. $122,077,000)
25 CLEAN WATER/CLEAN AIR IMPLEMENTATION (CCP)
26 Capital Projects Funds - Other
27 Clean Water/Clean Air Implementation Fund
28 Clean Water/Clean Air Implementation Purpose
29 By chapter 55, section 1, of the laws of 2009:
30 For services and expenses including personal services and fringe bene-
31 fits necessary to implement the clean water/clean air bond act
32 (09BA09WI) ... 1,050,000 .......................... (re. $1,050,000)
33 By chapter 55, section 1, of the laws of 2008:
34 For services and expenses including personal services and fringe bene-
35 fits necessary to implement the clean water/clean air bond act
36 (09BA08WI) ... 1,050,000 .......................... (re. $1,050,000)
37 By chapter 55, section 1, of the laws of 2007:
38 For services and expenses including personal services and fringe bene-
39 fits necessary to implement the clean water/clean air bond act
40 (09BA07WI) ... 1,050,000 .......................... (re. $1,050,000)
41 By chapter 55, section 1, of the laws of 2006:
42 For services and expenses including personal services and fringe bene-
43 fits necessary to implement the clean water/clean air bond act
44 (09BA06WI) ... 1,050,000 ............................ (re. $348,000)
128 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2005:
2 For services and expenses including personal services and fringe bene-
3 fits necessary to implement the clean water/clean air bond act
4 (09BA05WI) ... 1,050,000 .......................... (re. $1,050,000)
5 By chapter 55, section 1, of the laws of 2004:
6 For services and expenses including personal services and fringe bene-
7 fits necessary to implement the clean water/clean air bond act in
8 accordance with the purpose included in the following project sched-
9 ule (09BA04WI) ... 2,527,000 ...................... (re. $1,857,000)
10 Project Schedule
11 PROJECT AMOUNT
12 --------------------------------------------
13 (thousands of dollars)
14 Clean Water .......................... 1,071
15 Environmental Restoration ............ 1,138
16 Solid Waste ............................ 318
17 --------------
18 Total ............................ 2,527
19 ==============
20 ENVIRONMENT AND RECREATION (CCP)
21 Capital Projects Funds - Other
22 Environmental Protection Fund
23 Environment and Recreation Purpose
24 By chapter 55, section 1, of the laws of 2016:
25 For services and expenses of projects and purposes authorized by
26 section 92-s of the state finance law to receive funding from the
27 solid waste account in accordance with a programmatic and financial
28 plan to be approved by the director of the budget, including subal-
29 location to other state departments and agencies, according to the
30 following:
31 Non-hazardous landfill closure projects, including $300,000 for Essex
32 county under an agreement with the department of environmental
33 conservation and $150,000 for Hamilton county under an agreement
34 with the department of environmental conservation (09LC16ER) .......
35 700,000 ............................................. (re. $700,000)
36 Municipal waste reduction or recycling projects, and $3,000,000 of
37 such amount shall be made available through the household hazardous
38 waste state assistance program including, but not limited to, those
39 items defined in subdivision 5 of section 27-2601 of the environ-
40 mental conservation law (09MR16ER) .................................
41 14,000,000 ....................................... (re. $10,542,000)
42 Secondary materials regional marketing assistance including productive
43 reuse of cathode ray tubes and energy conservation services projects
44 (09SM16ER) ... 1,000,000 .......................... (re. $1,000,000)
45 Pesticide program, not less than $200,000 of which shall be for activ-
46 ities related to Long Island pesticide pollution prevention
47 (09PD16ER) ... 1,200,000 ............................ (re. $364,000)
129 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any law to the contrary, for the payment of the costs
2 associated with environmental justice projects and programs, includ-
3 ing but not limited to: monitoring of air quality; education and
4 outreach; not more than $500,000 for the connect kids program facil-
5 itating access by title 1 schools to outdoor recreational activ-
6 ities, public lands and parks; improvements to environmental quali-
7 ty; or environmental job training, in environmental justice, inner
8 city and underserved communities, and which are undertaken by the
9 state, or on behalf of the state by municipalities or not-for-profit
10 corporations; and $2,000,000 of such amount shall be made available
11 for community impact and job training grants. Community impact and
12 job training grants shall be in or affecting environmental justice
13 communities in an amount of up to $50,000 for community groups for
14 projects that address an environmental justice community's exposure
15 to multiple environmental harms and risks, including lead exposure
16 and shall include implementation, studies, including air monitoring,
17 to investigate the environment, or related public health issues of
18 the community, research that will be used to expand the knowledge or
19 understanding of the affected community and ways to improve the
20 resiliency of the affected community. The results of the investi-
21 gation shall be disseminated to members of the affected community.
22 Community groups eligible for funding shall be located in the same
23 area as the environmental and/or related public health issues to be
24 addressed by the project. Such groups shall be primarily focused on
25 addressing the environmental and/or related public health issues of
26 the residents of the affected community and shall be comprised
27 primarily of members of the affected community (09EJ16ER) ...
28 7,000,000 ......................................... (re. $6,997,000)
29 Notwithstanding any law to the contrary, for assessment and recovery
30 of any natural resource damages (09RD16ER) .........................
31 1,950,000 ......................................... (re. $1,950,000)
32 Notwithstanding any law to the contrary, for the pollution prevention
33 institute (09PP16ER) ... 4,000,000 ................ (re. $4,000,000)
34 Environmental health for assessments, testing and actions including
35 but not limited to abatement to address suspected human exposure to
36 chemical, physical and microbiological agents, including contam-
37 inants in drinking water; and $2,000,000 for children's environ-
38 mental health centers, including school and community childhood lead
39 exposure assessment conducted by such centers (09EH16ER) ...........
40 3,000,000 ......................................... (re. $3,000,000)
41 Brownfield opportunity area grants as authorized pursuant to section
42 970-r of the general municipal law (09BO16ER) ......................
43 2,000,000 ......................................... (re. $2,000,000)
44 For services and expenses of projects and purposes authorized by
45 section 92-s of the state finance law to receive funding from the
46 parks, recreation and historic preservation account in accordance
47 with a programmatic and financial plan to be approved by the direc-
48 tor of the budget, including suballocation to other state depart-
49 ments and agencies, according to the following:
50 Local waterfront revitalization programs, notwithstanding any law to
51 the contrary, not less than, $10,000,000 for waterfront revitaliza-
52 tion projects which are in or primarily serve areas where demograph-
130 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ic and other relevant data for such areas demonstrate that the areas
2 are densely populated and have sustained physical deterioration,
3 decay, neglect, or disinvestment, or where a substantial proportion
4 of the residential population is of low income or is otherwise
5 disadvantaged and is underserved with respect to the existing recre-
6 ational opportunities in the area including up to $2,000,000 for
7 updates to existing local waterfront revitalization program plans to
8 mitigate future physical climate risks; and including $660,000 for
9 Adirondack infrastructure and environmental improvements for the
10 towns of Minerva, Indian Lake and Newcomb and $200,000 for the
11 Niagara River greenway commission and including $150,000 for
12 Hammonds Cove dredging projects; and $1,000,000 to the city of New
13 York for the East River Esplanade 107th Street pier (09WR16ER) .....
14 16,000,000 ....................................... (re. $15,800,000)
15 Parks, recreation and historic preservation projects, notwithstanding
16 any law to the contrary, not less than, $10,000,000 for municipal
17 parks projects which are in or primarily serve areas where demo-
18 graphic and other relevant data for such areas demonstrate that the
19 areas are densely populated and have sustained physical deteri-
20 oration, decay, neglect or disinvestment or where a substantial
21 proportion of the residential population is of low income or is
22 otherwise disadvantaged and is underserved with respect to the
23 existing recreational opportunities in the area; and including
24 $250,000 for Tivoli Park, $300,000 for the Ulster County rail trail,
25 pursuant to initiation of a public planning process, and including
26 $100,000 for Old Westbury Gardens to rehabilitate property barns,
27 and including $150,000 for Udall's Cove land acquisition, and
28 including $100,000 to the Town of Middlesex Vine Valley Public Park
29 (09MP16ER) ... 20,000,000 ........................ (re. $20,000,000)
30 Notwithstanding any law to the contrary, for state parks and land and
31 easement infrastructure, access and stewardship projects which shall
32 include capital projects: (i) on state parks and state lands pursu-
33 ant to sections 54-0303 and 56-0307 of the environmental conserva-
34 tion law; (ii) on state parks or state owned lands and easements
35 under the jurisdiction of the department of environmental conserva-
36 tion or the office of parks, recreation and historic preservation
37 for access opportunities for people with disabilities; access to the
38 State Forest Preserve, State reforestation, Wildlife Management
39 areas and conservation easement lands; recreational trail
40 construction and maintenance; Catskill and Adirondack camp ground
41 improvements to public access and sanitation facilities; environ-
42 mental education; facility improvements; archeological, historic,
43 cultural and natural resource surveys, forest health surveys, inter-
44 pretation, and inventories, and response to forest pests; Forest
45 Preserve and state forest unit management planning; invasive species
46 management; conservation easement public recreation planning; habi-
47 tat restoration and enhancement; state fish hatchery improvements;
48 state tree nursery improvements; water access facilities and safety
49 improvements; public beach facility development and improvement;
50 public access improvements at day use areas; state historic site
51 exterior restoration; and cabin area and camping facility develop-
52 ment, restoration and reconstruction; (iii) $500,000 for Belleayre
131 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Mountain ski center projects; (iv) $500,000 from the public access
2 and stewardship allocation to Parks & Trails New York for the
3 purpose of awarding grants on a competitive basis to local parks'
4 friends groups, provided that up to ten percent of such amount may
5 be made available for administrative costs and/or technical assist-
6 ance; and $250,000 for the Hudson River Valley Trail Grants Program
7 and including $200,000 to SUNY ESF for an updated assessment of the
8 state's deer population (09ST16ER) .................................
9 28,000,000 ....................................... (re. $25,789,000)
10 Notwithstanding subdivision 7 of section 92-s of the state finance law
11 or any other law to the contrary, for services and expenses of the
12 Hudson River Park Trust for projects related to the development of
13 the Hudson River Park consistent with provisions of chapter 592 of
14 the laws of 1998; provided, however, such funds shall not be avail-
15 able for suballocation to any public benefit corporation or public
16 authority with the exception of the Hudson River Park Trust and
17 shall be available solely for the liabilities incurred by the Hudson
18 River Park Trust or by other state departments or agencies on behalf
19 of the Hudson River Park Trust on or after April 1, 1999. Provided
20 further that, the comptroller is hereby authorized and directed to
21 release monies to the Hudson River Park Trust in amounts set forth
22 in a schedule approved by the director of the budget (09HR16ER) ...
23 2,500,000 ......................................... (re. $2,500,000)
24 Notwithstanding any law to the contrary, for zoos, botanical gardens
25 and aquaria program (09ZB16ER) ... 15,000,000 .... (re. $15,000,000)
26 For services and expenses of projects and purposes authorized by
27 section 92-s of the state finance law to receive funding from the
28 open space account in accordance with a programmatic and financial
29 plan to be approved by the director of the budget, including subal-
30 location to other state departments and agencies, according to the
31 following:
32 Costs related to the acquisition of the following properties: Atlantic
33 Coast, Long Island Sound Coastal Area, Long Island South Shore Estu-
34 ary Reserve, Peconic Pinelands Maritime Reserve Projects, Central
35 Pine Barrens, Hudson River projects, Western Suffolk/Nassau Special
36 Groundwater Protection Areas, Mott Haven-Port Morris Waterfront,
37 Bronx River Greenway, Inner City/Underserved Community Parks, Long
38 Pond/Butler Woods, Staten Island Greenbelt, Staten Island Bluebelt,
39 Staten Island Wet Woods, Great Swamp, Neversink Highlands,
40 Plutarch/Black Creek Wetlands Complex, New York Highlands, Northern
41 Putnam Greenway, Shawangunk Mountains, Catskill Mountain/ Delaware
42 River Region, Beaverkill/ Willowemoc, Hudson River Estuary/Greenway
43 Trail/Quadricentennial Legacy Trail Corridor, Catskill Unfragmented
44 Forest, Catskill River and Road Corridors, Long Path, New York City
45 Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
46 Rivers Environmental Education Center, Batten Kill Watershed-Sarato-
47 ga National Historic Park View shed, Washington County Agricultural
48 Lands-Saratoga National Historic Park View shed, Lake George
49 watershed, Lake Champlain watershed, Boeselager forestry, Rensselaer
50 plateau, Oomsdale Farm and Surrounding Landscape, Hudson River
51 Gorge, Susquehanna River Valley Corridor, Lake Champlain Shoreline
52 and Wetlands, Saratoga County, State Forest and Wildlife Management
132 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Area Protection, Follensby Park, Undeveloped Lake George Shore,
2 Whitney Park, Finch Woodlands, Washington County, Washington County
3 Grasslands, Recreational Trail Linkages and Networks, Rome Sand
4 Plains, Black Creek Watershed, Portaferry Lake, Tug Hill Core
5 Forests and Headwater Streams, Tioga County Park Opportunities,
6 Nelson Swamp, Clark Reservation State Park, State Parks
7 Greenbelt/Tompkins County, Cattaraugus Creek and tributaries, North-
8 ern Montezuma Wetlands, Seneca Army Depot Conservation Area, Lake
9 Erie Tributary Gorges, Two Rivers State Park, Buffalo River
10 Watershed, Braddock Bay, Catharine Valley Complex, Genesee
11 Greenway/Recreationway, Hi Tor/Bristol Hills, Allegany State Park,
12 Great Lakes Shorelines and Niagara River, Long Island Trail and
13 Greenway System, Bronx Harlem Greenway, Harbor Herons Wildlife
14 Complex, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Held-
15 erberg Escarpment, and Western Finger Lakes: Conesus, Hemlock,
16 Canadice & Honeoye, Hand Hollow Conservation Area, Northern Flow
17 River Corridors, Black River Valley Corridor, Fort Drum Conservation
18 Partnership Project, Herkimer Home Viewshed, Inman Gulf, Massawepie
19 Mire, Moose River Corridor, St. Lawrence River Islands, Shoreline
20 and Wetlands, Carpenter Falls/Bear Swamp Creek Corridor, Salmon
21 River Corridor, Emerald Necklace, Finger Lakes Shorelines, Long
22 Distance Trail Corridors, Statewide Small Projects, Working Forest
23 Lands, State Park and State Historic Site Protection, (a) notwith-
24 standing any law to the contrary, $1,000,000 from the land acquisi-
25 tion allocation for urban forestry projects provided that no less
26 than $500,000 shall be made available for such programs in cities
27 and towns with populations of 65,000 or more; (b) notwithstanding
28 any law to the contrary, $2,000,000 from the land acquisition allo-
29 cation to the land trust alliance for the purpose of awarding grants
30 on a competitive basis to local land trusts, provided that up to ten
31 percent of such amount may be made available for administrative
32 costs and/or technical assistance; (c) notwithstanding any law to
33 the contrary, not less than $3,000,000 for land acquisition in
34 department of environmental conservation regions 1, 2 and 3;
35 $500,000 for a resiliency planting program (09LA16ER) ..............
36 40,000,000 ....................................... (re. $39,986,000)
37 Albany Pine Bush Preserve Commission, with $50,000 to the city of
38 Schenectady for the Woodlawn Preserve (09AP16ER) ...................
39 2,675,000 ......................................... (re. $1,428,000)
40 Long Island Central Pine Barrens Planning (09LP16ER) .................
41 1,800,000 ......................................... (re. $1,800,000)
42 Long Island South Shore Estuary Reserve (09SE16ER) ...................
43 900,000 ............................................. (re. $700,000)
44 Agricultural non-point source abatement and control projects, notwith-
45 standing any law to the contrary, (a) $1,000,000 shall be made
46 available for services and expenses of the Cornell University Inte-
47 grated Pest Management program; and (b) $500,000 shall be made
48 available to the Cornell Cooperative Extension of Suffolk County for
49 nutrient management planning and implementation activities
50 (09AN16ER) ... 19,000,000 ........................ (re. $19,000,000)
51 Non-agricultural non-point source abatement and control projects
52 notwithstanding any law to the contrary, $550,000 of such amount
133 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 shall be made available for Cornell community integrated pest
2 management and including $250,000 to the county of Rockland for the
3 development of a long-term water conservation strategy (09NP16ER)
4 ... 8,000,000 .................................... (re. $7,792,000)
5 Agriculture and farmland protection activities, notwithstanding any
6 law to the contrary, $1,000,000 shall be made available to the tug
7 hill tomorrow land trust for army compatible use buffer program
8 projects around Fort Drum, and $70,000 shall be made available to
9 Cornell University for services and expenses of land classification
10 and master list of soils (09FP16ER) ................................
11 20,000,000 ....................................... (re. $19,938,000)
12 Biodiversity stewardship and research; notwithstanding any law to the
13 contrary, any or all of this amount shall be used for the New York
14 state landowner incentive program to offer grants awarded on a
15 competitive basis to landowners for the implementation of habitat
16 conservation plans and up to $500,000 of this amount to support
17 pollinator diversity, including the development of bee husbandry
18 best management practices such as pest and pathogen controls; creat-
19 ing diversity of pollinator habitats; research to understand,
20 prevent and recover from pollinator losses; and outreach and educa-
21 tion (09BD16ER) ... 1,000,000 ....................... (re. $997,000)
22 Notwithstanding any law to the contrary, for the Hudson River Estuary
23 Management Plan prepared pursuant to section 11-0306 of the environ-
24 mental conservation law, $800,000 of which shall be for the Mohawk
25 river action plan (09HE16ER) ... 5,000,000 ........ (re. $5,000,000)
26 Notwithstanding any law to the contrary, for the Finger Lakes-Lake
27 Ontario Watershed Protection Alliance (09FL16ER) ...................
28 2,279,000 ......................................... (re. $2,279,000)
29 Notwithstanding any law to the contrary, to the Erie County Soil and
30 Water Conservation District for the Lake Erie Watershed Protection
31 Alliance (09LE16ER) ... 250,000 ..................... (re. $250,000)
32 Notwithstanding any law to the contrary, for the state share of costs
33 of wastewater treatment improvement projects undertaken by munici-
34 palities to upgrade municipal systems to meet stormwater, combined
35 sewer overflow, sanitary sewer overflow and wastewater treatment
36 discharge requirements with priority given to systems that are in
37 violation of title 8 of article 17 of the environmental conservation
38 law and aquatic habitat restoration projects undertaken by munici-
39 palities and not-for-profit corporations for aquatic habitat resto-
40 ration projects as defined in subdivision 1 of section 56-0101 of
41 the environmental conservation law; including up to $3,000,000 to
42 Suffolk county to provide a 50 percent match for a program developed
43 in consultation with the department for research, development and
44 pilot projects to develop cost effective methods to address nitrogen
45 and pathogen loading from septic system or cesspool effluent or
46 other sources or to support such efforts without a match at the
47 state university of Stony Brook directly or through its research
48 foundation and $1,500,000 for Suffolk county for sewer improvement
49 projects; and including $5,000,000 for Nassau county for the Bay
50 park wastewater treatment plant outfall pipe, associated conveyance
51 systems, nitrogen abatement treatment works, ocean outfall and/or
52 connections; including $1,000,000 to maximize the availability of
134 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 drug collection programs for communities throughout the state,
2 including to local law enforcement agencies for the purchase and
3 distribution of tamper proof drug collection boxes, and other feder-
4 ally approved drug collection programs, and including $750,000 for
5 the city of Corning Denison Park stormwater outfall pipe (09WQ16ER)
6 ... 20,000,000 ................................... (re. $20,000,000)
7 Notwithstanding any law to the contrary for New York ocean and Great
8 Lakes ecosystem conservation projects, consistent with the policy
9 articulated in article 14 of the environmental conservation law;
10 including $200,000 to Suffolk county for the Peconic Bay Estuary
11 Program (09GL16ER) ... 15,000,000 ................ (re. $14,723,000)
12 Notwithstanding any law to the contrary, for the implementation of the
13 recommendations of the invasive species task force prepared pursuant
14 to chapter 324 of the laws of 2003 and for the purposes set forth in
15 chapter 674 of the laws of 2007 including not less than $450,000 for
16 Lake George, provided that not less than $5,550,000 be made avail-
17 able for invasive species eradication, including but not limited to
18 southern pine beetle, emerald ash borer, and hydrilla and including
19 grants related to the control and management of invasive species.
20 Such funding for grants shall be provided on a competitive basis in
21 consultation with the New York Invasive Species Council (09IS16ER)
22 ... 12,000,000 ................................... (re. $11,673,000)
23 Notwithstanding any law to the contrary, for Soil and Water Conserva-
24 tion District activities as authorized for reimbursement and funding
25 in section 11-a of the soil and water conservation districts law
26 (09SW16ER) ... 9,000,000 .......................... (re. $8,586,000)
27 Notwithstanding any law to the contrary, for Agricultural Waste
28 Management projects (09AW16ER) ... 1,500,000 ...... (re. $1,500,000)
29 Notwithstanding any law to the contrary, for a public waterway recon-
30 struction program to be established and administered by the depart-
31 ment of state, at the request of any county, city, town, village or
32 other governmental entity, for projects to dredge, clear, and repair
33 public waterways, according to best practices, that allow for proac-
34 tively managing public waterways. Funds appropriated herein shall
35 provide fifty percent reimbursement to such localities for author-
36 ized expenditures (09DR16ER) ... 1,000,000 ........ (re. $1,000,000)
37 Notwithstanding any law to the contrary, and within amounts appropri-
38 ated, for a free water testing pilot program to be established and
39 administered by the department of health, or pursuant to contracts
40 with laboratories, within one hundred and twenty days whereby, at
41 the request of any individual, public water system, or school
42 district, the department shall cause to be provided to such individ-
43 ual, public water system, or school district a container or contain-
44 ers for the collection of a sample of drinking water and the means
45 to forward such sample to a laboratory to be tested for contam-
46 inants. The results of such test shall be forwarded to the individ-
47 ual, public water system, or school district by the laboratory as
48 soon as practicable (09WT16ER) .....................................
49 1,500,000 ......................................... (re. $1,500,000)
50 For services and expenses of projects and purposes authorized by
51 section 92-s of the state finance law to receive funding from the
52 climate change mitigation and adaptation account in accordance with
135 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 a programmatic and financial plan to be approved by the director of
2 the budget, including suballocation to other state departments and
3 agencies, according to the following:
4 Notwithstanding any law to the contrary, to address greenhouse gas
5 emissions outside of the power sector including but not limited to
6 the development of inventories, demonstration projects and applied
7 research related to the transportation sector or methane sources
8 (09GG16ER) ... 1,000,000 .......................... (re. $1,000,000)
9 Notwithstanding any law to the contrary, smart growth program state
10 assistance payments, provided on a competitive basis, to counties,
11 cities, towns, or villages to establish, update or implement compre-
12 hensive plans in a manner consistent with smart growth; provided,
13 however, that up to 25 percent of such payments may be awarded to
14 not-for-profit organizations for such purposes (09SG16ER) ..........
15 2,000,000 ......................................... (re. $2,000,000)
16 Notwithstanding any law to the contrary for the New York state soil
17 and water conservation committee in conjunction with the department
18 of agriculture and markets to develop a pilot climate resilient
19 farms program consistent with agriculture and markets law article
20 11-a, agricultural environmental management program (09CR16ER) .....
21 2,500,000 ......................................... (re. $2,500,000)
22 Climate smart communities projects pursuant to title 15 of article 54
23 of the environmental conservation law (09CS16ER) ...................
24 14,000,000 ....................................... (re. $14,000,000)
25 The appropriation made by chapter 55, section 1, of the laws of 2016, is
26 hereby amended and reappropriated to read:
27 Notwithstanding any law to the contrary, to conduct state vulnerabili-
28 ty assessments (09SV16ER) ..........................................
29 [4,500,000] 2,500,000 ............................. (re. $2,500,000)
30 The appropriation made by chapter 54, section 1, of the laws of 2015, is
31 hereby amended and reappropriated to read:
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 solid waste account in accordance with a programmatic and financial
35 plan to be approved by the director of the budget, including subal-
36 location to other state departments and agencies, according to the
37 following:
38 Non-hazardous landfill closure projects (09LC15ER) ...................
39 250,000 ............................................. (re. $250,000)
40 Municipal waste reduction or recycling projects (09MR15ER) ...........
41 7,500,000 ........................................... (re. $224,000)
42 Secondary materials regional marketing assistance and energy conserva-
43 tion services projects (09SM15ER) ... 1,000,000 ... (re. $1,000,000)
44 Pesticide program, not less than $200,000 of which shall be for activ-
45 ities related to Long Island pesticide pollution prevention
46 (09PD15ER) ... 1,200,000 ............................ (re. $201,000)
47 Notwithstanding any law to the contrary, for community impact research
48 grants. Such grants shall be in or affecting environmental justice
49 communities in an amount of up to $50,000 for community groups for
50 projects that address an environmental justice community's exposure
136 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 to multiple environmental harms and risks. Such projects shall
2 include studies, including air monitoring, to investigate the envi-
3 ronment, or related public health issues of the community, research
4 that will be used to expand the knowledge or understanding of the
5 affected community and ways to improve the resiliency of the
6 affected community. The results of the investigation shall be
7 disseminated to members of the affected community. Community groups
8 eligible for funding shall be located in the same area as the envi-
9 ronmental and/or related public health issues to be addressed by the
10 project. Such groups shall be primarily focused on addressing the
11 environmental and/or related public health issues of the residents
12 of the affected community and shall be comprised primarily of
13 members of the affected community, $100,000 of which shall be made
14 available to the city of Buffalo for lead inspection [activities]
15 kits in zip codes of northeast Buffalo previously designated by the
16 Erie County department of health as "communities of concern" where
17 children are at exceptionally high risk for lead poisoning
18 (09EJ15ER) ... 1,100,000 .......................... (re. $1,100,000)
19 Notwithstanding any law to the contrary, for assessment and recovery
20 of any natural resource damages (09RD15ER) .........................
21 1,000,000 ........................................... (re. $750,000)
22 Notwithstanding any law to the contrary, for the pollution prevention
23 institute (09PP15ER) ... 3,250,000 ................ (re. $2,887,000)
24 For services and expenses of projects and purposes authorized by
25 section 92-s of the state finance law to receive funding from the
26 parks, recreation and historic preservation account in accordance
27 with a programmatic and financial plan to be approved by the direc-
28 tor of the budget, including suballocation to other state depart-
29 ments and agencies, according to the following:
30 Local waterfront revitalization programs, notwithstanding any law to
31 the contrary, not less than, $6,250,000 for waterfront revitaliza-
32 tion projects which are in or primarily serve areas where demograph-
33 ic and other relevant data for such areas demonstrate that the areas
34 are densely populated and have sustained physical deterioration,
35 decay, neglect, or disinvestment, or where a substantial proportion
36 of the residential population is of low income or is otherwise
37 disadvantaged and is underserved with respect to the existing recre-
38 ational opportunities in the area; and provided further this appro-
39 priation shall not be construed to restrict the use of any addi-
40 tional monies for such projects including $250,000 for Flood Smart
41 communities, and $250,000 for Schuyler County Soil and Water Conser-
42 vation District (09WR15ER) ... 12,500,000 ........ (re. $12,500,000)
43 Parks, recreation and historic preservation projects, notwithstanding
44 any law to the contrary, not less than, $7,875,000 for municipal
45 parks projects which are in or primarily serve areas where demo-
46 graphic and other relevant data for such areas demonstrate that the
47 areas are densely populated and have sustained physical deteri-
48 oration, decay, neglect or disinvestment or where a substantial
49 proportion of the residential population is of low income or is
50 otherwise disadvantaged and is underserved with respect to the
51 existing recreational opportunities in the area; including $250,000
52 for Tivoli Park; $500,000 for Clute Park; and $150,000 for Yates
137 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 County SWCD Keuka Outlet Trail (09MP15ER) ..........................
2 15,750,000 ....................................... (re. $15,617,000)
3 Notwithstanding any law to the contrary, for state parks and land and
4 easement infrastructure, access and stewardship projects which shall
5 include capital projects: (i) on state parks and state owned lands
6 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
7 mental conservation law; (ii) on state parks or state owned lands
8 and easements under the jurisdiction of the department of environ-
9 mental conservation or the office of parks, recreation and historic
10 preservation for access opportunities for people with disabilities;
11 access to the State Forest Preserve, State reforestation, Wildlife
12 Management areas and conservation easement lands; recreational trail
13 construction and maintenance; Catskill and Adirondack campground
14 improvements to public access and sanitation facilities; environ-
15 mental education; conservation education facility improvements;
16 archeological, historic, cultural and natural resource surveys,
17 forest health surveys, interpretation, and inventories, and response
18 to forest pests; Forest Preserve and state forest unit management
19 planning; conservation easement public recreation planning; habitat
20 restoration and enhancement; state fish hatchery improvements; state
21 tree nursery improvements; water access facilities and safety
22 improvements; public beach facility development and improvement;
23 public access improvements at day use areas; state historic site
24 exterior restoration; and cabin area and camping facility develop-
25 ment, restoration and reconstruction; (iii) $500,000 for Belleayre
26 Mountain ski center projects; (iv) $500,000 from the public access
27 and stewardship allocation to Parks & Trails New York for the
28 purpose of awarding grants on a competitive basis to local parks'
29 friends groups, provided that up to ten percent of such amount may
30 be made available for administrative costs and/or technical assist-
31 ance; and $100,000 for the Hudson River Valley Trail Grants Program
32 (09ST15ER) ... 18,500,000 ......................... (re. $8,024,000)
33 Notwithstanding subdivision 7 of section 92-s of the state finance law
34 or any other law to the contrary, for services and expenses of the
35 Hudson River Park Trust for projects related to the development of
36 the Hudson River Park consistent with provisions of chapter 592 of
37 the laws of 1998; provided, however, such funds shall not be avail-
38 able for suballocation to any public benefit corporation or public
39 authority with the exception of the Hudson River Park Trust and
40 shall be available solely for the liabilities incurred by the Hudson
41 River Park Trust or by other state departments or agencies on behalf
42 of the Hudson River Park Trust on or after April 1, 1999. Provided
43 further that, the comptroller is hereby authorized and directed to
44 release monies to the Hudson River Park Trust in amounts set forth
45 in a schedule approved by the director of the budget (09HR15ER) ....
46 2,500,000 ......................................... (re. $2,500,000)
47 Notwithstanding any law to the contrary, for zoos, botanical gardens
48 and aquaria program (09ZB15ER) ... 12,450,000 ....... (re. $737,000)
49 For services and expenses of projects and purposes authorized by
50 section 92-s of the state finance law to receive funding from the
51 open space account in accordance with a programmatic and financial
52 plan to be approved by the director of the budget, including subal-
138 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 location to other state departments and agencies, according to the
2 following:
3 Costs related to the acquisition of the following properties: Atlan-
4 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
5 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
6 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
7 Special Groundwater Protection Areas, Mott Haven-Port Morris Water-
8 front, Bronx River Greenway, Inner City/Underserved Community Parks,
9 Long Pond/Butler Woods, Staten Island Greenbelt, Staten Island Blue-
10 belt, Staten Island Wet Woods, Great Swamp, Neversink Highlands,
11 Plutarch/Black Creek Wetlands Complex, New York Highlands, Northern
12 Putnam Greenway, Shawangunk Mountains, Catskill Mountain/ Delaware
13 River Region, Beaverkill/ Willowemoc, Hudson River Estuary/Greenway
14 Trail/Quadricentennial Legacy Trail Corridor, Catskill Unfragmented
15 Forest, Catskill River and Road Corridors, Long Path, New York City
16 Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
17 Rivers Environmental Education Center, Batten Kill Watershed-Sarato-
18 ga National Historic Park View shed, Washington County Agricultural
19 Lands-Saratoga National Historic Park View shed, Lake George
20 watershed, Lake Champlain watershed, Boeselager forestry, Rensselaer
21 plateau, Oomsdale Farm and Surrounding Landscape, Hudson River
22 Gorge, Susquehanna River Valley Corridor, Lake Champlain Shoreline
23 and Wetlands, Saratoga County, State Forest and Wildlife Management
24 Area Protection, Follensby Park, Undeveloped Lake George Shore,
25 Whitney Park, Finch Woodlands, Washington County, Washington County
26 Grasslands, Recreational Trail Linkages and Networks, Rome Sand
27 Plains, Black Creek Watershed, Portaferry Lake, Tug Hill Core
28 Forests and Headwater Streams, Tioga County Park Opportunities,
29 Nelson Swamp, Clark Reservation State Park, State Parks
30 Greenbelt/Tompkins County, Cattaraugus Creek and tributaries, North-
31 ern Montezuma Wetlands, Seneca Army Depot Conservation Area, Lake
32 Erie Tributary Gorges, Two Rivers State Park, Buffalo River
33 Watershed, Braddock Bay, Catharine Valley Complex, Genesee
34 Greenway/Recreationway, Hi Tor/Bristol Hills, Allegany State Park,
35 Great Lakes Shorelines and Niagara River, Long Island Trail and
36 Greenway System, Bronx Harlem Greenway, Harbor Herons Wildlife
37 Complex, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Held-
38 erberg Escarpment, and Western Finger Lakes: Conesus, Hemlock,
39 Canadice & Honeoye, Long Distance Trail Corridors, Statewide Small
40 Projects, Working Forest Lands, State Park and State Historic Site
41 Protection, (a) notwithstanding any law to the contrary, $1,000,000
42 from the land acquisition allocation for urban forestry projects
43 provided that no less than $500,000 shall be made available for such
44 programs in cities and towns with populations of 65,000 or more; (b)
45 notwithstanding any law to the contrary, $2,000,000 from the land
46 acquisition allocation to the land trust alliance for the purpose of
47 awarding grants on a competitive basis to local land trusts,
48 provided that up to ten percent of such amount may be made available
49 for administrative costs and/or technical assistance; (c) $250,000
50 for a resiliency planting program; and, notwithstanding any law to
51 the contrary, not less than $1,000,000 for land acquisition in
139 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 department of environmental conservation regions 1, 2 and 3
2 (09LA15ER) ... 26,550,000 ........................ (re. $11,698,000)
3 Albany Pine Bush Preserve Commission (09AP15ER) ......................
4 2,475,000 ......................................... (re. $1,275,000)
5 Long Island Central Pine Barrens Planning (09LP15ER) .................
6 1,600,000 ........................................... (re. $443,000)
7 Long Island South Shore Estuary Reserve (09SE15ER) ...................
8 900,000 ............................................. (re. $750,000)
9 Agricultural non-point source abatement and control projects
10 (09AN15ER) ... 14,200,000 ........................ (re. $14,200,000)
11 Non-agricultural non-point source abatement and control projects
12 (09NP15ER) ... 4,800,000 .......................... (re. $4,560,000)
13 Agriculture and farmland protection activities, notwithstanding any
14 law to the contrary, $1,000,000 shall be made available to the tug
15 hill tomorrow land trust for army compatible use buffer program
16 projects around Fort Drum (09FP15ER) ...............................
17 15,000,000 ....................................... (re. $14,700,000)
18 Biodiversity stewardship and research; notwithstanding any law to the
19 contrary, any or all of this amount shall be used for the New York
20 State Landowner Incentive Program to offer grants awarded on a
21 competitive basis to landowners for the implementation of habitat
22 conservation plans (09BD15ER) ... 500,000 ........... (re. $500,000)
23 Notwithstanding any law to the contrary, for the Hudson River Estuary
24 Management Plan prepared pursuant to section 11-0306 of the environ-
25 mental conservation law, $800,000 of which shall be for the Mohawk
26 river action plan and $200,000 of which shall be for the Peconic Bay
27 Estuary Program (09HE15ER) ... 4,700,000 .......... (re. $4,442,000)
28 Notwithstanding any law to the contrary, for state assistance
29 payments, pursuant to a smart growth program, provided on a compet-
30 itive basis, to counties, cities, towns, or villages to establish,
31 update or implement comprehensive plans in a manner consistent with
32 smart growth; provided, however, that up to 25 percent of such
33 payments may be awarded to not-for-profit organizations for such
34 purposes (09SG15ER) ... 600,000 ..................... (re. $529,000)
35 Notwithstanding any law to the contrary, for the Finger Lakes-Lake
36 Ontario Watershed Protection Alliance (09FL15ER) ...................
37 1,750,000 ........................................... (re. $962,000)
38 Notwithstanding any law to the contrary, for the Lake Erie Watershed
39 Protection Alliance (09LE15ER) ... 250,000 .......... (re. $250,000)
40 Notwithstanding any law to the contrary, for the state share of costs
41 of wastewater treatment improvement projects undertaken by munici-
42 palities to upgrade municipal systems to meet stormwater, combined
43 sewer overflow, sanitary sewer overflow and wastewater treatment
44 discharge requirements with priority given to systems that are in
45 violation of title 8 of article 17 of the environmental conservation
46 law and aquatic habitat restoration projects undertaken by munici-
47 palities and not-for-profit corporations for aquatic habitat resto-
48 ration projects as defined in subdivision 1 of section 56-0101 of
49 the environmental conservation law; including up to $3,000,000 to
50 Suffolk county to provide a 50 percent match for a program developed
51 in consultation with the department for research, development and
52 pilot projects to develop cost effective methods to address nitrogen
140 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 and pathogen loading from septic system or cesspool effluent or
2 other sources or to support such efforts without a match at the
3 state university of Stony Brook directly or through its research
4 foundation (09WQ15ER) ... 8,000,000 ............... (re. $7,319,000)
5 Notwithstanding any law to the contrary for New York ocean and Great
6 Lakes ecosystem conservation projects, consistent with the policy
7 articulated in article 14 of the environmental conservation law
8 (09GL15ER) ... 6,050,000 .......................... (re. $5,979,000)
9 Notwithstanding any law to the contrary, for the implementation of the
10 recommendations of the invasive species task force prepared pursuant
11 to chapter 324 of the laws of 2003 and for the purposes set forth in
12 chapter 674 of the laws of 2007 including not less than $450,000 for
13 Lake George, provided that not less than $1,000,000 be made avail-
14 able for invasive species eradication, and including grants related
15 to the control and management of invasive species. Such funding for
16 grants shall be provided on a competitive basis in consultation with
17 the New York Invasive Species Council (09IS15ER) ...................
18 5,850,000 ......................................... (re. $4,433,000)
19 Notwithstanding any law to the contrary, for Soil and Water Conserva-
20 tion District activities as authorized for reimbursement and funding
21 in section 11-a of the soil and water conservation districts law;
22 including $500,000 for the New York State Soil and Water Conserva-
23 tion Committee in conjunction with the Department of Agriculture and
24 Markets to develop a pilot climate resilient farms program consist-
25 ent with agriculture and markets law article 11-a, agricultural
26 environmental management program (09SW15ER) ........................
27 5,275,000 ........................................... (re. $480,000)
28 Notwithstanding any law to the contrary, for Agricultural Waste
29 Management projects (09AW15ER) ... 1,500,000 ...... (re. $1,449,000)
30 By chapter 54, section 1, of the laws of 2014:
31 For services and expenses of projects and purposes authorized by
32 section 92-s of the state finance law to receive funding from the
33 solid waste account in accordance with a programmatic and financial
34 plan to be approved by the director of the budget, including subal-
35 location to other state departments and agencies, according to the
36 following:
37 Non-hazardous landfill closure projects (09LC14ER) ...................
38 250,000 ............................................. (re. $250,000)
39 Municipal waste reduction or recycling projects (09MR14ER) ...........
40 7,000,000 ........................................... (re. $704,000)
41 Secondary materials regional marketing assistance and energy conserva-
42 tion services projects (09SM14ER) ... 1,000,000 ... (re. $1,000,000)
43 Pesticide program, not less than $200,000 of which shall be for activ-
44 ities related to Long Island pesticide pollution prevention
45 (09PD14ER) ... 1,200,000 ............................. (re. $44,000)
46 Notwithstanding any law to the contrary, for assessment and recovery
47 of any natural resource damages (09RD14ER) .........................
48 1,000,000 ........................................... (re. $817,000)
49 Notwithstanding any law to the contrary, for the pollution prevention
50 institute (09PP14ER) ... 3,250,000 ................ (re. $1,204,000)
141 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services and expenses of projects and purposes authorized by
2 section 92-s of the state finance law to receive funding from the
3 parks, recreation and historic preservation account in accordance
4 with a programmatic and financial plan to be approved by the direc-
5 tor of the budget, including suballocation to other state depart-
6 ments and agencies, according to the following:
7 Local waterfront revitalization programs, notwithstanding any law to
8 the contrary, not less than, $6,250,000 for waterfront revitaliza-
9 tion projects which are in or primarily serve areas where demograph-
10 ic and other relevant data for such areas demonstrate that the areas
11 are densely populated and have sustained physical deterioration,
12 decay, neglect, or disinvestment, or where a substantial proportion
13 of the residential population is of low income or is otherwise
14 disadvantaged and is underserved with respect to the existing recre-
15 ational opportunities in the area; and provided further this appro-
16 priation shall not be construed to restrict the use of any addi-
17 tional monies for such projects; including $200,000 for the Town of
18 Tonawanda; $75,000 for the Town of Evans; $125,000 for Hamburg Water
19 Rescue Unit; $50,000 for the village of Orchard Park; and $300,000
20 for the Beacon Institute (09WR14ER) ................................
21 12,500,000 ....................................... (re. $12,089,000)
22 Parks, recreation and historic preservation projects, notwithstanding
23 any law to the contrary, not less than, $7,750,000 for municipal
24 parks projects which are in or primarily serve areas where demo-
25 graphic and other relevant data for such areas demonstrate that the
26 areas are densely populated and have sustained physical deteri-
27 oration, decay, neglect or disinvestment or where a substantial
28 proportion of the residential population is of low income or is
29 otherwise disadvantaged and is underserved with respect to the
30 existing recreational opportunities in the area; including $50,000
31 for Yaddo Artists' Community; including $50,000 for Green Lake Dam;
32 including $150,000 for Greek Lakes Center; including $180,000 for
33 Joseph Rodman Drake Park; including $20,000 for Udall's Cove; and
34 including $200,000 for Chestnut Ridge Conservancy (09MP14ER) .......
35 15,500,000 ....................................... (re. $12,305,000)
36 Notwithstanding any law to the contrary, for state parks and land and
37 easement infrastructure, access and stewardship projects which shall
38 include capital projects: (i) on state parks and state owned lands
39 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
40 mental conservation law; (ii) on state parks or state owned lands
41 and easements under the jurisdiction of the department of environ-
42 mental conservation or the office of parks, recreation and historic
43 preservation for access opportunities for people with disabilities;
44 access to the State Forest Preserve; State reforestation, Wildlife
45 Management areas and conservation easement lands; recreational trail
46 construction and maintenance; Catskill and Adirondack campground
47 improvements to public access and sanitation facilities; environ-
48 mental education; conservation education facility improvements;
49 archeological, historic, cultural and natural resource surveys,
50 forest health surveys, interpretation, and inventories; Forest
51 Preserve and state forest unit management planning; conservation
52 easement public recreation planning; habitat restoration and
142 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 enhancement; state fish hatchery improvements; water access facili-
2 ties and safety improvements; public beach facility development and
3 improvement; public access improvements at day use areas; state
4 historic site exterior restoration; and cabin area and camping
5 facility development, restoration and reconstruction; and (iii)
6 $500,000 for Belleayre Mountain ski center projects (09ST14ER) .....
7 17,350,000 ........................................ (re. $4,750,000)
8 Notwithstanding subdivision 7 of section 92-s of the state finance law
9 or any other law to the contrary, for services and expenses of the
10 Hudson River Park Trust for projects related to the development of
11 the Hudson River Park consistent with provisions of chapter 592 of
12 the laws of 1998; provided, however, such funds shall not be avail-
13 able for suballocation to any public benefit corporation or public
14 authority with the exception of the Hudson River Park Trust and
15 shall be available solely for the liabilities incurred by the Hudson
16 River Park Trust or by other state departments or agencies on behalf
17 of the Hudson River Park Trust and shall be available solely for the
18 liabilities incurred by the Hudson River Park Trust or by other
19 state departments or agencies on behalf of the Hudson River Park
20 Trust on or after April 1, 1999. Provided further that, the comp-
21 troller is hereby authorized and directed to release monies to the
22 Hudson River Park Trust in amounts set forth in a schedule approved
23 by the director of the budget (09HR14ER) ...........................
24 3,000,000 ......................................... (re. $3,000,000)
25 Notwithstanding any law to the contrary, for zoos, botanical gardens
26 and aquaria program (09ZB14ER) ... 11,350,000 ....... (re. $124,000)
27 For services and expenses of projects and purposes authorized by
28 section 92-s of the state finance law to receive funding from the
29 open space account in accordance with a programmatic and financial
30 plan to be approved by the director of the budget, including subal-
31 location to other state departments and agencies, according to the
32 following:
33 Costs related to the acquisition of the following properties: Atlan-
34 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
35 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
36 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
37 Special Groundwater Protection Areas, Inner City/Underserved Commu-
38 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
39 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
40 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
41 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
42 Mountain/ Delaware River Region, Beaverkill/ Willowemoc, Hudson
43 River Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor,
44 Catskill Unfragmented Forest, Catskill River and Road Corridors,
45 Long Path, New York City Watershed Lands, Taconic Ridge/Harlem
46 Valley, Albany Pine Bush, Five Rivers Environmental Education
47 Center, Batten Kill Watershed-Saratoga National Historic Park View
48 shed, Washington County Agricultural Lands-Saratoga National Histor-
49 ic Park View shed, Lake George watershed, Lake Champlain watershed,
50 Boeselager forestry, Rensselaer plateau, Oomsdale Farm and Surround-
51 ing Landscape, Hudson River Gorge, Susquehanna River Valley Corri-
52 dor, Lake Champlain Shoreline and Wetlands, Saratoga County, State
143 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Forest and Wildlife Management Area Protection, Follensby Park,
2 Undeveloped Lake George Shore, Whitney Park, Finch Woodlands, Wash-
3 ington County, Washington County Grasslands, Recreational Trail
4 Linkages and Networks, Rome Sand Plains, Black Creek Watershed,
5 Portaferry Lake, Tug Hill Core Forests and Headwater Streams, Tioga
6 County Park Opportunities, Nelson Swamp, Clark Reservation State
7 Park, State Parks Greenbelt/Tompkins County, Cattaraugus Creek and
8 tributaries, Northern Montezuma Wetlands, Lake Erie Tributary Gorg-
9 es, Two Rivers State Park, Buffalo River Watershed, Braddock Bay,
10 Catharine Valley Complex, Genesee Greenway/Recreationway, Hi
11 Tor/Bristol Hills, Allegany State Park, Great Lakes Shorelines and
12 Niagara River, Long Island Trail and Greenway System, Bronx Harlem
13 Greenway, Harbor Herons Wildlife Complex, Schunnemunk
14 Mountain/Moodna Creek/Woodcock Mountain, Helderberg Escarpment, and
15 Western Finger Lakes: Conesus, Hemlock, Canadice & Honeoye, Long
16 Distance Trail Corridors, Statewide Small Projects, Working Forest
17 Lands, State Park and State Historic Site Protection, (a) notwith-
18 standing any law to the contrary, $1,000,000 from the land acquisi-
19 tion allocation for urban forestry projects provided that no less
20 than $250,000 shall be made available for such programs in cities
21 and towns with populations of 65,000 or more; (b) notwithstanding
22 any law to the contrary, $2,000,000 from the land acquisition allo-
23 cation to the land trust alliance for the purpose of awarding grants
24 on a competitive basis to local land trusts, provided that up to ten
25 percent of such amount may be made available for administrative
26 costs and/or technical assistance; (c) $250,000 for a resiliency
27 planting program; (d) notwithstanding any law to the contrary,
28 $1,500,000 for land acquisition in Department of Environmental
29 Conservation Regions 1, 2 and 3 (09LA14ER) .........................
30 21,650,000 ....................................... (re. $13,203,000)
31 Long Island South Shore Estuary Reserve (09SE14ER) ...................
32 900,000 ............................................. (re. $900,000)
33 Agricultural non-point source abatement and control projects
34 (09AN14ER) ... 14,200,000 ......................... (re. $7,916,000)
35 Non-agricultural non-point source abatement and control projects
36 (09NP14ER) ... 4,500,000 .......................... (re. $4,081,000)
37 Agriculture and farmland protection activities, notwithstanding any
38 law to the contrary, not less than $1,000,000 shall be made avail-
39 able to the tug hill tomorrow land trust for army compatible use
40 buffer program projects around Fort Drum (09FP14ER) ................
41 14,000,000 ....................................... (re. $13,000,000)
42 Biodiversity stewardship and research; notwithstanding any law to the
43 contrary, any or all of this amount shall be used for the New York
44 State Landowner Incentive Program to offer grants awarded on a
45 competitive basis to landowners for the implementation of habitat
46 conservation plans (09BD14ER) ... 500,000 ........... (re. $500,000)
47 Notwithstanding any law to the contrary, for the Hudson River Estuary
48 Management Plan prepared pursuant to section 11-0306 of the environ-
49 mental conservation law, $800,000 of which shall be for the Mohawk
50 river action plan (09HE14ER) ... 3,800,000 ........ (re. $2,317,000)
51 Notwithstanding any law to the contrary, for state assistance
52 payments, pursuant to a smart growth program, provided on a compet-
144 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 itive basis, to counties, cities, towns, or villages to establish,
2 update or implement comprehensive plans in a manner consistent with
3 smart growth; provided, however, that up to 25 percent of such
4 payments may be awarded to not-for-profit organizations for such
5 purposes (09SG14ER) ... 400,000 ..................... (re. $307,000)
6 Notwithstanding any law to the contrary, for the state share of costs
7 of wastewater treatment improvement projects undertaken by munici-
8 palities to upgrade municipal systems to meet stormwater, combined
9 sewer overflow, sanitary sewer overflow and wastewater treatment
10 discharge requirements with priority given to systems that are in
11 violation of title 8 of article 17 of the environmental conservation
12 law and aquatic habitat restoration projects undertaken by munici-
13 palities and not-for-profit corporations for aquatic habitat resto-
14 ration projects as defined in subdivision 1 of section 56-0101 of
15 the environmental conservation law; including up to $3,000,000 to be
16 allocated to Suffolk county to provide a 50 percent match for a
17 program developed in consultation with the department for research,
18 development and pilot projects to develop cost effective methods to
19 address nitrogen and pathogen loading from septic system or cesspool
20 effluent or other sources and the county may transfer a portion of
21 such funds to the town of Southampton or the state university of
22 Stonybrook (09WQ14ER) ... 7,800,000 ............... (re. $7,800,000)
23 Notwithstanding any law to the contrary for New York ocean and Great
24 Lakes ecosystem conservation projects, consistent with the policy
25 articulated in article 14 of the environmental conservation law
26 (09GL14ER) ... 5,050,000 .......................... (re. $4,238,000)
27 Notwithstanding any law to the contrary, for the implementation of the
28 recommendations of the invasive species task force prepared pursuant
29 to chapter 324 of the laws of 2003 and for the purposes set forth in
30 chapter 674 of the laws of 2007 including not less than $550,000 for
31 Lake George, provided that not less than $1,000,000 be made avail-
32 able for invasive species eradication, and including grants related
33 to the control and management of invasive species. Such funding for
34 grants shall be provided on a competitive basis in consultation with
35 the New York Invasive Species Council (09IS14ER) ...................
36 4,700,000 ......................................... (re. $4,102,000)
37 Notwithstanding any law to the contrary, for Agricultural Waste
38 Management projects (09AW14ER) ... 1,500,000 ...... (re. $1,332,000)
39 By chapter 54, section 1, of the laws of 2013:
40 For services and expenses of projects and purposes authorized by
41 section 92-s of the state finance law to receive funding from the
42 solid waste account in accordance with a programmatic and financial
43 plan to be approved by the director of the budget, including subal-
44 location to other state departments and agencies, according to the
45 following:
46 Non-hazardous landfill closure projects (09LC13ER) ...................
47 250,000 .............................................. (re. $49,000)
48 Secondary materials regional marketing assistance and energy conserva-
49 tion services projects (09SM13ER) ... 1,000,000 ... (re. $1,000,000)
145 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any law to the contrary, for assessment and recovery
2 of any natural resource damages (09RD13ER) .........................
3 155,000 .............................................. (re. $15,000)
4 Notwithstanding any law to the contrary, for the pollution prevention
5 institute (09PP13ER) ... 3,250,000 ................... (re. $48,000)
6 For services and expenses of projects and purposes authorized by
7 section 92-s of the state finance law to receive funding from the
8 parks, recreation and historic preservation account in accordance
9 with a programmatic and financial plan to be approved by the direc-
10 tor of the budget, including suballocation to other state depart-
11 ments and agencies, according to the following:
12 Local waterfront revitalization programs, notwithstanding any law to
13 the contrary, not less than, $6,250,000 for waterfront revitaliza-
14 tion projects which are in or primarily serve areas where demograph-
15 ic and other relevant data for such areas demonstrate that the areas
16 are densely populated and have sustained physical deterioration,
17 decay, neglect, or disinvestment, or where a substantial proportion
18 of the residential population is of low income or is otherwise
19 disadvantaged and is underserved with respect to the existing recre-
20 ational opportunities in the area; and provided further this appro-
21 priation shall not be construed to restrict the use of any addi-
22 tional monies for such projects; including $300,000 for the town of
23 Tonawanda; and $75,000 for the city of Tonawanda (09WR13ER) ........
24 12,500,000 ....................................... (re. $12,500,000)
25 Parks, recreation and historic preservation projects, notwithstanding
26 any law to the contrary, not less than, $7,750,000 for municipal
27 parks projects which are in or primarily serve areas where demo-
28 graphic and other relevant data for such areas demonstrate that the
29 areas are densely populated and have sustained physical deteri-
30 oration, decay, neglect or disinvestment or where a substantial
31 proportion of the residential population is of low income or is
32 otherwise disadvantaged and is underserved with respect to the
33 existing recreational opportunities in the area; including
34 $2,000,000 for the Ulster County Rail Trail, pursuant to the initi-
35 ation of a public planning process; $200,000 for the town of Orchard
36 Park; $150,000 for the Cazenovia community resource center; $100,000
37 for the town of Evans; and $275,000 for the Buffalo military and
38 naval park (09MP13ER) ... 15,500,000 ............. (re. $10,017,000)
39 Notwithstanding any law to the contrary, for state parks and land and
40 easement infrastructure, access and stewardship projects which shall
41 include capital projects: (i) on state parks and state owned lands
42 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
43 mental conservation law; (ii) on state parks or state owned lands
44 and easements under the jurisdiction of the department of environ-
45 mental conservation or the office of parks, recreation and historic
46 preservation for access opportunities for people with disabilities;
47 access to the State Forest Preserve; State reforestation, Wildlife
48 Management areas and conservation easement lands; recreational trail
49 construction and maintenance; Catskill and Adirondack campground
50 improvements to public access and sanitation facilities; environ-
51 mental education; conservation education facility improvements;
52 archeological, historic, cultural and natural resource surveys,
146 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 forest health surveys, interpretation, and inventories; Forest
2 Preserve and state forest unit management planning; conservation
3 easement public recreation planning; habitat restoration and
4 enhancement; state fish hatchery improvements; water access facili-
5 ties and safety improvements; public beach facility development and
6 improvement; public access improvements at day use areas; state
7 historic site exterior restoration; and cabin area and camping
8 facility development, restoration and reconstruction; and (iii)
9 $500,000 for Belleayre Mountain ski center projects (09ST13ER) .....
10 16,600,000 ........................................ (re. $4,082,000)
11 Notwithstanding subdivision 7 of section 92-s of the state finance law
12 or any other law to the contrary, for services and expenses of the
13 Hudson River Park Trust for projects related to the development of
14 the Hudson River Park consistent with provisions of chapter 592 of
15 the laws of 1998; provided, however, such funds shall not be avail-
16 able for suballocation to any public benefit corporation or public
17 authority with the exception of the Hudson River Park Trust and
18 shall be available solely for the liabilities incurred by the Hudson
19 River Park Trust or by other state departments or agencies on behalf
20 of the Hudson River Park Trust and shall be available solely for the
21 liabilities incurred by the Hudson River Park Trust or by other
22 state departments or agencies on behalf of the Hudson River Park
23 Trust on or after April 1, 1999. Provided further that, the comp-
24 troller is hereby authorized and directed to release monies to the
25 Hudson River Park Trust in amounts set forth in a schedule approved
26 by the director of the budget (09HR13ER) ...........................
27 3,000,000 ......................................... (re. $3,000,000)
28 Notwithstanding any law to the contrary, for zoos, botanical gardens
29 and aquaria program (09ZB13ER) ... 10,250,000 ....... (re. $141,000)
30 For services and expenses of projects and purposes authorized by
31 section 92-s of the state finance law to receive funding from the
32 open space account in accordance with a programmatic and financial
33 plan to be approved by the director of the budget, including subal-
34 location to other state departments and agencies, according to the
35 following:
36 Costs related to the acquisition of the following properties: Atlan-
37 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
38 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
39 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
40 Special Groundwater Protection Areas, Inner City/Underserved Commu-
41 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
42 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
43 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
44 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
45 Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
46 Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
47 kill Unfragmented Forest, Catskill River and Road Corridors, Long
48 Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
49 Albany Pine Bush, Five Rivers Environmental Education Center, Batten
50 Kill Watershed-Saratoga National Historic Park View shed, Washington
51 County Agricultural Lands-Saratoga National Historic Park View shed,
52 Lake George watershed, Lake Champlain watershed, Boeselager fores-
147 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 try, Rensselaer plateau, Oomsdale Farm and Surrounding Landscape,
2 Hudson River Gorge, Susquehanna River Valley Corridor, Lake Cham-
3 plain Shoreline and Wetlands, Saratoga County, State Forest and
4 Wildlife Management Area Protection, Follensby Park, Undeveloped
5 Lake George Shore, Whitney Park, Finch Woodlands, Washington County,
6 Washington County Grasslands, Recreational Trail Linkages and
7 Networks, Rome Sand Plains, Black Creek Watershed, Portaferry Lake,
8 Tug Hill Core Forests and Headwater Streams, Tioga County Park
9 Opportunities, Nelson Swamp, Clark Reservation State Park, State
10 Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
11 Northern Montezuma Wetlands, Lake Erie Tributary Gorges, Two Rivers
12 State Park, Buffalo River Watershed, Braddock Bay, Catharine Valley
13 Complex, Genesee Greenway/Recreationway, Hi Tor/Bristol Hills, Alle-
14 gany State Park, Great Lakes Shorelines and Niagara River, Long
15 Island Trail and Greenway System, Bronx Harlem Greenway, Harbor
16 Herons Wildlife Complex, Schunnemunk Mountain/Moodna Creek/Woodcock
17 Mountain, Helderberg Escarpment, and Western Finger Lakes: Conesus,
18 Hemlock, Canadice & Honeoye, Long Distance Trail Corridors, State-
19 wide Small Projects, Working Forest Lands, State Park and State
20 Historic Site Protection, (a) notwithstanding any law to the contra-
21 ry, $500,000 from the land acquisition allocation for urban forestry
22 projects provided that no less than $250,000 shall be made available
23 for such programs in cities and towns with populations of 65,000 or
24 more; (b) notwithstanding any law to the contrary, $1,575,000 from
25 the land acquisition allocation to the land trust alliance for the
26 purpose of awarding grants on a competitive basis to local land
27 trusts, provided that up to ten percent of such amount may be made
28 available for administrative costs and/or technical assistance; (c)
29 notwithstanding any law to the contrary, $1,000,000 for land acqui-
30 sition in department of environmental conservation regions 1, 2 and
31 3 (09LA13ER) ... 20,000,000 ....................... (re. $8,385,000)
32 Long Island South Shore Estuary Reserve (09SE13ER) ...................
33 900,000 ............................................. (re. $900,000)
34 Agricultural non-point source abatement and control projects
35 (09AN13ER) ... 14,200,000 ......................... (re. $7,300,000)
36 Non-agricultural non-point source abatement and control projects
37 (09NP13ER) ... 4,500,000 .......................... (re. $4,040,000)
38 Agriculture and farmland protection activities (09FP13ER) ............
39 13,000,000 ....................................... (re. $13,000,000)
40 Biodiversity stewardship and research (09BD13ER) .....................
41 500,000 ............................................. (re. $500,000)
42 Notwithstanding any law to the contrary, for the Hudson River Estuary
43 Management Plan prepared pursuant to section 11-0306 of the environ-
44 mental conservation law, $800,000 of which shall be for the Mohawk
45 river action plan (09HE13ER) ... 3,800,000 ........ (re. $1,097,000)
46 Notwithstanding any law to the contrary, for state assistance
47 payments, pursuant to a smart growth program, provided on a compet-
48 itive basis, to counties, cities, towns, or villages to establish,
49 update or implement comprehensive plans in a manner consistent with
50 smart growth; provided, however, that up to 25 percent of such
51 payments may be awarded to not-for-profit organizations for such
52 purposes (09SG13ER) ... 400,000 ..................... (re. $313,000)
148 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any law to the contrary, for the state share of costs
2 of wastewater treatment improvement projects undertaken by munici-
3 palities to upgrade municipal systems to meet stormwater, combined
4 sewer overflow, sanitary sewer overflow and wastewater treatment
5 discharge requirements with priority given to systems that are in
6 violation of title 8 of article 17 of the environmental conservation
7 law and aquatic habitat restoration projects undertaken by munici-
8 palities and not-for-profit corporations for aquatic habitat resto-
9 ration projects as defined in subdivision 1 of section 56-0101 of
10 the environmental conservation law; including $4,000,000 to be
11 distributed to municipalities pursuant to a competitive grants proc-
12 ess for natural infrastructure projects designed to mitigate the
13 impacts of floods, storm surge, and other effects of climate change
14 (09WQ13ER) ... 6,945,000 .......................... (re. $6,858,000)
15 Notwithstanding any law to the contrary for New York ocean and Great
16 Lakes ecosystem conservation projects, consistent with the policy
17 articulated in article 14 of the environmental conservation law
18 (09GL13ER) ... 4,750,000 .......................... (re. $3,672,000)
19 Notwithstanding any law to the contrary, for the implementation of the
20 recommendations of the invasive species task force prepared pursuant
21 to chapter 324 of the laws of 2003 and for the purposes set forth in
22 chapter 674 of the laws of 2007 including not less than $100,000 for
23 Lake George, provided that not less than $1,000,000 be made avail-
24 able for invasive species eradication, and including grants related
25 to the control and management of invasive species. Such funding for
26 grants shall be provided on a competitive basis in consultation with
27 the New York Invasive Species Council (09IS13ER) ...................
28 4,600,000 ......................................... (re. $3,188,000)
29 Notwithstanding any law to the contrary, for Agricultural Waste
30 Management projects (09AW13ER) ... 1,000,000 ........ (re. $481,000)
31 By chapter 54, section 1, of the laws of 2012:
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 solid waste account in accordance with a programmatic and financial
35 plan to be approved by the director of the budget, including subal-
36 location to other state departments and agencies, according to the
37 following:
38 Secondary materials regional marketing assistance and energy conserva-
39 tion services projects (09SM12ER) ... 1,000,000 ... (re. $1,000,000)
40 Notwithstanding any law to the contrary, for assessment and recovery
41 of any natural resource damages (09RD12ER) .........................
42 175,000 ............................................. (re. $175,000)
43 For services and expenses of projects and purposes authorized by
44 section 92-s of the state finance law to receive funding from the
45 parks, recreation and historic preservation account in accordance
46 with a programmatic and financial plan to be approved by the direc-
47 tor of the budget, including suballocation to other state depart-
48 ments and agencies, according to the following:
49 Local waterfront revitalization programs, notwithstanding any law to
50 the contrary, not less than, $5,750,000 for waterfront revitaliza-
51 tion projects which are in or primarily serve areas where demograph-
149 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ic and other relevant data for such areas demonstrate that the areas
2 are densely populated and have sustained physical deterioration,
3 decay, neglect, or disinvestment, or where a substantial proportion
4 of the residential population is of low income or is otherwise
5 disadvantaged and is underserved with respect to the existing recre-
6 ational opportunities in the area; and provided further this appro-
7 priation shall not be construed to restrict the use of any addi-
8 tional monies for such projects; including $60,000 for Jefferson and
9 St. Lawrence; and $400,000 for Niagara and Erie Waterfront Revitali-
10 zation (09WR12ER) ... 11,500,000 ................. (re. $10,212,000)
11 Parks, recreation and historic preservation projects, notwithstanding
12 any law to the contrary, not less than, $6,500,000 for municipal
13 parks projects which are in or primarily serve areas where demo-
14 graphic and other relevant data for such areas demonstrate that the
15 areas are densely populated and have sustained physical deteri-
16 oration, decay, neglect or disinvestment or where a substantial
17 proportion of the residential population is of low income or is
18 otherwise disadvantaged and is underserved with respect to the
19 existing recreational opportunities in the area; including $425,000
20 for Buffalo - area parks; and $300,000 for Niagara and Erie Historic
21 Preservation (09MP12ER) ... 13,000,000 ............ (re. $5,603,000)
22 Notwithstanding any law to the contrary, for state parks and land and
23 easement infrastructure, access and stewardship projects which shall
24 include capital projects: (i) on state parks and state owned lands
25 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
26 mental conservation law; (ii) on state parks or state owned lands
27 and easements under the jurisdiction of the department of environ-
28 mental conservation or the office of parks, recreation and historic
29 preservation for access opportunities for people with disabilities;
30 access to the State Forest Preserve; State reforestation, Wildlife
31 Management areas and conservation easement lands; recreational trail
32 construction and maintenance; Catskill and Adirondack campground
33 improvements to public access and sanitation facilities; environ-
34 mental education; conservation education facility improvements;
35 archeological, historic, cultural and natural resource surveys,
36 forest health surveys, interpretation, and inventories; Forest
37 Preserve and state forest unit management planning; conservation
38 easement public recreation planning; habitat restoration and
39 enhancement; state fish hatchery improvements; water access facili-
40 ties and safety improvements; public beach facility development and
41 improvement; public access improvements at day use areas; state
42 historic site exterior restoration; and cabin area and camping
43 facility development, restoration and reconstruction; and (iii)
44 $500,000 for Belleayre Mountain ski center projects (09ST12ER) .....
45 16,000,000 ........................................ (re. $2,737,000)
46 Notwithstanding subdivision 7 of section 92-s of the state finance law
47 or any other law to the contrary, for services and expenses of the
48 Hudson River Park Trust for projects related to the development of
49 the Hudson River Park consistent with provisions of chapter 592 of
50 the laws of 1998; provided, however, such funds shall not be avail-
51 able for suballocation to any public benefit corporation or public
52 authority with the exception of the Hudson River Park Trust and
150 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 shall be available solely for the liabilities incurred by the Hudson
2 River Park Trust or by other state departments or agencies on behalf
3 of the Hudson River Park Trust and shall be available solely for the
4 liabilities incurred by the Hudson River Park Trust or by other
5 state departments or agencies on behalf of the Hudson River Park
6 Trust on or after April 1, 1999. Provided further that, the comp-
7 troller is hereby authorized and directed to release monies to the
8 Hudson River Park Trust in amounts set forth in a schedule approved
9 by the director of the budget (09HR12ER) ...........................
10 3,000,000 ......................................... (re. $3,000,000)
11 Notwithstanding any law to the contrary, for zoos, botanical gardens
12 and aquaria program (09ZB12ER) ... 9,000,000 ......... (re. $96,000)
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 open space account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies, according to the
18 following:
19 Costs related to the acquisition of the following properties: Atlan-
20 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
21 Estuary Reserve, Peconic Pine lands Maritime Reserve Projects,
22 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
23 Special Groundwater Protection Areas, Inner City/Underserved Commu-
24 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
25 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
26 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
27 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
28 Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
29 Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
30 kill Unfragmented Forest, Catskill River and Road Corridors, Long
31 Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
32 Albany Pine Bush, Five Rivers Environmental Education Center, Batten
33 Kill Watershed-Saratoga National Historic Park View shed, Washington
34 County Agricultural Lands-Saratoga National Historic Park View shed,
35 Lake George watershed, Lake Champlain watershed, Boeselager fores-
36 try, Catskill River and Road corridor, Rensselaer plateau, Oomsdale
37 Farm and Surrounding Landscape, Hudson River Gorge, Susquehanna
38 River Valley Corridor, Lake Champlain Shoreline and Wetlands, Sara-
39 toga County, State Forest and Wildlife Management Area Protection,
40 Follensby Park, Undeveloped Lake George Shore, Whitney Park, Finch
41 Woodlands, Washington County, Washington County Grasslands, Recre-
42 ational Trail Linkages and Networks, Rome Sand Plains, Black Creek
43 Watershed, Portaferry Lake, Tug Hill Core Forests and Headwater
44 Streams, Tioga County Park Opportunities, Nelson Swamp, Clark Reser-
45 vation State Park, State Parks Greenbelt/Tompkins County, Cattarau-
46 gus Creek and tributaries, Northern Montezuma Wetlands, Lake Erie
47 Tributary Gorges, Two Rivers State Park, Buffalo River Watershed,
48 Braddock Bay, Catharine Valley Complex, Genesee Greenway/ Recrea-
49 tionway, Hi Tor/Bristol Hills, Allegany State Park, Great Lakes
50 Shorelines and Niagara River, Long Distance Trail Corridors, State-
51 wide Small Projects, Working Forest Lands, State Park and State
52 Historic Site Protection, (a) notwithstanding any law to the contra-
151 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ry, $500,000 from the land acquisition allocation for urban forestry
2 projects provided that no less than $250,000 shall be made available
3 for such programs in cities and towns with populations of 65,000 or
4 more; (b) notwithstanding any law to the contrary, $1,575,000 from
5 the land acquisition allocation to the land trust alliance for the
6 purpose of awarding grants on a competitive basis to local land
7 trusts, provided that up to ten percent of such amount may be made
8 available for administrative costs and/or technical assistance
9 (09LA12ER) ... 17,500,000 ......................... (re. $1,356,000)
10 Long Island Central Pine Barrens Planning (09LP12ER) .................
11 1,100,000 ............................................. (re. $9,000)
12 Long Island South Shore Estuary Reserve (09SE12ER) ...................
13 900,000 ............................................. (re. $900,000)
14 Agricultural non-point source abatement and control projects
15 (09AN12ER) ... 13,000,000 ......................... (re. $3,250,000)
16 Non-agricultural non-point source abatement and control projects
17 (09NP12ER) ... 4,000,000 .......................... (re. $3,294,000)
18 Agriculture and farmland protection activities (09FP12ER) ............
19 12,000,000 ....................................... (re. $12,000,000)
20 Biodiversity stewardship and research (09BD12ER) .....................
21 500,000 ............................................. (re. $324,000)
22 Notwithstanding any law to the contrary, for the Hudson River Estuary
23 Management Plan prepared pursuant to section 11-0306 of the environ-
24 mental conservation law (09HE12ER) ... 3,000,000 ..... (re. $27,000)
25 Notwithstanding any law to the contrary, for state assistance
26 payments, pursuant to a smart growth program, provided on a compet-
27 itive basis, to counties, cities, towns, or villages to establish,
28 update or implement comprehensive plans in a manner consistent with
29 smart growth; provided, however, that up to 25 percent of such
30 payments may be awarded to not-for-profit organizations for such
31 purposes (09SG12ER) ... 300,000 ..................... (re. $281,000)
32 Notwithstanding any law to the contrary, for the state share of costs
33 of wastewater treatment improvement projects undertaken by munici-
34 palities to upgrade municipal systems to meet stormwater, combined
35 sewer overflow, sanitary sewer overflow and wastewater treatment
36 discharge requirements with priority given to systems that are in
37 violation of title 8 of article 17 of the environmental conservation
38 law and aquatic habitat restoration projects undertaken by munici-
39 palities and not-for-profit corporations for aquatic habitat resto-
40 ration projects as defined in subdivision 1 of section 56-0101 of
41 the environmental conservation law and not less than $300,000 for a
42 total maximum daily load study for the Western Bays in the South
43 Shore Estuary Reserve (09WQ12ER) ... 2,932,000 .... (re. $2,775,000)
44 Notwithstanding any law to the contrary for New York ocean and Great
45 Lakes ecosystem conservation projects, consistent with the policy
46 articulated in article 14 of the environmental conservation law
47 (09GL12ER) ... 4,728,000 .......................... (re. $2,953,000)
48 Notwithstanding any law to the contrary, for the implementation of the
49 recommendations of the invasive species task force prepared pursuant
50 to chapter 324 of the laws of 2003 and for the purposes set forth in
51 chapter 674 of the laws of 2007 including not less than $100,000 for
52 Lake George, provided that not less than $1,000,000 be made avail-
152 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 able for invasive species eradication, and including grants related
2 to the control and management of invasive species. Such funding for
3 grants shall be provided on a competitive basis in consultation with
4 the New York Invasive Species Council (09IS12ER) ...................
5 3,400,000 ......................................... (re. $2,890,000)
6 By chapter 54, section 1, of the laws of 2011:
7 For services and expenses of projects and purposes authorized by
8 section 92-s of the state finance law to receive funding from the
9 solid waste account in accordance with a programmatic and financial
10 plan to be approved by the director of the budget, including subal-
11 location to other state departments and agencies, according to the
12 following:
13 Non-hazardous landfill closure projects (09LC11ER) ...................
14 600,000 .............................................. (re. $15,000)
15 Secondary materials regional marketing assistance and energy conserva-
16 tion services projects (09SM11ER) ... 1,000,000 ... (re. $1,000,000)
17 Notwithstanding any law to the contrary, for assessment and recovery
18 of any natural resource damages (09RD11ER) .........................
19 200,000 .............................................. (re. $49,000)
20 For services and expenses of projects and purposes authorized by
21 section 92-s of the state finance law to receive funding from the
22 parks, recreation and historic preservation account in accordance
23 with a programmatic and financial plan to be approved by the direc-
24 tor of the budget, including suballocation to other state depart-
25 ments and agencies, according to the following:
26 Local waterfront revitalization programs, notwithstanding any law to
27 the contrary, not less than, $5,750,000 for waterfront revitaliza-
28 tion projects which are in or primarily serve areas where demograph-
29 ic and other relevant data for such areas demonstrate that the areas
30 are densely populated and have sustained physical deterioration,
31 decay, neglect, or disinvestment, or where a substantial proportion
32 of the residential population is of low income or is otherwise
33 disadvantaged and is underserved with respect to the existing recre-
34 ational opportunities in the area; and provided further this appro-
35 priation shall not be construed to restrict the use of any addi-
36 tional monies for such projects, $100,000 for Hoyt Lake; $300,000
37 for Buffalo Waterfront; and $225,000 for Niagara River Greenway
38 (09WR11ER) ... 11,500,000 ......................... (re. $9,476,000)
39 Parks, recreation and historic preservation projects, notwithstanding
40 any law to the contrary, not less than, $6,500,000 for municipal
41 parks projects which are in or primarily serve areas where demo-
42 graphic and other relevant data for such areas demonstrate that the
43 areas are densely populated and have sustained physical deteri-
44 oration, decay, neglect or disinvestment or where a substantial
45 proportion of the residential population is of low income or is
46 otherwise disadvantaged and is underserved with respect to the
47 existing recreational opportunities in the area; $250,000 for Olmst-
48 ed Park; $125,000 for Hyde Park; $250,000 for Darwin Martin House;
49 and $50,000 for Graycliff Manor (09MP11ER) .........................
50 13,000,000 ........................................ (re. $4,669,000)
153 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any law to the contrary, for state parks and land and
2 easement infrastructure, access and stewardship projects which shall
3 include capital projects: (i) on state parks and state owned lands
4 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
5 mental conservation law; (ii) on state parks or state owned lands
6 and easements under the jurisdiction of the department of environ-
7 mental conservation or the office of parks, recreation and historic
8 preservation for access opportunities for people with disabilities;
9 access to the State Forest Preserve; State reforestation, Wildlife
10 Management areas and conservation easement lands; recreational trail
11 construction and maintenance; Catskill and Adirondack campground
12 improvements to public access and sanitation facilities; environ-
13 mental education; conservation education facility improvements;
14 archeological, historic, cultural and natural resource surveys,
15 forest health surveys, interpretation, and inventories; Forest
16 Preserve and state forest unit management planning; conservation
17 easement public recreation planning; habitat restoration and
18 enhancement; state fish hatchery improvements; water access facili-
19 ties and safety improvements; public beach facility development and
20 improvement; public access improvements at day use areas; state
21 historic site exterior restoration; and cabin area and camping
22 facility development, restoration and reconstruction; and (iii)
23 $500,000 for Belleayre Mountain ski center projects (09ST11ER) .....
24 16,228,000 ........................................ (re. $1,077,000)
25 Notwithstanding subdivision 7 of section 92-s of the state finance law
26 or any other law to the contrary, for services and expenses of the
27 Hudson River Park Trust for projects related to the development of
28 the Hudson River Park consistent with provisions of chapter 592 of
29 the laws of 1998; provided, however, such funds shall not be avail-
30 able for suballocation to any public benefit corporation or public
31 authority with the exception of the Hudson River Park Trust and
32 shall be available solely for the liabilities incurred by the Hudson
33 River Park Trust or by other state departments or agencies on behalf
34 of the Hudson River Park Trust and shall be available solely for the
35 liabilities incurred by the Hudson River Park Trust or by other
36 state departments or agencies on behalf of the Hudson River Park
37 Trust on or after April 1, 1999. Provided further that, the comp-
38 troller is hereby authorized and directed to release monies to the
39 Hudson River Park Trust in amounts set forth in a schedule approved
40 by the director of the budget (09HR11ER) ...........................
41 3,000,000 ......................................... (re. $3,000,000)
42 Notwithstanding any law to the contrary, for zoos, botanical gardens
43 and aquaria program (09ZB11ER) ... 9,000,000 ......... (re. $36,000)
44 For services and expenses of projects and purposes authorized by
45 section 92-s of the state finance law to receive funding from the
46 open space account in accordance with a programmatic and financial
47 plan to be approved by the director of the budget, including subal-
48 location to other state departments and agencies, according to the
49 following:
50 Costs related to the acquisition of the following properties: Atlan-
51 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
52 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
154 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Central Pine Barrens, Hudson River projects, Western Suffolk/Nassau
2 Special Groundwater Protection Areas, Inner City/Underserved Commu-
3 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
4 Island Bluebelt, Staten Island Wet Woods, Great Swamp, Neversink
5 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
6 lands, Northern Putnam Greenway, Shawangunk Mountains, Catskill
7 Mountain/Delaware River Region, Beaverkill/Willowemoc, Hudson River
8 Estuary/Greenway Trail/Quadricentennial Legacy Trail Corridor, Cats-
9 kill Unfragmented Forest, Catskill River and Road Corridors, Long
10 Path, New York City Watershed Lands, Taconic Ridge/Harlem Valley,
11 Albany Pine Bush, Five Rivers Environmental Education Center, Batten
12 Kill Watershed-Saratoga National Historic Park View shed, Washington
13 County Agricultural Lands-Saratoga National Historic Park View shed,
14 Lake George watershed, Lake Champlain watershed, Boeselager fores-
15 try, Catskill River and Road corridor, Rensselaer plateau, Hudson
16 River Gorge, Susquehanna River Valley Corridor, Lake Champlain
17 Shoreline and Wetlands, Saratoga County, State Forest and Wildlife
18 Management Area Protection, Follensby Park, Undeveloped Lake George
19 Shore, Whitney Park, Finch Woodlands, Washington County, Washington
20 County Grasslands, Recreational Trail Linkages and Networks, Rome
21 Sand Plains, Portaferry Lake, Tug Hill Core Forests and Headwater
22 Streams, Tioga County Park Opportunities, Nelson Swamp, Clark Reser-
23 vation State Park, State Parks Greenbelt/Tompkins County, Cattarau-
24 gus Creek and tributaries, Lake Erie Tributary Gorges, Two Rivers
25 State Park, Buffalo River Watershed, Braddock Bay, Catharine Valley
26 Complex, Genesee Greenway/Recreationway, Allegany State Park, Great
27 Lakes Shorelines and Niagara River, Long Distance Trail Corridors,
28 Statewide Small Projects, Working Forest Lands, State Park and State
29 Historic Site Protection, (a) notwithstanding any law to the contra-
30 ry, $500,000 from the land acquisition allocation for urban forestry
31 projects provided that no less than $250,000 shall be made available
32 for such programs in cities with populations of 65,000 or more; (b)
33 notwithstanding any law to the contrary, $1,575,000 from the land
34 acquisition allocation to the land trust alliance for the purpose of
35 awarding grants on a competitive basis to local land trusts,
36 provided that up to ten percent of such amount may be made available
37 for administrative costs and/or technical assistance (09LA11ER) ....
38 17,500,000 ........................................ (re. $3,034,000)
39 Long Island South Shore Estuary Reserve (09SE11ER) ...................
40 900,000 ............................................. (re. $637,000)
41 Agricultural non-point source abatement and control projects
42 (09AN11ER) ... 13,000,000 ......................... (re. $3,200,000)
43 Non-agricultural non-point source abatement and control projects
44 (09NP11ER) ... 4,000,000 .......................... (re. $3,454,000)
45 Agriculture and farmland protection activities (09FP11ER) ............
46 12,000,000 ....................................... (re. $12,000,000)
47 Biodiversity stewardship and research (09BD11ER) .....................
48 500,000 ............................................. (re. $427,000)
49 Notwithstanding any law to the contrary, for the Hudson River Estuary
50 Management Plan prepared pursuant to section 11-0306 of the environ-
51 mental conservation law (09HE11ER) ... 3,000,000 .... (re. $621,000)
155 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any law to the contrary, for state assistance
2 payments, pursuant to a smart growth program, provided on a compet-
3 itive basis, to counties, cities, towns, or villages to establish,
4 update or implement comprehensive plans in a manner consistent with
5 smart growth; provided, however, that up to 25 percent of such
6 payments may be awarded to not-for-profit organizations for such
7 purposes (09SG11ER) ... 300,000 ..................... (re. $300,000)
8 Notwithstanding any law to the contrary, for the state share of costs
9 of wastewater treatment improvement projects undertaken by munici-
10 palities to upgrade municipal systems to meet stormwater, combined
11 sewer overflow, sanitary sewer overflow and wastewater treatment
12 discharge requirements with priority given to systems that are in
13 violation of title 8 of article 17 of the environmental conservation
14 law and aquatic habitat restoration projects undertaken by munici-
15 palities and not-for-profit corporations for aquatic habitat resto-
16 ration projects as defined in subdivision 1 of section 56-0101 of
17 the environmental conservation law (09WQ11ER) ......................
18 2,932,000 ......................................... (re. $2,532,000)
19 Notwithstanding any law to the contrary for New York ocean and Great
20 Lakes ecosystem conservation projects, consistent with the policy
21 articulated in article 14 of the environmental conservation law
22 (09GL11ER) ... 5,000,000 .......................... (re. $4,026,000)
23 Notwithstanding any law to the contrary, for the implementation of the
24 recommendations of the invasive species task force prepared pursuant
25 to chapter 324 of the laws of 2003 and for the purposes set forth in
26 chapter 674 of the laws of 2007 including not less than $95,000 for
27 Lake George, provided that not less than $1,000,000 be made avail-
28 able for invasive species eradication, and including grants related
29 to the control and management of invasive species. Such funding for
30 grants shall be provided on a competitive basis in consultation with
31 the New York Invasive Species Council (09IS11ER) ...................
32 3,800,000 ......................................... (re. $2,142,000)
33 Notwithstanding any law to the contrary, for Soil and Water Conserva-
34 tion District activities as authorized for reimbursement in section
35 11-a of the soil and water conservation districts law (09SW11ER) ...
36 3,000,000 ............................................. (re. $4,000)
37 By chapter 99, section 1, of the laws of 2010:
38 For services and expenses of projects and purposes authorized by
39 section 92-s of the state finance law to receive funding from the
40 solid waste account in accordance with a programmatic and financial
41 plan to be approved by the director of the budget, including subal-
42 location to other state departments and agencies, according to the
43 following:
44 Municipal waste reduction or recycling projects (09MR10ER) ...........
45 6,639,000 ............................................ (re. $76,000)
46 Secondary materials regional marketing assistance and energy conserva-
47 tion services projects (09SM10ER) ... 1,000,000 ... (re. $1,000,000)
48 For services and expenses of projects and purposes authorized by
49 section 92-s of the state finance law to receive funding from the
50 parks, recreation and historic preservation account in accordance
51 with a programmatic and financial plan to be approved by the direc-
156 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 tor of the budget, including suballocation to other state depart-
2 ments and agencies, according to the following:
3 Parks, recreation and historic preservation projects, notwithstanding
4 any law to the contrary, not less than, $6,716,000 for municipal
5 parks projects which are in or primarily serve areas where demo-
6 graphic and other relevant data for such areas demonstrate that the
7 areas are densely populated and have sustained physical deteri-
8 oration, decay, neglect or disinvestment or where a substantial
9 proportion of the residential population is of low income or is
10 otherwise disadvantaged and is underserved with respect to the
11 existing recreational opportunities in the area, and notwithstanding
12 any law to the contrary, $225,000 for Olmstead Park, $125,000 for
13 Hyde Park, $225,000 for Darwin Martin House and $125,000 for Gray-
14 cliff Manor (09MP10ER) ... 13,432,000 ............. (re. $5,410,000)
15 Notwithstanding any law to the contrary, for state parks and land and
16 easement infrastructure, access and stewardship projects which shall
17 include capital projects: (i) on state parks and state owned lands
18 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
19 mental conservation law and (ii) on state parks or state owned lands
20 and easements under the jurisdiction of the department of environ-
21 mental conservation or the office of parks, recreation and historic
22 preservation for access opportunities for people with disabilities;
23 access to the State Forest Preserve; State reforestation, Wildlife
24 Management areas and conservation easement lands; recreational trail
25 construction and maintenance; Catskill and Adirondack campground
26 improvements to public access and sanitation facilities; environ-
27 mental education; conservation education facility improvements;
28 archeological, historic, cultural and natural resource surveys,
29 forest health surveys, interpretation, and inventories; Forest
30 Preserve and state forest unit management planning; conservation
31 easement public recreation planning; habitat restoration and
32 enhancement; state fish hatchery improvements; water access facili-
33 ties and safety improvements; public beach facility development and
34 improvement; public access improvements at day use areas; state
35 historic site exterior restoration; and cabin area and camping
36 facility development, restoration and reconstruction (09ST10ER) ....
37 16,228,000 .......................................... (re. $890,000)
38 Notwithstanding subdivision 7 of section 92-s of the state finance law
39 or any other law to the contrary, for services and expenses of the
40 Hudson River Park Trust for projects related to the development of
41 the Hudson River Park consistent with provisions of chapter 592 of
42 the laws of 1998; provided, however, such funds shall not be avail-
43 able for suballocation to any public benefit corporation or public
44 authority with the exception of the Hudson River Park Trust and
45 shall be available solely for the liabilities incurred by the Hudson
46 River Park Trust or by other state departments or agencies on behalf
47 of the Hudson River Park Trust and shall be available solely for the
48 liabilities incurred by the Hudson River Park Trust or by other
49 state departments or agencies on behalf of the Hudson River Park
50 Trust on or after April 1, 1999. Provided further that, the comp-
51 troller is hereby authorized and directed to release monies to the
52 Hudson River Park Trust in amounts set forth in a schedule approved
157 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 by the director of the budget (09HR10ER) ...........................
2 3,000,000 ......................................... (re. $2,025,000)
3 Notwithstanding any law to the contrary, for zoos, botanical gardens
4 and aquaria program (09ZB10ER) ... 9,000,000 ......... (re. $15,000)
5 For services and expenses of projects and purposes authorized by
6 section 92-s of the state finance law to receive funding from the
7 open space account in accordance with a programmatic and financial
8 plan to be approved by the director of the budget, including subal-
9 location to other state departments and agencies, according to the
10 following:
11 Costs related to the acquisition of the following properties: Atlan-
12 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
13 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
14 Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
15 projects, Western Suffolk/Nassau Special Groundwater Protection
16 Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
17 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
18 Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
19 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
20 lands, Mongaup Valley Wildlife Management Area, Northern Putnam
21 Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
22 Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
23 Northeastern Westchester Watershed and Biodiversity Lands, Rockland
24 Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
25 River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
26 Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
27 City Watershed Lands, Taconic Ridge/ Harlem Valley, Albany Pine
28 Bush, Five Rivers Environmental Education Center, Helderberg Escarp-
29 ment, Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill
30 Watershed-Saratoga National Historic Park View shed, Washington
31 County Agricultural Lands-Saratoga National Historic Park View shed,
32 Westmere Woods, Lake George watershed, Lake Champlain watershed,
33 Boeselager forestry, Domtar/Lyme Fee Lands, Catskill River and Road
34 corridor, Rensselaer plateau, Hudson River Gorge, Franklinton Vlaie
35 Wildlife Management area, Black Creek Marsh/Vly Swamp, Mohawk River
36 Valley Corridor/Barge Canal, Oomsdale farm and surrounding land-
37 scape, Susquehanna River Valley Corridor, Pilot Knob, Floodwood
38 Camp, Lake Champlain Shoreline and Wetlands, Saratoga County, Mays
39 Pond Tract, State Forest and Wildlife Management Area Protection,
40 Follensby Park, Undeveloped Lake George Shore, Whitney Park, Finch
41 Woodlands, Washington County Grasslands, Northern Flow River Corri-
42 dors, Recreational Trail Linkages and Networks, Bog River/Beaver
43 River Headwater Complex, Maumee Swamp, Moose River Corridor, Rome
44 Sand Plains, Saint Lawrence River Islands, Shorelines and Wetlands,
45 Eastern Lake Ontario Shoreline and Islands, Tug Hill Core Forests
46 and Headwater Streams, Tioga County Park Opportunities, Nelson
47 Swamp, Genny-Green Trail/Link Trail, Clark Reservation State Park,
48 Salmon River Corridor, State Parks Greenbelt/Tompkins County, Catta-
49 raugus Creek and tributaries, Carpenter Falls/Bear Swamp Creek
50 Corridor, Tonawanda Creek Watershed, Two Rivers State Park, Finger
51 Lakes Shoreline, Buffalo/Niagara River Corridors, Northern Montezuma
52 Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine Valley
158 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus, Hemlock,
2 Canadice and Honeoye, Genesee Greenway/Recreationway, Allegany State
3 Park, Alder Bottom Pond/French Creek, Great Lakes Shorelines and
4 Niagara River, Chautauqua Lake Access, Shore Lands and Vistas,
5 Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
6 Small Projects, Working Forest Lands, State Park and State Historic
7 Site Protection, (a) notwithstanding any law to the contrary,
8 $500,000 from the land acquisition allocation for urban forestry
9 projects provided that no less than $250,000 shall be made available
10 for such programs in cities with populations of 65,000 or more; (b)
11 notwithstanding any law to the contrary, $1,575,000 from the land
12 acquisition allocation to the land trust alliance for the purpose of
13 awarding grants on a competitive basis to local land trusts,
14 provided that up to ten percent of such amount may be made available
15 for administrative costs and/or technical assistance (09LA10ER) ....
16 17,614,000 .......................................... (re. $733,000)
17 Long Island South Shore Estuary Reserve (09SE10ER) ...................
18 900,000 .............................................. (re. $37,000)
19 Agricultural non-point source abatement and control projects
20 (09AN10ER) ... 13,297,000 ............................ (re. $76,000)
21 Non-agricultural non-point source abatement and control projects
22 (09NP10ER) ... 3,703,000 .......................... (re. $3,645,000)
23 Agriculture and farmland protection activities (09FP10ER) ............
24 10,750,000 ....................................... (re. $10,750,000)
25 Biodiversity stewardship and research, and notwithstanding any law to
26 the contrary, $75,000 for Cayuga Island (09BD10ER) .................
27 500,000 ............................................. (re. $420,000)
28 Notwithstanding any law to the contrary, for the Hudson River Estuary
29 Management Plan prepared pursuant to section 11-0306 of the environ-
30 mental conservation law (09HE10ER) ... 3,000,000 .... (re. $265,000)
31 Notwithstanding any law to the contrary, for state assistance
32 payments, pursuant to a smart growth program, provided on a compet-
33 itive basis, to counties, cities, towns, or villages to establish,
34 update or implement comprehensive plans in a manner consistent with
35 smart growth; provided, however, that up to 25 percent of such
36 payments may be awarded to not-for-profit organizations for such
37 purposes (09SG10ER) ... 300,000 ..................... (re. $300,000)
38 Notwithstanding any law to the contrary, for the state share of costs
39 of wastewater treatment improvement projects undertaken by munici-
40 palities to upgrade municipal systems to meet stormwater, combined
41 sewer overflow, sanitary sewer overflow and wastewater treatment
42 discharge requirements with priority given to systems that are in
43 violation of title 8 of article 17 of the environmental conservation
44 law and aquatic habitat restoration projects undertaken by munici-
45 palities and not-for-profit corporations for aquatic habitat resto-
46 ration projects as defined in subdivision 1 of section 56-0101 of
47 the environmental conservation law (09WQ10ER) ......................
48 2,932,000 ......................................... (re. $1,873,000)
49 Notwithstanding any law to the contrary for New York ocean and Great
50 Lakes ecosystem conservation projects, consistent with the policy
51 articulated in article 14 of the environmental conservation law
52 (09GL10ER) ... 5,000,000 .......................... (re. $3,560,000)
159 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any law to the contrary, for the implementation of the
2 recommendations of the invasive species task force prepared pursuant
3 to chapter 324 of the laws of 2003 and for the purposes set forth in
4 chapter 674 of the laws of 2007 including not less than $95,000 for
5 Lake George, provided that not less than $1,000,000 be made avail-
6 able for invasive species eradication, and including grants related
7 to the control and management of invasive species. Such funding for
8 grants shall be provided on a competitive basis in consultation with
9 the New York Invasive Species Council (09IS10ER) ...................
10 3,800,000 ......................................... (re. $1,033,000)
11 Notwithstanding any law to the contrary, for Soil and Water Conserva-
12 tion District activities as authorized for reimbursement in section
13 11-a of the soil and water conservation districts law (09SW10ER) ...
14 3,000,000 ............................................. (re. $1,000)
15 By chapter 99, section 1, of the laws of 2010, as amended by chapter 54,
16 section 1, of the laws of 2011:
17 Local waterfront revitalization programs, notwithstanding any law to
18 the contrary, not less than, $6,000,000 for waterfront revitaliza-
19 tion projects which are in or primarily serve areas where demograph-
20 ic and other relevant data for such areas demonstrate that the areas
21 are densely populated and have sustained physical deterioration,
22 decay, neglect, or disinvestment, or where a substantial proportion
23 of the residential population is of low income or is otherwise
24 disadvantaged and is underserved with respect to the existing recre-
25 ational opportunities in the area; and provided further this appro-
26 priation shall not be construed to restrict the use of any addi-
27 tional monies for such projects; $550,000 for Buffalo Waterfront;
28 $300,000 for Niagara River Greenway; $250,000 for Hudson and Cham-
29 plain Docks; and $400,000 for the Beacon Institute including costs
30 incurred prior to April 1, 2011 (09WR10ER) .........................
31 12,000,000 ....................................... (re. $10,219,000)
32 By chapter 55, section 1, of the laws of 2009:
33 For services and expenses of projects and purposes authorized by
34 section 92-s of the state finance law to receive funding from the
35 solid waste account in accordance with a programmatic and financial
36 plan to be approved by the director of the budget, including subal-
37 location to other state departments and agencies, according to the
38 following:
39 Notwithstanding any law to the contrary, for the breast cancer and
40 environmental risk factors program at Cornell University (09BC09ER)
41 ... 450,000 ......................................... (re. $450,000)
42 For services and expenses of projects and purposes authorized by
43 section 92-s of the state finance law to receive funding from the
44 parks, recreation and historic preservation account in accordance
45 with a programmatic and financial plan to be approved by the direc-
46 tor of the budget, including suballocation to other state depart-
47 ments and agencies, according to the following:
48 Notwithstanding subdivision 7 of section 92-s of the state finance law
49 or any other law to the contrary, for services and expenses of the
50 Hudson River Park Trust for projects related to the development of
160 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 the Hudson River Park consistent with provisions of chapter 592 of
2 the laws of 1998; provided, however, such funds shall not be avail-
3 able for suballocation to any public benefit corporation or public
4 authority with the exception of the Hudson River Park Trust and
5 shall be available solely for the liabilities incurred by the Hudson
6 River Park Trust or by other state departments or agencies on behalf
7 of the Hudson River Park Trust and shall be available solely for the
8 liabilities incurred by the Hudson River Park Trust or by other
9 state departments or agencies on behalf of the Hudson River Park
10 Trust on or after April 1, 1999. Provided further that, the comp-
11 troller is hereby authorized and directed to release monies to the
12 Hudson River Park Trust in amounts set forth in a schedule approved
13 by the director of the budget (09HR09ER) ...........................
14 6,000,000 ......................................... (re. $2,678,000)
15 Notwithstanding any law to the contrary, for zoos, botanical gardens
16 and aquaria program (09ZB09ER) ... 9,000,000 ......... (re. $83,000)
17 For services and expenses of projects and purposes authorized by
18 section 92-s of the state finance law to receive funding from the
19 open space account in accordance with a programmatic and financial
20 plan to be approved by the director of the budget, including subal-
21 location to other state departments and agencies, according to the
22 following:
23 Long Island South Shore Estuary Reserve (09SE09ER) ...................
24 900,000 ............................................. (re. $244,000)
25 Non-agricultural non-point source abatement and control projects
26 (09NP09ER) ... 5,600,000 .......................... (re. $2,055,000)
27 Biodiversity stewardship and research, and notwithstanding any law to
28 the contrary, $100,000 for Cayuga Island (09BD09ER) ................
29 500,000 ............................................. (re. $310,000)
30 By chapter 55, section 1, of the laws of 2009, as amended by chapter
31 502, section 5, of the laws of 2009:
32 Secondary materials regional marketing assistance and energy conserva-
33 tion services projects (09SM09ER) ... 1,381,000 ... (re. $1,381,000)
34 Notwithstanding any law to the contrary, for assessment and recovery
35 of any natural resource damages (09RD09ER) .........................
36 431,000 .............................................. (re. $39,000)
37 Local waterfront revitalization programs, notwithstanding any law to
38 the contrary, not less than, $9,750,000 for waterfront revitaliza-
39 tion projects which are in or primarily serve areas where demograph-
40 ic and other relevant data for such areas demonstrate that the areas
41 are densely populated and have sustained physical deterioration,
42 decay, neglect, or disinvestment, or where a substantial proportion
43 of the residential population is of low income or is otherwise
44 disadvantaged and is underserved with respect to the existing recre-
45 ational opportunities in the area; and provided further this appro-
46 priation shall not be construed to restrict the use of any addi-
47 tional monies for such projects; $1,000,000 for Buffalo Waterfront;
48 $300,000 for Niagara River Greenway; and $700,000 for Hudson and
49 Champlain Docks (09WR09ER) ... 24,021,000 ........ (re. $16,112,000)
50 Parks, recreation and historic preservation projects, notwithstanding
51 any law to the contrary, not less than, $8,490,000 for municipal
161 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 parks projects which are in or primarily serve areas where demo-
2 graphic and other relevant data for such areas demonstrate that the
3 areas are densely populated and have sustained physical deteri-
4 oration, decay, neglect or disinvestment or where a substantial
5 proportion of the residential population is of low income or is
6 otherwise disadvantaged and is underserved with respect to the
7 existing recreational opportunities in the area, and notwithstanding
8 any law to the contrary, $500,000 for Olmstead Park (09MP09ER) .....
9 20,813,000 ........................................ (re. $8,265,000)
10 Notwithstanding any law to the contrary, for state parks and land and
11 easement infrastructure, access and stewardship projects which shall
12 include capital projects: (i) on state parks and state owned lands
13 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
14 mental conservation law and (ii) on state parks or state owned lands
15 and easements under the jurisdiction of the department of environ-
16 mental conservation or the office of parks, recreation and historic
17 preservation for access opportunities for people with disabilities;
18 access to the State Forest Preserve; State reforestation, Wildlife
19 Management areas and conservation easement lands; recreational trail
20 construction and maintenance; Catskill and Adirondack campground
21 improvements to public access and sanitation facilities; environ-
22 mental education; conservation education facility improvements;
23 archeological, historic, cultural and natural resource surveys,
24 forest health surveys, interpretation, and inventories; Forest
25 Preserve and state forest unit management planning; conservation
26 easement public recreation planning; habitat restoration and
27 enhancement; state fish hatchery improvements; water access facili-
28 ties and safety improvements; public beach facility development and
29 improvement; public access improvements at day use areas; state
30 historic site exterior restoration; and cabin area and camping
31 facility development, restoration and reconstruction (09ST09ER) ....
32 5,000,000 ............................................ (re. $35,000)
33 Notwithstanding any law to the contrary, for the purposes of
34 Hudson-FultonChamplain Quadricentennial celebrations, projects and
35 programs (09QC09ER) ... 450,000 ..................... (re. $125,000)
36 Costs related to the acquisition of the following properties: Atlan-
37 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
38 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
39 Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
40 projects, Western Suffolk/Nassau Special Groundwater Protection
41 Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
42 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
43 Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
44 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
45 lands, Mongaup Valley Wildlife Management Area, Northern Putnam
46 Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
47 Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
48 Northeastern Westchester Watershed and Biodiversity Lands, Rockland
49 Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
50 River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
51 Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
52 City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
162 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Five Rivers Environmental Education Center, Helderberg Escarpment,
2 Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill Watershed-
3 Saratoga National Historic Park View shed, Washington County Agri-
4 cultural Lands-Saratoga National Historic Park View shed, Westmere
5 Woods, International Paper Fee Lands, Lake George watershed, Lake
6 Champlain watershed, Boeselager forestry, Domtar/Lyme Fee Lands,
7 Catskill River and Road corridor, Rensselaer plateau, Hudson River
8 Gorge, Franklinton Vlaie Wildlife Management area, Black Creek
9 Marsh/Vly Swamp, Mohawk River Valley Corridor/Barge Canal, Oomsdale
10 farm and surrounding landscape, Susquehanna River Valley Corridor,
11 Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and Wetlands,
12 Saratoga County, Mays Pond Tract, State Forest and Wildlife Manage-
13 ment Area Protection, Follensby Park, National Lead/Tahawus, Unde-
14 veloped Lake George Shore, Whitney Park, Finch Woodlands, Washington
15 County Grasslands, Northern Flow River Corridors, Recreational Trail
16 Linkages and Networks, Bog River/Beaver River Headwater Complex,
17 Maumee Swamp, Moose River Corridor, Rome Sand Plains, Saint Lawrence
18 River Islands, Shorelines and Wetlands, Eastern Lake Ontario Shore-
19 line and Islands, Tug Hill Core Forests and Headwater Streams, Tioga
20 County Park Opportunities, Nelson Swamp, Genny-Green Trail/Link
21 Trail, Clark Reservation State Park, Salmon River Corridor, State
22 Parks Greenbelt/Tompkins County, Cattaraugus Creek and tributaries,
23 Carpenter Falls/Bear Swamp Creek Corridor, Junius Ponds State Forest
24 and Wildlife Management Area Protection, Tonawanda Creek Watershed,
25 Two Rivers State Park, Finger Lakes Shoreline, Buffalo/Niagara River
26 Corridors, Northern Montezuma Wetlands, HiTor/Bristol Hills, Brad-
27 dock Bay, Catharine Valley Complex, Sonnenberg Gardens, Western
28 Finger Lakes: Conesus, Hemlock, Canadice and Honeoye, Genesee
29 Greenway/Recreationway, Allegany State Park, Alder Bottom
30 Pond/French Creek, Great Lakes Shorelines and Niagara River, Chau-
31 tauqua Lake Access, Shore Lands and Vistas, Randolph Swamp, Eighteen
32 Mile Creek/Hampton Brook Woods, Statewide Small Projects, Working
33 Forest Lands, State Park and State Historic Site Protection, (a)
34 notwithstanding any law to the contrary, $500,000 from the land
35 acquisition allocation for urban forestry projects provided that no
36 less than $250,000 shall be made available for such programs in
37 cities with populations of 65,000 or more; (b) notwithstanding any
38 law to the contrary, $1,575,000 from the land acquisition allocation
39 to the land trust alliance for the purpose of awarding grants on a
40 competitive basis to local land trusts, provided that up to ten
41 percent of such amount may be made available for administrative
42 costs and/or technical assistance (09LA09ER) .......................
43 58,900,000 ........................................... (re. $91,000)
44 Agricultural non-point source abatement and control projects
45 (09AN09ER) ... 11,468,000 ............................ (re. $82,000)
46 Notwithstanding any law to the contrary, for the Hudson River Estuary
47 Management Plan prepared pursuant to section 11-0306 of the environ-
48 mental conservation law (09HE09ER) ... 3,706,000 ..... (re. $10,000)
49 Notwithstanding any law to the contrary, for state assistance
50 payments, pursuant to a smart growth program, provided on a compet-
51 itive basis, to counties, cities, towns, or villages to establish,
52 update or implement comprehensive plans in a manner consistent with
163 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 smart growth; provided, however, that up to 25 percent of such
2 payments may be awarded to not-for-profit organizations for such
3 purposes (09SG09ER) ... 400,000 ..................... (re. $119,000)
4 Agriculture and farmland protection activities (09FP09ER) ............
5 22,054,000 ....................................... (re. $21,410,000)
6 Notwithstanding any law to the contrary, for the state share of costs
7 of wastewater treatment improvement projects undertaken by munici-
8 palities to upgrade municipal systems to meet stormwater, combined
9 sewer overflow, sanitary sewer overflow and wastewater treatment
10 discharge requirements with priority given to systems that are in
11 violation of title 8 of article 17 of the environmental conservation
12 law and aquatic habitat restoration projects undertaken by munici-
13 palities and not-for-profit corporations for aquatic habitat resto-
14 ration projects as defined in subdivision 1 of section 56-0101 of
15 the environmental conservation law (09WQ09ER) ......................
16 8,900,000 ......................................... (re. $1,452,000)
17 Notwithstanding any law to the contrary for New York ocean and Great
18 Lakes ecosystem conservation projects, consistent with the policy
19 articulated in article 14 of the environmental conservation law
20 (09GL09ER) ... 5,953,000 .......................... (re. $2,554,000)
21 Notwithstanding any law to the contrary, for the implementation of the
22 recommendations of the invasive species task force prepared pursuant
23 to chapter 324 of the laws of 2003 and for the purposes set forth in
24 chapter 674 of the laws of 2007 including not less than $96,000 for
25 Lake George, provided that not less than $1,000,000 be made avail-
26 able for invasive species eradication, and including grants related
27 to the control and management of invasive species. Such funding for
28 grants shall be provided on a competitive basis in consultation with
29 the New York Invasive Species Council (09IS09ER) ...................
30 4,794,000 ......................................... (re. $1,538,000)
31 By chapter 55, section 1, of the laws of 2008:
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 parks, recreation and historic preservation account in accordance
35 with a programmatic and financial plan to be approved by the direc-
36 tor of the budget, including suballocation to other state depart-
37 ments and agencies, according to the following:
38 Notwithstanding any law to the contrary, for zoos, botanical gardens
39 and aquaria program (09ZB08ER) ... 9,000,000 ......... (re. $74,000)
40 Notwithstanding any law to the contrary, for the Catskill Interpretive
41 Center (09CC08ER) ... 1,000,000 ..................... (re. $994,000)
42 Notwithstanding any law to the contrary, for the purposes of
43 Hudson-FultonChamplain Quadricentennial celebrations, projects and
44 programs (09QC08ER) ... 3,000,000 ................... (re. $137,000)
45 Notwithstanding any law to the contrary, for solar energy initiatives
46 (09SO08ER) ... 2,000,000 ............................. (re. $82,000)
47 For services and expenses of projects and purposes authorized by
48 section 92-s of the state finance law to receive funding from the
49 open space account in accordance with a programmatic and financial
50 plan to be approved by the director of the budget, including subal-
164 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 location to other state departments and agencies, according to the
2 following:
3 Long Island South Shore Estuary Reserve (09SE08ER) ...................
4 900,000 .............................................. (re. $74,000)
5 By chapter 55, section 1, of the laws of 2008, as amended by chapter 1,
6 section 4, of the laws of 2009:
7 Secondary materials regional marketing assistance and energy conserva-
8 tion services projects (09SM08ER) ... 2,500,000 ... (re. $2,500,000)
9 Parks, recreation and historic preservation projects, notwithstanding
10 any law to the contrary, not less than, $6,400,000 for municipal
11 parks projects which are in or primarily serve areas where demo-
12 graphic and other relevant data for such areas demonstrate that the
13 areas are densely populated and have sustained physical deteri-
14 oration, decay, neglect or disinvestment or where a substantial
15 proportion of the residential population is of low income or is
16 otherwise disadvantaged and is underserved with respect to the
17 existing recreational opportunities in the area, and notwithstanding
18 any law to the contrary, $50,000 from the heritage areas allocation
19 for the purpose of awarding grants on a competitive basis to herit-
20 age area organizations designated in statute (09MP08ER) ............
21 19,225,000 ........................................ (re. $6,921,000)
22 Notwithstanding any law to the contrary, for state parks and land and
23 easement infrastructure, access and stewardship projects which shall
24 include capital projects: (i) on state parks and state owned lands
25 acquired pursuant to sections 54-0303 and 56-0307 of the environ-
26 mental conservation law; (ii) on state parks or state owned lands
27 and easements under the jurisdiction of the department of environ-
28 mental conservation or the office of parks, recreation and historic
29 preservation for access opportunities for people with disabilities;
30 access to the State Forest Preserve; State reforestation, Wildlife
31 Management areas and conservation easement lands; recreational trail
32 construction and maintenance; Catskill and Adirondack campground
33 improvements to public access and sanitation facilities; environ-
34 mental education; conservation education facility improvements;
35 archeological, historic, cultural and natural resource surveys,
36 forest health surveys, interpretation, and inventories; Forest
37 Preserve and state forest unit management planning; conservation
38 easement public recreation planning; habitat restoration and
39 enhancement; state fish hatchery improvements; water access facili-
40 ties and safety improvements; public beach facility development and
41 improvement; public access improvements at day use areas; state
42 historic site exterior restoration; and cabin area and camping
43 facility development, restoration and reconstruction; (iii) $750,000
44 from such amount for Belleayre Mountain ski center projects
45 (09ST08ER) ... 4,000,000 ............................ (re. $435,000)
46 Costs related to the acquisition of the following properties: Atlan-
47 tic Coast, Long Island Sound Coastal Area, Long Island South Shore
48 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects,
49 Central Pine Barrens, Adirondack Mountain Club Lands, Hudson River
50 projects, Western Suffolk/Nassau Special Groundwater Protection
51 Areas, Harbor Herons Wildlife Complex, Inner City/Underserved Commu-
165 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 nity Parks, Long Pond/Butler Woods, Staten Island Greenbelt, Staten
2 Island Wet Woods, Harlem River Waterfront, Great Swamp, Neversink
3 Highlands, Plutarch/Black Creek Wetlands Complex, New York High-
4 lands, Mongaup Valley Wildlife Management Area, Northern Putnam
5 Greenway, Putnam Railroad, Schunnemunk Mountain/Moodna
6 Creek/Woodcock Mountain, Sterling Forest, Shawangunk Mountains,
7 Northeastern Westchester Watershed and Biodiversity Lands, Rockland
8 Riverfront Communities/Palisades Ridge, Catskill Mountain/Delaware
9 River Region, Beaverkill/Willowemoc, Hudson River Estuary/Greenway
10 Trail Corridor, Catskill Unfragmented Forest, Long Path, New York
11 City Watershed Lands, Taconic Ridge/Harlem Valley, Albany Pine Bush,
12 Five Rivers Environmental Education Center, Helderberg Escarpment,
13 Pine Bush-Hudson River Link/Tivoli Preserve, Batten Kill Watershed-
14 Saratoga National Historic Park View shed, Washington County Agri-
15 cultural Lands-Saratoga National Historic Park View shed, Westmere
16 Woods, International Paper Fee Lands, Lake George watershed, Lake
17 Champlain watershed, Boeselager forestry, Domtar/Lyme Fee Lands,
18 working forests lands, Catskill River and Road corridor, Rensselaer
19 plateau, Hudson River Gorge, Franklinton Vlaie Wildlife Management
20 area, Black Creek Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie
21 Canal, Oomsdale farm and surrounding landscape, Susquehanna River
22 Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain Shore-
23 line and Wetlands, Saratoga County, Mays Pond Tract, State Forest
24 and Wildlife Management Area Protection, Follensby Park, National
25 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
26 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
27 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
28 Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
29 and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
30 Core Forests and Headwater Streams, Tioga County Park Opportunities,
31 Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
32 Park, Salmon River Corridor, State Parks Greenbelt/Tompkins County,
33 Cattaraugus Creek and tributaries, Carpenter Falls/Bear Swamp Creek
34 Corridor, Junius Ponds State Forest and Wildlife Management Area
35 Protection, Tonawanda Creek Watershed, Two Rivers State Park, Finger
36 Lakes Shoreline, Buffalo/Niagara River Corridors, Northern Montezuma
37 Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine Valley
38 Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus, Hemlock,
39 Canadice and Honeoye, Genesee Greenway/Recreationway, Allegany State
40 Park, Alder Bottom Pond/French Creek, Great Lakes Shorelines and
41 Niagara River, Chautauqua Lake Access, Shore Lands and Vistas,
42 Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
43 Small Projects, Working Forest Lands, and State Park and State
44 Historic Site Protection, (a) notwithstanding any law to the contra-
45 ry, $500,000 from the land acquisition allocation for urban forestry
46 projects provided that no less than $250,000 shall be made available
47 for such programs in cities with populations of 65,000 or more; (b)
48 notwithstanding any law to the contrary, $1,575,000 from the land
49 acquisition allocation to the land trust alliance for the purpose of
50 awarding grants on a competitive basis to local land trusts,
51 provided that up to ten percent of such amount may be made available
166 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 for administrative costs and/or technical assistance (09LA08ER) ....
2 58,725,000 ........................................ (re. $3,915,000)
3 Agricultural non-point source abatement and control projects
4 (09AN08ER) ... 9,500,000 .......................... (re. $1,156,000)
5 Non-agricultural non-point source abatement and control projects
6 (09NP08ER) ... 4,750,000 .......................... (re. $1,761,000)
7 Agriculture and farmland protection activities (09FP08ER) ............
8 23,000,000 ........................................ (re. $4,507,000)
9 Notwithstanding any law to the contrary, for the Hudson River Estuary
10 Management Plan prepared pursuant to section 11-0306 of the environ-
11 mental conservation law provided however that no more than
12 $1,000,000 shall be used for Hudson-Fulton Champlain Quadricentenni-
13 al celebrations, projects and programs (09HE08ER) ..................
14 5,000,000 ........................................... (re. $147,000)
15 Notwithstanding any law to the contrary, for state assistance
16 payments, pursuant to a smart growth program, provided on a compet-
17 itive basis, to counties, cities, towns, or villages to establish,
18 update or implement comprehensive plans in a manner consistent with
19 smart growth; provided, however, that up to 25 percent of such
20 payments may be awarded to not-for-profit organizations for such
21 purposes (09SG08ER) ... 1,000,000 ................... (re. $277,000)
22 Notwithstanding any law to the contrary, for the state share of costs
23 of wastewater treatment improvement projects undertaken by munici-
24 palities to upgrade municipal systems to meet stormwater, combined
25 sewer overflow, sanitary sewer overflow and wastewater treatment
26 discharge requirements with priority given to systems that are in
27 violation of title 8 of article 17 of the environmental conservation
28 law and aquatic habitat restoration projects undertaken by munici-
29 palities and not-for-profit corporations for aquatic habitat resto-
30 ration projects as defined in subdivision 1 of section 56-0101 of
31 the environmental conservation law (09WQ08ER) ......................
32 9,000,000 ......................................... (re. $5,413,000)
33 Notwithstanding any law to the contrary for New York ocean and Great
34 Lakes ecosystem conservation projects, consistent with the policy
35 articulated in article 14 of the environmental conservation law
36 (09GL08ER) ... 4,500,000 ............................ (re. $510,000)
37 Notwithstanding any law to the contrary, for the implementation of the
38 recommendations of the invasive species task force prepared pursuant
39 to chapter 324 of the laws of 2003 and for the purposes set forth in
40 chapter 674 of the laws of 2007 provided that not less than
41 $1,000,000 be made available for invasive species eradication, and
42 including grants related to the control and management of invasive
43 species. Such funding for grants shall be provided on a competitive
44 basis in consultation with the New York Invasive Species Council
45 (09IS08ER) ... 4,000,000 .......................... (re. $1,096,000)
46 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
47 section 1, of the laws of 2009:
48 Local waterfront revitalization programs, notwithstanding any law to
49 the contrary, not less than, $7,100,000 for waterfront revitaliza-
50 tion projects which are in or primarily serve areas where demograph-
51 ic and other relevant data for such areas demonstrate that the areas
167 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 are densely populated and have sustained physical deterioration,
2 decay, neglect, or disinvestment, or where a substantial proportion
3 of the residential population is of low income or is otherwise
4 disadvantaged and is underserved with respect to the existing recre-
5 ational opportunities in the area; and provided further this appro-
6 priation shall not be construed to restrict the use of any addi-
7 tional monies for such projects; $250,000 for services and expenses
8 of the Upper Susquehanna Coalition (09WR08ER) ......................
9 22,375,000 ....................................... (re. $10,473,000)
10 By chapter 55, section 1, of the laws of 2007:
11 For services and expenses of projects and purposes authorized by
12 section 92-s of the state finance law to receive funding from the
13 solid waste account in accordance with a programmatic and financial
14 plan to be approved by the director of the budget, including subal-
15 location to other state departments and agencies, according to the
16 following:
17 Secondary materials regional marketing assistance and energy conserva-
18 tion services projects (09SM07ER) ... 8,750,000 ... (re. $8,750,000)
19 Notwithstanding any law to the contrary, for assessment and recovery
20 of any natural resource damages to the Hudson River (09RD07ER) .....
21 1,300,000 ............................................ (re. $19,000)
22 For services and expenses of projects and purposes authorized by
23 section 92-s of the state finance law to receive funding from the
24 parks, recreation and historic preservation account in accordance
25 with a programmatic and financial plan to be approved by the direc-
26 tor of the budget, including suballocation to other state depart-
27 ments and agencies, according to the following:
28 Local waterfront revitalization programs, notwithstanding any law to
29 the contrary, not less than, $6,656,000 for waterfront revitaliza-
30 tion projects which are in or primarily serve areas where demograph-
31 ic and other relevant data for such areas demonstrate that the areas
32 are densely populated and have sustained physical deterioration,
33 decay, neglect, or disinvestment, or where a substantial proportion
34 of the residential population is of low income or is otherwise
35 disadvantaged and is underserved with respect to the existing recre-
36 ational opportunities in the area; and provided further this section
37 shall not be construed to restrict the use of any additional monies
38 for such projects; $1,625,000 for services and expenses of the
39 Beacon Institute; $1,000,000 for services and expenses of riverfront
40 development properties in Rensselaer county; and $1,000,000 for
41 services and expenses for Long Island water projects (09WR07ER) ....
42 26,625,000 ........................................ (re. $1,624,000)
43 Parks, recreation and historic preservation projects, notwithstanding
44 any law to the contrary, not less than, $5,306,000 for municipal
45 parks projects which are in or primarily serve areas where demo-
46 graphic and other relevant data for such areas demonstrate that the
47 areas are densely populated and have sustained physical deteri-
48 oration, decay, neglect or disinvestment or where a substantial
49 proportion of the residential population is of low income or is
50 otherwise disadvantaged and is underserved with respect to the
168 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 existing recreational opportunities in the area (09MP07ER) .........
2 21,225,000 ........................................ (re. $5,010,000)
3 For services and expenses of projects and purposes authorized by
4 section 92-s of the state finance law to receive funding from the
5 open space account in accordance with a programmatic and financial
6 plan to be approved by the director of the budget, including subal-
7 location to other state departments and agencies, according to the
8 following:
9 Costs related to the acquisition of the following properties: Long
10 Island Sound Coastal Area, Long Island South Shore Estuary Reserve,
11 Peconic Pinelands Maritime Reserve Projects, Central Pine Barrens,
12 Adirondack Mountain Club Lands, Hudson River projects, Western
13 Suffolk/Nassau Special Groundwater Protection Area, Inner
14 City/Underserved Community Parks, Long Pond/Butler Wood, Staten
15 Island Greenbelt, Staten Island Wet Woods, Fahnestock State Park,
16 Great Swamp, Neversink Highlands, Plutarch/Black Creek Wetlands
17 Complex, Highlands Greenway Corridor, Mongaup Valley Wildlife
18 Management Area, Northern Putnam Greenway, Schunnemunk
19 Mountain/Moodna Creek/Woodcock Mountain, Sterling Forest, Shawangunk
20 Mountains, Westchester Marine Corridor, Rockland County Highlands,
21 Catskill Mountain/Delaware River Region, Beaverkill/Willowemoc,
22 Hudson River Corridor Estuary/Greenway Trail, Catskill Unfragmented
23 Forest, Long Path, New York City Watershed Lands-Croton, Taconic
24 Ridge/Harlem Valley, Albany Pine Bush, Five Rivers Environmental
25 Education Center, Helderberg Escarpment, Pine Bush-Hudson River
26 Link/Tivoli Preserve, Batten Kill Watershed-Saratoga National
27 Historic Park Viewshed, Washington County Agricultural LandsSaratoga
28 National Historic Park Viewshed, Westmere Woods, International Paper
29 Fee Lands, Lake George watershed, Lake Champlain watershed, Boese-
30 lager forestry, Domtar/Lyme Fee Lands, Catskill River and Road
31 corridor, Rensselaer plateau, Franklinton Vlaie Wildlife Management
32 area, Black Creek Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie
33 Canal, Oomsdale farm and surrounding landscape, Susquehanna River
34 Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain Shore-
35 line and Wetlands, Saratoga County, Mays Pond Tract, State Forest
36 and Wildlife Management Area Protection, Follensby Park, National
37 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
38 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
39 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
40 Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
41 and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
42 Core Forests and Headwater Streams, Tioga County Park Opportunities,
43 Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
44 Park, Salmon River Corridor, Cattaraugus Creek and tributaries,
45 Carpenter Falls/Bear Swamp Creek Corridor, Junius Ponds State Forest
46 and Wildlife Management Area Protection, Tonawanda Creek Watershed,
47 Two Rivers State Park, Finger Lakes Shoreline, Buffalo/Niagara River
48 Corridors, Northern Montezuma Wetlands, HiTor/Bristol Hills, Brad-
49 dock Bay, Catharine Valley Complex, Sonnenberg Gardens, Western
50 Finger Lakes: Conesus, Hemlock, Canadice and Honeoye, Genesee
51 Greenway/Recreationway, Allegany State Park, Alder Bottom
52 Pond/French Creek, Great Lakes and Niagara River Access Shore Lands
169 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 and Vistas, Chautauqua Lake Access, Shore Lands and Vistas, Randolph
2 Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide Small
3 Projects, Working Forest Lands, and State Park and State Historic
4 Site Protection, (a) notwithstanding any law to the contrary,
5 $500,000 from the land acquisition allocation for urban forestry
6 projects provided that no less than $250,000 shall be made available
7 for such programs in cities with populations of 65,000 or more and
8 (b) notwithstanding any law to the contrary, $1,000,000 from the
9 land acquisition allocation to the land trust alliance for the
10 purpose of awarding grants on a competitive basis to local land
11 trusts, provided that up to ten percent of such amount shall be made
12 available for administrative costs (09LA07ER) ......................
13 55,000,000 .......................................... (re. $715,000)
14 Agriculture and farmland protection activities (09FP07ER) ............
15 28,000,000 ....................................... (re. $10,293,000)
16 Long Island South Shore Estuary Reserve (09SE07ER) ...................
17 900,000 .............................................. (re. $70,000)
18 Agricultural non-point source abatement and control projects
19 (09AN07ER) ... 12,833,000 ............................ (re. $29,000)
20 Non-agricultural non-point source abatement and control projects
21 (09NP07ER) ... 6,417,000 ............................ (re. $819,000)
22 Notwithstanding any law to the contrary, for state assistance
23 payments, pursuant to a smart growth program, provided on a compet-
24 itive basis, to counties, cities, towns or villages to establilsh or
25 update comprehensive plans in a manner consistent with smart growth
26 (09SG07ER) ... 2,000,000 ............................ (re. $150,000)
27 Notwithstanding any law to the contrary for New York ocean and Great
28 Lakes ecosystem conservation projects, consistent with the policy
29 articulated in article 14 of the environmental conservation law
30 (09GL07ER) ... 4,000,000 ............................ (re. $938,000)
31 Notwithstanding any law to the contrary, for the implementation of the
32 recommendations of the invasive species task force prepared pursuant
33 to chapter 324 of the laws of 2003 including not less than $250,000
34 for Lake George, provided that not less than $1,000,000 be made
35 available for invasive species eradication. Funding shall be limited
36 to the preparation of a comprehensive invasive species management
37 plan, and grants for projects related to the control and management
38 of invasive species, education and outreach efforts, and for
39 projects aimed at the early detection and prevention of invasive
40 species. Such funding for grants shall be provided on a competitive
41 basis in consultation with the New York State Invasive Species Task
42 Force (09IS07ER) ... 5,000,000 ....................... (re. $94,000)
43 By chapter 55, section 1, of the laws of 2007, as amended by chapter 55,
44 section 1, of the laws of 2008:
45 Notwithstanding any law to the contrary, for state parks and land
46 infrastructure, access and stewardship projects which shall include
47 capital projects: (i) on state parks and state owned lands acquired
48 pursuant to sections 54-0303 and 56-0307 of the environmental
49 conservation law; (ii) on state parks or state owned lands under the
50 jurisdiction of the department of environmental conservation or the
51 office of parks, recreation and historic preservation for access
170 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 opportunities for people with disabilities; access to the State
2 Forest Preserve; recreational trail construction and maintenance;
3 Catskill and Adirondack campground improvements to public access and
4 sanitation facilities; conservation education facility improvements;
5 archeological, historic, cultural and natural resource surveys,
6 interpretation, and inventories; Forest Preserve and state forest
7 unit management planning; habitat restoration and enhancement; state
8 fish hatchery improvements; water access facilities and safety
9 improvements; public beach facility development and improvement;
10 public access improvements at day use areas; state historic site
11 exterior restoration; and cabin area and camping facility develop-
12 ment, restoration and reconstruction and (iii) $750,000 from such
13 amount for Belleayre Mountain ski center projects (09ST07ER) .......
14 22,250,000 .......................................... (re. $406,000)
15 Notwithstanding any law to the contrary, for the state share of costs
16 of wastewater treatment improvement projects undertaken by munici-
17 palities to upgrade municipal systems to meet stormwater, combined
18 sewer overflow, sanitary sewer overflow and wastewater treatment
19 discharge requirements with priority given to systems that are in
20 violation of title 8 of article 17 of the environmental conservation
21 law and aquatic habitat restoration projects undertaken by munici-
22 palities and not-for-profit corporations for aquatic habitat resto-
23 ration projects as defined in subdivision 1 of section 56-0101 of
24 the environmental conservation law (09WQ07ER) ......................
25 10,000,000 .......................................... (re. $541,000)
26 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
27 section 1, of the laws of 2007:
28 For services and expenses of projects and purposes authorized by
29 section 92-s of the state finance law to receive funding from the
30 solid waste account in accordance with a programmatic and financial
31 plan to be approved by the director of the budget, including subal-
32 location to other state departments and agencies, including: (a)
33 notwithstanding any law to the contrary, $1,300,000 for the assess-
34 ment and recovery of any natural resource damages to the Hudson
35 River; and (b) notwithstanding any law to the contrary, $450,000 for
36 a Cornell University program to assess breast cancer and environ-
37 mental risk factors in New York State (09E206ER) ...................
38 23,770,500 ........................................ (re. $8,856,000)
39 PROJECT SCHEDULE
40 PROJECT AMOUNT
41 -------------------------------------------
42 (thousands of dollars)
43 Non-hazardous landfill closure
44 projects ........................... 3,000
45 Municipal waste reduction or
46 recycling projects ................. 8,750
47 Secondary materials regional
48 marketing assistance and
49 energy conservation services
50 projects ........................... 8,750
171 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Services and expenses of the
2 assessment and recovery of
3 any natural resource damages
4 to the Hudson River ................ 1,300
5 Pesticides program ................... 2,475
6 --------------
7 Total ............................. 24,275
8 ==============
9 By chapter 55, section 1, of the laws of 2006, as added by chapter 108,
10 section 5, of the laws of 2006:
11 For services and expenses of projects and purposes authorized by
12 section 92-s of the state finance law to receive funding from the
13 parks, recreation and historic preservation account in accordance
14 with a programmatic and financial plan to be approved by the direc-
15 tor of the budget, including suballocation to other state depart-
16 ments and agencies, including: (a) notwithstanding subdivision 7 of
17 section 92-s of the state finance law or any other law to the
18 contrary, $5,000,000 for services and expenses of the Hudson River
19 Park Trust for projects related to the development of the Hudson
20 River Park consistent with provisions of chapter 592 of the laws of
21 1998; provided, however, such funds shall not be available for
22 suballocation to any public benefit corporation or public authority
23 with the exception of the Hudson River Park Trust and shall be
24 available solely for the liabilities incurred by the Hudson River
25 Park Trust or by other state departments or agencies on behalf of
26 the Hudson River Park Trust and shall be available solely for the
27 liabilities incurred by the Hudson River Park Trust or by other
28 state departments or agencies on behalf of the Hudson River Park
29 Trust on or after April 1, 1999. Provided further that, the comp-
30 troller is hereby authorized and directed to release monies to the
31 Hudson River Park Trust in amounts set forth in a schedule approved
32 by the director of the budget; (b) notwithstanding any law to the
33 contrary, $15,000,000 for state parks and land infrastructure,
34 access and stewardship projects which shall include capital
35 projects: (i) on state parks and state owned lands acquired pursuant
36 to sections 54-0303 and 56-0307 of the environmental conservation
37 law or (ii) on state parks or state owned lands under the jurisdic-
38 tion of the department of environmental conservation or the office
39 of parks, recreation and historic preservation for access opportu-
40 nities for people with disabilities; access to the State Forest
41 Preserve; recreational trail construction and maintenance; Catskill
42 and Adirondack campground improvements to public access and sanita-
43 tion facilities; conservation education facility improvements;
44 archeological, historic, cultural and natural resource surveys,
45 interpretation, and inventories; Forest Preserve and state forest
46 unit management planning; habitat restoration and enhancement; state
47 fish hatchery improvements; water access facilities and safety
48 improvements; public beach facility development and improvement;
49 public access improvements at day use areas; state historic site
50 exterior restoration; and cabin area and camping facility develop-
51 ment, restoration and reconstruction; and (iii) $750,000 from such
172 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 amount for Belleayre Mountain ski center projects; (c) notwithstand-
2 ing any law to the contrary, $5,000,000 for historic barns program;
3 (d) notwithstanding any law to the contrary, $7,500,000 for zoos,
4 botanical gardens and aquaria program; (e) notwithstanding any law
5 to the contrary, not less than, $6,750,000 for waterfront revitali-
6 zation projects which are in or primarily serve areas where demo-
7 graphic and other relevant data for such areas demonstrate that the
8 areas are densely populated and have sustained physical deteri-
9 oration, decay, neglect, or disinvestment, or where a substantial
10 proportion of the residential population is of low income or is
11 otherwise disadvantaged and is underserved with respect to the
12 existing recreational opportunities in the area; and provided
13 further this section shall not be construed to restrict the use of
14 any additional monies for such projects; (f) notwithstanding any law
15 to the contrary, not less than, $5,118,000 for municipal parks
16 projects which are in or primarily serve areas where demographic and
17 other relevant data for such areas demonstrate that the areas are
18 densely populated and have sustained physical deterioration, decay,
19 neglect or disinvestment or where a substantial proportion of the
20 residential population is of low income or is otherwise disadvan-
21 taged and is underserved with respect to the existing recreational
22 opportunities in the area; and provided further this section shall
23 not be construed to restrict the use of any additional monies for
24 such projects and not less than $1,500,000 for the Albany Pine Bush
25 Preserve Discovery Center; (g) notwithstanding any law to the
26 contrary, $7,250,000 from the waterfront revitalization allocation
27 for the Beacon Institute including $5,000,000 for the development of
28 the upper satellite center associated with the Beacon Institute
29 located on the Troy waterfront; and (h) notwithstanding any law to
30 the contrary, $1,000,000 for waterfront revitalization and river-
31 front development projects in the county of Rensselaer and $300,000
32 for Sea Cliff, $300,000 for the town of Huntington, $100,000 for
33 Laurel Hollow, $100,000 for Asharoken, $100,000 for Lloyd Harbor and
34 $100,000 for Bayville; provided that such state assistance payment
35 shall not be construed to restrict the use of any additional monies
36 for such project or be considered a state assistance payment or
37 other assistance for the purposes of title 11 of article 54 of the
38 environmental conservation law and title 3 of article 56 of the
39 environmental conservation law; and provided further, however that
40 such state assistance payment shall reduce the total cost of such
41 project for purposes of calculating eligibility for further state
42 assistance payments (09E306ER) ... 79,970,000 ..... (re. $4,548,000)
43 PROJECT SCHEDULE
44 PROJECT AMOUNT
45 --------------------------------------------
46 (thousands of dollars)
47 Local waterfront revitaliza-
48 tion programs ..................... 27,000
49 Parks, recreation and historic
50 preservation projects ............. 20,470
173 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Stewardship projects ................ 15,000
2 Historic barn preservation ........... 5,000
3 Zoos, botanical gardens and
4 aquaria projects ................... 7,500
5 Hudson River Park .................... 5,000
6 --------------
7 Total ............................. 79,970
8 ==============
9 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
10 section 1, of the laws of 2007:
11 For services and expenses of projects and purposes authorized by
12 section 92-s of the state finance law to receive funding from the
13 open space account in accordance with a programmatic and financial
14 plan to be approved by the director of the budget, including subal-
15 location to other state departments and agencies, including costs
16 related to the acquisition of the following properties: Long Island
17 Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
18 Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
19 Growth Area and Critical Resource Area, Western Suffolk/Nassau
20 Special Groundwater Protection Area, Inner City/Underserved Communi-
21 ty Parks, Long Pond/Butler Wood, Staten Island Greenbelt, Staten
22 Island Wet Woods, Fahnestock State Park, Great Swamp, Neversink
23 Highlands, Plutarch/Black Creek Wetlands Complex, Highlands Greenway
24 Corridor, Mongaup Valley Wildlife Management Area, Northern Putnam
25 Greenway, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Ster-
26 ling Forest, Shawangunk Mountains, Westchester Marine Corridor,
27 Rockland County Highlands, Catskill Mountain/Delaware River Region,
28 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
29 Catskill Unfragmented Forest, Long Path, New York City Watershed
30 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
31 Rivers Environmental Education Center, Helderberg Escarpment, Pine
32 Bush-Hudson River Link/Tivoli Preserve, Westmere Woods, Interna-
33 tional Paper Fee Lands, Lake George watershed, Lake Champlain
34 watershed, Boeselager forestry, Domtar/Lyme Fee Lands, Catskill
35 River and Road corridor, Rensselaer plateau, Franklinton Vlaie Wild-
36 life Management area, Black Creek Marsh/Vly Swamp, Mohawk River
37 Valley Corridor/Erie Canal, Oomsdale farm and surrounding landscape,
38 Susquehanna River Valley Corridor, Pilot Knob, Floodwood Camp, Lake
39 Champlain Shoreline and Wetlands, Wilton Wildlife Preserve and Park,
40 Follensby Park, National Lead/Tahawus, Undeveloped Lake George
41 Shore, Whitney Park, Northern Flow River Corridors, Recreational
42 Trail Linkages and Networks, Bog River/Beaver River Headwater
43 Complex, Maumee Swamp, Moose River Corridor, Rome Sand Plains, Saint
44 Lawrence River Islands, Shorelines and Wetlands, Eastern Lake Ontar-
45 io Shoreline and Islands, Tug Hill Core Forests and Headwater
46 Streams, Tioga County Park Opportunities, Nelson Swamp, Genny-Green
47 Trail/Link Trail, Clark Reservation State Park, Salmon River Corri-
48 dor, Cattaraugus Creek and tributaries, Carpenter Falls/Bear Swamp
49 Creek Corridor, Junius Ponds State Forest and Wildlife Management
50 Area Protection, Tonawanda Creek Watershed, Two Rivers State Park,
51 Finger Lakes Shoreline, Buffalo/Niagara River Corridors, Northern
174 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Montezuma Wetlands, HiTor/Bristol Hills, Braddock Bay, Catharine
2 Valley Complex, Sonnenberg Gardens, Western Finger Lakes: Conesus,
3 Hemlock, Canadice and Honeoye, Genesee Greenway/Recreationway, Alle-
4 gany State Park, Alder Bottom Pond/French Creek, Great Lakes and
5 Niagara River Access Shore Lands and Vistas, Chautauqua Lake Access,
6 Shore Lands and Vistas, Randolph Swamp, Eighteen Mile Creek/Hampton
7 Brook Woods, Statewide Small Projects, Working Forest Lands, and
8 State Park and State Historic Site Protection, including: (a)
9 notwithstanding any law to the contrary, $5,000,000 for the Hudson
10 River Estuary Management Plan prepared pursuant to section 11-0306
11 of the environmental conservation law; (b) notwithstanding any law
12 to the contrary, $2,000,000 for the Finger Lakes-Lake Ontario
13 Watershed Protection Alliance; (c) notwithstanding any law to the
14 contrary, $3,000,000 for Soil and Water Conservation District activ-
15 ities as authorized for reimbursement in section 11-a of the soil
16 and water conservation districts law; (d) notwithstanding any law to
17 the contrary, $500,000 from the land acquisition allocation for
18 urban forestry projects provided that no less than $250,000 shall be
19 made available for such programs in cities with populations of
20 65,000 or more; (e) notwithstanding any law to the contrary,
21 $500,000 from the land acquisition allocation to the land trust
22 alliance for the purpose of awarding grants on a competitive basis
23 to local land trusts, provided that up to ten percent of such amount
24 shall be made available for administrative costs; (f) notwithstand-
25 ing any law to the contrary, $3,000,000 for reimbursement of eligi-
26 ble costs related to the New York state quality communities program;
27 (g) notwithstanding any law to the contrary, $7,000,000 for the
28 state share costs of wastewater treatment improvement projects
29 undertaken by municipalities to upgrade municipal systems to meet
30 stormwater discharge requirements with priority given to systems
31 that are in violation of title 8 of article 17 of the environmental
32 conservation law and aquatic habitat restoration projects undertaken
33 by municipalities and not-for-profit corporations for aquatic habi-
34 tat restoration projects as defined in subdivision 1 of section
35 56-0101 of the environmental conservation law; (h) notwithstanding
36 any law to the contrary $3,000,000 for New York ocean and Great
37 Lakes ecosystem conservation projects, consistent with the policy
38 articulated in article 14 of the environmental conservation law; (i)
39 notwithstanding any law to the contrary, $3,250,000 for the imple-
40 mentation of the recommendations of the invasive species task force
41 prepared pursuant to chapter 324 of the laws of 2003 including not
42 less than $250,000 for Lake George, provided that not less than
43 $1,000,000 be made available for invasive species eradication.
44 Funding shall be limited to the preparation of a comprehensive inva-
45 sive species management plan, and grants for projects related to the
46 control and management of invasive species, education and outreach
47 efforts, and for projects aimed at the early detection and
48 prevention of invasive species. Such funding for grants shall be
49 provided on a competitive basis in consultation with the New York
50 State Invasive Species Task Force; and (j) notwithstanding any law
51 to the contrary, $16,505,000 for non-point source abatement and
52 control projects provided that no less than $11,003,000 shall be
175 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 made available for agricultural nonpoint source abatement and
2 control projects and no less than $5,502,000 shall be made available
3 for non-agricultural non-point source abatement and control projects
4 (09E606ER) ... 121,259,500 ........................ (re. $3,028,000)
5 PROJECT SCHEDULE
6 PROJECT AMOUNT
7 --------------------------------------------
8 (thousands of dollars)
9 Land acquisition .................... 50,000
10 Hudson River Estuary Manage-
11 ment Plan .......................... 5,000
12 Biodiversity stewardship and
13 research ........................... 1,500
14 County agriculture and farm-
15 land protection activities ........ 23,000
16 Agricultural non-point source
17 abatement and control
18 projects .......................... 11,003
19 Non-agricultural non-point
20 source abatement and control
21 projects ........................... 5,502
22 Soil and water conservation
23 districts .......................... 3,000
24 Finger Lakes-Lake Ontario
25 Watershed Protection Alli-
26 ance ............................... 2,000
27 Albany Pine Bush Preserve
28 Commission ......................... 1,500
29 Long Island Central Pine
30 Barrens Planning ................... 1,100
31 Long Island South Shore Estu-
32 ary Reserve .......................... 900
33 Quality Communities Projects ......... 3,000
34 Invasive Species Projects ............ 3,250
35 Water Quality Improvement
36 Projects ........................... 7,000
37 New York ocean and Great Lakes
38 Ecosystem conservation ............. 3,000
39 --------------
40 Total ............................ 120,755
41 ==============
42 By chapter 55, section 1, of the laws of 2005, as amended by chapter 54,
43 section 1, of the laws of 2011:
44 For services and expenses of projects and purposes authorized by
45 section 92-s of the state finance law to receive funding from the
46 solid waste account in accordance with a programmatic and financial
47 plan to be approved by the director of the budget, including subal-
48 location to other state departments and agencies, including: (a)
49 notwithstanding any law to the contrary, $1,300,000 for the assess-
50 ment and recovery of any natural resource damages to the Hudson
176 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 River; and (b) notwithstanding any law to the contrary, $450,000 for
2 a Cornell University program to assess breast cancer and environ-
3 mental risk factors in New York State (09E205ER) ...................
4 18,750,000 .......................................... (re. $909,000)
5 PROJECT SCHEDULE
6 PROJECT AMOUNT
7 --------------------------------------------
8 (thousands of dollars)
9 Non-hazardous landfill closure
10 projects ........................... 3,000
11 Municipal waste reduction or
12 recycling projects ................. 7,000
13 Secondary materials regional
14 marketing assistance and
15 energy conservation services
16 projects ........................... 7,000
17 Services and expenses of the
18 assessment and recovery of
19 any natural resource damages
20 to the Hudson River ................ 1,300
21 Pesticides program ................... 2,475
22 --------------
23 Total ............................. 20,775
24 ==============
25 By chapter 55, section 1, of the laws of 2005, as added by chapter 62,
26 section 4, of the laws of 2005:
27 For services and expenses of projects and purposes authorized by
28 section 92-s of the state finance law to receive funding from the
29 parks, recreation and historic preservation account in accordance
30 with a programmatic and financial plan to be approved by the direc-
31 tor of the budget, including suballocation to other state depart-
32 ments and agencies, including: (a) notwithstanding subdivision 7 of
33 section 92-s of the state finance law or any other law to the
34 contrary, $5,000,000 for services and expenses of the Hudson River
35 Park Trust for projects related to the development of the Hudson
36 River Park consistent with provisions of chapter 592 of the laws of
37 1998; provided, however, such funds shall not be available for
38 suballocation to any public benefit corporation or public authority
39 with the exception of the Hudson River Park Trust and shall be
40 available solely for the liabilities incurred by the Hudson River
41 Park Trust or by other state departments or agencies on behalf of
42 the Hudson River Park Trust and shall be available solely for the
43 liabilities incurred by the Hudson River Park Trust or by other
44 state departments or agencies on behalf of the Hudson River Park
45 Trust on or after April 1, 1999. Provided further that, the comp-
46 troller is hereby authorized and directed to release monies to the
47 Hudson River Park Trust in amounts set forth in a schedule approved
48 by the director of the budget; (b) notwithstanding any law to the
49 contrary, $6,500,000 for state parks and land infrastructure and
50 stewardship projects which shall include capital projects: (i) on
177 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 state parks and state owned lands acquired pursuant to sections
2 54-0303 and 56-0307 of the environmental conservation law or (ii) on
3 state parks or state owned lands under the jurisdiction of the
4 department of environmental conservation or the office of parks,
5 recreation and historic preservation for access opportunities for
6 people with disabilities; access to the State Forest Preserve;
7 recreational trail construction and maintenance; Catskill and
8 Adirondack campground improvements to public access and sanitation
9 facilities; conservation education facility improvements; archeolog-
10 ical, historic, cultural and natural resource surveys, interpreta-
11 tion, and inventories; Forest Preserve unit management planning;
12 habitat restoration and enhancement; water access facilities; public
13 beach facility development and improvement; public access improve-
14 ments at day use areas; state historic site exterior restoration;
15 and cabin area and camping facility development, restoration and
16 reconstruction; and include seven hundred fifty thousand dollars
17 from such amount for Belleayre Mountain ski center projects; (c)
18 notwithstanding any law to the contrary, $750,000 for historic barns
19 program; (d) notwithstanding any law to the contrary, $6,000,000 for
20 zoos, botanical gardens and aquaria program; (e) notwithstanding any
21 law to the contrary not less than, $3,563,000 for waterfront revi-
22 talization projects which are in or primarily serve areas where
23 demographic and other relevant data for such areas demonstrate that
24 the areas are densely populated and have sustained physical deteri-
25 oration, decay, neglect, or disinvestment, or where a substantial
26 proportion of the residential population is of low income or is
27 otherwise disadvantaged and is underserved with respect to the
28 existing recreational opportunities in the area; and provided
29 further this section shall not be construed to restrict the use of
30 any additional monies for such projects; (f) notwithstanding any law
31 to the contrary, not less than, $3,579,000 for municipal parks
32 projects which are in or primarily serve areas where demographic and
33 other relevant data for such areas demonstrate that the areas are
34 densely populated and have sustained physical deterioration, decay,
35 neglect or disinvestment or where a substantial proportion of the
36 residential population is of low income or is otherwise disadvan-
37 taged and is underserved with respect to the existing recreational
38 opportunities in the area; and provided further this section shall
39 not be construed to restrict the use of any additional monies for
40 such projects; (g) notwithstanding any law to the contrary,
41 $1,000,000 from the waterfront revitalization allocation for the
42 rivers and estuaries center on the Hudson; and (h) notwithstanding
43 any law to the contrary, $1,000,000 for waterfront revitalization
44 and riverfront development projects in the county of Rensselaer and
45 $500,000 for Oyster Bay and $500,000 for the town of Huntington;
46 provided that such state assistance payment shall not be construed
47 to restrict the use of any additional monies for such project or be
48 considered a state assistance payment or other assistance for the
49 purposes of title 11 of article 54 of the environmental conservation
50 law and title 3 of article 56 of the environmental conservation law;
51 and provided further, however that such state assistance payment
52 shall reduce the total cost of such project for purposes of calcu-
178 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 lating eligibility for further state assistance payments (09E305ER)
2 ... 46,815,000 .................................... (re. $2,967,000)
3 PROJECT SCHEDULE
4 PROJECT AMOUNT
5 --------------------------------------------
6 (thousands of dollars)
7 Local waterfront revitaliza-
8 tion programs ..................... 14,250
9 Parks, recreation and historic
10 preservation projects ............. 14,315
11 Stewardship projects ................. 6,500
12 Historic barn preservation ............. 750
13 Zoos, botanical gardens and
14 aquaria projects ................... 6,000
15 Hudson River Park .................... 5,000
16 --------------
17 Total ............................. 46,815
18 ==============
19 By chapter 55, section 1, of the laws of 2005, as amended by chapter 55,
20 section 1, of the laws of 2007:
21 For services and expenses of projects and purposes authorized by
22 section 92-s of the state finance law to receive funding from the
23 open space account in accordance with a programmatic and financial
24 plan to be approved by the director of the budget, including subal-
25 location to other state departments and agencies, including costs
26 related to the acquisition of the following properties: Long Island
27 Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
28 Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
29 Growth Area and Critical Resource Area, Western Suffolk/Nassau
30 Special Groundwater Protection Area, Inner City/Underserved Communi-
31 ty Parks, Long Pond/Butler Wood, Staten Island Greenbelt, Staten
32 Island Wet Woods, Fahnestock State Park, Great Swamp, Neversink
33 Highlands, Plutarch/Black Creek Wetlands Complex, Highlands Greenway
34 Corridor, Mongaup Valley Wildlife Management Area, Northern Putnam
35 Greenway, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain, Ster-
36 ling Forest, Shawangunk Mountains, Westchester Marine Corridor,
37 Rockland County Highlands, Catskill Mountain/Delaware River Region,
38 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Train,
39 Catskill Unfragmented Forest, Long Path, New York City Watershed
40 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Five
41 Rivers Environmental Education Center, Helderberg Escarpment, Pine
42 Bush-Hudson River Link/Tivoli Preserve, Westmere Woods, Black Creek
43 Marsh/Vly Swamp, Mohawk River Valley Corridor/Erie Canal, Susquehan-
44 na River Valley Corridor, Pilot Knob, Floodwood Camp, Lake Champlain
45 Shoreline and Wetlands, Wilton Wildlife Preserve and Park, National
46 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
47 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
48 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
49 Corridor, Rome Sand Plains, Saint Lawrence River Islands, Shorelines
50 and Wetlands, Eastern Lake Ontario Shoreline and Islands, Tug Hill
179 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Core Forests and Headwater Streams, Tioga County Park Opportunities,
2 Nelson Swamp, Genny-Green Trail/Link Trail, Clark Reservation State
3 Park, Salmon River Corridor, Northern Montezuma Wetlands,
4 HiTor/Bristol Hills, Braddock Bay, Catharine Valley Complex, Sonnen-
5 berg Gardens, Western Finger Lakes: Conesus, Hemlock, Canadice and
6 Honeoye, Genesee Greenway/Recreationway, Allegany State Park, Alder
7 Bottom Pond/French Creek, Great Lakes and Niagara River Access Shore
8 Lands and Vistas, Chautauqua Lake Access, Shore Lands and Vistas,
9 Randolph Swamp, Eighteen Mile Creek/Hampton Brook Woods, Statewide
10 Small Projects, Working Forest Lands, and State Park and State
11 Historic Site Protection, including: (a) notwithstanding any law to
12 the contrary, $5,000,000 for the Hudson River Estuary Management
13 Plan prepared pursuant to section 11-0306 of the environmental
14 conservation law; (b) notwithstanding any law to the contrary,
15 $1,500,000 for the Finger Lakes-Lake Ontario Watershed Protection
16 Alliance; (c) notwithstanding any law to the contrary, $1,860,000
17 for Soil and Water Conservation District activities as authorized
18 for reimbursement in section 11-a of the soil and water conservation
19 districts law; (d) notwithstanding any law to the contrary, $500,000
20 from the land acquisition allocation for urban forestry projects
21 provided that no less than $250,000 shall be made available for such
22 programs in cities with populations of 65,000 or more; (e) notwith-
23 standing any law to the contrary, $500,000 from the land acquisition
24 allocation to the land trust alliance for the purpose of awarding
25 grants on a competitive basis to local land trusts, provided that up
26 to ten percent of such amount shall be made available for adminis-
27 trative costs; and (f) notwithstanding any law to the contrary,
28 $3,000,000 for reimbursement of eligible costs related to the New
29 York state quality communities program pursuant to chapter 62 of the
30 laws of 2005 (09E605ER) ... 84,435,000 ............ (re. $1,498,000)
31 PROJECT SCHEDULE
32 PROJECT AMOUNT
33 --------------------------------------------
34 (thousands of dollars)
35 Land acquisition .................... 40,000
36 Hudson River Estuary Manage-
37 ment Plan .......................... 5,000
38 Biodiversity stewardship and
39 research ........................... 1,000
40 County agriculture and farm-
41 land protection activities ........ 16,000
42 Non-point source abatement and
43 control projects .................. 11,700
44 Soil and water conservation
45 districts .......................... 1,860
46 Finger Lakes-Lake Ontario
47 Watershed Protection Alli-
48 ance ............................... 1,500
49 Albany Pine Bush Preserve
50 Commission ........................... 800
180 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Long Island Central Pine
2 Barrens Planning ..................... 950
3 Long Island South Shore Estu-
4 ary Reserve .......................... 600
5 Quality Communities Projects ......... 3,000
6 --------------
7 Total ............................. 82,410
8 ==============
9 By chapter 55, section 1, of the laws of 2004:
10 For services and expenses of projects and purposes authorized by
11 section 92-s of the state finance law to receive funding from the
12 solid waste account in accordance with a programmatic and financial
13 plan to be approved by the director of the budget, including subal-
14 location to other state departments and agencies (09E204ER) ........
15 16,775,000 ............................................ (re. $9,000)
16 PROJECT SCHEDULE
17 PROJECT AMOUNT
18 --------------------------------------------
19 (thousands of dollars)
20 Municipal waste reduction or
21 recycling projects ................. 6,500
22 Secondary materials regional
23 marketing assistance and
24 energy conservation services
25 projects ........................... 6,500
26 Services and expenses of the
27 assessment and recovery of
28 any natural resource damages
29 to the Hudson River ................ 1,300
30 Pesticides program ................... 2,475
31 --------------
32 Total ............................. 16,775
33 ==============
34 For services and expenses of projects and purposes authorized by
35 section 92-s of the state finance law to receive funding from the
36 open space account in accordance with a programmatic and financial
37 plan to be approved by the director of the budget, including subal-
38 location to other state departments and agencies including costs
39 related to the acquisition of the following properties: Long Island
40 Sound Coastal Area, Long Island South Shore Estuary Reserve, Peconic
41 Pinelands Maritime Reserve Projects, Pine Barrens Core Compatible
42 Growth Area and Critical Resource Area, Western Suffolk/Nassau
43 Special Groundwater Protection Area, Inner City/Underserved Communi-
44 ty Parks, Staten Island Green-Belt, Staten Island Wet Woods, Fahnes-
45 tock State Park, Great Swamp, Neversink Highlands, Plutarch/Black
46 Creek Wetland Complex, Highlands Greenway Corridor, Mongaup Valley
47 Wildlife Management Area, Northern Putnam Greenway, Schunnemunk
48 Mountain/Moodna Creek/Woodcock Mountain, Sterling Forest, Shawangunk
49 Mountains, Westchester Marine Corridor, Rockland County Highlands,
181 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Catskill Mountain/Delaware River Region, Beaverkill/Willowemoc,
2 Hudson River Corridor Estuary/Greenway Trail, Catskill Unfragmented
3 Forest, Long Path, New York City Watershed Lands-Croton, Taconic
4 Ridge/Harlem Valley, Albany Pine Bush, Five Rivers Environmental
5 Education Center, Pine Bush-Hudson River/Tivoli Preserve, Westmere
6 Woods, Black Creek Marsh/Vly Swamp, Susquehanna River Valley Corri-
7 dor, Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and
8 Wetlands, Wilton Wildlife Preserve and Park, National Lead/Tahawus,
9 Undeveloped Lake George Shore, Whitney Park, Northern River Flow
10 Corridors, Recreational Trail Linkages and Networks, Bog
11 River/Beaver River Headwater Complex, Maumee Swamp, Moose River
12 Corridor, Rome Sand Plains, Eastern Lake Ontario Shoreline and
13 Islands, Tug Hill Core Forests and Headwater Streams, Nelson Swamp,
14 Genny-Green Trail/Link Trail, Clark Reservation State Park, Salmon
15 River Corridor, Northern Montezuma Wetlands, HiTor/Bristol Hills,
16 Braddock Bay, Catharine Valley Complex, Western Finger Lakes: Cone-
17 sus, Hemlock, Canadice and Honeoye, Genesee Greenway/Recreation way,
18 Allegany State Park, Alder Bottom Pond/French Creek, Great Lakes and
19 Niagara River Access Shore Lands and Vistas, Chautauqua Lake Access
20 Shore Lands and Vistas, Randolph Swamp, Eighteen Mile Creek/Hampton
21 Brook Woods, Statewide Small Projects, Working Forest Lands, State
22 Park and State Historic Site Protection, Helderberg Escarpment, Long
23 Pond/Bulter Wood, Saint Lawrence River Island, and Sonnenberg
24 Gardens (09E604ER) ... 66,660,000 .................... (re. $70,000)
25 PROJECT SCHEDULE
26 PROJECT AMOUNT
27 --------------------------------------------
28 (thousands of dollars)
29 Land acquisition .................... 32,000
30 Hudson River Estuary Manage-
31 ment Plan .......................... 5,000
32 Biodiversity stewardship and
33 research ............................. 700
34 County agriculture and farm-
35 land protection activities ........ 12,600
36 Non-point source abatement and
37 control projects .................. 10,850
38 Soil and water conservation
39 districts ...........................1,860
40 Finger Lakes-Lake Ontario
41 Watershed Protection Alli-
42 ance ............................... 1,500
43 Albany Pine Bush Preserve
44 Commission ........................... 600
45 Long Island Central Pine
46 Barrens Planning ..................... 950
47 Long Island South Shore Estu-
48 ary Reserve .......................... 600
49 --------------
50 Total ............................. 66,660
51 ==============
182 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2004, as amended by chapter 54,
2 section 1, of the laws of 2011:
3 For services and expenses of projects and purposes authorized by
4 section 92-s of the state finance law to receive funding from the
5 parks, recreation and historic preservation account in accordance
6 with a programmatic and financial plan to be approved by the direc-
7 tor of the budget, including suballocation to other state depart-
8 ments and agencies (09E304ER) ... 41,565,000 ...... (re. $1,707,000)
9 PROJECT SCHEDULE
10 PROJECT AMOUNT
11 --------------------------------------------
12 (thousands of dollars)
13 Local waterfront revitaliza-
14 tion programs ..................... 12,500
15 Parks, recreation and historic
16 preservation projects ............. 12,565
17 Hudson River Park ................... 10,000
18 Stewardship projects ................. 5,750
19 Historic barns projects ................ 750
20 --------------
21 Total ............................. 41,565
22 ==============
23 By chapter 55, section 1, of the laws of 2003, as added by chapter 684,
24 section 2, of the laws of 2003:
25 For services and expenses of projects and purposes authorized by
26 section 92-s of the state finance law to receive funding from the
27 solid waste account in accordance with a programmatic and financial
28 plan to be approved by the director of the budget, including subal-
29 location to other state departments and agencies (09E203ER) ........
30 16,925,000 .......................................... (re. $638,000)
31 Project Schedule
32 PROJECT AMOUNT
33 --------------------------------------------
34 (thousands of dollars)
35 Municipal waste reduction or
36 recycling projects ................. 6,500
37 Secondary materials regional
38 marketing assistance and
39 energy conservation services
40 projects ........................... 6,500
41 Services and expenses of the
42 assessment and recovery of
43 any natural resource damages
44 to the Hudson River ................ 1,300
45 Pesticides program ................... 2,625
46 --------------
47 Total ............................. 16,925
48 ==============
183 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services and expenses of projects and purposes authorized by
2 section 92-s of the state finance law to receive funding from the
3 parks, recreation and historic preservation account in accordance
4 with a programmatic and financial plan to be approved by the direc-
5 tor of the budget, including suballocation to other state depart-
6 ments and agencies (09E303ER) ... 45,665,000 ........ (re. $799,000)
7 Project Schedule
8 PROJECT AMOUNT
9 --------------------------------------------
10 (thousands of dollars)
11 Local waterfront revitaliza-
12 tion projects ..................... 12,000
13 Parks, recreation and historic
14 preservation projects ............. 12,165
15 Hudson River Park ................... 15,000
16 Stewardship projects ................. 5,750
17 Historic barns projects ................ 750
18 --------------
19 Total ............................. 45,665
20 ==============
21 For services and expenses of projects and purposes authorized by
22 section 92-s of the state finance law to receive funding from the
23 open space account in accordance with a programmatic and financial
24 plan to be approved by the director of the budget, including subal-
25 location to other state departments and agencies including costs
26 related to the acquisition of the following properties: Long Island
27 Sound Coastal Area; Long Island South Shore Estuary Reserve; Peconic
28 Pinelands Maritime Reserve Projects; Pine Barrens Core, Compatible
29 Growth Area and Critical Resource Area; Western Suffolk/Nassau
30 Special Groundwater Protection Area; Inner City/Underserved Communi-
31 ty Parks; Staten Island Greenbelt; Staten Island Wet Woods; Fahnes-
32 tock State Park; Great Swamp; Neversink Highlands; Plutarch/Black
33 Creek Wetland Complex; Highlands Greenway Corridor; Mongaup Valley
34 Wildlife Management Area; Catskill Mountain/Delaware River Region;
35 Schunnemunk Mountain/Moodna Creek/Woodcock Mountain; Sterling
36 Forest; Sawangunk Mountains; Westchester Marine Corridor;
37 Beaverkill/Willowemoc; Hudson River Corridor Estuary/Greenway Trail;
38 Catskill Unfragmented Forest; Long Path; New York City Watershed
39 Lands-Croton; Taconic Ridge/Harlem Valley; Albany Pine Bush; Five
40 Rivers Environmental Education Center; Pine Bush-Hudson River/Tivoli
41 Preserve; Westmere Woods; Pilot Knob; Floodwood Camp; McLenitahn
42 Property; Lake Champlain Shoreline and Wetlands; Wilton Wildlife
43 Preserve and Park; National Lead/Hahawus; Undeveloped Lake George
44 Shore; Whitney Park; Roden Property; Northern Flow River Corridors;
45 Recreational Trail Linkages and Networks; Bog River/Beaver River
46 Headwater Complex; Eastern Lake Ontario Shoreline and Islands;
47 Maumee Swamp; Moose River Corridor; Tug Hill Core Forests and Head-
48 water Streams; Rome Sand Plains; Nelson Swamp; Genesee
49 Greenway/Recreationway; Genny-Green Trail/Link Trail; Northern
50 Montezuma Wetlands; HiTor/Bristol Hills; Western Finger Lakes:
184 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Conesus, Hemlock, Canadice, and Honeoye; Allegany State Park; Alder
2 Bottom Pond/French Creek; Great Lakes and Niagara River Access,
3 Shore Lands and Vistas; Salmon River Corridor; Braddock Bay; Catha-
4 rine Valley Complex; Clark Reservation State Park; Chautauqua Lake
5 Access, Shore Lands and Vistas; Randolph Swamp; Eighteen Mile
6 Creek/Hampton Brook Woods; Statewide Small Projects; Working Forest
7 Lands; State Park and State Historic Site Protection; and Northern
8 Putnam Greenway (09E603ER) ... 62,410,000 ........... (re. $116,000)
9 Project Schedule
10 PROJECT AMOUNT
11 --------------------------------------------
12 (thousands of dollars)
13 Land acquisition .................... 30,000
14 Hudson River Estuary Manage-
15 ment Plan .......................... 5,000
16 Biodiversity stewardship and
17 research ............................. 700
18 County agriculture and farm-
19 land protection activities ........ 12,000
20 Non-point source abatement and
21 control projects .................. 10,100
22 Soil and water conservation
23 districts .......................... 1,860
24 Finger Lakes-Lake Ontario
25 Watershed Protection Alli-
26 ance ............................... 1,300
27 Albany Pine Bush Preserve
28 Commission ........................... 400
29 Long Island Central Pine
30 Barrens Planning ..................... 700
31 Long Island South Shore Estu-
32 ary Reserve .......................... 350
33 --------------
34 Total ............................. 62,410
35 ==============
36 By chapter 54, section 1, of the laws of 2002:
37 For services and expenses of projects and purposes authorized by
38 section 92-s of the state finance law to receive funding from the
39 solid waste account in accordance with a programmatic and financial
40 plan to be approved by the director of the budget, including subal-
41 location to other state departments and agencies (09E202ER) ........
42 14,435,000 .......................................... (re. $135,000)
43 Project Schedule
44 PROJECT AMOUNT
45 --------------------------------------------
46 (thousands of dollars)
47 Municipal waste reduction or
48 recycling projects ................. 5,255
49 Secondary materials regional
185 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 marketing assistance and
2 energy conservation services
3 projects ........................... 5,255
4 Services and expenses of the
5 assessment and recovery of
6 any natural resource damages
7 to the Hudson River ................ 1,300
8 Pesticides program ................... 2,625
9 --------------
10 Total ............................. 14,435
11 ==============
12 For services and expenses of projects and purposes authorized by
13 section 92-s of the state finance law to receive funding from the
14 parks, recreation and historic preservation account in accordance
15 with a programmatic and financial plan to be approved by the direc-
16 tor of the budget, including suballocation to other state depart-
17 ments and agencies. Notwithstanding any other law to the contrary,
18 $11 million of this appropriation shall support capital projects,
19 excluding personal service costs, eligible and authorized for fund-
20 ing from any office of parks, recreation and historic preservation
21 state park infrastructure fund - 076 appropriation or reappropri-
22 ation, subject to the approval of the director of the budget.
23 Notwithstanding any other law to the contrary, such expenses shall be
24 paid in the first instance from the state park infrastructure fund -
25 076, then reimbursed from this appropriation, including the transfer
26 of expenses and the payment of liabilities incurred prior to April
27 1, 2002, up to the limit of $11 million (09E302ER) .................
28 47,935,000 .......................................... (re. $758,000)
29 Project Schedule
30 PROJECT AMOUNT
31 --------------------------------------------
32 (thousands of dollars)
33 Local waterfront revitaliza-
34 tion programs ...................... 6,685
35 Parks, recreation and historic
36 preservation projects .............. 7,250
37 Hudson River Park ................... 15,000
38 Stewardship projects ................. 7,000
39 State parks projects ................ 11,000
40 Historic barns projects .............. 1,000
41 --------------
42 Total ............................. 47,935
43 ==============
44 For services and expenses of projects and purposes authorized by
45 section 92-s of the state finance law to receive funding from the
46 open space account in accordance with a programmatic and financial
47 plan to be approved by the director of the budget, including subal-
48 location to other state departments and agencies including costs
49 related to the acquisition of the following properties: Long Island
186 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Sound Coastal Area including Held Property, Long Island South Shore
2 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects, Pine
3 Barrens Core Compatible Growth Area and Critical Resource Area,
4 Western Suffolk/Nassau Special Groundwater Protection Area Undhill,
5 Inner City/Underserved Community Parks - including Bushwick Inlet,
6 Mount Loretto, Staten Island Greenbelt, Staten Island Wet Woods,
7 Fahnestock State Park, Great Swamp, Lundy Estate, Neversink High-
8 lands, Highlands Greenway Corridor, Mongaup Valley Wildlife Manage-
9 ment Area, Schunnemunk Mountain/Moodna Creek/Woodcock Mountain,
10 Sterling Forest, Shawangunk Mountains, Westchester Marine Corridor,
11 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
12 Catskill Unfragmented Forest, Long Path, New York City Watershed
13 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Olana
14 Viewshed, Five Rivers Environmental Education Center, Tivoli
15 Preserve, Cedarlands, Pilot Knob, Floodwood Camp, Lake Champlain
16 Shoreline and Wetlands, Wilton Wildlife Preserve and Park, National
17 Lead/Tahawus, Undeveloped Lake George Shore, Whitney Park, Northern
18 Flow River Corridors, Recreational Trail Linkages and Networks, Bog
19 River/Beaver River Headwater Complex, Eastern Lake Ontario Shoreline
20 and Islands, Minnehaha Tract, Maumee Swamp, Moose River Corridor,
21 Tug Hill Core Forests and Headwater Streams, Rome Sand Plains,
22 Nelson Swamp, Genesee Greenway/Recreationway, Genny-Green Trail/Link
23 Trail, Northern Montezuma Wetlands, Hemlock/Canadice/Honeoye Lakes,
24 Allegany State Park, Alder Bottom/French Creek, Great Lakes &
25 Niagara River Access, Shore Lands & Vistas, Salmon River Corridor,
26 Braddock Bay, Clark Reservation State park, Chautauqua Lake Access,
27 Shore Lands and Vistas, Randolf Swamp, Eighteen Mile Creek/Hampton
28 Brook Woods, Delaware River Tailwaters, Statewide Small Projects,
29 Working Forest Lands/Conservation Easements, Working Forest
30 Lands/Conservation Easements, Working Forest Lands/Conservation
31 Easements-Domtar Inc., Working Forest Lands/Conservation Easements-
32 Boeselager Forestry, and Working Forest Lands/Conservation Ease-
33 ments-Clerical Medical Forestry (09E402ER) .........................
34 62,630,000 .......................................... (re. $382,000)
35 Project Schedule
36 PROJECT AMOUNT
37 --------------------------------------------
38 (thousands of dollars)
39 Land acquisition .................... 38,000
40 Hudson River Estuary Manage-
41 ment Plan .......................... 5,800
42 Biodiversity stewardship and
43 research ............................. 750
44 County agriculture and farm-
45 land protection activities ......... 8,000
46 Non-point source abatement and
47 control projects ................... 5,500
48 Soil and water conservation
49 districts .......................... 1,860
50 Finger Lakes-Lake Ontario
51 Watershed Protection Alli-
187 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ance ............................... 1,300
2 Albany Pine Bush Preserve
3 Commission ........................... 370
4 Long Island Central Pine
5 Barrens Planning ..................... 700
6 Long Island South Shore Estu-
7 ary Reserve .......................... 350
8 --------------
9 Total ............................. 62,630
10 ==============
11 By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
12 section 1, of the laws of 2007:
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 solid waste account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies (09E200ER) ........
18 22,025,000 .......................................... (re. $160,000)
19 Project Schedule
20 PROJECT AMOUNT
21 --------------------------------------------
22 (thousands of dollars)
23 Non-hazardous landfill closure
24 projects ........................... 7,000
25 Municipal waste reduction or
26 recycling projects ................. 6,225
27 Secondary materials regional
28 marketing assistance and
29 energy conservation services
30 projects ........................... 5,000
31 Services and expenses of the
32 assessment and recovery of
33 any natural resource damages
34 to the Hudson River ................ 1,300
35 Pesticides program ................... 2,650
36 --------------
37 Total ............................. 22,175
38 ==============
39 For services and expenses of projects and purposes authorized by
40 section 92-s of the state finance law to receive funding from the
41 parks, recreation and historic preservation account in accordance
42 with a programmatic and financial plan to be approved by the direc-
43 tor of the budget, including suballocation to other state depart-
44 ments and agencies (09E300ER) ... 46,550,000 ........ (re. $736,000)
45 Project Schedule
46 PROJECT AMOUNT
47 --------------------------------------------
188 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 (thousands of dollars)
2 Local waterfront revitaliza-
3 tion programs ...................... 7,068
4 Park, recreation and historic
5 preservation projects .............. 7,482
6 Hudson River Park ................... 20,000
7 Stewardship projects ................ 12,000
8 --------------
9 Total ............................. 46,550
10 ==============
11 By chapter 55, section 1, of the laws of 2000, as amended by chapter 55,
12 section 1, of the laws of 2007:
13 For services and expenses of projects and purposes authorized by
14 section 92-s of the state finance law to receive funding from the
15 open space account in accordance with a programmatic and financial
16 plan to be approved by the director of the budget, including subal-
17 location to other state departments and agencies including costs
18 related to the acquisition of the following properties: Long Island
19 South Shore Estuary Reserve; Peconic Pinelands Maritime Reserve
20 Projects; Pine Barrens Core and Critical Resource Areas; Mt. Loret-
21 to; Inner City/Underserved Community Park-Eastern District Terminal;
22 Fahnestock State Park; Lundy Estate; Mongaup Valley Wildlife Manage-
23 ment Area Additions; Neversink Gorge; Schunemunk Mountain/Moodna
24 Creek; Shawangunk Ridge/Minnewaska State Park Preserve; New York
25 City Reservoirs-Croton; Sterling Forest; Hudson River
26 Estuary/Greenway Trail; Albany Pine Bush; Taconic Ridge/Harlem
27 Valley; Beaverkill/Willowemoc; Five Rivers Education Center; Long
28 Path; Bartlett Carry; Delaware River Tailwaters; Bear
29 Pen/Vly/Roundtop Mountains; Floodwood (Boy Scout Camp); Lake Cham-
30 plain Shoreline and Wetlands; National Lead/Tahawus; Underdeveloped
31 Lake George Shore; Wilton Wildlife Preserve and Park; Pilot Knob;
32 Northern Flow River Corridors; Minnehaha Tract; Rome Sand Plains;
33 Eastern Ontario Shoreline; Northern Montezuma Wetlands; Statewide
34 Small Projects; Hemlock/Canadice/Honeoye Lakes; Whitney Park;
35 Genny-Green Trail/Link Trail; Allegany State Park; Braddock Bay;
36 Chautauqua Lake Access; Nelson Swamp; Randolph Swamp; Alder Bottom
37 Pond/French Creek; Long Island Sound Coastal Area; Genesee
38 Greenway/Recreationway; Deveaux Woods; Watkins Glen State Park;
39 Taughannock Falls State Park; Onlana Viewshed; East Branch Fish
40 Creek; Staten Island Greenbelt - Decker Farm; Staten Island Green-
41 belt - Reeds Basket Willow Swamp/Chapin Avenue Woods; Westchester
42 Marine Corridor - Titus Mill Pond; Working Forest Lands/Conservation
43 Easements - Cedarlands; Working Forest Lands/Conservation Easements
44 - Champion International Inc and Working Forest Lands/Conservation
45 Easements - Domtar Inc; Lake Erie Niagara River Access/Spicer Creek;
46 Long Island Sound Coastal Access/Mt. Sinai Harbor - Chandler Estate;
47 Long Island Sound Coastal Area/Central Bays Complex - Conscience Bay
48 Watershed/Laurel Hill Cemetary; Innercity/Underserved Community Park
49 - Graniteville Quarry; Working Forest Lands/Conservation Easments
50 Boeselager Forestry; and Working Forest Lands/Conservation Easements
189 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 - Clerical Medical Forestry (09E400ER) .............................
2 56,425,000 ........................................... (re. $25,000)
3 Project Schedule
4 PROJECT AMOUNT
5 --------------------------------------------
6 (thousands of dollars)
7 Land acquisition .................... 33,500
8 Hudson River Estuary Manage-
9 ment Plan .......................... 6,000
10 Biodiversity stewardship and
11 research ............................. 750
12 County agriculture and farm-
13 land protection activities ......... 5,500
14 Non-point source abatement and
15 control projects ................... 6,500
16 Soil and water conservation
17 districts .......................... 1,350
18 Finger Lakes-Lake Ontario
19 Watershed Protection Alli-
20 ance ............................... 1,300
21 Albany Pine Bush Preserve
22 Commission ........................... 325
23 Long Island Central Pine
24 Barrens Planning ..................... 700
25 Long Island South Shore Estu-
26 ary Reserve .......................... 350
27 --------------
28 Total ............................. 56,275
29 ==============
30 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
31 section 1, of the laws of 2007:
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 solid waste account in accordance with a programmatic and financial
35 plan to be approved by the director of the budget, including subal-
36 location to other state departments and agencies (09E299ER) ........
37 22,083,319 .......................................... (re. $161,000)
38 Project Schedule
39 PROJECT AMOUNT
40 --------------------------------------------
41 (thousands of dollars)
42 Non-hazardous landfill closure
43 projects ........................... 9,000
44 Municipal waste reduction or
45 recycling projects ................. 4,500
46 Secondary materials regional
47 marketing assistance and
48 energy conservation services
190 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 projects ........................... 4,500
2 Services and expenses of the
3 assessment and recovery of
4 any natural resource damages
5 to the Hudson River ................ 1,300
6 Pesticides program ................... 3,600
7 --------------
8 Total ............................. 22,900
9 ==============
10 By chapter 55, section 1, of the laws of 1999:
11 For services and expenses of projects and purposes authorized by
12 section 92-s of the state finance law to receive funding from the
13 parks, recreation and historic preservation account in accordance
14 with a programmatic and financial plan to be approved by the direc-
15 tor of the budget, including suballocation to other state depart-
16 ments and agencies (09E399ER) ... 44,850,000 ........ (re. $759,000)
17 Project Schedule
18 PROJECT AMOUNT
19 --------------------------------------------
20 (thousands of dollars)
21 Local waterfront revitaliza-
22 tion programs ...................... 4,975
23 Park, recreation and historic
24 preservation projects .............. 6,875
25 Hudson River Park ................... 21,000
26 Stewardship projects ................ 12,000
27 --------------
28 Total ............................. 44,850
29 ==============
30 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
31 section 1, of the laws of 2007:
32 For services and expenses of projects and purposes authorized by
33 section 92-s of the state finance law to receive funding from the
34 open space account in accordance with a programmatic and financial
35 plan to be approved by the director of the budget, including subal-
36 location to other state departments and agencies including costs
37 related to the acquisition of the following properties: Peconic
38 Pinelands Maritime Reserve Projects; Pine Barrens Core and Critical
39 Resource Areas; Fahnestock State Park; Hudson River Estuary/Greenway
40 Trail; Sterling Forest; New York City Reservoirs-Croton; Albany Pine
41 Bush; Genny-Green Trail; Blue Mountain Lake; Taconic Ridge/Harlem
42 Valley; Inner City/Underserved Community Park-Graniteville Quarry;
43 Innercity/Underserved Community Park-Eastern District Terminal;
44 Shawangunk Ridge/Minnewaska State Park Preserve; Mount Loretto;
45 Floodwood (Boy Scout Camp); National Lead/Tahawus; Eastern Ontario
46 Shoreline; Wilton Wildlife Preserve and Park; Ess Kay Farm; Five
47 Rivers Education Center; statewide small projects; Barlett Carry;
48 Benton/Ludlow Creek; Gaisman; Long Path; Braddock Bay; Fair Haven
49 Beach State Park; Northern Montezuma Wetlands; Undeveloped Lake
191 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 George Shore; Hemlock/Canadice/Honeoye Lakes; Beaverkill/Willowemoc;
2 Deveaux Woods; Rockland County Highlands; Allegany State Park;
3 Neversink Gorge; Delaware River Tailwaters; Relay Forest; Minnehaha;
4 Whitney Park; Northern Flow River Corridor; Chautauqua Lake Access;
5 Bear Pen/Vly/Round Top Mountains; Nelson Swamp; Irondequoit Bay;
6 Rome Sand Plains; Olana Viewshed; Randolph Swamp; Pilot Knob;
7 Taughanock Falls State Park; Alder Bottom Pond French Creek; Watkins
8 Glen State Park; Mongaup Valley Wildlife Management Area; Long
9 Island Sound Coastal Area-Grandifolia Sand Hills; Working Forest
10 Lands/Conservation Easements - Champion International Inc.; Working
11 Forest Lands/Conservation Easements - Domtar Inc.; Great Swamp and
12 Millerton Meadows (09E499ER) ... 58,066,681 .......... (re. $20,000)
13 Project Schedule
14 PROJECT AMOUNT
15 --------------------------------------------
16 (thousands of dollars)
17 Land acquisition .................... 34,250
18 Hudson River Estuary Manage-
19 ment Plan .......................... 8,325
20 Biodiversity stewardship and
21 research ............................. 300
22 County agriculture and farm-
23 land protection activities ......... 4,500
24 Non-point source abatement and
25 control projects ................... 6,500
26 Soil and water conservation
27 districts ............................ 900
28 Finger Lakes-Lake Ontario
29 Watershed Protection Alli-
30 ance ............................... 1,300
31 Albany Pine Bush Preserve
32 Commission ........................... 240
33 Long Island Central Pine
34 Barrens Planning ..................... 650
35 Long Island South Shore Estu-
36 ary Reserve .......................... 285
37 --------------
38 Total ............................. 57,250
39 ==============
40 By chapter 55, section 1, of the laws of 1998:
41 For services and expenses of projects and purposes authorized by
42 section 92-s of the state finance law to receive funding from the
43 solid waste account in accordance with a programmatic and financial
44 plan to be approved by the director of the budget, including subal-
45 location to other state departments and agencies (09E298ER) ........
46 26,100,000 ........................................... (re. $62,000)
47 project schedule
48 PROJECT AMOUNT
49 --------------------------------------------
192 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 (thousands of dollars)
2 Non-hazardous landfill closure
3 projects .......................... 13,000
4 Municipal waste reduction or
5 recycling projects ................. 6,000
6 Secondary materials regional
7 marketing assistance and
8 energy conservation services
9 projects ........................... 6,000
10 Pesticides program ................... 1,100
11 --------------
12 Total ............................. 26,100
13 ==============
14 For services and expenses of projects and purposes authorized by
15 section 92-s of the state finance law to receive funding from the
16 parks, recreation and historic preservation account in accordance
17 with a programmatic and financial plan to be approved by the direc-
18 tor of the budget, including suballocation to other state depart-
19 ments, agencies and public authorities (09E398ER) ..................
20 19,700,000 .......................................... (re. $622,000)
21 project schedule
22 PROJECT AMOUNT
23 --------------------------------------------
24 (thousands of dollars)
25 Local waterfront revitaliza-
26 tion programs ...................... 5,600
27 Park, recreation and historic
28 preservation projects,
29 including $4,000,000 which
30 shall be made available for
31 services and expenses
32 related to development of
33 the Hudson River Park ............. 13,100
34 Coastal rehabilitation
35 projects ........................... 1,000
36 --------------
37 Total ............................. 19,700
38 ==============
39 For services and expenses of projects and purposes authorized by
40 section 92-s of the state finance law to receive funding from the
41 open space account in accordance with a programmatic and financial
42 plan to be approved by the director of the budget, including subal-
43 location to other state departments and agencies including costs
44 related to the acquisition of the following properties: Peconic
45 Pinelands Maritime Reserve Projects; Pine Barrens Core and Critical
46 Resource Areas; Fahnestock State Park; Hudson River Estuary/Greenway
47 Trail; Sterling Forest; New York City Reservoirs-Croton; Albany Pine
48 Bush; Genny-Green Trail; Whitney Park; Northern Flow River Corri-
49 dors; Minnehaha Tract; Blue Mountain Lake; Taconic Ridge/Harlem
193 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Valley; Inner City/Underserved Community Park-Graniteville Quarry;
2 Chautauqua Lake Access; Working Forest Lands; Bear Pen/Vly/Roundtop
3 Mountains; Shawangunk Ridge/Minnewaska State Park Preserve; Mount
4 Loretto; Floodwood (Boy Scout Camp); National Lead/Tahawus; Rome
5 Sand Plains; Eastern Ontario Shoreline; Nelson Swamp; Irondequoit
6 Bay; Alder Bottom Pond/French Creek; Wilton Wildlife Preserve and
7 Park; Taughannock Falls State Park; Ess Kay Farm; Watkins Glen State
8 Park; Mongaup Valley Wildlife Management Area; Five Rivers Education
9 Center; Pilot Knob; Randolph Swamp; Olana Viewshed and statewide
10 small projects (09E498ER) ... 44,725,000 ............. (re. $50,000)
11 project schedule
12 PROJECT AMOUNT
13 --------------------------------------------
14 (thousands of dollars)
15 Land acquisition .................... 32,000
16 Biodiversity stewardship and
17 research ............................. 300
18 County agriculture and farm-
19 land protection activities ......... 5,000
20 Non-point source abatement and
21 control projects, including
22 $1,300,000 which shall be
23 made available to the Finger
24 Lakes-Lake Ontario Watershed
25 Protection Alliance ................ 6,300
26 Albany Pine Bush Preserve
27 Commission ........................... 220
28 Long Island Central Pine
29 Barrens Planning ..................... 630
30 Long Island South Shore Estu-
31 ary Reserve .......................... 275
32 --------------
33 Total ............................. 44,725
34 ==============
35 By chapter 55, section 1, of the laws of 1997:
36 For services and expenses of projects and purposes authorized by
37 section 92-s of the state finance law to receive funding from the
38 solid waste account in accordance with a programmatic and financial
39 plan to be approved by the director of the budget, including subal-
40 location to other state departments and agencies (09E297ER) ........
41 29,110,000 .......................................... (re. $641,000)
42 project schedule
43 PROJECT AMOUNT
44 --------------------------------------------
45 (thousands of dollars)
46 Non-hazardous landfill closure
47 projects .......................... 17,000
48 Municipal waste reduction or
194 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 recycling projects ................. 5,505
2 Secondary materials regional
3 marketing assistance and
4 energy conservation services
5 projects ........................... 5,505
6 Pesticides program ................... 1,100
7 --------------
8 Total ............................. 29,110
9 ==============
10 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
11 section 1, of the laws of 2007:
12 For services and expenses of projects and purposes authorized by
13 section 92-s of the state finance law to receive funding from the
14 parks, recreation and historic preservation account in accordance
15 with a programmatic and financial plan to be approved by the direc-
16 tor of the budget, including suballocation to other state depart-
17 ments and agencies (09E397ER) ... 33,800,000 ...... (re. $8,646,000)
18 project schedule
19 PROJECT AMOUNT
20 --------------------------------------------
21 (thousands of dollars)
22 Local waterfront revitaliza-
23 tion programs ...................... 8,975
24 Park, recreation and historic
25 preservation projects ............. 14,525
26 Coastal rehabilitation
27 projects .......................... 10,675
28 --------------
29 Total ............................. 34,175
30 For services and expenses of projects and purposes authorized by
31 section 92-s of the state finance law to receive funding from the
32 open space account in accordance with a programmatic and financial
33 plan to be approved by the director of the budget, including subal-
34 location to other state departments and agencies including costs
35 related to the acquisition of the following properties: Albany Pine
36 Bush, Northern Flow River Corridors, Alder Bottom Pond/French Creek,
37 Rome Sand Plains, Hudson River Greenway/Trail, Fahnestock State
38 Park-Hubbard Perkins Conservation Area, Taconic Ridge/Harlem Valley,
39 Eastern Ontario Shoreline, Sterling Forest, Staten Island Greenbelt
40 - St. Francis Seminary, Peconic Pinelands Maritime Reserve Projects,
41 Massawepie Mire, Plateau Mountain, Chautauqua Lake Access, New York
42 City reservoirs-Croton, Ganondagan Historic Site, Moreau Lake state
43 park, Olana Viewshed, Hudson Valley Winery, Staten Island Wet
44 Woods/Paw-Paw Hybrid Oak Woods, Nelson Swamp, Rockland County High-
45 lands, Whitney Park, Mt. Loretto, Green Lakes, Inner
46 City/Underserved Community Park-Graniteville Quarry, Irondequoit Bay
47 and Statewide small projects (09E497ER) ............................
48 47,090,000 ........................................... (re. $13,000)
195 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 project schedule
2 PROJECT AMOUNT
3 --------------------------------------------
4 (thousands of dollars)
5 Land acquisition .................... 36,000
6 Biodiversity stewardship and
7 research ............................. 275
8 County agriculture and farm-
9 land protection activities ......... 4,000
10 Non-point source abatement and
11 control projects including
12 $653,000 which shall be made
13 available to county soil and
14 water conservation districts
15 and $1,300,000 which shall
16 be made available to the
17 Finger Lakes-Lake Ontario
18 Watershed Protection Alli-
19 ance ............................... 5,400
20 Albany Pine Bush Preserve
21 Commission ........................... 200
22 Long Island Central Pine
23 Barrens Planning ..................... 615
24 Long Island South Shore Estu-
25 ary Reserve .......................... 225
26 --------------
27 Total ............................. 46,715
28 ==============
29 By chapter 55, section 1, of the laws of 1996, as amended by chapter 55,
30 section 1, of the laws of 2007:
31 For services and expenses of projects and purposes authorized by
32 section 92-s of the state finance law to receive funding from the
33 parks, recreation and historic preservation account in accordance
34 with a programmatic and financial plan to be approved by the direc-
35 tor of the budget, including suballocation to other state depart-
36 ments and agencies (09E396ER) ... 21,624,000 ........ (re. $986,000)
37 project schedule
38 PROJECT AMOUNT
39 --------------------------------------------
40 (thousands of dollars)
41 Local waterfront revitaliza-
42 tion programs ...................... 3,000
43 Local waterfront revitaliza-
44 tion projects ...................... 1,500
45 Parks, recreation and historic
46 preservation projects .............. 8,000
47 Parks, recreation and historic
48 preservation projects .............. 8,500
49 Coastal rehabilitation
50 projects ........................... 1,500
196 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 --------------
2 Total ............................. 22,500
3 ==============
4 By chapter 54, section 1, of the laws of 1995, as amended by chapter 55,
5 section 1, of the laws of 2007:
6 For services and expenses of projects and purposes authorized by
7 section 92-s of the state finance law to receive funding from the
8 parks, recreation and historic preservation account (71E395ER) .....
9 6,340,000 ........................................... (re. $220,000)
10 project schedule
11 PROJECT AMOUNT
12 --------------------------------------------
13 (thousands of dollars)
14 Local waterfront revitaliza-
15 tion plans ......................... 1,300
16 Parks, recreation and historic
17 preservation projects .............. 4,000
18 Coastal rehabilitation
19 projects ........................... 1,200
20 --------------
21 Total .............................. 6,500
22 ==============
23 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
24 section 1, of the laws of 2007:
25 For services and expenses of projects authorized by the environmental
26 protection act of 1993 to receive funding from the solid and hazard-
27 ous materials account (71E294ER) ... 12,400,000 ....... (re. $4,000)
28 project schedule
29 PROJECT AMOUNT
30 --------------------------------------------
31 (thousands of dollars)
32 Non-hazardous landfill closure
33 projects ........................... 9,000
34 Municipal waste reduction or
35 recycling projects ................. 2,000
36 Secondary materials regional
37 marketing assistance
38 projects ........................... 2,000
39 --------------
40 Total ............................. 13,000
41 ==============
42 ENVIRONMENTAL PROTECTION AND ENHANCEMENTS (CCP)
43 Capital Projects Funds - Other
44 Environmental Protection Fund
45 Environmental Protection and Enhancements Purpose
197 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 54, section 1, of the laws of 2002:
2 For supplemental services and expenses of projects and purposes,
3 including the payment of liabilities incurred during state fiscal
4 year 2001-02 for natural resource damages and pesticides program,
5 authorized by section 92-s of the state finance law to receive fund-
6 ing from the solid waste account in accordance with a programmatic
7 and financial plan to be approved by the director of the budget,
8 including suballocation to other state departments and agencies
9 (09E502EA) ... 13,920,000 ........................... (re. $114,000)
10 Project Schedule
11 PROJECT AMOUNT
12 --------------------------------------------
13 (thousands of dollars)
14 Municipal waste reduction or
15 recycling projects ................. 5,000
16 Secondary materials regional
17 marketing assistance and
18 energy conservation services
19 projects ........................... 4,995
20 Services and expenses of the
21 assessment and recovery of
22 any natural resource damages
23 to the Hudson River ................ 1,300
24 Pesticides program ................... 2,625
25 --------------
26 Total ............................. 13,920
27 ==============
28 For supplemental services and expenses of projects and purposes
29 authorized by section 92-s of the state finance law to receive fund-
30 ing from the parks, recreation and historic preservation account in
31 accordance with a programmatic and financial plan to be approved by
32 the director of the budget, including suballocation to other state
33 departments and agencies. Notwithstanding any other law to the
34 contrary, $10 million of this appropriation shall support capital
35 projects, excluding personal service costs, eligible and authorized
36 for funding from any office of parks, recreation and historic pres-
37 ervation state parks infrastructure fund-076 appropriation or reap-
38 propriation, subject to the approval of the director of the budget.
39 Notwithstanding any other law to the contrary, such expenses shall be
40 paid in the first instance from the state parks infrastructure fund
41 - 076, then reimbursed from this appropriation, including the trans-
42 fer of expenses and the payment of liabilities incurred prior to
43 April 1, 2002, up to the limit of $10 million (09E602EA) ...........
44 47,750,000 ........................................ (re. $1,749,000)
45 Project Schedule
46 PROJECT AMOUNT
47 --------------------------------------------
48 (thousands of dollars)
49 Local waterfront revitaliza-
198 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 tion programs ...................... 6,750
2 Parks, recreation and historic
3 preservation projects .............. 8,500
4 Hudson River Park ................... 15,000
5 Stewardship projects ................. 6,500
6 State parks projects ................ 10,000
7 Historic barns projects .............. 1,000
8 --------------
9 Total ............................. 47,750
10 ==============
11 By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
12 section 1, of the laws of 2003:
13 For supplemental services and expenses of projects and purposes,
14 including the payment of liabilities incurred during state fiscal
15 year 2001-02 for biodiversity stewardship and research, soil and
16 water conservation districts. Finger Lakes-Lake Ontario Watershed
17 Protection Alliance, Albany Pinebush Preserve Commission, Long
18 Island South Shore Estuary Reserve and Peconic Bay; authorized by
19 section 92-s of the state finance law to receive funding from the
20 open space account in accordance with a programmatic and financial
21 plan to be approved by the director of the budget, including subalo-
22 cation to other state departments and agencies including costs
23 related to the acquisition of the following properties: Long Island
24 Sound Coastal Area including Held Property, Long Island South Shore
25 Estuary Reserve, Peconic Pinelands Maritime Reserve Projects, Pine
26 Barrens Core Compatible Growth Area and Critical Resource Area,
27 Western Suffolk/Nassau Special Groundwater Protection Area Under-
28 hill, Inner City/Underserved Community Parks - including Bushwick
29 Inlet, Mount Loretto, Staten Island Greenbelt, Staten Island Wet
30 Woods, Fahnestock State Park, Great Swamp, Lundy Estate, Neversink
31 Highlands, Highlands Greenway Corridor, Mongaup Valley Wildlife
32 Management Area, Shunnemunk Mountain/Moodna Creek/Woodcock Mountain,
33 Sterling Forest, Shawangunk Mountains, Westchester Marine Corridor,
34 Beaverkill/Willowemoc, Hudson River Corridor Estuary/Greenway Trail,
35 Catskill Unfragmented Forest, Long Path, New York City Watershed
36 Lands-Croton, Taconic Ridge/Harlem Valley, Albany Pine Bush, Olana
37 Viewshed, Five Rivers Environmental Education Center, Tivoli
38 Preserve, Pilot Knob, Floodwood Camp, Lake Champlain Shoreline and
39 Wetlands, Wilton Wildlife Preserve and Park, National Lead/Tahawus,
40 Undeveloped Lake George Shore, Whitney Park, Recreational Trail
41 Linkages and Networks, Bog River/Beaver River Headwater Complex,
42 Eastern Lake Ontario Shoreline and Islands, Minnehaha Tract, Maumee
43 Swamp, Moose River Corridor, Tug Hill Core Forests and Headwater
44 Streams, Rome Sand Plains, Nelson Swamp, Genesee
45 Greenway/Recreationway, Genny-Green Trail/Link Trail, Northern
46 Montezuma Wetlands, Hemlock/Canadice/Honeoye Lakes, Allegany State
47 Park, Alder Bottom/French Creek, Great Lakes & Niagara River Access,
48 Shore Lands & Vistas, Salmon River Corridor, Braddock Bay, Clark
49 Reservation State Park, Chautauqua Lake Access, Shore Lands and
50 Vistas, Randolf Swamp, Eighteen Mile Creek/Hampton Brook Woods,
51 Delaware River Tailwaters, Statewide Small Projects, Working Forest
199 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Lands/Conservation Easements - Cedarlands, Working Forest
2 Lands/Conservation Easements - Champion International Inc., Working
3 Forest Lands/Conservation Easements-Domtar Inc., Working Forest
4 Lands/Conservation Easements-Boeselager Forestry, and Working Forest
5 Lands/Conservation Easements-Clerical Medical Forestry (09E702EA)
6 ... 63,330,000 ...................................... (re. $130,000)
7 Project Schedule
8 PROJECT AMOUNT
9 --------------------------------------------
10 (thousands of dollars)
11 Land acquisition .................... 38,000
12 Hudson River Estuary Manage-
13 ment Plan .......................... 5,800
14 Biodiversity stewardship and
15 research ............................. 750
16 County agriculture and farm-
17 land protection activities ......... 8,000
18 Non-point source abatement and
19 control projects ................... 6,000
20 Soil and water conservation
21 districts .......................... 1,860
22 Finger Lakes-Lake Ontario
23 Watershed Protection Alli-
24 ance ............................... 1,300
25 Albany Pine Bush Preserve
26 Commission ........................... 370
27 Long Island Central Pine
28 Barrens Planning ..................... 700
29 Long Island South Shore Estu-
30 ary Reserve .......................... 350
31 Peconic Bay ............................ 200
32 --------------
33 Total ............................. 63,330
34 ==============
35 By chapter 55, section 1, of the laws of 2000:
36 For services and expenses of projects to receive funding from the
37 parks, recreation, and historic preservation account, in accordance
38 with a programmatic and financial plan to be approved by the direc-
39 tor of the budget, including suballocation to other state depart-
40 ments, agencies, public benefit corporations and public authorities
41 (09E500EA) ... 10,000,000 ......................... (re. $1,467,000)
42 By chapter 55, section 1, of the laws of 1999:
43 For services and expenses of projects to receive funding from the
44 solid waste account, in accordance with a programmatic and financial
45 plan to be approved by the director of the budget, including subal-
46 location to other state departments, agencies, public benefit corpo-
47 rations and public authorities (09E599EA) ..........................
48 3,250,000 ............................................ (re. $46,000)
200 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services and expenses of projects to receive funding from the
2 parks, recreation and historic preservation account, in accordance
3 with a programmatic and financial plan to be approved by the direc-
4 tor of the budget, including suballocation to other state depart-
5 ments, agencies, public benefit corporations and public authorities
6 (09E699EA) ... 26,650,000 ........................... (re. $858,000)
7 ENVIRONMENTAL QUALITY BOND ACT FUND (CCP)
8 Capital Projects Funds - Other
9 Environmental Quality Bond Act Fund
10 Bond Proceeds Purpose
11 By chapter 54, section 1, of the laws of 1992, as amended by chapter 55,
12 section 1, of the laws of 1996:
13 The sum of $209,000,000 or so much thereof as may be necessary is
14 hereby appropriated from the "environmental quality bond act fund"
15 as established by section 97-d of the state finance law for payment
16 to the capital projects fund for disbursements from such fund as
17 certified by the state comptroller as: "Hazardous Waste Site Remedi-
18 ation Disbursements," "Municipal Landfill Closure Disbursements,"
19 "Land Acquisition, Preservation and Improvement Disbursements," and
20 "Historic Preservation, Municipal Park and Urban Cultural Parks
21 Disbursements." The director of the budget is hereby authorized to
22 designate to the state comptroller appropriations made from the
23 capital projects fund in accordance with the provisions of article
24 52 of the environmental conservation law for the purposes heretofore
25 specified. The state comptroller shall at the commencement of each
26 month certify to the director of the budget, the chairman of the
27 senate finance committee, and the chairman of the assembly ways and
28 means committee, the amounts disbursed from the appropriations
29 designated by the director of the budget for each of the purposes
30 herein enumerated for the month preceding such certification and
31 such certifications shall not exceed in the aggregate the moneys
32 appropriated therefor from the capital projects fund. A copy of each
33 such certification shall also be delivered to the public officers of
34 the respective state department or agency to which such capital
35 projects fund appropriations are made available (71109210) .........
36 209,000,000 ...................................... (re. $55,601,000)
37 ENVIRONMENTAL QUALITY PROTECTION FUND (CCP)
38 Capital Projects Funds - Other
39 Environmental Quality Protection Fund
40 Bond Proceeds Purpose
41 By chapter 54, section 1, of the laws of 1992, as amended by chapter 55,
42 section 1, of the laws of 1996:
43 The sum of $84,369,000, or so much thereof as may be necessary is
44 hereby appropriated from the "environmental quality protection fund"
45 as established by section 97-a of the state finance law for payment
46 to the capital projects fund for disbursements from such fund as
201 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 certified by the state comptroller as: "Water Quality Improvement
2 Disbursements," "State Air Quality Improvement Disbursements,"
3 "Municipal Air Quality Improvement Disbursements," "Land Preserva-
4 tion and Improvement Disbursements," "Municipal Solid Waste Manage-
5 ment Disbursements," and "Park Lands Disbursements."
6 The director of the budget is hereby authorized to designate to the
7 state comptroller appropriations made from the capital projects fund
8 in accordance with the provisions of article 51 of the environmental
9 conservation law for the purposes heretofore specified.
10 The state comptroller shall at the commencement of each month certify
11 to the director of the budget, the chairman of the senate finance
12 committee, and the chairman of the assembly ways and means commit-
13 tee, the amounts disbursed from the appropriations designated by the
14 director of the budget for each of the purposes herein enumerated
15 for the month preceding such certification and such certifications
16 shall not exceed in the aggregate the moneys appropriated therefor
17 from the capital projects fund. A copy of each such certification
18 shall also be delivered to the public officers of the respective
19 state department or agency to which such capital projects fund
20 appropriations are made available (71059210) .......................
21 84,369,000 ....................................... (re. $22,250,000)
22 By chapter 54, section 9, of the laws of 1981, as amended by chapter 55,
23 section 1, of the laws of 1996:
24 The sum of seven hundred fifty-nine million nine hundred eighty-one
25 thousand two hundred eighty dollars ($759,981,280), or so much ther-
26 eof as may be necessary is hereby appropriated from the "environ-
27 mental quality protection fund" as established by section 97-a of
28 the state finance law for payment to the capital projects fund for
29 disbursements from such fund as certified by the state comptroller
30 as: "Water Quality Improvement Disbursements," "State Air Quality
31 Improvement Disbursements," "Municipal Air Quality Improvement
32 Disbursements," "Land Preservation and Improvement Disbursements,"
33 "Municipal Solid Waste Management Disbursements," and "Park Lands
34 Disbursements."
35 The director of the budget is hereby authorized to designate to the
36 state comptroller appropriations made from the capital projects fund
37 in accordance with the provisions of article fifty-one of the envi-
38 ronmental conservation law for the purposes heretofore specified.
39 The state comptroller shall at the commencement of each month certify
40 to the director of the budget, the chairman of the senate finance
41 committee, and the chairman of the assembly ways and means commit-
42 tee, the amounts disbursed from the appropriations designated by the
43 director of the budget for each of the purposes herein enumerated
44 for the month preceding such certification and such certifications
45 shall not exceed in the aggregate the moneys appropriated therefor
46 from the capital projects fund. A copy of each such certification
47 shall also be delivered to the public officers of the respective
48 state department or agency to which such capital projects fund
49 appropriations are made available (01371610) ...... (re. $1,269,000)
202 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ENVIRONMENTAL RESTORATION - CLEAN WATER/CLEAN AIR (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Environmental Restoration Purpose
5 By chapter 54, section 1, of the laws of 2002:
6 For state assistance payments for the state share of the costs of
7 environmental restoration projects in accordance with the provisions
8 of title 5 of article 56 of the environmental conservation law for
9 project costs, including costs incidental and appurtenant thereto
10 and for payment of reimbursements to the clean water/clean air
11 implementation fund for services and expenses of state departments
12 and agencies, including fringe benefits, hereinafter referred to as
13 "Environmental Restoration Project Disbursements". The moneys appro-
14 priated herein may be suballocated to other state departments and
15 agencies.
16 Notwithstanding the provisions of any general or special law, the
17 moneys hereby appropriated shall be available for environmental
18 restoration projects in accordance with title 5 of article 56 of the
19 environmental conservation law upon the issuance of a certificate of
20 approval of availability by the director of the division of the
21 budget.
22 The state comptroller shall at the commencement of each month certify
23 to the director of the division of the budget, the commissioner of
24 environmental conservation, the chairman of the senate finance
25 committee, and the chairman of the assembly ways and means committee
26 the amounts disbursed from this appropriation for "Environmental
27 Restoration Project Disbursements" for the month preceding such
28 certification (09BA02W5) ... 75,000,000 ............. (re. $918,000)
29 By chapter 54, section 1, of the laws of 2001:
30 For state assistance payments for the state share of the costs of
31 environmental restoration projects in accordance with the provisions
32 of title 5 of article 56 of the environmental conservation law for
33 project costs, including costs incidental and appurtenant thereto
34 and for payment of reimbursements to the clean water/clean air
35 implementation fund for services and expenses of state departments
36 and agencies, including fringe benefits, hereinafter referred to as
37 "Environmental Restoration Project Disbursements". The moneys appro-
38 priated herein may be suballocated to other state departments and
39 agencies.
40 Notwithstanding the provisions of any general or special law, the
41 moneys hereby appropriated shall be available for environmental
42 restoration projects in accordance with title 5 of article 56 of the
43 environmental conservation law upon the issuance of a certificate of
44 approval of availability by the director of the division of the
45 budget.
46 The state comptroller shall at the commencement of each month certify
47 to the director of the division of the budget, the commissioner of
48 environmental conservation, the chairman of the senate finance
49 committee, and the chairman of the assembly ways and means committee
203 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 the amounts disbursed from this appropriation for "Environmental
2 Restoration Project Disbursements" for the month preceding such
3 certification (09BA01W5) ... 25,000,000 ............. (re. $570,000)
4 By chapter 55, section 1, of the laws of 2000:
5 For state assistance payments for the state share of the costs of
6 environmental restoration projects in accordance with the provisions
7 of title 5 of article 56 of the environmental conservation law for
8 project costs, including costs incidental and appurtenant thereto
9 and for payment of reimbursements to the clean water/clean air
10 implementation fund for services and expenses of state departments
11 and agencies, including fringe benefits, hereinafter referred to as
12 "Environmental Restoration Project Disbursements". The moneys appro-
13 priated herein may be suballocated to other state departments and
14 agencies.
15 Notwithstanding the provisions of any general or special law, the
16 moneys hereby appropriated shall be available for environmental
17 restoration projects in accordance with title 5 of article 56 of the
18 environmental conservation law upon the issuance of a certificate of
19 approval of availability by the director of the division of the
20 budget.
21 The state comptroller shall at the commencement of each month certify
22 to the director of the division of the budget, the commissioner of
23 environmental conservation, the chairman of the senate finance
24 committee, and the chairman of the assembly ways and means committee
25 the amounts disbursed from this appropriation for "Environmental
26 Restoration Project Disbursements" for the month preceding such
27 certification (09BA00W5) ... 10,000,000 ............. (re. $534,000)
28 By chapter 55, section 1, of the laws of 1999:
29 For state assistance payments for the state share of the costs of
30 environmental restoration projects in accordance with the provisions
31 of title 5 of article 56 of the environmental conservation law for
32 project costs, including costs incidental and appurtenant thereto
33 and for payment of reimbursements to the clean water/clean air
34 implementation fund for services and expenses of state departments
35 and agencies, including fringe benefits, hereinafter referred to as
36 "Environmental Restoration Project Disbursements". The moneys appro-
37 priated herein may be suballocated to other state departments and
38 agencies.
39 Notwithstanding the provisions of any general or special law, the
40 moneys hereby appropriated shall be available for environmental
41 restoration projects in accordance with title 5 of article 56 of the
42 environmental conservation law upon the issuance of a certificate of
43 approval of availability by the director of the division of the
44 budget.
45 The state comptroller shall at the commencement of each month certify
46 to the director of the division of the budget, the commissioner of
47 environmental conservation, the chairman of the senate finance
48 committee, and the chairman of the assembly ways and means committee
49 the amounts disbursed from this appropriation for "Environmental
204 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Restoration Project Disbursements" for the month preceding such
2 certification (09BA99W5) ... 10,000,000 ............. (re. $160,000)
3 By chapter 55, section 1, of the laws of 1998:
4 For state assistance payments for the state share of the costs of
5 environmental restoration projects in accordance with the provisions
6 of title 5 of article 56 of the environmental conservation law for
7 project costs, including costs incidental and appurtenant thereto
8 and for payment of reimbursements to the clean water/clean air
9 implementation fund for services and expenses of state departments
10 and agencies, including fringe benefits, hereinafter referred to as
11 "Environmental Restoration Project Disbursements". The moneys appro-
12 priated herein may be suballocated to other state departments and
13 agencies.
14 Notwithstanding the provisions of any general or special law, the
15 moneys hereby appropriated shall be available for environmental
16 restoration projects in accordance with title 5 of article 56 of the
17 environmental conservation law upon the issuance of a certificate of
18 approval of availability by the director of the division of the
19 budget.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the division of the budget, the commissioner of
22 environmental conservation, the chairman of the senate finance
23 committee, and the chairman of the assembly ways and means committee
24 the amounts disbursed from this appropriation for "Environmental
25 Restoration Project Disbursements" for the month preceding such
26 certification (09BA98W5) ... 10,000,000 ........... (re. $1,549,000)
27 By chapter 55, section 1, of the laws of 1997:
28 For state assistance payments for the state share of the costs of
29 environmental restoration projects in accordance with the provisions
30 of title 5 of article 56 of the environmental conservation law for
31 project costs, including costs incidental and appurtenant thereto
32 and for payment of reimbursements to the clean water/clean air
33 implementation fund for services and expenses of state departments
34 and agencies, including fringe benefits, hereinafter referred to as
35 "Environmental Restoration Project Disbursements". The moneys appro-
36 priated herein may be suballocated to other state departments and
37 agencies.
38 Notwithstanding the provisions of any general or special law, the
39 moneys hereby appropriated shall be available for environmental
40 restoration projects in accordance with title 5 of article 56 of the
41 environmental conservation law upon the issuance of a certificate of
42 approval of availability by the director of the division of the
43 budget.
44 The state comptroller shall at the commencement of each month certify
45 to the director of the division of the budget, the commissioner of
46 environmental conservation, the chairman of the senate finance
47 committee, and the chairman of the assembly ways and means committee
48 the amounts disbursed from this appropriation for "Environmental
49 Restoration Project Disbursements" for the month preceding such
50 certification (09BA97W5) ... 20,000,000 .......... (re. $20,000,000)
205 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 413, section 29, of the laws of 1996, as amended by chapter
2 55, section 1, of the laws of 1997:
3 For state assistance payments for the state share of the costs of
4 environmental restoration projects in accordance with the provisions
5 of title 5 of article 56 of the environmental conservation law for
6 project costs, including costs incidental and appurtenant thereto
7 and for payment of reimbursements to the clean water/clean air
8 implementation fund for services and expenses of state departments
9 and agencies, including fringe benefits, hereinafter referred to as
10 "Environmental Restoration Project Disbursements". The moneys appro-
11 priated herein may be suballocated to other state departments and
12 agencies.
13 Notwithstanding the provisions of any general or special law, moneys
14 hereby appropriated shall be available for environmental restoration
15 projects in accordance with title 5 of article 56 of the environ-
16 mental conservation law upon the issuance of a certificate of
17 approval of availability by the director of the division of the
18 budget.
19 The state comptroller at the commencement of each month shall certify
20 to the director of the division of the budget, the commissioner of
21 environmental conservation, the chairman of the senate finance
22 committee, and the chairman of the assembly ways and means committee
23 the amounts disbursed from this appropriation for "Environmental
24 Restoration Project Disbursements" for the month preceding such
25 certification (09BA96W5) ... 50,000,000 ........... (re. $1,114,000)
26 FISH AND WILDLIFE (CCP)
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Fish and Wildlife Purpose
30 By chapter 54, section 1, of the laws of 2013:
31 For the purchase of capital equipment and for the renovation, rehabil-
32 itation and reconstruction of the department of environmental
33 conservation's fish hatcheries including personal service, fringe
34 benefits and indirect costs (09HE1354) ... 500,000 .. (re. $500,000)
35 By chapter 54, section 1, of the laws of 2012:
36 For the purchase of capital equipment and for the renovation, rehabil-
37 itation and reconstruction of the department of environmental
38 conservation's fish hatcheries including personal service, fringe
39 benefits and indirect costs (09HE1254) ... 500,000 .. (re. $500,000)
40 By chapter 54, section 1, of the laws of 2011:
41 For the purchase of capital equipment and for the renovation, rehabil-
42 itation and reconstruction of the department of environmental
43 conservation's fish hatcheries including personal services and
44 fringe benefits and indirect costs (09HE1154) ......................
45 1,000,000 ......................................... (re. $1,000,000)
46 By chapter 55, section 1, of the laws of 2010:
206 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For the purchase of capital equipment and for the renovation, rehabil-
2 itation and reconstruction of the department of environmental
3 conservation's fish hatcheries including personal services and
4 fringe benefits and indirect costs (09HE1054) ......................
5 1,000,000 ......................................... (re. $1,000,000)
6 By chapter 55, section 1, of the laws of 2009:
7 For the purchase of capital equipment and for the renovation, rehabil-
8 itation and reconstruction of the department of environmental
9 conservation's fish hatcheries including personal services and
10 fringe benefits and indirect costs (09HE0954) ......................
11 1,000,000 ......................................... (re. $1,000,000)
12 By chapter 55, section 1, of the laws of 2008:
13 For the purchase of capital equipment and for the renovation, rehabil-
14 itation and reconstruction of the department of environmental
15 conservation's fish hatcheries including personal services and
16 fringe benefits and indirect costs (09HE0854) ......................
17 1,000,000 ......................................... (re. $1,000,000)
18 By chapter 55, section 1, of the laws of 2007:
19 For the purchase of capital equipment and for the renovation, rehabil-
20 itation and reconstruction of the department of environmental
21 conservation's fish hatcheries including personal services and
22 fringe benefits and indirect costs (09HE0754) ......................
23 1,000,000 ......................................... (re. $1,000,000)
24 By chapter 55, section 1, of the laws of 2006:
25 For the purchase of capital equipment and for the renovation, rehabil-
26 itation and reconstruction of the department of environmental
27 conservation's fish hatcheries including personal services and
28 fringe benefits and indirect costs (09HE0654) ......................
29 1,000,000 ........................................... (re. $209,000)
30 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
31 section 1, of the laws of 2004:
32 For the purchase of capital equipment and for the renovation, rehabil-
33 itation and reconstruction of the department of environmental
34 conservation's fish hatcheries including personal services, fringe
35 benefits and indirect costs (09HE0354) ... 800,000 .... (re. $4,000)
36 For rehabilitation and improvements of fishing access sites including
37 personal services, fringe benefits and indirect costs (09FA0354) ...
38 500,000 ............................................. (re. $409,000)
39 Capital Projects Fund - Other
40 Miscellaneous Capital Projects Fund
41 Habitat Conservation and Access Account
42 Fish and Wildlife Purpose
43 By chapter 55, section 1, of the laws of 2016:
44 For services and expenses, including personal service, non-personal
45 service, fringe benefits and indirect costs related to management,
207 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 protection and restoration fish and wildlife habitat, and improve-
2 ment and development of public access for fish and wildlife related
3 recreation (09HC1654) ... 1,500,000 ............... (re. $1,244,000)
4 By chapter 54, section 1, of the laws of 2015:
5 For services and expenses, including personal service, nonpersonal
6 service, fringe benefits and indirect costs related to management,
7 protection and restoration fish and wildlife habitat, and improve-
8 ment and development of public access for fish and wildlife related
9 recreation (09HC1554) ... 1,500,000 ................. (re. $997,000)
10 Capital Projects Funds - Other
11 Miscellaneous Capital Projects Fund
12 Hudson River Habitat Restoration Fund
13 Fish and Wildlife Purpose
14 By chapter 712, section 3, of the laws of 1994:
15 For payment of the state match portion of any and all costs and
16 expenditures incurred for the purpose of Hudson River habitat resto-
17 ration capital projects (09HR9454) ... 600,000 ...... (re. $351,000)
18 Capital Projects Funds - Federal
19 Federal Capital Projects Fund
20 Fish and Wildlife Purpose
21 By chapter 55, section 1, of the laws of 2010:
22 For the federal share of the Clean Vessel Act pumpout grant program,
23 including payment to the Environmental Facilities Corporation and
24 suballocation to other state departments and agencies (09CV1054) ...
25 3,000,000 ......................................... (re. $3,000,000)
26 By chapter 55, section 1, of the laws of 2009:
27 For the federal share of the Clean Vessel Act pumpout grant program,
28 including payment to the Environmental Facilities Corporation and
29 suballocation to other state departments and agencies (09CV0954) ...
30 1,250,000 ......................................... (re. $1,250,000)
31 By chapter 55, section 1, of the laws of 2007:
32 For the federal share of the Clean Vessel Act pumpout grant program,
33 including payment to the Environmental Facilities Corporation and
34 suballocation to other state departments and agencies (09CV0754) ...
35 600,000 ............................................. (re. $495,000)
36 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
37 section 1, of the laws of 2005:
38 For the federal share of the Clean Vessel Act pumpout grant program,
39 including payment to the Environmental Facilities Corporation and
40 suballocation to other state departments and agencies (09CV0454) ...
41 600,000 .............................................. (re. $23,000)
42 LANDS AND FORESTS (CCP)
208 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Capital Projects Funds - Other
2 Capital Projects Fund
3 Lands and Forests Purpose
4 By chapter 55, section 1, of the laws of 2016:
5 For services and expenses, including personal service, non-personal
6 service, indirect costs and fringe benefits related to the steward-
7 ship of newly acquired and existing state lands, for the implementa-
8 tion of Unit Management Plans, costs related to invasive species
9 management activities and for the development and implementation of
10 Green Certification for state forests, including suballocation to
11 other state departments and agencies (09LF1653) ....................
12 4,000,000 ......................................... (re. $4,000,000)
13 For the purchase and replacement of equipment and facility improve-
14 ments, including air monitoring, maintenance of facilities and emer-
15 gency response in support of public safety, including personal
16 services, fringe benefits and indirect costs (09PS1653) ............
17 500,000 ............................................. (re. $500,000)
18 By chapter 54, section 1, of the laws of 2015:
19 For the purchase and replacement of equipment and facility improve-
20 ments, including air monitoring, maintenance of facilities and emer-
21 gency response in support of public safety, including personal
22 services, fringe benefits and indirect costs (09PS1553) ............
23 2,500,000 ......................................... (re. $2,500,000)
24 By chapter 54, section 1, of the laws of 2014:
25 For services and expenses, including personal service, non-personal
26 service, indirect costs and fringe benefits related to the steward-
27 ship of newly acquired and existing state lands, for the implementa-
28 tion of Unit Management Plans, costs related to invasive species
29 management activities and for the development and implementation of
30 Green Certification for state forests, including suballocation to
31 other state departments and agencies (09LF1453) ....................
32 1,500,000 ........................................... (re. $885,000)
33 For the purchase and replacement of equipment and facility improve-
34 ments, including air monitoring, maintenance of facilities and emer-
35 gency response in support of public safety, including personal
36 services, fringe benefits and indirect costs (09PS1453) ............
37 2,300,000 ............................................. (re. $1,000)
38 By chapter 54, section 1, of the laws of 2013:
39 For services and expenses, including personal service, non-personal
40 service, indirect costs and fringe benefits related to the steward-
41 ship of newly acquired and existing state lands, for the implementa-
42 tion of Unit Management Plans, costs related to invasive species
43 management activities and for the development and implementation of
44 Green Certification for state forests, including suballocation to
45 other state departments and agencies (09LF1353) ....................
46 1,500,000 ............................................ (re. $53,000)
47 For the purchase and replacement of equipment and facility improve-
48 ments, including air monitoring, maintenance of facilities and emer-
209 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 gency response in support of public safety, including personal
2 services, fringe benefits and indirect costs (09PS1353) ............
3 1,000,000 ............................................ (re. $91,000)
4 By chapter 54, section 1, of the laws of 2012:
5 For services and expenses, including personal service and fringe bene-
6 fits, necessary for development and implementation of Green Certif-
7 ication for state forests (09GC1253) ... 100,000 ..... (re. $77,000)
8 By chapter 54, section 1, of the laws of 2011:
9 For services and expenses, including personal services and fringe
10 benefits, necessary for implementation of Unit Management Plans,
11 including suballocation to other state departments and agencies
12 (09MP1153) ... 600,000 .............................. (re. $600,000)
13 By chapter 55, section 1, of the laws of 2010:
14 For the stewardship of newly acquired and existing state lands includ-
15 ing personal services, fringe benefits and indirect costs, including
16 suballocation to other state departments and agencies (09SW1053) ...
17 500,000 ............................................. (re. $500,000)
18 For services and expenses, including personal services and fringe
19 benefits, necessary for implementation of Unit Management Plans,
20 including suballocation to other state departments and agencies
21 (09MP1053) ... 600,000 .............................. (re. $150,000)
22 By chapter 55, section 1, of the laws of 2009:
23 For the stewardship of newly acquired and existing state lands includ-
24 ing personal services, fringe benefits and indirect costs, including
25 suballocation to other state departments and agencies (09SW0953) ...
26 900,000 ............................................. (re. $884,000)
27 For services and expenses, including necessary consultant costs, for
28 judgement or settlement payments related to land acquisition claims
29 or cases, pursuant to section 503 of the eminent domain procedure
30 law or article 78 of the civil practice law and rules (09AA0953) ...
31 15,000,000 ....................................... (re. $15,000,000)
32 By chapter 55, section 1, of the laws of 2008:
33 For the purchase and replacement of equipment and facility improve-
34 ments, including air monitoring, maintenance of facilities and emer-
35 gency response in support of public safety, including personal
36 services, fringe benefits and indirect costs (09PS0853) ............
37 400,000 ............................................... (re. $2,000)
38 By chapter 55, section 1, of the laws of 2007:
39 For services and expenses, including necessary consultant costs, for
40 judgement or settlement payments related to land acquisition claims
41 or cases, pursuant to section 503 of the eminent domain procedure
42 law or article 78 of the civil practice law and rules (09AA0753) ...
43 4,300,000 ......................................... (re. $4,300,000)
44 By chapter 54, section 1, of the laws of 2001, as amended by chapter 55,
45 section 1, of the laws of 2003:
210 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For the state's share of Federal Transportation Efficiency Act of the
2 21st Century program grants including personal services and fringe
3 benefits (09IT0153) ... 2,532,000 ................. (re. $2,325,000)
4 By chapter 55, section 1, of the laws of 2000:
5 For services and expenses, including necessary consultant costs, for
6 judgement or settlement payments related to land acquisition claims
7 or cases brought before the court of claims or the supreme court,
8 pursuant to section 503 of the eminent domain procedure law or arti-
9 cle 78 of the civil practice law and rules (09AA0053) ..............
10 1,000,000 ......................................... (re. $1,000,000)
11 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
12 section 1, of the laws of 2004:
13 For the state's share of Federal Intermodal Surface Transportation
14 Efficiency Act enhancement program grants including personal
15 services, fringe benefits and indirect costs. No portion of this
16 appropriation shall be allocated until the commissioner of the
17 department of environmental conservation and the director of the
18 budget have determined that no other sources of funding, including
19 but not limited to natural resource damage claim settlements and
20 environmental protection fund appropriations, are available for this
21 purpose (09IT9453) ... 500,000 ...................... (re. $297,000)
22 By chapter 54, section 1, of the laws of 1993:
23 For services and expenses including necessary consultant costs, for
24 judgment or settlement payments related to land acquisition claims
25 or cases brought before the court of claims or the supreme court,
26 pursuant to section 503 of the eminent domain procedure law or arti-
27 cle 78 of the civil practice law and rules (09AA9353) ..............
28 18,800,000 .......................................... (re. $596,000)
29 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
30 section 3, of the laws of 1990:
31 For demolition of buildings at the former Edgewood Hospital site on
32 Long Island (09168953) ... 3,450,000 ................ (re. $891,000)
33 By chapter 54, section 1, of the laws of 1987, for: Demolition of
34 buildings at the former Edgewood Hospital site on Long Island
35 (09668753) ... 6,000,000 .......................... (re. $2,246,000)
36 Capital Projects Funds - Other
37 Forest Preserve Expansion Fund
38 Lands and Forests Purpose
39 By chapter 55, section 1, of the laws of 1996:
40 For the acquisition of additional lands for the forest preserve within
41 either the Adirondack or Catskill parks, in accordance with the
42 provisions of section 97-e of the state finance law (09999653) .....
43 20,000 ............................................... (re. $20,000)
44 By chapter 54, section 1, of the laws of 1993:
211 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For the acquisition of additional lands for the forest preserve within
2 either the Adirondack or Catskill parks, in accordance with the
3 provisions of section 97-e of the state finance law (09999353) .....
4 175,000 .............................................. (re. $90,000)
5 Capital Projects Funds - Federal
6 Federal Capital Projects Fund
7 Lands and Forests Purpose
8 By chapter 55, section 1, of the laws of 2016:
9 For the federal share of costs associated with the acquisition of
10 lands under the forest legacy program, including suballocation to
11 other state departments and agencies (09FL1653) ....................
12 2,000,000 ......................................... (re. $2,000,000)
13 By chapter 54, section 1, of the laws of 2013:
14 For the federal share of costs associated with the acquisition of
15 lands under the forest legacy program, including suballocation to
16 other state departments and agencies (09FL1353) ....................
17 1,900,000 ......................................... (re. $1,900,000)
18 By chapter 54, section 1, of the laws of 2011:
19 For the federal share of costs associated with the acquisition of
20 lands under the forest legacy program, including suballocation to
21 other state departments and agencies (09FL1153) ....................
22 4,000,000 ......................................... (re. $3,200,000)
23 By chapter 55, section 1, of the laws of 2008:
24 For the federal share of costs associated with the acquisition of
25 lands under the forest legacy program, including suballocation to
26 other state departments and agencies (09FL0853) ....................
27 2,000,000 ......................................... (re. $1,016,000)
28 By chapter 55, section 1, of the laws of 2007:
29 For the federal share of costs associated with the acquisition of
30 lands under the forest legacy program, including suballocation to
31 other state departments and agencies (09FL0753) ....................
32 2,000,000 ........................................... (re. $505,000)
33 By chapter 55, section 1, of the laws of 2006:
34 For the federal share of costs associated with the acquisition of
35 lands under the forest legacy program, including suballocation to
36 other state departments and agencies (09FL0653) ....................
37 1,000,000 ............................................ (re. $15,000)
38 By chapter 55, section 1, of the laws of 2005:
39 For the federal share of costs associated with the acquisition of
40 lands under the forest legacy program, including suballocation to
41 other state departments and agencies (09FL0553) ....................
42 2,000,000 ........................................... (re. $324,000)
212 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 MARINE RESOURCES (CCP)
2 Capital Projects Funds - Federal
3 Federal Capital Projects Fund
4 Marine Projects Purpose
5 By chapter 54, section 1, of the laws of 2015:
6 For the federal share of capital projects undertaken pursuant to fish
7 and wildlife and marine resources purposes including the acquisition
8 of property including suballocation to other state departments and
9 agencies (09MR15A1) ... 5,000,000 ................. (re. $5,000,000)
10 By chapter 54, section 1, of the laws of 2011:
11 For the federal share of capital projects undertaken pursuant to fish
12 and wildlife and marine resources purposes including the acquisition
13 of property including suballocation to other state departments and
14 agencies (09MR11A1) ... 5,000,000 ................. (re. $5,000,000)
15 By chapter 55, section 1, of the laws of 2010:
16 For the federal share of capital projects undertaken pursuant to fish
17 and wildlife and marine resources purposes including the acquisition
18 of property including suballocation to other state departments and
19 agencies (09MR10A1) ... 5,700,000 ................. (re. $5,282,000)
20 By chapter 55, section 1, of the laws of 2008:
21 For the federal share of capital projects undertaken pursuant to fish
22 and wildlife and marine resources purposes including the acquisition
23 of property including suballocation to other state departments and
24 agencies (09MR08A1) ... 4,000,000 ................. (re. $1,498,000)
25 NEW YORK WORKS (CCP)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Flood Control Purpose
29 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
30 section 1, of the laws of 2015:
31 For New York Works Infrastructure projects to improve and enhance
32 water management infrastructure and public safety with respect to
33 flood management, including but not limited to various dam safety
34 projects and the demolition of unsafe structures on state-owned
35 land; various flood protection projects including the state share of
36 federal sponsored flood control projects, and the maintenance of
37 flood control projects, including Western NY, Ithaca and Syracuse
38 Channel; the state share of various shore protection projects,
39 including Long Island Coastal Erosion projects and Coney Island/Sea
40 Gate Beach, including an advance payment by the state for the local
41 costs of various shore protection projects, including personal
42 service, non-personal service, fringe benefits and indirect costs
43 and the payment of liabilities incurred prior to April 1, 2012,
213 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 including suballocation to other state departments and agencies
2 (09NY1263) ... 101,743,000 ....................... (re. $37,707,000)
3 Capital Projects Funds - Other
4 Capital Projects Fund
5 Operational Services Purpose
6 By chapter 55, section 1, of the laws of 2016:
7 For services, expenses, and indirect costs related to New York Works
8 projects including but not limited to air monitoring infrastructure
9 investments; remediation of legacy environmental contamination;
10 investments in information technology; dam safety projects and the
11 demolition of unsafe structures on state-owned land; state-owned
12 flood protection projects; shore protection projects; state land
13 stewardship, public access and environmental and recreation infras-
14 tructure projects; vehicles and equipment; water quality improvement
15 projects, fish hatcheries; and well plugging; including personal
16 service, non-personal service and fringe benefits, including subal-
17 location to other state departments and agencies (09NY1651) ........
18 40,000,000 ....................................... (re. $39,558,000)
19 By chapter 54, section 1, of the laws of 2015:
20 For services, expenses, and indirect costs related to New York Works
21 projects, including but not limited to air monitoring infrastructure
22 investments; remediation of legacy environmental contamination;
23 investments in information technology; dam safety projects and the
24 demolition of unsafe structures on state-owned land; state-owned
25 flood protection projects; state land stewardship, public access and
26 environmental and recreation infrastructure projects; vehicles and
27 equipment related to stewardship and emergency preparedness; water
28 quality improvement projects; and fish hatcheries; including
29 personal service, nonpersonal service and fringe benefits, including
30 suballocation to other state departments and agencies (09NY1551) ...
31 40,000,000 ....................................... (re. $29,859,000)
32 By chapter 54, section 1, of the laws of 2014, as amended by chapter 54,
33 section 1, of the laws of 2015:
34 For services, expenses, and indirect costs related to New York Works
35 projects, including but not limited to air monitoring infrastructure
36 investments; remediation of legacy environmental contamination;
37 investments in information technology; dam safety projects and the
38 demolition of unsafe structures on state-owned land; state-owned
39 flood protection projects; state land stewardship, public access and
40 environmental and recreation infrastructure projects; vehicles and
41 equipment related to stewardship and emergency preparedness; fish
42 hatcheries; and marine program infrastructure; including personal
43 service, nonpersonal service and fringe benefits, including suballo-
44 cation to other state departments and agencies (09NY1451) ..........
45 40,000,000 ....................................... (re. $24,459,000)
46 By chapter 54, section 1, of the laws of 2013, as amended by chapter 55,
47 section 1, of the laws of 2016:
214 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services, expenses, and indirect costs related to New York Works
2 projects, including but not limited to environmental restoration
3 projects; remediation of legacy environmental contamination; invest-
4 ments in information technology; State land stewardship and environ-
5 mental and recreation infrastructure projects; and water quality
6 improvement projects, including suballocation to other state depart-
7 ments and agencies.
8 Notwithstanding any law to the contrary, the Department may enter into
9 agreements with municipalities to undertake environmental restora-
10 tion projects on behalf of a municipality upon request, provided
11 that the municipality shall provide ten percent of the total project
12 costs. Any and all moneys recovered or reimbursed through agreements
13 shall be deposited with the comptroller and credited to the account
14 of the fund from which the expenditures were made (09NY1351) .......
15 40,000,000 ....................................... (re. $23,408,000)
16 OPERATIONS (CCP)
17 Capital Projects Funds - Other
18 Capital Projects Fund
19 Operational Services Purpose
20 By chapter 55, section 1, of the laws of 2016:
21 For rehabilitation and improvements of various department facilities
22 and systems including personal service and fringe benefits and indi-
23 rect costs in accordance with a programmatic and financial plan to
24 be approved by the director of the budget including suballocation to
25 other state departments and agencies (09RI1651) ....................
26 11,750,000 ....................................... (re. $11,750,000)
27 For replacement of vehicles and heavy duty construction equipment
28 (09EQ1651) ... 1,000,000 .......................... (re. $1,000,000)
29 For services and expenses, including personal service and fringe bene-
30 fits, necessary for projects and purposes required by Executive
31 Order 88, including design, construction, operation and maintenance
32 of all new buildings, and the development and purchase of energy
33 efficient equipment; for remedial activities at state-owned facili-
34 ties, including the compliance with state and federal laws and regu-
35 lations (09SF1651) ... 900,000 ...................... (re. $900,000)
36 By chapter 54, section 1, of the laws of 2015:
37 For rehabilitation and improvements of various department facilities
38 and systems including personal service and fringe benefits and indi-
39 rect costs in accordance with a programmatic and financial plan to
40 be approved by the director of the budget including suballocation to
41 other state departments and agencies (09RI1551) ....................
42 9,650,000 ......................................... (re. $9,150,000)
43 For replacement of vehicles and heavy duty construction equipment
44 (09EQ1551) ... 2,750,000 .......................... (re. $2,750,000)
45 For services and expenses, including personal services and fringe
46 benefits, for design and construction of department facilities
47 (09DF1551) ... 750,000 .............................. (re. $750,000)
215 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services and expenses, including personal service, fringe bene-
2 fits, and non-personal services necessary for remedial activities to
3 plug or replug abandoned oil and gas wells including the surface
4 restoration of the affected land pursuant to article 23 of the envi-
5 ronmental conservation law (09OG1551) ..............................
6 500,000 ............................................. (re. $500,000)
7 For services and expenses, including personal service and fringe bene-
8 fits, necessary for projects and purposes required by Executive
9 Order 88, including design, construction, operation and maintenance
10 of all new buildings, and the development and purchase of energy
11 efficient equipment; for remedial activities at state-owned facili-
12 ties, including the compliance with state and federal laws and regu-
13 lations (09SF1551) ... 2,000,000 .................. (re. $2,000,000)
14 By chapter 54, section 1, of the laws of 2014:
15 For rehabilitation and improvements of various department facilities
16 and systems including personal service and fringe benefits and indi-
17 rect costs in accordance with a programmatic and financial plan to
18 be approved by the director of the budget including suballocation to
19 other state departments and agencies (09RI1451) ....................
20 9,650,000 ......................................... (re. $2,500,000)
21 For replacement of vehicles and heavy duty construction equipment
22 (09EQ1451) ... 2,000,000 ............................ (re. $603,000)
23 For services and expenses, including personal services and fringe
24 benefits, for design and construction of department facilities
25 (09DF1451) ... 750,000 .............................. (re. $750,000)
26 For services and expenses, including personal service, fringe bene-
27 fits, and non-personal services necessary for remedial activities to
28 plug or replug abandoned oil and gas wells including the surface
29 restoration of the affected land pursuant to article 23 of the envi-
30 ronmental conservation law (09OG1451) ... 500,000 ... (re. $500,000)
31 For services and expenses, including personal service and fringe bene-
32 fits, necessary for projects and purposes required by Executive
33 Order 111, including design, construction, operation and maintenance
34 of all new buildings, and the development and purchase of energy
35 efficient equipment; for remedial activities at state-owned facili-
36 ties, including the compliance with state and federal laws and regu-
37 lations (09SF1451) ... 1,200,000 .................... (re. $396,000)
38 By chapter 54, section 1, of the laws of 2013:
39 For services and expenses relating to the operational services of the
40 department of environmental conservation (09HD1351) ................
41 12,000,000 ....................................... (re. $12,000,000)
42 For rehabilitation and improvements of various department facilities
43 and systems including personal service and fringe benefits and indi-
44 rect costs in accordance with a programmatic and financial plan to
45 be approved by the director of the budget including suballocation to
46 other state departments and agencies (09RI1351) ....................
47 9,150,000 ......................................... (re. $1,269,000)
48 For services and expenses, including personal services and fringe
49 benefits, for design and construction of department facilities
50 (09DF1351) ... 750,000 .............................. (re. $490,000)
216 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For services and expenses, including personal service, fringe bene-
2 fits, and non-personal services necessary for remedial activities to
3 plug or replug abandoned oil and gas wells including the surface
4 restoration of the affected land pursuant to article 23 of the envi-
5 ronmental conservation law (09OG1351) ... 500,000 ... (re. $500,000)
6 For services and expenses, including personal service and fringe bene-
7 fits, necessary for projects and purposes required by Executive
8 Order 111, including design, construction, operation and maintenance
9 of all new buildings, and the development and purchase of energy
10 efficient equipment; for remedial activities at state-owned facili-
11 ties, including the compliance with state and federal laws and regu-
12 lations (09SF1351) ... 1,000,000 .................... (re. $577,000)
13 By chapter 54, section 1, of the laws of 2012:
14 For services and expenses relating to the operational services of the
15 department of environmental conservation (09HD1251) ................
16 12,000,000 ....................................... (re. $12,000,000)
17 For rehabilitation and improvements of various department facilities
18 and systems including personal service and fringe benefits and indi-
19 rect costs in accordance with a programmatic and financial plan to
20 be approved by the director of the budget including suballocation to
21 other state departments and agencies (09RI1251) ....................
22 10,000,000 ........................................... (re. $71,000)
23 For replacement of vehicles and heavy duty construction equipment
24 (09EQ1251) ... 500,000 ................................ (re. $4,000)
25 For dam safety and the demolition of unsafe structures on state-owned
26 land, and for various dam safety projects including personal service
27 and fringe benefits (09DS1251) ... 1,500,000 ...... (re. $1,500,000)
28 For services and expenses, including personal service and fringe bene-
29 fits, necessary for projects and purposes required by Executive
30 Order 111, including design, construction, operation and maintenance
31 of all new buildings, and the development and purchase of energy
32 efficient equipment; for remedial activities at state-owned facili-
33 ties, including the compliance with state and federal laws and regu-
34 lations (09SF1251) ... 1,000,000 .................... (re. $100,000)
35 By chapter 54, section 1, of the laws of 2011:
36 For services and expenses relating to the operational services of the
37 department of environmental conservation (09HD1151) ................
38 12,000,000 ....................................... (re. $12,000,000)
39 For rehabilitation and improvements of various department facilities
40 and systems including personal services and fringe benefits and
41 indirect costs in accordance with a programmatic and financial plan
42 to be approved by the director of the budget including suballocation
43 to other state departments and agencies (09RI1151) .................
44 10,250,000 .......................................... (re. $298,000)
45 By chapter 55, section 1, of the laws of 2010:
46 For services and expenses relating to the operational services of the
47 department of environmental conservation (09HD1051) ................
48 12,000,000 ....................................... (re. $12,000,000)
217 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For rehabilitation and improvements of various department facilities
2 and systems including personal services and fringe benefits and
3 indirect costs in accordance with a programmatic and financial plan
4 to be approved by the director of the budget including suballocation
5 to other state departments and agencies (09RI1051) .................
6 8,300,000 ........................................... (re. $330,000)
7 For services and expenses, including personal services and fringe
8 benefits, necessary for projects and purposes required by Executive
9 Order 111, including design, construction, operation and maintenance
10 of all new buildings, and the development and purchase of energy
11 efficient equipment; for remedial activities at state-owned facili-
12 ties, including the compliance with state and federal laws and regu-
13 lations (09SF1051) ... 2,000,000 ..................... (re. $57,000)
14 By chapter 55, section 1, of the laws of 2009:
15 For rehabilitation and improvements of various department facilities
16 and systems including personal services and fringe benefits and
17 indirect costs in accordance with a programmatic and financial plan
18 to be approved by the director of the budget including suballocation
19 to other state departments and agencies (09RI0951) .................
20 11,150,000 .......................................... (re. $210,000)
21 For replacement of vehicles and heavy duty construction equipment
22 (09EQ0951) ... 4,200,000 .............................. (re. $5,000)
23 For dam safety and the demolition of unsafe structures on state-owned
24 land, and for various dam safety projects including personal
25 services and fringe benefits (09DS0951) ............................
26 2,000,000 ......................................... (re. $1,753,000)
27 For services and expenses, including personal services and fringe
28 benefits, for design and construction of department facilities
29 (09DF0951) ... 450,000 ............................... (re. $34,000)
30 For services and expenses, including personal services and fringe
31 benefits, necessary for projects and purposes required by Executive
32 Order 111, including design, construction, operation and maintenance
33 of all new buildings, and the development and purchase of energy
34 efficient equipment; for remedial activities at state-owned facili-
35 ties, including the compliance with state and federal laws and regu-
36 lations (09SF0951) ... 3,000,000 ..................... (re. $25,000)
37 By chapter 55, section 1, of the laws of 2008:
38 For dam safety and the demolition of unsafe structures on state-owned
39 land, and for various dam safety projects including personal
40 services and fringe benefits (09DS0851) ............................
41 2,000,000 ......................................... (re. $1,911,000)
42 For services and expenses, including personal services and fringe
43 benefits, for design and construction of department facilities
44 (09DF0851) ... 450,000 .............................. (re. $277,000)
45 For services and expenses, including personal services and fringe
46 benefits, necessary for projects and purposes required by Executive
47 Order 111, including design, construction, operation and maintenance
48 of all new buildings, and the development and purchase of energy
49 efficient equipment; for remedial activities at state-owned facili-
218 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ties, including the compliance with state and federal laws and regu-
2 lations (09SF0851) ... 3,000,000 ..................... (re. $46,000)
3 By chapter 55, section 1, of the laws of 2007:
4 For rehabilitation and improvements of various department facilities
5 and systems including personal services and fringe benefits and
6 indirect costs in accordance with a programmatic and financial plan
7 to be approved by the director of the budget including suballocation
8 to other state departments and agencies (09RI0751) .................
9 11,066,000 ........................................... (re. $45,000)
10 For dam safety and the demolition of unsafe structures on state-owned
11 land including personal services and fringe benefits (09DS0751) ....
12 2,000,000 ........................................... (re. $691,000)
13 For services and expenses, including personal services and fringe
14 benefits, for design and construction of department facilities
15 (09DF0751) ... 250,000 ................................ (re. $7,000)
16 For services and expenses, including personal services and fringe
17 benefits, necessary for projects and purposes required by Executive
18 Order 111, including design, construction, operation and maintenance
19 of all new buildings, and the development and purchase of energy
20 efficient equipment; for remedial activities at state-owned facili-
21 ties, including the compliance with state and federal laws and regu-
22 lations (09SF0751) ... 3,000,000 ..................... (re. $64,000)
23 By chapter 55, section 1, of the laws of 2006:
24 For services and expenses, including personal services and fringe
25 benefits, for design and construction of department facilities
26 (09DF0651) ... 750,000 ............................... (re. $58,000)
27 For services and expenses, including personal services and fringe
28 benefits, necessary for projects and purposes required by Executive
29 Order 111, including design, construction, operation and maintenance
30 of all new buildings, and the development and purchase of energy
31 efficient equipment; for remedial activities at state-owned facili-
32 ties, including the compliance with state and federal laws and regu-
33 lations (09SF0651) ... 2,090,000 ..................... (re. $11,000)
34 By chapter 55, section 1, of the laws of 2005:
35 For services and expenses of remedial activities performed at stat-
36 eowned sites and including compliance with state and federal laws
37 and regulations (09SF0551) ... 8,000,000 ............ (re. $141,000)
38 Capital Projects Funds - Other
39 Miscellaneous Capital Projects Fund
40 Operational Services Purpose
41 By chapter 55, section 1, of the laws of 2016:
42 For services and expenses of the department to complete or remediate a
43 department-regulated project using the proceeds specified in the
44 project's required financial security arrangement when the terms of
45 that arrangement must be implemented. No portion of this appropri-
46 ation shall be available for projects for which financial security
219 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 proceeds have not been received (09431651) .........................
2 5,000,000 ......................................... (re. $5,000,000)
3 By chapter 54, section 1, of the laws of 1994:
4 For services and expenses of the department to complete or remediate a
5 department-regulated project using the proceeds specified in the
6 project's required financial security arrangement when the terms of
7 that arrangement must be implemented. No portion of this appropri-
8 ation shall be available for projects for which financial security
9 proceeds have not been received (09439451) .........................
10 2,000,000 ........................................... (re. $829,000)
11 Capital Projects Funds - Other
12 Natural Resource Damages Fund
13 Operational Services Purpose
14 By chapter 55, section 1, of the laws of 2016:
15 For services and expenses related to restoration projects, replacement
16 acquisition projects or combinations thereof resulting from success-
17 ful natural resource damages claims including suballocation to other
18 state departments and agencies (09441651) ..........................
19 26,000,000 ....................................... (re. $26,000,000)
20 By chapter 55, section 1, of the laws of 2007, as amended by chapter 54,
21 section 1, of the laws of 2013:
22 For services and expenses related to restoration projects, replacement
23 acquisition projects or combinations thereof resulting from success-
24 ful natural resource damages claims, and suballocation to other
25 state departments and agencies (09440751) ..........................
26 26,000,000 ....................................... (re. $11,599,000)
27 By chapter 54, section 1, of the laws of 1994, as amended by chapter 54,
28 section 1, of the laws of 2005:
29 For services and expenses related to restoration projects, replacement
30 acquisition projects or combinations thereof resulting from success-
31 ful natural resource damages claims. No portion of this appropri-
32 ation shall be available for projects for which recovered funds have
33 not been received including suballocation to the department of
34 health and the office of parks, recreation and historic preservation
35 (09449451) ... 23,503,000 ........................... (re. $528,000)
36 PURE WATERS BOND FUND (CCP)
37 Capital Projects Funds - Other
38 Pure Waters Bond Fund
39 Bond Proceeds Purpose
40 By chapter 54, section 8, of the laws of 1978, as amended by chapter 55,
41 section 1, of the laws of 1996:
42 The sum of two hundred sixty-three million thirty-five thousand nine
43 hundred sixty-one dollars ($263,035,961) or so much thereof as may
44 be necessary, is hereby appropriated from the proceeds of the sale
220 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 of bonds authorized pursuant to the provisions of chapter one
2 hundred and seventy-six of the laws of nineteen hundred sixty-five
3 known as the "Pure Waters Bond Act" for payment to the capital
4 projects fund as created by section ninety-three of the state
5 finance law for disbursements from such fund pursuant to appropri-
6 ations for the payment of the non-municipal share of the cost of
7 construction of sewage treatment works in the manner and to the
8 extent specified in section 17-1903 of the environmental conserva-
9 tion law. Such disbursements are hereinafter referred to as "Pure
10 Waters disbursements."
11 The director of the budget is hereby authorized to designate to the
12 state comptroller appropriations made from the capital projects fund
13 for purposes for which pure waters expenditures are authorized. The
14 state comptroller shall at the commencement of each month certify to
15 the director of the budget, the chairman of the senate finance
16 committee, and the chairman of the assembly ways and means commit-
17 tee, the amounts disbursed from the appropriations designated by the
18 director of the budget from the capital construction fund for pure
19 waters disbursements for the month preceding such certification.
20 Such certifications shall not exceed in aggregate the moneys appro-
21 priated thereof from the capital projects fund. A copy of each such
22 certification shall also be delivered to the public officer of the
23 respective state department to which such capital projects fund
24 appropriations are made available (01354910) ..... (re. $20,568,000)
25 RECREATION (CCP)
26 Capital Projects Funds - Other
27 Capital Projects Fund
28 Recreation Purpose
29 By chapter 54, section 1, of the laws of 2013:
30 For campground modernization and reconstruction including personal
31 services, fringe benefits and indirect costs (09CM1352) ............
32 1,000,000 ......................................... (re. $1,000,000)
33 By chapter 55, section 1, of the laws of 2010, as amended by chapter 54,
34 section 1, of the laws of 2012:
35 For alterations and improvements to Belleayre Mountain Ski Center
36 lifts and trails to comply with safety regulations including
37 personal services, fringe benefits and indirect costs, including
38 suballocation to other state departments and agencies (09LS1052) ...
39 500,000 ............................................. (re. $117,000)
40 By chapter 55, section 1, of the laws of 2009:
41 For campground modernization and reconstruction including personal
42 services, fringe benefits and indirect costs (09CM0952) ............
43 500,000 ............................................. (re. $500,000)
44 By chapter 55, section 1, of the laws of 2008:
221 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For campground modernization and reconstruction including personal
2 services, fringe benefits and indirect costs (09CM0852) ............
3 1,000,000 ........................................... (re. $275,000)
4 By chapter 55, section 1, of the laws of 2006:
5 For campground modernization and reconstruction including personal
6 services, fringe benefits and indirect costs (09CM0652) ............
7 1,000,000 ............................................ (re. $18,000)
8 By chapter 55, section 1, of the laws of 2006, as amended by chapter 54,
9 section 1, of the laws of 2012:
10 For services and expenses for the construction of a new ski lodge at
11 Belleayre Mountain Ski Center, including suballocation to other
12 state departments and agencies (09BL0652) ..........................
13 5,500,000 ......................................... (re. $3,168,000)
14 SOLID AND HAZARDOUS WASTE MANAGEMENT (CCP)
15 Capital Projects Funds - Other
16 Capital Projects Fund
17 Hazardous Waste Purpose
18 By chapter 55, section 1, of the laws of 2016:
19 For payment by the state, as reimbursement or as an advance from
20 responsible parties or volunteers for remedial and monitoring work
21 at sites contaminated with hazardous waste. No portion of this
22 appropriation shall be available for expenditure until a party or
23 parties either responsible for a site or volunteering to cleanup a
24 site have entered into an agreement with the commissioner of the
25 department of environmental conservation or the commissioner's
26 designee, and which agreement is approved by the director of the
27 budget, providing for repayment to the state of an amount equal to
28 the amount disbursed from this appropriation. A copy of such agree-
29 ment shall be filed with the state comptroller, the chairman of the
30 senate finance committee and chairman of the assembly ways and means
31 committee.
32 Notwithstanding any other provision of law to the contrary, the comp-
33 troller is authorized to repay settlements or advances for specified
34 remedial and monitoring projects from this fund with monies of the
35 hazardous waste remedial fund received for such projects pursuant to
36 consent orders and agreements to address sites contaminated with
37 hazardous waste.
38 The director of the budget shall certify to the comptroller the
39 specific portions of this appropriation for which monies have been
40 received pursuant to such consent orders and agreements (09AD16F7)
41 ... 8,000,000 ..................................... (re. $8,000,000)
42 By chapter 54, section 1, of the laws of 2015:
43 For payment by the state, as reimbursement or as an advance from
44 responsible parties or volunteers for remedial and monitoring work
45 at sites contaminated with hazardous waste. No portion of this
46 appropriation shall be available for expenditure until a party or
222 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 parties either responsible for a site or volunteering to cleanup a
2 site have entered into an agreement with the commissioner of the
3 department of environmental conservation or the commissioner's
4 designee, and which agreement is approved by the director of the
5 budget, providing for repayment to the state of an amount equal to
6 the amount disbursed from this appropriation. A copy of such agree-
7 ment shall be filed with the state comptroller, the chairman of the
8 senate finance committee and chairman of the assembly ways and means
9 committee.
10 Notwithstanding any other provision of law to the contrary, the comp-
11 troller is authorized to repay settlements or advances for specified
12 remedial and monitoring projects from this fund with monies of the
13 hazardous waste remedial fund received for such projects pursuant to
14 consent orders and agreements to address sites contaminated with
15 hazardous waste.
16 The director of the budget shall certify to the comptroller the
17 specific portions of this appropriation for which monies have been
18 received pursuant to such consent orders and agreements (09AD15F7)
19 ... 8,000,000 ..................................... (re. $5,093,000)
20 By chapter 55, section 1, of the laws of 2008, as amended by chapter 55,
21 section 1, of the laws of 2010:
22 For payment by the state, as reimbursement or as an advance from
23 responsible parties for remedial and monitoring work at inactive
24 hazardous waste disposal sites or from volunteers for the voluntary
25 cleanup of contaminated brownfield sites. No portion of this appro-
26 priation shall be available for expenditure until a party or parties
27 either responsible for a site or volunteering to cleanup a site have
28 entered into an agreement with the commissioner of the department of
29 environmental conservation or the commissioner's designee, and which
30 agreement is approved by the director of the budget, providing for
31 repayment to the state of an amount equal to the amount disbursed
32 from this appropriation. A copy of such agreement shall be filed
33 with the state comptroller, the chairman of the senate finance
34 committee and chairman of the assembly ways and means committee.
35 Nothwithstanding any other provision of law to the contrary, the comp-
36 troller is authorized to repay settlements or advances for specified
37 inactive hazardous waste remedial projects and voluntary cleanup
38 projects from this fund with monies of the hazardous waste remedial
39 fund received for such projects pursuant to inactive hazardous waste
40 site remediation consent orders and voluntary cleanup agreements.
41 The director of the budget shall certify to the comptroller the
42 specific portions of this appropriation for which monies have been
43 received pursuant to such consent orders and voluntary cleanup
44 agreements (09AD08F7) ... 10,000,000 .............. (re. $3,912,000)
45 By chapter 55, section 1, of the laws of 2006, as amended by chapter 55,
46 section 1, of the laws of 2007:
47 For services and expenses for the Town of Smithtown/Kings Park Psychi-
48 atric Center Rehabilitation including suballocation to other state
49 departments and agencies (09KP06F7) ................................
50 25,000,000 ....................................... (re. $10,984,000)
223 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
2 section 1, of the laws of 2006:
3 For payment by the state, as reimbursement or as an advance from
4 responsible parties for remedial and monitoring work at inactive
5 hazardous waste disposal sites or from volunteers for the voluntary
6 cleanup of contaminated brownfield sites. No portion of this appro-
7 priation shall be available for expenditure until a party or parties
8 either responsible for a site or volunteering to cleanup a site have
9 entered into an agreement with the commissioner of the department of
10 environmental conservation or the commission's designee, and which
11 agreement is approved by the director of the budget, providing for
12 repayment to the state of an amount equal to the amount disbursed
13 from this appropriation. A copy of such agreement shall be filed
14 with the state comptroller, the chairman of the senate finance
15 committee and chairman of the assembly ways and means committee.
16 Notwithstanding any other provision of law to the contrary, the comp-
17 troller is authorized to repay settlements or advances for specified
18 inactive hazardous waste remedial projects and voluntary cleanup
19 projects from this fund with monies of the hazardous waste remedial
20 fund received for such projects pursuant to inactive hazardous waste
21 site remediation consent orders and voluntary cleanup agreements.
22 The director of the budget shall certify to the comptroller the
23 specific portions of this appropriation for which monies have been
24 received pursuant to such consent orders and voluntary cleanup
25 agreements (09AD04F7) ... 30,000,000 .............. (re. $1,523,000)
26 By chapter 55, section 1, of the laws of 1999:
27 For payment by the state, as an advance for remedial and monitoring
28 work at inactive hazardous waste disposal sites. No portion of this
29 appropriation shall be available for expenditure until a party or
30 parties responsible for a site have entered into an agreement with
31 the commissioner of the department of environmental conservation,
32 and which agreement is approved by the director of the budget,
33 providing for repayment to the state of an amount equal to the
34 amount disbursed from this appropriation. A copy of such agreement
35 shall be filed with the state comptroller, the chairman of the
36 senate finance committee and chairman of the assembly ways and means
37 committee.
38 Notwithstanding any other provision of law to the contrary, the comp-
39 troller is authorized to repay advances for specified inactive
40 hazardous waste remedial projects from this fund with moneys of the
41 hazardous waste remedial fund received for such projects pursuant to
42 inactive hazardous waste site remediation consent orders. The direc-
43 tor of the budget shall certify to the comptroller the specific
44 portions of this appropriation for which moneys have been received
45 pursuant to such consent orders (09AD99F7) .........................
46 60,000,000 ........................................ (re. $2,802,000)
47 By chapter 55, section 1, of the laws of 1998:
48 For payment by the state, as an advance for remedial and monitoring
49 work at inactive hazardous waste disposal sites (09AD98F7) .........
50 30,000,000 .......................................... (re. $501,000)
224 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Capital Projects Funds - Other
2 Hazardous Waste Remedial Fund
3 Hazardous Waste Cleanup Account
4 Hazardous Waste Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For payment of the state share of the costs of hazardous waste site
7 remediation projects, in accordance with title 13 of article 27 of
8 the environmental conservation law and section 97-b of the state
9 finance law, for projects, and for payment of state costs associated
10 with the remediation of offsite contamination at significant threat
11 sites as provided for in section 27-1411 of the environmental
12 conservation law, including personal service and fringe benefits of
13 the departments of environmental conservation, health and law and
14 including suballocations to the departments of health and law and
15 including costs incidental and appurtenant thereto, provided that a
16 portion of such amount may be available for environmental restora-
17 tion projects in accordance with title 5 of article 56 of the envi-
18 ronmental conservation law (09HB16F7) ..............................
19 100,000,000 ...................................... (re. $82,502,000)
20 By chapter 54, section 1, of the laws of 2015:
21 For payment of the state share of the costs of hazardous waste site
22 remediation projects, in accordance with title 13 of article 27 of
23 the environmental conservation law and section 97-b of the state
24 finance law, for projects, and for payment of state costs associated
25 with the remediation of offsite contamination at significant threat
26 sites as provided for in section 27-1411 of the environmental
27 conservation law, including personal service and fringe benefits of
28 the departments of environmental conservation, health and law and
29 including suballocations to the departments of health and law and
30 including costs incidental and appurtenant thereto, provided that a
31 portion of such amount may be available for environmental restora-
32 tion projects in accordance with title 5 of article 56 of the envi-
33 ronmental conservation law (09HB15F7) ..............................
34 100,000,000 ...................................... (re. $52,564,000)
35 By chapter 54, section 1, of the laws of 2012:
36 For payment of the state share of the costs of hazardous waste site
37 remediation projects, in accordance with title 13 of article 27 of
38 the environmental conservation law and section 97-b of the state
39 finance law, for projects, and for payment of state costs associated
40 with the remediation of offsite contamination at significant threat
41 sites as provided for in section 27-1411 of the environmental
42 conservation law, including personal service and fringe benefits of
43 the departments of environmental conservation, health and law and
44 including suballocations to the departments of health and law and
45 including costs incidental and appurtenant thereto (09HB12F7) ......
46 120,000,000 ...................................... (re. $11,588,000)
47 By chapter 54, section 1, of the laws of 2011:
225 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For payment of the state share of the costs of hazardous waste site
2 remediation projects, in accordance with title 13 of article 27 of
3 the environmental conservation law and section 97-b of the state
4 finance law, for projects, and for payment of state costs associated
5 with the remediation of offsite contamination at significant threat
6 sites as provided for in section 27-1411 of the environmental
7 conservation law, including personal services and fringe benefits of
8 the departments of environmental conservation, health and law and
9 including suballocations to the departments of health and law and
10 including costs incidental and appurtenant thereto (09HB11F7) ......
11 120,000,000 ...................................... (re. $43,670,000)
12 By chapter 55, section 1, of the laws of 2010:
13 For payment of the state share of the costs of hazardous waste site
14 remediation projects, in accordance with title 13 of article 27 of
15 the environmental conservation law and section 97-b of the state
16 finance law, for projects, and for payment of state costs associated
17 with the remediation of offsite contamination at significant threat
18 sites as provided for in section 27-1411 of the environmental
19 conservation law, including personal services and fringe benefits of
20 the departments of environmental conservation, health and law and
21 including suballocations to the departments of health and law and
22 including costs incidental and appurtenant thereto (09HB10F7) ......
23 120,000,000 ...................................... (re. $23,618,000)
24 By chapter 55, section 1, of the laws of 2009:
25 For payment of the state share of the costs of hazardous waste site
26 remediation projects, in accordance with title 13 of article 27 of
27 the environmental conservation law and section 97-b of the state
28 finance law, for projects, and for payment of state costs associated
29 with the remediation of offsite contamination at significant threat
30 sites as provided for in section 27-1411 of the environmental
31 conservation law, including personal services and fringe benefits of
32 the departments of environmental conservation, health and law and
33 including suballocations to the departments of health and law and
34 including costs incidental and appurtenant thereto (09HB09F7) ......
35 120,000,000 ....................................... (re. $4,989,000)
36 By chapter 55, section 1, of the laws of 2008:
37 For payment of the state share of the costs of hazardous waste site
38 remediation projects, in accordance with title 13 of article 27 of
39 the environmental conservation law and section 97-b of the state
40 finance law, for projects, and for payment of state costs associated
41 with the remediation of offsite contamination at significant threat
42 sites as provided for in section 27-1411 of the environmental
43 conservation law, including personal services and fringe benefits of
44 the departments of environmental conservation, health and law and
45 including suballocations to the departments of health and law and
46 including costs incidental and appurtenant thereto (09HB08F7) ......
47 120,000,000 ...................................... (re. $32,031,000)
48 By chapter 55, section 1, of the laws of 2007:
226 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For payment of the state share of the costs of hazardous waste site
2 remediation projects, in accordance with title 13 of article 27 of
3 the environmental conservation law and section 97-b of the state
4 finance law, for projects, and for payment of state costs associated
5 with the remediation of offsite contamination at significant threat
6 sites as provided for in section 27-1411 of the environmental
7 conservation law, including personal services and fringe benefits of
8 the departments of environmental conservation, health and law and
9 including suballocations to the departments of health and law and
10 including costs incidental and appurtenant thereto (09HB07F7) ......
11 120,000,000 ....................................... (re. $3,539,000)
12 By chapter 55, section 1, of the laws of 2006:
13 For payment of the state share of the costs of hazardous waste site
14 remediation projects, in accordance with title 13 of article 27 of
15 the environmental conservation law and section 97-b of the state
16 finance law, for projects, and for payment of state costs associated
17 with the remediation of offsite contamination at significant threat
18 sites as provided for in section 27-1411 of the environmental
19 conservation law, including personal services and fringe benefits of
20 the departments of environmental conservation, health and law and
21 including suballocations to the departments of health and law and
22 including costs incidental and appurtenant thereto (09HB06F7) ......
23 120,000,000 ....................................... (re. $3,465,000)
24 By chapter 55, section 1, of the laws of 2005:
25 For payment of the state share of the costs of hazardous waste site
26 remediation projects, in accordance with title 13 of article 27 of
27 the environmental conservation law and section 97-b of the state
28 finance law, for projects, and for payment of state costs associated
29 with the remediation of offsite contamination at significant threat
30 sites as provided for in section 27-1411 of the environmental
31 conservation law, including personal services and related fringe
32 benefits of the departments of environmental conservation, health
33 and law and including suballocations to the departments of health
34 and law and including costs incidental and appurtenant thereto
35 (09HB05F7) ... 120,000,000 ........................ (re. $2,582,000)
36 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
37 section 1, of the laws of 2005:
38 For payment of the state share of the costs of hazardous waste site
39 remediation projects, in accordance with title 13 of article 27 of
40 the environmental conservation law and section 97-b of the state
41 finance law, for projects, and for payment of state costs associated
42 with the remediation of offsite contamination at significant threat
43 sites as provided for in section 27-1411 of the environmental
44 conservation law, including personal services and related fringe
45 benefits of the departments of environmental conservation, health
46 and law and including suballocations to the departments of health
47 and law and including costs incidental and appurtenant thereto
48 (09HB04F7) ... 120,222,000 ........................ (re. $5,950,000)
227 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 SCHEDULE
2 Personal service .............................. 15,855,844
3 Nonpersonal service .............................. 975,871
4 Fringe benefits ................................ 5,746,290
5 Maintenance undistributed
6 For services and expenses related to the
7 hazardous waste remedial program at the
8 department of health and for suballocation
9 to the department of health .................. 5,880,163
10 For services and expenses related to the
11 hazardous waste remedial program at the
12 department of law and for suballocation to
13 the department of law .......................... 763,832
14 For payment of the state share of the costs
15 of hazardous waste site remediation
16 projects in accordance with title 13 of
17 article 27 of the environmental conserva-
18 tion law and section 97-b of the state
19 finance law and for payment of state costs
20 associated with the remediation of offsite
21 contamination at significant threat sites
22 as provided for in section 27-1411 of the
23 environmental conservation law, including
24 costs incidental and appurtenant thereto .... 91,000,000
25 --------------
26 Available for maintenance undistributed ..... 97,643,995
27 --------------
28 Total of schedule ........................ 120,222,000
29 ==============
30 By chapter 55, section 1, of the laws of 2003, as amended by chapter 1,
31 part I, section 5, of the laws of 2003:
32 For payment of the state share of costs of hazardous waste site reme-
33 diation projects, in accordance with title 13 of article 27 of the
34 environmental conservation law and section 97-b of the state finance
35 law, for projects, and for payment of state costs associated with
36 the remediation of offsite contamination at significant threat sites
37 as provided for in section 27-1411 of the environmental conservation
38 law, including personal services and related fringe benefits of the
39 departments of environmental conservation, health and law and
40 including costs incidental and appurtenant thereto (09HB03F7) ......
41 120,000,000 ....................................... (re. $6,716,000)
42 SCHEDULE
43 Personal service .............................. 15,700,000
44 Nonpersonal service .............................. 966,325
45 Fringe benefits ................................ 5,689,680
228 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Maintenance undistributed
2 For services and expenses related to the
3 hazardous waste remedial program at the
4 department of health and for suballocation
5 to the department of health .................. 5,880,163
6 For services and expenses related to the
7 hazardous waste remedial program at the
8 department of law and for suballocation to
9 the department of law .......................... 763,832
10 For payment of the state share of the costs
11 of hazardous waste site remediation
12 projects in accordance with title 13 of
13 article 27 of the environmental conserva-
14 tion law and section 97-b of the state
15 finance law and for payment of state costs
16 associated with the remediation of offsite
17 contamination at significant threat sites
18 as provided for in section 27-1411 of the
19 environmental conservation law, including
20 costs incidental and appurtenant thereto .... 91,000,000
21 --------------
22 Available for maintenance undistributed ..... 97,643,995
23 --------------
24 Total of schedule ........................ 120,000,000
25 ==============
26 Capital Projects Funds - Other
27 Hazardous Waste Remedial Fund
28 Hazardous Waste Remediation Oversight and Assistance Account
29 Hazardous Waste Purpose
30 By chapter 55, section 1, of the laws of 2016:
31 For the personal services and fringe benefits of the department of
32 environmental conservation including suballocation to the department
33 of health related to the brownfield cleanup program pursuant to
34 title 14 of article 27 of the environmental conservation law and the
35 voluntary cleanup program including costs incurred prior to April 1,
36 2016 (09BC16F7) ... 6,000,000 ..................... (re. $4,539,000)
37 By chapter 54, section 1, of the laws of 2015:
38 For the personal services and fringe benefits of the department of
39 environmental conservation including suballocation to the department
40 of health related to the brownfield cleanup program pursuant to
41 title 14 of article 27 of the environmental conservation law and the
42 voluntary cleanup program including costs incurred prior to April 1,
43 2015 (09BC15F7) ... 6,000,000 ....................... (re. $630,000)
44 By chapter 54, section 1, of the laws of 2014:
45 For the personal services and fringe benefits of the department of
46 environmental conservation including suballocation to the department
47 of health related to the brownfield cleanup program pursuant to
48 title 14 of article 27 of the environmental conservation law and the
229 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 voluntary cleanup program including costs incurred prior to April 1,
2 2014 (09BC14F7) ... 6,000,000 ....................... (re. $440,000)
3 By chapter 54, section 1, of the laws of 2013:
4 For the personal services and fringe benefits of the department of
5 environmental conservation including suballocation to the department
6 of health related to the brownfield cleanup program pursuant to
7 title 14 of article 27 of the environmental conservation law and the
8 voluntary cleanup program including costs incurred prior to April 1,
9 2013 (09BC13F7) ... 6,000,000 ....................... (re. $629,000)
10 By chapter 54, section 1, of the laws of 2012:
11 For the personal services and fringe benefits of the department of
12 environmental conservation including suballocation to the department
13 of health related to the brownfield cleanup program pursuant to
14 title 14 of article 27 of the environmental conservation law and the
15 voluntary cleanup program including costs incurred prior to April 1,
16 2012 (09BC12F7) ... 10,000,000 .................... (re. $4,405,000)
17 By chapter 54, section 1, of the laws of 2011:
18 For the personal services and fringe benefits of the department of
19 environmental conservation including suballocation to the department
20 of health related to the brownfield cleanup program pursuant to
21 title 14 of article 27 of the environmental conservation law and the
22 voluntary cleanup program including costs incurred prior to April 1,
23 2011 (09BC11F7) ... 10,000,000 .................... (re. $5,564,000)
24 By chapter 55, section 1, of the laws of 2010:
25 For the following purposes: non-bondable services and expenses associ-
26 ated with the brownfield cleanup and hazardous waste remediation
27 projects; and, suballocation to other state departments and agen-
28 cies; and for other brownfield site cleanup hazardous waste purposes
29 (09TG10F7) ... 2,250,000 .......................... (re. $2,250,000)
30 For the personal services and fringe benefits of the department of
31 environmental conservation including suballocation to the department
32 of health related to the brownfield cleanup program pursuant to
33 title 14 of article 27 of the environmental conservation law and the
34 voluntary cleanup program including costs incurred prior to April 1,
35 2010 (09BC10F7) ... 10,000,000 .................... (re. $5,414,000)
36 By chapter 55, section 1, of the laws of 2009:
37 For the following purposes: non-bondable services and expenses associ-
38 ated with the brownfield cleanup and hazardous waste remediation
39 projects; and, suballocation to other state departments and agen-
40 cies; and for other brownfield site cleanup hazardous waste purposes
41 (09TG09F7) ... 2,250,000 .......................... (re. $2,250,000)
42 For the personal services and fringe benefits of the department of
43 environmental conservation including suballocation to the department
44 of health related to the brownfield cleanup program pursuant to
45 title 14 of article 27 of the environmental conservation law and the
46 voluntary cleanup program including costs incurred prior to April 1,
47 2009 (09BC09F7) ... 10,000,000 .................... (re. $3,462,000)
230 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2008:
2 For the following purposes: non-bondable services and expenses associ-
3 ated with the brownfield cleanup and hazardous waste remediation
4 projects; and, suballocation to other state departments and agen-
5 cies; and for other brownfield site cleanup hazardous waste purposes
6 (09TG08F7) ... 2,250,000 .......................... (re. $2,250,000)
7 For the following purposes: non-bondable services and expenses associ-
8 ated with the brownfield cleanup and hazardous waste remediation
9 projects; grants authorized pursuant to section 970-r of the general
10 municipal law; and, suballocation to other state departments and
11 agencies; and for other brownfield site cleanup hazardous waste
12 purposes (09BA08F7) ... 2,750,000 ................. (re. $1,934,000)
13 For the personal services and fringe benefits of the department of
14 environmental conservation including suballocation to the department
15 of health related to the brownfield cleanup program pursuant to
16 title 14 of article 27 of the environmental conservation law and the
17 voluntary cleanup program including costs incurred prior to April 1,
18 2008 (09BC08F7) ... 10,275,000 .................... (re. $2,022,000)
19 By chapter 55, section 1, of the laws of 2007:
20 For the following purposes: non-bondable services and expenses associ-
21 ated with the brownfield cleanup and hazardous waste remediation
22 projects; and, suballocation to other state departments and agen-
23 cies; and for other brownfield site cleanup hazardous waste purposes
24 (09TG07F7) ... 2,250,000 ............................ (re. $715,000)
25 For the following purposes: non-bondable services and expenses associ-
26 ated with the brownfield cleanup and hazardous waste remediation
27 projects; grants authorized pursuant to section 970-r of the general
28 municipal law; and, suballocation to other state departments and
29 agencies; and for other brownfield site cleanup hazardous waste
30 purposes (09BA07F7) ... 12,750,000 ................ (re. $3,318,000)
31 For the personal services and fringe benefits of the department of
32 environmental conservation including suballocation to the department
33 of health related to the brownfield cleanup program pursuant to
34 title 14 of article 27 of the environmental conservation law and the
35 voluntary cleanup program including costs incurred prior to April 1,
36 2007 (09BC07F7) ... 9,375,000 ..................... (re. $3,417,000)
37 By chapter 55, section 1, of the laws of 2006:
38 For the following purposes pursuant to a memorandum of understanding
39 to be executed by the governor, the temporary president of the
40 senate and the speaker of the assembly: non-bondable services and
41 expenses associated with the brownfield cleanup and hazardous waste
42 remediation projects; grants authorized pursuant to section 970-r of
43 the general municipal law; technical assistance grants pursuant to
44 titles 13 and 14 of article 27 of the environmental conservation
45 law; services and expenses associated with negotiating and oversee-
46 ing implementation of brownfield site cleanup agreements in accord-
47 ance with title 14 of article 27 of the environmental conservation
48 law; including personal services and fringe benefits of the depart-
49 ment of environmental conservation including costs incidental and
50 appurtenant thereto including suballocation to other state depart-
231 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ments and agencies; and for other brownfield site cleanup hazardous
2 waste purposes (09HT06F7) ... 15,000,000 ......... (re. $15,000,000)
3 For the personal services and fringe benefits of the department of
4 environmental conservation including suballocation to the department
5 of health related to the brownfield cleanup program pursuant to
6 title 14 of article 27 of the environmental conservation law and the
7 voluntary cleanup program including costs incurred prior to April 1,
8 2006 (09BC06F7) ... 7,375,000 ....................... (re. $702,000)
9 By chapter 55, section 1, of the laws of 2005:
10 For the following purposes pursuant to a memorandum of understanding
11 to be executed by the governor, the temporary president of the
12 senate and the speaker of the assembly: non-bondable services and
13 expenses associated with the brownfield cleanup and hazardous waste
14 remediation projects; grants authorized pursuant to section 970-r of
15 the general municipal law; technical assistance grants pursuant to
16 titles 13 and 14 of article 27 of the environmental conservation
17 law; services and expenses associated with negotiating and oversee-
18 ing implementation of brownfield site cleanup agreements in accord-
19 ance with title 14 of article 27 of the environmental conservation
20 law; including personal services and related fringe benefits of the
21 department of environmental conservation including costs incidental
22 and appurtenant thereto including suballocation to other state
23 departments and agencies; and for other brownfield site cleanup
24 hazardous waste purposes (09HT05F7) ................................
25 15,000,000 ....................................... (re. $15,000,000)
26 For the personal services and related fringe benefits of the depart-
27 ment of environmental conservation including suballocation to the
28 department of health related to the brownfield cleanup program
29 pursuant to title 14 of article 27 of the environmental conservation
30 law and the voluntary cleanup program including costs incurred prior
31 to April 1, 2005 (09BC05F7) ... 14,217,000 ........ (re. $1,765,000)
32 By chapter 55, section 1, of the laws of 2004, as amended by chapter 55,
33 section 1, of the laws of 2009:
34 For the following purposes pursuant to a memorandum of understanding
35 to be executed by the governor, the temporary president of the
36 senate and the speaker of the assembly: non-bondable services and
37 expenses associated with the brownfield cleanup and hazardous waste
38 remediation projects; grants authorized pursuant to section 970-r of
39 the general municipal law; technical assistance grants pursuant to
40 titles 13 and 14 of article 27 of the environmental conservation
41 law; services and expenses associated with negotiating and oversee-
42 ing implementation of brownfield site cleanup agreements in accord-
43 ance with title 14 of article 27 of the environmental conservation
44 law; including personal services and related fringe benefits of the
45 department of environmental conservation including costs incidental
46 and appurtenant thereto including suballocation to other state
47 departments and agencies; and for other brownfield site cleanup
48 hazardous waste purposes (09HT04F7) ................................
49 15,000,000 ........................................ (re. $6,382,000)
232 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2003, as amended by chapter 55,
2 section 1, of the laws of 2009:
3 For the following purposes pursuant to a Memorandum of Understanding
4 to be executed by the Governor, the temporary president of the
5 Senate and the speaker of the Assembly: non-bondable services and
6 expenses associated with brownfield clean up and hazardous waste
7 remediation projects; grants authorized pursuant to section 970-r of
8 the general municipal law; technical assistance grants pursuant to
9 titles 13 and 14 of article 27 of the environmental conservation
10 law; services and expenses associated with negotiating and oversee-
11 ing implementation of brownfield site cleanup agreements in accord-
12 ance with title 14 of article 27 of the environmental conservation
13 law; including personal services and related fringe benefits of the
14 department of environmental conservation including costs incidental
15 and appurtenant thereto including suballocation to other state
16 departments and agencies; and for other brownfield site cleanup
17 hazardous waste purposes (09HT03F7) ................................
18 15,000,000 ........................................ (re. $8,371,000)
19 Capital Projects Funds - Other
20 Hazardous Waste Remedial Fund
21 Hazardous Waste Remediation Site Investigation and
22 Construction Account
23 Hazardous Waste Purpose
24 By chapter 55, section 1, of the laws of 2016:
25 For services and expenses related to Hazardous Waste Program, includ-
26 ing personal service, fringe benefits and non-bondable services and
27 expenses related to hazardous waste remediation projects (09IN16F7)
28 ... 2,000,000 ..................................... (re. $2,000,000)
29 SOLID AND HAZARDOUS WASTE MANAGEMENT - EQBA 86 (CCP)
30 Capital Projects Funds - Other
31 Capital Projects Fund
32 Hazardous Waste Purpose
33 By chapter 55, section 1, of the laws of 1999:
34 For payment of the state's share of the costs of hazardous waste site
35 remediation projects, in accordance with the provisions of title 3
36 of article 52 of the environmental conservation law, for projects,
37 including costs incidental and appurtenant thereto, and for payment
38 of reimbursements to the hazardous waste remedial fund for services
39 and expenses of the departments of environmental conservation, law
40 and health, including fringe benefits (09HW99F7) ...................
41 37,625,000 .......................................... (re. $579,000)
42 By chapter 55, section 1, of the laws of 1997:
43 For payment of the state's share of the costs of hazardous waste site
44 remediation projects, in accordance with the provisions of title 3
45 of article 52 of the environmental conservation law, for projects,
233 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 including costs incidental and appurtenant thereto (09HW97F7)
2 ... ..... 30,000,000 .............................. (re. $501,000)
3 By chapter 55, section 1, of the laws of 1996:
4 For payment of the state's share of the costs of hazardous waste site
5 remediation projects, in accordance with the provisions of title 3
6 of article 52 of the environmental conservation law, for projects,
7 including costs incidental and appurtenant thereto (09HW96F7)
8 ... ..... 32,800,000 .............................. (re. $228,000)
9 By chapter 54, section 1, of the laws of 1995:
10 For payment of the state's share of the costs of hazardous waste site
11 remediation projects, in accordance with the provisions of title 3
12 of article 52 of the environmental conservation law, for projects,
13 including costs incidental and appurtenant thereto (09HW95F7)
14 ... ..... 66,000,000 ............................ (re. $1,642,000)
15 By chapter 54, section 1, of the laws of 1994:
16 For payment of the state's share of the costs of hazardous waste site
17 remediation projects, in accordance with the provisions of title 3
18 of article 52 of the environmental conservation law, for projects,
19 including costs incidental and appurtenant thereto (09HW94F7)
20 ... ..... 150,000,000 .......................... (re. $11,785,000)
21 By chapter 54, section 1, of the laws of 1993:
22 For payment of the state's share of the costs of hazardous waste site
23 remediation projects, in accordance with the provisions of title 3
24 of article 52 of the environmental conservation law, for projects,
25 including costs incidental and appurtenant thereto (09HW93F7)
26 ... ..... 140,000,000 ........................... (re. $9,501,000)
27 By chapter 54, section 1, of the laws of 1992:
28 For payment of the state's share of the costs of hazardous waste site
29 remediation projects, in accordance with the provisions of title 3
30 of article 52 of the environmental conservation law, for projects,
31 including costs incidental and appurtenant thereto (09HW92F7)
32 ... ..... 204,000,000 ........................... (re. $4,298,000)
33 By chapter 54, section 1, of the laws of 1991, as amended by chapter 54,
34 section 3, of the laws of 1992:
35 For payment of the state's share of the costs of hazardous waste site
36 remediation projects, in accordance with the provisions of title 3
37 of article 52 of the environmental conservation law, for projects,
38 including costs incidental and appurtenant thereto (091691F7)
39 ... ..... 110,000,000 ........................... (re. $5,050,000)
40 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
41 section 3, of the laws of 1991:
42 For payment of the state share of the costs of hazardous waste site
43 remediation projects, in accordance with the provisions of title 3
44 of article 52 of the environmental conservation law, for projects,
234 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 including costs incidental and appurtenant thereto (095390F7)
2 ... ..... 173,575,000 .......................... (re. $10,170,000)
3 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
4 section 3, of the laws of 1990:
5 For payment of the state share of the costs of hazardous waste site
6 remediation projects, in accordance with the provisions of title 3
7 of article 52 of the environmental conservation law, for projects,
8 including costs incidental and appurtenant thereto (095489F7)
9 ... ..... 26,000,000 ............................ (re. $1,960,000)
10 By chapter 54, section 1, of the laws of 1987, as amended by chapter 54,
11 section 3, of the laws of 1990:
12 For payment of the state share of the costs of hazardous waste site
13 remediation projects, in accordance with the provisions of title
14 three of article fifty-two of the environmental conservation law,
15 for projects, including the transfer of obligations from capital
16 projects appropriations funded from the hazardous waste remedial
17 fund - 312 and including costs incidental and appurtenant thereto,
18 (095887F7) ... ..... 100,000,000 ................ (re. $1,499,000)
19 Capital Projects Funds - Other
20 Capital Projects Fund
21 Solid Waste Management Purpose
22 By chapter 55, section 1, of the laws of 2010:
23 For payment of the state share of the costs of municipal landfill
24 closure projects, in accordance with the provisions of article 52
25 and title 5 of article 54 of the environmental conservation law, for
26 projects, including costs incidental and appurtenant thereto and the
27 payment of liabilities incurred prior to April 1, 2010 (09571056)
28 ... 342,000 ......................................... (re. $342,000)
29 By chapter 54, section 1, of the laws of 1991:
30 For payment of the state's share of the costs of municipal landfill
31 closure projects, in accordance with the provisions of article 52
32 and title 5 of article 54 of the environmental conservation law, for
33 projects, including costs incidental and appurtenant thereto
34 (09279156) ... ..... 50,000,000 ................... (re. $188,000)
35 SOLID WASTE - CLEAN WATER/CLEAN AIR (CCP)
36 Capital Projects Funds - Other
37 Capital Projects Fund
38 Solid Waste Management Purpose
39 By chapter 54, section 1, of the laws of 2001:
40 For state assistance payments for the state share of the costs of
41 solid waste projects in accordance with the provisions of title 4 of
42 article 56 of the environmental conservation law for project costs,
43 including costs incidental and appurtenant thereto and for payment
44 of reimbursements to the clean water/clean air implementation fund
235 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 for services and expenses of state departments and agencies, includ-
2 ing fringe benefits, hereinafter referred to as "Solid Waste Project
3 Disbursements". The moneys appropriated herein may be suballocated
4 to other state departments and agencies.
5 Notwithstanding the provisions of any general or special law, the
6 moneys hereby appropriated shall be available for solid waste
7 projects in accordance with title 4 of article 56 of the environ-
8 mental conservation law upon the issuance of a certificate of
9 approval of availability by the director of the division of the
10 budget.
11 The state comptroller shall at the commencement of each month certify
12 to the director of the division of the budget, the commissioner of
13 environmental conservation, the chairman of the senate finance
14 committee, and the chairman of the assembly ways and means committee
15 the amounts disbursed from this appropriation for "Solid Waste
16 Project Disbursements" for the month preceding such certification
17 (09BA0156) ... 45,000,000 ........................... (re. $200,000)
18 Project Schedule
19 PROJECT AMOUNT
20 --------------------------------------------
21 (thousands of dollars)
22 Fresh Kills landfill closure
23 project ........................... 30,000
24 Municipal landfill projects .......... 2,000
25 Municipal recycling projects ........ 13,000
26 --------------
27 Total ............................. 45,000
28 ==============
29 By chapter 55, section 1, of the laws of 2000:
30 For state assistance payments for the state share of the costs of
31 solid waste projects in accordance with the provisions of title 4 of
32 article 56 of the environmental conservation law for project costs,
33 including costs incidental and appurtenant thereto and for payment
34 of reimbursements to the clean water/clean air implementation fund
35 for services and expenses of state departments and agencies, includ-
36 ing fringe benefits, hereinafter referred to as "Solid Waste Project
37 Disbursements". The moneys appropriated herein may be suballocated
38 to other state departments and agencies.
39 Notwithstanding the provisions of any general or special law, the
40 moneys hereby appropriated shall be available for solid waste
41 projects in accordance with title 4 of article 56 of the environ-
42 mental conservation law upon the issuance of a certificate of
43 approval of availability by the director of the division of the
44 budget.
45 The state comptroller shall at the commencement of each month certify
46 to the director of the division of the budget, the commissioner of
47 environmental conservation, the chairman of the senate finance
48 committee, and the chairman of the assembly ways and means committee
49 the amounts disbursed from this appropriation for "Solid Waste
236 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Project Disbursements" for the month preceding such certification
2 (09BA0056) ... 16,500,000 ........................... (re. $130,000)
3 Project Schedule
4 PROJECT AMOUNT
5 --------------------------------------------
6 (thousands of dollars)
7 Fresh Kills landfill closure
8 project ........................... 10,000
9 Municipal landfill projects .......... 1,500
10 Municipal recycling projects ......... 5,000
11 --------------
12 Total ............................. 16,500
13 ==============
14 By chapter 55, section 1, of the laws of 1998:
15 For state assistance payments for the state share of the costs of
16 solid waste projects in accordance with the provisions of title 4 of
17 article 56 of the environmental conservation law for project costs,
18 including costs incidental and appurtenant thereto and for payment
19 of reimbursements to the clean water/clean air implementation fund
20 for services and expenses of state departments and agencies, includ-
21 ing fringe benefits, hereinafter referred to as "Solid Waste Project
22 Disbursements". The moneys appropriated herein may be suballocated
23 to other state departments and agencies.
24 Notwithstanding the provisions of any general or special law, the
25 moneys hereby appropriated shall be available for solid waste
26 projects in accordance with title 4 of article 56 of the environ-
27 mental conservation law upon the issuance of a certificate of
28 approval of availability by the director of the division of the
29 budget.
30 The state comptroller shall at the commencement of each month certify
31 to the director of the division of the budget, the commissioner of
32 environmental conservation, the chairman of the senate finance
33 committee, and the chairman of the assembly ways and means committee
34 the amounts disbursed from this appropriation for "Solid Waste
35 Project Disbursements" for the month preceding such certification
36 (09BA9856) ... 25,000,000 ........................... (re. $199,000)
37 project schedule
38 PROJECT AMOUNT
39 --------------------------------------------
40 (thousands of dollars)
41 Fresh Kills landfill closure
42 project ........................... 15,000
43 Municipal landfill projects .......... 5,000
44 Municipal recycling projects ......... 5,000
45 --------------
46 Total ............................. 25,000
47 ==============
237 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 413, section 28, of the laws of 1996, as amended by chapter
2 55, section 1, of the laws of 1997:
3 For state assistance payments for the state share of the costs of
4 solid waste projects in accordance with the provisions of title 4 of
5 article 56 of the environmental conservation law for project costs,
6 including costs incidental and appurtenant thereto and for payment
7 of reimbursements to the clean water/clean air implementation fund
8 for services and expenses of state departments and agencies, includ-
9 ing fringe benefits, hereinafter referred to as "Solid Waste Project
10 Disbursements". The moneys appropriated herein may be suballocated
11 to other state departments and agencies.
12 Notwithstanding the provisions of any general or special law, moneys
13 hereby appropriated shall be available for solid waste projects in
14 accordance with title 4 of article 56 of the environmental conserva-
15 tion law upon the issuance of a certificate of approval of avail-
16 ability by the director of the division of the budget.
17 The state comptroller at the commencement of each month shall certify
18 to the director of the division of the budget, the commissioner of
19 environmental conservation, the chairman of the senate finance
20 committee, and the chairman of the assembly ways and means committee
21 the amounts disbursed from this appropriation for "Solid Waste
22 Project Disbursements" for the month preceding such certification
23 (09BA9656) ... 35,000,000 ........................... (re. $446,000)
24 SOLID WASTE MANAGEMENT (CCP)
25 Capital Projects Funds - Other
26 Capital Projects Fund
27 Solid Waste Purpose
28 By chapter 55, section 1, of the laws of 2016:
29 For pre-closure and post-closure costs associated with Adirondack
30 landfills pursuant to agreements with Essex county (09EX1656) ......
31 500,000 ............................................. (re. $500,000)
32 By chapter 55, section 1, of the laws of 2010:
33 For post-closure costs associated with the state-owned Rush Landfill
34 including suballocation to other state departments and agencies
35 (09RL1056) ... 50,000 ................................ (re. $50,000)
36 By chapter 55, section 1, of the laws of 2009:
37 For post-closure costs associated with the state-owned Rush Landfill
38 including suballocation to other state departments and agencies
39 (09RL0956) ... 50,000 ................................ (re. $50,000)
40 By chapter 55, section 1, of the laws of 2008:
41 For post-closure costs associated with the state-owned Rush Landfill
42 including suballocation to other state departments and agencies
43 (09RL0856) ... 50,000 ................................. (re. $8,000)
44 By chapter 55, section 1, of the laws of 2007:
238 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For pre-closure and post-closure costs associated with Adirondack
2 landfills pursuant to agreements with Essex county (09EX0756) ......
3 400,000 ............................................. (re. $400,000)
4 For post-closure costs associated with the state-owned Rush Landfill
5 including suballocation to other state departments and agencies
6 (09RL0756) ... 350,000 .............................. (re. $350,000)
7 By chapter 55, section 1, of the laws of 2006:
8 For pre-closure and post-closure costs associated with Adirondack
9 landfills pursuant to agreements with Essex county (09EX0656) ...
10 495,000 ............................................. (re. $132,000)
11 For post-closure costs associated with the state-owned Rush Landfill
12 including suballocation to other state departments and agencies
13 (09RL0656) ... 450,000 .............................. (re. $112,000)
14 Capital Projects Funds - Federal
15 Federal Capital Projects Fund
16 Hazardous Waste Purpose
17 By chapter 55, section 1, of the laws of 2016:
18 For the federal share of the cleanup of hazardous waste sites pursuant
19 to the provision of the federal comprehensive environmental
20 response, compensation and liability act of 1980 reauthorization or
21 amendments thereto including suballocation to other state depart-
22 ments and agencies (09FS16F7) ......................................
23 30,000,000 ....................................... (re. $30,000,000)
24 By chapter 55, section 1, of the laws of 2004:
25 For the federal share of the cleanup of hazardous waste sites pursuant
26 to the provision of the federal comprehensive environmental
27 response, compensation and liability act of 1980 reauthorization or
28 amendments thereto including suballocation to other state depart-
29 ments and agencies (09FS04F7) ... 10,000,000 ...... (re. $8,239,000)
30 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
31 section 1, of the laws of 2005:
32 For the federal share of the cleanup of hazardous waste sites pursuant
33 to the provisions of the federal comprehensive environmental
34 response, compensation and liability act of 1980 reauthorization or
35 amendments thereto including suballocation to other state depart-
36 ments and agencies (09FS99F7) ... 30,082,000 ...... (re. $4,386,000)
37 By chapter 54, section 1, of the laws of 1986, as amended by chapter 55,
38 section 1, of the laws of 1997:
39 For the federal share of the cleanup of hazardous waste sites pursuant
40 to the provisions of the federal comprehensive environmental
41 response, compensation and liability act of 1980 reauthorization or
42 amendments thereto including suballocation to the department of
43 health (090486F7) ... 55,000,000 .................. (re. $3,609,000)
44 By chapter 54, section 1, of the laws of 1983, as amended by chapter 55,
45 section 1, of the laws of 1997:
239 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For the federal share of the clean up of hazardous waste sites pursu-
2 ant to the provisions of the federal comprehensive environmental
3 response, compensation and liability act of 1980 reauthorization or
4 amendments thereto including suballocation to the department of
5 health (028789F7) ................................. (re. $2,330,000)
6 SOLID WASTE MANAGEMENT - EQBA (CCP)
7 Capital Projects Funds - Other
8 Capital Projects Fund
9 Solid Waste Management Purpose
10 Municipal Solid Waste Management Projects
11 By chapter 54, section 1, of the laws of 1989, as amended by chapter 54,
12 section 1, of the laws of 2002:
13 For the state share of the costs of municipal solid waste management
14 projects, including the payment of liabilities incurred prior to
15 April 1, 1989, in accordance with the following schedule and with
16 the provisions of title 9 of article 51 of the environmental conser-
17 vation law, including costs incidental and appurtenant thereto,
18 hereinafter referred to as "Municipal Solid Waste Management
19 Disbursements."
20 Notwithstanding the provisions of any general or special law, the
21 moneys hereby appropriated shall be available for municipal solid
22 waste management expenditures approved for municipal solid waste
23 management projects in accordance with section 51-0905 of the envi-
24 ronmental conservation law upon the issuance of a certificate of
25 approval of availability by the director of the division of the
26 budget. The state comptroller shall at the commencement of each
27 month certify to the director of the division of the budget, the
28 commissioner of environmental conservation, the chairman of the
29 senate finance committee and the chairman of the assembly ways and
30 means committee the amounts expended from this appropriation for
31 "Municipal Solid Waste Management Disbursements" for each approved
32 project for the month preceding such certification (09A58956) ......
33 6,250,000 ........................................... (re. $115,000)
34 project schedule
35 ESTIMATED
36 STATE
37 PROJECT SHARE
38 --------------------------------------------
39 (thousands of dollars)
40 Brookhaven. Notwithstanding
41 the provisions of any gener-
42 al or special law, the
43 amounts hereby appropriated,
44 in whole or in part,for
45 municipal solid waste
46 management projects may be
47 used by the Town of Brookha-
240 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ven, for the purpose of
2 providing recycling, materi-
3 als recovery, and solid
4 waste management services
5 within Suffolk and Nassau
6 counties. In addition to
7 other purposes allowed by
8 law, such funds may be used
9 for the purpose of acquiring
10 land and making improvements
11 thereon; for the purpose of
12 constructing new structures
13 or purchasing existing
14 structures and making
15 improvements thereon; and
16 for the purchase of resource
17 recovery equipment and
18 source separation equipment
19 as such terms are defined in
20 section 51-0903 of the envi-
21 ronmental conservation
22 law. Notwithstanding the
23 provisions of subdivision 1
24 of section 51-0905 of the
25 environmental conservation
26 law, this project for the
27 Town of Brookhaven is hereby
28 deemed to be eligible for a
29 payment of the funds herein
30 appropriated for eligible
31 project costs ...................... 6,250
32 --------------
33 Total ............................ 6,250
34 ==============
35 By chapter 54, section 1, of the laws of 1985, as amended by chapter 54,
36 section 1, of the laws of 2002:
37 For the state share of the cost of municipal solid waste management
38 projects, including the payment of liabilities incurred prior to
39 April one, nineteen hundred eighty-five, in accordance with the
40 following schedule and with the provisions of title nine of article
41 fifty-one of the environmental conservation law, including costs
42 incidental and appurtenant thereto, hereinafter referred to as
43 "Municipal Solid Waste Management Disbursements."
44 Notwithstanding the provisions of any general or special law, the
45 moneys hereby appropriated shall be available for municipal solid
46 waste management expenditures approved for municipal solid waste
47 management projects in accordance with section 51-0905 of the envi-
48 ronmental conservation law upon the issuance of a certificate of
49 approval of availability by the director of the division of the
50 budget.
241 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 The state comptroller shall at the commencement of each month certify
2 to the director of the division of the budget, the commissioner of
3 environmental conservation, the chairman of the senate finance
4 committee and the chairman of the assembly ways and means committee
5 the amounts expended from this appropriation for "Municipal Solid
6 Waste Management Disbursements" for each approved project for the
7 month preceding such certification (09108556) ......................
8 7,812,000 ............................................ (re. $32,000)
9 project schedule
10 ESTIMATED
11 STATE
12 PROJECT SHARE
13 --------------------------------------------
14 (thousands)
15 St. Lawrence .......................... $750
16 Broome ............................... 5,562
17 Oneida ............................... 1,000
18 Source separation and recycl-
19 ing projects, Nassau and
20 Suffolk counties ..................... 500
21 --------------
22 Total ............................. $7,812
23 ==============
24 By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
25 section 3, of the laws of 1990, and as adjusted by certificate of
26 transfer issued pursuant to the provisions of section 93 of the
27 state finance law as amended, for:
28 The state share of the cost of municipal solid waste management
29 projects, including the payment of liabilities incurred prior to
30 April 1, 1975 (00320856) ... ..... 40,285,000 ... (re. $3,361,000)
31 By chapter 673, section 6, of the laws of 1973, as amended by chapter
32 54, section 1, of the laws of 2002:
33 The state share of the cost of municipal solid waste management
34 projects in accordance with the following schedule and the
35 provisions of title nine of article fifty-one of the environmental
36 conservation law, including costs incidental and appurtenant there-
37 to, hereinafter referred to as "Municipal Solid Waste Management
38 Disbursements."
39 Notwithstanding the provisions of any general or special law, the
40 moneys hereby appropriated shall be available for municipal solid
41 waste management disbursements approved for municipal solid waste
42 management projects in accordance with the following schedule as
43 provided by section 51-0905 of the environmental conservation law
44 upon the issuance of a certificate of approval of availability by
45 the director of the division of the budget. A copy of such certif-
46 icate shall be filed with the state comptroller, the chairman of the
47 senate finance committee and the chairman of the assembly ways and
48 means committee. Such certificate may be amended from time to time
49 subject to the approval of the director of the division of the budg-
242 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 et and a copy of each such amendment shall be filed with the state
2 comptroller, the chairman of the senate finance committee, and the
3 chairman of the assembly ways and means committee.
4 The state comptroller shall at the commencement of each month certify
5 to the director of the division of the budget, the commissioner of
6 environmental conservation, the chairman of the senate finance
7 committee, and the chairman of the assembly ways and means committee
8 the amounts disbursed from this appropriation for Municipal Solid
9 Waste Management Disbursements for the month preceding such certif-
10 ication. The moneys hereby appropriated, when made available pursu-
11 ant to a certificate of approval of availability issued by the
12 director of the division of the budget, shall be paid from the capi-
13 tal construction fund on the audit and warrant of the state comp-
14 troller on vouchers approved by the commissioner of environmental
15 conservation (00319256) ... 38,339,000 .............. (re. $725,000)
16 project schedule
17 ESTIMATED
18 ELIGIBLE ESTIMATED
19 PROJECT STATE
20 PROJECT COST SHARE
21 -----------------------------------------------------------------------
22 Resource Recovery Projects (thousands)
23 New York City ................................... $38,000 $14,000
24 (Notwithstanding the provisions of any
25 general or special law, the amounts
26 hereby appropriated for resource recov-
27 ery projects within the city of New
28 York, shall be used by such city for the
29 purpose of implementing a local law or
30 ordinance governing the source sepa-
31 ration and segregation of recyclable or
32 reusable materials, pursuant to section
33 120-aa of the general municipal law.In
34 addition to other purposes allowed by
35 law, such funds may be used for the
36 purpose of acquiring land and making
37 improvements thereon; for the purpose of
38 constructing new structures or purchas-
39 ing existing structures and making
40 improvements thereon; and, for the
41 purchase of resource recovery equipment,
42 and source separation equipment, as such
43 terms are defined in section 51-0903 of
44 the environmental conservation law,
45 provided that such purposes are neces-
46 sary to the implementation of the local
47 law or ordinance required pursuant to
48 section 120-aa of the general municipal
49 law.)
50 Town of Smithtown ............................... 2,600 1,300
51 (Notwithstanding the provisions of article
243 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 fifty-one of the environmental conserva-
2 tion law, any rules and regulations and
3 any general or special law, this project
4 for the Town of Smithtown is hereby
5 deemed to be eligible for a State grant
6 of fifty percent of the eligible project
7 cost)
8 Chemung County .................................. 1,008 556
9 Monroe County ................................... 18,000 9,000
10 Onondaga County ................................. 1,000 295
11 Westchester County .............................. 12,000 6,000
12 Various Solid Waste Disposal Projects statewide . 14,000 3,500
13 Solid Waste Management Projects
14 Town of North Hempstead ......................... 8,000 3,688
15 -------
16 (Notwithstanding any other section of law,
17 rule, or regulation, any reimbursement
18 for project costs pursuant to this reap-
19 propriation shall be eligible for up to
20 fifty percent of the total cost of the
21 project)
22 Total ....................................... $38,339
23 ========
24 WATER RESOURCES (CCP)
25 Capital Projects Funds - Other
26 Capital Projects Fund
27 Flood Control Purpose
28 By chapter 55, section 1, of the laws of 2016:
29 For various new and existing flood protection projects including the
30 state share of federal sponsored flood control projects, and the
31 maintenance of existing flood control projects; for coastal erosion
32 hazard area mapping of the state's Atlantic Ocean and Great Lakes
33 coastlines and the state share of costs associated with matching
34 federal funds for a statewide flood plain map modernization program;
35 for the state share of costs associated with the installation and/or
36 reinstallation, upgrade, monitoring and maintenance of a statewide
37 network of stream flow gauges, including personal service, non-per-
38 sonal service, fringe benefits and indirect costs, including subal-
39 location to other state departments and agencies (09FL1663) ...
40 2,250,000 ......................................... (re. $2,250,000)
41 For an advance payment by the state for the local costs of various
42 shore protection projects. No portion of this appropriation shall be
43 available until the respective municipality has entered into an
44 agreement with the commissioner of the department of environmental
45 conservation, and such agreement is approved by the director of the
46 budget (09AD1663) ... 3,000,000 ................... (re. $3,000,000)
47 By chapter 54, section 1, of the laws of 2015:
244 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For an advance payment by the state for the local costs of various
2 shore protection projects. No portion of this appropriation shall be
3 available until the respective municipality has entered into an
4 agreement with the commissioner of the department of environmental
5 conservation, and such agreement is approved by the director of the
6 budget (09AD1563) ... 3,000,000 ................... (re. $3,000,000)
7 By chapter 54, section 1, of the laws of 2014:
8 For various new and existing flood protection projects including the
9 state share of federal sponsored flood control projects, and the
10 maintenance of existing flood control projects; for coastal erosion
11 hazard area mapping of the state's Atlantic Ocean and Great Lakes
12 coastlines and the state share of costs associated with matching
13 federal funds for a statewide flood plain map modernization program;
14 for the state share of costs associated with the installation and/or
15 reinstallation, upgrade, monitoring and maintenance of a statewide
16 network of stream flow gauges, including personal service, nonper-
17 sonal service, fringe benefits and indirect costs, including subal-
18 location to other state departments and agencies (09FL1463) ........
19 1,000,000 ........................................... (re. $675,000)
20 By chapter 54, section 1, of the laws of 2013:
21 For various new and existing flood protection projects including the
22 state share of federal sponsored flood control projects, and the
23 maintenance of existing flood control projects; for coastal erosion
24 hazard area mapping of the state's Atlantic Ocean and Great Lakes
25 coastlines and the state share of costs associated with matching
26 federal funds for a statewide flood plain map modernization program;
27 for the state share of costs associated with the installation and/or
28 reinstallation, upgrade, monitoring and maintenance of a statewide
29 network of stream flow gauges, including personal service, nonper-
30 sonal service, fringe benefits and indirect costs, including subal-
31 location to other state departments and agencies (09FL1363) ........
32 500,000 ............................................. (re. $500,000)
33 By chapter 54, section 1, of the laws of 2012:
34 For the state's share including personal service, nonpersonal service,
35 fringe benefits and indirect costs of various shore protection
36 projects including suballocation to other state departments and
37 agencies (09W11263) ... 1,000,000 ................. (re. $1,000,000)
38 For various new and existing flood protection projects including the
39 state share of federal sponsored flood control projects, and the
40 maintenance of existing flood control projects; for coastal erosion
41 hazard area mapping of the state's Atlantic Ocean and Great Lakes
42 coastlines and the state share of costs associated with matching
43 federal funds for a statewide flood plain map modernization program;
44 for the state share of costs associated with the installation and/or
45 reinstallation, upgrade, monitoring and maintenance of a statewide
46 network of stream flow gauges, including personal service, nonper-
47 sonal service, fringe benefits and indirect costs, including subal-
48 location to other state departments and agencies (09FL1263) ........
49 5,000,000 ......................................... (re. $1,940,000)
245 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 54, section 1, of the laws of 2011:
2 For the state's share including personal services, fringe benefits and
3 indirect costs of various shore protection projects including subal-
4 location to other state departments and agencies (09W11163) ........
5 1,000,000 ......................................... (re. $1,000,000)
6 For various new and existing flood protection projects including the
7 state share of federal sponsored flood control projects, and the
8 maintenance of existing flood control projects including personal
9 services and fringe benefits, including suballocation to other state
10 departments and agencies (09FL1163) ................................
11 1,000,000 ......................................... (re. $1,000,000)
12 For services and expenses for the state share of costs associated with
13 matching federal funds for a statewide flood plain map modernization
14 program, including suballocation to other state departments and
15 agencies (09FP1163) ... 834,000 ..................... (re. $834,000)
16 By chapter 55, section 1, of the laws of 2010:
17 For various new and existing flood protection projects including the
18 state share of federal sponsored flood control projects, and the
19 maintenance of existing flood control projects including personal
20 services and fringe benefits, including suballocation to other state
21 departments and agencies (09FL1063) ................................
22 1,000,000 ......................................... (re. $1,000,000)
23 For services and expenses for the state share of costs associated with
24 matching federal funds for a statewide flood plain map modernization
25 program, including suballocation to other state departments and
26 agencies (09FP1063) ... 834,000 ..................... (re. $834,000)
27 By chapter 55, section 1, of the laws of 2009:
28 For the state's share including personal services, fringe benefits and
29 indirect costs of various shore protection projects including subal-
30 location to other state departments and agencies (09W10963) ........
31 1,000,000 ......................................... (re. $1,000,000)
32 For various new and existing flood protection projects including the
33 state share of federal sponsored flood control projects, and the
34 maintenance of existing flood control projects including personal
35 services and fringe benefits, including suballocation to other state
36 departments and agencies (09FL0963) ... 1,000,000 ... (re. $370,000)
37 For services and expenses for the state share of costs associated with
38 matching federal funds for a statewide flood plain map modernization
39 program, including suballocation to other state departments and
40 agencies (09FP0963) ... 834,000 ..................... (re. $834,000)
41 By chapter 55, section 1, of the laws of 2008:
42 For the state's share including personal services, fringe benefits and
43 indirect costs of various shore protection projects including subal-
44 location to other state departments and agencies (09W10863) ........
45 50,000 ............................................... (re. $22,000)
46 For services and expenses for the state share of costs associated with
47 matching federal funds for a statewide flood plain map modernization
48 program, including suballocation to other state departments and
49 agencies (09FP0863) ... 834,000 ...................... (re. $95,000)
246 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2007:
2 For various dam safety projects (09FD0763) ...........................
3 300,000 ............................................. (re. $261,000)
4 By chapter 55, section 1, of the laws of 2006:
5 For the state's share including personal services, fringe benefits and
6 indirect costs of various shore protection projects including subal-
7 location to other state departments and agencies (09W10663) ........
8 797,000 ............................................. (re. $537,000)
9 For services and expenses for the state share of costs associated with
10 matching federal funds for a statewide flood plain map modernization
11 program, including suballocation to other state departments and
12 agencies (09FP0663) ... 834,000 ..................... (re. $145,000)
13 By chapter 55, section 1, of the laws of 2005:
14 For the state's share including personal services, fringe benefits and
15 indirect costs of various shore protection projects including subal-
16 location to other state departments and agencies (09W10563) ........
17 800,000 ............................................. (re. $800,000)
18 By chapter 55, section 1, of the laws of 2004:
19 For the state's share including personal services, fringe benefits and
20 indirect costs of various shore protection projects including subal-
21 location to other state departments and agencies (09W10463) ........
22 1,000,000 ......................................... (re. $1,000,000)
23 By chapter 55, section 1, of the laws of 2003:
24 For the state's share including personal services, fringe benefits and
25 indirect costs of various shore protection projects including subal-
26 location to other state departments and agencies (09W10363) ........
27 2,210,000 ........................................... (re. $337,000)
28 For the state's share of federally funded flood control projects
29 including personal services, fringe benefits and indirect costs. No
30 portion of this appropriation shall be available until the federal
31 share of such projects is appropriated (09FC0363) ..................
32 2,359,000 ......................................... (re. $2,341,000)
33 For an advance payment by the state for the local costs of various
34 shore protection projects. No portion of this appropriation shall be
35 available until the respective county has entered into an agreement
36 with the commissioner of the department of environmental conserva-
37 tion, and such agreement is approved by the director of the budget
38 (09AD0363) ... 895,000 .............................. (re. $150,000)
39 By chapter 54, section 1, of the laws of 2002:
40 For the state's share of various shore protection projects including
41 suballocation to other state departments and agencies (09W10263) ...
42 3,500,000 ............................................ (re. $15,000)
43 For an advance payment by the state for the local costs of various
44 shore protection projects. No portion of this appropriation shall be
45 available until the respective county has entered into an agreement
46 with the commissioner of the department of environmental conserva-
247 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 tion, and such agreement is approved by the director of the budget
2 (09AD0263) ... 1,955,000 ............................ (re. $102,000)
3 By chapter 54, section 1, of the laws of 2002, as amended by chapter 55,
4 section 1, of the laws of 2004:
5 For the state's share of federally funded flood control projects
6 including personal services, fringe benefits and indirect costs. No
7 portion of this appropriation shall be available until the federal
8 share of such projects is appropriated (09FC0263) ..................
9 1,850,000 ........................................... (re. $247,000)
10 By chapter 54, section 1, of the laws of 2001:
11 For the state's share of various shore protection projects including
12 suballocation to other state departments and agencies (09W10163) ...
13 4,020,000 ........................................... (re. $725,000)
14 For an advance payment by the state for the local costs of various
15 shore protection projects. No portion of this appropriation shall be
16 available until the respective county has entered into an agreement
17 with the commissioner of the department of environmental conserva-
18 tion, and such agreement is approved by the director of the budget
19 (09070163) ... 1,275,000 .............................. (re. $3,000)
20 By chapter 55, section 1, of the laws of 2000:
21 For the state's share of various shore protection projects including
22 suballocation to other state departments and agencies (09W10063) ...
23 6,300,000 ........................................... (re. $177,000)
24 For an advance payment by the state for the local costs of various
25 shore protection projects. No portion of this appropriation shall be
26 available until the respective county has entered into an agreement
27 with the commissioner of the department of environmental conserva-
28 tion, and such agreement is approved by the director of the budget
29 (09A10063) ... 1,275,000 ............................. (re. $55,000)
30 By chapter 55, section 1, of the laws of 1999:
31 For an advance payment by the state for the local costs of various
32 shore protection projects. No portion of this appropriation shall be
33 available until the respective county has entered into an agreement
34 with the commissioner of the department of environmental conserva-
35 tion, and such agreement is approved by the director of the budget
36 (09A29963) ... 880,000 .............................. (re. $675,000)
37 By chapter 55, section 1, of the laws of 1999, as amended by chapter 55,
38 section 1, of the laws of 2009:
39 For the state's share of shore protection projects including Shinne-
40 cock Inlet, coastal erosion of Coney Island, coastal erosion of
41 Westhampton, West of Shinnecock, Orchard Beach and the Rockaway
42 Beach Nourishment Project (09W29963) ... 3,750,000 .. (re. $147,000)
43 For an advance by the state for shore protection projects including
44 Shinnecock Inlet, coastal erosion of Coney Island, coastal erosion
45 of Westhampton, West of Shinnecock, Orchard Beach and the local
46 costs of the Rockaway Beach nourishment Shore protection Project.
47 No portion of this appropriation shall be available until the
248 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 respective county has entered into an agreement with the commission-
2 er of the department of environmental conservation, and such agree-
3 ment is approved by the director of the budget (09A39963) ..........
4 1,600,000 ............................................ (re. $63,000)
5 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
6 section 1, of the laws of 2009:
7 For the state's share of shore protection projects including Shinne-
8 cock Inlet, coastal erosion of Coney Island, coastal erosion of
9 Westhampton, West of Shinnecock, Orchard Beach and the Jones Inlet
10 Beach Nourishment Project (09W39863) ... 490,000 .... (re. $490,000)
11 For an advance payment by the state for shore protection projects
12 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
13 erosion of Westhampton, West of Shinnecock, Orchard Beach and Nassau
14 county's share of the costs of a beach nourishment project at Jones
15 Beach Inlet. No portion of this appropriation shall be available
16 until the county has entered into an agreement with the commissioner
17 of the department of environmental conservation, and such agreement
18 is approved by the director of the budget (09A29863) ...............
19 210,000 ............................................. (re. $210,000)
20 For an advance payment by the state of shore protection projects
21 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
22 erosion of Westhampton, West of Shinnecock, Orchard Beach and the
23 local costs of the Shinnecock Inlet Shore Protection project includ-
24 ing suballocation to the department of state. No portion of this
25 appropriation shall be available until the county has entered into
26 an agreement with the commissioner of the department of environ-
27 mental conservation, and such agreement is approved by the director
28 of the budget (09A49863) ... 2,013,000 ............ (re. $1,225,000)
29 By chapter 55, section 1, of the laws of 1998, as amended by chapter 55,
30 section 1, of the laws of 2010:
31 For the state's share of shore protection projects including Shinne-
32 cock Inlet, coastal erosion of Coney Island, coastal erosion of
33 Westhampton, West of Shinnecock, Orchard Beach and the Shinnecock
34 Inlet project including suballocation to the department of state
35 (09W49863) ... 2,183,000 ............................ (re. $130,000)
36 By chapter 55, section 1, of the laws of 1997, as amended by chapter
37 108, section 5, of the laws of 2006:
38 For various dam safety projects (09009763) ...........................
39 500,000 .............................................. (re. $72,000)
40 For costs associated with storm damage reduction and beach nourishment
41 projects on Long Beach Barrier Island in the communities of Point
42 Lookout and Lido Beach (09099763) ... 7,600,000 ... (re. $7,600,000)
43 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
44 section 1, of the laws of 2004:
45 For various state and municipal flood projects including personal
46 services, fringe benefits and indirect costs; and rehabilitation of
47 flood damage incurred subsequent to January 1, 1996, for flood
48 control projects for which federal funding is available and for
249 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 projects which are eligible for funds pursuant to section 299-x of
2 the county law (09799763) ... 2,633,000 ............. (re. $728,000)
3 By chapter 54, section 1, of the laws of 1994, as amended by chapter 55,
4 section 1, of the laws of 2009:
5 For the state's share of shore protection projects including Shinne-
6 cock Inlet, coastal erosion of Coney Island, coastal erosion of
7 Westhampton, West of Shinnecock, Orchard Beach and the Jones Inlet
8 Beach nourishment project (09539463) ... 840,000 .... (re. $611,000)
9 For the state's share of shore protection projects including Shinne-
10 cock Inlet, coastal erosion of Coney Island, coastal erosion of
11 Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
12 shore monitoring systems (09A69463) ... 1,400,000 ... (re. $900,000)
13 For the state's share of shore protection projects including Shinne-
14 cock Inlet, coastal erosion of Coney Island, coastal erosion of
15 Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
16 sand bypassing projects at Asharoken Beach and the LILCO Jetties
17 (09A79463) ... 1,000,000 ............................. (re. $65,000)
18 For the state's share of shore protection projects including Shinne-
19 cock Inlet, coastal erosion of Coney Island, coastal erosion of
20 Westhampton, West of Shinnecock, Orchard Beach and sand bypassing
21 projects at the Long Island South Shore Inlets (09A19463) ..........
22 1,450,000 ............................................ (re. $55,000)
23 For the state's share of shore protection projects including Shinne-
24 cock Inlet, coastal erosion of Coney Island, coastal erosion of
25 Westhampton, West of Shinnecock, Orchard Beach and coastal erosion
26 evacuation route projects at Bayville, Rockaway and Long Beach
27 (09A49463) ... 2,000,000 .......................... (re. $1,072,000)
28 By chapter 54, section 2, of the laws of 1994, as amended by chapter 55,
29 section 1, of the laws of 2009:
30 An advance for the payment by the state of shore protection projects
31 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
32 erosion of Westhampton, West of Shinnecock, Orchard Beach and Nassau
33 County's share of the costs of a coastal erosion project at Jones
34 Inlet.
35 No portion of this appropriation shall be available until the county
36 has entered into an agreement with the commissioner of the depart-
37 ment of environmental conservation, and such agreement is approved
38 by the director of the budget (09019463) ...........................
39 360,000 ............................................. (re. $333,000)
40 By chapter 54, section 2, of the laws of 1993, as amended by chapter 55,
41 section 1, of the laws of 2009:
42 For payment by the state, as an advance, of shore protection projects
43 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
44 erosion of Westhampton, West of Shinnecock, Orchard Beach and New
45 York City's share of the costs of a coastal erosion project at Coney
46 Island.
47 No portion of this appropriation shall be available for the city's
48 share of project costs until the city has entered into an agreement
49 with the commissioner of the department of environmental conserva-
250 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 tion, and which agreement is approved by the director of the budget,
2 providing for repayment to the state of an amount equal to the
3 amount disbursed from this appropriation. A copy of such agreement
4 shall be filed with the state comptroller, the chairman of the
5 senate finance committee and the chairman of the assembly ways and
6 means committee (09099363) ... 2,800,000 ............. (re. $55,000)
7 By chapter 54, section 2, of the laws of 1990, as amended by chapter 55,
8 section 1, of the laws of 2009:
9 For payment by the state, as an advance, of shore protection projects
10 including Shinnecock Inlet, coastal erosion of Coney Island, coastal
11 erosion of Westhampton, West of Shinnecock, Orchard Beach and
12 Suffolk county's share of the costs of a coastal erosion project at
13 Westhampton Beach.
14 No portion of this appropriation shall be available for the county's
15 share of project costs until the county has entered into an agree-
16 ment with the commissioner of the department of environmental
17 conservation, and which agreement is approved by the director of the
18 division of the budget, providing for repayment to the state of an
19 amount equal to the amount disbursed from this appropriation. A copy
20 of such agreement shall be filed with the state comptroller, the
21 chairman of the senate finance committee and the chairman of the
22 assembly ways and means committee (091A9063) .......................
23 4,050,000 ........................................... (re. $318,000)
24 Capital Projects Funds - Other
25 Capital Projects Fund
26 Water Resources Purpose
27 By chapter 55, section 1, of the laws of 2016:
28 An advance for costs incurred relating to work required for the safety
29 of dams and other structures impounding water, to be reimbursed in
30 accordance with section 15-0507 of the environmental conservation
31 law (09DA1657) ... 500,000 .......................... (re. $500,000)
32 For payment of a portion of the state's match for federal capitaliza-
33 tion grants for the water pollution control revolving fund
34 (09RF1657) ... 35,000,000 ........................ (re. $35,000,000)
35 For services and expenses including personal service, fringe benefits,
36 and nonpersonal service for the water pollution control revolving
37 fund and related water quality activities including suballocation to
38 other state departments and agencies (09SR1657) ....................
39 3,500,000 ......................................... (re. $2,570,000)
40 For services and expenses including personal service, fringe benefits,
41 and nonpersonal service for the Excelsior Conservation Corps program
42 including suballocation to other state departments and agencies
43 (09CC1657) ... 200,000 .............................. (re. $200,000)
44 The sum of $200,000,000 is hereby appropriated over a multi-year peri-
45 od for the capital costs of water quality infrastructure projects as
46 authorized by the New York state water infrastructure improvement
47 act of 2015. Up to $100,000,000 shall be available from this appro-
48 priation in state fiscal year 2016-17, with no less than $10,000,000
49 available for water quality infrastructure projects for compliance
251 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 with environmental and public health laws and regulations related to
2 water quality; and up to an additional $100,000,000 shall be avail-
3 able in state fiscal year 2017-18, with no less than $10,000,000
4 available for water quality infrastructure projects for compliance
5 with environmental and public health laws and regulations related to
6 water quality. All or a portion of the funds may be suballocated or
7 transferred to any department, agency, or public authority
8 (09WW1657) ... 200,000,000 ...................... (re. $200,000,000)
9 By chapter 54, section 1, of the laws of 2015:
10 An advance for costs incurred relating to work required for the safety
11 of dams and other structures impounding water, to be reimbursed in
12 accordance with section 15-0507 of the environmental conservation
13 law (09DA1557) ... 500,000 .......................... (re. $500,000)
14 The sum of $200,000,000 is hereby appropriated over a multi-year peri-
15 od for the capital costs of water quality infrastructure projects as
16 authorized by the New York state water infrastructure improvement
17 act of 2015. Up to $50 million shall be available from this appro-
18 priation in state fiscal year 2015-16, up to an additional $75
19 million shall be available in state fiscal year 2016-17, and up to
20 an additional $75 million shall be available in state fiscal year
21 2017-18. All or a portion of the funds may be suballocated or trans-
22 ferred to any department, agency, or public authority (09WW1557) ...
23 200,000,000 ..................................... (re. $185,000,000)
24 For payment of a portion of the state's match for federal capitaliza-
25 tion grants for the water pollution control revolving fund
26 (09RF1557) ... 35,000,000 ........................ (re. $35,000,000)
27 By chapter 54, section 1, of the laws of 2014:
28 An advance for costs incurred relating to work required for the safety
29 of dams and other structures impounding water, to be reimbursed in
30 accordance with section 15-0507 of the environmental conservation
31 law (09DA1457) ... 500,000 .......................... (re. $500,000)
32 For payment of a portion of the state's match for federal capitaliza-
33 tion grants for the water pollution control revolving fund
34 (09RF1457) ... 35,000,000 ........................ (re. $35,000,000)
35 By chapter 54, section 1, of the laws of 2013:
36 An advance for costs incurred relating to work required for the safety
37 of dams and other structures impounding water, to be reimbursed in
38 accordance with section 15-0507 of the environmental conservation
39 law (09DA1357) ... 500,000 .......................... (re. $500,000)
40 For payment of a portion of the state's match for federal capitaliza-
41 tion grants for the water pollution control revolving fund
42 (09RF1357) ... 35,000,000 ......................... (re. $3,127,000)
43 By chapter 54, section 1, of the laws of 2012:
44 An advance for costs incurred relating to work required for the safety
45 of dams and other structures impounding water, to be reimbursed in
46 accordance with section 15-0507 of the environmental conservation
47 law (09DA1257) ... 500,000 .......................... (re. $500,000)
252 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2007:
2 An advance for costs incurred relating to work required for the safety
3 of dams and other structures impounding water, to be reimbursed in
4 accordance with section 15-0507 of the environmental conservation
5 law (09DA0757) ... 350,000 .......................... (re. $349,000)
6 By chapter 55, section 1, of the laws of 2006:
7 An advance for costs incurred relating to work required for the safety
8 of dams and other structures impounding water, to be reimbursed in
9 accordance with section 15-0507 of the environmental conservation
10 law (09DA0657) ... 300,000 .......................... (re. $300,000)
11 By chapter 54, section 1, of the laws of 1985, as amended by chapter 55,
12 section 1, of the laws of 2009:
13 For the state share of shore protection projects including Shinnecock
14 Inlet, coastal erosion of Coney Island, coastal erosion of Westhamp-
15 ton, West of Shinnecock, Orchard Beach and for removal of derelict
16 structures and other hazards along the New York harbor shoreline
17 under provisions of PL930251 water resources development act of 1974
18 ... (09168557) ...................................... (re. $180,000)
19 Capital Projects Funds - Federal
20 Federal Capital Projects Fund
21 Water Resources Purpose
22 By chapter 55, section 1, of the laws of 2016:
23 For federal capitalization grants for the water pollution control
24 revolving fund (09SF1657) ... 175,000,000 ....... (re. $175,000,000)
25 By chapter 54, section 1, of the laws of 2015:
26 For federal capitalization grants for the water pollution control
27 revolving fund (09SF1557) ... 175,000,000 ....... (re. $175,000,000)
28 By chapter 54, section 1, of the laws of 2014:
29 For federal capitalization grants for the water pollution control
30 revolving fund (09SF1457) ... 175,000,000 ....... (re. $175,000,000)
31 By chapter 54, section 1, of the laws of 2013:
32 For federal capitalization grants for the water pollution control
33 revolving fund (09SF1357) ... 175,000,000 ........ (re. $15,633,000)
34 By chapter 55, section 1, of the laws of 2009:
35 For federal capitalization grants for the water pollution control
36 revolving fund, as funded by the American recovery and reinvestment
37 act of 2009. Funds appropriated herein shall be subject to all
38 applicable reporting and accountability requirements contained in
39 such act (09FS0957) ... 435,000,000 ............... (re. $2,436,000)
40 WATER RESOURCES - CLEAN WATER/CLEAN AIR (CCP)
41 Capital Projects Funds - Other
42 Capital Projects Fund
253 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Water Resources Purpose
2 Water Quality Improvement Projects
3 By chapter 54, section 1, of the laws of 2002:
4 For state assistance payments for the state share of the costs of
5 clean water projects in accordance with the provisions of title 3 of
6 article 56 of the environmental conservation law for project cost,
7 including costs incidental and appurtenant thereto and for payment
8 of reimbursements to the clean water/clean air implementation fund
9 for services and expenses of state departments and agencies, includ-
10 ing fringe benefits, hereinafter referred to as "Clean Water Project
11 Disbursements".
12 The moneys appropriated herein may be suballocated to all state
13 departments and agencies. Further, moneys herein appropriated may be
14 suballocated only to public authorities and public benefit corpo-
15 rations specifically authorized by paragraph (1) of subdivision 1 of
16 section 56-0303 of the environmental conservation law to enter into
17 contracts for state assistance payments for the state share of costs
18 for clean water projects, provided however, that moneys herein
19 appropriated pursuant to paragraph (i) of subdivision 1 of section
20 56-0303 of the environmental conservation law for state facility
21 projects may be suballocated to any public authority or public bene-
22 fit corporation.
23 Notwithstanding the provisions of any general or special law, the
24 moneys hereby appropriated shall be available for clean water quali-
25 ty projects in accordance with title 3 of article 56 of the environ-
26 mental conservation law upon the issuance of a certificate of
27 approval of availability by the director of the division of the
28 budget.
29 The state comptroller shall at the commencement of each month certify
30 to the director of the division of the budget, the commissioner of
31 environmental conservation, the chairman of the senate finance
32 committee, and the chairman of the assembly ways and means committee
33 the amounts disbursed from this appropriation for "Clean Water
34 Project Disbursements" for the month preceding such certification
35 (09BA0257) ... 46,918,000 ......................... (re. $7,571,000)
36 Project Schedule
37 PROJECT AMOUNT
38 --------------------------------------------
39 (thousands of dollars)
40 Hudson River water quality
41 improvement projects ............... 1,334
42 Long Island Sound water quali-
43 ty improvement projects ........... 21,000
44 New York Harbor water quality
45 improvement projects ............... 1,142
46 Finger Lakes water quality
47 improvement projects ............... 3,372
48 Peconic and South Shore Estu-
49 ary water quality improve-
254 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ment projects ...................... 7,500
2 State facility projects .............. 1,881
3 Municipal wastewater treatment
4 improvement projects and
5 municipal flood control
6 projects ........................... 2,575
7 Dam safety projects .................. 4,000
8 State parks projects ................. 1,814
9 Municipal parks projects and
10 historic preservation and
11 heritage area projects ............. 2,300
12 --------------
13 Total ............................. 46,918
14 ==============
15 By chapter 54, section 1, of the laws of 2001:
16 For state assistance payments for the state share of the costs of
17 clean water projects in accordance with the provisions of title 3 of
18 article 56 of the environmental conservation law for project cost,
19 including costs incidental and appurtenant thereto and for payment
20 of reimbursements to the clean water/clean air implementation fund
21 for services and expenses of state departments and agencies, includ-
22 ing fringe benefits, hereinafter referred to as "Clean Water Project
23 Disbursements".
24 The moneys appropriated herein may be suballocated to all state
25 departments and agencies. Further, moneys herein appropriated may be
26 suballocated only to public authorities and public benefit corpo-
27 rations specifically authorized by paragraph (1) of subdivision 1 of
28 section 56-0303 of the environmental conservation law to enter into
29 contracts for state assistance payments for the state share of costs
30 for clean water projects, provided however, that moneys herein
31 appropriated pursuant to paragraph (i) of subdivision 1 of section
32 56-0303 of the environmental conservation law for state facility
33 projects may be suballocated to any public authority or public bene-
34 fit corporation.
35 Notwithstanding the provisions of any general or special law, the
36 moneys hereby appropriated shall be available for clean water quali-
37 ty projects in accordance with title 3 of article 56 of the environ-
38 mental conservation law upon the issuance of a certificate of
39 approval of availability by the director of the division of the
40 budget.
41 The state comptroller shall at the commencement of each month certify
42 to the director of the division of the budget, the commissioner of
43 environmental conservation, the chairman of the senate finance
44 committee, and the chairman of the assembly ways and means committee
45 the amounts disbursed from this appropriation for "Clean Water
46 Project Disbursements" for the month preceding such certification
47 (09BA0157) ... 87,582,000 ......................... (re. $9,021,000)
48 Project Schedule
49 PROJECT AMOUNT
50 --------------------------------------------
255 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 (thousands of dollars)
2 Hudson River water quality
3 improvement projects ............... 2,800
4 Long Island Sound water quali-
5 ty improvement projects ........... 50,000
6 Lake Champlain water quality
7 improvement projects ............... 1,000
8 Onondaga Lake water quality
9 improvement projects ............... 9,912
10 New York Harbor water quality
11 improvement projects ............... 1,500
12 Finger Lakes water quality
13 improvement projects ............... 3,500
14 Peconic and South Shore Estu-
15 ary water quality improve-
16 ment projects ...................... 2,000
17 State facility projects .............. 1,400
18 Open space land conservation
19 projects ........................... 3,470
20 State parks projects ................. 4,000
21 Municipal parks projects and
22 historic preservation and
23 heritage area projects ............. 8,000
24 --------------
25 Total ............................. 87,582
26 ==============
27 By chapter 55, section 1, of the laws of 2000:
28 For state assistance payments for the state share of the costs of
29 clean water projects in accordance with the provisions of title 3 of
30 article 56 of the environmental conservation law for project cost,
31 including costs incidental and appurtenant thereto and for payment
32 of reimbursements to the clean water/clean air implementation fund
33 for services and expenses of state departments and agencies, includ-
34 ing fringe benefits, hereinafter referred to as "Clean Water Project
35 Disbursements".
36 The moneys appropriated herein may be suballocated to all state
37 departments and agencies. Further, moneys herein appropriated may be
38 suballocated only to public authorities and public benefit corpo-
39 rations specifically authorized by paragraph (1) of subdivision 1 of
40 section 56-0303 of the environmental conservation law to enter into
41 contracts for state assistance payments for the state share of costs
42 for clean water projects, provided however, that moneys herein
43 appropriated pursuant to paragraph (i) of subdivision 1 of section
44 56-0303 of the environmental conservation law for state facility
45 projects may be suballocated to any public authority or public bene-
46 fit corporation.
47 Notwithstanding the provisions of any general or special law, the
48 moneys hereby appropriated shall be available for clean water quali-
49 ty projects in accordance with title 3 of article 56 of the environ-
50 mental conservation law upon the issuance of a certificate of
256 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 approval of availability by the director of the division of the
2 budget.
3 The state comptroller shall at the commencement of each month certify
4 to the director of the division of the budget, the commissioner of
5 environmental conservation, the chairman of the senate finance
6 committee, and the chairman of the assembly ways and means committee
7 the amounts disbursed from this appropriation for "Clean Water
8 Project Disbursements" for the month preceding such certification
9 (09BA0057) ... 104,500,000 ........................ (re. $9,489,000)
10 Project Schedule
11 PROJECT AMOUNT
12 --------------------------------------------
13 (thousands of dollars)
14 Hudson River water quality
15 improvement projects ............... 2,000
16 Long Island Sound water quali-
17 ty improvement projects ........... 30,000
18 Lake Champlain water quality
19 improvement projects ............... 1,000
20 Onondaga Lake water quality
21 improvement projects .............. 15,000
22 New York Harbor water quality
23 improvement projects ............... 2,000
24 Finger Lakes water quality
25 improvement projects ............... 3,500
26 Peconic and South Shore Estu-
27 ary water quality improve-
28 ment projects ...................... 2,000
29 State facility projects .............. 2,500
30 Municipal wastewater treatment
31 improvement projects and
32 municipal flood control
33 projects ........................... 2,000
34 Dam safety projects .................. 2,000
35 Open space land conservation
36 projects .......................... 30,000
37 State parks projects ................. 4,500
38 Municipal parks projects and
39 historic preservation and
40 heritage area projects ............. 8,000
41 --------------
42 Total ............................ 104,500
43 ==============
44 For state assistance payments for the state share of the costs of
45 clean water projects in accordance with the provisions of title 3 of
46 article 56 of the environmental conservation law for project costs,
47 including costs incidental and appurtenant thereto and for payment
48 of reimbursements to the clean water/clean air implementation fund
49 for services and expenses of state departments and agencies, includ-
257 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ing fringe benefits, hereinafter referred to as "Clean Water Project
2 Disbursements".
3 The moneys appropriated herein may be suballocated to all state
4 departments and agencies. Further, moneys herein appropriated may be
5 suballocated only to public authorities and public benefit corpo-
6 rations specifically authorized by paragraph (1) of subdivision 1 of
7 section 56-0303 of the environmental conservation law to enter into
8 contracts for state assistance payments for the state share of costs
9 for clean water projects, provided however, that moneys herein
10 appropriated pursuant to paragraph (i) of subdivision 1 of section
11 56-0303 of the environmental conservation law for state facility
12 projects may be suballocated to any public authority or public bene-
13 fit corporation.
14 Notwithstanding the provisions of any general or special law, the
15 moneys hereby appropriated shall be available for clean water quali-
16 ty projects in accordance with title 3 of article 56 of the environ-
17 mental conservation law upon the issuance of a certificate of
18 approval of availability by the director of the division of the
19 budget.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the division of the budget, the commissioner of
22 environmental conservation, the chairman of the senate finance
23 committee, and the chairman of the assembly ways and means committee
24 the amounts disbursed from this appropriation for "Clean Water
25 Project Disbursements" for the month preceding such certification
26 (09B20057) ... 5,000,000 ............................ (re. $177,000)
27 By chapter 55, section 1, of the laws of 1999:
28 For state assistance payments for the state share of the costs of
29 clean water projects in accordance with the provisions of title 3 of
30 article 56 of the environmental conservation law for project cost,
31 including costs incidental and appurtenant thereto and for payment
32 of reimbursements to the clean water/clean air implementation fund
33 for services and expenses of state departments and agencies, includ-
34 ing fringe benefits, hereinafter referred to as "Clean Water Project
35 Disbursements".
36 The moneys appropriated herein may be suballocated to all state
37 departments and agencies. Further, moneys herein appropriated may be
38 suballocated only to public authorities and public benefit corpo-
39 rations specifically authorized by paragraph (1) of subdivision one
40 of section 56-0303 of the environmental conservation law to enter
41 into contracts for state assistance payments for the state share of
42 costs for clean water projects, provided however, that moneys herein
43 appropriated pursuant to paragraph (i) of subdivision 1 of section
44 56-0303 of the environmental conservation law for state facility
45 projects may be suballocated to any public authority or public bene-
46 fit corporation.
47 Notwithstanding the provisions of any general or special law, the
48 moneys hereby appropriated shall be available for clean water quali-
49 ty projects in accordance with title 3 of article 56 of the environ-
50 mental conservation law upon the issuance of a certificate of
258 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 approval of availability by the director of the division of the
2 budget.
3 The state comptroller shall at the commencement of each month certify
4 to the director of the division of the budget, the commissioner of
5 environmental conservation, the chairman of the senate finance
6 committee, and the chairman of the assembly ways and means committee
7 the amounts disbursed from this appropriation for "Clean Water
8 Project Disbursements" for the month preceding such certification
9 (09BA9957) ... 188,000,000 ........................ (re. $9,149,000)
10 Project Schedule
11 PROJECT AMOUNT
12 --------------------------------------------
13 (thousands of dollars)
14 Hudson River water quality
15 improvement projects ............... 4,000
16 Long Island Sound water quali-
17 ty improvement projects ........... 50,000
18 Lake Champlain water quality
19 improvement projects ............... 2,000
20 Onondaga Lake water quality
21 improvement projects .............. 20,000
22 New York Harbor water quality
23 improvement projects ............... 2,000
24 Great Lakes water quality
25 improvement projects ............... 1,000
26 Finger Lakes water quality
27 improvement projects ............... 7,000
28 Peconic and South Shore Estu-
29 ary water quality improve-
30 ment projects ...................... 7,000
31 State facility projects .............. 5,000
32 Municipal wastewater treatment
33 improvement projects and
34 municipal flood control
35 projects ........................... 2,000
36 Environmental compliance
37 assistance projects-water
38 quality ........................... 26,000
39 Dam safety projects .................. 2,000
40 Open space land conservation
41 projects .......................... 40,000
42 State parks projects ................ 10,000
43 Municipal parks projects and
44 historic preservation and
45 heritage area projects ............ 10,000
46 --------------
47 Total ............................ 188,000
48 ==============
49 For state assistance payments for the state share of the costs of
50 clean water projects in accordance with the provisions of title 3 of
259 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 article 56 of the environmental conservation law for project costs,
2 including costs incidental and appurtenant thereto and for payment
3 of reimbursements to the clean water/clean air implementation fund
4 for services and expenses of state departments and agencies, includ-
5 ing fringe benefits, hereinafter referred to as "Clean Water Project
6 Disbursements". The moneys appropriated herein may be suballocated
7 to all state departments and agencies. Further, moneys herein appro-
8 priated may be suballocated only to public authorities and public
9 benefit corporations specifically authorized by paragraph (1) of
10 subdivision 1 of section 56-0303 of the environmental conservation
11 law to enter into contracts for state assistance payments for the
12 state share of costs for clean water projects, provided however,
13 that moneys herein appropriated pursuant to paragraph (i) of subdi-
14 vision 1 of section 56-0303 of the environmental conservation law
15 for state facility projects may be suballocated to any public
16 authority or public benefit corporation.
17 Notwithstanding the provisions of any general or special law, the
18 moneys hereby appropriated shall be available for clean water quali-
19 ty projects in accordance with title 3 of article 56 of the environ-
20 mental conservation law upon the issuance of a certificate of
21 approval of availability of the director of the division of the
22 budget.
23 The state comptroller shall at the commencement of each month certify
24 to the director of the division of the budget, the commissioner of
25 environmental conservation, the chairman of the senate finance
26 committee, and the chairman of the assembly ways and means committee
27 the amounts disbursed from this appropriation for "Clean Water
28 Project Disbursements" for the month preceding such certification
29 (09B29957) ... 8,000,000 .......................... (re. $2,254,000)
30 By chapter 55, section 1, of the laws of 1998:
31 For state assistance payments for the state share of the costs of
32 clean water projects in accordance with the provisions of title 3 of
33 article 56 of the environmental conservation law for project costs,
34 including costs incidental and appurtenant thereto and for payment
35 of reimbursements to the clean water/clean air implementation fund
36 for services and expenses of state departments and agencies, includ-
37 ing fringe benefits, hereinafter referred to as "Clean Water Project
38 Disbursements".
39 The moneys appropriated herein may be suballocated to all state
40 departments and agencies. Further, moneys herein appropriated may be
41 suballocated only to public authorities and public benefit corpo-
42 rations specifically authorized by paragraph (1) of subdivision one
43 of section 56-0303 of the environmental conservation law to enter
44 into contracts for state assistance payments for the state share of
45 costs for clean water projects, provided however, that moneys herein
46 appropriated pursuant to paragraph (i) of subdivision one of section
47 56-0303 of the environmental conservation law for state facility
48 projects may be suballocated to any public authority or public bene-
49 fit corporation.
50 Notwithstanding the provisions of any general or special law, the
51 moneys hereby appropriated shall be available for clean water quali-
260 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ty projects in accordance with title 3 of article 56 of the environ-
2 mental conservation law upon the issuance of a certificate of
3 approval of availability by the director of the division of the
4 budget.
5 The state comptroller shall at the commencement of each month certify
6 to the director of the division of the budget, the commissioner of
7 environmental conservation, the chairman of the senate finance
8 committee, and the chairman of the assembly ways and means committee
9 the amounts disbursed from this appropriation for "Clean Water
10 Project Disbursements" for the month preceding such certification
11 (09BA9857) ... 149,000,000 ........................ (re. $5,519,000)
12 project schedule
13 PROJECT AMOUNT
14 --------------------------------------------
15 (thousands of dollars)
16 Hudson River water quality
17 improvement projects ............... 5,000
18 Long Island Sound water quali-
19 ty improvement projects ........... 15,000
20 Lake Champlain water quality
21 improvement projects ............... 5,000
22 Onondaga Lake water quality
23 improvement projects .............. 20,000
24 New York Harbor water quality
25 improvement projects ............... 2,000
26 Great Lakes water quality
27 improvement projects ............... 2,000
28 Finger Lakes water quality
29 improvement projects ............... 5,000
30 Peconic and South Shore Estu-
31 ary water quality improve-
32 ment projects ...................... 5,000
33 State facility projects .............. 5,000
34 Municipal wastewater treatment
35 improvement projects and
36 municipal flood control
37 projects ........................... 6,000
38 Municipal wastewater treatment
39 improvement projects and
40 municipal flood control
41 projects .......................... 15,000
42 Environmental compliance
43 assistance projects-water
44 quality ............................ 2,000
45 Dam safety projects .................. 2,000
46 Open space land conservation
47 projects .......................... 40,000
48 State parks projects ................ 10,000
49 Municipal parks projects and
50 historic preservation and
51 heritage area projects ............ 10,000
261 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 --------------
2 Total ............................ 149,000
3 ==============
4 For state assistance payments for the state share of the costs of
5 clean water projects in accordance with the provisions of title 3 of
6 article 56 of the environmental conservation law for project costs,
7 including costs incidental and appurtenant thereto and for payment
8 of reimbursements to the clean water/clean air implementation fund
9 for services and expenses of state departments and agencies, includ-
10 ing fringe benefits, hereinafter referred to as "Clean Water Project
11 Disbursements". The moneys appropriated herein may be suballocated
12 to all state departments and agencies. Further, moneys herein appro-
13 priated may be suballocated only to public authorities and public
14 benefit corporations specifically authorized by paragraph (1) of
15 subdivision one of section 56-0303 of the environmental conservation
16 law to enter into contracts for state assistance payments for the
17 state share of costs for clean water projects, provided however,
18 that moneys herein appropriated pursuant to paragraph (i) of subdi-
19 vision one of section 56-0303 of the environmental conservation law
20 for state facility projects may be suballocated to any public
21 authority or public benefit corporation.
22 Notwithstanding the provisions of any general or special law, the
23 moneys hereby appropriated shall be available for clean water quali-
24 ty projects in accordance with title 3 of article 56 of the environ-
25 mental conservation law upon the issuance of a certificate of
26 approval of availability of the director of the division of budget.
27 The state comptroller shall at the commencement of each month certify
28 to the director of the division of the budget, the commissioner of
29 environmental conservation, the chairman of the senate finance
30 committee, and the chairman of the assembly ways and means committee
31 the amounts disbursed from this appropriation for "Clean Water
32 Project Disbursements" for the month preceding such certification
33 (09B29857) ... 15,000,000 ........................... (re. $185,000)
34 By chapter 55, section 1, of the laws of 1997:
35 For state assistance payments for the state share of the costs of
36 clean water projects in accordance with the provisions of title 3 of
37 article 56 of the environmental conservation law for project costs,
38 including costs incidental and appurtenant thereto and for payment
39 of reimbursements to the clean water/clean air implementation fund
40 for services and expenses of state departments and agencies, includ-
41 ing fringe benefits, hereinafter referred to as "Clean Water Project
42 Disbursements".
43 The moneys appropriated herein may be suballocated to all state
44 departments and agencies. Further, moneys herein appropriated may be
45 suballocated only to public authorities and public benefit corpo-
46 rations specifically authorized by paragraph (1) of subdivision one
47 of section 56-0303 of the environmental conservation law to enter
48 into contracts for state assistance payments for the state share of
49 costs for clean water projects, provided however, that moneys herein
50 appropriated pursuant to paragraph (i) of subdivision one of section
262 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 56-0303 of the environmental conservation law for state facility
2 projects may be suballocated to any public authority or public bene-
3 fit corporation.
4 Notwithstanding the provisions of any general or special law, the
5 moneys hereby appropriated shall be available for clean water quali-
6 ty projects in accordance with title 3 of article 56 of the environ-
7 mental conservation law upon the issuance of a certificate of
8 approval of availability by the director of the division of the
9 budget.
10 The state comptroller shall at the commencement of each month certify
11 to the director of the division of the budget, the commissioner of
12 environmental conservation, the chairman of the senate finance
13 committee, and the chairman of the assembly ways and means committee
14 the amounts disbursed from this appropriation for "Clean Water
15 Project Disbursements" for the month preceding such certification
16 (09BA9757) ... 101,000,000 ........................ (re. $4,717,000)
17 project schedule
18 PROJECT AMOUNT
19 --------------------------------------------
20 (thousands of dollars)
21 Hudson River water quality
22 improvement projects ............... 2,000
23 Long Island Sound water quali-
24 ty improvement projects ........... 14,000
25 Lake Champlain water quality
26 improvement projects ............... 2,000
27 Onondaga Lake water quality
28 improvement projects .............. 10,000
29 New York Harbor water quality
30 improvement projects ............... 3,000
31 Great Lakes water quality
32 improvement projects ............... 2,000
33 Finger Lakes water quality
34 improvement projects ............... 2,000
35 Peconic and South Shore Estu-
36 ary water quality improve-
37 ment projects ...................... 2,000
38 Other water bodies water qual-
39 ity improvement projects ........... 2,000
40 State facility projects .............. 5,000
41 Municipal wastewater treatment
42 improvement projects and
43 municipal flood control
44 projects .......................... 15,000
45 Environmental compliance
46 assistance projects-water
47 quality ............................ 2,000
48 Dam safety projects .................. 5,000
49 Open space land conservation
263 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 projects .......................... 20,000
2 State parks projects ................ 10,000
3 Municipal parks projects and
4 historic preservation and
5 heritage area projects ............. 5,000
6 --------------
7 Total ............................ 101,000
8 ==============
9 By chapter 55, section 1, of the laws of 1997, as amended by chapter 55,
10 section 1, of the laws of 1998:
11 For state assistance payments for the state share of the costs of
12 clean water projects in accordance with the provisions of title 3 of
13 article 56 of the environmental conservation law for project costs,
14 including costs incidental and appurtenant thereto and for payment
15 of reimbursements to the clean water/clean air implementation fund
16 for services and expenses of state departments and agencies, includ-
17 ing fringe benefits, hereinafter referred to as "Clean Water Project
18 Disbursements". The moneys appropriated herein may be suballocated
19 to all state departments and agencies. Further, moneys herein appro-
20 priated may be suballocated only to public authorities and public
21 benefit corporations specifically authorized by paragraph (1) of
22 subdivision one of section 56-0303 of the environmental conservation
23 law to enter into contracts for state assistance payments for the
24 state share of costs for clean water projects, provided however,
25 that moneys herein appropriated pursuant to paragraph (i) of subdi-
26 vision one of section 56-0303 of the environmental conservation law
27 for state facility projects may be suballocated to any public
28 authority or public benefit corporation.
29 Notwithstanding the provisions of any general or special law, the
30 moneys hereby appropriated shall be available for clean water quali-
31 ty projects in accordance with title 3 of article 56 of the environ-
32 mental conservation law upon the issuance of a certificate of
33 approval of availability of the director of the division of budget.
34 The state comptroller shall at the commencement of each month certify
35 to the director of the division of the budget, the commissioner of
36 environmental conservation, the chairman of the senate finance
37 committee, and the chairman of the assembly ways and means committee
38 the amounts disbursed from this appropriation for "Clean Water
39 Project Disbursements" for the month preceding such certification
40 (09B29757) ... 10,000,000 ........................... (re. $504,000)
41 By chapter 413, section 27, of the laws of 1996, as amended by chapter
42 55, section 1, of the laws of 1997:
43 For state assistance payments for the state share of the costs of
44 clean water projects in accordance with the provisions of title 3 of
45 article 56 of the environmental conservation law for project costs,
46 including costs incidental and appurtenant thereto and for payment
47 of reimbursements to the clean water/clean air implementation fund
48 for services and expenses of state departments and agencies, includ-
49 ing fringe benefits, hereinafter referred to as "Clean Water Project
50 Disbursements". The moneys appropriated herein may be suballocated
264 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 to the environmental facilities corporation, other state depart-
2 ments, agencies, and public authorities.
3 Notwithstanding the provisions of any general or special law, moneys
4 hereby appropriated shall be available for clean water quality
5 projects in accordance with title 3 of article 56 of the environ-
6 mental conservation law upon the issuance of a certificate of
7 approval of availability by the director of the division of the
8 budget. The state comptroller at the commencement of each month
9 shall certify to the director of the division of the budget, the
10 commissioner of environmental conservation, the chairman of the
11 senate finance committee, and the chairman of the assembly ways and
12 means committee the amounts disbursed from this appropriation for
13 "Clean Water Project Disbursements" for the month preceding such
14 certification (09BA9657) ... 75,000,000 ........... (re. $2,681,000)
15 WATER RESOURCES - EQBA (CCP)
16 Capital Projects Funds - Other
17 Capital Projects Fund
18 Water Resources Purpose
19 By chapter 54, section 1, of the laws of 1981, as amended by chapter 54,
20 section 1, of the laws of 2002:
21 For the state share of the costs of construction of water quality
22 improvement projects, including the payment of liabilities incurred
23 prior to April 1, 1981, in accordance with the provisions of title
24 three of article fifty-one of the environmental conservation law as
25 amended for projects included in the following schedule, including
26 costs incidental and appurtenant thereto, hereinafter referred to as
27 "Water Quality Improvement Disbursements."
28 Notwithstanding the provisions of any general or special law, the
29 moneys hereby appropriated shall be available for water quality
30 improvement expenditures for eligible water quality improvement
31 projects as defined by section 51-0303 of the environmental conser-
32 vation law upon the issuance of a certificate of approval of avail-
33 ability by the director of the division of the budget. The state
34 comptroller shall at the commencement of each month certify to the
35 director of the division of the budget, the commissioner of environ-
36 mental conservation, the chairman of the senate finance committee,
37 and the chairman of the assembly ways and means committee the
38 amounts disbursed from this appropriation for Water Quality Improve-
39 ment Disbursements for the month preceding such certification
40 (01387057) ... 27,190,300 ........................... (re. $604,000)
41 project schedule
42 ESTIMATED ESTIMATED
43 ELIGIBLE STATE
44 COUNTY PROJECT PROJECT COST SHARE
45 -----------------------------------------------------------------------
46 (thousands)
47 Supplements to previous appro-
265 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 priations:
2 Allegany County
3 Village of Cuba ............................... $6,200 $775
4 Broome County
5 Village of Endicott ........................... 608 76
6 Town of Sanford ............................... 952 119
7 Chautauqua County
8 Village of Brocton ............................ 1,272 159
9 Ripley Sewer District ......................... 2,384 298
10 Chautauqua County ............................. 560 70
11 Columbia County
12 Village of Chatham ............................ 880 110
13 Erie County
14 Southtown's Sewage Treatment
15 Agency ...................................... 440 55
16 Village of Alden .............................. 1,808 195
17 City of Lackawanna ............................ 984 123
18 Village of Blasdell ........................... 4,600 548
19 Genesee
20 Village of Attica ............................. 3,480 435
21 Monroe County
22 Rochester Pure Waters District ................ 47,736 5,967
23 Nassau County
24 Nassau County Sewer District 3 ................ 11,920 1,490
25 New York City
26 City of New York: Newtown
27 Creek Plant Upgrading ....................... 2,040 255
28 Niagara County
29 Village of Middleport ......................... 96 12
30 Oneida County
31 City of Sherrill .............................. 1,384 173
32 Onondaga County
33 Baldwinsville-Seneca Knolls
34 Sewer District .............................. 2,224 278
35 Nine Mile Creek ............................... 2,936 367
36 Orange County
37 Town of New Windsor ........................... 1,336 167
38 St. Lawrence County
39 City of Ogdensburg ............................ 696 87
40 Saratoga County
41 Village of South Glens Falls .................. 1,200 150
42 Seneca County
43 Seneca County Sewer District 1 ............... 4,200 525
44 Sullivan County
45 Town of Rockland .............................. 296 37
46 Town of Delaware .............................. 412 89
47 Tioga County
48 Village of Waverly ............................ 1,104 138
49 Village of Owego .............................. 1,408 176
50 Tompkins County
51 City of Ithaca ................................ 440 55
52 Yates County
266 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Village of Penn Yan ........................... 1,720 215
2 --------- --------
3 Subtotal-Supplements .......................... $13,144
4 New Projects (In Planning and
5 Construction):
6 Albany County
7 City of Albany ................................ $360 $45
8 Cattaraugus County
9 Town of Olean ................................. 8 1
10 Clinton County
11 Clinton County Sludge Study ................... 1,040 130
12 Town of Black Brook ........................... 1,384 173
13 Cortland County
14 Village of McGraw ............................. 912 114
15 Delaware County
16 Village of Hancock ............................ 968 121
17 Village of Hobart ............................. 72 9
18 Fulton County
19 City of Gloversville .......................... 2,192 274
20 Genesee County
21 Batavia Sewer District 2 ...................... 72 9
22 Greene County
23 Town and Village of Catskill .................. 96 12
24 Town of Catskill .............................. 192 24
25 Herkimer County
26 Village of Herkimer ........................... 304 38
27 Livingston County
28 Village of Avon ............................... 160 20
29 Madison County
30 Village of Hamilton ........................... 504 63
31 Monroe County
32 Town of Perinton .............................. 88 11
33 Rochester Pure Waters District ................ 1,528 191
34 Village of Spencerport ........................ 1,400 175
35 Town of Henrietta ............................. 56 7
36 Ontario County
37 City of Geneva ................................ 1,720 215
38 Onondaga County
39 Onondaga County/Syracuse
40 Metro ....................................... 10,776 1,347
41 Onondaga County (Ley Creek) ................... 56 7
42 Orange County
43 Town of Montgomery ............................ 728 91
44 Village of Montgomery ......................... 1,632 204
45 Orleans County
46 Town of Shelby ................................ 8 1
47 Town of Ridgeway .............................. 264 33
48 Putnam County
49 Putnam County ................................. 152 19
50 Rockland County
51 Village of Suffern ............................ 4,160 520
52 Seneca County
267 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Village of Lodi ............................... 360 45
2 Town of Waterloo .............................. 144 18
3 St. Lawrence County
4 Town of Lawrence .............................. 200 25
5 Steuben County
6 Village of South Corning ...................... 808 101
7 Sullivan County
8 Town of Tusten ................................ 816 102
9 Town of Fallsburg ............................. 504 63
10 Tompkins County
11 Town of Newfield .............................. 384 48
12 Village of Dryden ............................. 1,000 125
13 Ulster County
14 Village of Ellenville ......................... 448 56
15 Town of Wawarsing ............................. 1,224 153
16 Town of Crawford .............................. 1,240 155
17 Town of Saugerties ............................ 5,912 702
18 Westchester County
19 Town of North Castle .......................... 1,408 176
20 Wyoming County
21 Village of Castile ............................ 40 5
22 --------
23 Subtotal-New Projects ......................... $5,628
24 Statewide
25 Supplement to various previously
26 scheduled projects .......................... $62,152 $7,684
27 Engineering studies, reports
28 and designs, various projects ............... 6,088 736
29 --------
30 Supplements ................................... $8,420
31 Grand Total Appropriation ................... $27,190
32 =========
33 By chapter 54, section 3, of the laws of 1978, as amended by chapter 55,
34 section 1, of the laws of 2003, for:
35 The state share of the cost of construction of water quality improve
36 ment projects, including the payment of liabilities incurred prior
37 to April 1, 1978, in accordance with the provisions of title three
38 of article fifty-one of the environmental conservation law as
39 amended for projects included in the following schedule, including
40 costs incidental and appurtenant thereto, hereinafter referred to as
41 "Water Quality Improvement Disbursements."
42 Notwithstanding the provisions of any general or special law, the
43 moneys hereby appropriated shall be available for water quality
44 improvement expenditures for eligible water quality improvement
45 projects as defined by section 51-0303 of the environmental conser-
46 vation law upon the issuance of a certificate of approval of avail-
47 ability by the director of the division of the budget.
48 The state comptroller shall at the commencement of each month certify
49 to the director of the division of the budget, the commissioner of
50 environmental conservation, the chairman of the senate finance
51 committee, and the chairman of the assembly ways and means committee
268 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 the amounts disbursed from this appropriation for Water Quality
2 Improvement Disbursements for the month preceding such certification
3 (01385957) ... 21,229,100 ........................... (re. $525,000)
4 project schedule
5 ESTIMATED
6 ELIGIBLE ESTIMATED
7 PROJECT STATE
8 COUNTY OR CITY PROJECT COST SHARE
9 -----------------------------------------------------------------------
10 (thousands)
11 Supplements to previous appropriations:
12 Albany
13 Town of Guilderland .............................. $2,088 $261
14 Chautauqua
15 City of Jamestown ................................. 3,720 465
16 Chautauqua Lake Sewer District .................... 4,864 164
17 Delaware
18 Village of Hancock ................................ 4,984 623
19 Erie
20 Buffalo Sewer Authority ........................... 33,104 4,001
21 Towns of Aurora and Holland; Village of East
22 Aurora .......................................... 3,448 431
23 Southtown's Sewage Treatment Agency ............... 22,944 2,757
24 Niagara
25 Village of Wilson ................................. 2,600 311
26 Ontario
27 Honeoye Lake Sewer District ....................... 1,664 208
28 Orange
29 Towns of Blooming Grove, Cornwall and New Wind-
30 sor ............................................. 1,104 138
31 Oswego
32 City of Fulton .................................... 4,680 585
33 Rensselaer
34 Town of Sand Lake ................................. 2,208 97
35 Rockland
36 Rockland County Sewer District No. 1 .............. 8,136 1,017
37 Suffolk
38 Suffolk County Sewer District No. 3 ............... 1,296 162
39 Sullivan
40 Town of Bethel .................................... 7,208 901
41 Westchester
42 Mamaroneck Sewer District ......................... 5,128 641
43 --------
44 Subtotal-Supplements .............................. $12,761
45 New Construction Projects:
46 Albany
47 Town of Coeymans .................................. $440 $55
48 Chautauqua
49 Village of Falconer ............................... 424 53
50 Clinton
269 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Town of Peru ...................................... 1,072 134
2 Columbia
3 Town of Stockport ................................. 544 68
4 Erie
5 Buffalo Sewer Authority (Project C-36-915) ........ 768 96
6 City of Lackawanna ................................ 7,080 885
7 Genesee
8 Village of Elba ................................... 256 32
9 Greene
10 Town of Hunter and Village of Tannersville ........ 120 15
11 Jefferson
12 Village of Brownville ............................. 104 13
13 Town of Watertown ................................. 176 22
14 Madison
15 Town of Sullivan .................................. 72 9
16 Oneida
17 Town of Marcy ..................................... 144 18
18 Onondaga
19 Meadowbrook-Limestone Sewage Treatment Plant Ex-
20 pansion ......................................... 1,352 169
21 Morgan Road Sewer Agency .......................... 3,056 382
22 Ontario
23 Town of Farmington ................................ 408 51
24 Village of Holcomb ................................ 392 49
25 Orange
26 Village of Montgomery ............................. 1,576 197
27 Town of Warwick and Village of Greenwood Lake ..... 48 6
28 Town of Woodbury .................................. 12,472 1,559
29 Otsego
30 City and Town of Oneonta .......................... 320 40
31 Village of Richfield Springs ...................... 15 2
32 Rensselaer
33 Town of Brunswick ................................. 128 16
34 Town of North Greenbush ........................... 152 19
35 Schoharie
36 Village of Richmondville .......................... 16 2
37 Schuyler
38 Town of Reading ................................... 384 48
39 Seneca
40 Towns of Romulus and Varick ....................... 304 38
41 Seneca County Sewer District No. 1 ................ 2,352 294
42 Village of Waterloo ............................... 1,368 171
43 Ulster
44 City of Kingston .................................. 2,744 343
45 New York City
46 City of New York: Area Sludge Study (C-36-1082) ... 9,608 1,118
47 --------
48 Subtotal-New Projects ............................. $5,904
49 New Projects (In Planning):
50 Albany
51 City of Cohoes .................................... $72 $9
52 Broome
270 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Village of Endicott ............................... 144 18
2 Town of Sanford ................................... 16 2
3 Cattaraugus
4 City of Olean ..................................... 144 18
5 Village of Portville .............................. 64 8
6 Chautauqua
7 Town of Ellicott .................................. 32 4
8 Ripley Sewer District ............................. 152 19
9 Village of Sinclairville .......................... 16 2
10 Clinton
11 Town of Champlain ................................. 104 13
12 Town of Plattsburgh ............................... 788 99
13 Dutchess
14 Village of Pawling ................................ 192 24
15 Erie
16 Village of Akron .................................. 80 10
17 Town of Brant ..................................... 110 14
18 Buffalo Sewer Authority (Project C-36-1044) ....... 3,416 427
19 Buffalo Sewer Authority (Project C-36-1070) ....... 112 14
20 Buffalo Sewer Authority (Project C-36-1130) ....... 800 100
21 Village of Springville ............................ 104 13
22 Essex
23 Town of Port Henry ................................ 40 5
24 Town of Willsboro ................................. 80 10
25 Franklin
26 Village of Tupper Lake ............................ 104 13
27 Fulton
28 City of Gloversville and Village of Johnstown ..... 360 45
29 Genesee
30 City of Batavia ................................... 560 70
31 Greene
32 Village of Coxsackie .............................. 160 20
33 Jefferson
34 Village of Deferiet ............................... 32 4
35 Lewis
36 Village of Castorland ............................. 8 1
37 Madison
38 Village of Chittenango ............................ 88 11
39 Monroe
40 Town of Brighton .................................. 32 4
41 Towns of Hamlin and Kendall ....................... 48 6
42 Montgomery
43 City of Amsterdam and Town of Amsterdam ........... 336 42
44 Nassau
45 Nassau County Sewer District No. 3 ................ 1,021 128
46 Oyster Bay Sewer District ......................... 256 32
47 West Long Beach Sewer District (Project C-36-
48 1043) ........................................... 1,984 248
49 Niagara
50 Town of Lewiston .................................. 88 11
51 Village of Middleport ............................. 136 17
52 Oneida
271 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Town of Marcy ..................................... 552 69
2 County of Oneida, Pump Station, Sequoit Creek ..... 520 65
3 Onondaga
4 Village of Marcellus .............................. 224 28
5 Orange
6 Town of Warwick ................................... 264 33
7 Orleans
8 Village of Medina ................................. 376 47
9 Rensselaer
10 Village of Hoosick Falls .......................... 56 7
11 City of Rensselaer ................................ 56 7
12 Rockland
13 Village of Suffern ................................ 200 25
14 St. Lawrence
15 Village of Heuvelton .............................. 56 7
16 Village of Norwood ................................ 64 8
17 Saratoga
18 Village of South Glens Falls ...................... 104 13
19 Seneca
20 Town of Seneca Falls .............................. 528 66
21 Steuben
22 City of Corning ................................... 200 22
23 Suffolk
24 Village of Greenport and Town of Southold ......... 1,064 133
25 Town of Huntington ................................ 312 39
26 Town of Southold .................................. 24 3
27 Sullivan
28 Towns of Callicoon and Delaware, and Village of
29 Jeffersonville (C-D-J) Joint Sewer Board ........ 40 5
30 Town of Delaware .................................. 72 9
31 Tompkins
32 Village of Lansing ................................ 104 13
33 Ulster
34 Town of Wawarsing ................................. 16 2
35 Town of Woodstock ................................. 120 15
36 Washington
37 Village of Fort Ann ............................... 32 4
38 Wayne
39 Village of Clyde .................................. 64 8
40 Village of Newark ................................. 128 16
41 Village of Lyons .................................. 40 5
42 Westchester
43 Town of Mount Pleasant ............................ 128 16
44 Yonkers Sewer District ............................ 728 91
45 Town of Yorktown .................................. 168 21
46 Wyoming
47 Village of Attica ................................. 280 35
48 Town of Bennington and Hamlet of Cowlesville ...... 24 3
49 Towns of Castile and Perry ........................ 288 36
50 New York City
51 City of New York: Newtown Creek Plant Upgrading
52 (C-36-713) ...................................... 2,008 251
272 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 --------
2 Subtotal-Projects In Planning ..................... $2,563
3 Grand Total of Appropriations ................. $21,229
4 ========
5 By chapter 54, section 3, of the laws of 1977, as amended by chapter 54,
6 section 1, of the laws of 2002:
7 The state share of the cost of construction of water quality improve-
8 ment projects, including the payment of liabilities incurred prior
9 to April 1, 1977, in accordance with the provisions of title three
10 of article fifty-one of the environmental conservation law as
11 amended for projects included in the following schedule, including
12 costs incidental and appurtenant thereto, hereinafter referred to as
13 "Water Quality Improvement Disbursements."
14 Notwithstanding the provisions of any general or special law, the
15 moneys hereby appropriated shall be available for water quality
16 improvement expenditures for eligible water quality improvement
17 projects as defined by section 51-0303 of the environmental conser-
18 vation law upon the issuance of a certificate of approval of avail-
19 ability by the director of the division of the budget.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the division of the budget, the commissioner of
22 environmental conservation, the chairman of the senate finance
23 committee, and the chairman of the assembly ways and means committee
24 the amounts expended from this appropriation for Water Quality
25 Improvement Disbursements for the month preceding such certification
26 (01385757) ... 20,829,700 ........................... (re. $415,000)
27 project schedule
28 ADDITIONAL
29 ESTIMATED ADDITIONAL
30 ELIGIBLE ESTIMATED
31 PROJECT STATE
32 COUNTY OR CITY PROJECT COST SHARE
33 -----------------------------------------------------------------------
34 (thousands)
35 Supplements to previous appropriations:
36 Chautauqua
37 City of Jamestown .............................. $3,824 $478
38 Erie
39 Southtown's sewage treatment agency ............ 8,128 880
40 Monroe
41 Town of Webster ................................ 5,560 695
42 Rochester pure waters district (project C-36-
43 745) ......................................... 80,736 10,092
44 Irondequoit Bay pure waters district ........... 352 44
45 South Central pure waters district ............. 1,112 139
46 Ontario
47 City of Canandaigua ............................ 4,640 580
48 Rockland
49 Rockland County sewer district No. 1 ........... 4,304 538
50 Saratoga
273 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Saratoga County sewer district No. 1 ........... 1,864 ...
2 Sullivan
3 Town of Thompson, Village of Monticello ........ 4,344 543
4 Wayne
5 Town of Ontario ................................ 8 1
6 New York City
7 Oakwood Beach .................................. 23,424 2,928
8 ---------
9 Subtotal-Supplements ........................... $16,909
10 ---------
11 New Projects
12 Chautauqua
13 North Chautauqua Lake sewer district
14 (project C-36-913) ........................... $2,701 $338
15 Chenango
16 Village of Greene .............................. 43 6
17 Madison
18 Town of Lenox .................................. 1,700 213
19 Town of Sullivan, East Sullivan ................ 400 50
20 Oneida
21 Town of Verona, East Oneida Lake ............... 2,500 313
22 Otsego
23 Town of Oneonta ................................ 302 38
24 Suffolk
25 Suffolk County sewer district (project C-36-
26 1036) ........................................ 20,064 2,508
27 ---------
28 Subtotal-New Projects .......................... $3,466
29 Step I Planning
30 Albany
31 Town of Bethlehem (C-36-1096) .................. $6
32 Chautauqua
33 Portland, Pomfret, Dunkirk Sewer District
34 (C-36-1097) .................................. 4
35 Chenango
36 Village of Sherburne (C-36-1051) ............... 8
37 Columbia
38 Village of Chatham (C-36-1101) ................. 4
39 Town of Kinderhook (C-36-1118) ................. 5
40 Cortland
41 Cortland County SA (C-36-1001) ................. 5
42 Delaware
43 Village of Hancock (C-36-874) .................. 5
44 Village of Stamford (C-36-1114) ................ 1
45 Erie
46 Town of Aurora (C-36-836) ...................... 26
47 Village of Blasdell (C-36-1012) ................ 25
48 Buffalo Sewer Authority (C-36-830) ............. 32
49 Essex
50 Village of Elizabethtown (C-36-1105) ........... 3
51 Franklin
52 St. Regis Mohawk Indian Reservation
274 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 (C-36-1111) .................................. 10
2 Genesee
3 Town of Pavilion (C-36-1078) ................... 2
4 Greene
5 Town of Catskill (C-36-1024) ................... 1
6 Herkimer
7 Town of West Winfield (C-36-1084) .............. 1
8 Jefferson
9 Village of Dexter (C-36-1005) .................. 1
10 LaFargeville, Town of Orleans (C-36-1119) ...... 4
11 Livingston
12 Village of Caledonia (C-36-1010) ............... 5
13 Town of Livonia (C-36-1088) .................... 3
14 Town of York (C-36-1011) ....................... 5
15 Madison
16 Town of Cazenovia (C-36-1092) .................. 3
17 Onondaga
18 Village of Skaneateles (C-36-1000) ............. 13
19 Ontario
20 Village of Rushville (C-36-1094) ............... 9
21 Oswego
22 City of Fulton (C-36-1009) ..................... 24
23 Rensselaer
24 Town of Schodack (C-36-1117) ................... 10
25 Rockland
26 Town of Stony Point (C-36-993) ................. 10
27 St. Lawrence
28 Village of Waddington (C-36-1076) .............. 4
29 Saratoga
30 Town of Stillwater (C-36-1113) ................. 5
31 Schoharie
32 Village of Middleburgh (C-36-929) .............. 3
33 Village of Sharon Springs (C-36-1098) .......... 1
34 Seneca
35 Village of Seneca Falls (C-36-1102) ............ 7
36 Sullivan
37 Town of Bethel (C-36-1115) ..................... 10
38 Tioga
39 Town of Owego (C-36-1004) ...................... 3
40 Tompkins
41 City of Ithaca (C-36-1095) ..................... 42
42 Ulster
43 Town of Gardiner (C-36-1086) ................... 6
44 Town of Marlborough (C-36-1098) ................ 101
45 Town & Village of New Paltz (C-36-1087) ........ 12
46 Washington
47 Washington County SA (C-36-1021) ............... 28
48 Wayne
49 Village of Sodus (C-36-1091) ................... 3
50 Yates
51 Village of Penn Yan (C-36-1022) ................ 5
52 ---------
275 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Subtotal-Step I Planning ....................... $455
2 ---------
3 Grand Total Appropriation .................... $20,830
4 =========
5 By chapter 54, section 5, of the laws of 1976, as amended by chapter 55,
6 section 1, of the laws of 2003, for:
7 The state share of the cost of construction of water quality improve
8 ment projects, including the payment of liabilities incurred prior
9 to April 1, 1976, in accordance with the provisions of title three
10 of article fifty-one of the environmental conservation law as
11 amended for projects included in the following schedule, including
12 costs incidental and appurtenant thereto, hereinafter referred to as
13 "Water Quality Improvement Disbursements."
14 Notwithstanding the provisions of any general or special law, the
15 moneys hereby appropriated shall be available for water quality
16 improvement expenditures for eligible water quality improvement
17 projects as defined by section 51-0303 of the environmental conser-
18 vation law upon the issuance of a certificate of approval of avail-
19 ability by the director of the division of the budget.
20 The state comptroller shall at the commencement of each month certify
21 to the director of the division of the budget, the commissioner of
22 environmental conservation, the chairman of the senate finance
23 committee, and the chairman of the assembly ways and means committee
24 the amounts disbursed from this appropriation for Water Quality
25 Improvement Disbursements for the month preceding such certification
26 (01385557) ... 45,543,700 ........................... (re. $346,000)
27 project schedule
28 ADDITIONAL
29 ESTIMATED ADDITIONAL
30 ELIGIBLE ESTIMATED
31 PROJECT STATE
32 COUNTY OR CITY PROJECT COST SHARE
33 -----------------------------------------------------------------------
34 (thousands)
35 Supplements to previous appropriations:
36 Albany
37 Village of Green Island ....................... $424 $53
38 Chautauqua
39 So. Central Chautauqua Lake sewer district .... 3,592 449
40 Erie
41 Town of Grand Island .......................... 3,824 478
42 Southtown's Sewage Treatment Agency ........... 13,664 1,708
43 Herkimer
44 Herkimer County sewer district ................ 2,136 267
45 Madison
46 City of Oneida ................................ 2,208 276
47 Monroe
48 Rochester pure waters district (project C-36-
49 745) ........................................ 16,560 1,935
276 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Town of Webster ............................... 288 36
2 Nassau
3 Recharge facility, Nassau Co. sewer district
4 No. 3 ....................................... 6,224 778
5 Niagara
6 Town of Niagara ............................... 2,432 304
7 Oneida
8 Village of Sylvan Beach ....................... 1,416 177
9 City of Utica ................................. 496 62
10 Onondaga
11 Baldwinsville--
12 Seneca Knolls sewer district .................. 4,032 504
13 Oak Orchard service area ...................... 3,744 468
14 Ontario
15 City of Canandaigua ........................... 904 113
16 Putnam
17 Town of Carmel, Lake Secor sewer district
18 No. 4 ....................................... 704 88
19 Rockland
20 Rockland County sewer district No. 1 .......... 9,600 1,200
21 Sullivan
22 Town of Thompson, Village of Monticello ....... 1,208 151
23 Wayne
24 Town of Williamson ............................ 2,424 303
25 Westchester
26 Blind Brook sewer district .................... 1,368 171
27 Port Chester sewer district ................... 1,488 186
28 New York City
29 Coney Island .................................. 53,776 6,722
30 Oakwood Beach ................................. 20,864 2,608
31 Red Hook ...................................... 19,608 2,451
32 Statewide
33 Supplements to various previously scheduled
34 projects ................................... 157,864 19,171
35 ---------
36 Subtotal--Supplements ........................... $40,659
37 ---------
38 New Projects
39 Genesee
40 Town of Batavia, Sewer district No. 1 ......... $51 $7
41 Onondaga
42 Meadowbrook Trunk sewer ....................... 1,000 125
43 Statewide Engineering studies, reports and
44 designs, various projects ................... 38,584 4,764
45 ---------
46 Subtotal--New Projects ........................ $4,896
47 ---------
48 Grand Total Appropriation ................... $45,544
49 =========
50 By chapter 54, section 1, of the laws of 1975, as amended by chapter 54,
51 section 1, of the laws of 2002, for:
277 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 The state share of the cost of construction of water quality improve-
2 ment projects, including the payment of liabilities incurred prior
3 to April 1, 1975, in accordance with the provisions of title three
4 of article fifty-one of the environmental conservation law as
5 amended for projects included in the following schedule, including
6 costs incidental and appurtenant thereto, hereinafter referred to as
7 "Water Quality Improvement Disbursements."
8 Notwithstanding the provisions of any general or special law, the
9 moneys hereby appropriated shall be available for water quality
10 improvement expenditures for eligible water quality improvement
11 projects as defined by section 51-0303 of the environmental conser-
12 vation law upon the issuance of a certificate of approval of avail-
13 ability by the director of the division of the budget.
14 The state comptroller shall at the commencement of each month certify
15 to the director of the division of the budget, the commissioner of
16 environmental conservation, the chairman of the senate finance
17 committee, and the chairman of the assembly ways and means committee
18 the amounts disbursed from this appropriation for Water Quality
19 Improvement Disbursements for the month preceding such certification
20 (00320557) ... 92,201,700 ........................... (re. $460,000)
21 project schedule
22 ESTIMATED
23 ELIGIBLE ESTIMATED
24 PROJECT STATE
25 COUNTY PROJECT COST SHARE
26 -----------------------------------------------------------------------
27 (thousands)
28 Supplements to previous appropriations
29 Albany
30 Village of Altamont ............................ $315 $39
31 Town of Guilderland ............................ 1,182 148
32 Village of Green Island ........................ 130 16
33 Cattaraugus
34 Village of Franklinville ....................... 205 26
35 Village of Limestone ........................... 50 7
36 Village of Little Valley ....................... 1,594 200
37 Chautauqua
38 So. Chautauqua Lake Sewer District ............. 422 53
39 Chautauqua Utility District .................... 2,080 260
40 Village of Fredonia ............................ 2,400 300
41 Town of Hanover ................................ 770 96
42 Village of Sherman ............................. 211 26
43 Chemung
44 Chemung County ................................. 27,770 3,471
45 Columbia
46 Town of Greenport .............................. 420 52
47 City of Hudson ................................. 24 3
48 Village of Philmont ............................ 449 57
49 Village of Valatie ............................. 161 20
50 Cortland
278 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 City of Cortland ............................... 64 8
2 Erie
3 Erie County Sewer District No. 4 ............... 6,352 794
4 Town of Amherst ................................ 65,184 8,148
5 Essex
6 Village of Ticonderoga ......................... 512 64
7 Franklin
8 Village of Chateaugay .......................... 28 4
9 Herkimer
10 Herkimer County Sewer District ................. 1,304 163
11 Jefferson
12 Village of Adams ............................... 490 62
13 City of Watertown .............................. 904 113
14 Lewis
15 Village of Croghan ............................. 26 3
16 Livingston
17 Village of Dansville ........................... 80 10
18 Madison
19 Cazenovia ...................................... 112 14
20 Monroe
21 City of Rochester .............................. 44,850 5,607
22 Montgomery
23 Montgomery County Sewer District No. 1 ......... 1,400 175
24 Niagara
25 Town of Newfane ................................ 670 84
26 Niagara County Sewer District No. 1 ............ 1,880 235
27 City of North Tonawanda ........................ 126 16
28 Village of Youngstown, Town of Porter .......... 376 47
29 Town of Somerset, Village of Barker ............ 184 23
30 Oneida
31 Village of Clinton, Town of Kirkland ........... 1,497 187
32 City of Sherrill ............................... 450 57
33 Village of Sylvan Beach ........................ 4,877 610
34 Onondaga
35 Clay Sewer District ............................ 3,537 442
36 Village of Jordan .............................. 94 12
37 Limestone Sewer District ....................... 10 2
38 Baldwinsville Seneca Knolls Sewer District ..... 1,992 249
39 Ontario
40 City of Canandaigua ............................ 845 106
41 Orange
42 Town of Goshen ................................. 48 6
43 Orleans
44 Village of Albion .............................. 2,428 304
45 Oswego
46 Village of Mexico .............................. 56 7
47 Town of Minetto ................................ 98 12
48 City of Oswego ................................. 1,656 207
49 Village of Phoenix ............................. 416 52
50 Otsego
51 Village of Milford ............................. 128 16
52 Putnam
279 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Town of Carmel, Lake Secor Sewer District No.
2 4 ............................................ 625 79
3 Rensselaer
4 Village of Castleton-on-Hudson ................. 177 23
5 Town of East Greenbush ......................... 390 48
6 Town of North Greenbush ........................ 240 30
7 Rockland
8 Rockland County Sewer District No. 1 ........... 6,273 784
9 St. Lawrence
10 Village of Massena ............................. 455 57
11 City of Ogdensburg ............................. 144 18
12 Saratoga
13 Saratoga County Sewer District No. 1 ........... 1,820 184
14 Village of Schuylerville ....................... 447 55
15 Town and Village of Waterford .................. 1,722 216
16 Schuyler
17 Village of Watkins Glen ........................ 520 65
18 Steuben
19 Village of Wayland ............................. 217 28
20 Suffolk
21 Village of Ocean Beach ......................... 210 26
22 Sullivan
23 Village of Monticello, Town of Thompson ........ 1,471 184
24 Town of Fallsburg .............................. 15,336 1,917
25 Village of Woodbridge .......................... 1,944 243
26 Tioga
27 Village of Owego ............................... 97 12
28 Village of Waverly ............................. 74 10
29 Tompkins
30 Village of Groton .............................. 39 5
31 Ulster
32 Town of Shawangunk ............................. 2,135 267
33 Wayne
34 Town of Marion ................................. 165 21
35 Town of Williamson ............................. 4,960 620
36 Westchester
37 Blind Brook Sewer District ..................... 7,215 902
38 Ossining Sewer District ........................ 10,221 1,278
39 Port Chester Sewer District .................... 1,800 225
40 Wyoming
41 Village of Warsaw .............................. 110 14
42 New York City
43 Coney Island ................................... 1,584 198
44 Oakwood Beach .................................. 7,229 904
45 --------
46 Subtotal Supplements ........................... $31,026
47 New Projects
48 Albany
49 City of Albany ................................. $280 $35
50 Allegany
51 Village of Bolivar ............................. 904 113
52 Broome
280 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 City of Binghamton ............................. 10,952 1,330
2 Cattaraugus
3 Village of Allegany ............................ 1,560 191
4 Cayuga
5 City of Auburn ................................. 70 9
6 Village and Town of Union Springs .............. 2,118 265
7 Chautauqua
8 City of Jamestown .............................. 6,136 665
9 City of Jamestown .............................. 4,000 500
10 Village of Brocton ............................. 1,200 150
11 Chenango
12 City of Norwich ................................ 3,000 375
13 Dutchess
14 Tri-Municipal Sewer District ................... 16,840 2,105
15 Erie
16 Village of Alden ............................... 1,870 234
17 Village of Gowanda ............................. 3,017 377
18 City of Lackawanna ............................. 4,000 500
19 Southtowns ..................................... 40,335 5,042
20 Greene
21 Town of New Baltimore .......................... 830 104
22 Herkimer
23 Town of Webb ................................... 400 50
24 Livingston
25 Village of Geneseo ............................. 900 113
26 Madison
27 Village of Canastota ........................... 2,577 322
28 Monroe
29 City of Rochester, West Side ................... 152,560 19,070
30 Village of Honeoye Falls ....................... 296 37
31 Town of Victor, Town of Mendon ................. 1,240 155
32 Nassau
33 Sewer District No. 2, Bay Park ................. 150,000 18,750
34 Wantaugh Recharge Sewer District No. 3 ......... 14,803 1,850
35 Niagara
36 City of Lockport ............................... 600 75
37 Village of Wilson .............................. 1,360 170
38 Oneida
39 Starch Factory Creek ........................... 2,356 295
40 Town of Kirkland ............................... 40 5
41 Onondaga
42 Nine Mile Creek ................................ 6,700 837
43 Ontario
44 Canandaigua Lake Sewer District ................ 2,695 337
45 Otsego
46 Village of Cooperstown ......................... 24 3
47 Oswego
48 Village of Parish .............................. 470 59
49 Orange
50 Sewer District No. 2 ........................... 800 100
51 Town of Newburgh ............................... 784 98
52 Putnam
281 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Town of Putnam Valley .......................... 112 14
2 Rensselaer
3 Town of Sand Lake .............................. 2,823 353
4 Schenectady
5 Town of Niskayuna .............................. 480 60
6 Town of Rotterdam .............................. 3,968 496
7 Seneca
8 Village of Interlaken .......................... 88 11
9 Suffolk
10 Port Jefferson Sewer District .................. 9,184 1,148
11 Town of Riverhead .............................. 3,664 458
12 Sullivan
13 Village of Liberty ............................. 4,700 547
14 Town of Liberty ................................ 1,528 191
15 Ulster
16 Town of Esopus ................................. 3,000 375
17 Village of Rosendale ........................... 778 97
18 Warren
19 Village of Lake George ......................... 955 119
20 Warren County Sewer District ................... 1,760 182
21 Washington
22 Village of Cambridge ........................... 48 6
23 Westchester
24 Irvington Extension ............................ 1,552 194
25 Mamaroneck Sewer District ...................... 20,000 2,500
26 Town of North Castle, Armonk Sewer District .... 1,500 188
27 Town of Greenburgh ............................. 208 26
28 --------
29 Subtotal New Projects ............................ $61,176
30 --------
31 Grand Total Appropriations ..................... $92,202
32 ========
33 WATER RESOURCES - PWBA (CCP)
34 Capital Projects Funds - Other
35 Capital Projects Fund
36 Water Resources Purpose
37 Water Quality Improvements
38 By chapter 55, section 1, of the laws of 2003:
39 For water resources purposes, shall be available for the state share
40 of the costs of water quality improvement projects, as defined in
41 section 56-0101 of the environmental conservation law, to implement
42 the Long Island Sound Comprehensive Conservation Management Plan
43 consistent with paragraph (b) of subdivision 1 of section 56-0303 of
44 the environmental conservation law, and to implement wastewater
45 treatment improvement projects in small upstate communities
46 (09650357) ... 8,168,000 ............................ (re. $544,000)
47 By chapter 54, section 1, of the laws of 2002:
282 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For water resources purposes, shall be available for the state share
2 of the costs of water quality improvement projects, as defined in
3 section 56-0101 of the environmental conservation law, to implement
4 the Long Island Sound Comprehensive Conservation Management Plan
5 consistent with paragraph (b) of subdivision 1 of section 56-0303 of
6 the environmental conservation law, and to implement wastewater
7 treatment improvement projects in small upstate communities
8 (09650257) ... 4,900,000 ............................ (re. $668,000)
9 By chapter 54, section 1, of the laws of 1990, as amended by chapter 54,
10 section 1, of the laws of 2002:
11 For the state share of the costs of construction of water quality
12 improvement projects, including the payment of liabilities incurred
13 prior to April 1, 1990, in accordance with the provisions of title 3
14 of article 51 of the environmental conservation law as amended, to
15 provide state matching funds for projects scheduled to receive
16 construction grants from federal fiscal years 1989 and 1990 funds,
17 including costs incidental and appurtenant thereto, hereinafter
18 referred to as "Water Quality Improvement Disbursements."
19 Notwithstanding the provisions of any general or special law, the
20 moneys hereby appropriated shall be available for water quality
21 improvement expenditures for eligible water quality improvement
22 projects as defined by section 51-0303 of the environmental conser-
23 vation law upon the issuance of a certificate of approval of avail-
24 ability by the director of the division of the budget. No such
25 certificates of approval of availability shall be issued for or
26 include funds for projects which have not received a federal grant
27 for the construction of sewage treatment related facilities.
28 Notwithstanding the provisions of any general or special law, the
29 amounts hereby appropriated shall have all disbursements reimbursed
30 from the Pure Waters Bond Act proceeds authorizations and are
31 contingent upon the partial repeal of existing capital projects fund
32 authorizations elsewhere in this chapter. The state comptroller
33 shall at the commencement of each month certify to the director of
34 the division of the budget, the commissioner of environmental
35 conservation, the chairman of the senate finance committee, and the
36 chairman of the assembly ways and means committee the amounts
37 disbursed from this appropriation for Water Quality Improvement
38 Disbursements for the month preceding such certification (09019057)
39 ... 4,609,600 ..................................... (re. $1,466,000)
40 By chapter 54, section 1, of the laws of 1988, as amended by chapter 55,
41 section 1, of the laws of 2003:
42 For the state share of the costs of construction of water quality
43 improvement projects, including the payment of liabilities incurred
44 prior to April 1, 1988, in accordance with the provisions of title 3
45 of article 51 of the environmental conservation law as amended, to
46 provide a reserve to supplement or fund additional phases of
47 projects previously appropriated and scheduled on or after May 12,
48 1965.
49 Notwithstanding the provisions of any general or special law, the
50 moneys hereby appropriated shall be available for water quality
283 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 improvement expenditures for any project scheduled in appropriation
2 bills on or after May 12, 1965.
3 Notwithstanding the provisions of any general or special law, the
4 amounts hereby appropriated shall be made available from the Pure
5 Waters Bond Act authorizations and are contingent upon the repeal of
6 existing authorizations elsewhere in this chapter.
7 Notwithstanding the provisions of any general or special law, the
8 moneys hereby appropriated shall not be made available until the
9 director of the division of the budget issues a certificate of
10 approval of availability with a schedule of approved and previously
11 authorized projects for which such funds shall be used. No such
12 certificates of approval of availability shall be issued for or
13 include funds for projects which have not received a federal grant
14 for the construction of sewage treatment related facilities. The
15 state comptroller shall at the commencement of each month certify to
16 the director of the division of the budget, the commissioner of
17 environmental conservation, the chairman of the senate finance
18 committee, and the chairman of the assembly ways and means committee
19 the amounts disbursed from this appropriation for Water Quality
20 Improvement Disbursements for the month preceding such certification
21 (09P28857) ... 11,690,000 ........................... (re. $718,000)
22 By chapter 54, section 1, of the laws of 1984, as amended by chapter 55,
23 section 1, of the laws of 2006:
24 For the state share of the costs of construction of water quality
25 improvement projects, including the payment of liabilities incurred
26 prior to April one, nineteen hundred eighty-four, in accordance with
27 the provisions of title three of article fifty-one of the environ-
28 mental conservation law as amended, for projects previously appro-
29 priated and scheduled on or after April one, nineteen hundred seven-
30 ty-two.
31 Notwithstanding the provisions of any general or special law, the
32 moneys hereby appropriated shall be available for water quality
33 improvement expenditures for any project scheduled in appropriation
34 bills on or after April one, nineteen hundred seventy-two.
35 Notwithstanding the provisions of any general or special law, the
36 amounts hereby appropriated shall be made available from the Pure
37 Water Bond Act authorizations and are contingent upon the repeal of
38 existing authorizations elsewhere in this chapter.
39 Notwithstanding the provisions of any general or special law, the
40 moneys hereby appropriated shall not be made available until the
41 director of the division of the budget issues a certificate of
42 approval of availability with a schedule of approved and previously
43 authorized projects for which such funds shall be used. No such
44 certificates of approval of availability shall be issued for or
45 include funds for projects which have not received a federal grant
46 for the construction of sewage treatment related facilities
47 (09178457) ... 56,869,200 ........................... (re. $913,000)
48 By chapter 79, section 14, of the laws of 1970, as amended by chapter
49 55, section 1, of the laws of 2006:
284 12554-15-7
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding the provisions of chapter 657 of the laws of 1982 to
2 the contrary, the sum of two hundred eighty million nine hundred
3 thirty-four thousand dollars ($280,934,000), or so much thereof as
4 may be necessary, is hereby appropriated from the Capital Projects
5 Fund to the department of environmental conservation for the payment
6 of the nonmunicipal share of the cost of construction of sewage
7 treatment works in the manner and to the extent specified in section
8 17-1903 of the Environmental Conservation Law.
9 Notwithstanding the provisions of any general or special law, no part
10 of this appropriation made hereby shall be available until a certif-
11 icate of approval of availability shall have been issued by the
12 director of the budget and a copy of such certificate filed with the
13 state comptroller, the chairman of the senate finance committee and
14 the chairman of the assembly ways and means committee.
15 Such certificate may be amended from time to time by the director of
16 the budget and a copy of each such amendment shall be filed with the
17 state comptroller, the chairman of the senate finance committee and
18 the chairman of the assembly ways and means committee (01385357) ...
19 272,873,100 ....................................... (re. $1,101,000)
20 By chapter 177, section 5, of the laws of 1965, as amended by chapter
21 55, section 1, of the laws of 2003:
22 The sum of two hundred eighty-six million three hundred thirty-four
23 thousand dollars ($286,334,000), or so much thereof as may be neces-
24 sary, is hereby appropriated from the Capital Projects Fund to the
25 department of environmental conservation for the payment of the
26 nonmunicipal share of the cost of construction of sewage treatment
27 works in the manner and to the extent specified in section 17-1903
28 of the Environmental Conservation Law.
29 Notwithstanding the provisions of any general or special law, no part
30 of the appropriation made hereby shall be available until a certif-
31 icate of approval of availability shall have been issued by the
32 director of the budget and a copy of such certificate filed with the
33 state comptroller, the chairman of the senate finance committee and
34 the chairman of the assembly ways and means committee. Such certif-
35 icate may be amended from time to time by the director of the budget
36 and a copy of each such amendment shall be filed with the state
37 comptroller, the chairman of the senate finance committee and the
38 chairman of the assembly ways and means committee (01385057) .......
39 278,484,000 ......................................... (re. $630,000)
285 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Fund - Other ...... 152,699,000 257,098,000
6 ---------------- ----------------
7 All Funds ........................ 152,699,000 257,098,000
8 ================ ================
9 DESIGN AND CONSTRUCTION SUPERVISION (CCP) .................... 7,000,000
10 --------------
11 Capital Projects Funds - Other
12 Youth Facilities Improvement Fund
13 Preparation of Plans Purpose
14 For payment of design and construction
15 management account of the centralized
16 services fund of the New York state office
17 of general services for the purpose of
18 preparation and review of plans, specifi-
19 cations, estimates, services, construction
20 management and supervision, inspection
21 studies, appraisals, surveys, testing and
22 environmental impact statements and for
23 the cost of consultant design service
24 (25GS1730) ................................... 7,000,000
25 FACILITIES MAINTENANCE AND OPERATIONS (CCP)................... 5,000,000
26 --------------
27 Capital Projects Funds - Other
28 Capital Projects Fund
29 Maintenance and Operations Purpose
30 For the maintenance and operation of various
31 facilities and systems including personal
32 services, fringe benefits and indirect
33 costs. Notwithstanding any other law to
34 the contrary, all or a portion of the
35 funds appropriated herein may be suballo-
36 cated or transferred to any department,
37 agency, or public authority (25FM17M0) ....... 5,000,000
38 MAINTENANCE AND IMPROVEMENT OF YOUTH FACILITIES (CCP) ...... 130,699,000
39 --------------
40 Capital Projects Funds - Other
41 Capital Projects Fund
286 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2017-18
1 Preservation of Facilities Purpose
2 For alterations and improvements to youth
3 facilities, including the preparation of
4 designs, plans, specifications, and esti-
5 mates for the preservation of existing
6 facilities and programs, including liabil-
7 ities incurred prior to April 1, 2017
8 (25GM1703) ................................... 1,725,000
9 For the cost of maintaining the Tonawanda
10 Indian Community House pursuant to chapter
11 549 of the laws of 1936 (25T31703) ............. 100,000
12 Capital Projects Funds - Other
13 Youth Facilities Improvement Fund
14 Administration Purpose
15 For the preparation and review of plans,
16 specifications, estimates, studies,
17 inspections, appraisals and surveys, and
18 payment of personal service and nonper-
19 sonal service, including fringe benefits
20 and indirect costs related to the adminis-
21 tration and security of capital projects
22 provided by the office of children and
23 family services for new and reappropriated
24 projects (25ST1750) ............................ 874,000
25 Capital Projects Funds - Other
26 Youth Facilities Improvement Fund
27 Environmental Protection or Improvements Purpose
28 For payment of the cost of construction,
29 reconstruction and improvements, including
30 the preparation of designs, plans, spec-
31 ifications and estimates for environmental
32 protection or improvements at various
33 youth facilities, including liabilities
34 incurred prior to April 1, 2017 (25EN1706)
35 .............................................. 5,000,000
36 Capital Projects Funds - Other
37 Youth Facilities Improvement Fund
38 Health and Safety Purpose
39 For payment of the cost of construction,
40 reconstruction and improvements, including
41 the preparation of designs, plans, spec-
42 ifications and estimates, for health and
43 safety improvements to existing youth
44 facilities and programs, including liabil-
287 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2017-18
1 ities incurred prior to April 1, 2017
2 (25011701) ................................... 6,000,000
3 Capital Projects Funds - Other
4 Youth Facilities Improvement Fund
5 Preservation of Facilities Purpose
6 For payment of the cost of construction,
7 reconstruction and improvements, including
8 the preparation of designs, plans, spec-
9 ifications, and estimates for the preser-
10 vation of existing facilities and
11 programs, including liabilities incurred
12 prior to April 1, 2017 (25031703) ............ 7,000,000
13 Capital Projects Funds - Other
14 Youth Facilities Improvement Fund
15 Program Improvement or Program Change Purpose
16 For payment of the cost of land acquisition,
17 construction, reconstruction, rehabili-
18 tation and improvements, including the
19 preparation of designs, plans, specifica-
20 tions and estimates, for new and existing
21 capital projects and programs including,
22 but not limited to, preparation of plans,
23 administration, maintenance and improve-
24 ment of existing facilities of any state
25 agency, new facilities, energy conserva-
26 tion, environmental protection or improve-
27 ment, health and safety, preservation of
28 facilities, accreditation and program
29 improvement or program changes associated
30 with the raising the age of juvenile
31 jurisdiction, including to the extent
32 feasible, the reuse of a facility of any
33 state agency or a new facility, provided,
34 however, that expenditures from this
35 appropriation are pursuant to a chapter of
36 the laws of 2017 and no expenditures may
37 be made from this appropriation until a
38 plan of projects has been approved by the
39 director of the budget (25RA1708) .......... 110,000,000
40 PROGRAM IMPROVEMENT OR PROGRAM CHANGE (CCP) ................. 10,000,000
41 --------------
42 Capital Projects Funds - Other
43 Youth Facilities Improvement Fund
44 Program Improvement or Program Change Purpose
288 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS 2017-18
1 For payment of the cost of construction,
2 reconstruction, security and other
3 improvements, including the preparation of
4 designs, plans, specifications and esti-
5 mates related to improvements or changes
6 to existing facilities or programs,
7 including liabilities incurred prior to
8 April 1, 2017 (25081708) .................... 10,000,000
289 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 DESIGN AND CONSTRUCTION SUPERVISION (CCP)
2 Capital Projects Funds - Other
3 Youth Facilities Improvement Fund
4 Preparation of Plans Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 For payment of design and construction management account of the
7 centralized services fund of the New York state office of general
8 services for the purpose of preparation and review of plans, spec-
9 ifications, estimates, services, construction management and super-
10 vision, inspection studies, appraisals, surveys, testing and envi-
11 ronmental impact statements and for the cost of consultant design
12 service (25GS1630) ... 7,000,000 .................. (re. $7,000,000)
13 By chapter 54, section 1, of the laws of 2015:
14 For payment of design and construction management account of the
15 centralized services fund of the New York state office of general
16 services for the purpose of preparation and review of plans, spec-
17 ifications, estimates, services, construction management and super-
18 vision, inspection studies, appraisals, surveys, testing and envi-
19 ronmental impact statements and for the cost of consultant design
20 service (25GS1530) ... 7,000,000 .................. (re. $4,403,000)
21 By chapter 54, section 1, of the laws of 2014:
22 For payment of design and construction management account of the
23 centralized services fund of the New York state office of general
24 services for the purpose of preparation and review of plans, spec-
25 ifications, estimates, services, construction management and super-
26 vision, inspection studies, appraisals, surveys, testing and envi-
27 ronmental impact statements and for the cost of consultant design
28 service (25GS1430) ... 7,000,000 .................. (re. $4,285,000)
29 By chapter 54, section 1, of the laws of 2013:
30 For payment of design and construction management account of the
31 centralized services fund of the New York state office of general
32 services for the purpose of preparation and review of plans, spec-
33 ifications, estimates, services, construction management and super-
34 vision, inspection studies, appraisals, surveys, testing and envi-
35 ronmental impact statements and for the cost of consultant design
36 service (25GS1330) ... 7,000,000 .................. (re. $1,137,000)
37 By chapter 54, section 1, of the laws of 2012:
38 For payment of design and construction management account of the
39 centralized services fund of the New York state office of general
40 services for the purpose of preparation and review of plans, spec-
41 ifications, estimates, services, construction management and super-
42 vision, inspection studies, appraisals, surveys, testing and envi-
43 ronmental impact statements and for the cost of consultant design
44 service (25GS1230) ... 7,000,000 .................. (re. $3,574,000)
290 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 54, section 1, of the laws of 2011:
2 For payment of design and construction management account of the
3 centralized services fund of the New York state office of general
4 services for the purpose of preparation and review of plans, spec-
5 ifications, estimates, services, construction management and super-
6 vision, inspection studies, appraisals, surveys, testing and envi-
7 ronmental impact statements and for the cost of consultant design
8 service (25GS1130) ... 7,000,000 .................. (re. $3,560,000)
9 By chapter 53, section 1, of the laws of 2009:
10 For payment of design and construction management account of the
11 centralized services fund of the New York state office of general
12 services for the purpose of preparation and review of plans, spec-
13 ifications, estimates, services, construction management and super-
14 vision, inspection studies, appraisals, surveys, testing and envi-
15 ronmental impact statements and for the cost of consultant design
16 service (25GS0930) ... 7,000,000 .................. (re. $2,186,000)
17 By chapter 53, section 1, of the laws of 2008:
18 For payment of design and construction management account of the
19 centralized services fund of the New York state office of general
20 services for the purpose of preparation and review of plans, spec-
21 ifications, estimates, services, construction management and super-
22 vision, inspection studies, appraisals, surveys, testing and envi-
23 ronmental impact statements and for the cost of consultant design
24 service (25GS0830) ... 7,000,000 ..................... (re. $35,000)
25 By chapter 53, section 1, of the laws of 2007:
26 For payment of design and construction management account of the
27 centralized services fund of the New York state office of general
28 services for the purpose of preparation and review of plans, spec-
29 ifications, estimates, services, construction management and super-
30 vision, inspection studies, appraisals, surveys, testing and envi-
31 ronmental impact statements and for the cost of consultant design
32 service (25GS0730) ... 7,000,000 ..................... (re. $29,000)
33 By chapter 53, section 1, of the laws of 2006:
34 For payment of design and construction management account of the
35 centralized services fund of the New York state office of general
36 services for the purpose of preparation and review of plan, specifi-
37 cations, estimates, services, construction management and super-
38 vision, inspection studies, appraisals, surveys, testing and envi-
39 ronmental impact statements and for the cost of consultant design
40 service (25GS0630) ... 7,000,000 ..................... (re. $65,000)
41 MAINTENANCE AND IMPROVEMENT OF YOUTH FACILITIES (CCP)
42 Capital Projects Funds - Other
43 Capital Projects Fund
44 Preservation of Facilities Purpose
291 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 By chapter 55, section 1, of the laws of 2016:
2 For alterations and improvements to youth facilities, including the
3 preparation of designs, plans, specifications, and estimates for the
4 preservation of existing facilities and programs, including liabil-
5 ities incurred prior to April 1, 2016 (25GM1603) ...................
6 1,725,000 ......................................... (re. $1,372,000)
7 For the cost of maintaining the Tonawanda Indian Community House
8 pursuant to chapter 549 of the laws of 1936 (25T31603) .............
9 100,000 .............................................. (re. $99,000)
10 By chapter 54, section 1, of the laws of 2015:
11 For alterations and improvements to youth facilities, including the
12 preparation of designs, plans, specifications, and estimates for the
13 preservation of existing facilities and programs, including liabil-
14 ities incurred prior to April 1, 2015 (25GM1503) ...................
15 1,725,000 ........................................... (re. $848,000)
16 For the cost of maintaining the Tonawanda Indian Community House
17 pursuant to chapter 549 of the laws of 1936 (25T31503) .............
18 100,000 .............................................. (re. $23,000)
19 By chapter 54, section 1, of the laws of 2014:
20 For alterations and improvements to youth facilities, including the
21 preparation of designs, plans, specifications, and estimates for the
22 preservation of existing facilities and programs, including liabil-
23 ities incurred prior to April 1, 2014 (25GM1403) ...................
24 1,725,000 ......................................... (re. $1,239,000)
25 For the cost of maintaining the Tonawanda Indian Community House
26 pursuant to chapter 549 of the laws of 1936 (25T31403) .............
27 100,000 ............................................... (re. $2,000)
28 By chapter 54, section 1, of the laws of 2013:
29 For alterations and improvements to youth facilities, including the
30 preparation of designs, plans, specifications, and estimates for the
31 preservation of existing facilities and programs, including liabil-
32 ities incurred prior to April 1, 2013 (25GM1303) ...................
33 1,725,000 ........................................... (re. $901,000)
34 For the cost of maintaining the Tonawanda Indian Community House
35 pursuant to chapter 549 of the laws of 1936 (25T31303) .............
36 100,000 ............................................... (re. $3,000)
37 By chapter 54, section 1, of the laws of 2012:
38 For the cost of maintaining the Tonawanda Indian Community House
39 pursuant to chapter 549 of the laws of 1936 (25T31203) .............
40 100,000 ............................................. (re. $100,000)
41 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
42 section 1, of the laws of 2013:
43 For alterations and improvements to youth facilities, including the
44 preparation of designs, plans, specifications, and estimates for the
45 preservation of existing facilities and programs, including liabil-
292 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ities incurred prior to April 1, 2012 (25GM1203) ...................
2 1,725,000 ........................................... (re. $424,000)
3 By chapter 54, section 1, of the laws of 2011:
4 For alterations and improvements to youth facilities, including the
5 preparation of designs, plans, specifications, and estimates for the
6 preservation of existing facilities and programs, including liabil-
7 ities incurred prior to April 1, 2011 (25GM1103) ...................
8 1,725,000 ........................................... (re. $433,000)
9 For the cost of maintaining the Tonawanda Indian Community House
10 pursuant to chapter 549 of the laws of 1936 (25T31103) .............
11 100,000 .............................................. (re. $59,000)
12 By chapter 53, section 1, of the laws of 2010:
13 For alterations and improvements to youth facilities, including the
14 preparation of designs, plans, specifications, and estimates for the
15 preservation of existing facilities and programs, including liabil-
16 ities incurred prior to April 1, 2010 (25GM1003) ...................
17 1,725,000 ......................................... (re. $1,725,000)
18 By chapter 53, section 1, of the laws of 2009:
19 For alterations and improvements to youth facilities, including the
20 preparation of designs, plans, specifications, and estimates for the
21 preservation of existing facilities and programs, including liabil-
22 ities incurred prior to April 1, 2009 (25GM0903) ...................
23 1,500,000 ......................................... (re. $1,500,000)
24 For the cost of maintaining the Tonawanda Indian Community House
25 pursuant to chapter 549 of the laws of 1936 (25T30903) .............
26 325,000 ............................................. (re. $325,000)
27 By chapter 53, section 1, of the laws of 2008:
28 For alterations and improvements to youth facilities, including the
29 preparation of designs, plans, specifications, and estimates for the
30 preservation of existing facilities and programs, including liabil-
31 ities incurred prior to April 1, 2008 (25GM0803) ...................
32 1,500,000 ......................................... (re. $1,500,000)
33 For the cost of maintaining the Tonawanda Indian Community House
34 pursuant to chapter 549 of the laws of 1936 (25T30803) .............
35 325,000 ............................................. (re. $325,000)
36 By chapter 53, section 1, of the laws of 2007:
37 For alterations and improvements to youth facilities, including the
38 preparation of designs, plans, specifications, and estimates for the
39 preservation of existing facilities and programs, including liabil-
40 ities incurred prior to April 1, 2007 (25GM0703) ...................
41 1,500,000 ......................................... (re. $1,500,000)
42 For the cost of maintaining the Tonawanda Indian Community House
43 pursuant to chapter 549 of the laws of 1936 (25T30703) .............
44 325,000 ............................................. (re. $325,000)
45 By chapter 53, section 1, of the laws of 2006:
293 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For alterations and improvements to youth facilities, including the
2 preparation of designs, plans, specifications, and estimates for the
3 preservation of existing facilities and programs, including liabil-
4 ities incurred prior to April 1, 2006 (25GM0603) ...................
5 1,500,000 ............................................ (re. $19,000)
6 For the cost of maintaining the Tonawanda Indian Community House
7 pursuant to chapter 549 of the laws of 1936 (25T30603) .............
8 325,000 ............................................. (re. $200,000)
9 By chapter 53, section 1, of the laws of 2005:
10 For alterations and improvements to youth facilities, including the
11 preparation of designs, plans, specifications, and estimates for the
12 preservation of existing facilities and programs, including liabil-
13 ities incurred prior to April 1, 2005 (25GM0503) ...................
14 1,000,000 ............................................ (re. $11,000)
15 By chapter 53, section 1, of the laws of 2004:
16 For the cost of maintaining the Tonawanda Indian Community House
17 pursuant to chapter 549 of the laws of 1936 (25T30403) .............
18 325,000 .............................................. (re. $60,000)
19 By chapter 53, section 1, of the laws of 2003:
20 For the cost of maintaining the Tonawanda Indian Community House
21 pursuant to chapter 549 of the laws of 1936 (25T30303) .............
22 1,930,000 ........................................... (re. $305,000)
23 By chapter 53, section 1, of the laws of 2002:
24 For the cost of maintaining the Tonawanda Indian Community House
25 pursuant to chapter 549 of the laws of 1936 (25T30203) .............
26 935,000 .............................................. (re. $80,000)
27 Capital Projects Funds - Other
28 Youth Facilities Improvement Fund
29 Administration Purpose
30 By chapter 55, section 1, of the laws of 2016:
31 For the preparation and review of plans, specifications, estimates,
32 studies, inspections, appraisals and surveys, and payment of
33 personal service and nonpersonal service, including fringe benefits
34 and indirect costs related to the administration and security of
35 capital projects provided by the office of children and family
36 services for new and reappropriated projects (25ST1650) ............
37 850,000 ............................................. (re. $696,000)
38 By chapter 54, section 1, of the laws of 2015:
39 For the preparation and review of plans, specifications, estimates,
40 studies, inspections, appraisals and surveys, and payment of
41 personal service and nonpersonal service, including fringe benefits
42 and indirect costs related to the administration and security of
43 capital projects provided by the office of children and family
294 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 services for new and reappropriated projects (25ST1550) ............
2 850,000 ............................................. (re. $379,000)
3 By chapter 54, section 1, of the laws of 2014:
4 For the preparation and review of plans, specifications, estimates,
5 studies, inspections, appraisals and surveys, and payment of
6 personal service and nonpersonal service, including fringe benefits
7 and indirect costs related to the administration and security of
8 capital projects provided by the office of children and family
9 services for new and reappropriated projects (25ST1450) ............
10 850,000 ............................................. (re. $269,000)
11 By chapter 54, section 1, of the laws of 2013:
12 For the preparation and review of plans, specifications, estimates,
13 studies, inspections, appraisals and surveys, and payment of
14 personal service and nonpersonal service, including fringe benefits
15 and indirect costs related to the administration and security of
16 capital projects provided by the office of children and family
17 services for new and reappropriated projects (25ST1350) ............
18 850,000 ............................................. (re. $100,000)
19 By chapter 54, section 1, of the laws of 2011:
20 For the preparation and review of plans, specifications, estimates,
21 studies, inspections, appraisals and surveys, and payment of
22 personal service and nonpersonal service, including fringe benefits
23 and indirect costs related to the administration and security of
24 capital projects provided by the office of children and family
25 services for new and reappropriated projects (25ST1150) ............
26 850,000 ............................................... (re. $6,000)
27 Capital Projects Funds - Other
28 Youth Facilities Improvement Fund
29 Environmental Protection or Improvements Purpose
30 By chapter 55, section 1, of the laws of 2016:
31 For payment of the cost of construction, reconstruction and improve-
32 ments, including the preparation of designs, plans, specifications
33 and estimates for environmental protection or improvements at vari-
34 ous youth facilities, including liabilities incurred prior to April
35 1, 2016 (25EN1606) ... 5,000,000 .................. (re. $5,000,000)
36 By chapter 54, section 1, of the laws of 2015:
37 For payment of the cost of construction, reconstruction and improve-
38 ments, including the preparation of designs, plans, specifications
39 and estimates for environmental protection or improvements at vari-
40 ous youth facilities, including liabilities incurred prior to April
41 1, 2015 (25EN1506) ... 5,000,000 .................. (re. $4,931,000)
42 By chapter 54, section 1, of the laws of 2014:
43 For payment of the cost of construction, reconstruction and improve-
44 ments, including the preparation of designs, plans, specifications
295 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 and estimates for environmental protection or improvements at vari-
2 ous youth facilities, including liabilities incurred prior to April
3 1, 2014 (25EN1406) ... 5,000,000 .................. (re. $4,477,000)
4 By chapter 54, section 1, of the laws of 2013:
5 For payment of the cost of construction, reconstruction and improve-
6 ments, including the preparation of designs, plans, specifications
7 and estimates for environmental protection or improvements at vari-
8 ous youth facilities, including liabilities incurred prior to April
9 1, 2013 (25EN1306) ... 5,000,000 .................. (re. $2,865,000)
10 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
11 section 1, of the laws of 2013:
12 For payment of the cost of construction, reconstruction and improve-
13 ments, including the preparation of designs, plans, specifications
14 and estimates for environmental protection or improvements at vari-
15 ous youth facilities, including liabilities incurred prior to April
16 1, 2012 (25EN1206) ... 5,000,000 .................. (re. $2,874,000)
17 By chapter 54, section 1, of the laws of 2011:
18 For payment of the cost of construction, reconstruction and improve-
19 ments, including the preparation of designs, plans, specifications
20 and estimates for environmental protection or improvements at vari-
21 ous youth facilities, including liabilities incurred prior to April
22 1, 2011 (25EN1106) ... 5,000,000 .................. (re. $5,000,000)
23 By chapter 53, section 1, of the laws of 2010:
24 For payment of the cost of construction, reconstruction and improve-
25 ments, including the preparation of designs, plans, specifications
26 and estimates for environmental protection or improvements at vari-
27 ous youth facilities, including liabilities incurred prior to April
28 1, 2010 (25EN1006) ... 5,000,000 .................. (re. $5,000,000)
29 By chapter 53, section 1, of the laws of 2009:
30 For payment of the cost of construction, reconstruction and improve-
31 ments, including the preparation of designs, plans, specifications
32 and estimates for environmental protection or improvements at vari-
33 ous youth facilities, including liabilities incurred prior to April
34 1, 2009 (25EN0906) ... 4,000,000 .................. (re. $4,000,000)
35 By chapter 53, section 1, of the laws of 2008:
36 For payment of the cost of construction, reconstruction and improve-
37 ments, including the preparation of designs, plans, specifications
38 and estimates for environmental protection or improvements at vari-
39 ous youth facilities, including liabilities incurred prior to April
40 1, 2008 (25EN0806) ... 4,000,000 .................. (re. $4,000,000)
41 By chapter 53, section 1, of the laws of 2007:
42 For payment of the cost of construction, reconstruction and improve-
43 ments, including the preparation of designs, plans, specifications
44 and estimates for environmental protection or improvements at vari-
296 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 ous youth facilities, including liabilities incurred prior to April
2 1, 2007 (25EN0706) ... 4,000,000 .................. (re. $4,000,000)
3 By chapter 53, section 1, of the laws of 2006:
4 For payment of the cost of construction, reconstruction and improve-
5 ments, including the preparation of designs, plans, specifications
6 and estimates for environmental protection or improvements at vari-
7 ous youth facilities, including liabilities incurred prior to April
8 1, 2006 (25EN0606) ... 4,000,000 .................... (re. $680,000)
9 By chapter 53, section 1, of the laws of 2005:
10 For payment of the cost of construction, reconstruction and improve-
11 ments, including the preparation of designs, plans, specifications
12 and estimates for environmental protection or improvements at vari-
13 ous youth facilities, including liabilities incurred prior to April
14 1, 2005 (25EN0506) ... 4,000,000 .................. (re. $2,147,000)
15 By chapter 53, section 1, of the laws of 2004:
16 For payment of the cost of construction, reconstruction and improve-
17 ments, including the preparation of designs, plans, specifications
18 and estimates for environmental protection or improvements at vari-
19 ous youth facilities, including liabilities incurred prior to April
20 1, 2004 (25EN0406) ... 4,100,000 .................. (re. $2,032,000)
21 By chapter 53, section 1, of the laws of 2003:
22 For payment of the cost of construction, reconstruction and improve-
23 ments, including the preparation of designs, plans, specifications
24 and estimates for environmental protection or improvements at vari-
25 ous youth facilities, including liabilities incurred prior to April
26 1, 2003 (25EN0306) ... 4,000,000 .................. (re. $1,546,000)
27 By chapter 53, section 1, of the laws of 2001:
28 For payment of the cost of construction, reconstruction and improve-
29 ments, including the preparation of designs, plans, specifications
30 and estimates for environmental protection or improvements at vari-
31 ous youth facilities, including liabilities incurred prior to April
32 1, 2001 (25EN0106) ... 2,650,000 .................... (re. $203,000)
33 Capital Projects Funds - Other
34 Youth Facilities Improvement Fund
35 Health and Safety Purpose
36 By chapter 55, section 1, of the laws of 2016:
37 For payment of the cost of construction, reconstruction and improve-
38 ments, including the preparation of designs, plans, specifications
39 and estimates, for health and safety improvements to existing youth
40 facilities and programs, including liabilities incurred prior to
41 April 1, 2016 (25011601) ... 6,000,000 ............ (re. $6,000,000)
42 By chapter 54, section 1, of the laws of 2015:
297 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications
3 and estimates, for health and safety improvements to existing youth
4 facilities and programs, including liabilities incurred prior to
5 April 1, 2015 (25011501) ... 6,000,000 ............ (re. $5,118,000)
6 By chapter 54, section 1, of the laws of 2014:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications
9 and estimates, for health and safety improvements to existing youth
10 facilities and programs, including liabilities incurred prior to
11 April 1, 2014 (25011401) ... 6,000,000 ............ (re. $4,920,000)
12 By chapter 54, section 1, of the laws of 2013:
13 For payment of the cost of construction, reconstruction and improve-
14 ments, including the preparation of designs, plans, specifications
15 and estimates, for health and safety improvements to existing youth
16 facilities and programs, including liabilities incurred prior to
17 April 1, 2013 (25011301) ... 6,000,000 ............ (re. $3,195,000)
18 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
19 section 1, of the laws of 2013:
20 For payment of the cost of construction, reconstruction and improve-
21 ments, including the preparation of designs, plans, specifications
22 and estimates, for health and safety improvements to existing youth
23 facilities and programs, including liabilities incurred prior to
24 April 1, 2012 (25011201) ... 6,000,000 .............. (re. $384,000)
25 By chapter 54, section 1, of the laws of 2011:
26 For payment of the cost of construction, reconstruction and improve-
27 ments, including the preparation of designs, plans, specifications
28 and estimates, for health and safety improvements to existing youth
29 facilities and programs, including liabilities incurred prior to
30 April 1, 2011 (25011101) ... 6,000,000 ............ (re. $3,417,000)
31 By chapter 53, section 1, of the laws of 2010:
32 For payment of the cost of construction, reconstruction and improve-
33 ments, including the preparation of designs, plans, specifications
34 and estimates, for health and safety improvements to existing youth
35 facilities and programs, including liabilities incurred prior to
36 April 1, 2010 (25011001) ... 6,000,000 ............ (re. $6,000,000)
37 By chapter 53, section 1, of the laws of 2009:
38 For payment of the cost of construction, reconstruction and improve-
39 ments, including the preparation of designs, plans, specifications
40 and estimates, for health and safety improvements to existing youth
41 facilities and programs, including liabilities incurred prior to
42 April 1, 2009 (25010901) ... 5,000,000 ............ (re. $5,000,000)
43 By chapter 53, section 1, of the laws of 2008:
298 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications
3 and estimates, for health and safety improvements to existing youth
4 facilities and programs, including liabilities incurred prior to
5 April 1, 2008 (25010801) ... 5,000,000 ............ (re. $5,000,000)
6 By chapter 53, section 1, of the laws of 2007:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications
9 and estimates, for health and safety improvements to existing youth
10 facilities and programs, including liabilities incurred prior to
11 April 1, 2007 (25010701) ... 5,000,000 ............ (re. $3,653,000)
12 By chapter 53, section 1, of the laws of 2006:
13 For payment of the cost of construction, reconstruction and improve-
14 ments, including the preparation of designs, plans, specifications
15 and estimates, for health and safety improvements to existing youth
16 facilities and programs, including liabilities incurred prior to
17 April 1, 2006 (25010601) ... 5,000,000 .............. (re. $966,000)
18 By chapter 53, section 1, of the laws of 2005:
19 For payment of the cost of construction, reconstruction and improve-
20 ments, including the preparation of designs, plans, specifications
21 and estimates, for health and safety improvements to existing youth
22 facilities and programs, including liabilities incurred prior to
23 April 1, 2005 (25010501) ... 6,000,000 ............ (re. $1,361,000)
24 By chapter 53, section 1, of the laws of 2004:
25 For payment of the cost of construction, reconstruction and improve-
26 ments, including the preparation of designs, plans, specifications
27 and estimates, for health and safety improvements to existing youth
28 facilities and programs, including liabilities incurred prior to
29 April 1, 2004 (25010401) ... 4,600,000 .............. (re. $828,000)
30 By chapter 53, section 1, of the laws of 2003:
31 For payment of the cost of construction, reconstruction and improve-
32 ments, including the preparation of designs, plans, specifications
33 and estimates, for health and safety improvements to existing youth
34 facilities and programs, including liabilities incurred prior to
35 April 1, 2003 (25010301) ... 3,000,000 .............. (re. $595,000)
36 By chapter 53, section 1, of the laws of 2002:
37 For payment of the cost of construction, reconstruction and improve-
38 ments, including the preparation of designs, plans, specifications
39 and estimates, for health and safety improvements to existing youth
40 facilities and programs, including liabilities incurred prior to
41 April 1, 2002 (25010201) ... 2,000,000 .............. (re. $100,000)
42 For payment of the cost of construction, reconstruction and improve-
43 ments, including the preparation of designs, plans, specifications
44 and estimates, for health and safety improvements to existing youth
299 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 facilities and programs, including liabilities incurred prior to
2 April 1, 2002 (25A10201) ... 2,200,000 ............... (re. $48,000)
3 Capital Projects Funds - Other
4 Youth Facilities Improvement Fund
5 Preservation of Facilities Purpose
6 By chapter 55, section 1, of the laws of 2016:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications,
9 and estimates for the preservation of existing facilities and
10 programs, including liabilities incurred prior to April 1, 2016
11 (25031603) ... 7,000,000 .......................... (re. $7,000,000)
12 By chapter 54, section 1, of the laws of 2015:
13 For payment of the cost of construction, reconstruction and improve-
14 ments, including the preparation of designs, plans, specifications,
15 and estimates for the preservation of existing facilities and
16 programs, including liabilities incurred prior to April 1, 2015
17 (25031503) ... 7,000,000 .......................... (re. $6,055,000)
18 By chapter 54, section 1, of the laws of 2014:
19 For payment of the cost of construction, reconstruction and improve-
20 ments, including the preparation of designs, plans, specifications,
21 and estimates for the preservation of existing facilities and
22 programs, including liabilities incurred prior to April 1, 2014
23 (25031403) ... 7,000,000 .......................... (re. $5,620,000)
24 By chapter 54, section 1, of the laws of 2013:
25 For payment of the cost of construction, reconstruction and improve-
26 ments, including the preparation of designs, plans, specifications,
27 and estimates for the preservation of existing facilities and
28 programs, including liabilities incurred prior to April 1, 2013
29 (25031303) ... 7,000,000 .......................... (re. $3,621,000)
30 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
31 section 1, of the laws of 2013:
32 For payment of the cost of construction, reconstruction and improve-
33 ments, including the preparation of designs, plans, specifications,
34 and estimates for the preservation of existing facilities and
35 programs, including liabilities incurred prior to April 1, 2012
36 (25031203) ... 7,000,000 .......................... (re. $1,096,000)
37 By chapter 54, section 1, of the laws of 2011:
38 For payment of the cost of construction, reconstruction and improve-
39 ments, including the preparation of designs, plans, specifications,
40 and estimates for the preservation of existing facilities and
41 programs, including liabilities incurred prior to April 1, 2011
42 (25031103) ... 7,000,000 .......................... (re. $5,598,000)
43 By chapter 53, section 1, of the laws of 2010:
300 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 For payment of the cost of construction, reconstruction and improve-
2 ments, including the preparation of designs, plans, specifications,
3 and estimates for the preservation of existing facilities and
4 programs, including liabilities incurred prior to April 1, 2010
5 (25031003) ... 7,000,000 .......................... (re. $7,000,000)
6 By chapter 53, section 1, of the laws of 2009:
7 For payment of the cost of construction, reconstruction and improve-
8 ments, including the preparation of designs, plans, specifications,
9 and estimates for the preservation of existing facilities and
10 programs, including liabilities incurred prior to April 1, 2009
11 (25030903) ... 6,000,000 .......................... (re. $5,035,000)
12 By chapter 53, section 1, of the laws of 2008:
13 For payment of the cost of construction, reconstruction and improve-
14 ments, including the preparation of designs, plans, specifications,
15 and estimates for the preservation of existing facilities and
16 programs, including liabilities incurred prior to April 1, 2008
17 (25030803) ... 6,000,000 .......................... (re. $1,238,000)
18 By chapter 53, section 1, of the laws of 2007:
19 For payment of the cost of construction, reconstruction and improve-
20 ments, including the preparation of designs, plans, specifications,
21 and estimates for the preservation of existing facilities and
22 programs, including liabilities incurred prior to April 1, 2007
23 (25030703) ... 6,000,000 .......................... (re. $1,667,000)
24 By chapter 53, section 1, of the laws of 2006:
25 For payment of the cost of construction, reconstruction and improve-
26 ments, including the preparation of designs, plans, specifications,
27 and estimates for the preservation of existing facilities and
28 programs, including liabilities incurred prior to April 1, 2006
29 (25030603) ... 6,000,000 ............................ (re. $650,000)
30 By chapter 53, section 1, of the laws of 2004:
31 For payment of the cost of construction, reconstruction and improve-
32 ments, including the preparation of designs, plans, specifications,
33 and estimates for the preservation of existing facilities and
34 programs, including liabilities incurred prior to April 1, 2004
35 (25030403) ... 5,000,000 ............................. (re. $30,000)
36 By chapter 53, section 1, of the laws of 2003:
37 For payment of the cost of construction, reconstruction and improve-
38 ments, including the preparation of designs, plans, specifications,
39 and estimates for the preservation of existing facilities and
40 programs, including liabilities incurred prior to April 1, 2003
41 (25030303) ... 4,000,000 ............................ (re. $645,000)
42 By chapter 53, section 1, of the laws of 2002:
43 For payment of the cost of construction, reconstruction and improve-
44 ments, including the preparation of designs, plans, specifications,
301 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 and estimates for the preservation of existing facilities and
2 programs, including liabilities incurred prior to April 1, 2002
3 (25030203) ... 2,000,000 ............................ (re. $280,000)
4 PROGRAM IMPROVEMENT OR PROGRAM CHANGE (CCP)
5 Capital Projects Funds - Other
6 Youth Facilities Improvement Fund
7 Program Improvement or Program Change Purpose
8 By chapter 55, section 1, of the laws of 2016:
9 For payment of the cost of construction, reconstruction, security and
10 other improvements, including the preparation of designs, plans,
11 specifications and estimates related to improvements or changes to
12 existing facilities or programs, including liabilities incurred
13 prior to April 1, 2016 (25081608) ..................................
14 10,000,000 ....................................... (re. $10,000,000)
15 By chapter 54, section 1, of the laws of 2015:
16 For payment of the cost of construction, reconstruction, security and
17 other improvements, including the preparation of designs, plans,
18 specifications and estimates related to improvements or changes to
19 existing facilities or programs, including liabilities incurred
20 prior to April 1, 2015 (25081508) ... 10,000,000 .. (re. $7,918,000)
21 By chapter 54, section 1, of the laws of 2014:
22 For payment of the cost of construction, reconstruction, security and
23 other improvements, including the preparation of designs, plans,
24 specifications and estimates related to improvements or changes to
25 existing facilities or programs, including liabilities incurred
26 prior to April 1, 2014 (25081408) ... 10,000,000 .. (re. $9,856,000)
27 By chapter 54, section 1, of the laws of 2013:
28 For payment of the cost of construction, reconstruction, security and
29 other improvements, including the preparation of designs, plans,
30 specifications and estimates related to improvements or changes to
31 existing facilities or programs, including liabilities incurred
32 prior to April 1, 2013 (25081308) ... 10,000,000 .. (re. $6,027,000)
33 By chapter 54, section 1, of the laws of 2012, as amended by chapter 54,
34 section 1, of the laws of 2013:
35 For payment of the cost of construction, reconstruction, security and
36 other improvements, including the preparation of designs, plans,
37 specifications and estimates related to improvements or changes to
38 existing facilities or programs, including liabilities incurred
39 prior to April 1, 2012 (25081208) ... 10,000,000 .... (re. $197,000)
40 By chapter 54, section 1, of the laws of 2011:
41 For payment of the cost of construction, reconstruction, security and
42 other improvements, including the preparation of designs, plans,
43 specifications and estimates related to improvements or changes to
302 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF CHILDREN AND FAMILY SERVICES
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 existing facilities or programs, including liabilities incurred
2 prior to April 1, 2011 (25081108) ... 10,000,000 .. (re. $9,482,000)
3 By chapter 53, section 1, of the laws of 2010:
4 For payment of the cost of construction, reconstruction, security and
5 other improvements, including the preparation of designs, plans,
6 specifications and estimates related to improvements or changes to
7 existing facilities or programs, including liabilities incurred
8 prior to April 1, 2010 (25081008) ..................................
9 10,000,000 ....................................... (re. $10,000,000)
10 By chapter 53, section 1, of the laws of 2009:
11 For payment of the cost of construction, reconstruction, security and
12 other improvements, including the preparation of designs, plans,
13 specifications and estimates related to improvements or changes to
14 existing facilities or programs, including liabilities incurred
15 prior to April 1, 2009 (25080908) ..................................
16 13,000,000 ....................................... (re. $13,000,000)
17 By chapter 53, section 1, of the laws of 2008:
18 For payment of the cost of construction, reconstruction, security and
19 other improvements, including the preparation of designs, plans,
20 specifications and estimates related to improvements or changes to
21 existing facilities or programs, including liabilities incurred
22 prior to April 1, 2008 (25A80808) ... 13,840,000 .. (re. $8,705,000)
23 By chapter 53, section 1, of the laws of 2006:
24 For payment of the cost of construction, reconstruction, security and
25 other improvements, including the preparation of designs, plans,
26 specifications and estimates related to improvements or changes to
27 existing facilities or programs, including liabilities incurred
28 prior to April 1, 2006 (25A80608) ... 8,000,000 ...... (re. $36,000)
29 By chapter 53, section 1, of the laws of 2003:
30 For payment of the cost of construction, reconstruction and improve-
31 ments, including the preparation of designs, plans, specifications,
32 and estimates related to improvements or changes to existing facili-
33 ties or programs, including liabilities incurred prior to April 1,
34 2003 (25080308) ... 2,100,000 ....................... (re. $684,000)
303 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2017-18
1 For the comprehensive construction programs, purposes and
2 projects as herein specified in accordance with the
3 following:
4 APPROPRIATIONS REAPPROPRIATIONS
5 Capital Projects Funds - Other ..... 64,000,000 143,459,000
6 ---------------- ----------------
7 All Funds ........................ 64,000,000 143,459,000
8 ================ ================
9 SUPPORTED HOUSING PROGRAM (CCP) ............................. 64,000,000
10 --------------
11 Capital Projects Funds - Other
12 Capital Projects Fund
13 Homeless Housing Grants Purpose
14 Notwithstanding any inconsistent provision
15 of law, funds appropriated herein shall be
16 used for the preparation and review of
17 proposals, specifications, estimates,
18 studies, inspections, appraisals and
19 surveys, and payment of personal service
20 and nonpersonal service, including fringe
21 benefits and indirect costs related to
22 implementing the provisions of the home-
23 less housing and assistance program in
24 accordance with title 1 of article 2-A of
25 the social services law provided by the
26 office of temporary and disability assist-
27 ance for new and reappropriated projects
28 (27OP17G5) ................................... 1,000,000
29 Capital Projects Funds - Other
30 Housing Program Fund
31 Homeless Housing Grants Purpose
32 For services and expenses, including the
33 payments on contracts executed prior to
34 April 1, 2017, related to implementing the
35 provisions of the homeless housing and
36 assistance program in accordance with
37 title 1 of article 2-A of the social
38 services law, including costs incurred
39 through individual or joint contracts with
40 any entity where such contract will result
41 in expedited homeless project development,
42 and including, without deposit to the
43 homeless housing and assistance account,
304 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS 2017-18
1 payments to any entity for technical
2 assistance required to approve contracts.
3 Notwithstanding any inconsistent provision
4 of law, up to $1,000,000 of the amount
5 appropriated herein may be used for emer-
6 gency shelter repairs in local social
7 services districts with a population of
8 less than five million.
9 Notwithstanding any inconsistent provision
10 of law, up to two percent of the appropri-
11 ation for any fiscal year may be used to
12 pay for technical assistance in support of
13 project development and operation, support
14 services development, architecture and
15 engineering, legal services and financial
16 services and may be provided by individ-
17 uals and not-for-profit or business corpo-
18 rations. No funds shall be expended from
19 this appropriation until the director of
20 the budget has approved a financial plan
21 submitted by the office of temporary and
22 disability assistance on behalf of the
23 homeless housing and assistance program in
24 such detail as required by the budget
25 director (270317G5) ......................... 58,000,000
26 For the development of permanent, emergency
27 and transitional housing for persons with
28 AIDS in accordance with article 2-A of the
29 social services law including the payment
30 of liabilities prior to April 1, 2017;
31 provided, however, that if an insufficient
32 number of viable proposals for persons
33 with AIDS are received, the balance of
34 funding can be used for the development of
35 permanent, emergency and transitional
36 housing for other priority need popu-
37 lations as determined by the commissioner
38 of the office of temporary and disability
39 assistance and approved by the director of
40 the budget. Notwithstanding any incon-
41 sistent provision of law, up to two
42 percent of the appropriation for any
43 fiscal year may be used to pay for techni-
44 cal assistance in support of project
45 development and operation, support
46 services development, architecture and
47 engineering, legal services and financial
48 services and may be provided by individ-
49 uals and not-for-profit or business corpo-
50 rations (270817G5) ........................... 5,000,000
305 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 SUPPORTED HOUSING PROGRAM (CCP)
2 Capital Projects Funds - Other
3 Capital Projects Fund
4 Homeless Housing Grants Purpose
5 By chapter 55, section 1, of the laws of 2016:
6 Notwithstanding any inconsistent provision of law, funds appropriated
7 herein shall be used for the preparation and review of proposals,
8 specifications, estimates, studies, inspections, appraisals and
9 surveys, and payment of personal service and nonpersonal service,
10 including fringe benefits and indirect costs related to implementing
11 the provisions of the homeless housing and assistance program in
12 accordance with title 1 of article 2-A of the social services law
13 provided by the office of temporary and disability assistance for
14 new and reappropriated projects (27OP16G5) .........................
15 500,000 ............................................. (re. $358,000)
16 Capital Projects Funds - Other
17 Housing Program Fund
18 Homeless Housing Grants Purpose
19 By chapter 55, section 1, of the laws of 2016:
20 For services and expenses, including the payments on contracts
21 executed prior to April 1, 2016, related to implementing the
22 provisions of the homeless housing and assistance program in accor-
23 dance with title 1 of article 2-A of the social services law,
24 including costs incurred through individual or joint contracts with
25 any entity where such contract will result in expedited homeless
26 project development, and including, without deposit to the homeless
27 housing and assistance account, payments to any entity for technical
28 assistance required to approve contracts. Notwithstanding any incon-
29 sistent provision of law, up to two percent of the appropriation for
30 any fiscal year may be used to pay for technical assistance in
31 support of project development and operation, support services
32 development, architecture and engineering, legal services and finan-
33 cial services and may be provided by individuals and not-for-profit
34 or business corporations. No funds shall be expended from this
35 appropriation until the director of the budget has approved a finan-
36 cial plan submitted by the office of temporary and disability
37 assistance on behalf of the homeless housing assistance program in
38 such detail as required by the budget director (270316G5) ..........
39 58,000,000 ....................................... (re. $58,000,000)
40 For the development of permanent, emergency and transitional housing
41 for persons with AIDS in accordance with article 2-A of the social
42 services law; provided, however, that if an insufficient number of
43 viable proposals for persons with AIDS are received, the balance of
44 funding can be used for the development of permanent, emergency and
45 transitional housing for other priority need populations as deter-
46 mined by the commissioner of the office of temporary and disability
47 assistance and approved by the director of the budget.
306 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 Notwithstanding any inconsistent provision of law, up to two percent
2 of the appropriation for any fiscal year may be used to pay for
3 technical assistance in support of project development and opera-
4 tion, support services development, architecture and engineering,
5 legal services and financial services and may be provided by indi-
6 viduals and not-for-profit or business corporations (270816G5) .....
7 5,000,000 ......................................... (re. $5,000,000)
8 By chapter 54, section 1, of the laws of 2015:
9 For services and expenses, including the payments on contracts
10 executed prior to April 1, 2015, related to implementing the
11 provisions of the homeless housing and assistance program in accor-
12 dance with title 1 of article 2-A of the social services law,
13 including costs incurred through individual or joint contracts with
14 any entity where such contract will result in expedited homeless
15 project development, and including, without deposit to the homeless
16 housing and assistance account, payments to any entity for technical
17 assistance required to approve contracts. Notwithstanding any incon-
18 sistent provision of law, up to two percent of the appropriation for
19 any fiscal year may be used to pay for technical assistance in
20 support of project development and operation, support services
21 development, architecture and engineering, legal services and finan-
22 cial services and may be provided by individuals and not-for-profit
23 or business corporations. No funds shall be expended from this
24 appropriation until the director of the budget has approved a finan-
25 cial plan submitted by the office of temporary and disability
26 assistance on behalf of the homeless housing assistance program in
27 such detail as required by the budget director (270315G5) ..........
28 58,000,000 ....................................... (re. $58,000,000)
29 For the development of permanent, emergency and transitional housing
30 for persons with AIDS in accordance with article 2-A of the social
31 services law; provided, however, that if an insufficient number of
32 viable proposals for persons with AIDS are received, the balance of
33 funding can be used for the development of permanent, emergency and
34 transitional housing for other priority need populations as deter-
35 mined by the commissioner of the office of temporary and disability
36 assistance and approved by the director of the budget. Notwithstand-
37 ing any inconsistent provision of law, up to two percent of the
38 appropriation for any fiscal year may be used to pay for technical
39 assistance in support of project development and operation, support
40 services development, architecture and engineering, legal services
41 and financial services and may be provided by individuals and not-
42 for-profit or business corporations (270815G5) .....................
43 5,000,000 ......................................... (re. $5,000,000)
44 By chapter 54, section 1, of the laws of 2014:
45 For services and expenses, including the payments on contracts
46 executed prior to April 1, 2014, related to implementing the
47 provisions of the homeless housing and assistance program in accor-
48 dance with title 1 of article 2-A of the social services law,
49 including costs incurred through individual or joint contracts with
307 12554-15-7
DEPARTMENT OF FAMILY ASSISTANCE
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
CAPITAL PROJECTS - REAPPROPRIATIONS 2017-18
1 any entity where such contract will result in expedited homeless
2 project development, and including, without deposit to the homeless
3 housing and assistance account, payments to any entity for technical
4 assistance required to approve contracts. Notwithstanding any incon-
5 sistent provision of law, up to two percent of the appropriation for
6 any fiscal year may be used to pay for technical assistance in
7 support of project development and operation, support services
8 development, architecture and engineering, legal services and finan-
9 cial services and may be provided by individuals and not-for-profit
10 or business corporations. No funds shall be expended from this
11 appropriation until the director of the budget has approved a finan-
12 cial plan submitted by the office of temporary and disability
13 assistance on behalf of the homeless housing assistance program in
14 such detail as required by the budget director (270314G5) ..........
15 57,500,000 ....................................... (re. $17,101,000)